PC MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT
Title :
T10206-QE01-POZEN__-040216 INSPECTION AND TEST PLAN FOR BENCH CALIBRATION OF INSTRUMENTS
Drawing No. :
T10206-QE01-P0ZEN-040216
Page 1
:
T10206
UAS :
QE01
Unit :
PO
KKS :
ZEN
Reg. No. 040216 Revision : Page-No :
A 1 of 9
ITP for Bench Calibration of Instruments
Doc. No.
T10206-QE01-POZEN-040216
Rev. A
Contractor
DOOSAN
2 of 9
AES-VCM
This note is only applicable for AES-VCM Mong Duong
Detailed Legend
S
:
Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong except for the first or last operation on the basis of each process. AES-VCM Mong Duong could check the operation, if he is present at the site during the inspection by Doosan.
R
:
Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by .
W
:
Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to decide whether they will attend such inspection or not.
H
:
Hold Point / Downstream construction and other activities shall not proceed without attendance or any written approval of AES-VCM Mong Duong.
NOTE : The Site ITP and all of the abovementioned reports will be kept available by DOOSAN at anytime for control and or review by AES-VCM Mong Duong.
Page 2
Inspection & Test Plan for Bench Calibration of Instruments
Item Name
Oper. No.
A.Material Verification
B. Calibration work
Ab br eviat io n Note :
:
Specific Applicable drawing number, Standard Code number, Specification
Inspection Process
Doc. No.
T10206-QE01-POZEN-040216
Rev. A
ontract
DOOSAN
Page 3 of 9
AES-VCM Inspection & Test Activities Subcon
DOOSAN AES-VCM
Sign
A
VerificationDocument
Remarks (Allowable tolerance)
A Sign
A
Sign
Packing List
R
R
R
Packing List
N/A
Packing List/Data Sheet
R
R
R
Packing List
N/A
A1
Verify that the materials is free of any physical damage to the finish or overall construction.
A2
Verify materials supplied against relevant documentation and visual inspection.
A3
Verify the identification number.
Manufacturer's Documentation
R
R
R
pls refer to specified instrument test report
As per manufacturer's recommendation
A4
Verify the instrument data sheet and instrument type and range.
Manufacturer's Documentation
R
R
R
pls refer to specified instrument test report
As per manufacturer's recommen a on
A5
Verify the vendor specification
Manufacturer's Documentation
R
R
R
pls refer to specified instrument test report
As per manufacturer's recommendation
A6
Check the related accessories.
Manufacturer's Documentation
R
R
R
pls refer to specified instrument test report
As per manufacturer's recommendation
A7
Verify the instrument suitability/hazardous area classification
Manufacturer's Documentation
R
R
R
pls refer to specified instrument test report
As per manufacturer's recommendation
B1
Check the calibration methods are acceptable.
T10206-XW01-POZEN-150001
R
R
R
pls refer to specified instrument test report
As per manufacturer's recommendation
B2
Verify the calibration report.
T10206-XW01-POZEN-150001
R
R
R
pls refer to specified instrument test report
As per manufacturer's recommendation
S: Surveillance
R: Report Review
W: Witness Inspection
H: Hold Inspection
All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
page3
INSTRUMENT CALIBRATION REPORT
Project: Contract No. : Report No. :
Cal. Date:
Form Ref. No.:
RFI No.:
Sheet No.:
TEMPERATURE ELEMENT
INST. KKS NO:
SERVICE DESCRIPTION:
SER NO:
MANUFACTURER:
CAL. DATE:
DATA SHEET NO:
P & ID NO:
RANGE/UNIT :
TESTING INST. USED
CAL. DATE: CAL. DUE DATE: MODE/TYPE: CERTIFICATED No: SERIAL NO: ACCURACY: RANGE/UNIT: CALIBRATION DETAILS RANGE :
(ENG UNIT)
SPECIFIED ACCURACY:
Ambient Temp. : % Humidity :
INPUT
Reference
RANGE (%)
O
ELEMENT‐1
Value in C INCREASE
DECREASE
O
Error in C
INCREASE
DECREASE
O
Measured Value in C INCREASE
DECREASE
INCREASE
0
25 50 75 100 COMMENTS:
Checked By:
Subcontractor
Verified/Approved By: Doosan Const'n Dept
Doosan QA/QA Dept.
Name & Signature Position Date
Page 4
O
Error in C
AES-VCM
DECREASE
INSTRUMENT CALIBRATION REPORT Project: Contract No : Report No: