INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. :
SR. NO.
Name Signature Date
CHARACTERISTICS TO BE CHECKED
EXTEND OF CHECK
Rev No. : 0
REF. DOCUMENTS
TESTING INSTRUMENTS
INSPECTION BY SUBCONTRACT OR
INSPECTION FORMAT NO.
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. :
CHARACTERISTICS TO BE CHECKED
SR. NO.
EXTEND OF CHECK
1.0
P!e S!oo" F#$%c#o'
1.1
Check availability of latest Drawings / Spec.
2.0
R#( M#e%#" )e%*c#o' +D,%' F-U!
2.1
Check the correctness of specified #aterials sed and $it&p of 'ipe spool
3.0
F ,! C"e#%#'ce
3.1
Selection of "'S. $it + &p Checked, bevel ends free fro# conta#ination prior to tack welding.
4.0
/e"'
4.1
REF. DOCUMENTS
TESTING INSTRUMENTS
INSPECTION BY
INSPECTION FORMAT NO.
SUBCONTRACT OR
Approved Drawings Drawings
Visal
!
"
s
100% Verification Verification
Approved Drawings Drawings ( )aterial *C
Visal
!
"
s
100% Verification
V*-/001/*'/001
Visal
!
"
"
"'S ( "' alification
eview ( Approval
V*-/001/*'/001 *C2 Specifications
Visal
!
!
!
4.2
Check proper backing of electrode as applicable.
ando# Verification
*e#peratre 3n
!
"
"
4.3
Check availability of "'S and welder4s 5d at site..
ando# Verification
V*-/001/*'/001
Visal
!
"
S
4.4
Check 'reheating and 5nter pass te#peratre as applicable
ando# Verification
Visal
!
"
S
4.5
$it p 5nspection ( 'reheat 65f e7d.8
ando# verification
Approved "'S
oot 3age, "eld gage
!
"
"
4.6
"elding 5n process 5nspection as Correct ando# verification 2lectrode, 5nterpass *e#p etc.,
Approved "'S
"eld gage *e#peratre 3n
!
"
S
Name Signature Date
100% Verification
Rev No. : 0
"'S
"' " 'S
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. :
CHARACTERISTICS TO BE CHECKED
SR. NO.
EXTEND OF CHECK
Rev No. : 0
REF. DOCUMENTS
1.0 1.0
/e" /e"' ' #' #' NDT NDT C"e# C"e#%# %#'c 'ce e
9.1
"elder alification
100% Verification
9.:
Visal 5nspection of "elds
100% "elds
9.;
Dye 'enetrant 5nspection 6As applicable8
"here ever e7d. VTKN/9001/QM/014
9.<
)agnetic 'article 5nspection 6As Applicable8 Applicable8
10% $illet "elds
V*-/ V*-/00 001/ 1/)/0 )/01; 1;
9.9
<rasonic 5nspection6As applicable8
"here ever e7d.
V*-/ V*-/00 001/ 1/)/0 )/01: 1:
9.=
adiography 5nspection 6As applicable8
Code ( As per #aterial spec Applicable Code
9.>
'ne#atic *est on reinforce#ent pad 6As applicable8
All $ 'ads
2.0
S!oo" P %e %e3e% v# v#o'
=.1 =.:
2nsre Spools are correctly *agged with relevant details 2nsre Spools are correctly cleaned, stored ( protected dring t e#porary storage
=.;
elease for painting and 2rection
=.<
Spool !ydro *est 65f re7ired8
Name Signature Date
TESTING INSTRUMENTS
As 'er *C2 Spec. Spec. ( Applicable Code Code
Visal
*C2 Specifications
INSPECTION FORMAT NO.
SUBCONTRACT OR
!
"
!
!
"
"
Visal
!
"
D
Visa Visall
!
"
D
Visa Visall
!
"
"
$il# Viewer
!
"
"
'ressre 3age
!
"
"
"eld gage
INSPECTION BY
As 'er *C2 Spec. Approved 'rocedre 'rocedre
V*-/001/)/019 V*-/001/)/019
100% Verification
Approved Drawings Drawings
Visal
!
"
S
100% Verification
Approved Drawings Drawings
Visal
!
"
S
ando# Verification
V*-/001/*'/001
Visal
!
"
S
V*-/001/*'/001
'ressre 3age
!
"
!
100%
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. :
CHARACTERISTICS TO BE CHECKED
SR. NO.
EXTEND OF CHECK
Rev No. : 0
REF. DOCUMENTS
4.0
P!' E% E%eco'
>.1
're $abricated Spools verification
>.:
Verification Verification of erected 'iping Syste# for its Co#pleteness and )echanical 100% Verification Verification Clearance
>.;
Spool to Spool $it p 5nspection, ?oint o. "elder 5d
100% Verification Verification
Approved Drawings "'S
>.<
$inal "eld Visal
ando# Verification, Verification, ("eld !istory Sheet
Approved Drawings "'S
5.0
)#"ve3 E%eco'
@.1
5nstallation of " valves
Drawing ando# Verification Verification Approved Drawing
@.:
$it p ( "elding
100% Verification Verification
@.;
5nstalling 3asket 6original8
100% Verification Verification
@.<
$low direction all valves ( tag.no. 5nclde inline ite#s.
100% Verification Verification
Name Signature Date
ando# Verification Verification
TESTING INSTRUMENTS
INSPECTION BY
INSPECTION FORMAT NO.
SUBCONTRACT OR
Approved Drawings
Vi Visal
!
"
S
Approved Drawings
Vi V isal
!
"
S
oot gage
!
"
S
"eld 3age
!
"
S
Visal
!
"
S
oot 3age
!
"
"
Approved Drawing Drawing
Visal
!
"
S
Approved Drawing Drawing
Visal
"
S
Approved "'S
!
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. :
CHARACTERISTICS TO BE CHECKED
SR. NO.
EXTEND OF CHECK
Rev No. : 0
REF. DOCUMENTS
TESTING INSTRUMENTS
INSPECTION BY
INSPECTION FORMAT NO.
SUBCONTRACT OR
Approved Drawing Drawing *C2 Specifications Specifications
*or7e "rench
!
"
!
ando# Verification Verification
Approved Drawing Drawing
)easring *ape *ape
!
"
S
100% Verification Verification
Approved Drawing Drawing
Visal )easring *ape
!
"
"
5so#etric Clearence
100% Verification
Approved Drawing Drawing
Visal ( Doc#ent eview
!
!
S
10.:
elease for !ydrotest
100% Verificati Verification on
Approved Drawings Drawings '(5D and B!S
i il
!
"
"
10.;
Bine walk ( 'nch 'oints
100% Verificati Verification on
Approved Drawings Drawings
Vi V isal
!
"
"
10.<
$lshing of pipe syste#
100% Verificati Verification on
Approved Drawings Drawings *C2 Specification
Vi Visal
!
"
S
10.9
!ydrotest
100% Verificati Verification on
V*-/001/*'/00;
'ressre gages
!
"
"
11.0
'ainting
100% Verificati Verification on
V*-/001/*'/00<, As 'er approved 'ainting $'
!
"
"
@.=
olting ( *or7eing
100% Verification Verification
6.0
S,!!o%3 F#$%c#o'
.1
Spports 2rection
10.0
H7%o Te3
10.1
Name Signature Date
2l 2lco#eter
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. :
CHARACTERISTICS TO BE CHECKED
SR. NO.
EXTEND OF CHECK
1:.0
5nslation 6As re7ired8
100% Verificati Verification on
1;.0
'iping *est 'ack Clearence
100% Verificati Verification on
Rev No. : 0
REF. DOCUMENTS
TESTING INSTRUMENTS
Approved Drawings, Drawings, ( As per approved 5nslation $' Approved Drawings Drawings
INSPECTION BY
INSPECTION FORMAT NO.
SUBCONTRACT OR
Visal
!
"
"
Vi Visal
!
"
!
Lee'3: !
!old 'oint is a #andatory inspection point and work work shall shall not proceed withot the presence presence of of a representative of the organiation. organiation. Activity designated as !old #st
be signed off by the Ewner4s epresentative. epresentative. "
"itness 5nspection 5nspection 'oint 'oint Designated "itness 'oints 'oints for the involved personnel, which which are re7ired to be signed off by the personnel who who witnessed. witnessed. All All activities, which have a " point, will re7ire a written notification to owner representative. 5n the event the owner representative does not attend within an agreed period the work #ay proceed. 5n sch cases, the owner representative will record in the appropriate signatre space on the f or#s as Fot "itnessedG, and sign off.
"
"itness 5nspection 5nspection point Designated Designated % witness witness points assigned assigned by the owner4s representative, representative, which which will re7ire re7ire written notification notification fro# the owner representative. representative. 5n the event owner representative does not attend within agreed the work, #ay proceed. 5n sch cases, the owner representative will record in the appropriate signatre space on the for#s as Fot "itnessedG, and sign off. *he percentage #eans a #ini## of 10% inspection over all. !owever this #ay be increased at the discretion of constrction #anager or his designee.
S
Srveillance Ever seeing or #onitoring of activities by visiting. Activities designated as srveillance will ot ot be be signed off by the owner4s representative.
D
Doc#ent eview *his entails review of appropriate appropriate doc#entation and does not not re7ire re7ire signatre signatre of of owner owner representative. representative.
Name Signature Date