REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG BADAN KOORDINASI PENANAMAN MODAL DAERAH PROVINSI SULAWESI SELATAN
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BKPMD SUMBER DANA : APBD ANGGARAN : TAHUN 2012 JENIS PEKERJAAN
NO.
TOTAL HARGA (Rp.)
I
PEKERJAAN PERSIAPAN
Rp.
48,000,000.00
II
PEKERJAAN ARSITEKTUR
Rp.
1,588,356,524.20
III
PEKERJAAN ELEKTRIKAL
Rp.
388,384,400.00
IV
PEKERJAAN ORNAMEN ATAP (SCLUPTURE ATAP)
Rp.
765,279,140.75
V
PEKERJAAN SITE DEVELOPMENT
Rp.
156,397,775.13
Real Cost
Rp.
2,946,417,840.09
PPN 10%
Rp.
294,641,784.01
Total Biaya
Rp.
3,241,059,624.10
Dibulatkan
Rp.
3,241,059,000.00
Terbilang :
Tiga Milyar Dua Ratus Empat Puluh Satu Juta Lima Puluh Sembilan Ribu Rupiah
Sungguminasa, 2 Juli 2012 Penawar, CV. Mitra Jasa Mandiri Utama
ISKANDAR Direktur
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG BKPMD MAKASSAR PROVINSI SULAWESI SELATAN PEKERJAAN : PEKERJAAN PERSIAPAN SUMBER DANA : ANGGARAN : TAHUN 2012 Pek. Persiapan NO. I 1 2 3 4 5
URAIAN PEKERJAAN Pekerjaan Persiapan Listrik Proyek (Tahap III) Air Proyek (Tahap III) P3K (Tahap III) Jamsostek/Asuransi Pekerja (Tahap III) Keamanan Proyek = 4 Orang (2 Siff) (Tahap III)
Real Cost
VOL.
4.00 4.00 1.00 1.00 4.00
SAT.
Bln Bln Ls Ls Bln
Rp.
HARGA SAT.
3,000,000.00 1,500,000.00 4,000,000.00 10,000,000.00 4,000,000.00
JML. HARGA
12,000,000.00 6,000,000.00 4,000,000.00 10,000,000.00 16,000,000.00
48,000,000.00
Sungguminasa, 2 Juli 2012 Penawar, CV. Mitra Jasa Mandiri Utama
ISKANDAR Direktur
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG BADAN KOORDINASI PENANAMAN MODAL DAERAH PROVINSI SULAWESI SELATAN PEKERJAAN : ARSITEKTUR GEDUNG BKPMD MAKASSAR SUMBER DANA: ANGGARAN : TAHUN 2012 Arsitektur NO.
I
II
III
IV
V
JENIS PEKERJAAN
TOTAL HARGA (Rp.)
Pekerjaan Beton Non Struktur A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh)
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
Pekerjaan Dinding dan Plesteran A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh) H. Lantai VIII (Delapan), IX (Sembilan) Dan Dudukan Tangki Air
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
24,251,481.23
Pekerjaan Kosen, Pintu, Dan Jendela A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh)
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
33,926,062.99 21,775,000.00 21,775,000.00 64,058,727.52 61,144,203.72 67,073,953.88 54,979,030.94
Pekerjaan Langit-langit/Plafond B. Lantai II (Dua) G. Lantai VII (Tujuh) H. Lantai VIII (Delapan)
Rp. Rp. Rp.
11,016,571.31 42,829,318.96 3,232,131.58
Pekerjaan Pengecatan A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh) H. Lantai VIII (Delapan), IX (Sembilan) Dan Dudukan Tangki Air
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
33,620,205.62 47,768,505.10
903,380.57 853,192.76 1,279,789.15 426,596.38 2,165,426.74 6,323,664.02 5,018,780.97
11,958,967.20 32,891,143.20 12,359,409.57 12,359,409.57 37,663,293.39 34,674,577.14 10,687,103.94
71,574,021.81 22,067,014.81 36,451,021.81 46,035,318.98 44,199,589.75 64,087,654.09
VI
Pekerjaan Lantai A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh) H. Lantai VIII (Delapan) Dan Lantai IX (Sembilan)
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
9,957,266.90 9,957,266.90 12,641,237.69 12,641,237.69 12,641,237.69 12,751,495.99 9,957,266.90 39,538,441.14
VII Pekerjaan Sanitasi A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh) H. Lantai VIII (Delapan), IX (Sembilan) Dan Dudukan Tangki Air
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
20,711,612.50
VIII Pekerjaan Lain - Lain
Rp.
355,245,387.07
Real Cost
Rp.
1,588,356,524.20
20,711,612.50 24,969,325.00 24,497,325.00 24,497,325.00 24,497,325.00 20,711,612.50 11,000,000.00
Sungguminasa, 2 Juli 2012 Penawar, CV. Mitra Jasa Mandiri Utama
ISKANDAR Direktur
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG BADAN KOORDINASI PENANAMAN MODAL DAERAH PROVINSI SULAWESI SELATAN PEKERJAAN : ARSITEKTUR GEDUNG BKPMD MAKASSAR SUMBER DANA: ANGGARAN : TAHUN 2012
NO.
URAIAN PEKERJAAN
I Pekerjaan Beton Non Struktur A. Lantai I (Dasar) 1. Pek. Kolom Praktis KP, Uk. 12 x 15 (Sisa Pekerjaan Tahap II) ~Beton K175 ~Besi Beton : - Besi Beton Polos ~BeKisting 2x Pakai
B. Lantai II (Dua) 1. Pek. Kolom Praktis KP, Uk. 12 x 15 (Sisa Pekerjaan Tahap II) ~Beton K175 ~Besi Beton : - Besi Beton Polos ~BeKisting 2x Pakai
C. Lantai III (Tiga) 1. Pek. Kolom Praktis KP, Uk. 12 x 15 (Sisa Pekerjaan Tahap II) ~Beton K175 ~Besi Beton : - Besi Beton Polos ~BeKisting 2x Pakai
D. Lantai IV (Empat) 1. Pek. Kolom Praktis KP, Uk. 12 x 15 (Sisa Pekerjaan Tahap II) ~Beton K175 ~Besi Beton : - Besi Beton Polos ~BeKisting 2x Pakai
E. Lantai V (Lima) 1. Pek. Kolom Praktis KP, Uk. 12 x 15 (Sisa Pekerjaan Tahap II) ~Beton K175 ~Besi Beton : - Besi Beton Polos ~BeKisting 2x Pakai
F. Lantai VI (Enam) 1. Pek. Kolom Praktis KP, Uk. 12 x 15 (Sisa Pekerjaan Tahap II) ~Beton K175 ~Besi Beton : - Besi Beton Polos ~BeKisting 2x Pakai
G. Lantai VII (Tujuh) 1. Pek. Kolom Praktis KP, Uk. 12 x 15 (Sisa Pekerjaan Tahap II) ~Beton K175 ~Besi Beton : - Besi Beton Polos ~BeKisting 2x Pakai
VOL.
SAT.
HARGA SAT.
Arsitektur JML. HARGA
0.13
m3
717,563.20
92,996.19
29.81 2.16
Kg m2
12,855.00 197,775.00 Jumlah Lt. 1 (A)
383,181.84 427,202.54 903,380.57
0.12
m3
717,563.20
87,829.74
28.15 2.04
Kg m2
12,855.00 197,775.00 Jumlah Lt. 2 (B)
361,893.96 403,469.07 853,192.76
0.18
m3
717,563.20
131,744.60
42.23 3.06
Kg m2
12,855.00 197,775.00 Jumlah Lt. 3 (C)
542,840.94 605,203.60 1,279,789.15
0.06
m3
717,563.20
43,914.87
14.08 1.02
Kg m2
12,855.00 197,775.00 Jumlah Lt. 4 (E)
180,946.98 201,734.53 426,596.38
0.31
m3
823,592.06
252,019.17
70.38 5.10
Kg m2
12,855.00 197,775.00 Jumlah Lt. 5 (E)
904,734.90 1,008,672.67 2,165,426.74
0.91
m3
717,563.20
650,973.34
208.66 15.12
Kg m2
12,855.00 197,775.00 Jumlah Lt. 6 (F)
2,682,272.88 2,990,417.81 6,323,664.02
0.72
m3
717,563.20
516,645.50
165.60 12.00
Kg m2
12,855.00 197,775.00 Jumlah Lt. 7 (G)
2,128,788.00 2,373,347.47 5,018,780.97
Jumlah I
16,970,830.61
NO.
URAIAN PEKERJAAN
II Pekerjaan Dinding dan Plesteran A. Lantai I (Dasar) 1. Pek. Pas. Dinding Trasram 1/2 Bata (1Pc : 3Ps) (Sisa Pekerjaan Tahap II) 2. Pas. Dinding Tembok 1/2 Bata (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 3. Plesteran Trasram (1Pc : 3Ps) (Sisa Pekerjaan Tahap II) 4. Plesteran Biasa (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 5. Pekerjaan Acian Semen Dinding 6. Pekerjaan Acian Semen Beton
B. Lantai II (Dua) 1. Plesteran Biasa (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 2. Pekerjaan Acian Semen Dinding (Sisa Pekerjaan Tahap II) 3. Pekerjaan Acian Semen Beton
C. Lantai III (Tiga) 1. Pas. Dinding Tembok 1/2 Bata (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 2. Plesteran Biasa (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 3. Plesteran Beton (1Pc : 3Ps) (Atap Plat Sayap Kiri Dan Kanan Lt. II) 4. Pekerjaan Acian Semen Dinding (Sisa Pekerjaan Tahap II) 5. Pekerjaan Acian Semen Beton
D. Lantai IV (Empat) 1. Pas. Dinding Tembok 1/2 Bata (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 2. Plesteran Biasa (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 3. Pekerjaan Acian Semen Dinding (Sisa Pekerjaan Tahap II) 4. Pekerjaan Acian Semen Beton
E. Lantai V (Lima) 1. Pas. Dinding Tembok 1/2 Bata (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 2. Plesteran Biasa (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 3. Pekerjaan Acian Semen Dinding (Sisa Pekerjaan Tahap II) 4. Pekerjaan Acian Semen Beton
F. Lantai VI (Enam) 1. Pas. Dinding Tembok 1/2 Bata (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 2. Plesteran Biasa (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 3. Plesteran Beton (1Pc : 3Ps) (yang nampak) (Sisa Pekerjaan Tahap II) 4. Pekerjaan Acian Semen Dinding (Sisa Pekerjaan Tahap II) 5. Pekerjaan Acian Semen Beton
VOL.
SAT.
HARGA SAT.
Arsitektur JML. HARGA
16.17
m2
80,307.00
1,298,564.19
61.01
m2
75,773.00
4,622,607.64
32.34
m2
39,928.60
1,291,290.92
122.01
m2
37,452.40
4,569,642.23
245.04 382.35
m2 m2
19,875.00 19,875.00 Jumlah Lt. 1 (A)
4,870,170.00 7,599,206.25 24,251,481.23
18.52
m2
37,452.40
693,618.45
184.46
m2
19,875.00
3,666,142.50
382.35
m2
19,875.00 Jumlah Lt. 2 (B)
7,599,206.25 11,958,967.20
88.68
m2
75,773.00
6,719,246.55
174.25
m2
37,452.40
6,525,930.89
226.60 150.89
m2 m2
39,928.60 19,875.00
9,047,820.76 2,998,938.75
382.35
m2
19,875.00 Jumlah Lt. 3 (C)
7,599,206.25 32,891,143.20
12.46
m2
75,773.00
943,828.49
21.83
m2
37,452.40
817,436.08
150.89
m2
19,875.00
2,998,938.75
382.35
m2
19,875.00 Jumlah Lt. 4 (D)
7,599,206.25 12,359,409.57
12.46
m2
75,773.00
943,828.49
21.83
m2
37,452.40
817,436.08
150.89
m2
19,875.00
2,998,938.75
382.35
m2
19,875.00 Jumlah Lt. 5 (E)
7,599,206.25 12,359,409.57
139.64
m2
75,773.00
10,581,093.27
279.28
m2
37,452.40
10,459,856.08
53.90
m2
39,928.60
2,152,151.54
351.04
m2
19,875.00
6,976,920.00
377.02
m2
19,875.00 Jumlah Lt. 6 (F)
7,493,272.50 37,663,293.39
NO.
URAIAN PEKERJAAN
G. Lantai VII (Tujuh) 1. Pas. Dinding Tembok 1/2 Bata (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 2. Plesteran Biasa (1Pc : 5Ps) (Sisa Pekerjaan Tahap II) 4. Pekerjaan Acian Semen Dinding (Sisa Pekerjaan Tahap II) 5. Pekerjaan Acian Semen Beton
VOL.
SAT.
HARGA SAT.
Arsitektur JML. HARGA
125.23
m2
75,773.00
9,489,052.79
250.46
m2
37,452.40
9,380,328.10
385.63
m2
19,875.00
7,664,396.25
409.60
m2
19,875.00 Jumlah Lt. 7 (G)
8,140,800.00 34,674,577.14
H. Lantai VIII (Delapan), IX (Sembilan) Dan Dudukan Tangki Air 1. Plesteran Beton (1Pc : 3Ps) (Plat Atap + Dudukan Reservoir + Atap Rg. Mesin 139.87 Lift) 2. Pekerjaan Acian Semen Beton 256.71
m2 m2
39,928.60 19,875.00 Jumlah Lt. 8 & 9 (H)
5,584,933.07 5,102,170.88 10,687,103.94
Jumlah II III Pekerjaan Kosen, Pintu, Dan Jendela A. Lantai I (Dasar) 1. Pintu Type P3 = 2 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Daun Pintu Aluminium, Uk. 0,82x2,15 ~Engsel Pintu ~Kunci Pintu Aluminium (Bulat) ~Grendel Pintu 2. Pintu Type P4.a (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 3. Pintu Type P4.b (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 4. Pintu Type P6 (Pintu Emergency) = 1 Unit ~Kusen Pintu Dari Rangka Siku Dan Plat ~Pas. Daun Pintu Plat Baja, Rangka Hollow 4 x 4
176,845,385.24
10.60 3.52 6 2 2
m1 m2 Buah Buah Buah
143,710.00 1,027,520.00 40,825.00 386,000.00 25,000.00
1,523,326.00 3,616,870.40 244,950.00 772,000.00 50,000.00
3.35
m1
3,250,000.00
10,887,500.00
3.35
m1
3,250,000.00
10,887,500.00
1.00 1.00
Bh Bh
2,651,033.18 3,292,883.41 Jumlah Lt. 1 (A)
2,651,033.18 3,292,883.41 33,926,062.99
B. Lantai II (Dua) 1. Pintu Type P4.a (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 2. Pintu Type P4.b (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M
3.35
m1
3,250,000.00
10,887,500.00
3.35
m1
3,250,000.00 Jumlah Lt. 2 (B)
10,887,500.00 21,775,000.00
C. Lantai III (Tiga) 1. Pintu Type P4.a (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 2. Pintu Type P4.b (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M
3.35
m1
3,250,000.00
10,887,500.00
3.35
m1
3,250,000.00 Jumlah Lt. 3 (C)
10,887,500.00 21,775,000.00
29.84 2 8.35 2 2 1
m1 Buah m2 Set Set Ls
143,710.00 4,063,449.25 89,825.00 924,825.00 192,750.00 225,011.63
4,288,306.40 8,126,898.50 750,038.75 1,849,650.00 385,500.00 225,011.63
10.60 3.52 6 2 2
m1 m2 Buah Buah Buah
143,710.00 1,027,520.00 40,825.00 386,000.00 25,000.00
1,523,326.00 3,616,870.40 244,950.00 772,000.00 50,000.00
3.35
m1
3,250,000.00
10,887,500.00
3.35
m1
3,250,000.00
10,887,500.00
D. Lantai IV (Empat) 1. Pintu Type PJ2.a = 1 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Pintu Kaca Tempered 12 mm, Uk. 0,75 x 2,16 ~Pas. Kaca Mati Bening 5 mm ~Flooring Engsel ~Pegangan Pintu/Door Holder ~Acsesoris, Karet list Kaca, Silikon, Dll (Pada Kaca Mati) 2. Pintu Type P3 = 2 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Daun Pintu Aluminium, Uk. 0,82x2,15 ~Engsel Pintu ~Kunci Pintu Aluminium (Bulat) ~Grendel Pintu 3. Pintu Type P4.a (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 4. Pintu Type P4.b (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M
NO. 5.
6.
7.
URAIAN PEKERJAAN Pintu Type P5 = 1 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Daun Pintu Aluminium, Uk. 0,74x2,15 ~Engsel Pintu ~Kunci Pintu Aluminium (Bulat) ~Grendel Pintu Pintu Type P6 (Pintu Emergency) = 1 Unit ~Kusen Pintu Dari Rangka Siku Dan Plat ~Pas. Daun Pintu Plat Baja, Rangka Hollow 4 x 4 Jendela Type J10.a = 2 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Kaca Mati Bening 5 mm ~Acsesoris, Karet list Kaca, Silikon, Dll (Pada Kaca Mati)
E. Lantai V (Lima) 1. Pintu Type PJ2.a = 1 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Pintu Kaca Tempered 12 mm, Uk. 0,75 x 2,16 ~Pas. Kaca Mati Bening 5 mm ~Flooring Engsel ~Pegangan Pintu/Door Holder ~Acsesoris, Karet list Kaca, Silikon, Dll (Pada Kaca Mati) 2. Pintu Type P3 = 2 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Daun Pintu Aluminium, Uk. 0,82x2,15 ~Engsel Pintu ~Kunci Pintu Aluminium (Bulat) ~Grendel Pintu 3. Pintu Type P4.a (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 4. Pintu Type P4.b (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 5. Pintu Type P6 (Pintu Emergency) = 1 Unit ~Kusen Pintu Dari Rangka Siku Dan Plat ~Pas. Daun Pintu Plat Baja, Rangka Hollow 4 x 4 6. Jendela Type J10.a = 2 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Kaca Mati Bening 5 mm ~Acsesoris, Karet list Kaca, Silikon, Dll (Pada Kaca Mati)
F. Lantai VI (Enam) 1. Pintu Type PJ2.b = 1 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Pintu Kaca Tempered 12 mm, Uk. 0,75 x 2,16 ~Pas. Kaca Mati Bening 5 mm ~Flooring Engsel ~Pegangan Pintu/Door Holder ~Acsesoris, Karet list Kaca, Silikon, Dll (Pada Kaca Mati) 2. Pintu Type P2 = 2 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Daun Pintu Kaca Ryben 5 mm Bingkai Aluminium ~Pas. Kaca Mati Ryben 5mm ~Engsel Pintu ~Kunci Pintu Aluminium ~Pegangan Pintu/Door Holder ~Acsesoris, Karet list Kaca, Silikon, Dll (Pada Kaca Mati) 3. Pintu Type P3 = 2 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Daun Pintu Aluminium, Uk. 0,82x2,15 ~Engsel Pintu ~Kunci Pintu Aluminium (Bulat) ~Grendel Pintu 4. Pintu Type P4.a (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 5. Pintu Type P4.b (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M
VOL.
SAT.
HARGA SAT.
Arsitektur JML. HARGA
5.20 1.59 3 1 1
m1 m2 Buah Buah Buah
143,710.00 1,027,520.00 40,825.00 386,000.00 25,000.00
747,292.00 1,633,756.80 122,475.00 386,000.00 25,000.00
1.00 1.00
Bh Bh
2,651,033.18 3,292,883.41
2,651,033.18 3,292,883.41
61.80 23.22 1
m1 m2 Ls
143,710.00 89,825.00 625,720.95 Jumlah Lt. 4 (D)
8,881,278.00 2,085,736.50 625,720.95 64,058,727.52
29.84 2 8.35 2 2 1
m1 Buah m2 Set Set Ls
143,710.00 4,063,449.25 89,825.00 924,825.00 192,750.00 225,011.63
4,288,306.40 8,126,898.50 750,038.75 1,849,650.00 385,500.00 225,011.63
10.60 3.52 6 2 2
m1 m2 Buah Buah Buah
143,710.00 1,027,520.00 40,825.00 386,000.00 25,000.00
1,523,326.00 3,616,870.40 244,950.00 772,000.00 50,000.00
3.35
m1
3,250,000.00
10,887,500.00
3.35
m1
3,250,000.00
10,887,500.00
1.00 1.00
Bh Bh
2,651,033.18 3,292,883.41
2,651,033.18 3,292,883.41
61.80 23.22 1
m1 m2 Ls
143,710.00 89,825.00 625,720.95 Jumlah Lt. 5 (E)
8,881,278.00 2,085,736.50 625,720.95 61,144,203.72
30.14 2 8.63 2 2 1
m1 Buah m2 Set Set Ls
143,710.00 4,063,449.25 89,825.00 924,825.00 192,750.00 232,556.93
4,331,419.40 8,126,898.50 775,189.75 1,849,650.00 385,500.00 232,556.93
9.54 6.13 1.82 6 1 2 1
m1 m2 m2 Buah Buah Set Ls
143,710.00 600.00 177,825.00 40,825.00 386,000.00 192,750.00 97,177.81
1,370,993.40 3,680.64 323,926.02 244,950.00 386,000.00 385,500.00 97,177.81
10.60 3.52 6 2 2
m1 m2 Buah Buah Buah
143,710.00 1,027,520.00 40,825.00 386,000.00 25,000.00
1,523,326.00 3,616,870.40 244,950.00 772,000.00 50,000.00
3.35
m1
3,250,000.00
10,887,500.00
3.35
m1
3,250,000.00
10,887,500.00
NO. 6.
7.
8.
URAIAN PEKERJAAN Pintu Type P5 = 1 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Daun Pintu Aluminium, Uk. 0,74x2,15 ~Engsel Pintu ~Kunci Pintu Aluminium (Bulat) ~Grendel Pintu Pintu Type P6 (Pintu Emergency) = 1 Unit ~Kusen Pintu Dari Rangka Siku Dan Plat ~Pas. Daun Pintu Plat Baja, Rangka Hollow 4 x 4 Jendela Type J10.b = 2 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Kaca Mati Bening 5 mm ~Acsesoris, Karet list Kaca, Silikon, Dll (Pada Kaca Mati)
G. Lantai VII (Tujuh) 1. Pintu Type PJ1 = 1 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Pintu Kaca Tempered 12 mm, Uk. 0,75 x 2,16 ~Pas. Kaca Mati Bening 5 mm ~Flooring Engsel ~Pegangan Pintu/Door Holder ~Acsesoris, Karet list Kaca, Silikon, Dll (Pada Kaca Mati) 2. Pintu Type P3 = 2 Unit ~Kusen Aluminium 4" x 1 3/4" ~Pas. Daun Pintu Aluminium, Uk. 0,82x2,15 ~Engsel Pintu ~Kunci Pintu Aluminium (Bulat) ~Grendel Pintu 3. Pintu Type P4.a (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 4. Pintu Type P4.b (Partisi Km/Lavatory) = 1 Unit ~Pas. Panel Cubical 12 mm Laminated, T = 2,00 M 5. Pintu Type P6 (Pintu Emergency) = 1 Unit ~Kusen Pintu Dari Rangka Siku Dan Plat ~Pas. Daun Pintu Plat Baja, Rangka Hollow 4 x 4
IV Pekerjaan Langit-langit/Plafond B. Lantai II (Dua) 1. Pas. Plafond Gypsum Rangka Hollow Galvaniz (Tambahan Bawah Plat)
G. Lantai VII (Tujuh) 1. Pas. Plafond Gypsum Rangka Hollow Galvaniz 2. Pas. Plafond GRC Rangka Hollow Galvaniz (Km/Lavatory)
H. Lantai VIII (Delapan) 1. Pas. Plafond Gypsum Rangka Hollow Galvaniz
VOL.
SAT.
HARGA SAT.
Arsitektur JML. HARGA
5.20 1.59 3 1 1
m1 m2 Buah Buah Buah
143,710.00 1,027,520.00 40,825.00 386,000.00 25,000.00
747,292.00 1,633,756.80 122,475.00 386,000.00 25,000.00
1.00 1.00
Bh Bh
2,651,033.18 3,292,883.41
2,651,033.18 3,292,883.41
62.10 23.94 1
m1 m2 Ls
143,710.00 89,825.00 645,123.15 Jumlah Lt. 6 (F)
8,924,391.00 2,150,410.50 645,123.15 67,073,953.88
59.10 2 18.82 2 2 1
m1 Buah m2 Set Set Ls
143,710.00 4,063,449.25 89,825.00 924,825.00 192,750.00 507,151.95
8,493,261.00 8,126,898.50 1,690,506.50 1,849,650.00 385,500.00 507,151.95
10.60 3.52 6 2 2
m1 m2 Buah Buah Buah
143,710.00 1,027,520.00 40,825.00 386,000.00 25,000.00
1,523,326.00 3,616,870.40 244,950.00 772,000.00 50,000.00
3.35
m1
3,250,000.00
10,887,500.00
3.35
m1
3,250,000.00
10,887,500.00
1.00 1.00
Bh Bh
2,651,033.18 3,292,883.41 Jumlah Lt. 7 (G)
2,651,033.18 3,292,883.41 54,979,030.94
Jumlah III
324,731,979.04
76.44
m2
144,128.80 Jumlah Lt. 2 (B)
11,016,571.31 11,016,571.31
281.10 16.66
m2 m2
144,128.80 138,960.00 Jumlah Lt. 7 (G)
40,514,245.36 2,315,073.60 42,829,318.96
22.43
m2
144,128.80 Jumlah Lt. 8 (H)
3,232,131.58 3,232,131.58
Jumlah IV
57,078,021.84
V A. 1. 2. 3. 4.
Pekerjaan Pengecatan Lantai I (Dasar) Cat Tembok Dinding/Beton Dalam Cat Plafond Gypsum Biasa Cat Plafond GRC (Km Dan Lavatory) Cat Coating Batu Alam
614.89 258.04 16.66 4.97
m2 m2 m2 m2
37,620.00 37,620.00 37,620.00 30,960.00 Jumlah Lt. 1 (A)
23,132,161.80 9,707,423.42 626,749.20 153,871.20 33,620,205.62
B. 1. 2. 3. 4.
Lantai II (Dua) Cat Tembok Dinding/Beton Dalam Cat Plafond Gypsum Biasa Cat Plafond GRC (Km Dan Lavatory) Lapisan Waterproofing (Lantai Km/Lavatory)
639.52 531.68 16.66 19.88
m2 m2 m2 m2
37,620.00 37,620.00 37,620.00 155,000.00 Jumlah Lt. 2 (B)
24,058,742.40 20,001,613.50 626,749.20 3,081,400.00 47,768,505.10
NO.
URAIAN PEKERJAAN
VOL.
SAT.
HARGA SAT.
Arsitektur JML. HARGA
C. 1. 2. 3. 4. 5.
Lantai III (Tiga) Cat Tembok Dinding/Beton Dalam Cat Plafond Gypsum Biasa Cat Plafond GRC (Km Dan Lavatory) Lapisan Waterproofing (Plat Beton Atap Dak Sayap Kiri Dan Kanan LT. II) Lapisan Waterproofing (Lantai Km/Lavatory)
533.24 315.67 20.85 226.60 24.07
m2 m2 m2 m2 m2
37,620.00 37,620.00 37,620.00 155,000.00 155,000.00 Jumlah Lt. 3 (C)
20,060,488.80 11,875,343.63 784,339.38 35,123,000.00 3,730,850.00 71,574,021.81
D. 1. 2. 3. 4.
Lantai IV (Empat) Cat Tembok Dinding/Beton Dalam Cat Plafond Gypsum Biasa Cat Plafond GRC (Km Dan Lavatory) Lapisan Waterproofing (Lantai Km/Lavatory)
150.89 315.67 20.85 24.07
m2 m2 m2 m2
37,620.00 37,620.00 37,620.00 155,000.00 Jumlah Lt. 4 (D)
5,676,481.80 11,875,343.63 784,339.38 3,730,850.00 22,067,014.81
E. 1. 2. 3. 4.
Lantai V (Lima) Cat Tembok Dinding/Beton Dalam Cat Plafond Gypsum Biasa Cat Plafond GRC (Km Dan Lavatory) Lapisan Waterproofing (Lantai Km/Lavatory)
533.24 315.67 20.85 24.07
m2 m2 m2 m2
37,620.00 37,620.00 37,620.00 155,000.00 Jumlah Lt. 5 (E)
20,060,488.80 11,875,343.63 784,339.38 3,730,850.00 36,451,021.81
F. 1. 2. 3. 4.
Lantai VI (Enam) Cat Tembok Dinding/Beton Dalam Cat Plafond Gypsum Biasa Cat Plafond GRC (Km Dan Lavatory) Lapisan Waterproofing (Lantai Km/Lavatory)
728.06 374.70 21.03 24.25
m2 m2 m2 m2
37,620.00 37,620.00 37,620.00 155,000.00 Jumlah Lt. 6 (F)
27,389,617.20 14,096,082.33 791,024.45 3,758,595.00 46,035,318.98
G. 1. 2. 3. 4.
Lantai VII (Tujuh) Cat Tembok Dinding/Beton Dalam Cat Plafond Gypsum Biasa Cat Plafond GRC (Km Dan Lavatory) Lapisan Waterproofing (Lantai Km/Lavatory)
795.23 281.10 16.66 19.88
m2 m2 m2 m2
37,620.00 37,620.00 37,620.00 155,000.00 Jumlah Lt. 7 (G)
29,916,552.60 10,574,887.95 626,749.20 3,081,400.00 44,199,589.75
H. 1. 2. 3.
Lantai VIII (Delapan), IX (Sembilan) Dan Dudukan Tangki Air Cat Tembok Dinding/Beton Dalam Cat Plafond Gypsum Biasa Lapisan Waterproofing (Plat Beton Atap + Dudukan Reservoir + Atap Lift)
116.84 22.43 379.67
m2 m2 m2
37,620.00 37,620.00 155,000.00 Jumlah Lt. 8 & 9 (H)
4,395,520.80 843,639.79 58,848,493.50 64,087,654.09
Jumlah V VI A. 1. 2.
365,803,331.98
Pekerjaan Lantai Lantai I (Dasar) Pas. Lantai Keramik 30/30 (Lavatory) Pas. Keramik Dinding 30/50 (Lavatory), T = 2.00 m
19.88 50.76
m2 m2
133,005.00 144,084.00 Jumlah Lt. 1 (A)
2,644,139.40 7,313,127.50 9,957,266.90
B. Lantai II (Dua) 1. Pas. Lantai Keramik 30/30 (Lavatory) 2. Pas. Keramik Dinding 30/50 (Lavatory), T = 2.00 m
19.88 50.76
m2 m2
133,005.00 144,084.00 Jumlah Lt. 2 (B)
2,644,139.40 7,313,127.50 9,957,266.90
C. Lantai III (Tiga) 1. Pas. Lantai Keramik 30/30 (Lavatory + Km) 2. Pas. Keramik Dinding 30/50 (Lavatory + Km), T = 2.00 m
24.07 65.52
m2 m2
133,005.00 144,084.00 Jumlah Lt. 3 (C)
3,201,430.35 9,439,807.34 12,641,237.69
D. Lantai IV (Empat) 1. Pas. Lantai Keramik 30/30 (Lavatory + Km) 2. Pas. Keramik Dinding 30/50 (Lavatory + Km), T = 2.00 m
24.07 65.52
m2 m2
133,005.00 144,084.00 Jumlah Lt. 4 (D)
3,201,430.35 9,439,807.34 12,641,237.69
E. Lantai V (Lima) 1. Pas. Lantai Keramik 30/30 (Lavatory + Km) 2. Pas. Keramik Dinding 30/50 (Lavatory + Km), T = 2.00 m
24.07 65.52
m2 m2
133,005.00 144,084.00 Jumlah Lt. 5 (E)
3,201,430.35 9,439,807.34 12,641,237.69
NO.
URAIAN PEKERJAAN
VOL.
SAT.
HARGA SAT.
Arsitektur JML. HARGA
F. Lantai VI (Enam) 1. Pas. Lantai Keramik 30/30 (Lavatory + Km) 2. Pas. Keramik Dinding 30/50 (Lavatory + Km), T = 2.00 m
24.25 66.12
m2 m2
133,005.00 144,084.00 Jumlah Lt. 6 (F)
3,225,238.25 9,526,257.74 12,751,495.99
G. Lantai VII (Tujuh) 1. Pas. Lantai Keramik 30/30 (Lavatory + Km) 2. Pas. Keramik Dinding 30/50 (Lavatory + Km), T = 2.00 m
19.88 50.76
m2 m2
133,005.00 144,084.00 Jumlah Lt. 7 (G)
2,644,139.40 7,313,127.50 9,957,266.90
239.79 27.22 5.07
m2 m2 m2
145,318.00 145,318.00 145,318.00 Jumlah Lt. 8 & 9 (H)
34,846,486.21 3,955,497.83 736,457.09 39,538,441.14
H. 1. 2. 3.
Lantai VIII (Delapan) Dan Lantai IX (Sembilan) Pas. Lantai Keramik 40/40 Lantai Top Floor Pas. Lantai Keramik 40/40 (Depan Lift) Pas. Lantai Keramik 40/40 (Depan Tangga)
Jumlah VI
120,085,450.92
VII A. 1. 2. 3. 4. 5. 6. 7.
Pekerjaan Sanitasi Lantai I (Dasar) Kran Air, Ex Toto Pas. Wastafel, Ex. Toto Pas. Kloset Duduk, Ex Toto Urinoir Lengkap,Type U57 Ex. Toto Pas. Floor Drain, Ex. Toto Pas. Tempat Sabun Pas. Cermin Washtafel
7 3 4 3 4 3 3
Buah Buah Buah Buah Buah Buah Buah
45,087.50 642,350.00 2,219,100.00 2,638,850.00 44,000.00 150,000.00 350,000.00 Jumlah Lt. 1 (A)
315,612.50 1,927,050.00 8,876,400.00 7,916,550.00 176,000.00 450,000.00 1,050,000.00 20,711,612.50
B. 1. 2. 3. 4. 5. 6. 7.
Lantai II (Dua) Kran Air, Ex Toto Pas. Wastafel, Ex. Toto Pas. Kloset Duduk, Ex Toto Urinoir Lengkap,Type U57 Ex. Toto Pas. Floor Drain, Ex. Toto Pas. Tempat Sabun Pas. Cermin Washtafel
7 3 4 3 4 3 3
Buah Buah Buah Buah Buah Buah Buah
45,087.50 642,350.00 2,219,100.00 2,638,850.00 44,000.00 150,000.00 350,000.00 Jumlah Lt. 2 (B)
315,612.50 1,927,050.00 8,876,400.00 7,916,550.00 176,000.00 450,000.00 1,050,000.00 20,711,612.50
C. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
Lantai III (Tiga) Kran Air, Ex Toto Kran Air Shower, Ex Toto Shower + Acs Pas. Wastafel, Ex. Toto Pas. Kloset Duduk, Ex Toto Urinoir Lengkap,Type U57 Ex. Toto Pas. Floor Drain, Ex. Toto Pas. Tempat Sabun Pas. Cermin Washtafel Pas. Roof Drain (Atap Plat Sayap Kiri Dan Kanan Lt. II)
8 1 1 4 5 3 5 4 4 8
Buah Buah Set Buah Buah Buah Buah Buah Buah Buah
45,087.50 60,087.50 275,087.50 642,350.00 2,219,100.00 2,638,850.00 44,000.00 150,000.00 350,000.00 59,000.00 Jumlah Lt. 3 (C)
360,700.00 60,087.50 275,087.50 2,569,400.00 11,095,500.00 7,916,550.00 220,000.00 600,000.00 1,400,000.00 472,000.00 24,969,325.00
D. 1. 2. 3. 4. 5. 6. 7. 8. 9.
Lantai IV (Empat) Kran Air, Ex Toto Kran Air Shower, Ex Toto Shower + Acs Pas. Wastafel, Ex. Toto Pas. Kloset Duduk, Ex Toto Urinoir Lengkap,Type U57 Ex. Toto Pas. Floor Drain, Ex. Toto Pas. Tempat Sabun Pas. Cermin Washtafel
8 1 1 4 5 3 5 4 4
Buah Buah Set Buah Buah Buah Buah Buah Buah
45,087.50 60,087.50 275,087.50 642,350.00 2,219,100.00 2,638,850.00 44,000.00 150,000.00 350,000.00 Jumlah Lt. 4 (D)
360,700.00 60,087.50 275,087.50 2,569,400.00 11,095,500.00 7,916,550.00 220,000.00 600,000.00 1,400,000.00 24,497,325.00
E. 1. 2. 3. 4. 5. 6. 7. 8. 9.
Lantai V (Lima) Kran Air, Ex Toto Kran Air Shower, Ex Toto Shower + Acs Pas. Wastafel, Ex. Toto Pas. Kloset Duduk, Ex Toto Urinoir Lengkap,Type U57 Ex. Toto Pas. Floor Drain, Ex. Toto Pas. Tempat Sabun Pas. Cermin Washtafel
8 1 1 4 5 3 5 4 4
Buah Buah Set Buah Buah Buah Buah Buah Buah
45,087.50 60,087.50 275,087.50 642,350.00 2,219,100.00 2,638,850.00 44,000.00 150,000.00 350,000.00 Jumlah Lt. 5 (E)
360,700.00 60,087.50 275,087.50 2,569,400.00 11,095,500.00 7,916,550.00 220,000.00 600,000.00 1,400,000.00 24,497,325.00
NO.
URAIAN PEKERJAAN
VOL.
SAT.
HARGA SAT.
Arsitektur JML. HARGA
F. 1. 2. 3. 4. 5. 6. 7. 8. 9.
Lantai VI (Enam) Kran Air, Ex Toto Kran Air Shower, Ex Toto Shower + Acs Pas. Wastafel, Ex. Toto Pas. Kloset Duduk, Ex Toto Urinoir Lengkap,Type U57 Ex. Toto Pas. Floor Drain, Ex. Toto Pas. Tempat Sabun Pas. Cermin Washtafel
8 1 1 4 5 3 5 4 4
Buah Buah Set Buah Buah Buah Buah Buah Buah
45,087.50 60,087.50 275,087.50 642,350.00 2,219,100.00 2,638,850.00 44,000.00 150,000.00 350,000.00 Jumlah Lt. 6 (F)
360,700.00 60,087.50 275,087.50 2,569,400.00 11,095,500.00 7,916,550.00 220,000.00 600,000.00 1,400,000.00 24,497,325.00
G. 1. 2. 3. 4. 5. 6. 7.
Lantai VII (Tujuh) Kran Air, Ex Toto Pas. Wastafel, Ex. Toto Pas. Kloset Duduk, Ex Toto Urinoir Lengkap,Type U57 Ex. Toto Pas. Floor Drain, Ex. Toto Pas. Tempat Sabun Pas. Cermin Washtafel
7 3 4 3 4 3 3
Buah Buah Buah Buah Buah Buah Buah
45,087.50 642,350.00 2,219,100.00 2,638,850.00 44,000.00 150,000.00 350,000.00 Jumlah Lt. 7 (G)
315,612.50 1,927,050.00 8,876,400.00 7,916,550.00 176,000.00 450,000.00 1,050,000.00 20,711,612.50
4
Buah
2,750,000.00
11,000,000.00
Jumlah Lt. 8 & 9 (H)
11,000,000.00
H. Lantai VIII (Delapan), IX (Sembilan) Dan Dudukan Tangki Air 1. Pas. Reservoir Stainless Steel, Kap. 1 m3 (Lengkap)
Jumlah VII VIII Pekerjaan Lain - Lain 1. Pekerjaan Entrance - Rangka Utama Atap + Dudukan Pada Kolom - Penutup Atap Dari Kaca Stopsol 8 mm + Rangka - Penutup Atap Aluminium Composite Panel + Rangka - Bungkus Kolom Entrance Aluminium Composite Panel + Rangka 2.
Pekerjaan Reling Tangga, Void Dan Pagar (Stainless steel) - Pek. Reling Tangga Utama Lt. 1 - Pek. Reling Tangga Darurat Lt. 1 - 2 - Pek. Reling Tangga Darurat Lt. 2 - 3 - Pek. Reling Tangga Darurat Lt. 3 - 4 - Pek. Reling Tangga Darurat Lt. 4 - 5 - Pek. Reling Tangga Darurat Lt. 5 - 6 - Pek. Reling Tangga Darurat Lt. 6 - 7 - Pek. Reling Tangga Darurat Lt. 7 - 8 - Pek. Reling Void Lt. 2 - Pek. Reling Pagar Lt. 8 - Pek. Tangga Top Floor Ke Ruang Mesin Lift
171,596,137.50
1.00 22.37 49.73 39.94
Ls M2 M2 M2
150,000,000.00 713,855.00 684,816.00 684,816.00 Jumlah 1
150,000,000.00 15,968,936.35 34,055,899.68 27,351,551.04 227,376,387.07
26.76 6.66 7.43 7.43 7.43 7.43 7.43 8.02 25.85 40.70 6.00
M' M' M' M' M' M' M' M' M' M' M'
850,000.00 850,000.00 850,000.00 850,000.00 850,000.00 850,000.00 850,000.00 850,000.00 850,000.00 850,000.00 750,000.00 Jumlah 5
22,746,000.00 5,661,000.00 6,315,500.00 6,315,500.00 6,315,500.00 6,315,500.00 6,315,500.00 6,817,000.00 21,972,500.00 34,595,000.00 4,500,000.00 127,869,000.00
Jumlah VIII
355,245,387.07
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG BADAN KOORDINASI PENANAMAN MODAL DAERAH PROVINSI SULAWESI SELATAN PEKERJAAN : ELEKTRIKAL GEDUNG BKPMD MAKASSAR SUMBER DANA : ANGGARAN : TAHUN 2012 Elektrikal JENIS PEKERJAAN
NO.
I
Pekerjaan Listrik
Real Cost
TOTAL HARGA (Rp.)
Rp.
388,384,400.00
Rp.
388,384,400.00
Sungguminasa, 2 Juli 2012 Penawar, CV. Mitra Jasa Mandiri Utama
ISKANDAR Direktur
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG BADAN KOORDINASI PENANAMAN MODAL DAERAH PROVINSI SULAWESI SELATAN PEKERJAAN : ELEKTRIKAL GEDUNG BKPMD MAKASSAR SUMBER DANA : ANGGARAN : TAHUN 2012
URAIAN PEKERJAAN
NO. I A.
B.
C.
Pekerjaan Listrik Panel Instalasi - Panel Utama (P.U) - LP.1 - PP.1 - LP.2 - 7 - PP.2 - 7 - PP.Lift - PP.HD - LP.Tn Kabel Distribusi - Kabel NYY 4 x 16 mm2
VOL.
1.00 1.00 1.00 6.00 6.00 1.00 1.00 1.00
SAT.
Unit Unit Unit Unit Unit Unit Unit Unit
HARGA SAT.
Elektrikal JML. HARGA
21,400,000.00 6,900,000.00 6,700,000.00 6,900,000.00 6,700,000.00 5,200,000.00 5,800,000.00 3,600,000.00
21,400,000.00 6,900,000.00 6,700,000.00 41,400,000.00 40,200,000.00 5,200,000.00 5,800,000.00 3,600,000.00 131,200,000.00
116.00
m'
128,000.00
14,848,000.00 14,848,000.00
38.00 38.00 38.00 38.00 38.00 4.00
Buah Buah Buah Buah Buah Buah
828,000.00 828,000.00 828,000.00 828,000.00 828,000.00 828,000.00
31,464,000.00 31,464,000.00 31,464,000.00 31,464,000.00 31,464,000.00 3,312,000.00
128.00 128.00
Buah Buah
72,000.00 72,000.00
9,216,000.00 9,216,000.00
46.00 62.00 14.00 14.00 14.00 14.00 10.00
Buah Buah Buah Buah Buah Buah Buah
198,600.00 198,600.00 198,600.00 198,600.00 198,600.00 198,600.00 198,600.00
9,135,600.00 12,313,200.00 2,780,400.00 2,780,400.00 2,780,400.00 2,780,400.00 1,986,000.00
- Lampu Exit (c/w Battery), Lt 1 - 8 - Lampu Hias - Lantai 1
8.00
Buah
916,000.00
7,328,000.00
1.00
Buah
7,500,000.00
7,500,000.00
- Lampu Baret 9 Watt, Lt 1 - 8 - Lampu SL/Esential - Lantai 1 - Lantai 2 - Lantai 3 - Lantai 4 - Lantai 5 - Lantai 6 - Lantai 7
8.00
Buah
286,000.00
2,288,000.00
4.00 4.00 4.00 4.00 4.00 4.00 4.00
Buah Buah Buah Buah Buah Buah Buah
78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00
312,000.00 312,000.00 312,000.00 312,000.00 312,000.00 312,000.00 312,000.00
Armateaur Lampu, Dll - TL 2 x36 Watt, Type RM 300, Artolite - Lantai 3 - Lantai 4 - Lantai 5 - Lantai 6 - Lantai 7 - Lantai 8 - TL 1 x 36 Watt, Balk - Lantai 1 - Lantai 2 - Downlight DL SL 23 Watt - Lantai 1 - Lantai 2 - Lantai 3 - Lantai 4 - Lantai 5 - Lantai 6 - Lantai 7
URAIAN PEKERJAAN
NO. - Stop Kontak 16 A - Lantai 1 - Lantai 2 - Lantai 3 - Lantai 4 - Lantai 5 - Lantai 6 - Lantai 7
VOL.
SAT.
HARGA SAT.
JML. HARGA
4.00 4.00 14.00 14.00 14.00 14.00 4.00
Buah Buah Buah Buah Buah Buah Buah
40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00
160,000.00 160,000.00 560,000.00 560,000.00 560,000.00 560,000.00 160,000.00
- Stop Kontak AC (c/w Fuse) - Lantai 1 - Lantai 2 - Lantai 3 - Lantai 4 - Lantai 5 - Lantai 6 - Lantai 7
4.00 4.00 5.00 5.00 5.00 5.00 4.00
Buah Buah Buah Buah Buah Buah Buah
86,000.00 86,000.00 86,000.00 86,000.00 86,000.00 86,000.00 86,000.00
344,000.00 344,000.00 430,000.00 430,000.00 430,000.00 430,000.00 344,000.00
- Saklar Tunggal - Lantai 1 - Lantai 2 - Lantai 3 - Lantai 4 - Lantai 5 - Lantai 6 - Lantai 7
3.00 3.00 4.00 4.00 4.00 4.00 3.00
Buah Buah Buah Buah Buah Buah Buah
40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00
120,000.00 120,000.00 160,000.00 160,000.00 160,000.00 160,000.00 120,000.00
- Saklar Ganda - Lantai 1 - Lantai 2 - Lantai 3 - Lantai 4 - Lantai 5 - Lantai 6 - Lantai 7
10.00 10.00 10.00 10.00 10.00 10.00 4.00
Buah Buah Buah Buah Buah Buah Buah
46,000.00 46,000.00 46,000.00 46,000.00 46,000.00 46,000.00 46,000.00
460,000.00 460,000.00 460,000.00 460,000.00 460,000.00 460,000.00 184,000.00 242,336,400.00
Jumlah I (A+B+C)
388,384,400.00
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG BADAN KOORDINASI PENANAMAN MODAL DAERAH PROVINSI SULAWESI SELATAN PEKERJAAN : ORNAMEN ATAP BKPMD SUMBER DANA : ANGGARAN : TAHUN 2012 Struktur - Ornamen Atap URAIAN PEKERJAAN
NO. I 1.
Pekerjaan Ornamen Atap Utama Pekerjaan Ornamen Atap Utama Terdiri Dari : - Rangka Utama H Beam 200 x 200 x 8 x 12 - Rangka Sekunder IWF 150 x 75 x 5 x 7 - Rangka Sekunder Pipa BS 4" Medium A - Rangka Sekunder Pipa BS 2" Medium A - Pek. Aluminium Composit Panel + Rangka Hollow - Pek. Plat Pengaku, T = 10 mm - Pek. Angker Baut 19 mm - Pek. Baut 16 mm - Pek. Ornamen Puncak Dudukan Penangkal Petir - Pek. Pengecatan Baja Zinccromate - Pek. Perakitan Dan Alat Bantu
VOL.
SAT.
1.00
Unit
5,232.76 1,795.33 2,027.58 289.80 569.88 1,436.49 92.00 520.00 1.00 257.50 10,781.97
Kg Kg Kg Kg M2 Kg Bh Bh Set M2 Kg
HARGA SAT.
34,575.00 28,135.00 32,519.18 38,259.60 684,816.00 28,250.00 27,500.00 18,700.00 7,500,000.00 13,800.00 248.00
JML. HARGA
180,922,821.06 50,511,665.82 65,935,072.50 11,087,791.50 390,259,518.00 40,580,887.55 2,530,000.00 9,724,000.00 7,500,000.00 3,553,456.53 2,673,927.80 765,279,140.75
Real Cost
Rp.
765,279,140.75
Sungguminasa, 2 Juli 2012 Penawar, CV. Mitra Jasa Mandiri Utama
ISKANDAR Direktur
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG BADAN KOORDINASI PENANAMAN MODAL DAERAH PROVINSI SULAWESI SELATAN PEKERJAAN : SITE DEVELOPMENT SUMBER DANA : ANGGARAN : TAHUN 2012 Site Development JENIS PEKERJAAN
NO.
TOTAL HARGA (Rp.)
I A.
Pekerjaan Site Development Pekerjaan Jalan Dan Parkir
Rp.
118,973,840.34
B.
Pekerjaan Taman
Rp.
18,935,394.80
C.
Pekerjaan Pagar Depan
Rp.
18,488,539.99
Rp.
156,397,775.13
Real Cost
Sungguminasa, 2 Juli 2012 Penawar, CV. Mitra Jasa Mandiri Utama
ISKANDAR Direktur
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG BADAN KOORDINASI PENANAMAN MODAL DAERAH PROVINSI SULAWESI SELATAN PEKERJAAN : SITE DEVELOPMENT SUMBER DANA : ANGGARAN : TAHUN 2012 Site Development NO. I A.
URAIAN PEKERJAAN
VOL.
SAT.
HARGA SAT.
Pekerjaan Site Development Pekerjaan Jalan Dan Parkir A. Sisi Kanan Gedung - Pek. Pas. Paving Block - Pek. Pas. Keramik Kasar, Uk. 40 x 40 (Bawah Plat Lantai II) - Pek. Pas. Cansteen Beton
167.29 85.02 58.32
m2 m2 m'
122,400.00 145,318.00 103,166.10
20,476,895.76 12,354,936.36 6,016,646.95 38,848,479.07
B. Sisi Kanan Kiri - Pek. Pas. Paving Block - Pek. Pas. Keramik Kasar, Uk. 40 x 40 (Bawah Plat Lantai II) - Pek. Pas. Cansteen Beton
160.03 85.02 56.45
m2 m2 m'
122,400.00 145,318.00 103,166.10
19,587,745.44 12,354,936.36 5,823,726.35 37,766,408.15
C. Belakang Kantor - Pek. Pas. Paving Block - Pek. Pas. Cansteen Beton
195.39 75.42
m2 m'
122,400.00 103,166.10
23,915,833.92 7,780,787.26 31,696,621.18
50.04 32.87
m2 m'
145,318.00 103,166.10
7,271,262.23 3,391,069.71 10,662,331.94 118,973,840.34
D. Sisi Depan Gedung (Entrance) - Pek. Pas. Keramik Kasar, Uk. 40 x 40 (Drop Off) - Pek. Pas. Cansteen Beton
Total (1) B.
C.
JML. HARGA
Pekerjaan Taman - Pek. Urugan Tanah Subur - Pek. Penanaman Rumput Gajah Mini Pekerjaan Pagar Depan - Pek. Bongkar Pintu Sisi Kiri Dan Kanan - Pek. Penambahan Pagar Sisi Kiri Dan Kanan - Pek. Kolom Beton, Uk. 30 x 30 ' - Pek. Beton K175 ' - Pek. Pembesian ' - Pek. Bekisting 2 x Pakai - Pek. Ringbalk Beton, Uk. 15 x 20 ' - Pek. Beton K175 ' - Pek. Pembesian ' - Pek. Bekisting 2 x Pakai - Pek. Pas. Dinding Pagar 1/2 Bt, Camp. 1pc : 5ps - Pek. Plesteran Biasa, Camp. 1pc : 5ps - Pek. Plesteran Beton, Camp. 1pc : 3ps - Pek. Acian - Pek. Pengecatan - Pek. Pemasangan Kembali Pintu Sisi Kiri Dan Kanan - Pek. Tambahan Plat Duiker Jalan Masuk, T = 20 Cm - Pek. Beton K225 - Pek. Pembesian - Pek. Bekisting 2 x Pakai
51.04 255.19
m3 m2
196,000.00 35,000.00 Total (2)
10,003,604.80 8,931,790.00 18,935,394.80
1.00
Ls
1,184,000.00
1,184,000.00
0.36 50.25 4.80
m3 Kg m2
717,563.20 12,855.00 197,775.00
258,322.75 645,938.04 949,320.00
0.18 30.72 2.40 12.00 24.00 4.80 28.80 28.80 1.00
m3 Kg m2 m2 m2 m2 m2 m2 Ls
717,563.20 12,855.00 203,775.00 75,773.00 37,452.40 39,928.60 19,875.00 37,620.00 1,000,000.00
129,161.38 394,905.60 489,060.00 909,276.00 898,857.60 191,657.28 572,400.00 1,083,456.00 1,000,000.00
2.40 408.10 10.00
m3 Kg m2
762,441.86 13,905.00 227,775.00 Total (3)
1,829,860.46 5,674,574.88 2,277,750.00 18,488,539.99
DAFTAR ANALISA HARGA SATUAN PEKERJAAN A.6 PEKERJAAN PERSIAPAN A.6.2
A.6.4
A.6.5
Memasang 1 M' pagar sementara dari seng gelombang tinggi 2 meter 1.250 Btg Dolken kayu Ø8-10/400 cm @ Rp 2.500 Kg Semen Portland @ Rp 0.005 M3 Pasir beton @ Rp 0.009 M3 split/chipping 2-3 cm @ Rp 0.072 M3 Kayu klas II (balok) @ Rp 0.060 Kg Paku biasa 2" - 5" @ Rp 0.400 Ltr Residu @ Rp 0.200 Oh Tukang kayu @ Rp 0.400 Oh Pekerja @ Rp 0.020 Oh Kepala Tukang Kayu @ Rp 0.020 Oh Mandor @ Rp
15,000.00 1,100.00 145,000.00 260,000.00 4,000,000.00 15,000.00 5,000.00 70,000.00 50,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
18,750.00 2,750.00 725.00 2,340.00 288,000.00 900.00 2,000.00 14,000.00 20,000.00 2,000.00 2,000.00 353,465.00
Mengukur dan memasang 1 M' bouwplank 0.012 M3 Kayu klas II (balok) 0.020 Kg Paku biasa 2" - 5" 0.007 M3 Kayu klas II (papan) 0.100 Oh Tukang kayu 0.100 Oh Pekerja 0.010 Oh Kepala Tukang Kayu 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
4,000,000.00 15,000.00 4,500,000.00 70,000.00 50,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
48,000.00 300.00 31,500.00 7,000.00 5,000.00 1,000.00 500.00 93,300.00
Membuat1 M2 kantor sementara, dengan lantai plesteran 1.250 Btg Dolken kayu Ø8-10/400 cm 0.180 M3 Kayu klas II (balok) 0.850 Kg Paku biasa 2" - 5" 1.100 Kg Besi strip 35.000 Kg Semen Portland 0.150 M3 Pasir pasang 0.100 M3 Pasir beton 0.150 M3 split/chipping 2-3 cm 30.000 Bh Batu merah 0.250 Lbr Seng plat BJLS 0.30 2.000 set Kaca nako lengkap teralis 0.080 M2 Kaca bening 5 mm 0.150 Bh Kunci tanam biasa 0.060 Lbr Multipleks 1.22 x 2.44 x 6 mm 2.000 Oh Tukang kayu 1.000 Oh Tukang batu 2.000 Oh Pekerja 0.300 Oh Kepala Tukang Kayu 0.050 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
15,000.00 4,000,000.00 15,000.00 11,600.00 1,100.00 125,000.00 145,000.00 260,000.00 500.00 49,500.00 300,000.00 70,000.00 150,000.00 82,000.00 70,000.00 70,000.00 50,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
18,750.00 720,000.00 12,750.00 12,760.00 38,500.00 18,750.00 14,500.00 39,000.00 15,000.00 12,375.00 600,000.00 5,600.00 22,500.00 4,920.00 140,000.00 70,000.00 100,000.00 30,000.00 5,000.00 1,880,405.00
Menggali 1 M3 tanah biasa sedalam 1 m 0.750 Oh Pekerja 0.025 Oh Mandor
@ Rp @ Rp
50,000.00 100,000.00
Rp Rp Rp
37,500.00 2,500.00 40,000.00
Mengurug kembali 1 M3 galian 0.025 Oh Pekerja 0.008 Oh Mandor
@ Rp @ Rp
50,000.00 100,000.00
Rp Rp Rp
1,250.00 800.00 2,050.00
B.6 PEKERJAAN TANAH B.6.1
B.6.9
B.6.10 Memadatkan 1 M3 tanah (per 20 cm) 0.500 Oh Pekerja 0.050 Oh Mandor
@ Rp @ Rp
50,000.00 100,000.00
Rp Rp Rp
25,000.00 5,000.00 30,000.00
B.6.11 Mengurug 1 M3 pasir urug 1.200 M3 Pasir urug 0.300 Oh Pekerja 0.010 Oh Mandor
@ Rp @ Rp @ Rp
120,000.00 50,000.00 100,000.00
Rp Rp Rp Rp
144,000.00 15,000.00 1,000.00 160,000.00
@ Rp @ Rp @ Rp
150,000.00 50,000.00 100,000.00
Rp Rp Rp Rp
180,000.00 15,000.00 1,000.00 196,000.00
B.6.15 Mengurug 1 M3 sirtu padat untuk peninggian lantai bangunan 1.200 M3 Sirtu @ Rp 0.250 Oh Pekerja @ Rp 0.025 Oh Mandor @ Rp
160,000.00 50,000.00 100,000.00
Rp Rp Rp Rp
192,000.00 12,500.00 2,500.00 207,000.00
Mengurug 1 M3 Tanah Timbunan 1.200 M3 Tanah timbunan 0.300 Oh Pekerja 0.010 Oh Mandor
C.6 PEKERJAAN PONDASI C.6.2
C.6.3
C.6.9
D.6
Memasang 1 M3 pondasi batu belah, campuran 1PC : 5PP 1.200 M3 Batu gunung 163.000 Kg Semen Portland 0.520 M3 Pasir pasang 1.500 Oh Tukang batu 0.750 Oh Pekerja 0.075 Oh Kepala Tukang Batu 0.075 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
160,000.00 1,100.00 125,000.00 70,000.00 50,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
192,000.00 179,300.00 65,000.00 105,000.00 37,500.00 7,500.00 7,500.00 593,800.00
Memasang 1 M3 pondasi batu belah, campuran 1PC : 5PP 1.200 M3 Batu gunung 136.000 Kg Semen Portland 0.544 M3 Pasir pasang 1.500 Oh Tukang batu 0.750 Oh Pekerja 0.075 Oh Kepala Tukang Batu 0.075 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
160,000.00 1,100.00 125,000.00 70,000.00 50,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
192,000.00 149,600.00 68,000.00 105,000.00 37,500.00 7,500.00 7,500.00 567,100.00
Memasang 1 M3 batu kosong (aanstamping) 1.200 M3 Batu gunung 0.432 M3 Pasir urug 0.780 Oh Pekerja 0.390 Oh Tukang batu 0.039 Oh Kepala Tukang Batu 0.039 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
160,000.00 120,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
192,000.00 51,840.00 39,000.00 27,300.00 3,900.00 3,900.00 317,940.00
Rp Rp Rp Rp Rp Rp Rp Rp
70,000.00 36,245.00 11,375.00 30,000.00 14,000.00 2,000.00 3,000.00 166,620.00
PEKERJAAN DINDING D.6.2
Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 3PP 140.000 Bh Batu merah @ Rp 500.00 32.950 Kg Semen Portland @ Rp 1,100.00 0.091 M3 Pasir pasang @ Rp 125,000.00 0.600 Oh Pekerja @ Rp 50,000.00 0.200 Oh Tukang batu @ Rp 70,000.00 0.020 Oh Kepala Tukang Batu @ Rp 100,000.00 0.030 Oh Mandor @ Rp 100,000.00
D.6.3
D.6.4
D.6.8
D.6.9
Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 4PP 140.000 Bh Batu merah @ Rp 500.00 26.550 Kg Semen Portland @ Rp 1,100.00 0.093 M3 Pasir pasang @ Rp 125,000.00 0.600 Oh Pekerja @ Rp 50,000.00 0.200 Oh Tukang batu @ Rp 70,000.00 0.020 Oh Kepala Tukang Batu @ Rp 100,000.00 0.030 Oh Mandor @ Rp 100,000.00
Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 5PP 140.000 Bh Batu merah @ Rp 500.00 22.200 Kg Semen Portland @ Rp 1,100.00 0.102 M3 Pasir pasang @ Rp 125,000.00 0.600 Oh Pekerja @ Rp 50,000.00 0.200 Oh Tukang batu @ Rp 70,000.00 0.020 Oh Kepala Tukang Batu @ Rp 100,000.00 0.030 Oh Mandor @ Rp 100,000.00
Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 3PP 70.000 Bh Batu merah @ Rp 500.00 14.370 Kg Semen Portland @ Rp 1,100.00 0.040 M3 Pasir pasang @ Rp 125,000.00 0.300 Oh Pekerja @ Rp 50,000.00 0.100 Oh Tukang batu @ Rp 70,000.00 0.010 Oh Kepala Tukang Batu @ Rp 100,000.00 0.015 Oh Mandor @ Rp 100,000.00
Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 4PP 70.000 Bh Batu merah @ Rp 500.00 11.500 Kg Semen Portland @ Rp 1,100.00 0.043 M3 Pasir pasang @ Rp 125,000.00 0.300 Oh Pekerja @ Rp 50,000.00 0.100 Oh Tukang batu @ Rp 70,000.00 0.010 Oh Kepala Tukang Batu @ Rp 100,000.00 0.015 Oh Mandor @ Rp 100,000.00
D.6.10 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 5PP 70.000 Bh Batu merah @ Rp 500.00 9.680 Kg Semen Portland @ Rp 1,100.00 0.045 M3 Pasir pasang @ Rp 125,000.00 0.300 Oh Pekerja @ Rp 50,000.00 0.100 Oh Tukang batu @ Rp 70,000.00 0.010 Oh Kepala Tukang Batu @ Rp 100,000.00 0.015 Oh Mandor @ Rp 100,000.00
E.6
Rp Rp Rp Rp Rp Rp Rp Rp
70,000.00 29,205.00 11,625.00 30,000.00 14,000.00 2,000.00 3,000.00 159,830.00
Rp Rp Rp Rp Rp Rp Rp Rp
70,000.00 24,420.00 12,750.00 30,000.00 14,000.00 2,000.00 3,000.00 156,170.00
Rp Rp Rp Rp Rp Rp Rp Rp
35,000.00 15,807.00 5,000.00 15,000.00 7,000.00 1,000.00 1,500.00 80,307.00
Rp Rp Rp Rp Rp Rp Rp Rp
35,000.00 12,650.00 5,375.00 15,000.00 7,000.00 1,000.00 1,500.00 77,525.00
Rp Rp Rp Rp Rp Rp Rp Rp
35,000.00 10,648.00 5,625.00 15,000.00 7,000.00 1,000.00 1,500.00 75,773.00
Rp Rp Rp Rp Rp Rp Rp
8,553.60 2,875.00 15,000.00 10,500.00 1,500.00 1,500.00 39,928.60
PEKERJAAN PLESTERAN E.6.3
Memasang 1 M2 plesteran 1PC : 3PP, tebal 15 mm 7.776 Kg Semen Portland 0.023 M3 Pasir pasang 0.300 Oh Pekerja 0.150 Oh Tukang batu 0.015 Oh Kepala Tukang Batu 0.015 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,100.00 125,000.00 50,000.00 70,000.00 100,000.00 100,000.00
E.6.4
Memasang 1 M2 plesteran 1PC : 4PP, tebal 15 mm 6.240 Kg Semen Portland 0.024 M3 Pasir pasang 0.300 Oh Pekerja 0.150 Oh Tukang batu 0.015 Oh Kepala Tukang Batu 0.015 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,100.00 125,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
6,864.00 3,000.00 15,000.00 10,500.00 1,500.00 1,500.00 38,364.00
Memasang 1 M2 plesteran 1PC : 5PP, tebal 15 mm 5.184 Kg Semen Portland 0.026 M3 Pasir pasang 0.300 Oh Pekerja 0.150 Oh Tukang batu 0.015 Oh Kepala Tukang Batu 0.015 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,100.00 125,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
5,702.40 3,250.00 15,000.00 10,500.00 1,500.00 1,500.00 37,452.40
E.6.20 Memasang 1 M2 plesteran skoning 1PC : 2PP, tebal 10 mm 0.500 Kg Semen Portland 0.013 M3 Pasir pasang 0.080 Oh Pekerja 0.400 Oh Tukang batu 0.040 Oh Kepala Tukang Batu 0.004 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,100.00 125,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
550.00 1,625.00 4,000.00 28,000.00 4,000.00 400.00 38,575.00
E.6.27 Memasang 1 M2 acian 3.250 Kg Semen Portland 0.150 Oh Pekerja 0.100 Oh Tukang batu 0.010 Oh Kepala Tukang Batu 0.008 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
1,100.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
3,575.00 7,500.00 7,000.00 1,000.00 800.00 19,875.00
Rp Rp Rp Rp Rp Rp Rp Rp
9,900,000.00 18,750.00 25,000.00 350,000.00 1,470,000.00 210,000.00 35,000.00 12,008,750.00
E.6.5
F.6
PEKERJAAN KAYU F.6.1
F.6.5
F.6.6
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I 1.100 M3 Kayu klas I (balok) untuk kosen pintu/jendela @ Rp 9,000,000.00 1.250 Kg Paku biasa 2" - 5" @ Rp 15,000.00 1.000 Kg Lem kayu @ Rp 25,000.00 7.000 Oh Pekerja @ Rp 50,000.00 21.000 Oh Tukang kayu @ Rp 70,000.00 2.100 Oh Kepala Tukang Kayu @ Rp 100,000.00 0.350 Oh Mandor @ Rp 100,000.00
Membuat dan memasang 1 m2 Daun pintu panel, kayu kelas I 0.040 M3 Kayu klas I (papan) listplank dan pintu/jendela @ Rp 0.500 Kg Lem kayu @ Rp 1.000 Oh Pekerja @ Rp 3.000 Oh Tukang kayu @ Rp 0.300 Oh Kepala Tukang Kayu @ Rp 0.050 Oh Mandor @ Rp
9,500,000.00 25,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
380,000.00 12,500.00 50,000.00 210,000.00 30,000.00 5,000.00 687,500.00
Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I 0.024 M3 Kayu klas I (papan) listplank dan pintu/jendela @ Rp 0.300 Kg Lem kayu @ Rp 0.800 Oh Pekerja @ Rp 2.400 Oh Tukang kayu @ Rp 0.240 Oh Kepala Tukang Kayu @ Rp 0.040 Oh Mandor @ Rp
9,500,000.00 25,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
228,000.00 7,500.00 40,000.00 168,000.00 24,000.00 4,000.00 471,500.00
G.6 PEKERJAAN BETON G.6.1
G.6.4
G.6.5
G.6.7
G.6.8
G.6.9
Membuat 1 M3 beton mutu f'c=7,4 Mpa (K100), slump (12 ± 2) cm, w/c=0,87 247.000 Kg Semen Portland @ Rp 1,100.00 869.000 Kg Pasir beton (Kg) @ Rp 103.57 999.000 Kg split/chipping 2-3 cm(Kg) @ Rp 100.00 215.000 Ltr Air @ Rp 300.00 1.650 Oh Pekerja @ Rp 50,000.00 0.275 Oh Tukang batu @ Rp 70,000.00 0.028 Oh Kepala Tukang Batu @ Rp 100,000.00 0.083 Oh Mandor @ Rp 100,000.00 Membuat 1 M3 lantai kerja beton mutu f'c=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87 230.000 Kg Semen Portland @ Rp 1,100.00 893.000 Kg Pasir beton (Kg) @ Rp 103.57 1,027.000 Kg split/chipping 2-3 cm(Kg) @ Rp 100.00 200.000 Ltr Air @ Rp 300.00 1.200 Oh Pekerja @ Rp 50,000.00 0.200 Oh Tukang batu @ Rp 70,000.00 0.020 Oh Kepala Tukang Batu @ Rp 100,000.00 0.060 Oh Mandor @ Rp 100,000.00 Membuat 1 M3 beton mutu f'c=14,5 Mpa (K 175), slump (12 ± 2) cm, w/c=0,66 326.000 Kg Semen Portland @ Rp 1,100.00 760.000 Kg Pasir beton (Kg) @ Rp 103.57 1,029.000 Kg split/chipping 2-3 cm(Kg) @ Rp 100.00 215.000 Ltr Air @ Rp 300.00 1.650 Oh Pekerja @ Rp 50,000.00 0.275 Oh Tukang batu @ Rp 70,000.00 0.028 Oh Kepala Tukang Batu @ Rp 100,000.00 0.083 Oh Mandor @ Rp 100,000.00 Membuat 1 M3 beton mutu f'c=19,3 Mpa (K 225), slump (12 ± 2) cm, w/c=0,58 371.000 Kg Semen Portland @ Rp 1,100.00 698.000 Kg Pasir beton (Kg) @ Rp 103.57 1,047.000 Kg split/chipping 2-3 cm(Kg) @ Rp 100.00 215.000 Ltr Air @ Rp 300.00 1.650 Oh Pekerja @ Rp 50,000.00 0.275 Oh Tukang batu @ Rp 70,000.00 0.028 Oh Kepala Tukang Batu @ Rp 100,000.00 0.083 Oh Mandor @ Rp 100,000.00 Membuat 1 M3 beton mutu f'c=21,7 Mpa (K 250), slump (12 ± 2) cm, w/c=0,56 384.000 Kg Semen Portland @ Rp 1,100.00 692.000 Kg Pasir beton (Kg) @ Rp 103.57 1,039.000 Kg split/chipping 2-3 cm(Kg) @ Rp 100.00 215.000 Ltr Air @ Rp 300.00 1.650 Oh Pekerja @ Rp 50,000.00 0.275 Oh Tukang batu @ Rp 70,000.00 0.028 Oh Kepala Tukang Batu @ Rp 100,000.00 0.083 Oh Mandor @ Rp 100,000.00 Membuat 1 M3 beton mutu f'c=24,0 Mpa (K 275), slump (12 ± 2) cm, w/c=0,53 406.000 Kg Semen Portland @ Rp 1,100.00 684.000 Kg Pasir beton (Kg) @ Rp 103.57 1,026.000 Kg split/chipping 2-3 cm(Kg) @ Rp 100.00 215.000 Ltr Air @ Rp 300.00 1.650 Oh Pekerja @ Rp 50,000.00 0.275 Oh Tukang batu @ Rp 70,000.00 0.028 Oh Kepala Tukang Batu @ Rp 100,000.00 0.083 Oh Mandor @ Rp 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
271,700.00 90,002.33 99,900.00 64,500.00 82,500.00 19,250.00 2,800.00 8,300.00 638,952.33
Rp Rp Rp Rp Rp Rp Rp Rp Rp
253,000.00 92,488.01 102,700.00 60,000.00 60,000.00 14,000.00 2,000.00 6,000.00 590,188.01
Rp Rp Rp Rp Rp Rp Rp Rp Rp
358,600.00 78,713.20 102,900.00 64,500.00 82,500.00 19,250.00 2,800.00 8,300.00 717,563.20
Rp Rp Rp Rp Rp Rp Rp Rp Rp
408,100.00 72,291.86 104,700.00 64,500.00 82,500.00 19,250.00 2,800.00 8,300.00 762,441.86
Rp Rp Rp Rp Rp Rp Rp Rp Rp
422,400.00 71,670.44 103,900.00 64,500.00 82,500.00 19,250.00 2,800.00 8,300.00 775,320.44
Rp Rp Rp Rp Rp Rp Rp Rp Rp
446,600.00 70,841.88 102,600.00 64,500.00 82,500.00 19,250.00 2,800.00 8,300.00 797,391.88
G.6.17 Pembesian 1 Kg dengan besi polos atau besi ulir A. Pembesian 1 Kg dengan besi polos 10.500 Kg Besi beton polos 0.150 Kg Kawat beton 0.070 Oh Pekerja 0.070 Oh Tukang besi 0.007 Oh Kepala Tukang Besi 0.004 Oh Mandor
B.
Pembesian 1 Kg dengan besi ulir 10.500 Kg Besi beton ulir 0.150 Kg Kawat beton 0.070 Oh Pekerja 0.070 Oh Tukang besi 0.007 Oh Kepala Tukang Besi 0.004 Oh Mandor
G.6.20 Memasang 1 M2 bekisting untuk Pondasi 0.040 M3 Kayu klas III (papan) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang batu 0.026 Oh Kepala Tukang Batu 0.026 Oh Mandor
Memasang 1 M2 bekisting untuk Pondasi 2 Kali Pemakaian 0.0200 M3 Kayu klas III (papan) (Papan 2 kali Pakai) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang batu 0.026 Oh Kepala Tukang Batu 0.026 Oh Mandor
G.6.21 Memasang 1 M2 bekisting untuk sloof 0.045 M3 Kayu klas III (papan) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang batu 0.026 Oh Kepala Tukang Batu 0.026 Oh Mandor
Memasang 1 M2 bekisting untuk sloof 2 Kali Pemakaian 0.023 M3 Kayu klas III (papan) (Papan 2 kali Pakai) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang batu 0.026 Oh Kepala Tukang Batu 0.026 Oh Mandor
@ Rp 11,000.00 @ Rp 19,000.00 @ Rp 50,000.00 @ Rp 80,000.00 @ Rp 100,000.00 @ Rp 100,000.00 Untuk Pembesian 10 Kg Untuk Pembesian 1 Kg
Rp Rp Rp Rp Rp Rp Rp Rp
115,500.00 2,850.00 3,500.00 5,600.00 700.00 400.00 128,550.00 12,855.00
@ Rp 12,000.00 @ Rp 19,000.00 @ Rp 50,000.00 @ Rp 80,000.00 @ Rp 100,000.00 @ Rp 100,000.00 Untuk Pembesian 10 Kg Untuk Pembesian 1 Kg
Rp Rp Rp Rp Rp Rp Rp Rp
126,000.00 2,850.00 3,500.00 5,600.00 700.00 400.00 139,050.00 13,905.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
3,000,000.00 15,000.00 7,500.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
120,000.00 4,500.00 750.00 26,000.00 18,200.00 2,600.00 2,600.00 174,650.00
@ Rp
3,000,000.00
Rp
60,000.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
15,000.00 7,500.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
4,500.00 750.00 26,000.00 18,200.00 2,600.00 2,600.00 114,650.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
3,000,000.00 15,000.00 7,500.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
135,000.00 4,500.00 750.00 26,000.00 18,200.00 2,600.00 2,600.00 189,650.00
@ Rp
3,000,000.00
Rp
67,500.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
15,000.00 7,500.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
4,500.00 750.00 26,000.00 18,200.00 2,600.00 2,600.00 122,150.00
G.6.22 Memasang 1 M2 bekisting untuk kolom 0.040 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.015 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 2.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk kolom Untuk 2x Pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.008 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
G.6.23 Memasang 1 M2 bekisting untuk balok 0.040 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.018 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 2.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk balok Untuk 2x pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.009 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
3,000,000.00 15,000.00 7,500.00 4,000,000.00 129,000.00 15,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
120,000.00 6,000.00 1,500.00 60,000.00 45,150.00 30,000.00 33,000.00 23,100.00 3,300.00 3,300.00 325,350.00
3,000,000.00
Rp
60,000.00
15,000.00 7,500.00 4,000,000.00
Rp Rp Rp
6,000.00 1,500.00 30,000.00
129,000.00
Rp
22,575.00
15,000.00
Rp
15,000.00
50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp
33,000.00 23,100.00 3,300.00 3,300.00 197,775.00
3,000,000.00 15,000.00 7,500.00 4,000,000.00 129,000.00 15,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
120,000.00 6,000.00 1,500.00 72,000.00 45,150.00 30,000.00 33,000.00 23,100.00 3,300.00 3,300.00 337,350.00
3,000,000.00
Rp
60,000.00
15,000.00 7,500.00 4,000,000.00
Rp Rp Rp
6,000.00 1,500.00 36,000.00
129,000.00
Rp
22,575.00
15,000.00
Rp
15,000.00
50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp
33,000.00 23,100.00 3,300.00 3,300.00 203,775.00
G.6.24 Memasang 1 M2 bekisting untuk lantai 0.040 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.015 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 6.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk lantai Untuk 2x Pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.008 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 3.000 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
G.6.25 Memasang 1 M2 bekisting untuk dinding 0.030 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.020 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 3.000 Btg Dolken kayu Ø8-10/400 cm 4.000 Bh Spacer/formite/penjaga jarak bekisting 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk dinding Untuk 2x Pemakaian 0.015 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.010 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 1.500 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 2.000 Bh Spacer/formite/penjaga jarak bekisting @ Rp (spacer 2x pemakaian) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
3,000,000.00 15,000.00 7,500.00 4,000,000.00 129,000.00 15,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
120,000.00 6,000.00 1,500.00 60,000.00 45,150.00 90,000.00 33,000.00 23,100.00 3,300.00 3,300.00 385,350.00
3,000,000.00
Rp
60,000.00
15,000.00 7,500.00 4,000,000.00
Rp Rp Rp
6,000.00 1,500.00 30,000.00
129,000.00
Rp
22,575.00
15,000.00
Rp
45,000.00
50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp
33,000.00 23,100.00 3,300.00 3,300.00 227,775.00
3,000,000.00 15,000.00 7,500.00 4,000,000.00 129,000.00 15,000.00 7,500.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
90,000.00 6,000.00 1,500.00 80,000.00 45,150.00 45,000.00 30,000.00 33,000.00 23,100.00 3,300.00 3,300.00 360,350.00
3,000,000.00
Rp
45,000.00
15,000.00 7,500.00 4,000,000.00
Rp Rp Rp
6,000.00 1,500.00 40,000.00
129,000.00
Rp
22,575.00
15,000.00
Rp
22,500.00
7,500.00
Rp
15,000.00
50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp
33,000.00 23,100.00 3,300.00 3,300.00 215,275.00
I.6
PEKERJAAN LANGIT - LANGIT/PLAFOND I.6.7
Memasang 1 M2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 0.364 Lbr Gypsumboard 9 mm @ Rp 69,200.00 0.110 Kg Paku sekrup 3,5" @ Rp 40,000.00 0.100 Oh Pekerja @ Rp 50,000.00 0.050 Oh Tukang kayu @ Rp 70,000.00 0.005 Oh Kepala Tukang Kayu @ Rp 100,000.00 0.005 Oh Mandor @ Rp 100,000.00
Rp Rp Rp Rp Rp Rp Rp
Memasang 1 M2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm + rangka Hollow 4.400 M Besi Hollow Galvanis 2 x 4 MB, Tbl 0.7 mm@ Rp 6,700.00 Rp 1.500 Bh Ramsel nails @ Rp 5,000.00 Rp 0.364 Lbr Gypsumboard 9 mm @ Rp 69,200.00 Rp 0.03 Zak (20kg/zak) 0.600 Kg UB 888/400 Compoud @ Rp 10,000.00 Rp 0.016 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 11.500 Bh Srews/sekrup @ Rp 1,000.00 Rp 1.000 Lbr Kertas Amplas @ Rp 2,500.00 Rp 0.070 Oh Pekerja @ Rp 50,000.00 Rp 0.700 Oh Tukang besi @ Rp 80,000.00 Rp 0.007 Oh Kepala Tukang Besi @ Rp 100,000.00 Rp 0.012 Oh Mandor @ Rp 100,000.00 Rp Rp
25,188.80 4,400.00 5,000.00 3,500.00 500.00 500.00 39,088.80
SPL
Memasang 1 M2 langit-langit Calsyboard board ukuran (120x240) mm, tebal 6 mm + rangka Hollow 4.400 M Besi Hollow Galvanis 2 x 4 MB, Tbl 0.7 mm@ Rp 6,700.00 Rp 1.500 Bh Ramsel nails @ Rp 5,000.00 Rp 0.364 Lbr Calsyboard 4 mm @ Rp 55,000.00 Rp 0.03 Zak (20kg/zak) 0.600 Kg UB 888/400 Compoud @ Rp 10,000.00 Rp 0.016 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 11.500 Bh Srews/sekrup @ Rp 1,000.00 Rp 1.000 Lbr Kertas Amplas @ Rp 2,500.00 Rp 0.070 Oh Pekerja @ Rp 50,000.00 Rp 0.700 Oh Tukang besi @ Rp 80,000.00 Rp 0.007 Oh Kepala Tukang Besi @ Rp 100,000.00 Rp 0.012 Oh Mandor @ Rp 100,000.00 Rp Rp
29,480.00 7,500.00 25,188.80 6,000.00 560.00 11,500.00 2,500.00 3,500.00 56,000.00 700.00 1,200.00 144,128.80
SPL
Memasang 1 M2 langit-langit gypsum board Acoustic ukuran (60x80), tebal 9 mm + rangka Besi Hollow 4.400 M Besi Hollow 40 x 40 x 2.3 mm @ Rp 43,100.00 Rp 1.500 Bh Ramsel nails @ Rp 5,000.00 Rp 1.050 M2 Kawat Rang 3 x 3 @ Rp 17,500.00 Rp 0.381 Roll Glass Wool DN City 48 kg/m2, Uk. 1.2 x 2.3@m,Rp T = 5 cm 230,000.00 Rp 0.364 Lbr Gypsumboard 9 mm @ Rp 69,200.00 Rp 0.03 Zak (20kg/zak) 0.600 Kg UB 888/400 Compoud @ Rp 10,000.00 Rp 0.016 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 11.500 Bh Srews/sekrup @ Rp 1,000.00 Rp 1.000 Lbr Kertas Amplas @ Rp 2,500.00 Rp 0.070 Oh Pekerja @ Rp 50,000.00 Rp 0.700 Oh Tukang besi @ Rp 80,000.00 Rp 0.007 Oh Kepala Tukang Besi @ Rp 100,000.00 Rp 0.012 Oh Mandor @ Rp 100,000.00 Rp Rp
29,480.00 7,500.00 20,020.00 6,000.00 560.00 11,500.00 2,500.00 3,500.00 56,000.00 700.00 1,200.00 138,960.00
SPL
189,640.00 7,500.00 18,375.00 87,630.00 25,188.80 6,000.00 560.00 11,500.00 2,500.00 3,500.00 56,000.00 700.00 1,200.00 410,293.80
J.6
PEKERJAAN PIPA DAN SANITER J.6.1
J.6.2
J.6.4
J.6.5
J.6.9
Memasang 1 Bh kloset duduk/monoblok 1.000 Bh Closet duduk Lengkap 6 % Perlengkapan 3.300 Oh Pekerja 1.100 Oh Tukang batu 0.001 Oh Kepala Tukang Batu 0.160 Oh Mandor
Memasang 1 Bh kloset jongkok porselen 1.000 Bh Closet jongkok 6.000 Kg Semen Portland 0.010 M3 Pasir pasang 1.000 Oh Pekerja 1.500 Oh Tukang batu 1.500 Oh Kepala Tukang Batu 0.160 Oh Mandor
Memasang 1 Bh Urinoir 1.000 Bh Urinoir Type U57, Lengkap 30 % Perlengkapan 6.000 Kg Semen Portland 0.010 M3 Pasir pasang 1.000 Oh Pekerja 1.000 Oh Tukang batu 0.300 Oh Kepala Tukang Batu 0.110 Oh Mandor
Memasang 1 Bh wastafel 1.000 Bh Wastafel keramik 12 % Perlengkapan 6.000 Kg Semen Portland 0.010 M3 Pasir pasang 1.200 Oh Pekerja 1.450 Oh Tukang batu 0.150 Oh Kepala Tukang Batu 0.100 Oh Mandor
Memasang 1 Bh badkip porselen 1.000 Bh Bath tub + Acs 2 % Perlengkapan 0.008 Oh Pekerja 0.075 Oh Tukang pipa 0.008 Oh Kepala Tukang pipa 0.004 Oh Mandor
J.6.33 Memasang 1 Bh bak cuci piring stainles steel 1.000 Bh Washbasin stainless stel 1.000 Bh Waterdrain + accesoriss 0.030 Oh Pekerja 0.300 Oh Tukang batu 0.030 Oh Kepala Tukang Batu 0.002 Oh Mandor
@ Rp
1,850,000.00
Rp Rp Rp Rp Rp Rp Rp
1,850,000.00 111,000.00 165,000.00 77,000.00 100.00 16,000.00 2,219,100.00
@ Rp @ Rp @ Rp @ Rp
50,000.00 70,000.00 100,000.00 100,000.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
175,000.00 1,100.00 125,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
175,000.00 6,600.00 1,250.00 50,000.00 105,000.00 150,000.00 16,000.00 503,850.00
@ Rp
1,900,000.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,100.00 125,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
1,900,000.00 570,000.00 6,600.00 1,250.00 50,000.00 70,000.00 30,000.00 11,000.00 2,638,850.00
@ Rp
400,000.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,100.00 125,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
400,000.00 48,000.00 6,600.00 1,250.00 60,000.00 101,500.00 15,000.00 10,000.00 642,350.00
@ Rp
8,500,000.00
@ Rp @ Rp @ Rp @ Rp
50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
8,500,000.00 170,000.00 375.00 6,000.00 750.00 380.00 8,677,505.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
250,000.00 50,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
250,000.00 50,000.00 1,500.00 21,000.00 3,000.00 150.00 325,650.00
J.6.35 Memasang 1 Bh kran diameter 3/4" atau 1/2" 1.000 Bh Kran air biasa 1/2" - 3/4" 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
35,000.00 3,500.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
35,000.00 87.50 500.00 8,000.00 1,000.00 500.00 45,087.50
Memasang 1 Bh kran air ganda diameter 3/4" atau 1/2" 1.000 Bh Kran air ganda 1/2" - 3/4" 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
250,000.00 3,500.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
250,000.00 87.50 500.00 8,000.00 1,000.00 500.00 260,087.50
Memasang 1 Bh kran Shower 1.000 Bh Kran Shower 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
50,000.00 3,500.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
50,000.00 87.50 500.00 8,000.00 1,000.00 500.00 60,087.50
Memasang 1 Bh Shower 1.000 Bh Shower + Acc 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
265,000.00 3,500.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
265,000.00 87.50 500.00 8,000.00 1,000.00 500.00 275,087.50
Memasang 1 Bh Stop kran 1.000 Bh Stop Kran 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
45,000.00 3,500.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
45,000.00 87.50 500.00 8,000.00 1,000.00 500.00 55,087.50
J.6.36 Memasang 1 Bh floor drain 1.000 Bh Floor drain Stainlees 0.010 Oh Pekerja 0.100 Oh Tukang batu 0.010 Oh Kepala Tukang Batu 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
35,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
35,000.00 500.00 7,000.00 1,000.00 500.00 44,000.00
J.6.36 - SPL Memasang 1 Bh Roof drain 1.000 Bh Roof drain 0.010 Oh Pekerja 0.100 Oh Tukang batu 0.010 Oh Kepala Tukang Batu 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
50,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
50,000.00 500.00 7,000.00 1,000.00 500.00 59,000.00
K.6 PEKERJAAN BESI DAN ALUMINIUM K.6.1 A.
Memasang 1 Kg besi profil 1.150 Kg Besi Siku L. 50. 50. 5 0.060 Oh Pekerja 0.060 Oh Tukang las 0.006 Oh Kepala Tukang Besi 0.003 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
14,900.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
17,135.00 3,000.00 4,800.00 600.00 300.00 25,835.00
B.
1.150 0.060 0.060 0.006 0.003
Kg Oh Oh Oh Oh
Besi Siku L. 60. 60. 6 Pekerja Tukang las Kepala Tukang Besi Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
16,400.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
18,860.00 3,000.00 4,800.00 600.00 300.00 27,560.00
C.
1.150 0.060 0.060 0.006 0.003
Kg Oh Oh Oh Oh
Besi Siku L. 70. 70. 7 Pekerja Tukang las Kepala Tukang Besi Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
15,300.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
17,595.00 3,000.00 4,800.00 600.00 300.00 26,295.00
D.
1.150 0.060 0.060 0.006 0.003
Kg Oh Oh Oh Oh
Plat Baja T = 10 mm Pekerja Tukang las Kepala Tukang Besi Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
17,000.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
19,550.00 3,000.00 4,800.00 600.00 300.00 28,250.00
E.
1.150 0.060 0.060 0.006 0.003
Kg Oh Oh Oh Oh
Besi Profil Kanal C. 125 x 50 x 20 x 2,3 Pekerja Tukang las Kepala Tukang Besi Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
13,500.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
15,525.00 3,000.00 4,800.00 600.00 300.00 24,225.00
@ Rp @ Rp @ Rp @ Rp @ Rp
11,000.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
12,650.00 3,000.00 4,800.00 600.00 300.00 21,350.00
F.
Pek. Treaktang Besi 10 mm Dan Crosstank Besi 16 mm 1.150 Kg Besi beton polos 0.060 Oh Pekerja 0.060 Oh Tukang las 0.006 Oh Kepala Tukang Besi 0.003 Oh Mandor
G.
1.150 0.060 0.060 0.006 0.003
Kg Oh Oh Oh Oh
Pipa BS Medium Class Dia. 100 mm (4") Pekerja Tukang las Kepala Tukang Besi Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
20,712.33 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
23,819.18 3,000.00 4,800.00 600.00 300.00 32,519.18
H.
1.150 0.060 0.060 0.006 0.003
Kg Oh Oh Oh Oh
Pipa BS Medium Class Dia. 50 mm (2") Pekerja Tukang las Kepala Tukang Besi Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
25,704.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
29,559.60 3,000.00 4,800.00 600.00 300.00 38,259.60
K.6.2 A.
B.
K.6.3
Memasang 1 Kg rangka kuda-kuda baja IWF/ H Beam 1.150 Kg Besi Profil H Beam 200 x 200 x 8 x 12 0.060 Oh Pekerja 0.060 Oh Tukang las 0.006 Oh Kepala Tukang Besi 0.003 Oh Mandor
1.150 0.060 0.060 0.006 0.003
Kg Oh Oh Oh Oh
Besi Profil IWF Pekerja Tukang las Kepala Tukang Besi Mandor
Mengerjakan 100 Kg pekerjaan perakitan 1.000 Ltr Solar 0.100 Ltr Minyak pelumas 0.100 Oh Pekerja 0.100 Oh Tukang besi 0.001 Oh Kepala Tukang Besi 0.005 Oh Mandor 0.008 Jam Sewa alat
@ Rp @ Rp @ Rp @ Rp @ Rp
22,500.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
25,875.00 3,000.00 4,800.00 600.00 300.00 34,575.00
@ Rp @ Rp @ Rp @ Rp @ Rp
16,900.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
19,435.00 3,000.00 4,800.00 600.00 300.00 28,135.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
6,500.00 35,000.00 50,000.00 80,000.00 100,000.00 100,000.00 150,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
6,500.00 3,500.00 5,000.00 8,000.00 100.00 500.00 1,200.00 24,800.00 248.00
Rp Rp Rp Rp Rp Rp Rp Rp
128,480.00 3,600.00 5,400.00 2,150.00 3,440.00 430.00 210.00 143,710.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
118,800.00 101,750.00 81,840.00 5,400.00 2,150.00 3,440.00 430.00 210.00 10,079.67 140,509.67 123,459.67 103,549.67
Rp Rp Rp Rp Rp Rp Rp Rp
3,466,127.70 50,000.00 200,000.00 25,000.00 5,000.00 1,733,063.85 173,306.39 5,652,497.94
Rp Rp Rp Rp Rp Rp Rp Rp
2,440,935.00 50,000.00 200,000.00 25,000.00 5,000.00 1,220,467.50 122,046.75 4,063,449.25
Untuk 1 Kg Pek. Perakitan
K.6.11-SNI Mengerjakan 1 M' Kusen Aluminium 1.100 M' Kusen Aluminium Warna 4" x 1 3/4" 2.000 Bh Sektrup Fixer 0.060 Tube Sealent 0.043 Oh Pekerja 0.043 Oh Tukang besi 0.0043 Oh Kepala Tukang Besi 0.0021 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
116,800.00 1,800.00 90,000.00 50,000.00 80,000.00 100,000.00 100,000.00
SPL.1 A B C
Mengerjakan 1 M' Bingkai Jendela Aluminium 1.100 M' Bingkai Pintu Aluminium Warna 4" x 1 1/2" @ Rp 108,000.00 1.100 M' Bingkai Pintu / Rangka Partisi Aluminium Warna @ Rp3" x 1 1/2" 92,500.00 1.100 M1 Bingkai Jendela Aluminium Warna (2"x1") @ Rp 74,400.00 0.060 Tube Sealent @ Rp 90,000.00 0.043 Oh Pekerja @ Rp 50,000.00 0.043 Oh Tukang besi @ Rp 80,000.00 0.0043 Oh Kepala Tukang Besi @ Rp 100,000.00 0.0021 Oh Mandor @ Rp 100,000.00 1.000 Ls Alat Bantu + Accessories dll A B C
SPL
1 Unit Pasang Pintu Kaca Tempered, Tebal 12 Mm, Uk. 1.065 x 216 cm 2.415 M2 Pintu Kaca Tempered 12 mm @ Rp 1,435,000.00 1.000 Oh Pekerja @ Rp 50,000.00 2.500 Oh Tukang Besi @ Rp 80,000.00 0.250 Oh Kepala Tukang Besi @ Rp 100,000.00 0.050 Oh Mandor @ Rp 100,000.00 1.000 Set Frame List, Baut / Sekrup DLL 1.000 Ls Alat bantu + Fabrikasi dll
1 Unit Pasang Pintu Kaca Tempered, Tebal 12 Mm, Uk. 75 x 216 cm 1.701 M2 Pintu Kaca Tempered 12 mm @ Rp 1.000 Oh Pekerja @ Rp 2.500 Oh Tukang Besi @ Rp 0.250 Oh Kepala Tukang Besi @ Rp 0.050 Oh Mandor @ Rp 1.000 Set Frame List, Baut / Sekrup DLL 1.000 Ls Alat bantu + Fabrikasi dll
1,435,000.00 50,000.00 80,000.00 100,000.00 100,000.00
SPL
1 M2 Daun Pintu Kaca Rangka Aluminium 4.400 m Bingkai Pintu Aluminium Warna 4" x 1 1/2" @ Rp 0.814 m2 Kaca Ryben 5mm @ Rp 8.800 m Karet List Kaca @ Rp 1.000 Ls Alat Bantu + Assesories @ Rp 0.085 Oh Pekerja @ Rp 0.085 Oh Tukang besi @ Rp 0.009 Oh Kepala Tukang Besi @ Rp 0.005 Oh Mandor @ Rp
108,000.00 150,000.00 2,500.00 61,923.40 50,000.00 80,000.00 100,000.00 100,000.00
1 Bh Memasang Jendela Kaca Rangka Alluminium Ukuran (0.82x0.605)m 3.135 m Bingkai Jendela Aluminium Warna (2"x1") @ Rp 74,400.00 0.373 m Kaca Ryben 5mm @ Rp 150,000.00 2.000 Buah Engsel jendela Kw.1 @ Rp 25,000.00 6.270 m Karet List Kaca @ Rp 2,500.00 1.000 Ls Alat Bantu + Assesories @ Rp 35,493.65 0.042 Oh Pekerja @ Rp 50,000.00 0.042 Oh Tukang besi @ Rp 80,000.00 0.004 Oh Kepala Tukang Besi @ Rp 100,000.00 0.002 Oh Mandor @ Rp 100,000.00
SPL
SPL
1 M2 Pasang Pintu 1.000 m2 1.050 Oh 1.050 Oh 0.105 Oh 0.0052 Oh
1 4.400 0.891 8.800 1.000 0.085 0.085 0.009 0.005
M2 m m m Ls Oh Oh Oh Oh
Aluminium Pintu Aluminium Pekerja Tukang besi Kepala Tukang Besi Mandor
Rp Rp Rp Rp Rp Rp Rp Rp Rp
475,200.00 122,034.00 22,000.00 61,923.40 4,250.00 6,800.00 900.00 500.00 693,607.40
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
233,244.00 56,017.50 50,000.00 15,675.00 35,493.65 2,108.43 3,373.48 446.49 242.00 396,600.55
@ Rp @ Rp @ Rp @ Rp @ Rp
880,000.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
880,000.00 52,500.00 84,000.00 10,500.00 520.00 1,027,520.00
Memasang Jendela Kaca Rangka Alluminium Bingkai Jendela Aluminium Warna (2"x1") @ Rp Kaca bening 5 mm @ Rp Karet List Kaca @ Rp Alat Bantu + Assesories @ Rp Pekerja @ Rp Tukang besi @ Rp Kepala Tukang Besi @ Rp Mandor @ Rp
74,400.00 70,000.00 2,500.00 41,173.00 50,000.00 80,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
327,360.00 62,370.00 22,000.00 41,173.00 4,250.00 6,800.00 900.00 500.00 465,353.00
SPL
1 Unit Membuat Dan Memasang Kosen Pintu Emergency Rangka Baja Siku, Uk. 90 x 220 22.957 Kg Besi Siku L. 50. 50. 5 @ Rp 14,900.00 Rp 342,066.01 44.696 Kg Besi Siku L. 70. 70. 7 @ Rp 15,300.00 Rp 683,847.27 34.572 Kg Plat Baja T = 5 mm @ Rp 19,700.00 Rp 681,065.94 1.000 Ls Alat Bantu + Assesories @ Rp 170,697.92 Rp 170,697.92 5.333 Oh Pekerja @ Rp 50,000.00 Rp 266,674.50 5.333 Oh Tukang las @ Rp 80,000.00 Rp 426,679.20 0.533 Oh Kepala Tukang Besi @ Rp 100,000.00 Rp 53,334.90 0.267 Oh Mandor @ Rp 100,000.00 Rp 26,667.45 Rp 2,651,033.18
SPL
1 Unit Membuat Dan Memasang Pintu Emergency Rangka Hollow 4 x 4, Uk. 90 x 220 11.730 M' Besi Hollow 40 x 40 x 2.3 mm @ Rp 43,100.00 Rp 73.844 Kg Plat Baja T = 2 mm @ Rp 19,700.00 Rp 1.000 Ls Alat Bantu + Assesories @ Rp 588,089.16 Rp 5.134 Oh Pekerja @ Rp 50,000.00 Rp 5.134 Oh Tukang las @ Rp 80,000.00 Rp 0.513 Oh Kepala Tukang Besi @ Rp 100,000.00 Rp 0.257 Oh Mandor @ Rp 100,000.00 Rp Rp
505,563.00 1,454,734.19 588,089.16 256,723.13 410,757.00 51,344.63 25,672.31 3,292,883.41
SPL
10 M2 Pek. Cladding Aluminium Composite Panel + Rangka 11.000 m2 Aluminium Composite Panel @ Rp 40.000 m' Besi Hollow 20 x 40 x 1.8 mm @ Rp 20.000 m' Besi Hollow 40 x 40 x 2.3 mm @ Rp 3.500 kg Cat meni @ Rp 2.400 Bh Sealent @ Rp 3.500 Oh Pekerja @ Rp 3.500 Oh Tukang besi @ Rp 1.000 Oh Kepala Tukang Besi @ Rp 0.050 Oh Mandor @ Rp 1.000 Ls Alat Bantu+Accesories+Fabrikasi (Sekrup Dll)
324,600.00 25,200.00 43,100.00 25,000.00 90,000.00 50,000.00 80,000.00 100,000.00 100,000.00 Untuk 10 M2 Untuk 1 M2
L.6
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,570,600.00 1,008,000.00 862,000.00 87,500.00 216,000.00 175,000.00 280,000.00 100,000.00 5,000.00 544,060.00 6,848,160.00 684,816.00
PEKERJAAN KUNCI DAN KACA L.6.2
L.6.4
L.6.5
SPL
L.6.6
L.6.9
Memasang 1 Bh kunci tanam biasa 1.000 Bh Kunci tanam biasa (2 x Slag) 0.010 Oh Pekerja 0.500 Oh Tukang kayu 0.010 Oh Kepala Tukang Kayu 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
227,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
227,000.00 500.00 35,000.00 1,000.00 500.00 264,000.00
Memasang 1 Bh kunci silinder 1.000 Bh Kunci tanam silinder 0.005 Oh Pekerja 0.500 Oh Tukang kayu 0.005 Oh Kepala Tukang Kayu 0.0025 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
350,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
350,000.00 250.00 35,000.00 500.00 250.00 386,000.00
Memasang 1 Bh engsel pintu 1.000 Bh Engsel pintu Kw.1 0.015 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.0008 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
28,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
28,000.00 750.00 10,500.00 1,500.00 75.00 40,825.00
Memasang 1 Psg Flooring Engsel pintu 1.000 Psg Flooring engsel 0.015 Oh Pekerja 0.300 Oh Tukang kayu 0.030 Oh Kepala Tukang Kayu 0.0008 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
900,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
900,000.00 750.00 21,000.00 3,000.00 75.00 924,825.00
Memasang 1 Bh engsel jendela 1.000 Bh Engsel jendela Kw.1 0.010 Oh Pekerja 0.100 Oh Tukang kayu 0.010 Oh Kepala Tukang Kayu 0.0005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
25,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
25,000.00 500.00 7,000.00 1,000.00 50.00 33,550.00
Memasang 1 Bh kait angin 1.000 Bh Kait angin 0.015 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.00075 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
20,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
20,000.00 750.00 10,500.00 1,500.00 75.00 32,825.00
SPL
Memasang 1 Bh grendel jendela 1.000 Bh Grendel jendela Kw.1 0.010 Oh Pekerja 0.100 Oh Tukang kayu 0.010 Oh Kepala Tukang Kayu 0.00050 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
28,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
28,000.00 500.00 7,000.00 1,000.00 50.00 36,550.00
L.6.10 Memasang 1 Bh door closer 1.000 Bh Door closer/espanyolet 0.050 Oh Pekerja 0.500 Oh Tukang kayu 0.050 Oh Kepala Tukang Kayu 0.0025 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
250,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
250,000.00 2,500.00 35,000.00 5,000.00 250.00 292,750.00
L.6.11 Memasang 1 Bh kunci selot A 1.000 Bh Kunci selot B 1.000 Bh Kunci selot biasa 0.020 Oh Pekerja 0.200 Oh Tukang kayu 0.020 Oh Kepala Tukang Kayu 0.0010 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
500,000.00 225,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
500,000.00 225,000.00 1,000.00 14,000.00 2,000.00 100.00 517,100.00 242,100.00
Juml. A Juml. B L.6.12 Memasang 1 Bh pegangan pintu/door holder 1.000 Bh Door Holder 0.050 Oh Pekerja 0.500 Oh Tukang kayu 0.050 Oh Kepala Tukang Kayu 0.0025 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
150,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
150,000.00 2,500.00 35,000.00 5,000.00 250.00 192,750.00
L.6.17 Memasang 1 M2 kaca, tebal 5 mm 1.100 M2 Kaca Ryben 5mm 0.015 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.00075 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
150,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
165,000.00 750.00 10,500.00 1,500.00 75.00 177,825.00
Memasang 1 M2 kaca, tebal 5 mm 1.100 M2 Kaca bening 5 mm 0.015 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.00075 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
70,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
77,000.00 750.00 10,500.00 1,500.00 75.00 89,825.00
Memasang 1 M2 kaca, tebal 8 mm 1.100 M2 Kaca Stopsol Laminated 8 mm 0.015 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.00075 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
637,300.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
701,030.00 750.00 10,500.00 1,500.00 75.00 713,855.00
M.6 PEKERJAAN PENUTUP LANTAI DAN DINDING
SPL
SPL
Memasang 1 M2 lantai keramik ukuran (40x40) cm 6.630 Bh Tegel keramik 40 x 40 cm (Warna) 9.800 Kg Semen Portland 0.045 M3 Pasir pasang 1.300 Kg Semen warna 0.700 Oh Pekerja 0.350 Oh Tukang batu 0.035 Oh Kepala Tukang Batu 0.035 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
9,100.00 1,100.00 125,000.00 1,600.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
60,333.00 10,780.00 5,625.00 2,080.00 35,000.00 24,500.00 3,500.00 3,500.00 145,318.00
Memasang 1 M2 lantai keramik ukuran (30x30) cm 11.870 Bh Tegel keramik 30 x 30 cm (Putih) 10.000 Kg Semen Portland 0.045 M3 Pasir pasang 1.500 Kg Semen warna 0.700 Oh Pekerja 0.350 Oh Tukang batu 0.035 Oh Kepala Tukang Batu 0.035 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
4,000.00 1,100.00 125,000.00 1,600.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
47,480.00 11,000.00 5,625.00 2,400.00 35,000.00 24,500.00 3,500.00 3,500.00 133,005.00
Memasang 1 M2 lantai keramik ukuran (20x20) cm 26.500 Bh Tegel keramik 20 x 20 cm (kasar) 10.400 Kg Semen Portland 0.045 M3 Pasir pasang 1.620 Kg Semen warna 0.620 Oh Pekerja 0.350 Oh Tukang batu 0.035 Oh Kepala Tukang Batu 0.030 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,900.00 1,100.00 125,000.00 1,600.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
50,350.00 11,440.00 5,625.00 2,592.00 31,000.00 24,500.00 3,500.00 3,000.00 132,007.00
Memasang 1 M2 dinding keramik ukuran (20x25) cm 21.000 Bh Tegel keramik 20 x 25 cm ( warna ) 9.300 Kg Semen Portland 0.018 M3 Pasir pasang 1.940 Kg Semen warna 0.600 Oh Pekerja 0.450 Oh Tukang batu 0.045 Oh Kepala Tukang Batu 0.030 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
2,400.00 1,100.00 125,000.00 1,600.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
50,400.00 10,230.00 2,250.00 3,104.00 30,000.00 31,500.00 4,500.00 3,000.00 134,984.00
Memasang 1 M2 dinding keramik ukuran (30x50) cm 7.000 Bh Tegel keramik 30 x 50 Cm 9.300 Kg Semen Portland 0.018 M3 Pasir pasang 1.940 Kg Semen warna 0.600 Oh Pekerja 0.450 Oh Tukang batu 0.045 Oh Kepala Tukang Batu 0.030 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
8,500.00 1,100.00 125,000.00 1,600.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
59,500.00 10,230.00 2,250.00 3,104.00 30,000.00 31,500.00 4,500.00 3,000.00 144,084.00
M.6.43 - SPL Memasang 1 M2 lantai Marmer 1.060 Bh Marmer Lantai Ex Ujungpandang, t = 2 cm @ Rp 8.190 Kg Semen Portland @ Rp 0.045 M3 Pasir pasang @ Rp 0.650 Kg Semen warna @ Rp 0.620 Oh Pekerja @ Rp 0.350 Oh Tukang batu @ Rp 0.035 Oh Kepala Tukang Batu @ Rp 0.030 Oh Mandor @ Rp
638,000.00 1,100.00 125,000.00 1,600.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
676,280.00 9,009.00 5,625.00 1,040.00 31,000.00 24,500.00 3,500.00 3,000.00 753,954.00
M.6.58 - SPL Memasang 1 M2 dinding batu Alam Undersheet 1.100 M2 Batu Alam Undersheet 11.750 Kg Semen Portland 0.035 M3 Pasir pasang 0.620 Oh Pekerja 0.350 Oh Tukang batu 0.035 Oh Kepala Tukang Batu 0.030 Oh Mandor
195,000.00 1,100.00 125,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
214,500.00 12,925.00 4,375.00 31,000.00 24,500.00 3,500.00 3,000.00 293,800.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
5,000.00 3,150.00 2,890.00 13,000.00 3,500.00 630.00 600.00 250.00 29,020.00
Rp Rp Rp Rp Rp Rp
18,000.00 2,000.00 4,410.00 6,300.00 250.00 30,960.00
Rp Rp Rp Rp Rp Rp Rp Rp
2,100.00 1,700.00 14,950.00 3,000.00 13,230.00 1,890.00 750.00 37,620.00
Rp Rp Rp Rp Rp Rp
2,100.00 1,400.00 2,940.00 420.00 250.00 7,110.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
N.6 PEKERJAAN PENGECATAN N.6.8
Mengecat 1 M2 bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup 0.200 Kg Cat meni @ Rp 25,000.00 0.150 Kg Dempul @ Rp 21,000.00 0.170 Kg Cat dasar @ Rp 17,000.00 0.260 Kg Cat kayu @ Rp 50,000.00 0.070 Oh Pekerja @ Rp 50,000.00 0.009 Oh Tukang cat @ Rp 70,000.00 0.006 Oh Kepala Tukang Cat @ Rp 100,000.00 0.0025 Oh Mandor @ Rp 100,000.00
N.6.10 - SPL Melabur 1 M2 bidang Batu Alam dengan Coating 0.360 Ltr Coating 0.040 Oh Pekerja 0.063 Oh Tukang cat 0.063 Oh Kepala Tukang Cat 0.0025 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
50,000.00 50,000.00 70,000.00 100,000.00 100,000.00
N.6.14 Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup) 0.100 Kg Plamur tembok @ Rp 21,000.00 0.100 Kg Cat dasar @ Rp 17,000.00 0.260 Kg Cat tembok Kw. 1 @ Rp 57,500.00 0.060 Oh Pekerja @ Rp 50,000.00 0.189 Oh Tukang cat @ Rp 70,000.00 0.0189 Oh Kepala Tukang Cat @ Rp 100,000.00 0.0075 Oh Mandor @ Rp 100,000.00
SPL - An. Melabur/Plamur 1 M2 tembok 0.100 Kg Plamur tembok 0.028 Oh Pekerja 0.042 Oh Tukang cat 0.0042 Oh Kepala Tukang Cat 0.0025 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
21,000.00 50,000.00 70,000.00 100,000.00 100,000.00
N.6.23 Mengecat 1 M2 permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat mutakhir dengan tebal 200 µm 0.300 Kg Cat meni @ Rp 25,000.00 0.006 Oh Pekerja @ Rp 50,000.00 0.060 Oh Tukang cat @ Rp 70,000.00 0.012 Oh Kepala Tukang Cat @ Rp 100,000.00 0.006 Oh Mandor @ Rp 100,000.00
Rp Rp Rp Rp Rp Rp
7,500.00 300.00 4,200.00 1,200.00 600.00 13,800.00
PEKERJAAN LISTRIK SPL - 01 Mengerjakan 1 Titik Instalasi Penerangan 16.000 M' Kabel NYM (3x2,5) mm 32.000 Bh Klem Kabel No. 10 1.000 Bh Pipa Instalasi Listrik 1.000 Bh Inbow Dos 4.000 Bh Las Dop 4.000 Bh Isolasi 1.000 Bh T - Dos 5/8" 0.100 Ls Alat bantu 0.500 Oh Tukang listrik 0.500 Oh Kepala Tukang listrik
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
13,000.00 500.00 8,000.00 5,000.00 500.00 7,000.00 500.00 5,000.00 90,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
208,000.00 16,000.00 8,000.00 5,000.00 2,000.00 28,000.00 500.00 500.00 45,000.00 50,000.00 363,000.00
SPL - 02 Mengerjakan 1 Titik Instalasi Stop Kontak 18.000 M' Kabel NYM (3x2,5) mm 36.000 Bh Klem Kabel No. 10 5.000 Bh Pipa Instalasi Listrik 1.000 Bh Inbow Dos 6.000 Bh Las Dop 4.000 Bh Isolasi 1.000 Bh T - Dos 5/8" 0.100 Ls Alat bantu 0.500 Oh Tukang listrik 0.500 Oh Kepala Tukang listrik
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
13,000.00 500.00 8,000.00 5,000.00 500.00 7,000.00 500.00 5,000.00 90,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
234,000.00 18,000.00 40,000.00 5,000.00 3,000.00 28,000.00 500.00 500.00 45,000.00 50,000.00 424,000.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,200.00 120,000.00 160,000.00 70,000.00 100,000.00 50,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
60,600.00 12,000.00 24,000.00 35,000.00 2,000.00 12,500.00 300.00 122,400.00 146,400.00
@ Rp @ Rp
40,000.00 38,575.00
Rp Rp
2,700.00 4,166.10
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
35,000.00 120,000.00 50,000.00 70,000.00 100,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
77,000.00 1,200.00 7,500.00 8,400.00 1,200.00 1,000.00 103,166.10
SPL
SPL
Mengerjakan 1 M2 Pasangan Paving Block 50.500 Bh Paving Block K300, Uk. 10 x 20 Tbl 8 cm 0.100 M3 Pasir urug 0.150 M3 Sirtu 0.500 Oh Tukang Batu 0.020 Oh Kepala Tukang Batu 0.250 Oh Pekerja 0.003 Oh Mandor Tebal 8 cm + Pasir Tebal 8 cm + Pasir + Sirtu Mengerjakan 1 M' Cansteen Beton 0.068 M3 Galian Tanah 0.108 M2 Plesteran Siar/Skoning 1 : 2 (Harga Diambil Dari Analisa Diatas) 2.200 Bh Cansteen Beton Uk. 20 x 25 x 50 0.010 M3 Pasir Urug 0.150 Oh Pekerja 0.120 Oh Tukang Batu 0.012 Oh Kepala Tukang Batu 0.010 Oh Mandor
DAFTAR HARGA BAHAN DAN UPAH Tahun Anggaran 2012 I.
HARGA BAHAN BAHAN BATU, PASIR, CIPPING DAN BATU MERAH Batu gunung Batu Kali Batu belah 7/10 Batu pecah 5/7 Pasir pasang Pasir beton Pasir beton (Kg) Pasir urug split/chipping 2-3 cm split/chipping 2-3 cm(Kg) Tanah Timbunan Krikil Krikil (Kg) Sirtu Batu merah Paving Block K300, Uk. 10 x 20 Tbl 8 cm Cansteen Beton Uk. 20 x 25 x 50 Air
SAT M3 M3 3 M M3 3 M M3 Kg 3 M M3 Kg M3 3 M Kg M3 Bh Bj Bj Ltr
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
HARGA 160,000.00 145,000.00 230,000.00 245,000.00 125,000.00 145,000.00 103.57 120,000.00 260,000.00 100.00 150,000.00 275,000.00 200.00 160,000.00 500.00 1,200.00 35,000.00 300.00
BAHAN SEMEN Semen PC 50kg (zak) Semen Portland Semen PC 40 kg (zak) Semen Nat Semen Putih Semen warna
Zak Kg Zak Kg Zak Kg
Rp. Rp. Rp. Rp. Rp. Rp.
54,000.00 1,100.00 44,000.00 7,500.00 53,000.00 1,600.00
BAHAN BESI Besi beton polos Besi beton ulir Besi Siku L. 50. 50. 5 Besi Siku L. 60. 60. 6 Besi Siku L. 70. 70. 7 Besi Profil Kanal C. 125 x 50 x 20 x 2,3 Besi Profil H Beam 300 x 300 x 10 x 15 Besi Profil H Beam 200 x 200 x 8 x 12 Besi Profil IWF Plat Baja T = 10 mm Plat Baja T = 8 mm Plat Baja T = 5 mm Plat Baja T = 2 mm Kawat beton Kawat Rang 3 x 3 Paku Biasa 1/2" - 1" Paku biasa 2" - 5" Paku asbes Paku beton Paku pancing Paku Sekrup Galvaniz Dia. 3 mm Besi Hollow 20 x 40 x 1.8 mm Besi Hollow 30 x 30 x 1.8 mm Besi Hollow 30 x 30 x 2.3 mm Besi Hollow 40 x 40 x 1.8 mm Besi Hollow 40 x 40 x 2.3 mm Besi Hollow Galvanis 2 x 4 MB, Tbl 0.7 mm Besi Hollow Galvanis 4 x 4 MB, Tbl 0.7 mm Besi strip Baut - Baut Baut Dia. 16 mm Paku sekrup 3,5" Paku sekrup 4"-6"
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg M2 Kg Kg Kg Dos Kg Bj M M M M M M M Kg Bh Bh Kg Kg
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
11,000.00 12,000.00 14,900.00 16,400.00 15,300.00 13,500.00 16,100.00 22,500.00 16,900.00 17,000.00 18,900.00 19,700.00 19,700.00 19,000.00 17,500.00 15,000.00 15,000.00 27,500.00 25,000.00 25,000.00 1,500.00 25,200.00 24,200.00 30,800.00 33,600.00 43,100.00 6,700.00 8,100.00 11,600.00 9,000.00 18,700.00 40,000.00 25,000.00
Jarum Pengeras Pintu Aluminium List Alluminium strip Aluminium Composite Panel Srews/sekrup
Bh M2 M M2 Bh
Rp. Rp. Rp. Rp. Rp.
175,000.00 880,000.00 10,000.00 324,600.00 1,000.00
BAHAN PLAPON DAN PARTISI Mulripleks 1.22 x 2.44 x 4 mm Multipleks 1.22 x 2.44 x 6 mm Multipleks 1.22 x 2.44 x 9 mm Gypsumboard 9 mm Calsyboard 4 mm Teakwood Uk. 80 x 240 x 4 mm Plywood Uk.80x240 cm Tebal 4 mm Glass Wool DN City 48 kg/m2, Uk. 1.2 x 2.3 m, T = 5 cm Lambrasering Aluminium L = 20 Cm Lambrasering Aluminium L = 12 Cm Jalusi Aluminium Ramsel nails UB 888/400 Compoud Isolasi Gypsun
Lbr Lbr Lbr Lbr Lbr Lbr Lbr Roll M2 M2 M2 Bh Kg Roll
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
50,500.00 82,000.00 129,000.00 69,200.00 55,000.00 65,000.00 85,000.00 230,000.00 580,000.00 455,000.00 275,000.00 5,000.00 10,000.00 35,000.00
BAHAN KERAMIK Tegel keramik 40 x 40 cm (putih) Tegel keramik 40 x 40 cm (Warna) Tegel keramik 30 x 30 cm (putih) Tegel keramik 30 x 30 cm (Warna) Tegel keramik 20 x 20 cm (kasar) Tegel keramik 20 x 20 cm (putih) Tegel keramik 20 x 25 cm ( warna ) Tegel keramik 10 x 10 cm ( putih ) Tegel keramik 30 x 50 Cm Tegel keramik Anti noda, T = 1 Cm, 60 x 60 Cm Tegel keramik Anti noda, T = 1 Cm, 20 x 60 Cm Tegel keramik 40 x 40 cm Tegel keramik 30 x 30 cm impresso Tegel keramik 20 x 20 cm kia Tegel keramik 20 x 25 cm kia Granit Lantai Type Starwhite, t = 2 cm Granit Dinding Type Starwhite, t = 2 cm Marmer Lantai Ex Ujungpandang, t = 2 cm Marmer Dinding Ex Ujungpandang, t = 2 cm Plint Granit Type Starwhite, t = 2 cm Plint Keramik 15 x 60 cm Batu Alam Undersheet
Bh Bh Bh Bh Bh Bh Dos Dos Bh Bh Bh Dos Dos Dos Dos M2 M2 M2 M2 M M 2 M
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
8,000.00 9,100.00 4,000.00 4,500.00 1,900.00 1,700.00 2,400.00 500.00 8,500.00 90,200.00 30,000.00 48,000.00 45,000.00 42,500.00 48,000.00 420,000.00 420,000.00 638,000.00 638,000.00 70,000.00 22,500.00 195,000.00
BAHAN ATAP Genteng keramik Natural Karet Pelapis Genteng Nok genteng keramik Natural Atap Genteng Bitumen Uk. 106 x 40 x 0.3 Nok Atap Bitumen Uk. 50 x 90 x 0.3 Rangka Atap Baja Ringan Aluminium foil/sisalation single type Ancor / Seng Pelapis Genteng
Bh 2 M Bh Lbr Lbr M2 2 M Rol
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
9,000.00 10,000.00 19,000.00 64,200.00 81,200.00 190,000.00 15,000.00 2,500,000.00
BAHAN SENG/ALUMINIUM Seng plat BJLS 0.30 Seng plat BJLS 0.28 Seng gelombang BWG 34 " BJLS 0.18 mm Seng gelombang BWG 33 " BJLS 0.22 mm Seng gelombang BWG 32 " BJLS 0.30 mm Seng gelombang BWG 28 " BJLS 0.35 mm Kusen Aluminium Warna 4" x 1 3/4" Bingkai Pintu Aluminium Warna 4" x 1 1/2" Bingkai Pintu / Rangka Partisi Aluminium Warna 3" x 1 1/2"
Lbr Lbr Kaki Kaki Kaki Kaki M' M' M'
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
49,500.00 60,000.00 6,500.00 7,000.00 8,900.00 14,000.00 116,800.00 108,000.00 92,500.00
Bingkai Jendela Aluminium Warna (2"x1") Cubical Toilet 12 mm Laminated (Harga Terpasang)
M' M'
Rp. Rp.
74,400.00 3,250,000.00
BAHAN KAYU Kayu klas I (balok) untuk kuda-kuda Kayu klas II (balok) Kayu klas II (papan) Kayu klas III (balok) Kayu klas III (papan) Kayu klas I (papan) listplank dan pintu/jendela Dolken kayu Ø8-10/400 cm Kayu klas I (balok) untuk kosen pintu/jendela HPL Uk. 120 x 240 Woodplank T. 8 x 300 x 4000 mm
M M3 3 M M3 M3 3 M Btg 3 M Lbr Lbr
3
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
8,000,000.00 4,000,000.00 4,500,000.00 2,500,000.00 3,000,000.00 9,500,000.00 15,000.00 9,000,000.00 200,000.00 90,000.00
BAHAN KUNCI, ENGSEL, GRENDEL DAN HAK ANGIN Kunci tanam biasa (2 x Slag) Kunci tanam silinder Kunci selot Kunci selot biasa Kunci tanam biasa Flooring engsel Engsel pintu Kw.1 Engsel jendela Kw.1 Grendel jendela Kw.1 Kait angin Grendel tanam Door closer/espanyolet Door Holder Door stop
Bh Bh Bh Bh Bh Psg Bh Bh Bh Bh Bh Bh Bh Bh
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
227,000.00 350,000.00 500,000.00 225,000.00 150,000.00 900,000.00 28,000.00 25,000.00 28,000.00 20,000.00 150,000.00 250,000.00 150,000.00 75,000.00
BAHAN KACA Kaca bening 3 mm Kaca bening 5 mm Kaca buram 5 mm Kaca Ryben 5mm Kaca Stopsol Laminated 8 mm Kaca nako lengkap teralis Pintu Kaca Tempered 12 mm Karet List Kaca
M2 M2 2 M M2 M2 set M2 M'
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
50,000.00 70,000.00 95,000.00 150,000.00 637,300.00 300,000.00 1,435,000.00 2,500.00
BAHAN CAT Cat tembok Kw. 1 Cat tembok Kw. 1 (Exterior) Cat tembok Kw. 2 Cat Seng Cat kayu Cat Besi Minyak bekisting Cat meni Plamur tembok Lem kayu Residu Kertas amplas Dempul Minyak cat Cat dasar Cat dasar Kayu Cat Waterproofing Coating
Kg Kg Kg Kg Kg Kg Ltr Kg Kg Kg Ltr Lbr Kg Kg Kg Kg Ltr Ltr
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
57,500.00 65,000.00 29,000.00 40,000.00 50,000.00 50,000.00 7,500.00 25,000.00 21,000.00 25,000.00 5,000.00 2,500.00 21,000.00 18,000.00 17,000.00 50,000.00 65,000.00 50,000.00
BAHAN SANITASI Closet duduk Lengkap Bath tub + Acs Closet jongkok Urinoir Type U57, Lengkap Wastafel Keramik Roof drain
Bh Bh Bh Bh Bh Bh
Rp. Rp. Rp. Rp. Rp. Rp.
1,850,000.00 8,500,000.00 175,000.00 1,900,000.00 400,000.00 50,000.00
Floor drain Stainlees Seal tape Kran air Biasa 1/2" - 3/4" Kran air ganda 1/2" - 3/4" Kran Shower Shower + Acc Stop kran Washbasin stainless stel Waterdrain + Accesoriss Reservoir stainless steel Kap. 1 M3 Tempat Sabun Dinding Saringan got
Bh Bh Bh Bh Bh Set Bh Bh Bh Bh Bh Bh
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
35,000.00 3,500.00 35,000.00 250,000.00 50,000.00 265,000.00 45,000.00 250,000.00 50,000.00 2,750,000.00 150,000.00 35,000.00
BAHAN PIPA Pipa PVC AW Dia. 15 mm (1/2'') Pipa PVC AW Dia. 20 mm (3/4'') Pipa PVC AW Dia. 25 mm (1'') Pipa PVC AW Dia. 32 mm (1 1/4'') Pipa PVC AW Dia. 40 mm (1 1/2'') Pipa PVC AW Dia. 50 mm (2'') Pipa PVC AW Dia. 65 mm (2 1/2'') Pipa PVC AW Dia. 80 mm (3'') Pipa PVC AW Dia. 100 mm (4'') Pipa PVC AW Dia. 200 mm (8'') Pipa PVC Type D, Dia. 150 mm (6'') Pipa PVC Type D, Dia. 100 mm (4'')
M' M' M' M' M' M' M' M' M' M' M' M'
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
7,500.00 6,000.00 8,700.00 11,800.00 15,400.00 21,900.00 28,200.00 43,000.00 66,500.00 197,900.00 115,300.00 50,900.00
Pipa PVC Type D, Dia. 80 mm (3'') Pipa PVC Type D, Dia. 65 mm (2 1/2'') Pipa PVC Type D, Dia. 50 mm (2'') Pipa PVC Air Panas 1/2'' Pipa GIP Medium Class Dia. 100 mm (4") Pipa GIP Medium Class Dia. 80 mm (3") Pipa GIP Medium Class Dia. 65 mm (2 1/2") Pipa GIP Medium Class Dia. 50 mm (2") Pipa GIP Medium Class Dia. 40 mm (1 1/2") Pipa GIP Medium Class Dia. 32 mm (1 1/4") Pipa GIP Medium Class Dia. 25 mm (1") Pipa GIP Medium Class Dia. 20 mm (3/4") Pipa GIP Medium Class Dia. 15 mm (1/2") Pipa BS Medium Class Dia. 100 mm (4") Pipa BS Medium Class Dia. 80 mm (3") Pipa BS Medium Class Dia. 65 mm (2 1/2") Pipa BS Medium Class Dia. 50 mm (2") Pipa BS Medium Class Dia. 40 mm (1 1/2") Pipa BS Medium Class Dia. 32 mm (1 1/4") Pipa BS Medium Class Dia. 25 mm (1") Pipa BS Medium Class Dia. 20 mm (3/4") Pipa BS Medium Class Dia. 15 mm (1/2") Lem pipa
M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' Klg
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
33,900.00 24,200.00 15,300.00 41,200.00 295,200.00 208,300.00 160,100.00 125,400.00 88,800.00 76,400.00 60,000.00 38,800.00 30,000.00 252,000.00 177,800.00 136,700.00 107,100.00 75,800.00 65,900.00 51,200.00 33,100.00 25,600.00 35,000.00
BAHAN LISTRIK Lampu Pijar 40 Watt Lampu Pijar 15 Watt Lampu Downlight DL PLC 9 Watt Lampu RMI 2 x 40 Watt, Tutup Metal Louvre Lengkap Lampu TL 1 x 40 Watt Lampu SL-E 15 Watt Lampu SL-E 18 Watt Lampu SL-E 23 Watt Lampu Hias Ceiling Fan For Lavatory/Wc Stop Kontak Kw. 1 16A Stop Kontak AC Kw. 1 c/w Fuse Saklar Tunggal Kw. 1 Saklar Ganda Kw. 1 Klem Kabel No. 10 Pipa Instalasi Listrik Inbow Dos Las Dop Isolasi T - Dos 5/8" Fitting Kabel NYM (2x2,5) mm Kabel NYM (3x2,5) mm Kabel NYY (4x6) mm Kabel NYY (4x10) mm MCB 6A Ex. Supran MCB 32A Ex. Supran Fuse Box Kotak Panil + MCB + Pentanahan Pengadan dan pemasangan lampu TL 2x36 W Pengadan dan pemasangan lampu TL 2x18 W Pengadan dan pemasangan lampu SL 25 W Pengadan dan pemasangan lampu SL 18 W Pengadan dan pemasangan lampu Douwn Light SL 25 W Pengadan dan pemasangan lampu gantung SL 25 W Pengadan dan pemasangan lampu SL 18 W Pengadan dan pemasangan lampu kolom SL 25 W Pengadan dan pemasangan lampu gantung SL 25 W Kotak kontak biasa 200 VA Kotak kontak khusus 1000 VA Pengadan dan pemasangan saklar ganda Pengadan dan pemasangan saklar tunggal Instalasi cahaya
Bh Bh Bh Set Set Bh Set Bh Set Set Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh M' M' M' M' Bh Bh Bh Set Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Ttk
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
6,000.00 5,000.00 160,000.00 675,000.00 93,000.00 33,600.00 36,000.00 42,000.00 3,850,000.00 325,000.00 48,000.00 75,000.00 40,000.00 45,000.00 500.00 8,000.00 5,000.00 500.00 7,000.00 500.00 10,000.00 10,000.00 13,000.00 42,200.00 67,400.00 61,200.00 85,000.00 150,000.00 450,000.00 315,000.00 225,000.00 98,000.00 85,000.00 175,000.00 98,000.00 85,000.00 98,000.00 98,000.00 40,000.00 49,000.00 38,500.00 35,000.00 95,000.00
Instalasi KKB 200 VA Instalasi KKK 1000 VA Pengadan dan pemasangan panel penerangan Tranking kabel Distribustion panel + acc Kabel NYFGby 4 x 16 mm2 Alat bantu BAHAN LAIN - LAIN Spacer/formite/penjaga jarak bekisting Sealent Sektrup Fixer Pompa Air Booster (Lengkap Preasure Tank Dan Pengabelan) Karpet KW 1 Underlayer/rubber corrugate Lem Karpet AC Split 1 PK AC Split 1 1/2 PK
Kabel Tray, 300 mm Kabel Duct, 20 mm Kabel Duct, 10 mm Solar Minyak pelumas Sewa Alat
Ttk Ttk Set M' Set M' Ls
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
90,000.00 105,000.00 3,000,000.00 210,000.00 4,000,000.00 50,000.00 5,000.00
Bh Tube Bh Unit M2 M2 Kg Unit Unit M' M' M' Ltr Ltr Jam
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
7,500.00 90,000.00 1,800.00 1,900,000.00 350,000.00 75,000.00 17,500.00 5,600,000.00 7,200,000.00 250,000.00 125,000.00 100,000.00 6,500.00 35,000.00 150,000.00
II.
HARGA UPAH KERJA Tukang kayu Tukang las Tukang Pipa Tukang gali Tukang batu Tukang besi Tukang cat Tukang listrik Kepala Tukang Kayu Kepala Tukang Batu Kepala Tukang Cat Kepala Tukang Listrik Kepala Tukang Pipa Kepala Tukang Besi Mandor Pekerja
Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
70,000.00 80,000.00 80,000.00 70,000.00 70,000.00 80,000.00 70,000.00 90,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 50,000.00
Sungguminasa, 2 Juli 2012 Penawar, CV. Mitra Jasa Mandiri Utama
ISKANDAR Direktur
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI NILAI GABUNGAN BARANG DAN JASA URAIAN PEKERJAAN
KDN
KLN
TKDN Barang /Jasa
Total
Gabungan
A. Barang I.
Material Langsung (Bahan Baku)
Rp
II. Peralatan (Bahan Jadi)
1,340,527,075.31
Rp
Sub Total Barang (A)
-
Rp
84,993,565.69
Rp
Rp
1,340,527,075.31
Rp
III. Manajemen Proyek & Perekayasaan
Rp
241,531,017.22
Rp
IV. Alat Kerja / Fasilitas kerja
Rp
395,362,658.83
V. Konstruksi & Fabrikasi
Rp
84,993,565.69
Rp
1,425,520,641.00
Rp
94.04%
-
Rp
1,425,520,641.00
94.04%
-
Rp
241,531,017.22
15.88%
Rp
-
Rp
395,362,658.83
26.00%
Rp
-
Rp
B. Jasa
VI. Jasa Umum Sub Total Jasa (B) C. Total Biaya
% TKDN Gabungan Barang & Jasa = =
-
-
Rp
884,003,523.04
Rp
-
Rp
884,003,523.04
58.12%
Rp
1,520,897,199.09
Rp
-
Rp
1,520,897,199.09
100.00%
Rp
2,861,424,274.40
Rp
Rp
2,946,417,840.09
84,993,565.69
Biaya Gabungan (9C) - Biaya Gabungan LN (9B) Biaya Gabungan (9C) 97.12% Sungguminasa, 2 Juli 2012 Penawar, CV. Mitra Jasa Mandiri Utama
ISKANDAR Direktur
97.12%
JADWAL WAKTU PELAKSANAAN (TIME SCHEDULE) PEMBANGUNAN GEDUNG BADAN KOORDINASI PENANAMAN MODAL DAERAH TAHAP III PROVINSI SULAWESI SELATAN NO.
JENIS PEKERJAAN
NILAI
%
I
PEKERJAAN PERSIAPAN
Rp.
48,000,000.00
II
PEKERJAAN ARSITEKTUR
Rp.
1,588,356,524.20
I
Pekerjaan Beton Non Struktur A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh)
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
903,380.575 853,192.765 1,279,789.147 426,596.382 2,165,426.744 6,323,664.022 5,018,780.970
0.03% 0.03% 0.04% 0.01% 0.07% 0.21% 0.17%
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
24,251,481.231 11,958,967.198 32,891,143.198 12,359,409.570 12,359,409.570 37,663,293.388 34,674,577.144
0.82% 0.41% 1.12% 0.42% 0.42% 1.28% 1.18%
Rp.
10,687,103.943
0.36%
Pekerjaan Kosen, Pintu, Dan Jendela A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh)
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
33,926,062.990 21,775,000.000 21,775,000.000 64,058,727.515 61,144,203.715 67,073,953.881 54,979,030.940
1.15% 0.74% 0.74% 2.17% 2.08% 2.28% 1.87%
Pekerjaan Langit-langit/Plafond B. Lantai II (Dua) G. Lantai VII (Tujuh) H. Lantai VIII (Delapan)
Rp. Rp. Rp.
11,016,571.305 42,829,318.958 3,232,131.579
0.37% 1.45% 0.11%
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
33,620,205.618 47,768,505.100 71,574,021.814 22,067,014.814 36,451,021.814 46,035,318.984 44,199,589.750
1.14% 1.62% 2.43% 0.75% 1.24% 1.56% 1.50%
Rp.
64,087,654.086
2.18%
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
9,957,266.904 9,957,266.904 12,641,237.694 12,641,237.694 12,641,237.694 12,751,495.989 9,957,266.904
0.34% 0.34% 0.43% 0.43% 0.43% 0.43% 0.34%
Rp.
39,538,441.140
1.34%
II
III
IV
V
VI
Pekerjaan Dinding dan Plesteran A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh) Lantai VIII (Delapan), IX H. (Sembilan) Dan Dudukan Tangki Air
Pekerjaan Pengecatan A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh) Lantai VIII (Delapan), IX H. (Sembilan) Dan Dudukan Tangki Air Pekerjaan Lantai A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh) H.
VII
Lantai VIII (Delapan) Dan Lantai IX (Sembilan)
Pekerjaan Sanitasi A. Lantai I (Dasar) B. Lantai II (Dua) C. Lantai III (Tiga) D. Lantai IV (Empat) E. Lantai V (Lima) F. Lantai VI (Enam) G. Lantai VII (Tujuh) Lantai VIII (Delapan), IX H. (Sembilan) Dan Dudukan Tangki Air
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
20,711,612.500 20,711,612.500 24,969,325.000 24,497,325.000 24,497,325.000 24,497,325.000 20,711,612.500
0.70% 0.70% 0.85% 0.83% 0.83% 0.83% 0.70%
Rp.
11,000,000.000
0.37% 12.06%
Pekerjaan Lain - Lain
Rp.
355,245,387.070
III
PEKERJAAN ELEKTRIKAL
Rp.
388,384,400.00
Panel Instalasi Kabel Distribusi Armateaur Lampu, Dll
0.543
0.01
IV
V
VI
3 VII
0.181
0.02 0.01
0.019 0.014 0.029 0.005
90
VIII
IX
X
4 XI
0.181
XII
XIII
XIV
XV
0.181
XVI
5 XVII
0.181 0.362
0.01 0.024 0.049 0.072 0.143 0.057 0.114
0.249 0.274 0.299 0.123 0.135 0.148 0.338 0.372 0.406 0.127 0.14 0.153 0.127 0.14 0.153 0.387 0.426 0.465 0.357 0.392 0.428
80
0.11
0.48
70
0.121 0.132
0.672 0.308 0.431 0.308 0.431 0.906 1.268 0.865 1.211 0.949 1.328 0.777 1.088 0.196 0.178 0.761 0.692 0.057 0.052
60
0.415
50
0.38 0.59
0.346 0.54 0.491 0.883 0.81 0.736 0.272 0.25 0.227 0.45 0.412 0.375 0.568 0.521 0.473 0.545 0.5 0.455 0.791 0.725 0.659
0.161 0.177 0.161 0.177 0.204 0.225 0.204 0.225 0.204 0.225 0.206 0.227 0.161 0.177
40
0.639 0.703
0.178 0.196 0.754 0.904 1.055 1.206 1.356 1.507 1.356 1.206 1.055 0.904 0.754
4.04% 0.64% 0.63%
0.734 0.808 0.881 0.808 0.808 0.306 0.337 0.299 0.329
V
PEKERJAAN SITE DEVELOPMENT
Rp.
156,397,775.13 118,973,840.340 18,935,394.800 18,488,539.992
Rp.
20
1.06
765,279,140.75
Pekerjaan Jalan Dan Parkir Pekerjaan Taman Pekerjaan Pagar Depan
0.335 0.368 0.335 0.368 0.404 0.444 0.396 0.436 0.396 0.436 0.396 0.436 0.335 0.368
25.97%
Rp.
Total Progres
2 III
4.45% 0.50% 8.22%
IV
TOTAL
II
131,200,000.000 14,848,000.000 242,336,400.000
PEKERJAAN ORNAMEN ATAP (SCLUPTURE ATAP)
-
100
1 I
30
VIII
A. B. C.
1.63%
Skala
2,946,417,840.09 20,711,612.50
100.00%
2.169 2.055 0.228 0.504 2.742 2.742 2.742
10
0
1.378 1.696 2.014 2.332
4.64
5.32
2.65
2.968 3.286 2.756 2.226 1.696 1.166 0.636 0.106
7.47
9.11 10.78 10.17 8.10
1.29
1.14
2.61
2.98
3.42
8.34
9.21
9.86
4.33
1.25
1.3
2.4
5.0
8.0
11.4 16.1 21.4 28.9 38.0 48.7 58.9 67.0 75.3 84.6 94.4 98.8
100
Sungguminasa, 2 Juli 2012 Penawar, CV. Mitra Jasa Mandiri Utama
ISKANDAR Direktur