Secant pile walls are formed by constructing intersecting reinforced concrete piles. The secant piles are reinforced with either steel rebar or with steel beams and are constructed by either drilling under mud or augering. Primary piles are installed first with secondary (male) piles constructed in between primary (female) piles once the latter gain sufficient strength. Pile overlap is typically in the order of 3 inches (8 cm). In a tangent pile wall there is no pile overlap as the piles are constructed flush to each other.
a. b. c. d. a. b. c.
The main advantages of Secant Pile Walls are: Increased construction alignment flexibility. Increased wall stiffness compared to sheet piles. Can be installed in difficult ground (cobbles/boulders). (cobbles/boulders). Less noisy construction. The main disadvantages of secant pile walls are: Verticality tolerances may be hard to achieve for deep piles. Total waterproofing is very difficult to obtain in joints. Increased cost compared to sheet pile walls.
Secant pile wall design when steel beams are used involves the use of wea!er than normal concrete. The pile that is lagging the wall between two main beams has to be e"amined for shear and compression arching.
Tangent
Pile
Wall
Tangent pile walls are a variation of secant pile walls and soldier pile walls. #owever tangent pile walls are constructed with no overlap and ideally one pile touches the other. $ompared to secant pile walls tangent pile walls offer the following advantages% a. Increased construction alignment flexibility. b. Easier and quicker construction.
The main disadvantage of tangent pile They are can not be used in high groundwater tables without dewatering.
walls
is%
Secant Pile Wall – Hard/Soft or Hard/Firm
&here short term water retention is re'uired this system offers the most costeffective and rapid solution. The wall consists of interloc!ing bored piles. Primary piles are constructed first using a soft* cementbentonite mi" (commonly +,-mm) or firm* concrete (commonly +/,-mm). Secondary piles formed in structural reinforced concrete are then installed between the primary piles with a typical interloc! of +0/mm. These walls may need a reinforced concrete lining for permanent wor!s applications depending on the particular re'uirements of the pro1ect.
Secant Wall – Hard/Hard
#ard-hard wall construction is very similar to a hard-firm wall but in this case the primary piles are constructed in higher strength concrete and may be reinforced. #eavy duty rotary piling rigs using tools fitted with specially designed cutting heads are necessary to cut the secondary piles. Since structural concrete is used throughout there may be no need to provide a lining wall. The end product provides a fully concreted face and can be an effective alternative to diaphragm wall construction.