Form No.: 0219/ATP/BTEL-TX Plan/02/2009
TRANSMISSION LINK ACCEPTANCE TEST CERTIFICATE No._______________(Vendor Letter/Agreement system No.)
Project PO Ref No. Link WO Ref No.
: : : :
Date : Date :
On this day, (day) , (month) (date) , (year) , the undersigned on behalf of the following parties: I. …………………(BTEL Project Manager) ,PT.Bakrie Telecom, hereinafter referred as THE FIRST PARTY. II. (Vendor represent Name) , (Vendor title represent Name) , (Vendor Company Name) , hereinafter referred as THE SECOND PARTY. Both parties agreed and state as follow: 1.
Whereas in relation with the obligation of THE SECOND PARTY to supply and installation Transmission Link System including technical, schedule and material requirements thereof as referred to in the Purchase Order or Agreement.
2.
The both parties tested and commissioned the mentioned above of supply and install the Transmission Link System as stated at attached documents as follows : 2.1 Commissioning Test Form, 2.2 Site inventory data 2.3 As-built deliverables 2.4 Functional Test & Installation Quality Inspection Result
These certificates are made in two-fold, having similar contents and equal legal power for proper perusal.
THE SECOND PARTY
(Vendor Company Name)
THE FIRST PARTY PT. Bakrie Telecom, Tbk.
____________________ Title
( Title
BTEL Radio Link ATP Certificate Form Version 1.4
This document is part of Hand over system
)
This Document is part of handover system
Commisioning Test Document
COMMISIONING TEST FORM No._______________(Vendor Letter/Agreement system No.)
Site Info
NEAR END (Site A)
Regional ID Site Name Site Address City Province/State Postal Code Latitude (in degrees decimal format) Longitude (in degrees decimal format)
FAR END (Site B)
1
1
Site Satu
Site Dua
Jakarta Barat
Jakarta Barat
DKI Jakarta
DKI Jakarta
Description
Remark
Link Information Link Name Link Format (PDH/ SDH/ IP etc) LOS distance (km) Radio Type Vendor Capacity (4E1/ 16E1/ 63E1/ STM-1) Protection Type (1+0/ 2+0/ 1+1HSB) Installed Date Ready For Service Date
Link parameters Near End / Radio-1 Rx Level (- dBm) Tx Level (+ dBm) Interference Level (- dBm) Tx frequency, Channel No. (MHz) Rx frequency, Channel No. (MHz) ODU frequency sub band Center frequency (GHz) BER test (8hr for PDH, 24hr for SDH) Far End / Radio-2 Rx Level (- dBm) Tx Level (+ dBm) Interference Level (- dBm) Tx frequency, Channel No. (MHz) Rx frequency, Channel No. (MHz) ODU frequency sub band Center frequency (GHz) BER test (8hr for PDH, 24hr for SDH) Antenna Xpolarization V/H (dB) (only for XPIC) MUX Supporting System Checklist DC Power Supply (Vdc) Neutral to Ground voltage (Vdc) Room temperature ( o C) Room humidity
WO / Standard Value
Measured Value
OK / Not OK / NA
Remark
Rx Level(ET) + 4dB
attach result in capture sheet
as state in ET/WO
attach result in capture sheet
< -90dBm
attach result in capture sheet
as state in ET/WO PDH <10E-9, SDH < 10E-10
attach result in capture sheet
Rx Level(ET) + 4dB
attach result in capture sheet
as state in ET/WO
attach result in capture sheet attach result in capture sheet
as state in ET/WO PDH <10E-9, SDH < 10E-10
attach result in capture sheet
See Site Inventory data > 25dB
See Site Inventory data -24Vdc s/d -60Vdc <3Vdc
Page 2 of 18
This Document is part of handover system
Commisioning Test Document
MUX Information
Description
Remark
Mux Type Manufacturer STM-16 Port Quantity STM-4 Port Quantity STM-1 Port Quantity Trunk (E1) Port Quantity Impedance (ohm) Ethernet Port Quantity MUX parameters DC Power Supply (Vdc) Neutral to Ground voltage (Vdc)
BER Test for each E1 (2 minutes)
Measured Value
OK / Not OK / NA
Remark
-24Vdc s/d -60Vdc <3Vdc
Optical Power Transmitted (- dBm)
Optical Power Received (- dBm)
WO / Standard Value
(each optical port)
(each optical port)
No Error
attach result in capture sheet
THE SECOND PARTY (Vendor Company Name)
THE FIRST PARTY PT. Bakrie Telecom, Tbk.
____________________ Title
( Title
)
Page 3 of 18
SITE INVENTORY DATA SITE INFO
NEAR END (Site A)
FAR END (Site B)
Site Satu
Site Dua
Site Name
ANTENNA
NEAR END (Site A) Antenna - 1 Antenna - 2
FAR END (Site B) Antenna - 1
Diameter (m) Type Part Number Manufacturer Gain (dB) Freq (GHz) Antenna height (m AGL) Azimuth ( o degres) Polarization (V/H)
OUTDOOR UNIT
Description
Remark
NEAR END (Site A)
FAR END (Site B)
Slot Position
Board Type
Part Number
Slot Position
Board Type
Part Number
Type Part Number Manufacturer Serial Number Firmware Version
FEEDERS/CABLES Type Part Number Manufacturer Length (m) Remark
INDOOR UNIT NEAR END (SITE A) Indoor Unit - 1 Module#1 Module#2 Module#3 (list all of modules installed) Indoor Unit - 2 Module#1 Module#2 Module#3 (list all of modules installed)
INDOOR UNIT FAR END (SITE B) Indoor Unit - 1 Module#1 Module#2 Module#3
(list all of modules installed) Indoor Unit - 2 Module#1 Module#2 Module#3 (list all of modules installed)
MUX Information
NEAR END (Site A)
FAR END (Site B)
Mux Type Manufacturer SDH (STM-1) Capacity Trunk (E1) Capacity Impedance (ohm)
MUX Modules NEAR END (SITE A)
Slot Position
Board Type
Part Number
Slot Position
Board Type
Part Number
MUX Module#1 Module#2 Module#3 (list all of modules installed)
MUX Modules FAR END (SITE B) MUX Module#1 Module#2 Module#3 (list all of modules installed) THE SECOND PARTY
(Vendor Company Name)
____________________ Title
FAR END (Site B) Site Dua
FAR END (Site B) Antenna - 2
Serial Number
Firmware Version
Remark
Serial Number
Firmware Version
Remark
Serial Number
Firmware Version
Remark
Serial Number
Firmware Version
Remark
THE FIRST PARTY PT. Bakrie Telecom, Tbk.
( Title
)
LocationSite Type
LocationSite Type
LocationSite Type
Regional
Country
AS BUILT DELIVERABLES Content : a. Link Configuration b. As Built Installation drawing & wiring (NEAR END and FAR END site) b.1 Antenna & Tower Layout b.2 Equipment room layout b.3 Rack/Frame layout b.4 Radio & Mux Installation (wiring & board) b.5 DDF wiring and connection (see format below) b.6 Image/photo documentation c. IP Network Element (NE) Configuration c.1 IP Address assignment (see format below) c.2 NMS network & node configuration
b.5 DDF wiring and connection Equipment (IDU or MUX) Equipment
Board Type
Slot Port DDF Index Number Number (Number of DDF Group)
DDF Block (DDF Frame Number)
Column Row Port
Connection Type
c. IP Address assignment NE Configuration Site Identifier(NE ID) Local IP address Subnet Mask IP Address Gateway IP Address Remark
THE SECOND PARTY
Local side
(Vendor Company Name)
Remote Side
THE FIRST PARTY PT. Bakrie Telecom, Tbk.
Remark
____________________ Title
( Title
)