2010
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
1. 0
ACKNOWLEDGEMENT
First of all, thanks to Allah for all His Gracious and Kindness in guidi guiding ng and helping helping me and my group group to finish finishing ing this report report.. We would like to express our sincere gratitude to the SUG596 lecturer, Dr. Rosm Rosmad adii bin bin Ghaz Ghazal alii for for his his advi advice ce and and guid guidan ance ce to us in the the preparation finishing our practical work and also give the guide line on how to make and complete this report.
Besides that, I would like to thanks to my group, who cooperate in finish up the survey in this practical. Without them, this practical cannot perfectly finish. Furthermore, I would like to thank everyone who has contributed to the completion of this practical. Special thanks to all my friends for their help and support during finish this report.
Page 1 of 60
2010
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2.0
FIELDWORK DIARY
DATE/DAY 20
NOVEMBER
EVENTS •
Travel to UiTM Shah Alam to UiTM Pulau Pinang.
2010
•
Arrived at UiTM Pulau Pinang
Saturday
•
Meeting at television’s room
– 21
NOVEMBER
•
Dividing group members
Dr Rosmadi Ghazali gave explanation about our
2010
task 1, Deformation Survey and recce side
Sunday
location. Our site in UiTM Pulau Pinang around the dining hall in Kristal College. •
We did calibr calibrati ation on ins instru trumen ments ts.. The The resul resultt was 0.002
22
NOVEMBER
•
2010
Traversing around the dining hall at Kristal College, UiTM Pulau Pinang.
Monday
23
NOVEMBER
•
2010
sticker was used as target point for observation for
Tuesday
24
monitoring.
NOVEMBER
•
2010
Wednesday
Stamp the sticker at the wall of the dining hall. The
Reconnaissance Reconnaissance site of surveying for Task 2, Road Design. At Taman Tungku, Seberang Jaya.
•
Dr Rosmadi explained our task.
•
Our group had conducted Deformation Deformation survey
•
We started at station 8. The angle 0, 90, 180 and 270 were set as RO. The observation was conducted for 4 times reading at 4 target points on the wall of dining hall.
Page 2 of 60
2010
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
25
NOVEMBER
•
Continue deformation deformation survey for station 9 and 10.
•
Deformation survey was done again by using
2010
Thursday 26
NOVEMBER 2010
different
Friday
27
RO setting, 105, 110, 115,120.
NOVEMBER
•
2010
Traversing at the route survey area at Taman Tunku.
Saturday
28
NOVEMBER 2010
•
Start route survey.
•
We Conducted sub traverse in the main Traverse.
Sunday
Each group need to conduct the traverse for detailing and calculation of control point.
29
NOVEMBER
•
Discussion on route design
•
Designing route
•
Calculate curve
•
Designing route
2010
Monday
30
NOVEMBER 2010
Tuesday
1
DISEMBER 2010
Wednesday
Page 3 of 60
2010
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2
DISEMBER
•
2010
Our group conducts the setting out to peg the chainage, IP, TS, ST, CS and the relevant points for
Thursday
curve design. •
We had detected some mistake in calculation and autoCAD design for the curve.
•
We canceled all of the surveying on that day.
•
We decide to recalculate the curve and design the curve by using the new calculation value.
3
DISEMBER
•
2010
Friday
We conducted the surveying to peg the picket for our road design
•
All praise to ALLAH. We had completed our task 2 today. ALHAMDULILLAH.
4
DISEMBER
•
We completed our Report.
2010
Saturday
Page 4 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
3.1
2010
INTRODUCTION
Two peg test:
As in other survey work it is a compulsory to carry out checking towards instrument used in field work. Hence in levelling work it is necessary to carry out the two peg test. The purpose of this checking is to ensure the instrument in good condition condition.. Based Based on observat observation ion made, made, we will compute compute the differen difference ce reading reading value and the result should be within 10mm. If the value is more than 10mm redo the observation or hand the instrument to the lab assistance for them to do the physical checking towards the instrument. instrument. (s1-s2)-(s3-s4) = ±1mm
Differential field test:
Purpose of this test is also to determine the condition of the total station. Its applied as the same concept in two peg test procedure. At the end of the test, we will compute the different value between two readings to know the value. The value limitation is in between ± 0.010mm. if the value is more than the limitation then, we should not used the total station or else it will produce an accurate result of field work.
3.2
OBJECTIVES
Two peg test and differential field test: 1. To determ determine ine the the accura accuracy cy of the the instru instrument ment 2. To know know the the conditio condition n of the the instru instrument ment 3. To learn learn how to do the the calibrat calibration ion of the the instrum instrument ent
Page 5 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
3.3
2010
INSTRUMENTATION
Total station is the most important instrument in survey works. It is used in traversing and collecting detail survey. We can obtain bearings and distance and almost accurate usin using g this this inst instru rume ment nt.. Most Most sett settin ing g out out work work can can be readil readily y and accur accurate ately ly accom accompli plishe shed d by the method method of coordinates
Prism Prism used used as a target target to measu measure re dis distan tances ces.. Prism Prism is placed on top of the tripod. As the reflector unit where it will will give give the inform informati ation on about about bearin bearing g and dis distan tance ce during the observation
Tripod is used to place the total station and prism on top of it. Tripod is placed at back sight and foresight together with the prism. In this surveying work, instead of using prism as target, we used arrow to mark the setting out point.
Page 6 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Tape will used to measure the distance from one station to another.
Field Book is used for recording observation data during the survey work using permanent black ink. Observation data data that that must must be recor ecorde ded d are are bear bearin ing, g, dist distan ance ce,, stat statio ions ns,,
prepre-co comp mput utat atio ions ns,,
lati latitu tude de,,
depa depart rtur ure e
and and
coor coordi dina nate te of stat statio ions ns.. A free freeha hand nd sket sketch ch of the the lot lot surveyed must be included in the field book.
Length of Nail is not less 55mm and centre with lines 8mm. Head of nail must be centre with lines 15mm and have lid centre with with lines 46mm with to possess evidence evidence for a drop of station. We used hammer to hit the spikes in marking the stations
Staf is used to give give height height of the ground. ground. It is used with with bubble. When we want to read the height, we must make sure that the staf in a level condition. The accuracy of the staf is 0.001m.
Page 7 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Aut Autom omat atic ic Leve Levell is used used to obse observ rve e the the heig height ht of the the ground from the staf.
3.4
PROCEDURAL
Two peg test: 1. Measure by tape 25m from point C to point A and B. Choose flat area for this test and observe the staff A and B.
2. After that, the the auto level move to point point D where where is about about L/10 meter. meter. L is total length from point A to B. Jot down the Staff A and B reading. Page 8 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
3. Do comparison comparison between between 2 set of readings and the collimating should within 1mm 4. Repeat Repeat the observatio observation n with another another total total distance distance value. value.
Differential field test:
1. Stand Stand the total total statio station n in betwee between n 2 prism prism.. 2. Measured Measured both both prism prism and record record the the distance distance value value
Page 9 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
A B C
2010
1 2
Page 10 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
3. Next, stand stand prism prism on point point B and and move total total station station to point point c 4. Again Again observe observe the distan distance ce value value and record record the the reading reading B C
3
Page 11 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
5. Compare Compare both both reading reading to determi determine ne the differ difference ence value value 6. Repeat Repeat the observatio observation n by using differ different ent total total distance distance value. value.
3.5
RESULTS
Two peg test:
For 30m
S1
1.470m
S2
1.425m
S3
1.390m
S4
1.346m
(1.470m – 1.425m) – (1.390m -1.346m) = 0.001m
For 40m
S1
1.454m
S2
1.400m Page 12 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
S3
1.407m
S4
1.355m
2010
(1.131m – 1.130m) – (1.128m -1.129m) = 0.002m
For 50m
S1
14571m
S2
14550m
S3
1.387m
S4
1.386m
(1.447m – 1.455m) – (1.387m -1.386m) = 0.001m
Differential field test:
For 30m AB
30.000m
AC
16.164m
CB
13.838m
(AB)-((AC)+(CB)) (30.000m)-((16.164)+(13.838)) (30.000m)-((16.164)+(13.838)) = 0.002m
For 40m AB
40.000m
AC
19.423m
CB
20.577m
Page 13 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
(AB)-((AC)+(CB)) (40.000m)-((19.423)+(20.577)) (40.000m)-((19.423)+(20.577)) = 0.000m
For 50m AB
50.000m
AC
24.989m
CB
25.011m (AB)-((AC)+(CB))
(50.000m)-((24.989)+(25.011)) (50.000m)-((24.989)+(25.011)) = 0.000m
3.6
CONCLUSION
Two peg test:
Based on our observation it can be shown that our instrument is in a good condition since the difference value between 2 set of reading are in acceptable limit which is 0.001m and 0.002m less than 0.010m. Hence, we will get high accuracy in observation and will produce an accurate work.
Differential field test:
Based on the observation the difference value that we got is 0.003 hence the total station we used is in a good condition. So, at the end of our field work can form a result of high accuracy. The different value that we got is o.ooom and 0.001m
Page 14 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
4.1
2010
INTRODUCTION
Deformation survey work is to determine the alteration in the shape or dimensions of an object as a result of the application of stress to it. Deformation is primarily related to the field of applied surveying, and also related to the civil engineering, mechan mechanica icall engine engineeri ering, ng, plant plant const constru ructi ction, on, soil soil and rock rock stabil stability ity mechan mechanics ics.. Instruments used in deformation monitoring based on application, chosen method and regularity. The concepts are: •
Involved the multi-epoch observation.
•
The network of survey that involved from the control point and target point.
•
The observation by triangulation either 2D or 3D.
•
The adjustment computations and network analyses are required.
•
Invo Involv lved ed
the the
dete determ rmin inat atio ion n
of
the the
coor coordi dina nate tes s
chan changi ging ng (shi (shift ft))
and and
comparison comparison with the magnitude of the error of observation (ellipse error). Deformation Deformation monitoring can be required for the following applications: applications: •
Roads and Tunnels
•
Dams, Dams, Bridges and Viaducts
•
Settlement areas, High-rise and historical buildings
•
Foundations and Construction sites
•
Mining Page 15 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
•
Landslide, Volcanoes Slopes and Earthquake area
•
As proactive control of a hazard related to possible change or failure of a structure.
4.2
1. 2.
OBJECTIVES
To determ determine ine any movem movement ents s of of bui buildi lding ng struc structur ture e To expose our group with deformation surveying and give experienced in actual surveying environment and experience the actual work of deformation deformation monitoring survey theoretically and practically.
3.
To impro improve ve the know knowled ledge ge and and skills skills in in settin setting g and opera operate te the inst instru rumen ments ts,, technique of survey, network planning and post processing.
4.
To acces access s the stud student ent’s ’s abili ability ty to desig design n the surve survey y projec projectt includ includes es the the pre analyses, network design, selection of the target point, post processing etc.
5.
To expe experi rien ence ced d the the stud studen ents ts with with defo deform rmat atio ion n comp comput utat atio ions ns us usin ing g the the software especially Star*Net to prepare 3D resection.
4.3 4.3
LOCA LOCATI TION ONAL AL AND AND DURA DURATI TION ON
Location: Bangunan Dewan Makan dan Kemudahan Pelajar, Kolej Kristal UiTM Pulau Pinang
Page 16 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
Duration of survey works:
2010
The Building
Three (3) Days
4.4
–
Reco Reconn nnai aiss ssan ance ce Surv Survey ey
–
3D Per Perim imet eter er Surve urvey y
–
3D Buil Buildi ding ng Defo Deform rmat atio ion n Sur Surve vey y
INSTRUMENTATION •
4.5
Topcon Total Station GTS-235N with tripod
•
A set of prism with tripod
•
Measuring tape
•
Booking
PROCEDURAL
4.5.1 4.5.1 Reconn Reconnais aissa sance nce Surv Survey ey
Page 17 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
•
2010
To determine determine the suitable suitable place place to locate locate the deformation deformation station station and after all, the flat surrounding area of the building is suitable to make the deformation.
•
The building has two (2) storeys and the deformation took at every side of the building.
•
Target points have been placed at every side of the building at every floor.
•
Ten (10) groups have been divided and each group has to take three (3) stations and has to monitor four (4) target points.
4.5.2 4.5.2 3D Perime Perimeter ter Surve Survey y •
It is a three dimensional perimeter perimeter survey because it took control of x, y, z at every station where Height of Instrument, Height of Target, Vertical Angle and Slope Distance is taken in every occupied station
•
Traverse has been conducted all around the building and the station of the traverse is been setup suitable for make a monitoring of the target points.
•
Traverse starts from the known GPS station of 2 (X = 7759.794, Y = -4380.741, Z = 2.951) with the back sight is station 1 and the fore sight is the station 3. And it continues until it close back to the line 1-2
•
The station 11 is also a known GPS point. And the Linear Misclosure after the C and the M Correctio Correction n is 1: 47643. 47643. (M Correction Correction is referring referring to the bearing of baseline of GPS2-GPS11)
Page 18 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
4.5.3 4.5.3 3D Building Building Deforma Deformation tion Survey Survey •
Same Same as perime perimeter ter survey survey this this time time it also also took took Height Height of Instru Instrumen ment, t, Height of Target, Vertical Angle and Slope Distance of the target point (1, 2, 3, 4).
•
On first station observed each observed point on building with different initial bearing (RO) which is 0, 90, 180, and 270 on the both faces (face left and face right).
Page 19 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Diagram: The location of target points
Diagram: How the monitoring of the target points took place 4.6 4.6
DATA DATA PROC PROCES ESSI SING NG AND AND ADJ ADJUS USTM TMEN ENT T •
Deformation data processing and adjustment is being done using least square adjustment of Star*Net Software.
Page 20 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
•
2010
The adjustment firstly done to the whole traverse network based on a fixed coordinate and elevation of GPS point 2 and 11.
•
Then the second adjustment is being done to the each of target points which is observed by every group.
•
All the set of reading of 00°, 90°, 180°, 270° is being input into the Star*Net. Then run the adjustment. adjustment. If the run is unsuccessful unsuccessful do check the related error.
The adjustment runs successfully successfully
Page 21 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
The result of adjustment is produced and do check either e ither it passed the 5% chi square test or not.
Page 22 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
The adjusted network is plotted
Star*Net also allows to make an export to *.dxf format which later can be edited in AutoCAD.
Page 23 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
4.7 4.7
2010
DISC DISCUS USS SIONS IONS AND AND ANA ANAL LYSIS YSIS
4.7. 4.7.1 1 An Anal alys ysis is of Ad Adju just stme ment nt Outp Output ut (Mai (Main n Traverse)
Adjustment Statistical Summary ============================== Iterations Number of Stations Number of Observations Number of Unknowns Number Number of of Redund Redundant ant Obs Observation Count Sum Squares of StdRes Angles 13 0.068 Distances 12 0.443 Zeniths 12 0.057 Total 37 0.568
= = = = =
2 14 37 33 4
Error Factor 0.220 0.584 0.209 0.377
The Chi-Square Test at 5.00% Level Passed Lower/Upper Bounds (0.348/1.669)
1.
The 3D 3D network network consists consists of 14 14 station stations. s. And And 3 statio stations ns are are held held fixed fixed (Stati (Station on 2, 2, 1, 11) with known coordinates and elevation using code “!” in the Input Data. So the number of free stations is 11 stations.
2.
So for for each each of these these 11 11 statio stations ns we need need to to comput compute e the (N, (N, E, Z) com compon ponent ents; s; Number of Unknowns per station is
=3
Number of Unknowns for 11 stations is 11 x 3
= 33 Unknowns (N, E,
Z) 3.
This This netw networ ork k is cons consid ider ered ed “ove “overr-de dete term rmin ined ed” ” beca becaus use e the the obse observ rvat atio ions ns exceed the unknowns.
4.
The The redund redundan antt obse observ rvat atio ion n or also also known known as degre degree e of free freedo dom m is defi define ned d from: Number of Observations – Number of Unknowns Number of Redundant Observation
= 37 – 33 =4
Page 24 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
5.
2010
The netw network ork cann cannot ot be solve solved d if the redun redundan dantt observ observati ations ons are are less than than zero zero and generally, the more redundant observations the better.
6.
The The Sum Sum Squar Squares es of “StdRe “StdRes” s” means means each each Stan Standa dard rdiz ized ed Resid Residua uall whic which h is squared and summed. So the values of below are the function of the number of observations of that data type.
Angles D istan ces Zeniths T otal
*
Sum Squares of StdRes 0.068 0.443 0.057 0.568
Residual is the difference between the value of the observation in the field, and the value that fits best into final adjusted network.
* Standardized Residual is the actual Residual divided by its Standard Error value. Then the value value is
listed in the the “StdRes” column column for every observation observation in the
listing file. 7.
The “Tot “Total al Erro Errorr Factor Factor” ” is the squ square are root root of of the Tota Totall Sum of of the Squar Squares es of the Standardized Residual divided by the Number of Redundant observation. SQRT (∑ (Squares of StdRes) / Number of Redundancies) Sum Squares of the StdRes
= 0.568
Number of redundancies redundancies = 4 SQRT (0.568 / 4) 8.
= 0.377
Total Error Factor
= 0.377
These Error Factors should be roughly equal and should be all approximately be within a range of 0.348 to 1.669 depending on the Chi-Square Test 5% Toleranc Tolerance. e. Since Since the Error Factor is 0.377, 0.377, so it falls falls within within the level passed range. So it passed the Chi – Square test.
9.
The Chi Chi Square Square test test often calle called d the “goodne “goodness ss-of -of-fi -fit-t t-test est”, ”, statis statistic ticall ally y tests whether the residuals are due to normal random errors.
Page 25 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
4.7. 4.7.2 2 An Anal alys ysis is
of
Adju Ad just stme ment nt
Outp Output ut
2010
(Bu (Buildi ilding ng
Deformation) Adjustment Statistical Summary ============================== Iterations = 3 Number of Stations = 18 Number of Observations = 85 Number of Unknowns = 45 Number Number of Redun Redundant dant Obs = 40 Observa Observation tion Count Count Sum Sum Squares Squares of StdRes Angles 29 138.421 Distances 28 339.075 Zeniths 28 3448.308 Total 85 3925.803
Error Error Factor 3.185 5.073 16.177 9.907
Warning: The Chi-Square Test at 5.00% Level Exceeded Upper Bound Lower/Upper Bounds (0.782/1.218)
1.
The The 3D net netwo work rk con consi sist sts s of 18 18 stat statio ions ns.. And And 3 stations are held fixed (Station 2, 1, 11) with known known coord coordina inates tes and elevatio elevation n usi using ng code code “!” in the Input Data. So the the number of free stations is 15 stations.
2.
So for for each each of these these 15 15 statio stations ns we need need to to comput compute e the (N, (N, E, Z) com compon ponent ents; s; Number of Unknowns per station is
=3
Number of Unknowns for 11 stations is 15 x 3
= 45 Unknowns (N, E,
Z) 3.
This This netw networ ork k is cons consid ider ered ed “ove “overr-de dete term rmin ined ed” ” beca becaus use e the the obse observ rvat atio ions ns exceed the unknowns.
Page 26 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
4.
2010
The The redund redundan antt obse observ rvat atio ion n or also also known known as degre degree e of free freedo dom m is defi define ned d from: Number of Observations – Number of Unknowns
= 85 – 45
Number of Redundant Observation 5.
= 40
The netw network ork cann cannot ot be solve solved d if the redun redundan dantt observ observati ations ons are are less than than zero zero and generally, the more redundant observations the better.
6.
The The Sum Sum Squar Squares es of “StdRe “StdRes” s” means means each each Stan Standa dard rdiz ized ed Resid Residua uall whic which h is squared and summed. So the values of below are the function of the number of observations of that data type. Sum Squares of StdRes Angles 138.421 Distances 339.075 Zeniths 3448.308 Total 3925.803
*
Residual is the difference between the value of the observation in the field, and the value that fits best into final adjusted network.
* Standardized Residual is the actual Residual divided by its Standard Error value. Then the value value is
listed in the the “StdRes” column column for every observation observation in the
listing file. 7.
The “Tot “Total al Erro Errorr Factor Factor” ” is the squ square are root root of of the Tota Totall Sum of of the Squar Squares es of the Standardized Residual divided by the Number of Redundant observation. SQRT (∑ (Squares of StdRes) / Number of Redundancies) Sum Squares of the StdRes
= 3925.803
Number of redundancies redundancies = 40 SQRT (3925.803 / 40) 8.
Total Error Factor
= 9.907 = 9.907
These Error Factors should be roughly equal and should be all approximately be within within a range range of (0.782 (0.782/1. /1.218 218)) depend depending ing on the the Chi-Sq Chi-Squa uare re Test Test 5% Page 27 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Tolerance. Since the Error Factor is 9.907, which exceeding the Upper Bound, so it did not pass the Chi – Square tests.
4.7.3 4.7.3 Analysis Analysis of Adjustm Adjustment ent Output Output (Combinati (Combination on of All Groups) Groups)
Adjustment Statistical Summary ============================== Iterations = 4 Number of Stations = 48 Number of Observations = 415 Number of Unknowns = 135 Number Number of Redun Redundant dant Obs = 280 280 Observation Count Sum Squares of StdRes Angles 139 84234.661 Distances 138 72938.189 Zeniths 138 20848.043 Total 415 178020.894
Error Factor 29.970 27.989 14.964 25.215
Warning: The Chi-Square Test at 5.00% Level Exceeded Upper Bound Lower/Upper Bounds (0.917/1.083)
1.
The The 3D net netwo work rk con consi sist sts s of 48 48 stat statio ions ns.. And 3 stations are held fixed (Station 2, 1,
11)) 11
with with kno known
coor oordin dinates ates and and
elev elevat atio ion n usin using g code code “!” “!” in the the Inpu Inputt Data. So the number of free stations is 45 stations. 2.
Each Each of thes these e 45 stat station ions s we need need to to compu compute te the the (N, E, E, Z) com compon ponent ents; s; Number of Unknowns per station is
=3 Page 28 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
Number of Unknowns for 11 stations is 45 x 3
2010
= 135 Unknowns (N,
E, Z) 3.
This This netw networ ork k is cons consid ider ered ed “ove “overr-de dete term rmin ined ed” ” beca becaus use e the the obse observ rvat atio ions ns exceed the unknowns.
4.
The The redund redundan antt obse observ rvat atio ion n or also also known known as degre degree e of free freedo dom m is defi define ned d from: Number of Observations – Number of Unknowns
= 415 415 – 135 135
Number of Redundant Observation 5.
= 280
The netw network ork cann cannot ot be solve solved d if the redun redundan dantt observ observati ations ons are are less than than zero zero and generally, the more redundant observations the better.
6.
The The Sum Sum Squar Squares es of “StdRe “StdRes” s” means means each each Stan Standa dard rdiz ized ed Resid Residua uall whic which h is squared and summed. So the values of below are the function of the number of observations of that data type. Observation Sum Squares of StdRes Angles 84234.661 Distances 72938.189 Zeniths 20848.043 Total 178020.894
*
Residual is the difference between the value of the observation in the field, and the value that fits best into final adjusted network.
* Standardized Residual is the actual Residual divided by its Standard Error value. Then the value value is
listed in the the “StdRes” column column for every observation observation in the
listing file. 7.
The “Tot “Total al Erro Errorr Factor Factor” ” is the squ square are root root of of the Tota Totall Sum of of the Squar Squares es of the Standardized Residual divided by the Number of Redundant observation. SQRT (∑ (Squares of StdRes) / Number of Redundancies) Sum Squares of the StdRes
= 178020.894
Number of redundancies redundancies = 280 SQRT (17802 (178020.89 0.894 4 / 280) = 25.215 25.215 Page 29 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
1.
Total Error Factor
2010
= 25.215
These Error Factors should be roughly equal and should be all approximately be withi within n a range range of (0.917 (0.917/1. /1.083 083)) depend depending ing on the Chi-S Chi-Squa quare re Test Test 5% Tolerance. Since the Error Factor is 25.215, which exceeding the Upper Bound, so it did not pass the Chi – Square tests.
4.8
CONCLUSION
Deformation Deformation monitoring is one of survey work which the purpose is to determine the condition of a building structure or dam or tunnel and etc whether there is any movement occur since the structure is build. The detection of the movement is based on the bearing reading taken on each point on the building on the different time. As a result, if t here is any movement occurred then, the bearing reading observed archived will de differ from time to time and the interval time depends on the expected movement. If not, the bearing reading will be the same. Control point is a must as a reference of the structure position. Movement can occurred due to any movement in the earth, quality of composition of the structure, natural sources and etc. Hence, if we managed to detect any movement occurred we can take any precaution to prevent any negative things happen.
Any deformation survey must pay particular attention to errors in the survey so that gross or systematic errors do not contaminate the detection of movements and produce false results. Graphical representations of deformation analyses are ofte often n
show sh own n
as elli ellips pses es with with vect vector ors s
of movem ovemen ent. t. 3D and and
multi ulti-e -epo poch ch Page 30 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
representations area are possible with CAD system. As the building newly build, hence there are no movement occur towards the building. In order to form a 3D visualization of the building, we need to combine each of group results where each group observed on different point around the building. We also need to observed z value in order to get the 3D design of building.
As a result when we combined all of each group result we managed to form it in 3D monitoring form. Where each point on their own position shown the shape of the building.
4.9
INDIVIDUAL CO COMMENTS
BY:
NUR SHAFINAZ BT HASSAN BASERI (2008401502)
Based on our work, what do i understand is that deformation monitoring is about movement detection on any construction structure such as building, bridge and etc. There There most most impor importan tantt thing thing in this this work work is contr control ol point point and and bearin bearing g reading. Control point used as reference of the true position of any structure mean while the bearing reading is used as detection of mark point on the building from time to time.
In full fill our task, we were asking to form a product in 3D. Hence the reading of height and slope distance is needed. The true position of control point can be obtains from GPS system. For true position of mark point on the building can be archi archived ved trough trough trans transfer fer method method.. To determ determine ine and confi confirm rmati ation on of our work work Page 31 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
product at the end of work, each group will combine the result and it will form the dimension of the building in 3D form.
Most Most impor importan tantt thing thing in this this work work is in determ determina inatio tion n of contr control ol point point.. In setting up the control point must undergo the traversing. The datum used can be either assume datum or used the real value. Here, in our task we use from GPS value.
Plus, Plu s, we also also underg undergo o least least square square equati equation on toward towards s our result result in order order remove all the error in our reading. Once the error had been eliminated then it will produce an accurate result. We used star net software to process all the data were we need to key in all the data capture in notepad format first.
BY:
FAUZIAH BT ABDUL MALEK (2008401502) (2008401502)
Deformation survey is very precise surveys performed to detect and measure movements of a variety of physical objects or land parcels. Deformation surveys can can detect detect relati relative ve or absolu absolute te movem movement ents s for monit monitori oring. ng. The The proce procedur dures es of deformation survey job are not as difficult and complicated as the other types of survey. If only change in shape, then a minimal constraint or free network solution can be used to avoid any influence from external constraints. If a block shift or rotate, then connection must be made to survey stations which are sited in stable areas to provide the required absolute datum. Survey for deformation is generally repeat repeated ed at certai certain n time time interv intervals als that that depend depend on the expect expected ed moveme movement nt or settlement of the structure.
Page 32 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Our task is to detect any relative of absolute movement for the retaining wall. We must must compa compare re our result result from from other other group group that have have been been used used the same control point by comparing the coordinates for all point at the wall of the building but the wall of building that has been choose by our group was not same as all the other groups. So, we cannot compare the coordinates of point at the wall with the other groups. To find the coordinates at the retaining wall, it is possible to calculate manually because it take a lots of calculation and quite difficult to solve it. So we have used StarNet programming to find the coordinates points of the retaining wall. By using the programmed, we could know all the coordinates and also be able to know the standard deviation and residual for the retaining wall.
While monitoring the building, the slope distance must be read for design three dimensional building. Before the measurements be made, we must make sure that the sticker that used as a observed point on the building can reflect the signal from the theodelite for slope distance measurement. This is because we found that some of the sticker cannot reflect the signal from the theodelite. Furthermore, the signal from theodelite also cannot be reflected if the station is far from the building. Because of that, we decide to choose the station nearest to the building as long as it can measure the slope distance.
BY:
MOHD RIZALMAN BIN RASIDIN (2009201944) (2009201944)
For this deformation survey we were received the task to do the deformation to monitoring the movement for the Student Facilities building of in UiTM Penang. This movement can be detected by comparing the deformation result with history, to get the best best value value for error error by using using statis statistic tical al calcu calculat lation ion from from redun redundan dantt observation. For For the the firs firstt day, day, we done done reco reconn nnai aiss ssan ance ce at the the build uildin ing g for for targ target et identification and decide where the control point should be established. The control point should be safe from disturbance so the observation does not contain too much error. Moreover, the control point should not be established too close from the Page 33 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
building. The shape of control point should be in good triangle. It means the inner angle is between 60 degree and 120 degree. Before we done the traversing, the datum for network control was taken from GPS observation on station 11 and 2. After done traversing around the building, we get the linear linear misclo misclose se of 1:9000 1:9000 usi using ng bowdit bowditch ch method method.. But there there are some some different when the misclose is calculate using starnet software which applying Least Square Adjustment (LSA). The linear misclose when using starnet software is 1:400 000. This situation happen when starnet use LSA to calculate error for each station from redundant redundant observation. Meanwhile the bowditch bowditch method generally distributed distributed error equally for each station. For the observation, we have observed 4 points from 3 control points which are. We also determined the Z value for each station using GPS observation to get reduce level for each control station. The purpose of the leveling survey is to design 3-di 3-dime mens nsio ion n defo deform rmat atio ion n in Star StarNe Net. t. It need needs s the the Z valu value e to desi design gn the the 3-D 3-D dimension. For my comment, the location of target should be well spread around of the building and not focus at one certain part only. Moreover, the target point should be at stable place and should have clear line of sight. In my opinion, the observation should avoid during afternoon because during afternoon, the refraction and sun heat make the observation contain error. Moreover, the targets become blurry when afternoon. In addition, the instrument should be done calibration first before it use for observation. To obtain good observation, the control point should have good geometry. By using StarNet software its can detect all of error in observation, this software is good to make the analysis for the surveying work. From this software we can define how well the field work, because its use more statistical calculation for analysis. I suggest, all of student for survey studies need more knowledge about StarNet software and must be expert to handle StarNet software. Because it’s good for analysis survey data and define error. BY:
MOHD ZULKARNAIN BIN ZAINAL ABIDIN (208411092) (208411092)
Defor Deformat mation ion task task requir required ed us to conduc conductt the deform deformati ation on survey survey at the the Student’s facilities building, nearby the crystal college, UiTM Penang. We are given 2 days to finish the task. The works involved in this survey work are reconnaissance, reconnaissance, traversing, GPS coordinate conversion and transferring, deformation and processing processing the collection of data. The processing of data is used using StarNet software. Page 34 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Before Before start starting ing a job, job, reconn reconnais aissa sance nce of the area area is very very impor importan tant, t, to invest investiga igate te and to get famili familiar ar with with the area. area. Reconn Reconnais aissa sance nce are needed needed to properly planed the works involve to ensure smooth flow and to avoid any obstacle during the field work.
Deformation work mainly focused on detecting or to identify any movement or deformation of a certain manmade structure, which in this case is a building. The work given requires observation of the target points mounted on the sides of the buil buildi ding ng,, and and shou should ld be done done in time time fram frame e to moni monito torr the the move moveme ment nt of the the building. However, as we only has a few days to complete the job, the job was condu conducte cted d only only for learn learning ing proces process s of the the proced procedure ure,, metho methods ds and the main main objectives is to understand the whole process of conducting the job.
The control points located on the building are pre determined, as a group required observing minimum 4 target points on the building, from 3 ground control points. As the work requires us to observe the same points on the building, the target points located on the building must be visible from all the ground control points points.. The The best best locati locations ons for the the ground ground contr control ol points points are ident identifi ified ed and the processes of observing the building are then started, starting from the traversing work.
The 1st task is to establish the ground control points. This is obtained by traversing around the student facilities building. Then the coordinate of the control points points or statio stations ns are determ determine ined d by trans transfer ferrin ring g the coord coordina inate te from from the the GPS observation made from 2 stations, located on the traverse network itself. The GPS observation also gives the corrected bearing for the traverse, as the rotations of the traverse are done. The data processing of the traverse are made in StarNet, using 3D parameter, to obtain the least square correction for the traverse. As the job require all 10 groups to be located on the same building with minimum 3 stations per group, the distances between the stations are quite small, thus affecting the accuracy of the traverse work.
Page 35 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Then the deformation work was carried out, by observing 4 sets of different starting bearing for all 3 points on the building. During the deformation survey process, we were required to obtained the slope distance from the ground control points to the building CP. The method used was by using reflective stickers on the building, to rebounce back the wave signal send from the Total Station. There were issues of reflective capability of the sticker, but the problem is then solved by selecting the right material.
Finally, I would to conclude that the work done was very successful, although there were some problems arise at the site, such as the problem with the sticker wave rebounces capability. Other than that, the process of data processing using the StarNet software were very time consuming, as we are not so familiar with using the software.
Page 36 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
BY:
2010
MUHAMMAD KHAIRI BIN IDRUS (2008401526) (2008401526)
I would like to say thank you to Allah s.w.t for giving His opportunity for completing this deformation project. Also thanks to my lecturer, Dr Rosmadi Bin Ghazali, and all my friends for the guidance and cooperation. The objective of this practical is to train students how to detect the movement object from observation with total station.
As we have have lear learnt nt,, defo deform rmat atio ion n su surv rvey eys s are are very very pres presic ice e su surv rvey ey in engineering works. It is performed to detect and measure movements of a variety of physical objects or land parcels. In this project, we are needed to monitor and detect any movement at Student’s facilities building, nearby the crystal college, UiTM Penang .
Firstly, we done reconnaissance at the building and we decide where the control point should be established e stablished.. The control point should be in suitable location. The control point should not be established too close from the building because the shape of control point should be in good triangle.
The datum for network control was taken from GPS observation on station 11 and 2 and we make the traverse around the building that we want monitoring. After that, we have observed 4 target points from 3 control points which are. Then, we also determined the Z value for each station using GPS observation to get reduce level for each control station. It is to design 3-dimension deformation in StarNet. It needs the Z value to design the 3-D dimension.
The The error error also also came came from from the observ observati ation on by the diffe differen rentt obseve obsever, r, the different observer will gain the different observation value. The instrument for the observ observati ation on also also bring brings s impor importan tantt result result,, small smaller er error error will will comes comes out with with the accurate value for these accurately survey. If we can see the zenith error from the result of the analysis above, the value was too high and absolutely not in the acceptance range of the chi square. My comment it was we used the standard Page 37 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
leveling, leveling, in my opinion opinion we should come out with the precise precise leveling leveling to get more accur accurate ately ly result result .The points points on the wall wall also also play play an import important ant result result for this this accuracy survey. The unclear and invisibility crosshair of centering on the points will produce an error during the observation.
BY:
SITI NAIMAH BT NGISAH@NORMAN (2009687856) (2009687856)
Assalamualaikum. All praise to be ALLAH. Thanks to Dr Rosmadi Bin Ghazali for his guidance in this fieldwork. Defor Deformat mation ion surve surveys ys are are very very precis precise e survey survey perfor performed med to detect detect and measure movement of a variety of physical objects or land parcels. Beside that deformation surveys can detect relative or absolute movements for monitoring of pump pump base base or pipe pipe connec connectio tions, ns, storag storage e tanks, tanks, retai retainin ning g walls, walls, slope slope areas areas or general ground subsidence but in this practical we just to monitoring the retaining walls. The procedures of deformation survey job are not as difficult and complicated as the other types of survey. In this practical task we are needed to monitor and detect any movement of the building of dining hall at Kolej Kristal, UiTM Pulau Pinang. There are 3 control points on the ground at station 8, 9, 10 and 4 observe points. At the first day, we had done reconnaissance of the area to identify the suita suitable ble locati location on for contro controll point points. s. There There are 10 group groups s those those co-ope co-operat rated ed to conduct traverse around the building of dining hall. The traverse used to determine the coordinate of ground control. The 3 control points were used in the monitoring. The next day, we conduct the monitoring from the control point station to observe the 4 target points on the wall of building of dining hall. We spend two day to complete this job. During do the practical, i noticed that weather condition also affect our sight viewi viewing ng to target target that that give give the refracti refraction on becaus because e the the hot weathe weather. r. Rain Rain also also delayed our fieldwork. Human error exists in our data reading because difference observers have difference parallax. The observation also difficult to done because the sticker at the wall unable to reflect. However, after the little adjustment that had been done to the sticker, the observation able to read by using total station finally. Page 38 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
For the processing data, Starnet software was used. The observation data is entering to calculate standard error, error factor, error propagation and residual. Starnet give a plot and listing the coordinate at 4 targets and our observation data is acceptable. At the end I hope this practical helpful to me as a guideline in the real job. I conclude that this task enable to identify the changing in construction monument. I hope our lecturer satisfy with this practical. InsyaALLAH.
BY:
i.
MUHAMMAD RUZAINI BIN MOHAMMAD FADZIL (2009837016)
Alhamdul Alhamdulilah, ilah, for for the compl completion etion of of the task. task. Deform Deformation ation Survey Surveying ing is about about a precis precise e surve surveyin ying g conduc conducted ted to detect detect and and monit monitor or the movem movement ent of the the physical structure in the engineering field.
ii. In this task task we have been assigned assigned to monitor monitor the structu structural ral of a three-store three-storey y build building ing which which taking taking consi consider der of observ observing ing four four target target point points. s. Two target target points were placed at the first floor and the other two at the second floor. iii. At the first thing, thing, a three three dimensiona dimensionall traverse traverse control has been done around around the building purposely for setting up stations for deformation. And the traverse has been controlled with two known (x, y, z) GPS points. iv. We have to observe observe the height height of instrum instrument ent,, height height of target target point, point, slope slope distance between the instrument to target point instead the horizontal angles and the vertical angles. v. for the observa observation tion of the target target points, points, we have observed observed with with three three different different horizontal angles (0°, 90°, 180°) for the both face of left and right. vi. Once Once the the observ observati ation on finish finished, ed, based based on the yet two known known GPS control control,, it would be input into the Star*Net Least Square Adjustment software, to make an adjustment for the traverse station and also the four target points. vii.The vii.The trav traver erse se cont contro roll netw networ ork k has has pass passed ed the the 5% Chi Chi Squar quare e Test Test but but unfortunately the target points (1071, 1072, 1073, and 1074) were not. viii.As a result of the adjustment, all the target points would be produced with the coor coordi dina nate te of X and and Y plus plus the the elev elevat atio ion. n. This This is what what it call called ed thre three e dimensional monitoring. Page 39 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
ix. Many thankful thankful for Assoc. Assoc. Prof Dr. Rosmadi Rosmadi for helping helping in advance advance and also the fellow group members for a good teamwork.
5.1
INTRODUCTION
Route Route surve surveyin ying g is compr comprise ised d of all surve survey y opera operatio tions ns requir required ed for design design and and construction construction of engineering works such as highways, pipelines, canals, or railroads.
A route surveying system usually contains four separate but interrelated processes: •
Reconnaissance an and pl planning
•
Works design
•
Right of of way ac acquisition
•
Construction of works
Major Components of Route Surveying Systems •
Stationing
•
Offset distance
•
Profile grades (slope percentage)
•
Curves (Horizontal and Vertical)
•
Cross sections
•
Slope staking
5.2
OBJECTIVES
The objective mainly is to give the student an exposure to conduct an actual route survey on the given site. Secondly is to give the student an opportunity to practice and apply their knowledge and theoretical wise on handling the whole process of route route survey surveyin ing g job. job. Third Thirdly ly to give give the stude student nt an experi experienc ence e of using using survey survey Page 40 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
proc proces essi sing ng soft softwa ware re and and CAD CAD pack packag ages es for for the the surv survey ey data data proc proces essi sing ng and and preparation of plan.
5.3 5.3
LOCA LOCATI TION ONAL AL AND AND DURA DURATI TION ON
Location Location
: Taman Taman Tunku Tunku Sebera Seberang ng Jaya, Jaya, Pulau Pulau Pinang Pinang adjac adjacent ent to Masjid Masjid
Seberang Jaya
Satellite image of the site area
Page 41 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Location of the site
OUR SURVEY AREA
Page 42 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
The survey area has been proportioned into ten areas according to the ten groups of survey.
The Duration of the survey works: Four (4) Days •
reconnaisance reconnaisance survey
•
perimeter survey
•
details and topographical survey
•
setting-out survey of the proposed proposed road
5.2
INSTRUMENTATION •
5.2
Topcon Total Station GTS-235N with tripod
•
A set of prism with tripod
•
Mini prism and prism with pole
•
Measuring tape
PROCEDURAL
5.5.1
Reconnaisance Survey •
It has been done on the first day of survey to determine the condition and of the area and the details to be covered.
•
Generally this area is a public area and better known for a recreational park.
•
The The terr terrai ain n of the the grou ground nd is flat flat and and undu undula lati ting ng and and the the deta detail ils s comprised with natural features such as waterways and river and some structural structural permanent feature such as bridge, pondok, bench and etc.
•
This reconnaissance also including the planning of the perimeter survey to be conduct upon the area.
Page 43 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
5.5. 5.5.2 2 Peri Perime mete terr Surv Survey ey •
A traverse for the whole area has been done to establish the control of x, y and z for the area.
•
However the control x, y, z of the area is only based on assumed value at the Station 1 (x = 1000, y = 1000, z = 3.850).
•
Afte Afterr the the area area of the the area area has has been been acqu acquir ired ed,, it late laterr has has been been proportioned into ten (10) portions for the ten (10) survey groups.
Page 44 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
The black line is the main traverse for the whole area
2010
STATION 1: N1000 E1000 Z = 3.850
The red line is our sub traverse upon the proportioned area
5.5. 5.5.3 3 Deta Detail ils s Sur Surve vey y •
The details survey has to be conducted upon an area of 10,000 meter square with a coverage for the both side is 20 meter each.
•
And generally the details covered in our proportioned area are a portion of rive riverr and and wate waterw rway ay,, slop slope e cutt cuttin ing g and and perm perman anen entt feat featur ures es like like pondok, drainage, concrete wall and benchs. Page 45 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
•
The details taken are stored in the total station internal memory
•
To start the details survey basically we make a sub traverse starting from from the known known point point Statio Station n 3 (916.8 (916.833, 33, 998.72 998.729, 9, 3.862) 3.862) with with the reference to the station 2 and make foresight to station 100, 101, 17, 103 10 3 and and clos close e back back at the the line line of stat statio ion n 2 and and 3. An And d the the line linear ar misclosure misclosure after the C correction is 1 : 17251.
•
Instead the station for traversing, the same station also used to pickup details. And the method used is Radiation Method
5.5. 5.5.4 4 Road Road Set Setti ting ng out out •
After the details of the area has been covered and processed, then we can determine which area suitable for designing a road.
Page 46 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
•
2010
Since the bottom side of the area is mostly a waterway and river so it is better to design a road at the above side area which flat and undulating area.
•
Two curves have been designed with different specifications. And each curve is to be set out by five (5) groups. And we are assigned to design the curve no. 2.
Curve no.2
•
The Specifications: Specifications:
Page 47 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
1.
The Design Speed
2010
= 80 km/h = 1.2 m/s 3
2. Lateral Acceleration 3. Radius
= 200 meters
4. Deflection Angle
= 15° 14’ 16”
5. Chainage Interval
= 5 meters
6. Incoming Tangent Bearing
= 173° 23’ 50”
The proposed curve design •
The calculations of the coordinate of the chainage of the curve is at Appendices 6.11
5.5 5.5
DATA DATA PROC PROCES ESSI SING NG AND AND PRE PREPA PARA RATI TION ON OF OF PLA PLAN N
Page 48 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
5.5. 5.5.1 1 Data Data Tran Transf sfer er •
Data is being transferred from the total station to computer using the manufacturer software. So in this survey since we use Topcon Total Station the suitable software is T-COM.
•
•
•
The parameter for the transfer is like in the Diagram 1 Once after transfer finished it would appear like in the Diagram 2 Then set the file name with the extension “*.gt6”
Diagram 1: T-Com data
Diagram 2: After the data transfer has been finished
5.5. 5.5.2 2 Data Data Pro Proce cess ssin ing g •
The software used for processing survey data is Civil Design and Survey (CDS).
•
Then import the *.gt6 file into the CDS and make it a stadia before it can be stored in the data base. Then export to a *.dxf or *.dwg format.
Diagram 3: Stadia
Page 49 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Diagram 4: Details is been stored in the database 5.5.3
Plan Preparation •
The software used for data editing and coding joining for a plan preparation is AutoCAD 2007.
•
User have to open the saved *.dxf or *.dwg file into the AutoCAD.
•
And later the details are being joined appropriately according its coding. It is important the person who produces the plan get an impression of the site before joining the coding. And it also better for the surveyor to assist with providing a brief diagram of the site and further explanation.
•
It also better for the draftman to put a diagram of certain features in the plan such as a diagram of concrete drain with the diameter.
Page 50 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
The detail and topographical topographical plan is prepared. •
And the detail and topographical plan we prepared are in the scale of 1 : 500 in the A3 sized.
5.6
CONCLUSION
It can be said that route survey is a work that consist of several important procedure to make sure it will form a high accuracy result in the end of the work. It accomplishes accomplishes the need of engineering field work according to the need of customer. In other word, routes survey is defined as being the required service and product that adequately locates the planned path of a linear project or right of way which crosses a prescribed area of real estate, extending from at least one known point and turning or terminating at another known point. Adequate location shall mean
Page 51 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
subst substant antial ial compli complianc ance e with with the condit condition ions s and tolera tolerance nces s expres expressed sed in this this standard. Based on our field work, now we able to visualise how the real world is for route survey work, especially the condition of the ground, complication of detailing, appearance of station invisibility, any natural problem and etc. In producing high accuracy of work product depends on how close we carry out the traverse. In our task, in order to check our work is correct or not, at the end of the work we must compare our product with the others group which each of group must get an equal and parallel distance between the curve designs. However the main problem is that each group us a different datum. Hence the possibility in getting error is high. As a result, in order to checking each of group work the combination of the circular curve are parallel to each other. Even though each group use the different datum supposed to be that the circular to be parallel since it use the value from big traverse as a reference to their small traverse.
5.7
INDIVIDUAL CO COMMENTS
BY:
NUR SHAFINAZ BT HASSAN BASERI (2008401504)
Based Based on our field field work, work, i found found that that in finish finishin ing g the route route surve survey y work, work, planning is the major factor to complete and produce a good quality work. Without planning wisely we might not produce a good work. The planning work must be Page 52 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
based on the details, area parameter, ground level and all off sets on the area work. In this work also involve the use of CDS software which is use as processing data and AutoCAD which is use to design.
If error occurred in bearing determination and design calculation, later it will effect during setting out process. Plus, during traverse work also is important where it act as a horizontal control. control. If there is error in control, hence during setting out will produce an absolute high error result. We used GPS in order to get coordinate value.
During setting out procedure, must be based on a right bearing and distance compute from the planning drawing that had been made. After open the bearing based on calculation made, then the pegging must be done wisely and accurately. The checking step based on the coordinate reading where the same point must the same coordinate value.
At the end of our work, now I realise and able to visualize on how the real world is in full fill the route survey work. All the possibility that I might face during route survey and how to solve also I have learn. Including all the possibility of the condition of the ground, complication of detailing, appearance of station invisibility, any natural problem and etc
BY:
MUHAMMAD KHAIRI BIN IDRUS (2008401526) (2008401526)
I would like to say thank you to Allah s.w.t for giving His opportunity for completing this task. Also thanks to my lecturer, Dr Rosmadi Bin Ghazali and all my friends for the guidance and cooperation. Page 53 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
The objective of this practical is to train surveying students how to plan and reconnaissance for route surveying, how to establish control points on ground, how to conduct route alignment and how to conduct a cross section and longitudinal surveys. details on the site were observed to identify the topography and layout of the site. Besides, the observe details on the area are made to carry out detail survey for the purpose of designing and planning for the road design and to produce a detail drawing of the site.
Firstly, we make traverse. It is required to established the control network frame frame on the site, and to obtained obtained a roughly roughly estimation estimation of the site area. Then, we get the coordinate of the station on the traverse by GPS observation on two stations located on the traverse network.The traverse made by ourselves in this practical and we just to peg chainages above traverse line. Then, we transfer the coordinates by calculation.
When the field work were completed, we used CDS and AutoCAD to process all data that taken, taken, and produc produce e cross cross section section and detail detail plan. plan. It was a good good experience for me to learn and practice this software and doing this practical so I think this practical have gave me clearly overview of route surveying work.
BY:
MOHD ZULKARNAIN BIN ZAINAL ABIDIN (2008411092) (2008411092)
Page 54 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
I wish to thank Dr Rosmadi bin Ghazali for providing me with the opportunity to work alongside him, for all his patience and guidance in the way of conducting the field work. The field work for road design survey was conducted at the Taman Tunku, Sebera Seberang ng Jaya, Jaya, Penang Penang.. The object objective ive for this this pract practica icall are are to establ establish ish contr control ol points (horizontal and vertical) around or in the area and chainages (CH) using pegs. Moreover, the details on the site were observed to identify the topography and layout of the site. Besides, the observe details on the area are made to carry out detail survey for the purpose of designing and planning for the road design and to produce a detail drawing of the site. All measurements in this practical are based on a network of horizontal and vertical control points. These networks are used on site in the preparation of maps and plans. Firstly, traversing is required to established the control network frame on the site, and to obtained a roughly estimation of the site area. The coordinate of the station on the traverse are obtained from GPS observation on two stations located on the traverse network itself. Then, the coordinate are transferred to the chainage using calculated value from the road design curve. Afte Afterr all all the the deta detail il surv survey ey and and trav traver ersi sing ng work work are are done done,, all all data data we downloaded from the total station using the T-Com software. Data processing are done done by using using the CDS softw software are,, all all data data downlo downloade aded d in CDS softw softwar are e where where graphic image from observation can be produced and editing by file checking on screen. This software can produced data or information from measured points of station. Each of those points has their level and coordinates. All complete data then export exported ed to AutoCA AutoCAD D R14 softwar software e in DWG DWG forma formatt and graphic graphic editin editing g will will be plotted to the final plan. Then, the curve or the road design took place. The design was made based on the details drawing that were made earlier. From the design, the calculation for the curve was made to obtain every chainage, IP, TS and ST coordinate. The final coordi coordina nate te are are used used to obtain obtained ed the the bearin bearing g and dis distan tance ce by calcul calculati ating ng the differences in coordinate from the traverse stations. Lastly, the chainage are pegs according to the calculated values. Finally, I would like to conclude that the survey and design work that has been carried out was a success, with minimum obstacle, as the planning work was conducted accordingly. Page 55 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
BY:
2010
MOHD RIZALMAN BIN RASIDIN (2009201944) (2009201944)
AlhamdulillaH, a grateful thanks I wish to our Creator as He is the only who can give us ideas and zest especially to complete this route surveying practical. First of all, I would like to wish a big thankful to our lecturer Dr Rosmadi bin Ghazali as his pleasant teaching in this subject and definitely we had completely finished this practical practical route surveying and and not forgotten to our group members members in finishing this practical work.
We have done the procedure work accordly. Starting with reconnaissance on the first week, we identify the area before observations started. Every group is assigned to a different area at Taman Tunku, Seberang Jaya, Penang. After that, we carried out traversing works for establishing control points. The absolute values of the corrected horizontal and vertical value were obtained using GPS observation. These steps are very important for every surveying observation. observation.
The second process of the practical works required for detailed survey at the given area. The detail survey works were conducted by making observation from stations on the traverse network frames, to the features on the site. The pickup featur features es on the sit site, e, are trees, trees, draina drainage, ge, river, river, buildi building ng and others others perma permanen nentt features and the ground level heighting.
After all the field work done, we downloaded and processed all the data in total total statio station n to T-COM T-COM softw softwar are. e. All the raw data were were then then impor imported ted to CDS CDS software and then transferred to Auto CAD. In Auto CAD, detail plan are made, by based on the points extracted from the CDS software.
The The deta detail ils s su surv rvey ey plan plans s that that were were draw drawn n are are us used ed to obta obtain ined ed the the topographic features on the site and then are used to design the curve. The curve design were created using autocad based on the spec given. Then, then curve are
Page 56 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
calculated to obtained the final coordinate of every chainage and other required features of the curve. Fina Finall lly, y, the the curv curve e is pegs pegs on site site,, base based d on the the coor coordi dina nate te calc calcul ulat ated ed.. The The diff differ eren ence ces s of coor coordi dina nate te were were tran transf sfer erre red d from from the the obse observ rved ed stat statio ion n to the the chainage.
BY:
FAUZIAH BT ABDUL MALEK (2008401502) (2008401502)
Route Route survey survey includes includes the applicat application ion of detailed detailed survey, setting out and circular circular curves. Details Details on the site were observed observed to identify identify the topograp topography hy and layout of the site. The observed details on the area are made to carry out detail survey for the purpose of designing and planning for the road design and to produce a detail drawing of the site. Setting out is the establishment of the marks and lines to define the position and level of the elements for the construction work so that works may proceed with reference to them. Setting out begins with the plan and ends ends with with the variou various s elemen elements ts of a partic particula ularr engine engineeri ering ng projec projectt correc correctly tly positioned in the area. Mistakes in setting out can cause abortive work and delays which leave personnel, machinery and plant idle, resulting in additional costs.
In this practical, we make traverse which required to established the control network frame on the site and to obtained a roughly estimation of the site area. After that, we use GPS observation on two stations on the traverse network to get the coordi coordinat nate e of the statio station. n. Then, Then, we peg chaina chainages ges above above traver traverse se line line and tran transf sfer er the the coor coordi dina nate tes s by calc calcul ulat atio ion. n. This This oper operat atio ion n shou should ld inco incorp rpor orat ate e a checking checking procedure procedure.. Work is not complete complete until it has been checked. checked. We did the coordina coordinate te checking checking between calculat calculation ion and GPS observati observation on and the checking checking proved that our coordinate that we calculated are nearly accurate. The set back bearing at back stations and open a long chord bearing with it distance for pegging to make a spiral and circular curves. The circular that we peg should be align and intersect with the other groups. We have checked the accuracy of IP point of our group and others which are parallel with our circular, and the results is around 0.1 to 0.3. Page 57 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Finally after the field work were completed, we used CDS and AutoCAD to process all data that taken, and produce cross section and detail plan.
BY:
SITI NAIMAH BT NGISAH@NORMAN (2009687856 (2009687856 )
All praise to be ALLAH. Thanks to Dr Rosmadi Bin Ghazali for his guidance in this fieldwork. In this practical the main objective is to design a road based on horizontal and vertical control point around the site area. Our site area is at Taman Tunku, Seberang Jaya, Pulau Pinang.
At the first, traversing is done at the site area to get the horizontal control (x, y) along route. The coordinate of the control point on the traverse are obtained from GPS. Then, the detail at the site area are observed and recorded for the purpose of designing the route and detail drawing. Besides that we are recorded all important details think such as drain, tree, retaining wall, Culvert, Pipe line Ground Level. Along traverse we are marked chainage every 5 meter intervals. The coordinate of chainage (CH) can be obtained from the curve calculation.
Then, we used CDS software to process the data and plotting the plan using AutoCAD. Besides, using CDS is easier to joint all details compared to AutoCAD because we just need to key-in all the data and then process but in AutoCAD we have to key-in the data one by one and joint the details which is much more complica complicated. ted.
After After all measurem measurement, ent, calculati calculation on and plotting plotting are completed; completed; we
marked the chainage(CH), TS,ST and IP according to calculated values.
Page 58 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
Finally, this task is very challenging but we all co-operated to complete it. I conclude that this task had been conducted successfully and all group members gave the good commitment. I hope our lecturer satisfy with our job. Thank you.
BY:
i.
MUHAMMAD RUZAINI BIN MOHAMMAD FADZIL (2009837016)
Alhamdul Alhamdulillah illah for for the comp completio letion n of the job. job. Route Route surveyin surveying g is about about a survey survey which conducted to design and setting out a road alignment and some would take consider curves.
ii. And this route route surveyin surveying g is mainly compri comprised sed of details details survey survey and alignment alignment survey survey,, which which the later later detail details s plan plan produc produced, ed, would would give give an idea idea which which terrain is suitable to design a road. iii. Basically the site site is mainly a flat flat and undulating undulating area although although some part of of it is waterway, river and permanent features. iv. iv. The The cont contro roll for for the the surv survey ey job is base based d on an assu assume med d valu value e of x, y and and assumed reduced level of z. v. The details details are observe observed d using using a radia radiatio tion n method method using using total total statio station n and later would be processed and generated using CDS software. And the final output is a detail and topographical plan which was edited using AutoCAD 2007. vi. The area covered is is about 10000 meter square square with an offset for for the both side 20 meters.
Page 59 of 60
SUG 596 - FIELD SCHEME II (ENGINEERING SURVEY)
2010
vii. Once finished the part of detailing and the proposed location location for the road is determined, we are required to design a road which concerned about a spiral and circular curves. viii.A calculation has been made according to the given specification specification and once the coordinate of chainage is computed, the setting out for the chainage is started. ix. The setting out out is being carried carried out from the nearby traverse traverse station and as as a result is pegging mark on the ground according to the computed coordinate. coordinate. x. Lastly many many thankful thankful for Assoc. Prof Dr. Rosmadi Ghazali for for supervising supervising and and fellow group members for the helping hands to finish this task.
Page 60 of 60