14.4. SEWA ALAT BERAT 1
Asphalt Mixing Plant
220,0
2
50,0
T/Jam
6.742.675
6.742.675
6.742.675
6.742.675
6.742.675
6.742.675
Asphalt Finisher
50,0
5,0
Ton
502.934
502.934
502.934
502.934
502.934
502.934
3
Asphalt Sprayer
15,0
800,0
Liter
99.242
99.242
99.242
99.242
99.242
99.242
4
Bulldozer
140,0
HP
688.233
688.233
688.233
688.233
688.233
688.233
5
Compressor 4000-6500 L\M
80,0
5.000,0
5.000,00
260.086
260.086
260.086
260.086
260.086
260.086
6
Concrete Mixer 0.3-0.6 m3
15,0
500,0
Liter
111.148
111.148
111.148
111.148
111.148
111.148
7
Crane 10-15 Ton
150,0
25,0
Ton
763.057
763.057
763.057
763.057
763.057
763.057
8
Dump Truck 3 - 4 m3
100,0
6,0
Ton
319.716
319.716
319.716
319.716
319.716
319.716
9
Dump Truck 10 Ton
125,0
8,0
Ton
406.616
406.616
406.616
406.616
406.616
406.616
10
Excavator 80-140 HP
80,0
0,9
M3
429.975
429.975
429.975
429.975
429.975
429.975
11
Flat Bed Truck 3-4 m3
125,0
4,0
ton
460.372
460.372
460.372
460.372
460.372
460.372
12
100 - 150
Generator Set
220,0
180,0
13
Motor Grader >100 HP
125,0
10.800,0
KVA
649.587
649.587
649.587
649.587
649.587
649.587
10.800,00
669.975
669.975
669.975
669.975
669.975
669.975
14
Track Loader 75-100 HP
95,0
1,5
M3
398.904
398.904
398.904
398.904
398.904
398.904
15
Wheel Loader 1.0-1.6 M3
125,0
1,5
M3
625.202
625.202
625.202
625.202
625.202
625.202
16
Tree Wheel Roller 6-8 T
60,0
8,0
Ton
301.336
301.336
301.336
301.336
301.336
301.336
17
Tandem Roller 6-8 T.
60,0
8,0
Ton
487.143
487.143
487.143
487.143
487.143
487.143
18
Tire Roller 8-10 T.
60,0
10,0
Ton
461.025
461.025
461.025
461.025
461.025
461.025
19
Vibratory Roller 5-8 T.
60,0
8,0
Ton
378.282
378.282
378.282
378.282
378.282
378.282
20
Concrete Vibrator
3,0
25,0
25,00
39.081
39.081
39.081
39.081
39.081
39.081
21
Stone Crusher
220,0
50,0
T/Jam
1.152.441
1.152.441
1.152.441
1.152.441
1.152.441
1.152.441
22
Water Pump 70-100 mm
-
44.104
44.104
44.104
44.104
44.104
44.104
Water Tanker 3000-4500 L.
125,0
4.000,0
Liter
375.222
375.222
375.222
375.222
375.222
375.222
Pedestrian Roller
11,0
1,00
Ton
78.175
78.175
78.175
78.175
78.175
78.175
25
Tamper
5,0
0,20
Ton
48.054
48.054
48.054
48.054
48.054
48.054
26
Jack Hammer
3,0
1.330,00
1.330,00
40.061
40.061
40.061
40.061
40.061
40.061
27
Fluvi Mixer
75,0
2.005,00
2.005,00
1.641.201
1.641.201
1.641.201
1.641.201
1.641.201
1.641.201
23 24
6,0
-
SEWA
Page 305
STANDARISASI HARGA BELANJA PUBLIK TAHUN 2014
(Rupiah)
No.
URAIAN
SATUAN (HP)
KAPASITAS
ZONA PENAJAM 1
BIAYA SEWA ALAT PER JAM (diluar PPN) ZONA ZONA ZONA PENAJAM 2 PENAJAM 3 WARU
ZONA BABULU
ZONA SEPAKU
28
Concrete Pump
100,0
8,00
M3
314.886
314.886
314.886
314.886
314.886
314.886
29
Trailer 20 TON
175,0
20,00
Ton
620.730
620.730
620.730
620.730
620.730
620.730
30
Pile Driver + Hammer
25,0
6,00
Ton
615.427
615.427
615.427
615.427
615.427
615.427
31
Crane on Track 35 TON
125,0
35,0
Ton
822.804
822.804
822.804
822.804
822.804
822.804
32
Welding Set
40,0
250,0
Amp
140.438
140.438
140.438
140.438
140.438
140.438
33
Bore Pile Machine
150,0
2.000,0
Meter
944.576
944.576
944.576
944.576
944.576
944.576
34
Asphalt Liquid Mixer
5,0
1.000,0
Liter
108.723
108.723
108.723
108.723
108.723
108.723
35
Tronton
150,0
15,0
Ton
643.655
643.655
643.655
643.655
643.655
643.655
36
Cold Milling
248,0
1.000,0
m
1.839.005
1.839.005
1.839.005
1.839.005
1.839.005
1.839.005
37
Rock Drill Breaker
-
70.416
70.416
70.416
70.416
70.416
70.416
38
Cold Recycler
900,0
2,2
M
7.067.166
7.067.166
7.067.166
7.067.166
7.067.166
7.067.166
39
Hot recycler
400,0
3,0
M
8.286.850
8.286.850
8.286.850
8.286.850
8.286.850
8.286.850
40
Aggregat (Chip) Spreader
115,0
3,5
M
613.282
613.282
613.282
613.282
613.282
613.282
41
Asphalt Distributor
115,0
4.000,0
Liter
422.416
422.416
422.416
422.416
422.416
422.416
42
Slip Form Paver
105,0
2,5
M
611.530
611.530
611.530
611.530
611.530
611.530
43
Concrete Pan Mixer
134,0
600,0
Liter
748.636
748.636
748.636
748.636
748.636
748.636
44
Concrete Breaker
290,0
20,0
m3/jam
969.953
969.953
969.953
969.953
969.953
969.953
45
Asphalt Tanker
190,0
4.000,0
liter
644.860
644.860
644.860
644.860
644.860
644.860
46
Cement Tanker
190,0
4.000,0
liter
598.660
598.660
598.660
598.660
598.660
598.660
47
Condrete Mixer (350)
20,0
350,0
liter
86.165
86.165
86.165
86.165
86.165
86.165
48
Vibrating Rammer
4,2
80,0
KG
47.970
47.970
47.970
47.970
47.970
47.970
49
Truk Mixer (Agitator)
220,0
5,0
M3
741.072
741.072
741.072
741.072
741.072
741.072
50
Bore Pile Machine
125,0
60,0
CM
750.983
750.983
750.983
750.983
750.983
750.983
51
Crane on Track 75-100 Ton
200,0
75,0
Ton
730.163
730.163
730.163
730.163
730.163
730.163
52
Blending Equipment
50,0
30,0
Ton
264.522
264.522
264.522
264.522
264.522
264.522
53
Asphalt Liquid Mixer
40,0
20.000,0
Liter
160.270
160.270
160.270
160.270
160.270
160.270
3,0
-