RENCANA ANGGARAN BIAYA Satker Peke Pekerj rjaa aan n Lokasi T.A.
: : : :
Kantor Gubernur Sulawesi Selatan Reno Renova vasi si Gedu Gedung ng Kant Kantin in Jl. Urip Sumuharjo 2016
No
Jenis Kegiatan
Satuan
Volume
Harga Satuan (Rp)
Jumlah (Rp)
1
2
3
4
5
6
A PEKE PEKERJ RJAA AAN N PERSI PERSIAP APAN AN 1
Peng Penguk ukur uran an & Pemas Pemasan anga gan n Bow Bowpl plan ank k
m
1
13.000
86,900.00
1,129,700.00
2
Administrasi dan Dokumentasi
Ls
4.000
500,000.00
2,000,000.00
3
Pembongkaran Tembok
Ls
1.000
5,000,000.00
5,000,000.00 8,129,700.00
B I
PEKE PEKERJ RJAA AAN N RENO RENOVA VASI SI PEKE PEKERJ RJAA AAN N POND PONDAS ASII Galian Tanah Pasir Urug Bawah Pondasi Pekerjaan Pondasi Batu Kali 1 PC : 4 PP Pekerjaan Pondasi Penambahan Lantai Urugan Tanah Penambahan Lantai Pasir Urug Penambahan Lantai Screed Lantai
m3 m3 m3 m3 m3 m3 m3
1.422 0.3555 3.9816 15 5.488 16.176 1.44
Rp Rp Rp Rp Rp Rp Rp
70,125.00 191,730.00 736,285.00 736,285.00 173,250.00 191,730.00 817,936.54
99,717.75 68,160.02 2,931,592.36 11,044,275.00 950,796.00 3,101,424.48 1,177,828.62 19,373,794.23
II PEKE PEKERJ RJAA AAN N BET BETON ON Pek. Plat Lantai Beton penutup Saluran Pas. Pondasi Poer Pedestal 32/32 Pek, Kolom Pedestal 22/22
3
5.087
3,559,824.25
18,108,626.61
3
0.041
3,559,824.25
145,810.40
3
0.048
3,559,824.25
172,295.49
m m m
18,426,732.50 III PEKERJAAN PEKERJAAN DINDING DINDING DAN LANTAI LANTAI 1 2 3 4 5 6
Pas. Pas. Dind Dindin ing g Bat Batu u Bat Bataa Cam Camp. p. 1 : 4 Pek. Pek. Plas Plaste tera ran n1:4 Pek. Ac Ac ia ian Te Te mb mbok Pek. Pek. Tim Timbu buna nan n Tan Tanah ah di di baw bawah ah Lan Lanta taii Pek. Pek. Tim Timbu buna nan n Pas Pasir ir di di baw bawah ah Lan Lanta taii Pek. Pek. Pema Pemada data tan n Timb Timbun unan an Tana Tanah h Pili Piliha han n
7
Pek. Pek. Scre Screed ed Lant Lantai ai T = 7 cm cm
8
Pas. Tegel Keramik 40 x 40 (Lantai Teras)- Warna Setara mass
2
11.000
105,853.00
1,164,383.00
2
13.200
79,882.00
1,054,442.40
2
13.200
36,148.75
477,163.50
3
8.673
173,250.00
1,502,597.25
3
2.478
191,730.00
475,106.94
3
8.673
52,250.00
453,164.25
1.735
817,936.54
1,418,792.73
74.000
252,953.25
18,718,540.50
m m m m m
M
3
M m2
25,264,190.57
No
Jenis Kegiatan
1 2 IV PEKERJAAN ELEKTRIKAL 1 Pemasangan Instalasi Penerangan Pemasangan Instalasi Stop Kontak 2 3 Pek. Pas. Stop Kontak 4 Pek. Pas. Saklar Ganda
Satuan
Volume
Harga Satuan (Rp)
Jumlah (Rp)
3
4
5
6
Unit ttk buah buah
6.000 8.000 8.000 3.000
215,600.00 257,345.00 28,500.00 55,000.00
1,293,600.00 2,058,760.00 228,000.00 165,000.00 3,745,360.00
V PEKERJAAN PENGECATAN 1 Pek. Cat Dinding / tembok Bagian dalam 2 Pek. Cat Listplank 3 Pek. Cat tembok Lama Bagian Luar 4 Pek Pengecatan Kolom Baja Eksisting
m2 m2 m2 m2
13.200 23.600 48.000 184.993728
39,202.90 32,338.90 39,202.90 32,338.90
517,478.28 763,198.04 1,881,739.20 5,982,493.67 9,144,909.19
VI PEKERJAAN KONSTRUKSI BAJA 1 Pek. Kolom Rangka Pipa Ø 3" 2 Pek. Kuda Kuda pipa 3 Pek Gording 5:5 4 Pek. Perakitan / Erection Baja 5 Pekerjaan Pengelasan 6
Zinkchromate Coating
Kg Kg Kg Kg Cm 2
m
130.400 140.556 253.890 524.846 52.485
38,153.50 38,153.50 34,105.50 317.68 4,131.60
4,975,216.40 5,362,688.08 8,659,045.40 166,732.95 216,845.21
5.248
63,717.50
334,418.50 19,714,946.53
VII PEKERJAAN PENUTUP GOT / GRILL 1 Pek. Baja Siku 50.50.5 mm 2 Pekerjaan Pengelasan 3 Pek. Besi Ø10
kg Cm kg
102.06 12.887775 26.81775
Rp Rp Rp
34,105.50 4,131.60 16,567.10
3,480,807.33 53,247.13 444,292.35 3,978,346.81
VIII PEKERJAAN ATAP KANOPI DEPAN 1 Kanopi Tambahan Hollow dengan atap Spandek Hollow 4/4
m2
118.250
435,878.58
51,542,642.09 51,542,642.09
IX PEKERJAAN LIST VARIASI UNTUK TAMPAK 1 Pekerjaan List Variasi Untuk Tampak
m1
76.160
30,030.00
2,287,084.80 2,287,084.80
C PEKERJAAN AKHIR 1 Pek. Pembersihan Sisa Pekerjaan
Ls
1.000
2,500,000.00
Makassar 16 juni 2016 Kontraktor Pelaksana CV. Tirsa Dwi Guna
Andi Bayuni Marsuki. ST Kuasa Direktur
2,500,000.00 2,500,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA Kegiatan Pekerjaan Lokasi T.A.
: : : :
Kantor Gubernur Sulawesi Selatan Renovasi Gedung Kantin Jl. Urip Sumuharjo 2016 URAIAN PEKERJAAN
No. A
PEKERJAAN PERSIAPAN
B
PEKERJAAN RENOVASI
I II
JUMLAH HARGA Rp.
8,129,700.00
PEKERJAAN PONDASI
Rp.
19,373,794.23
PEKERJAAN BETON
Rp.
18,426,732.50
III PEKERJAAN DINDING DAN LANTAI
Rp.
25,264,190.57
IV PEKERJAAN ELEKTRIKAL
Rp.
3,745,360.00
V
Rp.
9,144,909.19
VI PEKERJAAN KONSTRUKSI BAJA
Rp.
19,714,946.53
VII PEKERJAAN PENUTUP GOT / GRILL
Rp.
3,978,346.81
VIII PEKERJAAN ATAP KANOPI DEPAN
Rp.
51,542,642.09
PEKERJAAN PENGECATAN
. C
PEKERJAAN AKHIR
,
,
.
Rp.
2,500,000.00
REAL COST Rp.
164,107,706.72
PPN 10 % Rp.
16,410,770.67
TOTAL Rp.
180,518,477.39
DIBULATKAN Rp.
180,518,000.00
Terbilang : Seratus Delapan Puluh Juta Lima Ratus Delapan Belas Ribu Rupiah
Makassar 16 juni 2016 Kontraktor Pelaksana CV. Tirsa Dwi Guna
Andi Bayuni Marsuki. ST Kuasa Direktur
DAFTAR HARGA BAHAN DAN UPAH
No.
NAMA BAHAN
HARGA SATUAN
SAT.
BAHAN DASAR 3
1
Batu gunung
Rp
167,000.00
/m
2
Pasir pasangan
Rp
135,000.00
/m
3
Pasir beton
Rp
142,000.00
/m
4
Pasir Urug
Rp
124,000.00
/m
5
Tanah urugan
Rp
110,000.00
/m
6
Kerikil
Rp
277,000.00
/m
7
Split 1-2
Rp
247,000.00
8
Batu Merah
Rp
550.00
/m /buah
9
Semen ( dihitung 40 kg/zak )
Rp
1,250.00
/kg
10
Semen warna
Rp
18,500.00
/kg
11
Bata Ringan / Hebel (60x20x7.5 s/d 20)
Rp
1,205,000.00
/m
3 3 3 3 3 3
3
BAHAN KAYU 3
1
Balok Kayu Kls I Sawmill
Rp
10,250,000.00
/m
2
Papan Kayu Kls I Sawmill
Rp
11,250,000.00
/m
3
Balok kayu kls. II ( samarinda )
Rp
4,350,000.00
/m
4
Papan kayu kls. II ( samarinda )
Rp
4,500,000.00
/m
5
Balok kayu kls. III
Rp
2,900,000.00
/m
6
Papan kayu kls. III
Rp
3,400,000.00
/m
3 3 3 3 3
BAHAN LANTAI
1
Tegel keramik 40/40 cm Polos Setara Mass
Rp
65,000.00
Dos
2
Tegel keramik 40/40 cm Warna Setara Mass
Rp
75,000.00
Dos
3
Tegel keramik 20/40 cm Warna
Rp
60,000.00
Dos
4
Tegel keramik 20/25 cm Polos
Rp
55,000.00
Dos
5
Tegel keramik 20/25 cm Warna
Rp
58,000.00
Dos
6
Nossing 10/40 cm Warna
Rp
15,000.00
/Bh
7
Membrane Fiber (Uk. 20X100) cm
Rp
37,500.00
/lbr
8
Cat Anti Bocor Lapis I
Rp
57,500.00
/kg
9
Laminate floor
Rp
235,000.00
2
/m
BAHAN BESI
1
Besi Beton U24 Polos
Rp
13,000.00
/kg
2
Besi Beton U32 Ulir
Rp
13,500.00
/kg
3
Besi Profil
Rp
16,500.00
/kg
4
Baja
Rp
19,700.00
/kg
5
Paku Biasa
Rp
17,500.00
/kg
6
Paku Asbes
Rp
45,500.00
/kg
7
Kawat Beton
Rp
21,500.00
/kg
8
Paku tripleks
Rp
26,000.00
/kg
9
Paku Beton
Rp
44,000.00
/dos
10
Besi Strip 35.4 mm
Rp
28,000.00
/kg
11
Besi siku 40.4 mm - 6 mtr
Rp
200,000.00
/btg
12
Besi siku 30.30.3 mm - 6 mtr
Rp
146,500.00
/btg
13
Slab Decking W Profile - Bomdek T= 0,75 mm
Rp
189,000.00
14
Wire Mesh 15 cm D-8
Rp
15
Kawat Las
Rp
35,000.00
/m /kg
16
Formite/spacer
Rp
27,000.00
/Bh
17
Seng Plat BJLS 0.35 mm
Rp
75,500.00
/Lbr
18
Jendela Nako
Rp
85,000.00
/Bh
19
Stek Angker - D 16 mm + Bout / Ring, L- 45 cm
Rp
32,500.00
/Bh
20
Stek Angker - D 24 mm + Bout / Ring, L- 60 cm
Rp
75,000.00
/Bh
-
2
/m
2
KET.
22 Mour Baut D. 16 mm
Rp
9,500.00
/Bh
23 Mour Baut D. 14 mm
Rp
7,500.00
/Bh
2 4 Walter Mu r Ø14
Rp
38,500.00
/Bh
2 5 Trekstang Ø12 lengkap dengan Mur Baut P= 80 cm
Rp
58,000.00
/Bh
BAHAN PIPA 1
1
Pipa PVC 1/2 "
Rp
5,750.00
/m
2
Pipa PVC 3/4 "
Rp
7,000.00
/m
3
Pipa PVC 1 "
Rp
9,125.00
/m
4
Pipa PVC 1.5 "
Rp
20,125.00
/m
5
Pipa PVC 2 "
Rp
29,000.00
/m
6
Pipa PVC 2.5 "
Rp
40,875.00
/m
7
Pipa PVC 3 "
Rp
58,750.00
/m
8
Pipa PVC 4 "
Rp
89,125.00
/m
1 1 1 1 1 1 1
BAHAN SANITER
1
Kloset Duduk setara Toto
Rp
2,005,000.00
/Bh
2
Kloset Jongkok setara Toto
Rp
650,000.00
/Bh
3
Floor Drain
Rp
75,000.00
/Bh
4
Water Drain
Rp
55,000.00
/Bh
5
Kran Air
Rp
51,000.00
/Bh
6
Stop Kran
Rp
77,000.00
/Bh
7
Jet Spray
Rp
125,000.00
/Bh
8
Sealtape
Rp
2,500.00
/Bh
9
Cermin 60 x 80 cm (Lengkap)
Rp
650,000.00
/Bh
10
Tangki Air (Fiber) Kapasitas 1 m3
Rp
1,350,000.00
/Bh
, 12
Pintu Aluminium + Accessories
,
.
Rp
1,500,000.00
/Bh
BAHAN LANGIT-LANGIT
1
Tripleks 6 MM
Rp
98,500.00
/Lbr
2
Tripleks 9 MM
Rp
130,500.00
/Lbr
3
Teakwood 3 MM
Rp
92,500.00
/Lbr
4
Gypsum Board 9 mm
Rp
69,500.00
/Lbr
5
Calciboard 3.5 mm
Rp
70,500.00
/Lbr
6
Plywood tebal 9 mm
Rp
135,000.00
/Lbr
7
Plywood tebal 4 mm
Rp
75,000.00
/Lbr
8
List Profil 3 x 3
Rp
16,000.00
/m
9
List Profil Gypsum
Rp
18,000.00
/m
10
List Profil PVC
Rp
36,300.00
/m
11
Metal Furing Channel - Main Runner
Rp
16,500.00
12
Wall track
Rp
57,500.00
/m /Btg
13
Wall stud
Rp
45,000.00
/Btg
14
Top cross rail
Rp
19,470.00
/Btg
15
Connector clip
Rp
1,500.00
pcs
16
Suspention rod
Rp
6,500.00
/Btg
17
Suspention clip
Rp
8,500.00
pcs
18
Angel bracket
Rp
15,500.00
/Btg
19
Drywall Screw
Rp
65,000.00
dos
20
Cornice Adhesive
Rp
66,000.00
zak
21
Catton Tape
Rp
15,500.00
roll
22
Hollow 40.60.5 mm
Rp
16,000.00
/m
23
Hollow 40.40.5 mm
Rp
14,000.00
/m
24
Hollow 40.20.5 mm
Rp
10,500.00
Rp
15,000.00
/m /Kg
Rp
40,000.00
/Kg
25 26
Kawat Gantung Sekrup Plafond
1 1 1 1
1 1 1
28
Joiner
Rp
850.00
/Bh
29
Penggantung besi
Rp
5,000.00
/Bh
30
Braket L
Rp
4,500.00
/Pcs
31
Braket Sepatu
Rp
4,500.00
/Pcs
32
Dynabolt Hilti
Rp
5,250.00
/Pcs
BAHAN ATAP
1
Atap Genteng Metal (Polos) tb 0.4 setara Multiroof
Rp
96,500.00
/Lbr
2
Atap Spandek 0.35 mm SID 5 (750) - Color Bond Zincalume
Rp
74,250.00
3
Nok Genteng Metal model U (Polos) setara Multiroof
Rp
55,000.00
/m /Lbr
4
Nok Samping Genteng Metal (Polos) setara Multiroof
Rp
47,500.00
/m
5
Nok / Talang Zincalume T=0.35 mm Lebar 60cm
Rp
46,250.00
/m
6
Nok / Talang Zincalume T=0.35 mm Lebar 120cm
Rp
87,500.00
1
1 1 1
7
Sekrup Atap 6.5 cm
Rp
1,200.00
/m /Biji
8
Sekrup Atap Metal
Rp
75,000.00
/Kg
9
Seng Plat
Rp
75,500.00
/Lbr
10
Seng Plat T= 0.35 mm L= 90 cm
Rp
46,250.00
/m
11
Seng Plat T= 0.45 mm L= 90 cm
Rp
58,750.00
/m
12
Kanal C Baja Ringan 0.75
Rp
27,666.67
13
Reng Baja ringan 0.45
Rp
57,500.00
/m /btg
14
Aluminium Foil
Rp
47,500.00
/m
15
Woodplank lebar 20 cm
Rp
31,250.00
/m
Rp
250,000.00
/m
Rp
307,500.00
16
1 1 1
2 1
Rangka Atap Baja Ringan + Pasang (Lengkap) Setara Smartruss
2
BAHAN PENGGANTUNG/KACA
1
Kunci Pintu SES
,
/Bh
.
3
Grendel Jendela
Rp
28,000.00
/Bh
4
Grendel Pintu
Rp
65,000.00
/Bh
5
Ensel Pintu
Rp
45,000.00
/Bh
6
Engsel Jendela
Rp
35,500.00
/Bh
7
Kaca 5 mm (bening)
Rp
125,500.00
2
/m
BAHAN FINISHING/CAT
1
Cat Dasar Skim Coat (setara Mowilex)
Rp
33,000.00
/kg
2
Cat Tembok setara mowilex - Interior
Rp
53,000.00
/kg
3
Cat Tembok setara mowilex - Exterior
Rp
77,000.00
/kg
4
Cat Kayu - ICI
Rp
76,000.00
/kg
5
Cat Meni
Rp
18,750.00
/kg
6
Cat Zinkchromate
Rp
38,500.00
/kg
7
Minyak cat
Rp
12,500.00
/Ltr
8
Minyak Bekisting
Rp
6,500.00
/Ltr
9
Plamur kayu
Rp
31,500.00
/kg
10
Plamur tembok
Rp
31,500.00
/kg
11
Kertas gosok
Rp
12,500.00
/lbr
12
Lem Kayu
Rp
17,000.00
/Ltr
13
Kuas
Rp
16,500.00
/Bh
BAHAN INSTALASI LISTRIK
1
Lampu TL 1X36 watt ex. Philips + KAP Lengkap
Rp
450,000.00
/Bh
2
Lampu TL 2X36 watt ex. Philips + KAP Lengkap
Rp
750,000.00
/Bh
3
Lampu Mercuy 250 watt ex. Philips
Rp
170,000.00
/Bh
4
Lampu DL RD 175 - ex Philips 18 Watt
Rp
185,000.00
/Bh
5
Lampu DL RD 150 - ex Philips 11 Watt
Rp
165,000.00
/Bh
6
Lampu SL 18 Watt
Rp
55,000.00
/Bh
7
Lampu Pijar 25 Watt
Rp
32,500.00
/Bh
8
Saklar Tunggal ex. Panasonic
Rp
35,000.00
/Bh
9
Saklar Ganda Ex. Panasonic
Rp
55,000.00
/Bh
10
Stop Kontak ex. Panasonic
Rp
28,500.00
/Bh
11
Stop Kontak Kipas Angin ex. Panasonic
Rp
28,500.00
/Bh
12
Zakering Kast 3 Group
Rp
96,000.00
/Bh
13
Fitting
Rp
16,000.00
/Bh
14
Titik Lampu
Rp
75,000.00
/Bh
15
Kabel NYY 4 x 25 m2 dari Panel Induk
Rp
175,000.00
16
Kabel NYM 3X2,5 mm2 ex Supreme
Rp
4,500.00
17
Pipa PVC 20 mm2 ex Clipsal
Rp
16,000.00
/m /Btg
18
Sok Pipa Conduit
Rp
5,000.00
/Bh
19
Pipa Fleksible
Rp
1,500.00
20
In-Bow Dos ex. Panasonic
Rp
8,500.00
/m /Bh
21
Isolasi
Rp
18,500.00
/Bh
Rp
325,000.00
1
/m
1
1
BAHAN KUSEN ALUMINIUM
1
Sunscreen Aluminium -
,
.
2
/m
1
m
1
3
Profil Aluminium - Pintu
Rp
90,000.00
/m
4
Profil Aluminium - Jendela
Rp
85,000.00
5
Skrup Fixer
Rp
1,500.00
/m /Buah
6
Sealent
Rp
45,000.00
/Tube
1
BAHAN LAIN-LAIN 2
1
Ijuk
Rp
60,000.00
2
Bambu
Rp
20,000.00
/m /Btg
3
Dolken Kayu Diameter 8-10/400 cm
Rp
35,000.00
/Btg
4
Tali Rotan
Rp
18,000.00
/Kg
5
Solar
Rp
6,500.00
/Ltr
6
Minyak Pelumas
Rp
35,000.00
/Ltr
7
Batu Apung
Rp
7,500.00
/Kg
8
Buis Beton 1/2 D= 30 cm - 1 mtr
Rp
145,000.00
/Biji
9
Cincin Sumur D-80 cm
Rp
215,000.00
/Buah
10
Beton Ready Mix K-250
Rp
1,250,000.00
11
Rooster
Rp
45,000.00
/m /Biji
12
Alat Bantu
Rp
1,000.00
/Set
13
Air
Rp
250.00
/Ltr
3
No.
TENAGA KERJA
HARGA SATUAN
SAT.
1
Pekerja
Rp
80,000.00
/hr
2
Tukang
Rp
100,000.00
/hr
3
Kepala Tukang
Rp
130,000.00
/hr
4
Mandor
Rp
150,000.00
/hr
KET.
.
No.
PERALATAN
HARGA SATUAN
SAT.
1
Sewa Tripot/Tackel & Handle Crane 2 T
Rp
350,000.00
/hr
2
Sewa Alat Las
Rp
85,000.00
/Jam
. Makassar 16 juni 2016 Kontraktor Pelaksana CV. Tirsa Dwi Guna
Andi Bayuni Marsuki. ST Kuasa Direktur