BILL OF QUANTITY (BQ) REKAPITULASI RENCANA ANGGARAN BIAYA TOTAL
KEGIATAN
:
PEKERJAAN
:
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
LOKASI
:
KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG
TAHUN ANGGARAN
:
201 1
JENIS PEKERJAAN
NO
JUMLAH HARGA (Rp)
I
GEDUNG UTAMA
1
PEKERJAAN KANOPI ENTRANCE
1,228,636,303.07
2
PEKERJAAN INTERIOR & EKSTERIOR GEDUNG
5,731,410,269.42
II
ELEK ELEKTR TRIK IKAL AL DAN VIDEO VIDEO SYSTE SYSTEM M
1
PENERANGAN & INSTALASI TELEPHONE GEDUNG GRAHA
789,740,445.00
2
AREA PARKIR
985,818,779.38
3
INSTALASI LAMPU HALL GEDUNG
4
INSTALASI VIDEO SYSTEM
5
INSTALASI MICROPHONE
82,058,250.00
6
INSTALASI FIBER-OPTIC
215,118,505.32
48,441,000.00 3,462,079,400.00
III III
LAPA LAPANG NGAN AN TEN TENNIS NIS INDOO INDOOR R
1
PEKERJAAN LAPANGAN TENNIS
2
PEKERJAAN TRIBUN
747,159,978.93
IV
TRIB TRIBUN UN STAD STADIO ION N
3,973,989,395.14
8,982,584,378.03
JUMLAH
2 6 , 2 47 , 0 3 6, 7 0 4 . 2 8
DIBULATKAN
2 6 , 2 4 7 , 03 6 , 00 0 . 0 0
Terbilang
:
DUA PULUH ENAM MILYAR DUA RATUS EMPAT PULUH TUJ UH JUTA TIGA PULUH ENAM RIBU RUPIAH
KET: HARGA SUDAH TERMASUK PAJAK-PAJAK, KEUNTUNGAN, OVERHEAD DAN BIAYA UMUM.
Surabaya, 28 April 2011 PT. WASKITA KARYA (Persero) CABANG JAWA TIMUR
Ir. PIUS SUTRISNO Kepala Cabang
REKAPITULASI RENCANA ANGGARAN BIAYA KEGIATAN
:
UNIVERSITAS NEGERI MALANG
PEKERJAAN PEKERJAAN
:
BELANJA BELANJA MODAL GEDUNG DAN BANGUNAN BANGUNAN BERUPA BERUPA PERENCANAAN PERENCANAAN
LOKASI LOKASI
:
KAMPUS KAMPUS UNIVER UNIVERSIT SITAS AS NEGERI NEGERI MALANG MALANG
TAHU AHUN ANGG ANGGAR ARAN AN
:
PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
Jl.SEMARANG NO 5 MALANG 2011 2011
R EK AP IT UL AS I I
G RA HA
PEKERJAAN KANOPI ENTRANCE
Rp.
216,674,831.37
A
PEKERJAAN KANOPI ENTRANCE SISI SELATAN
B
PEKERJAAN KANOPI ENTRANCE SISI UTARA
Rp.
216,674,831.37
C
PEKERJAAN KANOPI ENTRANCE BASEMENT SISI UTARA
Rp.
300,681,572.00
D
PEKERJAAN KANOPI ENTRANCE BASEMENT SISI SELATAN
Rp.
300,681,572.00
E
PEKERJAAN KANOPI ENTRANCE BASEMENT SISI BARAT
Rp.
193,923,496.33
JUMLAH I
Rp.
1,228,636,303.07
Rp.
310,385,021.02
II
A
PEKERJAAN INTERIOR & EKSTERIOR GEDUNG
AREA INTERIOR GEDUNG
I
PEKERJAAN MODUL STAGE MOVEABLE SISI SELATAN
II
PEKERJAAN MODUL STAGE MOVEABLE SISI UTARA
Rp.
310,385,021.02
III
PEKERJAAN PEMASANGAN ORNAMEN KAYU JATI
Rp.
583,491,937.35
IV
PEKERJAAN AREA TANGGA SERVICE
Rp.
359,671,360.95
V
PEKERJAAN PENGECATAN
Rp.
86,421,730.59
VI
PEKERJAAN AREA BASEMENT
Rp.
140,857,758.14
VII
PEKERJAAN LAIN-LAIN
Rp.
2,866,435,000.00
B
AREA EKSTERIOR GEDUNG
I
PEKERJAAN AREA PLAT ATAP (AC)
Rp.
340,603,498.36
II
PEKERJAAN AREA WATER TOWER
Rp.
33,977,462.57
III
PEKERJAAN BETON PLAT LEUVEL
Rp.
656,424,224.33
IV
PEKERJAAN AREA LUAR GEDUNG
Rp.
34,872,449.93
V
PEMBUATAN ROLLBAR KESEHATAN TYPE A
Rp.
2,787,375.16
VI
PEMBUATAN ROLLBAR KESEHATAN TYPE B
Rp.
5,097,430.01
JUMLAH II
Rp.
5,731,410,269.42
JUMLAH I+II
Rp.
6,960,046,572.49
JUMLAH TOTAL DIBULATKAN
Rp.
6,960,046,000.00
Terbilang:
ENAM MILYAR SEMBILAN RATUS ENAM PULUH JUTA EMPAT PULUH ENAM RIBU RUPIAH
Surabaya, 28 April 2011 PT. WASKITA KARYA (Persero) CABANG JAWA TIMUR
Ir. PIUS SUTRISNO Kepala Cabang
+
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
LOKASI LOKASI
: KAMPUS KAMPUS UNIVERSITA UNIVERSITAS S NEGERI NEGERI MALANG MALANG
TAHU TAHUN N ANGG ANGGAR ARAN AN
: 2011 2011
Jl.SEMARANG NO 5 MALANG
No
URAIAN PEKERJAAN
A
PEKERJAAN KANOPI KANOPI ENTRANCE SISI SELATAN
I
PEKERJAAN PERSIAPAN 1 Pembersihan lokasi 2 Pasang Bowplank 3 Penyambungan Beton dengan Chemical Anchoring System
II 1 2 3 4 5 III III 1 2 3 4 5 6 7 IV 1 2 3 4 5 6 7 8 9 10
PEKERJAAN TANAH Galian tanah Pondasi Bor Straus Ø 30 cm Urugan Urugan tana tanah h kembal kembalii Urugan Tanah peninggian lantai dipadatkan Urugan pasir Bawah Pondasi PEKE PEKERJ RJAA AAN N PASA PASANG NGAN AN Pondasi Rollag 1 : 3 Pasangan batu merah tebal 1/2 1:5 Plesteran + Acian 1: 3 Pl P lesteran beton + Acian 1:5 Benan Benangan gan sudut sudut Pasangan Batu Lempeng Cirebon Pasangan Batu Andesit 10x20 cm PEKERJAAN BETON Rabat Lantai Kerja Straus Ø 30cm Poor pondasi 150x150 Kolom Strukture Ø 50 Balok strukture 30x50 Balok strukture 20/40 Balok Gantung 20/25 Plat Atap tbl 10 cm Pl P lat Penempatan Pot tbl 10 cm Lisplank Beton tbl 10 cm
Volume
Harga Satuan
48.51 29.65 40.00
M² M² Titik
7.58 14.00 5.10 0.45 0.30
M³ M' M³ M³ M³
1.07 24.26 32.68 160.16 312.49 312.49 2.99 32.68
0.30 0.99 2.43 3.17 4.45 1.94 1.21 7.55 0.22 1.19
M³ M² M² M² M' M² M²
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³
3,333.00 60,800.00
161,683.83 1,802,416.00
126,600.00 JUMLAH I
5,064,000.00 7,028,099.83
33,000.00 21,780.00 9,280.00 105,700.00 116,500.00 JUMLAH II
250,129.69 304,920.00 47,315.41 48,070.38 35,321.34
603,043.00 79,811.00 37,095.00 33,540.00 11,620.00 182,813.00
VI
PEKERJAAN BESI 1 Pasang Pasang Sun Screen Screen Besi Hollow Hollow 40/60 2 Pasang Ornamen Besi Hollow 50/50 Stainless Stell 3 Pasang Pagar Besi Hollow Samping Entrance 4 Pasang Pagar Besi Hollow 60/60 dan 40/40 Depan PEKERJAAN PENGECATAN 1 Cat Pagar Besi & Sun Screen Hollow 2 Ca Cat Dinding Luar / Beton 3 Waterproffing Coating 4 Cat Coat Coatin ing g Pasan Pasangan gan Bat Batu u
22.23 32.34 22.91 12.94
109.13 215.82 101.68 48.06
M² M' M' M²
M² M² M² M²
685,756.82 643,579.55 1,935,815.81 1,212,398.61 5,371,895.53 3,631,078.61 545,890.59 6,597,677.44
201,865.00 JUMLAH III
19,938,336.12
788,374.00 2,506,559.00 2,659,672.00 6,115,845.00 4,343,483.00 4,343,483.00 4,343,483.00 4,526,651.00 4,526,651.00 4,526,651.00
239,025.14 2,481,716.74 6,451,034.44 19,407,793.18 19,314,383.03 8,428,094.41 5,267,559.01 34,158,108.45 1,006,444.27 5,367,702.76
JUMLAH IV V
Jumlah
780,890.00 207,271.00 649,886.00 1,083,143.33 JUMLAH V 42,053.00 34,568.00 176,564.00
102,121,861.42 17,362,113.04 6,703,144.14 14,887,263.55 14,011,542.16 52,964,062.88 4,589,115.65 7,460,493.00 17,953,442.45 3,033,663.20
63,116.00 JUMLAH VI
33,036,714.29
450,000.00 JUMLAH VII
900,000.00
VII
PEKERJAAN LAIN-LAIN 1 Pot Tanaman Ø 100
2.00
Bh
900,000.00
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
LOKASI LOKASI
: KAMPUS KAMPUS UNIVERSITA UNIVERSITAS S NEGERI NEGERI MALANG MALANG
TAHU TAHUN N ANGG ANGGAR ARAN AN
: 2011 2011
Jl.SEMARANG NO 5 MALANG
No
URAIAN PEKERJAAN
B I
Volume
Harga Satuan
Jumlah
PEKE PEKERJ RJAA AAN N KAN KANOP OPII ENT ENTRA RANC NCE E SIS SISII UTA UTARA RA PEKERJAAN PERSIAPAN 1 Pembersihan lokasi 2 Pasang Bowplank 3 Penyambungan Beton dengan Chemical Anchoring System
48.51 29.65 40.00
M² M² Titik
3,333.00 60,800.00 126,600.00 JUMLAH I
II 1 2 3 4 5
PEKERJAAN TANAH Galian tanah Pondasi Bor Straus Ø 30 cm Urugan Urugan tana tanah h kembal kembalii Urugan Tanah peninggian lantai dipadatkan Urugan pasir Bawah Pondasi
7.58 14.00 5.10 0.45 0.30
M³ M' M³ M³ M³
33,000.00 21,780.00 9,280.00 105,700.00 116,500.00 JUMLAH II
III III 1 2 3 4 5 6 7
PEKE PEKERJ RJAA AAN N PASA PASANG NGAN AN Pondasi Rollag 1 : 3 Pasangan batu merah tebal 1/2 1:5 Plesteran + Acian 1: 3 Plesteran beton 1:5 Benan Benangan gan sudut sudut Pasangan Batu Lempeng Cirebon Pasangan Batu Andesit 10x20 cm
IV
PEKERJAAN BETON Rabat Lantai Kerja Straus Ø 30cm Poor pondasi 150x150 Kolom Strukture Ø 50 Balok strukture 30x50 Balok strukture 20/40 Balok Gantung 20/25 Plat Atap tbl 10 cm Pl P lat Penempatan Pot tbl 10 cm Lisplank Beton tbl 10 cm
1.07 24.26 32.68 160.16 312.49 312.49 2.99 32.68
M³ M² M² M² M' M² M²
603,043.00 79,811.00 37,095.00 33,540.00 11,620.00 182,813.00 201,865.00 JUMLAH III
1 2 3 4 5 6 7 8 9 10
0.30 0.99 2.43 3.17 4.45 1.94 1.21 7.55 0.22 1.19
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³
788,374.00 2,506,559.00 2,659,672.00 6,115,845.00 4,343,483.00 4,343,483.00 4,343,483.00 4,526,651.00 4,526,651.00 4,526,651.00 JUMLAH IV
V 1 2 3 4 VI 1 2 3 4
PEKERJAAN BESI Pasang Pasang Sun Screen Screen Besi Hollow Hollow 40/60 Pasang Ornamen Besi Hollow 50/50 Stainless Stell Pasang Pagar Besi Hollow Samping Entrance Pasang Pagar Besi Hollow 60/60 dan 40/40 Depan PEKERJAAN PENGECATAN Cat Pagar Besi & Sun Screen Hollow Ca Cat Dinding Luar / Beton Waterproffing Coating Cat Coat Coatin ing g Pasan Pasangan gan Bat Batu u
22.23 32.34 22.91 12.94
109.13 215.82 101.68 48.06
M² M' M' M²
M² M² M² M²
780,890.00 207,271.00 649,886.00
161,683.83 1,802,416.00 5,064,000.00 7,028,099.83 250,129.69 304,920.00 47,315.41 48,070.38 35,321.34 685,756.82 643,579.55 1,935,815.81 1,212,398.61 5,371,895.53 3,631,078.61 545,890.59 6,597,677.44 19,938,336.12 239,025.14 2,481,716.74 6,451,034.44 19,407,793.18 19,314,383.03 8,428,094.41 5,267,559.01 34,158,108.45 1,006,444.27 5,367,702.76 102,121,861.42 17,362,113.04 6,703,144.14 14,887,263.55 14,011,542.16
1,083,143.33 JUMLAH V
52,964,062.88
42,053.00 34,568.00 176,564.00 63,116.00
4,589,115.65 7,460,493.00 17,953,442.45 3,033,663.20
JUMLAH VI
33,036,714.29
VII
PEKERJAAN LAIN-LAIN 1 Pot Tanaman Ø 100
2.00
Bh
450,000.00 JUMLAH VII
900,000.00 900,000.00
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
LOKASI LOKASI
: KAMPUS KAMPUS UNIVERSITA UNIVERSITAS S NEGERI NEGERI MALANG MALANG
TAHU TAHUN N ANGG ANGGAR ARAN AN
: 2011 2011
Jl.SEMARANG NO 5 MALANG
No
URAIAN PEKERJAAN
C
PEKERJ PEKERJAAN AAN KANOP KANOPII ENTR ENTRAN ANCE CE BASEME BASEMENT NT SISI SISI UTAR UTARA A
I
PEKERJAAN PERSIAPAN 1 Pembersihan lokasi 2 Pasang Bowplank 3 Penyambungan Beton dengan Chemical Anchoring System
II 1 2 3 4 5
PEKERJAAN TANAH Galian tanah Pondasi Bor Straus Ø 30 cm Urugan Urugan tana tanah h kembal kembalii Urugan Tanah peninggian lantai dipadatkan Urugan pasir Bawah Pondasi
Volume
Harga Satuan
97.02 35.04 40.00
M² M² Titik
16.98 1.98 12.65 12.65 0.45 0.30
M³ M³ M³ M³ M³
3,333.00 60,800.00
323,367.66 2,130,128.00
126,600.00 JUMLAH I
5,064,000.00 7,517,495.66
33,000.00 861,233.82 9,280.00 105,700.00 116,500.00
560,290.50 1,705,396.43 117,378.62 48,070.38 35,321.34
JUMLAH II III III 1 2 3 4 5 6 7
PEKE PEKERJ RJAA AAN N PASA PASANG NGAN AN Pondasi Rollag 1 : 3 Pasangan batu merah tebal 1/2 1:5 Plesteran + Acian 1: 3 Plesteran beton 1:5 Benan Benangan gan sudut sudut Pasangan Batu Lempeng Cirebon Pasangan Batu Andesit 10x20 cm
IV
PEKERJAAN BETON Rabat Lantai Kerja Straus Ø 30cm Poor pondasi 150x150 Kolom Strukture Ø 40 Balok strukture 30x50 Balok strukture 20/40 Balok Gantung 20/25 Plat Atap tbl 10 cm Pl P lat Penempatan Pot tbl 10 cm Lisplank Beton tbl 10 cm
2.13 48.51 65.37 181.49 366.39 366.39 2.99 65.37
M³ M² M² M² M' M² M²
603,043.00 79,811.00 37,095.00 33,540.00 11,620.00 182,813.00 201,865.00 JUMLAH III
1 2 3 4 5 6 7 8 9 10
0.61 1.98 4.85 4.06 1.21 3.67 1.62 9.70 0.22 1.40
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³
788,374.00 2,506,559.00 2,659,672.00 6,115,845.00 4,343,483.00 4,343,483.00 4,343,483.00 4,526,651.00 4,526,651.00 4,526,651.00 JUMLAH IV
V 1 2 3 4 VI
PEKERJAAN BESI Pasang Pasang Sun Screen Screen Besi Hollow Hollow 40/60 Pasang Ornamen Besi Hollow 50/50 Stainless Stell Pasang Pagar Besi Hollow Samping Entrance Pasang Pagar Besi Hollow 60/60 dan 40/40 Depan
PEKERJAAN PENGECATAN 1 Cat Sun Screen Hollow 2 Ca Cat Dinding Luar / Beton 3 Cat Waterproffing 4 Cat Coat Coatin ing g Pasan Pasangan gan Bat Batu u
29.11 64.68 22.91 12.94
87.52 244.56 130.73 92.11
M² M' M' M²
M² M² M² M²
Jumlah
780,890.00 207,271.00 649,886.00 1,083,143.33 JUMLAH V 42,053.00 34,568.00 176,564.00 63,116.00 JUMLAH VI
2,466,457.27 1,287,159.10 3,871,631.61 2,424,797.21 6,087,153.97 4,257,396.61 545,890.59 13,195,354.87 31,669,383.96 478,050.28 4,963,433.49 12,902,068.87 24,841,975.27 5,267,559.01 15,919,733.89 7,023,412.01 43,917,568.00 1,006,444.27 6,343,648.71 122,663,893.80 22,728,584.34 13,406,288.28 14,887,263.55 14,011,542.16 65,033,678.33 3,680,455.48 8,453,844.52 23,082,997.43 5,813,365.55 41,030,662.98
VII
PEKERJAAN LAIN-LAIN 1 Pot Tanaman Ø 100 2 Pasang Pintu Rolling Grill
2.00 42.00
Bh M²
450,000.00 700,000.00 JUMLAH VII
900,000.00 29,400,000.00 30,300,000.00
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
LOKASI LOKASI
: KAMPUS KAMPUS UNIVERSITA UNIVERSITAS S NEGERI NEGERI MALANG MALANG
TAHU TAHUN N ANGG ANGGAR ARAN AN
: 2011 2011
Jl.SEMARANG NO 5 MALANG
No
URAIAN PEKERJAAN
D I
Volume
Harga Satuan
PEKERJ PEKERJAAN AAN KANOP KANOPI I ENTRA ENTRANCE NCE BASEME BASEMENT NT SISI SISI SELA SELATAN TAN PEKERJAAN PERS IA IAPAN 1 Pembersihan lokasi 2 Pasang Bowplank 3 Penyambungan Beton dengan Chemical Anchoring System
II 1 2 3 4 5
PEKERJAAN TANAH Galian tanah Pondasi Bor Straus Ø 30 cm Urugan Urugan tana tanah h kembal kembalii Urugan Tanah peninggian lantai dipadatkan Urugan pasir Bawah Pondasi
97.02 35.04 40.00
M² M² Titik
16.98 1.98 12.65 12.65 0.45 0.30
M³ M³ M³ M³ M³
3,333.00 60,800.00
323,367.66 2,130,128.00
126,600.00 JUMLAH I
5,064,000.00 7,517,495.66
33,000.00 861,233.82 9,280.00 105,700.00 116,500.00
560,290.50 1,705,396.43 117,378.62 48,070.38 35,321.34
JUMLAH II III III 1 2 3 4 5 6 7
PEKE PEKERJ RJAA AAN N PASA PASANG NGAN AN Pondasi Rollag 1 : 3 Pasangan batu merah tebal 1/2 1:5 Plesteran + Acian 1: 3 Plesteran beton 1:5 Benan Benangan gan sudut sudut Pasangan Batu Lempeng Cirebon Pasangan Batu Andesit 10x20 cm
IV
PEKERJAAN BETON Rabat Lantai Kerja Straus Ø 30cm Poor pondasi 150x150 Kolom Strukture Ø 40 Balok strukture 30x50 Balok strukture 20/40 Balok Gantung 20/25 Plat Atap tbl 10 cm Pl P lat Penempatan Pot tbl 10 cm Lisplank Beton tbl 10 cm
2.13 48.51 65.37 181.49 366.39 366.39 2.99 65.37
M³ M² M² M² M' M² M²
603,043.00 79,811.00 37,095.00 33,540.00 11,620.00 182,813.00 201,865.00 JUMLAH III
1 2 3 4 5 6 7 8 9 10
0.61 1.98 4.85 4.06 1.21 3.67 1.62 9.70 0.22 1.40
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³
788,374.00 2,506,559.00 2,659,672.00 6,115,845.00 4,343,483.00 4,343,483.00 4,343,483.00 4,526,651.00 4,526,651.00 4,526,651.00 JUMLAH IV
V 1 2 3 4
PEKERJAAN BESI Pasang Pasang Sun Screen Screen Besi Hollow Hollow 40/60 Pasang Ornamen Besi Hollow 50/50 Stainless Stell Pasang Pagar Besi Hollow Samping Entrance Pasang Pagar Besi Hollow 60/60 dan 40/40 Depan
29.11 64.68 22.91 12.94
M² M' M' M²
780,890.00 207,271.00 649,886.00 1,083,143.33 JUMLAH V
VI
Jumlah
PEKERJAAN PENGECATAN 1 Cat Sun Screen Hollow 2 Ca Cat Dinding Luar / Beton 3 Cat Waterproffing 4 Cat Coat Coatin ing g Pasan Pasangan gan Bat Batu u
87.52 244.56 130.73 92.11
M² M² M² M²
42,053.00 34,568.00 176,564.00 63,116.00 JUMLAH VI
2,466,457.27 1,287,159.10 3,871,631.61 2,424,797.21 6,087,153.97 4,257,396.61 545,890.59 13,195,354.87 31,669,383.96 478,050.28 4,963,433.49 12,902,068.87 24,841,975.27 5,267,559.01 15,919,733.89 7,023,412.01 43,917,568.00 1,006,444.27 6,343,648.71 122,663,893.80 22,728,584.34 13,406,288.28 14,887,263.55 14,011,542.16 65,033,678.33 3,680,455.48 8,453,844.52 23,082,997.43 5,813,365.55 41,030,662.98
VII
PEKERJAAN LAIN-LAIN 1 Pot Tanaman Ø 100 2 Pasang Pintu Rolling Grill
2.00 42.00
Bh M²
450,000.00 700,000.00 JUMLAH VII
900,000.00 29,400,000.00 30,300,000.00
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
LOKASI LOKASI
: KAMPUS KAMPUS UNIVERSITA UNIVERSITAS S NEGERI NEGERI MALANG MALANG
TAHU TAHUN N ANGG ANGGAR ARAN AN
: 2011 2011
Jl.SEMARANG NO 5 MALANG
No
URAIAN PEKERJAAN
E
PEKERJ PEKERJAAN AAN KANOP KANOPII ENTR ENTRAN ANCE CE BASEME BASEMENT NT SISI SISI BAR BARAT AT
I
PEKERJAAN PERSIAPAN 1 Pembersihan lokasi 2 Pasang Bowplank 3 Penyambungan Beton dengan Chemical Anchoring System
Volume
75.46 29.65 40.00
Harga Satuan
M² M² Titik
3,333.00 60,800.00 126,600.00 JUMLAH I
II
PEKERJAAN TANAH Galian tanah Pondasi Bor Straus Ø 30 cm Urugan Urugan tana tanah h kembal kembalii Urugan Tanah peninggian lantai dipadatkan 5 Urugan pasir Bawah Pondasi 1 2 3 4
9.10 0.99 7.14 0.91 0.30
M³ M³ M³ M³ M³
33,000.00 861,233.82 9,280.00 105,700.00 116,500.00 JUMLAH II
III III 1 2 3 4 5 6 7
PEKE PEKERJ RJAA AAN N PASA PASANG NGAN AN Pondasi Rollag 1 : 3 Pasangan batu merah tebal 1/2 1:5 Plesteran + Acian 1: 3 Plesteran beton 1:5 Benan Benangan gan sudut sudut Pasangan Batu Lempeng Cirebon Pasangan Batu Andesit 10x20 cm
IV
PEKERJAAN BETON Rabat Lantai Kerja Straus Ø 30cm Poor pondasi 150x150 Kolom Strukture Ø 50 Balok strukture 30x50 Balok strukture 20/40 Balok Gantung 20/25 Plat Atap tbl 10 cm Pl P lat Penempatan Pot tbl 10 cm Lisplank Beton tbl 10 cm
1.07 24.26 32.68 151.89 317.88 317.88 2.99 32.68
M³ M² M² M² M' M² M²
603,043.00 79,811.00 37,095.00 33,540.00 11,620.00 182,813.00 201,865.00 JUMLAH III
1 2 3 4 5 6 7 8 9 10
0.30 0.99 2.43 2.03 3.64 1.94 1.21 7.55 0.22 1.19
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³
788,374.00 2,506,559.00 2,659,672.00 6,115,845.00 4,343,483.00 4,343,483.00 4,343,483.00 4,526,651.00 4,526,651.00 4,526,651.00 JUMLAH IV
V
PEKERJAAN BESI 1 Pasang Pasang Sun Screen Screen Besi Hollow Hollow 40/60 2 Pasang Ornamen Besi Hollow 50/50 Stainless Stell 3 Pasang Pagar Besi Hollow
24.26 64.68 16.17
M² M' M'
780,890.00 207,271.00 649,886.00 JUMLAH V
VI
PEKERJAAN PENGECATAN 1 Cat Pagar Besi & Sun Screen Hollow 2 Ca Cat Dinding Luar / Beton 3 Cat Waterproffing 4 Cat Coat Coatin ing g Pasan Pasangan gan Bat Batu u
54.47 204.67 101.68 48.06
M² M² M² M²
42,053.00 34,568.00 176,564.00
Jumlah
251,508.18 1,802,416.00 5,064,000.00 7,117,924.18 300,155.63 852,698.21 66,271.91 96,140.76 35,321.34 1,350,587.85 643,579.55 1,935,815.81 1,212,398.61 5,094,306.92 3,693,710.41 545,890.59 6,597,677.44 19,723,379.31 239,025.14 2,481,716.74 6,451,034.44 12,420,987.63 15,802,677.02 8,428,094.41 5,267,559.01 34,158,108.45 1,006,444.27 5,367,702.76 91,623,349.87 18,940,486.95 13,406,288.28 10,508,656.62 42,855,431.85 2,290,739.93 7,074,977.70 17,953,442.45 3,033,663.20
63,116.00 JUMLAH VI
30,352,823.27
450,000.00 JUMLAH VII
900,000.00
VII
PEKERJAAN LAIN-LAIN 1 Pot Tanaman Ø 100
2.00
Bh
900,000.00
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
LOKASI LOKASI
: KAMPUS KAMPUS UNIVERSITA UNIVERSITAS S NEGERI NEGERI MALANG MALANG
TAHU TAHUN N ANGG ANGGAR ARAN AN
: 2011 2011
Jl.SEMARANG NO 5 MALANG
No
URAIAN PEKERJAAN
A
Volume
Harga Satuan
Jumlah
AREA INTERIOR GEDUNG GEDUNG
I 1 2 3 4 5 6 7
PEKE PEKERJ RJAA AAN N MOD MODUL UL STAG STAGE E MOVE MOVEAB ABLE LE SISI SISI SEL SELAT ATAN AN Pembersihan lokasi Pasang Rangka Besi hollow 30/60 Pasang Covering Multipleks Tebal 18 mm Pasang Karpet Tebal 5 mm Pasang Papan Cover Kayu Jati Motif Ukiran Pasang Pagar Kayu Jati Stage Movable tinggi 30 cm Sanding finish melamin Cover Kayu Jati
8
Sandi Sanding ng fini finish sh mela melamin min Pagar Pagar Kayu Kayu Jati Jati
1 2 3 4 5 6 7
PEKE PEKERJ RJAA AAN N MOD MODUL UL STAG STAGE E MOV MOVEA EABL BLE E SIS SISII UTA UTARA RA Pembersihan lokasi Pasang Rangka Besi hollow 30/60 Pasang Covering Multipleks Tebal 18 mm Pasang Karpet Tebal 5 mm Pasang Papan Cover Kayu Jati Motif Ukiran Pasang Pagar Kayu Jati Stage Movable tinggi 30 cm Sanding finish melamin Cover Kayu Jati
8
Sandi Sanding ng fini finish sh mela melamin min Pagar Pagar Kayu Kayu Jati Jati
II
III III 1 2 3 4 5 6 7 8 9 10 IV
PEKE PEKERJ RJAA AAN N PEM PEMAS ASAN ANGA GAN N ORN ORNAM AMEN EN KAY KAYU U JAT JATII Pasang List Gipsum Pasang List Gipsum Pasang Hand Railing Kayu Jati Area Tangga Lantai 1 Pasang Hand Railing Kayu Jati Area Tribun Lantai 2 Pasang Papan Kayu Jati Bawah Hand Railing Pasang Connector Hand Railling Lantai 1 & 2 Kuse Kusen n Pint Pintu u Kayu Kayu Jati Jati Pasang Pintu Jati Area Hall Lantai 2 Pasang Kayu Jati Penutup Rel Pintu Sisi Utara & Selatan Prasas Prasasti ti Bongg Bonggol ol Kayu Kayu Jati Jati tinggi tinggi 1 mete meterr Ø 70 cm cm
5
PEKE PEKERJ RJAA AAN N AREA AREA TANG TANGGA GA SERV SERVIC ICE E Pasang Pagar Besi Hollow Area Tangga Service Lantai 1 Pasang Pagar Besi Hollow Area Tangga Service Lantai 2 Acian Area Tangga Service Pengecatan Area Tangga Service interior Pasang Pintu Besi Area Tangga ke Balkon Finishing Cat
1 2 4 5 6 7 8
PEKERJAAN PENGECATAN Cat Pagar Besi Hollow Area Tangga Service Lantai 1 dan 2 Cat Dinding / Beton eksterior Sanding finish melamin Papan Kayu Jati Hand Railing Sanding finish melamin Papan Kayu Jati Bawah Hand Railing Sanding Sanding finish finish melamin melamin Kusen Kusen Pintu Pintu Kayu Jati Sanding finish melamin Pintu Kayu Jati Area Hall Lantai 2 Sanding Sanding finish finish melamin melamin Kayu Jati Penutup Penutup Rel Pintu Pintu
9
Sanding Sanding finish finish melamin melamin Prasasti Prasasti Bonggol Bonggol Kayu Jati
1 2 3 4
V
90.25 319.34 112.94 90.25 22.69 37.81 30.57 50.95
M² M² M² M² M² M¹ M² M²
90.25 319.34 112.94 90.25 22.69 37.81 30.57 50.95
M² M² M² M² M² M¹ M² M²
1,447.22 862.27 57.40 161.70 295.24 98.00 0.15 0.15 9.49 48.51 2.00
139.57 213.03 2,097.12 2,825.87 2.00
475.13 395.71 55.62 59.05 4.37 9.49 26.15 2.96
3,333.00 238,213.00 124,471.00 90,446.00 5,861,315.00 1,362,932.00 334,715.20
300,812.77 76,071,076.49 14,057,675.70 8,163,009.72 132,972,781.36 51,533,617.41 10,232,267.84
334,715.20 JUMLAH I
17,053,779.73 310,385,021.02
3,333.00 238,213.00 124,471.00 90,446.00 5,861,315.00 1,362,932.00 334,715.20
300,812.77 76,071,076.49 14,057,675.70 8,163,009.72 132,972,781.36 51,533,617.41 10,232,267.84
334,715.20 JUMLAH II
17,053,779.73 310,385,021.02
M' M' M' M' M' Bh M³ M² M'
28,500.00 28,500.00 621,520.00 621,520.00 487,110.00 680,000.00 134,222,583.00 5,861,315.00 1,667,760.00
Unit
7,500,000.00 JUMLAH II III
41,245,627.50 24,574,559.63 35,677,423.32 100,499,784.00 143,815,314.18 66,640,000.00 19,533,412.50 55,602,778.62 80,903,037.60 15,000,000.00
M' M' M² M² Unit
M² M² M² M² M² M² M² M²
649,886.00 649,886.00 37,095.00 17,355.00 1,842,768.90 JUMLAH IV 42,053.00 34,568.00 334,715.20 334,715.20 334,715.20 334,715.20 334,715.20 334,715.20 JUMLAH V
583,491,937.35 90,707,221.06 138,442,793.75 77,792,778.01 49,043,030.33 3,685,537.80 359,671,360.95 19,980,597.23 13,678,980.71 18,618,059.86 19,764,394.76 1,461,333.09 3,175,242.27 8,751,761.52 991,361.15 86,421,730.59
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
LOKASI LOKASI
: KAMPUS KAMPUS UNIVERSITA UNIVERSITAS S NEGERI NEGERI MALANG MALANG
TAHU TAHUN N ANGG ANGGAR ARAN AN
: 2011 2011
Jl.SEMARANG NO 5 MALANG
No
URAIAN PEKERJAAN
VI 1 2 3 4 5
PEKERJAAN AREA BASEMENT Pasang Bata untuk Saluran Air Resapan Dinding Basement Plesteran Bata Saluran Air Basement Keliling Benangan Sudut Saluran Air Resapan Lapisan Screed Saluran Air Resapan Dinding Basement Pengecatan Area Basement interior
6
Pasang Pasang Ross Rosster ter Bawa Bawah h tangga tangga Sisi Sisi Bara Baratt uk.15x uk.15x30 30
VII 1 2 3 4
PEKERJAAN LAIN-LAIN Pengadaan Kursi Hall Pengadaan Kursi Tribun dan Balkon Cove Coverr kurs kursii Hall Hall (ba (baha han n sati satin, n, bor bordi dirr logo logo+b +bra rand nd nam name e comp comput uter eriz ize) e) Karpet Hall dan Stage (tebal 3 mm)
5
Gril Grilll Out Outle lett AC AC di di Pan Pangg ggun ung g
Volume
Harga Satuan
4.97 49.72 220.99 22.10 6,485.59 83.01
M³ M² M' M² M² M²
2,500.00 2,750.00 2,50 2,500. 0.00 00 2,100.00 14.00
Unit Unit Unit m2 Unit
79,811.00 37,095.00 11,620.00 28,759.00 17,355.00
396,842.24 1,844,465.41 2,567,903.80 635,545.14 112,557,382.45
275,349.00 JUMLAH VI VI
22,855,619.09 140,857,758.14
362,700.00 646,100.00 42,000.00 27,100.00
906,750,000.00 1,776,775,000.00 105,000,000.00 56,910,000.00 21,000,000.00
1,500,000.00 JUMLAH VI VII
B
Jumlah
2,866,435,000.00
AREA EKSTERIOR GEDUNG
I 1 2 3 4 5 6 7
PEKER EKERJA JAA AN AREA AREA PLAT ATAP TAP (AC) Lapisan Screed Plat Atap Tbl 10 cm Waterproffing Coating Area Atas Cat Kalsiplank Gedung exterior Besi Grill Outlet AC Pasangan Bata Pelindung AC tinggi 15 cm Plesteran Bata Pelindung AC + Acian 1 : 3 Benangan Sudut
8
Cat Cat Dind Dindin ing g Pasa Pasang ngan an ext exter erio iorr
II
5
PEKER EKERJA JAA AN AREA AREA WATE WATER R TOWE TOWER R Penyambungan Beton dengan Chemical Anchoring System Plat Leuvel Area Pintu Masuk Tbl 10 cm Lisplank Beton tbl 10 cm Plat Besi Penutup Bordes Tangga Tower Finishing Cat Plat penutup groundtank 100 x 100 cm, t=1,5 mm + cat Urugan Katel Penutup Pipa ke Saluran
6
Pasang Pasang Rumput Rumput Penutu Penutup p Pipa Pipa ke ke Salu Saluran ran
1 2 3 4
1,504.50 1,504.50 241.47 12.00 13.10 39.29 87.32 52.95
M² M² M² Unit M² M² M' M²
56.00 4.53 0.05 1.00 2.00 6.06 20.21
Titik M³ M³ Unit Unit M³ M²
28,759.00 176,564.00 34,568.00 1,500,000.00 79,811.00 37,095.00 11,620.00
43,267,915.50 265,640,538.00 8,347,204.10 18,000,000.00 1,045,340.53 1,457,577.54 1,014,635.16
34,568.00 JUMLAH I
1,830,287.53 340,603,498.36
126,600.00 4,526,651.00 4,526,651.00 1,500,000.00 1,750,000.00 105,700.00
7,089,600.00 20,494,865.07 242,461.57 1,500,000.00 3,500,000.00 640,938.38
25,212.00 JUMLAH II
509,597.55 33,977,462.57
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V
LOKASI LOKASI
: KAMPUS KAMPUS UNIVERSIT UNIVERSITAS AS NEGERI NEGERI MALANG MALANG
TAHU TAHUN N ANGG ANGGAR ARAN AN
: 2011 2011
Jl.SEMARANG NO 5 MALANG
No
URAIAN PEKERJAAN
III III 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
PEKE PEKERJ RJAA AAN N BETO BETON N PLAT PLAT LEUV LEUVEL EL Uitset/Pengukuran Pembersihan lokasi Penyambungan Beton dengan Chemical Anchoring System Balok Konsol 15/30 untuk Plat Leuvel Type 1 Lantai 1 Balok Konsol 15/30 untuk Plat Leuvel Type 2 Lantai 1 Balok Konsol 15/30 untuk Plat Leuvel Type 3 Lantai 1 Plat Leuvel Type 1 Tebal 10 cm Lantai 1 Plat Leuvel Type 2 Tebal 10 cm Lantai 1 Plat Leuvel Type 3 Tebal 10 cm Lantai 1 Acian Plat Leuvel Lantai 1 Benangan Sudut Plat Leuvel Lantai 1 Pasang Sun Screen Besi Hollow 40/60 Plat Leuvel Lantai 1 Pasang Sun Screen Besi Hollow 40/60 Plat Leuvel Lantai 2 Cat Sun Screen Besi Hollow 40/60 Plat Leuvel Lantai 1 dan 2 Cat Waterproffing Plat Leuvel Lantai 1 dan 2 Pengecatan Plat Leuvel Lantai 1 dan 2 Cat Waterproffing Plat Leuvel Lantai 3 Acian Plat Leuvel Sisi Barat Lantai 3 Pengec Pengecata atan n Plat Plat Leuvel Leuvel Sisi Sisi Bar Barat at Lanta Lantaii 3
IV 1 2 3 4
PEKER EKERJA JAA AN AR AREA LUAR GEDUN EDUNG G Pasang Batu Tebar Warna di Sekeliling Gedung Batu Alam Abstrak Tempat duduk Ø 1 meter Beton Lantai kerja tbl 5 cm Bawah tangga Gedung Sisi Barat Pasangan Lantai Bata Bawah tangga Gedung Sisi Barat
5
Pleste Plesteran ran Bawah Bawah Tan Tangga gga Gedu Gedung ng Sisi Sisi Barat Barat
1 2 3 4 5 6
PEMBUATAN ROLLBAR ROLLBAR KESEHATAN KESEHATAN TYPE A Galian Tanah Pondasi Pasang Pondasi Rollag Urugan Pasir Beton Lantai kerja tbl 5 cm Pasang Pondasi Rollbar Pasang Batu Ampyang Besar
7
1 2 3 4 5 6 7
Volume
190.75 152.58 512.00 1.46 0.87 1.16 7.76 6.05 8.38 515.34 484.99 168.63 168.63 454.47 623.12 623.12 101.06 101.06 101.06
Harga Satuan
M' M² Titik M³ M³ M³ M³ M³ M³ M² M' M² M² M² M² M² M² M² M²
60,800.00 3,333.00 126,600.00 4,343,483.00 4,343,483.00 4,343,483.00 4,526,651.00 4,526,651.00 4,526,651.00 37,095.00 11,620.00 780,890.00 780,890.00 42,053.00 176,564.00 34,568.00 176,564.00 37,095.00 34,568.00 JUMLAH III
150.92 8.00 4.04 80.85 108.95
M² Bh M³ M² M²
VI
Roll Rollba barr Pip Pipa a Sta Stain inle less ss Ø 2 "
1.27 0.44 0.50 1.01 0.11 3.96 3.77
M³ M³ M³ M³ M³ M² M'
PEMBUATAN ROLLBAR ROLLBAR KESEHATAN KESEHATAN TYPE B Galian Tanah Pondasi Pasang Pondasi Rollag Urugan Pasir Beton Lantai kerja tbl 5 cm Pasang Pondasi Rollbar Pasang Batu Ampyang Besar Roll Rollba barr Pip Pipa a Sta Stain inle less ss Ø 2 "
2.09 0.71 0.81 1.61 0.19 9.70 5.88
M³ M³ M³ M³ M³ M² M'
11,597,727.68 508,549.54 64,819,200.00 6,321,070.81 3,792,642.49 5,056,856.65 35,134,054.40 27,386,995.41 37,927,211.73 19,116,459.40 5,635,609.36 131,684,366.87 131,684,366.87 19,111,734.84 110,020,865.14 21,540,071.96 17,843,999.25 3,748,913.44 3,493,528.50 656,424,224.33
45,000.00 1,800,000.00 788,374.00 79,811.00
6,791,400.00 14,400,000.00 3,187,001.90 6,452,719.35
37,095.00
4,041,328.69
JUMLAH IV V
Jumlah
34,872,449.93
33,000.00 603,043.00 116,500.00 788,374.00 788,374.00 193,093.60
42,066.26 266,939.25 58,554.94 792,501.14 84,986.72 764,969.26
206,031.70 JUMLAH V
777,357.60 2,787,375.16
33,000.00 603,043.00 116,500.00 788,374.00 788,374.00 193,093.60 206,031.70
68,835.69 427,834.13 94,033.27 1,272,676.09 148,726.76 1,873,394.11 1,211,929.97
JUMLAH VI
5,097,430.01
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
A
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
PEKERJAAN PE PERSIAPAN
A.1 A.1
1 M1 UITS UITSET ET/P /PEN ENGU GUKU KURA RAN N
No. 1
Jenis Tenaga & Bahan
Kuantitas
S Sa atuan
Harga Satuan Rp
Tenaga Mandor Pekerja
0.005 0.100
Oh Oh
66,000.00 41,800.00
Harga Satuan per M1 Dibulatkan
A.2 A.2
Jumlah Harga Rp 330.00 4,180.00 4,510.00 4,510.00 4,510.00
1 M' M' PEM PEMBU BUAT ATAN AN BOUW BOUWPL PLAN ANK K UITZ UITZET ET
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
S Sa atuan
Harga Satuan Rp
Bahan Kayu meranti 2/20 Kayu meranti 5/7 Paku
0.004 0.004 0.100
m3 m3 kg
6,376,500.00 3,685,500.00 29,250.00
26,781.30 14,373.45 2,925.00 44,079.75
Mandor Kepala tukang kayu Tukang kayu Pekerja
0.005 0.020 0.200 0.100
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
330.00 1,210.00 11,000.00 4,180.00 16,720.00 60,799.75 60,800.00
Tenaga
Harga Satuan per M1 Dibulatkan
A.3 A.3
Jumlah Harga Rp
1 M2 PEMB PEMBER ERSI SIHA HAN N LOKA LOKASI SI
No. 1
Jenis Tenaga & Bahan
Kuantitas
S Sa atuan
Harga Satuan Rp
Tenaga Mandor Pekerja
0.003 0.075
Oh Oh
66,000.00 41,800.00
Harga Satuan per M2 Dibulatkan
A.4 A.4
Jumlah Harga Rp 198.00 3,135.00 3,333.00 3,333.00 3,333.00
1 M² MEM MEMBE BERS RSIH IHKA KAN N LAPA LAPANG NGAN AN DAN DAN PER PERAT ATAA AAN N
No. 1
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Tenaga Mandor Pekerja
0.05000 0.10000
Oh Oh
66,000.00 41,800.00
Harga Satuan per M3 Dibulatkan
A.4
2
3,300.00 4,180.00 7,480.00 7,480.00 7,480.00
1 TITIK TITIK CH CHEMI EMICHA CHAL L ANCHOR ANCHORS S SYSTEM SYSTEM UNTUK UNTUK PENY PENYAMB AMBUNG UNGAN AN BETON BETON
No. 1
Jumlah Harga Rp
Jenis Tenaga & Bahan
Kuantitas
S Sa atuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Chemical Anchors HIT HY 150
0.300
ml
180,000.00
54,000.00 54,000.00
Mandor Kepala Tukang Tukang batu Pekerja
0.075 0.100 0.550 0.750
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
4,950.00 6,050.00 30,250.00 31,350.00
Tenaga
72,600.00 Harga Satuan per Titik Dibulatkan
A.5 A.5
126,600.00 126,600.00
1 M3 BONG BONGKA KARA RAN N BETO BETON N
No. 1
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Tenaga Mandor Pekerja
0.333 5.500
Oh Oh
66,000.00 41,800.00
Harga Satuan per M2 Dibulatkan
A.6
Jenis Tenaga & Bahan
Kuantitas
251,878.00 251,878.00
Satuan
Harga Satuan Rp
0.020 0.200
Oh Oh
66,000.00 41,800.00
Harga Satuan per M3 Dibulatkan
Jenis Tenaga & Bahan
9,680.00 9,680.00
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Tenaga Pekerja Sewa dump truk 5 ton
0.250 0.250
Oh j am
41,800.00 250,000.00
Harga Satuan per M3 Dibulatkan
B
1,320.00 8,360.00 9,680.00
1 M3 PEN PENGAN GANGK GKUT UTAN AN BON BONGKA GKARA RAN N KELU KELUAR AR PROY PROYEK EK
No. 1
Jumlah Harga Rp
Tenaga Mandor Pekerja
A.7
21,978.00 229,900.00 251,878.00
1 M2 M2 BON BONG GKAR PA PAVING ING
No. 1
Jumlah Harga Rp
10,450.00 62,500.00 72,950.00 72,950.00 72,950.00
PEKERJAAN TANAH
B.1 B.1
1M³ 1M³ GAL GALIA IAN N TAN TANA AH BIA BIASA SA
No. 1
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Tenaga Mandor Pekerja
0.025 0.750
Oh Oh
66,000.00 41,800.00
Harga Satuan per M3 Dibulatkan
B.2 B.2
Jumlah Harga Rp 1,650.00 31,350.00 33,000.00 33,000.00 33,000.00
1M³ 1M³ GALI GALIAN AN TAN TANAH AH BIAS BIASA A SEDA SEDALA LAM M 3M
No. 1
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Tenaga Mandor Pekerja
0.045 0.900
Oh Oh
66,000.00 41,800.00
Harga Satuan per M3 Dibulatkan
B.3
2,970.00 37,620.00 40,590.00 40,590.00 40,590.00
1M1 PENGE PENGEBO BORA RAN N TANA TANAH H dia dia 30 CM CM KEDA KEDALA LAMA MAN N s/d 6 M'
No. 1
Jumlah Harga Rp
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Tenaga Mandor Pekerja
0.045 0.450
Oh Oh
Harga Satuan per M1 Dibulatkan
66,000.00 41,800.00
2,970.00 18,810.00 21,780.00 21,780.00 21,780.00
B.4
1M3 PENGE PENGEBO BORA RAN N TANA TANAH H dia dia 30 CM CM KEDA KEDALA LAMA MAN N s/d 6 M'
No. 1
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Tenaga Mandor Pekerja
9.015 6.369
Oh Oh
66,000.00 41,800.00
Harga Satuan per M3 Dibulatkan
B.5
Jumlah Harga Rp 594,997.08 266,236.74 861,233.82 861,233.82 861,233.82
1 M3 M3 UR URUGAN PA PASIR
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Pasir Urug
1.200
M3
87,000.00
104,400.00 104,400.00
Mandor Pekerja
0.025 0.250
Oh Oh
66,000.00 41,800.00
1,650.00 10,450.00 12,100.00
Tenaga
Harga Satuan per M3 Dibulatkan
B.6 B.6
Jumlah Harga Rp
116,500.00 116,500.00
1 M3 M3 URU URUGA GAN N PAS PASIR IR PANT PANTAI AI
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Pasir Pantai
1.20000
M3
138,500.00
166,200.00 166,200.00
Mandor Pekerja
0.02500 0.25000
Oh Oh
66,000.00 41,800.00
1,650.00 10,450.00 12,100.00
Tenaga
Harga Satuan per M3 Dibulatkan
B.6 B.6
Jumlah Harga Rp
178,300.00 178,300.00
1 M3 M3 URUG URUGAN AN TANA TANAH H KEMB KEMBAL ALII
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
Harga Satuan Rp
Tenaga Mandor Pekerja
0.019 0.192
Oh Oh
66,000.00 41,800.00
Harga Satuan per M3 Dibulatkan
B.7
Jenis Tenaga & Bahan
2
9,279.60 9,280.00
Kuantitas
Satuan
Harga Satuan Rp
Tanah katel
1.100
M3
104,000.00
114,400.00 114,400.00
Mandor Pekerja
0.010 0.300
Oh Oh
66,000.00 41,800.00
660.00 12,540.00 13,200.00
Tenaga
Jenis Tenaga & Bahan
2
127,600.00 127,600.00
1 M2 M2 GE GEBALAN RU RUMPU MPUT
No. 1
Jumlah Harga Rp
Bahan
Harga Satuan per M3 Dibulatkan
B.8
1,254.00 8,025.60 9,279.60
1 M3 URUGAN GAN KATEL
No. 1
Jumlah Harga Rp
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Rumput gajah Mini
1.100
M3
22,100.00
24,310.00 24,310.00
Mandor Pekerja
0.001 0.020
Oh Oh
66,000.00 41,800.00
66.00 836.00 902.00
Tenaga
Harga Satuan per M2 Dibulatkan
B.9
1 M3 URUGAN GAN TAN TANAH
No.
Jenis Tenaga & Bahan 1
2
25,212.00 25,212.00
Kuantitas
Satuan
Harga Satuan Rp
Bahan Tanah Urug
1.200
M3
78,000.00
93,600.00 93,600.00
Mandor Pekerja
0.025 0.250
Oh Oh
66,000.00 41,800.00
1,650.00 10,450.00 12,100.00
Tenaga
Harga Satuan per M3 Dibulatkan
B.10 .10
Jenis Tenaga & Bahan
2
105,700.00 105,700.00
1 M3 M3 URU URUGA GAN N SIR SIRTU TU
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Sirtu
1.200
M3
91,000.00
109,200.00 109,200.00
Mandor Pekerja
0.025 0.250
Oh Oh
66,000.00 41,800.00
1,650.00 10,450.00 12,100.00
Tenaga
121,300.00 121,300.00
1M2 PEKE PEKERJ RJAA AAN N CUT CUT & FILL FILL TANA TANAH H
No. 1
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
0.04500 0.12000
Oh Oh
66,000.00 41,800.00
Harga Satuan per M3 Dibulatkan
Jenis Tenaga & Bahan
Kuantitas
7,986.00 7,986.00
Satuan
Harga Satuan Rp
0.51600 0.05000
Oh Oh
66,000.00 41,800.00
Harga Satuan per M3 Dibulatkan
Jenis Tenaga & Bahan
Kuantitas
36,146.00 36,146.00
Satuan
Harga Satuan Rp
1.200 0.432
M3 M3
166,750.00 87,000.00
200,100.00 37,584.00 237,684.00
0.025 0.039 0.390 0.780
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,650.00 2,359.50 21,450.00 32,604.00 58,063.50
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
Harga Satuan per M3 Dibulatkan
C.2
Jumlah Harga Rp
Bahan Batu Belah 15/20 cm Pasir Urug
2
34,056.00 2,090.00 36,146.00
PEKERJAAN PASANGAN 1 M³ PASA PASANG NGAN AN BATU BATU KOSON KOSONG G / AAN AANSTA STAMPI MPING NG
No. 1
Jumlah Harga Rp
Tenaga Mandor Pekerja
C C.1
2,970.00 5,016.00 7,986.00
1M³ PEMB PEMBUAN UANGAN GAN TANAH TANAH BEKA BEKAS S GALIAN GALIAN SEJAUH SEJAUH 150 150 M
No. 1
Jumlah Harga Rp
Tenaga Mandor Pekerja
B.13
Jumlah Harga Rp
Bahan
Harga Satuan per M3 Dibulatkan
B.12 B.12
Jumlah Harga Rp
295,747.50 295,748.00
1M³ PEMA PEMASA SANGA NGAN N POND PONDAS ASII BATU BATU KAL KALII 1PC: 1PC: 5PS 5PS Harga Satuan
Jumlah Harga
.
Rp 1
Batu Belah 15/20 cm Semen portland Pasir Pasang 2
1.200 120.000 0.561
Bh Kg M3
166,750.00 1,558.75 130,500.00
200,100.00 187,050.00 73,210.50 460,360.50
0.075 0.075 0.750 1.500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
4,950.00 4,537.50 41,250.00 62,700.00 113,437.50
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
Harga Satuan per M3 Dibulatkan
C.3
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
70.000 14.370 0.040
Bh Kg M3
580.00 1,558.75 130,500.00
40,600.00 22,399.24 5,220.00 68,219.24
0.015 0.010 0.100 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 12,540.00 19,635.00
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
Harga Satuan per M2 Dibulatkan
C.4
Jenis Tenaga & Bahan
Kuantitas
No. 1
2
Harga Satuan Rp
Bh Kg M3
580.00 1,558.75 130,500.00
40,600.00 14,356.09 5,220.00 60,176.09
0.015 0.010 0.100 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 12,540.00 19,635.00
Harga Satuan per M2 Dibulatkan 1M² PEMA PEMASAN SANGAN GAN BATU BATU MERA MERAH H PATLAH PATLAHAN AN 1/3 1/3 DARI DARI 1/2 BATA BATA 1PC:5P 1PC:5PS S ±5CM ±5CM Harga Satuan Jenis Tenaga & Bahan Kuantitas Satuan Rp Bahan Batu Merah 5x11x22 cm 25.00000 Bh 580.00 Semen portland 3.07000 Kg 1,558.75 Pasir Pasang 0.04000 M3 130,500.00
79,811.09 79,811.00
Tenaga
0.00100 0.00100 0.01000 0.02000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
Harga Satuan per M2 Dibulatkan
14,500.00 4,785.36 5,220.00 24,505.36 66.00 60.50 550.00 836.00 1,512.50 26,017.86 26,018.00
1 M³ PASA PASANG NGAN AN ROLLA ROLLAG G BAT BATU U MERA MERAH H 1 PC PC : 3 PS
No.
Jenis Tenaga & Bahan 1
Jumlah Harga Rp
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
C.5
Jumlah Harga Rp
70.000 9.210 0.040
Mandor Kepala Tukang Tukang batu Pekerja
C.5
Satuan
Bahan Batu Merah 5x11x22 cm Semen portland Pasir Pasang
2
87,854.24 87,854.00
1M² PEMA PEMASA SANGA NGAN N BATU BATU MER MERAH AH 1/2 1/2 BAT BATA A 1PC:5 1PC:5PS PS
No. 1
Jumlah Harga Rp
Bahan Batu Merah 5x11x22 cm Semen portland Pasir Pasang
2
573,798.00 573,798.00
1M² PASA PASANG NGAN AN BAT BATU U MERA MERAH H TEBA TEBAL L 1/2 1/2 BATA BATA 1 PC PC : 3PS 3PS
No. 1
Rp
Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Batu Merah 5x11x22 cm Semen portland
550.000 142.000
Bh Kg
580.00 1,558.75
319,000.00 221,342.50
Pasir Pasang 2
0.330
M3
130,500.00
43,065.00 583,407.50
0.015 0.010 0.100 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 12,540.00 19,635.00
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
Harga Satuan per M2 Dibulatkan
C.6
1 M² PLES PLESTER TERAN AN TAS TASRA RAM M 1PC:3 1PC:3PS PS TEB TEBAL AL 15 15 mm
No.
Jenis Tenaga & Bahan 1
2
603,042.50 603,043.00
Kuantitas
Satuan
Harga Satuan Rp
Bahan Semen portland Pasir Pasang
7.776 0.023
Kg M3
1,558.75 130,500.00
12,120.84 3,001.50 15,122.34
Mandor Kepala Tukang Tukang batu Pekerja
0.015 0.010 0.100 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 12,540.00 19,635.00
Tenaga
Harga Satuan per M2 Dibulatkan
C.7
Jenis Tenaga & Bahan
2
34,757.34 34,757.00
1 M² PLES PLESTER TERAN AN TAS TASRA RAM M 1PC:5 1PC:5PS PS TEB TEBAL AL 15 15 mm
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Semen portland Pasir Pasang
5.120 0.027
Kg M3
1,558.75 130,500.00
7,980.80 3,523.50 11,504.30
Mandor Kepala Tukang Tukang batu Pekerja
0.015 0.010 0.100 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 12,540.00 19,635.00
Tenaga
Harga Satuan per M2 Dibulatkan
C.8
Jumlah Harga Rp
31,139.30 31,139.00
1 M² AC ACIAN
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Semen portland
3.250
Kg
1,558.75
5,065.94 5,065.94
Mandor Kepala Tukang Tukang batu Pekerja
0.015 0.010 0.100 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 12,540.00 19,635.00
Tenaga
Harga Satuan per M2 Dibulatkan
C.8a C.8a
Jenis Tenaga & Bahan
2
24,700.94 24,701.00
1 M² PLES PLESTE TER R + ACIA ACIAN N 1: 3
No. 1
Jumlah Harga Rp
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Pasir Pasang Semen portland
0.02400 8.430
m3 Kg
130,500.00 1,558.75
3,132.00 13,140.26 16,272.26
Mandor Kepala Tukang Tukang batu Pekerja
0.008 0.010 0.130 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
528.00 605.00 7,150.00 12,540.00 20,823.00
Tenaga
Harga Satuan per M2 Dibulatkan
C.8b C.8b
1 M² PLESTER PLESTER BETON BETON + ACIAN ACIAN 1: 5
No.
Jenis Tenaga & Bahan 1
2
37,095.26 37,095.00
Kuantitas
Satuan
Harga Satuan Rp
Bahan Pasir Pasang Semen portland
0.02600 6.744
m3 Kg
130,500.00 1,558.75
3,393.00 10,512.21 13,905.21
Mandor Kepala Tukang Tukang batu Pekerja
0.015 0.010 0.100 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 12,540.00 19,635.00
Tenaga
Harga Satuan per M2 Dibulatkan
C.9 C.9
Jumlah Harga Rp
33,540.21 33,540.00
1 M2 PASA PASANG NG BATU BATU ANDES NDESIT IT
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Batu Andesit 10x20 Semen Portland Pasir Pasang
1.200 9.500 0.020
M2 Kg M3
125,000.00 1,558.75 130,500.00
150,000.00 14,808.13 2,610.00 167,418.13
Mandor Kepala Tukang Batu Tukang Batu Pekerja
0.013 0.017 0.250 0.450
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
858.00 1,028.50 13,750.00 18,810.00 34,446.50
Tenaga
Harga Satuan per M2 Dibulatkan
C.10 C.10
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1.1000 11.3800 0.0420
M2 Kg M3
100,000.00 1,558.75 130,500.00
110,000.00 17,738.58 5,481.00 133,219.58
0.0350 0.0350 0.3500 0.6200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,310.00 2,117.50 19,250.00 25,916.00 49,593.50
Tenaga Mandor Kepala Tukang Batu Tukang Batu Pekerja
Harga Satuan per M2 Dibulatkan
C.11 C.11
Jenis Tenaga & Bahan
2
182,813.08 182,813.00
1 M2 M2 PEMA PEMASA SANG NGAN AN KERA KERAMIK MIK 20X20 20X20
No. 1
Jumlah Harga Rp
Bahan Batu Lempeng Portland Cement (PC) 50 Kg Pasir Pasang
2
201,864.63 201,865.00
1 M2 PASA PASANG NG BAT BATU U LEM LEMPE PENG NG
No. 1
Jumlah Harga Rp
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Semen berwarna yiyitan Semen pc @ 50 kg Keramik roman 20 x 20 Pasir pasang
0.200 3.760 1.000 0.022
kg kg m2 m3
3,250.00 1,558.75 84,100.00 130,500.00
650.00 5,860.90 84,100.00 2,871.00 93,481.90
Mandor Kepala Tukang batu Tukang batu Pekerja
0.025 0.025 0.250 0.500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,650.00 1,512.50 13,750.00 20,900.00 37,812.50
Tenaga
Harga Satuan per M2
131,294.40
Dibulatkan
C.12 C.12
1 M2 PEMAS PEMASAN ANGAN GAN KERA KERAMIK MIK DIN DINDIN DING G 20 X 25
No.
Jenis Tenaga & Bahan 1
2
131,294.00
Kuantitas
Satuan
Harga Satuan Rp
Bahan Semen berwarna yiyitan Semen pc @ 50 kg Keramik roman 20 x 25 Pasir pasang
0.200 3.760 1.000 0.022
kg kg m2 m3
3,250.00 1,558.75 85,550.00 130,500.00
650.00 5,860.90 85,550.00 2,871.00 94,931.90
Mandor Kepala Tukang batu Tukang batu Pekerja
0.025 0.025 0.250 0.500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,650.00 1,512.50 13,750.00 20,900.00 37,812.50
Tenaga
Harga Satuan per M2 Dibulatkan
C.13
Jenis Tenaga & Bahan
2
132,744.40 132,744.00
1 M2 PEMASAN PEMASANGAN GAN KERAMIK KERAMIK 30X30 30X30 WARNA WARNA TERANG TERANG
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Semen berwarna yiyitan Semen pc @ 50 kg Pasir pasang Keramik roman 30x30
0.200 4.680 0.022 1.000
kg kg m3 m2
3,250.00 1,558.75 130,500.00 85,550.00
650.00 7,294.95 2,871.00 85,550.00 96,365.95
Mandor Kepala Tukang batu Tukang batu Pekerja
0.025 0.025 0.250 0.500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,650.00 1,512.50 13,750.00 20,900.00 37,812.50
Tenaga
Jenis Tenaga & Bahan
2
134,178.45 134,178.00
1 M2 PEMASAN PEMASANGAN GAN KERAMIK KERAMIK 30X30 30X30 WARNA WARNA GELAP GELAP
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Semen berwarna yiyitan Semen pc @ 50 kg Pasir pasang Keramik roman 30x30
0.200 4.680 0.022 1.000
kg kg m3 m2
3,250.00 1,558.75 130,500.00 94,105.00
650.00 7,294.95 2,871.00 94,105.00 104,920.95
Mandor Kepala Tukang batu Tukang batu Pekerja
0.025 0.025 0.250 0.500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,650.00 1,512.50 13,750.00 20,900.00 37,812.50
Tenaga
Jenis Tenaga & Bahan
2
142,733.45 142,733.00
1 M2 PEMASAN PEMASANGAN GAN KERAMIK KERAMIK ANTI ANTI SELIP SELIP 30X30 30X30
No. 1
Jumlah Harga Rp
Bahan
Harga Satuan per M2 Dibulatkan
C.15
Jumlah Harga Rp
Bahan
Harga Satuan per M2 Dibulatkan
C.14
Jumlah Harga Rp
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Semen berwarna yiyitan Semen pc @ 50 kg Keramik roman 30 x 30 Pasir pasang
0.200 3.760 1.050 0.022
kg kg m2 m3
3,250.00 1,558.75 101,500.00 130,500.00
650.00 5,860.90 106,575.00 2,871.00 115,956.90
Mandor Kepala Tukang batu Tukang batu Pekerja
0.025 0.025 0.250 0.500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,650.00 1,512.50 13,750.00 20,900.00 37,812.50
Tenaga
Harga Satuan per M2
153,769.40
Dibulatkan
C.16 C.16
1 M2 M2 PEMA PEMASA SANG NGAN AN KERA KERAMIK MIK 40X40 40X40
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
Harga Satuan Rp
1.050 6.480 1.500 0.019
M2 Kg Kg M3
94,250.00 1,075.00 3,250.00 130,500.00
98, 96 962.50 6,966.00 4,875.00 2, 47 479.50 113,283.00
0.035 .035 0.040 .040 0.400 .400 0.700 .700
Oh Oh Oh Oh
60,0 0,000.0 0.00 55,0 5,000.0 0.00 45,0 5,000.0 0.00 32,0 2,000.0 0.00
2,10 ,100.0 0.00 2,20 ,200.0 0.00 18,00 ,000.0 0.00 22,40 ,400.0 0.00 44,700.00
Tenaga Mandor Kepala Tukang batu Tukang batu Pekerja
Harga Satuan per M2 Dibulatkan
C.17 C.17
Jenis Tenaga & Bahan
2
157,983.00 157,983.00
1 M1 PEMA PEMASA SANG NGAN AN KER KERAM AMIK IK BOR BORDE DER R 10 X 20 20
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Semen berwarna yiyitan Semen pc @ 50 kg Keramik roman 10 x 20 Pasir pasang
0.200 3.760 1.050 0.022
kg kg M2 m3
3,250.00 1,558.75 69,600.00 130,500.00
650.00 5,860.90 73,080.00 2,871.00 82,461.90
Mandor Kepala Tukang batu Tukang batu Pekerja
0.025 0.025 0.250 0.500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,650.00 1,512.50 13,750.00 20,900.00 37,812.50
Tenaga
Jenis Tenaga & Bahan
2
12,027.44 12,027.00
1 M2 M2 BAT BATU U ACA ACAK K CIR CIREB EBON ON
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Semen pc @ 50 kg Batu alam acak Pasir pasang
9.300 1.050 0.100
kg m2 m3
1,558.75 100,050.00 130,500.00
14,496.38 105,052.50 13,050.00 132,598.88
Mandor Kepala Tukang batu Tukang batu Pekerja
0.045 0.045 0.450 0.900
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,970.00 2,722.50 24,750.00 37,620.00 68,062.50
Tenaga
Jenis Tenaga & Bahan
2
200,661.38 200,661.00
1 M' PASA PASANG NG PROF PROFIL IL GRC GRC
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Profil GRC Semen Portland Pasir Pasang
1.10000 9.50000 0.02000
m' Kg M3
208,000.00 1,558.75 130,500.00
228,800.00 14,808.13 2,610.00 246,218.13
Mandor Kepala Tukang Batu Tukang Batu Pekerja
0.01300 0.01700 0.10000 0.15000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
858.00 1,028.50 5,500.00 6,270.00 11,770.00
Tenaga
Harga Satuan per M' Dibulatkan
C.19 .19
Jumlah Harga Rp
Bahan
Harga Satuan per M2 Dibulatkan
C.18 C.18
Jumlah Harga Rp
Bahan
Harga Satuan per M' Dibulatkan
C.18 C.18
Jumlah Harga Rp
Bahan Keramik 40/40 Semen portland Semen warna Pasir pasang
2
153,769.00
257,988.13 257,988.00
1 M2 M2 BA BATU TE TEBAR Harga Satuan
Jumlah Harga
.
Rp 1
Batu Tebar warna 2
10.000
Kg
7,250.00
72,500.00 72,500.00
0.005 0.008 0.050 0.075
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
330.00 453.75 2,750.00 3,135.00 6,668.75
Tenaga Mandor Kepala Tukang batu Tukang batu Pekerja
Harga Satuan per M2 Dibulatkan
C.20
Jenis Tenaga & Bahan
2
79,168.75 79,169.00
1M¹ PEKERJ PEKERJAAN AAN BENANGA BENANGAN N SUDU SUDUT/ T/ COL-C COL-COLAN OLAN
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Semen portland Pasir Pasang
0.750 0.007
Kg M3
1,558.75 130,500.00
1,169.06 848.25 2,017.31
Mandor Kepala Tukang Tukang batu Pekerja
0.015 0.010 0.100 0.060
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 2,508.00 9,603.00
Tenaga
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1.100
M2
143,000.00
157,300.00 157,300.00
0.015 0.010 0.100 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 12,540.00 19,635.00
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
Harga Satuan per M1 Dibulatkan
C.20 C.20
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1.100 123.750 5.150 0.031 0.035
m' bh kg m³ m³
96,200.00 580.00 1,558.75 130,500.00 87,000.00
105,820.00 71,775.00 8,027.56 3,980.25 3,001.50 192,604.31
0.0020 0.0380 0.0380 0.0570
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
132.00 2,299.00 2,090.00 2,382.60 6,903.60
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
Harga Satuan per M1 Dibulatkan
C.22
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Batu Merah 5x11x22 cm Semen portland Pasir Pasang
2
199,507.91 199,508.00
1M² PEMA PEMASAN SANGAN GAN BATU BATU MERA MERAH H KANSTIN KANSTIN 1/2 BATA BATA 1PC:5P 1PC:5PS S
No. 1
Jumlah Harga Rp
Bahan Buis beton Ø 20 cm Batu merah 5 x 11 x 22 cm Semen PC ( 50 Kg ) Pasir pasang Pasir urug
2
176,935.00 176,935.00
1M1 PEKE PEKERJ RJAA AAN N BET BETON ON BUIS BUIS U 20
No. 1
Jumlah Harga Rp
Bahan Kaca Ribben
2
11,620.31 11,620.00
1M¹ PEKE PEKERJ RJAA AAN N PLINT PLINTCOL COL KACA KACA RIBE RIBEN N
No. 1
Jumlah Harga Rp
Bahan
Harga Satuan per M1 Dibulatkan
C.21 C.21
Rp
Bahan
10.000 9.210 0.040
Bh Kg M3
580.00 1,558.75 130,500.00
5,800.00 14,356.09 5,220.00 25,376.09
0.015
Oh
66,000.00
990.00
Tenaga Mandor
Kepala Tukang Tukang batu Pekerja
0.010 0.100 0.300
Oh Oh Oh
60,500.00 55,000.00 41,800.00
Harga Satuan per M2 Dibulatkan
C.23 C.23
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
0.035 1.100
M3 M2
130,500.00 83,375.00
4,567.50 91,712.50 96,280.00
0.002 0.038 0.038 0.057
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
132.00 2,299.00 2,090.00 2,382.60 6,903.60
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
Harga Satuan per M2 Dibulatkan
C.24
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
84.000 1.100 5.000 0.040
Bh M1 Kg M3
580.00 96,200.00 1,558.75 130,500.00
48,720.00 105,820.00 7,793.75 5,220.00 167,553.75
0.002 0.038 0.038 0.057
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
132.00 2,299.00 2,090.00 2,382.60 6,903.60
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
Harga Satuan per M2 Dibulatkan
C.25 C.25
2
174,457.35 174,457.00
1 M2 M2 BAT BATU U AMP AMPYA YANG NG BATU BATU KECIL KECIL
No. 1
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Batu Ampyang Semen portland Pasir Pasang
10.000 1.500 0.750
Kg Kg M3
5,510.00 1,558.75 130,500.00
55,100.00 2,338.13 97,875.00 155,313.13
Mandor Kepala Tukang Tukang batu Pekerja
0.020 0.050 0.250 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,320.00 3,025.00 13,750.00 12,540.00 30,635.00
Tenaga
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Batu Merah 5x11x22 cm Semen portland Pasir Pasang
2
185,948.13 185,948.00
1Buah 1Buah PEMAS PEMASAN ANGAN GAN BAK BAK KONT KONTRO ROL L
No. 1
Jumlah Harga Rp
Bahan
Harga Satuan per M2 Dibulatkan
C.22 C.22
Jumlah Harga Rp
Bahan Batu Merah 5x11x22 cm Beton Buis U 20 Semen portland Pasir Pasang
2
103,183.60 103,184.00
1M1 PEKERJ PEKERJAAN AAN SALURA SALURAN N KELIL KELILING ING AIR HUJAN HUJAN
No. 1
Jumlah Harga Rp
Bahan Pasir Pasang Paving Blok Tbl 6 Cm
2
45,011.09 45,011.00
1M2 1M2 PEKE PEKERJ RJAA AAN N PAVI PAVING NG BLO BLOK K
No. 1
605.00 5,500.00 12,540.00 19,635.00
50.0000 20.0000 0.7500
Bh Kg M3
580.00 1,558.75 130,500.00
29,000.00 31,175.00 97,875.00 158,050.00
0.0020 0.0380 0.0380 0.0570
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
132.00 2,299.00 2,090.00 2,382.60 6,903.60
Tenaga Mandor Kepala Tukang Tukang batu Pekerja
Harga Satuan per Unit Dibulatkan
C.26 C.26
1 M2 M2 BAT BATU U AMP AMPYA YANG NG BATU BATU BESA BESAR R
No.
Jenis Tenaga & Bahan 1
2
164,953.60 164,954.00
Kuantitas
Satuan
Harga Satuan Rp
Bahan Batu Ampyang Semen portland Pasir Pasang
20.000 1.500 0.750
Kg Kg M3
7,250.00 1,558.75 130,500.00
145,000.00 2,338.13 97,875.00 245,213.13
Mandor Kepala Tukang Tukang batu Pekerja
0.020 0.050 0.250 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,320.00 3,025.00 13,750.00 12,540.00 30,635.00
Tenaga
Harga Satuan per M2 Dibulatkan
C.27
Jenis Tenaga & Bahan
2
275,848.13 275,848.00
1 M2 PASANGA PASANGAN N DINDI DINDING NG ROST ROSTER/T ER/TERA ERAWANG WANG 12X11X2 12X11X24 4
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Roster/Trawang Semen portland Pasir Pasang
30.000 11.000 0.035
Bh Kg M3
7,800.00 1,558.75 130,500.00
234,000.00 17,146.25 4,567.50 255,713.75
Mandor Kepala Tukang Tukang batu Pekerja
0.015 0.010 0.100 0.300
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 605.00 5,500.00 12,540.00 19,635.00
Tenaga
Jenis Tenaga & Bahan
2
275,348.75 275,349.00
1 BH PASA PASANGA NGAN N KA KANS NSTE TEIN IN 25X 25X20X 20X40 40
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kanstein Semen portland Pasir Pasang
1.000 2.500 0.035
Bh Kg M3
22,750.00 1,558.75 130,500.00
22,750.00 3,896.88 4,567.50 31,214.38
Mandor Kepala Tukang Tukang batu Pekerja
0.002 0.020 0.060 0.100
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
132.00 1,210.00 3,300.00 4,180.00 8,822.00
Tenaga
Harga Satuan per M2 Dibulatkan
D
Jumlah Harga Rp
Bahan
Harga Satuan per M2 Dibulatkan
C.28 C.28
Jumlah Harga Rp
40,036.38 40,036.00
PEKERJAAN BETON
D.1 D.1
1 M3 M3 BET BETON ON READ READY Y MIX MIX K-27 K-275 5
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Beton ready mix K-275 Concrete pump Sewa Alat Bantu
1.050 0.030 1.000
M3 Ls Ls
710,500.00 325,000.00 6,500.00
746,025.00 9,750.00 6,500.00 762,275.00
Mandor Kep. Tukang batu Tukang batu Pekerja
0.080 0.025 0.250 1.650
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
5,280.00 1,512.50 13,750.00 68,970.00 89,512.50
Tenaga
Harga Satuan per M3 Dibulatkan
851,787.50 851,788.00
D.2
1 M3 M3 PEK PEKER ERJA JAAN AN BETON BETON STRU STRUKT KTUR UR K- 275
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
0.586 406.000 0.760 215.000 0.026 0.324 0.026 0.324
m3 kg m3 ltr j am j am j am j am
130,500.00 1,558.75 224,250.00 5.85 325,000.00 162,500.00 84,500.00 6,500.00
76,510.29 632,852.50 170,430.00 1,257.75 8,538.08 52,650.00 2,219.90 2,106.00 946,564.51
0.083 0.028 0.275 1.650
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
5,478.00 1,694.00 15,125.00 68,970.00 91,267.00
Tenaga Mandor Kep. Tukang batu Tukang batu Pekerja
Harga Satuan per M3 Dibulatkan
D.3 D.3
Jumlah Harga Rp
Bahan Pasir cor Semen Porland @ 50 Kg Koral / split uk. 2 - 3 cm Air Sewa concret Mixer Sewa Pump W ater Sewa Vibrator Sewa Alat Bantu
2
Kuantitas
1,037,831.51 1,037,832.00
1 KG PEM PEMBE BESI SIAN AN BETO BETON N (STR (STRUK UKTU TUR) R)
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.050 0.015
kg kg
10,150.00 18,850.00
10,657.50 282.75 10,940.25
0.0003 0.0007 0.0070 0.0070
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
19.80 42.35 385.00 292.60 739.75
Tenaga Mandor Kep. Tukang besi Tukang besi Pekerja
Harga Satuan per M3 Dibulatkan
D.4 D.4
1 KG KG PEM PEMBE BESI SIAN AN WIRE WIRE MESH MESH M8
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
11,680.00 11,680.00
Harga Satuan Rp
Besi beton polos / ulir Kawat bendrat
1.05000 0.01500
kg kg
10,150.00 18,850.00
10,657.50 282.75 10,940.25
Mandor Kep. Tukang besi Tukang besi Pekerja
0.00030 0.00070 0.00700 0.00700
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
19.80 42.35 385.00 292.60 739.75
Tenaga
Jenis Tenaga & Bahan
2
11,680.00 11,680.00
1 M2 M2 BE BEKIST ISTING ING KOL KOLO OM
No. 1
Jumlah Harga Rp
Bahan
Harga Satuan per M3 Dibulatkan
D.4
Jumlah Harga Rp
Bahan Besi beton polos / ulir Kawat bendrat
2
Kuantitas
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kayu meranti Papan Balok kayu meranti Paku Multiplek 9 mm Minyak bekisting Bambu
0.040 0.015 0.400 0.350 0.200 2.000
m3 m3 kg lbr ltr btg
3,685,500.00 3,685,500.00 29,250.00 175,500.00 19,500.00 24,700.00
147,420.00 55,282.50 11,700.00 61,425.00 3,900.00 49,400.00 329,127.50
Mandor Kep. Tukang kayu Tukang kayu Pekerja
0.033 0.033 0.330 0.660
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,178.00 1,996.50 18,150.00 27,588.00 49,912.50
Tenaga
Harga Satuan 2 x pakai Harga Satuan per M2 Dibulatkan
D.5
1 M2 M2 BE BEKIST ISTING ING BA BALOK
No.
Jenis Tenaga & Bahan 1
2
379,040.00 379,040.00 379,040.00
Kuantitas
Satuan
Harga Satuan Rp
Bahan Kayu meranti Balok kayu meranti Paku Multiplek 9 mm Minyak bekisting Bambu
0.040 0.018 0.400 0.350 0.200 2.000
m3 m3 kg lbr ltr btg
3,685,500.00 3,685,500.00 29,250.00 175,500.00 19,500.00 24,700.00
147,420.00 66,339.00 11,700.00 61,425.00 3,900.00 49,400.00 340,184.00
Mandor Kep. Tukang kayu Tukang kayu Pekerja
0.033 0.033 0.330 0.660
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,178.00 1,996.50 18,150.00 27,588.00 49,912.50
Tenaga
Harga Satuan 2 x pakai Harga Satuan per M2 Dibulatkan
D.6
Jenis Tenaga & Bahan
2
390,096.50 390,096.50 390,097.00
1 M2 M2 BE BEKIST ISTING ING PL PLAT
No. 1
Kuantitas
Satuan
Harga Satuan Rp
No.
Kayu meranti Balok kayu meranti Paku Multiplek 9 mm Minyak bekisting Bambu
0.040 0.015 0.400 0.350 0.200 6.000
m3 m3 kg lbr ltr s et
3,685,500.00 3,685,500.00 29,250.00 175,500.00 19,500.00 24,700.00
147,420.00 55,282.50 11,700.00 61,425.00 3,900.00 148,200.00 427,927.50
Mandor Kep. Tukang kayu Tukang kayu Pekerja
0.033 0.033 0.330 0.660
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,178.00 1,996.50 18,150.00 27,588.00 49,912.50
Tenaga
477,840.00 477,840.00 477,840.00
1 M3 KOLOM Ø 50 Jenis Tenaga & Bahan Beton ready mix K-275 Pembesian Bekisting 2 x pakai kolom bulat Alat bantu
Kuantitas
Satuan
1.000 287.573 8.000 1.000
Harga Satuan Rp
M3 kg m2 ls
851,788.00 11,680.00 236,900.00 10,000.00
Harga Satuan per M3 Dibulatkan
D.8 D.8 No.
851,788.00 3,358,856.53 1,895,200.00 10,000.00 6,115,844.53 6,115,844.53 6,115,845.00
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 227.24000 8.00000 1.00000
Harga Satuan Rp
M3 kg m2 ls
851,788.00 11,680.00 189,520.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jumlah Harga Rp
1 M3 M3 KOL KOLOM OM 50 / 50 50 ( K2') K2') ( D4 D4 )
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.9 D.9
Jumlah Harga Rp
Bahan
Harga Satuan 2 x pakai Harga Satuan per M2 Dibulatkan
D.7
Jumlah Harga Rp
Jumlah Harga Rp 851,788.00 2,654,163.20 1,516,160.00 10,000.00 5,032,111.20 5,032,111.20 5,032,111.00
1 M3 M3 KOL KOLOM OM 50 / 50 50 ( K7') K7') ( D4 D4 ) Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
1.00000 155.88000 8.00000 1.00000
M3 kg m2 ls
851,788.00 11,680.00 189,520.00 10,000.00
Harga Satuan per M3 Dibulatkan
D.10 D.10 No.
No.
4,198,626.40 4,198,626.00
1 M3 M3 KOL KOLOM OM 40 / 40 ( K2 K2 ) ( D4 ) Jenis Tenaga & Bahan Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.8
Kuantitas
Jenis Tenaga & Bahan
Satuan
1.00000 321.91667 10.00000 1.00000
Harga Satuan Rp
M3 kg m2 ls
851,788.00 11,680.00 189,520.00 10,000.00
Harga Satuan per M2 Dibulatkan
0.20 0.13 1 M3 KOLOM Ø 40
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
Kuantitas
Satuan
1.000 187.000 13.333 1.000
Harga Satuan Rp
M3 kg m2 ls
No.
Jumlah Harga Rp 851,788.00 3,759,986.67 1,895,200.00 10,000.00 6,516,974.67 6,516,974.67 6,516,975.00
851,788.00 11,680.00 148,062.50 10,000.00
Harga Satuan per M3 Dibulatkan
D.12 D.12
851,788.00 1,820,678.40 1,516,160.00 10,000.00 4,198,626.40
Jumlah Harga Rp 851,788.00 2,184,160.00 1,974,166.67 10,000.00 5,020,114.67 5,020,114.67 5,020,115.00
1 M3 M3 KOL KOLOM OM 30 / 30 ( K3 K3 ) ( D4 ) Jenis Tenaga & Bahan Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
Kuantitas
Satuan
1.00000 233.33333 13.33333 1.00000
Harga Satuan Rp
M3 kg m2 ls
851,788.00 11,680.00 148,062.50 10,000.00
Harga Satuan per M2 Dibulatkan
Jumlah Harga Rp 851,788.00 2,725,333.33 1,974,166.67 10,000.00 5,561,288.00 5,561,288.00 5,561,288.00
1 M3 KOLOM 30 / 30 ( K8) ( D4 ) No.
Jenis Tenaga & Bahan Beton ready mix K-275 Pembesian Bekisting Alat bantu
Kuantitas
Satuan
1.00000 175.85185 13.33333 1.00000
Harga Satuan Rp
M3 kg m2 ls
851,788.00 11,680.00 148,062.50 10,000.00
Harga Satuan per M2 Dibulatkan
D.9 No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.000 105.000 13.333 1.000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 148,062.50 10,000.00
Harga Satuan per M3 Dibulatkan
No.
851,788.00 2,053,949.63 1,974,166.67 10,000.00 4,889,904.30 4,889,904.30 4,889,904.00
1 M3 KOLOM 15 / 20
Beton site mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.14 D.14
Jumlah Harga Rp
Jumlah Harga Rp 1,037,832.00 1,226,400.00 1,974,166.67 10,000.00 4,248,398.67 4,248,398.67 4,248,399.00
1 M3 M3 KOL KOLOM OM 50/ 50/ 50 ( K6 K6 ) ( D4 ) Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
1.00000 142.56000 8.00000 1.00000
M3 kg m2 ls
1,037,832.00 11,680.00 148,062.50 10,000.00
Harga Satuan per M2 Dibulatkan
D.10 .10 No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.000 151.763 8.333 1.000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 148,062.50 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.000 157.499 8.333 1.000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 477,840.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 234.96599 6.16327 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 477,840.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 213.26667 8.08000 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 477,840.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 228.76667 8.10000 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 477,840.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jumlah Harga Rp 1,037,832.00 1,839,583.78 3,982,000.00 10,000.00 6,869,415.78 6,869,415.78 6,869,416.00
Jumlah Harga Rp 1,037,832.00 2,744,402.72 2,945,054.69 10,000.00 6,737,289.41 6,737,289.41 6,737,289.00
Jumlah Harga Rp 1,037,832.00 2,490,954.67 3,860,947.20 10,000.00 7,399,733.87 7,399,733.87 7,399,734.00
1 M3 M3 BALO BALOK K B3 25/4 25/40 0 ( D4 )
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.20 .20
4,054,277.57 4,054,278.00
1 M3 M3 BALO BALOK K B2 25/5 25/50 0 ( D4 )
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.19 D.19
1,037,832.00 1,772,591.41 1,233,854.17 10,000.00 4,054,277.57
1 M3 M3 BALO BALOK K B1 35/7 35/70 0 ( D4 )
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.18 D.18
Jumlah Harga Rp
1 M3 BETO BETON N PLA PLAT T TEBA TEBAL L 10 CM
Beton ready mix K-275 Pembesian Bekisting Alat bantu
D.17 D.17
3,897,432.80 3,897,433.00
1 M3 M3 KOL KOLOM OM PRAK PRAKTI TIS S
Beton site mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.11 D.11
1,037,832.00 1,665,100.80 1,184,500.00 10,000.00 3,897,432.80
Jumlah Harga Rp 1,037,832.00 2,671,994.67 3,870,504.00 10,000.00 7,590,330.67 7,590,330.67 7,590,331.00
1 M3 BALO BALOK K B3' B3' 25/5 25/50 0 Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
1.00000 213.26667 8.08000 1.00000
M3 kg m2 ls
1,037,832.00 11,680.00 477,840.00 10,000.00
Harga Satuan per M3 Dibulatkan
D.12 .12 No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.000 136.584 8.133 1.000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 390,097.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.000 146.340 8.133 1.000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.000 136.000 8.133 1.000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
Kuantitas
Satuan
1.000 111.667 8.100 1.000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 390,097.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 208.41667 8.10000 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 390,097.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jumlah Harga Rp 1,037,832.00 1,709,256.76 1,586,394.47 10,000.00 4,343,483.23 4,343,483.23 4,343,483.00
Jumlah Harga Rp 1,037,832.00 1,588,480.00 1,586,394.47 10,000.00 4,222,706.47 4,222,706.47 4,222,706.00
Jumlah Harga Rp 1,037,832.00 1,304,266.67 3,159,785.70 10,000.00 5,511,884.37 5,511,884.37 5,511,884.00
1 M3 M3 BALO BALOK K BKA BKA 25/4 25/40 0 ( D4 D4 )
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.24 D.24
5,815,927.24 5,815,927.00
1 M3 BALO BALOK K BK 15/2 15/20 0 Jenis Tenaga & Bahan
D.23 D.23
1,037,832.00 1,595,306.31 3,172,788.93 10,000.00 5,815,927.24
1 M3 BALOK 20/2 20/25 5
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.15 .15
Jumlah Harga Rp
1 M3 BALOK 30/5 30/50 0
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.14 .14
7,399,733.87 7,399,734.00
1 M3 BALO BALOK K B4 20/4 20/40 0
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.13 .13
1,037,832.00 2,490,954.67 3,860,947.20 10,000.00 7,399,733.87
Jumlah Harga Rp 1,037,832.00 2,434,306.67 3,159,785.70 10,000.00 6,641,924.37 6,641,924.37 6,641,924.00
1 M3 M3 BALO BALOK K BL 30/3 30/30 0 ( D4 ) Jenis Tenaga & Bahan Beton ready mix K-275 Pembesian
Kuantitas 1.00000 166.94444
Satuan M3 kg
Harga Satuan Rp 1,037,832.00 11,680.00
Jumlah Harga Rp 1,037,832.00 1,949,911.11
Bekisting 2 x pakai Alat bantu
8.13333 1.00000
m2 ls
390,097.00 10,000.00
Harga Satuan per M3 Dibulatkan
D.25 .25 No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 143.64444 8.13333 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 390,097.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 35.91111 8.13333 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 390,097.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 128.00000 8.13333 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 390,097.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
5,898,388.04 5,898,388.00
Jumlah Harga Rp 1,037,832.00 419,441.78 3,172,788.93 10,000.00 4,640,062.71 4,640,062.71 4,640,063.00
Jumlah Harga Rp 1,037,832.00 1,495,040.00 3,172,788.93 10,000.00 5,715,660.93 5,715,660.93 5,715,661.00
1 M3 BETO BETON N PLA PLAT T TANG TANGGA GA 15 15 CM CM Jenis Tenaga & Bahan Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
Kuantitas
Satuan
1.00000 162.37778 6.66667 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 390,097.00 10,000.00
Harga Satuan per M2 Dibulatkan
D.17 D.17
1 M3 M3 BET BETON ON PLAT PLAT LEUVE LEUVEL L 12 12 CM CM
No.
Jenis Tenaga & Bahan Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
Kuantitas
Satuan
1.000 158.683 8.333 1.000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
D.29 D.29
1,037,832.00 1,677,767.11 3,172,788.93 10,000.00 5,898,388.04
1 M3 BALOK 20/3 20/30 0
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.27 D.27
Jumlah Harga Rp
1 M3 BALO BALOK K BR 15/1 15/15 5
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.16 .16
6,170,532.04 6,170,532.00
1 M3 BALO BALOK K BR 30/3 30/30 0
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.25 D.25a a
3,172,788.93 10,000.00 6,170,532.04
Jumlah Harga Rp 1,037,832.00 1,896,572.44 2,600,646.67 10,000.00 5,545,051.11 5,545,051.11 5,545,051.00
Jumlah Harga Rp 1,037,832.00 1,853,414.50 1,625,404.17 10,000.00 4,526,650.67 4,526,650.67 4,526,651.00
1 M3 BETON BETON STROU STROUSS SS dia 20 CM CM K-27 K-275 5 Harga Satuan
Jumlah Harga
.
Rp Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
1.00000 124.891 8.33333 1.00000
M3 kg m2 ls
1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M2 Dibulatkan
D.18 D.18 No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.000 124.891 1.000
M3 kg ls
Harga Satuan Rp 1,037,832.00 11,680.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.000 167.500 8.333 1.000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 115.000 8.33333 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,040,393.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M2 Dibulatkan
No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
1.00000 146.991 8.33333 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M2 Dibulatkan
D.20 D.20
1 M3 M3 BET BETON ON POER POER 150X 150X150 150 K-275 K-275
No.
Jenis Tenaga & Bahan Beton ready mix K-275 Pembesian Alat bantu
Kuantitas
Satuan
1.000 138.000 1.000
M3 kg ls
Harga Satuan Rp 1,037,832.00 11,680.00 10,000.00
Harga Satuan per M3 Dibulatkan
No.
1,037,832.00 1,458,726.88 10,000.00 2,506,558.88 2,506,558.88 2,506,559.00
Jumlah Harga Rp 1,037,832.00 1,956,400.00 1,625,404.17 10,000.00 4,629,636.17 4,629,636.17 4,629,636.00
Jumlah Harga Rp 1,040,393.00 1,343,200.00 1,625,404.17 10,000.00 4,018,997.17 4,018,997.17 4,018,997.00
1 M3 BETO BETON N POE POER R 60X 60X60 60 K-2 K-275 75
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.21 D.21
Jumlah Harga Rp
1 M3 BETON BETON SLOFF SLOFF KOPEL KOPEL 20/40 20/40 K-27 K-275 5
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.33 D.33
4,131,963.05 4,131,963.00
1 M3 BET BETON ON SLO SLOFF FF 15/ 15/20 20 K-2 K-275 75
Beton ready mix K-275 Pembesian Bekisting 2 x pakai Alat bantu
D.32 D.32
1,037,832.00 1,458,726.88 1,625,404.17 10,000.00 4,131,963.05
1 M3 BETON BETON STROU STROUSS SS dia 30 CM CM K-27 K-275 5
Beton ready mix K-275 Pembesian Alat bantu
D.19 D.19
Rp
1 M3 M3 BET BETON ON PLAT PLAT LISPL LISPLAN ANK K 12 12 CM CM Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp 1,037,832.00 1,716,858.61 1,625,404.17 10,000.00 4,390,094.78 4,390,094.78 4,390,095.00
Jumlah Harga Rp 1,037,832.00 1,611,840.00 10,000.00 2,659,672.00 2,659,672.00 2,659,672.00
Jumlah Harga Rp
Beton ready mix K-275 Pembesian Bekisting Alat bantu
1.000 68.730 6.667 1.000
M3 kg m2 ls
1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
D.22 D.22 No.
3,150,921.73 3,150,922.00
1 M3 M3 BET BETON ON LANT LANTAI AI KERJ KERJA A Jenis Tenaga & Bahan Beton ready mix K-225 Alat bantu
Kuantitas 1.0000 1.0000
Satuan
Harga Satuan Rp
m3 ls
778,374.00 10,000.00
Harga Satuan per M3 Dibulatkan
D.23 .23 No.
Jenis Tenaga & Bahan
1 M3 BETON BETON PLAT PLAT LAND LANDAS ASAN AN K-275 K-275 Jenis Tenaga & Bahan
Beton ready mix K-275 Pembesian Bekisting Alat bantu
Kuantitas
Satuan
1.00000 1.00000
Harga Satuan Rp
M3 ls
778,374.00 10,000.00
Kuantitas
Satuan
1.00000 87.66667 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
D.25 D.25 No.
1 M3 M3 KOL KOLOM OM 40 / 70 ( K7 K7 ) ( D4 ) Jenis Tenaga & Bahan
Beton ready mix K-275 Pembesian Bekisting Alat bantu
Kuantitas
Satuan
1.00000 187.00000 13.33333 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
D.26 D.26 No.
1 M3 BET BETON ON SLO SLOFF FF 15/ 15/20 20 K-2 K-275 75 Jenis Tenaga & Bahan
Beton ready mix K-275 Pembesian Bekisting Alat bantu
Kuantitas
Satuan
1.00000 167.50000 8.33333 1.00000
M3 kg m2 ls
Harga Satuan Rp 1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
D.27 D.27 No.
778,374.00 10,000.00 788,374.00 788,374.00 788,374.00
Harga Satuan per M3 Dibulatkan
No.
Jumlah Harga Rp
1 M3 BETO BETON N UMPA UMPAK K
Beton ready mix K-225 Alat bantu
D.24 D.24
1,037,832.00 802,766.40 1,300,323.33 10,000.00 3,150,921.73
1 M3 BETON BETON SLOFF SLOFF KOPEL KOPEL 20/40 20/40 K-27 K-275 5 Jenis Tenaga & Bahan
Beton ready mix K-275 Pembesian
Kuantitas 1.00000 115.00000
Satuan M3 kg
Harga Satuan Rp 1,037,832.00 11,680.00
Jumlah Harga Rp 778,374.00 10,000.00 788,374.00 788,374.00 788,374.00
Jumlah Harga Rp 1,037,832.00 1,023,946.67 10,000.00 2,071,778.67 2,071,778.67 2,071,779.00
Jumlah Harga Rp 1,037,832.00 2,184,160.00 2,600,646.67 10,000.00 5,832,638.67 5,832,638.67 5,832,639.00
Jumlah Harga Rp 1,037,832.00 1,956,400.00 1,625,404.17 10,000.00 4,629,636.17 4,629,636.17 4,629,636.00
Jumlah Harga Rp 1,037,832.00 1,343,200.00
Bekisting Alat bantu
8.33333 1.00000
m2 ls
195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
D.28 D.28 No.
1 M3 M3 BALO BALOK K B3 25/4 25/40 0 ( D4 ) Jenis Tenaga & Bahan
Beton ready mix K-275 Pembesian Bekisting Alat bantu
Kuantitas
Satuan
1.00000 228.76667 8.10000 1.00000
M3 kg m2 ls
4,016,436.17 4,016,436.00
Harga Satuan Rp 1,037,832.00 11,680.00 195,048.50 10,000.00
Harga Satuan per M3 Dibulatkan
E
PEKE PEKERJ RJAA AAN N BES BESII DAN DAN PEN PENGGAN GGANTU TUN NG
E.1 E.1
PENG PENGEL ELAS ASAN AN DAN DAN PEM PEMAS ASAN ANGA GAN N BESI BESI
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Jumlah Harga Rp 1,037,832.00 2,671,994.67 1,579,892.85 10,000.00 5,299,719.52 5,299,719.52 5,299,720.00
Harga Satuan Rp
Jumlah Harga Rp
Bahan Elektrode Sewa welding set
0.50000 0.20000
kg j am
58,500.00 227,500.00
29,250.00 45,500.00 74,750.00
Mandor Tukang besi Pekerja
0.00030 0.06000 0.08000
Oh Oh Oh
66,000.00 55,000.00 41,800.00
19.80 3,300.00 3,344.00 6,663.80
Tenaga
Harga Satuan per M2 Dibulatkan
E.1 E.1
1,625,404.17 10,000.00 4,016,436.17
81,413.80 81,414.00
1 M1 M1 PAG PAGAR AR BESI BESI TERA TERALI LIS S
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Besi Hollow 40/40 Besi Hollow 60/60 Besi BSP Ø 2,5" Tebal 1,6 Elektrode Sewa welding set Alat Bantu
1.150 1.150 1.200 0.900 0.750 1.000
m¹ m¹ m¹ kg j am ls
41,083.33 62,833.33 181,250.00 58,500.00 227,500.00 10,000.00
47,245.83 72,258.33 217,500.00 52,650.00 170,625.00 10,000.00 570,279.17
Mandor Kepala Tukang Las Tukang Las Pekerja
0.032 0.075 0.750 0.650
Oh Oh Oh Oh
66,000.00 66,000.00 60,500.00 41,800.00
2,112.00 4,950.00 45,375.00 27,170.00 79,607.00
Tenaga
Harga Satuan per M1 Dibulatkan
E.2 E.2
Jumlah Harga Rp
649,886.17 649,886.00
1 M2 M2 PAG PAGAR AR BESI BESI PEMB PEMBAT ATAS AS
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Besi Hollow 40/40 Besi Hollow 60/60 Besi BSP Ø 2,5" Tebal 1,6 Elektrode Sewa welding set Alat Bantu
1.150 1.150 1.200 0.900 0.750 1.000
m¹ m¹ m¹ kg j am ls
41,083.33 62,833.33 181,250.00 58,500.00 227,500.00 12,000.00
47,245.83 72,258.33 217,500.00 52,650.00 170,625.00 12,000.00 572,279.17
Mandor Kepala Tukang Las Tukang Las Pekerja
0.032 0.075 0.750 0.650
Oh Oh Oh Oh
66,000.00 66,000.00 60,500.00 41,800.00
2,112.00 4,950.00 45,375.00 27,170.00
Tenaga
79,607.00 Harga Satuan per M1 Dibulatkan
E.3 E.3
651,886.17 651,886.00
1 M2 M2 SUNS SUNSCR CREE EEN N HOLL HOLLOW OW
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Besi Hollow 40/40 Besi Hollow 60/60 Elektrode Sewa welding set Alat Bantu
4.400 4.400 1.050 0.750 1.000
m¹ m¹ kg j am ls
41,083.33 62,833.33 58,500.00 227,500.00 12,000.00
180,766.67 276,466.67 61,425.00 170,625.00 12,000.00 701,283.33
Mandor Kepala Tukang Las Tukang Las Pekerja
0.032 0.075 0.750 0.650
Oh Oh Oh Oh
66,000.00 66,000.00 60,500.00 41,800.00
2,112.00 4,950.00 45,375.00 27,170.00 79,607.00
Tenaga
Harga Satuan per M1 Dibulatkan
E.4 E.4
Jumlah Harga Rp
780,890.33 780,890.00
1 M1 M1 ORN ORNAM AMEN EN HOLL HOLLOW OW STAI STAINL NLES ESS S
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Besi Stainless 50x50 Elektrode Sewa welding set Alat Bantu
1.100 0.220 0.220 1.000
m¹ kg j am ls
59,812.50 58,500.00 227,500.00 5,000.00
65,793.75 12,870.00 50,050.00 5,000.00 133,713.75
Mandor Kepala Tukang Las Tukang Las Pekerja
0.032 0.075 0.650 0.650
Oh Oh Oh Oh
66,000.00 66,000.00 60,500.00 41,800.00
2,112.00 4,950.00 39,325.00 27,170.00 73,557.00
Tenaga
Harga Satuan per M1 Dibulatkan
E.5 E.5
Jumlah Harga Rp
207,270.75 207,271.00
1 M1 M1 ROL ROLLB LBAR AR PIPA PIPA STAI STAINL NLES ESS S
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Pipa StainlessØ 2" Elektrode Sewa welding set Alat Bantu
1.100 0.220 0.220 1.000
m¹ kg j am ls
138,958.33 58,500.00 227,500.00 5,000.00
152,854.17 12,870.00 50,050.00 5,000.00 220,774.17
Mandor Kepala Tukang Las Tukang Las Pekerja
0.032 0.075 0.650 0.650
Oh Oh Oh Oh
66,000.00 66,000.00 60,500.00 41,800.00
2,112.00 4,950.00 39,325.00 27,170.00 73,557.00
Tenaga
Harga Satuan per M1 Dibulatkan
E.6 E.6
1 M2 M2 SUN SUN SCRE SCREEN EN HOLL HOLLOW OW 40/6 40/60 0
No.
Jenis Tenaga & Bahan 1
2
Jumlah Harga Rp
Kuantitas
Satuan
294,331.17 294,331.00
Harga Satuan Rp
Jumlah Harga Rp
Bahan Besi Hollow 40/40 Besi Hollow 60/60 Besi Galv anis Ø 2,5" Elektrode Sewa welding set Alat Bantu
1.100 1.000 1.150 0.650 0.650 1.000
m¹ m¹ m¹ kg j am ls
41,083.33 62,833.33 181,250.00 58,500.00 227,500.00 10,000.00
45,191.67 62,833.33 208,437.50 38,025.00 147,875.00 10,000.00 512,362.50
Mandor
0.032
Oh
66,000.00
2,112.00
Tenaga
Kepala Tukang Las Tukang Las Pekerja
0.075 0.650 0.650
Oh Oh Oh
66,000.00 60,500.00 41,800.00
Harga Satuan per M2 Dibulatkan
E.2 E.2
1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA >=WF >=WF15 150 0
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
585,919.50 585,920.00
Harga Satuan Rp
Jumlah Harga Rp
Bahan Baja profil Elektrode baja
1.10000 0.20000
kg kg
17,400.00 58,500.00
Harga Satuan per M3 Dibulatkan
E.3 E.3
4,950.00 39,325.00 27,170.00 73,557.00
19,140.00 11,700.00 30,840.00 30,840.00 30,840.00
1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA PLAT PLAT
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
Harga Satuan Rp
Bahan Baja plat Elektrode baja
1.10000 0.20000
kg kg
15,950.00 58,500.00
Harga Satuan per M3 Dibulatkan
E.4 E.4
Jumlah Harga Rp 17,545.00 11,700.00 29,245.00 29,245.00 29,245.00
1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA CNP CNP 150 150
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
Harga Satuan Rp
Bahan Baja profil Elektrode baja
1.10000 0.20000
kg kg
17,400.00 58,500.00
Harga Satuan per M3 Dibulatkan
E.5 E.5
Jumlah Harga Rp 19,140.00 11,700.00 30,840.00 30,840.00 30,840.00
1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA >=si >=siku ku
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
Harga Satuan Rp
Bahan Baja profil Elektrode baja
1.10000 0.20000
kg kg
15,805.00 58,500.00
Harga Satuan per M3 Dibulatkan
E.5a E.5a
Jenis Tenaga & Bahan
29,085.50 29,086.00
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Anker Bar Baut
1.10000 2.04000
Kg Kg
19,500.00 36,250.00
Harga Satuan per M3 Dibulatkan
E.6 E.6
17,385.50 11,700.00 29,085.50
1 KG PEKE PEKERJ RJAA AAN N BA BAJA JA >=B >=Baut aut Ang Angku kurr Baja Baja
No. 1
Jumlah Harga Rp
21,450.00 73,950.00 95,400.00 95,400.00 95,400.00
1 M' PASA PASANG NG TAL TALAN ANG G PEM PEMBU BULU LUH H D 4 ''''
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Klem PVC Pipa PVC 4 "
1.00000 1.00000
Bh M'
7,800.00 31,200.00
7,800.00 31,200.00 39,000.00
Mandor Pekerja
0.01350 0.13500
Oh Oh
66,000.00 41,800.00
891.00 5,643.00 6,534.00
Tenaga
Harga Satuan per M' Dibulatkan
45,534.00 45,534.00
E.7 E.7
1 M' PASA PASANG NG TAL TALAN ANG G PEM PEMBU BULU LUH H D 3 ''''
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Klem PVC Pipa PVC 3 "
1.00000 1.00000
Bh M'
7,800.00 28,275.00
7,800.00 28,275.00 36,075.00
Mandor Pekerja
0.01350 0.13500
Oh Oh
66,000.00 41,800.00
891.00 5,643.00 6,534.00
Tenaga
Harga Satuan per M2 Dibulatkan
E.8 E.8
Jumlah Harga Rp
42,609.00 42,609.00
1 M2 M2 PAS PASAN ANG G ALU ALUMU MUNI NIUM UM FOIL FOIL
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Alumuniumfoil one one face
0.05000
Bh
546,000.00
27,300.00 27,300.00
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.01400 0.07000 0.06700 0.14000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
924.00 4,235.00 3,685.00 5,852.00 14,696.00
Tenaga
Harga Satuan per M2 Dibulatkan
E.9 E.9
Jumlah Harga Rp
41,996.00 41,996.00
1 M2 M2 PAS PASAN ANG G GEN GENTE TENG NG PORT PORTUG UGIS IS
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
11.00000
Bh
6,240.00
68,640.00 68,640.00
0.01400 0.07000 0.06700 0.14000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
924.00 4,235.00 3,685.00 5,852.00 14,696.00
Tenaga Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
Harga Satuan per M2 Dibulatkan
E.10 E.10
2
83,336.00 83,336.00
1 M1 PASA PASANG NG NOK NOK GENTE GENTENG NG PORTU PORTUGIS GIS
No. 1
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Nok genteng glazur natural
4.00000
M'
11,700.00
46,800.00 46,800.00
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.00850 0.01300 0.12500 0.08500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
561.00 786.50 6,875.00 3,553.00 11,775.50
Tenaga
Harga Satuan per M2 Dibulatkan
E.7 E.7
Jumlah Harga Rp
Bahan Genteng glazur natural
2
Kuantitas
58,575.50 58,576.00
1 M2 M2 RAN RANGK GKA A HOL HOLLO LOW W 30/ 30/60 60
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Besi Hollow 30/60 Conector Kawat penggantung Screw Alat Bantu
2
Kuantitas
Tenaga
4.40000 6.00000 4.00000 20.00000 1.00000
m¹ bj bj bj ls
45,916.67 260.00 910.00 260.00 10,000.00
202,033.33 1,560.00 3,640.00 5,200.00 10,000.00 222,433.33
Mandor Kepala Tukang Las Tukang Las Pekerja
0.01400 0.07500 0.06700 0.14000
Oh Oh Oh Oh
66,000.00 66,000.00 60,500.00 41,800.00
Harga Satuan per M2 Dibulatkan
E.8
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Siku 60.60.4 Besi Polos Sewa Mesin Las Elektroda Meni Besi
2
238,212.83 238,213.00
PASANG 1 M² M² Pla Platt Gr Grill ill
No. 1
924.00 4,950.00 4,053.50 5,852.00 15,779.50
3.400 6.500 0.500 0.300 0.250
kg kg Hr kg kg
35,100.00 10,150.00 182,000.00 58,500.00 22,000.00
119,340.00 65,975.00 91,000.00 17,550.00 5,500.00 299,365.00
0.00525 1.10500 1.05000 1.05000
Oh Oh Oh Oh
66,000.00 66,000.00 55,000.00 41,800.00
346.50 72,930.00 57,750.00 43,890.00 174,916.50
Tenaga Mandor Kepala tukang Las Tukang Las Pekerja
Harga Satuan per M2 Dibulatkan
474,281.50 474,282.00
F
PEKERJAAN PE PENGECATAN
F.1
1 M2 CAT CAT EXTER EXTERIOR IOR WHEAT WHEATHE HERC RCOA OAT T "MOWI "MOWILE LEX" X"
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Alkali Cat penutup 3 x Alat bantu
0.100 0.390 1.000
Kg Kg Ls
41,600.00 87,000.00 2,000.00
4,160.00 33,930.00 2,000.00 30,067.50
Mandor Kepala Tukang Cat Tukang Cat Pekerja
0.003 0.006 0.063 0.020
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
165.00 381.15 3,118.50 836.00 4,500.65 34,568.15 34,568.00
Tenaga
Harga Satuan per M2 Dibulatkan
F.2
1 M2 M2 CAT CAT INTER INTERIOR IOR CEND CENDAN ANA A DIND DINDING ING DAN DAN PLA PLAFON FOND D
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
F.3
Jumlah Harga Rp
Bahan Alkaplas Alkabond Cat penutup 3x Kertas gosok
0.200 0.040 0.390 0.100
Kg Kg Kg lbr
26,000.00 52,000.00 36,250.00 3,900.00
5,200.00 2,080.00 14,137.50 390.00 10,903.75
Mandor Kepala Tukang Cat Tukang Cat Pekerja
0.003 0.008 0.075 0.050
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
165.00 484.00 3,712.50 2,090.00 6,451.50 17,355.25 17,355.00
Tenaga
Harga Satuan per M2 Dibulatkan
1 M2 CAT KAYU EMCO
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
0.200 0.150 0.170 0.350 1.000
kg kg kg kg unit
31,900.00 28,600.00 33,567.50 70,760.00 2,000.00
6,380.00 4,290.00 5,706.48 24,766.00 2,000.00 43,142.48
0.003 0.008 0.075 0.050
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
165.00 453.75 3,712.50 2,090.00 6,421.25 49,563.73 49,564.00
Tenaga Mandor Kepala Tukang Cat Tukang Cat Pekerja
Harga Satuan per M2 Dibulatkan
F.4
Jumlah Harga Rp
Bahan Cat Meni Kayu Plamir Cat Dasar Cat Penutup 2x Alat Bantu
1 M2 CAT BESI EMCO
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Cat meni Besi Cat penutup 3 kali Alat Bantu
0.200 0.352 1.000
kg kg unit
31,900.00 58,000.00 8,000.00
6,380.00 20,416.00 8,000.00 34,796.00
0.003 0.008 0.075 0.070
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
165.00 453.75 3,712.50 2,926.00 7,257.25 42,053.25 42,053.00
Tenaga Mandor Kepala Tukang Cat Tukang Cat Pekerja
Harga Satuan per M2 Dibulatkan
F.5 F.5
Jumlah Harga Rp
1 M2 COAT COATIN ING G BATU BATU ALAM LAM
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
0.422 0.520 1.000
kg kg unit
74,965.00 31,200.00 8,000.00
31,635.23 16,224.00 8,000.00 55,859.23
0.003 0.008 0.075 0.070
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
165.00 453.75 3,712.50 2,926.00 7,257.25 63,116.48 63,116.00
Tenaga Mandor Kepala Tukang Cat Tukang Cat Pekerja
Harga Satuan per M2 Dibulatkan
F.6
Jumlah Harga Rp
Bahan Coating Batu Alam Thinner A Alat Bantu
2
Kuantitas
1 M2 LAPIS LAPISAN AN DASA DASAR R COAT COATING ING WARNA WARNA HITAM HITAM TBL TBL 1MM 1MM
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.10000 1.00000
M2 unit
60,000.00 8,000.00
66,000.00 8,000.00 74,000.00
0.00250 0.00750 0.07500 0.07000
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
165.00 453.75 3,712.50 2,926.00 7,257.25 81,257.25 81,257.00
Tenaga Mandor Kepala Tukang Cat Tukang Cat Pekerja
Harga Satuan per M2 Dibulatkan
F.7
Jumlah Harga Rp
Bahan Fleksi Coating Dasar tbl 1 mm Alat Bantu
2
Kuantitas
1 M2 LAPIS LAPISAN AN DASA DASAR R COAT COATING ING WARNA WARNA BIR BIRU U TBL TBL 1MM 1MM
No. 1
Jenis Tenaga & Bahan
Satuan
Harga Satuan Rp
1.10000 1.00000
M2 unit
141,000.00 8,000.00
155,100.00 8,000.00 163,100.00
0.00250 0.00750 0.07500 0.07000
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
165.00 453.75 3,712.50 2,926.00 7,257.25 170,357.25 170,357.00
Tenaga Mandor Kepala Tukang Cat Tukang Cat Pekerja
Harga Satuan per M2 Dibulatkan
F.8
Jumlah Harga Rp
Bahan Fleksi Coating tb tbl 1 mm Alat Bantu
2
Kuantitas
1 M2 LAP LAPISA ISAN N DASA DASAR R COAT COATING ING WAR WARNA NA MER MERAH AH TBL TBL 0,08 0,08 CM CM
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.10000 1.00000
M2 unit
35,500.00 8,000.00
39,050.00 8,000.00 47,050.00
0.00250 0.00750 0.07500 0.07000
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
165.00 453.75 3,712.50 2,926.00 7,257.25 54,307.25 54,307.00
Tenaga Mandor Kepala Tukang Cat Tukang Cat Pekerja
Harga Satuan per M2 Dibulatkan
F.9 F.9
Jumlah Harga Rp
Bahan Fleksi Roll Coating tbl 0,08 Cm Alat Bantu
2
Kuantitas
1 KG CAT CAT ZIN ZINCROM CROMAT ATE E BAJA BAJA
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Zincromate ex danapaint Thinner Kertas gosok Alat bantu
0.02500 0.04000 0.01000 0.02000
Kg ltr lbr Kg
58,500.00 31,200.00 3,900.00 10,000.00
1,462.50 1,248.00 39.00 200.00 2,949.50
Mandor
0.00100
Oh
66,000.00
66.00
Tenaga
Kepala Tukang Cat Tukang Cat Pekerja
0.00100 0.00500 0.00500
Oh Oh Oh
Harga Satuan per M2 Dibulatkan
60,500.00 49,500.00 41,800.00
60.50 247.50 209.00 583.00 3,532.50 3,533.00
F.6 F.6
1 M2 WATE WATERP RPRO ROOF OFIN ING G COAT COATIN ING G
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
0.010 2.500 1.000
m3 Kg Kg
130,500.00 1,558.75 149,500.00
1,305.00 3,896.88 149,500.00 154,701.88
0.0150 0.0150 0.1500 0.3000
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
990.00 907.50 7,425.00 12,540.00 21,862.50 176,564.38 176,564.00
Tenaga Mandor Kepala Tukang Cat Tukang Cat Pekerja
Harga Satuan per M2 Dibulatkan
F.7
1 M2 SC SCREED
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
0.020 2.750
m3 Kg
130,500.00 1,558.75
2,610.00 4,286.56 6,896.56
0.0150 0.0150 0.1500 0.3000
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
990.00 907.50 7,425.00 12,540.00 21,862.50 28,759.06 28,759.00
Tenaga Mandor Kepala Tukang Cat Tukang Cat Pekerja
Harga Satuan per M2 Dibulatkan
F.8
Jumlah Harga Rp
Bahan Pasir pasang Semen
1 M2 C A AT T MELAMIN
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
1.500 1.150 0.800 1.500 2.000 1.000
kg kg kg Ltr kg unit
56,550.00 66,950.00 68,250.00 29,250.00 68,250.00 8,000.00
84,825.00 76,992.50 54,600.00 43,875.00 136,500.00 8,000.00 404,792.50
0.020 0.025 0.150 0.080
Oh Oh Oh Oh
66,000.00 60,500.00 49,500.00 41,800.00
1,320.00 1,512.50 7,425.00 3,344.00 13,601.50 418,394.00 418,394.00
Tenaga Mandor Kepala Tukang Cat Tukang Cat Pekerja
Harga Satuan per M2 Dibulatkan
G
Jumlah Harga Rp
Bahan W ood Filler W ood Stain Shanding Sealer Thiner Super Top Coating Alat Bantu
PEKE PEKERJ RJAA AAN N ORNA ORNAMEN MEN KAYU KAYU JATI JATI + AKSE AKSESO SORIS RIS INTER INTERIOR IOR
G.1 G.1
1 M1 M1 PAS PASAN ANG G LIS LIST T KAY KAYU U PRO PROFI FIL L
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
0.00690 0.10000 1.00000
M³ kg unit
121,968,000.00 29,250.00 8,000.00
841,579.20 2,925.00 8,000.00 844,504.20
0.0050 0.0220 0.2200 0.1100
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
330.00 1,331.00 12,100.00 4,598.00 18,359.00
Tenaga Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
Harga Satuan per M1 Dibulatkan
E.11 E.11
Jumlah Harga Rp
Bahan Kayu Profil Jati uk.17 cm Paku Alat bantu
No.
Jumlah Harga Rp
Bahan Pasir pasang Semen Sika Rainted
2
Kuantitas
862,863.20 862,863.00
1 M2 PASA PASANG NG LISP LISPLA LANK NK ( KALS KALSIPL IPLAN ANK K) Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
1
2
Bahan Kalsiplank Paku
0.25000 0.10000
lj kg
107,900.00 29,250.00
26,975.00 2,925.00 29,900.00
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.00850 0.01300 0.12500 0.08500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
561.00 786.50 6,875.00 3,553.00 11,775.50
Tenaga
Harga Satuan per M2 Dibulatkan
G.2
1 M2 PASA PASANG NG PAP PAPAN AN KAYU KAYU JATI JATI MOTI MOTIF F UKIR UKIRAN AN
No.
Jenis Tenaga & Bahan 1
2
41,675.50 41,676.00
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kayu Papan Jati Lem kayu Paku Alat bantu
0.040 0.500 0.100 1.000
M³ kg kg unit
121,968,000.00 19,500.00 29,250.00 20,000.00
4,878,720.00 9,750.00 2,925.00 20,000.00 4,911,395.00
Mandor Kepala Tukang Kayu Tukang Kayu Tukang Ukir Pekerja
0.120 0.800 2.000 4.000 2.000
Oh Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 175,000.00 41,800.00
7,920.00 48,400.00 110,000.00 700,000.00 83,600.00 949,920.00
Tenaga
0.55
30 0.02
Harga Satuan per M1 Dibulatkan
5,861,315.00 5,861,315.00
G.3
1 M1 PAS PASAN ANG G PAGA PAGAR R PAPA PAPAN N KAYU KAYU JAT JATII Tinggi Tinggi=3 =30 0 cm
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Kayu Papan Jati T=30 CM Paku Alat bantu
0.011 0.100 1.000
M³ kg unit
121,968,000.00 29,250.00 20,000.00
1,341,648.00 2,925.00 20,000.00 1,344,573.00
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.005 0.022 0.220 0.110
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
330.00 1,331.00 12,100.00 4,598.00 18,359.00
Tenaga
Harga Satuan per M1 Dibulatkan
G.4
Jenis Tenaga & Bahan
2
1,362,932.00 1,362,932.00
1 M1 PASA PASANG NG HAN HAND D RAIL RAILING ING KAYU KAYU JATI JATI Ø 6 CM
No. 1
Jumlah Harga Rp
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kayu Balok Jati Paku Alat bantu
0.006 0.150 1.000
M³ kg unit
97,574,400.00 29,250.00 20,000.00
573,737.47 4,387.50 20,000.00 578,124.97
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.050 0.070 0.500 0.200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
3,300.00 4,235.00 27,500.00 8,360.00 43,395.00
Tenaga
Harga Satuan per M1 Dibulatkan
621,519.97 621,520.00
G.5
1 M1 PAS PASAN ANG G PAPA PAPAN N KAYU KAYU JAT JATII PENUT PENUTUP UP REL REL PIN PINTU TU
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Kayu Papan Jati Paku Alat bantu
0.013 0.150 1.000
M³ kg unit
121,968,000.00 29,250.00 10,000.00
1,609,977.60 4,387.50 10,000.00 1,624,365.10
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.050 0.070 0.500 0.200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
3,300.00 4,235.00 27,500.00 8,360.00 43,395.00
Tenaga
Harga Satuan per M1 Dibulatkan
G.6
Jenis Tenaga & Bahan
2
1,667,760.10 1,667,760.00
1 M1 PAS PASAN ANG G PAPA PAPAN N KAYU KAYU JAT JATII BAWAH BAWAH HAND HAND RAIL RAILING ING
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Kayu Papan Jati Paku Alat bantu
0.004 0.150 1.000
M³ kg unit
97,574,400.00 29,250.00 10,000.00
429,327.36 4,387.50 10,000.00 443,714.86
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.050 0.070 0.500 0.200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
3,300.00 4,235.00 27,500.00 8,360.00 43,395.00
Tenaga
2
487,109.86 487,110.00
1 M3 M3 PAS PASAN ANG G KUS KUSEN EN KAYU KAYU JATI JATI
No. 1
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Kayu Balok Jati Paku Alat bantu
1.100 0.150 1.000
M³ kg unit
121,968,000.00 29,250.00 10,000.00
134,164,800.00 4,387.50 10,000.00 134,179,187.50
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.050 0.070 0.500 0.200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
3,300.00 4,235.00 27,500.00 8,360.00 43,395.00
Tenaga
Jenis Tenaga & Bahan
2
134,222,582.50 134,222,583.00
1 M2 PASA PASANG NG PIN PINTU TU PANE PANEL L KAYU KAYU JATI JATI
No. 1
Kuantitas
Satuan
Harga Satuan Rp
Kayu Balok Jati Paku Alat bantu
0.040 0.200 1.000
M³ kg unit
121,968,000.00 29,250.00 10,000.00
4,878,720.00 5,850.00 10,000.00 4,894,570.00
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.050 0.070 1.500 0.200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
3,300.00 4,235.00 82,500.00 8,360.00 98,395.00
Tenaga
4,992,965.00 4,992,965.00
1 M2 M2 PAS PASAN ANG G MUL MULTI TIPL PLEK EKS S
No. 1
Jumlah Harga Rp
Bahan
Harga Satuan per M2 Dibulatkan
G.9 G.9
Jumlah Harga Rp
Bahan
Harga Satuan per M3 Dibulatkan
G.8 G.8
Jumlah Harga Rp
Bahan
Harga Satuan per M1 Dibulatkan
G.7 G.7
Jumlah Harga Rp
Jenis Tenaga & Bahan Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
2
Multipleks tbl 18 mm Conector Kawat penggantung Screw Alat Bantu
0.347 6.000 4.000 20.000 1.000
Lbr bj bj bj ls
257,400.00 260.00 910.00 260.00 10,000.00
89,375.00 1,560.00 3,640.00 5,200.00 10,000.00 109,775.00
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.014 0.070 0.067 0.140
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
924.00 4,235.00 3,685.00 5,852.00 14,696.00
Tenaga
Harga Satuan per M2 Dibulatkan
124,471.00 124,471.00
G.10 G.10
1 M2 M2 PAS PASAN ANG G KA KARPET RPET
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Karpet Tebal 5 mm Lem
1.100 0.500
m2 Kg
60,000.00 19,500.00
66,000.00 9,750.00 75,750.00
Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
0.014 0.070 0.067 0.140
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
924.00 4,235.00 3,685.00 5,852.00 14,696.00
Tenaga
Harga Satuan per M2 Dibulatkan
G.11 G.11
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1.100 50.000 45.000 1.200 2.500 5.000 1.000
m2 Bh Bh m2 Kg Kg Ls
41,083.33 260.00 1,040.00 2,000,000.00 725,000.00 31,900.00 1,350,000.00
45,191.67 13,000.00 46,800.00 2,400,000.00 1,812,500.00 159,500.00 1,350,000.00 5,826,991.67
0.250 0.750 1.500 3.000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
16,500.00 45,375.00 82,500.00 125,400.00 269,775.00
Tenaga Mandor Kepala Tukang Kayu Tukang Kayu Pekerja
Harga Satuan per M2 Dibulatkan
H
Jumlah Harga Rp
Bahan Hollow 40/40 Screw 6 mm Fixer 6 mm Plat Kuningan Tbl 2 mm Coating Pu Cat Zincromate Fabrikasi
2
90,446.00 90,446.00
1 M2 PAS PASAN ANG G COVE COVERIN RING G KOLOM KOLOM EKS EKSPOS POSE E
No. 1
Jumlah Harga Rp
6,096,766.67 6,096,767.00
PEKERJAAN INS INSTALASI AIR
H.1 H.1
1 Bh Bh PEM PEMAS ASAN ANGA GAN N KRA KRAN N AIR AIR
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Kran air TOTO Ø 5/8 seal tape
1.000 1.000
bh rol
150,000.00 7,410.00
150,000.00 7,410.00 157,410.00
Mandor Kepala tukang pipa Tukang pipa
0.030 0.030 0.150
Oh Oh Oh
66,000.00 55,000.00 46,200.00
1,980.00 1,650.00 6,930.00 10,560.00
Tenaga
Harga Satuan per Bh Dibulatkan
H.2 H.2 No. 1
2
1 Bh Bh KLO KLOSE SET T JON JONGK GKOK OK PORS PORSEL ELIN IN Jenis Tenaga & Bahan
Kuantitas
Satuan
167,970.00 167,970.00
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kloset jongkok ex Toto U57 Semen PC
1.000 1.000
bh kg
125,000.00 1,558.75
125,000.00 1,558.75 126,558.75
Mandor Kepala tukang pipa Tukang pipa
0.030 0.300 1.500
Oh Oh Oh
66,000.00 55,000.00 46,200.00
1,980.00 16,500.00 69,300.00 87,780.00
Tenaga
Harga Satuan per Bh Dibulatkan
H.3
Jumlah Harga Rp
214,338.75 214,339.00
1 Bh KLOSET DUDUK Harga Satuan
Jumlah Harga
.
Rp 1
2
Rp
Bahan Kloset duduk ex Toto CW 860NJ Semen PC
1.000 5.000
bh kg
2,509,000.00 1,558.75
2,509,000.00 7,793.75 2,516,793.75
Mandor Kepala tukang pipa Tukang pipa
0.030 0.300 1.500
Oh Oh Oh
66,000.00 55,000.00 46,200.00
1,980.00 16,500.00 69,300.00 87,780.00
Tenaga
Harga Satuan per Bh Dibulatkan
2,604,573.75 2,604,574.00
H.4 H.4
1 Bh Bh BAK BAK MAND MANDII LAP LAPIS IS KERA KERAMI MIK K
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Bak Mandi Semen PC
1.000 5.000
bh kg
208,000.00 1,558.75
208,000.00 7,793.75 215,793.75
Mandor Kepala tukang pipa Tukang pipa
0.030 0.300 1.500
Oh Oh Oh
66,000.00 55,000.00 46,200.00
1,980.00 16,500.00 69,300.00 87,780.00
Tenaga
Harga Satuan per Bh Dibulatkan
H.5
Jenis Tenaga & Bahan
2
303,573.75 303,574.00
1 Bh Bh WAS WASHT HTAF AFEL EL TEMPE TEMPEL L + KACA KACA CERMI CERMIN N
No. 1
Jumlah Harga Rp
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan W ashtafel Ina 12% Perlengkapan Semen PC Pasir Pasang Cermin
1.000
bh kg m3 bh
532,000.00 532,000.00 1,558.75 130,500.00 65,000.00
532,000.00 63,840.00 6,235.00 1,305.00 65,000.00 668,380.00
4.000 0.010 1.000
Mandor Kepala tukang pipa Tukang pipa
0.030 0.300 1.500
Oh Oh Oh
66,000.00 55,000.00 46,200.00
1,980.00 16,500.00 69,300.00 87,780.00
Tenaga
Harga Satuan per Bh Dibulatkan
756,160.00 756,160.00
H.6 H.6
1 M1 M1 PIP PIPA A PVC PVC AW AW Ø 1/2 1/2 MAS MASPI PION ON
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Pipa PVC AW dia 1/2 35% Perlengkapan
1.200
M'
5,026.67 5,026.67
6,032.00 1,759.33 7,791.33
Mandor Kepala tukang pipa Tukang pipa
0.030 0.300 1.500
Oh Oh Oh
66,000.00 55,000.00 46,200.00
1,980.00 16,500.00 69,300.00 87,780.00
Tenaga
Harga Satuan per M1 Dibulatkan
H.7 H.7
Jumlah Harga Rp
95,571.33 95,571.00
1 M1 M1 PIP PIPA A PVC PVC AW AW Ø 5/8 5/8 MAS MASPI PION ON
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Pipa PVC AW dia 5/8 35% Perlengkapan
1.200
M'
6,066.67 6,066.67
7,280.00 2,123.33 9,403.33
Mandor Kepala tukang pipa Tukang pipa
0.030 0.300 1.500
Oh Oh Oh
66,000.00 55,000.00 46,200.00
1,980.00 16,500.00 69,300.00 87,780.00
Tenaga
Harga Satuan per M1 Dibulatkan
H.8 H.8
Jumlah Harga Rp
97,183.33 97,183.00
1 M1 M1 PIP PIPA A PVC PVC TIPE TIPE D Ø 3 "MA "MASP SPIO ION N
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Pipa PVC dia 3" 30% Perlengkapan
1.200
m'
18,850.00 18,850.00
22,620.00 5,655.00 28,275.00
Mandor Kepala tukang pipa Tukang pipa
0.030 0.300 1.500
Oh Oh Oh
66,000.00 55,000.00 46,200.00
1,980.00 16,500.00 69,300.00 87,780.00
Tenaga
Harga Satuan per M1 Dibulatkan
H.9 H.9
Jumlah Harga Rp
116,055.00 116,055.00
1 M1 M1 PIP PIPA A PVC PVC TIPE TIPE D Ø 4 "MA "MASP SPIO ION N
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Pipa PVC dia 4" 30% Perlengkapan
1.2000
M1
20,800.00 20,800.00
24,960.00 6,240.00 31,200.00
Mandor Kepala tukang pipa Tukang pipa
0.0300 0.3000 1.5000
Oh Oh Oh
66,000.00 55,000.00 46,200.00
1,980.00 16,500.00 69,300.00 87,780.00
Tenaga
Harga Satuan per M1 Dibulatkan
H.10 H.10
PASA PASANG NG 1 M' PIPA PIPA RCP RCP VARIA VARIANT NT Ø 1000 1000 mm
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
118,980.00 118,980.00
Harga Satuan Rp
Jumlah Harga Rp
Bahan Pipa RCP VARIANT Ø 1000 mm 15% Perlengkapan
2
Jumlah Harga Rp
1.10000
m %
1,227,200.00 1,227,200.00
1,349,920.00 184,080.00 1,534,000.00
0.75000 0.98000 1.45000 1.56000
Oh Oh Oh Oh
66,000.00 55,000.00 46,200.00 41,800.00
49,500.00 53,900.00 66,990.00 65,208.00 235,598.00
Tenaga Mandor Kepala tukang pipa Tukang pipa Pekerja
Harga Satuan per M1 Dibulatkan
H.
PEKE PEKERJ RJAA AAN N KAY KAYU U, KACA KACA DAN DAN BES BESII
H.1 H.1
1 Bh Bh ENG ENGSE SEL L PIN PINTU TU SOLI SOLID D
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Engsel Pintu uk.12
2
Kuantitas
1,769,598.00 1,769,598.00
1.000
Set
124,800.00
124,800.00 124,800.00
0.001 0.010 0.100 0.010
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
33.00 605.00 5,500.00 418.00 6,556.00
Tenaga Mandor Kepala tukang Kayu Tukang Kayu Pekerja
Harga Satuan per Set Dibulatkan
131,356.00 131,356.00
H.2 H.2
1 Bh Bh GRE GREND NDEL EL PINT PINTU U SOL SOLID ID
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.000
Set
126,100.00
126,100.00 126,100.00
0.001 0.010 0.100 0.010
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
33.00 605.00 5,500.00 418.00 6,556.00
Tenaga Mandor Kepala tukang Kayu Tukang Kayu Pekerja
Harga Satuan per Set Dibulatkan
H.3 H.3
Jumlah Harga Rp
Bahan Grendel Pintu
2
Kuantitas
132,656.00 132,656.00
1 Bh Bh GRE GREND NDEL EL JEND JENDEL ELA A SOLI SOLID D
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.000
Set
119,600.00
119,600.00 119,600.00
0.001 0.010 0.100 0.010
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
33.00 605.00 5,500.00 418.00 6,556.00
Tenaga Mandor Kepala tukang Kayu Tukang Kayu Pekerja
Harga Satuan per Set Dibulatkan
H.4 H.4
Jumlah Harga Rp
Bahan Grendel Jendela
2
Kuantitas
126,156.00 126,156.00
1 Bh Bh ENG ENGSE SEL L JEN JENDE DELA LA SOLI SOLID D
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.000
Set
74,750.00
74,750.00 74,750.00
0.001 0.010 0.100 0.010
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
33.00 605.00 5,500.00 418.00 6,556.00
Tenaga Mandor Kepala tukang Kayu Tukang Kayu Pekerja
Harga Satuan per Set Dibulatkan
H.5 H.5
Jumlah Harga Rp
Bahan Engsel Jendela
2
Kuantitas
81,306.00 81,306.00
1 Bh Bh KU KUNCI NCI TAN TANAM AM SOLI SOLID D
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.000
Bh
406,900.00
406,900.00 406,900.00
0.001 0.010 0.100 0.010
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
33.00 605.00 5,500.00 418.00 6,556.00
Tenaga Mandor Kepala tukang Kayu Tukang Kayu Pekerja
Harga Satuan per Bh Dibulatkan
H.6
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Hak Angin
2
413,456.00 413,456.00
1 Bh Bh Ha Hak An Angin gin SOL SOLID ID
No. 1
Jumlah Harga Rp
Bahan Kunci Tanam
2
Kuantitas
1.000
Bh
37,310.00
37,310.00 37,310.00
0.001 0.010 0.100 0.010
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
33.00 605.00 5,500.00 418.00 6,556.00
Tenaga Mandor Kepala tukang Kayu Tukang Kayu Pekerja
Harga Satuan per Bh Dibulatkan
H.7
1 Bh Bh Kun Kunci ci Pintu Pintu KM/WC KM/WC Stainl Stainlees ees SOLID SOLID
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kunci Pintu
2
43,866.00 43,866.00
1.000
Bh
422,500.00
422,500.00 422,500.00
0.001 0.010 0.100 0.010
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
33.00 605.00 5,500.00 418.00 6,556.00
Tenaga Mandor Kepala tukang Kayu Tukang Kayu Pekerja
Harga Satuan per Bh Dibulatkan
429,056.00 429,056.00
H.8 H.8
1 Bh Bh ENG ENGSE SEL L PIN PINTU TU DORO DORONG NG SOLI SOLID D
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Engsel Pintu Dorong
1.000
Bh
117,900.00
117,900.00 117,900.00
Mandor Kepala tukang Kayu Tukang Kayu Pekerja
0.001 0.010 0.100 0.010
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
33.00 605.00 5,500.00 418.00 6,556.00
Tenaga
Harga Satuan per Bh Dibulatkan
H.10 H.10
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1.10000 0.02000
M2 Kg
29,900.00 29,250.00
32,890.00 585.00 33,475.00
0.01500 0.15000 0.01500 0.00080
Oh Oh Oh Oh
66,000.00 66,000.00 55,000.00 41,800.00
990.00 9,900.00 825.00 33.44 11,748.44
Tenaga Mandor Kepala tukang Besi Tukang Besi Pekerja
Harga Satuan per Bh Dibulatkan
H.11 H.11
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1.10000
M2
88,400.00
97,240.00 97,240.00
0.01500 0.15000 0.01500 0.00080
Oh Oh Oh Oh
66,000.00 66,000.00 55,000.00 41,800.00
990.00 9,900.00 825.00 33.44 11,748.44
Tenaga Mandor Kepala tukang Besi Tukang Besi Pekerja
Harga Satuan per Bh Dibulatkan
H.12 H.12
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1.10000 1.10000
M1 M1
212,062.50 104,218.75
233,268.75 114,640.63 233,268.75
0.01500 0.15000 0.01500 0.00080
Oh Oh Oh Oh
66,000.00 66,000.00 55,000.00 41,800.00
990.00 9,900.00 825.00 33.44 11,748.44
Tenaga Mandor Kepala tukang Besi Tukang Besi Pekerja
Harga Satuan per Bh Dibulatkan
H.13 H.13
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kaca Ribben
2
245,017.19 245,017.00
1 M2 M2 KAC KACA A RIB RIBBE BEN N Tbl Tbl 5 mm mm
No. 1
Jumlah Harga Rp
Bahan Pipa Tegak Hitam Ø 3 " Pipa Tegak Hitam Ø 1,5 "
2
108,988.44 108,988.00
PASA PASANG NG 1 M² Rangk Rangka a Pag Pagar ar Kelili Keliling ng
No. 1
Jumlah Harga Rp
Bahan Kawat Harmonika PVC BW G 16
2
45,223.44 45,223.00
PASA PASANG NG 1 M² M² Kawa Kawatt Harm Harmon onik ika a
No. 1
Jumlah Harga Rp
Bahan Kawat nyamuk besi Paku
2
124,456.00 124,456.00
PASA PASANG NG 1 M² M² Kaw Kawat at Nya Nyamu muk k
No. 1
Jumlah Harga Rp
1.100
M2
143,000.00
157,300.00 157,300.00
0.015 0.150 0.015 0.001
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
990.00 9,075.00 825.00 33.44
Tenaga Mandor Kepala tukang Besi Tukang Besi Pekerja
10,923.44 Harga Satuan per Bh Dibulatkan
168,223.44 168,223.00
H.14 H.14
1 M2 DAUN DAUN PINT PINTU U PANIL PANIL KAYU KAYU KAMP KAMPER ER
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Kayu Kamper Paku Biasa 1/2" . 1" Lem Kayu
0.025 0.500 0.300
m3 Kg Kg
12,210,000.00 29,250.00 19,500.00
305,250.00 14,625.00 5,850.00 325,725.00
Mandor Kepala tukang Besi Tukang Besi Pekerja
0.050 0.250 2.500 1.000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
3,300.00 15,125.00 137,500.00 41,800.00 197,725.00
Tenaga
Harga Satuan per M2 Dibulatkan
523,450.00 523,450.00
1 Bh DAUN PINTU UKURAN 240 x 80 CM 1 Bh DAUN PINTU UKURAN 240 x 31 CM 1 Bh DAUN PINTU UKURAN 200 x 70 CM 1 Bh DAUN PINTU UKURAN 120 x 80 CM
H.15
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
0.0250 0.5000 0.3472 0.3000
m3 Kg Lbr Kg
12,210,000.00 29,250.00 104,000.00 19,500.00
305,250.00 14,625.00 36,111.11 5,850.00 361,836.11
0.0500 0.2500 2.5000 1.0000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
3,300.00 15,125.00 137,500.00 41,800.00 155,925.00
Tenaga Mandor Kepala tukang Kayu Tukang Kayu Pekerja
Harga Satuan per M2 Dibulatkan
I.
PEKE PEKERJ RJAA AAN N INST INSTAL ALAS ASII LIST LISTR RIK
I.1 I.1
1 Ttk Ttk Lamp Lampu u TL TL 40 40 W + Titi Titik k Ins Insta tala lasi si
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
517,761.11 517,761.00
Harga Satuan Rp
1.000 15.000 1.000 6.000 0.200 2.000 1.000 0.300
bh m' Ljr bh roll bh bh kg
104,000.00 11,050.00 36,400.00 400.00 850.00 3,700.00 2,000.00 29,250.00
104,000.00 165,750.00 36,400.00 2,400.00 170.00 7,400.00 2,000.00 8,775.00 326,895.00
0.005 0.010 0.100 0.600
Oh Oh Oh Oh
66,000.00 55,000.00 46,200.00 41,800.00
330.00 550.00 4,620.00 25,080.00 30,580.00
Tenaga Mandor Kepala tukang Listrik Tukang Listrik Pekerja
Harga Satuan per Titik Dibulatkan
I.2 I.2
Jumlah Harga Rp
Bahan Lampu TL 40 PHILIPS Kabel NYA 2 x 2,5 mm Pipa PVC 3/8" Lasdop Benang Tdooz Isolasi Paku
2
Jumlah Harga Rp
Bahan Kayu Kamper Paku Biasa 1/2" . 1" Tripleks Lapis Aluminium Lem Kayu
2
1,038,734.18 418,027.17 792,210.17 515,074.80
1 M2 DAUN DAUN PINTU PINTU PANIL PANIL KAYU KAYU KAMPER KAMPER LAPIS LAPIS ALUMIN ALUMINIUM IUM JERUK JERUK
No. 1
Jumlah Harga Rp
357,475.00 357,475.00
1 Ttk Ttk Lamp Lampu u SL SL 25 25 W + Tit Titik ik Inst Instal alas asii
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Lampu SL 25 W ATT PHILIPS Kabel NYA 2 x 2,5 mm Pipa PVC 3/8" Lasdop Benang
1.000 15.000 1.000 6.000 0.200
bh m' Ljr bh roll
78,000.00 11,050.00 36,400.00 400.00 850.00
78,000.00 165,750.00 36,400.00 2,400.00 170.00
2
Tdooz Isolasi Paku
2.000 1.000 0.300
bh bh kg
3,700.00 2,000.00 29,250.00
7,400.00 2,000.00 8,775.00 300,895.00
Mandor Kepala tukang Listrik Tukang Listrik Pekerja
0.005 0.010 0.100 0.600
Oh Oh Oh Oh
66,000.00 55,000.00 46,200.00 41,800.00
330.00 550.00 4,620.00 25,080.00 30,580.00
Tenaga
Harga Satuan per Titik Dibulatkan
331,475.00 331,475.00
I.2a I.2a
1 Ttk Ttk Lamp Lampu u Dind Dinding ing 25 W + Titi Titik k Insta Instalas lasii
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Lampu SL 25 W ATT PHILIPS Kabel NYA 1 x 2,5 mm Pipa PVC 3/8" Lasdop Benang Tdooz Isolasi Paku
2
Kuantitas 1.000 15.000 1.000 6.000 0.200 2.000 1.000 0.300
bh m' Ljr bh roll bh bh kg
78,000.00 11,050.00 36,400.00 400.00 850.00 3,700.00 2,000.00 29,250.00
78,000.00 165,750.00 36,400.00 2,400.00 170.00 7,400.00 2,000.00 8,775.00 300,895.00
0.005 0.010 0.100 0.600
Oh Oh Oh Oh
66,000.00 55,000.00 46,200.00 41,800.00
330.00 550.00 4,620.00 25,080.00 30,580.00
Tenaga Mandor Kepala tukang Listrik Tukang Listrik Pekerja
Harga Satuan per Titik Dibulatkan
331,475.00 331,475.00
I.3 I.3
1 Ttk Ttk Stop Stop Kont Kontak ak + Tit Titik ik Inst Instal alas asii
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.000 15.000 1.000 6.000 0.200 2.000 1.000 0.300
bh m' Ljr bh roll bh bh kg
24,050.00 11,050.00 36,400.00 400.00 850.00 3,700.00 2,000.00 29,250.00
24,050.00 165,750.00 36,400.00 2,400.00 170.00 7,400.00 2,000.00 8,775.00 246,945.00
0.005 0.010 0.100 0.600
Oh Oh Oh Oh
66,000.00 55,000.00 46,200.00 41,800.00
330.00 550.00 4,620.00 25,080.00 30,580.00
Tenaga Mandor Kepala tukang Listrik Tukang Listrik Pekerja
Harga Satuan per Titik Dibulatkan
I.4 I.4
Jumlah Harga Rp
Bahan Stop Kontak broco Kabel NYA 1 x 2,5 mm Pipa PVC 3/8" Lasdop Benang Tdooz Isolasi Paku
2
Kuantitas
277,525.00 277,525.00
1 Ttk Ttk Sake Sakela larr + Tit Titik ik Inst Instal alas asii
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.000 15.000 1.000 6.000 0.200 2.000 1.000 0.300
bh m' Ljr bh roll bh bh kg
33,540.00 11,050.00 36,400.00 400.00 850.00 3,700.00 2,000.00 29,250.00
33,540.00 165,750.00 36,400.00 2,400.00 170.00 7,400.00 2,000.00 8,775.00 256,435.00
0.005 0.010 0.100 0.600
Oh Oh Oh Oh
66,000.00 55,000.00 46,200.00 41,800.00
330.00 550.00 4,620.00 25,080.00 30,580.00
Tenaga Mandor Kepala tukang Listrik Tukang Listrik Pekerja
Harga Satuan per Titik Dibulatkan
I.5 I.5
Jumlah Harga Rp
Bahan Sakelar broco Kabel NYA 1 x 2,5 mm Pipa PVC 3/8" Lasdop Benang Tdooz Isolasi Paku
2
Kuantitas
287,015.00 287,015.00
1 Ttk Ttk Lamp Lampu u TL TL 2 X 400 400 W + Titi Titik k Inst Instal alas asii
No.
Jenis Tenaga & Bahan 1
2.000 15.000 1.000 6.000 0.200 2.000 1.000 0.300
bh m' Ljr bh roll bh bh kg
1,885,000.00 11,050.00 36,400.00 400.00 850.00 3,700.00 2,000.00 29,250.00
3,770,000.00 165,750.00 36,400.00 2,400.00 170.00 7,400.00 2,000.00 8,775.00 3,992,895.00
Oh Oh Oh Oh
66,000.00 55,000.00 46,200.00 41,800.00
330.00 550.00 4,620.00 25,080.00 30,580.00
Tenaga Mandor Kepala tukang Listrik Tukang Listrik Pekerja
0.0050 0.0100 0.1000 0.6000
Harga Satuan per M2 Dibulatkan
I.6 I.6
Jumlah Harga Rp
Satuan
Bahan Lampu TL 400 W att PHILIPS Kabel NYA 1 x 2,5 mm Pipa PVC 3/8" Lasdop Benang Tdooz Isolasi Paku
2
Harga Satuan Rp
Kuantitas
4,023,475.00 4,023,475.00
1 Ttk Ttk Lamp Lampu u RMI RMI 2 X 40 40 W + Titi Titik k Inst Instal alas asii
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
2.000 15.000 1.000
bh m' Ljr
Harga Satuan Rp
Jumlah Harga Rp
Bahan Lampu RMI 2 x 40 W att PHILIPS Kabel NYA 1 x 2,5 mm Pipa PVC 3/8"
412,000.00 11,050.00 36,400.00
824,000.00 165,750.00 36,400.00
Lasdop Benang Tdooz Isolasi Paku 2
6.000 0.200 2.000 1.000 0.300
bh roll bh bh kg
400.00 850.00 3,700.00 2,000.00 29,250.00
2,400.00 170.00 7,400.00 2,000.00 8,775.00 1,046,895.00
Oh Oh Oh Oh
66,000.00 55,000.00 46,200.00 41,800.00
330.00 550.00 4,620.00 25,080.00 30,580.00
Tenaga Mandor Kepala tukang Listrik Tukang Listrik Pekerja
0.0050 0.0100 0.1000 0.6000
Harga Satuan per M2 Dibulatkan
I.7 I.7
1,077,475.00 1,077,475.00
1 M1 PENA PENARI RIKA KAN N KAB KABEL EL PEN PENYA YAMB MBUN UNGA GAN N
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Bahan Kabel NYY 4 X 10 mm
1.100
m'
74,750.00
82,225.00 82,225.00
Mandor Kepala tukang Listrik Tukang Listrik Pekerja
0.001 0.002 0.005 0.010
Oh Oh Oh Oh
66,000.00 55,000.00 46,200.00 41,800.00
66.00 110.00 231.00 418.00 825.00
Tenaga
Harga Satuan per M1 Dibulatkan
I.8
Jumlah Harga Rp
83,050.00 83,050.00
1 Tiang Lampu
No.
Jenis Tenaga & Bahan 1
1.100 1.100 0.500 0.350 0.650
m' Hr kg kg kg
3,244,375.00 182,000.00 58,500.00 22,000.00 58,000.00
3,568,812.50 200,200.00 29,250.00 7,700.00 37,700.00 3,843,662.50
Oh Oh Oh Oh Oh Oh
66,000.00 60,500.00 60,500.00 55,000.00 55,000.00 41,800.00
1,320.00 18,150.00 18,150.00 27,500.00 27,500.00 50,160.00 142,780.00
Tenaga Mandor Kepala tukang besi Kepala tukang las Tukang Besi Tukang Las Pekerja
0.0200 0.3000 0.3000 0.5000 0.5000 1.2000
Harga Satuan per M2 Dibulatkan
J.
PEKERJAAN AL ALUMINIUM
J.1
MEMBU MEMBUAT AT 1M' 1M' KUS KUSEN EN PINT PINTU U / JEN JENDE DELA LA ALU ALUMIN MINIUM IUM
No.
Jenis Tenaga & Bahan 1
Kuantitas
Satuan
3,986,442.50 3,986,443.00
Harga Satuan Rp
Jumlah Harga Rp
Bahan Profil Aluminium Skrup Fixer 4" Sealant
2
Jumlah Harga Rp
Satuan
Bahan Pipa Besi Sewa Mesin Las Elektroda Cat Chrome Cat Penutup 3x
2
Harga Satuan Rp
Kuantitas
1.1000 2.0000 0.0600
M' Bh Tube
89,700.00 1,040.00 37,310.00
98,670.00 2,080.00 2,238.60 102,988.60
0.0030 0.0250 0.2500 0.1000
Oh Oh Oh Oh
66,000.00 55,000.00 49,500.00 41,800.00
198.00 1,375.00 12,375.00 4,180.00 18,128.00
Tenaga Mandor Kepala tukang Aluminium Tukang Aluminium Pekerja
Harga Satuan per M1 Dibulatkan
121,116.60 121,117.00
PEKERJAAN RAILING JEMBATAN / m1 No.
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
1 2 3 4 5 6 7 8 9 10 11 12
rangka hollow 60/60 rangka hollow 40/40 handrail BSP dia 2" dekorasi hollow 20/40 dinabolt dia8/100mm dekorasi bola ring kaki rangka 40/40 ring kaki rangka 60/60 endplate/angkur t: 5mm fabrikasi dan instalasi finishing OCP finishing cat sycromate + cat semprot ducco
1.10000 m1 98,000.00 1.00000 m1 75,000.00 1.00000 m1 540,000.00 12.50000 m1 45,000.00 4.00000 pcs 7,000.00 1.00000 pcs 600.00 1.00000 pcs 22,000.00 1.00000 pcs 28,500.00 1.00000 pcs 30,000.00 1.00000 m1 2,000.00 21.56550 kg 2,530.00 1.00000 m1 22,500.00 Harga Satuan per M' Dibulatkan
107,800.00 75,000.00 540,000.00 562,500.00 28,000.00 600.00 22,000.00 28,500.00 30,000.00 2,000.00 54,560.72 22,500.00 1,473,460.72 1,473,461.00
Harga Satuan Rp 1.10000 m1 98,000.00 1.00000 m1 75,000.00 1.00000 m1 540,000.00 12.50000 m1 45,000.00 4.00000 pcs 7,000.00 1.00000 pcs 600.00 1.00000 pcs 22,000.00 1.00000 pcs 28,500.00 1.00000 pcs 30,000.00 1.00000 m1 2,000.00 1.00000 m1 22,500.00 Harga Satuan per M' Dibulatkan
Jumlah Harga Rp 107,800.00 75,000.00 540,000.00 562,500.00 28,000.00 600.00 22,000.00 28,500.00 30,000.00 2,000.00 22,500.00 1,418,900.00 1,418,900.00
PEKERJAAN RAILING TANGGA / m1 No.
Jenis Tenaga & Bahan
1 2 3 4 5 6 7 8 9 10 11
rangka hollow 60/60 rangka hollow 40/40 handrail BSP dia 2" dekorasi hollow 20/40 dinabolt dia8/100mm dekorasi bola ring kaki rangka 40/40 ring kaki rangka 60/60 endplate/angkur t: 5mm fabrikasi dan instalasi finishing cat sycromate + cat semprot ducco
J.2 J.2
1 UNI UNIT T PIN PINTU TU JEND JENDEL ELA A ( PJ PJ 2) 2)
No.
Jenis Tenaga & Bahan 1
Satuan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kusen alumunium Frame daun j endela alm. Kaca polos 5 mm Pintu kaca tempered 12 mm Engsel jendela Floor hinge ex dorma Patch fitting pintu Grendel jendela Kunci pintu ex dorma Handle pintu steinless steel Karet kaca Screw Alat bantu
2
Kuantitas
13.800 10.680 2.520 3.623 4.000 1.000 1.000 2.000 1.000 2.000 10.680 25.000 1.000
m' m' m2 m2 bh s et s et bj unit psg m' bj ls
100,100.00 75,000.00 116,610.00 210,000.00 64,000.00 360,000.00 35,000.00 19,500.00 350,000.00 450,000.00 575.00 200.00 2,000.00
1,381,380.00 801,000.00 293,857.20 760,725.00 256,000.00 360,000.00 35,000.00 39,000.00 350,000.00 900,000.00 6,141.00 5,000.00 2,000.00 5,190,103.20
0.250 0.250 2.500 3.500 2.500
Oh Oh Oh Oh Oh
50,000.00 40,000.00 35,000.00 35,000.00 28,500.00
12,500.00 10,000.00 87,500.00 122,500.00 71,250.00 303,750.00
Tenaga Mandor Kepala Tukang batu Tukang alumunium Tukang kaca Pekerja
Harga Satuan per Unit Dibulatkan
5,493,853.20 5,493,853.00
J.3
1 UNIT PINTU PVC
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
1.000 15.000 1.000
unit bj ls
416,000.00 200.00 2,000.00
416,000.00 3,000.00 2,000.00 421,000.00
0.025 0.025 0.750 1.000
Oh Oh Oh Oh
50,000.00 40,000.00 35,000.00 28,500.00
1,250.00 1,000.00 26,250.00 28,500.00 57,000.00
Tenaga Mandor Kepala Tukang kaca Tukang alumunium Pekerja
Harga Satuan per Unit Dibulatkan
J.4
478,000.00 478,000.00
1 UNIT PINTU ( P 2)
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
5.550 6.020 1.634 4.000 1.000 1.000 1.000 6.020 15.000 1.000
m' m' m2 bh s et unit psg m' bj ls
100,100.00 82,000.00 116,610.00 65,000.00 5,500.00 350,000.00 450,000.00 575.00 200.00 2,000.00
555,555.00 493,640.00 190,540.74 260,000.00 5,500.00 350,000.00 450,000.00 3,461.50 3,000.00 2,000.00 2,313,697.24
0.250 0.250 1.000 0.750 1.000
Oh Oh Oh Oh Oh
50,000.00 40,000.00 35,000.00 35,000.00 28,500.00
12,500.00 10,000.00 35,000.00 26,250.00 28,500.00 112,250.00
Tenaga Mandor Kepala Tukang batu Tukang alumunium Tukang kaca Pekerja
Harga Satuan per Unit Dibulatkan
J.5 J.5
Jenis Tenaga & Bahan 1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9 10
2,425,947.24 2,425,947.00
1 UNI UNIT T PIN PINTU TU BESI BESI (PB1 (PB1))
No.
No.
Jumlah Harga Rp
Bahan Kusen alumunium Frame daun pintu alm. Kaca polos 5 mm Engsel pintu Door closer Kunci pintu ex dorma Handle pintu steinless steel Karet kaca Screw Alat bantu
J.6 J.6
Jumlah Harga Rp
Bahan Kusen + daun pintu PVC komplit Screw Alat bantu
2
Kuantitas
kusen pintu hollow 20/40 daun pintu hollow 20/40 engsel dia30mm penutup plat besi finishing sycromate + cat semprot ducco dynabolt dia5mm/50mm end plate 4mm fabrikasi dan instalasi
Harga Satuan Rp 2.650 m' 45,000.00 7.025 m' 45,000.00 2.000 pcs 109,250.00 0.438 m2 780,000.00 0.438 m2 20,125.00 8.000 pcs 7,500.00 2.000 pcs 50,000.00 0.438 m2 2,000.00 Harga Satuan per Unit Dibulatkan
Jumlah Harga Rp 119,250.00 316,125.00 218,500.00 341,250.00 8,804.69 60,000.00 100,000.00 875.00 1,164,804.69 1,164,805.00
Harga Satuan Rp 7.800 m1 45,000.00 14.100 m1 45,000.00 4.000 pcs 109,250.00 1.000 pcs 250,000.00 1.000 s et 350,000.00 2.700 m2 76,033.06 2.700 m2 20,125.00 6.000 pcs 7,500.00 6.000 pcs 50,000.00 2.700 m2 2,000.00 Harga Satuan per Unit Dibulatkan
Jumlah Harga Rp 351,000.00 634,500.00 437,000.00 250,000.00 350,000.00 205,289.26 54,337.50 45,000.00 300,000.00 5,400.00 2,632,526.76 2,632,527.00
Kuantitas
Satuan
1 UNI UNIT T PIN PINTU TU BESI BESI (PB2 (PB2)) Jenis Tenaga & Bahan kusen pintu hollow 20/40 daun pintu hollow 20/40 engsel dia30mm selot pintu kunci penutup polycarbonat 5mm finishing sycromate + cat semprot ducco dynabolt dia5mm/50mm end plate t:5mm fabrikasi dan instalasi
Kuantitas
Satuan
J.7 J.7
1 UNI UNIT T PIN PINTU TU BESI BESI (PB3 (PB3))
No.
Jenis Tenaga & Bahan
1 2 3 4 5 6 7 9 10 11 12 13
J.8
kusen besi hollow 30/60 daun pintu hollow 30/60 besi penjepit kaca, vircan 12mm engsel dia30mm selot pintu kunci penutup kaca 5mm karet kaca finishing sycromate + cat semprot ducco dynabolt dia8mm/80mm Handle stainless fabrikasi dan instalasi
Harga Satuan Rp 4.800 m1 72,000.00 16.200 m' 72,000.00 12.800 m1 7,000.00 4.000 pcs 109,250.00 1.000 pcs 250,000.00 1.000 s et 350,000.00 2.800 m2 70,000.00 12.800 m1 575.00 3.200 m2 20,125.00 6.000 pcs 7,500.00 4.000 pcs 450,000.00 3.200 m2 2,000.00 Harga Satuan per Unit Dibulatkan
Kuantitas
Satuan
Kuantitas
Satuan
Jumlah Harga Rp 345,600.00 1,166,400.00 89,600.00 437,000.00 250,000.00 350,000.00 196,000.00 7,360.00 64,400.00 45,000.00 1,800,000.00 6,400.00 4,757,760.00 4,757,760.00
1 UNIT JEN JENDELA ( J1)
No.
Jenis Tenaga & Bahan 1
Jumlah Harga Rp
Bahan Kusen alumunium Frame daun j endela alm. Kaca polos 5 mm Engsel jendela Grendel jendela Karet kaca Screw Sealant Alat bantu
2
Harga Satuan Rp
26.400 10.260 9.628 4.000 2.000 10.260 30.000 26.920 1.000
m' m' m2 bh bj m' bj m' ls
65,000.00 75,000.00 70,000.00 35,000.00 19,500.00 575.00 200.00 25,000.00 2,000.00
1,716,000.00 769,500.00 673,946.00 140,000.00 39,000.00 5,899.50 6,000.00 673,000.00 2,000.00 4,025,345.50
0.250 0.250 1.500 2.500 1.500
Oh Oh Oh Oh Oh
66,000.00 55,000.00 49,500.00 49,500.00 41,800.00
16,500.00 13,750.00 74,250.00 123,750.00 62,700.00 290,950.00
Tenaga Mandor Kepala Tukang Aluminium Tukang alumunium Tukang kaca Pekerja
Harga Satuan per Unit Dibulatkan
4,316,295.50 4,316,296.00
J.9
1 UNIT JEN JENDELA ( J2)
No.
Jenis Tenaga & Bahan 1
Satuan
Harga Satuan Rp
16.550 7.200 3.090 4.000 2.000 7.200 15.000 15.680 1.000
m' m' m2 bh bj m' bj m' ls
65,000.00 75,000.00 70,000.00 35,000.00 19,500.00 575.00 200.00 25,000.00 2,000.00
1,075,750.00 540,000.00 216,272.00 140,000.00 39,000.00 4,140.00 3,000.00 392,000.00 2,000.00 2,412,162.00
0.250 0.250 1.500 2.500 1.500
Oh Oh Oh Oh Oh
66,000.00 40,000.00 35,000.00 35,000.00 41,800.00
16,500.00 10,000.00 52,500.00 87,500.00 62,700.00 229,200.00
Tenaga Mandor Kepala Tukang Aluminium Tukang alumunium Tukang kaca Pekerja
Harga Satuan per Unit Dibulatkan
J.10 J.10
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
9.600 2.688 15.000 0.060 1.000
m' m2 bj Tube ls
65,000.00 70,000.00 200.00 25,000.00 2,000.00
624,000.00 188,160.00 3,000.00 1,500.00 2,000.00 818,660.00
0.250 0.250 1.500 2.500 1.500
Oh Oh Oh Oh Oh
66,000.00 40,000.00 35,000.00 35,000.00 41,800.00
16,500.00 10,000.00 52,500.00 87,500.00 62,700.00 229,200.00
Tenaga Mandor Kepala Tukang Aluminium Tukang alumunium Tukang kaca Pekerja
Harga Satuan per Unit Dibulatkan
J.11 J.11
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kusen alumunium Kaca polos 5 mm Screw Sealant Alat bantu
2
1,047,860.00 1,047,860.00
1 UNIT NIT JEND JENDEL ELA A ( J4) J4)
No. 1
Jumlah Harga Rp
Bahan Kusen alumunium Kaca polos 5 mm Screw Sealant Alat bantu
2
2,641,362.00 2,641,362.00
1 UNI UNIT T JEND JENDEL ELA A ( J3) J3) D4
No. 1
Jumlah Harga Rp
Bahan Kusen alumunium Frame daun j endela alm. Kaca polos 5 mm Engsel jendela Grendel jendela Karet kaca Screw Sealant Alat bantu
2
Kuantitas
10.800 2.550 15.000 0.060 1.000
m' m2 bj Tube ls
65,000.00 70,000.00 200.00 25,000.00 2,000.00
702,000.00 178,500.00 3,000.00 1,500.00 2,000.00 887,000.00
0.250 0.250 1.500 2.500 1.500
Oh Oh Oh Oh Oh
66,000.00 40,000.00 35,000.00 35,000.00 41,800.00
16,500.00 10,000.00 52,500.00 87,500.00 62,700.00 229,200.00
Tenaga Mandor Kepala Tukang Aluminium Tukang alumunium Tukang kaca Pekerja
Harga Satuan per Unit Dibulatkan
1,116,200.00 1,116,200.00
J.12 J.12
1 UNIT UNIT BOUV BOUVEN ENLI LIGH GHT T ( BV )
No.
Jenis Tenaga & Bahan 1
2
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kusen alumunium Kaca es 5 mm Screw Sealant Alat bantu
2.200 0.310 6.000 0.060 1.000
m' m2 bj Tube ls
65,000.00 85,000.00 200.00 25,000.00 2,000.00
143,000.00 26,350.00 1,200.00 1,500.00 2,000.00 174,050.00
Mandor Kepala Tukang Aluminium Tukang alumunium Tukang kaca Pekerja
0.250 0.250 0.500 0.250 0.500
Oh Oh Oh Oh Oh
66,000.00 40,000.00 35,000.00 35,000.00 41,800.00
16,500.00 10,000.00 17,500.00 8,750.00 20,900.00 73,650.00
Tenaga
Harga Satuan per Unit Dibulatkan
J.13 J.13
1 UNI UNIT T PIN PINTU TU ROLL ROLLIN ING G GRI GRILL LL
No.
Jenis Tenaga & Bahan 1
247,700.00 247,700.00
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Roling Grill+Aksesoris
1.100
m2
975,000.00
1,072,500.00 1,072,500.00
Mandor Kepala Tukang Baja Tukang Baja Tukang Las Pekerja
0.250 0.250 1.500 1.500 0.500
Oh Oh Oh Oh Oh
66,000.00 66,000.00 60,500.00 60,500.00 41,800.00
16,500.00 16,500.00 90,750.00 90,750.00 20,900.00 235,400.00
Tenaga
Harga Satuan per Unit Dibulatkan
Surabaya, 28 April 2011 PT. WASKITA KARYA (Persero) CABANG JAWA TIMUR
Ir. PIUS SUTRISNO Kepala Cabang
1,307,900.00 1,307,900.00
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
A A.1 A.2 A.3 A.4 A.4 A.5 A.6 A.7 B B.1 B.1 B.2 B.2 B.3 B.4 B.5 B.6 B.6 B.6 B.6 B.7 B.8 B.9 B.10 B.10 B.12 B.12 B.13 C C.1 C.2 C.3 C.4 C.5 C.5 C.6 C.7 C.8 C.8a C.8a C.8b C.8b C.9 C.9
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
PEKERJAAN PERSIAPAN 1 M1 UITSET/PENGU UITSET/PENGUKURAN KURAN 1 M' PEMBUATAN PEMBUATAN BOUWPLANK BOUWPLANK UITZET UITZET 1 M2 PEMB PEMBERSIHA ERSIHAN N LOKASI 1 M² MEMBERSIHKA MEMBERSIHKAN N LAPANGAN LAPANGAN DAN PERATAAN PERATAAN 1 TITIK CHEMICHAL CHEMICHAL ANCHORS ANCHORS SYSTEM SYSTEM UNTUK PENYAMBUNGA PENYAMBUNGAN N BETON 1 M3 BONGKARAN BONGKARAN BETON BETON 1 M2 BONGKAR BONGKAR PAVING PAVING 1 M3 PENGANGKUT PENGANGKUTAN AN BONGKARAN BONGKARAN KELUAR KELUAR PROYEK PROYEK
BAHAN+UPAH
BAHAN
UP UPAH
Rp Rp Rp Rp Rp Rp Rp Rp
4,510.00 60,800.00 3,333.00 7,480.00 126,600.00 251,878.00 9,680.00 72,950.00
Rp Rp Rp Rp Rp Rp Rp Rp
44,079.75 54,000.00 -
Rp Rp Rp Rp Rp Rp Rp Rp
4,510.00 16,720.00 3,333.00 7,480.00 72,600.00 251,878.00 9,680.00 72,950.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
33,000.00 40,590.00 21,780.00 861,233.82 116,500.00 178,300.00 9,280.00 127,600.00 25,212.00 105,700.00 121,300.00 7,986.00 36,146.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
104,400.00 166,200.00 114,400.00 24,310.00 93,600.00 109,200.00 -
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
33,000.00 40,590.00 21,780.00 861,233.82 12,100.00 12,100.00 9,279.60 13,200.00 902.00 12,100.00 12,100.00 7,986.00 36,146.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
295,748.00 573,798.00 87,854.00 79,811.00 26,018.00 603,043.00 34,757.00 31,139.00 24,701.00 37,095.00 33,540.00 201,865.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
237,684.00 460,360.50 68,219.24 60,176.09 24,505.36 583,407.50 15,122.34 11,504.30 5,065.94 16,272.26 13,905.21 167,418.13
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
58,063.50 113,437.50 19,635.00 19,635.00 1,512.50 19,635.00 19,635.00 19,635.00 19,635.00 20,823.00 19,635.00 34,446.50
PEKE PEKERJ RJAA AAN N TANA TANAH H 1M³ 1M³ GAL GALIA IAN N TAN TANAH AH BIASA IASA 1M 1M³³ GALI GALIAN AN TAN TANAH AH BIA BIASA SA SED SEDAL ALAM AM 3M 3M 1M1 PENG PENGEB EBOR ORAN AN TAN TANAH AH dia dia 30 30 CM KED KEDALA ALAMA MAN N s/d 6 M' 1M3 PENG PENGEB EBOR ORAN AN TAN TANAH AH dia dia 30 30 CM KED KEDALA ALAMA MAN N s/d 6 M' 1M M3 3 UR URUGAN PA PASIR 1 M3 M3 UR URUGAN UGAN PASI PASIR R PAN PANTA TAII 1 M3 URUG URUGAN AN TANA TANAH H KEMB KEMBAL ALII 1 M3 URUGAN GAN KATEL 1M M2 2 GE GEBALAN RU RUMPUT 1 M3 URUGAN GAN TANAH 1 M3 URUG URUGAN AN SIRT SIRTU U 1M2 PEKE PEKERJA RJAAN AN CUT CUT & FILL FILL TAN TANAH AH 1M³ PEMBU PEMBUANGA ANGAN N TANAH TANAH BEKAS BEKAS GALIA GALIAN N SEJAUH SEJAUH 150 M PEKE PEKERJ RJAA AAN N PASA PASANG NGAN AN 1 M³ PASA PASANG NGAN AN BATU BATU KOSON KOSONG G / AAN AANST STAM AMPIN PING G 1M³ PEMAS PEMASAN ANGAN GAN PONDA PONDASI SI BAT BATU U KALI KALI 1PC 1PC:: 5PS 5PS 1M² PAS PASAN ANGA GAN N BATU BATU MER MERAH AH TEB TEBAL AL 1/2 1/2 BAT BATA A 1 PC : 3PS 1M² PEMA PEMASA SANGA NGAN N BATU BATU MER MERAH AH 1/2 1/2 BAT BATA A 1PC: 1PC:5PS 5PS 1M² PEMAS PEMASANG ANGAN AN BATU BATU MERA MERAH H PATLAH PATLAHAN AN 1/3 1/3 DARI DARI 1/2 BATA BATA 1PC:5P 1PC:5PS S ±5CM ±5CM 1 M³ PASA PASANG NGAN AN ROLLA ROLLAG G BAT BATU U MERA MERAH H 1 PC : 3 PS PS 1 M² PLES PLESTE TERA RAN N TASR TASRAM AM 1PC 1PC:3P :3PS S TEBA TEBAL L 15 mm 1 M² PLES PLESTE TERA RAN N TASR TASRAM AM 1PC 1PC:5P :5PS S TEBA TEBAL L 15 mm 1 M² AC ACIAN 1 M² PLES PLESTE TER R + ACI ACIAN AN 1: 3 1 M² PLES PLESTE TER R BETON BETON + ACIAN ACIAN 1: 5 1 M2 PASA PASAN NG BATU BATU ANDE ANDESI SIT T
page 63 from 113
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
C.10 C.10 C.11 C.11 C.12 C.13 C.14 C.15 C.16 C.16 C.17 C.17 C.18 C.18 C.18 C.18 C.1 .19 9 C.20 C.21 C.21 C.20 C.20 C.22 C.23 C.23 C.24 C.25 C.25 C.22 C.22 C.26 C.26 C.27 C.28 C.28 D D.1 D.1
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
1 M2 M2 PAS PASAN ANG G BAT BATU U LEM LEMPE PENG NG 1 M2 M2 PEMA PEMASA SANG NGAN AN KERA KERAMIK MIK 20 20X2 X20 0 1 M2 PEMASAN PEMASANGAN GAN KERAMIK KERAMIK DINDING DINDING 20 X 25 1 M2 PEMASAN PEMASANGAN GAN KERAMIK KERAMIK 30X30 30X30 WARNA WARNA TERA TERANG NG 1M M2 2 PEMA PEMASAN SANGAN GAN KERAMIK KERAMIK 30X30 30X30 WA WARNA RNA GELAP GELAP 1M M2 2 PEMA PEMASAN SANGAN GAN KERAMIK KERAMIK ANTI ANTI SELIP SELIP 30X30 30X30 1 M2 M2 PEMA PEMASA SANG NGAN AN KERA KERAMIK MIK 40 40X4 X40 0 1 M1 PEMA PEMASA SANG NGAN AN KER KERAM AMIK IK BORD BORDER ER 10 10 X 20 1M M2 2 BAT BATU U ACA ACAK K CIR CIREB EBON ON 1 M' PASAN PASANG G PROF PROFIL IL GRC GRC 1M M2 2 BA BATU TE TEBAR 1M¹ PEKERJA PEKERJAAN AN BENANG BENANGAN AN SUDUT/ SUDUT/ COL-COL COL-COLAN AN 1M 1M¹¹ PEKE PEKERJA RJAAN AN PLIN PLINTC TCOL OL KAC KACA A RIBE RIBEN N 1M 1M1 1 PEK PEKER ERJAA JAAN N BET BETON ON BUIS BUIS U 20 20 1M² PEMA PEMASAN SANGAN GAN BATU BATU MERA MERAH H KANSTIN KANSTIN 1/2 BATA BATA 1PC:5 1PC:5PS PS 1M 1M2 2 PEKE PEKERJA RJAAN AN PAVI PAVING NG BLOK BLOK 1M1 PEKERJA PEKERJAAN AN SALURA SALURAN N KELIL KELILING ING AIR HUJAN HUJAN 1M M2 2 BAT BATU U AMP AMPYA YANG NG BATU BATU KECIL KECIL 1Bua 1Buah h PEMA PEMASA SANGA NGAN N BAK BAK KONTR KONTROL OL 1M M2 2 BAT BATU U AMP AMPYA YANG NG BATU BATU BESA BESAR R 1 M2 PASANG PASANGAN AN DIND DINDING ING ROSTE ROSTER/TE R/TERAWA RAWANG NG 12X1 12X11X2 1X24 4 1 BH PAS PASAN ANGA GAN N KANS KANSTE TEIN IN 25X 25X20 20X4 X40 0
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
182,813.00 131,294.00 132,744.00 134,178.00 142,733.00 153,769.00 157,983.00 12,027.00 200,661.00 257,988.00 79,169.00 11,620.00 176,935.00 199,508.00 45,011.00 103,184.00 174,457.00 185,948.00 164,954.00 275,848.00 275,349.00 40,036.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
133,219.58 93,481.90 94,931.90 96,365.95 104,920.95 115,956.90 113,283.00 8,246.19 132,598.88 246,218.13 72,500.00 2,017.31 157,300.00 192,604.31 25,376.09 96,280.00 167,553.75 155,313.13 158,050.00 245,213.13 255,713.75 31,214.38
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
49,593.50 37,812.50 37,812.50 37,812.50 37,812.50 37,812.50 44,700.00 3,781.25 68,062.50 11,770.00 6,668.75 9,603.00 19,635.00 6,903.60 19,635.00 6,903.60 6,903.60 30,635.00 6,903.60 30,635.00 19,635.00 8,822.00
Rp
851,788.00
Rp
762,275.00
Rp
89,512.50
PEKE PEKERJ RJAA AAN N BETO BETON N 1 M3 M3 BET BETON ON READY EADY MIX MIX K-2 K-275 75
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
C.10 C.10 C.11 C.11 C.12 C.13 C.14 C.15 C.16 C.16 C.17 C.17 C.18 C.18 C.18 C.18 C.1 .19 9 C.20 C.21 C.21 C.20 C.20 C.22 C.23 C.23 C.24 C.25 C.25 C.22 C.22 C.26 C.26 C.27 C.28 C.28 D D.1 D.1 D.2 D.3 D.3 D.4 D.4 D.4 D.5 D.6 D.7
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
1 M2 M2 PAS PASAN ANG G BAT BATU U LEM LEMPE PENG NG 1 M2 M2 PEMA PEMASA SANG NGAN AN KERA KERAMIK MIK 20 20X2 X20 0 1 M2 PEMASAN PEMASANGAN GAN KERAMIK KERAMIK DINDING DINDING 20 X 25 1 M2 PEMASAN PEMASANGAN GAN KERAMIK KERAMIK 30X30 30X30 WARNA WARNA TERA TERANG NG 1M M2 2 PEMA PEMASAN SANGAN GAN KERAMIK KERAMIK 30X30 30X30 WA WARNA RNA GELAP GELAP 1M M2 2 PEMA PEMASAN SANGAN GAN KERAMIK KERAMIK ANTI ANTI SELIP SELIP 30X30 30X30 1 M2 M2 PEMA PEMASA SANG NGAN AN KERA KERAMIK MIK 40 40X4 X40 0 1 M1 PEMA PEMASA SANG NGAN AN KER KERAM AMIK IK BORD BORDER ER 10 10 X 20 1M M2 2 BAT BATU U ACA ACAK K CIR CIREB EBON ON 1 M' PASAN PASANG G PROF PROFIL IL GRC GRC 1M M2 2 BA BATU TE TEBAR 1M¹ PEKERJA PEKERJAAN AN BENANG BENANGAN AN SUDUT/ SUDUT/ COL-COL COL-COLAN AN 1M 1M¹¹ PEKE PEKERJA RJAAN AN PLIN PLINTC TCOL OL KAC KACA A RIBE RIBEN N 1M 1M1 1 PEK PEKER ERJAA JAAN N BET BETON ON BUIS BUIS U 20 20 1M² PEMA PEMASAN SANGAN GAN BATU BATU MERA MERAH H KANSTIN KANSTIN 1/2 BATA BATA 1PC:5 1PC:5PS PS 1M 1M2 2 PEKE PEKERJA RJAAN AN PAVI PAVING NG BLOK BLOK 1M1 PEKERJA PEKERJAAN AN SALURA SALURAN N KELIL KELILING ING AIR HUJAN HUJAN 1M M2 2 BAT BATU U AMP AMPYA YANG NG BATU BATU KECIL KECIL 1Bua 1Buah h PEMA PEMASA SANGA NGAN N BAK BAK KONTR KONTROL OL 1M M2 2 BAT BATU U AMP AMPYA YANG NG BATU BATU BESA BESAR R 1 M2 PASANG PASANGAN AN DIND DINDING ING ROSTE ROSTER/TE R/TERAWA RAWANG NG 12X1 12X11X2 1X24 4 1 BH PAS PASAN ANGA GAN N KANS KANSTE TEIN IN 25X 25X20 20X4 X40 0
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
182,813.00 131,294.00 132,744.00 134,178.00 142,733.00 153,769.00 157,983.00 12,027.00 200,661.00 257,988.00 79,169.00 11,620.00 176,935.00 199,508.00 45,011.00 103,184.00 174,457.00 185,948.00 164,954.00 275,848.00 275,349.00 40,036.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
133,219.58 93,481.90 94,931.90 96,365.95 104,920.95 115,956.90 113,283.00 8,246.19 132,598.88 246,218.13 72,500.00 2,017.31 157,300.00 192,604.31 25,376.09 96,280.00 167,553.75 155,313.13 158,050.00 245,213.13 255,713.75 31,214.38
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
49,593.50 37,812.50 37,812.50 37,812.50 37,812.50 37,812.50 44,700.00 3,781.25 68,062.50 11,770.00 6,668.75 9,603.00 19,635.00 6,903.60 19,635.00 6,903.60 6,903.60 30,635.00 6,903.60 30,635.00 19,635.00 8,822.00
Rp Rp Rp Rp Rp Rp Rp Rp
851,788.00 1,037,832.00 11,680.00 11,680.00 379,040.00 390,097.00 477,840.00 6,115,845.00
Rp Rp Rp Rp Rp Rp Rp Rp
762,275.00 946,564.51 10,940.25 10,940.25 329,127.50 340,184.00 427,927.50 -
Rp Rp Rp Rp Rp Rp Rp Rp
89,512.50 91,267.00 739.75 739.75 49,912.50 49,912.50 49,912.50 -
PEKE PEKERJ RJAA AAN N BETO BETON N 1 M3 M3 BET BETON ON READY EADY MIX MIX K-2 K-275 75 1M M3 3 PEK PEKER ERJAA JAAN N BET BETON ON STRU STRUKT KTUR UR K- 27 275 5 1 KG PEM PEMBE BESI SIAN AN BET BETON ON (ST (STRU RUKT KTUR UR)) 1 KG PEMB PEMBES ESIA IAN N WIRE WIRE MESH MESH M8 1 M2 M2 BE BEKIST ISTING ING KOL KOLOM OM 1 M2 M2 BE BEKIST ISTING ING BA BALOK LOK 1 M2 M2 BE BEKIST ISTING ING PLA PLAT T 1 M3 KOLOM Ø 50
page 64 from 113
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
D.8 D.8 D.9 D.9 D.10 D.10 D.8 D.12 D.12 D.9 D.14 D.14 D.10 D.10 D.11 D.11 D.17 D.17 D.18 D.18 D.19 D.19 D.20 D.20 D.12 D.12 D.13 D.13 D.14 D.14 D.15 D.15 D.23 D.23 D.24 D.24 D.25 D.25 D.25 D.25a a D.16 D.16 D.27 D.27 D.17 D.17 D.29 D.29
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
1M M3 3 KOL KOLOM OM 50 / 5 50 0 ( K2') K2') ( D4 D4 ) 1M M3 3 KOL KOLOM OM 50 / 5 50 0 ( K7') K7') ( D4 D4 ) 1M M3 3 KOL KOLOM OM 40 / 4 40 0 ( K2 ) ( D4 ) 1 M3 KOLOM Ø 40 1M M3 3 KOL KOLOM OM 30 / 3 30 0 ( K3 ) ( D4 ) 1 M3 KOLOM 30 / 30 ( K8) ( D4 ) 1 M3 KO KOLOM 15 / 2 20 0 1 M3 M3 KOL KOLOM OM 50 50// 50 50 ( K6 K6 ) ( D4 ) 1 M3 M3 KOL KOLOM OM PRA PRAKTIS KTIS 1 M3 M3 BET BETON ON PLAT PLAT TEBA TEBAL L 10 10 CM CM 1 M3 BALO BALOK K B1 35 35/7 /70 0 ( D4 ) 1 M3 BALO BALOK K B2 25 25/5 /50 0 ( D4 ) 1 M3 BALO BALOK K B3 25 25/4 /40 0 ( D4 ) 1 M3 BALO ALOK B3' B3' 25/5 25/50 0 1 M3 BALO ALOK B4 20/40 20/40 1 M3 BALO ALOK 30/ 30/50 50 1 M3 BALO ALOK 20/ 20/25 25 1 M3 BALO ALOK BK 15/20 15/20 1 M3 M3 BAL BALOK OK BKA BKA 25 25/4 /40 0 ( D4 ) 1 M3 BALO BALOK K BL 30 30/3 /30 0 ( D4 ) 1 M3 BALO ALOK BR 30/30 30/30 1 M3 BALO BALOK K BR 15 15/1 /15 5 1 M3 BALO ALOK 20/ 20/30 30 1M M3 3 BET BETON ON PLAT PLAT TANG TANGGA GA 15 CM CM 1 M3 M3 BET BETON ON PLAT PLAT LEUV LEUVEL EL 12 CM 1 M3 BET BETON ON STR STROU OUSS SS dia dia 20 20 CM K-27 K-275 5
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
5,032,111.00 4,198,626.00 6,516,975.00 5,020,115.00 5,561,288.00 4,889,904.00 4,248,399.00 3,897,433.00 4,054,278.00 6,869,416.00 6,737,289.00 7,399,733.87 7,590,331.00 7,399,734.00 5,815,927.00 4,343,483.00 4,222,706.00 5,511,884.00 6,641,924.00 6,170,532.00 5,898,388.00 4,640,063.00 5,715,661.00 5,545,051.00 4,526,651.00 4,131,963.00
Rp
-
Rp
-
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
D.8 D.8 D.9 D.9 D.10 D.10 D.8 D.12 D.12 D.9 D.14 D.14 D.10 D.10 D.11 D.11 D.17 D.17 D.18 D.18 D.19 D.19 D.20 D.20 D.12 D.12 D.13 D.13 D.14 D.14 D.15 D.15 D.23 D.23 D.24 D.24 D.25 D.25 D.25 D.25a a D.16 D.16 D.27 D.27 D.17 D.17 D.29 D.29 D.18 D.18 D.19 D.19 D.32 D.32 D.33 D.33 D.20 D.20 D.21 D.21 D.22 D.22 D.23 D.23 D.24 D.24 D.25 D.25 D.26 D.26 D.27 D.27 D.28 D.28
E
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
1M M3 3 KOL KOLOM OM 50 / 5 50 0 ( K2') K2') ( D4 D4 ) 1M M3 3 KOL KOLOM OM 50 / 5 50 0 ( K7') K7') ( D4 D4 ) 1M M3 3 KOL KOLOM OM 40 / 4 40 0 ( K2 ) ( D4 ) 1 M3 KOLOM Ø 40 1M M3 3 KOL KOLOM OM 30 / 3 30 0 ( K3 ) ( D4 ) 1 M3 KOLOM 30 / 30 ( K8) ( D4 ) 1 M3 KO KOLOM 15 / 2 20 0 1 M3 M3 KOL KOLOM OM 50 50// 50 50 ( K6 K6 ) ( D4 ) 1 M3 M3 KOL KOLOM OM PRA PRAKTIS KTIS 1 M3 M3 BET BETON ON PLAT PLAT TEBA TEBAL L 10 10 CM CM 1 M3 BALO BALOK K B1 35 35/7 /70 0 ( D4 ) 1 M3 BALO BALOK K B2 25 25/5 /50 0 ( D4 ) 1 M3 BALO BALOK K B3 25 25/4 /40 0 ( D4 ) 1 M3 BALO ALOK B3' B3' 25/5 25/50 0 1 M3 BALO ALOK B4 20/40 20/40 1 M3 BALO ALOK 30/ 30/50 50 1 M3 BALO ALOK 20/ 20/25 25 1 M3 BALO ALOK BK 15/20 15/20 1 M3 M3 BAL BALOK OK BKA BKA 25 25/4 /40 0 ( D4 ) 1 M3 BALO BALOK K BL 30 30/3 /30 0 ( D4 ) 1 M3 BALO ALOK BR 30/30 30/30 1 M3 BALO BALOK K BR 15 15/1 /15 5 1 M3 BALO ALOK 20/ 20/30 30 1M M3 3 BET BETON ON PLAT PLAT TANG TANGGA GA 15 CM CM 1 M3 M3 BET BETON ON PLAT PLAT LEUV LEUVEL EL 12 CM 1 M3 BET BETON ON STR STROU OUSS SS dia dia 20 20 CM K-27 K-275 5 1 M3 BET BETON ON STR STROU OUSS SS dia dia 30 30 CM K-27 K-275 5 1M M3 3 BET BETON ON SLOF SLOFF F 15/ 15/20 20 K-275 K-275 1 M3 BET BETON ON SLO SLOFF FF KOPE KOPEL L 20/40 20/40 K-27 K-275 5 1 M3 M3 BET BETON ON POER POER 60 60X6 X60 0 K-27 K-275 5 1M M3 3 BET BETON ON POER POER 15 150X 0X150 150 K-27 K-275 5 1M M3 3 BET BETON ON PLAT PLAT LI LISP SPLA LANK NK 12 CM CM 1 M3 M3 BET BETON ON LANT LANTAI AI KERJ KERJA A 1 M3 M3 BET BETON ON UMPA MPAK 1 M3 BETO BETON N PLAT PLAT LAND LANDAS ASAN AN K-2 K-275 75 1M M3 3 KOL KOLOM OM 40 / 7 70 0 ( K7 ) ( D4 ) 1M M3 3 BET BETON ON SLOF SLOFF F 15/ 15/20 20 K-275 K-275 1 M3 BET BETON ON SLO SLOFF FF KOPE KOPEL L 20/40 20/40 K-27 K-275 5 1 M3 BALO BALOK K B3 25 25/4 /40 0 ( D4 )
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
5,032,111.00 4,198,626.00 6,516,975.00 5,020,115.00 5,561,288.00 4,889,904.00 4,248,399.00 3,897,433.00 4,054,278.00 6,869,416.00 6,737,289.00 7,399,733.87 7,590,331.00 7,399,734.00 5,815,927.00 4,343,483.00 4,222,706.00 5,511,884.00 6,641,924.00 6,170,532.00 5,898,388.00 4,640,063.00 5,715,661.00 5,545,051.00 4,526,651.00 4,131,963.00 2,506,559.00 4,629,636.00 4,018,997.00 4,390,095.00 2,659,672.00 3,150,922.00 788,374.00 788,374.00 2,071,779.00 5,832,639.00 4,629,636.00 4,016,436.00 5,299,720.00
Rp
-
Rp
-
PEKERJA PEKERJAAN AN BESI DAN PENGGAN PENGGANTUN TUNG G
page 65 from 113
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
E.1 E.1 E.1 E.2 E.3 E.4 E.4 E.5 E.5 E.6 E.6 E.2 E.2 E.3 E.4 E.4 E.5 E.5 E.5a E.5a E.6 E.6 E.7 E.7 E.8 E.8 E.9 E.9 E.10 E.10 E.7 E.8
F F.1 F.1 F.2 F.3 F4
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
PENG PENGEL ELAS ASAN AN DAN DAN PEMA PEMASA SANG NGAN AN BESI BESI 1 M1 M1 PAG PAGA AR BES BESII T TER ERAL ALIS IS 1 M2 M2 PAG PAGA AR BES BESII PEM PEMBA BAT TAS 1M M2 2 SUN SUNS SCREE CREEN N HOLL HOLLOW OW 1 M1 ORNA ORNAME MEN N HOL HOLLO LOW W STAI STAINL NLES ESS S 1M M1 1 ROL ROLLB LBAR AR PIPA PIPA STAI STAINL NLES ESS S 1M M2 2 SUN SUN SCRE SCREEN EN HOLL HOLLOW OW 40/ 40/60 60 1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA >=WF >=WF15 150 0 1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA PLAT PLAT 1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA CNP CNP 150 150 1 KG KG PEKE PEKERJ RJAA AAN N BAJA BAJA >=si >=siku ku 1 KG PEK PEKER ERJAA JAAN N BAJA BAJA >=B >=Baut aut Ang Angkur kur Baja Baja 1 M' M' PAS PASAN ANG G TAL TALAN ANG G PEMB PEMBUL ULUH UH D 4 '' 1 M' M' PAS PASAN ANG G TAL TALAN ANG G PEMB PEMBUL ULUH UH D 3 '' 1M M2 2 PAS PASAN ANG G ALU ALUMU MUNI NIUM UM FOIL FOIL 1 M2 PASA PASANG NG GENT GENTEN ENG G POR PORTU TUGI GIS S 1 M1 PAS PASAN ANG G NOK NOK GE GENT NTEN ENG G PORT PORTUG UGIS IS 1 M2 M2 RAN RANG GKA HOLL HOLLO OW 30/6 30/60 0 PASA PASANG NG 1 M M²² Pla Platt Gri Grill ll
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
81,414.00 649,886.00 651,886.00 780,890.00 207,271.00 294,331.00 585,920.00 30,840.00 29,245.00 30,840.00 29,086.00 95,400.00 45,534.00 42,609.00 41,996.00 83,336.00 58,576.00 238,213.00 474,282.00
Rp Rp Rp Rp
34,568.00 17,355.00 49,564.00 42,053.00
33,924.00
PEKERJ PEKERJAA AAN N PENGEC PENGECAT ATAN AN 1 1 1 1
M2 M2 M2 M2 M2 M2
CAT CAT EXT EXTER ERIO IOR R WHEA WHEATH THER ERCO COAT AT "M "MOWI OWILE LEX" X" CAT INTERI INTERIOR OR CENDAN CENDANA A DINDIN DINDING G DAN PLAFON PLAFOND D CAT KAYU EM CO CO C AT AT BESI EMCO
Rp Rp Rp Rp
30,067.50 10,903.75 43,142.48 34,796.00
Rp Rp Rp Rp
4,500.65 6,451.50 6,421.25 7,257.25
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
E.1 E.1 E.1 E.2 E.3 E.4 E.4 E.5 E.5 E.6 E.6 E.2 E.2 E.3 E.4 E.4 E.5 E.5 E.5a E.5a E.6 E.6 E.7 E.7 E.8 E.8 E.9 E.9 E.10 E.10 E.7 E.8
F
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
PENG PENGEL ELAS ASAN AN DAN DAN PEMA PEMASA SANG NGAN AN BESI BESI 1 M1 M1 PAG PAGA AR BES BESII T TER ERAL ALIS IS 1 M2 M2 PAG PAGA AR BES BESII PEM PEMBA BAT TAS 1M M2 2 SUN SUNS SCREE CREEN N HOLL HOLLOW OW 1 M1 ORNA ORNAME MEN N HOL HOLLO LOW W STAI STAINL NLES ESS S 1M M1 1 ROL ROLLB LBAR AR PIPA PIPA STAI STAINL NLES ESS S 1M M2 2 SUN SUN SCRE SCREEN EN HOLL HOLLOW OW 40/ 40/60 60 1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA >=WF >=WF15 150 0 1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA PLAT PLAT 1 KG KG PEK PEKER ERJA JAAN AN BAJA BAJA CNP CNP 150 150 1 KG KG PEKE PEKERJ RJAA AAN N BAJA BAJA >=si >=siku ku 1 KG PEK PEKER ERJAA JAAN N BAJA BAJA >=B >=Baut aut Ang Angkur kur Baja Baja 1 M' M' PAS PASAN ANG G TAL TALAN ANG G PEMB PEMBUL ULUH UH D 4 '' 1 M' M' PAS PASAN ANG G TAL TALAN ANG G PEMB PEMBUL ULUH UH D 3 '' 1M M2 2 PAS PASAN ANG G ALU ALUMU MUNI NIUM UM FOIL FOIL 1 M2 PASA PASANG NG GENT GENTEN ENG G POR PORTU TUGI GIS S 1 M1 PAS PASAN ANG G NOK NOK GE GENT NTEN ENG G PORT PORTUG UGIS IS 1 M2 M2 RAN RANG GKA HOLL HOLLO OW 30/6 30/60 0 PASA PASANG NG 1 M M²² Pla Platt Gri Grill ll
81,414.00 649,886.00 651,886.00 780,890.00 207,271.00 294,331.00 585,920.00 30,840.00 29,245.00 30,840.00 29,086.00 95,400.00 45,534.00 42,609.00 41,996.00 83,336.00 58,576.00 238,213.00 474,282.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
34,568.00 17,355.00 49,564.00 42,053.00 63,116.00 81,257.00 170,357.00 54,307.00 3,533.00 176,564.00 28,759.00 418,394.00
Rp Rp Rp Rp Rp
862,863.00 41,676.00 5,861,315.00 1,362,932.00 621,520.00
33,924.00
PEKERJ PEKERJAA AAN N PENGEC PENGECAT ATAN AN
F.1 F.1 F.2 F.3 F.4 F.5 F.5 F.6 F.6 F.7 F.7 F.8 F.9 F.9 F.6 F.6 F.7 F.8
1 M2 M2 CAT CAT EXT EXTER ERIO IOR R WHEA WHEATH THER ERCO COAT AT "M "MOWI OWILE LEX" X" 1 M2 M2 CAT INTERI INTERIOR OR CENDAN CENDANA A DINDIN DINDING G DAN PLAFON PLAFOND D 1 M2 CAT KAYU EM CO CO 1 M2 C AT AT BESI EMCO 1 M2 COA COATING ING BAT BATU ALAM ALAM 1 M2 LA LAPI PISA SAN N DASA DASAR R COAT COATIN ING G WARNA WARNA HIT HITAM AM T TBL BL 1MM 1MM 1 M2 LAP LAPIS ISAN AN DAS DASAR AR COA COATI TING NG WARN WARNA A BIRU BIRU TBL TBL 1MM 1MM 1 M2 LAPISA LAPISAN N DASAR DASAR COATIN COATING G WARNA WARNA MERA MERAH H TBL TBL 0,08 0,08 CM 1 KG KG CAT CAT ZINCR INCROM OMAT ATE E BAJA BAJA 1 M2 WATER WATERPR PROO OOFI FING NG COAT COATIN ING G 1 M2 SC SCREED 1 M2 C AT AT MELAMIN
G
PEKERJAA PEKERJAAN N ORNAMEN ORNAMEN KAYU KAYU JATI JATI + AKSESORI AKSESORIS S INTERI INTERIOR OR
G.1 G.1 E.11 E.11 G.2 G.2 G.3 G.4 G.4
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1M M1 1 PAS PASAN ANG G LIS LIST T KAY KAYU U PRO PROFI FIL L 1 M2 PAS PASAN ANG G LISP LISPLA LANK NK ( KAL KALSI SIPL PLAN ANK K) 1 M2 PAS PASAN ANG G PA PAPA PAN N KAYU KAYU JAT JATII MOTI MOTIF F UKIR UKIRAN AN 1 M1 PASANG PASANG PAGAR PAGAR PAPAN PAPAN KAYU KAYU JATI JATI Tinggi= Tinggi=30 30 cm 1 M1 PASA PASANG NG HAND HAND RAIL RAILIN ING G KAY KAYU U JATI JATI Ø 6 CM CM
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
30,067.50 10,903.75 43,142.48 34,796.00 55,859.23 74,000.00 163,100.00 47,050.00 2,949.50 154,701.88 6,896.56 404,792.50
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,500.65 6,451.50 6,421.25 7,257.25 7,257.25 7,257.25 7,257.25 7,257.25 583.00 21,862.50 21,862.50 13,601.50
page 66 from 113
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
G.5 G.6 G.7 G.7 G.8 G.8 G.9 G.10 G.10 G.11 G.11
H H.1 H.1 H.2 H.2 H.3 H.4 H.4 H.5 H.5 H.6 H.6 H.7 H.7 H.8 H.8 H.9 H.9 H.10 H.10
1 1 1 1 1 1 1
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
M1 PASANG PASANG PAPAN PAPAN KAYU KAYU JATI JATI PENUT PENUTUP UP REL REL PINT PINTU U M1 PASANG PASANG PAPAN PAPAN KAYU KAYU JATI JATI BAWAH BAWAH HAND HAND RAILIN RAILING G M M3 3 PAS PASAN ANG G KUS KUSEN EN KAYU KAYU JATI JATI M2 M2 PAS PASAN ANG G PIN PINTU TU PANE PANEL L KAY KAYU U JAT JATII M2 M2 PAS PASA ANG MULT MULTIP IPLE LEKS KS M2 M2 PAS PASA ANG KARPE ARPET T M2 PASANG PASANG COVERI COVERING NG KOLOM KOLOM EKSPOS EKSPOSE E
Rp Rp Rp Rp Rp Rp Rp
1,667,760.00 487,110.00 134,222,583.00 4,992,965.00 124,471.00 90,446.00 6,096,767.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
167,970.00 214,339.00 2,604,574.00 303,574.00 756,160.00 95,571.00 97,183.00 116,055.00 118,980.00 1,769,598.00
Rp Rp Rp
131,356.00 132,656.00 126,156.00
PEKER PEKERJA JAAN AN INST INSTAL ALASI ASI AIR AIR 1 Bh Bh PEM PEMA ASANG SANGAN AN KRAN KRAN AIR AIR 1 Bh Bh KLO KLOSE SET T JON JONGK GKOK OK PORS PORSEL ELIN IN 1 Bh KL OS OSET DUDUK 1 Bh Bh BAK BAK MAND MANDII L LAP APIS IS KERA KERAMI MIK K 1 Bh Bh WASH WASHTA TAFE FEL L TEM TEMPE PEL L + KACA KACA CERM CERMIN IN 1M M1 1 PIP PIPA A PVC PVC AW Ø 1/ 1/2 2M MAS ASPI PION ON 1M M1 1 PIP PIPA A PVC PVC AW Ø 5/ 5/8 8M MAS ASPI PION ON 1 M1 PIPA PIPA PVC PVC TIP TIPE E D Ø 3 "MA "MASP SPIO ION N 1 M1 PIPA PIPA PVC PVC TIP TIPE E D Ø 4 "MA "MASP SPIO ION N PASA PASANG NG 1 M' M' PIPA PIPA RCP RCP VARI VARIAN ANT T Ø 1000 1000 mm
H.
PEKERJAA PEKERJAAN N KAYU, KAYU, KACA KACA DAN BESI
H.1 H.1 H.2 H.2 H.3 H.3
1 Bh Bh ENG ENGSE SEL L PI PINTU NTU SO SOLI LID D 1 Bh GREN GRENDE DEL L PINT PINTU U SOLI SOLID D 1 Bh Bh GRE GREND NDEL EL JEND JENDEL ELA A SOL SOLID ID
Rp 157,410.00 Rp 126,558.75 Rp 2,516,793.75 Rp 215,793.75 Rp 668,380.00 Rp 7,791.33 Rp 9,403.33 Rp 28,275.00 Rp 31,200.00 Rp 1,534,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
10,560.00 87,780.00 87,780.00 87,780.00 87,780.00 87,780.00 87,780.00 87,780.00 87,780.00 235,598.00
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
G.5 G.6 G.7 G.7 G.8 G.8 G.9 G.10 G.10 G.11 G.11
H H.1 H.1 H.2 H.2 H.3 H.4 H.4 H.5 H.5 H.6 H.6 H.7 H.7 H.8 H.8 H.9 H.9 H.10 H.10
H. H.1 H.1 H.2 H.2 H.3 H.3 H.4 H.4 H.5 H.5 H.6 H.7 H.7 H.8 H.8 H.10 H.10 H.11 H.11 H.12 H.12 H.13 H.13 H.14 H.14 H.15 H.15
1 1 1 1 1 1 1
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
M1 PASANG PASANG PAPAN PAPAN KAYU KAYU JATI JATI PENUT PENUTUP UP REL REL PINT PINTU U M1 PASANG PASANG PAPAN PAPAN KAYU KAYU JATI JATI BAWAH BAWAH HAND HAND RAILIN RAILING G M M3 3 PAS PASAN ANG G KUS KUSEN EN KAYU KAYU JATI JATI M2 M2 PAS PASAN ANG G PIN PINTU TU PANE PANEL L KAY KAYU U JAT JATII M2 M2 PAS PASA ANG MULT MULTIP IPLE LEKS KS M2 M2 PAS PASA ANG KARPE ARPET T M2 PASANG PASANG COVERI COVERING NG KOLOM KOLOM EKSPOS EKSPOSE E
Rp Rp Rp Rp Rp Rp Rp
1,667,760.00 487,110.00 134,222,583.00 4,992,965.00 124,471.00 90,446.00 6,096,767.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
167,970.00 214,339.00 2,604,574.00 303,574.00 756,160.00 95,571.00 97,183.00 116,055.00 118,980.00 1,769,598.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
131,356.00 132,656.00 126,156.00 81,306.00 413,456.00 43,866.00 429,056.00 124,456.00 45,223.00 108,988.00 245,017.00 168,223.00 523,450.00 517,761.00
Rp Rp
357,475.00 331,475.00
PEKER PEKERJA JAAN AN INST INSTAL ALASI ASI AIR AIR 1 Bh Bh PEM PEMA ASANG SANGAN AN KRAN KRAN AIR AIR 1 Bh Bh KLO KLOSE SET T JON JONGK GKOK OK PORS PORSEL ELIN IN 1 Bh KL OS OSET DUDUK 1 Bh Bh BAK BAK MAND MANDII L LAP APIS IS KERA KERAMI MIK K 1 Bh Bh WASH WASHTA TAFE FEL L TEM TEMPE PEL L + KACA KACA CERM CERMIN IN 1M M1 1 PIP PIPA A PVC PVC AW Ø 1/ 1/2 2M MAS ASPI PION ON 1M M1 1 PIP PIPA A PVC PVC AW Ø 5/ 5/8 8M MAS ASPI PION ON 1 M1 PIPA PIPA PVC PVC TIP TIPE E D Ø 3 "MA "MASP SPIO ION N 1 M1 PIPA PIPA PVC PVC TIP TIPE E D Ø 4 "MA "MASP SPIO ION N PASA PASANG NG 1 M' M' PIPA PIPA RCP RCP VARI VARIAN ANT T Ø 1000 1000 mm
Rp 157,410.00 Rp 126,558.75 Rp 2,516,793.75 Rp 215,793.75 Rp 668,380.00 Rp 7,791.33 Rp 9,403.33 Rp 28,275.00 Rp 31,200.00 Rp 1,534,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
10,560.00 87,780.00 87,780.00 87,780.00 87,780.00 87,780.00 87,780.00 87,780.00 87,780.00 235,598.00
PEKERJAA PEKERJAAN N KAYU, KAYU, KACA KACA DAN BESI 1 Bh Bh ENG ENGSE SEL L PI PINTU NTU SO SOLI LID D 1 Bh GREN GRENDE DEL L PINT PINTU U SOLI SOLID D 1 Bh Bh GRE GREND NDEL EL JEND JENDEL ELA A SOL SOLID ID 1 Bh ENGS ENGSEL EL JEND JENDEL ELA A SOLI SOLID D 1 Bh Bh KUN KUNCI CI TANAM ANAM SOLI SOLID D 1 Bh Bh Ha Hak An Angin SO SOLID 1 Bh Bh Kunc Kuncii Pint Pintu u KM/ KM/WC WC Sta Stainl inlee ees s SOLI SOLID D 1 Bh ENG ENGSE SEL L PINT PINTU U DORO DORONG NG SOLI SOLID D PASA PASANG NG 1 M² Kaw Kawat Nya Nyamu muk k PASA PASANG NG 1 M² M² Kaw Kawat at Harm Harmon onika ika PASA PASANG NG 1 M² M² Rangk Rangka a Paga Pagarr Kel Kelili iling ng 1M M2 2 KAC KACA A RIB RIBBE BEN N Tbl Tbl 5 m mm m 1 M2 DAU DAUN N PINT PINTU U PANI PANIL L KAYU KAYU KAMP KAMPER ER 1 M2 DAUN DAUN PINTU PINTU PANIL PANIL KAYU KAYU KAMPE KAMPER R LAPIS LAPIS ALUMI ALUMINIU NIUM M JERUK JERUK
I.
PEKER PEKERJA JAAN AN INST INSTAL ALASI ASI LISTR LISTRIK IK
I. I.1 1 I. I.2 2
1 Ttk Ttk La Lamp mpu u TL TL 4 40 0 W + Titi Titik k Ins Insta tala lasi si 1 Ttk Ttk La Lamp mpu u SL SL 2 25 5 W + Tit Titik ik In Inst stal alas asii
page 67 from 113
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
I. I.2a 2a I. I.3 3 I. I.4 4 I. I.5 5 I. I.6 6 I. I.7 7 I.8
J. J.1 J.2 J.2 J.3 J.4 J.5 J.5 J.6 J.6 J.7 J.7 J .8 .8 J .9 .9 J.10 J.10 J.11 J.11 J.12 J.12 J.13 J.13
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
1 Ttk Ttk Lam Lampu pu Dind Dindin ing g 25 W + Titi Titik k Inst Instala alasi si 1 Ttk Ttk Sto Stop p Kon Konta tak k + Tit Titik ik Ins Insta tala lasi si 1 Ttk Ttk Sake Sakela larr + Titi Titik k Ins Insta tala lasi si 1 Ttk Ttk La Lamp mpu u TL TL 2 X 400 400 W + Titi Titik k Inst Instal alasi asi 1 Ttk Ttk La Lamp mpu u RMI RMI 2 X 40 W + Tit Titik ik In Inst stala alasi si 1 M1 PEN PENAR ARIK IKAN AN KAB KABEL EL PEN PENYA YAMB MBUN UNGA GAN N 1 Tiang Lampu
Rp Rp Rp Rp Rp Rp Rp
331,475.00 277,525.00 287,015.00 4,023,475.00 1,077,475.00 83,050.00 3,986,443.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
121,117.00 1,473,461.00 1,418,900.00 5,493,853.00 478,000.00 2,425,947.00 1,164,805.00 2,632,527.00 4,757,760.00 4,316,296.00 2,641,362.00 1,047,860.00 1,116,200.00 247,700.00 1,307,900.00
PEKERJ PEKERJAA AAN N ALUM ALUMIN INIU IUM M MEMB MEMBUA UAT T 1M' 1M' KUSE KUSEN N PINT PINTU U / JEND JENDEL ELA A ALUM ALUMIN INIU IUM M PEKERJAAN RAILING JEMBATAN / m1 PEKERJAAN RAILING TANGGA / m1 1 UNI UNIT T PINT PINTU U JEN JENDE DELA LA ( PJ PJ 2) 2) 1 UNIT PINTU PVC 1 UNIT PINTU ( P 2) 1 UNI UNIT T PIN PINT TU BES BESII (PB (PB1) 1) 1 UNI UNIT T PIN PINT TU BES BESII (PB (PB2) 2) 1 UNI UNIT T PIN PINT TU BES BESII (PB (PB3) 3) 1 UNIT JENDELA ( J1) 1 UNIT JENDELA ( J2) 1 UNIT UNIT JENDE JENDELA LA ( J3) J3) D4 1 UNIT UNIT JEN JENDELA DELA ( J4) J4) 1 UNIT UNIT BOUV BOUVEN ENLI LIGH GHT T ( BV ) 1 UNI UNIT T PINT PINTU U ROL ROLLI LING NG GRIL GRILL L
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
I. I.2a 2a I. I.3 3 I. I.4 4 I. I.5 5 I. I.6 6 I. I.7 7 I.8
J. J.1 J.2 J.2 J.3 J.4 J.5 J.5 J.6 J.6 J.7 J.7 J .8 .8 J .9 .9 J.10 J.10 J.11 J.11 J.12 J.12 J.13 J.13
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
1 Ttk Ttk Lam Lampu pu Dind Dindin ing g 25 W + Titi Titik k Inst Instala alasi si 1 Ttk Ttk Sto Stop p Kon Konta tak k + Tit Titik ik Ins Insta tala lasi si 1 Ttk Ttk Sake Sakela larr + Titi Titik k Ins Insta tala lasi si 1 Ttk Ttk La Lamp mpu u TL TL 2 X 400 400 W + Titi Titik k Inst Instal alasi asi 1 Ttk Ttk La Lamp mpu u RMI RMI 2 X 40 W + Tit Titik ik In Inst stala alasi si 1 M1 PEN PENAR ARIK IKAN AN KAB KABEL EL PEN PENYA YAMB MBUN UNGA GAN N 1 Tiang Lampu
Rp Rp Rp Rp Rp Rp Rp
331,475.00 277,525.00 287,015.00 4,023,475.00 1,077,475.00 83,050.00 3,986,443.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
121,117.00 1,473,461.00 1,418,900.00 5,493,853.00 478,000.00 2,425,947.00 1,164,805.00 2,632,527.00 4,757,760.00 4,316,296.00 2,641,362.00 1,047,860.00 1,116,200.00 247,700.00 1,307,900.00
Rp Rp Rp Rp Rp Rp Rp
837,579.00 1,675,159.00 165,365.00 511,120.00 70,650.00 6,736,888.00 379,040.00
PEKERJ PEKERJAA AAN N ALUM ALUMIN INIU IUM M MEMB MEMBUA UAT T 1M' 1M' KUSE KUSEN N PINT PINTU U / JEND JENDEL ELA A ALUM ALUMIN INIU IUM M PEKERJAAN RAILING JEMBATAN / m1 PEKERJAAN RAILING TANGGA / m1 1 UNI UNIT T PINT PINTU U JEN JENDE DELA LA ( PJ PJ 2) 2) 1 UNIT PINTU PVC 1 UNIT PINTU ( P 2) 1 UNI UNIT T PIN PINT TU BES BESII (PB (PB1) 1) 1 UNI UNIT T PIN PINT TU BES BESII (PB (PB2) 2) 1 UNI UNIT T PIN PINT TU BES BESII (PB (PB3) 3) 1 UNIT JENDELA ( J1) 1 UNIT JENDELA ( J2) 1 UNIT UNIT JENDE JENDELA LA ( J3) J3) D4 1 UNIT UNIT JEN JENDELA DELA ( J4) J4) 1 UNIT UNIT BOUV BOUVEN ENLI LIGH GHT T ( BV ) 1 UNI UNIT T PINT PINTU U ROL ROLLI LING NG GRIL GRILL L
K.
PEKERJ PEKERJAA AAN N LAIN LAIN-LA -LAIN IN
K.1 K.1 K.2 K.2 K.3 K.3 K.4 K.5 K.5 K.6 K.6 K.7 K.7
1M 1M1 1 PASA PASANG NG PAG PAGAR AR PEN PENGA GAMA MAN N SENG SENG TIN TINGG GGI: I: 2M 2M 1M 1M2 2 PASA PASANG NG PAG PAGAR AR PEN PENGA GAMA MAN N SENG SENG TIN TINGG GGI: I: 2M 2M 1M 1M3 3 BON BONGK GKAR AR PASA PASANG NGAN AN BATU BATU KALI KALI 1M3 BO BONGKAR BE BETON 1M2 1M2 BON BONGK GKAR AR KAWAT KAWAT HARM HARMON ONIK IKA A 1M3 1M3 BET BETON ON KOLOM OLOM K-27 K-275 5 1M 1M2 2 BEKI BEKIST STIN ING G KOL KOLOM OM DG MUL MULTI TIPL PLEK EK 9MM
page 68 from 113
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
ANALISA HARGA SATUAN BAHAN DAN UPAH KEGIATAN PEKERJAAN
: :
LOKASI
:
TAHUN ANGGARAN
:
UNIVERSITAS NEGERI MALANG BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMBANGUNAN GEDUNG TEACHER STUDY & TRAINING CENTER TAHAP V KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG 2011
page 69 from 113
DAFTAR HARGA SATUAN BAHAN DAN UPAH
No
URAIAN
A
BAHAN BANGUNAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Ai r Additive adibond Alkabon Alkaplas Alkali siller Asbes gelombang besar uk. 3,00 m Acrylic sending sealer Ampere meter Anker Bar AC 1 PK ex Panasonic + Accessories Alumunium frame pintu 1" x 4" brown ex. Indall Alumunium frame 1" x 2" brown ex. Indall Asesoris bola besi dia. 3 " Asesoris kerang 40/40 Alumunium foil single face Asesoris kerang 60/60 Bak mandi Fiber putih 60 x 60 cm
SAT
Ltr Kg Kg Kg Ltr Lb r 2,5 Ltr Bh Bh buah M' M' Bh Bh Roll Bh Bh
HARGA SATUAN
5.85 58,760.00 52,000.00 26,000.00 41,600.00 158,600.00 100,100.00 165,750.00 19,500.00 8,320,000.00 89,700.00 61,750.00 24,700.00 9,100.00 546,000.00 12,350.00 208,000.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
No
URAIAN
A
BAHAN BANGUNAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
Ai r Additive adibond Alkabon Alkaplas Alkali siller Asbes gelombang besar uk. 3,00 m Acrylic sending sealer Ampere meter Anker Bar AC 1 PK ex Panasonic + Accessories Alumunium frame pintu 1" x 4" brown ex. Indall Alumunium frame 1" x 2" brown ex. Indall Asesoris bola besi dia. 3 " Asesoris kerang 40/40 Alumunium foil single face Asesoris kerang 60/60 Bak mandi Fiber putih 60 x 60 cm Batu Belah Batu bata merah Batu palimanan natural Batu Candi 15x30 Batu Alam Acak Batu Alam Acak Cirebon Batu kerikil warna ( ampyang butiran kecil ) Batu kerikil warna ( ampyang butiran besar ) Batu Terracota 5x20 Be Bendrat Besi beton polos Besi beton ulir Baja profil WF Besi profil C Besi profil L Besi plat Besi virkan Beton ready mix K- 250 Beton ready mix K- 275 Beton ready mix B0 Bambu untuk andang L= 4 - 5 m Box Panel 50 X 70 X 20 , 2mm Box Panel 40 X 60 X 20 , 2mm Box Panel 60 X 80 X 20 , 2mm BC BC 16 mm BC BC 25 mm BC BC 35 mm BC BC 50 mm Bak kontrol uk. 45 x 45 x 60 cm Baut angkur dia. 11/4" panjang 16" Baja ringan profil C, t = 75 mm, p = 6 m Baja ringan profil C, t = 65 mm, p = 6 m Baja ringan profil U, t=30 mm, p = 6 m Baja ringan profil U, t=50 mm, p = 6 m Baja ringan profil U, t=70 mm, p = 6 m Coating batu alam ex propan Coating Pu Cat besi emco
SAT
Ltr Kg Kg Kg Ltr Lb r 2,5 Ltr Bh Bh buah M' M' Bh Bh Roll Bh Bh M³ Bh M² M² M² M² Kg Kg M² Kg Kg Kg Kg Kg Kg Kg Kg M³ M³ M³ Btg Bh Bh Bh M' M' M' M' M' Kg Ljr Ljr Ljr Ljr Ljr Kg Kg Kg
HARGA SATUAN
5.85 58,760.00 52,000.00 26,000.00 41,600.00 158,600.00 100,100.00 165,750.00 19,500.00 8,320,000.00 89,700.00 61,750.00 24,700.00 9,100.00 546,000.00 12,350.00 208,000.00 166,750.00 580.00 174,000.00 174,000.00 73,225.00 100,050.00 5,510.00 7,250.00 94,250.00 18,850.00 10,150.00 10,150.00 17,400.00 17,400.00 15,805.00 15,950.00 20,300.00 696,000.00 710,500.00 616,250.00 24,700.00 919,100.00 626,600.00 1,254,500.00 16,900.00 27,300.00 37,700.00 52,000.00 680,050.00 36,250.00 182,700.00 158,050.00 65,250.00 82,650.00 120,350.00 74,965.00 725,000.00 58,000.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
No 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107
URAIAN Cat dasar Alkali / Undercoat Cat kayu emco Cat exterior Weathercoat "Mowilex" Cat exterior Weathershield "DULUX" Cat Interior "Cendana" Cat Dasar Tembok Cat Interior "Catylac" Cat meni besi / Zincromate ex. Pedang Cat meni kayu ex. Pedang Clamp dia. 5 mm Conector Dempul kayu ex. Propan Door closer ex. Doorma Dynabolt dia. 12 mm x 80 mm Engsel pintu uk. 12 cm SOLID Engsel jendela uk. 6 cm SOLID Engsel jendela uk. 12 cm SOLID Engsel pintu uk. 12 cm DEKSON Engsel jendela uk. 6 cm DEKSON Engsel casement alumunium Engsel floor hinge ex. DEKSON Endplate/angkur t: 5mm Elektroda baja (kawat las) RD 26 Fabrikasi & Instalasi Rangka hollow Fitting lampu bulat ex broco Finishing OCP Floor drain Stainless ex Toto TX1AN Fuse Floor Drain Lotus Fleksi Coating warna hitam Fleksi Coating warna hijau Fleksi Coating warna Merah Grendel tanam ex. SOLID Grendel pintu ex. SOLID Grendel jendela ex. SOLID Gate valp 3/4" EX. Kitz Granite 60 x 60 "Weidoli" warna terang Granite 60 x 60 "Weidoli" warna gelap Granite 60 x 60 Granit Cina warna terang Granite 60 x 60 Granit Cina warna Gelap Granite 60 x 60 "Hugo" warna terang Granite 60 x 60 "Hugo" warna gelap Granite 60 x 60 "Ezenza" warna terang Granite 60 x 60 "Ezenza" warna gelap Gypsum board 120 x 240 x 0,9 cm ex. Jayaboard Gypsum board 120 x 240 x 0,9 cm ex. Elephant Gipsum Jayabelt 120 x 240 x 12 mm Grill besi siku 40.40 Genteng ex goodyear type maridional/portugese Genteng nok ex goodyear Hak angin (Sikutan), ex. SOLID Handle Stainless steel L = 60 cm (standart) Handle Stainless steel L = 30 cm (standart) Ijuk Jarum keras 6 mm Jarum keras 12 mm
SAT Kg Kg Ltr Ltr Kg Kg Kg Kg Kg Bh Bj Kg Set Bh Psng Psng Psng Psng Psng Bh Set Bh Kg M' Bh Kg Bh Bh Bh M² M² M² Bh Bh Bh Bh M² M² M² M² M² M² M² M² Lb r Lb r Lb r Bh Bh Bh Psg Psg Psg Kg Bh Bh
HARGA SATUAN 67,135.00 70,760.00 87,000.00 130,500.00 36,250.00 28,855.00 27,550.00 31,900.00 31,900.00 870.00 260.00 61,100.00 894,400.00 9,100.00 112,060.00 74,750.00 124,800.00 107,900.00 58,500.00 158,600.00 2,275,000.00 39,000.00 58,500.00 2,600.00 15,600.00 3,250.00 107,900.00 104,000.00 64,350.00 78,000.00 183,300.00 46,150.00 127,010.00 126,100.00 119,600.00 234,000.00 309,400.00 341,900.00 16,120.00 297,700.00 149,500.00 183,300.00 351,000.00 501,800.00 97,110.00 102,700.00 417,300.00 417,300.00 6,240.00 11,700.00 37,310.00 672,750.00 585,000.00 29,900.00 49,400.00 89,700.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
No 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 131 132 133 134 135 136 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161
URAIAN Klem PVC D-3" s.d 4" Kansteen uk. 15 x 40 x 50 cm Kansteen uk. 15 x 25 x 40 cm Kalsiplank 2/30 Karet tutup dia 5 mm Kaca bening 12 mm, Tempered Kaca bening 5 mm Asahi mas Kaca es 5 mm Kaca rayben 5 mm Kalsiboard 4,5 mm ex. Varia Usaha Gresik Kalsiboard 9 mm ex. Varia Usaha Gresik Kayu meranti balok Kayu meranti papan Kayu meranti Campur Kayu Dolken D-7 cm Kayu Jati Papan ex. Bojonegoro Kualitas Hara Kayu Jati Papan ex. Bojonegoro Kualitas Hara Ukiran Kayu Jati Balok ex. Bojonegoro Kualitas Hara Kayu Kruing Balok Kayu Kruing Papan Kayu Kamfer Balok Kayu Kamfer Papan Kawat ayam Kawat Berduri Kawat Nyamuk Besi Kawat Harmonika Kawat Penggantung Kuas 4" Kertas gosok Keramik roman 10 x 20 Keramik roman 20 x 20 Keramik roman 20 x 25 Keramik roman 30 x 30 Keramik roman 40 x 40 polos Keramik roman 40 x 40 anti selip Keramik Asia Tile 20 x 20 Keramik Asia Tile 20 x 25 Keramik Asia Tile 30 x 30 Polos Keramik Asia Tile 30 x 30 anti selip Keramik Asia Tile 40 x 40 polos Keramik Asia Tile 40 x 40 anti selip Kran air 1/2" - 3/4" ex. TOTO Kran air 5/8" ex. TOTO Kran air wastafel, Dupon Kunci pintu 2 x putar, Dexon Kunci pintu 2 x putar, SOLID Kunci pintu KM, Stainless steel ex. SOLID Kunci pintu KM, Stainless steel ex. LOCO Kunci pintu alumunium, Stainless steel ex. SOLID Kunci kait jendela alumunium Kunci Tanam ex. SOLID Kusen Alumunium 4"x 1,00mm ex. Indall Silver Kusen Alumunium 4"x 1,00mm ex. Indall Brown Kusen Alumunium 4"x 1,20mm ex. YKK Silver Kusen Alumunium 4"x 1,20mm ex. YKK Brown Kloset duduk ex Toto warna terang
SAT Bh Bh Bh Ljr Bh M² M² M² M² Lb r Lb r M³ M³ M³ Btg M³ M³ M³ M³ M³ M³ M³ M² M' M² M² Bj Bh Lb r M' M² M² M² M² M² M² M² M² M² M² M² Bh Bh Bh Bh Bh Bh Bh Bh Psg Psg M' M' M' M' Bh
HARGA SATUAN 7,800.00 28,600.00 22,750.00 107,900.00 780.00 1,794,000.00 116,610.00 138,970.00 143,000.00 97,110.00 175,500.00 5,785,650.00 6,376,500.00 3,685,500.00 22,750.00 121,968,000.00 121,968,000.00 97,574,400.00 8,250,000.00 8,800,000.00 11,275,000.00 12,210,000.00 67,600.00 4,160.00 29,900.00 88,400.00 910.00 29,900.00 3,900.00 6,960.00 84,100.00 85,550.00 85,550.00 94,250.00 101,500.00 59,450.00 75,110.00 51,475.00 65,540.00 83,375.00 92,075.00 141,700.00 218,400.00 325,000.00 520,000.00 542,750.00 422,500.00 501,800.00 617,500.00 49,400.00 406,900.00 100,100.00 109,200.00 208,000.00 226,200.00 2,509,000.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
No 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217
URAIAN Kloset duduk ex Toto warna gelap Kloset jongkok ex INA warna terang Kloset jongkok ex INA warna gelap Kabel NYM 2 X 2,5 mm ex. Supreme Kabel NYM 3 X 2,5 mm ex. Supreme Kabel NYY 4 X 16 mm ex. Supreme Kabel NYY 4 X 6 mm ex. Supreme Kabel NYY 4 X 10 mm ex. Supreme Kabel Telepon ITC 4 x 0,6 ex. Focus (indoor) Karpet Nobel Tebal 5 cm Koral / split uk. 1 - 2 cm Koral / split uk. 2 - 3 cm List plafond gypsum 12 cm Lampu downligh (Armateur) 4" Phillips Lampu Esential SL 8 - 23 watt Phillips Lampu Genie SL 13 - 23 watt Phillips Lampu Genie SL 25 - 40 watt Phillips Lampu + Reflector RMI 2 X 20 watt Phillips/SAKA Lampu RMI 2 X 60 watt Phillips Lampu RMI 2 X 400 watt Phillips Lampu RMI 2 X 500 watt Phillips Lampu baret ring 20 watt ex. Artolite Lampu baret ring 40 watt ex. Artolite Lampu downligth 25 watt Lampu TL 40 watt Philips Lampu TL 2 x 18 watt Saka Lampu spot Phillips 150 watt Lem kayu ex. Rajawali Minyak Bekisting Minyak cat/Thinner B Minyak cat/Thinner A Minyak solar Minyak pelumas Multiplek 18 mm Multiplek 12 mm Multiplek 9 mm Mur baut dia. 8 mm x 10 mm OCP (elektro plating) Paving stone t=6 cm, K-300 Paving stone t=8 cm, K-400 Pa P asir cor Pasir pasang Pa P asir urug Portland Cement (PC) gresik Portland Cement (PC) putih tiga roda Plamir kayu ex. PEDANG Plamir tembok Plitur Jadi Paku Patch Fitting pintu tempered Patch Fitting kaca tempered Pintu PVC + kusen komplit Plafond gypsum rangka metal furing Pi P ilot lamp Pipa Hitam dia 3" Pipa Hitam dia 2,5"
SAT Bh Bh Bh M' M' M' M' M' M' M² M³ M³ M' Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Kg Ltr Ltr Ltr Ltr Ltr Lb r Lb r Lb r Bh Kg M² M² M³ M³ M³ Kg Kg Kg Kg Ltr Kg set set Bh M² Bh lj lj
HARGA SATUAN 2,616,250.00 227,500.00 251,550.00 11,050.00 15,730.00 130,000.00 50,700.00 74,750.00 3,900.00 162,500.00 292,500.00 224,250.00 14,950.00 59,800.00 50,700.00 54,600.00 78,000.00 357,500.00 312,000.00 1,885,000.00 4,875,000.00 468,000.00 585,000.00 293,800.00 104,000.00 534,300.00 292,500.00 19,500.00 19,500.00 14,300.00 15,600.00 7,800.00 45,500.00 257,400.00 189,800.00 175,500.00 780.00 3,900.00 65,250.00 83,375.00 130,500.00 130,500.00 87,000.00 1,558.75 2,900.00 28,600.00 15,600.00 84,500.00 29,250.00 5,850,000.00 3,575,000.00 416,000.00 100,100.00 26,000.00 1,696,500.00 833,750.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
No 218 219 219 220 221 222 223 224 225 226 227 228 229 230 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 261 262 262 263 264 265 266 267 268 269
URAIAN Pipa Stainless Stell dia 3" Pipa Stainless Stell dia 2" Pipa hollow 30 x 60 x 1,6 mm Pipa hollow 60 x 60 x 1,6 mm Pipa hollow 15 x 30 x 1,2 mm Pipa hollow 20 x 40 x 1,2 mm Pipa hollow 40 x 40 x 1,5 mm Pipa Stainless Stell 50x50 tbl 1,0 Plat strip 3/4" x 4 mm Pipa BSP dia. 2" Pipa BSP dia. 2,5" Pipa Besi dia. 4" Plat besi tbl. 1,2 mm Plat Siku 40.40.4 Pipa air bersih PVC 1/2" AW ex. Maspion Pipa air bersih PVC 3/4" AW ex. Maspion Pipa air bersih PVC 5/8" AW ex. Maspion Pipa air bersih PVC 1" AW ex. Maspion Pipa air kotor PVC 4 " D ex. Maspion Pipa air kotor PVC 3 " D ex. Maspion Pipa air kotor PVC 2 " D ex. Maspion Pipa RCP Variant Ø 400 mm Pipa RCP Variant Ø 500 mm Pipa RCP Variant Ø 600 mm Pipa RCP Variant Ø 700 mm Pipa RCP Variant Ø 800 mm Pipa RCP Variant Ø 900 mm Pipa RCP Variant Ø 1000 mm Pipa RCP Variant Ø 1100 mm Pipa RCP Variant Ø 1500 mm Polykarbonat 2,1 x 11 (Twinlite) Palem sadeng Palem putri Profil GRC Ring kaki rangka 40/40 Ring kaki rangka 60/60 Rangka plafond profil U Rangka plafond profil Hollow ring kaki rangka 40/40 ring kaki rangka 60/60 Rolling Door Rolling Grill Roster / Terawang 12X11X24 Rumput Slink PVC dia 5 mm Semen Warna Seng TBL 0,3 mm, l = 90 cm Srew Sr Srew drill Se S eal tape Se S ealent Selector switch Saklar Tunggal ex. BROCO Type Gracio Saklar Ganda ex. BROCO Type Gracio Stop kontak ex. Broco Semen Nat ex. MU
SAT lj lj lj lj lj lj lj lj lj lj lj lj lb r Kg Ljr Ljr Ljr Ljr Ljr Ljr Ljr M' M' M' M' M' M' M' M' M' 1 Lbr Phn Phn m' bh bh lj lj p cs p cs M² Bh Bh M³ M' Kg M' Bj Bj Roll Tube Bh Bh Bh Bh Kg
HARGA SATUAN 1,160,000.00 833,750.00 275,500.00 377,000.00 142,100.00 181,250.00 246,500.00 358,875.00 142,100.00 783,000.00 1,087,500.00 12,977,500.00 1,232,500.00 35,100.00 30,160.00 32,500.00 36,400.00 39,000.00 124,800.00 113,100.00 91,000.00 273,000.00 343,200.00 436,800.00 650,000.00 767,000.00 1,106,300.00 1,227,200.00 1,430,000.00 2,600,000.00 2,730,000.00 975,000.00 546,000.00 208,000.00 28,600.00 36,920.00 65,000.00 75,400.00 33,800.00 42,900.00 715,000.00 975,000.00 7,800.00 22,100.00 13,000.00 3,250.00 58,500.00 260.00 4,160.00 7,410.00 37,310.00 126,100.00 29,900.00 33,540.00 24,050.00 14,300.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
No 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307
URAIAN Shower Jet ex. DUPON Sirtu Saluran Buis beton U-30 cm Saluran Buis beton U-20 cm Saluran Buis beton O-30 cm Saluran Buis beton O-20 cm Split penangkal petir Sekrup asbes Sekrup Fixer Serat Fiber Si S ika Latex Sika Rainted Tempat sabun Amstad Tanah urug Tanah Katel Tandon air stainless steel 1000 ltr ex. Maspion Thiner Volt meter Wastafel ex Toto LW 587 J Water profing sika Water profing sika rainted Wood Filler Wo W ood Stain Shanding Sealer Thiner Super Top Coating Tripleks Lapis Aluminium Zincromate ex danapaint Sewa concret pump Sewa concret mixer Sewa Alat Bantu Sewa Dump Truck Sewa Mesin Las Sewa Pump Water Sewa scafolding Sewa Vibrator Sewa Stamper Sewa Welding Set
SAT Bh M³ M' M' M' M' Bh Bh Bh Lbr Kg Kg Bh M³ M³ Bh Ltr Bh Bh M² M² kg kg kg Ltr kg Lbr Kg Jam Jam Jam Jam Jam Jam Unit/bln Jam Jam Jam
HARGA SATUAN 273,000.00 91,000.00 111,800.00 96,200.00 130,000.00 109,200.00 546,000.00 1,170.00 1,040.00 11,050.00 49,660.00 149,500.00 26,000.00 78,000.00 104,000.00 3,737,500.00 31,200.00 166,400.00 754,000.00 75,400.00 124,800.00 56,550.00 66,950.00 68,250.00 29,250.00 68,250.00 104,000.00 58,500.00 325,000.00 422,500.00 6,500.00 325,000.00 182,000.00 162,500.00 58,500.00 84,500.00 84,500.00 227,500.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
No
URAIAN
B
TENAGA KERJA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Mandor Kepala tukang kayu Kepala tukang batu Kepala tukang besi Kepala tukang cat / plitur Kepala tukang baja Kepala tukang Las Kepala tukang gali Kepala tukang listrik Kepala tukang pipa Kepala tukang aluminium Tukang kayu Tukang batu Tukang besi Tukang Aluminium Tukang baja Tukang Las Tukang cat / plitur Tukang gali Tukang listrik Tukang pipa Pekerja
SAT
HARGA SATUAN
Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr Org / Hr
Surabaya, 28 April 2011 PT. WASKITA KARYA (Persero) CABANG JAWA TIMUR
Ir. PIUS SUTRISNO Kepala Cabang
66,000.00 60,500.00 60,500.00 60,500.00 60,500.00 66,000.00 66,000.00 55,000.00 55,000.00 55,000.00 55,000.00 55,000.00 55,000.00 55,000.00 49,500.00 60,500.00 60,500.00 49,500.00 49,500.00 46,200.00 46,200.00 41,800.00
ANALISA HARGA SATUAN SATUAN BAHAN DAN UPAH Kegiatan Pekerjaan Lokasi Tahun Anggaran
1
: Universitas Negeri Malang : Belanja Modal Gedung Dan Bangunan Berupa Pembangunan Tribun Penunjang Graha Cakrawala : Kampus Universitas Negeri Malang Jl. Semarang No. 05 Malang : 2011
1 M2 Pas. Keramik 20/20
No. 1
2
Jenis Tenaga & Bahan Bahan Keramik 20/20 Semen portland Semen warna Pasir pasang Tenaga Mandor Kep. Tukang batu Tukang batu Pekerja
Harga Satuan Rp
Satuan
1.0500 10.4000 1.6200 0.0450
M2 Kg Kg M3
84,100.00 1,558.75 14,300.00 130,500.00
88,305.00 16,211.00 23,166.00 5,872.50 133,554.50
0.0350 0.0350 0.3500 0.7000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,310.00 2,117.50 19,250.00 29,260.00 52,937.50
Harga Satuan per M2 Dibulatkan 2
Jumlah Harga Rp
Kuantitas
186,492.00 186,492.00
1 M2 Pas. Keramik 20/25
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Keramik 20/25 Semen portland Semen warna Pasir pasang
1.0500 9.3000 1.9400 0.0180
M2 Kg Kg M3
85,550.00 1,558.75 14,300.00 130,500.00
89,827.50 14,496.38 27,742.00 2,349.00 134,414.88
Tenaga Mandor Kep. Tukang batu Tukang batu Pekerja
0.0450 0.0450 0.4500 0.9000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,970.00 2,722.50 24,750.00 37,620.00 68,062.50
Harga Satuan per M2 Dibulatkan
202,477.38 202,477.00
3
1 M2 Pas. Pas. Kera Kerami mik k 40/40 /40 Inte Interrior ior
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Keramik 40/40 Semen portland Semen warna Pasir pasang
1.0500 6.4800 1.5000 0.0190
M2 Kg Kg M3
94,250.00 1,558.75 14,300.00 130,500.00
98,962.50 10,100.70 21,450.00 2,479.50 132,992.70
Tenaga Mandor Kep. Tukang batu Tukang batu Pekerja
0.0350 0.0400 0.4000 0.7000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,310.00 2,420.00 22,000.00 29,260.00 55,990.00
Harga Satuan per M2 Dibulatkan 4
Jumlah Harga Rp
188,982.70 188,982.00
1 M2 Pas. Granito 40/40
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Granito 40/40 Semen Portland Semen warna Pasir Pasang
1.0500 6.4800 1.5000 0.0190
M2 Kg Kg M3
309,400.00 1,558.75 14,300.00 130,500.00
324,870.00 10,100.70 21,450.00 2,479.50 358,900.20
Tenaga Mandor Kep. Tukang batu Tukang batu Pekerja
0.0350 0.0400 0.4000 0.7000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,310.00 2,420.00 22,000.00 29,260.00 55,990.00
Harga Satuan per M2 Dibulatkan 5
Jumlah Harga Rp
414,890.20 414,890.00
1 M2 Pas. Pas. keram eramik ik 40/40 Exte Exteri rior or
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Keramik 40/40 Semen Portland Semen warna Pasir Pasang
1.0500 6.4800 1.5000 0.0190
M2 Kg Kg M3
101,500.00 1,558.75 14,300.00 130,500.00
106,575.00 10,100.70 21,450.00 2,479.50 140,605.20
Tenaga Mandor Kep. Tukang batu Tukang batu Pekerja
0.0350 0.0400 0.4000 0.7000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,310.00 2,420.00 22,000.00 29,260.00 55,990.00
Harga Satuan per M2 Dibulatkan
196,595.20 196,595.00
6
1 M2 Pas. Pas. keram eramik ik 40/40 Pola Pola lant lantai ai
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Keramik 40/40 Semen Portland Semen warna Pasir Pasang
2.1000 6.4800 1.5000 0.0190
M2 Kg Kg M3
94,250.00 1,558.75 14,300.00 130,500.00
197,925.00 10,100.70 21,450.00 2,479.50 231,955.20
Tenaga Mandor Kep. Tukang batu Tukang batu Pekerja
0.0350 0.0400 0.4000 0.7000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,310.00 2,420.00 22,000.00 29,260.00 55,990.00
Harga Satuan per M2 Dibulatkan
7
Jumlah Harga Rp
287,945.20 287,945.00
1 M' Pas. Li st st Kerami k 10/20
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Keramik 10/20 Semen Portland Semen warna Pasir Pasang
5.3000 1.1400 0.0250 0.0030
Bh Kg Kg M3
1,392.00 1,558.75 14,300.00 130,500.00
7,377.60 1,776.98 357.50 391.50 9,903.58
Tenaga Mandor Kep. Tukang batu Tukang batu Pekerja
0.0050 0.0090 0.0900 0.0900
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
330.00 544.50 4,950.00 3,762.00 9,586.50
Harga Satuan per M' Dibulatkan 8
Jumlah Harga Rp
19,490.08 19,490.00
1 Kg Besi Beton Polos
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Besi beton polos Kawat bendrat
1.0500 0.0150
Kg Kg
10,150.00 18,850.00
10,657.50 282.75 10,940.25
Upah Kerja Mandor Kepala tukang besi Tukang besi Pekerja
0.0003 0.0007 0.0070 0.0070
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
19.80 42.35 385.00 292.60 739.75
Harga Satuan per M3 Dibulatkan
11,680.00 11,680.00
21 No. 1
2
1 Kg Besi Beton Uli r Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Besi beton ulir Kawat bendrat
1.0500 0.0150
Kg Kg
10,150.00 18,850.00
10,657.50 282.75 10,940.25
Upah Kerja Mandor Kepala tukang besi Tukang besi Pekerja
0.0003 0.0007 0.0070 0.0070
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
19.80 42.35 385.00 292.60 739.75
Harga Satuan per M3 Dibulatkan
8
Jumlah Harga Rp
11,680.00 11,680.00
Bekisting Sloof
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Kayu meranti Paku biasa 2" - 5"
0.0450 0.3000
M3 Kg
3,685,500.00 29,250.00
165,847.50 8,775.00 174,622.50
Upah Kerja Mandor Kepala tukang kayu Tukang kayu Pekerja
0.0050 0.0260 0.2600 0.3000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
330.00 1,573.00 14,300.00 12,540.00 28,743.00
Harga Satuan per M2 Dibulatkan 9
Jumlah Harga Rp
203,365.50 203,365.00
Bekisting Kolom
No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kayu meranti usuk Kayu perancah meranti Kayu papan meranti Paku biasa 2" - 5"
0.0400 0.0280 0.0150 0.4000
M3 M3 M3 Kg
5,785,650.00 3,685,500.00 6,376,500.00 29,250.00
231,426.00 103,194.00 95,647.50 11,700.00 441,967.50
Upah Kerja Mandor Kepala tukang kayu Tukang kayu Pekerja
0.0060 0.0330 0.3300 0.3000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
396.00 1,996.50 18,150.00 12,540.00 33,082.50
Harga Satuan per M2 Dibulatkan
475,050.00 475,050.00
10 No. 1
2
Bekisting Balok Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Kayu meranti usuk Kayu meranti perancah Kayu papan meranti Paku biasa 2" - 5"
0.0400 0.0280 0.0180 0.4000
M3 M3 M3 Kg
5,785,650.00 3,685,500.00 6,376,500.00 29,250.00
231,426.00 103,194.00 114,777.00 11,700.00 461,097.00
Upah Kerja Mandor Kepala tukang kayu Tukang kayu Pekerja
0.0060 0.0330 0.3300 0.3200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
396.00 1,996.50 18,150.00 13,376.00 33,918.50
Harga Satuan per M2 Dibulatkan
11 No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1
2
Jumlah Harga Rp
Bahan Kayu meranti usuk Kayu meranti perancah Kayu papan meranti Paku biasa 2" - 5"
0.0400 0.0280 0.0150 0.4000
M3 M3 Lb r Kg
5,785,650.00 3,685,500.00 6,376,500.00 29,250.00
231,426.00 103,194.00 95,647.50 11,700.00 441,967.50
Upah Kerja Mandor Kepala tukang kayu Tukang kayu Pekerja
0.0060 0.0330 0.3300 0.3200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
396.00 1,996.50 18,150.00 13,376.00 33,918.50
Dibulatkan
No.
495,015.50 495,015.00
Beki st sti ng ng Pl Pl at at La Lantai
Harga Satuan per M2
12
Jumlah Harga Rp
475,886.00 475,886.00
Beki st sti ng ng Pondasi Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kayu papan meranti Paku biasa 2" - 5"
0.0150 0.4000
Lb r Kg
6,376,500.00 29,250.00
95,647.50 11,700.00 107,347.50
Upah Kerja Mandor Kepala tukang kayu Tukang kayu Pekerja
0.0060 0.0330 0.3300 0.3200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
396.00 1,996.50 18,150.00 13,376.00 33,918.50
Harga Satuan per M2 Dibulatkan
141,266.00 141,266.00
13 No. 1
2
1 M3 Spes Spesii Bet Beton on (K-2 (K-275 75)) Read Readym ymix ix Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Ready Mix Concrete Pump Teknisi
1.000 1.000 1.000
M3 M3 M3
710,500.00 325,000.00
710,500.00 325,000.00 1,035,500.00
Upah Kerja Mandor Kepala tukang batu Tukang batu Pekerja
1.000 0.035 0.350 2.000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
66,000.00 2,117.50 19,250.00 83,600.00 170,967.50
Harga Satuan per M3 Dibulatkan
14 No. 1
2
Jenis Tenaga & Bahan Bahan Semen PC Pasir cor Air Kerikil 2/3 Upah Kerja Mandor Kepala tukang batu Tukang batu Pekerja
Harga Satuan Rp
1
2
Jumlah Harga Rp
Kuantitas
Satuan
371.000 0.977 215.000 1.413
Kg M3 Ltr M3
1,558.75 130,500.00 5.85 220,000.00
578,296.25 127,524.60 1,257.75 310,959.00 1,018,037.60
1.000 0.035 0.350 2.000
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
66,000.00 2,117.50 19,250.00 83,600.00 170,967.50
Dibulatkan
No.
1,206,467.50 1,206,467.00
1 M3 M3 Spe Spesi si Beto Beton n 1 Pc : 2 Pasi Pasirr : 3 Ker Kerik ikil il
Harga Satuan per M3
15
Jumlah Harga Rp
1,189,005.10 1,189,005.00
1 M3 M3 Lan Lanta taii Kerj Kerja1 a1 Pc : 3 Pasir Pasir : 5 Keri Keriki kill Jenis Tenaga & Bahan Bahan Semen PC Pasir cor Air Kerikil 2/3 Upah Kerja Mandor Kepala tukang batu Tukang batu Pekerja
Harga Satuan Rp
Jumlah Harga Rp
Kuantitas
Satuan
230.000 1.250 200.000 1.386
Kg M3 Ltr M3
1,558.75 130,500.00 5.85 220,000.00
358,512.50 163,151.10 1,170.00 305,019.00 827,852.60
0.060 0.020 0.200 1.200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
3,960.00 1,210.00 11,000.00 50,160.00 66,330.00
Harga Satuan per M3 Dibulatkan
894,182.60 894,182.00
16 No. 1
1 M3 Beto Beton n Kolom olom 50/70 /70 Jenis Tenaga & Bahan Bahan Spesi beton Besi ulir Besi polos Bekisting Alat bantu
Kuantitas
Satuan
Harga Satuan Rp
1.000 112.450 19.990 6.860 1.000
M3 Kg Kg M2 Ls
1,189,005.10 11,680.00 11,680.00 237,525.00 10,000.00
Harga Satuan per M3 Dibulatkan 17 No. 1
Jenis Tenaga & Bahan Bahan Spesi beton Besi polos Bekisting Alat bantu
Kuantitas
Satuan
Harga Satuan Rp
1.0000 103.5600 9.9500 1.0000
M3 Kg M2 Ls
1,189,005.10 11,680.00 237,525.00 10,000.00
Dibulatkan
No. 1
4,375,325.80 4,375,325.00
Jumlah Harga Rp 1,189,005.10 1,209,580.80 2,363,373.75 10,000.00 4,771,959.65 4,771,959.65 4,771,959.00
1 M3 M3 Beto Beton n Kol Kolom om prak prakti tis s Jenis Tenaga & Bahan Bahan Spesi beton Besi polos Bekisting Alat bantu
Kuantitas
Satuan
1.0000 82.4600 12.0000 1.0000
M3 Kg M2 Ls
Harga Satuan Rp 894,182.60 11,680.00 237,525.00 10,000.00
Harga Satuan per M3 Dibulatkan 19
1 M3 M3 Beto Beton n Bal Balok ok kons konsol ol 50/6 50/60 0
No.
Jenis Tenaga & Bahan
1
1,189,005.10 1,313,416.00 233,483.20 1,629,421.50 10,000.00 4,375,325.80
1 M3 Beto Beton n Kolom olom 20/25 /25
Harga Satuan per M3
18
Jumlah Harga Rp
Bahan Spesi beton Besi ulir Besi polos Bekisting Alat bantu
Kuantitas
Satuan
Harga Satuan Rp
1.0000 74.9300 46.2300 6.9500 1.0000
M3 Kg kg M2 Ls
1,189,005.10 11,680.00 11,680.00 247,507.75 10,000.00
Harga Satuan per M3 Dibulatkan
Jumlah Harga Rp 894,182.60 963,132.80 2,850,300.00 10,000.00 4,717,615.40 4,717,615.40 4,717,615.00
Jumlah Harga Rp 1,189,005.10 875,182.40 539,966.40 1,720,178.86 10,000.00 4,334,332.76 4,334,332.76 4,334,332.00
20 No. 1
1 M3 M3 Beto Beton n Balo Balok k Lat Latai ai 15/2 15/20, 0, 15/3 15/30 0 Jenis Tenaga & Bahan Bahan Spesi beton Besi polos Bekisting Alat bantu
Kuantitas
Satuan
Harga Satuan Rp
1.0000 87.5600 7.0000 1.0000
M3 Kg M2 Ls
1,189,005.10 11,680.00 247,507.75 10,000.00
Harga Satuan per M3 Dibulatkan
21 No. 1
Jenis Tenaga & Bahan Bahan Spesi beton Besi polos Bekisting Alat bantu
Kuantitas
Satuan
Harga Satuan Rp
1.0000 86.8300 8.3300 1.0000
M3 Kg M2 Ls
1,189,005.10 11,680.00 237,943.00 10,000.00
Dibulatkan
No. 1
Jenis Tenaga & Bahan Bahan Spesi beton Besi polos Bekisting Alat bantu
Kuantitas
Satuan
Harga Satuan Rp
1.0000 118.5700 7.5000 1.0000
M3 Kg M2 Ls
1,189,005.10 11,680.00 101,682.75 10,000.00
Dibulatkan
No. 1
3,954,260.15 3,954,260.00
Jumlah Harga Rp 1,189,005.10 1,014,174.40 1,982,065.19 10,000.00 4,195,244.69 4,195,244.69 4,195,244.00
1 M3 Balok Sloof
Harga Satuan per M3
23
1,189,005.10 1,022,700.80 1,732,554.25 10,000.00 3,954,260.15
1 M3 Beto Beton n Plat/ lat/ca cano nopy py
Harga Satuan per M3
22
Jumlah Harga Rp
Jumlah Harga Rp 1,189,005.10 1,384,897.60 762,620.63 10,000.00 3,346,523.33 3,346,523.33 3,346,523.00
1 M3 Foot Plat Jenis Tenaga & Bahan Bahan Spesi beton Besi ulir Besi polos Bekisting Alat bantu
Kuantitas
Satuan
Harga Satuan Rp
1.0000 71.7100 48.8300 1.5000 1.0000
M3 Kg Kg M2 Ls
1,189,005.10 11,680.00 11,680.00 70,633.00 10,000.00
Harga Satuan per M3 Dibulatkan
Jumlah Harga Rp 1,189,005.10 837,572.80 570,334.40 105,949.50 10,000.00 2,712,861.80 2,712,861.80 2,712,861.00
24 No. 1
2
1 M3 Rabat Be Beton Jenis Tenaga & Bahan Bahan Semen portland Pasir cor Koral/split 2-3
Harga Satuan Rp
Satuan
232.000 0.520 0.780
Kg M3 M3
1,558.75 130,500.00 220,000.00
361,630.00 67,860.00 171,600.00 601,090.00
0.080 0.025 0.250 1.650
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
5,280.00 1,512.50 13,750.00 68,970.00 89,512.50
Tenaga Mandor Kepala tukang batu Tukang batu Pekerja
Harga Satuan per M3 Dibulatkan
25 No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1
2
Jumlah Harga Rp
Bahan Profil alluminium Skrup Fixer Sealant
1.100 2.000 0.060
M' Bh Tube
89,700.00 1,040.00 37,310.00
98,670.00 2,080.00 2,238.60 102,988.60
Tenaga Mandor Kepala tukang besi Tukang besi Pekerja
0.002 0.004 0.043 0.043
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
138.60 260.15 2,365.00 1,797.40 4,561.15
Dibulatkan
No.
690,602.50 690,602.00
1 M' Pasa Pasang ng Kus Kusen en Pin Pintu tu/J /Jen ende dela la Alu Alumi mini nium um
Harga Satuan per M'
36
Jumlah Harga Rp
Kuantitas
107,549.75 107,549.00
1 Bh Bh Pasa Pasang ng daun daun jend jendel ela a Alu Alumi mini nium um Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Pintu Alluminium Sealant
4.400 0.270
M' Tube
89,700.00 37,310.00
394,680.00 10,073.70 404,753.70
Tenaga Mandor Kepala tukang besi Tukang besi Pekerja
0.005 0.009 0.085 0.085
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
330.00 544.50 4,675.00 3,553.00 9,102.50
Harga Satuan per M2 Dibulatkan
413,856.20 413,856.00
27 No. 1
2
1 Bh Bh Pasa Pasang ng pint pintu u lapi lapis s mul multi tipl plek eks s Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Papan kayu Paku 1-2,5cm Multipleks 5mm Lem kayu
0.026 0.030 1.000 0.500
M3 Kg lb r Kg
6,376,500.00 29,250.00 114,075.00 19,500.00
163,238.40 877.50 114,075.00 9,750.00 287,940.90
Tenaga Mandor Kepala tukang kayu Tukang kayu Pekerja
0.040 0.240 2.400 0.800
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,640.00 14,520.00 132,000.00 33,440.00 182,600.00
Harga Satuan per M2 Dibulatkan
28 No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1
2
Jumlah Harga Rp
Bahan Kaca 5mm
1.1000
M2
116,610.00
128,271.00 128,271.00
Tenaga Mandor Kepala tukang kayu Tukang kayu Pekerja
0.0008 0.0150 0.1500 0.0150
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
49.50 907.50 8,250.00 627.00 9,834.00
Dibulatkan
No.
470,540.90 470,540.00
1 M2 Pasa Pasang ng Kaca aca Teba Teball 5mm
Harga Satuan per M2
29
Jumlah Harga Rp
138,105.00 138,105.00
1 M2 Pasa Pasang ng Kaca aca Teba Teball 8mm Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Kaca 8mm
1.1000
M2
145,762.50
160,338.75 160,338.75
Tenaga Mandor Kepala tukang kayu Tukang kayu Pekerja
0.0008 0.0165 0.1650 0.0165
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
52.80 998.25 9,075.00 689.70 10,815.75
Harga Satuan per M2 Dibulatkan
171,154.50 171,154.00
30 No. 1
2
1 M2 Pasang Kaca Es Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Kaca 8mm
1.1000
M2
173,712.50
191,083.75 191,083.75
Tenaga Mandor Kepala tukang kayu Tukang kayu Pekerja
0.0008 0.0150 0.1500 0.0150
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
49.50 907.50 8,250.00 627.00 9,834.00
Harga Satuan per M2 Dibulatkan 31 No. 1
2
Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
1
2
Jumlah Harga Rp
Bahan Kayu kaso Paku
0.016 0.250
M' Kg
8,250,000.00 29,250.00
134,475.00 7,312.50 141,787.50
Tenaga Mandor Kepala tukang kayu Tukang kayu Pekerja
0.010 0.030 0.300 0.200
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
660.00 1,815.00 16,500.00 8,360.00 27,335.00
Dibulatkan
No.
200,917.75 200,917.00
1 M2 M2 Pas Pasan ang g ran rangk gka a pla plafo fond nd
Harga Satuan per M2
32
Jumlah Harga Rp
169,122.50 169,122.00
1 M2 Gypsum board 9mm Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Gypsumboard 9mm Paku
0.364 0.010
Lb r Kg
102,700.00 29,250.00
37,382.80 292.50 37,675.30
Tenaga Mandor Kepala tukang kayu Tukang kayu Pekerja
0.040 0.080 0.800 0.800
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
2,640.00 4,840.00 44,000.00 33,440.00 84,920.00
Harga Satuan per M2 Dibulatkan
122,595.30 122,595.00
33 No. 1
2
1 M2 Cat Cat dindi dinding ng dalam dalam (int (inter erior ior)) Mowi Mowile lex x Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Plamur tembok Cat dasar Cat penutup 2 x
0.1000 0.1000 0.2600
Kg Kg Kg
15,600.00 28,855.00 36,250.00
1,560.00 2,885.50 9,425.00 13,870.50
Tenaga Tukang Cat Kepala Tukang Cat Pekerja Mandor
0.0630 0.0063 0.0200 0.0025
Oh Oh Oh Oh
49,500.00 60,500.00 41,800.00 66,000.00
3,118.50 381.15 836.00 165.00 4,500.65
Harga Satuan per M2
18,371.15 Dibulatkan
34 No. 1
2
No. 1
2
18,371.00
1 M2 Cat Cat Temb Tembok ok luar luar Weat Weathe herc rcoa oatt Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan
Jumlah Harga
Rp
Rp
Bahan Plamur dasar Cat dasar Cat penutup 2 x
0.1000 0.1000 0.2600
Kg Kg Kg
15,600.00 67,135.00 87,000.00
1,560.00 6,713.50 22,620.00 30,893.50
Tenaga Tukang Cat Kepala Tukang Cat Pekerja Mandor
0.0630 0.0063 0.0200 0.0025
Oh Oh Oh Oh
49,500.00 60,500.00 41,800.00 66,000.00
3,118.50 381.15 836.00 165.00 4,500.65
Dibulatkan
35,394.00
Harga Satuan per M2
35
Jumlah Harga Rp
35,394.15
1 M2 C at at Plafond Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan
Jumlah Harga
Rp
Rp
Bahan Plamur tembok Cat dasar Cat penutup 2 x
0.1000 0.1000 0.2600
Kg Kg Kg
15,600.00 28,855.00 36,250.00
1,560.00 2,885.50 9,425.00 13,870.50
Tenaga Tukang Cat Kepala Tukang Cat Pekerja Mandor
0.0630 0.0063 0.0200 0.0025
Oh Oh Oh Oh
49,500.00 60,500.00 41,800.00 66,000.00
3,118.50 381.15 836.00 165.00 4,500.65
Harga Satuan per M2
18,371.15 Dibulatkan
18,371.00
36 No. 1
2
1 M2 C at at Plincol Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Bahan Plamur Cat dasar Cat penutup 2 x
0.1500 0.1700 0.2600
Kg Kg Kg
28,600.00 31,900.00 70,760.00
4,290.00 5,423.00 18,397.60 28,110.60
Tenaga Tukang Cat Kepala Tukang Cat Pekerja Mandor
0.0090 0.0060 0.0700 0.0025
Oh Oh Oh Oh
49,500.00 60,500.00 41,800.00 66,000.00
445.50 363.00 2,926.00 165.00 3,899.50 32,010.10 32,010.00
Harga Satuan per M2 Dibulatkan 37
1 M' M' Pas Pasan ang g Pip Pipa a PVC PVC AW f 1/2 1/2" "
No.
Jenis Tenaga & Bahan
1
2
Kuantitas
Satuan
Harga Satuan Rp
1.200 0.350
M' Ls
5,026.67 603.20
6,032.00 211.12 6,243.12
Tenaga Mandor Kepala tukang batu Tukang batu Pekerja
0.002 0.006 0.060 0.036
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
132.00 363.00 3,300.00 1,504.80 5,299.80
Dibulatkan
38
1 M' M' Pas Pasan ang g Pip Pipa a PVC PVC AW f 3/4 3/4" "
No.
Jenis Tenaga & Bahan
2
Jumlah Harga Rp
Bahan Pipa PVC AW f 1/2" Aksesoris
Harga Satuan per M'
1
Jumlah Harga Rp
Kuantitas
Satuan
Harga Satuan Rp
11,542.92 11,542.00
Jumlah Harga Rp
Bahan Pipa PVC AW f 3/4" Aksesoris
1.200 0.350
M' Ls
5,416.67 650.00
6,500.00 227.50 6,727.50
Tenaga Mandor Kepala tukang batu Tukang batu Pekerja
0.002 0.006 0.060 0.036
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
132.00 363.00 3,300.00 1,504.80 5,299.80
Harga Satuan per M' Dibulatkan
12,027.30 12,027.00
39 No. 1
2
1 M' M' Pas Pasan ang g Pip Pipa a PV PVC AW AW f 3" Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Pipa PVC AW f 3" Aksesoris
1.200 0.350
M' Ls
18,850.00 2,262.00
22,620.00 791.70 23,411.70
Tenaga Mandor Kepala tukang batu Tukang batu Pekerja
0.002 0.006 0.060 0.036
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
132.00 363.00 3,300.00 1,504.80 5,299.80
Harga Satuan per M'
28,711.50 28,711.00
Dibulatkan 40 No. 1
2
1 M' M' Pas Pasan ang g Pip Pipa a PV PVC AW AW f 4" Jenis Tenaga & Bahan
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
Bahan Pipa PVC AW f 4" Aksesoris
1.200 0.350
M' Ls
20,800.00 2,496.00
24,960.00 873.60 25,833.60
Tenaga Mandor Kepala tukang batu Tukang batu Pekerja
0.002 0.006 0.060 0.036
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
132.00 363.00 3,300.00 1,504.80 5,299.80
Harga Satuan per M'
31,133.40 31,133.00
Dibulatkan
41 No. 1
2
1 M2 M2 Pas Pasan ang g Pav Pavin ing g Sto Stone ne (blo (blok) k) Jenis Tenaga & Bahan Bahan Paving stone Pasir pasang Tenaga Mandor Kepala tukang batu Tukang batu Pekerja
Kuantitas
Satuan
Harga Satuan Rp
Jumlah Harga Rp
33.000 0.035
Bh M3
1,667.50 130,500.00
55,027.50 4,567.50 59,595.00
0.025 0.025 0.250 0.500
Oh Oh Oh Oh
66,000.00 60,500.00 55,000.00 41,800.00
1,650.00 1,512.50 13,750.00 20,900.00 37,812.50
Harga Satuan per M' Dibulatkan
97,407.50 97,407.00
Surabaya, 28 April 2011 PT. WASKITA KARYA (Persero) CABANG JAWA TIMUR
Ir. PIUS SUTRISNO
Kepala Cabang
ANALISA HARGA SATUAN BAHAN DAN UPAH Kegiatan Pekerjaan Lokasi Tahun Anggaran
1 2 3 4 5 6 7 8 21 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 36 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
: Universitas Negeri Malang : Belanja Modal Gedung Dan Bangunan Berupa Pembangunan Tribun Penunjang Graha Cakrawala : Kampus Universitas Negeri Malang Jl. Semarang No. 05 Malang : 2011
1 M2 Pas. Keramik 20/20 1 M2 Pas. Keramik 20/25 1 M2 Pas. Kerami ramik k 40/4 0/40 Inte Interi rior or 1 M2 P as as. Granito 40/40 1 M2 Pas. kera kerami mik k 40/4 0/40 Exterio erior r 1 M2 Pas. kera kerami mik k 40/4 0/40 Pola lant lantai ai 1 M' P a as s. Li st st Keramik 10/20 1 Kg Besi Beton Polos 1 Kg Kg Be Besi Be Beton Ulir Bekisting Sloof Bekisting Kolom Bekisting Ba Balok Bek is isting Pl Plat La Lantai Bekisting Po Pondasi 1 M3 M3 Spe Spesi si Beto Beton n (K(K-27 275) 5) Read Readym ymix ix 1 M3 M3 Spe Spesi si Beto Beton n 1 Pc : 2 Pasi Pasirr : 3 Ker Kerik ikil il 1 M3 M3 Lan Lanta taii Ker Kerja ja1 1 Pc Pc : 3 Pas Pasir ir : 5 Ker Keriki ikill 1 M3 M3 Beton Kolom 50/70 1 M3 M3 Beton Kolom 20/25 1 M3 Beton ton Kolom olom prakt raktis is 1 M3 M3 Be Beton ton Bal Balok ok kon konsol sol 50 50/60 /60 1 M3 M3 Bet Beton on Balo Balok k Lat Latai ai 15/2 15/20, 0, 15/3 15/30 0 1 M3 M3 Be Beton Pl Plat/canopy 1 M3 Balok Sloof 1 M3 Foot Plat 1 M3 Rabat Beton 1 M' M' Pas Pasan ang g Kus Kusen en P Pin intu tu/J /Jen ende dela la Alum Alumin iniu ium m 1 Bh Bh Pas Pasan ang gd dau aun n jend jendel ela a Alu Alumi mini nium um 1 Bh Bh Pas Pasan ang g pin pintu tu lapi lapis s mul multi tipl plek eks s 1 M2 Pasan sang Kaca Teba Teball 5mm 5mm 1 M2 Pasan sang Kaca Teba Teball 8mm 8mm 1 M2 P as asang Kaca Es 1 M2 M2 Pa Pasang sang rang rangka ka plafo lafon nd 1 M2 Gypsum boar d 9mm 1 M2 Cat Cat dind dindin ing g dala dalam m (int (inter erio ior) r) Mow Mowilex ilex 1 M2 Cat Cat Temb Tembok ok luar luar Weat Weathe herc rcoa oatt 1 M2 Ca Cat Plafond 1 M2 Ca Cat Plincol 1 M' M' Pa Pasang sang Pipa ipa PV PVC AW AW f 1/ 1/2" 1 M' M' Pa Pasang sang Pipa ipa PV PVC AW AW f 3/ 3/4" 1 M' M' Pasang sang Pipa ipa PVC AW f 3" 1 M' M' Pasang sang Pipa ipa PVC AW f 4" 1 M2 M2 Pas Pasan ang g Pav Pavin ing g Sto Stone ne (blo (blok) k)
Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan Dibulatkan
186,492.00 202,477.00 188,982.00 414,890.00 196,595.00 287,945.00 19,490.00 11,680.00 11,680.00 203,365.00 475,050.00 495,015.00 475,886.00 141,266.00 1,206,467.00 1,189,005.00 894,182.00 4,375,325.00 4,771,959.00 4,717,615.00 4,334,332.00 3,954,260.00 4,195,244.00 3,346,523.00 2,712,861.00 690,602.00 107,549.00 413,856.00 470,540.00 138,105.00 171,154.00 200,917.00 169,122.00 122,595.00 18,371.00 35,394.00 18,371.00 32,010.00 11,542.00 12,027.00 28,711.00 31,133.00 97,407.00
Surabaya, 28 April 2011 PT. WASKITA KARYA (Persero) CABANG JAWA TIMUR
Ir. PIUS SUTRISNO Kepala Cabang -
REKAPITULASI RENCANA ANGGARAN BIAYA KEGIATAN PEKE PEKERJ RJAA AAN N TAHU TAHUN N ANGG ANGGAR ARAN AN LOKASI
: UNIVERSITAS NEGERI MALANG : BEL BELAN ANJA JA MODA MODAL L GED GEDUN UNG G DAN DAN BANG BANGUN UNAN AN BERU BERUPA PA PERE PERENC NCAN ANAA AAN N PEM PEMAS ASAN ANGA GAN N ELE ELEK KTRIK TRIKAL AL DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA : 2011 2011 : JL.SEMARANG NO.5 MALANG
REKAPITULASI ELEKTRIKAL DAN VIDEO SYSTEM I A
A.1 A.2 A.3 A.4
GEDUNG GR GRAHA LANTAI 1 (Daerah Service dan Main Entrance)
INSTALASI PENERANGAN DAN DAN STOP KONTAK KONTAK PENGADAAN DAN PEMASANGAN PEMASANGAN INSTALASI CCTV CCTV PENGADAAN DAN PEMASANGAN PEMASANGAN INSTALASI TELEPHONE TELEPHONE PENGADAAN DAN PEMASANGAN PEMASANGAN INSTALASI SOUND SOUND SYSTEM SYSTEM
Rp. Rp. Rp. Rp.
170,427,900.00 294,320,000.00 64,167,575.00 36,166,600.00
B
LANTAI BALKON
Rp.
115,304,487.50
C
LANTAI TRIBUN
Rp. Rp.
102,236,975.00 7,116,907.50
Rp. Rp.
947,690,545.00 38,128,234.38
III INSTAL INSTALASI ASI LAMPU LAMPU HALL HALL GEDUNG GEDUNG A AREA HALL GEDUNG GEDUNG
Rp.
48,441,000.00
IV
INST INSTAL ALAS ASII VIDE VIDEO O SYST SYSTEM EM
Rp.
3,462,079,400.00
V
INSTALASI MICROPHONE
Rp.
82,058,250.00
VI
INSTALASI FIBER-OPTIC
Rp.
215,118,505.32
C.1 INSTALASI PENERANGAN C.2 PENGADAAN DAN PEMASANGAN INSTALASI TELEPHONE II
AREA PARKIR
A B
INSTALASI PENERANGAN DAN DAN STOP KONTAK KONTAK PENGADAAN DAN PEMASANGAN INSTALASI SOUND SYSTEM
TERBILANG :
JUMLAH
Rp.
5,583,256,379.70
JUMLAH TOTAL
Rp.
5,583,256,379.70
JUMLAH TOTAL DIBULATKAN
Rp.
5,583,256,000.00
LIMA MILYAR LIMA RATUS DELAPAN PULUH TIGA JUTA DUA RATUS LIMA PULUH ENAM RIBU RUPIAH
Surabaya, 28 April 2011 PT. WASKITA KARYA (Persero) CABANG JAWA TIMUR
Ir. PIUS SUTRISNO Kepala Cabang
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEK PEKERJA ERJAA AN
: BEL BELA ANJA NJA MOD MODA AL GED GEDUN UNG G DA DAN BA BANGUN NGUNA AN BER BERUP UPA A PE PERENC RENCA ANAAN NAAN PEMA PEMASA SANG NGA AN ELE ELEK KTRIK TRIKA AL
TAHUN ANGGARAN
: 2011
LOKASI
: JL.SEMARANG NO.5 MALANG
DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
NO. I A
URAIAN PEKERJAAN
VOLUME
SATUAN
HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
GEDUNG GRAHA LANTAI 1 (Daerah Service dan Main Entrance)
A.1 INSTALASI PENERANGAN DAN STOP KONTAK KONTAK 1 Lampu HPI-T 400 W (Philips) Arm. Spot Light
8.00
Bh
3,852,500.00
30,820,000.00
Type AMAR E40 (Artolite) 2 Ti Tiang Lampu HPI-T 400 W Indoor ( penggantung )
8.00
Bh
5,025,000.00
40,200,000.00
3 Titik Instalasi Penerangan (NYM - Supreme)
8.00
TTk
544,375.00
4,355,000.00
4 M Me enggeser Titik Lampu Existing + Kabel Instalasi
14.00
Bh
56,950.00
797,300.00
5 La Lampu PL-C 2x13 W Armature Down Light (Artolite)
24.00
Bh
510,875.00
12,261,000.00
6 Lampu SL- Essential 18 W Armature Accent Light Tuba Down 108 (Artolite)
62.00
Bh
435,500.00
27,001,000.00
4.00
Bh
351,750.00
1,407,000.00
10.00
Bh
778,875.00
7,788,750.00
8.00
Bh
678,375.00
5,427,000.00
6.00
Bh
318,250.00
1,909,500.00
7 Lampu SL- Essential 18 W Armature Type E0206 WLTriangle (Artolite) 8 Lampu Spot Tone 100 W Armature Spot Light S 72 E 27 (Artolite) 9 Lp. Halogen Dicroic 20 W Arm. Water Proffing Type IL UL MD2079 (Artolite) 10 Lampu PL-S 7 W Armature Down Light Type RD 100 E27 Savy (Artolite) 11 Lampu Halogen Dicroic 20 W Armature Artolite (Menempel di Hollow)
12.00
Bh
309,875.00
3,718,500.00
12 Lampu Halogen Dicroic 50 W Armature Artolite (Diatas Plafond Drop Ceiling)
9.00
Bh
309,875.00
2,788,875.00
13 Lp. Halogen Dicroic 20 W Arm.Type RD 2-1 Artolite (Diatas Lantai + 10 cm)
9.00
Bh
812,375.00
7,311,375.00
14 Lp.Halogen Dicroic 20 W Arm.Type RD 2-1 Artolite(Diatas Plafond Ornamen)
9.00
Bh
812,375.00
7,311,375.00
13.00
Bh
100,500.00
1,306,500.00
16 Saklar 8 Grid (Panasonic)
1.00
Bh
427,125.00
427,125.00
17 Saklar Tunggal (Panasonic)
8.00
Bh
92,125.00
737,000.00
18 Saklar Ganda (Panasonic)
10.00
Bh
100,500.00
1,005,000.00
19 Ti Titik Instalasi Stop Kontak CCTV (NYMHY-Supreme)
13.00
Titik
319,087.50
4,148,137.50
1.00
Unit
5,795,500.00
5,795,500.00
15 Stop Kontak 100 VA (Inbouw dan Outbouw) untuk CCTV (Panasonic)
20 Panel Daerah Service dan Main Entrance 22 Kabel Antar Panel (P.Induk Lt.1 ke P.Daerah Service dan Main Entrance)
7.00
M'
68,675.00
480,725.00
23 Kabel Grounding BC 10 mm2
- NYY 4x4 mm2 (Supreme)
7.00
M'
21,775.00
152,425.00
24 Pengadaan dan pemasangan MCB 3 Phase 16 A di Panel Induk Lt.1
1.00
Bh
766,312.50
766,312.50
25 Tes Commisioning
1.00
Ls
2,512,500.00
2,512,500.00
Jumlah
170,427,900.00
A.2 PENGADAAN DAN PEMASANGAN INSTALASI INSTALASI CCTV 1
CCTV XSPEED DOME CAMERA (outdoor ( outdoor )) c/w 9 meter Steel Pole Spesifikasi : 1/4" Sony Exview HAD CCD, 350TVL Built-in Auto Focus / Auto Iris Max. 432x Zoom (36x Optical / 12x Digital) TDN(ICR), WDR, DSS, OSD Max. Speed : Pan (360O /sec), Swing (180O /sec) Angular Travel : pan (Endless 360O), Tilt (90O) 128 Presets, 8swings, 4patterns, 8groups Privacy Zone, Auto Flip, Auto Parking 24VAC(line lock) single voltage * include floor stand outdoor bracket
1.00
Unit
Rp
42,380,000
42,380,000.00
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKE PEKERJ RJAA AAN N
: BEL BELAN ANJA JA MODA MODAL L GED GEDUN UNG G DAN DAN BANG BANGUN UNAN AN BERU BERUPA PA PERE PERENC NCAN ANAA AAN N PEM PEMAS ASAN ANGA GAN N ELE ELEKT KTRI RIKA KAL L DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
TAHUN ANGGARAN
: 2011
LOKASI
: JL.SEMARANG NO.5 MALANG
NO. 2
URAIAN PEKERJAAN
DAY & NIGHT IR CAMERA (Indoor Security Camera)
VOLUME
SATUAN
HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
24.00
Unit
Rp
1,755,000
42,120,000.00
6.00
Unit
Rp
4,875,000
29,250,000.00
Spesifikasi :
1/3" Sony Super HAD Color CCD High Resolution 520TV Lines 24IR LED : Day & Night Vision Camera Weather Proff (IP66) Automatic White Balance Automatic gain gain Control back Light Compensation DC 12V 10%, Less than 100mA / LED on 340mA * Include Ceiling Bracket DAY & NIGHT IR CAMERA (Outdoor Security Camera) Spesifikasi :
1/3" Sony Super HAD Color CCD High Resolution 600TV Lines 42IR LED : Day & Night Vision Camera 2D+3D DNR (digital noise reduction) Weather Proff (IP66) Automatic White Balance Automatic gain gain Control back Light Compensation DC 12V 10%, Less than 100mA / LED on 340mA Privacy masking : 4 zone Motion detection OSD Function * Include Ceiling Bracket 3
CCTV PTZ FOR SPEED DOME SERIES CONTROL SYSTEM
2.00
Unit
Rp
7,930,000
15,860,000.00
4
DVR CCTV SYSTEM INCLUDE HDD 1TB
3.00
Unit
Rp
16,770,000
50,310,000.00
LCD MONITOR DISPLAY 40"
1.00
Unit
Rp
36,400,000
36,400,000.00
58,500,000.00
5
Spesification :
Technolog logy
: Sp Splice Li Liquid Crystal Di Display
Size
: (w) 911,7 x (h) 522,9 x (d) 95 mm
Resolution
: 1920 x 1080 p (full HD)
Colo Colorr Satu Satura rati tion on
: 97 %
Brightness
: 700cd / mtr2 : 3000 : 1
Contrast
Refresh Frequency Frequency : 120 Hz View Angle
: 178
O
Seam
: ≤ 18 mm
Inp Input
: Complex Vide ideo, Chromatism ism Ponderan rance, S-Video, VGA, DVI, HDMI
Work Temperatur : 0 - 40 O C Power Consumptio Consumptio : 180 Watt Weight
: 18 Kg
Original Creating Steel Glass Protection 6
Cabling and Interconnection
1.00
ls
Rp
58,500,000
7
Installation, Testing and Training Fee
1.00
ls
Rp
19,500,000
Jumlah
19,500,000.00 294,320,000.00
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKE PEKERJ RJAA AAN N
: BELA BELANJ NJA A MODA MODAL L GEDU GEDUNG NG DAN DAN BANG BANGUN UNAN AN BERU BERUPA PA PERE PERENC NCAN ANA AAN PEMA PEMASA SANG NGA AN ELEK ELEKTR TRIK IKAL AL
TAHUN AN ANGGARAN
: 2011
LOKASI
: JL.SEMARANG NO.5 MALANG
DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
NO.
URAIAN PEKERJAAN
VOLUME
SATUAN
HARGA SATUAN (Rp.)
JUMLAH HA HARGA (Rp.)
A.3 PENGADAAN PENGADAAN DAN PEMASANGAN PEMASANGAN INSTALASI INSTALASI TELEPHONE 1 Outlet Telephone (Panasonic)
9.00
2 Pesawat Telephone KX-T 2373 (Panasonic)
9.00
3 Titik Instalasi Telephone (Kabel ITC)
8.00
4 Titik Instalasi Telephone (OTC-Supreme) (Kantor Pengelola Lap. Tenes)
1.00
5 Bok Terminal Kabel (BTK) 10 pairs
2.00
6 Kabel Induk Telephone ITC 10x2x0,6 mm2
120.00
Bh
100,500.00
904,500.00
Bh
431,312.50
3,881,812.50
Titik
207,700.00
1,661,600.00
Titik
2,391,062.50
2,391,062.50
Unit
670,000.00
1,340,000.00
22,780.00
2,733,600.00 921,250.00
M'
7 MDF Kapasitas 30 Pairs
1.00
Unit
921,250.00
8 Single line Interface Box (SIB)
1.00
Unit
837,500.00
837,500.00
9 PA P ABX 30 Extension KX-TDA 30 + Rectifier (Panasonic)
1.00
Unit
30,150,000.00
30,150,000.00
10 Back Up Battery Battery 24 Volt
1.00
Bh
5,108,750.00
5,108,750.00
11 Setting + Kabel Instalasi PABX
1.00
Ls
1,675,000.00
1,675,000.00
12 Penyambungan Langsung 1 Nomer dari Telkom
1.00
Ls
8,375,000.00
8,375,000.00
13 Tes Comissioning dan Trainer
1.00
Ls
4,187,500.00 Jumlah
4,187,500.00 64,167,575.00
A.4 PENGADAAN PENGADAAN DAN PEMASANGAN PEMASANGAN INSTALASI INSTALASI SOUND SYSTEM 1 Lo Loudspeaker Type Ceiling Speaker Inbouw (TOA)
19.00
2 Ti Titik Instalasi Loudspeaker (NYMHY - Supreme)
Bh
138,187.50
2,625,562.50 7,494,787.50
19.00
Ttk
394,462.50
4 Bok Terminal Kabel Audio Daerah Service
1.00
Unit
837,500.00
837,500.00
5 Po Power Amplifier 250 Watt (J Accoustic PA-300)
1.00
Bh
5,946,250.00
5,946,250.00
6 Mixer 8 Channel (J Accoustic P8-D)
1.00
Bh
4,271,250.00
4,271,250.00
7 Paging Microphone (PM660U-TOA)
1.00
Bh
2,554,375.00
2,554,375.00 1,716,875.00
8 DVD Multiplayer (SONY)
1.00
Bh
1,716,875.00
9 Setting + Kabel Instalasi Sound System
1.00
Ls
586,250.00
586,250.00
10 Rak Sound System
1.00
Unit
5,946,250.00
5,946,250.00
11 Tes Comissioning dan Trainer
1.00
Ls
4,187,500.00 Jumlah
B
4,187,500.00 36,166,600.00
LANTAI BA BALKON 1 La Lampu PL-C 2x13 W Armature Down Light (Artolite) 2 Lampu Halogen Dicroic 20 W Arm.Type RD 2-1 Artolite (8 Bh /Kolom) 3 Saklar Ganda (Panasonic) 4 Titik Instalasi Penerangan (NYM - Supreme) 5 Panel Balkon
42.00
Bh
510,875.00
21,456,750.00
192.00
Bh
309,875.00
59,496,000.00
9.00
Bh
100,500.00
904,500.00
66.00
Titik
295,637.50
19,512,075.00
1.00
Unit
5,410,250.00
5,410,250.00
6 Kabel Antar Panel (P.Induk Lt.1 ke ke Panel Balkon) Balkon) - NYY 4x4 mm2 (Supreme) 7 Kabel Grounding BC 10 mm2
58.00
M'
68,675.00
3,983,150.00
58.00
M'
21,775.00
1,262,950.00
8 Pengadaan dan pemasangan MCB 3 Phase 25 A di Panel Induk Lt.1
1.00
Bh
766,312.50
766,312.50
9 Tes Commisioning
1.00
Ls
2,512,500.00
2,512,500.00
Jumlah
C
115,304,487.50
LANTAI TR TRIBUN
C.1 INSTAL INSTALASI ASI PENE PENERA RANGA NGAN N 1 Me Menggeser Titik Lampu Existing + Kabel Instalasi
7.00
Bh
56,950.00
398,650.00
77.00
Bh
510,875.00
39,337,375.00
3 Lampu SL- Essential 18 W Armature Type E0206 WLTriangle (Artolite)
2.00
Bh
351,750.00
703,500.00
4 Lampu Halogen Dicroic 20 W Arm.Type RD 2-1 Artolite (8 Bh /Kolom)
80.00
Bh
309,875.00
24,790,000.00
4.00
Bh
92,125.00
368,500.00
13.00
Bh
100,500.00
1,306,500.00
2 La Lampu PL-C 2x13 W Armature Down Light (Artolite)
5 Saklar Tunggal (Panasonic) 6 Saklar Ganda (Panasonic)
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKE PEKERJ RJAA AAN N
: BELA BELANJ NJA A MODA MODAL L GEDU GEDUNG NG DAN DAN BANG BANGUN UNAN AN BERUP ERUPA A PERE PERENC NCAN ANAA AAN N PEMA PEMASA SANG NGAN AN ELEK ELEKTR TRIK IKAL AL
TAHUN AN ANGGARAN
: 2011
LOKASI
: JL.SEMARANG NO.5 MALANG
DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
NO.
URAIAN PEKERJAAN
7 Titik Instalasi Penerangan (NYM - Supreme) 8 Panel Lampu Tribun
VOLUME
SATUAN
HARGA SATUAN (Rp.)
JUMLAH HA HARGA (Rp.)
89.00
Titik
295,637.50
26,311,737.50
1.00
Unit
5,108,750.00
5,108,750.00
9 Kabel Antar Panel (Panel Tribun ke Panel Panel Lampu Tribun) Tribun) 7.00
M'
68,675.00
480,725.00
10 Kabel Grounding BC 10 mm2
- NYY 4x4 mm2 (Supreme)
7.00
M'
21,775.00
152,425.00
11 Pengadaan dan pemasangan MCB 3 Phase 16 A di Panel Tribun
1.00
Bh
766,312.50
766,312.50
12 Tes Commisioning
1.00
Ls
2,512,500.00
2,512,500.00
Jumlah
102,236,975.00
C.2 PENGADAA PENGADAAN N DAN PEMASANGA PEMASANGAN N INSTALASI INSTALASI TELEPHONE TELEPHONE 1 Outlet Telephone
7.00
Bh
100,500.00
703,500.00
2 Pesawat Pesawat Telephone Telephone
7.00
Bh
431,312.50
3,019,187.50
3 Titik Instalasi Telephone (Kabel ITC)
7.00
Titik
207,700.00
1,453,900.00
1.00
Unit
5 Bok Terminal Kabel (BTK) 10 pairs 6 Kabel Induk Telephone ITC 10x2x0,6 mm2 7 Tes Commisioning
670,000.00
670,000.00
19.00
M'
22,780.00
432,820.00
1.00
Ls
837,500.00 Jumlah
II
AREA PA PARKIR
A
INSTALASI PENERANGAN PENERANGAN DAN STOP KONTAK 1 Lp Mercury 250 W (Philips)+ Armature PJU Type RL ARTO C E40 (Artolite)
Bh
2,177,500.00
80,567,500.00
2 Tiang Lampu 2 Cabang (Galvanised) (Artolite)
9.00
Unit
4,020,000.00
36,180,000.00
3 Ti Tiang Lampu 1 Cabang (Galvanised) (Artolite)
15.00
Unit
3,601,250.00
54,018,750.00
M'
460,625.00
514,518,125.00
Titik
293,125.00
10,845,625.00
4 Kabel Instalasi Penerangan Area Parkir (NYY 2x4 mm2 - Supreme) 5 Pe Penyambungan Titik Instalsi Lampu Mercury 250 W
37.00
837,500.00 7,116,907.50
1,117.00 37.00
6 Lampu HPI-T 400 W (Philips) Arm. Spot Light Type AMAR E40 (Artolite)
2.00
Bh
4,606,250.00
9,212,500.00
7 Lampu HPI-T 1000 W (Philips) Armt. Spot Light Type AMEG E40 (Artolite)
2.00
Bh
5,443,750.00
10,887,500.00
8 Kabel Instalasi Lampu Spot Light HP H PI-T (NYY 2x4 mm2 - Supreme) 9 St S top Kontak 100 VA (Outbouw) untuk CCTV (Panasonic) 10 St S top Kontak 200 VA (Outbouw) untuk CCTV (Panasonic)
377.00
M'
418,750.00
157,868,750.00
3.00
Bh
100,500.00
301,500.00
Bh
100,500.00
904,500.00
12.00
Titik
319,087.50
3,829,050.00
12 Tiang CCTV
1.00
Unit
5,795,500.00
5,795,500.00
13 Panel Panel Parkir Parkir Type Outdoor Outdoor
1.00
Unit
20,451,750.00
20,451,750.00
28,818,375.00
11 Ti T itik Instalasi Stop Kontak CCTV (NYMHY-Supreme)
9.00
14 Kabel Antar Panel (P.Induk Gedung Gedung Graha ke Panel Parkir) - NYFGbY 4x35 mm2 (Supreme)
75.00
M'
384,245.00
15 Pembuatan Grounding Panel Parkir
1.00
Unit
753,750.00
753,750.00
16 Pengadaan dan pemasangan NFB 40 A di Panel Induk Gedung Graha)
1.00
Bh
2,093,750.00
2,093,750.00
17 Pembuatan Rumah Panel Parkir (Pasangan Batu Merah+Pntu Pengaman)
1.00
Unit
2,211,000.00
2,211,000.00
18 Pembuatan Rumah Lampu Spot HPI-T (Pas.Batu Merah+Pengaman Lampu)
4.00
Unit
1,061,280.00
4,245,120.00
19 Tes Commisioning
1.00
Ls
4,187,500.00 Jumlah
B
4,187,500.00 947,690,545.00
PENGADAA PENGADAAN N DAN DAN PEMASANG PEMASANGAN AN INSTALASI INSTALASI SOUND SYSTEM 1 Lo L oudspeaker Type Outdoor Speaker Horn Persegi (TOA)
10.00
Bh
670,000.00
6,700,000.00
2 Ka Kabel Instalasi Loudspeaker (NYMHY - Supreme)
477.00
M'
20,100.00
9,587,700.00
3 Pipa Clipsal
477.00
M'
5,025.00
2,396,925.00
4 Pa P asang Lo Loudspeaker Outdoor + Instalasi Kabel NYMHY
10.00
Titik
242,875.00
2,428,750.00
5 Bo Bok Terminal Kabel Audio Parkir (di Ged.Graha Lt.1)
1.00
Unit
837,500.00
837,500.00
6 Bok Terminal Kabel ( NYMHY ke kabel RCA) (di Ged.Graha Lt.1)
1.00
Unit
837,500.00
837,500.00
7 Kabel Induk Audio (NYMHY 4x1.5 mm2)
73.00
M'
105,734.38
7,718,609.38
8 Po Power Amplifier 250 Watt (J Accoustic PA-300)
1.00
Bh
5,946,250.00
5,946,250.00
9 Tes Comissioning dan Trainer
1.00
Ls
1,675,000.00 Jumlah
1,675,000.00 38,128,234.38
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKE PEKERJ RJAA AAN N
: BELAN ELANJA JA MODA MODAL L GEDU GEDUNG NG DAN DAN BANGU ANGUNA NAN N BERU BERUPA PA PERE PERENC NCA ANAA NAAN PEMA PEMASA SANG NGA AN ELEK ELEKTR TRIK IKAL AL
TAHUN ANGGARAN
: 2011
LOKASI
: JL.SEMARANG NO.5 MALANG
DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
NO.
URAIAN PEKERJAAN
VOLUME
SATUAN
HARGA SATUAN (Rp.)
JUMLAH HA HARGA (Rp.)
III INSTA INSTALAS LASI I LAMPU LAMPU HALL HALL GEDUNG GEDUNG A
AREA HALL HALL GEDUNG 1 Lampu HPI-T 400 W (Philips) Arm. Spot Light Type AMAR E40 (Artolite)
8.00
Bh
4,606,250.00
36,850,000.00
2 Pasang Pasang Penggantung Penggantung Lampu
8.00
Unit
502,500.00
4,020,000.00
3 Pa P asang Box Switch Kontaktor On Off Lampu Hall Gedung
1.00
Unit
251,250.00
251,250.00
4 Titik Instalasi Penerangan (NYM - Supreme)
8.00
Titik
293,125.00
2,345,000.00
5 Pasang Panel Lampu Hall Gedung
1.00
Unit
418,750.00
418,750.00
6 Kabel Antar Panel (Panel Lampu Hall ke Panel Induk Gedung) - NYY 4x4 mm2 (Supreme)
40.00
M'
63,650.00
7 Pe Penambahan MCB 3 Phase 16 A di Panel Induk Gedung
1.00
Bh
753,750.00
753,750.00
8 Tes Commisioning
1.00
Ls
1,256,250.00
1,256,250.00
Jumlah
2,546,000.00
48,441,000.00
IV INSTA INSTALA LASI SI VID VIDEO EO SYS SYSTE TEM M 1 MATERIAL INTEGRATOR MULTIMEDIA SYSTEM
1.00
Ls
3,288,009,400.00
2 MATERIAL SHOOTING VIDEO
1.00
Ls
174,070,000.00 Jumlah
V
174,070,000.00 3,462,079,400.00
INSTALASI MICROPHONE MICROPHONE 1 PL. 37
26.00
Pcs
1,298,125.00
33,751,250.00
2 Re 2N75
10.00
Set
2,051,875.00
20,518,750.00
7,537.50
7,537,500.00 9,949,500.00
3 Kabel Canare L2T25 4 Conektor Noutrik (MF) SLR Conector 5 Stage Box Yamaha 6 Kable Snake Balden 24 Cord x 2 7 Tes Commisioning
1,000.00
M
72.00
Pcs
138,187.50
1.00
Unit
921,250.00
921,250.00
34,337.50
6,867,500.00
200.00
M
1.00
Ls
2,512,500.00 Jumlah
VI
3,288,009,400.00
2,512,500.00 82,058,250.00
INSTALASI FIBER-OPTIC FIBER-OPTIC Switch 24 port (management, 2SFP port+ transceiver, transceiver, 22 UTP port 10/100/1000 VLAN 1 Trunking)
1.00
Unit
32,720,930.70
32,720,930.70
2 Wireless Outdoor, AP/ A+B+G
2.00
Unit
10,247,059.06
20,494,118.12
3 An Antena OMNI Sektoral (20dbi 120 deg sector pane)
2.00
Unit
11,823,528.86
23,647,057.72
13.0 13.00 0
Unit
7,094,118.12
92,223,535.56
5 Wall Mount Rack
1.00
Unit
4,729,412.08
4,729,412.08
6 UPS 500 VA
1.00
Unit
2,207,059.06
2,207,059.06
7 Patch Core
8.00
Unit
197,059.06
1,576,472.48
55,175.84
16,552,752.00
4 Wire Wirele less ss n rou route terr (dr (draf aftt 802 802.1 .11n 1n,, por portt 10/ 10/10 100/ 0/10 1000 00 LAN, LAN, 1 por portt 10/ 10/10 100/ 0/10 1000 00 WLAN WLAN))
8 Fiber Optic Single Mode 8 core 9 Terminasi 10 Pulling 11 Instalasi
300.00 16.00 300.00 28.00
M' Unit M' Buah
157,646.98
2,522,351.68
39,412.08
11,823,624.00
236,471.14 Jumlah
6,621,191.92 215,118,505.32
RENCANA ANGGARAN BIAYA KEGIATAN
:
UNIVE UNIVERSI RSITAS TAS NEGERI NEGERI MALA MALANG NG
PEKERJAAN
:
BELANJA MODAL MODAL GEDUNG GEDUNG DAN BANGUNAN BANGUNAN BERUPA BERUPA PERENCANAAN PERENCANAAN PEMASANGAN PEMASANGAN ELEKTRIKAL ELEKTRIKAL DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
TAHUN ANGGARAN
: 2011
LOKASI
:
JL.SE JL.SEMAR MARANG ANG NO.5 NO.5 MALA MALANG NG
PRODUCT
NO
QTY
TOTAL (Rp)
HARGA SATUAN (Rp)
MULTIMEDIA DISPLAY 1
1.00 unit
1,794,000,000.00
1,794,000,000.00
2.00 unit
325,000,000.00
650,000,000.00
2.00 Unit
96,200,000.00
Rp
192,400,000
CEILING BRACKET for SCREEN 360"
2.00 Unit
11,700,000.00
Rp
23,400,000
PROJECTOR CEILING BRACKET
2.00 Unit
10,400,000.00
Rp
20,800,000
Ligh Lightt Emi Emitt ttin ing g Dio Diode de
Indoor Full Color LED Display Jarak antar lampu : 10mm Kebutuhan Ukuran (overal size) : 3x8 m tr Ukuran Viewing : 2.88 x 7.68 mtr Total Jumlah Cabinet : 18 Cabinet Teknology : Surface Mount Display 3 in 1 Feature : Independent Lamp Adjustment Density Pixel : 10.000 /m2 Driver mode : 1/8 scan Brightness : 1200 Viewing angle : 110 degree degree at Horisontal ; 60 degree at vertical vertical Included Bracket 2
LCD PR PROJ EC ECTOR Spesification :
Brand
: Japan
Brightness
: 15,000 ANSI Lumens
Lens Lens Thro Throw w Rat Ratio io
: min min.. 4.4 4.4 - 6.2 6.2 - 1
Lens weight
: 2.8 - 4.2 kg
Contrast Ratio
: min. 1800:1
Image Image Diag Diagona onall
: Up to 40' 40' wide wide (600" (600" Diag Diagona onal). l). (suppl (supplied ied withou withoutt lens) lens)
Horizontal Horizontal Resolut Resolutio io : 800 TV Lines Lines (HDTV) (HDTV) Compatible Resoluti : 480i/p, 480i/p, 575i/p, 575i/p, 720p, 720p, 1035i, 1080i-50/60 Scre Screen en Pixel xels
: 1,0 1,02 24 x 768 768 In In Str Strip ipe e Con Conffigur igurat atiion
Imagin Imaging g Syst System em
: 1,8" 1,8" Polys Polysili ilicon con Activ Active e matri matrix x TFT TFT Pane Panels ls x 3
Video Signal Input
: DVI, RGB, Y/C, DVD, HDTV HDTV
Video Display
: 4:3 & 16:9 in NTSC/PAL.SECAM/NTSC NTSC/PAL.SECAM/NTSC 4.43/PAL-M/PAL-N 4.43/PAL-M/PAL-N
Video System
: DVI input support support HDCP for true digital digital imaging
Fan Noise
: As low as 51 dBA
Lens Lens Shif Shiftt
: Avai Availb lble le in Powe Powerr mod mode e (ca (can n be be shi shift ft to vert vertic ical ally ly and and hor horiz izon onta tall lly y)
Lens Lens Install Installati ation on
: Quick Quick inst install allati ation, on, Wide Wide Choi Choice ce of Lens Lenses es Avail Availab able. le.
Remote
: Wireless / Wired. Di Digital Zo Zoom 50 50% - 70 700% (Horizontal)
Contro Controll Swit Switche cherr
: Univ Univers ersal al Protoc Protocol ol 1600-1 1600-1152 15200 00 baud baud rate rate Celector Switch: Projector on/of, PC/video, Auto sync, volume input: PC,video, audio signal, mix signal 6.35 mm jack. Output : PC signal 15 pin, video signal, audio signal, RS 232 signal amplifyer 250 MHz.
Estimated Lamp Life : Up to 3,000 Hours Weight
: 34 - 37 Kg (Without Lens )
Waranty
: 3 years include service and pacth, full backup unit service (diberikan unit pengganti jika ada kerusakan selama 3 tahun)
3
ELEC ELECT TRIC SCRE SCREEN EN Spesification :
Type
: Custom large Screen 360" (732 x 549cm)
Black Border
: 9 - 15cm
Casing Color
: White
Material Scr Screen
: Matte White
RENCANA ANGGARAN BIAYA KEGIATAN
:
UNIVE UNIVERSI RSITAS TAS NEGERI NEGERI MALA MALANG NG
PEKERJAAN
:
BELANJA MODAL MODAL GEDUNG GEDUNG DAN BANGUNAN BANGUNAN BERUPA BERUPA PERENCANAAN PERENCANAAN PEMASANGAN PEMASANGAN ELEKTRIKAL ELEKTRIKAL DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
TAHUN ANGGARAN
: 2011
LOKASI
:
JL.SEM JL.SEMARA ARANG NG NO. NO.5 5 MALAN MALANG G
PRODUCT
NO
QTY
TOTAL (Rp)
HARGA SATUAN (Rp)
4
LG N1941 N1941 WP-PF WP-PF Monito Monitorr Flat Flat
4.00 4.00 unit
2,544,750.00
Rp
10,179,000
5
Telvi Telview ew 17" Monito Monitorr Broadc Broadcast ast
1.00 1.00 unit
9,330,750.00
Rp
9,330,750
6
Extron MAV Plus 1616AV
1.00 unit
71,818,500.00
Rp
71,818,500
1.00 unit
1,922,700.00
Rp
1,922,700
2.00 unit
6,333,600.00
Rp
12,667,200
3.00 unit
18,944,250.00
Rp
56,832,750
2.00 unit
5,954,000.00
Rp
11,908,000
2.00 unit
6,968,000.00
Rp
13,936,000
1.00 unit
9,204,000.00
Rp
9,204,000
IMAGE PROCESSING
Standart International Switcher Video RCA 16 input, 16 output 7
D-Link 16port Distribution LAN/HUB 16 port
8
Kramer VP-501xl Converter VGA to Video
9
Extron GLI2000 5BNC Groud Loop Inhibitor RGBHV
10 TRANSMITTER FOR VGA AND AUDIO Spesification :
Input
: Female 15 Pin HD
Output
: Female RJ-45 Connector 8cm pigtail (CAT-7)
Video Signal Moni Monito torr Out Outpu putt
: Pre-peaking circuit for optimizing optimizing video signal : Buf Buffe fere red d loc local al moni monito torr out outpu putt
Finishing & Installati Installati : Metal Enclosure, Wall Bracket Bracket 11 RECEIVER FOR VGA Spesification :
Input
: Female RJ-45 Connector for CAT-7 with buffered loop-through
Output
: Female 15-pin HD Connector
Controls
: Separate variable levels an and peaking controls
Finishing & Installati Installati : Metal Enclosure, Wall Bracket Bracket * Buffered MTP CAT-7 output for daisy-charming up to ten receivers. 12 WIRELESS WI-FI EXTENDER Spesification :
Cove Covere red d Dis Dista tanc nce e
: Up Up to to 100 100 ft
Video Format
: Unlimited
Audio Format
: Unlimited
Oper Operat atin ing g Syst System em
: Ind Indep epen ende dent nt
Sign Signal al Freq Freque uenc ncy y
: 2,4 2,4Gh Ghzz WiF WiFii 11B 11B/G /G/N /N
Driverless / Plug and Play. Real-Time Wireless Video / Audio Transmission. Transmitter Features :
Video Input Input Format
: CVBS / S-Video / Component Component (YPbPr) / VGA : - CVBS: NTSC / PAL / SECAM - S-Video: NTSC / PAL / SECAM - Component (YPbPr) : 480i/p, 576i/p, 720p (50/60Hz), 1080i/p (50/60Hz) - VGA : 640 x 480 / 800 x 600 / 1024 x 768 / 1280 x 768 / 1280 x 1024
Audio Input
: Stereo with 4,5mm Line-in-jack Line-in-jack
PCM Encoding
: 48Khz 16 16-bit sam sampling
LED LED Ind Indic icat ator or
: WLA WLAN N Sta Statu tuss / 4 WiWi-Fi Fi Chan Channe nels ls / 4 Vide Video o Sou Sourc rces es Inpu Input. t.
Receiver Features :
Video Output Outp utput Form Format at
: Component (YPbPr) (YPbPr) / VGA : - 480p 80p (6 (60Hz) 0Hz) / 576 576 (50H (50Hz) z) - VGA : 640 x 480 / 800 x 600 / 1024 x 768 / 1280 x 768 / 1280 x 1024
Audio Input
: Stereo with 4,5mm Line-in-jack Line-in-jack
PCM Encoding
: 48Khz 16 16-bit sam sampling
LED LED Ind Indic icat ator or
: WLA WLAN N Sta Statu tuss / 4 WiWi-Fi Fi Chan Channe nels ls / 4 Vide Video o Sou Sourc rces es Inpu Input. t.
RENCANA ANGGARAN BIAYA KEGIATAN
:
UNIVE UNIVERSI RSITAS TAS NEGERI NEGERI MALA MALANG NG
PEKERJAAN
:
BELANJA MODAL MODAL GEDUNG GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PERENCANAAN PEMASANGAN ELEKTRIKAL DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
TAHUN ANGGARAN
: 2011
LOKASI
:
JL.SEM JL.SEMARA ARANG NG NO.5 NO.5 MALANG MALANG
PRODUCT
NO
QTY
TOTAL (Rp)
HARGA SATUAN (Rp)
SOURCE
10 DVD Player Pioneer
1.00 unit
1,560,000.00
Rp
1,560,000
11 Ko K omputer Source Animation Mixing
1.00 unit
12,441,000.00
Rp
12,441,000
1.00 unit
14,137,500.00
Rp
14,137,500
1.00 unit
12,441,000.00
Rp
12,441,000
4.00 unit
12,441,000.00
Rp
49,764,000
1.00 unit
160,602,000.00
Rp
160,602,000
7.00 day
5,200,000.00
Rp
36,400,000
17 Kable VGA Hi Resolution RGBHV
1.00 lsm
11,505,000.00
Rp
11,505,000
18 Kabel Video Belden 1505A
1.00 lsm
14,430,000.00
Rp
14,430,000
19 Kabel Listrik Supreme NYM 3x1.5mm
1.00 lsm
10,790,000.00
Rp
10,790,000
20 Kabel Listrik Supreme NYM 3x2.5mm
1.00 lsm
7,150,000.00
Rp
7,150,000
21 Kabel Listrik Supreme NYM 4x0,75mm for screen
1.00 lsm
5,850,000.00
Rp
5,850,000
Intel Dual Core Processor Memory 2GB Harddisk min 160GB Software Source Animation Mixing Source Animation Content minimal 700 unit animation stock VGA Card ATI Radeon Radeon 128 Windows XP / 7 12 NoteBook Intel Core I 3 Harddisk minimal 160 GB Display 14"
13 Desktop Komputer Control LED Intel Dual Core Processor Memory 4GB Harddisk min 160GB Software LED VGA Card ATI Radeon Radeon 128 Composite Capture card Windows XP / 7
14 Desktop Komputer Intel Dual Core Processor Memory 4GB Harddisk min 160GB VGA Card ATI Radeon Radeon 128 Composite Capture card Windows XP / 7
15 Software License for Multiscreen Display Digital Technology Digital Imagery Seamless image Capability Overlap Capability Optional Wired & Wireless Network System Connection QuickFind Feature for visual controling Network Presentation Capability Optional VGA & Video Input Capability
16 System System training training & software software training training minimal 1 years experience in event multimedia Trainer have minimal 2 international event event multimedia experience experience Trainer have minimal 30 domestic event multimediaexperience INSTALATION SYSTEM
RENCANA ANGGARAN BIAYA KEGIATAN
:
UNIVE UNIVERSI RSITAS TAS NEGERI NEGERI MALANG MALANG
PEKERJAAN
:
BELANJA BELANJA MODAL GEDUNG GEDUNG DAN BANGUNAN BANGUNAN BERUPA PERENCANA PERENCANAAN AN PEMASANGAN PEMASANGAN ELEKTRIKAL ELEKTRIKAL DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
TAHUN ANGGARAN
: 2011
LOKASI
:
JL.SEM JL.SEMARA ARANG NG NO. NO.5 5 MALA MALANG NG
PRODUCT
NO
QTY
TOTAL (Rp)
HARGA SATUAN (Rp)
22 Kabel data STP
1.00 lsm
7,150,000.00
Rp
7,150,000
23 Kabel IR
1.00 lsm
650,000.00
Rp
650,000
24 Connector dan Stop kontak
1.00 lsm
5,070,000.00
Rp
5,070,000
25 Ducting Cable
1.00 lsm
17,940,000.00
Rp
17,940,000
* Pipa clipsal untuk plafond * Albion untuk tembok & lantai 26 Recept Receptacl acle e (outlet (outlet)) Video Video
4.00 4.00 unit
357,500.00
Rp
1,430,000
27 Materi Material al Bantu Bantu Instala Instalasi si
1.00 1.00 lsm
7,150,000.00
Rp
7,150,000
28 Content Fee
1.00 lsm
7,150,000.00
Rp
7,150,000
1.00 lsm
26,000,000.00
Rp
26,000,000
* Materi TMS * Materi Background (DVD) 29 Instalation Fee * Wiring, Pulling, Connection & Instalation * Testing & Commissioning Instalastion * Programable System * Transportasi & Akomodasi TOTAL [Rupiah]
Rp.
3,288,009,400
TOTAL [Rupiah]
Rp.
3,288,009,400
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BERUPA PERENCANAAN PEMASANGAN ELEKTRIKAL
TAHUN ANGGARAN
: 2011
LOKASI
: JL.SEMARANG NO.5 MALANG
DAN VIDEO SYSTEM GEDUNG GRAHA CAKRAWALA
PRODUCT
NO 1 2 3 4
QTY
SATUAN (Rp)
3.00
unit
Rp
Tripod Camera
3.00
unit
Recording Panasonic DMR-EH59
1.00
unit
2.00
unit
Camera Panasonic type HMC 82
Video Mixer DataVideo 4 input SE500
TOTAL (Rp)
39,650,000
Rp
Rp
3,185,000
Rp
9,555,000
Rp
12,415,000
Rp
12,415,000
Rp
16,575,000
Rp
33,150,000
TOTAL [Rupiah]
Rp.
118,950,000
174,070,000
REKAPITULASI RENCANA ANGGARAN BIAYA KEGIATAN PEKERJ PEKERJAAN AAN
: :
LOKASI TAHU TAHUN N ANGG ANGGAR ARAN AN
: :
UNIVERSITAS NEGERI MALANG BELANJ BELANJA A MODAL MODAL GEDUNG GEDUNG DAN BANGUN BANGUNAN AN BERUPA BERUPA PERENCANAAN INDOOR SPORT LAPANGAN TENNIS PENUNJANG GEDUNG TEACHER STUDY DAN TRAINING CENTRE KAMPUS UNIVERSITA UNIVERSITAS S NEGERI NEGERI MALANG Jl.SEMARANG Jl.SEMARANG NO 5 MALANG 2011 2011 R E KA P IT U LA S I
A
►
I II III IV V VI VII VIII IX X X.A X.B X.C
B
PEKERJAAN LAPANGAN TENNIS
R p. R p. R p. R p. R p. R p. R p. R p. R p.
11,891,614.72 72,223,796.86 218,987,946.46 1,399,733,983.92 111,863,928.33 2,068,241,886.51 142,768,761.80 237,418,000.00 236,509,182.00
JUMLAH A
R p. R p. R p. Rp.
2,680,829,489.92 1,037,619,588.72 764,496,198.80 8,982,584,378.03
JUMLAH B
R p. R p. R p. R p. R p. R p. Rp. Rp.
1,231,876.80 3,781,308.16 248,273,691.60 129,626,726.12 312,889,433.25 2,405,403.00 48,951,540.00 48,951,540.00 747,159,978.93
JUMLAH TOTAL A+B JUMLAH TOTAL DIBULATKAN
Rp. Rp.
9,729,744,356.96 9,729,744,000.00
PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PASANGAN PEKERJAAN BETON PEKERJAAN PENUTUP LAPISAN PEK.BESI PERLENGKAPAN LAPANGAN PEKERJAAN PENGECATAN PEKERJAAN INSTALASI LISTRIK PEKERJAAN BESI VARIASI PENUTUP DINDING PEKERJAAN RANGKA ATAP APORA Space Frame Gording Terpasang Atap Terpasang
►
I II III IV V VII VIII
Terbilang:
T O TA L
PEKERJAAN TRIBUN
PEKERJAAN PERSIAPAN PEKERJAAN PASANGAN PEKERJAAN BETON PEKERJAAN PENUTUP LANTAI & DINDING PEKERJAAN BESI DAN KACA PEKERJAAN PENGECATAN PEKERJAAN INSTALASI INSTALASI LISTRIK
:
+
+
SEMBILAN MILYAR TUJUH RATUS DUA PULUH SEMBILAN JUTA TUJUH RATUS EMPAT PULUH EMPAT RIBU RUPIAH
Surabaya, 28 April 2011 PT. WASKITA KARYA (Persero) CABANG JAWA TIMUR
Ir. PIUS SUTRISNO Kepala Cabang
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BANGUNAN BERUPA PERENCANAAN INDOOR SPORT LAPANGAN TENNIS PENUNJANG GEDUNG TEACHER STUDY DAN TRAINING CENTRE
LOKASI
: KAMPUS UNIVERSITAS NEGERI MALANG Jl.SEMARANG NO 5 MALANG MALANG
TAHUN TAHUN ANGGA ANGGARA RAN N
: 2011 2011
No
A. PEKERJAAN LAPANGAN TENNIS
I
Volume
Sat
Harga Satuan
Jumlah
(Rp)
(Rp)
PEKE PEKERJ RJA AAN PERS PERSIA IAPA PAN N 1 Pembersihan lokasi
3,567.84
M²
3,333.00 JUMLAH I
II
PEKE PEKERJ RJA AAN TANA TANAH H 1 Galian Galian tanah
36.29
M³
33,000.00
1,197,504.00
2 Bor Straus Ø 20 cm
22.68
M³
861,233.82
19,535,676.70
3 Bor Straus Ø 30 cm
47.48
M³
861,233.82
40,888,625.66
4 Urugan Urugan tanah kembali kembali
29.39
M³
9,280.00
272,769.64
5 Urugan Urugan pasir
88.66
M³
116,500.00
10,329,220.86
JUMLAH II III III
72,223,796.86
PEKE PEKERJ RJAA AAN N PASAN PASANGA GAN N
1 Pa Pasangan batu merah tebal 1/2 1:3
215.49
M²
87,854.00
18,931,482.75
2 Pa Pasangan batu merah tebal 1/2 1:5
592.59
M²
79,811.00
47,295,360.11
1,616.16
M²
37,095.00
59,951,455.20
790.02
M²
33,540.00
26,497,270.80
2,695.00 2,695.00
M'
11,620.00
31,315,900.00
191.43
M²
3 Plesteran + Acian 1: 3 4 Plesteran beton + Acian 1:5 5 Benangan Benangan sudut 6 Pasangan Batu Lempeng
182,813.00 JUMLAH III
IV
11,891,614.72 11,891,614.72
34,996,477.59 218,987,946.46
PEKE PEKERJ RJA AAN BETO BETON N 1 Plat Wire Mesh landasan lapangan Te Tennis
120.75
M³
2,071,779.00
250,161,223.22
2 Rabat Lantai Kerja
86.21
M³
788,374.00
67,968,403.01
3 Straus Ø 20cm
19.47
M³
2,506,559.00
48,802,412.97
4 Straus Ø 30cm
22.41
M³
2,506,559.00
56,179,521.91
5 Poor pondasi 100x180
18.14
M³
2,659,672.00
48,257,088.77
6 Poor pondasi 100x100
1.68
M³
2,659,672.00
4,468,248.96
7 Kolom Strukture 40x70
79.23
M³
5,832,639.00
462,112,988.80
8 Kolom Strukture 30x30
5.75
M³
5,832,639.00
33,512,010.64
9 Sloof praktis 15x20 tepi lapangan tennis
1.64
M³
4,629,636.00
7,583,343.77
10 Sloof Kopel 30x40
27.72
M³
4,016,436.00
111,335,605.92
11 Balok strukture 20x40 tengah
18.48
M³
5,299,720.00
97,938,825.60
12 Balok strukture 30x60 atas
25.86
M³
5,299,720.00
137,025,320.54
3.36
M³
5,299,720.00
17,807,059.20
14 Balok ( Konsol Beton ) 30x40
3.68
M³
5,299,720.00
19,480,922.76
15 Kolom ( Konsol Beton ) 30x30
1.51
M³
5,299,720.00
8,013,176.64
16 Balok ( Konsol Beton ) 30x30
1.50
M³
5,299,720.00
7,933,044.87
17 Balok ( Konsol Beton ) 40x60 bentang 11,88m
3.99
M³
5,299,720.00
21,154,786.33
13 Konsol Beton 40x60
JUMLAH IV V
1 La Lapisan dasar coating warna hitam
632.48
M²
88,432.14
55,931,964.17
2 La Lapisan Pleksicoat warna biru
287.19
M²
88,432.14
25,397,231.93
3 Lapisan Pleksicoat rool tepi area main
345.29
M²
88,432.14 JUMLAH V
VI
1,399,733,983.92
PEKERJAAN PENUTUP PENUTUP LAPISAN LAPISAN
30,534,732.24 111,863,928.33
PEKERJAAN BESI PERLENGKAPAN PERLENGKAPAN LAPANGAN LAPANGAN 1 Kawat Harmonica Lapis PVC + Rangka
2,230.58
M²
918,720.00
2,049,277,649.13
885.48
M²
14,500.00
12,839,437.38
3 Tempat duduk wasit lengkap fungsional ( tennis )
1.00
Unt
3,828,000.00
3,828,000.00
4 Nett lengkap dengan tiang penyangga ( tennis )
1.00
Set
2,296,800.00
2 Renovasi Lapangan
JUMLAH VI
2,296,800.00 2,068,241,886.51
231.9575
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN
: BELANJA MODAL GEDUNG DAN BANGUNAN BANGUNAN BERUPA PERENCANAAN INDOOR SPORT LAPANGAN TENNIS PENUNJANG GEDUNG TEACHER STUDY DAN TRAINING CENTRE
LOKASI
: KAMPUS UNIVERSITAS NEGERI MALANG MALANG Jl.SEMARANG NO 5 MALANG
TAHUN TAHUN ANGG ANGGAR ARAN AN
: 2011 2011
No
A. PEKERJAAN LAPANGAN TENNIS
Volume
Sat
Harga Satuan
Jumlah
(Rp)
(Rp)
VII PEKERJAAN PENGECATAN PENGECATAN 1 Cat Besi
1,533.34
M²
42,053.00
64,481,378.81
2 Cat Dinding Luar
808.08
M²
34,568.00
27,933,709.44
3 Cat Dinding Dalam
808.08
M²
17,355.00
14,024,228.40
4 Cat Beton
790.02
M²
34,568.00
27,309,411.36
5 Ca C at Coating Pasangan Batu Teracota
142.91
M²
63,116.00 JUMLAH VII
9,020,033.79 142,768,761.80
VIII PEKERJAAN INSTALASI INSTALASI LISTRIK 1 Lampu HPI-T 400 W (Philips) Arm. Spot Light
32.00
Bh
3,852,500.00
123,280,000.00
Type AMAR E40 (Artolite) 5.00
Unit
1,750,000.00
8,750,000.00
3 Tiang Lampu HPI-T 400 W Indoor ( penggantung )
2 Ti Tiang Lampu HPI-T 400 W Outdoor
27.00
Unit
1,150,000.00
31,050,000.00
4 Titik Instalasi Penerangan (NYM - Supreme)
32.00
Unit
567,750.00
18,168,000.00
5 Stop Kontak 300 VA (Panasonic)
10.00
Titik
75,000.00
750,000.00
6 Titik Instalasi Stop Kontak (NYM-Supreme)
10.00
Bh
336,000.00
3,360,000.00
7 Pasang Panel Lapangan 8 Kabel Antar Panel ( Panel Parkir ke Panel Lapangan)
1.00
Titik
4,325,000.00
4,325,000.00
130.00
Unit
267,000.00
34,710,000.00
- NYFGbY 4x25 mm2 (Supreme) 9 Pa Pasang Grounding Panel Lapangan 10 Pasang Panel Tribun 11 Kabel Antar Panel (Panel Tribun ke Panel Lapangan)
1.00
M'
806,250.00
806,250.00
1.00
Unit
4,325,000.00
4,325,000.00
15.00
Unit
510,000.00
7,650,000.00
15.00
M'
- NYY 4x4 mm2 (Supreme) 12 Pa Pasang Kabel Grounding BC 10 mm2
16,250.00 JUMLAH VIII
IX
243,750.00 237,418,000.00
PEKERJAAN PEKERJAAN BESI VARIASI VARIASI PENUTUP PENUTUP DINDING DINDING 1 Kisi-kisi baja atas ( untuk grill atas luar )
118.80
M²
780,890.00
92,769,732.00
7,326.00 48.00
Kg
15,500.00
113,553,000.00
Bh
75,000.00
4 Stifner
3,600,000.00
366.30
Kg
15,500.00
5 Kalsiplank L : 50cm
5,677,650.00
217.80
M'
96,000.00
20,908,800.00
Besi Holow 4x6 2 Besi WF 200.500 3 Ankur baut Ø 32mm
JUMLAH X X X.A
PEKERJAAN RANGKA RANGKA ATAP ATAP APORA APORA Space Frame
2,680,829,489.92
2,632.00
Kg
57,777.77
2 Connector Sheet
5,433.40
Kg
57,777.77
313,929,746.38
45,178.00
Kg
33,222.23
1,500,913,816.58
910.00
Kg
33,223.53
30,233,410.48
54,153.40
Kg
4,334.17
234,710,258.29
57,777,777.20
57,777,777.20
7,223.80
391,193,385.07
4 Supports & Angkur 5 Wet Painting 6 Transp 7 Install
1.00
Fuso
152,071,095.90
54,153.40
Kg
350.00
Bh
43,333.33
2 Dudukan Gording Skunder
2,780.00
Bh
23,111.11
64,248,896.92
3 Gording Primer PIPA Ø 3"
10,864.00
Kg
31,779.37
345,251,086.54
4 Go Gording Skunder C75.45.15.4.6
22,740.20
Kg
26,000.03
591,245,791.25
939.40
Kg
23,107.46
21,707,148.86
3,780.00
M²
169,650.00
308.00
Bh
62,400.00
19,219,198.80
1.00
Ls
104,000,000.00
104,000,000.00
Gordi ordin ng Ter Terpasa pasang ng 1 Dudukan Gording Primer
5 Trekstang Ø 10mm X.C
JUMLAH X.A
1 Ball Joint 3 Pipa STK 400
X.B X.B
236,509,182.00
JUMLAH X.B
Atap Terpasang 1 Genteng 2 Nok Prima 4 Instalasi
JUMLAH X.C
1,037,619,588.72 15,166,665.15
764,496,198.80 641,277,000.00
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN PEKERJAAN
: BELANJA BELANJA MODAL GEDUNG DAN BANGUNAN BANGUNAN BERUPA BERUPA PERENCANAAN INDOOR SPORT LAPANGAN TENNIS PENUNJANG GEDUNG TEACHER STUDY DAN TRAINING CENTRE
LOKASI
: KAMPUS KAMPUS UNIVERSITAS UNIVERSITAS NEGERI NEGERI MALANG MALANG Jl.SEMARANG Jl.SEMARANG NO 5 MALANG MALANG
TAHUN TAHUN ANGG ANGGAR ARAN AN
: 2011 2011
No
A. PEKERJAAN LAPANGAN TENNIS
Volume
Sa t
Harga Satuan
Jumlah
(Rp)
(Rp) 808.08
RENCANA ANGGARAN BIAYA KEGIATAN
: UNIVERSITAS NEGERI MALANG
PEKERJAAN PEKERJAAN
: BELANJA BELANJA MODAL MODAL GEDUNG GEDUNG DAN BANGUNAN BANGUNAN BERUPA BERUPA PERENCANAAN INDOOR SPORT LAPANGAN TENNIS PENUNJANG GEDUNG TEACHER STUDY DAN TRAINING CENTRE
LOKASI LOKASI
: KAMPUS KAMPUS UNIVERSITA UNIVERSITAS S NEGERI NEGERI MALANG MALANG Jl.SEMARA Jl.SEMARANG NG NO 5 MALANG MALANG
TAHU TAHUN N ANGG ANGGAR ARAN AN
: 2011 2011
No
B. JENIS PEKERJAAN TRIBUN
I
Volume
Harga Satuan
Jumlah
PEKERJAAN PERSIAPAN 1 Pembersihan lokasi
369.60
M²
3,333.00 JUMLAH I
II
1,231,876.80 1,231,876.80
PEKER EKERJA JAA AN PASA PASANG NGA AN 1 Plesteran beton 1:5 2 Benan Benangan gan sudut sudut
8.40
M²
301.17 301.17
M'
33,540.00 11,620.00 JUMLAH III
III III
281,736.00 3,499,572.16 3,781,308.16
PEKER EKERJA JAA AN BETO BETON N 16.49
M³
4,526,651.00
74,646,937.49
2 Kol Kolom 30x3 30x30 0
3.78
M³
5,832,639.00
22,047,375.42
3 Bal Balok 30x 30x50 50
13.51
M³
5,299,720.00
71,617,766.22
4 Balo Balok k Kon Konso soll
0.88
M³
5,299,720.00
4,674,353.04
16.63
M³
1 Beton Beton Plat Plat dag dag atas atas trib tribun un
5 Plat Plat Dag Dag Ruan Ruang g VIP VIP
4,526,651.00 JUMLAH IV
IV
75,287,259.43 248,273,691.60
PEKE PEKERJ RJAA AAN N PENU PENUTU TUP P LANT LANTAI AI & DIN DINDI DING NG 1 Keramik Keramik lantai lantai tribun tribun 40x40
696.86
M²
2 Keramik plat lantai atas tribun 40x40
123.65
M²
157,983.00 157,983.00 JUMLAH V
V
110,092,665.31 19,534,060.81 129,626,726.12
PEKERJAAN BESI DAN KACA 1 Pagar Holow 4" tepi tribun atas + penutup double gybsum
262.67
M²
829,886.00
217,984,495.85
2 Pagar Holow 4" Trap tangga tepi tribun bawah
39.90
M²
649,886.00
25,930,451.40
3 Daun Jendela Almunium
28.00
Unit
862,410.00
24,147,480.00
4 Engsel Jendela Alm
28.00
Bh
35,625.00
997,500.00
5 Grendel Jendela Alm
14.00
Bh
11,875.00
166,250.00
6 Hak Angin
14.00
Bh
18,050.00
252,700.00
299.54
M'
86,500.00
25,910,556.00
7 Kusen Almunium 8 Tangga Baja + Pegangan tangga + Cat
1.00
Unt
17,500,000.00 JUMLAH VI
VII
PEKERJAAN PENGECATAN
1 Cat Dinding Dinding / Beton eksterior
394.76
M²
2 Cat Plafon Plafond d dag interi interior or
138.60
M²
34,568.00 17,355.00 JUMLAH VIII
VIII
17,500,000.00 312,889,433.25 13,645,994.54 2,405,403.00 2,405,403.00
PEKERJAAN INSTALASI LISTRIK
1 Lampu Halogen 150 W Armature Spot Light
10.00
Ttk
3,274,625.00
32,746,250.00
2 Lampu TL 1x36 W Armature Type V Shave TP (Artolite)
13.00 Ttk
321,600.00
4,180,800.00
3 Titik Instalasi Penerangan (NYM - Supreme)
23.00 Ttk
323,610.00
7,443,030.00 180,900.00
Type AMLC (Artolite)
4 Saklar Ganda (Panasonic)
5.00 Ttk
36,180.00
5 Stop Kontak 300 VA (Panasonic)
6.00
M'
40,200.00
241,200.00
6 Titik Instalasi Stop Kontak (NYM - Supreme)
6.00
Bh
414,060.00
2,484,360.00
7 Tes Commisioning
1.00
1,675,000.00 JUMLAH VI VIII
1,675,000.00 48,951,540.00
REKAPITULAS I RENCANA ANGGARAN BIAYA Kegiatan Pekerjaan Lokasi Tahun Anggaran
: Universitas Negeri Malang : Belanja Modal Gedung Dan Bangunan Berupa Pembangunan Tribun Penunjang Graha Cakrawala : Kampus Universitas Negeri Malang Jl. Semarang No. 05 Malang : 2011
NO
URAIAN PEKERJAAN
JUMLAH HARGA
I
PEKERJAAN PERSIAPAN
Rp.
3,500,000.00
II
PEKERJAAN TANAH
Rp.
70,015,907.31
III
PEKERJAAN PASANGAN
Rp.
578,768,339.78
IV
PEKERJAAN BETON
Rp.
635,648,218.65
V
PEK. KUSEN PINTU DAN JENDELA
Rp.
33,347,551.61
VI
PEK. PENGGANTUNG DAN PENGUNCI
Rp.
22,763,657.97
VII
PEKERJAAN CAT-CATAN
Rp.
103,334,144.54
VIII
PEKERJAAN ATAP
Rp.
2,098,010,734.52
IX
PEKERJAAN INSTALASI LISTRIK
Rp.
26,901,002.50
X
PEKERJAAN SANITASI
Rp.
99,996,990.02
XI
PEKERJAAN LAIN-LAIN
Rp.
301,702,848.24
JUMLAH DIBULATKAN
Rp. Rp.
3,973,989,395.14 3,973,989,000.00
TERBILANG :
A MILYAR SEMBILAN RATUS TUJUH PULUH TIGA JUTA SEMBILAN RATUS DELAPAN PULUH SEMBILAN RIBU RUPI
Surabaya, 28 April 2011 PT. WASKITA KARYA (Persero) CABANG JAWA TIMUR
Ir. PIUS SUTRISNO Kepala Cabang
RENCANA ANGGARAN BIAYA Kegiatan Pekerjaan Lokasi Tahun Anggaran
No
: Universitas Negeri Malang : Belanja Modal Gedung Dan Bangunan Berupa Pembangunan Tribun Penunjang Graha Cakrawala : Kampus Universitas Negeri Malang Jl. Semarang No. 05 Malang : 2011
Uraian Pekerjaan
I
Harga Satuan (Rp)
Volume
Jumlah Harga (Rp)
1
PEKERJAAN PERSIAPAN Pembersihan lokasi
1.000
Ls
3,500,000.00 Jumlah
3,500,000.00 3,500,000.00
1 2 3 4 5
PEKERJAAN TANAH Galian tanah pondasi Urugan tanah kembali Urugan pasir bawah pondasi Urugan pasir bawah lantai Urugan sirtu dan pemadatan
271.095 108.438 24.155 20.984 451.812
M3 M3 M3 M3 M3
33,000.00 9,280.00 116,500.00 116,500.00 121,300.00 Jumlah
8,946,135.00 1,006,304.64 2,814,057.50 2,444,670.37 54,804,739.80 70,015,907.31
146.450 271.588 842.225 63.175 1684.450 126.350 719.686 324.450 1027.540 259.456 2569.250 189.525 65.560 65.560 186.973 147.225 216.880 2.400
M3 M3 M2 M2 M2 M2 M2 M2 M2 M2 M' M' M2 M2 M2 M' M2 M2
295,748.00 573,798.00 79,811.00 87,854.00 37,095.00 31,139.00 33,540.00 33,540.00 33,540.00 33,540.00 11,620.00 136,550.00 176,564.00 186,492.00 202,477.00 19,490.00 188,982.00 414,890.00 Jumlah
43,312,294.60 155,836,364.33 67,218,819.48 5,550,176.45 62,484,672.75 3,934,412.65 24,138,265.09 10,882,053.00 34,463,691.60 8,702,154.24 29,854,685.00 25,879,638.75 11,575,535.84 12,226,415.52 37,857,630.88 2,869,415.25 40,986,378.36 995,736.00 578,768,339.78
18.693 24.450 6.450 23.791 22.599 5.360 17.027 206.901
M3 M3 M3 M3 M3 M3 M3 M3
4,375,325.00 4,375,325.00 4,334,332.00 3,346,523.00 4,717,615.00 4,195,244.00 3,954,260.00 690,602.00 Jumlah
81,785,762.56 106,976,696.25 27,956,441.40 79,615,455.43 106,612,201.98 22,486,507.84 67,329,185.02 142,885,968.16 635,648,218.65
40.64 M' 36.00 Bh 10.00 Bh 2.00 Unit 7.00 Bh 25.15 M2 5.50 M2
107,549.00 413,856.00 470,540.00 941,080.00 416,000.00 138,105.00 200,917.00 Jumlah
4,370,791.36 14,898,816.00 4,705,400.00 1,882,160.00 2,912,000.00 3,473,340.75 1,105,043.50 33,347,551.61
II
III 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 IV
PEKERJAAN PASANGAN Pas. Aanstampeng Pas. Pondasi batu kali kali 1 : 6 Pas. dinding bata merah 1 : 6 Pasangan trasram 1 : 3 Plesteran dinding bata merah 1 : 6 Plesteran trasram Plesteran +acian plat beton plafond Plesteran +acian beton kolom Plesteran + acian beton tribun Plesteran + acian beton balok Benangan sudut Plintcol Water proofing coating km/wc Lantai Keramik 20/20 km/wc Dinding Keramik 20/25 Pasang list keramik dinding Pasang Keramik 40/40 interior (Roman) Pas. Granit tile 40/40 (top table-wastafel)
1 2 3 4 5 6 7 8
PEKERJAAN BETON Beton Kolom 50/70 Beton kolom tumpuan atas (kepala kolom) Beton konsol 50/60 Beton sloof 15/20 Beton kolom praktis Beton plat (meja wastafel) Beton balok latai 15/20,15/30 Rabat beton
1 2 3 4 5 6 7
PEK. KUSEN PINTU DAN JENDELA Pas. Kusen pintu, jendela aluminium 4" (Indal) Pas.bovenlight (aluminium) Pasang daun pintu Lapis multipleks Pasang pintu swing Pas. daun pintu (km/wc) PVC-p1 Pasang kaca 5mm polos Pasang kaca es 5mm
V
RENCANA ANGGARAN BIAYA Kegiatan Pekerjaan Lokasi Tahun Anggaran
No
: Universitas Negeri Malang : Belanja Modal Gedung Dan Bangunan Berupa Pembangunan Tribun Penunjang Graha Cakrawala : Kampus Universitas Negeri Malang Jl. Semarang No. 05 Malang : 20 11
Uraian Pekerjaan
VI
1 2 3 4 5 6 7
PEK. PENGGANTUNG DAN PENGUNCI Handle pintu (30 cm) solid Pasang slot 2x putar Dexon Pasang grendel tanam Ex Solid Pasang engsel pintu 12cm Dexon Pas. List plafond Pas. Rangka plafond metal furing Pas. Plafond calsi board 9mm
1 2 3 4 5
PEKERJAAN CAT-CATAN Cat dinding dalam Interior Mowilex Cat plafond Cat plincol Cat Pintu Duco Cat tribun penonton weathercoat
VII
Harga Satuan (Rp)
Volume
Jumlah Harga (Rp)
4.00 2.00 2.00 30.00 126.35 44.36 44.36
Set Bh Bh Bh M' M2 M2
435,000.00 145,000.00 126,156.00 131,356.00 28,500.00 169,122.00 122,595.00 Jumlah
1,740,000.00 290,000.00 252,312.00 3,940,680.00 3,600,975.00 7,501,744.55 5,437,946.42 22,763,657.97
1,684.45 44.36 23.20 28.89 1,975.10
M2 M2 M2 M2 M2
18,371.00 18,371.00 32,010.00 32,010.00 35,394.00
30,945,030.95 814,882.45 742,632.00 924,909.74 69,906,689.40 103,334,144.54
Jumlah
RENCANA ANGGARAN BIAYA Kegiatan Pekerjaan Lokasi Tahun Anggaran VIII 1
2 3
: Universitas Negeri Malang : Belanja Modal Gedung Dan Bangunan Berupa Pembangunan Tribun Penunjang Graha Cakrawala : Kampus Universitas Negeri Malang Jl. Semarang No. 05 Malang : 20 11
PEKERJAAN ATAP Space Frame Ball joint Conector Set Pipa STK 400 Supports dan angkur Wet painting Transp Install Pipa gantungan Non SF 4" Atap Terpasang Atap Metal Profile Profile HBA 680 t=0.45 TCT, TCT, Colorbond BlueScope Steel Verge Capping ColorBondt=0.45 ColorBondt=0.45 TCT, W=600mm Capping penutup penetrasi gantungan gantungan rangka atap t=0.45mm TCT w=600mm Capping penutup tepi atap purlin t=0.45mm TCT W=600mm
1,320.00 2,196.00 17,205.00 960.00 21,681.00 1.00 21,681.00 24.00
Kg Kg Kg Kg Kg Fuso Kg
57,777.77 57,777.77 33,222.23 72,222.23 4,333.33 72,222,222.80 7,222.23 Sub total pcs 1,994,569.47 Sub total
1,790.60
m2
276,851.42
495,730,150.86
69.00 288.00
m' m'
241,109.15 241,109.15
16,636,531.63 69,439,436.35
52.00
m'
241,109.15
12,537,676.01
Sub total
4
IX
1
Gording terpasang Dudukan gording primer Dudukan gording sekunder Gording primer pipa 2.5" Gording sekunder C100 Tie Rod dia 10mm Transportasi
PEKERJAAN INSTALASI LISTRIK Sistem Penangkal Petir Streamer Viking radius 100 m + kabel Titik grounding (elektroda pentanahan) Terminal Box Accesoris Pipa GIP (Ø 3" + Ø 2") Pemasangan sistim penangkal petir dan pentanahan
76,266,659.04 126,879,987.31 571,588,432.74 69,333,338.88 93,950,906.05 72,222,222.80 156,585,125.27 1,166,826,672.09 47,869,667.35 47,869,667.35
240.00 552.00 625.00 1,590.00 587.00 1.00
1.00 1.00 2.00 1.00 1.00 3.00 1.00
Pcs Pcs M' M' M' Ls
Set Set Bh Bh Set Ls Unit
594,343,794.85
43,333.33 21,666.67 150,020.00 93,831.11 20,615.11 11,555,555.70 Sub total Jumlah Total
10,399,998.96 11,960,002.39 93,762,500.00 149,191,471.26 12,101,071.92 11,555,555.70 288,970,600.23 2,098,010,734.52
22,110,000.00 277,631.25 670,000.00 100,500.00 1,005,000.00 450,240.00
22,110,000.00 555,262.50 670,000.00 100,500.00 3,015,000.00 450,240.00
Jumlah
26,901,002.50
RENCANA ANGGARAN BIAYA Kegiatan Pekerjaan Lokasi Tahun Anggaran
No
: Universitas Negeri Malang : Belanja Modal Gedung Dan Bangunan Berupa Pembangunan Tribun Penunjang Graha Cakrawala : Kampus Universitas Negeri Malang Jl. Semarang No. 05 Malang : 2011
Uraian Pekerjaan
X
Harga Satuan (Rp)
Volume
Jumlah Harga (Rp)
PEKERJAAN SANITASI 1
2 3 4 5 6 7 8 9 10 11 12 13 14 15
XI 1 2 3 4 5
Pasang pipa PVC AW1 1/2" (Air bersih) Pasang pipa PVC D 3" (Air kotor) Pasang pipa PVC D 4" ( Kotoran ) Pasang kran 1/2" Ex SAN- EI Pasang floordrain stainlesstell Ex Toto Tempat sabun Pasang avoor bak mandi Pasang waslet shower spray.ex toto Pasang Urinoir lengkap Ex Toto Wastafel lengkap + kran,meja beton & kaca Pas. Kloset duduk ex Toto Pas. Kloset jongkok ex Toto Pasang Shower ex Toto lengkap Pasang bak mandi lapis keramik Pemipaan air distribusi Pengadaan dan pemasangan pipa GI lengkap dengan Support, klem, penanaman penanaman pipa dan material bantu lainnya. a. Pipa GI - Pipa GI Dia f 3 " - Pipa GI Dia f 2 " - Pipa GI Dia f 1 1/2 " b. Fitting-fitting pipa GI PEKERJAAN LAIN-LAIN Pasang pagar tribun penonton Pasang sika membran (tribun) dan screading Pasang silent ( delatasi tribun) Pembuatan septicktank + resapan Pembersihan akhir
269.98 89.98 95.00 17.00 8.00 8.00 8.00 2.00 4.000 4.000 2.000 5.000 2.000 7.00
M' M' M' Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
11,542.00 28,711.00 31,133.00 222,574.00 431,312.50 75,710.00 75,710.00 1,189,652.00 4,460,772.90 756,160.00 2,604,574.00 214,339.00 1,189,652.00 4,020,000.00
3,116,109.16 2,583,415.78 2,957,635.00 3,783,758.00 3,450,500.00 605,680.00 605,680.00 2,379,304.00 17,843,091.60 3,024,640.00 5,209,148.00 1,071,695.00 2,379,304.00 28,140,000.00
45.00 47.00 61.00 1.00
M' M' M' Ls
199,392.00 123,146.00 98,516.80 2,077,002.68 Jumlah
8,972,640.00 5,787,862.00 6,009,524.80 2,077,002.68 99,996,990.02
649,886.00 80,000.00 450,000.00 10,150,000.00 3,000,000.00 Jumlah
100,628,348.24 158,008,000.00 9,616,500.00 30,450,000.00 3,000,000.00 301,702,848.24
154.840 M2 1975.100 M2 21.370 M' 3.000 Unit 1.000 Ls