This document describes the installation method for GRP tanks installations. especially needed by the consultants and to be provided by contractors.Full description
This document describes the installation method for GRP tanks installations. especially needed by the consultants and to be provided by contractors.
okay
bacaanFull description
This document describes the installation method for GRP tanks installations. especially needed by the consultants and to be provided by contractors.
bacaan
Full description
VesdaFull description
aw
7.1
Installation of PPR
7.1.1
Prior Prior to installati installations ons site will will be checked checked for the accessibi accessibility lity.. Also Also Co-ordin Co-ordinatio ation n will be done with other services at the time of marking.
7.1.2 7.1.2
Deter Determi mine ne the positio position n of sppor spports ts and install install the sppo spports rts as per the approve approved d standard detail drawings.
7.1.!
"he water water spply spply piping piping system system is polypr polypropy opylene lene #PP$% #PP$% pipes pipes system system and &oints &oints are are to be fsion welded' electro welded type.
7.1.(
)very chang change e in directio directions ns of the pipes' pipes' spports spports shall shall be provi provided ded with with in 1*+mm 1*+mm on both sides' irrespective of distance mentioned in the standard detail drawing.
7.1.*
"he polypr polypropyl opylene ene pipes pipes and fittings fittings will will be &oined &oined by fsion fsion &ointin &ointing g method' method' in which which two pieces of pipes and fitting are heated by a heating tool ntil their srface melt' and then they are fitted together.
7.1., 7.1.,
"he 1,mm 1,mm to ,!mm pipes pipes and fitting fittings s are fsion fsion &ointe &ointed d by hand hand held held fsion fsion tool. tool. "he 7*mm to 11+mm diameter pipes are &oined by bench monted fsion machines.
7.1.7 7.1.7
"he fsion fsion tool tool is plgge plgged d into an 11+ 11+ spply spply and and allowe allowed d to heat heat p for abot abot * mintes. mintes. "he temperat temperatre re is checked checked sing a temple stick stick which melts at 2*! C temperatres. °
7.1. 7.1.
"he srfa srface ce of the pipe pipe and intern internal al srfac srface e of the fitting fittings s are cleane cleaned d by a moist moist cloth with cleaning flid' as per manfactrer recommendation. recommendation.
7.1./
"he pipe pipe mst mst be be ct at right right angles angles sing sing pipe pipe ctters ctters.. 0hears 0hears are are sed sed for 1,mm to 2*mm pipe diameter and roller ctters are sed for pipe of 2*mm to ,!mm diameter' diameter' after this t his process chamfering will take place.
7.1.1+ ark the welding welding depth at the end end of the pipe with with the enclosed pencil pencil and template. template. 7.1.11 "he pipe pipe and fitting are pshed simltaneosly simltaneosly on to the heating heating bshes. bshes. hen their their srface comes in contact with heating plate they will start to melt. 7.1.12 7.1.12 "he insertio insertion n mark mst be seen seen all the time dring dring melting melting process. process. "he fitting fitting is pshed on to the heating bsh ntil it reaches the first ridge on the bsh. 7.1.1! 7.1.1! "he timer is then started started when pipe and fittings fittings are flly inserted. inserted. hen the timer beeps withdraw the pipe and fitting 3ickly and align pipe and fitting after bringing them together. 7.1.1( 7.1.1( 4t is important important to bring the pipe pipe and fitting together together 3ickly 3ickly to prevent their their srface cooling and drying. drying. "he molten pipes and fittings fittings shold be aligned together together withot any twisting. 7.1.1* "he pipe is pshed pshed into fitting fitting pto insertion mark. mark. After &ointing &ointing one one bead of molten material is formed on pipe and another bead on the fitting. "his demonstrates a perfect &oint. 7.1.1, All valves will be installed installed as per approved approved shop drawings. drawings. 7.1.17 )nsre all valves' strainers strainers and inline inline fittings orientation is correct. 7.3
Testing of Water Supply Pipe work
7.!.1
5ydralic testing will be carried ot for checking leaks and defects in new pipe work. "he testing will be performed in sections and separate test reports will be prepared.
7.!.2
"he pipes will be &ointed' plgged and shall have been in position for at least 2(hors before test are carried ot.
7.!.!
"he pipes shall be tested for water pressre holding and alignment.
7.!.(
"he water for testing will be obtained from the temporary water spply provided at the site.
7.!.*
inimm of 2 identical pressre gages will be installed at e6treme ends of the circit however one pressre gage is enogh for the testing of water spply pipes inside the toilets.
7.!.,
"he system will be pressri8ed sing manal pmps in increment of 2* 9 of the test pressre. A standing period of 1+ mintes will be allowed after each increment of pressre.
A record will be maintained for water temperatre along with pressre readings