Method Statement for Installation of Cable TraysFull description
Method Statement for Installation of TransformerFull description
Method Statement for Installation of TransformerFull description
MS AHU
Method Statement for Installation of DBsFull description
Guide to transformer installation.
iguyDescription complète
fire alarm systemDescription complète
dfgdfg
Method Statement for Installation Safety Crash Barriers is Civil Engineering documentation useful reference for your project. The document specify the various methods of installation.Full description
dfgffDescription complète
dfgffDescription complète
dgdfgDescription complète
dfgff
jygjhDescription complète
ergerger
Method of Statement For Duct Installation, Insulation& Leak Testing Testing TABLE OF CONTENTS
1.1 "$is %et$o- state%ent eplains t$e proce-ure of -uct /orks0 inclu-in t$e -uct i nstallation0 insulation0 fiin of -ucts accessories an- -uct l eakae testin (!i$t "e "est*. st*.
2.
Reference
2.1 Approved Drawings 2.1 Approved 2.2 Manufacturer’s Catalogues, Vendor Drawing 2.3 General Specifications for HVAC Sste! 2.4 Material Su"!ission for HVAC #$uip!ent % Materials
3.
Responsibilities
3.1 Mec!nic!l " #$A #$AC C En%ineer •
He s&all "e overall responsi"le for t&e co!plete activit including, "ut not li!ited to' (.1.1 Assigning wor)!an crew (.1.2 Se$uence of activities to "e carried out for t&e wor) as per t&is Met&od State!ent. (.1.( Stage inspection * surveillance (.1.+ otification to client engineer for inspection and dail co!!issioning activities. (.1.- rovide da to da guidance and delegate wor)s as necessar. (.1./ #nsure t&at t&e e$uip!ent and tools re$uired for carring out t&e test are availa"le, !aintained and used in safe !anner. (.1.0 roduce all necessar records for t&e confir!ation of testing wor)s co!pleted And pass to C inspector as re$uired.
3.2 Mec!nic!l"#$AC S&per'isor •
He s&all "e overall responsi"le for t&e activit including, "ut not li!ited to'
(.2.1 Assigning wor)s!an crew. (.2.2 Se$uence of activities to "e carried out for t&e wor). (.2.( #nsure t&e $ualit levels are !aintained. (.2.+ #nsure t&at t&e e$uip!ent and tools re$uired for carring out t&e test are availa"le, !aintained and used in safe !anner. 3.3 (A"(C )nspector (.(.1 Maintain records of $ualit control c)ec) s&eets % report for!ats for t&e site ests and inspection. (.(.2 Carr out surveillance so as to ensure t&at t&e personel are wor)ing i accor3 Dance wit& t&e approved standards. (.(.( Assurances of approved !et&ods are "eing used for testing and !aterial receipt inspection. (.(.+ Verification of !aterial approval and vendor certification. Control Me!s&res
4.
*.1 (&!lit+ Control +.1.1 +.1.2
#nsure availa"ilit of latest released for construction drawings and specifications. #nsure t&e tools%e$uip!ent used for testing * co!!issioning purpose is cali"rated and certificates availa"le.
*.2 S!fet+ +.2.1 All e$uip!ent and accessories &ave "een certified for t&eir capacit And integrit. +.2.2 Safet and ris) assess!ent s&all "e perfor!ed for ever 4o" or tas), w&ic& &as potential for &ar!. +.2.( All personnel are issued wit& ersonal rotective #$uip!ent wit& 56C. ,.
Se-&ence of Acti'ities
5.1 andling and Storage of Ducts 5.1.1 nloa- t$e -uct b) $an-loa-er an- store t$e -uct insi-e t$e Respective buil-ins or /orks$op area.
5.! "rimar# Ste$ 5.2.1 C$eck approval of /orkin -ra/ins. 5.2.2 C$eck site clearance for /ork. 5.2.3 C$eck /allslab openin as per approve- -ra/ins.
5.2.4 otif) to client for inspection of receivin factor) %a-e -uct. 5.2.5 Asse%ble- t$e fabricate- -ucts at site /it$ consultantqualit) fficial for correctness of construction.
5.% Installation & Insulation of Duct
5.3.1 or +nternal Conceale- uct0 Mark t$e routin of t$e -ucts an- install 7+ t$rea-e- ro- an- supports. 5.3.2 +nstall t$e factor) %a-e uct as per +C -ra/in. 5.3.3 Seal t$e -uct 8oints /it$ approve- sealant. 5.3.4 Appl) sealant outsi-e of t$e -uct bet/een t$e ap an- corner an- also Appl) insi-e of t$e -uct (/$erever it9s possible*. 5.3.5 Stick self:a-$esive alu%inu% allo) sticker pins (1 pin;.16 sq. %.* to "$e bare -uct fir%l). 5.3.6 ,aste t$e bon-in a-$esive lue on t$e bare -uct. 5.3.# All 8oints to be insulate after co%pletion of -uct leak test (li$tnin test* 5.3.< Approve- fiber lass insulation s$all be fie- fir%l) on t$e -uct. 5.3.= +nsulation s$all be overlappe- b) at least 1;;%% an- s$all be astene- /it$ 65%% /i-e alu%inu% foil tape an- tape s$all be verlappe- b) 15%%. 5.3.1; ti$t insulation /it$ alu%inu% ban-. 5.3.11 uct s$all be clean an- all open en-s s$all be covere- in a suitable Manner to prevent fro% -ust an- -ebris. 5.3.12 for internal epose- -uct0 sa%e proce-ure s$all be follo/e-0 anApprove- seal coatin /it$ lass clot$ coverin s$all be applie- after +nsulation. 5.3.13 for eternal epose- -uct0 sa%e proce-ure s$all be follo/e-0 anApprove- alu%inu% cla--in (8acketin* s$all be applie- after +nsulation.
5.4.1 C$eck t$e -i%ension an- location of t$e /allslabceilin openin as ,er t$e ven-or -ra/ins /$erever necessar). 5.4.2 +nstall access -oors as per t$e approve- -ra/in. (>esi-e eac$ M? An- *. "$e ?C0 fire -a%pers0 access -oors0 -oor rilles0 test $oles An- fres$ air intakes s$all be installe- onl) after t$e inspection of Material as per SA@S. 5.4.3 +nstall t$e rilles -iffusers properl) as per +C -ra/ins. 5.4.4 +nstall fleible -uct /it$ necessar) support as per t$e +C -ra/ins. 5.4.5 Connect t$e bot$ en-s of t$e fleible -uct /it$ stainless steel cla%p. i. "$e louver0 rilles an- -iffusers as per -ra/in.
).
Ins$ection ).1 Duct Leak Test
6.1.1 !i$t test s$all be perfor%e- to -eter%ine t$at all 8oints are l eak proof An- it /ill be perfor%e- b) passin a la%p $avin a po/er ratin of not !ess t$an 5;; /atts. (Selection of 5;;/ in nor%al B?AC installation ,ractice*. 6.1.2 !i$t ,o/er ratin not less t$an 5;; /atts0 selection of 5;; /atts !i$tnin s$all be cover onl) 1; sq. %. -uctin area. A--itional
!li$ts /ill be provi-e- if t$e -uct area is %ore t$an 1; sq. %. 6.1.3 "$e insulation of -ucts can be carrie- out before li$t test0 >ut t$e 8oints s$oul- be free in or-er to be teste- before insulation. 6.1.4 "$e test can be perfor%e- part b) part accor-in to t$e site con-ition. 6.1.5 +nsert t$e li$t insi-e t$e -uct inspecte-0 %ove t$e li$t as near as ,ossible in eac$ transverse 8oint0 for t$e case of s%aller -uct0 floo- b) !i$t eac$ strai$t -uct of 6 %eters %ini%u% lent$0 t$en visual +nspection s$all be perfor%e- fro% outsi-e t$e peri%eter 8oint to eter%ine t$e leak. 6.1.6 n /itness inspection0 furt$er activit) s$all be procee-e- to con-uct utri$t corrective action to seal t$e i-entifie- leaks. 6.1.# "$e inspection s$all be recor-e- an- sine- b) t$e client inspector for Recor- reference.
).! Final Ins$ection.
6.2.1 @nsure- t$at all ventilation -uct /ork s$all be carrie- out in Accor-ance /it$ 8ob specification an- stan-ar-s. 6.2.2 Re- line %ark:ups an- as built -ra/in to be prepare+ncorporatin t$e %o-ifications if an) for t$e installe- -uctin !a)out. 6.2.3 inal inspection to be %a-e for installation of all ventilation -ucts Work.