PEKERJAAN PEMBANGUNAN JARINGAN GAS UNTUK RUMAH TANGGA DI SERANG, BOGOR, CIREBON, (13.666) SR
LAPORAN HAZID
C1
09-02-2016
ISSUED FOR APPROVAL YAHYO
REV
DATE
DESCRIPTION
SW
RFM
APPROVAL SIGNED
No part of this document may be reproduced, in any form or by any means, e xcept as permitted by PERTAMINA
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
P ro je c t N o : C . 1 6 0 1
REVISION CONTROL SHEET
Rev.
Bab.
Deskripsi Perubahan
Doc . S t atus : IF A Page 2 of 29
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 3 of 29
P r o je c t N o : C . 1 6 0 1
DAFTAR ISI
1.
TUJUAN..............................................................................................................4
2.
DEFINISI.............................................................................................................4
3. REFERENSI, STANDAR DAN SPESIFIKASI .....................................................5 4. HAZID CLOSE OUT .............................................................................................6 LAMPIRAN 1 SAFETY ACTION LOG
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Doc . S t atus : IF A
Rev.Da te : 0 9 -02 -20 16
Page 4 of 29
P r o je c t N o : C . 1 6 0 1
1. TUJUAN Dokumen ini menyajikan ringkasan tindakan pencegahan dan rekomendasi Laporan Hazard Identification (HAZID) Pekerjaan Jaringan Gas Untuk Rumah Tangga di
Serang, Bogor, Cirebon (13.666) SR.
Ringkasan
tindakan
pencegahan
dan
rekomendasi disajikan dalam format Safety Action Log untuk memfasilitasi tindak lanjut pencegahan bahaya.
2. DEFINISI Dalam spesifikasi ini, kata-kata atau kalimat maupun istilah harus mempunyai arti sebagaimana ditentukan di bawah ini, kecuali ditentukan atau disebut lain. PERUSAHAAN
: KSO Pratiwi-DHAMMA, yang didefinisikan sebagai Pemilik danpengguna fasilitas akhir.
KONSULTAN
: Badan Usaha yang ditunjuk oleh PERUSAHAAN sebagai pelaksana pekerjaan Desain Perencanaan meliputi,
pekerjaan
termasuk
basic & detail engineering,
mendampingi
PERUSAHAAN
dalam
pelaksanaan pekerjaan KONTRAKTOR KONTRAKTOR
: Badan Usaha yang dipilih oleh pihak PERUSAHAAN untuk melaksanakan Procurement & Construction sesuai yang disyaratkan PERUSAHAAN
SUB KONTRAKTOR : Badan Usaha yang ditunjuk oleh KONTRAKTOR untuk
mengerjakan
bagian-bagian
kecil
dari
pekerjaannya sesuai lingkup yang diberikan dan harus disetujui oleh PERUSAHAAN PROYEK
MANUFAKTUR
: PEKERJAAN PEMBANGUNAN JARINGAN GAS UNTUK RUMAH TANGGA DI SERANG, BOGOR, CIREBON, (13.666) SR : Fabrikan
yang
handal
dan
telah
teruji
untuk
membuat peralatan beserta komponen lainnya sesuai dengan
spesifikasi
yang
ditentukan
untuk
pembangunan Jaringan Gas di Serang, Bogor, Cirebon
(13.666)
SR
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Doc . S t atus : IF A
Rev.Da te : 0 9 -02 -20 16
Page 5 of 29
P r o je c t N o : C . 1 6 0 1
3. REFERENSI, STANDAR DAN SPESIFIKASI Untuk referensi standard minimum menggunakan edisi paling baru atau revisi standar industri Oil & Gas. Berikut dokumen dan standar kode yang akan digunakan dalam mengidentifikasi bahaya (Hazid) 3.1.
Dokumen Referensi Dokumen berikut ini, merupakan bagian yang tidak terpisahkan dan dianggap sebagai dokumen referensi. Dokumen tersebut antara lain : 1.
SKNT-SPBG.BID-PRO-BDS-001 :
Desain Basis Proyek
2.
SKNT-SPBG.BID-PRO-BDS-002 :
Deskripsi Proses
3.
SKNT-SPBG.BID-PRO-BDS-004 :
Proses Operasi dan Filosofi Kontrol
4.
SKNT-SPBG.BID-ELE-SPE-008
:
Hazardous Area Clasification
5.
SKNT-SPBG.BID-INS-SPE-009
:
Instrument
Control
dan
Safety
description 6.
SKNT-SPBG.BID-INS-DWG-005
:
Layout Instalasi CCTV
7.
SKNT-SPBG.BID-INS-DWG-003
:
Layout Instalasi Fire & Gas Detector
8.
SKNT-SPBG.BID-INS-DWG-004
:
Layout
Instalasi
smoke
&
heat
Detector 9.
SKNT-SPBG.BID-HSE-SPE-003
:
Spesifikasi
Fire
Protection
Sistem
(portable extinguisher, etc) 10. SKNT-SPBG.BID-PRO-DWG-001 : Pocess Flow Diagram SPBG Station 11. SKNT-SPBG.BID-PRO-BDS-003 : Deskripsi Utilitas 12. SKNT-SPBG.BID-ELE-CAL-002
: Perhitungan Sistem Lightning & Grounding
13. SKNT-SPBG.BID-HSE-RPT-001
: Perhitungan Kebutuhan Peralatan Pemadam Kebakaran
14. SKNT-SPBG.BID-CIV-SPE-001
: General Pekerjaan Sipil
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 6 of 29
P r o je c t N o : C . 1 6 0 1
3.2.
Code dan Standar Referensi American
Institute
of
Chemical
Engineer
(AlChE),
"Guidelines
for Hazard Evaluation Procedures", 2nd Edition, 1992. CCPS, "HAZID Techniques in Process Industries, 1992. IEC/FDIS 31010, "International Standard, Final Draft, Risk
4. HAZID CLOSE OUT Upaya menangani secara tepat bahaya yang telah diidentifikasi dalam Laporan HAZID, maka tindakan pencegahan, pengendalian, dan rekomendasi, baik yang bersifat wajib maupun opsional, disusun dan diajukan. Untuk memudahkan pencatatan tindakan pencegahan atau tindakan keselamatan, Safety Action Log dibuat dalam laporan ini. Safety Action Log adalah form yang menginformasikan status close out tindakan pencegahan yang dibuat dalam Laporan HAZID. KONTRAKTOR dan perwakilan PERUSAHAAN adalah pihak yang bertanggung jawab untuk memutuskan apakah suatu tindakan pencegahan atau rekomendasi harus diimplementasikan atau tidak.
Safety Action Log dapat dilihat pada Lampiran 1.
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 7 of 29
P r o je c t N o : C . 1 6 0 1
LAMPIRAN 1 SAFETY ACTION LOG
Sheet No.
SAFETY ACTION LOG 1 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 0 0 2 rev. C1)
NO. REF
KATA KUNCI
DESKRIPSI
1
Peristiwa alam
Fasilitas tersambar petir
TINGKAT RISIKO
[ ] Tindakan Pencegahan (Wajib) Grounding dipasang pada setiap peralatan (SKNT-SPBG.BID-ELE-CAL-002) Perhitungan Sistem Lightning & Grounding)
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 8 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 2 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 0 0 2 rev. C1)
NO. REF 2
KATA KUNCI Peristiwa alam
DESKRIPSI Banjir di lokasi SPBG
[ ] Tindakan Pencegahan (Wajib) Dibuat sistem drainase menuju sumur resapan Ketinggian permukaan tanah SPBG dibuat lebih tinggi dari permukaan jalan Mulut oil catcher dibuat lebih tinggi dari muka permukaan tanah SPBG
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator Respon:
Ditulis oleh:
Tandatangan:
Tanggal:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 2
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 9 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 3 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 0 0 2 rev. C1)
NO. REF 3
KATA KUNCI Peristiwa diluar dugaan
DESKRIPSI Korosi eksternal
[ ] Tindakan Pencegahan (Wajib) Pengecatan dan pemasangan coating pada pipa dan peralatan Pemeliharaan secara periodik terhadap perpipaan dan peralatan
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 4
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 10 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 4 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 4
KATA KUNCI Keamanan (security)
DESKRIPSI Pencurian/sabotase
TINGKAT RISIKO 2
[ ] Tindakan Pencegahan (Wajib) Pagar sebagai pembatas untuk melindungi aset (SKNT-SPBG.BID-CIV-DWG-004) General Fencing & Main Equipment Area Fencing) CCTV dipasang untuk keperluan monitoring (SKNT-SPBG.BID-INS-DWG -005) Layout Instalasi CCTV) Tim pengaman fasilitas
[
] Rekomendasi (Opsional) Bentuk satuan tim pengaman fasilitas yang bekerja 24 jam saat fasilitas beroperasi
Ditulis oleh: HAZID Facilitator Respon:
Ditulis oleh:
Tandatangan:
Tanggal:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 11 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 5 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF
KATA KUNCI Keamanan (security)
5
DESKRIPSI Orang yang tidak berkepentingan masuk ke area perkantoran atau area proses
TINGKAT RISIKO 4
[ ] Tindakan Pencegahan (Wajib) Tim pengaman fasilitas
[
] Rekomendasi (Opsional) Buat ID card atau pasang sistem finger print untuk membatasi akses keluar dan masuk perkantoran dan area proses Pasang warning sign "AUTHORIZED PERSONNEL ONLY"
Ditulis oleh: HAZID Facilitator Respon: Ditulis oleh:
Close-out: Ditulis oleh:
Tandatangan:
Tanggal:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 12 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 6 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 6
KATA KUNCI Kebisingan
DESKRIPSI Kebisingan tinggi di area kompresor
TINGKAT RISIKO 1
[ ] Tindakan Pencegahan (Wajib) Ambang batas kebisingan untuk kompresor berpenggerak gas engine adalah 85 dB pada jarak 3 m, sedangkan untuk kompresor berpenggerak motor listrik adalah 75 dB pada jarak 3 m.
[
] Rekomendasi (Opsional) Buat SOP untuk memasang ear plug di area kompresor Pasang warning sign area dengan kebisingan tinggi
Ditulis oleh: HAZID Facilitator Respon:
Ditulis oleh:
Tandatangan:
Tanggal:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 13 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 7 of 22
PROYEK TUGAS DOKUMEN NO. REF 7
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1) KATA KUNCI Pemeliharaan/konstruksi
DESKRIPSI Bahaya listrik
[ ] Tindakan Pencegahan (Wajib) Kabel dipasang conduit dengan benar Pekerja memakai alat pelindung keselamatan (PPE) secara lengkap
[
] Rekomendasi (Opsional)
Siapkan izin kerja sebelum memulai pekerjaan dan JSA (Job Safety Analysis)
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 4
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 14 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN NO. REF 8
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1) KATA KUNCI Pemeliharaan/konstruksi
DESKRIPSI Permukaan panas
[ ] Tindakan Pencegahan (Wajib) Setiap permukaan panas diberi isolasi untuk melindungi personil dari sengatan panas Pekerja memakai alat pelindung keselamatan (PPE) secara lengkap
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator Respon:
Ditulis oleh:
Tandatangan:
Tanggal:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 4
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 15 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 9 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 9
KATA KUNCI Loss of containment
DESKRIPSI Kebocoran pada peralatan proses
TINGKAT RISIKO 4
[ ] Tindakan Pencegahan (Wajib) Perawatan dan inspeksi rutin Pemasangan fire and gas detector (SKNT-SPBG.BID-INS-DWG-003) Layout Instalasi Fire & Gas Detector) Dibuat prosedur operasi drain valve untuk mencegah gas blow by Pemasangan 1 (satu) unit SDV untuk menyetop gas umpan dari GTM ke SPBG
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 16 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 10 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 10
KATA KUNCI Sumber pengapian
DESKRIPSI Vent
TINGKAT RISIKO 4
[ ] Tindakan Pencegahan (Wajib) Penangkal petir dipasang di area SPBG
[
] Rekomendasi (Opsional)
Definisikan lokasi yang aman dan ketinggian minimum yang dibutuhkan vent stack dan vent location yang sesuai dengan arah angin
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 17 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 11 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 11.a
KATA KUNCI Transportasi
11.b
Transportasi
DESKRIPSI Hose tidak terhubung dengan benar pada GTM GTM bergerak ketika hose masih terhubung
[ ] Tindakan Pencegahan (Wajib) Dibuat prosedur pengisian decanting panel/SPBG Memasang breakaway coupling
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator Respon:
Ditulis oleh:
Tandatangan:
Tanggal:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 2 2
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 18 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN NO. REF 12
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1) KATA KUNCI Pemeliharaan/konstruksi
DESKRIPSI Api di dalam gedung
TINGKAT RISIKO 4
[ ] Tindakan Pencegahan (Wajib) Fire extinguisher di gedung Detektor asap dan detektor panas (SKNT-SPBG.BID-INS-DWG-004) Layout Installasi Smoke dan Heat Detector) Melakukan fire drill, menyiapkan escape route, membuat muster point
[
] Rekomendasi (Opsional)
Membuat jadwal dan bahan fire drill
Ditulis oleh: HAZID Facilitator Respon:
Ditulis oleh:
Tandatangan:
Tanggal:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 19 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 13
KATA KUNCI Shut down
DESKRIPSI Aliran Listrik PLN Terputus
[ ] Tindakan Pencegahan (Wajib) Sistem kontrol membuat fasilitas lebih aman (fail to safe position) Dispenser dilengkapi dengan back up batery selama 15 menit
[
] Rekomendasi (Opsional)
Pertimbangkan emergency genset untuk menjamin kelangsungan operasi
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 3
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 20 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 14
KATA KUNCI Pembuangan ke udara
DESKRIPSI Venting dilakukan saat kondiisi darurat
[ ] Tindakan Pencegahan (Wajib) Setiap permukaan panas diberi isolasi untuk melindungi personil dari sengatan panas Pekerja memakai alat pelindung keselamatan (PPE) secara lengkap
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator Respon:
Ditulis oleh:
Tandatangan:
Tanggal:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 4
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 21 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN NO. REF 15
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1) KATA KUNCI Pembuangan ke badan air
DESKRIPSI Pembuangan ke badan air
[ ] Tindakan Pencegahan (Wajib) Sistem drain terpisah untuk air hujan Drainase untuk closed drain ditutup dengan rain cover
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 2
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 22 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 16
KATA KUNCI Kebakaran
DESKRIPSI Merokok/nyala api di area SPBG
TINGKAT RISIKO 4
[ ] Tindakan Pencegahan (Wajib) Zona dilarang merokok atau menyalakan api Fire extinguisher di area SPBG (BGR1-SPBG.DS-PIP-DRW-010 Emergency route and fire extinguisher layout)
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 23 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 17
KATA KUNCI Tata letak
DESKRIPSI Akses dalam ruangan terhalang
[ ] Tindakan Pencegahan (Wajib) Tata letak interior gedung diatur sedemikian rupa sehingga memudahkan akses dalam gedung
[
] Rekomendasi (Opsional)
Tata letak interior gedung dibuat memenuhi kebutuhan untuk memudahkan aktivitas
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 2
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 24 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 18
KATA KUNCI Transportasi
DESKRIPSI Peralatan tertabrak kendaraan
TINGKAT RISIKO 8
[ ] Tindakan Pencegahan (Wajib) Area parkir kendaraan dibuat cukupjauh dari area peralatan Area proses yang berdekatan dengan jalur keluar masuk kendaraan dilengkapi dengan barlkade/pagar pembatas
[
] Rekomendasi (Opsional)
Buat warning sign maksimum kecepatan kendaraan
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 25 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 19
KATA KUNCI Bahaya proses
DESKRIPSI Kesalahan operasi
[ ] Tindakan Pencegahan (Wajib) Instrumentasi dan kontrol dipasang untuk mengembalikan kondisi tidak normal menjadi normal
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 4
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 26 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 20
KATA KUNCI Bahaya proses
DESKRIPSI Tombol ESDV tidak sengaja tertekan
[ ] Tindakan Pencegahan (Wajib) Tombol ESDV dilengkapi dengan cover untuk mencegah tertekan secara tidak disengaja
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 2
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 27 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 21
KATA KUNCI Bahaya proses
DESKRIPSI Kegagalan peralatan berputar
[ ] Tindakan Pencegahan (Wajib) Melakukan pemeliharaan peralatan berputar secara berkala
[
] Rekomendasi (Opsional) Buat log book sistem pemeliharaan peralatan berputar
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 4
D o c . N o .
L A P O R AN H A ZI D
S K N T - S P B G . B I D – H S E - RP T – 0 0 2
Revisi on D oc umen t t y p e : L ap o r an
Discip lin e : H SE
: C1
Rev.Da te : 0 9 -02 -20 16
Doc . S t atus : IF A Page 28 of 29
P r o je c t N o : C . 1 6 0 1
Sheet No.
SAFETY ACTION LOG 8 of 22
PROYEK TUGAS DOKUMEN
PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Studi HAZID pada Pekerjaan Konstruksi Pembangunan Infrastruktur PEMBANGUNAN INFRASTRUKTUR SPBG ECOSTATION TAHAP 2 Laporan HAZID (S K N T - S P B G . B I D – H S E - R P T – 00 2 rev. C1)
NO. REF 22
KATA KUNCI Bahaya proses
DESKRIPSI Temperatur udara dalam kabinet kompresor tinggi
[ ] Tindakan Pencegahan (Wajib) Temperature switch dipasang untuk mematikan kompresor
[
] Rekomendasi (Opsional)
Ditulis oleh: HAZID Facilitator
Tandatangan:
Tanggal:
Respon:
Ditulis oleh:
Tanda tangan:
Tanggal:
Tanda tangan:
Tanggal:
Close-out:
Ditulis oleh:
TINGKAT RISIKO 2