LARSEN & TOUBRO LIMITED Project
: IOCL Panipat , PNCP Project.(EPCC-1)
OWNER:- Ind
Acptd. Std. : Applicable Specs.
PMC:- Engine
Product
EPCC :-L&T
: STATIC EQUIPMENT
INSPECTION & TEST PLAN Sr. No.
Inspection Activity
A
BEFORE ERECTION
1
Execution scheme of equipments foundation Incoming materia Documents : Review Review & Acce Acce tanc tance e Incoming material (Physical verfication ) Readyn dyness for Ere Erectio ctionn
2.A 2.B 2.C 2.C
Inspection By L&T
EIL
WC
RW
WC
RW
WC
W
2.C.1
Centre line marking on equipment & foundation
WC
S
2.C.2
Level of Foundation(shims/Packing Foundation( shims/Packing with marking to be prepared & kept ready)
WC
S
Correctness of no & size of foundation bolts Hole dia and no. of hole in base/structure of equipment equipment & columns Matching equipments base bolt holes with actual foundation
WC
W
WC
W
WC
W
Marking orientation
WC
RW
2.C.3 2.C.4 2.C.5 2.C.6
1.G 2
2.A 2.B 2.C 2.D 2.E 2.F 2.G 2.H 2.I 2.J 3
3.A
To identify the safe crane with requisite capacity
WC
RW
DURING ERECTION To check counterweight of crane and Boom length To check slew limitation of crane
WC
RW
WC
RW
WC
RW
WC
RW
WC
RW
WC
RW
WC
RW
WC
W
RW
RW
WC
S
WC
W/ RW
To check ground conditions are adequate for supporting full/rigged crane and load To check the crane can be travelled in loaded condition To check clearances from overhead electric ower cables To check maintenance certificates To check whether operators, riggers have received proper instructions To verify safe load indicator on the crane is in working condtion To c ec t e provision o racing o equipment as per Engg/ Manufacture's Requirement/ A roved dr s To check the guys, shoring, bracing, interference with works SAFETY TEST
Load test of cranes,lifting beams,slings and shackles, length and dia of sling & condition of wire rope(Broken/ damaged- strands should not
5
AFTER ERECTION
5.A
Tightening of bolts and providing washers
5.B
Levelling and alignment of equipments
WC
S
5.B.1
Critical equipments/ ODC's
WC
HP
5.B.2
Other
WC
W
5.C
Corresponding requirement elevation & distance between nozzles in special cases
WC
W
5.D
Cleaning of sleeves before grouting
WC
S
5.E
Grouting
5.E.1
Availability of Specified grouting materials
WC
RW
5.E.2
Placement of grouting
WC
W
5.E.3
Curing of grout
WC
S
Final tightening of bolts INSPECTION & TEST DOCUMENTS Review test and inspection documents
WC
S
HP
RW
5.F 7 1
Legend : HP - Hold Point W - Witness Point S - Surveillance inspection by OWNER/PMC Rv - Review of documentation WC - 100% inspection by L&T
Format No.:LT/PNCP/ITP/STAT-EQPT/014 Rev.0 Date 03.10.2006
an Oil Corporation Limited rs India Ltd.
Type of Record
---------
clarify
LT/PNCP/PIPING-MRIR/043 LT/PNCP/PIPING-MRIR/043
may change to Rw -----------------------------------------
---------
-----------------
-----------------
--------LT/PNCP/STAT-EQUIP/024
LARSEN & TOUBRO LIMITED
PMC
ITP No. - LT/MSQ/ITP/STAT.-EQPT./008
MSQ (EPCC-1) UPGRADATION PROJECT, IOCL PANIPAT IOCL-PANIPAT
Rev.- 01 DATE:- 04.09.2008
INSPECTION AND TEST PLAN FOR STATIC EQUIPMENT OWNER : INDIAN OIL CORPORATION LIMITED PMC :JACOBS ENGINEERING INDIA (P) LIMITED
JOB NO: 18-3177
EPCC : L&T Sl. No.
Inspection By L&T JACOBS
Activity/Characteristics to be check
Type of Record
A
BEFORE ERECTION
1
Execution scheme of equipments foundation
WC
RW
Approved Civil Format
2.A
Incoming material (Owner Supply)
WC
RW
LT/MSQ/IMIR/GEN/001
2.B
Incoming material (Contractor Supply, including check test, if any )
WC
HP
LT/MSQ/IMIR/GEN/001
2.C
Readyness for Erection
2.C.1
Centre line marking on equipment & foundation
WC
S
LT/MSQ/STAT-EQPT/029
2.C.2
Level of Foundation(shims/Packing with marking to be prepared & kept ready)
WC
S
LT/MSQ/STAT-EQPT/029
2.C.3
Correctness of no & size of foundation bolts
WC
S
LT/MSQ/STAT-EQPT/029
2.C.4
Hole dia and no. of hole in base/structure of equipment & columns
WC
S
LT/MSQ/STAT-EQPT/029
2.C.5
Matching equipments base bolt holes with actual foundation
WC
S
LT/MSQ/STAT-EQPT/029
2.C.6
Marking orientation
WC
RW
LT/MSQ/STAT-EQPT/029
2.C.7
Checking the threads of bolts & nuts
WC
S
LT/MSQ/STAT-EQPT/029
Remarks
Signature: Name: Date : Prepared by
Checked by
Approved by
Reviewed & Accepted by
L&T
L&T
L&T
JACOBS
Page 7 of 1 6
LARSEN & TOUBRO LIMITED
PMC
ITP No. - LT/MSQ/ITP/STAT.-EQPT./008
MSQ (EPCC-1) UPGRADATION PROJECT, IOCL PANIPAT IOCL-PANIPAT
Rev.- 01 DATE:- 04.09.2008
INSPECTION AND TEST PLAN FOR STATIC EQUIPMENT OWNER : INDIAN OIL CORPORATION LIMITED PMC :JACOBS ENGINEERING INDIA (P) LIMITED
JOB NO: 18-3177
EPCC : L&T Sl. No.
2.C.6 2 2.A 3
Activity/Characteristics to be check
Inspection By L&T JACOBS
Chipping and roughening of foundation
WC
S
LT/MSQ/STAT-EQPT/029
WC
HP
---------
Type of Record
ERECTION SCHEMES FOR CRITICAL EQUIPMENTS
Approved Rigging procedure ( As per Annexure - 1 ) SAFETY TEST
3.A
Load test of cranes,lifting beams,slings and shackles, length and dia of sling & condition of wire rope
WC
W/ RW
Approved Safety Checklist Format
3.B
Placement of Main & tailing crane as per approved rigging procedure
WC
RW
Erection / Rigging Scheme
4
DURING ERECTION
4.A
Deployment of competent Rigging crew
WC
RW
---------
4.B
Orientation to be checked
WC
S
---------
4.C
Placement of packing as per AFC Drawing
WC
S
---------
4.D
Outside cleaning, coating/wrapping,painting for underground equipment only
WC
W
---------
4.E
Orientation of equipments as per AFC drg
WC
S
NA
5
Remarks
AFTER ERECTION
Signature: Name: Date : Prepared by
Checked by
Approved by
Reviewed & Accepted by
L&T
L&T
L&T
JACOBS
Page 8 of 16
LARSEN & TOUBRO LIMITED
ITP No. - LT/MSQ/ITP/STAT.-EQPT./008
MSQ (EPCC-1) UPGRADATION PROJECT, IOCL PANIPAT IOCL-PANIPAT
PMC
Rev.- 01 DATE:- 04.09.2008
INSPECTION AND TEST PLAN FOR STATIC EQUIPMENT OWNER : INDIAN OIL CORPORATION LIMITED PMC :JACOBS ENGINEERING INDIA (P) LIMITED
JOB NO: 18-3177
EPCC : L&T Activity/Characteristics to be check
Inspection By L&T JACOBS
5.A
Tightening of bolts and providing washers
WC
5.B
Levelling and alignment of equipments
Sl. No.
S
Type of Record LT/MSQ/STAT-EQ./030 - 31 LT/MSQ/STAT-EQ./030 - 31
5.B.1
Critical equipments/ ODC's
WC
HP
5.B.2
WC
W
---------
WC
W
---------
5.D
Other Corresponding requirement elevation & distance between nozzles in special cases Cleaning of sleeves before grouting
WC
S
LT/MSQ/STAT-EQ./030 - 31
5.E
Grouting
5.C
5.E.1
Availability of Specified grouting materials
WC
RW
LT/MSQ/STAT-EQ./030 - 31
5.E.2
Placement of grouting
WC
W
LT/MSQ/STAT-EQ./030 - 31
5.E.3
Curing of grout
WC
S
LT/MSQ/STAT-EQ./030 - 31
Final tightening of bolts PACKED EQUIPMENTS BEFORE INSTALLATION Identify the material, check thickness, dimensions, no. and angle of fingers of packing rings
WC
S
---------
WC
S
---------
5.F 6 1 1.A
Remarks
Signature: Name: Date :
2
Prepared by
Checked by
Approved by
Reviewed & Accepted by
L&T
L&T
L&T
JACOBS
DURING INSTALLATION
Page 9 of 16
LARSEN & TOUBRO LIMITED
ITP No. - LT/MSQ/ITP/STAT.-EQPT./008
MSQ (EPCC-1) UPGRADATION PROJECT, IOCL PANIPAT IOCL-PANIPAT
PMC
Rev.- 01 DATE:- 04.09.2008
INSPECTION AND TEST PLAN FOR STATIC EQUIPMENT OWNER : INDIAN OIL CORPORATION LIMITED PMC :JACOBS ENGINEERING INDIA (P) LIMITED
JOB NO: 18-3177
EPCC : L&T Activity/Characteristics to be check
Inspection By L&T JACOBS
2.A
Degrease and cleaning of packing material
WC
S
---------
2.B
Check packing support plate
WC
S
---------
2.C
Check for stacked or dumped packing as per specifications.
WC
S
---------
2.D
Check for nesting
WC
S
---------
2.E
Check for packings are touching bed limiter
WC
S
---------
HP
RW
LT/MSQ/STAT-EQ./030 - 31
Sl. No.
7
INSPECTION & TEST DOCUMENTS
1
Review test and inspection documents HP - Hold Point
W - Witness Point
S - Surveillance inspection by JACOBS
Rw - Review of contractor documentation
WC - 100% inspection by contractor
Type of Record
NA - Not Applicable
Dwg- Drawing
Spec - Specification
Std - Standard
Remarks
Signature: Name:
B MAJUMDAR
A K SRIVASTAVA
Prepared by
Checked by
Reviewed & Accepted by
L&T
L&T
JACOBS
Date :
Page 10 of 16
LARSEN & TOUBRO LIMITED
ITP No. - LT/MSQ/ITP/STAT.-EQPT./006
MSQ UPGRADATION (EPCC-1) PROJECT PANIPAT IOCL-PANIPAT
Rev.- 00 11.08.2008
ANNEXURE-1
INSPECTION AND TEST PLAN FOR STATIC EQUIPMENT OWNER : INDIAN OIL CORPORATION LIMITED PMC : JACOBS ENGINEERING INDIA (P) LTD.
JOB NO: 18-3177
EPCC : L&T Sl. No.
Inspection By L&T JACOBS
Activity / Characteristics to be check
Type of Record
Remarks
ERECTION SCHEME FOR CRITICAL EQUIPMENTS Approved Rigging Procedure
1
Before Erection
1.A
Checking proper sequence for lifting of the equipment
WC
RW
1.B
To check weight of equipment
WC
RW
1.C
To check the center of gravity
WC
RW
1.D
To check suspensition points
WC
RW
1.E
To check maximum/minimum radius at which the lifting tackle will operate
WC
RW
1.F
To check the max. load to be lifted including wt. Of slings, hook-block, lifting beams and equipment etc.
WC
RW
1.G
To identify the safe crane with requisite capacity
WC
RW
2
DURING ERECTION
APPROVED CIVIL FORMAT
Approved Load Certificate ---------
2.A
To check counterweight of crane and Boom length
WC
RW
Approved Load Certificate
2.B
To check slew limitation of crane
WC
RW
Approved Load Certificate
Signature: Name: Date : Prepared by
Checked by
Approved by
Reviewed & Accepted by
L&T
L&T
L&T
JACOBS
Page 11 of 14
LARSEN & TOUBRO LIMITED
ITP No. - LT/MSQ/ITP/STAT.-EQPT./006
MSQ UPGRADATION (EPCC-1) PROJECT PANIPAT IOCL-PANIPAT
Rev.- 00 11.08.2008
ANNEXURE-1
INSPECTION AND TEST PLAN FOR STATIC EQUIPMENT OWNER : INDIAN OIL CORPORATION LIMITED
JOB NO: 18-3177
PMC : JACOBS ENGINEERING INDIA (P) LTD. EPCC : L&T Activity / Characteristics to be check
Inspection By L&T JACOBS
2.C
To check ground conditions are adequate for supporting full/rigged crane and load
WC
RW
Approved Load Certificate
2.D
To check the crane can be travelled in loaded condition
WC
RW
Approved Load Certificate
2.E
To check clearances from overhead electric power cables
WC
RW
---------
2.F
To check maintenance certificates
WC
RW
---------
2.G
To check whether operators, riggers have received proper instructions
WC
RW
---------
2.H
To verify safe load indicator on the crane is in working condtion
WC
W
---------
2.I
To check the provision of bracing of equipment as per Engg/ Manufacture's Requirement/ Approved drgs
RW
RW
Approved Drawing
2.J
To check the guys, shoring, bracing, interference with works
WC
S
---------
HP
RW
LT/PNCP/AU/STAT-EQPT/020
Sl. No.
7
INSPECTION & TEST DOCUMENTS
1
Review test and inspection documents HP - Hold Point
W - Witness Point
S - Surveillance inspection by JACOBS
Rw - Review of contractor do cumentation
WC - 100% inspection by contractor
Type of Record
NA - Not Applicable
Dwg- Drawing
Spec - Specification
Std - Standard
Remarks
Signature: Name: Date : Prepared by
Checked by
Approved by
Reviewed & Accepted by
L&T
L&T
L&T
JACOBS
Page 12 of 14