EQUIPMENT ERECTION, STATIC AND ROTARYDescrição completa
Installation Guidelines - Rotating Equipment
EQUIPMENT ERECTION, STATIC AND ROTARYDescripción completa
Coupling AlignmentFull description
EQUIPMENT ERECTION, STATIC AND ROTARY
ITP
to assist construction estimators in planning laborFull description
to assist construction estimators in planning laborDescripción completa
cv
Full description
Itp for Fabrication & Installation of Pipe Support
ITPDescription complète
Inspection and Test Plan for Installation of Static Equipment
ITP No.: Rev.: Date: Page:
ITP-MAG-IPP4-003 0 10.Jul.2013 1 of 1
IPP4 Power Project ITP Subject: Installation of Static Equipment Test Description of Required Tests & Checks Code 1 Procedures / Documents 1.1 Review of Installation Drawings, Vendor's Manual & Technical Documents 1.2 Installation of Static Equipment Method Statement Review & Approval 2 Material Receipt 2.1 Check Equipment Tag Number Identification
Reference Documents
Certification Form
MAG
Involvement WARTSILA
Drawing & Vendor Manual
xx
H
R
Drawing & Vendor Manual
xx
H
R
Packing Lists
xx
H
R
Packing Lists
xx
H
S
Installation Drawings
Survey Report IPP4-QA-FR-G-002
H
S
Method Statement
Grout Report IPP4-QA-FR-G-013
H
S
Method Statement
Grout Report IPP4-QA-FR-G-013
H
S
2.2
Check Incoming Material
3 3.1
3.3
Pre-Installation Activities Check Foundation for Location & Orienation of Anchor Bolts, Bolt Pocket Leveling, Sole Plates, Axis Marks of Foundation Check Chipping & Brushing of Foundation Surface under Base Plates Check Cleanliness of Pocket
3.4
Check Base Plate Elevation
Equipment Drawing
Leveling Report IPP4-QA-FR-G-014
H
S
4 4.1
Installation of Equipment Check Verticality, Orientation & the Equipment Leveling after Tightening of Anchor Bolts
Equipment Drawing
Leveling Report IPP4-QA-FR-G-014
H
W
3.2
ITP-MAG-IPP4-003 Rev 0
Owner
Remarks
Inspection and Test Plan for Installation of Static Equipment
ITP No.: Rev.: Date: Page:
ITP-MAG-IPP4-003 0 10.Jul.2013 1 of 1
IPP4 Power Project ITP Subject: Installation of Static Equipment Test Description of Required Tests & Checks Code 4.2 Equipment Base Grouting 4.3 5
Ensure all Mechanical Completion Check List is Completed Punch List Clearance
Legends S: Surveillance or Monitoring Point
ITP-MAG-IPP4-003 Rev 0
Reference Documents
Certification Form
MAG H
Involvement WARTSILA S
Equipment Drawing & Method Statement
Grout Report IPP4-QA-FR-G-013
As Per Mechanical Completion Check List
Check List IPP4-QA-FR-G-015
H
W
AS Per Punch List
Punch List IPP4-QA-FR-G-009
H
H
R: Review of Documant or Report
W: Witness
Owner
H: Hold Inspection
Remarks
Project:
IPP4 Power Project Document Title
Inspection and Test Plan for Installation of Static Equipment Document Number: