Description of contents for an HSE courseDescription complète
Full description
HSE Materi
h
seguridad en el tranbajoDescripción completa
Full description
HSE MateriDeskripsi lengkap
Description complète
Full description
Hse Statistics
seguridadFull description
Deskripsi lengkap
HSE MANUALDeskripsi lengkap
requerimientos para sistema de gestionDescripción completa
sa
seguridadDescripción completa
Baricade Pengamanan Pekerjaan dan Bahan Safety morning
Safety work & Preparation Method Statement
By Gunawan Poerworedjo
Deskripsi lengkap
hseDeskripsi lengkap
Identification Stage 1. Preliminarily Environmental Impacts Assessment-EIA for Project Options including duly completed Environment Engineering Review Report during Identification Stage for each option. 2. Risk Assessment for project Options including Site Risk Assessment (SRA) and use of Inherently Safer Design Checklist.
Concept Selection Stage 1. Project Risk Map for Selected Option 2. Design concept selection 3. Comparative HAZID and Quantitative Risk Assessment (QRA) or risk ranking 4. Comparison against risk acceptability criteria 5. ALARP dossier; demonstration of ALARP in option selection & subsequent decisions 6. Pre-sanction project HSE review and peer review (PHSER 1) 7. Lessons learned from previous projects 8. HSE Value Improvement Plan 9. HSE Action Tracking Register
Project Definition Stage - FEED and Project Execution Stage - Detailed Engineering & Design 1. Review of legal requirements 2. Development of HSE costs and time-frames tim e-frames 3. Hazard and Operability (HAZOP) strategy and preliminary HAZOP study 4. Contractor pre-qualification and selection (also on the basis of HSE performance) 5. Project HSE Risk Register 6. Contractor management, including:a.
Contract HSE terms and conditions
b. Contractor HSE standards c.
Contractor HSE Bridging Documents
7. Construction and Commissioning Environmental Management Plan, including a.
Waste management
8. Construction and Commissioning Health Management Plan, including; a.
Occupational exposure monitoring, including chemicals and noise
b. Health surveillance monitoring 9. Construction and Operations security plan, for example: a. Contractor reputation b. Emergency communications 10. Construction task risk assessments 11. Design HSE philosophies, including a.
Operating and maintenance philosophy
b. Environmental standards c.
Layout
12. Hazardous Area Classification 13. Management of Change Program 14. PHA/HAZID studies 15. HAZAN studies such as HAZOP, FMEA, FTA, ETA, THERP, etc. 16. Fire and explosion analysis 17. QRA studies 18. Register of safety-related devices 19. Safety critical elements and performance standards 20. Project HSE philosophy including SIL 21. Safety Integrity Level (SIL) rating of system and instrument protection 22. Environmental Impact Assessment, recommendations and preparation of Environmental Statement required for Kuwait EPA approval. 23. Operations Environmental Management Plan, including a.
Emissions monitoring
b. Environmental effects monitoring (e.g. ambient air quality) 24. Health impact assessment & Operations Health Management Plan 25. Evacuation, Escape and Rescue studies and emergency procedures 26. Operating, maintaining and commissioning procedures 27. Project HSE review and peer review (PHSER 2 for FEED and PHSER 3 fo r Detailed Engineering and Design)
Project Execution Stage - Construction and Commissioning 1. Construction and commissioning HAZIDS 2. Construction site inspections and audits 3. Factory acceptance tests (where specific HSE requirements exist) 4. Review of commissioning and operating procedures 5. Training 6. Actions closeout 7. Construction and Commissioning project HSE review and peer review (PHSER 4 & PHSER 5) 8. Pre-startup HSE review