RepublicofthePhilippines DepartmentofPublicWorksandHighways Manila
FLOODMANAGEMENTMASTERPLAN FORMETROMANILAAND SURROUNDINGAREAS
-September2012-
MasterPlanforFloodManagementinMetro ManilaandSurroundingAreas Objecve TheMasterPlanispreparedto TheMasterPlanispreparedtoestablishthe establishtheroad road map/visionforsustainableand map/visionforsustainableandeffec:veFlo effec:veFlood od ManagementinMetroMan ManagementinMetroManilaandSurround ilaandSurrounding ing Areasun:l2035.
Basedonriverbasins Pasig-MarikinaRiver BasinandLagunaLake Basin.
19km2 69km2
169km2
635km2
Totalarea4,354km2 TotalPopula:on17.1M
72km2 15km2 95km2
Boundaryof StudyAreaand theRiverBasins 3280km2
GuidingPrinciplesforMasterPlan Development 1)
Adopt Integrated Water Resources Management Principles and River BasinApproach
2)
Developsafesocietywithresiliencytofloodsthrough
•
Structuralmeasuresfortheriversbasinsandwaterways
•
StructuralmeasuresforLagunaLakeshore,and
•
Improvementofurbandrainagesystem
3)
ImprovementoftheFloodInforma:onandWarningSystem(FIWS)
4)
Establish integrated and consistent Flood Risk Management (FRM) ins:tu:onalsystem
5)
Strengthen community-based flood risk management – Land use and solidwaste
6)
U:liza:onofrunoffwatersaswaterresources,etc.
7)
Reforesta:onandwatershedmanagement
ThreeMajorFlooding Occurrence
(1)
Hugevolume ofwater comingfrom SierraMadre
(2)
Drainage capacity constraintsin coreareaof MetroManila
(3)
Lowlying communi:es around ManilaBay& LagunaLake
Small Dam Marikina Dam
900 3,600
Retarding Basin
RAM & FPM Retarding Basin
2,400 RAM & Small Wall RAM & Small Wall
FPM
2,900
Dredging
1,800
Dike and Excavation
3,000
1,750 1,000
1,000 Flood Wall
850(750**)
1,200
Flood Wall
800 (600*)
Heightening of Wall
RAM – River Area Management FPM – Flood Plain Management
2,000
600
Rehabiritation Rehabilitation of of Floodway Floodway
Note: Estimated population in Flood Risk Level-3 & 4.: 773,940 in NCR 294,000 in Laguna Lake
Population exposed to Flood Risk (unit:1000) Level-1 Low
Level-2 Medium
Level-3 High
Level-4 VeryHigh
Total 1-4
Overflowfrom Majorrivers
1,210
929
696
175
3,010
AroundLagunaLake
140
7
294
0
441
Flood Risk Map on Danger of Casualty-Risk Level
FloodCondionwithoutProject
FloodCondionwithProject
Exis%ngCondi%on
RiverImprovementand LargeFloodControlDam
(100-yearReturnPeriod)
(100-yearReturnPeriod)
Pasig-MarikinaRiver
Pasig-MarikinaRiver
ProposedComponents andMeasuresin DICAMM Ø
Rehabilitaonof15Major PumpingStaons
Ø
Rehab.ofDrainageChannel
• RemovalofObstruc:ons withindrainagechannels withse`lements • DredgingandDeclogging • Rehab.ofDrainageMains Ø
AddionalDrainageMains/ BoxCulverts
LagunaLakeshore:Long-listofAlternaves Pasig Tanay
Im provem ent of Tanay R iver
Mangahan
ImImprovement provem ent ofS t. of Sta. MMaria ariaRi ver River
P'queSpillway
D redging Sta.Maria
Parañaque
P arañaque Spillw ay Zapote
P arañaqueR iver Im provem ent P artialLakeShoreD ike & LandRising
S pillw ay toPacific O ceanbyTunnel
P arañaqueR iver Im provem ent Pagsanjan
R ingRoad D ike
Sta.Rosa
Sta.Cruz
Im provem entofSta. R osa R iver
Im provem entof P agsanhanR iver SanCristobal
Im provem entofS ta. C ruzR iver SanJuan
Im provem entofSta. R osa R iver ImImprovement provem entof of San San Juan River Fuan
:Partial Land Reclamation
Op:on-1ImageofLakeshoreDike withRoad
Op:on-2ImageofRaisingLakeshoreLand withRoadandFutureDevelopments
OponsfortheLakeshoreAreafromTaguigtoMunnlupa 11
Short-listedStructuralMi:ga:onMeasures(1/3) No.
Item
Highest Flood Risk Level
Target Flood Safety (R.P.)
Total Cost (Mil. Pesos)
EIRR
Resettle ment (1000 person)
Benefici ary (1000 person)
Preliminary Environmental Assess. (except negative impact of resettlement)
Pasig-Marikina (VH) River Improvement (RI) + Dam
4
100-y
198,435
16.4%
331
1,593
Moderate due to some negative social impact by dam (possible)
2
Meycauayan RI
3
50-y
14,040
22.9%
35
199
Positive due to improve. envir. (recommended)
Malabon-Tullahan RI
3
50-y
21,635
22.3%
39
298
Positive due to improve. envir. (recommended)
South Parañaque – Las Piñas RI
3
30-y
17,335
12.2%
30
104
Positive due to improve. envir. (recommended)
East Mangahan Floodway (Cainta & Taytay RIs)
3
30-y
25,901
26.8%
25
227
Positive due to improve. envir. (recommended)
1
(H)
3 (H)
4 (M)
5 (H)
Short-listedStructuralMi:ga:onMeasures(2/3) No.
Item
Highest Flood Risk Level
Target Flood Safety (R.P.)
Total Cost (Mil. Pesos)
EIRR
Resettle ment (1000 person)
Benefici ary (1000 person)
Preliminary Environmental Assess. (except negative impact of resettlement)
West Laguna (VH) Lakeshore Land Raising
3
60-y
25,185
17.2%
114
114
Positive due to improvement of environment and potential of development (recommended)
7
Land Raising for Small Cities around Laguna Lakeshore
3
60-y
7,158
17.2%
8.8
8.8
Positive (same as 6) (recommended and to be studied more)
Improvement of the Inflow Rivers to Laguna Lake
3
30-y
637
N.A.
N.A.
N.A.
Positive due to improve. of environment (recommended and to be studied more)
6
(H)
8 (H)
Short-listedStructuralMi:ga:onMeasures(3/3) No.
9 (H)
10 (M)
11
Item
Highest Flood Risk Level
Targe t Flood Safet y (R.P.)
Total Cost (Mil. Pesos)
EIRR
Resettl ement (1000 person)
Benefici Preliminary ary Environmental (1000 Assess. (except person) negative impact of resettlement)
Manila Core Area Drainage Improvement
2
10-y
27,257
19.1%
24
270
Positive due to improvement of environment (recommended )
West Mangahan Area Drainage Improvement
2
5-y
5,522
11.1%
3.2
25.6
Positive due to improvement of environment (recommended )
Valenzuela, 8,613 Obando and (Est. Meycauayan only) (VOM) Improve. (1)Priority(Tenta:ve)VHVeryHigh,HHigh,MMarginal (to be studied (2)Priorityissetbyconsidering1)severityoffloodsorfloodrisklevel,2)costandeconomicefficiency (EIRR≧further) 15%),and3)socialandnaturalimpactsandpreliminaryenvironmentalassessment.
ProposedNon-StructuralMeasures 1. StrengtheningoftheFloodInformaonandWarningSystem(FIWS)
• Effec:ve Flood Control Opera:on and Warning System (EFCOS) improvement • Newtelemetricrainfallandwaterlevelgaugingsta:ons 2.CapacityBuildingforStrengtheningCommunity-basedFRM
• Update and implement Informa:on and Educa:on Campaign (IEC) programs monitoring by Barangay Disaster Risk • Rainfall and water level Reduc:onandManagementCouncils(BDRRMCs)
• Construc:onofevacua:onroutesandtemporaryevacua:oncenters 3.ImprovementofManagementInformaonSystem (MIS)forDisasterRisk Management
• ImprovementanddevelopmentofMIS • Capacitybuilding 4. ReforestaonandWatershedManagement
FORT BONIFACIO RETARDING TANK A Model Urban Rainwater Catchment System
Project Location
PADRE BURGOS CIRCLE, FORT BONIFACIO GLOBAL CITY
The Detention Tank •isnotmeanttodetain waterforotheruses •ismeanttotemporarily detain“postdevelopment run-off”only •shouldalwaysbeempty •isfullyautomated
Estero de paco e e n u . A v N . U
Pedro Gil to 13 de Agosto Segment
before
DEVELOPMENT: •Market renovation •Dredging •Riprap •slope protection and phytoremediation •Walkway and riprap •SAIR e A p ac i b l
Present 13 de Agosto
i l r o G P e d
Estero de paco e e n u . A v N . U
13 de Agosto to Apacible Segment
before
DEVELOPMENT: •dredging •riprap •slope protection and phytoremediation •Facelifting of Residential Houses •Walkway / linear park
e A p ac i b l
13 de Agosto
i l r o G P e d
After
Estero de paco e e n u . A v N . U
Apacible to UN Ave. Segment
before
DEVELOPMENT: •dredging •riprap •slope protection and phytoremediation •Facelifting of Residential Houses •Walkway/Linear Park
e A p ac i b l
Present 13 de Agosto
i l r o G P e d
THANK YOU !