Built up rate for demolition works - plant cost and labour cost - profit and overhead
analisa pressure build up menggunakan metode hornerFull description
Civil WorkFull description
review grammarFull description
Build up your chessDescrição completa
consulta draw down y build upDescripción completa
Descripción: Build up your chess
Ejercicios de Build Up
Medical Check Up SuyudiFull description
construction projects
Cement Plastering on wallFull description
Full description
Ready to use Excell formats for Estimation of costs for Alterbative laying of DI PIPED WATER PIPELINE - LAYINGFull description
puabas para controlas la presión del pozo
Full description
puabas para controlas la presión del pozo
BUILT-UP RATE FOR PLASTERING TENDER FILE NO : PROJECT :
LOCATION : SUPPLIER :
SUB-CONTRACTOR : QUOTATION DATE : Material Cost Cement White Lime Plasterlime Lime Sand (ex-mining) Sand (wash fine)
10.35 per bags 50kg ( Including Rm 0.25 for unloading ) 3.90 per bags 13kg 2.00 per bags 10kg 250.00 pe per loads ( 14 cu. yard ) or 23.48 pe per m3 15.00 per cu. Yard 19.50 per m3
Cement & Sand ( 1:6 ) Mixed
Material Cost
Cement ( 1440kg/50 ) @ 1 m3 Lime ( 1 bag / 100 ft2 ) Sand (ex-mining) Total cost For 5 m3
29 bags 3 bags 6 m3
@ @ @
Net volume after shrinkage @ 33 1/3%
Plastering - Internal Cement & Sand (1:6) Material cost Wastage @ Total material cost / m2 Labour Cost Plant Cost ( Inclusived ) Tender Cost / m2
8.60 pe p er m2 4.92 per m 8.60 pe p er m2
5%
300.15 11.70 140.89 452.74 4.67 m3
Material cost per m3 Plant ant cost cost ( Concr oncret ete e mixer ixer @ 3.50 3.50//m3 ) Total Cost : Labour Cost Internal Plastering 300mm String External Plastering