analisa pressure build up menggunakan metode hornerFull description
review grammarFull description
Full description
Build up your chessDescrição completa
consulta draw down y build upDescripción completa
Descripción: Build up your chess
Ejercicios de Build Up
puabas para controlas la presión del pozo
puabas para controlas la presión del pozo
embedded
pressure drawdown and building up testingFull description
Full description
This PDF is a reference document for building characters for the BASH! UE RPG. Given are examples of iconic comic book characters and their statistic value in the BASH! game system.
embedded
terap
up and up
BFC31602 – BUILD UP RATE
Based on pad footing details and information as shown in the following figures and table, calculate the price rate for 1 metre cubic excavation work for the pad footing that is carried out manually (using hand).
Item
Worker salary (8 hours working/day)
Rate
RM 24.00/day
Soil excavation not exceeding 1.50 m depth
1.50 hour/m3
Soil excavation exceeding 1.50m but not exceeding 3.00 m depth
1.60 hour/m3
Spreading up soil in making up level (surface to receive pad footing)
0.12 hour/m2
Filling in and ramming soil
0.60 hour/m3
Carting away remainder load
1.20 hour/m3
Typical soil expansion
25%
Profit
20%
1. Cost of excavating out
Total depth of excavation = 0.05m + 0.65m + 0.65m + 0.35m = 1.70m
Volume of excavation (n.e. 1.50m): V
=
lxwxd
=
1.50 x 1.50 x 1.50
=
3.375 m3
Volume of excavation (e. 1.50m): V
=
lxwxd
=
1.50 x 1.50 x 0.20
=
0.45 m3
=
3.375 m 3 x 1.50 hour x (RM24.00/8 hour) +
Cost :
0.45 m3 x 1.60 hour x (RM24.00/8 hour) =
RM 15.19 + RM 2.16
=
RM 17.35
2. Cost of spread up in making up level (surface to receive pad footing) =
(1.50m x 1.50m) x 0.12 hour x RM3/hour
=
2.25 m 2 x 0.12 hour x RM3/hour
=
RM 0.81
3. Cost of filling in and ramming Actual volume to be filled in and rammed = total volume of excavation – (volume of pad + volume of stump + volume of ground beam)
Cost
=
[3.825m 3 – (1.5m x 1.5m x 0.65m) - ∏ j2t – (volume of ground beam)] x 0.60 hour x RM3/hour
=
[(3.825m 3 – 1.4625m 3 - ∏0.25 2(0.65m + 0.35m) – (volume of ground beam)] x 0.60 hour x RM3/hour
=
?? m3 x 0.60 hour x RM3/hour
=
RM ??.??
4. Cost of carting away remainder load Volume to be carted away = total volume of excavation – volume to be filled in and rammed
=
[3.825m 3 – (?? m3 x 1.25)] x 1.20 hour x RM3/hour