Built up rate for demolition works - plant cost and labour cost - profit and overhead
analisa pressure build up menggunakan metode hornerFull description
Civil WorkFull description
review grammarFull description
hoarding design
Build up your chessDescrição completa
consulta draw down y build upDescripción completa
Descripción: Build up your chess
Ejercicios de Build Up
Medical Check Up SuyudiFull description
construction projects
Ready to use Excell formats for Estimation of costs for Alterbative laying of DI PIPED WATER PIPELINE - LAYINGFull description
puabas para controlas la presión del pozo
puabas para controlas la presión del pozo
Full description
BUILT-UP RATE FOR METAL DECK HOARDING PROJECT : LOCATION : SUPPLIER : SUB-CONTRACTOR : QUOTATION DATE :
Metal Decking Hoarding ( 3.60m High @ 2.40m c/c/) Allow for 50% scrap value for structural steel & metal hoarding Footing Vertical Struct Horizontal Struct Metal hoarding
1200mm x 600mm x 600mm deep 100mm x 50mm x 3mm thk ( 2nos.) 100mm x 50mm x 3mm thk ( 3nos.) 2.40m x 3.60m
Profit & Overhead @ Tender Price / m
Inclusived
Tender Cost / m @ say
90.00 26.49 52.99 63.00 232.48 232.48 232.50
Metal Decking Hoarding ( 2.40m High @ 2.40m c/c/) Allow for 50% scrap value for structural steel & metal hoarding Footing Vertical Struct Horizontal Struct Metal hoarding
1200mm x 600mm x 600mm deep 100mm x 50mm x 3mm thk ( 2nos.) 100mm x 50mm x 3mm thk ( 3nos.) 2.40m x 3.60m