Cost / m3 NORMAL MIXED READY MIXED CONCRETE Labour cost ( Concretor generally ) Labour cost ( Lean concrete ) Note - Labour Rate are inclusive mobile vibrator equip. & robin engine. Mobile crane (20T) @ PUMP MIXED READY MIXED CONCRETE Labour Cost Pump Cost ( @ RM 1,200.00 per 100m3 & RM 15.00 per m3 for subsequent pour)
Cost / m3 NORMAL MIXED READY MIXED CONCRETE Labour cost ( Concretor generally ) Labour cost ( Lean concrete ) Note - Labour Rate are inclusive mobile vibrator equip. & robin engine. Mobile crane (20T) @ PUMP MIXED READY MIXED CONCRETE Labour Cost Pump Cost ( @ RM 1,200.00 per 100m3 & RM 15.00 per m3 for subsequent pour)
Note:Supply of standard sheet (standard size of 6.00m length x 2.20m wide) and supply of cut to size fabric reinforcement(requested size) (BRC reinforcement) are different of 5% increase due to additional cost.
Basic Labour Cost / m2 1.50 (0.14 per ft2) -
Labour Cost (including wires & ties) Plant Cost (included)