JETT
USER REQUIREMENTS SPECIFICATION
BLANK TEMPLATE
Page 1 of 1 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
USER REQUIREMENTS TEMPLATE FOR A SYSTEM (INSERT YOUR SYSTEM DESCRIPTION HERE )
JOINT EQUIPMENT TRANSITION TEAM
JETT
USER REQUIREMENTS SPECIFICATION
BLANK TEMPLATE
Page 2 of 2 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
REVISION HISTORY Rev.
Date
Developed By:
Revision Summary
0
04/01/2001
JETT
Initial Release
1
10/17/2002
MTFilary
1 Revision of the Blank Template based on input from users via JETT monthly meetings, email, and the JETT website.
2
09/15/2003
MRivera
Format review based on input from users via JETT monthly meetings.
3
06/30/2004
MTFilary
Revised the Blank Template based on input from users via JETT monthly meetings, email, and the JETT website.
st
The revision history section should be utilized during development to provide information that will allow the reviewer/approver to understand what part/parts of the document is/are being revised. For an initial release, provide a note that the document is being routed for initial review/approval. This will ensure reviewers/approvers reviewers/approver s evaluate the entire document. In the revision summary include the revision number of the Blank Template used to create any equipment specific temp lates.
(Reminder of Page Intentionally Left Blank)
JOINT EQUIPMENT TRANSITION TEAM
JETT
USER REQUIREMENTS SPECIFICATION
BLANK TEMPLATE
Page 3 of 3 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
TABLE OF CONTENTS 1.0
INTRODUCTION (SCOPE)............................................................................. 4
2.0
OVERVIEW ............................................... ........................................................ 5
3.0 OPERATIONAL REQUIREMENTS .............................................................. 6 3.1 CAPACITY ........................................................................................................ 6 3.2 PROCESS REQUIREMENTS ............................................................................... 6 3.3 PROCESS CONTROL ......................................................................................... 6 3.4 FUNCTIONS ...................................................................................................... 6 3.5 DATA AND SECURITY ....................................................................................... 9 3.6 ENVIRONMENT............................................................................................... 10 4.0 CONSTRAINTS .................................................. ............................................. 13 4.1 MILESTONES AND TIMELINES ....................................................................... 13 4.2 EQUIPMENT CONSTRAINTS ........................................................................... 14 4.3 COMPATIBILITY AND SUPPORT ..................................................................... 14 4.4 AVAILABILITY ............................................................................................... 16 4.5 PROCEDURAL CONSTRAINTS ........................................................................ 16 4.6 MAINTENANCE .............................................................................................. 17 5.0 LIFE-CYCLE ................................................................................................... 19 5.1 DEVELOPMENT .............................................................................................. 19 5.2 TESTING ......................................................................................................... 19 5.3 DELIVERY ...................................................................................................... 19 5.4 SUPPORT ........................................................................................................ 21 6.0
GLOSSARY...................................................................................................... 22
7.0
REFERENCES ................................................................................................. 23
8.0
APPROVAL ..................................................................................................... 24
9.0
ATTACHMENTS ............................................................................................ 25
JOINT EQUIPMENT TRANSITION TEAM
JETT
USER REQUIREMENTS SPECIFICATION
BLANK TEMPLATE
Page 4 of 4 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
Project No.: Insert the unique project number associated with this particular URS. Document No.: Insert the Document Identification Number and Revision. Document Description: Insert description of document, e.g. PURE STEAM GENERATOR, JETT Example User Requirements Specification.
1.0
INTRODUCTION (SCOPE) Note: Insert your own description and introduction. You may wish to include your own requirements and specifics to provide the inexperienced reader, contractors, and suppliers an adequate explanation to understand the scope of the equipment.
Describe who produced the document, under what authority, and for what purpose. Describe the contractual status of the document. Include or reference as an attachment the “legal” paragraph that communicates purchasing terms and conditions in this section. Describe the relationship of this document to other documents. This is important for equipment that is part of an integrated process or line and will help the Supplier to understand and ask questions that may otherwise be overlooked. Refer to the Equipment Validation Plan that outlines the Supplier’s responsibilities is attached. Remove any options that are not applicable for this project, if other uses will apply list each separately. This is to be utilized as a guide for the user to answer the majority of questions involved in specifying the “what” for the equipment. Addendums may be used to round out the requirements.
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT 2.0
BLANK TEMPLATE
Page 5 of 5 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
OVERVIEW This document encompasses the normal range of equipment operations. This section should be expanded to provide a high level description of the system explaining why it is required and what is required of it. Include the background, key objectives and benefits, main functions and interfaces, applicable GxP requirements, and other applicable regulations. Obviously, technology improvements and new applications may require deviation from this template. The User should consider including information on the following: 2.1
Use: Describe what applications the equipment/system will be used to support. Include a brief explanation of the general functions. For example (for a Wide Range Filler): 2.1.1
The wide range filler line shall process pharmaceutical vials under sanitary conditions with the following functions: vial filling, put stoppers to vials, oxygen reduction, sample check weighing, and vial eject.
For equipment dealing with solid dosage pharmaceutical products directly: 2.1.1
The products being developed on the specified equipment are of: 2.1.1.1
Low active (vitamins, supplements)
2.1.1.2 Medium active (e.g. Aspirin) 2.1.1.3 Highly active (e.g. Morphine) 2.1.1.4 Exclusive (e.g. Penicillin) 2.2
Capacity: Provide a brief description of the equipment/system capacity requirements. For example (for a Wide Range Filler): 2.2.1
The equipment shall be capable of producing XYZ product continuously, over an 8-hour shift.
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT 3.0
BLANK TEMPLATE
Page 6 of 6 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
OPERATIONAL REQUIREMENTS This Section shall state the operational requirements: system functions, data and interfaces. It shall also define the environment in which the system must operate. Critical requirements shall be specifically identified as such. Include process descriptions and flowcharts as appropriate. 3.1
3.2
3.3
Capacity
3.1.1
Range of products
3.1.2
Commodities to be used (i.e. vials, bottles, tablets, etc.)
3.1.3
Processed Materials to be used or involved
3.1.4
Production rates
Process Requirements
3.2.1
Quality of products and concentrations
3.2.2
Product limitations (i.e. temperature, humidity, pH, etc.)
Process Control
3.3.1
Measurement Range
3.3.2
Setpoint Range
3.3.3
Parameter Control Tolerance Note: At a minimum, list the critical, process parameters. Consider documenting how each of the parameter requirements was determined.
3.4
Functions
3.4.1
Operation Enter your specific operational requirements here. 3.4.1.1
Cycles expected the system will operate at are…
3.4.1.2
Recipes the system will contain are…
3.4.1.3
Operator interaction with the system will include…
The following is an example: 3.4.1.1
The system shall operate with a minimum of operator involvement. Operation shall be safe from an operator and environmental standpoint.
3.4.1.2
The system shall be operated locally at the equipment itself.
Control system requirements:
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE
3.4.2
3.4.1.4
Manual only
3.4.1.5
Manual/automatic
Page 7 of 7 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
Power failure/Recovery 3.4.2.1
Power Failure: Insert your specific power failure/recovery scheme here. For example: In the event of a power failure, the system shall protect in the following priority:
3.4.2.1.1
Personnel
3.4.2.1.2 Equipment 3.4.2.1.3 3.4.2.2
Product
Recovery Methods: Insert your specific recovery scheme here. For example:
3.4.2.2.1 Manually re-start based on operator inputs (Operator initiates power recovery sequence). 3.4.2.2.2 Re-start based on last state before loss of power. (System runs through power recovery sequence when operator start signal is given) 3.4.2.2.3 If there is an automatic batch reporting system, the information shall be retained in the event of a power failure (A UPS is required for automatic batch reporting systems for data retention). 3.4.3
“Emergency Stop” Insert your specific “Emergency Stop” (E-Stop) strategy and communication scheme here. For example: 3.4.5.1 The system shall have an E-Stop mechanism designed to stop all physical movement of the equipment immediately. The E-Stop mechanism(s) shall be located in easily accessible areas around the equipment as required by national and local safety standards.
3.4.4
Alarms and Warnings 3.4.4.1
“Critical alarms” - Insert your specific “Critical
JOINT EQUIPMENT TRANSITION TEAM
Page 8 of 8 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE Alarm” action scheme here. For example:
3.4.4.1.1
Critical Alarms shall take action via interlock(s) and/or operator procedural response to shut the equipment down and notify the operator of the condition(s). The operator shall be required to acknowledge the alarm before the alarm can be reset and the system restarted. Once the alarm is reset, the operator may restart the system.
“Informational Messages” shall notify the operator and take no further action.
3.4.4.2
Note: For a customized equipment application, include an alarm table, like the example that follows. For example:
3.4.4.2.1
Alarm or Informational Message
Critical Alarm
The Equipment shall have the following critical alarms and warnings: Stackpole Light Illumination (color/flashing)
Informational Message
Response Interlock(s)
Emergency Stop
X
X
Control Platform Communication Watchdog
X
X
Control Power Fault
X
X
Main Air Fault
X
X
Operator Procedural
XXXX
X
YYYY
X
ZZZZ
X
Motor Faults
X
CONTROL PLATFORM Battery Low Warning
X X
X
The list of critical alarms in the table is not intended to be a comprehensive list of all alarms for the system. A complete alarm list will be developed and included in the Functional Specification document.
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE
Page 9 of 9 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
For a standard equipment type application, request the supplier to submit the complete alarm list and differentiate between critical and non-critical alarms. Note: Consider documenting how “critical and informational message” criterions were determined. 3.5
Data and Security Controls provided with Data Collection systems intended for use in the manufacture of pharmaceutical products shall be required to meet 21 CFR Part 11 compliance.
3.5.1
User Interfaces This section should address the following issues: 3.5.1.1
User interface access levels
3.5.1.2
Frequency of data point collection
3.5.1.3
Hardcopy/electronic data collection requirements
3.5.1.4
Compliance with 21CFR Part 11 (for Europe - EREC Guidelines)
3.5.1.5
Data retention time on the system
3.5.1.6
Data storage media Access to all Input/Output values and system status bits shall be provided through a data-communication link. Security for data and operator access is provided by (User ID/Password, Card Reader, Biometric (Fingerprint, eye scan, voice recognition, etc.).
3.5.2
User Interface with Supervisors and Operators Insert your interface scheme here. For example: 3.5.2.1 The CONTROL PLATFORM system shall include interfaces with the Operator and Supervisor that ensures easy, safe, and reliable operation. 3.5.2.2 An operator-interface panel shall be provided and mounted near the equipment or on the equipment. This panel shall provide the necessary switches, indicators, and devices to operate the equipment.
3.5.3
Language requirements Specify language that information will be displayed in (i.e. English, Spanish, German, Bilingual, etc.) 3.5.3.1
Displayed Requirements:
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE
Page 10 of 10 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
State the system of measurement that will be used (English or Metric (S.I.)). Parameter
3.5.4
Format
Unit(s) of measurement
XXXXXXX
(###.#) units
units
YYYYYYY
(##)%
%
Interface with Other Equipment The control system shall include the interfaces necessary to facilitate operation and configuration. For example:
3.5.5
3.5.4.1
An RS-232 communications port shall be provided.
3.5.4.2
A Modem communications port shall be provided.
3.5.4.3
A high-speed configuration/monitoring connection shall be provided.
Security Levels List the total number of different access levels that will be required. Provide a general description of the access rights for each level (screen navigation, operational control, control loop variable manipulation, alarm setpoint manipulation, etc.).
3.5.6
Data Collection Consider any archiving and reporting requirements here. 3.5.6.1
None
3.5.6.2
Recorder
3.5.6.3
Process Printout
3.5.6.4
Electronic process printout, Historical Trending
3.5.6.5
Electronic process printout, Historical Trending and interface to company network
The following shall be recorded:
3.6
3.5.6.6
XXXXX
3.5.6.7
YYYYY
3.5.6.8
ZZZZZ
Environment Provide details of the physical environment in which the [equipment/system] will be operated.
3.6.1
Layout For example: 3.6.1.1
Allocated floor space for the equipment is _____ inches
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE
Page 11 of 11 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
by ________ inches with at least a _______inch corridor around the periphery for the equipment. 3.6.1.2
Vertical clearance is _________ inches.
3.6.1.3
Floor Loading is
3.6.1.4
See attached drawing #________________________ (if applicable).
pounds/ft2
Layout is specific to the size equipment being used and system requirements of the equipment.
3.6.2
Physical Conditions 3.6.2.1
Room Explosion Classification List the critical explosion requirements for the room.
3.6.2.2
3.6.2.1.1
Room will be non-hazardous
3.6.2.1.2
Room will be Class I Div II (Zone 2) (explosive atmosphere present at known times)
3.6.2.1.3
Room will be Class I Div I (Zone 1) (explosive atmosphere present at all times)
Environmental Classification List the critical air quality requirements for the environment.
3.6.2.3
3.6.2.2.1
ISO Class 5, 7, or 8 (ISO 14644-1 and ISO 14644-2)
3.6.2.2.2
Class A, B, C, or D (The Rules Governing Medicinal Products in the European Union – Annex 1)
3.6.2.2.3
Directional airflow
3.6.2.2.4
Airflow velocity
3.6.2.2.5
Number of air changes
3.6.2.2.6
Particle Ingress
Biohazard Level List the critical biohazard level requirements for the environment. 3.6.2.3.1
BL-1
3.6.2.3.2
BL-2
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE 3.6.2.4
Page 12 of 12 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
Rating of enclosures List the rating requirements for enclosures in the environment.
3.6.3
3.6.4
3.6.2.4.1
NEMA 1 (Open)
3.6.2.4.2
NEMA 12 (Oil tight)
3.6.2.4.3
NEMA 4 (Wash down)
3.6.2.4.4
NEMA 4X (Wash down and nonCorrosive)
Cleaning Requirements 3.6.3.1
Hand-Wash
3.6.3.2
Auto-Wash
3.6.3.3
Steam Clean
Sterilization Requirements Describe the type of sterilization that will be performed on or within the [equipment/system] and the duration the [equipment/system] will be exposed.
3.6.5
Intended Operating Environment: Describe the type of operating environment that the [equipment/system] will be exposed to following installation. For example: 3.6.5.1
The [equipment/system] shall be mounted in a GMP environment with a temperature range of 15 to 25 °C, non-condensing humidity.
3.6.5.2
Vibration levels in operating environment are
3.6.5.3
The Seismic Zone in the operating environment is .
JOINT EQUIPMENT TRANSITION TEAM
JETT 4.0
Page 13 of 13 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
USER REQUIREMENTS SPECIFICATION
BLANK TEMPLATE
CONSTRAINTS 4.1
Milestones and Timelines Based on the model outlined below, establish the project milestones with a timeline:
JETT EQUIPMENT ACQUISITION MODEL SUPPLIER
USER/(CONSULTANT if applicable) Master Validation Plan Equipment Validation Plan/ Risk Assessment
• Explanation to Supplier User Requirements Specification (Living Document) Proposal Analysis
User Audit Engineering Feasibility Study and Results
P.O. RFQ Proposal P.O.
Approval Review Functional Specification
Proposal
• Project Plan
•
Functional Specification
Detailed Design Documentation (traceable to Functional Specification)
Review Detailed Design
Review System Acceptance Test Specifications
Integrate with Validation Documentation as appropriate
Approval
System Acceptance Test Specifications (IQ/OQ)
• Hardware Approval
• Software
System Acceptance Testing and Results User Witness Optional Maintenance & Support Documentation
JOINT EQUIPMENT TRANSITION TEAM
JETT
4.2
Page 14 of 14 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
USER REQUIREMENTS SPECIFICATION
BLANK TEMPLATE Equipment Constraints
Describe the operating constraints that the [equipment/system] will be required to meet. For example:
4.2.1
Environmental Conditions The [equipment/system] is to be used at the following environmental conditions: 4.2.1.1
4.2.2
Altitude ________ ft above sea level
HVAC Equipment Constraints 4.2.2.1
Process air enters in from… °
Indoor Temperature: 4.2.2.2
4.2.2.3
4.2.3
C
Outdoor Temperature: Minimum:
°
Maximum:
°
C
C
Climatic conditions: Winter dry bulb
°
Winter wet bulb
°
Summer dry bulb
°
Summer wet bulb
°
C C C C
Equipment Generated Vibration The maximum allowable equipment vibration generated during operation is .
4.3
Compatibility and Support Include any requirements for compatibility with other User systems. In the examples provided below, fill in blanks with the appropriate information. Delete areas that are not applicable to this application.
4.3.1
CONTROL PLATFORM Controllers 4.3.1.1
The Supplier shall utilize Control Platform Controllers that shall include a communications port.
4.3.1.2
The Supplier shall provide documentation that the program (embedded software) was developed and coded utilizing program development and documentation software.
4.3.1.3
The supplier shall indicate the use of custom or “bespoke” code within the equipment, and shall supply
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE
Page 15 of 15 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
licensing of the custom code for the life of the equipment. 4.3.1.4
4.3.2
4.3.3
An escrow agreement shall be required in the event the supplier cannot support the supplied custom software any longer. In such instances, the source code and all information regarding the source code shall be given to the user in a timely fashion to prevent downtime of the equipment.
Preferred Vendor List 4.3.2.1
If necessary attach any critical preferred vendors. Refrain from driving the supplier into customizing his equipment package.
4.3.2.2
If the vendor wishes to deviate from the Preferred Instrumentation List, a listing of the proposed components and instrumentation sub-vendors indicating type and model numbers shall be submitted with the quotation, along with an explanation of why the deviation is recommended.
Utilities 4.3.3.1
The utilities and space involved needs to be discussed prior to purchasing the equipment. Obviously, the actual equipment size is but a small part of the entire scope of work necessary to implement a larger system. The unit and its support equipment must be able to be installed in current building facilities.
4.3.3.2
The User shall ensure that the following utilities are available and that the utility supply lines and piping are terminated with fittings or connections, which are compatible with those described on the Customer Connection Drawings.
4.3.3.3
The Supplier shall specify utility data, which is marked with a triangle. Utility data, which are not specified or marked with a triangle, shall be brought to the attention of the User. These data shall be specified (by the User or the Supplier) and shall be approved by both the User and the Supplier before system design begins. Base Utilities Worksheet
4.3.3.4
Related Discharges 4.3.3.4.1
Volume
4.3.3.4.2
pH
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE
4.3.3.5
4.3.3.6
4.3.3.4.3
Temperature
4.3.3.4.4
Materials
Page 16 of 16 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
Electricity 4.3.3.5.1
______ VAC ____ Hertz
4.3.3.5.2
Phases
4.3.3.5.3
Amperage
4.3.3.5.4
Uninterruptible Power Supply (Define Use)
Control Air 4.3.3.6.1
Pressure For example: _______ PSIG (must be clean, dry ISA instrument quality air, capacity to be determined by size of equipment). Recommend at least 90 PSIG constant air pressure for all equipments, unless specified.
4.3.3.7
Other Utility Requirements Provide details regarding any other utility systems that are required to support operation of the equipment/system.
4.4
4.5
Availability
4.4.1
The [equipment/system] is intended to be operated [Continuously, Regularly, __ hours per day, __ hours per week].
4.4.2
Operation of the [equipment/system] shall be suspended, and the system shall be available for preventative maintenance or routine service [__ hours per week, __ continuous hours per week, __ days per month, __ weeks per year].
Procedural Constraints
4.5.1
Product Contact Materials Describe any local procedural requirements such as local standards, which must be adhered to if applicable.
4.5.1.1
All piping welds and product contact welds shall meet ASME and 3A specification requirements.
4.5.1.2
Product contact metal to be (316L Stainless Steel, 316
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE
Page 17 of 17 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
Stainless Steel, 304 Stainless Steel, etc.) 4.5.1.3
List critical requirements for surface finish, roughness, etc.
4.5.1.4
Other standards are attached.
The Supplier shall adhere to the indicated sections only.
4.5.2
Product in Contact with Materials All product contact parts should be considered.
4.5.2.1
4.5.3
The [equipment/system] will be used for (aqueous solutions, low LEL (lower explosion limit) solvents, high LEL solvents, etc.).
Noise Level Constraints Insert your own noise level constraint requirements here. For example: The noise level generated during operation of the [equipment/system] will not exceed 85 dB from 3 feet away.
4.5.4
EMI / RFI levels are: Insert your own electrical and radio noise immunity requirements here. For example: The [equipment/system] [will/will not] be used in an area where two-way radio communication devices are in operation. The [equipment/system] shall meet CE requirements for electrical noise immunity and emissions.
4.5.5
Containment 4.5.5.1
Explosion Protection This section is only valid if the product being used is highly reactive. Insert containment guidelines here (i.e. Bar Construction with isolation and suppression, 10 Bar construction with isolation only, Closed-Loop Nitrogen System, etc.).
4.5.6
Labeling All equipment and control wiring shall be labeled and identified.
4.6
Maintenance Describe the expected hardware and software maintenance support including: ease of maintenance, expansion capability (software only), likely enhancements (software only), expected lifetime and long-term support.
JOINT EQUIPMENT TRANSITION TEAM
JETT
USER REQUIREMENTS SPECIFICATION
BLANK TEMPLATE
Page 18 of 18 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
4.6.1.1
System shall be maintained on a schedule as indicated by the supplier.
4.6.1.2
Supplier is to provide (at minimum) the following maintenance instructions:
4.6.1.3
All sub-systems provided (Maintenance and operation manuals of vendor equipment)
4.6.1.4
A comprehensive lubrication list and recommended lubrication schedule
4.6.1.5
A comprehensive recommended maintenance (regular recommended inspection intervals, wear points, recommended spare parts list)
4.6.1.6
Supplier shall supply ______ Copies of Operation, Installation, Maintenance and de-commissioning manuals
4.6.1.7
Accessibility for operation and maintenance personnel.
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT 5.0
BLANK TEMPLATE
Page 19 of 19 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
LIFE-CYCLE 5.1
Development If S88 is to be applied to the equipment being acquired, it should be referenced in this section of the document.
5.2
5.1.1
The Supplier shall provide a Quality and Project Plan as part of their proposal. The Supplier shall have a quality system in place. Internal quality procedures shall be available for the User’s review.
5.1.2
The Supplier shall provide a Project Manager for the project to provide a single communication point with the User.
5.1.3
The project shall utilize the GAMP methodology when developing the system and documentation.
Testing Describe the Supplier testing requirements. Reference the Validation Test Plan, Factory Acceptance Test, special tests, etc. This section should also include required amount of demonstrated run time, any special materials necessary to complete testing, integration testing, etc.
5.2.1
In order to verify system performance, the User shall witness the execution of the Factory Acceptance Test procedures. The Supplier shall notify the User _______ weeks in advance of the start of this test.
5.2.2
The Factory Acceptance Test Specification shall be submitted to the User for review and approval prior to execution. A minimum of _______ weeks shall be allowed for the User to review and to comment and/or approve the Factory Acceptance Test Specification.
5.2.3
The User shall notify the Supplier of the length of runs required, special materials required, and any other unique test requirements _______ weeks in advance of the start of testing.
Refer to the Equipment Validation Plan for applicable procedures. 5.3
Delivery The [equipment/system], with all options, equipment, and the documentation listed below, shall be delivered to the User’s receiving dock.
5.3.1
Documentation 5.3.1.1
Installation, operation, and maintenance instruction documentation for the system shall be developed to a
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
BLANK TEMPLATE
Page 20 of 20 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
level that is comprehensible to a high school graduate. 5.3.1.2
The Supplier shall use the formats described in the GAMP Supplier Guide, Current Version, to produce the documentation. The Supplier shall provide the documentation for preliminary review. The Supplier shall provide documentation reflecting “as-built” condition with final delivery.
5.3.1.3
All final documents shall be shipped with transmittals that identify them as contractually required documents. All final documents and drawings shall reflect “as-built” condition.
5.3.1.4
All documents shall in the language of the destination country and supplied with hard copies and electronic versions supplied in the format identified for each document:
•
Project Plan
Microsoft Word XX (*.doc)
•
User Requirements Specification
Microsoft Word XX (*.doc)
•
Functional Specification/Requirement
Microsoft Word XX (*.doc)
•
Design Specifications
Microsoft Word XX (*.doc)
•
Controls Test
Microsoft Word XX (*.doc)
•
Hardware Installation Test
Microsoft Word XX (*.doc)
•
Operational Test
Microsoft Word XX (*.doc)
•
Factory Acceptance Test
Microsoft Word XX (*.doc)
•
Operator, Maintenance and Service Manuals
Microsoft Word XX (*.doc)
•
Process and Instrumentation Diagram (P&ID)
•
Instrument Listing
•
Control Schematics
AutoCAD version XX.X (*.dxf)
•
Control Panel Assembly Drawings
AutoCAD version XX.X (*.dxf)
•
Equipment Assembly Drawings
AutoCAD version XX.X (*.dxf)
•
Bill of Materials
Microsoft Word XX (*.doc) or Excel XX (*.xls)
•
Spare Parts List
Microsoft Word XX (*.doc) or Excel XX (*.xls)
•
Component Cut Sheets
Microsoft Word XX (*.doc) or Excel XX (*.xls)
•
CONTROL PLATFORM Program Printout and Disk File
XXX Program Development format
•
OIP Configuration Printout and Disk File
XXX Program Development format
AutoCAD version XX.X (*.dxf) Microsoft Word XX (*.doc) or Excel XX (*.xls)
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT 5.4
BLANK TEMPLATE
Page 21 of 21 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
Support Describe what support activities are required after acceptance. The paragraphs outlined below provide some areas for consideration.
5.4.1
Start-up Support (list available options) 5.4.1.1
5.4.2
Training (list training options available)
Post Start-up Support (list post-startup support available) 5.4.2.1
5.4.2.2
Technical Support 5.4.2.1.1
Telephone (Voice or Modem)
5.4.2.1.2
Replacement Parts Availability List (Normal lead times shall be listed)
User Site Support 5.4.2.2.1
Preventative Maintenance (list maintenance contracts available)
5.4.2.2.2
System Improvements (supplier shall notify user of any improvements available on a regular basis)
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT 6.0
BLANK TEMPLATE
Page 22 of 22 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
GLOSSARY If necessary, attach a glossary, which includes definitions of terms that may be unfamiliar to the Supplier or terminology that may have meanings specific to entries on this User Requirements Check sheet. For example ( example list is not intended to be complete ): Acronym
Definition
C
Degrees Celsius
BL
Biohazard Level
°
CFR dB EMI ft
Code of Federal Regulations Decibels Electro-Magnetic Interference Feet
GUI
Graphic User Interface
HMI
Human – Machine Interface
HVAC ISO
Heating, Ventilation, and Air Conditioning International Organization for Standardization
JETT
Joint Equipment Transition Team
LEL
Lower Explosion Limit
OIP
Operator Interface Panel
RFI
Radio Frequency Interference
URS
User Requirement Specification
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT
7.0
BLANK TEMPLATE
Page 23 of 23 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
REFERENCES List references that were used in preparing this document or that provide additional details, such as: 7.1
Equipment Validation Plan
7.2
Current revision of GAMP Guidelines
7.3
Vendor Piping Certification (if applicable)
7.4
Customer Connection Diagram
7.5
Approved Instrumentation List
7.6
Process Flow Diagram
7.7
21 CFR Part 11
7.8
National Electric Code
7.9
S88
JOINT EQUIPMENT TRANSITION TEAM
USER REQUIREMENTS SPECIFICATION
JETT 8.0
BLANK TEMPLATE
Page 24 of 24 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
APPROVAL Insert your company’s standard approval page at the appropriate position in the document or utilize the sample approvals listed below. The approval process/requirements should be outlined in the Equipment Validation Plan.
This document has been reviewed by the User Project Manager and approved for use by the Supplier.
Printed/Typed Name
Signature
Date
This document has been reviewed by the User Quality Assurance Group and approved for use by the Supplier.
Printed/Typed Name
Signature
Date
This document has been reviewed by the Supplier Project Manager and approved for use by the Supplier Project Team.
Printed/Typed Name
Signature
Date
Other approvals as necessary may be included, such as the Technical Services Groups, User Groups, Engineering, etc. as required.
JOINT EQUIPMENT TRANSITION TEAM
JETT
9.0
USER REQUIREMENTS SPECIFICATION
BLANK TEMPLATE
Page 25 of 25 Doc ID: BLANK URS TEMPLATE Rev.3 June 2004
ATTACHMENTS
JOINT EQUIPMENT TRANSITION TEAM