SUG340 SURVEY PROJECT
JADUAL KADAR BAYAR PERKHIDMATAN UKUR TANAH BAGI TUJUAN KEJURUTERAAN
Berikut ialah jadual bayaran perkhidmatan yang dijalankan oleh Jurukur Tanah Berlesen yang berdaftar di bawah Akta Jurukur Tanah Berlesen 1958 (Akta 58! ("indaan 1991!# Jadual bayaran ini berdasarkan kepada kos sehari bagi satu pasukan ukur seperti berikut$% &em &emenanjung 'alaysia
$
&abah &arawak dan $ .ilayah .ilayah "ersekutuan /abuan
RM743.00 RM966
()adar &emenanjung 'alaysia * +,-!
PART I GENERAL ENGINEERING SURVEY
1# GENERAL ITEMS "ara 1#1 to 1#1 pres0ribe work items and work rates appli0able in all types of surey# They are to be in0luded as when ne0essary part and par0el of the releant work items for any parti0ular surey# 1#1 Classification of Terrain and Ground Condition The following 0lassifi0ation of terrain and ground 0ondition is to be adopted in determining the general ground 0ondition of the proje0t site# 2lassifi0ation of Terrain and 3round 2ondition
4es0ription
lat and undulating area
up to 1, degr degree eess slop slopee or diff differ eren en0e 0ess in heights of not more than 7, metres
6illy area
e0eeding 1, degrees slope or differen0e in heights of more than 7, metres
&wampy area
generally wetted at the time of surey whether temporary or permanent in nature
Built up area
are area with man made ade stru0tu 0ture su0 su0h as building road fen0e drain hedge 0utting embankment and et0#
1#7 Preparatory Preparatory Work Work .ork rate for preparatory work is 1 party%day# 1 6/15
1
MAAS-MACA
SUG340 SURVEY PROJECT
1#+ Mobilization Mobilization and Demobiliza Demobilization tion .ork rates for mobiliation and demobiliation per party are as follow$ 4istan0e between .orksite and 6ead:uarters
'obiliation and 4emobiliation 2ost
5, kilometres or less
'ore than 'ore than 5, kilo kilome metr tres es but but not not e0eeding 15, kilometres
1 party%day
'ore than 'ore than 15, 15, kilo kilome metr tres es but but not not e0eeding +,, kilometres
7 party%days
;0eeding +,, kilometres
+ party%days
1#+#1 1#+#1 'obili 'obiliat ation ion of the the surey party party by the the followi following ng modes modes of transpor transportat tation ion where ne0essary shall be reimbursable at 0ost# 1#+#1#1 6ire of heli0opter heli0opter or air0raft air0raft and 0rew 0rew 1#+#1#7 6ire of boat and 0rew 1#+#1#+ 6ire of additional motor motor ehi0les and driers under e0eptional 0ir0umstan0es# 1#+#1# 1#+#1# Air fares fares 1# Point Positioning Positioning by Satellite This item proides the fee for "oint "ositioning with the use of &atellite# The surey rates 0hargeable under this item for ea0h job shall 0onsist of the following 0harges$% 1##1 1##1 2harge 2harge for mobil mobilia iatio tionn and demobil demobilia iatio tionn of + ield partie partiess shall be be as follows$ 4istan0e to to .orksite fr from 6e 6ead:uarters
2harge fo for + ield "arties
'ore than 5, kilometres but not e0eeding 15, kilometres
=' 7>,,
'ore than 15, kilometres but not e0eeding +,, kilometres
=' 5,,
;0eeding +,, kilometres
=' 81,, 7
6/15
2
MAAS-MACA
SUG340 SURVEY PROJECT
1#+ Mobilization Mobilization and Demobiliza Demobilization tion .ork rates for mobiliation and demobiliation per party are as follow$ 4istan0e between .orksite and 6ead:uarters
'obiliation and 4emobiliation 2ost
5, kilometres or less
'ore than 'ore than 5, kilo kilome metr tres es but but not not e0eeding 15, kilometres
1 party%day
'ore than 'ore than 15, 15, kilo kilome metr tres es but but not not e0eeding +,, kilometres
7 party%days
;0eeding +,, kilometres
+ party%days
1#+#1 1#+#1 'obili 'obiliat ation ion of the the surey party party by the the followi following ng modes modes of transpor transportat tation ion where ne0essary shall be reimbursable at 0ost# 1#+#1#1 6ire of heli0opter heli0opter or air0raft air0raft and 0rew 0rew 1#+#1#7 6ire of boat and 0rew 1#+#1#+ 6ire of additional motor motor ehi0les and driers under e0eptional 0ir0umstan0es# 1#+#1# 1#+#1# Air fares fares 1# Point Positioning Positioning by Satellite This item proides the fee for "oint "ositioning with the use of &atellite# The surey rates 0hargeable under this item for ea0h job shall 0onsist of the following 0harges$% 1##1 1##1 2harge 2harge for mobil mobilia iatio tionn and demobil demobilia iatio tionn of + ield partie partiess shall be be as follows$ 4istan0e to to .orksite fr from 6e 6ead:uarters
2harge fo for + ield "arties
'ore than 5, kilometres but not e0eeding 15, kilometres
=' 7>,,
'ore than 15, kilometres but not e0eeding +,, kilometres
=' 5,,
;0eeding +,, kilometres
=' 81,, 7
6/15
2
MAAS-MACA
SUG340 SURVEY PROJECT
1## 1##77 Basi Basi00 0har 0harge ge ? =' =' @@ @@,# ,#,, ,, 1##+ 1##+ 2harge 2harge for for posit position ioning ing of of ea0h ea0h point point is ='19>, ='19>,#,, #,, 1## 1## 2harge 2harge for for the 0onstru 0onstru0ti 0tion on of a monumen monumentt similar similar to type type 2 'ark of &urey 4epartment is =' +,,#,, 1## 1##55 2har 2harge ge for site site 0learan 0learan0e 0e for obser obserat atio ionn shal shalll be on reimb reimburs ursabl ablee basis# 1##@ 1##@ 2harge 2harge of &ure &ureyy in &e0uri &e0urity ty Areas Areas shall shall be as per per item item 1#8# 1#8# 1#5 Planimetric Planimetric Control Control and Connection Connection The a00ura0y for planimetri0 0ontrol and 0onne0tion shall not be less than 1 in ,,,# The planimetri0 0ontrol and 0onne0tion in0ludes$ i! ii! ii!
2onne0 ne0tion to &u &urey rey 4epartm rtment ent dat datum um and and Alon Alongg the the prop propos osed ed or eis eisti ting ng rout routes es or alig alignm nmen entt
1#5#1 1#5#1 =ates =ates for plani planimet metri0 ri0 0ontr 0ontrol ol and 0onne 0onne0ti 0tion on are as follo follows$ ws$ 2lassifi0ation of Terrain and 3round 2ondition
"eninsular
&abahC&arawak
lat and undulating area
='7#,, C metre
='7#@, C metre
6illy area
='7#5, C metre
='+#75 C metre
&wampy area
='7#5, C metre
='+#75 C metre
Built up area
='7#5, C metre
='+#75 C metre
1#@ Height Control Control and Connection Connection The height 0ontrol and 0onne0tion in0ludes$ i! ii! ii!
2onne0tion to Ben0h 'arks and Alon Alongg the the prop propos osed ed or eis eisti ting ng rout routes es or alig alignm nmen entt
1#@#1 Height control shall be established established on the following conditions: 1#@#1# 1#@#1# The datum datum for for height height 0ontrol 0ontrol shal shalll be establi established shed by at least least two two eisting Ben0h 'arks# 1#@#1#5 1#@#1#5 The sure sureyor yor shall shall take take the the shortest shortest pra0ti0 pra0ti0al al route route## + 6/15
3
MAAS-MACA
SUG340 SURVEY PROJECT
1#@#7 Work rates are as follow:
2lass for 6eighting
A00ura0y (in metres!
.ork rate in kilometre per party%day lat and 6illy E &wampy Dndulating E Built up area
a# Frdinary
* ,#,7 G km
1#@ km C party%day 1#, km C party%day
b# "re0ise
* ,#,,+ G km
,#5 km C party%day ,#+ km C party%day
.here k is the distan0e in kilometre The sureyor may use any methods that he 0onsiders most suitable for the job to meet the a00ura0y re:uired# 1#> Monumenting 'arks!
(2onstru0tion of Hnterse0tion "oints Temporary Ben0h 'arks and =eferen0e These rates are appli0able if work item monumenting is done together with items 1#5 and 1#@# 1#>#1 Mon!enting The work rates for monumenting are as follows$% 'onument Type
'arks "er "arty%days A00essible
Hna00essible
a# .ith 0on0reting
7
b# .ithout 0on0reting
5
+
1#>#7 S"ecification for Standard Mon!ent The temporary ben0h marks (TB'! standard monument shall be 0onstru0ted out of a 1 metre length of , mm diameter galanied iron pipe set in 0on0rete of dimension +,0m +,0m 0 +,0m# The TB' standard monument number and the alue of the TB' must be written on the 0on0rete# 6/15
4
MAAS-MACA
SUG340 SURVEY PROJECT
1#>#+ S"ecification for Standard Mon!ent withot #oncreting The temporary ben0h marks (TB'! standard monument shall be 0onstru0ted out of a 1 metre length of , mm diameter galanied iron pipe to be firmly embedded# 1#># Non Standard Mon!ent Hn the eent where the &ureyor is re:uired to 0onstru0t monuments a00ording to non%standard spe0ifi0ations the 0harge shall be at a0tual 0ost# 1#8 Surey in Security !reas 1#8#1 .here se0urity pass or permit has to be obtained from the authority an additional 0harge of 75- of the total fees is appli0ableI or 1#8#7 .here armed es0ort is re:uired and working hours are di0tated by releant authority and additional fee of 5,- of the total fees is appli0ableI and 1#8#+ .hen there is a waiting time after mobiliation an additional 0harge at ='9,,#,, per party%day shall be appli0able# .here re:uired the proision of armed es0ort shall be at no 0ost to the /i0ensed /and &ureyors# 1#9
Surey
in "naccessible !reas
.here the surey worksite is away from motorable road the following 0harges are appli0able$ 4istan0e to .orksite from 'otorable =oad
Additional 2harges
a# , kilometre to 7 kilometres
b# 'ore than 7 kilometres
7,- of the total fees
1#1, #eimbursable 1#1,#1 Rei!brse!ents for ot of "ocket e$"enditre incrred are as follows: 1#1,#1#1A0tual epenses in0urred in pur0hase of releant do0uments plans maps re0ord and et0# 1#1,#1#7A0tual epenses in0urred for telegrams fa tele telephone 0alls and et0# 1#1,#1#+6iring 0harge of spe0ial e:uipments and software pa0kages as agreed with the 0lient# 5 6/15
5
MAAS-MACA
SUG340 SURVEY PROJECT
1#1,#1#;penses in0urred in traeling a00ommodation and subsisten0e allowan0e shall be as follows$% i! ii! iii!
Traelling Air are 'ilage 6otel &ubsisten0e Allowan0e
A0tual 5, 0ents per km 'aimum =' 18,#,,** per day ='85#,, per day
1#1,#1#5;penses in0urred in the use of spe0ial transportation e#g# heli0opter boat et0# as agreed with the 0lient#
1#11 Preparation of $and !c%uisition Plans 1#11#1 "reparatory work as per item 1#7# 1#11#7 All 0ertified plans and 0adastral sheets pur0hased for the 0ompilation C preparation of the land a0:uisition plans shall be 0harged as per item 1#1,#+#1 1#11#+ The time inoled for sear0h at the /and Fffi0e and other 3oernment 4epartment will be 0harged at ='1,#,, per hour plus traeling epenses 0hargeable as per item 1#1,#+## 1#11# 2harge for 0omputation and plan drawing shall be ='7,#,, per lot subje0t to a minimum 0harge of =',,#,, per A1 sie sheet# 2onditions$ /and a0:uisition plans shall be 0omplied from the &urey 4epartment 0adastral sheet and on the same s0ale# This drawing shall show$ (i!
lot boundaries with bearings and distan0es within the sureyed 0orridor
(ii!
lot numbers
(iii!
lot areas
(i!
any other information normally shown on &urey 4epartment 0adastral surey sheets#
1#17 Processing& Conersion and Translation of Digital Data together 'ith (uality !ssurance
.here the surey result is re:uired to be submitted in a designated format a 0harge of 7,- of the total surey fees is appli0able# @ 6/15
6
MAAS-MACA
SUG340 SURVEY PROJECT
1#1+
Transformation of Co)ordinates
The 0harge shall be ='7,#,, per point subje0t to a minimum 0harge of =',,#,, per job# 1#1 Supply of Plans and Documents 1#1#1 "lans and do0uments to be supplied to the 0lient without 0harge shall be as follows$ 1#1#1#1Fne (1! set of plan on tra0ing paper of weight 1,5C11, gms C s:#m# 1#1#1#7Two (7! sets of paper prints 1#1#1#+4igital data in 4.3 format 1#1#1#All releant data field book drawing 0al0ulation sheet et0# prepared in the ee0ution of the 0ontra0t# 2ondition$ ;0ept 1#1#1#1 all other do0uments shall bear the signature of the /i0ensed /and &ureyor# 1#1#7 The 0ost of replotting any drawing on a different s0ale on A1 sie is ='78, per sheet# 1#1#+ Additional sets of transparen0ies or paper prints shall be supplied at the following 0ost$ Type of &ie of "lan
7#
2harge per 0opy
ilm transparen0y of A1 sie
='5,#,,
Tra0ing paper transparen0y of A1 sie
='+,#,,
Tra0ing paper transparen0y of A7 sie or smaller
='75#,,
"aper print of A1 sie or smaller
='1,#,,
S"T* S+#,*-
7#1
Classification of Sites
&urey sites may in0lude$% > 6/15
7
MAAS-MACA
SUG340 SURVEY PROJECT
7#1#1 Building sites 7#1#7 4am sites 7#1#+ &ites for traffi0 inter0hanges and road jun0tion 7#1# Any site for deelopment and 0onstru0tion# ees for &ite &urey are as follows$% 7#7
Preparatory Work
.ork rate for preparatory work is 1 party%day# 7#+
Mobilization and Demobilization
=ates for mobiliation and demobiliation shall be as per item 1#+# 7#
Demarcation of .oundaries& Planimetric Control and Connection
=ates for demar0ation of boundaries planimetri0 0ontrol and 0onne0tion shall be as per item 1#5# 7#5
Height Control and Connection
.ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@# 7#@
Monumenting
.ork rates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with item 7#7 7#+ 7# and 7#5# 7#>
Surey in Security !reas
.ork rates for surey in se0urity areas shall be as per item 1#8# 7#8
Surey in "naccessible !reas
.ork rates for surey ina00essible areas shall be as per item 1#9# 7#9
#eimbursable
The 0harge for reimbursable shall be as per item 1#1,# 7#1,
Topographical Surey
These rates are appli0able if work item topographi0al surey is done together with items 7#7 7#+ 7# 7#5 and 7#@#
8 6/15
8
MAAS-MACA
SUG340 SURVEY PROJECT
7#1,#1 #ontor and %etail .ork rates per party%days in he0tare are as follows$% 2lassifi0ation of Terrain And 3round 2ondition
2ontour Hnterals 1 metre 7 metres + metres
lat E Dndulating area
1#75
1#5,
1#>5
%
,#>5
1#,,
&wampy area
1#,,
1#75
1#5,
Built up area
1#,,
1#75
1#5,
6illy area
7#1,#7 Grid Heighting .ork rates per kilometer in party%days are as follows
%$2lassifi0ation of Terrain And 3round 2ondition
3rid Hnteral (.ith detail! 1, m
3rid Hnteral (.ithout detail!
7, m
1, m
7, m
4eeloped area
5#,,
7#5,
7#5,
1#75
Built up area
@#,,
+#,,
+#,,
1#5,
Dndeeloped area
#,,
7#,,
7#,,
1#,,
&wampy area
5#5,
7#>5
7#>5
1#,
7#11 Minimum /ee The minimum fee shall be 7 party%days whi0h is in0lusie of 1 party%day for preparation works# 7#17 Preparation of $and !c%uisition Plans The 0harge for preparation of land a0:uisition plans shall be as per item 1#11#
9 6/15
9
MAAS-MACA
SUG340 SURVEY PROJECT
7#1+ Processing& Conersion and Translation of Digital Data together 'ith (uality !ssurance
.here the surey result is re:uired to be submitted in a designated format the 0harge shall be as per item 1#17# 7#1
Transformation of Co)ordinates
The 0harge for 0onersion and transformation of 0oordinates shall be as per item 1#1+# 7#15 Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1# +#
C#0SS)S*CT"01"1G W"TH S0+1D"1G /0# .#"DG* S"T*S /ees for Cross)Sectioning 'ith sounding for bridge sites surey are as follo's2)
+#1
Preparatory Work
.ork rate for preparatory work is 1 party%day# +#7
Mobilization and Demobilization
=ates for mobiliation and demobiliation shall be as per item 1#+# +#+
Planimetric Control and Connection
=ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5# +#
Height Control and Connection
.ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@# +#5
Monumenting
.ork rates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with item +#1 +#7 +#+ and +## +#@
Surey in Security !reas
.ork rates for surey in se0urity areas shall be as per item 1#8# +#>
Surey in "naccessible !reas
.ork rates for surey ina00essible areas shall be as per item 1#9# 1, 6/15
10
MAAS-MACA
SUG340 SURVEY PROJECT
+#8
#eimbursable
The 0harge for reimbursable shall be as per item 1#1,# +#9
Surey of .ridge Sites
The work rates for the surey of bridge site shall be 5#5, party%day C per he0tare e0luding the generally wetted area# These rates are appli0able if work item surey of bridge sites is done together with items +#1 +#7 +#+ +# and +#5# +#1,Cross)Sectioning 'ith Sounding These rates are appli0able if work item topographi0al surey is done together with items +#1 +#7 +#+ +# and +#5# +#1,#1 %e"th of water less than & !etre .here the depth of water is less than 1 metre the work rate shall be 8 party days per kilometer of 0ross%se0tioning with spot leel taken at 1, metres interals# Hf the interal is less than 1, metres the fees shall be in0reased proportionately# +#1,#7 %e"th of water greater than & !etre .here the depth of water is greater than 1 metre the 0harges are as follows$ +#1,#7#1
'obiliation and demobiliation of boat is ='@,,#,, per boat
+#1,#7#7
Boat rental ='+,,#,, per boat per day
+#1,#7#+
.ork rate for 0ross%se0tioning shall be 8 party%day per kilometer of 0ross%se0tioning with spot leel taken at 1, metres interals# Hf the interal is less than 1, metres the fees shall be in0reased proportionately#
+#11 Preparation of $and !c%uisition Plans The 0harges for preparation of land a0:uisition plans shall be as per item 1#11# These rates are appli0able of work item preparation of land a0:uisition plans is done together with item +#1# +#17 Processing& Conersion and Translation of Digital Data together 'ith (uality !ssurance
.here the surey result is re:uired to be submitted in a designated format the 0harge shall be as per item 1#17# 11 6/15
11
MAAS-MACA
SUG340 SURVEY PROJECT
+#1+
Transformation of Co)ordinates
The 0harge for 0onersion and transformation of 0oordinates shall be as per item 1#1+# +#1 Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1# #
#0!D !1D #!"$W!- S+#,*-
ees for =oad and =ailway &urey are as follows$% #1
Preparatory Work
.ork rate for preparatory work is 1 party%day# #7
Mobilization and Demobilization
=ates for mobiliation and demobiliation shall be as per item 1#+# #+
Planimetric Control and Connection
=ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5# #
Height Control and Connection
.ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@# #5
Monumenting
.ork rates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with item #1 #7 #+ and ## #@
Surey in Security !reas
.ork rates for surey in se0urity areas shall be as per item 1#8# #>
Surey in "naccessible !reas
.ork rates for surey ina00essible areas shall be as per item 1#9# #8
#eimbursable
The 0harge for reimbursable shall be as per item 1#1,#
17 6/15
12
MAAS-MACA
SUG340 SURVEY PROJECT
#9
Surey of Strip 'ith Spot $eel and Detail
These rates are appli0able if work item surey of strip with spot leel at 7, metres interal is done together with items #1 #7 #+ # #5 and #11# The work rates per party%day in he0tares are as follows$ 2lassifi0ation of Terrain And 3round 2ondition 4eeloped area C flat E undulating area
=ate 7#, ha C party%day
Built up area
1#5 ha C party%day
Dndeeloped area C hilly area
1#5 ha C party%day
&wampy area
1#, ha C party%day
#1, Setting 0ut of Centre $ine of #oad and #ail'ay These rates are appli0able if work item setting out of 0enter line of road and railway is done together with items #1 #7 and #+# #1,#1
&etting out of 0enter line of road and railway from H" to H" with 0hainage pegs at 7, metres interals# The work rates in party%days per kilometer are as follows$
2lassifi0ation of Terrain And 3round 2ondition lat E Dndulating area
7#>5 party%days C km
6illy area
#>5 party%days C km
&wampy area
#75 party%days C km
Built up area
#75 party%days C km
#1,#7
=ate
&etting out of 0enter line of road and railway from H" to H" with 7, metres interals 0hainage pegs and 0ure settings# .ork rates in party%days per kilometer are as follows
%$2lassifi0ation of Terrain And 3round 2ondition lat E Dndulating area
=ate +#>5 party%days C km
6illy area
5#5, party%days C km
&wampy area
5#5, party%days C km
Built up area
5#5, party%days C km
#ondition
1+ 6/15
13
MAAS-MACA
SUG340 SURVEY PROJECT
.here the 0hainage interal is less than 7, metres then the fees shall be in0reased proportionately# #11Connection to #eference Markers These rates are appli0able if work item 0onne0tion to referen0e markers is done together with items #1 #7 #+ and ## =ates for 0onne0tion to referen0e markers shall be as follow$ #11#1 'lani!etric #onnection =ates for planimetri0 0onne0tion shall be as per item 1#5# #11#7 Height #onnection .ork rates for height 0onne0tion shall be as per item 1#@ #17 $ongitudinal Profiling !long *stablished Chainage Pegs /ongitudinal "rofiling is the determination of leels at the pegs established and is done together with item #1,# The work rate in party%days per kilometer are as follows$% 2lassifi0ation of Terrain And 3round 2ondition
=ate
lat E Dndulating area
1#>5 party%days C km
6illy area
+#,, party%days C km
&wampy area
+#,, party%days C km
Built up area
+#,, party%days C km
#ondition
#1+
(i!
/eels to be taken at eery 7, metres and at any points to indi0ate signifi0ant 0hange in slope#
(ii!
.here the 0hainage interal is less than 7, metres then the fees shall be in0reased proportionately#
Cross)sectioning
1 6/15
14
MAAS-MACA
SUG340 SURVEY PROJECT
2ross%se0tioning shall be 0arried out at the 0hainage pegs established and is done together with item #1, and #17# The work rates in se0tions per party%days are as follows$ 2lassifi0ation of Terrain And 3round 2ondition lat E Dndulating area
=ate > se0tions C party%day
6illy area
se0tions C party%day
&wampy area
se0tions C party%day
Built up area
se0tions C party%day
#ondition
(i! 3453
.here the total width is more than >, metres then the fees shall be in0reased proportionately#
Setting 0ut of #esere .oundaries
These rates are appli0able if work item setting out of resere boundaries is done together with items #1,# The work rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain And 3round 2ondition lat E Dndulating area
7#5 party%days C km
6illy area
+#, party%days C km
&wampy area
+#, party%days C km
Built up area
=ate
+#, party%days C km
#onditions
(i!
The aboe rates are only appli0able when the setting out of the resere boundary is 0arried out together with the setting out of the 0enter line# Ftherwise the normal rates for planimetri0 0ontrol and 0onne0tion as per item 1#5 shall apply#
(ii!
6ard wood pegs to be planted at turning points and jungle roller pegs at intermediate points on the resere at about 1,, metres > interals# or resere width of @, metres or less fees shall be 0harged a00ording to the distan0e measured along the 0enter%line of the resere#
(iii!
15 6/15
15
MAAS-MACA
SUG340 SURVEY PROJECT
(i!
or resere width of more than @, metres or where the setting out has to be 0arried out along both sides of the resere fees shall be 0harged a00ording to planimetri0 0ontrol and 0onne0tion rates as per item 1#5 measured along both sides of the resere#
#15 Preparation of $and !c%uisition Plans The 0harges for preparation of /and A0:uisition "lans shall be as per item 1#11# These rates are appli0able if work item preparation of land a0:uisition plans is done together with item #1# #1@ Processing& Conersion and Translation of Digital Data together 'ith (uality !ssurance
.here the surey result is re:uired to be submitted in a designated format the 0harge shall be as per item 1#17# #1>
Transformation of Co)ordinates
The 0harge for 0onersion and transformation of 0oordinates shall be as per item 1#1+# #18 Supply of Plans and Documents The 0harges for supply of plans and do0uments shall be as per item 1#1# #18#1
Types of "lans to be &upplied The types of plans to be supplied to the 0lients department are as follows
%$#18#1#1 /o0ation plan of the surey area at a suitable s0ale su0h that the area under study 0an be shown in a single standard sie sheet# The 0hainages of the alignment shall be indi0ated for ease of 0ross referen0ing with the detail plans# #18#1#7 /ongitudinal profile and plan shall show details of ground leels 0hainages and all features as re:uired the surey stations along the 0enter%line of the road H"s lo0ations of the 0ross%se0tions taken referen0e points and ben0h marks# All items shall be 0learly indi0ated and referen0ed# The longitudinal profile shall be at a s0ale of$ 1 $ 1,,, (horiontal! 1 $ 1,, (erti0al!
1@ 6/15
16
MAAS-MACA
SUG340 SURVEY PROJECT
#18#1#+ 4rawing of all the 0ross%se0tions taken along the 0entre line of the proposed road plotted in 0onse0utie order to a s0ale of 1 $ 1,, both horiontal and erti0al# The drawings shall show details of ground leels and distan0es from the 0entre line of paement shoulders et0# #18#1# All formats of plans submitted shall 0onform to a00epted pra0ti0e# All drawings shall be on A1 sie unless otherwise agreed# 5#
P"P*$"1* S+#,*-
ees for "ipeline &urey are as follows$% 5#1
Preparatory Work
.ork rate for preparatory work is 1 party%day# 5#7
Mobilization and Demobilization
=ates for mobiliation and demobiliation shall be as per item 1#+# 5#+
Planimetric Control and Connection
=ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5# 5#
Height Control and Connection
.ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@# 5#5
Monumenting
.ork rates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with item 5#1 5#7 5#+ and 5## 5#@
Surey in Security !reas
.ork rates for surey in se0urity areas shall be as per item 1#8# 5#>
Surey in "naccessible !reas
.ork rates for surey ina00essible areas shall be as per item 1#9# 5#8
#eimbursable
The 0harge for reimbursable shall be as per item 1#1,#
5#9
Setting 0ut of Pipeline
1> 6/15
17
MAAS-MACA
SUG340 SURVEY PROJECT
&etting out of "ipeline from H" to H" with 0hainage pegs at 7, metres interals# These rates are appli0able if work item setting of pipeline is done together with items 5#1 5#7 5#+ 5# and 5#5# The work rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain and 3round 2ondition
Along ;isting =oad
Fther areas
lat and undulating area
+#,, party%days C km
+#>5 party%days C km
6illy area
+#>5 party%days C km
5#,, party%days C km
&wampy area
+#>5 party%days C km
5#,, party%days C km
Built up area
+#>5 party%days C km
5#,, party%days C km
5#1, $ongitudinal Profiling /ongitudinal "rofiling is the determination of leels at the pegs established and is done together with 5#9# The work rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain and 3round 2ondition
Along ;isting =oad
Fther areas
lat and undulating area
1#75 party%days C km
1#5 party%days C km
6illy area
7#,, party%days C km
7#5 party%days C km
&wampy area
7#,, party%days C km
7#5 party%days C km
Built up area
7#,, party%days C km
7#5 party%days C km
2onditions (i!
/eels along 0enter%line of the pipeline route to be taken at 7, metre interals and at points ne0essary to show any signifi0ant 0hanges in slope#
(ii!
/ongitudinal se0tions along the pipeline route shall be drawn to a s0ale of $ 1 1
(iii! 6/15
$ $
1,,, (horiontal! 1,, (erti0al!
At all streams bridge and 0ulert 0rossings the following information shall be obtained$ 18 18
MAAS-MACA
SUG340 SURVEY PROJECT
6455
(a!
&e0tion of streams along the pipeline 0enter%line giing leels at interals suffi0iently 0lose to show the bed leels#
(b!
The soffit leel of the longitudinal beam of the bridges together with their spans and the lo0ations of the 0olumns#
(0!
The inert leels and the 0rown leels of all 0ulerts#
Surey of Site 'ith 746 metre Contour and Detail
These rates are appli0able if work item surey of site with spot leel at 7,m interal and detail is done together with items 5#1 5#7 5#+ 5# and 5#5#
5#17
5#11#1
,#5 metre 0ontour and detail surey
,#>5 haCparty%days
5#11#7
The 0harge for minimum fees shall be as per item 7#11#
Cross)Sectioning
The 0harges for 0ross%se0tioning shall be as per item #1+# 5#1+ Surey of Strip 'ith Spot $eel and Detail The 0harges for surey of strip with 7 metre 0ontour interal and detail shall be as per item #9# 6453
Setting out of #esere .oundaries
The fees for setting out of resere boundaries shall be as per item #1# 6456
Preparation of $and !c%uisition Plans
The 0harges for preparation of land a0:uisition plans shall be as per item 1#11# These rates are appli0able if work item preparation of land a0:uisition plans is done together with items 5#1 5#1@ Processing& Conersion and Translation of Digital Data together 'ith (uality !ssurance
.here the surey result is re:uired to be submitted in a designated format the 0harge shall be as per item 1#17#
5#1>
Transformation of Co)ordinates
19 6/15
19
MAAS-MACA
SUG340 SURVEY PROJECT
The 0harges for 0onersion and transformation of 0oordinates shall be as per item 1#1+# 5#18 Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1# PART II ENGINEERING SURVEY FOR DRAINAGE AND IRRIGATION
@#
C$!SS"/"C!T"01 0/ T*##!"1 !1D G#0+1D C01D"T"01
The following 0lassifi0ation of terrain shall be applied $ @#1
4eeloped area refers to an area 0urrently planted with padi##
@#7
Built%up area refers to an area with man%made stru0tures su0h as building road fen0e drain hedge 0utting embankment et0#
@#+
Dndeeloped area refers to any area other than that referred to in @#1 and @#7 aboe#
@#
&wampy area refers to generally wetted area at the time of surey whether temporary or permanent in nature#
@#5
Tidal area refers to an area subje0ted to inundation by tides#
>#
S"T* S+#,*-
ees for &ite &urey are as follow $% >#1
Preparatory 'ork for Site Surey
.ork rate for preparatory work is 1 party%day# >#7
Mobilization and Demobilization
.ork rates for mobiliation and demobiliation shall be as per item 1#+ # >#+
Planimetric Control and Connection
=ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5 # >#
Height Control and Connection
.ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@ # >#5
Monumenting
7, 6/15
20
MAAS-MACA
SUG340 SURVEY PROJECT
.ork rates for monumenting shall be as per item 1#> # These rates are appli0able if work item monumenting is done together with items >#1 >#7 >#+ and >## >#@
Surey is Security !reas
>#>
Surey in inaccessible !reas
.ork rates for surey in &e0urity areas shall be as per item 1#8 # .ork rates for surey in ina00essible areas shall be as per item 1#9 #
>#8
#eimbursable
The 0harge for reimbursable shall be as per item 1#1, # >#9
Topographical Surey
These rates are appli0able if work item topographi0al surey is done together with items >#7 >#+ ># >#5 and >#@ >#9#1 #ontor and %etail .ork rates per party%days in he0tares are as follows $ 2lassifi0ation of Terrain and 3round 2ondition lat and Dndulating area C deelop 6illy area C undeeloped &wamp area Built up area
2ontour Hnteral 1 metre 7 metre + metre 1#75 1#5, 1#>5 % ,#>5 1#,, 1#,, 1#75 1#5, 1#,, 1#75 1#5,
>#9#7 Grid Sr(e) 2ost in party%day per kilometre 3rid line with &pot /eels at Base /ine interals of 2lassifi0ation of Terrain and 6eight and 3round 2ondition 75 metre 5, metre 1,, metre 2ontrol and aboe 4eeloped area 7#5, 7#,, 1#>5 1#5, Built up area +#,, +#,, 7#>5 7#5, Dndeeloped area +#75 7#5, 7#75 7#,, &wampy area #,, +#5, +#75 +#,, Tidal area #5, #,, +#>5 +#5,
>#1, Minimum /ee for Site Surey 71 6/15
21
MAAS-MACA
SUG340 SURVEY PROJECT
The minimum fees shall be 7 party%days whi0h is in0lusie of 1 party%day for preparatory work# The method of surey shall be left to the professional dis0retion of the /i0ensed /and &ureyor# >#11 Preparation of $and !c%uisition Plans The 0harge for preparation of land a0:uisition plans shall be as per item 1#11 # >#17 Processing& Conersion& and Translation of Digital Data together 'ith (uality !ssurance
.here the surey results is re:uired to be submitted in designated format the 0harge shall be as per item 1#17 # >#1+
Transformation of Co)ordinates
The 0harges for 0onersion and transformation of 0o%ordinates shall be as per item 1#1+ >#1 Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1 # 8#
W!T*#W!- S+#,*-
ees for &urey .aterways (in0lusie of /akes "onds and =eseroir! are as follows $% 8#1
Preparatory 'ork
.ork rate for preparatory work is 1 party%day# 8#7
Mobilization and Demobilization
.ork rates for mobiliation and demobiliation shall be as per item 1#+# 8#+
Planimetric Control and Connection
=ates for planimetri0 0ontrol and 0onne0tion of the site shall be as per item 1#5# 8#
Height Control and Connection
.ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@# 8#5
Monumenting
=ates for monumenting shall be as per item 1#># These rates are appli0able if work item monumenting is done together with items 8#1 8#7 8#+ and 8##
77 6/15
22
MAAS-MACA
SUG340 SURVEY PROJECT
8#@
Surey in Security !reas
.ork rates for surey in se0urity areas shall be as per item 1#8# 8#>
Surey in "naccessible !reas
.ork rates for surey in ina00essible areas shall be as per item 1#9# 8#8
#eimbursable
The 0harge for reimbursable shall be as per item 1#1,# 8#9
Surey of Strip 'ith Detail
These rates are appli0able if work item surey of strip with detail is done together with items 8#1 8#7 8#+ 8# and 8#5# .ork rates per party%days in he0tare are as follows$ 2lassifi0ation of Terrain and 3round 2ondition 4eeloped area C flat E undulating area Built up area Dndeeloped area C hilly area &wampy area Tidal area
=ate 7#,, ha C party%days 1#5, ha C party%days 1#5, ha C party%days 1#,, ha C party%days ,#>5 ha C party%days
8#1, Setting 0ut of Centre $ine of Proposed #oute& Water'ays& Canals and Drains These rates are appli0able if work item setting out of 0entre line longitudinal se0tioning and 0ross se0tioning for the proposed route waterways 0anals and drains is done together with items 8#1 8#7 8#+ 8# 8#5 and 8#9# 2ost in party%day per kilometer 2lassifi0ation of &etting /ongitudinal Terrain and Fut &e0tion .ith &pot 3round 2ondition /eels at interal of 5,m 1,,m 4eeloped area 7#>5 1#75 1#,, Dndeeloped area #75 1#>5 1#,, Built up #75 7#,, 1#>5 &wampy area #75 7#75 7#,, Tidal area #>5 7#5, 7#75
2ross se0tion at 5,m interals for sureyed width of 5,m 1#>5 7#,, 7#,, 7#>5 +#,,
>5m 7#,, 7#5, 7#5, +#75 +#5,
1,,m 7#75 +#,, +#,, +#>5 #,,
8#11 Surey of *8isting route& Water'ays& Canals and Drains 7+ 6/15
23
MAAS-MACA
SUG340 SURVEY PROJECT
These rates are appli0able if work item setting out of 0entre line longitudinal se0tioning and 0ross se0tioning of eisting route waterways 0anals and drains is done together with items 8#1 8#7 8#+ 8# 8#5 and 8#9# 2lassifi0ation of Terrain and 3round 2ondition 4eeloped area Dndeeloped area Built up &wampy area Tidal area
Alignment &urey
+#,, +#5, +#5, +#5, #75
/ongitudinal &e0tion .ith &pot /eels at interal of 5,m 1,,m 1#>5 1#5, 7#75 7#,, 7#5, 7#75 7#>5 7#5, +#,, 7#>5
2ross se0tion at 5,m interals for sureyed width of 5,m 7#75 7#5, 7#5, +#75 +#5,
>5m 7#5, +#,, +#,, +#>5 #,,
1,,m 7#>5 +#5, +#5, #75 #5,
&pe0ifi0ations $ (i!
&etting out of 0enter line from H" to H" of proposed or eisting where appli0able of route waterways 0anals and drains shall be 0arried out at 5, metres interal#
(ii!
where the interal of setting out is less or more than 5, metre then the fees shall be in0reased or de0reased proportionetely#
(iii!
Fnly and y 0oordinates of the setting our makers are to be supplied#
(i!
/ongitudinal se0tion surey of eisting route waterways 0anals and drains in0lude taking of leels of the right and left banks#
(!
/eels shall be taken along alignment at eery 5, metre interal and at points ne0essary to show signifi0ant 0hange in slope#
(i!
2ross se0tion surey shall be 0arried out at interals of 5, metres and a0ross 0orridor width of 5, metre#
(ii!
.here the width of 0orridor and interals is more of less than 5, metres then the fees shall be in0reased or de0reased proportionately#
(iii! Hf the depth of the route waterways drains and 0anals at the time of surey is more than 1 metre the 0harge shall be as per item +#1,#7 of "art 1#
7 6/15
24
MAAS-MACA
SUG340 SURVEY PROJECT
8#17 Site Surey 2ost in party%day per site 2lassifi0ation of Terrain and 3round 2ondition 4eeloped area Dndeeloped area Built up area &wampy area Tidal area
=ate for &ite of 15,m 15,m 7#5 party%day C site +#5 party%day C site +#5 party%day C site +#5 party%day C site +#5 party%day C site
2onditions $ (i!
2ross%se0tion surey shall be 0arried out at interals of 5, metre and a0ross 0orridor width of 5, metre#
(ii!
.here the width of 0orridor and interals is more than 5, metres then the fees shall be in0reased proportionately#
(iii!
Hf the depth of the waterways at the time of surey is more than 1 metre the 0harge shall be as per item +#1,#7 #
8#1+ Setting)out of Water'ays #esere These rates are appli0able if work item setting out of waterways resere is done together with items 8#1 8#7 8#+ and 8#1, # .ork rates in party%days per kilometre are as follows $ 2lassifi0ation of Terrain and 3round 2ondition 4eeloped area Built up area Dndeeloped area &wampy area Tidal area
=ate 7#5 party%days C km +#, party%days C km +#, party%days C km +#, party%days C km +#5 party%days C km
2onditions $ (i!
The aboe rates are only appli0able when the setting our of the resere boundary is 0arried out together with the setting out of the 0entre line# Ftherwise the normal rates for planimetri0 0ontrol and 0onne0tion as per item 1#5 shall apply# 75
6/15
25
MAAS-MACA
SUG340 SURVEY PROJECT
(ii!
6ard wood pegs to be planted at turning points and jungle roller pegs at intermediate points on the resere at about 1,, metre interals and where the interals is less than 1,, metres the fees shall be in0reased proportionately#
(iii!
or resere width of @, metres or less fees shall be 0harged a00ording to the distan0e measured along the 0entre%line of the resere#
(i!
or resere width of more than @, metres or where the setting out has to be 0arried out along both sides of the resere fees shall be 0harged a00ording to planimetri0 0ontrol and 0onne0tion rates as per item 1#5 measured along both sides of the resere#
8#1 Preparation of $and !c%uisition Plans The 0harge for preparation of land a0:uisition plans shall be as per item 1#11 # 8#15 Processing& Conersion and Translation of Digital Data together 'ith (uality !ssurance
.here the surey result is re:uired to be submitted in designated format the 0harge shall be as per item 1#17 # 8#1@
Transformation of Co)ordinates
The 0harges for 0onersion and transformation of 0o%ordinates shall be as per item 1#1+ # 8#1> Supply of Plans and Documents The 0harge for supply of plans and do0uments shall be as per item 1#1 # PART III ENGINEERING SURVEY FOR TRANSMISSION LINE
9#
C$!SS"/"C!T"01 0/ T*##!"1 !1D G#0+1D C01D"T"01
The following 0lassifi0ation of terrain shall be applied $ 9#1
lat and undulating area refers to an area with terrain of up to 1, slope#
9#7
6illy area refers to an area with terrain e0eeding 1, slope#
9#+
&wampy area refers to generally wetted area at the time of surey whether temporary or permanent in nature# 7@
6/15
26
MAAS-MACA
SUG340 SURVEY PROJECT
9#
Built%up area refers to an area with man%made stru0tures su0h as buildings road fen0e drain hedge 0utting embankment et0#
1,#
T#!1SM"SS"01 $"1* S+#,*-
ees for Transmission /ine &urey are as follow $ 1,#1 Preparatory 'ork .ork rate for preparatory work is 1 party%day per job# 1,#7 Mobilization and Demobilization .ork rates for mobiliation and demobiliation shall be as per item 1#5 # 1,#+ Planimetric Control and Connection =ates for planimetri0 0ontrol and 0onne0tion shall be as per item 1#5 # 1,# Height Control and Connection .ork rates and 0ondition for height 0ontrol and 0onne0tion shall be as per item 1#@ # 1,#5 Monumenting .ork rates for monumenting shall be as per item 1#> # These rates are appli0able if work item monumenting is done together with items 1,#1 1,#7 1,#+ and 1,# # 1,#@ Surey in Security !reas .ork rates for surey in se0urity areas shall be as per item 1#8 # 1,#> Surey in "naccessible !reas .ork rates for surey in ina00essible areas shall be as per item 1#9 # 1,#8 Surey of Strip 'ith Spot $eel and Detail These rates are appli0able if work item surey of strip with spot leel at 7,m interal is done together with items 1,#1 1,#7 1,#+ 1,# and 1,#5 # The work rates per party%days in he0tare are as follows$ 2lassifi0ation of Terrain And 3round 2ondition lat E undulating area 6illy area &wampy area Built up area
=ate 7#, ha C party%day 1#5 ha C party%day 1#, ha C party%day 1#5 ha C party%day
7> 6/15
27
MAAS-MACA
SUG340 SURVEY PROJECT
1,#9 Setting)out of Centre $ie of Transmission $ine These rates are appli0able if work item setting%out of 0entre line of transmission line is done together with item 1,#8# .ork rates in party%days per kilometer are as follows$ 2lassifi0ation of Terrain And 3round 2ondition lat E undulating area 6illy area &wampy area Built up area
=ate 7#>5 party%days C km #75 party%days C km #75 party%days C km #75 party%days C km
2onditions$ (i!
The setting%out of 0entre line of transmission line shall be 0arried out at 7,, metres interals#
(ii!
Angle positions shall be indi0ated by empla0ement of galanied iron pipes 1 meter in length and , mm in diameter# The pipe shall be buried in the ground to a depth of ,#>5 meter and remaining eposed portion to be painted red#
(iii!
.here the interal is less than 7,, metres then the fees shall be in0reased proportionately#
1,#1, $ongitudinal Profiling These rates are appli0able if work item longitudinal profiling is done together with item 1,#9# .ork rates in party%day per kilometer are as follow$% 2lassifi0ation of Terrain And 3round 2ondition lat E undulating area 6illy area &wampy area Built up area
=ate 1#5, party%days C km 7#>5 party%days C km 7#>5 party%days C km 7#>5 party%days C km
2onditions$ (i! (ii!
/eels shall be taken at eery 5, metres interals and points ne0essary to indi0ate signifi0ant 0hanges in slope# .here the interal is less than 5, metres then the fees shall be in0reased proportionately#
1,#11 Cross)Sectioning 78 6/15
28
MAAS-MACA
SUG340 SURVEY PROJECT
These rates are appli0able if work item 0ross se0tioning is done together with item 1,#8 and 1,#1,# .ork rates in party%day per se0tion are as follows$% 2lassifi0ation of Terrain And 3round 2ondition lat E undulating area 6illy area &wampy area Built up area
=ate 1 se0tions C party%day 1, se0tions C party%day 1, se0tions C party%day 1, se0tions C party%day
2onditions$% (i!
The total width of ea0h se0tion shall be 1, meters#
(ii!
.here the width is more than 1, meters then the fees shall be in0reased proportionately#
1,#17 Setting 0ut of To'er9Pylon Positions These rates are appli0able if work item setting out of towerC pylon positions is done together with items 1,#1 1,#7 and 1,#+# The work rates in towerC pylon per party%day are as follows$% 2lassifi0ation of Terrain And 3round 2ondition lat E undulating area 6illy area &wampy area
=ate + towersC pylon per party%day 7 towersC pylon per party%day 7 towersC pylon per party%day
1,#1+ Site Surey for To'er9Pylon Positions These rates appli0able if work item site surey for surey for towerC pylon positions is done together with items 1,#1 1,#7 1,#+ 1,# and 1,#5# .ork rates in sites per party%day are as follows$% 2lassifi0ation of Terrain And 3round 2ondition lat E undulating area 6illy area &wampy area
=ate + sites per party%day 7 sites per party%day 7 sites per party%day
79 6/15
29
MAAS-MACA
SUG340 SURVEY PROJECT
2onditions$% (i! (ii! (iii! (i!
The maimum area per site shall be 1,, s:uare meters# &pot leels shall be taken at 7 meters interals# .here the interal is less than 7 meters then the fees shall be in0reased proportionately# .here the area is more than 1,, s:uare meters the fees shall be in0reased proportionately#
1,#1 Setting 0ut #esere .oundaries These rates are appli0able if work item setting out resere boundaries is done together with item 1,#9# .ork rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain And 3round 2ondition lat E undulating area 6illy area &wampy area Built up area
2ontour Hnteral @,m ,m 7#5 party%day 7#75 +#, party%day 7#>5 +#, party%day 7#>5 +#, party%day 7#>5
7,m 7#, 7#5 7#5 7#5
2ondition$% (i!
&etting%out shall be 0arried out by off%setting from the 0entre line 7,, meters markers#
1,#15 Marking of Trees 'ithin the #esere .oundaries These rates are appli0able if work item marking of trees within the resere boundaries is done together with item 1,#1# .ork rates in party%days per kilometer are as follows$% 2lassifi0ation of Terrain And 3round 2ondition lat E undulating area 6illy area &wampy area Built up area
7,m ,#5, party%day ,#>5 party%day ,#>5 party%day ,#5, party%day
2ontour Hnteral ,m ,#>5 party%day 1#,, party%day 1#,, party%day ,#>5 party%day
@,m 1#,, party%day 1#75 party%day 1#75 party%day 1#,, party%day
2onditions$% The trees to be marked shall be +, 0entimeters or more in diameter measured at approimately 1 meter aboe ground leel# 1,#1@ #eimbursable +, 6/15
30
MAAS-MACA
SUG340 SURVEY PROJECT
The 0harge for reimbursable shall be as per item 1#1, # 1,#1> Preparation of $and !c%uisition Plans =ates and 0onditions for preparation of /and A0:uisition "lans shall be as per item 1#11 of "art 1# These rates are appli0able if work item preparation of land a0:uisition plans is done together with items 1,#1 # 1,#18 Processing& Conersion and Translation of Digital Data together 'ith (uality !ssurance
.here the surey results if re:uired to be submitted in designated format the 0harge shall be as per item 1#17 # 1,#19 Transformation of Co)ordinates The 0harges for 0onersion and transformation of 0o%ordinates shall be as per item 1#1+ # 1,#7, Supply of Plans and Documents 2ost of plans and do0uments to be supplied shall be as per item 1#1 # PART IV ENGINEERING SURVEY FOR AERIAL MAPPING
11#
!erial Mapping
11#1 !erial Mapping #ate 2ompilation &0ale
3round 2ontrol ee
2ompilation ee
&maller than or e:ual to 1 $ 1,,,,
=',#5(2(4*6!!
='(7#,,A!,#5
/arger than 1$1,,,, but smaller than or e:ual to 1 $ ,,,
='(2(4*6!!
='(7#,,A!
/arger than 1 $ ,,, but smaller than or e:ual to 1$1,,,
='1#5(2(4*6!!
='(7#,,A!1#5
/arger than 1$1,,,
='7#,(2(4*6!!
='(7#,,A!7#,
.here A is the area in 6e0tare# +1 6/15
31
MAAS-MACA
SUG340 SURVEY PROJECT
2 is the distan0e in metre 5A 1,,,, 4 is the rate for traersing as proided in terms 1#5 of "art H 6 is the rate for heighting as proided in para 1#@ of "art H 11#7 Delierables (i! (ii!
The 0ompiled hard 0opy plans# 4igital data in 4.3 format#
.here the surey result is re:uired to be submitted in a designated format an additional 0harge of 7,- of the total surey fees is appli0able# 17
!erial Photography
Aerial photography will be 0harged on a0tual 0ost plus 75- management fee# =eimbursable items are $ 17#1
2ost of 0hartering of air0raft#
17#7
2ost of rental of e:uipment su0h as 0amera and naigation e:uipment#
17#+
2ost of photographi0 material su0h as aerial film paper diapositie 0hemi0al and pro0essing#
17#
2ost of se0urity superision#
1+#
#eimbursable
The 0harge for reimbursable shall be as per item 1#1, # PART V HYDROGRAPHI SURVEY FOR TERRITORIAL !ATERS
1#
General
The s0hedule of rates for 2oastal 6ydrographi0 &ureys in support of $% • •
•
•
•
the management of 0oastal ones the hydrographi0 surey of deltai0 regions and rier mouths up to two kilometers upstream of the rier mouth the deelopment of 0oastal engineering property infrastru0ture proje0ts and a0tiities the management and deelopment of jetties ports harbours and asso0iated maritime fa0ilities the management and deelopment along inland waterways and inland water body +7
6/15
32
MAAS-MACA
SUG340 SURVEY PROJECT
The 3eneral Htems in "art H shall be appli0able here# 6ydrographi0 &urey are as follows $
ees for 2oastal
1#1 Mobilization and Demobilization .ork rates for mobiliation and demobiliation shall be as per item 1#+ of "art H 1#7 Planimetric Control and Connection .ork rates for planimetri0 0ontrol and 0onne0tion of the site shall be as per item 1#5 of "art H# 1#+ Height Control and Connection .ork rates for height 0ontrol and 0onne0tion shall be as per item 1#@ of "art H# 1# Monumenting .ork rate for monumenting shall be as per item 1#> of "art H# These rates are appli0able if work item monumenting is done together with items 1#1 1#7 and 1#+# 1#5 Surey in Security !reas .ork rates for surey in se0urity areas shall be as per item 1#8 of "art H# 1#@ Surey in "naccessible !reas .ork rates for surey in ina00essible areas shall be as per item 1#9 of "art H# 1#> #eimbursable The 0harge for reimbursable shall be as per item 1#1, 1#8 Surey of Strip With Detail These rates are appli0able if work item surey of strip with detail is done together with items 1#1 1#7 1#+ and 1# # .ork rates per party days in he0tare are as follows $ 1#8#1 4eeloped area C flat and undulating
7#, ha C party day
1#8#7 Built up area
1#5 ha C party days
1#8#+ Dndeeloped area C hilly area
1#5 ha C party days
1#8# &wampy area
1#, ha C party days
1#8#5 Tidal area
,#>5 ha C party days
++ 6/15
33
MAAS-MACA
SUG340 SURVEY PROJECT
1#9 Shoreline Profiling 1#9#1 Topographical :0nshore; Profiling These rates are appli0able if work item of topographi0al (Fnshore! profiling is done together with items 1#1 1#7 1#+ 1# and 1#8 2ost in party day per km &pe0ifi0ations
Base /ine and 6eight 2ontrol 7#5, +#,, +#75 #5, #5,
4eeloped area Dndeeloped area Built up area &wampy Tidal area
"rofiles at interal of 75m 5,m 1,,m and aboe 7#,, 7#5, +#,, #,, #,,
1#>5 7#75 7#>5 +#>5 +#>5
1#5, 7#,, 7#5, +#5, +#5,
&pe0ifi0ation $ &pot leels shall not be more than 1, metres apart along the profiling line and shall etend as far into the sea as is possible# 1#9#7 .athymetric :0ffshore; Profiling These rates are appli0able if work item of bathymetri0 profiling is done together with items 1#1 1#7 1#+ 1# 1#8 and 1#9#1 2ost in party day per km "rofiles at interal of (m!
"arty 4ay C km
75 5, >5 1,, or more
,#+, ,#, ,#, ,#5,
&ubje0t to a minimum of =' +,,,#,, per job# &pe0ifi0ation (i!
The e0ho sounder shall be 0alibrated at the start and at the end of ea0h days sounding using the bar 0he0k method#
+ 6/15
34
MAAS-MACA
SUG340 SURVEY PROJECT
(ii!
2ontinuous e0ho sounding shall be 0arried out with the sounding re0orded at not more than 1, metres interal along the profiling line#
(iii!
&ounding is to be etended as 0lose as possible to the shoreline#
(i!
&ounding must be redu0ed to the adopted height datum from obsered tides#
1#1, Tidal 0bseration These rates are appli0ation if work item of tidal obseration is done together with items 1#1 1#7 1#+ and 1# 1#1,#1 !utomatic Water $eel #ecording "eriod
Hnstallation
1 days or less +, days
='+@,, ='+@,,
'easurement and 4ata "ro0essing =' 5,,, ='177,,
.here the duration is less than +, days but more than 1 days the fees shall be 0omputed proportionately# .here the duration is more than +, days then the fees shall be in0reased proportionately# &pe0ifi0ation (i!
.ater leel measurement with self%re0ording (automati0! water leel re0order with the measurement re0orded at not more than 15 minutes interal 0ontinuously for measurement period#
(ii!
The re0orded data shall be down loaded at the end of the measurement period and pro0ess to produ0e tabulation of re0orded water leel in A&2HH or '& ;K2;/ format#
(iii!
or the purposes of harmoni0 analysis of tidal data a minimum of +, days re0orded data is re0ommended#
1#1,#7 Direct #eading The 0ost in party day and lump sum# Hnstallation of Tide "ole
=' 9,,#,,
Tidal Fbseration
=' 7,#,, C hour subje0t to a minimum of 1 party day per job +5
6/15
35
MAAS-MACA
SUG340 SURVEY PROJECT
&pe0ifi0ation (i!
.ater leel measurement by method of dire0t obseration of a tide pole establish in the i0inity of the surey area with the tidal obserations 0arried out at no more that 15 minutes interal#
(ii!
The obsered data should be pro0essed to produ0e tabulation of obsered tidal leels in A&2HH or '& ;K2;/ format#
1#11 Current Measurement These rates are appli0able if work item 0urrent measurement is done together with items 1#1 1#7 1#+ and 1# # 1#11#1 Self #ecording Current Measurement The 2ost in /ump &um per lo0ation per instrument# "eriod 1 days or less +, days
Hnstallation =' >,,, =' >,,,
'easurement and 4ata "ro0essing =' 19@,, =' +95,,
.here the duration is less than +, days but more than 1 days the fees shall be 0omputed proportionately# .here the duration is more than +, days then the fees shall be in0reased proportionately# &pe0ifi0ation (i!
A self%re0ording 0urrent meter shall be deployed at a designated lo0ation with a suitable mooring and re0oery system (e#g# D%shape mooring!
(ii!
'easurement of 0urrent speed and dire0tion using the self re0ording 0urrent meter the measurement of 0urrent speed and dire0tion at not more than +, minutes interal 0ontinuously for the measurement period#
(iii!
The self%re0ording 0urrent meter must not be subje0t to bifouling during the measurement period#
(i!
The re0orded data shall be down loaded at the end of the measurement period and pro0ess to produ0e tabulation of re0orded 0urrent speed and dire0tion in A&2HH or '& ;K2;/ format#
+@ 6/15
36
MAAS-MACA
SUG340 SURVEY PROJECT
1#11#7 Direct #eading The 0ost per lo0ation# "reparation and set up
='18,,
4ire0t obseration of
=' +,, C hour
2urrent &peed and 4ire0tion
subje0t to a minimum of ='+9,, per job#
&pe0ifi0ation (i!
Hn%situ obseration of the 0urrent speed and dire0tion using a dire0t reading 0urrent meter at three depths within the water 0olumn (one meter below surfa0e mid depth and one meter aboe the seabed! at the designated lo0ation# The 0urrent speed and dire0tion will be obsered at no more than +, minutes interal#
(ii!
The measurement is normally 0arried out during spring and neap tidal 0ondition and the measurement period shall not be less than 1+ hours to suffi0iently 0oer the basi0 tidal 0y0le#
(iii!
The obsered data should be pro0essed to produ0e tabulation of obsered 0urrent speed and dire0tion in A&2HH or '& ;K2;/ format#
1#17 Sea'aterTemperature and Salinity Measurement These rates are appli0able if work item &eawater Temperature and &alinity 'easurement is done together with items 1#1 1#7 1#+ and 1# The 0ost per lo0ation# Hnstallation
=' 18,,
Hn%situ (dire0t! obseration of &eawater Temperature and &alinity
&pe0ifi0ation (i!
=' +,, C hour subje0t to a minimum of ='+9,, per job#
Hn%situ obseration of sea water temperature and salinity using dire0t reading temperature and salinity bridge at three depths within the water 0olumn (one metre below surfa0e mid depth and one metre aboe the seabed#! at one designated lo0ation# The temperature and salinity will be obsered at no more that +, minutes interal# +>
6/15
37
MAAS-MACA
SUG340 SURVEY PROJECT
(ii!
The measurement is normally 0arried out during spring and neap tidal 0ondition and the measurement perild shall not be less than 1+ hours to suffi0iently 0oer the basi0 tidal 0y0le#
(iii!
The obsered data shall be pro0essed to produ0e tabulation in A&2HH or '& ;K2;/ format#
1#1+ Seabed :Grab; Soil Sampling These rate is appli0able if work item grab sampling is done together with item 1#1 1#7 1#+ and 1# 2ost in /ump &um per sample =' 75, per sample subje0t to a minimum 0harge of ='175, &pe0ifi0ation (i!
&eabed (3rab! soil sampling shall be 0arried out at designated lo0ation using appropriate frab sampler e#g# Lan 4er Leen type
(ii!
The seabed soil samples shall be sent to approed laboratory for parti0le sie distribution (siee analysis!
1#1 Sea'ater Sampling These rates is appli0able if work item sea water sampling is done together with item #1 1#7 1#+ and 1# # 2ost in /ump &um per sample =' 75, per sample subje0t to a minimum 0harge of ='175, &pe0ifi0ation (i!
&eawater sample shall be 0olle0ted using an appropriate water sampler at different depths within the water lo0aion at ea0h designated lo0ation#
(ii!
.ater sample shall be sent to an approal laboratory for total suspended solids analysis#
1#15 Processing& conersion and Transformation to Designated /ormat With (uality !ssurance
As per item 1#17 of "art 1#
+8 6/15
38
MAAS-MACA