15
16
13
14
L ANALOG TO DIGITAL ANALYZER ELEMENT
ARV AI AT
AIR RELEASE VALVE ANALYZER INDICATOR ANALYZER TRANSMITTER
BSWE BSWR BSWT BE
BS & W MEASURING ELEMENT BS & W RECORDER BS & W TRANSMITTER BURNER FLAME DETECTOR ELEMENT
CVA CVP
CHOKE VALVE ADJUSTABLE CHOKE VALVE POSITIVE
C
D DT DR DV
DENSITY TRANSMITTER DENSITY RECORDER DELUGE VALVE
ESD
EMERGENCY SHUT DOWN
FA FAH FAL
FLOW ALARM FLOW ALARM HIGH FLOW ALARM LOW
FV FE FG FI FDI FIC FIT FLA FM FPR FPTR
FLOW CONTROL VALVE FLOW ELEMENT FLOW GLASS FLOW INDICATOR FLOW DIFFERENTIAL INDICATOR FLOW INDICATING CONTROLLER FLOW INDICATING TRANSMITTER FLAME ARRESTOR FLOW METER FLOW PRESSURE RECORDER (TWO PEN) FLOW-PRESS.-TEMP. RECORDER (THREE PEN) FLOW INGRATOR FLOW INGRATOR AND INDICATOR FLOW RECORDER FLOW RATIO CONTROLLER FLOW RECORDER CONTROLLER FLOW SWITCH FLOW SWITCH HIGH FLOW SWITCH LOW FLOW TRANSMITTER FLAME FAILURE ALARM FLOW CALCULATION BLOCK
E
F
This drawing and the design it covers ate the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to borrower.
I
H
FQ FQI FR FFC FRC FS FSH FSL FT FFA FX
G
G GD
GAS DETECTOR
HAD HCV HIC HS
HEAT HAND HAND HAND
IH
F
E
D
C
8
ACTUATED DEVICE CONTROL VALVE INTIATED CONTROL (MANUAL LOADING) SELECTOR I
LY,PY FY,TY
CURRENT TO PNEUMATIC TRANSDUCER
ILAH ILAL ILC ILCV ILG ILIC ILT
INTERFACE INTERFACE INTERFACE INTERFACE INTERFACE INTERFACE INTERFACE
LA LAH LAHL LAL LC LV LG LI LIC LIT LR LRC LS LSH LSL LT LSHH LAHH LSLL LALL LAH2 LSH2
LEVEL ALARM LEVEL ALARM HIGH LEVEL ALARM HIGH LOW LEVEL ALARM LOW LEVEL CONTROLLER LEVEL CONTROL VALVE LEVEL GAUGE LEVEL INDICATOR LEVEL INDICATOR CONTROLLER LEVEL INDICATOR TRANSMITTER LEVEL RECORDER LEVEL RECORDER CONTROLLER LEVEL SWITCH LEVEL SWITCH HIGH LEVEL SWITCH LOW LEVEL TRANSMITTER LEVEL SWITCH HIGH HIGH LEVEL ALARM HIGH HIGH LEVEL SWITCH LOW LOW LEVEL ALARM LOW LOW SECOND LEVEL ALARM HIGH SECOND LEVEL SWITCH HIGH
LEVEL LEVEL LEVEL LEVEL LEVEL LEVEL LEVEL
ALARM HICH ALARM LOW CONTROL CONTROL VALVE GAUGE INDICATING CONTROL TRANSMITTER
L
M MA MAA MI MIA MLS MOV MT MFC
MOISTURE ANALYSER MOISTURE ANALYSER ALARM MOISTURE INDICATOR MOISTURE INDICATOR ALARM MANUAL LOADING SYSTEM MOTOR OPERATED VALVE MOISTURE TRANSMITTER MASTER FLOW CONTROLLER
PA PAL PAH PAHH PALL PB PC PV PCV PDA PDC PDCV PDI PDIC PDSH PDSL PDT PG PI PIC P/I PR PRC PS PSH PSLL PSHH PSHL PSL PSV PT PTR PVSV PY PDAH PDAL PX POV PVRV PDIS
PRESSURE ALARM PRESSURE ALARM LOW PRESSURE ALARM HIGH PRESSURE ALARM HIGH HIGH PRESSURE ALARM LOW LOW PUSH BUTTON PRESSURE CONTROLLER PRESSURE CONTROL VALVE SELF ACTUATED PRESSURE CONTROL VALVE PRESSURE DIFFERENTIAL ALARM PRESSURE DIFFERENTIAL CONTROLLER PRESSURE DIFFERENTIAL CONTROL VALVE PRESSURE DIFFERENTIAL INDICATOR PRESSURE DIFFERENTIAL INDICATING CONTROLLER PRESSURE DIFFERENTIAL SWITCH HIGH PRESSURE DIFFERENTIAL SWITCH LOW PRESSURE DIFFERENTIAL TRANSMITTER PRESSURE GAUGE PRESSURE INDICATOR PRESSURE INDICATING CONTROLLER PNEUMATIC TO CURRENT TRANSDUCER PRESSURE RECORDER PRESSURE RECORDER CONTROLLER PRESSURE SWITCH PRESSURE SWITCH HIGH PRESSURE SWITCH LOW LOW PRESSURE SWITCH HIGH HIGH PRESSURE SWITCH HIGH LOW PRESSURE SWITCH LOW PRESSURE SAFETY VALVE PRESSURE TRANSMITTER PRESSURE/TEMPERATURE RECORDER PRESSURE CUM VACUUM SAFETY VALVE PRESSURE RELAY PRESSURE DIFFERENTIAL ALARM HIGH PRESSURE DIFFERENTIAL ALARM LOW PRESSURE CALCULATION BLOCK PILOT OPERATED VALVE PRESSURE CUM VACUUM RELIEF VALVE PRESSURE DIFFERENTIAL INDICATOR AND SWITCH
O
DEW POINT ELEMENT MISC ALARM AUTO SELECT RELAY BEACON ALARM BLOW DOWN VALVE CONVERTER CORROSION METER CONTROL RELAY MISC CONTROL VALVE DEW POINT ALARM HIGH DEW POINT ALARM LOW DEW POINT RECORDER DERIVATIVE CONTROLLER DEW POINT INDICATOR DEW POINT TRANSMITTER FLOW ADDER FLOW COMPUTER FLAME FAILURE ALARM FLAME SENSOR FLOW TOTALIZER HAZARDOUS GAS DETECTOR IGNITION PANEL PIG ALARM PIG DETECTOR/INOICATOR PIG INDICATOR SWITCH POWER SUPPLY UNIT PILOT VALVE RAMP GENRATOR RATIO RELAY SELECTOR SWITCH SPHERE DETECTOR SHUT DOWN VALVE SELECTOR ALARM HIGH SELECTOR ALARM LOW LIMIT SWITCH HIGH SOLENOID VALVE TEMPERATURE CONVERTOR TICKET PRINTER
XVB
VOLUME BOOSTER
RUPTURE DISC RESTRICTION ORIFICE REMOTE OPERATED VALVE RESISTANCE TEMPERATURE TRANSMITTER REMOTE TERMINAL UNIT (TELEMETERY SYSTEM) RESISTANCE TO ELECTRICAL TRANSDUCER SPEED CONTROLLER SHUT DOWN ALARM SIGHT GLASS SOLENOIO OPERATED VALVE SPEED RECORDER SPEED SWITCH HIGH SPEED SWITCH LOW SUBSURFACE SAFETY VALVE SURFACE SAFETY VALVE SPEED TRANSMITTER SAFETY SHUTDOWN (PANEL)
T TA TAH TAL TC TV TE TG TR TRC TI TIC TS TSH TSL TSV TT TW TSHH TAHH TSLL TALL TM
TEMPERATURE ALARM TEMPERATURE ALARM HIGH TEMPERATURE ALARM LOW TEMPERATURE CONTROLLER TEMPERATURE CONTROL VALVE TEMPERATURE ELEMENT TEMPERATURE GAUGE TEMPERATURE RECORDER TEMPERATURE RECORDER CONTROLLER TEMPERATURE INDICATOR TEMPERATURE INDICATOR CONTROLLER TEMPERATURE SWITCH TEMPERATURE SWITCH HIGH TEMPERATURE SWTICH LOW THERMAL SWITCH VALVE TEMPERATURE TRANSMITTER THERMOWELL TEMPERATURE SWTICH HIGH HIGH TEMPERATURE ALARM HIGH HIGH TEMPERATURE SWTICH LOW LOW TEMPERATURE ALARM LOW LOW TIMER
UNIT (COMMOM) ALARM UNIT (COMMOM) SHUT DOWN UNIT CONTROL PANEL UNIT-SURGE CONTROLLER
VM VSV VR VT VX VSH VAH VSHH VAHH
VISCOSITY MONITOR VACUUM SAFETY VALVE VISCOSITY RECORDER VISCOSITY TRANSMITTER VISCOSITY COMPENSATOR VIBRATION SWITCH HIGH VIBRATION ALARM HIGH VIBRATION SWITCH HIGH HIGH VIBRATION ALARM HIGH HIGH
AC AO AR
AIR TO CLOSE AIR TO OPEN AUTO RESET
BOH BS&W CC CD CDH
BLOW OUT HATCH BASIS SEDIMENT & WATER CORROSION COUPON CONTINUOUS DRAIN CLOSE DRAIN HEADER
CN CO CP CSC CSO CTC
CHOKE NIPPLE CLEAN OUT CORROSION PROBE CAR SEAL CLOSED CAR SEAL OPEN CENTRAL TELEMETRY CONTROL
DA ID FB FC FO FL FSD HH HY LC LO MCC MO MOL MR
DIRECT ACTION INSIDE DIAMETER FULL BORE FAIL CLOSED FAIL OPEN FAIL LOCKED FIRE SHUT DOWN HAND HOLE HYDRANT LOCK CLOSED LOCK OPEN MOTOR CONTROL CENTER MANUALLY OPERATED MAIN OIL LINE MANUAL RESET
MF LCP LEL OD NB D/S NNF KIC
MAINTENANCE FLANGE LOCAL CONTROL PANEL LOWER EXPLOSIVE UNIT OUTSIDE DIAMETER NOMINAL BORE DOWN STREAM NORMALLY NO FLOW TIME SCHEDULE INDICATOR CONTROLLER NORMALLY CLOSED NORMALLY OPEN REVERSE ACTING REDUCED BORE REMOTE MANIFOLD REMOTE STATION SAMPLE POINT SPECIALITY ITEM STRAINER (PERMANENT) SEAM TO SEAM SELECTOR SWITCH THIEF HATCH TIGHT SHUTOFF UTILITY CONNECTION TYPICAL VENDOR FURNISHED HIGHER EXPLOSIVE LIMIT TANGENT TO TANGENT FIRE & GAS PANEL GAS CORROSION INHIBITOR DISTRIBUTED CONTROL SYSTEM HIGH PRESSURE FLARE LOW PRESSURE FLARE SHUT DOWN FIELD MANUAL RESET
F&G GCI DCS HPF LPF S/D FMR CMR IAS MSL LSS GH ODD HC LTCS TOL
A 16
15
14
13
12
CONTROL ROOM MANUAL RESET INSTRUMENT AIR SUPPLY MEAN SEA LEVEL LOWER SIGNAL SELECTOR GAUCING HATCH OPEN DECK DRAIN HYDROCARBON LOW TEMP. CARBON STEEL TOP OF LINE
11
1
2
L
EQUIPMENT PREFIXES
ANSI RATING
SERVICE
PROCESS LIQUIDS & VAPOUR RAW SEA WATER WATER INJECTION
P WR WI
DRAINS & RELIEFS
CLASS & SPECIFICATION INDEX SPEC. NO.
3
4
LINE LEGEND INSULATION
POSITION TRANSMITTER HIGH LIMITERS RUNNING LIGHT INDICATOR RUNNING INDICATOR VALVE POSITION SWITCH CLOSE VALVE POSITION CLOSE INDICATOR VALVE POSITION SWITCH OPEN VALVE POSITION OPEN INDICATOR
NC NO RA RB RM RS S SP STR S/S SS TH TSO UC TYP V/F HEL T/T
U UA USD UCP UIC
5
6
PROCESS LINES
LINE NO. BY SERIES CLASS & SPECIFICATION SERVICE & DESICNATION SIZE
OTHER ABBREVIATIONS
R/S
V
B
XDE XA XAS XBA XBDV XC XCM XCR XCV XDAH XDAL XDR XDC XDI XDT XFA XFC XFFA XFS XFT XGD XIP XPA XPI XPIS XPSU XPV XRG XRR XS XSD XV XSRH XSRL XSH SOV XTC XTP
XT XLY XL XI ZSC ZIC ZSO XIO
RD RO ROV RT RTU R/E SC SDA SG SOV SR SSH SSL SSSV SSV ST SSD
7
LINE DESIGNATIONS LINE INDENTIFICATION 12"-P-E1-1001-IS
X/Z
P
A/D AE
B
J
9
10
GENERAL ABBREVIATIONS A
K
11
12
A1
P,DW,BD,DH,C,DF,FG,FL, SV,VG,GI,GU,HY,N,WI,WC,
150
B1
P,DW,DH,C,DF,FG,N,CI, FL,SV,BD,VG,GU,HY,N,WI
300
D1
P,DW,BD,DH,C,FG,GI,FL SV,VG,CU,HI,N,WI
600
E1
P,DW,BD,DH,C,N,T,FL GI,FG,SV,VG,GU,HY,WI
900
XF1
P,PD,C,N,FL,SV,GI,GU,HY,WI
1500
F1
P,BD,C,N,FL,SV,GI,GU,HY
1500
A2
GL,T
150
B2
GL,T
300
D2
GL,T
600
E2
GL,T
900
A3
150
B3
AI,AU,C AU
A4
WP
150
A5
WF,WU,WR,DW,SH
150
A6
EX.
150
A8
WF,WU,SW
150
A15
P,SV,CD,GI
B15
P,SV,CD,GI
300
D15
P,SV,CD,GI
600
E15
P,SV,CD,GI
900
F15
P,SV,CD,GI,C
1500
PE11
PL
900
F2
CL
1500
A1N
P,SV,CD,G1,FC,BD
150
A1H
FL
150
A10
P,SV,CD,FG,BD,LO,C
150
B10
P,SV,FG,BD,CD LO,SO,M,C,WP LO,SO
300
E10
P
900
A17
P(LTCS), FL(LTCS)
150
E17
P(LTCS), FL(LTCS)
900
300
150
BLOW DOWN DRAIN, HYDROCARBON DRAIN, WATER ETC FLARE SAFETY VALVE DISCHARGE VENT GAS
BD DH DW FL SV VG
STEAM & CONDENSATE BOILER FEED WATER STEAM
HB S
UTILITY WATER C/W WC WF WP SW
CHILLED WATER COOLING WATER FIRE WATER POTABLE WATER SEWER
WU
UTILITY WATER
UTILITIES, GENERAL AIR, INSTRUMENT AIR, UTILITY GAS, INSTRUMENT GAS, UTILITY AIR, BREATHING
AI AU GI GU AB
UTILITY GAS & FUEL BLANKET GAS DIESEL FUEL FUEL GAS NITROGEN
BG DF FG N
B K D E F G H
BLOWER COMPRESSOR DRYER EXCHANGER/HEATER FILTER GENERATOR HEATER
M M M M P
MIXER MOTOR FLAME FRONT GENERATOR FLARE TIP PUMP
T,TK V X PK PM CH CM IM WH WM OM GLM WIM TG CG CIM COM DGT AC
TANK/COLUMN VESSEL/CAISSON MISCELLANEOUS PACKAGE PRODUCTION MANIFOLD CHLORINATOR CENTRAL MANIFOLD INLET MANIFOLD WELL HEAD WATER MAKER OIL MANIFOLD GAS LIFT MANIFOLD WATER INJECTION MANIFOLD TURBO GENERATOR DIESEL GENERATOR COMPRESSOR INLET MAINFOLD COMPRESSOR OUTLET MAINFOLD GAS TURBINE DRIVER AIR COOLER
K
J
I
UTILITY OILS LUBE OIL SEAL OIL
LO
SO
CHEMICALS C GL SH
H
CHEMICAL / CO2 GLYCOL COPPER CHLORINE SOLUTION
OTHERS PL T EX PW
PIPE LINES THERMAL TURBINE EXHAUST PROCESS WATER
INSULATION TYPES IH IC IS IA IT IE IF
G
INSULATION (HOT) INSULATION (COLD) INSULATION (SAFETY) INSULATION (ACCOUSTIC) STEAM TRACING ELECTRICAL TRACING THERMAL FLUID TRACING
ADDITIONAL INSTRUMENT ABBREVATIONS, IF REQUIRED
F
THE FOLLOWING TABLE IS A GUIDE FOR ADDING ABBREVITIONS USUAL OR PREFERRED USAGE FIRST POSITION
SECOND POSITION
THIRD POSITION
A
ANALYSIS
ALARM
ALARM
B
BURNER
C
CONDUCTIVITY (ELECTRICAL)
CONTROL CONTROLLER
CONTROL, CONTROLLER, CLOSE
D
DENSITY OR SPECIFIC GRAVITY
DIFFERENTIAL
E
VOLTAGE (EMF)
ELEMENT
F
FLOW
FRACTION (RATIO)
G
GLAZING (DIMENSIONAL)
GLASS
H
HAND INTIATED
I
CURRENT (ELECTRICAL)
INDICATOR/INDICATING
J
POWER
SCAN
FOURTH POSITION
CONTROLLER
E ELEMENT
HIGH
HIGH
INDICATOR
INDICATOR
K
TIME
CONTROL STATION
CONTROL STATION
L
LEVEL
LIGHT(PLOT)/LEVEL/LIMIT
LOW
LOW
M
MOISTURE OR HUMIDITY
MIDDLE
MIDDLE
B
ORIFICE RESTRICTION
OPEN
P
PRESSURE OR VACUUM
POINT (TEST CONNECTION)
PANEL
Q
QUANTITY OR EVENT
INTEGRATE (TOTALIZE)
R
SA
SH
MSP
AC
PH
JUY
LOC
APPROVAL BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.95
APPROVAL FOR ENGG.
MSP
GRR
C
3.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
B A
Date
Description of revision
Company;
RECOODER
SPEED OR FREQUENCY
SWITCH, SAFETY
SWITCH, SAFETY
T
TEMPERATURE
TRANSMITTER
TRABSMITTER
U
UNIT
COMPANY
CONSORTIUM BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
V
VIBRATION
VALVE
VALVE
VALVE
W
WEIGHT OR FORCE
WELL
X
UNCLASSIFIED
UNCLASSIFIED
UNGLASSIFIED
UNIGLASSIFIED
RELAY
RELAY
DRIVE
DRIVE
ENGINEERS INDIA LIMITED
Detailed Engineering:
NEW DELHI - INDIA
Worley Limited
Basic Engineering:
PETROVIETNAM GAS UTILISATION PROJECT CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Project name:
POSITION
EIL
VIETSOVPETRO
RECORDER
S
Y
EIL
PETECHIM/VIETSOPETRO
Contractor:
RECORDER
ISH
REVISED AS MARKED APPROVAL FOR CONSTRUCTION
7.2.96
DD-MM-YY
O
Z
AS - BUILT
20.11.96 20.3.96
1
Rev.
N
14.03.97
3 2
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
0
0
0
Rev.
2
4
1
0
1
1
0
B
Path\File name\Initials: Document title:
FLOW SHEET & INSTRUMENT LEGEND Page(s)
Company's document No.: Path\File name\Initials:
10
9
8
7
6
5
4
DISTRIBUTION CODE:
37130110
8
NOTES: -GENERAL
6
7
PROCESS/
GLOBE VALVE
Y-TYPE STRAINER (WITH VALVE)
UTILITY LINE
x
x
x
2" 2. ALL SAFETY VALVES DISCHARGE & EQUIPMENT DEPRESSURIZING LINES
BASKET STRAINER
PLUG VALVE
FLAME ARRESTER
CAPILLARY LINE
BALL VALVE
ANGLE VALVE
SKID/VENDOR LIMIT LINE
NEEDLE VALVE
ANGLE BALL VALVE
CENTER LINE
SPRING LOADED VALVE
ANGLE CHOKE VALVE
AXIES AND HAVE NO POCKETS TO AND INCLUDING HEADERS.
LSH
3. DELETED
5. DELETED
HYDRAULIC LINE
DIAPHRAGM VALVE
FUTURE
CONTROL VALVE
SOFTWARE SIGNAL
CONTROL VALVE
FROM
1"
1"
3-WAY VALVE
SOV
INST. PIPING
3-WAY CONTROL VALVE
FT
9. ALL VENT GAS PIPING SHOULD BE FREE DRAINING WITH NO POCKETS.
1/2"
J
FE
PIPING
(TYPICAL FOR FT, FR)
SPECS. DIAPHRAGM SEAL ALSO AS PER SPECS. ALL TAKE OFF
COONECTIONS SHALL BE SW (SOCKET WELD) UNLESS OTHERWISE
(WITH LIQUID SEAL)
2J3
ORIFICE CODE LETTER
24
OUTLET SIZE INCHES
PSV
SET PRESSURE kPa(g)
ST
PLC
TI
INST.
LO/LC LC/LO
NORMALLY LOCK CLOSED
NORMALLY OPEN
NNF
NORMALLY NO FLOW
3/4"
DRAIN FLANGE
LG
2"
DELUGE NOZZLE
STRAIGHTENING VALVES
M
MAN WAY
H
HAND HOLE
LG
LT
FABRICATED
9.11
LOC
32. DELETED
C
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
B
Rev.
INST.
BYPASS
RESTRICTION ORIFICE
LT
NEW DELHI - INDIA
12
11
SOV
10
FMR
9
SOV
SOV
B
C
3
7
1
3
0
0
0
Rev.
2
4
1
0
1
1
1
B
AR
FMR
Path\File name\Initials:
IAS
Document title:
8
Type of document PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
7
6
5
FLOW SHEET & INSTRUMENT LEGEND
Company's document No.:
ACTUATOR
13
SCALE
CCP-WT/95
I
PLC-1
XV
14
Limited
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
FROM
(TYPICAL FOR DISPLACER TYPE LEVEL TRANSMITTERS) (LT, ILT, LEVEL CONTROLLER (FIELD MOUNTED LC, ILC))
A
Worley
PETROVIETNAM GAS UTILISATION PROJECT
I
PLC-2
LT
2"
2"
2"
BORE SIZE MM
ENGINEERS INDIA LIMITED
Basic Engineering: Project name:
FROM
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
I
PB
EIL
CONSORTIUM
Contractor:
40. THE SOV ASSEMBLY IS AS FOLLOWS: -(APPLICABLE FOR PLATFORM INLET/OUTLET SHUTDOWN ISOLATION VALVES)
2"
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
A
15
Description of revision
Company;
39. ALL INSTRUMENT NOS. SHALL BE PREFIXED BY UNIT NO. Lo. TG-0101
1/2"
16
Date DD-MM-YY
2"
HOSE CONN. RO
LOC
JUY
A
INST.
2" FOAM NOZZLE
101
JUY
PH
GRR
38. DELETED
PIPING
11.6
BLIND FLANGE
OFF/ON SKID OR SHOP
PH
GRR
MSP
SHALL BE READ AS 21-TC-0101 IN UNIT NO. '21'.
1/2"
CAP (WELDED)
AC
MSP
APPROVED FOR ENGG.
37. DELETED
VESSEL
MOTOR DRIVE
M
SDH
MSP
APPROVED BY COMPANY FOR ENGG.
36. DELETED
INST.
CAP (THREADED)
SA
APPROVED FOR CONSTRUCTION
10.1.96
35. DELETED
(TYPICAL FOR LG, ILG)
FILTER
REVISRD AS MARKED
20.3.96 7.2.96
34. DELETED
1/2"
(FLANGE MODEL)
AS - BUILT
20.11.96
2
0
33. DELETED
LG
14.3.97
3
1
30. DELETED
3/4"
3/4"
B
31. DELETED
29. ALL SAMPLE POINTS SHALL BE ACCESSIBLE AND LOCATED IN HORIZONTAL LINE.
3/4" VESSEL
NO
E
VALVE IN THE PNEUMATIC LINE TO ENABLE LOCAL CLOSURE OF THE SHUTDOWN VALVE.
27. DELETED
PIPING
2"
C
B
MOUNTED WITH DOUBLE SEAL AND BLEED.
50. ALL SHUTDOWN VALVE WITH SINGLE SOLENOID VALVES SHALL HAVE A MANUAL 3-WAY
26. DELETED
INST.
1/2"
FSD VALVES NORMALLY CLOSED
AS BUILT.
28. DELETED
11.5
INTERCHANGEABLE TO LO
NC
SHALL BE DECIDED BY PIPING DISCRIPLINE, THESE SHALL BE BACK DRAFTED DURING
49. ALL 4" AND LARGER SIZE BALL VALVES IN 900# CLASS AND ABOVE SHALL BE TRUNNION
25. DELETED
(TYPICAL FOR TI, TSH, TSL, TG, TT, TC)
INTERCHANGEABLE TO LC
PIPING
ELECTRIC MOTOR
DRAIN PLUGGED
FUSIBLE PLUG
48. ALL PIPING LOW POINTS SHALL HAVE DRAIN CONNECTION WITH VALVE. LOCATION
24. DELETED
4" MINIMUM
VENTURI METER
QUICK EXHAUST VALVE
1.5"
SONIC METER
SOLENOID VALVE (3WAY)
FOUR WAY VALVE
47. ALL ELECTRONIC TRANSMITERS SHALL BE FITTED WITH LOCAL INDICATION.
21. ALL INJECTION AND TRANSFER PUMPS TO HAVE ADEQUATE SPACE FOR
22. ALL OPEN DECK DRAINS SHALL BE SEAL WELDED.
TI
PIPING
S
SOLENOID VALVE (2WAY)
20. DELETED
MAINTENANCE AND REMOVAL OF SUCTION AND DISCHARGE VALVE. SUCTION/ DISCHARGE LINES TO HAVE FLANGE/UNION CONNECTIONS CLOSE TO PUMP
RAIN CAP NORMALLY LOCK OPEN
PITOT TUBE
S
" VESSEL 1.5" FLANGED.
23. DELETED
RUNNING LIGHT (PANEL)
M
RELEVANT P&ID NO. FOR MULTIPLE TRAINS, A,B,C.... ARE ADDED AT THE END OF THE
FOR EASY DISASSEMBLY.
FLEXIBLE HOSE
POS. DISP. METER
S
3 4
F
46. THE FIRST TWO DIGITS OF ALL INSTRUMENTS DENOTE THE LAST TWO DIGITS OF THE INSTRUMENT TAG NO.
19. DELETED
11.4
NITROGEN CARTIDGE
TURBINE METER
ROTAMERTER
(LOCAL PANEL)
N2
TAKE OFF CONNECTION-PIPING:
PIPING
RUNNING LIGHT (LOCAL)
RUNNING LIGHT
TO LP FLARE
PER THE GENERAL STANDARDS.
TYPICAL FOR PDI, PDT, PDSH, PDSL, PDSHL)
STANDPIPE
8
SPECIALITY ITEM
TO DRAWINGS NO. 3713-00-16-51-1601 TO 1806
18. PIPING REQUIRING INSULATION FOR PERSONNEL PROTECTION SHALL BE AS
MANIFOLD (PER SPECS)
SCRAPER / SPHERE TEE SP
FLOW ON THE 1" PIPE
45. FOR LOCATION OF HEAT FIRE AND GAS DETECTORS, REFER
17. DELETED
101
FLOW ELEMENT ORIFICE
D
FACING THE DIRECTION OF
2"
CORROSIVE SALT LADEN MARINE ENVIRONMENT WITH 100HUMIDITY
PDI
ADAPTOR (TUBING PIPE)
INTERLOCK
G
PROVIDE 20 HOLES OF
15. DELETED
PDI
INSULATION JOINT
INJECTION CHEMICAL
PIECE
14. ALL EQUIPMENTS AND INSTRUMENTS SHALL BE SUITABLE FOR
FUNCTION BLOCK
E
SPOOL
1/2"
COMPANY
5mm EACH ON THE SIDE
RUPTURE DISK
UNION
STANDARD PRACTICE.
44. TYPICAL CHEMICAL INJECTION POINT SHALL BE AS INDICATED BELOW;
13. DELETED
BURIED
STEAM TRAP
TURBINE AND HP COMPRESSOR AUXILIARYS INCLUDING LUBE OIL COOLER AS PER SOLAR'S
SAMPLE
(GAS)
H
43. ALL PUMPS AND COOLER SHALL HAVE LOCAL START/STOP PUSH BUTTONS EXCEPT FOR POWER
11.2
RD
I
1/2"
BOMB
3 " VESSEL 1.5" FLANGED. 4 ALL DIAPHRAM SEAL TYPE INST. TO HAVE 1.5" FLANGED TAPPING.
16. DELETED B
DCS/DIDC
B
FMR
ACTUATOR
PIPE
TAKE OFF CONNECTIONS-PIPING
COMPUTER LOCAL PANEL
F
SOV
XV
AS PER SPEC.
11.3
REDUCER/EXPANDER
1"
1"x1/2"
(TYPICAL FOR PI, PT, PC, PIC, PSH, PSL, PSHL)
101
FLANGE
1"1/2
1" DIAPHRAGM SEAL
1/2"
(LIQUID)
INST.
COMPUTER
3/4"
PIPING
PIPING
SPECTACLE BLIND
I
I
IAS
A1
SAMPLE POINT
S
1"x1/2"
INST.
INLET SIZE INCHES BACK LOCAL PANEL
PB
A
S
PIPING
OPEN DRAIN SYSTEM
SLOPE (DOWN WARD) HAMMER BLIND
1" INST.
PI
BUTTERFLY CONTROL VALVE
G
PLC-1
PI
PI SILENCER
BALL CONTROL VALVE
BACK-PANEL MOUNTED
FOR LIQUIDS TOWARDS FT.
EXPANSION JOINT
SHUT DOWN VALVE
PILOT-OPERATED VALVE
FROM
FMR
MOTOR OPERATED VALVE
LOCAL, PANEL MOUNTED
PB
OPEN
GAS SAMPLE TO BE SURFACE ONLY UNLESS OTHERWISE SPECIFIED.
11.1
LOCAL, PURGED
PANEL MOUNTED
OPEN
SSD PANEL
1/2"
FOR GAS AND VAPOR-TOWARDS FE
HAND-OP. VANNE VALVE
M
H
OPEN
12. SAMPLE CONNECTION SHALL BE AS PER FOLLOWING TYP. DETAIL.
HOOK-UP DETAILS.
VANNE CONTROL VALVE
(PER SPEC.)
PB
I
SOV
SPECIFIED. FOR INST. SUPPLIED VALVES REFER TO INSTRUMENT
PISTON OPERATED VALVE
LOCALLY MOUNTED
PLC-2
ACTUATOR
IMPULSE LINE SLOPE-
BELOW. ALL VALVES SHOULD BE AS PER APPROPRIATE PIPING
UP STREAM
INST.
XV
42. THE SOV ASSEMBLY IS AS FOLLOWS: -(APPLICABLE FOR GENERAL PURPOSE BLOWDOWN VALVES)
FT
10. ALL LIQUID SAMPLES SHALL BE TAKEN FROM CENTER OF THE PIPE.
CONTINUOUS DRAIN
HAND-OPERATED VALVE
C
CMR
IAS
MANIFOLD
11. PIPING VALVES FOR INSTRUMENTS SHOULD BE AS PER DETAILS GIVENT
DEVICE IDENTIFICATION
SOV
B
FMR
8. PROTECTION AGAINST GALVANIC CORROSION TO BE PROVIDED WHEREVER
DOWN STREAM
SELF ACTUATED PCV
SOV
A FMR
11.8 DELETED
FROM
SELF ACTUATED PCV
I
PLC-1
7. FOR PUMP HANDLING LIQUID, CASING VENTS, DRAINS AND BASE PLATE DRAINS SHALL BE PIPED WITH VALVE TO NEAREST
K
CLOSE
TAKE OFF CONNECTIONS-PIPING 1" VESSEL 1.5" FLANGED.
1"x1/2"
(W/PIPING SPEC. DESIGNATION)
PB
FROM
WITH HAND WHEEL
I
PB
I
PLC-2
REQUIRED BETWEEN DISSIMILAR MATERIALS.
LINE RATING CHANGE
I CLOSE
LSH
(TYPICAL FOR EXTERNAL TYPE LSH, ILSH, LSL, ILSL)
TUBED TO CLOSED DRAIN HEADER WITH 12MM SS TUBING.
STANDPIPE
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
UNIT PLC
11.9 ANGLE CONTROL VALVE
FROM
LSH
DECK DRAIN FUNNEL.
J
1"
1/2"
6. DRAINS OF LEVEL INSTRUMENTS IN HYDROCARBON SERVICE SHALL BE
L
41. THE SOV ASSEMBLY IS AS FOLLOWS: -(APPLICABLE FOR ALL USD ISOLATION VALVES AND FOR HP COMPRESSOR BLOWDOWN VALVES)
2"
4. DELETED
1
NOTES CONTINUED ......
1"
HEADER FROM TOP WITH AN ANGLE OF 30° TO 45° WITH FLARE HEADER
TEMPORARY STRAINER
TS
BUTTERFLY VALVE
ELEC. TRACED LINE
x
1/2"
STANDPIPE
CHECK VALVE
PNEUMATIC LINE
x
BE SHOWN ON PIPING PLANS AND ELEVATION.
SHALL BE FREE DRAINING TO FLARE HEADER. THEY SHOULD JOIN FLARE
ELECTRICAL LINE
K
11.7
PIPING
T-TYPE STRAINER (WITH VALVE)
1. HIGH AND LOW PIPING VENTS AND DRAINS NOT SHOWN ON P&IDS SHALL
2
3
4
NOTES CONTINUED ......
LINES IDENTIFICATION GATE VALVE
5
INST.
PIPING SYMBOLS
9
10
11
PIPING
LINES
L
12
13
14
VESSEL
15
INST.
16
Path\File name\Initials: 4
DISTRIBUTION CODE:
Page(s) 37130111
PSHH-0105
CASE
NOTE-3
ZIC
ZIO
0104
0104
B1
ZSO 0104
XV
PI
TI
0104
0101
0101
I
V/F
PT
0105
0103
3/4"
CS0
V/F
PSHH
0103
4"-P-B1-1002
V/F
CMR
CLOSE SIGNAL TO RISER PLTF AND
0107
0107
0103
S
IAS
I/P
CAUSE PSD
ZSC XV
0107
B1
0109
FROM RISER PLTF
30"-P-B1-1001
DWG NO. 1133
NOTE-7
NOTE-2
LOW
30"x20"
HP GAS
TO CDH
3"
FC
3/4"
NC
I TO CLOSE XV-0107
0105
0105
S
ZSO
0105
0105
XV
PI
TI
0105
0102
0102
PI
0106
0104
PAL
V/F
FC
V/F
PSHH
PT
0106
0104
3/4"
LT
LG
0102
0108
2"
6"-SV-A1-2504
PSV
2"
IAS ZSC
ZSO
0106
0106
3/4"
TO CDH
SS TUBING
DRAIN
2"
NC
A1
DWG NO. 1137
B1
B1
A1
TO HP COMPRESSOR
30"-P-B1-1007 NOTE-2
12
11
THAT
TOTAL
P
IS
WITHIN
NO.
SET
POINT
1300 800 1200 850 1300 1200
kPa(g) kPa(g) kPa(g) kPa(g) kPa(g) kPa(g)
1060
mm
FROM
BTL
50
mm
FROM
BTL
950
mm
FROM
BTL
100
mm
FROM
BTL
700
mm
FROM
BTL
50
mm
FROM
BTL
600
mm
FROM
BTL
200
mm
FROM
H
BTL
850 kPa(g)
G
NOTE-6
4"-FG-B1-6301-IE
FUEL GAS TO 1-K-501 DWG NO. 1131
DWG NO. 1006
0103
TO 1-T-231
3"-P-B1-1008
DWG NO. 1007
I LALL 0115
XV-0109
0107
0109
S
LAH
0109
PH
JUY
LOC
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Date
Description of revision
LY
LV 0102
NEW DELHI - INDIA
3/4"
LY 0107
I/P
Limited
BLACK COND. TO CPP-2
2"-P-A1-1024
2"-P-B1-1024
DWG NO. 1012
FC
3/4"
3/4"
2"
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
2
8
SCALE
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
2
1
0
Rev.
2
4
1
1
0
0
1
B
Path\File name\Initials: HP GAS FROM RISER PLTF AND HP SEPARATOR
Company's document No.:
A1
Path\File name\Initials: 7
Type of document
CCP-WT/95
LV 0107
9
Worley
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
2"
COMPANY
ENGINEERS INDIA LIMITED
Basic Engineering:
1"
3/4"
EIL
CONSORTIUM
Detailed Engineering:
NC
10
EIL
ISH
PETECHIM/VIETSOPETRO
0102
ZIO
NC
AC
APPROVED BY COMPANY FOR ENGG.
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
I/P
0109
2"
SDH
MSP
7.2.96
Contractor:
0109
S
SA
APPROVED FOR CONSTRUCTION
1
VIETSOVPETRO
CMR
ZIC
REVISRD AS MARKED
20.3.96
Company;
LAL
IAS ZSC
AS - BUILT
20.11.96
2
DD-MM-YY LIC 0102
I
FC
14.3.97
3
Rev.
FC
XV-0106
CLOSE
I
B
Document title:
13
ENSURE
DWG NO. 1002
NOTE-6
NC
14
TO
PAHH-0105/06 PAH-0103/04 LAHH-0105/0113 LALL-0106/07 LAH-0101/02 LAL-0101/02 LAH2-0108/0110 LALL-0109/0115 LAH-0103/04 LAL-0103/04 PAL-0103/04
0101
LALL
B1
15
REVIEWED
PAL-0112
2"x3"
TRIP 1-K-501
0113
A
16
J
POINT.
F
FROM LSLL-0107
2"-P-B1-1009
TO CLOSE
3"x2"
BE
PAH-0112
RO
2
CLOSE XV-0105
LAHH
SOV
0109
3"-DH-A1-2217
3/4"
ASSEMBLEY.
HIGHEST
A1
I
3" XV
ZSO
3/4"
AT
TI
0115
3" FC
OF
PIPE
SUCTION SCRUBBER
LSLL
3"
NC
SOV
&
E
0109
V/F
0104
B1
OF
FROM
SUCTION HEADER
3"
LSH2 0110
1"
DETAILS
TOP
3"-FL-A1-2405
M
V/F
FC
INST.
LG 0117
ASSEMBLEY.
LP COMPRESSOR
LAL
LV
2"-P-B1-1010 A1
V/F LT
0104
FO
31.18
4"-P-B1-1020 4"-P-B1-1021
LY 0104
0106
B
V/F
FOR
PROVIDE
OF
No.
CSC
LAH2
LAH
LIC
I/P XV
2"
V/F
0104
0110
2H3
LSLL
3"-DW-B1-2302
ZIO 0106
3713-00-02-41-0111
6.
TAPPING
P&ID
3/4"
1-V-211B
INTERFACE ZIC 0106
DETAILS
LEGEND
CASE
CS0
0110
SOV
OF
B1
A1
3"
0106
3/4"
B1
LSLL-0115
S
I/P LV
0107
I
0110
2700
A1
FROM
CMR
0106
20"-P-B1-1006
3"
C
CSO
LY
3/4"
LSHH
V/F
2"-P-A1-1011
ZSO
2"
0113
DWG NO. 1124
FOR
NOTE-42
START-UP
CSC 1"
OILY WATER TO 1-V-451
SOV
K
SHALL HAVE MIN. BENDS AND LENGHT. PIPING GA's AND ISO's
CSO
1"
V/F
M
ASSEMBLEY.
NC
4"-P-B1-1003
2"
V/F
ZSC
4"-P-B1-1015
CS0
B1
PAH
PAHH
I
ZIO 0110
FIRE
3/4"
20"-P-B1-1004
D
0110
FC
0104
CS0
A1
NOTE-3 IAS
ZSC
LV 0101
0108
3/4"
0103
B1
E
SOV
TO 1-V-254
14"x20" 6"-SV-A1-2502
SOV
CLOSE XV-0105
0105
PSV
2700
S
XBDV
2"-P-B1-1022
FIRE CASE
I
ZIC 0110
0101
S
NC
HP FLARE
1.5"-DH-A1-2246
TO CDH
DWG NO. 1137
2H3
LSHH-0113
OF
No.
REQUIRED LIMITS.
0110
LY
0108
ZIO
0109
SOV
NOTE-5
I/P
ZIC
LALL
14"x20"
PSHH-0106
3713-00-02-41-0111
P&ID
7. THE ENTIRE PIPING FROM CCP B/L UPTO THE HP COMPRESSORS
IAS
0106
A1
FROM ESD
&
PALL-0111 ESD
I
NC
3"x2"
LEGEND
I
CMR
2"
B1
OF
3713-00-02-41-0110
SHALL
LAL
0101
FC
B1
ZIO
ZSC 0108
0108
3"-DH-A1-2216
No.
DETAILS
REFER
9.16
IAS
ZSO
A1
ZIC
S
2"-P-B1-1008
POINT
F
0108
FC
3" NC
P&ID
5.
0103
LAH
LIC
0109
3/4"
2"
3/4"
DWG NO. 1137
V/F
0103
1"
FC
INST.
30"x20"
G
TT
0111
LV
0107
DRAIN
0103
NOTE-41
3713-00-02-41-0110
CSO
FO
REFER
PAHH-0110
I
SOV
0108
LSH2 0108
V/F
SS TUBING
A1
LG
LEGEND &
TAG.
LSLL
2"-P-B1-1011
0109
V/F LT
LY
0107 TI
LAL
0103
ZSO
V/F
LAH
LIC
ZSO 0103
2"-FL-A1-2401
2"x3"
H
ZIO
6"-FL-A1-2403
I
ZIC
OF
FOR
LALL
FROM LSLL-0106
XV
DWG NO. 1135
SOV
NOTE-40
3713-00-02-41-0110 3713-00-02-41-0111
0106
3"
LAH2 0108
0107
REFER
CLOSE XV-0108
I
V/F
3"-DW-B1-2301
0111
NOTES.
0105
LSLL
INTERFACE
& FOR
M
1-V-211A
3"
I
ZSC 0103
CLOSE XV-0104 TRIP 1-K-501
I LAHH
0106
LSLL-0109 PSLL 0111
0103
3"
FROM
PALL
0103
4.
RO
3"
V/F
0110
0110
LG 0107
ZIO
2" CSO
2"
M
LT 0101
0103
S
ZIC
IAS
CSC
0105
I
I
ESD
4"-P-B1-1018 4"-P-B1-1019
V/F
PSHH
FROM
2"
LSHH
CAUSE PSD
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
PI 0103
SOV
NOTE-5
A1
CSC 1"
RISER PLTF AND
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
PAH
PAHH 0105
FIRE CASE
B1
A1
L
No.
2700
XBDV
PAL
20"-P-B1-1001
FC CLOSE SIGNAL TO
CLOSE
ZSC
J
CS0
B1
3/4"
2H3
PSV 0102
CS0
A1
IAS
0104
0101
S
6"-SV-A1-2503
6"-SV-A1-2501
I
0104
PAL
PT
PSV
SOV
0112
0112
14"x20"
2H3 2700
P&ID
FOR 1-V-211 A/B. 3.
HP FLARE
FIRE
LEGEND
3713-00-02-41-0110 3713-00-02-41-0111
DWG NO. 1007
HP FLARE
PI
PAH
FROM ESD LSHH-0105
REFER
DWG NO. 1135
K
6"-P-A1-1059-IS
DWG NO. 1135
14"x20"
A1
B1
1
2. SYMMETRICAL PIPING REQUIRED AT INLET AND GAS OUTLET
LP GAS FROM 1-K-252 NO POCKETS
20"-P-B1-1005
2"x3"
FC
EPOXY LINING - FOR BOOT ONLY
30"x20"
0102
30"x20"
0102
BOOT DIA. = 750 mm (ID) HEIGHT = 750 mm (T/T)
(1-K-251)
ZSO
2
3
4
1.
SPLIT
XV
180C
UCP
SPLIT
I
0102
LINING :
PAHH
5
NOTES
1800 mm (ID) x 7200 mm (T/T) 2700 kPa (g)
0102
I ZSC
I
6
7
RANGE
ZIO
(1-K-251)
0102
0102
S
IAS
DESIGN TEMP. :
8
INLET SEPARATOR
RANGE
NOTE-4
DESIGN PRESS. :
UCP
6"-FL-A1-2402
ZIC SOV
SIZE :
9
10
11
1-V-211A/B
I
HP FLARE
L
12
13
14 ESD,UCP OF 1-K-251
DWG NO. 1135
15
ITEM NAME :
XV-0104
16
ITEM NO. :
6
5
4
DISTRIBUTION CODE:
Page(s) 37131001
16
15
ITEM NAME:
9
10
11
1-PK-266 INLET GAS METERING SYSTEM 2700 KPa(g) / 180 C
8
6
7
5
NOTE-2
16"
ZIO
UCP
DWG NO. 1135
LP FLARE
DWG NO. 1135
FUTURE
0202C
I
ZIC
UCP
I
I
2. REFER NOTE-41 OF LEGEND P& ID 3713-00-02-41-0110 AND 0111. FOR SOV ASSEMBLY
IAS
ZSO
ZSC 0202C
3. REFER LEGEND P&ID No.
XV
16"-P-D1-1017C
16"-P-B1-1017C
1"-FL-A1-2432
1"-FL-A1-2420
0202C
K
B1 D1
UCP SS TUBING
B1
30"-P-B1-1007
FT
PT
TT
TI
PI
0201
0202
0202
0204
0205
FX 0201
FROM GAS
FQ 0201
CHROMATOGRAPH
FI
REFER DWG NO. 1011
NO
0201
5. DELETED
CMR IAS
ZSC
0201C
0201C
XV 0201C
J
1"-P-D1-1023C
PDT 0204C
I
UCP
PDI
I
0204C
30"-P-B1-1007
CC PT
TT
TI
PI
A1
0203
0203
0205
0206
B1
0201
NO
CSC
1" 30"-P-B1-1007
1-PK-266
3/4"
INLET GAS METERING SYSTEM NOTE-4
I
NOTE-2 ZIC
SOV
0202E
0202E S
UCP
0202E
UCP
I
IAS
XV
TO 1-V-251E
ZIO
HP PLARE
ESD/UCP
I
ZSC
ZSO
0202E
0202E
ESD/UCP NOTE-2
1.5"-FL-A1-2411
FT 0202
2100 MM
POINT
FE
DWG NO. 1403
0201C
10" LOW
0202
G
ASSEMBLY TO BE DONE BY 'SHI'
B1 D1
NC
H
ZIO
UCP
A1
0202B
UCP
0202B S
I ZSC 0202B
XV
FC B1 D1
UCP
0201B
I
D1 B1
ZIC
UCP
SOV
0201E
S
0201E
I ZSO
ZSC
0201B
0201B
ZSO 0201E
G
XV 0201B
1"-P-D1-1023B FC B1 D1
F
PDT 0204B
30"-P-B1-1007
XV
ZSC
I
IAS
I
0201E
NOTE-2
S
UCP
I
IAS
0201E
1"-P-D1-1023E FC D1 B1
UCP
I PDI 0204B
LEGEND:
PDT
E
CONTROL PANEL
I
UCP
PDI
PI 0201
ESD/UCP
NOTE-2 SOV 0202D
ZIC
ZIO
PT
0202D
0202D
0207
S
UCP
UCP
I
IAS
XV
TO 1-V-251D
NOTE-2 ZIO
UCP
I
ZSC
ZSO
0202D
0202D
0202A
I
0202D
16"-P-D1-1017D
ZIC
UCP
0202A
0202A S
I
IAS
ZSO
ZSC
0202A
0202A
0202A
16"-P-D1-1017A
16"-P-B1-1017A
ZIO
NOTE-2 SOV 0201D
ZIC
ZIO
0201D
0201D
UCP
UCP UCP
I
B
I
ZSC
ZSO
0201D
0201D
0201A
I
S
IAS
XV
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Description of revision
DD-MM-YY
TO 1-V-251A DWG NO. 1003
Date
Company;
ZIC
NOTE-2
I
ESD/UCP
VIETSOVPETRO
Detailed Engineering:
S
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
IAS
ZSO
ZSC
0201A
0201A
Worley
Basic Engineering: XV
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
0201A
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
1"-P-D1-1023A
0201D
1"-P-D1-1023D
FC FC
16"
D1 B1
B1 D1
FUTURE
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
0201A
I
EIL
CONSORTIUM
Contractor:
SOV
0201A
UCP
EIL
ISH
PETECHIM/VIETSOPETRO
FC B1 D1
I
B
Rev.
XV
D1 B1
ESD/UCP
I
SOV
16"-P-B1-1017D FC
C
VENDOR (NOTE-4)
DWG NO. 1003
0204E
D
E
TO STATION
0204E
ESD/UCP I
TO 1-V-251B DWG NO. 1103
0201B
ZIO
UCP
16"-P-D1-1017B
ESD/UCP SOV
0201B
NOTE-2
0201E
H
IAS
ZS0 0202B
0202B
16"-P-B1-1017E
ZIC
I
SOV
16"-P-B1-1017B
FC
F
ZIC
ZIO
16"-P-D1-1017E
I
0202B
I B1
0202E
ESD/UCP
DWG NO. 1303
K
I
S
ZSO
1"-P-B1-1016
0201
3713-00-02-41-0111 FOR NOTES.
4. ALL ITEMS ARE SUPPLIED LOOSE BY GAS METERING VENDOR
FC
DWG NO. 1135
DWG NO. 1001
0201C
I
DWG NO. 1011
1"-FL-A1-2419
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
FROM 1-V-211A/B
UCP
NOTE-2
3713-00-02-41-0110 &
TO 1-V-251C DWG NO. 1203
SOV
REFER DETAIL-A IN
NO
I
TO GAS CHROMATOGRAPH
ZIC
FE
3/4" will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
CSC
1"
30"-P-B1-1050
J
0201C
I
S
A1
ESD/UCP
FC
ZIO
L
1. DELETED
0202C S
0202C
1
NOTES:
SOV
0202C
2
3
4
ESD/UCP
°
DES. PRESS./DES. TEMP.:
LP FLARE
L
12
13
14
ITEM No.:
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PDT
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
0204A
Rev.
PDT 0204D
UCP
I
UCP
3
I
1
3
2
Document title:
0204A PDI
Path\File name\Initials: 15
14
0
13
12
11
10
9
8
7
2
4
1
1
0
0
2
B
HP COMPRESSOR SUCTION MANIFOLD
Company's document No.:
0204D
16
5
Path\File name\Initials:
PDI
A
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131002
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES ITEM NO.:
L
1-AC-251A
1-V-251A
ITEM NAME:
H.P. INTERSTAGE COOLER
H.P. INLET SCRUBBER
SIZE:
2110 mm(ID) x 3025 mm(T/T) 5500 kPa(g)
DESIGN PRESS : DESIGN TEMP. :
2. UIC REFERS
180C
180C
LINING :
1. UCP REFERS TO
DUTY: 25.936 MMKJ/Hr (7.204 MW) 5500 kPa(g)
3.
EPOXY (INTERNAL)
K
P&ID No.
DWG NO. 1153
4.
DELETED
5.
DELETED
K
TAHH
5500 PSV 0301A
DWG NO. 1136
TAH PALL
TI
0303A
0304A
TT
PSLL
TT
0301A
0303A
0304A
TAL
UCP
UCP
TAH TIC
TSHH
SS
INST.
0307A
D1
PIPING
CSO
V/F
0311A
1.5G2.5
0304A
A1
CSO
3/4" CSC
2" 2"-P-D1-1066A
2"-P-D1-1067A
FT
0304A
0301A
PT 0306A
I
H
V/F
PSLL
PI
0312A
0309A
PI
TI
0305A
0303A
S/D
M
I
0302A
I
PUMP
PSLL
PALL 0307A
PSHH
PAHH
0308A
0308A
FIVE
COMPRESSOR TRAINS
NOTE-9
0302A
TAG. NO.
SET
PB
PB
0301A
0302A
SERIAL LINKED TO
PAL-0304A PALL-0307A TAH-0306A TAL-0306A
kPa(g) kPa(g) kPa(g) kPa(g) kPa(g)
50
C
44
C
H
TAHH-0307A
170 C
LAH-0301A
400MM
FROM
BTL
LAL-0301A
200MM
FROM
BTL
LAHH-0304A
465MM
FROM
BTL
LALL-0303A
150MM
FROM
BTL
16"-P-D1-1017A
GOVERNOR
M
TOL
1-K-253A TRIP
TAH-0301A
UCP
TAL-0301A
SPEED CONTROL
I LSHH
F
FROM PT-0207
0301A
LAL
LT
LG
0301A
0302A
LIC
0304A
1-DGT-253A
V/F
G
LALL 0303A
BIAS
ON 2nd STAGE COMPR. DISCHARGE
SS
OVERRIDE
LSS
I
VENDOR'S SCOPE (SOLAR) NOTE-14
1-K-253A TRIP
0302A
ZIC
ZIO
0302A
0302A
IAS
XV
ZSO
FV
ZSC
V/F
0301A
V/F
ZSO 0301A
V/F
3/4"
0306A
3/4"
PB 0305A
D1 A1
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
FO
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
4"
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
NORMAL STOP
3/4"
ESD SIGNAL
12MM SS TUBING NNF
FAST STOP
D1
DWG NO. 1150
E1
Rev.
Date
3/4"
1-K-253A TRIP
PLC-1 (NORMAL S/D)
SS TUBING
TO UCP "B"
XI
TO UCP "C"
CLOSE
I
XV-4601A, XV-0302A, XV-0401A, XV-0402A
PB
PB
0304A
START MACHINE
0303A
START PRESSUR1SATION
UA
USD
0301A
0302A
COMMON
COMMON
ALARM
TRIP
M/C PARAMETER
CONSORTIUM
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering: TO UCP "D" DWG NO. 1303
TO UCP "E"
M/C PARAMETER
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
DWG NO. 1403
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
ITEM NO.:
1-DGT-253A
ITEM NAME:
1-K-253A
HP COMPRESSOR GAS TURBINE DRIVER
CAPACITY : DIFF. PR. :
3
HP COMPRESSOR
14
13
12
11
10
9
1
Document title:
3
2
5
0
Rev.
2
4
1
1
0
0
3
B
HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'A')
Company's document No.:
75450 Nm3/hr (GUARANTEE)
9.219 MW
15
7
Path\File name\Initials:
1st STAGE
3107 kPa
16
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
DWG NO. 1203
ON 1-K-253A TRIP
EIL
ISH
PETECHIM/VIETSOPETRO
Contractor:
DWG NO. 1103
0301A
V/F
I
EIL
Description of revision
DD-MM-YY
Company; VIETSOVPETRO
1-K-253A UCP
I
FROM PLC-1/2 (FAST STOP)
TO COH
B
METHANOL
PIPING INST.
INST. DRAIN
DWG NO. 1137
2"-DH-A1-2201A
NC
E
B
3/4"
2"
C
COOLER VENDOR'S SCOPE OF SUPPLY
DWG NO. 1005
0301A
LV
PB
FC
VENDOR'S SCOPE OF SUPPLY (SOLAR)
* FROM PT-0501
SURGE CONTROL
1"
A1 D1
I
V/F
FY
V/F
2"-P-D1-1029A FC
UCP
0301A
0302A
DWG NO. 1136
0301A
I
LY 0301A
0302A
ZIO
UCP
S
14"-P-D1-1037A
I/P ZSC
0301A
NOTE-6
S
0302A
CMR
0301A
PANEL
I SOV
V/F
0301A
I/P
CONTROL
LSLL-0303A
ZIC SOV
STATION
XV-0302A
I
UCP
V/F
CLOSE FROM
LEGEND:
DWG NO. 1004
0304A
0301A
E
F 20 kPa
FROM PIC-0410A
UCP
V/F SIC
C
4250 kPa(g) 3200 kPa(g)
PDI-0311A(MAX) SOFT
LSLL
45
165 C
PAH-0306A
VAHH-0302A
ST
0303A
C
VAHH-0301A
1-K-253A
0301A
DWG NO. 1002
55
TAH-0304A
PAL-0306A LAHH
0304A
1-V-251A LAH
A
ONE
POINT
4400 750 900 800 2300
PAH-0304A
NOTE-9
ARE
CONTROL PANEL.
PALL-0303A
XI
0303A
0307A
STATION
I
XI
I
TI
10"x12"
OIL
I
DWG NO. 1002
TO HP FLARE
I
UTILISED BY SOLAR FOR LUBE
PAHH-0308A
V/F
2"
FROM HP COMPRESSOR SUCTION HEADER
CMR
PSLL SHALL BE
14. UCPS OF FROM VSHH-0302A
FROM VSHH-0301A
UIC-0301A
0305A
12"x16"
DUAL PLATE WAFER TYPE.
13. THIS
UCP
2"-P-D1-1051A
SYSTEM VENDOR REQUIREMENT. 12.
VAHH
PAL
NOTE-13
G
10. USE 20 MESH PER VENDOR REQUIREMENT.
DWG NO. 1004
M
0301A
PI 0306A
J
LOCAL CONTROL ROOM.
0302A
MOTOR
VAHH
PAH
V/F
PT 0310A
ON
CONTROL
NOTE-8
V/F
AVAILABLE
9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN
3/4"
VSHH
0301A
S/D
UCP
SHALL BE
COMPRESSOR UCP.
11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR
*
I
16"-P-D1-1030A
D1
3/4"
PAL
MOTOR
PT
AS
NOTE-12
* VSHH
V/F
PAH
TOL
1-AC-251A 3/4"
PIC
TO TAP-OFF POINT.
TO 1-V-252A
12"-P-D1-1031A-IS
16"-P-D1-1030A
TS
INDICATIONS
DCS AS WELL
12"-P-D1-1032A
0302A
FV-0301A CLOSE
DELETED
8. ALL THESE
TY
V/F
CSO
I
7.
0306A
NOTE-10
PSV
I/P
6. LOCATE
DWG NO. 1004 TAL
NOTE-11
ST-0301A
5500
0306A
3/4"
I PDI
FIRE CASE
FROM TT-0306A
8"-P-D1-1037A
1.5G2.5
I
NOTE-8 TAH
TI 0301A
4"-SV-A1-2506A
TO HP FLARE
4"-SV-A1-2505A
FIRE CASE
NOTE-8
4"-FL-A1-2406A
J
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
CONTROLLER
3713-00-02-41-0111 FOR NOTES.
0307A
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
REFER LEGEND
L
UNIT CONTROL PANEL
ANTISURCE
3713-00-02-41-0110 & FROM 1-P-356A 12MM SS TUBING
D
TO
Path\File name\Initials: 8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131003
16
15
12
13
14
ITEM NO. ITEM NAME L
SIZE : DESIGN PRESS : DESIGN TEMP :
9
10
11
8
H.P. INTERSTAGE SCRUBBER 1710 mm (ID)X 2750 mm(T/T) 8400 kPa(g)
H.P. DISCHARGE COOLER DUTY: 22.236 MMKJ/H (6.177 MW) 14000 kPa(g)
180 C
1
NOTES:
SCRUBBER 1122 mm (ID) X 2415 mm(T/T) 14000 kPa(g)
°
L
1. REFER LEGEND P&ID No. 3713-00-02-41-0110 &
65 C
EPOXY (INTERNAL)
TO 1-DGT-253A SPEED CONTROL
2
3
4
H.P. DISCHARGE
180 C
°
5
1-V-253A
1-AC-252A
LINING :
6
7
1-V-252A
3713-00-02-41-0111 FOR NOTES.
°
EPOXY (INTERNAL)
2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.
DWG NO. 1003
V/F
FY
FO
70.99
0403A
NOTE-2
V/F
IS
NO POCKETS
NOTE-7
2J3 14000
3" F1 E1
PSV
D1 F1
J
RO
SS
6"-P-F1-1043A-IS
NNF
F1
INST. PIPING
NOTE-3 UCP
UCP
I
I
TAHH
PAHH
TI
0405A
0409A
0408A
TAH
I
FT 0402A
PSHH
TT
FT
0409A
0408A
0401A
PT
V/F
V/F
PSV 0401A
2"-P-D1-1044A
CSO
F
DWG NO. 1136
FIRE CASE
TAH TAL
TT 0401A
PI
PAH
0401A
PAL
NOTE-5
NOTE-3
1E2
PID 0412A
3/4"
D1
3/4"
CSO
CSC
2"
I
VENT
2"
F1
INST.
SS
TI
TAH
0406A
TAL
TAG. NO.
PALL-0407A PALL-0412A TAHH-0405A VENT
172 C
TAH-0406A
CC 0402A
M
NO POCKETS
8"-P-E1-1035A
VSHH
FROM
0401A
*
VSHH-0401A
M
1-K-253A TRIP VSHH
VSHH-0402A
M
I
1-V-253A
FROM
0402A
PSLL 0407A
0401A
PB
LSHH
0401A
MOTOR
NOTE-4
S/D
I
0402A
0402A
MOTOR
NOTE-4
LT
LG
0402A
0406A
C
I FROM
BTL
LAL-0401A
130
MM
FROM
BTL
LAHH-0404A
774
MM
FROM
BTL
50
MM
FROM
BTL
LAHH-0408A
465
MM
FROM
BTL
LALL-0407A
150
MM
FROM
BTL
LAH-0402A
400
MM
FROM
BTL
LAL-0402A
200
MM
FROM
BTL
PAH-0401A
4250 kPa(g) 3200 kPa(g)
TAH-0401A
LAHH
PAH-0405A
0408A
PAL-0405A
50
C
44
C
H
13000 kPa(g) 10500 kPa(g)
TAH-0408A
PB
C
55
MM
TAL-0401A
I
VAHH
C
35
290
PAL-0401A
I
50
LAH-0401A
LALL-0403A
3/4"
*
POINT
13200 kPa(g) 4500 kPa(g) 2300 kPa(g)
PAHH-0409A
2"
3/4"
I
SET
0407A TT 0406A
165
C
VAHH-0401A
G
VAHH-0402A
S/D
PI
LSLL
LALL
0407A
0407A
PDI-0412A(MAX)
20
kPa
0408A
PALL
PSLL
0412A
0412A
XI
XI
0401A
0402A
LIC 0402A
V/F UCP
V/F
PSLL
PT
0411A
0405A
PI 0405A
LAH
I
LAL
XV-0402A
CLOSE
PAH
F
PAL
NOTE-3 TI 0402A
ENTRY
12"-P-D1-1032A
DWG NO. 1003
PIPING
PUMP CONTROL.
TI
TAHH-0409A
VAHH
UCP
2"-P-D1-1041A
TOP
CSC
TSHH 0409A
TAL-0406A
UCP
NOTE-8
FROM 1-AC-251A
3/4"
J
8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL TAHH 0409A
V/F
3/4"
PSV 0402A
CSO
A1
0404A
2"
PALL 0407A
7. DUAL PLATE WAFER TYPE.
0408A
8400
2"-P-D1-1071A
1E2 8400
G
3"-SV-A1-2508A
CASE
TI 0401A NOTE-3
3"-FL-A1-2407A
FIRE
3"-SV-A1-2507A
TIC-0306A
TT 0306A
SYSTEM VENDOR REQUIREMENT. UCP
CSO
1-AC-252A
0401A
DWG NO. 1003
PSV
6"-P-F1-1042A-IS
TSHH
NOTE-6
3"-P-D1-1069A
NO POCKETS
DWG NO. 1146
TO HP FLARE
H
I
V/F
0405A
8"-P-F1-1034A-IS
0402A
TO FUEL GAS SKID
6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR 14000
CSO
TS
21.05
5. USE 20 MESH PER VENDOR REQUIREMENT.
8"-P-E1-1070A
2J3
F1
12"-P-D1-1033A
ST-0401A
RO
IN LOCAL CONTROL ROOM.
A1
3/4"
K
4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE
PT
F1
V/F
I
M
NO POCKETS
TI 0404A
1-K-253A TRIP
LSHH
0401A
LT
LG
LAL
0401A
0405A
LAHH 0404A
I SOV 0401A CMR
ZIC
ZIO
0401A
0401A
LY
S
LSLL
LALL
0403A
0403A
1-K-254A
0402A
I/P 0401A
TO CONDENSATE
XV
ACCUMULATOR
ZSC
ZSO
0401A
0401A
0401A
0401A
DWG NO. 1008
FC
0402A
1"
I
LV
3/4"
I/P LY
LY
IAS
D
1"
CLOSE XV-0401A
2"
LEGEND:
E1 A1
D1 F1
2"-DH-A1-2203A
LIC
LAH
3/4"
2"-P-D1-1036A
SS TUBING
NC
FC
FC
3/4"
B1 D1
*
INST. DRAIN
3/4"
3/4" 2"
VENDOR'S SCOPE OF SUPPLY (SOLAR) COOLER VENDOR'S SCOPE OF SUPPLY
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
NC D1
2"-DH-A1-2202A
C FROM
LSLL-0407A, 1-K-253A TRIP
I
CMR
B
ZIC
ZIO
0402A
0402A
IAS
XV
ZSC
ZSO
0402A
0402A
0402A
DWG NO. 1124
COMPANY
CONSORTIUM
Detailed Engineering:
ENGINEERS INDIA LIMITED
SS TUBING
NEW DELHI - INDIA
Worley
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
2"-P-E1-1074A
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
Rev.
FC
3
1-V-254A
ITEM NO.
13
12
11
10
2
Path\File name\Initials:
8743 kPa
14
3
5
0
2
4
1
1
0
0
4
B
HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-A
Company's document No.:
2nd STAGE 67696 Nm3/hr 15
1
Document title:
COMPRESSOR
CAPACITY : DIFF. PRESS :
7
Path\File name\Initials:
H.P.
ITEM NAME
16
EIL
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
INST. DRAIN
3/4"
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
DWG NO. 1154 Contractor:
A1 E1
A
Company;
Basic Engineering:
S
TO OILY WATER TREATMENT
12MM SS TUBING
TO CDH
SOV 0402A
FROM 1-P-357A
A1
E
VENDOR'S SCOPE
V/F
DWG NO. 1137
1-V-252A
FROM
LSLL-0403A, LSHH-0807 PSHH-0805, 1-K-253A TRIP
0404A
TO CDH
0401A
E
6"x8"
I
CC
0402A
10"x12"
PI
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
CSO
4"-P-F1-1125A-IS
I
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
12MM SS TUBING
DWG NO. 1150
0403A
53.79
0401A
3/4"
METHANOL
DWG NO. 1005
0401A
RO
0401A
DCS AS WELL AS COMPRESSOR UCP.
GAS HEADER
8"-P-E1-1038A NO POCKETS
6"-P-FI-1073A-IS
FV
0401A
IS
DWG NO. 1136
V/F
PIC 0401A
E1
ZSC
0401A
10"-P-D1-1070A
UCI-0401A
I/P 0401A
V/F
ZSO
CMR
3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON
TO DISCHARGE
6"-SV-A1-2509A
S
I
V/F
TO HP FLARE
I
SOV
0403A
6"-SV-A1-2516A
V/F
ZIC 0401A
UCP
6"-FL-A1-2408A
ZIO 0401A
UCP
K
UCP
I
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131004
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES: UCP/ESD
1.
SOV
ZIO ZIC 0510C
S
IAS
UCP
I XBDV
ZSC
0510C
0510C
NOTE-7
UCP
0510C
UCP
15.04
8"
RO
0510C
FUTURE
0500C
CSO
CSO
8"-P-E1-1038C
UCP
I XV
ZSC
0500C
0500C
0500C
XBDV 0510D
E17
UCP UCP
ZSO
UCP
NOTE-2
I
0500D
0500D
XV
0500D
0500D
8"-P-E1-1038D
0505D
17.98 UCP
I
15.04
ZSO
RO
0510B
0500B
CSO
2"x4"
2"-P-E1-1039B
E1
G
0500B
S
IAS
FROM 1-V-253B DWG NO. 1104
I XV
ZSC
0500B
0500B
UCP
ZSO
0501
0505B PAL
0510E
PAL
UCP
J
SET
POINT
250 kPa(g) 50C
TAL-0501
35C
PAH-0501
13000 kPa(g) 10500 kPa(g)
PAL-0501
I
FROM
G
UCP/ESD
CSO NOTE-2
I
S
IAS
I
0501
ZSC
XV
0500E
0500E
F FROM 1-V-253E
NOTE-6
8"-P-E1-1038E
UCP
DWG NO. 1404
FC
I
3/4"
2" PSL
0505B
DWG NO. 1003
NO.
0500E
0500E
0500E
ZSC
0501E
CSC ALARM
2"-P-E1-1127B
E
E1
NC NOTE-2
I
UCP
A1
ZIO ZIC 0510A
IAS
UCP
I XBDV
ZSC
0510A
0510A
17.98
ZSC
UCP
0510A
0505E
15.04
ZSO
FO
E17
E17
CSO
SOV ZIC 0500A
S
IAS
8"-P-E1-1038A
0502E
0501
UCP
I XV
ZSC
0500A
0500A
0500A
AS - BUILT
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
TT
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
0501
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
17.98
TO 1-T-311A/B
16"-P-E1-1040
A17
DWG NO. 1008 FLOW TEMPERATURE
ZIO
0500A
C
RO
CC
2"x4"
2"-P-E1-1039A
NOTE-2
14.3.97
3
TAL
NC
A1 E1
0500A
TAH B
8"-P-E1-1127E
RO
0510A
TI 0501
CSC
I
CSO
UCP/ESD
PAL 0501E
0502B
SOV 0510A
D
0505E
I
RO
S
I
E
ZIC
UCP/ESD
UCP
6"-FL-A17-2408
I
FLARE
2 : 1000
DWG NO. 1136
NO POCKETS
Description of revision
DD-MM-YY
Company;
I
3/4"
PSL 0501A
ALARM
PAL
ZIO 0511
ZSC
XBDV
ZSC
ZSO
RO
0511
0511
0511
0501
CSC
CSO
2"-P-E1-1127A
FO E1
E1
2"-P-E1-1160
CSO
2"-P-E1-1133
0505A
NC
NEW DELHI - INDIA
6.43
UCP
SEAL GAS DWG NO. 1056
E17
FUTURE
8"
FUTURE
4"
Limited
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
FUTURE
PIPING & INSTRUMENTATION DIAGRAM
7
1
3
2
Document title: NOTE-7
13
12
11
10
Rev.
0
2
HP
9
4
COMPRESSOR
Company's document No.: Path\File name\Initials:
14
5
1
1
0
0
5
B
Path\File name\Initials:
2"
17.98
15
Type of document
SCALE
CCP-WT/95
Contractor's document identification:
3
RO
Worley
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
Company's contract No.:
2"x3"
E17 A17
A1
0502A
ENGINEERS INDIA LIMITED
Basic Engineering:
IAS
I
0501A
ZIC 0511
S
ZIC 0505A
SOV
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering: 0511
EIL
CONSORTIUM
Contractor:
DWG NO. 1136 NO POCKETS
NOTE-4
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
VENT
4"-VG-A1-2834 ESD
A
Date
0500A
NOTE-6
2"
Rev.
ZSO
FC
16
CONN. WITH
SOV ZIC
0500E
ZSO
0501B
XBDV 0510E
ZIO
UCP
I
CONTROL PANEL
B
HEADERS
PURGE
PURGED
IAS ZSC
E17
PAH
PT
ALARM
S
FO
3/4" ZIC
DWG NO. 1004
VENT
FOR BE
GAS.
2"-P-E1-1039E
A17
NOTE-6
0510E
I
ZSO
PSL
FROM 1-V-253A
AND
SHALL
CSO
2"x4"
I
0501B
TO STATION
FLARE
INERT
I
SOV
UCP
0510E
0500E
0500B
2"
WITH
0510E
ZIC
0510E
I
15.04
PI
8"-P-E1-1038B
FC
F
UCP
OF
CONNECTIONS.
HEADERS
H
NOTE-2
RO 0500B
5M
PURGE
FLARE
HEADERS
NC
ZIO
UCP
E17 A17
ZIC
THAN
WITH
1135.
VENT
UCP/ESD
ZIO
0500B
NO.
AND
0502D
FO
SOV
PROVIDED
P&ID
GAS
TYPE.
LONGER
RO
E17
CSO NOTE-2
E17
UCP/ESD
K
8"-P-E1-1127D A1 E1
4"-VG-A1-2634
0510B
NOTES.
CSC
16"-FL-A17-2408
16"-P-E1-1040
ZIO
0510B
VALVE.
17.98
A1
0502C
I
I
PAL
ZSC
E1 RO
ZSC
BE
WAFER
ENDS
0501D
0505D
NC NOTE-2
XBDV
PLATE
TAG.
I
2"-P-E1-1127C
IAS
FOR
TAH-0501
ZIC
UCP
CSC
UCP
BLOWDOWN
DETAILS.
PAL-0501 A/B/C/D/E
ALARM
I
0510B
THE
DWG NO. 1304
PSL
ZSC
S
OPEN
FROM 1-V-253D
0501D
UCP
0505C
H
ASSEMBLY
DEAD
2"
3/4"
E1
PAL
0510B
TO
3713-00-02-41-0110
FC
0501C
ZIC
ALL
SHALL
ZIC
SOV
DUAL
7.
FEUL
ZSC
3/4"
0505C
0510B
6.
REFER
NOTE-6
ALARM
I
SOV
DELETED.
IAS
PSL
UCP/ESD
PROVIDED
No.
3713-00-02-41-0111
5.
S
I
ZSO
0501C
I
BE
P&ID
UCP/ESD
CSO
SOV ZIC
0500D
I
0500C
2"
SHALL
4. REFER NOTE-42 OF LEGEND P&ID NO. 3713-00-02-41-0110 & 0111 FOR
ZIO
I
NOTE-6 FC
LCR
LEGEND
2"-P-E1-1039D
0500D
E1
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
DWG NO. 1204
ZSC 0510D
CSO
A17
ZIO ZIC 0500C
IN
REFER &
IAS
0510D
0500D
3.
S
I
ZSO
RO
0510D
FO
IAS
FROM 1-V-253C
15.04
FUTURE
UCP
PANEL
0510D
ZIC
0510D
I
E17 A17
SOV 0500C S
J
FUTURE
2"x4"
FO E1
NOTE-2
E17
I
2"
2"x4"
2"-P-E1-1039C
UCP/ESD
4"
ASSEMBLY DETAILS. IN ADDITION, A PUSH BUTTON MOUNTED IN SSD
I
SOV
ZIO
I ZSO
2. REFER NOTE-41 OF LEGEND P&ID NO. 0110/0111 FOR SOV
UCP/ESD
NOTE-2
E1
0510C
K
L
DELETED.
NOTE-2
I
E17
L
8
7
6
5
4
DISTRIBUTION CODE:
DISCHARGE
MANIFOLD
Page(s) 37131005
16
15
12
13
14
9
10
11
8
6
7
5
PSV
PSV
0601
0602
4"x8" 4"x8"
VF
VF VF
CSO
CSO
2"
1/2"
K
1/2"
VF
DWG NO. 1007
3"x6" 6"-P-A1-1047
6
TAL
0604
S/D
ZSC
ZSO
0602
0602
TT
PSLL
0601
0604
UCP
L3
4P6 500
SUCTION HEADER
PI
14"-P-A1-1054-IE
5
FC
0603
PT 0601
500
0603
0604
CSO
CSO
4"x6"
4"x6"
1/2"
1/2"
CSC
FC
1/2"
0601
ZIC
ZIO
0601
0601
1-K-251
S
DWG NO. 1133
S/D
I
IAS XV
ZSC
ZSO
0601
0601
0601
V/F
2"
POINT
0601
S
TI
0602
0609
I
1-V-254
PSHH 0606
PAL
PI
PAHH
0605
0606
1"-FL-A1-2470
V/F
TI 0603
ZIC
ZIO 0603
0602 LSH
XV
ZSC
ZSO
0603
0603
I
0604
DWG NO. 1124
2"-P-A1-1053
8"x6"
FO
1-K-251
S/D
UCP
LG
I
UCP
CLOSE
CLOSE
LV-0602
LCP 1-K-251
LV
TT
TYPICAL
12.
FROM
OF
TAL
1"-DH-A1-2215
START
0607
ARRANGEMENT
12mm SS TUBING
A1
PROVIDED &
I VAHH
S/D
0601
OUTLET
OF
CYLINDER
PROVIDED
25-TT-0606
AT
OUTLET
PROVIDED
FOR
EACH
CYLINDER.
H
D3.
NO.
SET
POINT
40 kPa(g) (-)8.8 kPa(g) 400 kPa(g) 370 kPa(g) 260 kPa(g) 36 kPa(g) (-)5 kPa(g)
PAL-0605 PAH-0601 PAL-0601
G
TAH-0601
60C
TAL-0601
40C
TAHH-0602/04/06
135C
LAHH-0603
195MM
LALL-0604
(-)105MM FROM BTL
LAH-0602
125MM
LAL-0602
(-)25MM FROM BTL
TAH-0607
130C
PDI-0607(MAX.)
0602
FROM
BTL
FROM
F
BTL
10 kPa(g) E
I
COMMON
UA 0601
V/F
USD 0602
ALARM
COMMON TRIP
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
Company;
EIL
EIL
ISH
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
FOR TIE-IN DETAILS
Detailed Engineering:
ESD SIGNAL
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
FROM 1-T-T1
DWG NO. 1007
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
3/4"-DH-A1-2219 Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
1-K-251
A
3
LP COMPRESSOR 1st STAGE
ITEM NO. : ITEM NAME :
1
3
2
Document title:
310 KPa
5
0
Path\File name\Initials: 15
14
13
12
11
10
9
8
Rev.
2
4
1
1
0
0
6
B
COMPRESSION OF LOW PRESSURE GAS FROM CPP2
Company's document No.:
DIFF. PRESS.
16
7
Path\File name\Initials:
15018 Kg/hr
CAPACITY
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
TRIP XV-0702
I
LSHH 0703
1"-DH-A1-2218
J
UCP.
NO.-1.
PAH-0605
XI
M
MOTOR
AT
&
FROM PLC-1/2
3/4"
DCS.
THE
1-AC-253.
25-TT-0604
25-TI-0615
PAHH-0606
3/4"
1"-DH-A1-2228
BOTTLE
TAG.
V/F
UCP 1-K-251
PERMISSIVE
8
B1
AND
PAHH-0609
V/F
NOTE-6
REFER NUOVO PIGNONE
NOTE 12
THE
FROM
UCP
P&ID NO. SOP-52599/1 21
25-TI-0613
CYLINDER
VOLUME
DD-MM-YY
SKID LIMITS
25-TT-0602
NO.-2
PALL-0604
I
DWG NO. 1007
TO CDH
OUTLET
DRG NO. 1007
TAH
1/2"
DWG NO. 1007
TO
BE
FROM VSHH-0601
NOTE-6 FC
VENDOR.
0605
TI
UCP
L2
L1
DWG NO. 1137
AT
11.
2"
TO 1-V-D5
CYLINDER
8"x6"
0607
&
SIMILARLY
OF
80C
2"
B
V/F
25-TI-0603
NO.-4
98C
LALL
LINKED
SHALL
THROUGH
VAHH-0601
TSO
1/2"
GAS
100C
0602
9
FREE DRAIN
ROUTE
TAL-0605
SOV
RO
TO
TAH-0605
0604
PACKAGE
ROOM.
XV-0603
TAL-0607
LSLL
THOSE
FACILITIES.
V/F
0604
K
IN
EXCEPT BY
SERIAL
COMPRESSOR
0601
0601
C
TAL
S
LSLL-0604
TO 1-V-453
CONTROL
NOTE-5 (TYP.)
CMR
FROM
ALARMS
AUXILIARY
FOR
VSHH
0602
D
THE
FOR
LAHH
0602
SOV
WITH
0603
0601
LSL
S
SUPPLIED
0603
0602
AR
10.
TAH
8"-P-A1-1056-IS
FC 2
DWG NO. 1007
LAL
TX-0705 P&ID NO. 1007
0608
0603
12mm SS TUBING
OPEN
BE
ITEMS
LSHH
0602
M
THE
UCP
LAH LI
IAS
I
0603
LT
E
UCP.
PERMISSIVE
1-AC-253
NOTE-11
TO LP FLARE
UCP
I
TT
PAH
1-K-251 S/D
1.5"-DH-A1-2234
UCP
TI
I
TRIP
14"x16" PI
PT 0605
SHALL
COOLING
CONDENSATION
I
M PI
CONTROL
DETAILS.
JACKET
TO
1"
0608
WATER
HYDROCARBON.
DCS
INDICATIONS
START
TO 1-T-231
I
TS
LOW
DWG NO. 1135
0601
IN
TEMPERED
AND
AND
ASSEMBLEY
7. 1-AC-253 IS SUPPLIED LOOSE BY VENDOR. PIPING TO/FROM
8"x6" XI
AS
THE
AND
NOTE-10
1-V-D2/D3
UCP
1
IN
PB
TI 0601
0609
FC
DWG NO. 1137
VENT
RO 0603
1"
1-K-251
PSHH
UCP
UCP
NOTE-10
0602
1-V-D1
ST-0601
F
I TSHH
0607
16"-P-A1-1052
TO CDH
0602
6"-P-A1-1045
0609
S/D
I
PREVENT
INSTRUMENTATION
CHANGE
IAS
1-K-251
0602
UCP
I
CAPACITY CONTROL
PDI PAHH
V/F
SOV
PAL
A
ALL
-
S TAHH
1"
I
I
0601
RO
8"x4"
NOTE-3
LP GAS FROM CPP-2
SUPPLY
A1
UCP
G
0601
2"
UCP
UCP
ESD
I
PIC
NC
N2 PURGE
B1
FROM 1-K-251 S/D.
PAL 0601
PAH
PY
H
PAH 0601
TO
PROVIDE
SOV
9. ON ACTUATION OF TDAL -0705 (P&ID NO. 1007). OPERATOR SHOULD
0603
4"-P-A1-1139
1/2"
TO
FOR
- LCP SHALL CONTAIN COMPRESSOR START/STOP PUSH BUTTONS
NOTE-9
SOV
0601
NOTES.
3713-00-02-41-0110
1-AC-253 SHALL BE IN PURCHASER'S SCOPE.
PV
I/P
FOR
AND
8. LOCAL/REMOTE SELECTOR SWITCH FOR 1-AC-253 START SHALL BE
2"
CSO
OF
COMPRESSOR.
IN
6"-P-A1-1140
I
4P6
PSV
4"-P-B1-1015
DWG NO. 1001
DWG. NO. 1007
PSV
3713-00-02-41-0110
6. COMPRESSOR SHALL HAVE A UNIT CONTROL PANEL (UCP) IN THE CONTROL ROOM, AND A LOCAL PANEL (LCP) IN THE FIELD. - ALL PROCESS/MECHANICAL TRIP INTERLOCKS SHALL BE EXECUTED
7
8"-P-A1-1055-IS
XV 0602
8"-P-A1-1015
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
I
IAS
FROM HP COMPRESSOR
NO.
THE
5.
FREE DRAINING
0601
S
VENDOR
8"-P-A1-1057-IS
0602
1-K-251
NOTE-41
SYSTEM
CONTINUED ON
0602
PALL
REFER
4.
P&ID NO. 1007
TI
P&ID
3713-00-02-41-0111
6"-P-A1-1141
ZIO
L
LEGEND
INDICATED
6"-SV-A1-2513
0605
3.
NOTE-11
TAH ZIC
REFER
6"x8"
27
I
I
DELETED.
2.
3713-00-02-41-0111
LOCATION
UCP
NOTE-3 SOV
1.5"-FL-A1-2432A
6"-SV-A1-2512
I
J
VF
1.
180C
TO SAFE
CSC
3"x6" 6"-P-A1-1048 UCP
ESD
VF
VF
VF
2"
CSO
FROM 1-K-251 S/D.
500
3"-VG-A1-2637
100C
LP INTERSTAGE COOLER
DUTY: 183.46 KJ/Hr 500 kPa (g)
3L4
6"-FL-A1-2424
DESIGN TEMP.
500
1-AC-253
8"-FL-A1-2410
LP FLARE
DIA 1352mm x 2192mm (T/T) 500 kPa (g) & FULL VAC.
DESIGN PRESS.
3L4
DWG NO. 1135
LP SUCTION SCRUBBER
SIZE
8"-SV-A1-2511
1-V-254
ITEM NAME :
1
NOTES
DWG NO. 1135
8"-SV-A1-2510
L
2
3
4
LP FLARE
ITEM NO. :
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131006
12
13
14
8
6
7
1-T-231
ITEM NAME
TO HP FLARE
L
9
10
11
CONDENSATE STRIPPER 1200 mm (ID) X 8600 mm (T/T) 500 kPa (g) /F.V
SIZE DESIGN PRESS. DESIGN TEMP.
140
°
C
5
8"-FL-A1-2413
15
DWG NO. 1136
16
ITEM NO.
CONTAMINATED LIQUID FLASH DRUM 65°C
2. DELETED. 3. ALL INSTRUMENTATION AND CONTROL ITEMS EXCEPT THOSE
INDICATED AS IN DCS/PLC SHALL BE SUPPLIED BY PACKAGE
PSV 0703 CSO
PSV CSO
0701
6"-SV-A1-2522
1200
6"-SV-A1-2521
CONTINUED FROM
P & ID NO. 1006
FOR TIE IN DETAILS
VENDOR.
TAHH
S/D
TDAH 500
TDI
0708
1200
5. REFER NOTE-41 OF 3713-00-02-41-0111.
PSV CSO
0702
0702
S/D
PAL
PT
UCP
3/4"
I
PI
0708
0706
1"
0705
TDAL
1-K-251
PAH
6. LOCATE PUMPS ON TILTING PLATE SEPARATOR (1-V-453)
4"-P-A1-1105-IS
3/4"
2"
CSO
CSC
TI 0703
0702 PDI
TT
TI
0702
0701
DECK TO MEET NPSH REQUIREMENTS.
TI 0704
7. STRAINERS ST-1301/1302 PREVIOUSLY PROCURED FOR 1-P-232 A/B TO BE USED.
TAH TAL
TAG.
NO POCKETS
1"
TT
4"-P-A1-1104-IS
CSO
TX
1-V-D4
TS
3
10"-P-A1-1081-IE
3/4"
TI CSC
0705
3"-P-A1-1102-IS 3"-P-A1-1103-IS
6"-P-A1-1059-IS
1-V-D5
DWG NO. 1001 4
RO 0702
1-K-252
1"
10
DWG NO. 1006
MM
FROM
BTL
100
MM
FROM
BTL
LAH-0702
430
MM
FROM
BTL
LAL-0702
270
MM
FROM
BTL
PAHH-0701
1100 kPa(g) 231 kPa(g) 340 kPa(g) 245 kPa(g) 165
TAHH-0702
PT
PSHH
0705
0701
PI
L2
TT
0707
1050 kPa(g) 900 kPa(g) 150 kPa(g)
1-K-251
I
DWG NO. 1006
0705
PAH
PI
H
0705
TAL-0704
125
PDI-0701(MAX)
15 kPa(g)
PAL-0705
1.5"-FL-A1-2432A
UCP
16
S/D
DWG NO. 1006 CSO
I
C
TAH-0704
PAH-0705
DWG NO. 1006 PI 0704
C
600
LALL-0701
PAL-0708
12 mm SS TUBING
C
LAHH-0703
PAH-0708
TO 1"-DH-A1-2125
1"
J
POINT
25
PALL-0702
L1
RO
SET
TDAL-0705
0704
TO 1-V-211 A/B
V/F
NO.
TDAH-0705
0701
PSV
2"
3/4"
0702
PSLL
0704
CSO
PI
I
UCP
1.5H3
PALL
K
3L4
4"-P-A1-1106-IS
1-K-251
0705
I
3L4
4. ROUTE LINE SO THAT SAFETY INSULATION IS MINIMISED.
L3
3"-SV-A1-2515
500
DWG NO. 1135
TO HP FLARE
C
PAHH
H
0701
PAL
2"
0703
FROM COMP. CYLINDERS
1-T-T1
LG 0602
1"-DH-A1-2273
M1
6"X3"
3"-P-A1-1101-IS
G
G
#10 PDI
#1
FROM 1-K-251 1st. STAGE
TO 1-V-453
HOT
1-T-231
75 MM
F
ZIO
ZIC
0702
0702
SOV
3/4"-DH-A1-2219
IAS
0702
ZSO
ZSC
0702
0702
I
S XV
HC LIQUID
0702
3"-P-A1-1008
3/4"
0703
I
M2
LIC
ZIC
0701
0701
SOV
RO 0701
NC
ZSO
ZSC
0701
0701
I
S XV
FOR PI
NOTE-5
3/4"
0701
7.47
2"-P-A1-1058-IS
E
V/F:
COMPRESSOR VENDOR SCOPE SUPPLY.
2"-P-A1-1174-IS
3/4"
TO 1-PK-264
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
EIL
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
S
EIL
ISH
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
ST-0701 NOTE-7
NOTE-7
PI
PI
0708
3/4"
0709
0701
PB
STOP
I
PB
0701
ITEM NO. ITEM NAME CAPACITY DIFF. PRESS.
3
STOP
1-K-252
1-P-233A/B (NOTE-6) BLACK CONDENSATE PUMPS
LP COMPRESSOR 2 nd STAGE
2.0 m3/hr
17077 Kg/hr
10
8
7
1
3
2
Document title:
5
0
Rev.
2
4
1
1
0
0
7
B
LOW PRESSURE GAS COMPRESSION & CONDENSATE STRIPPING
Company's document No.: Path\File name\Initials:
719 kPa
9
7
Path\File name\Initials:
0702
350 kPa
11
Type of document PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
0702
LSLL-0701
SCALE
CCP-WT/95
XI
M
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
3/4" XI
M
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
2"X1"
3/4"
2"x1"
Worley
Basic Engineering:
ST-0702
LSLL-0701
12
BLACK CONDENSATE
B
DWG NO. 1012
FC
3/4"
13
FROM ESD. LSLL-0701
I
14
DWG NO. 1001
TO LV-0702
IAS
0701
2"-P-A1-1058-IS
INTS. DRAIN SS TUBING
ZIO
HOT
2"-P-A1-1171-IS
C
15
DRAIN
LAL
75 MM
2"-DH-A1-2232
XV-0701
16
A1 B1
FROM 1-V-211A/B
LOW POINT
2"-P-A1-1175-IS
TO CLOSE
TRIP 1-P-233A/B
A
3/4"
DWG NO. 1012
0702
0701
I
B
LT 0702
DRAIN
LSLL
LALL 0701
D
LG 0704
FC
LOW POINT
LAH
2"-P-A1-1172-IS
CLOSE XV-0702
3"-P-B1-1008
LSHH
LAHH 0703
2"-P-A1-1173-IS
TO 1-K-251 S/D
E
F
DWG NO. 1006
ON 1-K-251 S/D LSHH-0703
FREE DRAINING
8"-P-A1-1056-IS
DWG NO. 1006
NOTE-3
17
0708
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
1.5H3
NO. SOP-52599/1
DWG NO. 1006
3"-FL-A1-2412
3"-SV-A1-2514
J
P&ID
L
1. DELETED.
BY VENDOR
350 kPa (g)
6"X8"
K
1
NOTES:
13
REFER NUOVO PIGNONE
2
3
4
1-T-T1
6
5
4
DISTRIBUTION CODE:
Page(s) 37131007
15
COND. HOLDUP VESSEL
HP FLARE
ITEM NAME
1300 mm (ID) X 2800 mm (T/T) 4300 kPa (g)
SIZE DESIGN PRESS. DESIGN TEMP.
DWG NO. 1136
L
12
13
14
1-V-234
65° C
9
10
11
8
1-V-232
6"-FL-A1-2409
16
ITEM NO.
6"-SV-A1-2517
PSV
CONDENSATE ACCUMULATOR
CONDENSATE COALESCER
1300 mm (ID) X 3610 mm (T/T) 4300 kPa (g)
660 mm (OD) X 2438 mm (T/F).BOOT=475 mm(O0)X 610 mm (H) 4780 kPa (g)
65° C
65° C
1.
0813
B1
3/4" CS0
3/4" CSC
FROM 1-V-252B
4"-P-B1-1036
FROM 1-V-252C
3/4"
NO
2"-P-B1-1036E
DWG NO. 1404
5.
PUMP
CAVITY
BYPASS
6.
PI-0806
TO
7.
PROVIDE
EITHER TRUNION
PALL-0813
4"-P-81-
PALL-0809
LAH
LT
LIC
0802
PALL-0811
0802
LAL
PAHH-0808
A/B
ZSO 0107
PAHH-0810 PAHH-0812
M
LAH-0802
1.5"-P-B1-1147
M
LAHH-0807
TRIP
1-V-231 A/B/C
1.5"-P-B1-1158
FREE DRAINING
6"-P-B1-1060
NO
NO POCKET
3"-P-B1-1062
I
1D2
2"
VENT
14000
PSV
3 4
"
3 4
INTERFACE LT
LG
LSLL
0801
0804
0805
FV
0802
I/P
FY
"
0803
I/P
FY
FO
0801
3 4
FO
0802
1.5"
"
3 4
FY 0803
1.5"
"
3 4
"
LAH-0801 LAL-0801
444
mm
FROM
BTL
476 mm FROM BOOT T/T
G
1D2 14000
PSV
I/P
CSC
LV
0802
6"x4"
A1
3/4"
CS0
0802
6"x4"
H
BTL
PDI-0807 (MAX)
E1
LV
6"x4"
CS0
3/4"
PI 0807
S
F
E
TO 1- PK-263
3"
DWG NO. 1012 TRIP
INST. DRAIN
3 4
"
PSLL-1107 PSHH-1106
NOTE-5
NOTE-7
3"-P-F1-1130
NOTE-5
NOTE-5 PI 0802
4"x3"
3 4
"
3 4
"
PI 0803
4"x3"
FROM
3 4
ESD
"
LSLL-0808
PB
XI
PSLL-0809
0801
0801
PSHH-0810
I
3 4
"
JUY
LOC
PH
JUY
LOC
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Date
PB
XI
0802
0802
9
3 4
ESD
PSLL-1107
PSLL-0811 PSHH-0812
CONSORTIUM
Detailed Engineering:
"
ENGINEERS INDIA LIMITED
Worley
Basic Engineering:
REFER TO NIKKISO SUNDSTRAND
Limited
DWGS. NO. DE55-090A-04 FOR DETAILS
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
M
I
Company's contract No.: STOP
PB
XI
0803
0803
SCALE
1"-DH-A1-2251
PIPING & INSTRUMENTATION DIAGRAM
DWG NO. 1137
3
7
1
3
2
3
0
Document title:
Path\File name\Initials:
6
5
Rev.
2
4
1
1
0
0
8
B
Path\File name\Initials: CONDENSATE COALESCER & INJECTION PUMPS
Company's document No.:
7
Type of document
CCP-WT/95
Contractor's document identification:
LSLL-0808
8
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
9114 kPa
10
EIL
PETECHIM/VIETSOPETRO
VIETSOVPETRO
30 m3/hr
11
EIL
Description of revision
ISH
NEW DELHI - INDIA
4"x3"
FROM
CONDENSATE INJECTION PUMPS
12
PH
GRR
APPROVED FOR ENGG.
Contractor:
0804
1-P-231A/B/C
CAPACITY:
13
AC
MSP
10.1.96
PI
PSHH-1106 STOP
LSLL-0808
DIFF. PRESS.
14
SDH
MSP
APPROVED BY COMPANY FOR ENGG.
0
DD-MM-YY
CSO
TRIP 1-P-231C
LSLL-0806
M
I
PSHH-1106 STOP
ITEM NAME
15
SA
APPROVED FOR CONSTRUCTION
7.2.96
0803
CSO
I
PSLL-1107
PSLL-0807 PSHH-0808
TRIP 1-P-231B
LSLL-0806
M
I
TO CDH
2"-DH-A1-2233
DWG NO. 1137
ITEM NO.
I
LSLL-0806
SS TUBING
REVISRD AS MARKED
20.3.96
1
FT
A1
B1 ESD
A1
AS - BUILT
20.11.96
2
Rev.
FE
0802
CSO
TRIP 1-P-231A
3/4"
0803
14.3.97
3
0803
FT
0801
3/4"
B1
E1
B
Company;
FROM
B
CSO
FE 0802
FT
NC
3"
F1
F1
1"
CSO
FE 0801
2"X3"
3/4"
B1
2"-P-B1-1061 FC
4"-P-E1-1064
0812
F1
A1
CSO
0801
1" FC
3/4"
FAL
FIC
CSO
PSHH
0810
B1
0801
2"-P-A1-1061
0806
0812
FC
3/4"
4"x3"
PSLL 0811
2"x3"
0801
LV
FAL
FIC
PAHH
0802
CSO
PSHH
F1
ZSO
0810
PSLL 0809
B1
0801
ZSC
ST-0801
XV
FAL
FIC 0801
CSO
PSHH
I
0811
3"-P-F1-1129
0806
PSLL 0807
PAHH
1-P-231C
PALL
4"-P-B1-1131
LALL 0805
4"x3"
ST-0803
0801
IAS
PAHH
I
3"-P-F1-1028
XV-0801
4"-P-B1-1063
LY
ST-0802
0801
TO CLOSE
3"-P-F1-1064
0801
I/P
2"X3"
CMR
ZIO
0809
F1
0801
ZIC
I
3"-P-F1-1082
SOV
4"-P-B1-1062
I
1-P-231B
PALL
4"x3"
NOTE-7
1-P-231A
0807
I
TRIP
NOTE-7
PALL
3"-P-F1-1065
FROM
16
CS0
E1
2"-P-E1-1112
I/P
A1
F1
FV
0801
2"
2"
"
LSLL-0805
A
FROM BTL
2"-P-E1-1132
F1
FV 3 4
1.5"
C
mm
0804
B1
2"
LSLL 0808
FO
TREATMENT
150
18 m3/hr 18 m3/hr 18 m3/hr 532 mm FROM BOOT T/T 494 mm FROM BOOT T/T
2"-P-E1-1064
B1
F1
DWG NO. 1124
BTL BTL
FROM
FAL-0803
DWG NO. 1135
0803
B1
TO OILY WATER
FROM FROM
mm
LALL-0808
6"-P-B1-1062
LALL 0808
1-V-231
mm mm
FAL-0802
TO HP FLARE
6"-FL-A1-2418
6"-SV-A1-2519
PDI 0807
S
SEAL
I
250
LALL-0805
1-P-231A/B/C
V/F VENDOR SCOPE
D
TWIN
WITH 3/4" BLEED.
POINT
2600
FAL-0801
6"-SV-A1-2520
G
LIC
VALVE
MOUNTED VALVE WITH
2400
LALL-0806
TRIP
0801
LINE.
FROM THIS
LAL-0802
I
6"-P-B1-1160
LAL
START
ROOM.
SET
PALL-0807
0107
LAH
SHALL
3800 kPa (g) 3400 kPa(g) 3900 kPa(g) 3000 kPa(g) 4500 kPa(g) 4500 kPa(g) 4500 kPa(g) 13500 kPa(g) 13500 kPa(g) 13500 kPa(g)
PAHH-0805
0107
ZIO
DWG NO. 1135
2"
VISIBLE
TAG. NO.
1-V-234
WHITE CONDENSATE TO CPP-2
E
BE
PAL-0801
LG
F
SEAL
PAH-0801 ZIO
H
PUMP
J
ZSO
0803
(FUTURE)
CONTROL
1-V-232
I
0107
2"
STANDBY
K LOCAL
POINT
NC
PUMP TRIP. THE
AND BODY BLEED OR DOUBLE BLOCK VALVES
3/4"-P-B1-1149
FROM 1-V-252E
RUNNING
XV-0401A/B/C/D/E
3/4"-P-B1-1148
4"-P-B1-1036
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
I
ONE
LOCATED IN
1.5"-P-B1-1146
XV-0401A/B/C/D/E
LOW
2"-P-B1-1036D
DELETED
4. AUTO MANUAL SELECTOR SWITCH FOR 1-P-231A/B/C/ SHALL BE
B1 A1
CLOSE
I
2"
FREE DRAIN
2"
DWG NO. 1304
NOTES.
CLOSE VENT
FROM 1-V-252D
& FOR
DWG NO. 1136
0805
3/4"-P-B1-1147
2"-P-B1-1036C
DWG NO. 1204
L
No.
PAHH
0805
VENT
MIN
2"-P-B1-1036B
DWG NO. 1104
2"-P-A1-1068
FO
3/4"
PI
4"-P-B1-1107
4"-P-B1-1161
P&ID
AUTOMATICALLY.
HP FLARE
1"
0806
PSHH
LEGEND
3713-00-02-41-0110 3713-00-02-41-0111
3. ON
0801
1"
CS0
NOTE-6
2"-P-B1-1036A
DWG NO. 1004
PT 0801
2"-P-B1-1068
4"-P-B1-1109
4"-P-B1-1108
FROM 1-V-252A
PSLL 0813
1"
A1
REFER
PV
PSV
4"X2"
CS0
2"
(FUTURE)
2.
PAL
XV-0401A/B/C/D/E
0802
1
PY 0801
0801
CLOSE
I
4300
2
3
4
I/P
PAH
PIC
2.5J4
0801
K
J
6"-SV-A1-2518
4300
5
NOTES:
PALL
2.5J4
6
7
1-V-231
4
DISTRIBUTION CODE:
Page(s) 37131008
16
15
12
13
14
1"x2" RO 0902A
9.72 NOTE-15
CSC
TI
10"x14"
RO
E17 A17
16"-P-E1-1076
TO BE MINIMUM. 14. FI-0902A SHOULD BE VISIBLE FROM THE
6"-FL-A17-2417
TO PIC-1101
E17 A17
METERING
TAG. DWG NO. 1011
DWG NO. 1135
LT
0901A
0902A
LIC 0902A
LAH LAH
1-T-311A
LSLL 0905A
I
2"
CLOSE
m
XV-0903A
50
T HO
m
E1 E2
TO TRAIN # B DWG NO. 1109
FROM 1-AC-311A
PSLL-1022A
PSV 0905A
V/F
ZIO
0903A
0903A
I
V/F SOV
D
V/F
0903A
V/F
LV 0902A
ZSC
ZSO
0903A
0903A
V/F
2"x1"
2"x1"
1" FC
3/4"
2"
CMR IAS
PSV
BTL BTL
150 mm FROM
BTL
G
50 kPa(g)
TO
CSC
CS0
V/F
3"x2"
3"x2"
V/F
BE SUPPLIED
BY
DEHYDRATION VENDOR SYSTEM
2" TO 1-E-314A
2"-GL-A2-8201A
DWG NO. 1010
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
A2
Company;
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
V/F 1/2"
E2
BTL
FROM
LAL-0902A
E
NC
C
50 mm
PID-0901A(MAX)
3"x1.5"
0903A
E2
°
450 mm FROM
V/F
NOTE-13
FC
600 mm FROM
LAH-0902A
AHH-0902A
V/F :
3/4"
V/F
3/4"
LAHH-0903A
0906A
CS0
3/4"
XV
V/F
3"x6"
3"x1.5"
3"-GL-A2-8223A
0902A
ZIC
V/F CS0
LSLL-1010A LSHH-1003A
I/P
TAL-0909
700
3"x6"
LSHH-1012A
LY
H
1.5H3
700
V/F
PSHH-1011A
POINT
°
F
1.5H3
FROM LSLL-0905A
E
SET
10000 kPa(g) (-)40 C (-)40 C
LALL-0905A
NOTE-15.18
DWG NO. 1310
V/F
LG
NO.
PALL-0902A
LOW TEMP. FLARE
1"-GL-A17-8225
V/F
M2
LSHH 0903A
LALL
METERING DWG NO. 1011
TAL-0908A E1 E17
V/F
0905A
I
16. LG-0906 TO BE VISIBLE FROM THIS VALVE.
TO GAS EXPORT
3"-GL-A2-8224A
I
LAHH
BUTTERFLY VALVE.
15. PROVIDE 0.5M DISTANCE (MIN.) BETWEEN BALL AND GLOBE VALVE
DWG NO. 1011
0906
6"-SV-A1-2533A
PALL 0902A
12"-P-E1-1077
PT
NC
V/F
CLOSE XV-0901A
TRIP 1-P-311A/B
16"x10"
E1 E17
LG
I
16"x10"
13. DISTANCE BETWEEN XV-0903A AND TAPPING FOR PSV-0905A/0906A
FLARE DWG NO. 1135
2"x6"
2"-GL-E2-8208A
0903A
NOTE-12
TO LOW TEMP. CSO
FO
CSO
6"-SV-A1-2534A
0902A
DWG NO. 1005
0902
SYMMETRICAL
0909
TO GAS LIFT E1
PI 0903A
TRIP 1-P-311A/B PSLL
DISCHARGE HEADER
0902
0902
10"x14"
NOTE-8
FROM HP COMPRESSOR
XBOV
ZSO
2"
LOW
50 mm HOT
PDI
J
12. INLET/OUTLET PIPING TO/FROM 80TH DEHYDRATION TRAINS TO BE ZSC
1101
CLOSE XV-0901A
TO BE TRIPPED SO THAT ONLY TWO COMPRESSORS ARE LEFT RUNNING. TAL 11. DELETED.
POINT
0901A
0901A
TSO
0902
TT
3"-P-E1-1113A
XV
FI
0902
13.31
5 DIA
0902A
0902
0909
IAS
0907
CSO
S
NOTE-14
ZIO
0901
ESD
2" FC
I
ZIC
S
10"-P-E1-1040A
3/4"
9. DELETED.
10. IN CASE OF XV-0901A NOT OPEN SIGNAL, RUNNING H,P. COMPRESSORS
TI SOV
M1
IAS
8. PI-0903A TO BE VISIBLE FROM THIS VALVE.
FROM TRAIN # B NOTE-6
2"
PSLL-0902A
SOV
DWG NO. 1109
NOTE-12
ESD
50 mm HOT
I
PI 0907
10"-P-E1-1072A
FROM
0901A ZSO 0901A
CS0
V/F AT
K
7. DELETED.
10"-P-E1-1072B
0902A
LSHH-0903A
H ZSC
3/4"
FOR SOV ASSEMBLY DETAILS.
DEW POINT
S
1.5"x3"
E1
3/4"
2"x3"
NOTE-5
0901A
E1
A1
6. REFER NOTE-42 OF LEGEND P&ID No. 3713-00-02-41-0110/0111
H2 O
TO LP FLARE
I
CS0
FOR SOV ASSEMBLY DETAILS.
0902A
DWG NO. 1135
NOTE-10
CS0
A1
5. REFER NOTE-41 OF LEGEND P&ID No. 3713-00-02-41-0110/0111 AAH
AI
0901A
PSV
L
4. DELETED.
0902A
3"-P-E1-1113A
2"-P-E1-1143A
I
10"-P-E1-1040B
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
A1
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
INST. DRAIN SS TUBING
3/4"
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
TO CDH
2"-DH-A1-2235A
Project name:
B DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
E1
14000
2"x6"
1
3. DELETED.
6"-FL-A1-2436A
2"x1" E17
TI
CASE
2"x6"
2
3
4
2. DELETED.
1500 mm
1"
J
1.5"x3" 3"-P-E1-1114A
E17
ZIO
1.5D2
FIRE
3"-P-E1-1115A
PSV 0901A
0901A
6"-SV-A1-2526A
CASE
0908A
ZIC
°
16"-P-E1-1076
14000
FIRE
A17
16"-P-E1-1040
5
1. DELETED.
1"-FL-A1-2446A
1.5D2
TAL
0901A
DWG NO. 1135
6"-SV-A1-2525A
TT
TI 0908A
F
6
7
E2
K
65 C
6"-FL-A1-2415A
TO LT FLARE
2"-P-A17-1143A
DESIGN TEMP.
LP FLARE
1400 mm (ID) X 7900 mm (T/T) 14000 kPa (g)
TO HP FLARE
GLYCOL CONTACTOR
SIZE DESIGN PRESS.
G
8
NOTES
ITEM NAME DWG NO. 1135
L
9
10
11
1-T-311A DWG NO. 1135
ITEM No
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
3
1
0
Rev.
2
4
1
1
0
0
9
B
Path\File name\Initials: A
GAS DEHYDRATOR FACILITY TRAIN # A
Document title:
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131009
16
15
L
TUBE
250
250
DES. PRESSURE kPa(g)
350
700
1-E-318A
STRIPPING COLUMN
OVERHEAD CONDENSER
2621 F/F x 305 DIA
2330 F/F X 400 I/DIA
250
1-V-314A STILL COLUMN
2725 F/F x 305 I/DIA.
250
FULL VACUUM /350
9
10
11
1-V-313A
FIRED HEATER BURNER
NOTE-2
450KW
1010A
VENT
1010A
6"-SV-A1-2570A-IS
1006A
TP4
4"-FL-A1-2439A-IH
1 1/2" H 3"
NOTE-1
PSV 350
TP1
2"
FLASH DRUM
4"
CSO FB
C1136-RSL-PID-003
DWG NO. 1009
FAN
PURGE
RUNNING
COMPLETE
ON/OFF
XI
XI
XI
1005A
1006A
1007A
H 75mm
1004A
PILOT
BURNER
PROVEN
SHUTDOWN
1-E-318A TIC 1001A
I LY
DWG NO. 1210
P
XI 1009A
PALL-1017A PALL-1012A
1005A
2"x1"
2"
2"x1"
2"-GL-A2-8247A-IH
DWG NO. 1210
NO POCKETS
FC NC
1"
2"x1"
3/4"
H 75mm
1"
3/4"
2"x1"
400 °C
PAH-1015A
30 kPa (g) 0 kPa (g)
TAH-1001A
215 °C
TAL-1001A
195 °C
FAH-1001A
11 m3/HR
FAL-1001A
9 m3/HR
J
I
ZIC
ZIO
1001A
1001A
P
TY 1001A
1015A
2"-FG-A1-6378A-IH
PAH PAL
NOTE-4
FROM
I
TRIP FAN
FF
6"
I
PALL
ZIO
ZIO
ZIC
1004A
1002A
1002A
1017A SOV
NOTE-4 PAHH
2" H 100mm
NOTE-4
ZSC 1002A
NOTE-3
SET
ZSC
1020A
PCV 1001A
3"
TT
3"
1002A
FC
1 1/2"
1 1/2" XV 1004A SOV
TI
DWG NO. 1310
1003A
H 75mm
3/4" S
1-V-313A
1-E-314A
2" 2"
2"-GL-A2-8241A-IH
FI TI 1003A
1001A
PI
3/4"
3/4"
2"x1"
1001A
2"x1"
IGN TRX
FAL
1003A
ZSO
ZSC
1002A
1003A
1003A
E
PCV 1013A
ELECTRODE
I
FIT
1"
A/S
SET
FC
1 1/2"
PCV
220VAC
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
1011A
XV
SUPPLY
Date
Description of revision
DD-MM-YY
Company;
1003A
TRANSFORMER PI
FC
FC
3/4"
3/4"
VIETSOVPETRO
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
3/4"
Worley
Basic Engineering:
1"
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
TO GLYCOL
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
FLASH VESSEL
2"-FG-A1-6377A-IH
Company's contract No.:
SCALE
Type of document
CCP-WT/95
TO DRAIN SYSTEM
2"-DH-A1-2237A
DWG NO. 1210
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
1 1/2"-FG-A1-6376A
DWG NO. 1210
EIL
CONSORTIUM
Contractor:
1023A
NOTE-4
EIL
ISH
PETECHIM/VIETSOPETRO
IGNITION
1001A
1"
@ 30kPa(g)
@ 0.5kPa(g)
SPARK IGN
2" 2"x1"
1003A
FC
1 1/2"
I
S
BE
FAH
ZIC
1"
NOTE-3
1007A ZIO
FC
1 1/2"x1"
FC
LALL 1008A
TO GLYCOL
2"-GL-A2-8242A-IS
PI 1019A
1002A
1 1/2"x1"
TRIP XV-1001A
LSLL 1008A
SET
PSLL 1012A XV
1002
1 1/2"
I
LG 1009A
PSLL-1017A
I
A/S
@ 10kPa(g)
PI
PCV 1012A
1 1/2"
M1
1012A
NOTE-4
SET
@ 1kPa(g)
1004A 1021A
1001A TAHH
MIN
I
SOV
I
PALL
1002A
PSHH TT
LAHH 1012A
ZSO 1002A
A/S
1004A
TRIP XV-0903A
LSHH
ZSO 1004A
S
1002A
I
S
I
TSHH
H 75mm
ZIC
1021A
F
1-X-312A
1004A
I
1012A
G
NOTE-3
PT 1015A
1-E-314A
NOTE-5
LSLL-1008A
1-X-312A
PI
1-E-316A
TV 1001A PB
1014A
E
ZSO 1001A
1004
PSLL
PI
ZSC 1001A
STOP
1017A
3/4"
F
B
TAHH-1010A
PAL-1015A
2"x1 1/2"
2"-GL-A2-8231A-IH
C
BTL
1.3 kPa (g) 0.2 kPa (g) 1.15 kPa (g)
1 1/2"-FG-A1-6320A
2"
3"-GL-A2-8243A-IS
TI
LV
D
BTL
FROM
230 °C
PAHH-1021A
H I
TAL
1-V-314A
1001A
CHARCOAL FILTER
ACCUMULATOR
FROM
mm
1001A
FROM GLYCOL
G
TAH
XI 1008A
POINT mm
1305
TAHH-1002A
DWG NO. 1310
XI
SET 1700
LALL-1008A
FLASH DRUM
COND.
HEALTHY
NO.
LAHH-1012A
FROM GLYCOL
ACCUMULATOR
(BALANCE LINE)
FROM LIC-1001A
TAG.
DWG NO. 1210
3"-GL-A2-8244A-IH
INTERLOCKS
TUBING
K
TO/FROM GLYCOL
3/4"
PRIMARY
H
INSTRUMENT
C1136-RSL-PID-002
4"-FL-A1-2414A-IS
3"
TSHH-1010A
P&ID NO. C1136-RSL-PID-001
3/4"
2"
3/4"
2"-GL-A2-8220A-IH
AND
REFER READ SYSTEM LTD.
3/4"-FG-A1-6375A
2"-GL-A8-8201A-IH
TO GLYCOL
L
CONDENSER
LOCATION.
TP5
3"x1 1/2"
DWG NO. 1210
OVERHEAD
SAFE
4. CLOSE VALVES XV-1004A,XV-1002A AND XV-1003A.
6"x3"
FB
3/4"
2"-GL-A2-8201A
CSO
4"
LO
FROM
TO
BE-1001A
DWG NO. 1135
5.
DWG NO. 1135
TO LP PLARE
VISIBLE
2.
LP FLARE TAHH
1010A
TP12
3"
CONTACTOR
FROM GLYCOL
NOTE-4
TSHH
TI
2"-GL-A2-8240A
I
I
1.
3. FROM PSLL-1012A,PSHH-1021A,PSLL-1017A,TSHH-1002A
VF TT
1
NOTE:
FLOW 1444 m3/h
14
FULL VACUUM /350
2
3
4
AIR BLOWER
730KW
250
1006A
J
5
1-X-312A 500
6730 T/L TO F/F x 2000 I/DIA
FULL VACUUM /350
6
7
1-X-311A
GLYCOL REGENERATOR
2150
FULL VACUUM /350
8
1-E-314A
6"-FL-A1-2414A
4"-FL-A1-2439A
K
SHELL DES. TEMPERATURE °C
12
13
14
1-E-316A LEAN/RICH GLYCOL HEAT EXCHANGER 2x336 I/DIA x 4070 T/T
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
2"-FG-A1-6320A TP7
3
7
1
3
3
1
0
Rev.
2
4
1
1
0
1
0
B
Path\File name\Initials: FROM LP FUEL GAS
A
HEADER
16
15
14
13
12
11
10
9
8
7
6
5
Document title:
GAS DEHYDRATION UNIT TRAIN-"A"
Company's document No.:
DWG NO. 1134
Path\File name\Initials: 4
DISTRIBUTION CODE:
Page(s) 37131010
15
DWG NO. 1135
DESIGN TEMP.
HP FLARE
DESIGN PRESS.
DWG NO. 1135
ITEM NAME: LP FLARE
L
12
13
14
1-PK-261 (NOTE-6) PIPELINE GAS METERING
14000 KPa (g) 65 C °
9
10
11
8
6
7
5
1-PK-262 (NOTE-6) GASLIFT GAS METERING
1"-FL-A1-2427
16
ITEM No.:
2"-FL-A17-2467
14000 KPa (g)
A17 E17
65°C
1101
NOTE-11
SS TUBING
FOR SOV ASSEMBLY DETAILS.
LC
1"
FAL
6. ALL ITEMS SHALL BE SUPPLIED LOOSE BY METERING VENDOR FOR ASSEMBLY BY SH1.
ESD
PSHH-1106
LSS
I
PSLL-1107
1101
7. REFER NOTE-44 ON P&ID 3713-00-02-41-0111 FOR TYPICAL DETAIL OF CORROSION INHIBITOR POINT.
SOV 1101
FE
3/4" 1"-P-E1-1012
1101
L FT
PT
TT
TI
PI
1101
1120
1103
1104
1121
FX
FROM GAS CHROMA-
16"x10"
1101
TOGRAPH
FQ
FI
1101
1101
I
S
PAH
PI 1105
FE
16"x10"
PT
TT
TI
PI
1122
1105
1106
1123
1101
XV
ZSC
ZSO
1101
1101
1101
9. PT-1101 DUPLICATED IN DCS TO PIC-1102.
PV
PT
PI
1101
1105
1107
FC
3/4"
3/4"
CLOSE XV-1101
FROM FIC-1101.
PIPELINE EXPORT GAS TO RISER PLATFORM
PSHH
PSLL
1106
1107
11. PROVIDE 0.5M DISTANCE BETWEEN XBDV-1104 AND RO-1101.
NOTE-1 DWG NO. 1133
NOTE-7
NO
FC
CLOSE
12. PROVIDE 0.5M DISTANCE BETWEEN XBDV-1105
AND RO-1102
13. PROVIDE 0.5M DISTANCE BETWEEN XBDV-1106
AND RO-1103
I
PIPING INST.
4"-P-E1-1085
TRIP PUMPS
PAHH
PALL
TRIP PUMPS
1-P-231A/B/C
1106
1107
1-P-231A/B/C
TAG NO:
1"-FL-A1-2429
HP FLARE
DWG NO. 1135
PAL-1105 PAHH-1106 PALL-1107
1"-C-E1-8104
DWG NO. 1148
PAH-1114 PAL-1114 PAHH-1115
METHANOL 12mm SS TUBING
PALL-1116
DWG NO. 1150
PAHH-1118
A1 E1
PALL-1119
REFER PIC
DETAIL-A
NOTE-9
NOTE-3 ESD PSHH-1115
L
FE 1103
FAH
FIC
FT
PT
TT
TI
PI
1103
1124
1107
1108
1125
1102
NO
FAL
NO
FX
FROM GAS CHROMA-
1102
TOGRAPH
12"-P-E1-1077
FQ
FI
1102
1102
12"x10"
FY
PI
1102
1114
S
PAH IAS
10"
3/4"
PT
PI
1114
1111
FC
3/4"
NC FE
FT
PT
TT
TI
PI
1104
1126
1109
1110
1127
NOTE-3
ZIO 1102
XV
ZSC
ZSO
1102
1102
1102
1"
PSLL
PSHH
1116
1115
PALL
PAHH
SOV
XBDV
1116
1115
1105
1105
CLOSE
PIPING
CSC 2"
XV-1102
I
10"-P-E1-1077
ESD
I
I
INST.
FO
IAS
E1 E17 RO
PSHH-1118
1102
I
PSLL-1119
1103 S
FROM FT
FROM PT
FROM TT
NOTE-3
ZIC
ZIO
1103
1103
XV
ZSC
ZSO
1103
1103
1103
TO 1-PK-266 CLOSE
TO 1-PK-262
LIFT GAS
PSHH
PSLL
1118
1119
CLOSE XV-1103
AC
PH
JUY
LOC
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
FROM FT
I
I
1106
1106
PALL
1118
1119
10.19
CSO
LOW TEMP. FLARE
3"-FL-A17-2469
DWG NO. 1135
DWG NO. 1148
A
METHANOL 12mm SS TUBING
9
DWG NO. 1150
8
Worley
Limited
7
6
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CORROSION INHIBITOR
10
COMPANY
ENGINEERS INDIA LIMITED
E17
1"-C-E1-8115
11
EIL
CONSORTIUM
Basic Engineering:
E1
2'x3"
EIL
PETECHIM/VIETSOPETRO
NEW DELHI - INDIA
FO
IAS
A17
NNF
Description of revision
DD-MM-YY
Company;
Detailed Engineering:
NOTE-13
S PAHH
Date
ISH
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
CSO
E17
12
SDH
MSP
7.2.96
VIETSOVPETRO
XBDV
DETAIL-'A'
13
SA
APPROVED FOR CONSTRUCTION
1
2"-FL-E1-2469
1103
14
REVISRD AS MARKED
20.3.96
Contractor:
I
B
15
AS - BUILT
20.11.96
2
ESD
CSC 2"
RO
16
14.3.97
3
Rev.
DWG NO. 1133
SOV
FROM PT
TO 1-PK-267
XV-1103
FROM TT
FROM 1-PK-267
DWG NO. 1135
B
TO RISER PLATFORM
FC
TO 1-PK-261
2"-FL-A17-2468
A17
12"-P-E1-1079
C
FROM 1-PK-261
LOW TEMP. FLARE
CSO
E17
IAS
GAS CHROMATOGRAPH
5.10
SOV
D
NOTE-6
E
ESD
FROM 1-PK-262
F VENDOR
NOTE-12
NOTE-3
FROM 1-PK-266
G
CSO
S
3/4"
VENT TO SAFE HEIGHT
3.5 MMNCMD
DWG NO. 1133 FC
CLOSE
NO
3/4"
4.5 MMNCMD
FAL-1102
TO RISER PLATFORM
NOTE-7
10"
3/4"-C-E1-8123
12900 kPa(g) 11000 kPa(g)
FAH-1102
LIFT GAS
NOTE-8
XV-1102
1104
3.5 MMNCMD
PAH-1101
LEGEND:
FV 1102
LC
E
ZIC 1102
12"-P-E1-1077
12"x10"
4.5 MMNCMD
FAL-1101
H
PAL
NOTE-4
NOTE-10
12"x10"
1"-FL-E1-2430
12"x10"
SOV 1102
P
SS 1102
FAH-1101
PAL-1101
I
PSLL-1116
10"-P-E1-1083
1"-P-E1-1013 DWG NO. 1009
1102
1"
kPa(g) kPa(g) kPa(g) kPa(g) kPa(g) kPa(g) kPa(g) kPa(g) kPa(g) kPa(g)
2"-FL-E1-2468
SS TUBING
LC
3/4"
F
12800 11000 13100 10000 12800 11000 13100 10000 13100 10000
PAH-1105
CORROSION INHIBITOR
NNF
I
SET POINT
DWG NO. 1012
3/4"
H
.
CONDENSATE FROM METERING
3/4"
.
CSC 2"
XV-1101
I
3/4"-C-E1-8122
IS OUT OF SERVICE OR WHEN PV-1101 IS CONFIGURED FOR CONTROL
NOTE-8
12"
10"-P-E1-1076
J
10. MANUAL SELECTOR PIC-1102 TO BE USED WHEN EXPORT PIPELINE NOTE-3
16"-P-E1-1076
16"x10"
1102
1101
PAL
12"
1"
FT 1102
ZIO
NOTE-4
LC NC
8. CHECK VALVES TO BE CLOSE TO XV-1101 & XV-1102 RESPECTIVELY.
ZIC
IAS
1101
NO
16"-P-E1-1076
P
PY
NO
16"x10"
G
K
5. DELETED.
CSO
I
ESD
FAH
FIC 1101
RESPECTIVE SHUTDOWN VALVES.
XBDV 1104
1104
NOTE-3
10"-P-E1-1078
4. LOCATE CV ASSEMBLY AS CLOSE AS POSSIBLE TO THE
FO
SOV
PAL
MIN.
DWG NO. 1009
PIC
1"-FL-E1-2428
1"-FL-A1-2435
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
FROM 1-T-311 A/B
PAH
1101
S
J
3. REFER NOTE-40 OF LEGEND P&ID NO. 3713-00-02-41-0110/0111
6.58
E1 S
FROM PT-1101
DETAIL-A
L
1. CONDENSATE CONNECTION TO BE FROM TOP.
E17 IAS
REFER
DWG NO. 1135
CSO
RO
A1
DWG NO. 1009
1
NOTES:
2. DELETED.
E1
K
2
3
4
LOW TEMP. FLARE
5
4
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
2
6
0
Rev.
2
4
1
1
0
1
1
B
Path\File name\Initials: Document title:
GAS METERING SKID & GASLIFT METERING SKID
Company's document No.: Path\File name\Initials: DISTRIBUTION CODE:
Page(s) 37131011
15
12
13
14
1210
4"-P-E1-1064
V/F K
PDIS
1201
1201
OPEN
MOV
CASE
ZSO 1201
NOTE-7,8
ZIC
ZIO
1202
1202
CASE
3/4X1
3/4X1
14000
1650
1-P-231A/B/C
PSV
1202
MOV
1"
ZSO 1202
3"x4"
4"-P-E1-1086
2"x3"
1213
A
2"
1"
2"
A
FT 1201
B
PT
1204
1201
TW
ACTUAL CORRECTED
1201
FI
FQ
FI
1205
PT
PT 1205
1201
1201
1201
DI
TT 1202
OPEN
PI
1201
1201
ZIC
ZIO
ZIC
ZIO
1203
1203
1204
1204
ZSC
ZSO
ZSC
ZSO
1203
1203
1204
1204
OPEN CLOSE
FQ
FI
1204
1204
1204
CLOSE MOV-1206 OPEN MOV-1214
START PROVING
DI
TT 1205
ZIC
1208
1208
1204
OPEN
1208 ZSO
ZSC
1208
1208 M
C) SELECTOR SWITH TO "STANDBY" OPEN MOV-1205 OPEN MOV-1211 CLOSE MOV-1210 CLOSE MOV-1214 CLOSE MOV-1207
ZIO
ZIC
1209
1209
1209
MOV
ZSO
ZSC
1208
1209
1209
D) NO MOV SHOULD ACTUATE
CLOSE
IF THE PRIOR VALVE IN THE SEQUENCE HAS
NOT REACHED ITS CORRECT POSITION. THE LIMIT SWITCHES SHALL BE USED IN THE INTERLOCK TO VERIFY THIS.
MOV 1209
6. MINIMISE DISTANCE OF MOV'S FROM METER PROVER CONNECTION.
NOTE-7,8
M
NOTE-7,8
H
CLOSE MOV-1206 OPEN PB
CLOSE
3/4"x2"
4"-P-E1-1086
I
CLOSE MOV-1211 LINEUP PT-1203B
1204
PB
3"x2"
M
4"-P-E1-1085
7. AUTO CHANGEOVER OF METERING RUNS IS REQUIRED THROUGH A SINGLE
3/4"x2"
SELECTOR SWITCH OFFERING SELECTION OF RUN-1 OR RUN-2 FROM DCS.
MOV'S FOR THE METERING RUN BEING BROUGHT ON-LINE SHOULD BE
4"x3"
OPENED PRIOR TO CLOSURE OF MOV'S OF THE METERING RUN BEING TAKEN
3/4"-DH-A1-2242
TO CDH
DWG NO. 1137
A1
FY 1203 TO CDH
E1
1-PK-263
DWG NO. 1137
3/4"-DH-A1-2247
TO CDH
F
DWG NO. 1137
A1
FI
CLOSE MOV-1207 OPEN MOV-1210
1205
TT
1204 M
3"x4"
OPEN MOV-1205
TW
1204
ZIO
PB
MOV
1203
E1
B) SELECTOR SWITH TO "BLACK CONDENSATE PROVING"
PI
1204
NOTE-7,8
J
CLOSE MOV-1205 LINEUP PT-1203A
TI
1203
MOV
1205
1204
TI
PB
CLOSE
NOTE-7,8
G
3/4"
OPEN MOV-1207
1209
1204
ACTUAL CORRECTED
1202
1201
CLOSE MOV-1214 OPEN MOV-1206
PI
TW 1204
TT
OPEN MOV-1211
FE
FY
PI 1208
H
3"x2"
A
1204
TW
1201
INTERLOCK SEQUENCE SHALL BE PROVIDED IN THE DCS.
3/4"
START PROVING
1207
1201
CSO
CLOSE MOV-1210
1204
B
PI
FY
1206
SHALL BE PROVIDED ON THE SSD PANEL THE FOLLOWING
A) SELECTOR SWITCH TO "WHITE CONDENSATE PROVING"
B
1202
CSO
I
3/4"x2"
A
PT
PI
264B
1"
TO CDH
263A
CSO
2648
1212
2"-P-A1-1090
FT
3/4"
FT
1202
PSV POIS
K
a/ WHITE CONDENSATE PROVING b/ BLACK CONDENSATE PROVING & c/ STANDBY
1650
NOTE-7,8
MOV
FT
1204
ASSEMBLY BY 'SHI'. 5. A SELECTOR SWITH WITH 3 POSITIONS-
CLOSE
8
1202
1212
4. ALL ITEMS SHALL BE SUPPLIED LOOSE BY METERING VENDOR FOR
3/4X1
FT
8
1201
1212
DWG NO. 1007
M
2"-P-A1-1089
1205 FE
FE
8
1201
8
PSV
FT
ZSC
3. DELETED.
FROM 1-P-233A/B
FIRE CASE
OPEN PB
FT
FT
ZSO
M
3/4"x2"
B
ZIC 1212
1212
NOTE-7,8 MOV
1213
PDIS
ZIO 1212
CLOSE
1213
264A
1202 FE
8. AUTO/MANUAL SELECTOR FOR EACH MOV IN THE DCS.
TAG NO:
SET POINT
F
10000 kPa(g)
PSLL-1210
1207
E1
3/4"-FL-A1-2472
PANEL
ZIO 1207
ACTUAL CORRECTED
DWG NO. 1135
A1
CONTROL
DI
FI
FQ
FI
1203
1203
1203
1203
LEGEND:
VENDOR
PI
( NOTE-4)
1203
NOTE-5,8
MOV
PB ZSC
1207 ZIO
ZSO
1205
1205
CSO
1201
4"x8"
1205
1205
OPEN
PB
CLOSE
1205
NOTE-5,8
1206
ZIO
ZSO
1214
1214
ZIC
ZSC
1214
1214
MOV
NOTE-5,8
MOV
PB 1206 ZSC
1206
1206
ZSO
NOTE-5,8
M
ZSO
1210
1210
ZIC
ZSC
1210
1210
LV
I/P
0702
OPEN
PB
CLOSE
1210
M
FROM LIC-0702
OPEN
A1
CLOSE
LV
TO CPP2 DWG NO. 1133
NOTE-5,8
0702
BLACK CONDENSATE
3"-P-A1-1090
3"x2"
2"x4"
MOV
2"
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
PACKAGE
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
FOR DETAILS REFER
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
P&ID NO. E1
SO-21022-POR OF
A1
PECO/BROOKS
MOV
ZIO 1211
Rev.
4"x2"
PB
1211
1211
VIETSOVPETRO
NOTE-5,8
2"-P-A1-1090-IS
10
SCALE
Type of document
CCP-WT/95
FROM 1-V-211 A/B DWG NO. 1001
DWG NO. 1117 FROM TPS
11
Limited
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
2"-P-A1-1099
12
Worley
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
A
13
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
FROM LP FLARE K.O.D
14
COMPANY
CONSORTIUM
Basic Engineering:
2"-P-A1-1094
15
EIL
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
2"-P-A1-1024
16
EIL
ISH
PETECHIM/VIETSOPETRO
Contractor:
1211 ZSO
Description of revision
DD-MM-YY
Company;
1/2"x3/4"
A1
ZSC
Date
E1
M
4"x2"
3/4"
1203
1-PK-265
1211
1211
2"x4" FC
3/4"
MOV 1210
1"
NOTE-6
NOTE-6
E1
E
VENDOR FURNISHED
B
NOTE-6
ZIC
DWG NO. 1007
B
METER PROVER
1214
4"-P-E1-1088
ZIO
2"-P-E1-1092
4"-P-A1-1170
PB 1214
1206
CSO
INJECTION INTO PIPELINE
4"-P-E1-1085
OPEN CLOSE
V/F
TI
4"x2"
ZIO 1206
ZSO 1203
TT 1203
NOTE-6
OPEN
3/4"
DWG NO. 1011
V/F
ZSO 1207
ZSC 1203
A
4"-P-E1-1087
ZIC
1205
CONDENSATE
1207 M
CLOSE
3"x4"
1203B
TO CDH
PSV
ZSC
1203A
DWG NO. 1137
1500
ZIC
1/2"x3/4"
PT
M
3K4
PT
1207
M
D
CLOSE
V/F
2"-P-A1-1084
DWG NO. 1135
HP FLARE
OPEN
3/4"-DH-A1-2245
E
G
OFF-LINE.
LP FLARE
ZIC
8"-FL-A1-2471
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
OPEN
ZSC
1213
CSO
CSO
4"x3"
1213 PB
3/4"
M
4"-P-E1-1085
V/F
ZIC
1213
1202 M
3/4X1
3/4"
ZIO
264A
ZSO
2638
BLACK CONDENSATE
2"-P-A1-1058-IS
1"
PDIS
ZSC 1202
14000
CSO
CSO
263B
2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.
1202
PSV
CSO
PB
CLOSE
ZSC 1201
1201
2"x3"
CASE
J
ZIO
1201
CLOSE
263A
FIRE
ZIC
PB
OPEN
NOTE-7,8
1210
TRIP
I
L
1. DELETED.
120°C
DT
DWG NO. 1137
DWG NO. 1008
1
NOTES:
1600 KPa (g) V/F FIRE
2
3
4
1-PK-264
FIRE
PALL
PSLL
1201
FROM 1-P-231A/B
B
5
BLACK CONDENSATE METERING
65°C
V/F
DT
C
6
7
14000 KPa (g)
DESIGN PRESS. DESIGN TEMP.
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
8
3/4"-DH-A1-2243
L
9
10
11
1-PK-263 WHITE CONDENSATE METERING
ITEM NAME:
3/4"-DH-A1-2244
16
ITEM No.:
9
8
7
6
5
DWG NO. 1124
4
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
2
6
0
Rev.
2
4
1
1
0
1
2
B
Path\File name\Initials: Document title:
CONDENSATE METERING FACILITY
Company's document No.: Path\File name\Initials: DISTRIBUTION CODE:
Page(s) 37131012
16
15
12
13
14
8
6
7
5
H"-SV-A1-2555
K HOLD PSV
LO
1301
1.
CONDENSATE SURGE DRUM
CLOSE
PAHH
PAH
XV-0302A/B/C/D/E
PAL
No.
L
3713-00-02-41-0110&
FOR
GENERAL
NOTES.
I/P PY
PIC
K
1305
1305
I
PSV
LO
1302 PI
1304
PV
PT
PSHH
1305
1305
2"
3/4" LC
TO HP FLARE
H"-P-A1-1141
H"-P-A1-1142
P&ID
°
1304
LO
LEGEND
900 mm ID X 2650 mm T/T DP: 1500 kPa (g) DT: 65 C
1303
J
REFER
3713-00-02-41-0111
HOLD
3/4"
1
NOTES:
HP INLET SCRUBBER
H"-FL-A1-2461
TO HP FLARE
SIZE
DESIGN PRESS./DESIGN TEMP.
DWG NO. 1135
ITEM NAME
2
3
4
1-V-233
H"-SV-A1-2556
L
9
10
11
ITEM No
2"-P-A1-1139
2"-P-A1-1139
3/4"
FC
DWG NO. 1135
3/4"
2"
J
H"-P-A1-1140 VENT FROM 1-V-251A
2" 2"-P-A1-1029A
I
I FROM 1-V-251B DWG NO. 1103
2"-P-A1-1029B 2"-P-A1-1135
FROM 1-V-251C DWG NO. 1203
2"-P-A1-1029C
FROM 1-V-251D
H
DWG NO. 1303
2"-P-A1-1029D
H CLOSE
XV-0302A/B/C/D/E
FROM 1-V-251E DWG NO. 1403
2"-P-A1-1029E
LSHH
LAHH
(FUTURE)
2"
D
1-V-233
I
1303
1303
G (FUTURE)
2"
LG
LT
1301
1302
LIC 1302
1304
1304
LAL
M 1.5"-P-A1-1144
I
TRIP
1-P-232 A/B
F
E
LAH
LSLL
LALL
E
T
F
D
FV
FROM
1301
LSHH-0807 HOLD:
PSHH-0805
I
PSV-1301/1302 SIZE. PSV INLET/OUTLET LINE SIZE.
I/P
3/4" 1.5"
3/4"
LY
SOV
ZIC
ZIO
LV-1302
SIZE.
1302
1301
1301
1301
FV-1302
SIZE.
ZSC
ZSO
CMR S
E
IAS A1 B1 LV
FT
FE
XV
1302
1301
1301
1301
1301
1301
TO 1-V-232
2"-P-B1-1134
2"-P-A1-1138
2"-P-B1-1134
FC
2"
3/4"
DWG NO. 1008
FC
2"-P-B1-1136
3/4"
E
C
I/P FY 1301
FAL
FC
L D
G
FIC 1302
E
2"-P-A1-1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
DWG NO. 1003
B
14.3.97
AS - BUILT
2
20.3.96
APPROVED FOR CONSTRUCTION
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
0
10.1.96
APPROVED FOR ENGG
MSP
GRR
A
29.12.95
ISSUED FOR COMPANY'S APPROVAL
MSP
GRR
EIL
EIL
Rev.
Date
Description of revision
DD-MM-YY
Company; PI
3/4"
1302
WORLEY
SHI
LOC
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
PI
3/4"
1301
JUY
PH
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
3/4"
3/4" FROM LSLL-1304
B
I
M
FROM LSLL-1304
LSHH-0807
LSHH-0807
PSHH-0805
PSHH-0805
I
Worley
Basic Engineering:
XI
M
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
NOTE-2
XI 1301
Detailed Engineering:
3/4"
3/4"
NOTE-2
1302
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
1-P-232A/B
HP INLET SCRUBBER
3
COND. TRANSFER PUMPS CAPACITY
A
DIFF. PRESS
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
7
1
3
2
3
0
Document title:
: 3120 kPa
Path\File name\Initials: 15
14
13
12
11
10
4
1
1
0
1
3
B
Path\File name\Initials:
: 6.75 m3/hr
HP INLET SCRUBBER CONDENSATE HANDLING
Company's document No.:
16
Rev.
2
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131013
16
15
12
13
14
L
ITEM NAME
DESIGN TEMP.
6
7
5
1
NOTES:
L
1. QUICK CLOSING VALVE AT SKID EDGE.
VENDOR VENDOR
2. PIPES ARE ACID CLEANED.
VENDOR
130°C
2
3
4
FILTER-COALESCER
1.73 MMKJ/HR (481 KW) 10.8 kPa (g)
DESIGN PRESS.
8
FSA-901A
LUBE OIL COOLER
DUTY
9
10
11
1-LC-252A (HX901-1)
ITEM NO.
3. USE HOSE AND PNEUMATIC TRANSFER PUMP TO COLLECT LUBE OIL IN DRUMS.
K
K
VENT TO SAFE LOCATION
TAG NO.
SET POINT
VAHH-5601A
V/F
PDI
3/4"-VG-A1-2645A
* 3.0
901A
RO 5601A
J
PDI-903A(MAX)
FA-901A FLA
903A
V/F
8"-VG-A1-2638A
J
A1
RT
33
34
149291
149291
SHT 6
SHT 6
FROM D-R 149291 SHT 6
149291
149770
SHT 6
SHT 2 149770
586A
H
FE-930A
3"-FG-B1-6330-IE
DWG NO. 1134
NOTE-2
INTERFACE
B149370
20
317-962 SHT 1
PT
V/F
586A
DWG NO. 1003
CENTRIFUGAL
TURBINE
(TR586)
TO 1-K-253A UCP
FG. FILOT VENT
SEAL VENT
SEAL VENT
2"-VG-A1-2642A
Z3
(TPO586)
G
2"-VG-A1-2641A
T3
586A
TO 1-K-253A UCP
2"-VG-A1-2646A
W3
COMPRESSOR
317-962 SHT 2
H
2"-VG-A1-2640A
V3
PDT
V/F
2
SHT 3
V/F
I
SHT 2
HP COMPRESSOR TRAIN- 'A'
NOTE-1
FUEL GAS
SEAL VENT
DUCT
1
3
PACKACE
EXHAUST
AIR/GAS VENT
AIR INTAKE DUCT
SEAL VENT
M
8"-VG-A1-2638A
LUBE OIL VENT
5601A
(RT586)
G
2"-VG-A1-2647A
U3
DWG NO. 1003
2"-VG-A1-2648A
AA3 AE3
INST. AIR
1"x1/2"
1"-A1-A3-5116A
DWG NO. 1140
K3
317-962
B149370
SHT-1
SHT 3
1"-VG-A1-2649A
30
F
F START-UP
REFER SOLAR P&ID's:
SEAL GAS
2"-FG-E1-6366
126
ODD
(FUTURE)
B149770
B149770
SHT 2
SHT 2
D1
F1
A1
A1
1"
SHT 6
V/F
WATER WASH CONN.
2"
2"
VENDOR FURNISHED
126 VENDOR
26
19/1
21
H3
2"
NOTE-3
*
COOLER
VENDOR
(SOLAR)
(SOLAR)
FURNISHED
2"
G3
2"-DW-A1-2316A
65
COMBUSTOR DRAINS
1"-DH-A1-2264A
ODD
SEAL GAS HEATER
C
CONDENSATE DRAIN
DWG NO. 1456
1"-P-E1-1160E
1/4"x3/4"
TRAIN-E
SHT 3
22
1"-DW-A1-2256A
TO HP COMPR.
B149471
SHT 2
EXHAUST COLLECTOR &
DWG NO. 1356
164
HP. CASING DRAIN
2" 1"-P-E1-1160D
64
LUBE OIL DRAIN
TRAIN-D
54
LUBE OIL DRAIN
1"-P-E1-1160C
TO HP COMPR.
B149770
SHT 6
AG3
1"-DH-A1-2266A
DWG NO. 1256
D
E LEGEND:
B149291
149291
126
2"-DW-A1-2351A
TRAIN-C
V/F
1"-C-A3-8138A (EXTENDED)
98
126
LP. CASING DRAIN
1"-P-E1-1160B
TO HP COMPR.
(MAIN)
CO2 SYSTEM
SHT 5
317-962 SHT 1-3. (GAS SEAL SYSTEM)
1/4"
TRAIN-B DWG NO. 1156
1.5"-C-A3-8137A
97 149746
REFER DRESSER-RAND P&ID's:
2"-DH-A1-2268A
TO HP COMPR.
SHT-1
RESERVOIR DRAIN
2"-P-E1-1160
317-962
1"-DH-A1-2265A
DWG NO. 1005
J3
HYDRAULIC STARTER
1"-P-E1-1160A
SEAL GAS
E
49901-B149370 SHT 1-3. (FUEL GAS SYSTEM) 49901-149291 SHT 1-6. (LUBE OIL SYSTEM) 49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN) 49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM) 49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)
(FUTURE)
AIR INLET DUCT DRAIN
LC
LUBE OIL FILTER DRAIN
B1 E1
1"-DW-A1-2267A
DWG NO. 1131
2"
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
VF
FSA-901A
6"x4"
VSHH
VAHH 5601A
I
4"-LO-A10-9501A
6"x4"
LUBE OIL TANK VENT
4"-LO-A10-9501A
I
4"-VG-A1-2639A
MOTOR S/D
V/F
A10 NOTE-2
1-LC-252A
AIR/GAS VENT
NOTE-2
LUBE OIL TANK DRAIN
B
14.3.97
AS - BUILT
1
18.10.96
REVISRD AS MARKED
0
20.3.96
APPROVED FOR CONSTRUCTION
Rev.
Date
Company; ODD
ODD
SDH
SA
Description of revision
DD-MM-YY
ISH
MSP
AC
PH
JUY
EIL
EIL
WORLEY
SHI
LOC
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
ODD
ODD
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
TO CDH
2"-DH-A1-2269A
Worley
Basic Engineering:
DWG NO. 1137
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
2
5
0
Rev.
2
4
1
1
0
5
6
B
Path\File name\Initials: A
Document title:
HP COMPRESSOR TRAIN-A INTERFACES
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131056
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES 1-V-251B
ITEM NO.:
L
1-AC-251B
H.P. INLET SCRUBBER
ITEM NAME:
H.P. INTERSTAGE COOLER
2110 mm(ID) x 3025 mm(T/T) 5500 kPa(g)
SIZE: DESIGN PRESS : DESIGN TEMP. :
DUTY: 25.936 MMKJ/Hr (7.204 MW) 5500 kPa(g)
180C
LINING :
180C
1.
UCP
2.
UIC
3.
EPOXY (INTERNAL) FROM 1-P-356B 12MM SS TUBING
K
DWG NO. 1153
REFER
LEGEND
UNIT
CONTROL
ANTISURCE
P&ID
No.
3713-00-02-41-0110
&
3713-00-02-41-0111
FOR
4.
DELETED
5.
DELETED
6.
LOCATE
7.
DELETED
L
PANEL
CONTROLLER
NOTES.
K
1.5G2.5 5500 PSV 0301B
DWG NO. 1136
I
NOTE-8 TAH
TAH
TI
PALL
TI
0303B
0304B
TT
PSLL
TT
0301B
0303B
0304B
0301B
TAL
UCP
UCP
CSO
V/F
0311B
1.5G2.5
TIC
TSHH
SS
INST.
0307B
D1
PIPING
I/P
3/4"
0304B
PAL
A1
CSO
3/4" CSC
2" 2"-P-D1-1066B
2"-P-D1-1067B
FT 0301B
PT 0306B
PSLL
PI
I
0312B
0309B
H
V/F
PI
TI
0305B
0303B
S/D
M
I
I
THIS
2"-P-D1-1051B 16"-P-D1-1017B
0303B
I
NOTE-9
0302B
TYPE.
BE
I
UTILISED
PSHH
PAHH
0308B
0308B
NO.
BY
SET
SOLAR
FOR
LUBE
OIL
PUMP
PAL-0304B PALL-0307B
PB
PB
0301B
0302B
TAH-0306B
50
TAL-0306B
UCP
CONTROL
I
POINT
4400 750 900 800 2300
PAH-0304B
NOTE-9
SPEED
1-K-253B TRIP
WAFER
SHALL
TAG.
PALL 0307B
GOVERNOR
M
TOL
J
ROOM.
PALL-0303B
XI
8"-P-D1-1037B
10"x12"
12"x16"
FROM HP COMPRESSOR SUCTION HEADER
PLATE
PSLL
I
XI
I
DWG NO. 1002
DUAL
13.
2"
G
ON
SYSTEM VENDOR REQUIREMENT. 12.
UCP PSLL
CONTROL
PAHH-0308B
V/F
0307B
AVAILABLE
UCP.
FROM VSHH-0302B
FROM VSHH-0301B
UIC-0301B
TI
BE
0302B
PAL
NOTE-13
0305B
SHALL
COMPRESSOR
VAHH
0301B
PI 0306B
AS
10. USE 20 MESH PER VENDOR REQUIREMENT.
DWG NO. 1104
M
VAHH
PAH
V/F
PT 0310B
INDICATIONS
WELL
CONTROL
NOTE-8
V/F
THESE AS
LOCAL
3/4"
VSHH
S/D
UCP
POINT.
9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN
0302B
MOTOR
I
16"-P-D1-1030B
D1
3/4"
PT
TAP-OFF
11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR
*
MOTOR 0301B
0304B
TO
NOTE-12
* VSHH
V/F
PAH
TOL
1-AC-251B 3/4"
PIC
CLOSE
TO 1-V-252B
12"-P-D1-1031B-IS
16"-P-D1-1030B
TS
ALL DCS
12"-P-D1-1032B
CSO
I
8.
TY
V/F
0302B
FV-0301B
DWG NO. 1104 TAL
0306B
NOTE-10
PSV
0306B
NOTE-11
ST-0301B
5500
FROM TT-0306B
TAH
I PDI
FIRE CASE
4"-SV-A1-2506B
TO HP FLARE
4"-SV-A1-2505B
FIRE CASE
NOTE-8
4"-FL-A1-2406B
J
kPa(g) kPa(g) kPa(g) kPa(g) kPa(g)
H
C
44
C
TAHH-0307B
170
C
LAH-0301B
400MM
FROM
BTL
LAL-0301B
200MM
FROM
BTL
LAHH-0304B
465MM
FROM
BTL
LALL-0303B
150MM
FROM
BTL
TAH-0301B
55
C
TAL-0301B
45
C
TAH-0304B
165
C
PAH-0306B
4250 kPa(g) 3200 kPa(g)
PAL-0306B
G
VAHH-0301B LSHH
F LAH
0301B
LAL
LT
LG
0301B
0302B
LIC
LAHH
0304B
1-V-251B
1-DGT-253B
V/F
0304B
1-K-253B
VAHH-0302B
PDI-0311B(MAX)
ST
ON 2nd STAGE COMPR. DISCHARGE BIAS
SIC
0303B
OVERRIDE
LSS
VENDOR'S SCOPE (SOLAR)
I
E
XV-0302B
I/P
LSLL-0303B
0302B
ZIO
0302B
0302B
XV
ZSO
ZSC
V/F
0301B
V/F
ZSO 0301B
CONTROL PANEL
FC
3/4"
PB 0306B
PB
2"-DH-A1-2201B
ESD SIGNAL
14.3.97
AS - BUILT
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
FO
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
4"
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
NORMAL STOP
3/4"
METHANOL 12MM SS TUBING NNF
FAST STOP
D1
DWG NO. 1150
E1
Rev.
Date
Description of revision
DD-MM-YY
Company;
3/4"
XI
1-K-253B TRIP
PB
PB
0304B
0303B
START MACHINE
ENGINEERS INDIA LIMITED
CLOSE
I
START PRESSUR1SATION
UA
NEW DELHI - INDIA
XV-4601B, XV-0302B, XV-0401B, XV-0402B
Worley
Basic Engineering:
ON 1-K-253B TRIP
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
USD
0301B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
0302B
COMMON
COMMON
ALARM
TRIP
M/C PARAMETER
Company's contract No.:
M/C PARAMETER
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
ITEM NO.:
1-DGT-253B
ITEM NAME: A
1-K-253B
HP COMPRESSOR
CAPACITY : DIFF. PR. :
3
HP COMPRESSOR
GAS TURBINE DRIVER
1st STAGE
15
14
13
12
11
10
9
1
Document title:
3
2
5
0
Rev.
2
4
1
1
1
0
3
B
HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'B')
Company's document No.:
3107 kPa
16
7
Path\File name\Initials:
75450 Nm3/hr (GUARANTEE)
9.219 MW
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
PLC-1 (NORMAL S/D)
SS TUBING
EIL
CONSORTIUM
Contractor:
0301B
V/F
I
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
1-K-253B UCP
I
FROM PLC-1/2 (FAST STOP) INST. DRAIN
E
3
PIPING INST.
TO COH
B
0305B
D1 A1
NC
COOLER VENDOR'S SCOPE OF SUPPLY
B
3/4"
2"
C
VENDOR'S SCOPE OF SUPPLY (SOLAR)
V/F
SURGE CONTROL
DWG NO. 1003
3/4"
A1 D1
FV
0301B
FROM STATION
1"
V/F *
I
LV
2"-P-D1-1029B FC
UCP
0301B
0302B
DWG NO. 1136
0301B
FY
LY 0301B
0302B
ZIO
UCP
I
14"-P-D1-1037B
IAS ZSC
0301B
NOTE-6
I/P
0302B
V/F
S
0301B
S
TO HP FLARE
CMR
V/F
I
CMR
ZIC SOV 0301B
1-K-253B TRIP
D
I
UCP
CLOSE FROM
LEGEND:
DWG NO. 1104
0304B
0301B
ZIC
F
kPa
FROM PIC-0410B
V/F
LALL
LSLL 0303B
SOV
20
0301B
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
TO
TO
TAHH 0307B
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
REFERS
REFERS
Path\File name\Initials: 8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131103
16
15
12
13
14
ITEM NO. ITEM NAME L
SIZE : DESIGN PRESS : DESIGN TEMP :
9
10
11
8
180 C
5
H.P. DISCHARGE SCRUBBER 1122 mm (ID) X 2415 mm(T/T) 14000 kPa(g)
L
1. REFER LEGEND P&ID No.
°
3713-00-02-41-0110 &
EPOXY (INTERNAL)
°
EPOXY (INTERNAL)
TO 1-DGT-253B SPEED CONTROL
1
NOTES:
65 C
180 C
°
2
3
4
1-V-253B
1-AC-252B H.P. DISCHARGE COOLER DUTY: 22.236 MMKJ/H (6.177 MW) 14000 kPa(g)
LINING :
6
7
1-V-252B H.P. INTERSTAGE SCRUBBER 1710 mm (ID)X 2750 mm(T/T) 8400 kPa(g)
3713-00-02-41-0111 FOR NOTES.
2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.
DWG NO. 1103
V/F
FY
FV
0401B
FO
70.99
0403B
NOTE-2
V/F
IS
NO POCKETS
NOTE-7
2J3 14000
3" F1 E1
PSV
D1 F1
J
RO 0401B
CSO
4"-P-F1-1125B-IS
NNF
SS
F1
INST. PIPING UCP
UCP
I
I
TAHH
PAHH
TI
0405B
0409B
0408B
TAH
FT 0402B
PSV 0401B
2"-P-D1-1044B
CSO
F
DWG NO. 1136
TAL
TT 0401B
NOTE-3
FIRE CASE
2"-P-D1-1071B
1E2 8400
G
TAH
1E2 8400
PSV 0402B
CSO
PI
PAH
0401B
PAL
NOTE-5
PSHH
TT
FT
0409B
0408B
0401B
PID 0412B
3/4"
D1
2"
3/4"
FROM 1-AC-251B
12"-P-D1-1032B
TAL
PIPING
F1
INST.
SS
NO.
SET
PALL-0407B PALL-0412B VENT
CC 0402B
VSHH
FROM
0401B
*
8"-P-E1-1035B
VSHH-0401B
M
1-K-253B TRIP VSHH
VSHH-0402B
M
I
1-V-253B
FROM
0402B
VAHH
PSLL
PB
0401B
0407B
0401B
MOTOR
I
NOTE-4
S/D
I
0402B
0402B
NOTE-4
C
35
C
TAHH-0409B
55
C
290
MM
FROM
BTL
LAL-0401B
130
MM
FROM
BTL
LAHH-0404B
774
MM
FROM
BTL
50
MM
FROM
BTL
LAHH-0408B
465
MM
FROM
BTL
LALL-0407B
150
MM
FROM
BTL
LAH-0402B
400
MM
FROM
BTL
LAL-0402B
200
MM
FROM
BTL
PAH-0401B
4250 kPa(g) 3200 kPa(g) 50
TAL-0401B LSHH
LT
LG
0402B
0406B
I
LAH-0401B
TAH-0401B
44
LAHH
PAH-0405B
0408B
PAL-0405B
H
C C
13000 kPa(g) 10500 kPa(g)
TAH-0408B
PB
MOTOR
C
50
TAL-0406B
PAL-0401B
I
I
VAHH
172
TAH-0406B
LALL-0403B
M
NO POCKETS
3/4"
*
POINT
13200 kPa(g) 4500 kPa(g) 2300 kPa(g)
PAHH-0409B
2"
3/4" 3/4"
I
TAG.
0407B TT 0406B
CSC
165
C
VAHH-0401B
G
VAHH-0402B
S/D
LALL
LSLL
PDI-0412B(MAX)
0407B
0407B
XI
XI
0401B
0402B
LIC
PSLL
0402B
0412B
V/F UCP
V/F
PSLL
PT
0411B
20
kPa
0405B
PI 0405B
LAH
I
LAL
XV-0402B
CLOSE
PAH
F
PAL
NOTE-3 TI
2"-P-D1-1041B
TOP
TAH
0408B
0412B
2"
TI TI 0406B
PI
PALL
CSC
CSO
PUMP CONTROL.
V/F
UCP
UCP
VENT
TSHH 0409B
TAHH-0405B
PALL 0407B
NOTE-8
DWG NO. 1103
3/4"
J
8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL TAHH 0409B
0408B
NOTE-3
A1
7. DUAL PLATE WAFER TYPE.
0404B
6"-P-F1-1042B-IS
TSHH
NOTE-6
V/F TI 0401B
SYSTEM VENDOR REQUIREMENT. UCP
CSO
V/F
0405B
8"-P-F1-1034B-IS
V/F
0306B
3"-SV-A1-2508B
FIRE CASE
3"-SV-A1-2507B
TIC-0306B
TO HP FLARE
DWG NO. 1103
PSV
CSO
TS
PT 0401B
TT
I
1-AC-252B
ST-0401B
3"-P-D1-1069B
NO POCKETS
DWG NO. 1146
3"-FL-A1-2407B
H
6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR 14000
F1
21.05
TO FUEL GAS SKID
5. USE 20 MESH PER VENDOR REQUIREMENT.
8"-P-E1-1070B
2J3
A1
12"-P-D1-1033B
0402B
IN LOCAL CONTROL ROOM.
6"-P-FI-1073B-IS
3/4"
K
4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE
PT
F1
V/F
RO
DWG NO. 1005
NO POCKETS
2"
I
I
0402B
ENTRY
M
NO POCKETS
TI 0404B
1-K-253B TRIP
LAH
LT
LG
0401B
LAL
0401B
0405B
I SOV 0401B CMR
ZIC
ZIO
0401B
0401B
LY LALL
LSLL
0403B
0403B
S
0402B
D TO CONDENSATE
XV
ZSC
ZSO
0401B
0401B
0401B
0401B
DWG NO. 1008
FC
0402B
1"
I
LV
3/4"
I/P
I/P 0401B
ACCUMULATOR
1-K-254B LY
LY
IAS
1"
CLOSE XV-0401B
2"
LEGEND:
E1 A1
D1 F1
2"-DH-A1-2203B
LIC
0404B
3/4"
2"-P-D1-1036B
SS TUBING
NC
FC
FC
3/4"
B1 D1
*
INST. DRAIN
3/4"
3/4" 2"
VENDOR'S SCOPE OF SUPPLY (SOLAR) COOLER VENDOR'S SCOPE OF SUPPLY
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
NC D1
2"-DH-A1-2202B
C FROM
LSLL-0407B, 1-K-253B TRIP
I 0402B
CMR
B
ZIC
ZIO
0402B
0402B
IAS
XV
ZSC
ZSO
0402B
0402B
0402B
DWG NO. 1124
3/4"
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED
SS TUBING
NEW DELHI - INDIA
Worley
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
2"-P-E1-1074B
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
Rev.
FC
3
1-V-254B
ITEM NO.
14
13
12
11
3
2
Path\File name\Initials: 10
5
0
2
4
1
1
1
0
4
B
HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-B
Company's document No.:
8743 kPa
15
1
Document title:
2nd STAGE 67696 Nm3/hr
CAPACITY : DIFF. PRESS :
7
Path\File name\Initials:
H.P. COMPRESSOR
ITEM NAME
16
EIL
CONSORTIUM
Contractor:
A1 E1
A
VIETSOVPETRO
DWG NO. 1154
EIL
ISH
PETECHIM/VIETSOPETRO
Basic Engineering:
S
TO OILY WATER TREATMENT
12MM SS TUBING
Company;
INST. DRAIN
TO CDH
SOV
FROM 1-P-357B
A1
E
VENDOR'S SCOPE
V/F
DWG NO. 1137
1-V-252B
FROM
LSLL-0403B, LSHH-0807 PSHH-0805, 1-K-253B TRIP
LAHH
0404B
TO CDH
0402B
LSHH
6"x8"
I
CC 0401B
E
10"x12"
PI
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
NOTE-3
I
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
6"-P-F1-1043B-IS
12MM SS TUBING
DWG NO. 1150
0403B
53.79
3/4"
METHANOL
8"-P-E1-1038B
0401B
RO
0401B
IS
DCS AS WELL AS COMPRESSOR UCP.
GAS HEADER
PIC 0401B
E1
ZSC
0401B
10"-P-D1-1070B
V/F
0401B
V/F
ZSO
UCI-0401B
I/P
DWG NO. 1136
I
V/F
CMR
6"-SV-A1-2509B
S
TO HP FLARE
I
I SOV
0403B
6"-SV-A1-2516B
V/F
ZIC 0401B
UCP
6"-FL-A1-2408B
ZIO 0401B
UCP
K
3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON
TO DISCHARGE
UCP
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131104
16
15
12
13
14
8
6
7
5
1.5D2 14000
FIRE
FIRE
PSV
1.5D2
TI
14000
0901B
CASE
2"x6"
0901B
3. DELETED. 4. DELETED.
5. REFER NOTE-41 OF LEGEND P&ID No. 3713-00-02-41-0110/0111 FOR SOV ASSEMBLY DETAILS. AAH
AI 0902B
6. REFER NOTE-42 OF LEGEND P&ID No. 3713-00-02-41-0110/0111 FOR SOV ASSEMBLY DETAILS.
H2 O DEW POINT
8. PI-0903B TO BE VISIBLE FROM THIS VALVE.
AT
9. DELETED.
TO DEHYDRATION
0902B
0902B
OUTLET MANIFOLD
A17
3"-P-E1-1114B
1"
J
1.5"x3" RO
0902B
9.72
2"x1" E17
NOTE-15
E1
CS0
A1
CS0
E1
A1 E1
3/4"
3/4"
CS0
10"-P-E1-1072B
1.5"x3"
3"-P-E1-1115B
1"x2"
E17
CSC
K
7. DELETED.
V/F
S
PSV
2"x6"
2. DELETED.
1"-FL-A1-2446B
6"-SV-A1-2526B
CASE
0908B
TAL
LP FLARE
DWG NO. 1135
6"-SV-A1-2525B
TT
TI 0908B
°
6"-FL-A1-2415B
TO LT FLARE
2"-P-A17-1143B
K
65 C
L
1. DELETED.
DWG NO. 1135
1400 mm (ID) X 7900 mm (T/T) 14000 kPa (g)
TO HP FLARE
GLYCOL CONTACTOR
SIZE DESIGN TEMP.
1
NOTES
ITEM NAME DESIGN PRESS.
2
3
4
1-T-311B
DWG NO. 1135
L
9
10
11
ITEM No
10. IN CASE OF XV-0901B NOT OPEN SIGNAL, RUNNING H,P. COMPRESSORS TO BE TRIPPED SO THAT ONLY TWO COMPRESSORS ARE LEFT RUNNING.
DWG NO. 1009
11. DELETED.
J
12. DELETED.
10"x14"
13. DISTANCE BETWEEN XV-0903B AND TAPPING FOR PSV-0905B/0906B TO BE MINIMUM.
2"-P-E1-1143B
3"-P-E1-1113B
14. FI-0902B SHOULD BE VISIBLE FROM THE
LSHH-0903B PSLL-0902B
0901B
PI
IAS
0901B
0903B
TAG.
5 DIA
10"-P-E1-1040B 2" FC TSO
0901B
CLOSE XV-0901B
NOTE-8
G
TRIP 1-P-311C/D PSLL
I
0902B
CLOSE
DWG NO. 1009
XV-0901B
V/F
PALL 0902B
I
F
LG
LT
0901B
0902B
LIC 0902B
LAH LAH
0905B
0905B
TRIP 1-P-311C/D
10"-P-E1-1040B
V/F
1-T-311B
LSLL
LALL
TAL-0909B LAHH-0903B
600
°
mm
FROM
BTL
50
mm
FROM
BTL
LAH-0902B
450
mm
FROM
BTL
LAL-0902B
150
mm
FROM
BTL
2"
CLOSE XV-0903B
50
m m
T HO
E1 E2
1.5H3 700
700
V/F
PSHH-1011B PSLL-1022B
PSV 0905B
3"x6"
LSHH-1012B LSLL-1010B
V/F
ZIO
0903B
0903B
I
V/F SOV
D
V/F
0903B
V/F
LV
ZSC
ZSO
0902B
0903B
0903B
CMR IAS
3"-GL-A2-8223B
0902B
ZIC
2"x1" 1"
2"x1" FC
3/4"
2"
V/F
CS0
CS0
3"x6"
PSV
3/4" CSC
CS0
V/F
3"x2"
3"x2"
V/F
2"-GL-A2-8201B
E2
NOTE-13
BE
SUPPLIED
DEHYDRATION
DWG NO. 1110
BY
VENDOR
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
Company;
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
V/F 1/2"
E2
SYSTEM
B
DD-MM-YY
A2
NC
C
TO
3"x1.5"
3/4"
TO 1-E-314B
V/F FC
E
V/F :
0903B
3/4"
V/F
0906B
2"
XV
V/F
V/F
3"x1.5"
LSHH-1003B
I/P LY
F
1.5H3
FROM LSLL-0905B
E
G
50 kPa(g)
PID-0901B(MAX)
I
DISCHARGE HEADER
H
AHH-0902B
V/F
M2
0903B
0903B
FROM HP COMPRESSOR
POINT
°
LALL-0905B
V/F LSHH
LAHH
SET
10000 kPa(g) (-)40 C (-)40 C
TAL-0908B
10"x14"
XV
NO.
PALL-0902B
3"-GL-A2-8224B
0902B
0901B
S
ZSO
6"-SV-A1-2534B
FI
ZSC
PDI
ESD
SOV 0901B
NOTE-14
DWG NO. 1510
TO LP FLARE
I
NOTE-5
H
2"-GL-E2-8208B
M1
DWG NO. 1135
0901B
3"-P-E1-1113B E1
0901B
2"x3"
FROM
50 mm HOT
ZIO
50 mm HOT
ZIC
I FROM 1-AC-311B
CSO
6"-FL-A1-2436B
I
6"-SV-A1-2533B
NOTE-10
E2
I
BUTTERFLY VALVE.
15. PROVIDE 0.5M DISTANCE (MIN.) BETWEEN BALL AND GLOBE VALVE 2"
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
A1
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
INST. DRAIN SS TUBING
3/4"
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
TO CDH
DWG NO. 1137
B
2"-DH-A1-2235B
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
3
1
0
Rev.
2
4
1
1
1
0
9
B
Path\File name\Initials: A
GAS DEHYDRATOR FACILITY TRAIN # B
Document title:
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131109
16
15
L
TUBE
250
250
DES. PRESSURE kPa(g)
350
700
1-E-318B
STRIPPING COLUMN
OVERHEAD CONDENSER
2621 F/F x 305 DIA
2330 F/F X 400 I/DIA
250
1-V-314B STILL COLUMN
2725 F/F x 305 I/DIA.
250
FULL VACUUM /350
9
10
11
1-V-313B
FIRED HEATER BURNER
450KW
NOTE-4 LP FLARE
TSHH
TAHH
1010B
1010B
6"-SV-A1-2570B-IS
1006B
4"-FL-A1-2439B-IH
1 1/2" H 3"
NOTE-1
PSV 350
TP1
2"
FLASH DRUM
4"
CSO FB
DWG NO. 1109
FAN
PURGE
RUNNING
COMPLETE
ON/OFF
XI
XI
XI
1005B
1006B
1007B
H 75mm
PILOT
BURNER
PROVEN
SHUTDOWN
1-E-318B TIC 1001B
I LY
DWG NO. 1410
P
XI 1009B
1005B
2"x1"
2"
2"x1"
2"-GL-A2-8247B-IH
DWG NO. 1410
NO POCKETS
FC NC
1"
2"x1"
3/4"
H 75mm
1"
3/4"
2"x1"
PALL-1017B PALL-1012B
400 °C
PAH-1015B
30 kPa (g) 0 kPa (g)
PAL-1015B TAH-1001B
215 °C
TAL-1001B
195 °C
FAH-1001B
11 m3/HR
FAL-1001B
9 m3/HR
PI 1015B
2"-FG-A1-6378B-IH
ZIC
ZIO
1001B
1001B
P
TY 1001B
PAH PAL
NOTE-4
FROM
I
TRIP FAN
TV 1001B
NOTE-5
FF
6"
I
PALL
ZIO
ZIO
ZIC
1004B
1002B
1002B
1017B SOV
NOTE-4 PAHH
2" H 100mm
NOTE-4
ZSC 1002B
NOTE-3
SET
ZSC
1020B
PCV 1001B
3"
TT
3"
1002B
FC
1 1/2"
1 1/2" XV 1004B SOV
TI
DWG NO. 1510
1003B
H 75mm
3/4" S
1-V-313B
1-E-314B
2" 2"
2"-GL-A2-8241B-IH
FI TI 1003B
1001B
PI
3/4"
3/4"
2"x1"
1001B
2"x1"
IGN TRX
FAL
1003B
ZSO
ZSC
1002B
1003B
1003B
E
PCV 1013B
ELECTRODE
I
FIT
1"
A/S
SET
FC
1 1/2"
PCV
220VAC
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
1011B
XV
SUPPLY
Date
Description of revision
DD-MM-YY
Company;
1003B
TRANSFORMER PI
FC
FC
3/4"
3/4"
VIETSOVPETRO
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
3/4"
Worley
Basic Engineering:
1"
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
TO GLYCOL
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
FLASH VESSEL
2"-FG-A1-6377B-IH
Company's contract No.:
SCALE
Type of document
CCP-WT/95
DRAIN SYSTEM
2"-DH-A1-2237B
DWG NO. 1410
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
1 1/2"-FG-A1-6376B
DWG NO. 1410
EIL
CONSORTIUM
Contractor:
1023B
NOTE-4
EIL
ISH
PETECHIM/VIETSOPETRO
IGNITION
1001B
1"
@ 30kPa(g)
@ 0.5kPa(g)
SPARK IGN
2" 2"x1"
1003B
FC
1 1/2"
I
S
BE
FAH
ZIC
1"
NOTE-3
1007B ZIO
FC
1 1/2"x1"
FC
LALL 1008B
TO GLYCOL
2"-GL-A2-8242B-IS
PI 1019B
1002B
1 1/2"x1"
TRIP XV-1001B
LSLL 1008B
SET
PSLL 1012B XV
1002
1 1/2"
1009B
PSLL-1017B
I
A/S
@ 10kPa(g)
PI
PCV 1012B
1 1/2"
I
LG
M1
1012B
NOTE-4
SET
@ 1kPa(g)
1004B 1021B
1001B TAHH
MIN
I
SOV
I
PALL
1002B
PSHH TT
LAHH 1012B
ZSO 1002B
A/S
1004B
TRIP XV-0903B
LSHH
ZSO 1004B
S
1002B
I
S
I
TSHH
H 75mm
ZIC
1021B
F
1-X-312B
1004B
I
1012B
G
NOTE-3
PT 1015B
1-E-314B
ZSO 1001B
LSLL-1008B
1-X-312B
PI
1-E-316B
ZSC 1001B
PB
1014B
TO
I
1008
PSLL
B
TAHH-1010B
J
STOP
1017B
3/4"
F
C
BTL
1.3 kPa (g) 0.2 kPa (g) 1.15 kPa (g)
2"x1 1/2"
2"-GL-A2-8231B-IH
D
BTL
FROM
230 °C
PAHH-1021B
1 1/2"-FG-A1-6320B
2"
3"-GL-A2-8243B-IS
TI
LV
ACCUMULATOR
FROM
mm
H I
TAL
1-V-314B
1001B
CHARCOAL FILTER
E
POINT mm
1305
1001B
FROM GLYCOL
G
TAH
XI 1008B
SET 1700
LALL-1008B TAHH-1002B
DWG NO. 1510
XI
NO.
LAHH-1012B
FLASH DRUM
COND.
HEALTHY
TUBING
FROM GLYCOL
ACCUMULATOR
1004B
FROM LIC-1001B
TAG.
TO/FROM GLYCOL 3"-GL-A2-8244B-IH
INTERLOCKS
TSHH-1010B
K
DWG NO. 1410
(BALANCE LINE)
H
INSTRUMENT
C1136-RSL-PID-003
3/4"
PRIMARY
AND
C1136-RSL-PID-002
4"-FL-A1-2414B-IS
3"
L
CONDENSER
P&ID NO. C1136-RSL-PID-001
3/4"
2"
3/4"
2"-GL-A2-8220B-IH
OVERHEAD
REFER READ SYSTEM LTD.
3/4"-FG-A1-6375B
2"-GL-A8-8201B-IH
TO GLYCOL
FROM
LOCATION.
TP5
3"x1 1/2"
DWG NO. 1410
SAFE
4. CLOSE VALVES XV-1004B,XV-1002B AND XV-1003B
6"x3"
FB
3/4"
2"-GL-A2-8201B
CSO
4"
LO
TO
BE-1001B
DWG NO. 1135
5. TP12
TP4
VISIBLE VENT
3. FROM PSLL-1012B,PSHH-1021B,PSLL-1017B,TSHH-1002B
TI
DWG NO. 1135
TO LP PLARE
I
1010B
3"
CONTACTOR
FROM GLYCOL
2.
TT
2"-GL-A2-8240B
I
1.
VF
1006B
J
FLOW 1444 m3/h
NOTE-2
1
NOTE:
730KW
FULL VACUUM /350
2
3
4
AIR BLOWER
1/14
250
5
1-X-312B 500
6730 T/L TO F/F x 2000 I/DIA
FULL VACUUM /350
6
7
1-X-311B
GLYCOL REGENERATOR
2150
FULL VACUUM /350
8
1-E-314B
6"-FL-A1-2414B
4"-FL-A1-2439B
K
SHELL DES. TEMPERATURE °C
12
13
14
1-E-316B LEAN/RICH GLYCOL HEAT EXCHANGER 2x336 I/DIA x 4070 T/T
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
2"-FG-A1-6320B TP7
3
7
1
3
3
1
0
Rev.
2
4
1
1
1
1
0
B
Path\File name\Initials: FROM LP FUEL GAS
A
HEADER
16
15
14
13
12
11
10
9
8
7
6
5
Document title:
GAS DEHYDRATION UNIT TRAIN-"B"
Company's document No.:
DWG NO. 1134
Path\File name\Initials: 4
DISTRIBUTION CODE:
Page(s) 37131110
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES ITEM No. L
1-T-352
ITEM NAME
GLYCOL STORAGE TANK
SIZE
1710 mm (ID) X 3762 mm (H)
DESIGN PRESS.
FULL OF LIQUID + 50 mm WATER COLUMN
DESIGN TEMP.
L
1.
DELETED
2.
FOR
GENERAL
AND
0111.
60 °C
3.
TO
BE
4.
DELETED
5.
GLYCOL
NOTES
ACCESSIBLE
REFER
FROM
P&ID
NO.
3713-00-02-41-0110
DECK.
ANHYDROUS CALCIUM CHLORIDE
K
K
AIR DRYER
STORAGE
AND
ANTI
FOAM
STORAGE
SYSTEM
(REF.P&ID NO. 3713-35-02-41-1149) ARE ON A COMMON SKID. 2"-VG-A1-2602
2"-VG-A1-2601 TP6
6.
LOCATE
7.
MANHOLE
IN
SIGHT
FITTED
OF
VENT.
J
NOTE-7
CONNECTION PORTABLE DRUM
MANHOLE
ODD
NOTE-6
2"-GL-A2-8203
TRANSFER PUMP
TAG.
TP5
NO.
SET
POINT
3325
mm
540
mm
FROM
BTL
LAH-1602
3050
mm
FROM
BTL
LAL-1602
800
mm
FROM
BTL
LAHH-1604 LALL-1601
FROM
BTL
I
I LSHH
LAHH
1604
1604
LT
LI
1602
1602
LAH LAL
LG 1603
H
H
LSLL
LALL
1601
1601
1-T-352 I TRIP
1-P-352A/B
G
TP7
2"-DH-A1-2204
A1
TO GLYCOL ACCUMULATOR
DWG NO. 1137
A2
2"-GL-A2-8205
F
2"-GL-A2-8222B
2"-GL-A2-8222A
LOW POINT
PI
PI
1601
1604
CONTD. ON P&ID NO : 1149
E
REFER TO POSITIVE 3/4"
STOP
C
METERING SYSTEM
3/4"
1-P-352A
1-P-352B
M
1601
P&ID NO. C-1138/21
3/4"
3/4"
PB
(1-V-312 A) DWG NO. 1310
3/4"
2"-GL-A2-B219
3"-GL-A2-B205
2"-GL-A2-B222
D
F
TO GLYCOL ACCUMULATOR
TP8
E
(1-V-312 B) DWG NO. 1510
TO CDH
G
2"-GL-A2-B210
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
EMERGENCY
NOTE-3
J
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
LG-1603.
WITH
M
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
VENDOR'S SCOPE
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering: XI
I
1601
B
FROM
FROM
LSLL-1601
LSLL-1601
I
XI
PB
1602
1602
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
STOP
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
1-P-352A/B
ITEM No. A
ITEM NAME CAPACITY
1
3
3
Document title:
6.8 M3/hr
15
14
13
12
11
10
0
Rev.
2
4
1
1
1
1
6
B
TRIETHYLENE GLYCOL STORAGE & TRANSFER PUMP
Company's document No.:
208.7kPa
Path\File name\Initials:
16
5
Path\File name\Initials:
GLYCOL TRANSFER PUMPS
DIFF. PRESS.
7
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131116
16
15
12
13
14
ITEM NO. : L
ITEM NAME : SIZE DESIGN PRESS. DESIGN TEMP.
LOW TEMP. FLARE HEADER DWG NO. 1135
LP FLARE SCRUBBER
2500 mm (ID) x 6300 mm (T/T) 700 kPa (g)/50 mm WATER COLUMN VAC. 180C/(-45)C
1500 mm (ID) x 4500 mm (T/T) 350 kPa (g)/50 mm WATER COLUMN VAC. 180C/(-29)C
6
7
5
2:1000
1. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110/0111. 2.
ALL
LEVEL
AND
INSTRUMENTS
1-V-362
3.
DELETED.
4.
DELETED.
5.
DELETED.
6.
DELETED.
7.
DELETED.
ARE
CONNECTION
ELECTRICALLY
AND
TUBING
TRACED
AND
ON
L
1-V-361
INSULATED.
TO FLARE STACK
10"-FL-A17-2421
NO POCKETS
DWG NO. 1121
2:1000
10"-FL-A1-2425
DWG NO. 1135
1
NOTES
FREE DRAINING HP FLARE HEADER
2
3
4
SLOPE
10"x6"
K
8
1-V-362
HP FLARE SCRUBBER
2:1000
10"-FL-A17-2464
9
10
11
1-V-361
K
NO POCKET
4"x2" PI 1701
LAHH
LSHH
1703A
1703A
LSHH
LAHH
1703C
1703C
2"
9. AUTO/MANUAL SELECTOR FOR 1-P-361A/B AND DUTY/SPARE SELECTOR (SS-1701) LOCATED IN LOCAL CONTROL ROOM.
LSHH
LAHH
1703B
1703B
M
LX
1-V-361
TI
LAL
LT
1701
1702
TAG. FROM LSH-1705 AR
I
I
1703
1702
1702 LG
A17
2 OUT OF 3 VOTING
I
LY
1707
A1
SOV
FROM
1702
LSLL-1701
S
I
LV
1703
4"x2"
ZIO 1701
CSO
A1
FC
3/4"
TSLL 1703
ZSC
ZSO
1701
1701
1701
2"
CSO
SET
POINT
(-28C)
LAH-1702
350
MM
FROM
BTL
LAL-1702
200
MM
FROM
BTL
LAHH-1703A/B/C
450
MM
FROM
BTL
LALL-1701
150
MM
FROM
BTL
LAHH-1704A/B/C
450
MM
FROM
BTL
LALL-1706
150
MM
FROM
BTL
LAH-1705
*
LAL-1705
**
350
MM
250
MM
FROM FROM
I
BTL BTL
FC
3/4"
A17
*
A1
ON
**
CLOSE XV-1701 TO CDH DWG NO. 1137
XV
NO.
TALL-1703
3"-P-A17-1120
A17
XV-1701
1702
1.5"
2"
CLOSE
H
ZIC 1701
S
IAS LAHH
1701
I
SOV 1701
LSLL
1701
CMR
TSLL-1703
CAUSE PSD LALL
J
I/P
LAH LIC
DCS
ON
DCS
400
MM
200
FROM
MM
BTL
FROM
H
BTL
I TALL
2"-DH-A1-2252
1703
G
G 3"-P-A1-1120
NO POCKETS
LP FLARE HEADER
2:1000
10"-FL-A1-2426
DWG NO. 1135
2:1000
TO FLARE STACK
10"-FL-A1-2422
NO POCKETS
F
NO POCKETS
DWG NO. 1121
F
FREE DRAINING
4"x2" PI 1702
2"
START
1-P-361 A/B
E LAHH
LSHH
1704A
1704A
LAHH
1704C
1704C
LSHH
LAHH
1704B
1704B
I
M LG 1708
1-V-362
2 OUT OF 3 VOTING LX
D
TI
LT
1702
1705
LSH 1705 LSL
LI 1705
CAUSE PSD LALL
LSLL 1706
1705
LAH
I
1704
1706
E
CLOSE LV-1702
LSHH
LAL
I LAHH
TO BLACK COND. LINE
2"-P-A1-1094
STOP
1-P-361 A/B
1704
I
4"x2"
2"
3"-P-A1-1121
3"-P-A1-1119
TRIP PUMPS
CSO
1-P-361A/B
C
DWG NO. 1012
2"-P-A1-1095
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
J
8. PUMPS 1-P-361A/B ARE DUTY-SPARE.
3/4" LOW
DWG NO. 1137
INST. DRAIN
2"-DH-A1-2253
ST-1171
A1
XI
B
1701
FROM LSLL-1706
FROM LSH/LSL-1705
A1
ST-1172
B1
I
I
3/4"
M
PB
XI
1701
1702
JUY
LOC
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Date
Description of revision
A1
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
A1
B1
Detailed Engineering:
B1
ENGINEERS INDIA LIMITED
11
10
9
START/STOP
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
1702
I
SS
FROM LSLL-1706
7
6
7
1
3
3
Path\File name\Initials:
LP FLARE KOD PUMP
Document title:
5.0 M3/hr.
Company's document No.:
190 kPa
Path\File name\Initials: 4
Type of document PIPING & INSTRUMENTATION DIAGRAM
1-P-361A/B
5
SCALE
CCP-WT/95
Contractor's document identification:
3
1701
8
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
PB
M
Limited
STOP
Company's contract No.:
DIFF. FRESS.
12
3/4"
TRIP
CAPACITY
13
Worley
Basic Engineering:
TRIP
ITEM NAME :
14
PH
MSP
Contractor:
3"x2"
CSO
STOP
ITEM NO. :
15
AC
APPROVED BY COMPANY FOR ENGG.
NEW DELHI - INDIA
3"x2"
CSO
16
SDH
MSP
7.2.96
1704
SS TUBING
A
SA
APPROVED FOR CONSTRUCTION
1
Company;
2"x1"
B1
REVISRD AS MARKED
20.3.96
DD-MM-YY
POINT
1703
TO CDH
AS - BUILT
20.11.96
2
PI
2"x1"
3/4"
14.3.97
3
Rev.
CSO
PI
B
DISTRIBUTION CODE:
6
0
Rev.
2
4
1
1
1
1
7
B
HP/LP FLARE SCRUBBERS Page(s) 37131117
16
15
12
13
14
9
10
11
8
6
7
5
L
2
3
4
ITEM NAME :
1-K-411A/B
CAPACITY
1.
DELETED.
2.
DELETED.
L
AIR COMPRESSORS
DIFF. FRESS.
1450 Kg/hr 1034 kPa
3.
DELETED.
4.
AIR
INTAKE
FILTERS
ACCESSIBLE
K 2 OUT OF 2
UX 1801
J
ESD SIGNAL
ESD SIGNAL
FROM PLC-1/2
FROM PLC-1/2
I
COMMON
COMMON
COMMON
COMMON
PRE-ALARM
TRIP-ALARM
TRIP-ALARM
PRE-ALARM
1-K-411A
1-K-411A
1-K-411B
1-K-411B
UA
USD
USD
UA
1801
1802
1804
1803
I "B"
I
TRIP INERT GAS SYSTEM
5.
DELETED.
6.
DELETED.
AND
SILENCERS
TAG.
NO.
SET
PDHH-1801A/B TAHH-1801A/B TAHH-1802A/B TAHH-1803A/B
508
PDT
AIR FILTER
1801A
1801A
NOTE-4
TAHH
TI
1802A
1802A
1803A
1803A
I
PSV
PSV
1801A
1802A
I
I
PSV 1803A
TSHH
TSHH
TSHH
1801A
1802A
1803A
PDAH
TT
1801A
1801A
CSO
CSO
INTER
TT
TT
1802A
1803A
CSO
H
AFTER
PI
STAGE COOLER
PI
COOLER
1802A
SILENCER
1803A
SILENCER
NOTE-4
PAH
NOTE-4
PI 1811
TT PSH
1804B
CW
M
PAL
1805
CW
G
PSL
XI
PLC1
1801
CD
1-K-141A
CD
G
I
TO ATM
SILENCER
1801A
H
TI
1100
1801A
PDSH
370
TAHH
H2O
1034 kPa(g) 965 kPa(g) 896 kPa(g) 1050 kPa(g) 750 kPa(g)
PAL-1811 TO ATM
J
POINT
mm
220C
PAH-1811 370
1801A TI
AN
90C
PAL-1812
TAHH
AT
220C
PAH-1805
PDI
BE
K
PAL-1806
I
SHOULD
LOCATION.
7. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.
"A"
1806
TI 1804B
I
PSL 1812 PT
RUNNING
1811
INDICATION
TO 1-V-412
1-K-141A
2"-DW-A1-2305
F
3"-AU-A3-5208
DWG NO. 1119
F
PDI 1801B
PDT
AIR FILTER
TAHH
TI
1801B
1801B
NOTE-4 PDSH 1801B
TO ATM 370
370
TAHH
TI
1802B
1802B
TAHH
TI
1803B
1803B
TO ATM 1100
1801B
I
PSV
PSV
1801B
1802B
I
I
PSV
SILENCER
1803B TSHH
TSHH
TSHH
1801B
1802B
1803B
E PDAH
TT
1801B
1801B
CSO
CSO
INTER
TT
TT
1802B
1803B
E
CSO AFTER
PI
STAGE COOLER
PI
COOLER
1816
SILENCER
1817B
SILENCER
NOTE-4
NOTE-4 TT 1804B
CW
M
XI
PLC2
1802
CW
CD
1-K-141B
CD
D
I
TI 1804B
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
RUNNING
Date
Description of revision
DD-MM-YY
INDICATION
Company;
1-K-141B
C
VIETSOVPETRO
COMPANY
CONSORTIUM
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
2"-DW-A1-2305
SKID DRAIN
EIL
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
B
EIL
ISH
PETECHIM/VIETSOPETRO
Contractor: REFER TO TIDE AIR P&ID NO: 261808-FS1
2"-DW-A1-2304
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
1
NOTES
ITEM NO. :
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification: ODD
3
ODD
7
1
3
4
1
0
Rev.
2
4
1
1
1
1
8
B
Path\File name\Initials: A
Document title:
AIR COMPRESSOR SYSTEM
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131118
16
15
UTILITY AIR RECEIVER
ITEM NAME :
L
12
13
14
1-V-412
ITEM NO. :
DESIGN PRESS.
6
7
5
PRE FILTER
INSTRUMENT AIR RECEIVER
168 mm OD x 622 mm F/F 1150 KPa (g)
168 mm OD x 622 mm FF
65 C
65 C
INSTRUMENT AIR RECEIVER
K
I
1908
INCLUDING
DELETED.
DELETED.
6.
ATM
AS
DETAILS
3.
5.
2J3
SYSTEM
2.
4.
PALL
INDICATIVE
GENERAL 0111
PI-1911
TO
NOTES
BE
REFER
VISIBLE
P&ID
FROM
2"
2"-AI-A3-5119
CSO
1909
PAL
NO
THIS
TO
AND
GIVE
FILTERS.
3713-00-02-41-0110
VALVE.
CAUSE PSD TAG.
NO.
SET
J
POINT
LAH-1901
400mm
PALL-1908A/B/C
450 KPa(g) 1034 KPa(g) 600 KPa(g) (-) 15C 89 kPa(g) 750 kPa(g)
PAH-1909
I
VENDOR
DRYERS
K
FOR
PAL-1909
PAH
ONLY.
PANELS
DELETED.
PX
3/4"
PALL
PALL
PALL
1908A
1908B
1908C
AAH-1901 PDAH-1905 PAL-1907
PI
PSLL
PSLL
PSLL
1912
1908A
1908B
1908C
FROM
BTL
I
INST. AIR HEADER
3"-AI-A3-5106
PT
DWG NO. 1140
1909
UTILITY AIR HEADER
2"-AU-A3-5211
UTILITY AIR HEADER
2"-AU-A3-5211
DWG NO. 1140
H
H SET
REFER TO TIDE AIR
PI
@ 650 KPa(g)
1902
P&ID NO. 261808-FS2
PCV 1901
2"
FIRE
2"
CASE
G
1-F-411
3"x2"
1.5F2 1150
G
3"x2"
3"-AU-A3-5210
PSV
2"
1901
ATM
ATM
3/4"X1
TP1
2"
3/4"X1
1150
2"-AU-A3-5233
ATM
1150
PSV
PSV
1903
1904
PDAH 1905
F
CSO
2"
2"
2J3
PDI
DWG NO. 1118
1901
1901
M
LG 1902
2"x1"
CHAMBER
PCV
PI 1911
E
2"
CSO
2"
CD
3"x2"
TP2
PI
2"-AI-A3-5112
NOTE-6
1910
2"
1901 RO 1901
NO NO PI
NC
C
F
1902
3"-AI-A3-5104
3/4"
1-D-411 A/B
1901
SET
@ 830 KPa(g)
1902
3"
1-F-412 A/B
1906
1"-DW-A1-2308
D
ST
CHAMBER
RIGHT ATM
PSV
3"-AI-A3-5102
LSH
ATM
1905
1-V-411
M
1 1/2"-DW-A1-2311 AT
AAH
AI
1901
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
1901
2"
Company;
NC
ODD
1"
TP4 ODD
2"-DW-A1-2332
Detailed Engineering:
DRAIN
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
DRAIN
Company's contract No.:
SCALE
Type of document
CCP-WT/95
ODD
ODD
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES SKID
PRE FILTER
B
EIL
CONSORTIUM
Contractor:
TP3
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
1"
1"-DW-A1-2310
LAH
LEFT
NO
1"-DW-A1-2306
1-K-411A/B E
PT 1907
1150
3"-AU-A3-5208
1-V-412
PI 1907
CASE
CD
2"x1.5" 1.5"
PAL
FIRE
PI 1901
3"-AI-A3-5105
3/4"
1"-DW-A1-2307
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
IS
CONTROL
1908
PSV
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
SHOWN
AND
1905
PI
L
1. AUXILIARY EQUIPMENT FOR DRYERS ARE NOT SHOWN
65 C
1030
1
NOTES
2815 mm (ID) x 5000 mm (T/T) 1150 KPa (g)
1150 KPa (g)
J
2
3
4
1-V-411
1230 Kg/hr
65 C
DESIGN TEMP.
8
1-F-412A/B
1-F-411
DESICCANT AIR DRYER
1300 mm (ID) x 2600 mm (T/T) 1150 KPa (g)
SIZE
9
10
11
1-D-411A/B
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
1
0
Rev.
2
4
1
1
1
1
9
B
Path\File name\Initials: A
Document title:
UTILITY AIR/INSTRUMENT, AIR SYSTEM
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131119
16
15
12
13
14
9
10
11
8
6
7
5
L
ITEM NAME :
INERT GAS SYSTEM
DESIGN PRESS.
150 NM3/hr 1150 KPa (g)
DESIGN TEMP.
65 C
1.
VENDOR TAKE TO
TO ATM AT
3.
ALARM COMMON
AAH
ESD, UX-1801
UA
XI 2001
I
PAH
AI
PI
2001
2007
TERMINATION
ALARM
&
AT
TRIP
SKID
EDGE
SIGNALS
L
TO
FURTHER
INERT
GAS
HEADER
HAS
DISTINGUISHED
DIFFERENT
FROM
COLOUR
UTILITY
AND
TO
BE
INSTRUMENT
FI
4.
DELETED.
AIR
5.
DELETED.
K
2001
6. FOR LEGEND REFER P&ID NO. 3713-00-02-41-0110/0111.
PAL
7.
J
SUITABLE STATUS
HEADER.
TRIP SIGNAL
2001
PROVIDE
DIFFERENT
DELETED.
EASILY
12"-VG-A1-2610
K
TO
THE
LCR.
SAFE LOCATION 2.
DELETED.
J 2"-VG-A1-2617
TP4
I RO
RO
2712
2722
3"x2"
I
TAG.
NO.
SET
FIC KIC 2700
S
2730
IA
FC
POINT
850 KPa(g) 570 KPa(g)
PAH-2007 PAL-2007 AAH-2001
5.25
PAL-8303
550 KPa(g)
I
2
TO SILENCER
S
KIC
KIC
2700
2700
FC
IA
S
IA
SOV
XV
TO
2713
2713
SILENCER
1"x1"
FC
FI
PT
1050
7411
2730
H PI
XV
SOV
SOV
XV
PI
2712
2712
2722
2001
2792 PI
PI
TI
FY
SOV
2001
2730
2001
2730
2730
SOV 2724
XV
XV
2714
2724
AT
PT
TE
FT
2730
2730
2730
2730
PCV
G
DWG NO. 1142
1-V-421
FE
FC
2730
SILENCER
KIC
INERT GAS
2'-N-A1-6408
FC
S
2012
TP3
2730
1-V-422
FROM PSV 7401
KIC
2700
FC
PI
NC
1"x2"
1-H-421A
F
@ 500 KPa(g)
P
FCV
FROM PSV 2701
SET
7435
%2
1-H-421B
S
G
PI
S
2700
S
7401
7493
KIC SOV 2714
IA
2793
2701 KIC
AI
1050
PSV
2700
H
PSV
1"x1" 2791
VENT GAS
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
1
NOTES
CAPACITY
will not be reproduced copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
2
3
4
ITEM NO. :
S
2700
IA
IA
XV
SOV
SOV
XV
2711
2711
2721
2721
E
F
FC
E
3"x2" RO
RO
2711
2721
QE 2751
INSTRUMENT AIR (FEED GAS) DWG NO. 1140
TP1
2"-AI-A3-5107
D PAL
SET
8303
REFER LINE P & ID NO. PFP DWN
@ 600 KPa(g) PCV
DWG NO. 1140
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
8303
Date
Description of revision
DD-MM-YY
TP2
INSTRUMENT AIR
C
100 FOR SKID DETAILS.
PSL
8315
B
Company;
1"-AI-A3-5111
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
PI 8315
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
PACKAGE UNIT
NOTE-3
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
2
0
Rev.
2
4
1
1
1
2
0
B
Path\File name\Initials: A
Document title:
INERT GAS SYSTEM
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131120
16
15
12
13
14
L
9
10
11
8
6
7
5
2
3
4
1
NOTES
ITEM NO. :
1-M-361
ITEM NAME :
1-M-366
FLAME FRONT GENERATOR
SIZE
FLARE TIP
1.
DIA = 16"(HP) / 8"(LP) 71000 Kg/hr(HP)/20000 Kg/hr(LP)
CAPACITY
FOR
GENERAL
AND
3713-00-02-41--0111.
2.
DELETED.
3.
DELETED.
NOTES
REFER
P&ID
NO.
L
3713-00-02-41-0110
4. FLARE VENDOR SHALL PROVIDE PCV'S IF REQUIRED FOR FUEL GAS
K
VENT TO SAFE LOCATION
6.
DELETED.
7.
DELETED.
8.
DELETED.
GAS
LINES.
K
J
NOTE-9
FLA
CSO
VENT HEADER
2101
4"-VG-A1-2621
DWG NO. 1135
3/4"
LOW
FLA
CSC
POINT
2102
CSO
1-M-366
CSO
I
I
REFER TO KALDAIR
PDI 2101
VENDOR PACKAGE
DWG. NO. P-1119-100
BYPASS STACK VARIABLE
H
EL (+) 87658
SLOT
6"
TE 2101
H
ABOVE MSL
TE
690
2102
BURNER-I
BURNER-II RO
THERMOCOUPLE
2101
G
G THERMOCOUPLE
H
PCV 2103
B
PI
FIELD SET
C
A
E
EL (+) 84000
2103
ABOVE MSL
8"x10"
1"-FG-A1-6357
PILOT LINE
14"x16"
F
F
FLAME FAILURE BURNER-II
1.5"-FG-A1-6350
IGNITION LINE
XA
IGNITION
2102
PANEL FLAME FAILURE
XA
BURNER-I
2101
1-M-361 PCV
E
2101
FUEL GAS
SET
@ 176 KPa(g)
IGNITOR WITH SIGHT PI
SOV
RO
2101
2102
2101
14"-FL-A17-2421
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
PILOT
DELETED.
9. FLA-2101/2102 SHALL BE ACCESSIBLE FROM DECK.
J
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
TO
5.
GLASS
1.59
S
DWG NO. 1134
2"x1"
2"-FG-A1-6346
1"x1/2" PCV
A1 A3
INST. AIR
1"-AI-A3-5114
DWG NO. 1140
2102
SET
@ 176 KPa(g)
PI 2102
RO
RO
2101
2102
5.36
S
1"x1/2"
E
D REFER TO KALDAIR DWG. NO. P-1119-103
1-M-361
VENDOR PACKAGE
FROM LP FLARE SCRUBBER
10"-FL-A17-2422
DWG NO. 1117
10"x14"
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
FROM HP FLARE SCRUBBER
C
DWG NO. 1117
EIL
EIL
COMPANY
PETECHIM/VIETSOPETRO
10"-FL-A17-2421
FREE DRAINING
ISH
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
3
6
0
Rev.
2
4
1
1
1
2
1
B
Path\File name\Initials: A
Document title:
FLARE SYSTEM
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131121
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES L
1-V-441A/B
ITEM NO. : ITEM NAME :
SEA WATER SERVICE PUMP CAISSON
SIZE
16" (ID)
L
1. LOCATE PCV, ARV, AND PI AT CELLAR DECK UPSTREAM OF THE CHECK
K
2.
FI
3.
DELETED.
4.
PAL
FIELD
BE
LOCATED
SAMPLE
ON
CELLAR
DECK.
CONNECTION.
K
MAINTENANCE.
I
STANDBY
SHALL
5. PROVIDE HOOK FOR CHAIN PULLEY BLOCK (HANGING FROM MIDDLE DECK BOTTOM) TO FACILITATE PUMP PULL OUT FOR
2201
START
VALVE.
6.
DELETED.
PUMP PSL
PI
2201
2203
7.
3/4"
4"-WU-A5-4508
J
UTILITY
HIGH
WATER HEADER
POINT
8.
DWG NO. 1143
3/4"
FOR
GENERAL
AND
0111.
V/F
1379
1.5"
4"-WU-A5-4501B NOTE-2
1"-WU-A1-4505B
FI 2201
PI 2201
2"
NOTE-1
PI
FI
2201
1.5"
2202
3"x4"
ARV
V/F
CONTROL
NO.:
ROOM.
SET
POINT
I
877 kPa(g)
1"x1" 1379
2202
3"x1"
3"-WU-A5-4502B
4"-WU-A5-4503A
4"-WU-A5-4501A NOTE-2
G
@ 1160 KPa(g)
LOCAL
PSV
CSO
4"x1"
SET
3713-00-02-41-0110
2201
4"x1"
SET
@ 1160 KPa(g) PI 2202
2"
H
4"-WU-A5-4503B
3"-WU-A5-4502A
H
1"-WU-A1-4505A
G
NOTE-1
PI 2202
3"x4"
ARV
V/F
2202
COPPER-CHLORINE
F
DWG NO. 1125
EL (+) 16700mm
1.5"-SH-A5-8302
NOTE-5
EL (+) 16700mm
ABOVE MSL
NOTE-5
ABOVE MSL CELLAR DECK
EL(+)0
ATM
M
I
STANDBY PUMP START ON PSL-2201
BELOW MSL
XA
E
2101
EL (-) 9370mm
I
INDICATION
1-P-441B
OVER BOARD
E
RUNNING
BELOW MSL
1-P-441A
PUMP START ON PSL-2201
EL (-) 15000mm
COPPER-CHLORINE
STANDBY
XA 2102
INDICATION
BELOW MSL
M
BELOW MSL
RUNNING
EL (-) 15000mm
1-V-441B
EL(+)0
1-V-441A
EL (-) 9370mm
F
CELLAR DECK
ATM
4"-WU-A5-4504B
SOLUTION
4"-WU-A5-4506A
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
1"x1"
2201
3"x1"
IN
PAL-2201
PSV
CSO
NO.
J
LOCATED
1" NO
V/F
P&ID
DELETED.
TAG
1" NO
REFER
9. AUTO/MANUAL SELECTOR SWITCH FOR 1-P-441A/B SHALL
NOTE-4
BE
I
NOTES
OVER BOARD
SOLUTION DWG NO. 1125
1.5"-SH-A5-8303
D
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
C
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
ITEM NAME : CAPACITY:
A
DISCH. PRESS.:
SCALE
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
SEA WATER SERVICE PUMP
3
34.0 m3/hr 1060 KPa(g) (AT CELLAR DECK)
Path\File name\Initials:
7
1
3
4
Document title:
4
0
Path\File name\Initials: 15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Rev.
2
4
1
1
1
2
2
B
SERVICE WATER SYSTEM
Company's document No.:
16
Type of document
CCP-WT/95
1-P-441A/B
ITEM NO. :
Page(s) 37131122
16
15
12
13
14
L
9
10
11
8
6
7
5
SLOPS CAISSON
SIZE
1.
1219 mm(ID) x 45600 mm(H) 350 KPa(g) & 50 mm WATER COLUMN VAC.
DESIGN TEMP.
65C
2.
HEADER
3.
TO VENT
K
AT SAFE
4"
4"
4"
LOCATION
4"
4.
BE
HEADER
SEALS
SAMPLE
LCP
NOTE-1
500 MM
6"-DW-A1-2331
I
1-V-254
MAN
POINT
SHALL
SHOULD
INDEPENDENT
BE
GENERAL
LOCATED
SHOULD
BE
AT
FROM
SHALL
BE
CELLAR
FROM NOT
LOCATED
TAKEN
SEALS
EACH
FOR
BE
ACCESSIBLE
DECK
CONVENIENT
BE
AT
LOCATED
CELLAR
CENTRE
PROVIDED
DECK
OF
L
OR LOCATION.
NEAR
BOAT
AND
LANDING.
TAPPING
PIPE.
FOR
OPEN
DECK
DRAINS
FUNNEL.
K
NOTES
REFER
P&ID
NO.
3713-00-02-41-0110
0111.
GAS
LIFT
TYPE
TREATED
SAMPLER
WATER
SHALL
FROM
BE
SLOP
PROVIDED
CAISSON
FOR
BOTTOM.
TAKING ALL
SAMPLES
NECESSARY
PROVISIONS VIZ INERT GAS PIPING UPTO SAMPLE CONNECTION, PRESSURE GAUCES, VENT GAS PIPING , ETC. SHALL BE IN THE SCOPE OF SUPPLY
4"-VG-A1-2613
SLOPE 1:200
J
IT
FOR
OF
XI 2301
NO POCKETS
SLOPE 1:200
4"
1"-VG-A1-2612
4"
6"-DW-A1-2330
5.
4"
4"
SHALL
SHOULD
THESE
&
FROM ALL DECK OPEN DRAINS SLOPE 1:200 (TYPICAL) NOTE-3
SEALS
THESE
FOR
OF PURCHASER.
6.
ONE
PUMP
7.
STRUTURE
IS
WARE
CAN
BE
HOUSE
J
SPARE.
BUOYANT.
PROVIDE
PROPER
RESTRAINTS.
AUTO
V/F
LOCATE AT CELLAR DECK
FLA 2301
SLOPE 1:200
I
LI 2301 PI
CELLAR
1"
SLOPE 1:200
INERT GAS
1"x1/2" NOTE-1
PI
4"-PW-A1-9401
HEADER OF CPP-2
2"-P-A1-1096
DWG NO. 1133
NC
G
1/2"
TPS DRAIN DWG NO. 1124
H
TO CLOSED DRAIN
CSO
3/4"
NO POCKETS
FROM TPS DWG NO. 1124
s
2301
3"x2"
1"
DWG NO. 1142
NOTE-2
LO
SLOPE 1:200
TREATED WATER
G
1"-N-A1-6418
V/F
4"-VG-A1-2613
H
2302
500 MM
DECK
MINIMUM FOR PIPING
2"-PW-A1-9402
NOTE-5
LT
LS
2301
2301
SAMPLER SYSTEM
3"
F
F
EL(+) 8230 JACKET LEVEL FROM MSL
LEGEND:
E
V/F
E
VENDOR FURNISHED.
PUMP
EL(-) 5486 FROM MSL
MOTOR
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
1
1-V-454
ITEM NAME : DESIGN PRESS.
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
2
3
4
NOTES
ITEM NO. :
EL(-) 6096 FROM MSL
M
D
SAMPLER
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
1-V-454
C
EIL
EIL
ISH
VIETSOVPETRO
CONSORTIUM
Contractor:
EL(-) 38986
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
REFER TO ENGINEERING
12"
FROM MSL
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
SPECIALITIES P&ID NO. 021396
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
1-P-453A/B
ITEM NO. : ITEM NAME : A
3
(NOTE-6)
1
3
4
14
13
12
11
10
9
8
0
7
Rev.
2
4
1
1
1
2
3
B
SLOP CAISSON SYSTEM
Company's document No.: Path\File name\Initials:
15
5
Document title:
5.67 M3/hr 350 KPa (AT JACKET)
DIFF. PRESS.:
7
Path\File name\Initials:
OIL RECOVERY PUMPS
CAPACITY:
16
COMPANY
PETECHIM/VIETSOPETRO
6
5
4
DISTRIBUTION CODE:
Page(s) 37131123
16
15
12
13
14
ITEM NO. : L
9
10
11
8
1-V-451
ITEM NAME :
SIZE/CAPACITY:
DESIGN PRESS.:
5
PRODUCED WATER DEGASSER
TILTING PLATE SEPARATOR (TPS)
1219 mm (ID) x 2438 mm (T/T) 350 KPa(g) & 50 mm WATER COLUMN VAC.
7.63 m3/hr 1.9 KPa(g)
65C
65C
1.
3.
DELETED.
4.
DELETED.
5.
ROTAMETER NITROGEN VENT
OF
2"-N-A1-6422
8.
IN
THE
VERTICAL
LINE
WHERE
BY
THROUGH
K
UPWARDS. BE
SIZED
FOR
GAS
BLOW
LV-2401.
LOOP
TO
ENSURE
FULL
BORE
FLOW
FOR
SAMPLING.
J
3/4"
V/F
LO
FROM
PI
3/4" 3"
V/F
NOTE-6
LSLL-2408
V/F
LSHH-2407
2401
I
2"
I
(FUTURE)
FREE DRAINING
2" FROM 1-V-253A DWG NO. 1004
2"-P-A1-1074A
FROM 1-V-253B DWG NO. 1104
3"-P-A1-1122
2"-P-A1-1074B
CLOSE
LSLL 2408
I
LT
LIC
LY
2402
2402
2402
LAHH
LSHH
2407
2407
2"-P-A1-1074D
LV
FREE DRAINING FACE
LG 2405
LALL
LSLL
2406
2406
1-V-451
V/F
LT 2401
LIC 2401
V/F V/F
FC
INC. P&ID NO. 021396
2"
2"
LAL
3
I
(FUTURE)
BTL
LALL-2406
1445
MM
FROM
BTL
LAH-2402
1975
MM
FROM
BTL
LAL-2402
1850
MM
FROM
BTL
LAH-2401
1800
MM
FROM
BTL
LAL-2401
1625
MM
FROM
BTL
LAH-2403
2170
MM
FROM
BTL
LAL-2404
1970
MM
FROM
BTL
H
G
1-V-453 LCP
SS 2401
BYPASS
LY
2"
2401
NOTE-7
V/F 2"-PW-A1-9403
I
S
SOV
V/F
2401
3
E
2401
V/F 3/4"
FC
V/F 3/4"
2403
2404
TREATED WATER TO
1"
3"x4"
F
SLOPS CAISSON DWG NO. 1123
NO POCKETS NOTE-8
FREE DRAINING
S S NC
FREE DRAINING
NC
NC
RECOVERED OIL TO
2"-P-A1-1098
2"
FREE DRAINING
1"x1'
1"x1"
345
345
PSV
4"
3"x4" LOW POINT
2402 PI
PI
2403
2404
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
M
Date
Description of revision
DD-MM-YY
3/4"
1/2"
3/4"
M
Company;
XI
M
VIETSOVPETRO
SYSTEM
B
ENGINEERS INDIA LIMITED
PUMP 1-P-452B START/STOP
NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
SAND JET CONNECTION
TO SLOPS CAISSON FREE DRAINING
2"-PW-A1-9402
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
DWG NO. 1123
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
1-P-452A/B
ITEM NO. : ITEM NAME : A
CAPACITY:
3
7
1
3
4
CONDENSATE RECOVERY PUMPS
Path\File name\Initials:
2.27 m3/hr
Document title:
276 KPa
DIFF. PRESS.:
15
14
13
12
11
10
9
8
7
5
0
6
5
4
DISTRIBUTION CODE:
Rev.
2
4
1
1
1
2
4
B
OILY WATER SEPARATOR
Company's document No.: Path\File name\Initials:
16
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
M
EIL
CONSORTIUM
Contractor:
XI 2401
START/STOP
EIL
ISH
PETECHIM/VIETSOPETRO
2402
PUMP 1-P-452A
CHEMICAL INJ.
E
V/F: TPS VENDOR SCOPE OF SUPPLY
DWG NO. 1012
PSV
2401
C
LEGEND:
BLACK COND. HOR.
2"-P-A1-1099
PRODUCED WATER FROM
2"-P-A1-1053
3"-PW-A1-9401
1-V-453
2"x4"
2" 3
CLOSED HEADER DRAIN
4"-DH-A1-2223
LSL
1:200
4"x3"
LV
4"x2"
LSH
300
LSLL-2406
2"-P-A1-1097
4"-P-A1-1123
NC FROM
V/F
DWG NO. 1006
BTL
FROM
STOP DUTY PUMP
1"x1/2"
I/P
LP SUCTION SCRUBBER (1-V-254)
FROM
MM
2401
LV-2401
DWG NO. 1137
I
POINT MM
1865
START DUTY PUMP
1/2"
NOTE-5
V/F
CLOSE
F
SET 1790
LAHH-2407
LAH
FI
2"-P-A1-1074E
REFER ENGINEERING SPECIALTIES
2401
3/4"
FROM 1-V-253E DWG NO. 1404
NO.
LALL-2408
2402
FLA
3/4"
INTER
LAL 2404
V/F
2"-P-A1-1162
V/F
TAG. LAH 2403
2402
LAL
V/F
INTERFACE
FROM 1-V-253D
I/P
LG 2406
CLOSE
2"-P-A1-1074C
LAH
S
V/F
FROM 1-V-253C
DWG NO. 1304
V/F
V/F
M
V/F
LALL 2408
LV-2402
DWG NO. 1204
I
LV-2402
SOV
V/F
2-"-P-A1-1100
2"-P-A1-1011
6"-VG-A1-2615
DWG NO. 1001
FREE DRAINING
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
OR
PROVIDED
IS
9. 1-V-453 CP TO HAVE SUITABLE SAFETY SIGN (380V).
2"-P-A1-1061
FROM 1-V-211A/B
D
BE
SHALL
TO ATM AT SAFE LOCATION
FROM 1-V-231 DWG NO. 1008
G
TO
FLOW TPS
7. PUMP 1-P-452A/B ARE DUTY/SPARE, START/STOP AND SELECTOR SWITCH (SS-2401) OF DUTY PUMP ARE ON THE LOCAL CONTROL PANEL (LCP).
INERT GAS
H
L
DELETED.
2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.
LV-0602
J
1
NOTES
6.
DWG NO. 1142
2
3
4
4"-FL-A1-2423
LP FLARE
K
DWG NO. 1135
DESIGN TEMP.:
6
7
1-V-453
Page(s) 37131124
16
15
14
13
12
9
10
11
L
8
7
6
5
2
3
4
1
NOTES
ITEM No.:
1-PK-461
ITEM NAME:
BFCC TYPE CHLORINE GENERATOR
CAPACITY
20 M3/HR 1379 kPa (g)
DESIGN PRESS. DESIGN TEMP.
1.
DELETED
2.
PIPPING
L FROM
PSV-2501
BY
CONTRACTOR
65 °C
TAG.
K
NO.
SET
POINT
K
15 M3/hr
FSL-2501
3"-SH-A5-8301
s
1.5"-SH-A5-8309
TO CAISSON OF FIRE WATER PUMP 1-P-481B DWG NO. 1130
J
J 1.5"-SH-A5-8308
TO CAISSON OF FIRE WATER PUMP 1-P-481A
1.5"-SH-A5-8303
TO CAISSON OF FIRE WATER PUMP 1-P-441B
DWG NO. 1129
I 1.5"-SH-A5-8302
TO CAISSON OF FIRE WATER PUMP 1-P-441A
DWG NO. 1122
TP2
H
H
3/4X1 1300
PSV
1-PK-461
2501
I
ESD SIGNAL
FROM PLC-1/2
FSL 2501
G
G
DC COPPER POWER OUTPUT(S) DC MMO POWER OUTPUT(S)
FAL XI
2501
2501
F
UA
1-PK-461 3"-WU-A5-4510
DWG NO. 1143
COMMON
F
ALARM
LOCAL CONTROL
TP1
UTILITY WATER
2501
PANEL
NEGATIVE DC RETURN
E
E NOTE-2 FOR DETAILS SEE BHPS P&ID NO. BA08-K-001
TP3
PACKAGE-UNIT
D
2"-DW-A1-2320
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
DWG NO. 1122
I
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
C
EIL
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
ODD
EIL
ISH
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
6
0
Rev.
2
4
1
1
1
2
5
B
Path\File name\Initials: A
Document title:
CHLORRINATION SYSTEM
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131125
16
15
3713-00-02-41-0110 &0111. 6. LSH-2612 IS MOUNTED ON CRANE-1 DIESEL TANK AND LSH-2613
TO CRANE-2 NOTE-8 NOTE-6
ODD
1"
V/F
NO
1"
LSHH
CSO
LAHH
2607
2607
2601
NC
1-F-471A
ST
LG
1-F-471B
ST
2602
2601
NO
V/F
2602
NO
CD 2601
2"-DH-A1-2226
1" 1"
G
1"
3/4"
NO
3/4"
1"
1"-DH-A1-2207
LI 2605
NC
1-T-471
2"-DH-A1-2205
4"-VG-A1-2627
G
TAG
SS TUBING
CONNECT HOSE
1-F-472B
LG
ST
2604
2604
NO
CD 2604
1"
SS TUBING
1"
3/4"
INST.
3/4"
3/4"
NC
1900
LALL-2609
150
2"-DF-A1-6209
LOW POINT
2607
A1 B1
3"x2"
3/4" STOP
PB 2601
XI
M
2601
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Date
Description of revision
PB
M
XI 2602
PB 2603
A1
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Limited
PETROVIETNAM GAS UTILISATION PROJECT CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
XI
Company's contract No.:
2603
SCALE
Type of document
CCP-WT/95
I
ESD
1-P-471A/B
ITEM No. A
16
14
13
12
11
8
7
3
4
7
0
Rev.
2
4
1
1
1
2
6
B
DIESEL STORAGE SYSTEM
Company's document No.:
400 kPa
9
1
Document title:
6.8 m3/hr
10
7
Path\File name\Initials:
TREATED DIESEL TRANSFER PUMP
400 kPa
15
3
ESD
6.8 m3/hr
CAPACITY DIFF. PRESS.
FROM LSLL-2610
1-P-472
UNTREATED DIESEL TRANSFER PUMPS
ITEM NAME.
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
LSHH-2609
COMPANY
CONSORTIUM
Project name:
M
EIL
PETECHIM/VIETSOPETRO
Basic Engineering:
FROM LSLL-2606
I
EIL
ISH
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
3/4" STOP
DWG NO. 1144
3
Contractor:
A1 B1
2602
DIESEL LINE
AS - BUILT
B1
3"x2"
A1 B1 STOP
F
14.3.97
Detailed Engineering:
3/4"
A1 B1
B
PI 2607 ST
1"x2"
1"x2"
1"x2"
A1 B1
3"x2"
BTL BTL
B
VIETSOVPETRO
PI 2604 ST 2606
FROM
E
DD-MM-YY
PI
MM
BTL BTL
FROM
2"-DF-A1-6217
Company;
2603
MM
BTL BTL
FROM FROM
DWG NO. 1137
NC
POINT
3"-DF-A1-6207
LAHH-2610
FROM FROM
MM MM
TO CDH
2"-DH-A1-2214
C ST
1800 300
POINT MM
MM
NO
1"
2"-DF-A1-6208
3"-DF-A1-6206
500
PDI-2601/02/05/06(MAX)
Rev.
2605
SET 9720
LALL-2606 LAL-2611
DRAIN
3/4"
D
NO.
LAHH-2607
LAH-2611
INST.
1"
NO
LOW
TO CDH
2"-DH-A1-2208
TO CDH
DWG NO. 1137
DRAIN
E
DWG NO. 1137
NO
3"-DF-A1-6214
DRIPLESS QUICK
V/F
DWG NO. 1144
1-P-472
NO
LALL
NOTE-1
DRIPLESS QUICK CONNECT HOSE
LINE
I TRIP
1"
TO BE PROVIDED AT BOAT LANDINGS
DIESEL GRAVITY
2"-DF-A1-2613
2606
2"-DF-A1-6211
REEL
1"
CSO LSLL
1"-DH-A1-2254
NORTH
EAST
HOSE
V/F
LAL
2610
2610
1"
2606
LI 2611
LAH
LSLL
LALL
2"
AT CELLAR DECK LEVEL
700
2604
I
NC
LT 2611
1E2
CASE
NO
1"
INST.
A/B
2612
1-T-472
2606
1-P-471A/B
NO
H
LG
2609
2609
PSV
1"
ODD
LSHH
LAHH
V/F
TRIP
SS TUBING
I
NO
1"
FIRE
LT 2605
TRIP
1-P-471A/B 1"
NO
CSO
DRAIN
1"x2"
4"-DW-A1-2329 1"
NOTE-4
CD 2602
2"-DH-A1-2205
LOCATE
1"
PDI
1"
NO
NC
M
I
2603
2"-DH-A1-2214
LG
8" MAN HOLE
CD
1"-DH-A1-2212
V/F
1"
2601
4"-DF-A1-6202
4"-DF-A1-6210
4"-DF-A1-6201
FE-2601
CRANE PEDESTAI
NO
1"
ST
2"-DF-A1-6216
NO
1"
V/F VENDOR FURNISHED
SAFE LOCATION
2604
NO
I
J LEGEND:
NO
1-F-472A
LG 2603
2602
1"
CSO
FT
2"
V/F HOOTER AT BOAT LANDING AND ALARM IN CPP2
2"-DF-A1-6217
PDI
V/F
V/F
TO ATM AT
2"-DF-A1-6212
2"-DH-A1-2214
PDI
PSV 2602
CSO
2"
2601
900
CASE
V/F
FDI 2601
1E2
FIRE
900 PSV 2601
CSO
H
1"
1"
2"-DH-A1-2211
FIRE CASE
NC
HOLES
6"-DW-A1-2340
1133
FROM RISER PLTF.
25 mm
4"-DF-A1-6205 4"-DF-A1-6204
ODD
4"-DF-A1-6203
4"-DF-A1-6219
1" CSO
3/4" CSO
OPEN DECK DRAINS.
V/F
2"
1"
CSC
F
700 PSV 2603
NOTE-2
6"-VG-A1-2626
TSV
1E2
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
6"-VG-A1-2625
VENT AT SAFE LOCATION
900
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
CASE CSO
NOTE-7
3/4x1
I
NOTE-5 NOTE-6
2601
8. CRANE DAY TANK SHALL HAVE OVERLOW LINES ROUTED TO
1E2
FIRE
1.5"x1" 2"x1.5
2"-DF-A1-6222
DWG NO. 1144
K
ON CRANE-2 DIESEL TANK, TO ALARM IN DCS 7. LOCATE VALVE AT CRANE DAY TANK NEAR CRANE PLATFORM.
1"-DH-A1-2210
DWG NO. 1140
PDI 2605
NOTE-7
1"-AU-A3-5227
V/F
2"-DF-A1-6215
UTILITY AIR
DIESEL
3. ONLY ONE CRANE PEDESTAL (i.e. CRANE-1) SHALL BE USED FOR STORING 4. LI SHOULD BE READABLE FROM CELLAR DECK LEVEL NEAR 1-P-471A/B 5. FOR GENERRAL NOTES REFER P&ID No.
2"x1.5"
NOTE-7
DIESEL
J
BY DECK CRANE FOR BOATS UNLOADING DURING ROUGH WEATHER 2. ALL FLAME ARRESTORS SHALL BE ACCESSIBLE FROM PLATFROM DECK
60°C
2"-DF-A1-6223
DWG NO. 1144
K
L
1. THIS HOSE REEL SHALL BE KEPT ON DECK AND SHALL BE ACCESSIBLE
1.5"x1"
1"-AU-A3-5226
DWG NO. 1140
1
NOTES:
1750mm(D) X 2250mm(H) FULL OF LIQ. + 150 mmWC/-50 mmWC VACUUM
60°C
2
3
4
TREATED DIESEL STORAGE TANK
6.8 m3/hr 700 kPa (g)
60°C
NOTE-7
UTILITY AIR
5
1-T-472
DIESEL FILTER COALESCER
13.0 m3
FULL OF LIQ. + 150 mmWC/-50 mmWC VACUUM
60°C
6
7
1-F-472A/B
DIESEL STORAGE (CRANE-1 PEDESTAL)
6.8 m3/hr 900 kPa (g)
DESIGN TEMP.
8
1-T-471
INLET FILTER COALESCER
CAPACITY/ZISE DESIGN PRESS.
9
10
11
1-F-471A/B
ITEM NAME.
L
12
13
14
ITEM No.
Path\File name\Initials:
6
5
4
DISTRIBUTION CODE:
Page(s) 37131126
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES: L
1.
(TYPICAL-ONE UNIT)
HOSE REEL
(NOTE-7)
EDUCTOR
K 11 "
11 "
2
2
11 "
2
2
OF
WATER
DELETED
3.
THE
2
2
THE
BE
HERE
L
IS
ACTUAL
&
ARRANGEMENT
BASED
ON
FINAL
WATER
HEADERS
FROM
DAMAGE
SHALL
EACH
OF
BE
HEADER
BOTH
LAID
TO
K
MINIMISE
HEADERS
DUE
TO
FIRE
MANUAL
THE
BYPASS
VALVE
ACCESSIBLE FROM
ASSOCIATED
SHOULD
AREA
THE
FIRE
SUCH IN
SPRINKLER
BE
LOCATED
THAT
THE
IT
AREA
IS
COVERED
SYSTEM.
227 LITERS
5.
PB-2701 SSD
(ZONE-2)
OF
&
2702
PANEL.
THEY
RESPECTIVE
ARE
LOCATED
SHALL
DELUGE
BE
J
IN
USED
FOR
OPENING
VALVES.
QTY: 1 UNIT
CSO
CSO
CSO
6.
DELETED
7.
DELETED
8.
FLUSH
9.
DELETED
LINES
10.
DELETED
11.
DELETED
12.
DELETED
SHALL
BE
LOCATED
AT
END
OF
HEADERS.
2
2
2
2
11 "-WF-A5-4265
11 "-WF-A5-4264
11 "-WF-A5-4263
11 "-WF-A5-4262
2
2
2
11 "-WF-A5-4267
2
DWG NO. 1129
DWG NO. 1129
FIRE WATER HEADER
DWG NO. 1130
14"-WF-A5-4203
FIRE WATER HEADER
NOTE-3
H
13. POV 2701/2702 HAVE A MANUAL SWITCH TO OPEN XV-2701/2
2
H
11 "-WF-A5-4266
2
DWG NO. 1129
11 "-WF-A5-4269
11 "-WF-A5-4268
DWG NO. 1129
11 "-WF-A5-4261
I 11 "-WF-A5-4260
I
DWG NO. 1128
14. ADEQUATE NO. OF ISOLATION VALVES SHALL BE PROVIDED IN NO
NOTE-15
HOSE
PI
2702
I
2702
FLUSH LINES TO SEA
CHARGER PANEL
PSL
PI
2704
PLC-1
FUSIBLE PLUG
I
I
2706
(NOTE-8)
SOV
SOV
2701
2703
2701
NOTE-13
14"x12" 14" NOTE-4
XV
POV
SOV
SOV
FMR
IAS
TAG
2702
2704
2702
PAL
FMR
IAS
PLC-1
PAL
D
PSL
2701
BE
LOCATED
SET
PSH
PI
2704
2703
POINT
B
14.3.97
AS - BUILT
2
20.11.96
REVISED AS MARKED.
1
26.3.96
REVISED AS PER HAZOP COMMENTS
SA
PSH
PI
2708
2707
PAH 2708
RB
PH PH
0
9.2.96
APPROVED FOR ENGINEERING
VP
RB
C
6.2.96
REVISED AND ISSUED FOR APPROVAL
VP
RB
B
9.1.96
VP
RB
A
19.12.95
REVISED AS PER COMMENTS AND ISSUED FOR APPROVAL
RLT
ISSUED FOR COMMENTS
Date
Description of revision
SP
TYP. NOTE-1
LOC
JUY
RB
EIL
EIL
WORLEY
SHI
COMPANY
PETECHIM/VIETSOPETRO CONSORTIUM
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
SPRINKLER LOOP
10"-WF-A5-4256
VP
& ISSUED FOR APPROVAL
VIETSOVPETRO
SPRINKLER LOOP
ISH
SDH
ZSC 2702
2702
Contractor:
B
F
E
10"-WF-A5-4256
NOTE-1
NORMALLY
200 kpa(g) 200 kpa(g)
PAL-2704
Company;
SP
AND
450 kpa(g) 450 kpa(g)
PAL-2702 NOTE-4
DD-MM-YY
TYP.
ACCESSIBLE
200 kpa(g) 200 kpa(g)
PAH-2705
10"
Rev.
C
IN
G
NO
2705
PAH
OR
ZSO
ZIC
2701
2704
WATER
ZONE
2702
2702
ZSC
ZIC
SHALL
PAH-2704
I 2701
FIRE
ANY
FMR
ZIO
2705
2701
I PSL
FOR
FO
14"x12"
ZSO
ZIO 2701
AREA
EFFECTING
AREA.
PAL-2705
XV
FO
2701
SAFE
WITHOUT
2702
FMR
E
NORMALLY
ISOLATION
PAL-2701
NOTE-13
2701
AND
CSO
2702
2701
POV
LOOP
REEL.
ST-1272
PB
SP
VALVE SAFE
NOTE:5
PB
SP
CSO
I
NOTE:5
15.
10"-WF-A5-4259
2704
PLC-2
CSO
ST-1271
I
10"-WF-A5-4258
PAL
PLC-2
CSC
CSO
DWG NO. 1128
IAS
CHARGER PANEL
PLC-1
IAS
FUSIBLE PLUG
I
14"-WF-A5-4257
2702
PLC-2
PSL
F
14"-WF-A5-4256
PAL
PLC-2
CSC
14"-WF-A5-4224
DWG NO. 1130
G
14"-WF-A5-4204
FIRE WATER HEADER
ACCESSIBLE
STANDBY FIRE WATER HEADER
14"-WF-A5-4221
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
CSO
FIRE
EASILY
BY
FOAM
CELLAR DECK
QTY: 3 UNIT
CSO
SHALL
THE
SIZES
TANK
227 LITERS
(ZONE-1)
QTY: 1 UNIT
SHOWN
DECK.
LINE
CONCENTRATE
TANK
CELLAR DECK
TANK 227 LITERS
JACKET LEVEL
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
2
CONCENTRATE
CONCENTRATE
J
LOOPS
SEPARATED
PROTECTED
11 "
FOAM
FOAM
EACH
2
2
IN 11 "
TWO
WIDELY
SIMULTANEOUS
4.
11 "
FIRE
ARRANGEMENT
FOR
SPRINKLERS.
4"
11 "
11 "
2
OF
2.
FILL VENT
3/4"
4"
11 "
11 "
2
SYSTEM
INDICATIVE
NUMBER
EQUIPMENT LAYOUT
EDUCTOR
FILL VENT
3/4"
4"
11 "
11 "
2
HOSE REEL
EDUCTOR
FILL VENT
3/4"
DELUGE
ONLY
PACKAGED UNIT HOSE REEL
THE
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
FUSIBLE PLUG
FUSIBLE PLUG
LOOP
LOOP
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3 2" FLUSH CONN.
A
16
15
14
13
11
10
9
4
8
0
Path\File name\Initials: 8
Rev.
2
4
1
1
1
2
7
B
F.W.DISTBN. SYSTEM FOR CELLAR DECK & JACKET LEVEL
Company's document No.:
(ZONE-2) 12
3
Document title:
CELLAR DECK
(ZONE-1)
1
Path\File name\Initials:
2" FLUSH CONN.
CELLAR DECK & JACKET LEVLE
7
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131127
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES: L
(TYPICAL-ONE UNIT)
(TYPICAL-ONE UNIT)
(TYPICAL-ONE UNIT)
(TYPICAL-ONE UNIT)
1.
(TYPICAL-ONE UNIT)
(NOTE-7)
HOSE REEL
HOSE REEL
EDUCTOR
EDUCTOR
K
FILL VENT
3/4" NC
11 2
11 "
HOSE REEL
"
EDUCTOR
FILL VENT
3/4"
4"
11 "
NC
2
11 2
11 "
2
HOSE REEL
"
FILL VENT
3/4"
4"
11 "
NC
2
11 2
11 "
2
HOSE REEL
EDUCTOR
"
3/4"
4"
11 "
NC
2
11 2
11 "
2
"
11 2
2
"
11 2
11 "
FOAM
2
2
CONCENTRATE TANK
TANK
THE
4.
FILL VENT
"
CSO
CSO
CSO
CSO
CSO
CSO
CSO
EASILY
CONCENTRATE
CSO
6.
TANK
TANK
CSO
7.
227 LITERS
COOLER DECK
8.
CSO
THE
BASED
ON
&
2802 THEY
FIRE
L
FINAL
SUCH
DELUGE
MINIMISE DUE
TO
FIRE
K
LOCATED IT
AREA
IS
COVERED
SYSTEM.
LOCATED BE
BE
THAT
THE
SPRINKLER
ARE SHALL
LAID
TO
HEADERS
SHOULD
IN
BE
HEADER
BOTH
AREA
THE
SHALL
EACH
OF
VALVE
ASSOCIATED
IN
USED
FOR
OPENING
VALVES.
DELETED FLUSH
J
LINES
TOP
9.
DELETED DELETED
11.
DELETED
12.
DELETED
SHALL
BE
LOCATED
AT
END
OF
HEADERS.
DECK.
ACCESSIBLE
STANDBY HOSE 15.
AND
LOOP
NORMALLY
ISOLATION
SAFE
WITHOUT
AREA
FOR
EFFECTING
FIRE
ANY
I
WATER
ZONE
OR
REEL.
GRIDDED ONLY
WET
SPRINKLER
INDICATIVE
FOR
SYSTEM
ROOMS
IN
ARRANGEMENT MIDDLE
DECK
SHOWN
HERE
IS
CONSIDERING
AS ORDINARY HAZARD. NUMBER OF SPRINKLERS, LINE SIZES
2
2
IS
ARRANGEMENT
14. ADEQUATE NO. OF ISOLATION VALVES SHALL BE PROVIDED
11 "-WF-A5-4212
11 "-WF-A5-4211
2
2
HEADERS
FROM
BYPASS
FROM
PANEL
10.
&
DWG NO. 1129
ARRANGEMENT
OF
FIRE
WATER
LOOPS
SHALL
BE
BASED
ON
FINAL EQUIPMENT LAYOUT.
H DWG NO. 1127
BE
HERE
ACTUAL
&
13. POV 2801/2 HAVE A MANUAL SWITCH TO OPEN XV-2801/2
CSO
11 "-WF-A5-4210
11 "-WF-A5-4209
2
2
11 "-WF-A5-4280
11 "-WF-A5-4279
2
2
11 "-WF-A5-4278
11 "-WF-A5-4277
2
2
2
2
11 "-WF-A5-4276
11 "-WF-A5-4275
11 "-WF-A5-4274
11 "-WF-A5-4273
2
2
11 "-WF-A5-4272
11 "-WF-A5-4271
2
2
11 "-WF-A5-4286
2
11 "-WF-A5-4285
2
11 "-WF-A5-4284
11 "-WF-A5-4283
2
2
11 "-WF-A5-4282
11 "-WF-A5-4281
2
2
11 "-WF-A5-4292
11 "-WF-A5-4291
2
2
11 "-WF-A5-4290
2
2
11 "-WF-A5-4289
11 "-WF-A5-4287
DWG NO. 1129
SHOWN THE
SIZES
DELETED
IN
DWG NO. 1129
DECK.
LINE
SHALL
DAMAGE
RESPECTIVE
ON
QTY: 2 UNIT
CSO
WATER
ACCESSIBLE
PB-2801
OF
FOAM
I 11 "-WF-A5-4288
14"-WF-A5-4203
FIRE WATER HEADER
16.
NOTE-3
VALVE SAFE
SHALL
BE
LOCATED
IN
ACCESSIBLE
AND
H
NORMALLY
AREA.
NO NOTE-16
PI
2802
2802
I
I
CSO
ST-1281
PSL
PI
2804
2807
I
I
CSO
SOV
SOV
2803
2801
FMR
8" NOTE-4
XV
POV
SOV
SOV
2802
2804
2802
NOTE-13
PLC-1
ZIO
FMR
FMR
IAS
NC
2810
FMR
NC
D
ZSO
PAL
2801
2806
PLC-1
4"-WF-A5-4294
4"-WF-A5-4293
3"-WF-A5-4239
200 kpa(g) 200 kpa(g)
NO FLOW INDICATION
FS 2810
E LEGEND:
WATER
PSH
PI 2804
ALARM
B
14.3.97
AS - BUILT
2
20.11.96
REVISED AS MARKED.
SA
SDH
1
26.3.96
HAZOP COMMENTS INCORP. 4
VP
RB
PH PH
PI
2802
2802
2810
PAH 2809
PSH
PI
2809
2808
& ISSUED FOR APPROVAL 0
9.2.96
APPROVED FOR ENGINEERING
VP
RB
C
6.2.96
REVISED AND ISSUED FOR APPROVAL
VP
RB
B
9.1.96
A
19.12.95
Rev.
COMMENTS INCORPORATED
VP
AND ISSUED FOR APPROVAL ISSUED FOR COMMENTS
Date
Description of revision
DD-MM-YY
Company;
C
NOTE-1
TYP.
SP
NOTE-15
FUSIBLE PLUG
FUSIBLE PLUG
LOOP
LOOP
RB
RLT
RB
EIL
EIL
WORLEY
SHI
COMPANY
CONSORTIUM BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
WET SPRINKLER LOOP
SPRINKLER LOOP
B
SPRINKLER LOOP
NOTE-1
SP
TYP.
LOC
JUY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
Contractor:
SP
ISH
ZSC
ZIC
2804
FLOW
2802
2806
TYP.
F
ZSO
ZIO 2802
PSL
2801
PAH
6.8 M3/HR
PAL-2802
(NOTE-8)
I
2801
2804
450 kpa(g) 450 kpa(g)
FA-2810
PAL-2804
8"
ZSC
ZIC 2801
PAH-2809
PROCESS PLC
FO
I PSL
FA
NOTE-4
8"
2801
200 kpa(g) 200 kpa(g)
PAH-2804
CSC
G
POINT
FLOW/
8"
XV 2802
FO
PAL
SET
PAL-2806
FLUSH LINES TO SEA
CONNECTION
NO
PAL-2801
2802
NOTE-13
E
2801
CSC
PB
SP
2801
IAS
CSO
1.5" DRAIN
2801
POV
CSO
NOTE:5
PB
2801
CSO
TAG
ST-1282
NOTE:5 SP
3"-WF-A5-4232
CHARGER PANEL
8"-WF-A5-4298
IAS
I
FUSIBLE PLUG
PLC-1
PSL
F
CSO
PAL 2804
PLC-2
PLC-2
I
PLC-1
CHARGER PANEL
PLC-2
FUSIBLE PLUG
8"-WF-A5-4296
PAL 2802
PLC-2
8"-WF-A5-4297
14"-WF-A5-4204
FIRE WATER HEADER
8"-WF-A5-4295
DWG NO. 1127
G
IAS
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
CSO
FIRE
MANUAL
SSD
2
QTY: 2 UNITS
EACH
LOOPS
SEPARATED
PROTECTED
2
227 LITERS
QTY: 3 UNITS
QTY: 3 UNITS
THE IN
4"
11 "
11 "
MAIN UPPER DECK
TWO
WIDELY
CONCENTRATE
TANK
ARRANGEMENT
FOR
SPRINKLERS.
SIMULTANEOUS
FOAM
227 LITERS
MAIN DECK
MEZZANINE DECK
QTY: 3 UNITS
2
CONCENTRATE
227 LITERS
MIDDLE DECK
WATER
FIRE
BY
11 "
FOAM
CONCENTRATE
227 LITERS
J
2
FOAM
OF
3.
2
11 "
OF
DELETED
5. 11 "
SYSTEM
INDICATIVE
EQUIPMENT LAYOUT
3/4"
4"
11 "
DELUGE
NUMBER
2.
EDUCTOR
FILL VENT
THE
ONLY
PACKAGED UNIT
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3 2" FLUSH CONNECTION
7
1
3
Document title:
A
MAIN UPPER DECK
15
14
13
12
11
10
9
8
0
Rev.
2
4
1
1
1
2
8
B
F.W.DISTBN. SYSTEM FOR MAIN DECK AND OTHER DECKS
Company's document No.:
MIDDLE DECK
Path\File name\Initials:
16
8
Path\File name\Initials:
2" FLUSH CONNECTION
MAIN. MEZZANINE & MIDDLE DECK
4
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131128
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES: ITEM No. L
ITEM NAME:
1-P-481A
1-PK-481A
FIRE WATER PUMP
FIRE WATER PUMP-A PACKAGE
CAPACITY: m3/hr: DISCH. PRESS. Kpa(g): (AT CELLAR DECK)
L
1. THE TWO FIRE WATER HEADERS SHALL BE LAID OUT WIDELY SEPARATED FROM EACH OTHER TO AVOID
710
SIMULTANEOUS DAMAGE OF BOTH THE HEADERS DUE TO FIRE
1060 TO PLC-1
TO PLC-2 2. INDICATING TYPE BUTTERFLY VALVE SHALL BE PROVIDED.
I
I
3. LINE FOR INJECTING COPPER- CHLORINE SOLUTION INTO FIRE WATER PUMP
SHALL BE PROTECTED AGAINST MECHANICAL
DAMAGE LANDING AT BOAT LANDING AREA.
2909
4. LOCATE PAL-2908 & PAL-2909 IN SSD PANEL.
2907
NC
NOTE-7
PSL
PSL
2908
2909
7. ON PSL ACTUATION DUTY FIRE WATER PUMP STARTS IN CASE DUTY FIRE WATER PUMP FAILS TO START
NOTE-7
STANDBY PUMP STARTS.
DUTY / STANDBY SELECTOR FOR FIRE WATER PUMP
1 1/2"-WF-A5-4260 CSO
2"
1 1/2"-WF-A5-4262
CSO
2"
2"
SHALL BE LOCATED IN SSD PANEL.
CSO
2"
2"
8. PROVIDE A SEAL BY ENSURING THE BOTTOM OF THE SEAL
2"
14"-WF-A5-4203
FIRE WATER HEADER
14"-WF-A5-4204
FIRE WATER HEADER
14"-WF-A5-4214
11. PROVIDE FLOW ORFICE & DOWN STREAM GLOBE VALVE ON
NO
NO
APPROACHABLE AREA. 15. PIPE TO BE SLOPED DOWNWARD TOWARDS OPEN END AND CUT AT 45 IN HORIZONTAL PLANE TO PROVIDE
8"-EX-A6-4336
1" NO
2901
14"
14"-WF-A5-4205
PSV 2902
8"-WF-A5-4215
V/F
START
START
10"x8"
ARV
V/F
PACKAGE UNIT LIMIT
EXPANSION
I
PUMP START
V/F
1-PK-481A
PB
DAY TANK
12"x14"
TP13
TP1
I
3"-WF-A5-4212
FAIL TO START
(NOTE-7)
TP2
TP6
TP21
TP4
FAIL TO START
XA
TP5
2902
TAG NO
SET POINT
PAL-2908/09
600 kPa (g)
F
ODD
NC
ODD
C
VENDOR
SIGNALS
TO
LCR
E B
14.3.97
AS - BUILT
2
20.11.96
REVISED AS MARIKED
1
0
28.3.96
AND ISSUED FOR APPROVAL
COMMENTS FROM SHI INCORP.
6.2.96
COMMENTS FROM COMPANY INCORP.
8.1.96
PH
RB
PH
27.12.95
COMMENTS FROM M/S SHI INCORREVISED & ISSUED FOR APPROVAL
B
15.12.95
REVISED & ISSUED FOR APPROVAL
RLT
22.11.89
ISSUED FOR COMMENTS
VP
Date
NL/SS
Description of revision
Company;
EIL
LOC
JUY
RB
RB
RB
RLT
PORATED & REISSUED FOR APPROVAL
DD-MM-YY
AC RB
EIL
WORLEY
SHI
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor: ODD
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
TO CDH
2"-DH-A1-2272
RB
VP
22.12.95
A
1.5"-SH-A5-8308
VP
C
Rev.
OVER BOARD
SDH
VP
AND ISSUED FOR APPROVAL
ISH
SA
VP
AND ISSUED FOR APPROVAL
E
D
HOZOP COMMENTS INCORPORATED
APPROVED FOR ENGINEERING
9.2.96
F
1"-DF-A1-4244
FI 2902
1"-DF-A1-4233
NOTE-6
HOLD:
12 mm SS TUBING
EL (+) 0
3/4"-DH-A1-2279
1.5"-DH-A1-2278
LO
(NOTE-3)
G
DWG NO. 1144
NOTE-22
TP9
DWG NO. 1125
TP14
2902
1-PK-481A
SEE SPP DRG. NO: E15831/03
1.5"-SH-A5-8308
DIESEL SUPPLY
NOTE-17
NOTE-10
E
COPPER CHLORINE SOLUTION
1.5"-DF-A1-6220
TP16
22. 250# ON PUMP TO BE MATED WITH 150# FLANCE ON PIPING (V/F).
ATM
NOTE-19
10"-WF-A5-4206
OVER BOARD
A TIME DELAY OF 1 MINUITE.
TP10
2"-WF-A5-4207
(+ 5500mm)
HEADER THE STANDBY FIRE WATER PUMP SHALL START AFTER
2901A
( NOTE 12, 14, 16, 18 & 21)
JOINT
2901
V/F
BEING PUT ON MANUAL 21. IN CASE THE LOW PRESSURE PERSISTS IN THE FIRE WATER
FLA
TP12
8"
PCV
20. INTERLOCK SHOULD BE PROVIDED TO PREVENT BOTH PUMPS
PUMP ON MANUAL
V/F
CSO
2901
19. DELETED
2901
2902
H
BETWEEN A & B FIRE WATER PUMPS.
2903
PB
XI
LOCATION
TP15
CSO
SET @
1060 kPa(g)
XA
PIPE TO SAFE
14"-WF-A5-4201
1379
NOTE-6
F
18. PROVIDE FACILITY FOR INTERCHANGING OF AUTO START
NOTE-15
TP20
8"x8"
WEATHER PROTECTION.
17. TANK LEVEL GAUGE TO BE VISIBLE FROM THIS VALVE.
1"-DH-A1-2281
8"-WF-A5-4208
G
NOTE-20
16. PUMP SHALL STOP MANUALLY
ARRESTOR
CSC FE 2901
I
SILENCER/
NOTE-11
I
13. DELETED
CSC
500mm
H
CHARGE ACCUMULATOR AND AUTO CHARGING FACILITY.
DWG NO. 1128
14. FIRE WATER PUMP SHALL BE LOCATED IN SAFE AND EASILY
12mm SS TUBING
14"
12. IN ADDITION TO BATTERY STARTING, DIESEL ENGINE SHALL BE DISIGNED WITH HYDRAULIC STARTING SYSTEM INCLUDING
1 1/2"-WF-A5-4287
NOTE-8
FI
HORIZONTAL RUN DWG NO. 1127
PIPING INST.
TP11
DWG NO. 1130
10. TEST FIRE WATER PUMP START (SIMULATING FSD LOOP LOSS OF SIGNAL) WITHOUT ACTULLY CAUSING FSD.
1.5"-DH-A1-2282
2"-WU-A5-4509
1-P-481B
D
9. DELETED
DWG NO. 1130
1 1/2"-WF-A5-4266
1"-DH-A1-2280
UTILITY WATER HEADER
2"
1"-DF-A1-4233
2"
CSD
1"-DF-A1-4244
1 1/2"-WF-A5-4291
J
PIPE IS MINIMUM 500mm HIGHER THAN TOP OF HDR. PIPE. DWG NO. 1130
1 1/2"-WF-A5-4289
CSO
DWG NO. 1143
K
6. LOCATE AT CELLAR DECK.
NOTE-4
NOTE-2
DWG NO. 1128
NOTE-4
NC
NOTE-2
DWG NO. 1127
DWG NO. 1128
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
2908
PT
1 1/2"-WF-A5-4269
NOTE-2
DWG NO. 1127
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
2907
5. DELETED
NOTE-2
DWG NO. 1127
I
PAL
8"-WF-A5-4237
DWG NO. 1133
J
PAL
TO/FROM RISER PLATFROM
14"-WF-A5-4202
K
PI
Detailed Engineering:
DWG NO. 1130
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
EL (-) 14.000mm (MIN.)
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
8
0
Rev.
2
4
1
1
1
2
9
B
Path\File name\Initials: A
Document title:
FIRE WATER PUMP SYSTEM - PUMP A
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131129
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES: ITEM No. L
ITEM NAME:
1-P-481B
1-PK-481B
FIRE WATER PUMP
FIRE WATER PUMP-B PACKAGE
CAPACITY: m3/hr: DISCH. PRESS. Kpa(g): (AT CELLAR DECK)
L
1. THE TWO FIRE WATER HEADERS SHALL BE LAID OUT WIDELY SEPARATED FROM EACH OTHER TO AVOID
710
SIMULTANEOUS DAMAGE OF BOTH THE HEADERS DUE TO FIRE
1060
2. INDICATING TYPE BUTTERFLY VALVE SHALL BE PROVIDED. 3. LINE FOR INJECTING COPPER- CHLORINE SOLUTION INTO FIRE WATER PUMP
SHALL BE PROTECTED AGAINST MECHANICAL
DAMAGE LANDING AT BOAT LANDING AREA. 4. DELETED
K
K
5. DELETED 6. LOCATE AT CELLAR DECK.
7. IN CASE DUTY PUMP FAILS TO START, STANDBY PUMP START,
DUTY / STANDBY SELECTOR FOR FIRE WATER PUMP DWG NO. 1129
FIRE WATER HEADER
14"-WF-A5-4203
(NOTE-1) FIRE WATER HEADER
FIRE WATER HEADER
14"-WF-A5-4204
(NOTE-1) FIRE WATER HEADER
SHALL BE LOCATED IN SSD PANEL. DWG NO. 1127 8. DELETED
J
DWG NO. 1127
10. TEST FIRE WATER PUMP START (SIMULATING FSD LOOP LOSS OF SIGNAL) WITHOUT ACTULLY CAUSING FSD. 11. DELETED
12. IN ADDITION TO BATTERY STARTING, DIESEL ENGINE SHALL BE DISIGNED WITH HYDRAULIC STARTING SYSTEM INCLUDING
NO
NO
CHARGE ACCUMULATOR AND AUTO CHARGING FACILITY.
NOTE-2
NOTE-2
I
I
13. DELETED PIPING
14. FIRE WATER PUMP SHALL BE LOCATED IN SAFE AND EASILY
INST.
APPROACHABLE AREA. 15. PIPE TO BE SLOPED DOWNWARD TO OPEN END AND CUT AT 45 IN HORIZONTAL PLANE TO PROVIDE
8"-EX-A6-4240
12mm SS TUBING
1" NO
H
8"x8" 1379
NOTE-6 PSV
START
START
20. INTERLOCK SHOULD BE PROVIDED TO PREVENT BOTH PUMPS
PUMP ON MANUAL
BEING PUT ON MANUAL
V/F
TP20
PACKAGE UNIT LIMIT
EXPANSION
21. IN CASE THE LOW PRESSURE PERSISTS IN THE FIRE WATER
FLA
V/F
HEADER THE STANDBY FIRE WATER PUMP SHALL START AFTER
2901B
A TIME DELAY OF 1 MINUITE.
( NOTE 12, 14, 16, 18 & 21)
JOINT
I
PUMP START
1.5"-DF-A1-6221
TP16
FROM SSD PLC
DIESEL SUPPLY
ARV
NOTE-10
V/F
3001
DAY TANK
12"x14"
TP1
ODD
NOTE-22
I
3"-WF-A5-4243
E
F
TP13
ATM
NOTE-19
10"-WF-A5-4246
TP14
3002
1-PK-481B
2"-WF-A5-4247
V/F
1-PK-481B
PB
1.5"-DH-A1-2277
10"x8"
PCV
HOLD:
FAIL TO START
(NOTE-7)
TP4
XA
TP5
3002
FI 3002
NC
ODD
C
1"-DF-A1-4218
NOTE-6
(NOTE-3)
1"-DF-A1-4219
DWG NO. 1125
TO
B
14.3.97
AS - BUILT
2
20.11.96
REVISED AS MARIKED
1
0
28.3.96
LCR
AND ISSUED FOR APPROVAL
COMMENTS FROM SHI INCORP.
6.2.96
COMMENTS FROM COMPANY INCORP.
8.1.96
VP
RB
PH
VP
RB
PH
27.12.95
COMMENTS FROM M/S SHI INCOR-
C
22.12.95
REVISED & ISSUED FOR APPROVAL
B
15.12.95
REVISED & ISSUED FOR APPROVAL
RLT
22.11.89
ISSUED FOR COMMENTS
VP
A
Rev.
Date
NL/SS
Description of revision
Company;
EIL
LOC
JUY
RB
RB
RB
RLT
PORATED & REISSUED FOR APPROVAL
DD-MM-YY
AC RB
EIL
WORLEY
SHI
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
OVER BOARD
SDH
VP
AND ISSUED FOR APPROVAL
ISH
SA
VP
AND ISSUED FOR APPROVAL
E
D
HOZOP COMMENTS INCORPORATED
APPROVED FOR ENGINEERING
9.2.96
F
12 mm SS TUBING
EL (+) 0 1.5"-SH-A5-8309
3/4"-DH-A1-2273
1.5"-DH-A1-2274
FAIL TO START
1"-DH-A1-2276
TP21
1"-DH-A1-2275
TP6
1"-DF-A1-4219
TP2
SIGNALS
E 1"-DF-A1-4218
TP9
VENDOR
LO
SEE SPP DRG. NO: E15831/03
COPPER CHLORINE SOLUTION
G
8"-WF-A5-4241
3001
D
22. 250# ON PUMP TO BE MATED WITH 150# FLANCE ON PIPING (V/F).
DWG NO. 1144
(NOTE-22)
CSO
8"
19. DELETED
3001
3002
H
BETWEEN A & B FIRE WATER PUMPS.
3003
PB
XI
LOCATION
TP12
1060 kPa(g)
XA
PIPE TO SAFE
NOTE-17
3002
V/F SET @
F
18. PROVIDE FACILITY FOR INTERCHANGING OF AUTO START
NOTE-15
TP15
CSO
WEATHER PROTECTION.
17. TANK LEVEL GAUGE TO BE VISIBLE FROM THIS VALVE.
ARRESTOR
14"-WF-A5-4241
G
NOTE-20
16. PUMP SHALL STOP MANUALLY
SILENCER/
14"-WF-A5-4214
I
TP11
1-P-481A DWG NO. 1129
8"-WF-A5-4248
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
J
9. DELETED
14"-WF-A5-4242
DWG NO. 1129
CONSORTIUM
Contractor: ODD
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
1.5"-SH-A5-8309
Detailed Engineering:
2"-DH-A1-2272
DWG NO. 1129
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
EL (-) 14.000mm (MIN.)
TO CDH
2"-DH-A1-2272
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
DWG NO. 1137
B
Worley
Basic Engineering:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
8
0
Rev.
2
4
1
1
1
3
0
B
Path\File name\Initials: A
Document title:
FIRE WATER PUMP SYSTEM - PUMP B
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131130
16
15
12
13
14
8
SUCTION : 180°C, DISCH.: 180°C
L
1. DELETED
610mm ID x 1436mm(T/T) 3600 kPa (g)
180°C
1
NOTES:
FG RECEIVER
BY VENDOR
3600 kPa (g)
2
3
4
1-V-501
FG COMPRESSOR AFTER COOLER
3650 Kg/hr DIFF. PRESS. 2250 kPa
DISIGN TEMP.
5
1-E-344
FUEL GAS BOOSTER COMPRESSOR
CAPACITY DISIGN PRESS.
6
7
1-K-501
ITEM NAME:
L
9
10
11
ITEM NO.:
2. DELETED 3. DELETED
180°C
4. DELETED
TO SAFE LOCATION
5. DELETED
1"
6. DELETED
1"-VG-A1-2622
K
K 7. ALL FIELD INST. WITHIN THE SKID LIMITS ARE IN VENDOR SCOPE OF SUPPLY. DCS INST. ARE NOT IN VENDOR SCOPE.
8. REFER NOTE-41 OF LEGEND P&ID NO. 3713-00-02-41-0110 & 0111 FOR SOV ASSEMBLY DETAILS.
7
6
NOTE-11
I/P
J
PY
REFER NUOVO PIGNONE
2"-SV-A1-2532
1"-A1-A3-5115
NOTE-8
PALL 3105
SOV 3101
H
TRIP 1-K-501
ZSC 3101
XV
PDI
3101
3104
PI
PSLL
3101
3105
3/4" NC
OVERHEAD (1-V-211A) 4"-FG-B1-6301-IE
DWG NO. 1001
TI 3101
3/4"
2"-FG-B1-6323
NC
2"-FG-B1-6321-IS
TSHH
3104
M
TRIP SIGNAL
3/4"x1" 300mmH20
3101
200mm H20
3300 kPa(g)
LSHH-3121
530 mm FROM BTL
LSL-3121
220 mm FROM BTL
PDI-3104(MAX)
75 kPa(g)
H
DWG NO. 1146
FROM LSL-3121
3103
TRIP 1-K-501
I
PAHH
TAHH
LSL
3104
3102
LAL
3121
3121
I
S
IAS
LCP
RO 3122
RO PCV
3121
TRIP 1-K-501
I
3121 SOV
3121
I CLOSE XV-3121
3121
3
3121
TRIP 1-K-501
I
E
DWG NO. 1056
PSLL
START/STOP
PI 3121
G
LAHH
3121
3121
LC
3102
I
I
1-V-501
XI
M
DWG NO. 1142
PALL
LO
50mm H2O
PAH-3102
CONDITIONING SKID
3121
3121
HP FLARE
170C
PALL-3121
2
3"
XI
SET@
1"-N-A1-6414
TAHH-3102
TO FG
1-E-344
LG
PI
3102
TRIP 1-K-501
I
PSV
INERT GAS
3102
LSHH PSHH
1-K-501
F
PAHH-3104
PT
3/4"
3/4"
TI 3103
ATM
SET POINT
700 kPa(g) 3500 kPa(g)
PALL-3105
3"-FG-B1-6322
ST-3101
G
2"
B1
TS
FC
1
COMP. VENT
ZSO
3/4"
CSO
A1
I
IAS
3101
3101
B1
S
FROM HP SEP. OVHD
I TAG NO
PSV
A1
ZIC 3101
3/4"
3475
3121
RO
4
2"-FG-B1-6366
3101
3/4"
1"x2"
F
START-UP SEAL GAS
ZIO
FO
1.5F2
CSO
ESD/LCP
11. VENT FOR UNLOADING VALVES AND DISTANCE PIECE.
1"
LO
1"x4"
1.5"x2"
I
1"-VG-A1-2622
UCP
I
I
1"x1/2"
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
I
UCP
10. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111
2"-FG-B1-6326
FOR SKID DETAILS
110
3102
3102
A1 B1
4"-FG-A1-6326
2"-FG-B1-6325
DWG NO. 1140
J
PAH
PIC
3102 PV
P&ID NO. N.SOP52606/2 AND N.SOP52607/2
1"x1/2"
INST. AIR
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
9. DELETED .
HOLD: 1-E-344
E
DUTY.
3101
DWG NO. 1135
4"-FL-A1-2431
XV
LV
3121
3121
5 FC
D
TRIP 1-K-501
I
LOCAL
I
CONTROL PANEL CLOSE XV-3101
FC
3/4"
3/4"
1"
TRIP 1-E--344 MOTOR
1-K-501
I
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
A
31.8.95
WORLEY
SHI
Rev.
TITLE BLOCK DWEEL & ISSUED FOR COMMENTSGB/NL
ISH
SS/AC
ISSUED FOR KICK OFF MEETING
Date
Description of revision
DD-MM-YY
Company;
C
EIL
EIL
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
I
B
I
FROM
ESD FROM
LSHH-0105
PLC-1/2
LSHH-0113
UA
USD
3101
3102
COMMON
COMMON
Company's contract No.:
3101
SCALE
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
PSHH-4603 LSHH-3102
3
PSLL-4606 PSLL-3121
7
1
3
5
0
0
Document title:
Path\File name\Initials: 14
13
12
4
1
1
1
3
1
B
FUEL GAS BOOSTER COMPRESSOR
Company's document No.:
15
Rev.
2
Path\File name\Initials:
A
16
Type of document
CCP-WT/95
STOP
LSHH-4602
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
TRIP ALARM
PB
PSLL-3105 PSHH-3104 TSHH-3102
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
M/C PARAMETER M/C PARAMETER PRE-ALARM
Worley
Basic Engineering:
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131131
16
15
13
14
12
11
10
9
8
6
7
5
2
3
4
1
L
L
NOTES
1.
DELETED.
2. DELETED.
K
K
3. FOR GENERAL NOTES REFER P&ID NO. 3713-02-00-41-0110 & 0111. 4.
INSULATION
GASKET
SHALL
BE
PROVIDE
ON
THE
FIRST
FLANGE
ON
THE CCP PLATFORM/BRIDGE FOR ALL LINES IN ORDER TO ENSURE ELECTRICAL
DISCONTINUITY
BETWEEN
RISER
PLATFORM
AND
CCP.
5. VALVES TO BE INSTALLED ON RISER PLATFORM PIPING.
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
J
J
I
HP GAS
30"-P-B1-1001
LP GAS
16"-P-A1-1052
LIFT GAS
12"-P-E1-1077
LIFT GAS
12"-P-E1-1079
PIPELINE GAS
15"-P-E1-1076
BLACK CONDENSATE
3"-P-A1-1090
FIRE FIGHTING WATER
8"-WF-A5-4237
FUEL GAS
6"-FG-B1-6340
DIEZEL FUEL
4"-DF-A1-6219
CORROSION INHIBITOR
2"-C-A1-8117
POTABLE WATER
2"-WP-A4-4301
INST. AIR
2"-N-A3-5130
CLOSED DRAIN
2"-P-A1-1096
INERT GAS
2"-N-A1-6417
NOTE-5
NOTE-5
H
I DWG NO. 1001
DWG NO. 1006
DWG NO. 1011
DWG NO. 1011
H
NOTE-5
DWG NO. 1011
DWG NO. 1012
4"x3"
G
RISER
DWG NO. 1129
DWG NO. 1134
G
COMPRESSION PLATFORM
8"x6" DWG NO. 1126
PLATFORM
CCP DWG NO. 1148
3"x2" DWG NO. 1143
F
F DWG NO. 1140
DWG NO. 1123
4"x2"
E
HOLD
DWG NO. 1142
3"x2"
:-
TIE-IN WHITE CONDENSATE
4"-P-B1-
DETAILS
AND
E
NO.
DWG NO. 1008
D
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
C
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
0
0
0
Rev.
2
4
1
1
1
3
3
B
Path\File name\Initials: A
Document title:
BRIDGE INTERCONNECTIONS
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131133
16
15
12
13
14
8
6
7
5
2
3
4
PSV
4"-SV-A1-2558
2H3 1800
L
DWG NO. 1136
HP FLARE
4"-SV-A1-2557
DWG NO. 1456
HP COMP. TRAIN-"E"
TO 1-DGT-253E
HP COMP. TRAIN-"D"
TO 1-DGT-253D
DWG NO. 1256
HP COMP. TRAIN-"C"
TO 1-DGT-253C
DWG NO. 1156
HP COMP. TRAIN-"B"
TO 1-DGT-253B
DWG NO. 1056
K
HP COMP. TRAIN-"A"
TO 1-DGT-253A
°
4"-FL-A1-2443
200 C
HP FLARE
BY VENDOR
3450 KPa (g)
DESIGN TEMP.
NOTES
1.
2"-FG-B1-6338
FUEL GAS EXPORT METERING SYSTEM
SIZE DESIGN PRESS.
DWG NO. 1135
ITEM NAME:
2H3 1800
DELETED.
2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.
3401
DONE BY "SHI".
3402
4. REFER NOTE 40 OF LEGEND P&ID NO. 3713-00-02-41-0110 AND 3713
3"-FG-B1-6318
3"-FG-B1-6317
3"-FG-B1-6334-IE
3"-FG-B1-6333-IE
3"-FG-B1-6332-IE
B1
CSO
2"
3/4"
3/4"
CSC
B1
NO POCKETS
PY
PIC
3405
3405
PAH PAL PT
PV
3405
3405
1.5"
ASSEMBLY.
SET POINT
PAH-3405
1700 kPa(g)
PAL-3405
1300 kPa(g)
FAH-3401
210000NCMD
J
HP FUEL GAS HEADER
I
PI 3406
G
2"-FG-B1-6337-IE
H
DWG NO. 1338
TO 1-PK-501A
2"
TO 1-PK-501C
2"-FG-B1-6335-IE
6"-FG-B1-6340-IE
SOV
NO POCKETS
3/4"
2"-FG-B1-6336-IE
FC
3/4"
DWG NO. 1238
3"-FG-B1-6315-IE
OF
TAG NO:
8"-FG-B1-6310-IE
3"-FG-B1-6316
I/P
DETAILS
2"
3"
TOL
FOR
A1
FUTURE
I
H
A1
3"
TO 1-PK-501B
10"x8"
CSO
FUTURE
DWG NO. 1138
TOL
3"-FG-B1-6331-IE
3"-FG-B1-6330-IE HP FUEL GAS
2"-FG-A1-6343
FOR END HEADER PURGING
2"-FG-A1-6344
FOR END HEADER PURGING
2"-FG-A1-6346
TO FLARE PILOT SYSTEM
4"-FG-A1-6309
LP FUEL GAS HEADER
2"-FG-A1-6320A
TO DEHYDRATION-"A"
DWG NO. 1135
DWG NO. 1136
G
HP FUEL GAS DWG NO. 1147
DWG NO. 1121
F
F
DWG NO. 1010
2"-FG-A1-6320B
TO DEHYDRATION-"B"
LP FLARE
DWG NO. 1135
E VENDOR
FURNISHED
(NOTE-3)
A1
1-PK-267 S
(NOTE-3)
1"-P-B1-1163-IE
ESD
CSC
STRAIGHTENING
I
VANES
C
1"-FL-B1-2437
DRAWING NO. 3713-26-02-41-1011
1"-FL-B1-2438
D
LEGEND:
B1 REFER DETAIL-A
SS TUBING
LP FLARE
E
DWG NO. 1135
DWG NO. 1110
1"-FL-A1-2444
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
J
CSO
K
3. ALL ITEMS ARE SUPPLIED LOOSE BY METERING VENDOR ASSEMBLY TO BE
PSV
-00-02-41-0111
DWG NO. 1147
1
1-PK-267
DWG NO. 1356
L
9
10
11
ITEM No.:
6"-FG-B1-6339-IE NOTE-4 SOV
FE
3/4"
3401
3401 FT
PT
TT
TI
PI
3401
3401
3401
3402
3402
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
S
ZIC
ZIO
3401
3401
Date
Description of revision
DD-MM-YY
Company;
IAS
NO
B
VIETSOVPETRO
FX
CHROMATOGRAPH
3401
(P&ID NO. 1011)
FQ
FI
3401
3401
FAH
3/4"
XV
HIGH POINT
B
STRAIGHTENING VANES
FE
FT
PT
TT
TI
PI
3402
3403
3403
3404
3404
ZSO 3401
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
DWG NO. 1133
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
FC
LOW POINT
Worley
Basic Engineering:
DRAIN
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CSC NO
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
3402
SCALE
Type of document
CCP-WT/95
6"-FG-B1-6340-IE
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3/4"
3
1-PK-267
COMPANY
CONSORTIUM
Contractor: TO RISER PLTF.
6"-FG-B1-6340
3/4"
NC
ZSC 3401
3401
EIL
PETECHIM/VIETSOPETRO
NO
FROM GAS
EIL
ISH
7
1
3
2
6
0
Rev.
2
4
1
1
1
3
4
B
Path\File name\Initials: A
Document title:
HP & LP
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
FUEL GAS DISTRIBUTION SYSTEM
Page(s) 37131134
DWG NO. 1134
B
A DWG NO. 1136
DWG NO. 1136
1ST STAGE LIQUID HDR
DWG NO. 1136
DWG NO. 1136
16 15
C
FUEL GAS
2"-FG-A1-6343
LOW TEMP. FLARE HEADER
(FROM MAIN & MIDDLE DECK) 6"-FL-A1-2462
(FROM MAIN DECK) 6"-FL-A17-2464
VENT HEADER
(FROM MAIN DECK) 2"-FL-A1-2445
(FROM MAIN & MIDDLE DECK) 4"-VG-A1-2621
14 13
12 11
10 DWG NO. 1012
9 8 7
6 DWG NO. 1012
DWG NO. 1009
3/4"-FL-A1-2472
10"-FL-A1-2425
6"-FL-A17-2464 NOTE-3
5 10"-FL-A1-2416
DWG NO. 1011
DWG NO. 1146
FROM PSV-4601A/4601B
DWG NO. 1146
FROM 1-V-342
DWG NO. 1147
FROM XBDV-4603
DWG NO. 1131
FROM FG COMPRESSOR SKID
DWG NO. 1001
FROM PSV-0103/0104
DWG NO. 1134
FROM PSV-3401/02
DWG NO. 1124
FROM 1-V-451
DWG NO. 1147
FROM FG SKID
DWG NO. 1010
GLYCOL REGEN SKID TRAIN "A"
DWG NO. 1010
GLYCOL REGEN SKID TRAIN "A"
DWG NO. 1134
SAMPLE POINT
DWG NO. 1147
FROM PSV-4706/4707
DWG NO. 1109
SAMPLE POINT
DWG NO. 1009
SAMPLE POINT
DWG NO. 1007
FROM PSV-0703/0704
DWG NO. 1134
FROM 1-PK-267
DWG NO. 1110
GLYCOL REGEN SKID TRAIN "B"
DWG NO. 1009
FROM PSV-0905A/0906A
DWG NO. 1109
FROM PSV-0905B/0906B
DWG NO. 1110
GLYCOL REGEN SKID TRAIN "B"
6
2"-P-A1-1091
2"-FL-A1-2452
4"-FL-A1-2431
6"-FL-A1-2403
4"-FL-A1-2443
H
6"-FL-A1-2417
6"-FL-A1-2415B
4"-FL-A1-2423
1.5"-FL-A1-2455
DWG NO. 1002 SAMPLE POINT
7
FROM XBDV-0902
DWG NO. 1109
6"-FL-A1-2415A
6"-FL-A1-2402
2"-FL-A1-2401
6"-FL-A1-2414A
4"-FL-A1-2439A
1"-FL-A1-2444
4"-FL-A1-2457
DWG NO. 1006 SAMPLE POINT
8
FROM PSV-0901B/0902B
DWG NO. 1009
FROM PSV-0901A/0902A
DWG NO. 1001
FROM PSV-0101/0102
DWG NO. 1001
BLOWDOWN
1"-FL-A1-2429
6"-FL-A1-2416
3"-FL-A1-2405
DWG NO. 1002
FROM PSV-0603/0604
9
FROM LP GAS
DWG NO. 1011
FROM 1-PK-262
DWG NO. 1008
FROM PSV-0803-/0804
DWG NO. 1001
BLOWDOWN
1"-FL-A1-2427
1.5"-FL-A1-2411
1"-FL-A1-2446B
1"-FL-A1-2446A
DWG NO. 1007
FROM 1-PK-266
10
FROM 1-V-211A/B
DWG NO. 1011
FROM 1-PK-261
DWG NO. 1002
30"-P-B1-1007
8"-FL-A1-2471
3"-FL-A1-2412
1"-FL-A1-2438
4"-FL-A1-2439B
6"-FL-A1-2436A
6"-FL-A1-2436B
6"-FL-A1-2414B
1"-FL-A1-2435
1"-FL-A1-2432
8"-FL-A1-2424
1"-FL-A1-2420
DWG NO. 1006
FROM PSV-0701/0702
11
FROM PSV-1201
DWG NO. 1009
1"-FL-A17-8225
2"-P-A17-1143B
2"-P-A17-1143A
2"-FL-A17-2468
3"-FL-A17-2469
8"-FL-A1-2413
FROM SAMPLE VENT
DWG NO. 1006
FROM PSV-0601/02
12
FROM 16"-P-E1-1076
DWG NO. 1109
FROM 1-T-311B
3503
1"-FL-A1-2470
8"-FL-A1-2410
K
DWG NO. 1009
3502
13
FROM 1-T-311A
3501
DWG NO. 1011
FI
FROM XBDV-1105
FI
DWG NO. 1011
FI
2"-FL-A17-2467
1"-FG-A1-6360
1"-FG-A1-6352
14
FROM XBDV-1106
E 1"-FG-A1-6351
G
DWG NO. 1011
D
15
FROM XBDV-1104
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
16 5 4
10"-FL-A1-2426 NOTE-3
VENT HEADER DWG NO. 1121
4
3
1.
Rev.
3 7 1
2
DD-MM-YY
B 14.3.97 AS - BUILT
3 20.11.96 REVISRD AS MARKED SA SDH
2 20.3.96 APPROVED FOR CONSTRUCTION MSP AC PH JUY LOC
1 7.2.96 APPROVED BY COMPANY FOR ENGG. MSP GRR PH JUY LOC
0 10.1.96 APPROVED FOR ENGG. MSP GRR
E 03.11.95
ISSUED FOR COMPANY'S APPROVAL GRR SS
D 15.10.95
ISSUED FOR CLIENT'S APPROVAL GRR SS
C 25.9.95 ISSUED FOR PRELIMINARY HAZOPS
NL/SS AC
B 11.9.95 TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A 31.8.95 ISSUED FOR KICK OFF MEETING
WORLEY SHI
Date
Company;
Contractor: VIETSOVPETRO
Detailed Engineering:
HP FLARE HEADER
Project name:
Company's contract No.:
CCP-WT/95 3
DISTRIBUTION CODE:
3
Document title:
Path\File name\Initials:
6 0
Company's document No.: 37131135
2
1
L
NOTES L
2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.
DELETED.
3. THESE CONNECTIONS SHOULD BE AS CLOSE TO 1-V-361 AS POSSIBLE.
Description of revision EIL
Basic Engineering:
4 1
EIL
Contractor's document identification:
SCALE
1 1 3 5
K
J J
I I
H
LP HEADER
HP HEADER
DWG NO. 1117
G
LOW TEMP. FLARE HEADER
DWG NO. 1117
DWG NO. 1117
F F
A17
A1
E
ISH
PETECHIM/VIETSOPETRO
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
CONSORTIUM
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
PETROVIETNAM GAS UTILISATION PROJECT
Worley
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Limited
PIPING & INSTRUMENTATION DIAGRAM
Type of document Rev.
Path\File name\Initials:
B
FLARE DISTRIBUTION-II (CELLAR DECK) Page(s)
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
L
L
FUTURE
COMPRESSOR
TRAINS.
DWG NO. 1003
1-V-251A
K
3. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.
2"-P-A1-1029A
DWG NO. 1203
1-V-251B
DWG NO. 1103
2"-P-A1-1029B
DWG NO. 1303
1-V-251C
2"-P-A1-1029C
DWG NO. 1403
1-V-251E
1-V-251D
2"-P-A1-1029D
2"-P-A1-1068
2"-P-A1-1029E
DWG NO. 1008
FROM 1-V-232
DWG NO. 1004
FROM PSV-0401A/0402A
DWG NO. 1004
6"-FL-A1-2408A
3"-FL-A1-2407A
DWG NO. 1003
FROM PSV-0403A/0404A
FROM PSV-0301A/0302A
4"-FL-A1-2406A
6"-FL-A1-2409
DWG NO. 1008
FROM PSV-0801/0802
DWG NO. 1104
DWG NO. 1104
FROM PSV-0401B/0402B
3"-FL-A1-2407B
DWG NO. 1103
FROM PSV-0403B/0404B
6"-FL-A1-2408B
FROM PSV-0301B/0302B
4"-FL-A1-2406B
DWG NO. 1204
DWG NO. 1204
FROM PSV-0401C/0402C
3"-FL-A1-2407C
DWG NO. 1203
FROM PSV-0403C/0404C
6"-FL-A1-2408C
FROM PSV-0301C/0302C
4"-FL-A1-2406C
DWG NO. 1304
DWG NO. 1304
FROM PSV-0401D/0402D
3"-FL-A1-2407D
DWG NO. 1303
FROM PSV-0403D/0404D
6"-FL-A1-2408D
FROM PSV-0301D/0302D
4"-FL-A1-2406D
DWG NO. 1404
DWG NO. 1404
FROM PSV-0401E/0402E
3"-FL-A1-2407E
DWG NO. 1403
FROM PSV-0403E/0404E
6"-FL-A1-2408E
FROM PSV-0301E/0302E
4"-FL-A1-2406E
6"-FL-A17-2408
FOR
2. DELETED.
J
I
6"
6"
H
1.
6"
6"
6"
6"
6"
LOW TEMP. FLARE HEADER
(MAIN DECK)
MIN.
H
HP FLARE HEADER
(MAIN DECK)
MIN.
NOTE-1
2"
1ST STAGE LIQUID HDR
A17 NOTE-1
A1
2"-FL-A1-2445
DWG NO. 1135
6"-FL-A1-2462
6"-FL-A17-2463
4"-VG-A1-2634
2"-FG-A1-6344
1"-FG-A1-6354
FUEL GAS
FROM
FI 3603
1"-FG-A1-6359
F
DWG NO. 1134
FI 3604
DWG NO. 1005
G 8"-P-E1-1038A/B/C/D/E
G
F
LOW TEMP. FLARE HEADER DWG NO. 1135
E
E
HP FLARE HEADER MIN.
DWG NO. 1135 VENT HEADER
4"-VG-A1-2621
VENT HEADER
DWG NO. 1135
(MAIN DECK)
D
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
FI
C
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
3605 VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
B
INERT GAS
1"-N-A1-6423
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
J
I
DWG NO. 1134
8"-FG-B1-6310
2"-FG-A1-6338
K
DWG NO. 1005
& FROM XBDV-0511
FROM XBDV-0510A/B/C/D/E
NOTES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
DWG NO. 1142
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
3
6
0
Rev.
2
4
1
1
1
3
6
B
Path\File name\Initials: A
Document title:
FLARE DISTRIBUTION-I (MAIN DECK & MIDDLE DECK)
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131136
16 15 14 13
12 11
10
9 8 7 2"-DH-A1-2232
DWG NO. 1008
4"-DH-A1-2223
6 DWG NO. 1117
FROM 1-V-362
MAIN DECK UPPER LEVEL
DWG NO. 1117
FROM 1-V-361
2"-DH-A1-2253
DWG NO. 1146
FR FG SKID
2"-DH-A1-2214
J SS TUBING
INST. DRAIN
2"-DH-A1-2250
2"-DH-A1-2203E
2"-DH-A1-2202E
2"-DH-A1-2203D
2"-DH-A1-2202D
2"-DH-A1-2203C
2"-DH-A1-2202C
DWG NO. 1303
DWG NO. 1153
FROM 1-T-356
DWG NO. 1404
FROM 1-V-253E
DWG NO. 1404
FROM 1-V-252E
DWG NO. 1304
FROM 1-V-253D
DWG NO. 1304
FROM 1-V-252D
DWG NO. 1204
FROM 1-V-253C
DWG NO. 1204
FROM 1-V-252C
DWG NO. 1104
FROM 1-V-253B
DWG NO. 1104
FROM 1-V-252B
DWG NO. 1004
FROM 1-V-253A
DWG NO. 1004
FROM 1-V-252A
DWG NO. 1126
FROM 1-T-471
DWG NO. 1456
HP COMP TRAIN 'E'
DWG NO. 1403
FROM 1-V-251E
DWG NO. 1356
HP COMP TRAIN 'D'
7
2"-DH-A1-2253
2"-DH-A1-2252
DWG NO. 1139
FROM 1-PK-502
2"-DH-A1-2222
DWG NO. 1126
FROM 1-V-231
1"-DH-A1-2228
2"-DH-A1-2229C
(FUTURE)
FROM 1-T-472
2"-DH-A1-2233
DWG NO. 1006
FROM 1-K-251
DWG NO. 1338
FROM 1-PK-501C
2"-DH-A1-2203B
2"-DH-A1-2202B
DWG NO. 1256
FROM 1-V-251D
8
DWG NO. 1007
2"-DH-A1-2236B
2"-DH-A1-2229B
2"-DH-A1-2203A
DWG NO. 1203
HP COMP TRAIN 'C'
9
FROM 1-T-231
DWG NO. 1410
FROM GDU TR-'B'
DWG NO. 1238
FROM 1-PK-501B
2"-DH-A1-2229A
2"-DH-A1-2202A
2"-DH-A1-2208
DWG NO. 1156
FROM 1-V-251C
10
DWG NO. 1210
2"-DH-A1-2236A
DWG NO. 1138
(FUTURE)
DWG NO. 1001
FROM 30"-P-B1-1001
2"-DH-A1-2240
FROM 1-PK-501A
1.5"-DH-A1-2246
1:200
DWG NO. 1012
FROM 1-PK-265
1:200
3/4"-DH-A1-2245
DWG NO. 1012
FROM 1-PK-264(RUN-2)
DWG NO. 1012
FROM 1-PK-264(RUN-1)
2"-DH-A1-2269E
2"-DH-A1-2201E
2"-DH-A1-2269D
2"-DH-A1-2201D
2"-DH-A1-2269C
2"-DH-A1-2201C
DWG NO. 1103
HP COMP TRAIN 'B'
11
FROM GDU TR-'A'
1"-DH-A1-2251
3/4"-DH-A1-2244
3/4"-DH-A1-2243
DWG NO. 1012
FROM 1-PK-263(RUN-2)
MAIN DECK LOWER LEVEL
3/4"-DH-A1-2242
DWG NO. 1012
FROM 1-PK-263(RUN-1)
1"-DH-A1-2263C
1"-DH-A1-2263B
2"-DH-A1-2228
3/4"-DH-A1-2247
DWG NO. 1338
FROMM 1-PK-501C
DWG NO. 1238
1"-DH-A1-2263A
DWG NO. 1056
FROM 1-V-251B
12
DWG NO. 1008
2"-DH-A1-2205
FROMM 1-PK-501B
DWG NO. 1138
FROMM 1-PK-501A
2"-DH-A1-2269B
2"-DH-A1-2201B
2"-DH-A1-2269A
HP COMP TRAIN 'A'
DWG NO. 1003
FROM 1-V-251A
13
FROM 1-P-231A/B/C
DWG NO. 1126
CLOSED DRAIN HEADER FROM CELLAR DECK
FROM 1-F-471A/B
2"-DH-A1-2206
DWG NO. 1109
FROMM 1-T-311B
DWG NO. 1008
FROMM 1-T-311A
CLOSED DRAIN HEADER FROM MIDDLE DECK
2"-DH-A1-2235B
2"-DH-A1-2235A
DWG NO. 1130
2"-DH-A1-2201A
14
DWG NO. 1149
2"-DH-A1-2204
2"-DH-A1-2213
FW PUMP(1-PK-481A/B)
15
FROM 1-T-355
DWG NO. 1116
FROM 1-T-352
DWG NO. 1148
2"-DH-A1-2272
G
FROM 1-T-353
2"-DH-A1-2227
1.5"-DH-A1-2234
L
DWG NO. 1150
DWG NO. 1006
16"-P-A1-1052
(FUTURE)
FROM 1-T-351
3"-DH-A1-2217
F
DWG NO. 1001
FROM 1-V-211B
D 3"-DH-A1-2216
E
DWG NO. 1001
FROM 1-V-211A
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
16 6 5
1:200
5
4
1:200
4"-DH-A1-2223
B
A
4
3
Rev.
A
DD-MM-YY
B 14.3.97 AS - BUILT
3 20.11.96 REVISRD AS MARKED
2 20.3.96 APPROVED FOR CONSTRUCTION MSP AC PH JUY LOC
1 7.1.96 APPROVED BY COMPANY FOR ENGG. MSP GRR PH JUY LOC
0 10.1.96 APPROVED FOR ENGG. MSP GRR
B 3.11.95
ISSUED FOR COMPANY'S APPROVAL GRR SS
WORLEY SHI
3
15.10.95
C
7 1
2
Date
Company;
Contractor: VIETSOVPETRO
Detailed Engineering:
Project name:
Company's contract No.:
CCP-WT/95 3
DISTRIBUTION CODE:
4
Document title:
Path\File name\Initials:
5 0
Company's document No.: 37131137
2
1
NOTES:
1. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.
L
K K
J
2"-DH-A1-2241
(FUTURE)
I 1:200
I
H H
4"x2"
TO TILTING PLATE
SEPARATOR (1-V-453) DWG NO. 1124
G
F
1:200
E
SA
Basic Engineering:
4
SDH
ISSUED FOR CLIENT'S APPROVAL NL
Description of revision EIL
1
EIL
SCALE
1
ISH
PETECHIM/VIETSOPETRO
Contractor's document identification:
1 3 7
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
CONSORTIUM
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
PETROVIETNAM GAS UTILISATION PROJECT
Worley
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Limited
PIPING & INSTRUMENTATION DIAGRAM
Type of document Rev.
Path\File name\Initials:
B
CLOSED DRAIN HEADER SYSTEM
Page(s)
16
15
12
13
14
L
HX901A-1/2
ITEM NAME
6
7
5
1
NOTES:
L
1. QUICK CLOSING VALVE AT ACCESSIBLE LOCATION.
2.8 MW
176°C
DESIGN TEMP.
2
3
4
POWER GENERATOR
2068 kPa (g)
DESIGN PRESS.
8
1-PK-501A
LUBE OIL COOLERS
DUTY
9
10
11
ITEM NO.
2. DRAWING HAS BEEN REVISED. 1-PK-501B AND 1-PK-501C ARE ON P&ID NO. 3713-50-02-41-1238 AND 3713-50-02-41-1338 RESPECTIVELY. 3. UCP LOCATED IN LCR. 4. PIPES ARE ACID CLEANED.
K
K VENT TO SAFE LOCATION
HX901A-2 2"-LO-A10-9513A
2"-LO-A10-9512A NOTE-4
FA-901A
NOTE-4
FLA 901A
V/F
J
J
M 4"x6"
4"-VG-A1-2650A
M
33
34
3
B149531
B149531
B149531
SHT 5
SHT 5
SHT 5
H
FSA-901A
I
EXHAUST DUCT AIR INTAKE
FUEL GAS PILOT VENT
NOTE-4
I
DUCT
1 AN-0002 276
NOTE-1
FUEL GAS DWG NO. 1134
2"-FG-B1-6335-IE
NOTE-4
20
V/F
G
SHT 6 B149532
1-PK-501A
OUTSIDE
INSIDE
TURBINE
TURBINE
ROOM
ROOM
H
B149532
FS-931A
SHT 6
30
3/4"-VG-A1-2651A
G
TURBINE
GEN
F
F ESD SIGNAL FROM
PLC-1/2 I
RUNNING INDICATION
SHT 3
50061-B149531 SHT 1-5 LUBE OIL SYSTEM 50061-B149532 SHT 1-6 GAS FUEL SYSTEM
V/F
50061-AN-0002 SHT 1-2 EXHAUST SYSTEM
3801A
CO2 SYSTEM
B149776
REFER SOLAR P&ID's:
UCP 1-PK-501A
XI
3/4"-C-A3-8135A
97
NOTE-3
V/F
1/2"-C-A3-8136A
98
50061-B149536 SHT 1-4 HYDRAULIC START SYSTEM 50061-B149776 SHT 1-11 MECHANICAL INSTALLTION
E
LEGEND:
E
V/F
SHT 5 25
B149532
B149532
B149536
SHT 6
SHT 6
SHT 4
B149531 SHT 5
SHT 6
22
19
65
25
21
LUBE OIL
126
B149532
3/4"
WATER WASH CONN.
RESERVOIR DRAIN
HYDRAULIC STARTER
1"-DH-A1-2263A
TANK DRAIN
COMBUSTOR DRAINS
3/4"-DH-A1-2262A
ENGINE EXHAUST COLLECTOR &
ENGINE AIR
INLET DUCT DRAIN
1"-DH-A1-2261A
LUBE OIL DRAIN
3/4"-DH-A1-2260A
3/4"-DH-A1-2259A
ODD
LUBE OIL FILTER DRAIN
2"
ODD
C
FURNISHED
VENDOR B149531
126
2"-DW-A1-2324A
D
VENDOR
B149776 SHT 3
2"-DW-A1-2322A
126
2"-DW-A1-2323A
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
NOTE-4
4"-VG-A1-2650A
2"-LO-A10-9511A
2"-LO-A10-9510A
V/F
LUBE OIL TANK VENT
HX901A-1
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev. ODD
Date
Description of revision
DD-MM-YY
Company; VIETSOVPETRO
COMPANY
CONSORTIUM BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
DWG NO. 1137
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
TO CDH
2"-DH-A1-2229A
EIL
PETECHIM/VIETSOPETRO
Contractor:
TO CDH
EIL
ISH
Worley
Basic Engineering:
DWG NO. 1137
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
5
0
0
Rev.
2
4
1
1
1
3
8
B
Path\File name\Initials: A
Document title:
POWER GENERATOR- 'A'
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131138
16
15
14
12
13
L
9
10
11
ITEM NO. :
8
6
7
5
ITEM NAME :
1
NOTES: L
MERCENCY GENERATOR
CAPACITY
2
3
4
1-PK-502
1.
1000 KW
FOR &
EXHAUST TO SAFE LOCATION
GENERAL
DELETED
3.
DELETED
4.
DELETED
5. 6.
K
NOTES
REFER
P&ID
3713-00-02-41-0110
3713-00-02-41-0111
2.
TANK
LEVEL
CAUSE
EMERGENCY MAIN
TO
BE
GENERATOR
POWER
VISIBLE
SHALL
FROM
START
THIS
VALVE.
AUTOMATICALLY
ON
FAILURE
K
SUPPLY.
8"-EX-A6-3601-IH
OF
J
J
REFER P&ID
MUSTANG
NO.
POWER
11316C01
SYSTEMS
FOR
TIE-IN
DETAILS & OUTLET/INSTALLATION NO.
11316A01
I
I
6"-WC-A1-9505
104 6"x5"
12"x8"
SILENCER AND SPARK
6"-WC-A1-9504
H
6"x5"
6"x5"
ARRESTOR
104
H
12" EXHAUST FLEX
6"x5"
1-PK-502 LOCAL PANEL
GEN.
M
G
STOP
I
DIESEL
TRIP ON LEVEL-1 SHUTDOWN
FROM PLC-1/2
ENGINE
G XI 3901
RUNNING INDICATION
DAY TANK
F
DIESEL OVERFLOW DRAIN
F
LEGEND:
LUBE OIL DRAIN
DIESEL TANK DRAIN
E
H
G
I
J
K
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
C
3.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
29.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
WORLEY
SHI
B A
1.5"-DW-A1-2327
Rev.
DIESEL DWG NO. 1144
ODD
1"-DF-A1-6218
Date
Description of revision
DD-MM-YY
1"-DW-A1-2326
2"-DH-A1-2258
Company; 1"-DH-A1-2257
C
E
VENDOOR
D
NOTE-5
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
DWG.
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
ODD
TO CDH
2"-DH-AI-2258
Worley
Basic Engineering:
DWG NO. 1137
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
5
0
0
Rev.
2
4
1
1
1
3
9
B
Path\File name\Initials: A
Document title:
EMERGENCY GENERATOR
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131139
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES 1.
L
2.
DELETED FOR &
L
GENERAL
NOTES
REFER
P&ID
NO.
3713-00-02-41-0110
0111
3. REQUIRED NUMBER OF 3/4" INSTRUMENT TAP POINTS SHALL AS
PER
INST.
HOOK-UP
DRAWING.
HP COMP. TRAIN - 'E'
DWG NO. 1456
J
1"-AI-A3-5116E
HP COMP. TRAIN - 'D'
DWG NO. 1356
1"-AI-A3-5116D
HP COMP. TRAIN - 'C'
DWG NO. 1256
1"-AI-A3-5116C
HP COMP. TRAIN - 'B'
DWG NO. 1156
1"-AI-A3-5116B
HP COMP. TRAIN - 'A'
DWG NO. 1056
TO 1-M-381
DWG NO. 1121
1"-AI-A3-5116A
1"-AI-A3-5113
1"-AI-A3-5114
TO 1-K-251
DWG NO. 1155
GLYCOL REGEN. SKID TRAIN -'B'
DWG NO. 1510
1"-AI-A3-5117B
DWG NO. 1310
1"-AI-A3-5117A
1"-AI-A3-5115
TO 1-K-501
DWG NO. 1131
DWG NO. 1120
INERT GAS SYSTEM
2"-AI-A3-5107
1"-AI-A3-5111
INERT GAS SYSTEM
DWG NO. 1147
3/4"-AI-A3-5120
I
PROVIDED
K
I
(FUTURE)
(FUTURE)
NOTE 3
3/4"
3"-AI-A3-5116
SS. TUBING
H
INSTRUMENT AIR
DWG NO. 1133
H
2"-AU-A3-5211
UTILITY AIR DWG NO. 1119
1"-AU-A3-5264/5265
1"-AU-A3-5256
F 1"-AU-A3-5257
1"-AU-A3-5252
1"-AU-A3-5258/5259/5260
2"-AU-A3-5245
1"-AU-A3-5225
1"-AU-A3-5261
1"-AU-A3-5226
1"-AU-A3-5224
F
1"-AU-A3-5227
G
1"-AU-A3-5262/5263
G
TO FROM RISER PLTF.
2"-AI-A3-5130 CSC
3"-AI-A3-5106
DWG NO. 1119
1"-AU-A3-5251/5253/5254/5255
D
& 1-P-357 A~F
DECK
TO 1-P-356 A~F
MEZZANINE
1"
DWG NO. 1153
(2NOS)
DWG NO. 1155
ZONE-1
(4NOS)
1"
TO 1-K-251
CELLAR DECK
ZONE-1
TO CRANE-2
CELLAR DECK
DWG NO. 1126
1"
TO CRANE-1
1"
DWG NO. 1126
E
DWG NO. 1141
E
TO 1-PK-511
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
J
DWG NO. 1120
K
GLYCOL REGEN. SKID TRAIN - 'A'
BE
1"
1"
1"
1"
MIDDLE DECK
DRUM STORAGE
MAIN DECK
CELLAR DECK
CELLAR DECK
(3NOS)
AREA
ZONE-2
ZONE-2
SAFE AREA
(2NOS)
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
C
3.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
29.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
WORLEY
SHI
B A
Rev.
Date
Description of revision
DD-MM-YY
Company;
C
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
1
0
Rev.
2
4
1
1
1
4
0
B
Path\File name\Initials: A
INST./UTILITY AIR DIDTRIBUTION
Document title:
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131140
16
15
12
13
14
8
6
7
5
3028 L/day
CAPACITY
1
NOTES
SEWAGE TREATMENT UNIT
ITEM NAME :
2
3
4
12"-MAX. LENGHT
2"-VG-A1-2636
L
9
10
11
1-PK-511
ITEM NO. :
L
1. FOR GENERAL NOTES REFER P&ID 3713-00-02-41-0110 & 0111 2. VENT LINE FROM SEWAGE TREATMENT UNIT SHALL BE ROUTED TO AVOID DENOXIOUS DOOURS ON DECK 3. DELETED 4. DELETED
1.5"x2"
5. OUTLET TO BE MINIMUM 10M FROM FIRE WATER/UTILITY WATER INTAKES. 6. EJECTOR TO BE AT LEAST 20FT (6M) ABOVE TOP OF 1-PK-511
K
K
7. VENT TO BE AT LEAST 10FT (3.05M) ABOVE TOP OF SUGRE TANK V-1 UTILITY AIR
DWG NO. 1140
EJECTOR
1"-AU-A3-5224
V/F
1"x1/4"
J
2"-VG-A1-2644
NOTE-2.7
E REFER
I
P&ID
ELTECH
NO.
INTERNATIONAL
6MC-F-01.
FOR
CORPORATION
DETAILS
I
2"
2"
H
H
1 1/2"
UR
2"
G
UR
WC
WC
K2
LCP
2"
WC
2"
G 4"-SW-A8-4401
1-PK-511 F
ALARM
1
CELL
F
HIGHT LEVEL
TSH
LSH 2
PUMP ON RO
LSH
1
1
J1
E 4"-SW-A8-4401
TOILET WASTE SLOPE 20:1000
4" NO
1 1/2"
2"x4"
E
PUMP OFF LSL
A
1
NC NC
V-2
D NC
DWG NO. 1143
UYILITY WATER
1"x1/2"
V-1 MACERATOR
1 1/2" P
1"-WU-A5-4514
S
3"
EFFLUENT TANK
N
SURGE TANK
1 1/2"
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
B
3.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GB
GRR
WORLEY
SHI
A
NO
Rev.
3"
Date
Description of revision
DD-MM-YY
Company;
3"
C R
EIL
COMPANY
CONSORTIUM
Contractor:
D
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
H
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
SLOPE 20:1000
4"-SW-A8-4403
3"-SW-A8-4405
Worley
Basic Engineering:
NC
V-1 DRAIN
3"
NC
BYPASS
1"-SW-A8-4404
B
3"
NC
V-2 DRAIN
3"
2"-SW-A8-4406
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
J
2"-VG-A1-2620
J2
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
NOTE-6
2"x1/2"
V-1 VENT
V-2 VENT
2"-VG-A1-2643
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification: EMERGENCY BYPASS
4"-SW-A8-4407
3
7
1
3
0
A
Document title:
(-) 3000
14
13
12
11
10
9
8
7
6
5
2
4
1
1
1
4
1
B
SEWAGE TREATMENT UNIT
Company's document No.: Path\File name\Initials:
15
Rev.
0
Path\File name\Initials:
NOTE-5
16
0
4
DISTRIBUTION CODE:
Page(s) 37131141
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
L
1
L
NOTES 1. 2.
DELETED FOR &
3.
.
GENERAL
NOTES
REFER
P&ID
NO.
3713-00-02-41-0110
0111.
INERT EASLY
GAS
HEADER
HAS
DISTINGUISHED
DIFFRENT
FROM
COLOUR
UTILITY
&
TO
INST.
BE
AIR
HEADER.
K
K
1-K-253A &
1-K-253B &
1-K-253C &
1-K-253D &
1-K-253E &
1-K-254A
1-K-254B
1-K-254C
1-K-254D
1-K-254E
I
1"-N-A1-8412
1"-N-A1-8411
1"-N-A1-8410
1"-N-A1-8408
I
1"-N-A1-8409
J
TO/FROM RISER PLATFORM
2"-N-A3-6417
DWG NO. 1133
CSC
H
H INERT GAS DWG NO. 1120
2"-N-A1-6404
NOTE-3
PI 4201
1"-N-A1-6441/6442
1"-N-A1-6440
1"-N-A1-6423
1"-N-A1-6436
1"-N-A1-6418
1"-N-A1-6422
1"-N-A1-6415
1"-N-A1-6435
1"-N-A1-6414
1"-N-A1-6425
1"-N-A1-6407
F
1"-N-A1-6437/6438
G
1"-N-A1-6431/6432/6433
G
1"-N-A1-6424
F
DWG NO. 1123
(2NOS)
TO 1-V-454
MIDDLE DECK
DWG NO. 1124
SAFE AREA
(4NOS)
TO 1-V-453
CELLAR DECK
ZONE-1
DWG NO. 1150
CELLAR DECK
TO 1-T-351
DWG NO. 1131
1-K-501
TO 1-K-501
DWG NO. 1155
1-K-251/252
1"
CELLAR DECK ZONE-2
DWG NO. 1136
E 1"
VENT HEADER PURGE
E
TO 1-K-251/252
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
J
MEZZANINE
MAIN DECK
DECK
(2NOS)
D
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
C
3.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
7.10.95
ISSUED FOR PRELIMINARY HAZOPS
WORLEY
SHI
B A
Rev.
Date
Description of revision
DD-MM-YY
Company;
C
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
2
0
Rev.
2
4
1
1
1
4
2
B
Path\File name\Initials: A
Document title:
INERT GAS DISTRIBUTION SYSTEM
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131142
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES 1"-WP-A4-4335
TOILET WC
L
3/4"-WP-A4-4336
3.
DELETED
4.
SEVEN
MAKE-UP
TO HVAC
WATER TANK
NOTE-5,6
(1-K-253 A-E)
HP COMPRESSOR GTS
FOR WATER WASH OF
NOTE-5,6
TO 1-K-501
JACKET WATER
SURGE TANK
NOTE-5,6
L
GENERAL
NOTES
REFER
P&ID
NO.
3713-00-02-41-0110
0111
AS
(1-PK-502)
TO EMERGENCY GENERATOR
NOTE-5,6
(1-PK-501A/B/C)
POWER GENERATOR TURBINES
FOR WATER WASH OF
NOTE-5,6
TO 1-K-521
JACKET WATER
SURGE TANK
NOTE-5,6
1-K-411A/B
INST. AIR COMP
PUMP 1-K-481A/B
NOTE-5,6
TO FIRE WATER
TO CRANE-1
SERVICE PLATFORM
TO CRANE-2
J
FOR &
SINK
NOTE-5,6
1/2" K
DELETED
2.
SINK
SERVICE PLATFORM
1/2"
1.
BATTERY ROOM
SAFETY
PER
THE
-
TWO
-
SAFETY SHOWER &
&
EYE
COMPRESSOR
TWO
ON
CELLAR
-
NEAR
CHEMICAL
NEAR
CHLORINATOR
-
SHOWERS
THREE
WASH
FACLITIES
PROVIDED
FOLLOWING:
ON
ON
DECK
MIDDLE
-
IN
BATTERY
-
NEAR
LP
-
NEAR
STORE
K
DECK
STORAGE
DECK
ROOM
COMPRESSOR
J
EYE WASH
3/4"-WP-A4-4311-4317
3/4"-WP-A4-4337
3/4"-WP-A4-4310
3/4"-WP-A4-4309
3/4"-WP-A4-4307
3/4"-WP-A4-4305
3/4"-WP-A4-4306
3/4"-WP-A4-4322
3/4"-WP-A4-4304
3/4"-WP-A4-4302
3/4"-WP-A4-4319
3/4"-WP-A4-4318
A
SIGN
HOSE
SHALL
PROVIDED
BE
FOF
PROVIDED
ON
FURTURE
CONNECTION
POTABLE
WATER
HOSE
STATIONS
"NOT DRINKING WATER"
I
ODD
FUTURE
FUTURE
2"-WP-A4-4301
PI
H
POTABLE WATER
2"-WP-A4-4301
DWG NO. 1133
UTILITY WATER
G
H
2401
4"-WU-A5-4508
DWG NO. 1122
G 1.5"-WU-A5-4521/4522/4523/4524
NC
CSO
PCV
4"-WU-A5-4513
2"-WU-A5-4509
3"-WU-A5-4510
F
2"x1"
2"-WU-A5-4514
1.5"-WU-A5-4526
4301
2"-WU-A5-4512
1.5"-WU-A5-4525
1.5"-WU-A5-4527/4528/4529
F
1.5"-WU-A5-4538
1.5"-WU-A5-4531/4532/4533/4534
SET @
E
DWG NO. 1129
TO FIRE WATER HEADER
DWG NO. 1125
TO CHLORINE GENERATOR
(1-PK-461)
DWG NO. 1141
SEWAGE TREATMENT
UNIT (1-PK-511)
(4NOS)
CELLAR DECK ZONE 1
SAFE AREA
CELLAR DECK ZONE 1
(3NOS)
MIDDLE DECK
DECK
MEZZANINE
D
(4NOS)
1"
E
MAIN DECK
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
I
THREADED
6.
2"-WP-A4-4308
NOTE-4
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
5.
OVERBOARD
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
C
3.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
28.9.95
ISSUED FOR PRELIMINARY HAZOPS
WORLEY
SHI
B A
Rev.
Date
Description of revision
DD-MM-YY
Company;
C 1"
EIL
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
2"
EIL
ISH
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering: 1"
1"
1"
1/2"
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
1/2"
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
WC
WC
WC
URINALS
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
4
0
Rev.
2
4
1
1
1
4
3
B
Path\File name\Initials: A
Document title:
WATER DISTRIBUTION DIAGRAM
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131143
16
15
12
13
14
11
9
10
8
6
7
5
2
3
4
1
NOTES
L
1.
FOR &
L
GENERAL
NOTES
REFER
P&ID
NO.
3713-00-02-41-0110
0111
DWG NO. 1130
TO DAY TANK
J
1.5"-DF-A1-6221
OF 1-PK-481B
DWG NO. 1129
TO DAY TANK
OF 1-PK-481A
1.5"-DF-A1-6220
1"-DF-A1-6218
I
I
H
H
DIESEL (GRAVITY FLOW) DWG NO. 1126
2"-DF-A1-6213
3/4"
LOW POINT
G
G DIESEL FROM
1-P-471A/B & 1-P-472
2"-DF-A1-6217
DWG NO. 1126
CRANE NO.2
DAY TANK
E
DWG NO. 1126
CRANE NO.1
D
DAY TANK
E
2"-DF-A1-6223
F
2"-DF-A1-6222
F
DWG NO. 1126
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
J
DWG NO. 1139
TO DAY TANK
K
OF 1-PK-502
K
B
14.3.97
AS - BUILT
2
20.11.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
C
3.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
B
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
A
7.10.95
ISSUED FOR PRELIMINARY HAZOPS
WORLEY
SHI
Rev.
Date
Description of revision
Company;
C
EIL
EIL
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
7
0
Rev.
2
4
1
1
1
4
4
B
Path\File name\Initials: A
Document title:
DIESEL DISTRIBUTION SYSTEM
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131144
16
15
12
13
14
9
10
11
8
860 mm (ID) X 2300 mm (T/T) 3450 kPa(g)
SIZE : DESIGN PRESS. :
0
200 C
DESIGN TEMP. :
5
2
3
4
1
NOTES
DWG NO. 1135
ITEM NAME :
HP FLARE
FUEL GAS SCRUBBER
L
1. DELETED
2. PV-4601/4602 ARE FAIL LOCK DRIFT CLOSE.
10"-FL-A1-2416
L
6
7
1-V-342
ITEM NO. :
3. NECESSARY INSTRUMENTS TO BE PROVIDED BY VENDOR 4. DELETED. 5. REFER NOTE-41 OF LEGEND P&ID NO.3713-00-02-41-0110 & 3713-00-02-41-0111 FOR SOV ASSEMBLY DETAILS.
PAL
4601
4P6 3450
4"
PALL 4606
J
I
PV 4601
PSV 4601A
PSLL 4606
FROM ESD
8"-FG-D1-6304
PSLL-4606 ZIO
4601A
4601A
I
I
S
ZSO 46O1A
3/4"
3/4"
4602
FC
4601B
S
ZSO 46O1B
kpa(g) kpa(g) kpa(g) kpa(g) kpa(g)
I
PAL
FROM PT-4602
H
6"x4"
4"
6" 6"x10"
4"x6"
CLOSE
XV-4601 A/B/C/D/E
10"-FG-B1-6304 2"
3/4"
3/4"
I
D1 B1
XV
TRIP
4601B
1-K-501 CLOSE
(TRAIN # B)
XV-4601
3"-P-D1-1069B
PAH -4602 280 0
TRIP 1-K-501
FROM 1-V-252B DWG NO. 1104
PAL-4601 2850 PAL-4602 2 550
4602
IAS ZSC 4601B
PAH-4601 3050
PV
LSHH-4602 PSHH-4603 TRIP
NOTE-5
PALL-4606 2500
DWG NO. 1147
PY
ON 1-K-253B
SOV 4601B
LAHH-4602 600mm
4602
PSLL-4606
4601B
LAH-4601 450mm
PAH
I/P
6" FROM ESD
I
LAL-4601 150mm
DWG NO. 1147 FROM PT-4601
2"
ZIO
LALL-4603 0mm
DWG NO. 1147
(TRAIN # A)
ZIC
PAHH-4603 3270kpa(g)
TI 4605
FUTURE
PIC
3"-P-D1-1069A
CSO
4605
4601A
G
CSC
J TAG NO. SET POINT
PI
XV
H
3/4"
2"
10"-FG-B1-6306
FROM 1-V-252A DWG NO. 1004
B1
3/4"
9. PV-4601/4602 ARE FAIL LOCK DRIFT CLOSE.
N1 3"
IAS ZSC 4601A
8. PSLL-4606 INSTALLED BY SHI
FUEL GAS TO FILTERS
TRIP
NOTE-5
CSO A1
4"
PSHH-4603
SHALL BE SUPPLIED BY PACKAGE VENDOR.
PSV
NOTE-8
FC
G
1-V-342 PSHH
LSHH
4603
4602
LG
I
FROM ESD
LAHH
4602
A-E
4603
PSLL-4606 ZIC
ZIO
4601C
4601C
I 4601C
PAHH
PSHH-4603
4603
LT 4601
ON 1-K-253C
SOV
F
LSHH-4602
S
TRIP
NOTE-5
LSLL
LALL
4603
4603
F
IAS ZSC
ZSO
4601C
46O1C
XV 4601C
DWG NO. 1204
(TRAIN # C) 3"-P-D1-1069C
I
2"
FROM 1-V-252C LIC
LAH
4601
LAL
FC
CLOSE XV-4602
E
E FROM ESD PSLL-4606 ZIC
ZIO
4601D
4601D
I
LSHH-4602 PSHH-4603 ON 1-K-253D
SOV 4601D
S
A1 B1
TRIP
NOTE-5
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
NC
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
1/2"
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
ZSO
4601D
46O1D
XV
I/P
4601D
FROM 1-V-252D DWG NO. 1304
(TRAIN # D) 3"-P-D1-1069D
LY
LV
4601
4601
3/4"
FC 1"
2"x1"
D
ZSC
1"x2"
IAS
FC
3/4"
FROM FROM ESD
REFER
PSLL-4606
C
ZIC
ZIO
4601E
4601E
I 4601E
READ
LSHH-4602 PSHH-4603
P&ID
ON 1-K-253E
SOV S
NO.
SYSTEMS
ZSO
LTD
4602
C1341-RSL-PID-001 FOR
TRIP
NOTE-5
LSLL-4603
ZSO
4601E
46O1E
ZSC
ZIC 4602
B1
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
XV
CLOSED DRAIN ATM
N7
SKID LIMITS
FC
2"-DH-A1-2255
N3
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
15
14
13
12
11
10
9
Type of document PIPING & INSTRUMENTATION DIAGRAM
3 HP FLARE
2"-P-A1-1091
7
1
3
3
8
4
Rev.
0
2
DWG NO. 1135
Document title:
6
5
1
1
1
4
6
B
FUEL GAS SCRUBBER
Company's document No.:
7
4
Path\File name\Initials:
Path\File name\Initials:
16
SCALE
CCP-WT/95
Contractor's document identification:
3"
A
Worley
Basic Engineering:
DWG NO. 1147
TO CDH
FUTURE
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering: 4602
(TRAIN # E)
EIL
CONSORTIUM
Contractor:
4602
2"-DH-A1-2222
B
VIETSOVPETRO
S
A1
XV
EIL
PETECHIM/VIETSOPETRO
IAS
4601E
3"-P-D1-1069E
Description of revision
Company;
ISH
SOV
CMR
FC
FROM 1-V-252E DWG NO. 1404
Date DD-MM-YY
I
4602
4602 IAS
ZSC
ZIO
Rev.
DETAILS
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
4601A
4"x6"
LSHH-4602 ON 1-K-253A
SOV
6"x4"
7. ALL INSTRUMENTATION AND CONTROL ITEMS, EXCEPT THOSE AS DCS/PLC,
3450
4601B
6"-FG-B1-6305
ZIC
6"
8"x6"
3713-00-02-41-0111 FOR SOV ASSEMBLY DETAILS.
6"x10" CSO
K
6. REFER NOTE-42 OF LEGEND P&I D NO.3713-00-02-41-0110 &
FLARE
6"x10"
6"-FG-B1-6302 4"x6"
TRIP 1-K-501
LC B1 D1
DWG NO. 1147
4P6
4"x6"
4601
3"-FG-B1-6322
6"-FG-B1-6303
PIC
CLOSE
DWG NO. 1131
PAH
10"-SV-A1-2524
FROM BOOSTER COMPRESSOR
PY
10"-SV-A1-2523
I/P
START UP FUEL GAS
2"-FL-A1-2456
N4
XV-4601A/B/C/D/E
K
4
DISTRIBUTION CODE:
Page(s) 37131146
9
10
11
FUEL GAS FILTERS
LP FLARE
K
2
3
4
NOTE-6
381mm (ID) X 3110mm (T/F) 3450 kPa(g) 200C
1
L
1. REFER P&ID NO.3713-00-02-41-0110 & 3713-00-02-41-0111 FOR NOTES. 2. DELETED
.
DUTY: 400KW
3. HEAT TRACING WITHIN THE SKID IS NOT IN VENDORS'S SCOPE
1.5"-FL-A1-2455
DESIGN TEMP. :
5
LP FLARE
0
200 C
HP FLARE
DESIGN PRESS. :
6
7
NOTES
FUEL GAS HEATER
500 mm (ID) X 2892 mm (T/F) 3450 kPa(g)
SIZE :
DWG NO. 1135
ITEM NAME :
8
1-E-342
DWG NO. 1135
L
12
13
14
1-F-342 A/B
DWG NO. 1135
15
1.5G2.5
4"-FL-A1-2457
16
ITEM NO. :
4"-SV-A1-2552
600
4. DELETED.
5. ALL INSTRUMENTATION AND CONTROL ITEMS, EXCEPT THOSE AS IN
DCS/PLC, SHALL BE SUPPLIED BY PACKAGE VENDOR.
1.5G2.5
4"-SV-A1-2553
600
PSV
PSV 4706
CSO
a) 50KW FOR START-UP, POWERED FROM EMERGENCY BUS. b) 350KW+50KW FOR PRODUTION, POWERED FROM 6.3KV BUS.
4707
CSO
K
6. HEATER DESIGNED FOR DUAL SERVICE
7. REFER NOTE-42 OF LEGEND P&ID NO.3713-00-02-41-0110 &
3/4"
N5
TO PIC-4601
J
DWG NO. 1146 TO PIC-4602
@ 400 kPa(g) TRIP HEATER 1-E-342
FALL
FI
4701
FR
PT
PT
4602
4601
2"-FL-A1-2452
PSV 4704
LO 1"x2"
1"x2"
3/4" 2"-FG -B1-6371
LO
B1 A1
RO
FROM 1-V-342
2"-DH-B1-2221
10"-FG-B1-6306
1"X1"
A1 B1
3450
S
ZSC
ZIC 4603
ZSO
ATM
ZIO
4603
4603
TAH-4701 67 °C TAHH-4707 195 °C TAHH-4709 350 °C
kpa(g)
H
I
G
LO
TAHH
TAHH
4706
4707
TRIP HEATER
TAHH
FROM
4709
ESD TSHH-4704
I
I
TSHH-4706 FSLL-4701
TT
TE
TE
4706
4707
4709
TSHH-4708 TSHH-4707
1-E-342
NC
B1
4702
THYRISTOR
XI
PANEL
4701
F
RUNNING INDICATION
POWER
TE 4708
A1 TT 4705
10"-FG-B1-6308
PSV
2"-SV-A1-2551
1-E-342
TI
1" CSO
TDAL -4701 1 5 °C
10"-FG-B1-6310-IE
TDAL
1-E-342
TEMP.
I
TDAH-4701 25 °C TO HP FUEL GAS USERS
TAHH-4708 350 °C
2"-FG-B1-6373-IS
IAS
4603
4701
TRIP HEATER
SKIN
NM3/HR kpa(g) kpa(g)
TDAH
TDIC
ESD
SOV 4603
FO
10"-FG-B1-6308
1.5"-FL-A1-2455
LG 4705
F
10"-FG-B1-6307
4603
NO LSH 4708
LAH
I
NOTE-6
XBOV
4601
FALL-4701 700
TO LP FUEL GAS USERS
NO POCKET
TRIP HEATER
I
3/4"
4701
4708
4708
TI 4703
1"x2"
1"x2"
10"-FG-B1-6311
1"
10"-FG-B1-6306
1-F-342A
TAHH-4704 72 °C
P DI-4708/09(MAX) 95
4701
PSV
350mm FROM BTL
TAHH-4706
TAH
TT
4701
A1 B1
DWG NO. 1134
4701
3450
CSO
E
TI
4704
B1
NO POCKET
LAH-4607/08
DWG NO. 1134
TT
A1
PDI
FUEL GAS HEADER
kPa(g) kPa(g)
PAH -4707 5 00
N2
LO
PI
PAL-4707 300 PT
PAL-4707 300
FE-4701
1"x2"
G
PAH-4707 500
NOTE-3
I
1"X1"
NO
3/4"
TAG NO. SET POINT
PAL
4707
B1 A1
1-E-342
2"-FL-A1-2456
B1
2"x4"
J
PAH
2"
4704
TRIP HEATER
1.5"-FL-A1-2454
2"-FL-A1-2453
H
A1
2"-SV-A1-2550
E
4705 TI
LO 1"x2"
4705
B1 A1
1"x2"
3/4" 2"-FG -B1-6372 B1 A1
D NC PI
1"
PDI
1-F-342B
4702
10"-FG-B1-6313
LO
INST. AIR
4709
3/4"-A1-A3-5120
N9
DWG NO. 1140
NO
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY LAH 4707
C
LSH
LG
4707
4706
Company; VIETSOVPETRO
EIL
COMPANY
CONSORTIUM BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
2"-DH-B1-2220
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
N8
B1
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
A1
CLOSED DRAIN
3
7
1
3
3
Document title:
13
12
11
10
9
8
7
6
Rev.
0
2
4
1
1
1
4
7
B
FUEL GAS FILTER AND HEATER
Company's document No.:
ODD
14
4
Path\File name\Initials:
A
15
Type of document PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
DWG NO. 1146
16
SCALE
CCP-WT/95
2"-DW-A1-2328
B
EIL
ISH
PETECHIM/VIETSOPETRO
Contractor:
CONT. FROM P&D NO. 1146
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
FT 4701
PI 4707
4"-FG-A1-6309
3/4" FSLL 4701
TAHH
3450
PI 4706
2"
2"
I
1"X1"
PCV
B1 A1
FR
3713-00-02-41-0111 FOR SOV ASSEMBLY DETAILS.
CSO
2"-FG-A1-6363
4702
FO
I will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
2"
CSC
SET
DWG NO. 1146
DWG NO. 1146
3/4" 2"-FG-A1-6364
N6
DWG NO. 1146
2"-FG-A1-6362
FLARE
Path\File name\Initials: 5
4
DISTRIBUTION CODE:
Page(s) 37131147
16
15
12
13
14
L
9
10
11
ITEM NO. :
6
7
5
2. DELETED
.
60C
BOAT LANDING
900
AND ALARM IN CPP-2
I 1"
LAHH
LAHH
4801
4803
0111
3"-VG-A1-2603
3/4X1
3. FOR GENERAL NOTES REFER P&ID NO.3713-00-02-41-0110 &
TO SAFE LOCATION
HOOTER AT TRIP
1-P-353A/B/C
I
4801
4. ALL INSTRUMENT INDICATIONS AND CONTROL ITEMS SHOWN AS
APPEARING ON DCS/PLC ARE OUTSIDE,
4802
CSO
6 VENDOR TO PROVIDED A COMMON GLASS CALIBRATION TUBE, THE PUMP TO BE CALIBRATED SHALL BE FITTED WITH CALIBRATION TUBE AT THIS POINT.
FLA 4801
NOTE-1
7. DESTINATION SIGNS TO BE PROVIDED ON PUMP OUTLET VALVES.
NOTE-8
TO/FROM
RISER PLATFORM
REFER TO POSITIVE
MANHOLE
CSC
2"-C-A1-8117
DWG NO. 1133
8. MANHOLE FITTED WITH EMERGENCY VENT.
METERING SYSTEM
J
TAG NO. SET POINT
P&ID NO. C-1138/41
TP6
LALL-4801
520 mm FROM BTL
LAHH-4803 1700 mm FROM BTL CONECTION TO
L AH-4802 1 5 00 mm FROM BTL
2"-C-A1-8105
PORTABLE DRUM
LAL -4802
TRANSFER PUMP
700 mm FROM BTL
PAH-4804 6000
kPa(g)
PAH-4805 6000 k P a(g)
3/4" 2"
PAH-4806 6000 k P a(g)
3/4" LSHH
2"
DRIPLESS
QUICK
1-T-353
NORTH
HOSE
EAST
BOAT
BOAT
LANDING
LANDING
LT 4802
CONN.
H
I
4803
2"-C-A1-8126
I
2"-C-A1-8125
LSLL
LG
4801
4804
H
G
G
TP8
2"-DH-A1-2213
2"-C-A1-8103
TO CDH
TP10
E
NOTE-7
D
NOTE-7
E
NOTE-7
PI 4801
PI
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
PI
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
4802
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
1/2"X1 13705
1/2"
PSV
4801
PSH 4805
NOTE-6
A1 E1
1/2"X1 13705
1/2"
PSV
4803
4802
C
NOTE-5
A1 E1
A1 E1
M
A1 E1
M
M
Rev.
Date
Description of revision
DD-MM-YY
Company;
1-P-353A PAH
PB
XI
4804
4801
4801
DIAPHRAM RUPTUBE
FROM LSLL-4801
PAH
PB
XI
4806
4803
4803
DIAPHRAM
STOP
RUPTUBE
ITEM NO. :
VIETSOVPETRO
STOP
PAH
PB
XI
4805
4802
4802
DIAPHRAM
FROM LSLL-4801
RUPTUBE
STOP
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
3
14
13
12
7
1
3
3
Document title:
5
0
Rev.
2
4
1
1
1
4
8
B
CORROSION INHIBITOR SYSTEM
Company's document No.:
12449 kPa
15
Type of document PIPING & INSTRUMENTATION DIAGRAM
Path\File name\Initials:
15 LPH
DIFF. PRESS
SCALE
CCP-WT/95
CORROSION INHIBITOR INJECTION PUMPS
CAPACITY
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Contractor's document identification:
FROM LSLL-4801
COMPANY
CONSORTIUM
Company's contract No.:
I
EIL
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
1-P-353B
I
1-P-353A/B/C
ITEM NAME :
16
1-P-353C
I
EIL
ISH
PETECHIM/VIETSOPETRO
Contractor:
Project name:
B
A
CONTINUED ON P&ID. 1150
PSV
A1 E1
DAMPENER
1/2"
PSH 4806
NOTE-6
PULSATION
13705
DAMPENER
1/2"X1
PULSATION
A1 E1
DAMPENER
PSH 4804
PULSATION
4803
NOTE-6
DWG NO. 1137
1"-C-E1-8104
1"-C-E1-8104
DWG NO. 1011
2"-C-A1-8103
INJECTION INTO EXPORT PIPELINE
F
TP9
1"-C-E1-8119
1"-C-E1-8115
2"-C-A1-8118
DWG NO. 1011
1"-C-E1-8102
F
INJECTION INTO GASLIFT PIPELINE
2"-C-A1-8101
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
K
5. CORROSION INHIBITOR SYSTEM AND METHENOL SYSTEM (P&ID NO. 3713-35-02-41-1150) ARE ON A COMMON SKID.
LAL
TP7 OOO
VENDOR SCOPE OF
SUPPLY.
LAH
LI
3/4"
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
L
1. PROVIDED ACCESS FOR FLAME ARRESTOR.
FULL OF LIQUID + 50 mm WATER COLUMN
DESIGN TEMP. :
J
1
NOTES
1219 mm (ID) X 2134 mm (H)
DESIGN PRESS. :
TSV
2
3
4
CORROSION INHIBITOR TANK
SIZE :
K
8
1-T-353
ITEM NAME :
Path\File name\Initials: 11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131148
16
15
12
13
14
L
9
10
11
8
6
7
5
2
3
4
1
1-T-355
ITEM NO. :
ANTI-FOAM CHEMICAL TANK
ITEM NAME :
L
NOTES
500 mm (ID) X 1200 mm (T/T)
SIZE :
FULL OF LIQUID + 50 mm WATER COLUMN
DESIGN PRESS. :
60C
DESIGN TEMP. :
1. PROVIDED ACCESS FOR FLAME ARRESTOR.
TO SAFE LOCATION
2. DELETED
3"-VG-A1-2606
.
K
3. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111
4 VENDOR TO PROVIDED A GLASS CALIBRATION TUBE, THE PUMP THIS POINT.
TP2
TAG NO. SET POINT
FLA 4901
CONECTION TO
TP1
2"-C-A1-8110
PORTABLE DRUM TRANSFER PUMP
NOTE-5
NOTE-1
LALL-4902 380 mm FROM BTL
MANHOLE
NC
J
K
TO BE CALIBRATED SHALL BE FITTED WITH CALIBRATION TUBE AT
5. MANHOLE FITTED WITH EMERGENCY VENT.
3/4"
REFER TO POSITIVE
LAH-4903 950 mm FROM BTL
METERING SYSTEM
L AL -4903 450
P&ID NO. C-1138/21
PAH-49 0 2 160
mm FROM BTL k P a(g)
J
LOW
I
I
LG 4904
1-T-355
LSLL
LALL
4902
4902
LT 4903
H
LI
LAH
4903
LAL
H
I TRIP 1-P-355
G
G
NC
2" TP3
2"-DH-A1-2206
2"-C-A1-8017
TO CDH
F
1"-C-A1-8108A
332
1/2"
PSV 4901
DAMPENER
1/2"X1
4901
NOTE-4
(1-P-311 A/B) E
DWG NO. 1310
TO SUCTION OF GLYCOL RECIRCULATION PUMPS
1"-C-A1-8108B
PSH
PULSATION
D
TO SUCTION OF GLYCOL RECIRCULATION PUMPS TP4
1"-C-A1-8108
E
DWG NO. 1137
F
CONTINUED FROM P&ID NO.1116
(1-P-311 C/D) DWG NO. 1510
PI 4901
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
PAH
PB
XI
4902
4901
4901
DIAPHRAM
B
RUPTUBE
STOP
Date
Description of revision
DD-MM-YY
1-P-355
Company;
M
C
VIETSOVPETRO
I
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
TP5
2"-DW-A1-2338
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
POINT
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
FROM LSLL-4902
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
ODD
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
ITEM NO. : A
1-P-355
ITEM NAME :
16
14
13
12
11
3
5
0
Path\File name\Initials: 10
Rev.
2
4
1
1
1
4
9
B
ANTIFOAM CHEMICAL STORAGE & INJECTION PUMPS
Company's document No.:
200 kPa
15
3
Document title:
0.63 LPH
DIFF. PRESS
1
Path\File name\Initials:
ANTI-FOAM CHEMICAL INJECTION PUMP
CAPACITY
7
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131149
16
15
12
13
14
8
6
7
5
1829 mm (ID) X 3353 mm (H)
DESIGN PRESS. :
FULL OF LIQUID + 65 kPa & 40
2. DELETED
.
TO SAFE LOCATION
TO SAFE LOCATION
OVERBOARD
OVERBOARD
2"-VG-A1-2635
K SET
3. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111
4. ALL INSTRUMENTATION AND CONTROL ITEMS INDICATED ON DCS/PLC ARE NOT IN VENDOR'S SCOPE OF SUPPLY.
5 VENDOR TO PROVIDED A COMMON GLASS CALIBRATION TUBE, THE PUMP TO BE CALIBRATED SHALL BE FITTED WITH CALIBRATION TUBE AT THIS POINT.
TP3
PCV PI 5005
TAG NO. SET POINT
INERT GAS DWG NO. 1142
1"-N-A1-6415
1"
TP1
2"-C-A1-8116
PORTABLE DRUM
2"X2" NOTE-6
PVSV
PVSV
5003
5004
L ALL- 5001 FV-0301A INLET 12mm SS TURBING
12mm SS TURBING
2"-C-A1-8124
MANHOLE
3/4"
METERING SYSTEM
NORTH
5004
5004
LG 5003
HOSE
EAST
BOAT
BOAT
LANDING
LANDING
LALL
LSLL
5001
5001
LT
1-T-351
LI
5002
5002
12mm SS TURBING
DWG NO. 1203
DWG NO. 1303
I
DWG NO. 1403
LAH LAL
DWG NO. 1004 FV-0401B INLET
12mm SS TURBING
DWG NO. 1104
H
FV-0401C INLET 12mm SS TURBING
DWG NO. 1204 FV-0401D INLET
I
12mm SS TURBING
TRIP
DWG NO. 1304 FV-0401E INLET
1-P-351A/B
G
J
DWG NO. 1103
FV-0401A INLET
LSHH
LAHH
2"-C-E1-8114
2"-C-A1-8106
12mm SS TURBING
CONN.
H
PAH-5004 6000 k P a(g)
FV-0301E INLET
I
QUICK
mm FROM BTL
750 mm FROM BTL
PAH-5003 6000 k P a(g)
FV-0301D INLET 12mm SS TURBING
P&ID NO. C-1138/41
BOAT LANDING
DRIPLESS
PAH-5002
REFER TO POSITIVE HOOTER AT
2"
I
DWG NO. 1003
FV-0301C INLET 12mm SS TURBING
3/4"
500 mm FROM BTL
LAH - 5002 2650
2"
FV-0301B INLET CSO
TRANSFER PUMP
2"-C-A1-8127
12mm SS TURBING
DWG NO. 1404
G
FV-1101 INLET 12mm SS TURBING NC
2"
F
DWG NO. 1011 FV-1102 INLET
12mm SS TURBING TP4
DWG NO. 1011
2"-DH-A1-2227
F
TO CDH
DWG NO. 1137
2"-C-A1-8113
2"-C-A1-8113
2"-C-A1-8111
1"-C-E1-8112
E
NOTE-7
D
5004
A1
E1
1/2"X1 13925
PSV
INST.
E
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
PI
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
5002
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
DAMPENER
PSV 5001
PSH
NOTE-5
1/2"
PULSATION
13925
DAMPENER
PULSATION
1/2"X1 A1 E1
PIPING
Rev.
5002
A1 E1
LOW
3/4"
3/4"
POINT
M
PAH 5003
DIAPHRAM RUPTUBE
PB 5001
STOP
I
LOW
M
1-P-351B
XI
PAH
5001
5004
FROM
DIAPHRAM
LSLL-5001
RUPTUBE
PB 5002
STOP
I
NEW DELHI - INDIA
Company's contract No.:
12
7
1
3
3
5
0
Document title:
4
1
1
1
5
0
B
METHANOL STORAGE & INJECTION PUMPS
Company's document No.: Path\File name\Initials: 11
Rev.
2
Path\File name\Initials:
85 LPH
13
Type of document PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
12645 kPa
14
SCALE
CCP-WT/95
ODD
LSLL-5001
METHANOL INJECTION PUMPS
15
Limited
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
XI
1-P-351A/B
DIFF. PRESS
Worley
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
3
CAPACITY
ENGINEERS INDIA LIMITED
Basic Engineering:
ITEM NO. : ITEM NAME :
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
5002
FROM
EIL
CONSORTIUM
Contractor:
POINT
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
A1 E1
1-P-351A
16
Description of revision
DD-MM-YY
Company;
B
A
Date
TP11
2"-DW-A1-2337
C
PSH 5003
VENT
POINT
5001
NOTE-5
POINT
LOW
PI
1/2"
HIGHT
3/4"
1"x2"
1"-C-E1-8114
TP5
CONTINUED FROM P&ID NO.1148
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
CONECTION TO
1"x2"
J
TP2
LAHH-5004 2920 mm FROM BTL
TP12
2"X2" NOTE-6
K
6. SET PRESS IS 65 kPa(g) & 40mm WATER COLUUM VACUUM
@ 35 kPa(g) 5001
L
1. DELETED.
mm WATER COLUMN VACUUM
60C
DESIGN TEMP. :
1
NOTES
METHANOL STORAGE TANK
SIZE :
2
3
4
1-T-351
ITEM NAME :
2"-VG-A1-2655
L
9
10
11
ITEM NO. :
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131150
16
15
13
14
12
ITEM NAME : L
10
11
9
8
6
7
5
CAPACITY
1
NOTES
300 Lbs (PURPLE K POWER) 1725 kPa(g)
OPERATING PRESS
2
3
4
1-PK-485 TO 494 (NOTE-3) DRY CHEMICAL SKID (DCS)
ITEM NO. :
L
1. DELETED. 2. DELETED
.
3. TEN DRY CHEMICAL SKIDS ARE PROVIDED. FOR LOCATION OF THESE
SKIDS REFER TO EQUIPMENT LAYOUTS. 4. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0110
K
K
J
J
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
PI
I
I H
1
V
PI
H
H
HOLD 2930
S
1
H
V
2
V
G
G
DISCHARGE NOZZLE H
3
V
F
F
25.4 MM x 30.48 M DISCHARGE HOSE
E
E
N2 CYLINDER
DRY CHEMICAL CYLINDER
CAPACITY : 1.56 M3
D FOR DETAILS REFER DOOLEY TACKABERRY P&ID NO. 1155M02 SHT 2 OF 2
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
C
EIL
EIL
ISH
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
4
8
0
Rev.
2
4
1
1
1
5
1
B
Path\File name\Initials: A
Document title:
DRY CHEMICAL SYSTEM
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131151
16
15
12
13
14
8
6
7
5
2
3
4
1
1-T-356
ITEM NAME : L
9
10
11
ITEM NO. :
CORROSION INHIBITOR DAY TANK
SIZE :
OD.800 mm
DESIGN PRESS. :
x DIA.1200 mm
FULL OF WATER + 50 kPa
DESIGN TEMP. :
NOTES
L
/ 0.5 m3 1. PROVIDED DRIPLESS CLICK CONNECTION HOSE.
65C
2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 TO SAFE LOCATION
& 0111
JUST ABOVE 1000 LITRE DRUM 3. VENDOR SHALL PROVIDED ALL INSTRUMENTATION FOR PUMP OPERATION.
K
4. VENDOR TO PROVIDE A COMMON LOOSE GLASS CALIBRATION
2"-VG-A1-2635
1000 LITRE CHEMICAL DRUM NOTE-6
K
TUBE. THE PUMP TO BE CALIBRATED SHALL BE FITTED WITH CALIBRATION TUBE AT THIS POINT. LI 5302
5. DELETED. LAL
6. VENDOR SUPPLIED CONTAINER (RETURNABLE). 7. 1-P-356F IS WAREHOUSE SPARE.
8. A STEEL STRUCTURE WITH LEGS, TO SUPPORT 1000 LITRE DRUM ABOVE 1-T-356 SHALL BE PROVIDED BY VENDOR.
J
J
NOTE-8 TAG NO. SET POINT
2"-C-A1-8131 NOTE-1
TRANSFER PUMP
HAND HOLD
NC
* FROM 1-K-253 TRIP
A1
A1
A10
A10
10mm ∅ HOLE
I
200mm FROM BTL
LG
LT
5301
5302
CONTD. ON P&ID NO. 1154
PORTABLE DRUM
1-T-356
I
H
H
TO-CDH
2"-DH-A1-2250
DWG NO. 1137
A1 A10
G
TO-1-P-357 A-E SUCTION
1"-C-A10-8130
G
INST.
DWG NO. 1154 TO 1-AC-251A DWG NO. 1003
CALIBRATION
TO 1-AC-251B
POT
DWG NO. 1103
F
F
TO 1-AC-251C DWG NO. 1203 TO 1-AC-251D
PSV
PI
PSV
PI
5303
5303
5304
5304
A1
D1
S
610
400 kPa(g)
5301
I
PSV
1/2" PCV
VENT
*
12mm SS TUBING
TUBING
12mm SS
1"
I
*
1-P-356E
PCV 5303
SDH
MSP
AC
17.2.96
ISSUED FOR COMMENTS
MSP
GRR
EIL
EIL
Description of revision
3/4"X1"
PSV
610
5307
NEW DELHI - INDIA
Worley
Limited
PETROVIETNAM GAS UTILISATION PROJECT CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
PI 5307
Company's contract No.:
SCALE
Type of document
CCP-WT/95
1-P-356A/B/C/D/E/F
(NOTE-7)
10
3
3
5
0
Path\File name\Initials: 9
Rev.
2
4
1
1
1
5
3
B
COMPRESSOR CORROSION INHIBITOR SYSTEM-I
Company's document No.:
4060 kPa
11
1
Document title:
1.0 LPH
DIFF. PRESS
7
Path\File name\Initials:
I-STAGE CORROSION INHIBITOR INJECTION PUMPS
CAPACITY
12
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
ITEM NAME :
13
LOC
COMPANY
ENGINEERS INDIA LIMITED
TURBING
400 kPa(g)
14
SHI
CONSORTIUM
Project name:
SET @
JUY
WORLEY
PETECHIM/VIETSOPETRO
Detailed Engineering:
12 MM OD SS
TURBING
ISH PH
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
1/2"
3
15
Date
Basic Engineering:
ITEM NO. :
16
SA
APPROVED FOR CONSTRUCTION
A
VIETSOVPETRO
DWG NO. 1154
A
REVISRD AS MARKED
20.3.96
Company;
2"-AU-A3-5245
B
AS - BUILT
20.11.96
0
Contractor:
12 MM OD SS
TURBING
14.3.97
1
Rev.
*
1/2"
12 MM OD SS
B
DD-MM-YY
5305
1-P-356D
1/2"
TURBING
TURBING
DWG NO. 1140
*
12 MM OD SS
12 MM OD SS
UTILITY AIR
NOTE-3
SOV
5304
I
PI 5305
VENT
1"
1-P-356C
1/2"
5306
PI 5306
I
PSV 5305
D1
SOV
5303
1-P-356B S
3/4"X1"
4650
VENT
1" SOV
5302
1-P-356A
1/2"X1"
NOTE-3
1"
E
A1
D1
VENT
NOTE-3
SOV
DWG NO. 1403 DWG NO. 1154
A1
D1
VENT
NOTE-3
SOV
SET @
12mm SS TUBING
PI 5302
VENT
*
12mm SS TUBING
PSV 5302
1" 5301
12mm SS TUBING
PI 5301
A1
TO 1-AC-251E
1/2"
4650
PSV
NOTE-3
I
NOTE-4
1/2"X1"
1/2"
4650
5301
D1
C
NOTE-4
1/2"X1"
1/2"
4650
A1
D
NOTE-4
1/2"X1"
1/2"
4650
12mm SS TUBING
12mm SS TUBING
NOTE-4
1/2"X1"
1/2"
12mm SS TUBING
NOTE-4
S
E
12mm SS TUBING
12mm SS TUBING
DWG NO. 1303
S
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
L AL - 5302
S
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
CONECTION TO
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131153
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES
L
L
1. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111 2. VENDOR SHALL PROVIDED ALL INSTRUMENTATION FOR PUMP OPERATION. 3. VENDOR TO PROVIDE A COMMON LOOSE GLASS CALIBRATION TUBE. THE PUMP TO BE CALIBRATED SHALL BE FITTED WITH
K
4. 1-P-357F IS WAREHOUSE SPARE.
* FROM 1-K-253 TRIP
J
I
I
H
H
FROM 1-T-356
INST.
1"-C-A10-8130
DWG NO. 1153
TO 1-AC-252A DWG NO. 1004
G
G
TO 1-AC-252B DWG NO. 1104 TO 1-AC-252C DWG NO. 1204 TO 1-AC-252D
E
DWG NO. 1153
12mm SS TUBING
PSV
PI
PSV
PI
5401
5401
5402
5402
5403
5403
5404
5404
1/2"X1" 15300
A1
A1
A1
A1
A1
E1
E1
E1
E1
E1
VENT
VENT
NOTE-2
VENT
NOTE-2
VENT
NOTE-2
1"
SOV
SOV
5404
5405
I
S
*
I
S
*
I
S
*
1-P-357D I
S
*
1-P-357E S
*
1/2"
1/2"
1/2"
1/2"
12 MM OD SS
12 MM OD SS
12 MM OD SS
12 MM OD SS
TURBING
TURBING
TURBING
E
1"
SOV 5403
1-P-357C
PI 5405
VENT
1"
SOV 5402
1-P-357B
PSV 5405
NOTE-2
1"
SOV 5401
1-P-357A
TUBING
DWG NO. 1404
12mm SS
12mm SS TUBING
PI
12 MM OD SS UTILITY AIR
12mm SS TUBING
PSV
F
TO 1-AC-252E
1/2"
15300
PI
1/2"
C
NOTE-3
1/2"X1"
1/2"
15300
PSV
1"
I
NOTE-3
1/2"X1"
1/2"
15300
NOTE-2
D
NOTE-3
1/2"X1"
1/2"
15300
12mm SS TUBING
NOTE-3
1/2"X1"
1/2"
12mm SS TUBING
NOTE-3
12mm SS TUBING
DWG NO. 1153
12mm SS TUBING
F
12mm SS TUBING
DWG NO. 1304
12mm SS TUBING
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
J
CALIBRATION TUBE AT THIS POINT.
CONTD. ON P&ID NO. 1153
K
TURBING
B
14.3.97
AS - BUILT
1
20.11.96
REVISRD AS MARKED
SA
SDH
0
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
A
17.2.96
ISSUED FOR COMMENTS
MSP
GRR
EIL
EIL
Rev.
Date
Description of revision
DD-MM-YY
Company;
TURBING
2"-AU-A3-5245
ISH PH
JUY
WORLEY
SHI
LOC
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
1-P-357A/B/C/D/E
ITEM NO. :
A
(NOTE-4)
3
II-STAGE CORROSION INHIBITOR INJECTION PUMPS
ITEM NAME :
1
3
3
Document title:
12750 kPa
DIFF. PRESS
7
0
15
14
13
12
11
10
9
8
Rev.
2
4
1
1
1
5
4
B
COMPRESSOR CORROSION INHIBITOR SYSTEM-II
Company's document No.: Path\File name\Initials:
16
5
Path\File name\Initials:
1.0 LPH
CAPACITY
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131154
16
15
12
13
14
11
9
10
8
6
7
5
2
3
4
1
NOTES
L
L
1. FAN IS SHARED BY 1-AC-253 (DWG.NO. 1006) AND AC-1. 2. SURGE TANK SHALL BE LOCATED ABOVE THE HIGHEST SYSTEM POINT.
TAG NO. SET POINT
LAL-0620 700 MM FROM BTL
K
K
J
J
1"x1/2"
REFER NUOVO PIGNONE
P&ID. SOP 52601/1
INERT GAS
1"-N-A1-6407
DWG NO. 1142
130
1"x1/2" I
REFER NUOVO PIGNONE
P&ID. SOP 52600/2
INST. AIR
1"-AI-A3-5113
DWG NO. 1140
UTILITY AIR
90
1"-AU-A3-5225
DWG NO. 1140
I
REFER NUOVO PIGNONE
P&ID. SOP 31938/2
120
1"x1/2"
H
RECIPROCATING
MOTOR
H
COMPRESSOR
POTABLE WATER FILL CONN.
G
2"
G
2"
VF
VF LSL
LG
0620
0620
UCP LAL 0620
F
E
BLEED LINE 1/4"
F
BLEED LINE 1/4"
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
110
1"-WC-A1-9503
FOR LP COMPRESSOR DETAILS REFER
42
SOP 3"-WC-A1-9502
40
CYLINDERS & PACKINGS LUBE OIL
-
SOP 48907/1
P&ID NO. SOP 46627/1
-COMPRESSOR FRAME LUBE -COOLING SYSTEM 52601/1 -CAPACITY CONTROL 52600 / 2 N2 BUFFER / PURGING
OIL
SOP 46627/1 SOP SOP
3"-WC-A1-9501
52599/1 -PROCESS GAS
SOP 48906/ 3
REFER NUOVO PIGNONE
AC-1
D
E
NUOVO PIGNONE P&ID NO.:
-
41
B
14.3.97
AS - BUILT
1
20.11.96
REVISRD AS MARKED
SA
SDH
0
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
Rev.
Date
Description of revision
DD-MM-YY
Company;
C
M
EIL
EIL
ISH PH
JUY
WORLEY
SHI
LOC
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES NOTE-1
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
2
5
Rev.
0
2
4
1
1
1
5
5
B
Path\File name\Initials: A
Document title:
LP COMPRESSOR MECHANICAL INTERFACE
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131155
16
15
12
13
14
L
ITEM NAME
DESIGN TEMP.
6
7
5
1
NOTES:
L
1. QUICK CLOSING VALVE AT SKID EDGE.
VENDOR VENDOR
2. PIPES ARE ACID CLEANED.
VENDOR
130°C
2
3
4
FILTER-COALESCER
1.73 MMKJ/HR (481 KW) 10.8 kPa (g)
DESIGN PRESS.
8
FSA-901B
LUBE OIL COOLER
DUTY
9
10
11
1-LC-252B (HX901-1)
ITEM NO.
3. USE HOSE AND PNEUMATIC TRANSFER PUMP TO COLLECT LUBE OIL IN DRUMS.
K
K
VENT TO SAFE LOCATION
TAG NO.
SET POINT
VAHH-5601B
V/F
PDI
3/4"-VG-A1-2645B
* 3.0
901B
RO 5601B
J
PDI-903B(MAX)
FA-901B FLA
903B
V/F
8"-VG-A1-2638B
J
A1
RT
33
34
149291
149291
SHT 6
SHT 6
FROM D-R 149291 SHT 6
149291
149770
SHT 6
SHT 2 149770
586B
H DWG NO. 1134
3"-FG-B1-6331-IE
FE-930B
NOTE-2
INTERFACE
B149370
20
317-962 SHT 1
PT
V/F
586B
DWG NO. 1103
CENTRIFUGAL
TURBINE
(TR586)
TO 1-K-253B UCP
FG. FILOT VENT
SEAL VENT
SEAL VENT
2"-VG-A1-2642B
Z3
(TPO586)
G
2"-VG-A1-2641B
T3
586B
TO 1-K-253B UCP
2"-VG-A1-2646B
W3
COMPRESSOR
317-962 SHT 2
H
2"-VG-A1-2640B
V3
PDT
V/F
2
SHT 3
V/F
I
SHT 2
HP COMPRESSOR TRAIN- 'B'
NOTE-1
FUEL GAS
SEAL VENT
DUCT
1
3
PACKACE
EXHAUST
AIR/GAS VENT
AIR INTAKE DUCT
SEAL VENT
M
8"-VG-A1-2638B
LUBE OIL VENT
5601B
(RT586)
G
2"-VG-A1-2647B
U3
DWG NO. 1103
2"-VG-A1-2648B
AA3 AE3
INST. AIR DWG NO. 1140
1"x1/2"
1"-A1-A3-5116B
K3
317-962
B149370
SHT-1
SHT 3
1"-VG-A1-2649B
30
F
F
REFER SOLAR P&ID's: 49901-B149370 SHT 1-3. (FUEL GAS SYSTEM) 49901-149291 SHT 1-6. (LUBE OIL SYSTEM) 49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN) 49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM) 49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)
SEAL GAS 317-962 SHT-1
REFER DRESSER-RAND P&ID's:
126
164
3/4"x1"
B149471
SHT 2
SHT 3
22
65
3/4"x1"
G3
3/4"x1"
B149770
B149770
SHT 2
SHT 2
D1
F1
A1
A1
1"
WATER
1"-DW-A1-2256B
HP. CASING DRAIN
LP. CASING DRAIN
2"-DH-A1-2268B
RESERVOIR DRAIN
CONN.
HYDRAULIC STARTER
AIR INLET DUCT DRAIN
LUBE OIL DRAIN
LUBE OIL DRAIN
1"-DH-A1-2266B
1"-DH-A1-2265B
1/4" 1"-DH-A1-2264B
LUBE OIL FILTER DRAIN
SEAL GAS HEATER
CONDENSATE DRAIN
SHT 6
V/F
2"
2"
VENDOR FURNISHED
126 VENDOR
26
19/1
21
H3
WASH
ODD
LEGEND:
2"
NOTE-3
*
COOLER
VENDOR
(SOLAR)
(SOLAR)
FURNISHED
2"
2"-DW-A1-2351B ODD
64
3/4"x1"
1/4"x3/4"
C
B149770
SHT 6 54
126
B149291
149291
126
D
E
317-962 SHT 1-3. (GAS SEAL SYSTEM)
AG3
V/F
1"-C-A3-8138B (EXTENDED)
98
2"-DW-A1-2316B
E
CO2 SYSTEM
SHT 5
COMBUSTOR DRAINS
J3
1.5"-C-A3-8137B (MAIN)
97 149746
EXHAUST COLLECTOR &
1"-P-E1-1160B
1"-DW-A1-2267B
DWG NO. 1056
2"
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
VF
FSA-901B
6"x4"
VSHH
VAHH 5601B
I
4"-LO-A10-9501B
6"x4"
LUBE OIL TANK VENT
4"-LO-A10-9501B
I
4"-VG-A1-2639B
MOTOR S/D
V/F
A10 NOTE-2
1-LC-252B
AIR/GAS VENT
NOTE-2
LUBE OIL TANK DRAIN
B
14.3.97
AS - BUILT
1
18.10.96
REVISRD AS MARKED
0
20.3.96
APPROVED FOR CONSTRUCTION
Rev.
Date
Company; ODD
ODD
SDH
SA
Description of revision
DD-MM-YY
ISH
MSP
AC
PH
JUY
EIL
EIL
WORLEY
SHI
LOC
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
ODD
ODD
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
TO CDH
2"-DH-A1-2269B
Worley
Basic Engineering:
DWG NO. 1137
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
2
5
0
Rev.
2
4
1
1
1
5
6
B
Path\File name\Initials: A
Document title:
HP COMPRESSOR TRAIN-B INTERFACES
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131156
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES 1-V-251C
ITEM NO.:
L
1-AC-251C
H.P. INLET SCRUBBER
ITEM NAME:
H.P. INTERSTAGE COOLER
2110 mm(ID) x 3025 mm(T/T) 5500 kPa(g)
SIZE: DESIGN PRESS : DESIGN TEMP. :
DUTY: 25.936 MMKJ/Hr (7.204 MW) 5500 kPa(g)
180C
LINING :
180C
1.
UCP
2.
UIC
3.
EPOXY (INTERNAL) FROM 1-P-356C 12MM SS TUBING
K
DWG NO. 1153
REFER
LEGEND
UNIT
CONTROL
ANTISURCE
P&ID
No.
3713-00-02-41-0110
&
3713-00-02-41-0111
FOR
4.
DELETED
5.
DELETED
6.
LOCATE
7.
DELETED
L
PANEL
CONTROLLER
NOTES.
K
1.5G2.5 5500 PSV 0301C
DWG NO. 1136
I
NOTE-8 TAH
TAH
TI
PALL
TI
0303C
0304C
TT
PSLL
TT
0301C
0303C
0304C
0301C
TAL
UCP
UCP
CSO
V/F
0311C
1.5G2.5
TIC
TSHH
SS
INST.
0307C
D1
PIPING
I/P
3/4"
0304C
PAL
A1
CSO
3/4" CSC
2" 2"-P-D1-1066C
2"-P-D1-1067C
FT 0301C
PT 0306C
PSLL
PI
I
0312C
0309C
H
V/F
PI
TI
0305C
0303C
S/D
M
I
I
THIS
2"-P-D1-1051C 16"-P-D1-1017C
0303C
I
NOTE-9
0302C
TYPE.
BE
I
UTILISED
PAHH
0308C
0308C
NO.
BY
SET
SOLAR
FOR
LUBE
OIL
PUMP
PAL-0304C PALL-0307C
PB
PB
0301C
0302C
TAH-0306C
50
TAL-0306C
UCP
CONTROL
I
POINT
4400 750 900 800 2300
PAH-0304C
NOTE-9
SPEED
1-K-253C TRIP
WAFER
SHALL
TAG.
PALL 0307C
PSHH
GOVERNOR
M
TOL
J
ROOM.
PALL-0303C
XI
8"-P-D1-1037C
10"x12"
12"x16"
FROM HP COMPRESSOR SUCTION HEADER
PLATE
PSLL
I
XI
I
DWG NO. 1002
DUAL
13.
2"
G
ON
SYSTEM VENDOR REQUIREMENT. 12.
UCP PSLL
CONTROL
PAHH-0308C
V/F
0307C
AVAILABLE
UCP.
FROM VSHH-0302C
FROM VSHH-0301C
UIC-0301C
TI
BE
0302C
PAL
NOTE-13
0305C
SHALL
COMPRESSOR
VAHH
0301C
PI 0306C
AS
10. USE 20 MESH PER VENDOR REQUIREMENT.
DWG NO. 1204
M
VAHH
PAH
V/F
PT 0310C
INDICATIONS
WELL
CONTROL
NOTE-8
V/F
THESE AS
LOCAL
3/4"
VSHH
S/D
UCP
POINT.
9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN
0302C
MOTOR
I
16"-P-D1-1030C
D1
3/4"
PT
TAP-OFF
11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR
*
MOTOR 0301C
0304C
TO
NOTE-12
* VSHH
V/F
PAH
TOL
1-AC-251C 3/4"
PIC
CLOSE
TO 1-V-252C
12"-P-D1-1031C-IS
16"-P-D1-1030C
TS
ALL DCS
12"-P-D1-1032C
CSO
I
8.
TY
V/F
0302C
FV-0301C
DWG NO. 1204 TAL
0306C
NOTE-10
PSV
0306C
NOTE-11
ST-0301C
5500
FROM TT-0306C
TAH
I PDI
FIRE CASE
4"-SV-A1-2506C
TO HP FLARE
4"-SV-A1-2505C
FIRE CASE
NOTE-8
4"-FL-A1-2406C
J
kPa(g) kPa(g) kPa(g) kPa(g) kPa(g)
H
C
44
C
TAHH-0307C
170
C
LAH-0301C
400MM
FROM
BTL
LAL-0301C
200MM
FROM
BTL
LAHH-0304C
465MM
FROM
BTL
LALL-0303C
150MM
FROM
BTL
TAH-0301C
55
C
TAL-0301C
45
C
TAH-0304C
165
C
PAH-0306C
4250 kPa(g) 3200 kPa(g)
PAL-0306C
G
VAHH-0301C LSHH
F LAH
0301C
LAL
LT
LG
0301C
0302C
LIC
LAHH
0304C
1-V-251C
1-DGT-253C
V/F
0304C
1-K-253C
VAHH-0302C
PDI-0311C(MAX)
ST
ON 2nd STAGE COMPR. DISCHARGE BIAS
SIC
0303C
OVERRIDE
LSS
VENDOR'S SCOPE (SOLAR)
I
E
XV-0302C
I/P
LSLL-0303C
0302C
ZIO
0302C
0302C
XV
ZSO
ZSC
V/F
0301C
V/F
ZSO 0301C
CONTROL PANEL
FC
3/4"
PB 0306C
PB
2"-DH-A1-2201C
ESD SIGNAL
14.3.97
AS - BUILT
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
FO
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
4"
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
NORMAL STOP
3/4"
METHANOL 12MM SS TUBING NNF
FAST STOP
D1
DWG NO. 1150
E1
Rev.
Date
Description of revision
DD-MM-YY
Company;
3/4"
XI
1-K-253C TRIP
PB
PB
0304C
0303C
START MACHINE
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
CLOSE
I
START PRESSUR1SATION
UA
XV-4601C, XV-0302C, XV-0401C, XV-0402C
Worley
Basic Engineering:
ON 1-K-253C TRIP
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
USD
0301C
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
0302C
COMMON
COMMON
ALARM
TRIP
M/C PARAMETER
Company's contract No.:
M/C PARAMETER
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
ITEM NO.:
1-DGT-253C
ITEM NAME: A
1-K-253C
HP COMPRESSOR
CAPACITY : DIFF. PR. :
3
HP COMPRESSOR
GAS TURBINE DRIVER
1st STAGE
15
14
13
12
11
10
9
1
Document title:
3
2
5
0
Rev.
2
4
1
1
2
0
3
B
HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'C')
Company's document No.:
3107 kPa
16
7
Path\File name\Initials:
75450 Nm3/hr (GUARANTEE)
9.219 MW
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
PLC-1 (NORMAL S/D)
SS TUBING
EIL
CONSORTIUM
Contractor:
0301C
V/F
I
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
1-K-253C UCP
I
FROM PLC-1/2 (FAST STOP) INST. DRAIN
E
3
PIPING INST.
TO COH
B
0305C
D1 A1
NC
COOLER VENDOR'S SCOPE OF SUPPLY
B
3/4"
2"
C
VENDOR'S SCOPE OF SUPPLY (SOLAR)
V/F
SURGE CONTROL
DWG NO. 1003
3/4"
A1 D1
FV
0301C
FROM STATION
1"
V/F *
I
LV
2"-P-D1-1029C FC
UCP
0301C
0302C
DWG NO. 1136
0301C
FY
LY 0301C
0302C
ZIO
UCP
I
14"-P-D1-1037C
IAS ZSC
0301C
NOTE-6
I/P
0302C
V/F
S
0301C
S
TO HP FLARE
CMR
V/F
I
CMR
ZIC SOV 0301C
1-K-253C TRIP
D
I
UCP
CLOSE FROM
LEGEND:
DWG NO. 1204
0304C
0301C
ZIC
F
kPa
FROM PIC-0410C
V/F
LALL
LSLL 0303C
SOV
20
0301C
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
TO
TO
TAHH 0307C
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
REFERS
REFERS
Path\File name\Initials: 8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131203
16
15
12
13
14
ITEM NO. ITEM NAME L
SIZE : DESIGN PRESS : DESIGN TEMP :
9
10
11
8
180 C
5
H.P. DISCHARGE SCRUBBER 1122 mm (ID) X 2415 mm(T/T) 14000 kPa(g)
L
1. REFER LEGEND P&ID No.
°
3713-00-02-41-0110 &
EPOXY (INTERNAL)
°
EPOXY (INTERNAL)
TO 1-DGT-253C SPEED CONTROL
1
NOTES:
65 C
180 C
°
2
3
4
1-V-253C
1-AC-252C H.P. DISCHARGE COOLER DUTY: 22.236 MMKJ/H (6.177 MW) 14000 kPa(g)
LINING :
6
7
1-V-252C H.P. INTERSTAGE SCRUBBER 1710 mm (ID)X 2750 mm(T/T) 8400 kPa(g)
3713-00-02-41-0111 FOR NOTES.
2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.
DWG NO. 1203
V/F
FY
FV
0401C
FO
70.99
0403C
NOTE-2
V/F
IS
NO POCKETS
NOTE-7
2J3 14000
3" F1 E1
PSV
D1 F1
J
RO 0401C
CSO
4"-P-F1-1125C-IS
NNF
SS
F1
INST. PIPING UCP
UCP
I
I
TAHH
PAHH
TI
0405C
0409C
0408C
TAH
FT 0402C
V/F
1E2 8400
G
PSV 0401C
2"-P-D1-1044C
CSO
F
DWG NO. 1136
FIRE CASE
2"-P-D1-1071C
CASE
TAH TAL
TT 0401C
NOTE-3
3"-FL-A1-2407C
FIRE
3"-SV-A1-2507C
TIC-0306C
0306C
3"-SV-A1-2508C
DWG NO. 1203
TI 0401C
1E2 8400
PSV 0402C
CSO
PI
PAH
0401C
PAL
NOTE-5
NOTE-3 PID 0412C
PSHH
TT
FT
0409C
0408C
0401C
VENT
3/4"
D1
2"
3/4"
FROM 1-AC-251C
12"-P-D1-1032C
DWG NO. 1203
TAL
PIPING
F1
INST.
SS
NO.
SET
PALL-0407C PALL-0412C VENT
CC 0402C
VSHH
FROM
0401C
*
8"-P-E1-1035C
VSHH-0401C
M
1-K-253C TRIP VSHH
VSHH-0402C
M
I
1-V-253C
FROM
0402C
PB
I
0401C
0407C
0401C
MOTOR
I
NOTE-4
S/D
I
0402C
0402C
NOTE-4
C
55
C
LSHH
LT
LG
0402C
0406C
I
LAH-0401C
290
MM
FROM
BTL
LAL-0401C
130
MM
FROM
BTL
LAHH-0404C
774
MM
FROM
BTL
50
MM
FROM
BTL
LAHH-0408C
465
MM
FROM
BTL
LALL-0407C
150
MM
FROM
BTL
LAH-0402C
400
MM
FROM
BTL
LAL-0402C
200
MM
FROM
BTL
PAH-0401C
4250 kPa(g) 3200 kPa(g)
TAH-0401C
50 44
LAHH
PAH-0405C
0408C
PAL-0405C
H
C C
13000 kPa(g) 10500 kPa(g)
TAH-0408C
PB
MOTOR
C
35
TAHH-0409C
TAL-0401C
I
VAHH
C
50
TAL-0406C
PAL-0401C
0408C VAHH
PSLL
172
TAH-0406C
LALL-0403C
M
NO POCKETS
3/4"
*
POINT
13200 kPa(g) 4500 kPa(g) 2300 kPa(g)
PAHH-0409C
2"
3/4" 3/4"
I
TAG.
0407C TT 0406C
V/F
UCP
165
C
VAHH-0401C
G
VAHH-0402C
S/D
LALL
LSLL
PDI-0412C(MAX)
0407C
0407C
XI
XI
0401C
0402C
LIC 0402C
0412C
V/F
V/F
PSLL
PT
0411C
0405C
NOTE-8
20
kPa
PI 0405C
LAH
I
LAL
XV-0402C
CLOSE
PAH
F
PAL
NOTE-3 TI
2"-P-D1-1041C
TOP
TAH
CSC
PSLL
UCP
TI 0406C
PI
0412C
2"
PUMP CONTROL.
0408C
PALL
CSC
CSO
TSHH 0409C TI
F1
3/4"
J
8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL TAHH 0409C
TAHH-0405C
PALL 0407C
UCP
A1
7. DUAL PLATE WAFER TYPE.
0404C
6"-P-F1-1042C-IS
TSHH
NOTE-6
V/F
SYSTEM VENDOR REQUIREMENT. UCP
CSO
V/F
0405C
8"-P-F1-1034C-IS
PT 0401C
TT
I
PSV
CSO
TS
3"-P-D1-1069C
NO POCKETS
DWG NO. 1146
TO HP FLARE
H
6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR 14000
1-AC-252C
ST-0401C
TO FUEL GAS SKID
5. USE 20 MESH PER VENDOR REQUIREMENT.
8"-P-E1-1070C
2J3
A1
12"-P-D1-1033C
21.05
0402C
IN LOCAL CONTROL ROOM.
6"-P-FI-1073C-IS
3/4"
K
4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE
PT
F1
V/F
RO
DWG NO. 1005
NO POCKETS
2"
I
I
0402C
ENTRY
M
NO POCKETS
TI 0404C
1-K-253C TRIP
LAH
LT
LG
0401C
LAL
0401C
0405C
I SOV 0401C CMR
ZIC
ZIO
0401C
0401C
LY LALL
LSLL
0403C
0403C
S
0402C
D TO CONDENSATE
XV
ZSC
ZSO
0401C
0401C
0401C
0401C
DWG NO. 1008
FC
0402C
1"
I
LV
3/4"
I/P
I/P 0401C
ACCUMULATOR
1-K-254C LY
LY
IAS
1"
CLOSE XV-0401C
2"
LEGEND:
E1 A1
D1 F1
2"-DH-A1-2203C
LIC
0404C
3/4"
2"-P-D1-1036C
SS TUBING
NC
FC
FC
3/4"
B1 D1
*
INST. DRAIN
3/4"
3/4" 2"
VENDOR'S SCOPE OF SUPPLY (SOLAR) COOLER VENDOR'S SCOPE OF SUPPLY
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
NC D1
2"-DH-A1-2202C
C FROM
LSLL-0407C, 1-K-253C TRIP
I 0402C
CMR
B
ZIC
ZIO
0402C
0402C
IAS
XV
ZSC
ZSO
0402C
0402C
0402C
DWG NO. 1124
3/4"
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED
SS TUBING
NEW DELHI - INDIA
Worley
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
2"-P-E1-1074C
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
Rev.
FC
3
1-V-254C
ITEM NO.
14
13
12
11
3
2
Path\File name\Initials: 10
5
0
2
4
1
1
2
0
4
B
HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-C
Company's document No.:
8743 kPa
15
1
Document title:
2nd STAGE 67696 Nm3/hr
CAPACITY : DIFF. PRESS :
7
Path\File name\Initials:
H.P. COMPRESSOR
ITEM NAME
16
EIL
CONSORTIUM
Contractor:
A1 E1
A
VIETSOVPETRO
DWG NO. 1154
EIL
ISH
PETECHIM/VIETSOPETRO
Basic Engineering:
S
TO OILY WATER TREATMENT
12MM SS TUBING
Company;
INST. DRAIN
TO CDH
SOV
FROM 1-P-357C
A1
E
VENDOR'S SCOPE
V/F
DWG NO. 1137
1-V-252C
FROM
LSLL-0403C, LSHH-0807 PSHH-0805, 1-K-253C TRIP
LAHH
0404C
TO CDH
0402C
LSHH
6"x8"
I
CC 0401C
E
10"x12"
PI
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
NOTE-3
I
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
6"-P-F1-1043C-IS
12MM SS TUBING
DWG NO. 1150
0403C
53.79
3/4"
METHANOL
8"-P-E1-1038C
0401C
RO
0401C
IS
DCS AS WELL AS COMPRESSOR UCP.
GAS HEADER
PIC 0401C
E1
ZSC
0401C
10"-P-D1-1070C
V/F
0401C
V/F
ZSO
UCI-0401C
I/P
DWG NO. 1136
I
V/F
CMR
6"-SV-A1-2509C
S
TO HP FLARE
I
I SOV
0403C
6"-SV-A1-2516C
V/F
ZIC 0401C
UCP
6"-FL-A1-2408C
ZIO 0401C
UCP
K
3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON
TO DISCHARGE
UCP
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131204
16
15
12
13
14
9
10
11
8
GLYCOL FLASH DRUN
L
6
7
5
1-F-311A/B
1-V-311A
DES. TEMPERATURE °C: 75
DES. PRESSURE kPa(g):700
DES. PRESSURE kPa(g): 700
1.
DIMENSION-864 O/DIA x 1522 T/T
DIMENSION-230 I/DIA x 1233 T/F.F
DES. TEMPERATURE °C: 75
1
NOTE:
GLYCOL CHARCOAL FILTER
GLYCOL CARTRIDGE FILTER
DIMENSION 1300 I/DIA x 3900 T/T
2
3
4
1-F-312A
TO
BE
LOCATED
CLOSE
TO
L
PCV-1010A
DES. TEMPERATURE °C: 75
DES. PRESSURE kPa(g): 700 TO LP PLARE
4"-FL-A1-2414A-IS
K
1009A
K
2"
2"-P-A1-1080A 2"x1"
3/4"
FO
1"
1010A
2"x1"
2"x1"
1001A
2"x1 1/2"
PSV
1"X1"
1004A
700
2"
2"x1"
3/4" 2"
1016B
2"x1 1/2"
3/4"
PI
PSHH
PSLL
1010A
1011A
1022A
2"
2"x3/4"
H 50mm
I LSHH
M
F
LI 1011A
LAL
LT
I
1011A
SG
CLOSE XV-0903A
LSLL
LALL
1010A
0101A
LG
LT 1001A
TI 1009A
PSV
1"X1"
1003A
700
2"
2"
2"
1"
2"
2"x1"
BTL
FROM
BTL
mm
FROM
BTL
LAH-1001A
550
mm
FROM
BTL
LAL-1001A
450
mm
FROM
BTL
PAH-1009A
400 kPa (g) 300 kPa (g)
I
PDI-1007A(MAX.) PDI-1008A(MAX.)
H
PI
G
2"x3/4"
CSO
F
PI 1016A
2"x1"
1-F-312A
3/4"
2"
2"
2"x3/4"
2"
E
2"x1"
2"
1-F-311A
1" 2"x1"
NO
NO
D
2"
1"
2"-GL-A2-8257A-IH
2"x1"
1" 2"x1"
2"-DV-A1-2341A
C
BTL
FROM
mm
350
FB
H 50mm
E
FROM
mm
650
LAL-1011A
1013A
CLOSE XV-0903A
1002A
mm
350
LAH-1011A
3/4"
2"
LAHH
CSO
2"x1 1/2"
NC
2"x1"
1003A
650
LALL-1010A
FB
1-F-311B
2"x1"
2"x3/4"
1003A
3"
3"x2"
PSV
1"
1-V-311A
LAH
2" NC
1 1/2" F 2"
1005A
2"-GL-A2-8251A-IS
G
XV-0903A
PT 1009A
700
H 50mm
DWG NO. 1010
2"x3/4"
2"-GL-A2-8248A-IS
2"-GL-A2-8220A-IH
I CLOSE
2"-GL-A2-8245A-IH
CONDENSER
I CLOSE XV-0903A
2"-P-A1-1116A-IS
FROM OVER HEAD
PALL 1022A
2"-GL-A2-8252A-IS
PAL
2"-P-A1-1117A-IS 2"
PAHH 1011A
2"-GL-A2-8250A-IH
PAH
J
POINT
LAHH-1003A
PAL-1009A
NC
2"-GL-A2-8246A-IH
PI 1009A
H 50mm
LC FB
2"
2"-GL-A2-8249A-IS
2"-P-A1-1118A-IS
SET
500 kPa(g) 200 kPa(g)
PALL-1022A
DWG NO. 1310
3"-GL-A2-8254A-IS
2"
FB
NO.
PAHH-1011A
ACCUMULATOR
2"x1"
2"
2"
2"-GL-A2-8253A-IS
CSO
3/4"
4"x2"
PI
3/4"
H
TO LV 1001A DWG NO. 1010
H 50mm
FB
GAS SYSTEM
NOTE-1
FB
700
LO LO
2"x1"
DWG NO. 1010
LAL
PSV
4"
1"
2"-FG-A1-6377A-IH
TO GLYCOL
4"x2 1/2"
2"-FL-A1-2414A-IS
1 1/2" G 2 1/2" 1002A
4"x2 1/2"
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
FB
I
LAH
LIC 1001A
FC
TAG. LO
4"-SV-A1-2528A-IS
700
4"
4"-SV-A1-2527A-IS
FROM LP FUEL
2"
PSV
J
SET @345 kPa(g)
PCV
2"-FG-A1-6374A-IH
1 1/2" G 2 1/2"
DWG NO. 1010
SET @355 kPa(g)
PCV
1"
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
PDI
PDI
1007A
1008A
TO LEAN/RICH GLYCOL HEAT
DWG NO. 1010
EIL
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
EXCHANGER
2"-GL-A2-8231A-IH
EIL
ISH
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
2"-GL-A2-8216A-IH
3/4"
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B FROM GLYCOL
TO
REGENERATOR
DRAIN SYSTEM
2"-DH-A1-2237A DWG NO. 1010
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
DWG NO. 1310
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification: TP8
3
DWG NO. 1137
1
3
3
1
0
2"-DW-A1-2236A
Document title:
4
1
1
2
1
0
B
GAS DEHYDRATION UNIT TRAIN-"A"
Company's document No.: Path\File name\Initials:
16
Rev.
2
Path\File name\Initials:
TO CDH
A
7
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131210
16
15
12
13
14
L
HX901B-1/2
ITEM NAME
6
7
5
1
NOTES:
L
1. QUICK CLOSING VALVE AT ACCESSIBLE LOCATION.
2.8 MW
176°C
DESIGN TEMP.
2
3
4
POWER GENERATOR
2068 kPa (g)
DESIGN PRESS.
8
1-PK-501B
LUBE OIL COOLERS
DUTY
9
10
11
ITEM NO.
2. UCP LOCATED IN LCR. 3. PIPES ARE ACID CLEANED.
K
K VENT TO SAFE LOCATION
HX901B-2 2"-LO-A10-9513B
2"-LO-A10-9512B NOTE-3
FA-901B
NOTE-3
FLA 901B
V/F
J
J
M 4"x6"
4"-VG-A1-2650B
M
33
34
3
B149531
B149531
B149531
SHT 5
SHT 5
SHT 5
H
FSA-901B
I
EXHAUST DUCT AIR INTAKE
FUEL GAS PILOT VENT
NOTE-3
I
DUCT
1 AN-0002 276
NOTE-1
FUEL GAS DWG NO. 1134
2"-FG-B1-6336-IE
NOTE-3
20
SHT 6
V/F
G
B149532
1-PK-501B
OUTSIDE
INSIDE
TURBINE
TURBINE
ROOM
ROOM
H
B149532
FS-931B
SHT 6
30
3/4"-VG-A1-2651B
G
TURBINE
GEN.
F
F ESD SIGNAL FROM
PLC-1/2 I
RUNNING INDICATION
SHT 3
50061-B149531 SHT 1-5 LUBE OIL SYSTEM 50061-B149532 SHT 1-6 GAS FUEL SYSTEM
V/F
50061-AN-0002 SHT 1-2 EXHAUST SYSTEM
3801B
CO2 SYSTEM
B149776
REFER SOLAR P&ID's:
UCP 1-PK-501B
XI
3/4"-C-A3-8135B
97
NOTE-2
V/F
1/2"-C-A3-8136B
98
50061-B149536 SHT 1-4 HYDRAULIC START SYSTEM 50061-B149776 SHT 1-11 MECHANICAL INSTALLTION
E
LEGEND:
E
V/F
SHT 5 25
B149532
B149532
B149536
SHT 6
SHT 6
SHT 4
B149531 SHT 5
SHT 6
22
19
65
25
21
LUBE OIL
126
B149532
3/4"
WATER WASH CONN.
RESERVOIR DRAIN
HYDRAULIC STARTER
1"-DH-A1-2263B
TANK DRAIN
COMBUSTOR DRAINS
3/4"-DH-A1-2262B
ENGINE EXHAUST COLLECTOR &
ENGINE AIR
INLET DUCT DRAIN
1"-DH-A1-2261B
LUBE OIL DRAIN
3/4"-DH-A1-2260B
3/4"-DH-A1-2259B
ODD
LUBE OIL FILTER DRAIN
2"
ODD
C
FURNISHED
VENDOR B149531
126
2"-DW-A1-2324B
D
VENDOR
B149776 SHT 3
2"-DW-A1-2322B
126
2"-DW-A1-2323B
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
NOTE-3
4"-VG-A1-2650B
2"-LO-A10-9511B
2"-LO-A10-9510B
V/F
LUBE OIL TANK VENT
HX901B-1
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev. ODD
Date
Description of revision
DD-MM-YY
Company; VIETSOVPETRO
COMPANY
CONSORTIUM BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
DWG NO. 1137
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
TO CDH
2"-DH-A1-2229B
EIL
PETECHIM/VIETSOPETRO
Contractor:
TO CDH
EIL
ISH
Worley
Basic Engineering:
DWG NO. 1137
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
5
0
0
Rev.
2
4
1
1
2
3
8
B
Path\File name\Initials: A
Document title:
POWER GENERATOR- 'B'
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131238
16
15
12
13
14
L
ITEM NAME
DESIGN TEMP.
6
7
5
1
NOTES:
L
1. QUICK CLOSING VALVE AT SKID EDGE.
VENDOR VENDOR
2. PIPES ARE ACID CLEANED.
VENDOR
130°C
2
3
4
FILTER-COALESCER
1.73 MMKJ/HR (481 KW) 10.8 kPa (g)
DESIGN PRESS.
8
FSA-901C
LUBE OIL COOLER
DUTY
9
10
11
1-LC-252C (HX901-1)
ITEM NO.
3. USE HOSE AND PNEUMATIC TRANSFER PUMP TO COLLECT LUBE OIL IN DRUMS.
K
K
VENT TO SAFE LOCATION
TAG NO.
SET POINT
VAHH-5601C
V/F
PDI
3/4"-VG-A1-2645C
* 3.0
901C
RO 5601C
J
PDI-903C(MAX)
FA-901C FLA
903C
V/F
8"-VG-A1-2638C
J
A1
RT
33
34
149291
149291
SHT 6
SHT 6
FROM D-R 149291 SHT 6
149291
149770
SHT 6
SHT 2 149770
586C
H DWG NO. 1134
3"-FG-B1-6332-IE
FE-930C
NOTE-2
INTERFACE
B149370
20
317-962 SHT 1
PT
V/F
586C
DWG NO. 1203
CENTRIFUGAL
TURBINE
(TR586)
TO 1-K-253C UCP
FG. FILOT VENT
SEAL VENT
SEAL VENT
2"-VG-A1-2642C
Z3
(TPO586)
G
2"-VG-A1-2641C
T3
586C
TO 1-K-253C UCP
2"-VG-A1-2646C
W3
COMPRESSOR
317-962 SHT 2
H
2"-VG-A1-2640C
V3
PDT
V/F
2
SHT 3
V/F
I
SHT 2
HP COMPRESSOR TRAIN- 'C'
NOTE-1
FUEL GAS
SEAL VENT
DUCT
1
3
PACKACE
EXHAUST
AIR/GAS VENT
AIR INTAKE DUCT
SEAL VENT
M
8"-VG-A1-2638C
LUBE OIL VENT
5601C
(RT586)
G
2"-VG-A1-2647C
U3
DWG NO. 1203
2"-VG-A1-2648C
AA3 AE3
INST. AIR DWG NO. 1140
1"x1/2"
1"-A1-A3-5116C
K3
317-962
B149370
SHT-1
SHT 3
1"-VG-A1-2649C
30
F
F
REFER SOLAR P&ID's: 49901-B149370 SHT 1-3. (FUEL GAS SYSTEM) 49901-149291 SHT 1-6. (LUBE OIL SYSTEM) 49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN) 49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM) 49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)
SEAL GAS 317-962 SHT-1
REFER DRESSER-RAND P&ID's:
126
164
3/4"x1"
B149471
SHT 2
SHT 3
22
65
3/4"x1"
G3
3/4"x1"
B149770
B149770
SHT 2
SHT 2
D1
F1
A1
A1
1"
WATER
1"-DW-A1-2256C
HP. CASING DRAIN
LP. CASING DRAIN
2"-DH-A1-2268C
RESERVOIR DRAIN
CONN.
HYDRAULIC STARTER
AIR INLET DUCT DRAIN
LUBE OIL DRAIN
LUBE OIL DRAIN
1"-DH-A1-2266C
1"-DH-A1-2265C
1/4" 1"-DH-A1-2264C
LUBE OIL FILTER DRAIN
SEAL GAS HEATER
CONDENSATE DRAIN
SHT 6
V/F
2"
2"
VENDOR FURNISHED
126 VENDOR
26
19/1
21
H3
WASH
ODD
LEGEND:
2"
NOTE-3
*
COOLER
VENDOR
(SOLAR)
(SOLAR)
FURNISHED
2"
2"-DW-A1-2351C ODD
64
3/4"x1"
1/4"x3/4"
C
B149770
SHT 6 54
126
B149291
149291
126
D
E
317-962 SHT 1-3. (GAS SEAL SYSTEM)
AG3
V/F
1"-C-A3-8138C (EXTENDED)
98
2"-DW-A1-2316C
E
CO2 SYSTEM
SHT 5
COMBUSTOR DRAINS
J3
1.5"-C-A3-8137C (MAIN)
97 149746
EXHAUST COLLECTOR &
1"-P-E1-1160C
1"-DW-A1-2267C
DWG NO. 1056
2"
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
VF
FSA-901C
6"x4"
VSHH
VAHH 5601C
I
4"-LO-A10-9501C
6"x4"
LUBE OIL TANK VENT
4"-LO-A10-9501C
I
4"-VG-A1-2639C
MOTOR S/D
V/F
A10 NOTE-2
1-LC-252C
AIR/GAS VENT
NOTE-2
LUBE OIL TANK DRAIN
B
14.3.97
AS - BUILT
1
18.10.96
REVISRD AS MARKED
0
20.3.96
APPROVED FOR CONSTRUCTION
Rev.
Date
Company; ODD
ODD
SDH
SA
Description of revision
DD-MM-YY
ISH
MSP
AC
PH
JUY
EIL
EIL
WORLEY
SHI
LOC
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
ODD
ODD
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
TO CDH
2"-DH-A1-2269C
Worley
Basic Engineering:
DWG NO. 1137
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
2
5
0
Rev.
2
4
1
1
2
5
6
B
Path\File name\Initials: A
Document title:
HP COMPRESSOR TRAIN-C INTERFACES
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131256
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES 1-V-251D
ITEM NO.:
L
1-AC-251D
H.P. INLET SCRUBBER
ITEM NAME:
H.P. INTERSTAGE COOLER
2110 mm(ID) x 3025 mm(T/T) 5500 kPa(g)
SIZE: DESIGN PRESS : DESIGN TEMP. :
DUTY: 25.936 MMKJ/Hr (7.204 MW) 5500 kPa(g)
180C
LINING :
180C
1.
UCP
2.
UIC
3.
EPOXY (INTERNAL) FROM 1-P-356D 12MM SS TUBING
K
DWG NO. 1153
REFER
LEGEND
UNIT
CONTROL
ANTISURCE
P&ID
No.
3713-00-02-41-0110
&
3713-00-02-41-0111
FOR
4.
DELETED
5.
DELETED
6.
LOCATE
7.
DELETED
L
PANEL
CONTROLLER
NOTES.
K
1.5G2.5 5500 PSV 0301D
DWG NO. 1136
I
NOTE-8 TAH
TAH
TI
PALL
TI
0303D
0304D
TT
PSLL
TT
0301D
0303D
0304D
0301D
TAL
UCP
UCP
CSO
V/F
0311D
1.5G2.5
TIC
TSHH
SS
INST.
0307D
D1
PIPING
I/P
3/4"
*
0304D
PAL
A1
CSO
3/4" CSC
2" 2"-P-D1-1066D
2"-P-D1-1067D
FT 0301D
S/D
V/F
PT 0306D
PSLL
PI
I
0312D
0309D
H
V/F
PI
TI
0305D
0303D
S/D
M
I
I
THIS
2"-P-D1-1051D 16"-P-D1-1017D
0303D
I
NOTE-9
0302D
TYPE.
BE
I
UTILISED
PAHH
0308D
0308D
NO.
BY
SET
SOLAR
FOR
LUBE
OIL
PUMP
PAL-0304D PALL-0307D
PB
PB
0301D
0302D
TAH-0306D
50
TAL-0306D
UCP
CONTROL
I
POINT
4400 750 900 800 2300
PAH-0304D
NOTE-9
SPEED
1-K-253D TRIP
WAFER
SHALL
TAG.
PALL 0307D
PSHH
GOVERNOR
M
TOL
J
ROOM.
PALL-0303D
XI
8"-P-D1-1037D
10"x12"
12"x16"
FROM HP COMPRESSOR SUCTION HEADER
PLATE
PSLL
I
XI
I
DWG NO. 1002
DUAL
13.
2"
G
ON
SYSTEM VENDOR REQUIREMENT. 12.
UCP PSLL
CONTROL
PAHH-0308D
V/F
0307D
AVAILABLE
UCP.
FROM VSHH-0302D
FROM VSHH-0301D
UIC-0301D
TI
BE
0302D
PAL
NOTE-13
0305D
SHALL
COMPRESSOR
VAHH
0301D
PI 0306D
AS
10. USE 20 MESH PER VENDOR REQUIREMENT.
DWG NO. 1304
M
VAHH
PAH
V/F
PT 0310D
INDICATIONS
WELL
CONTROL
NOTE-8
UCP
THESE AS
LOCAL
0302D
MOTOR
I
16"-P-D1-1030D
D1
3/4"
PT
POINT.
9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN
3/4"
VSHH
MOTOR 0301D
0304D
TAP-OFF
11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR
*
VSHH
V/F
TO
NOTE-12
3/4" PAH
TOL
1-AC-251D
12"-P-D1-1031D-IS
PIC
CLOSE
TO 1-V-252D
16"-P-D1-1030D
TS
ALL DCS
12"-P-D1-1032D
CSO
I
8.
TY
V/F
0302D
FV-0301D
DWG NO. 1304 TAL
0306D
NOTE-10
PSV
0306D
NOTE-11
ST-0301D
5500
FROM TT-0306D
TAH
I PDI
FIRE CASE
4"-SV-A1-2506D
TO HP FLARE
4"-SV-A1-2505D
FIRE CASE
NOTE-8
4"-FL-A1-2406D
J
kPa(g) kPa(g) kPa(g) kPa(g) kPa(g)
H
C
44
C
TAHH-0307D
170
C
LAH-0301D
400MM
FROM
BTL
LAL-0301D
200MM
FROM
BTL
LAHH-0304D
465MM
FROM
BTL
LALL-0303D
150MM
FROM
BTL
TAH-0301D
55
C
TAL-0301D
45
C
TAH-0304D
165
C
PAH-0306D
4250 kPa(g) 3200 kPa(g)
PAL-0306D
G
VAHH-0301D LSHH
F LAH
0301D
LAL
LT
LG
0301D
0302D
LIC
LAHH
0304D
1-V-251D
1-DGT-253D
V/F
0304D
1-K-253D
VAHH-0302D
PDI-0311D(MAX)
ST
ON 2nd STAGE COMPR. DISCHARGE BIAS
SIC
0303D
OVERRIDE
LSS
VENDOR'S SCOPE (SOLAR)
I
E
XV-0302D
I/P
LSLL-0303D
0302D
ZIO
0302D
0302D
XV
ZSO
ZSC
V/F
0301D
V/F
ZSO 0301D
CONTROL PANEL
FC
3/4"
PB 0306D
PB
2"-DH-A1-2201D
ESD SIGNAL
14.3.97
AS - BUILT
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
FO
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
4"
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
NORMAL STOP
3/4"
METHANOL 12MM SS TUBING NNF
FAST STOP
D1
DWG NO. 1150
E1
Rev.
Date
Description of revision
DD-MM-YY
Company;
3/4"
XI
1-K-253D TRIP
PB
PB
0304D
0303D
START MACHINE
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
CLOSE
I
START PRESSUR1SATION
UA
XV-4601D, XV-0302D, XV-0401D, XV-0402D
Worley
Basic Engineering:
ON 1-K-253D TRIP
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
USD
0301D
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
0302D
COMMON
COMMON
ALARM
TRIP
M/C PARAMETER
Company's contract No.:
M/C PARAMETER
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
ITEM NO.:
1-DGT-253D
ITEM NAME: A
1-K-253D
HP COMPRESSOR
CAPACITY : DIFF. PR. :
3
HP COMPRESSOR
GAS TURBINE DRIVER
1st STAGE
15
14
13
12
11
10
9
1
Document title:
3
2
5
0
Rev.
2
4
1
1
3
0
3
B
HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'D')
Company's document No.:
3107 kPa
16
7
Path\File name\Initials:
75450 Nm3/hr (GUARANTEE)
9.219 MW
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
PLC-1 (NORMAL S/D)
SS TUBING
EIL
CONSORTIUM
Contractor:
0301D
V/F
I
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
1-K-253D UCP
I
FROM PLC-1/2 (FAST STOP) INST. DRAIN
E
3
PIPING INST.
TO COH
B
0305D
D1 A1
NC
COOLER VENDOR'S SCOPE OF SUPPLY
B
3/4"
2"
C
VENDOR'S SCOPE OF SUPPLY (SOLAR)
V/F
SURGE CONTROL
DWG NO. 1003
3/4"
A1 D1
FV
0301D
FROM STATION
1"
V/F *
I
LV
2"-P-D1-1029D FC
UCP
0301D
0302D
DWG NO. 1136
0301D
FY
LY 0301D
0302D
ZIO
UCP
I
14"-P-D1-1037D
IAS ZSC
0301D
NOTE-6
I/P
0302D
V/F
S
0301D
S
TO HP FLARE
CMR
V/F
I
CMR
ZIC SOV 0301D
1-K-253D TRIP
D
I
UCP
CLOSE FROM
LEGEND:
DWG NO. 1304
0304D
0301D
ZIC
F
kPa
FROM PIC-0410D
V/F
LALL
LSLL 0303D
SOV
20
0301D
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
TO
TO
TAHH 0307D
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
REFERS
REFERS
Path\File name\Initials: 8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131303
16
15
12
13
14
ITEM NO. ITEM NAME L
SIZE : DESIGN PRESS : DESIGN TEMP :
9
10
11
8
180 C
5
H.P. DISCHARGE SCRUBBER 1122 mm (ID) X 2415 mm(T/T) 14000 kPa(g)
L
1. REFER LEGEND P&ID No.
°
3713-00-02-41-0110 &
EPOXY (INTERNAL)
°
EPOXY (INTERNAL)
TO 1-DGT-253D SPEED CONTROL
1
NOTES:
65 C
180 C
°
2
3
4
1-V-253D
1-AC-252D H.P. DISCHARGE COOLER DUTY: 22.236 MMKJ/H (6.177 MW) 14000 kPa(g)
LINING :
6
7
1-V-252D H.P. INTERSTAGE SCRUBBER 1710 mm (ID)X 2750 mm(T/T) 8400 kPa(g)
3713-00-02-41-0111 FOR NOTES.
2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.
DWG NO. 1303
V/F
FY
FV
0401D
FO
70.99
0403D
NOTE-2
V/F
IS
NO POCKETS
NOTE-7
2J3 14000
3" F1 E1
PSV
D1 F1
J
RO 0401D
CSO
4"-P-F1-1125D-IS
NNF
SS
F1
INST. PIPING UCP
UCP
I
I
TAH
TAHH
PAHH
TI
0405D
0409D
0408D
FT 0402D
V/F
1E2 8400
G
PSV 0401D
2"-P-D1-1044D
CSO
F
DWG NO. 1136
FIRE CASE
2"-P-D1-1071D
CASE
TAH TAL
TT 0401D
NOTE-3
3"-FL-A1-2407D
FIRE
3"-SV-A1-2507D
TIC-0306D
0306D
3"-SV-A1-2508D
DWG NO. 1303
TI 0401D
1E2 8400
PSV 0402D
CSO
PI
PAH
0401D
PAL
NOTE-5
NOTE-3 PID 0412D
PSHH
TT
FT
0409D
0408D
0401D
VENT
3/4"
D1
2"
3/4"
FROM 1-AC-251D
12"-P-D1-1032D
DWG NO. 1303
TAL
PIPING
F1
INST.
SS
NO.
SET
PALL-0407D PALL-0412D VENT
CC 0402D
VSHH
*
FROM
8"-P-E1-1035D
0401D
VSHH-0401D
M
1-K-253D TRIP VSHH
VSHH-0402D
M
I
1-V-253D
FROM
0402D
PB
I
0401D
0407D
0401D
MOTOR
I
NOTE-4
S/D
I
0402D
0402D
NOTE-4
C
55
C
LSHH
LT
LG
0402D
0406D
I
LAH-0401D
290
MM
FROM
BTL
LAL-0401D
130
MM
FROM
BTL
LAHH-0404D
774
MM
FROM
BTL
50
MM
FROM
BTL
LAHH-0408D
465
MM
FROM
BTL
LALL-0407D
150
MM
FROM
BTL
LAH-0402D
400
MM
FROM
BTL
LAL-0402D
200
MM
FROM
BTL
PAH-0401D
4250 kPa(g) 3200 kPa(g)
TAH-0401D
50 44
LAHH
PAH-0405D
0408D
PAL-0405D
H
C C
13000 kPa(g) 10500 kPa(g)
TAH-0408D
PB
MOTOR
C
35
TAHH-0409D
TAL-0401D
I
VAHH
C
50
TAL-0406C
PAL-0401D
0408D VAHH
PSLL
172
TAH-0406D
LALL-0403D
M
NO POCKETS
3/4"
*
POINT
13200 kPa(g) 4500 kPa(g) 2300 kPa(g)
PAHH-0409D
2"
3/4" 3/4"
I
TAG.
0407D TT 0406D
V/F
UCP
165
C
VAHH-0401D
G
VAHH-0402D
S/D
LALL
LSLL
PDI-0412D(MAX)
0407D
0407D
XI
XI
0401D
0402D
LIC 0402D
0412D
V/F
V/F
PSLL
PT
0411D
0405D
NOTE-8
20
kPa
PI 0405D
LAH
I
LAL
XV-0402D
CLOSE
PAH
F
PAL
NOTE-3 TI
2"-P-D1-1041D
TOP
TAH
CSC
PSLL
UCP
TI 0406D
PI
0412D
2"
PUMP CONTROL.
0408D
PALL
CSC
CSO
TSHH 0409D TI
F1
3/4"
J
8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL TAHH 0409D
TAHH-0405D
PALL 0407D
UCP
A1
7. DUAL PLATE WAFER TYPE.
0404D
6"-P-F1-1042D-IS
TSHH
NOTE-6
V/F
SYSTEM VENDOR REQUIREMENT. UCP
CSO
V/F
0405D
8"-P-F1-1034D-IS
PT 0401D
TT
I
PSV
CSO
TS
3"-P-D1-1069D
NO POCKETS
DWG NO. 1146
TO HP FLARE
H
6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR 14000
1-AC-252D
ST-0401D
TO FUEL GAS SKID
5. USE 20 MESH PER VENDOR REQUIREMENT.
8"-P-E1-1070D
2J3
A1
12"-P-D1-1033D
21.05
0402D
IN LOCAL CONTROL ROOM.
6"-P-FI-1073D-IS
3/4"
K
4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE
PT
F1
V/F
RO
DWG NO. 1005
NO POCKETS
2"
I
I
0402D
ENTRY
M
NO POCKETS
TI 0404D
1-K-253D TRIP
LAH
LT
LG
0401D
LAL
0401D
0405D
I SOV 0401D CMR
ZIC
ZIO
0401D
0401D
LY LALL
LSLL
0403D
0403D
S
0402D
D TO CONDENSATE
XV
ZSC
ZSO
0401D
0401D
0401D
0401D
DWG NO. 1008
FC
0402D
1"
I
LV
3/4"
I/P
I/P 0401D
ACCUMULATOR
1-K-254D LY
LY
IAS
1"
CLOSE XV-0401D
2"
LEGEND:
E1 A1
D1 F1
2"-DH-A1-2203D
LIC
0404D
3/4"
2"-P-D1-1036D
SS TUBING
NC
FC
FC
3/4"
B1 D1
*
INST. DRAIN
3/4"
3/4" 2"
VENDOR'S SCOPE OF SUPPLY (SOLAR) COOLER VENDOR'S SCOPE OF SUPPLY
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
NC D1
2"-DH-A1-2202D
C FROM
LSLL-0407D, 1-K-253D TRIP
I 0402D
CMR
B
ZIC
ZIO
0402D
0402D
IAS
XV
ZSC
ZSO
0402D
0402D
0402D
DWG NO. 1124
3/4"
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED
SS TUBING
NEW DELHI - INDIA
Worley
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
2"-P-E1-1074D
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
Rev.
FC
3
1-V-254D
ITEM NO.
14
13
12
11
3
2
Path\File name\Initials: 10
5
0
2
4
1
1
3
0
4
B
HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-D
Company's document No.:
8743 kPa
15
1
Document title:
2nd STAGE 67696 Nm3/hr
CAPACITY : DIFF. PRESS :
7
Path\File name\Initials:
H.P. COMPRESSOR
ITEM NAME
16
EIL
CONSORTIUM
Contractor:
A1 E1
A
VIETSOVPETRO
DWG NO. 1154
EIL
ISH
PETECHIM/VIETSOPETRO
Basic Engineering:
S
TO OILY WATER TREATMENT
12MM SS TUBING
Company;
INST. DRAIN
TO CDH
SOV
FROM 1-P-357D
A1
E
VENDOR'S SCOPE
V/F
DWG NO. 1137
1-V-252D
FROM
LSLL-0403D, LSHH-0807 PSHH-0805, 1-K-253D TRIP
LAHH
0404D
TO CDH
0402D
LSHH
6"x8"
I
CC 0401D
E
10"x12"
PI
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
NOTE-3
I
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
6"-P-F1-1043D-IS
12MM SS TUBING
DWG NO. 1150
0403D
53.79
3/4"
METHANOL
8"-P-E1-1038D
0401D
RO
0401D
IS
DCS AS WELL AS COMPRESSOR UCP.
GAS HEADER
PIC 0401D
E1
ZSC
0401D
10"-P-D1-1070D
V/F
0401D
V/F
ZSO
UCI-0401D
I/P
DWG NO. 1136
I
V/F
CMR
6"-SV-A1-2509D
S
TO HP FLARE
I
I SOV
0403D
6"-SV-A1-2516D
V/F
ZIC 0401D
UCP
6"-FL-A1-2408D
ZIO 0401D
UCP
K
3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON
TO DISCHARGE
UCP
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131304
16
15
12
13
14
9
10
11
GLYCOL ACCUMULATOR
L
8
6
7
1-P-311A/B
1-V-312A
REFER
TO
NOTE
41-0111
DES. TEMPERATURE °C 150
FOR
DUTY kw 10.5 (INSTALLED)
DWG NO. 1010
3 4
3"-GL-A2-8244A-IH
OF
LEGEND
OF
P&ID
CHEMICAL
L
NO.3713-00-02-
INJECTION
POINT.
DUTY kw 100 2.
PORTABLE
PUMP
TAG.
K
-44
DETAILS
DES. PRESSURE kPa(g) 14000
DIFFERENTIAL TEMPERATURE 12750 kPa
DES. PRESSURE kPa(g) FULL VACUUM/350
1
NOTES: 1.
FLOW 3300 kg/hr
DES. TEMPERATURE °C 150
2
3
4
LEAN GLYCOL COOLER
GLYCOL CIRCULATION PUMPS
DIMENSION 915 I/DIA X 2200 T/T
5
1-AC-311A
FROM GLYCOL
"
2"
4"x2"
2"
STORAGE TANK
2"
2"-GL-A2-8222A
DWG NO. 1116
(BALANCE LINE)
TP10
S 50mm
CONNECTION
NO.
SET
POINT
LALL-1007A
200
PAH-0908A/10A PALL-0907A/09A
13200 kPa(g) 11000 kPa(g)
mm
FROM
BTL
K
TAHH-0908A
65 °C
FAL-0901A
2805 kg/HR
LAH-1013A
450
mm
FROM
BTL
LAL-1013A
250
mm
FROM
BTL
50 °C
TAH-0906A
2"-GL-A2-8214A-IS
1-V-312A J LSLL
M
TI
LG
LT
1008A
1004A
1013A
LALL
1007A
1007A
I
LAH
LI 1013A
LAL
VAHH-0901A
TRIP PUMPS
FROM FILTER
FROM LEAN/RICH
I
DWG NO. 1210
1004A
GLYCOL
DWG NO. 1010
RELIEF VALES
4"-GL-A2-8253A-IS
TI
1 2
2"-GL-A2-8242A-IS
"x1"
2"
A2
F2 PSV
1400
2"
2"x1"
0903A
CSO
2"-GL-A2-8213A-IS
FB
1 2
"x1"
A2
F2
14000
2"
2"x1"
PSV
2"x1/2"
H
CSO
0904A
2"-GL-F2-8255A-IS
PI
TI
0904A
0905A
H F2
2"-GL-F2-8207A-IS
2"
1-P-311A
CSO
2"
G
PI 0905A
PSLL
2"
TAH
3/4"
CSO NC
LOW POINT
2"
PALL
0909A
VSHH
0909A
TRIP PUMPS
I
0901A
PB
E
M
1001
3/4"-AI-A3-5139A
M F2
F2
XI
TSHH 0908A
1"-C-A1-8108A
D
PSLL 0907A
1"
1"
NOTE-1
TY
XI
0906A
0903A I
A2
XI 0902A
3"
1"
PB
3"
I
3"
1"
LSLL 1007A A2
"
F
0901A
1-P-311B
A2
0901A
TRIP FROM
A1
1 2
0908A
P
3"x2"
3"x2"
1-P-311A
STOP
2"x1
0903A
NC
1002
E
2"-GL-E2-8208A-IS
"
0910A
TAHH
STOP
VAHH
DAMPNER
1 2
PULSATION
2"x1 1"
PUMPS
TI
PB
FAN
DAMPNER
PAH
DAMPNER
PULSATION
DAMPNER
PAH
TRIP
1-P-311A/B
1003
TRIP
I
0908A
I FROM
I
TRIP PUMPS 1-P-311B
PULSATION
0908A
TSHH
VSHH-0901A
PULSATION NOTE-2
M
0901A
PSH
1-P-311A
TIC 0906A
G TT 0908A
PSLL
0907A
I
0908A
F
TT 0906A
0906A
2"-GL-F2-8209A
PSH
TE 0906A
PI
PALL
0907A
E2
2"x1/2" 2"-GL-F2-8256A-IS
3"-GL-A2-8219A-IS
FB
SPARE
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
1-P-311A/B I
HEAT EXCHANGER
J
3"
STOP
PSLL 0909A
FAL 0901A
3"-GL-A2-8212A-IS
FT
FE
0901A
0901A
TP2
LEAN GLYCOL TO GLYCOL CONTACTOR DWG NO. 1009
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
C
TP9
DWG NO. 1210
EIL
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
2"-DH-A1-2237A
GLYCOL DRAIN
TP6
EIL
ISH
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
TP3 Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
1"x3/4" B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
1"-AI-A3-5117A
CONTAINER
CHEMICAL
SCALE
Type of document
CCP-WT/95
ACCESS FOR
2"-GL-A2-8217A
AMTL. FOAM
DWG NO. 1149
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
INST. AIR DWG NO. 1140
Worley
Basic Engineering:
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
1"-C-A1-8108A
3
7
1
3
3
1
0
Rev.
2
4
1
1
3
1
0
B
Path\File name\Initials: A
Document title:
GAS DEHYDRATION UNIT TRAIN-"A"
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131310
16
15
12
13
14
L
HX901C-1/2
ITEM NAME
6
7
5
1
NOTES:
L
1. QUICK CLOSING VALVE AT ACCESSIBLE LOCATION.
2.8 MW
176°C
DESIGN TEMP.
2
3
4
POWER GENERATOR
2068 kPa (g)
DESIGN PRESS.
8
1-PK-501C
LUBE OIL COOLERS
DUTY
9
10
11
ITEM NO.
2. UCP LOCATED IN LCR. 3. PIPES ARE ACID CLEANED.
K
K VENT TO SAFE LOCATION
HX901C-2 2"-LO-A10-9513C
2"-LO-A10-9512C NOTE-3
FA-901C
NOTE-3
FLA 901C
V/F
J
J
M 4"x6"
4"-VG-A1-2650C
M
33
34
3
B149531
B149531
B149531
SHT 5
SHT 5
SHT 5
H
FSA-901C
I
EXHAUST DUCT AIR INTAKE
FUEL GAS PILOT VENT
NOTE-3
I
DUCT
1 AN-0002 276
NOTE-1
FUEL GAS DWG NO. 1134
2"-FG-B1-6337-IE
NOTE-3
20
SHT 6
V/F
G
B149532
1-PK-501C
OUTSIDE
INSIDE
TURBINE
TURBINE
ROOM
ROOM
H
B149532
FS-931C
SHT 6
30
3/4"-VG-A1-2651C
G
TURBINE
GEN.
F
F ESD SIGNAL FROM
PLC-1/2 I
RUNNING INDICATION
SHT 3
50061-B149531 SHT 1-5 LUBE OIL SYSTEM 50061-B149532 SHT 1-6 GAS FUEL SYSTEM
V/F
50061-AN-0002 SHT 1-2 EXHAUST SYSTEM
3801C
CO2 SYSTEM
B149776
REFER SOLAR P&ID's:
UCP 1-PK-501C
XI
3/4"-C-A3-8135C
97
NOTE-2
V/F
1/2"-C-A3-8136C
98
50061-B149536 SHT 1-4 HYDRAULIC START SYSTEM 50061-B149776 SHT 1-11 MECHANICAL INSTALLTION
E
LEGEND:
E
V/F
SHT 5
B149532
B149532
B149536
SHT 6
SHT 6
SHT 4
B149531 SHT 5
SHT 6
22
19
65
25
21
LUBE OIL
126
B149532
3/4"
WATER WASH CONN.
RESERVOIR DRAIN
HYDRAULIC STARTER
1"-DH-A1-2263C
TANK DRAIN
COMBUSTOR DRAINS
3/4"-DH-A1-2262C
ENGINE EXHAUST COLLECTOR &
ENGINE AIR
INLET DUCT DRAIN
1"-DH-A1-2261C
LUBE OIL DRAIN
3/4"-DH-A1-2260C
3/4"-DH-A1-2259C
ODD
LUBE OIL FILTER DRAIN
2"
ODD
C
FURNISHED
VENDOR B149531
25
2"-DW-A1-2324C
D
VENDOR
B149776 SHT 3
2"-DW-A1-2322C
126
2"-DW-A1-2323C
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
NOTE-3
4"-VG-A1-2650C
2"-LO-A10-9511C
2"-LO-A10-9510C
V/F
LUBE OIL TANK VENT
HX901C-1
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev. ODD
Date
Description of revision
DD-MM-YY
Company; VIETSOVPETRO
COMPANY
CONSORTIUM BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
DWG NO. 1137
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
TO CDH
2"-DH-A1-2229C
EIL
PETECHIM/VIETSOPETRO
Contractor:
TO CDH
EIL
ISH
Worley
Basic Engineering:
DWG NO. 1137
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
5
0
0
Rev.
2
4
1
1
3
3
8
B
Path\File name\Initials: A
Document title:
POWER GENERATOR- 'C'
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131338
16
15
12
13
14
L
ITEM NAME
DESIGN TEMP.
6
7
5
1
NOTES:
L
1. QUICK CLOSING VALVE AT SKID EDGE.
VENDOR VENDOR
2. PIPES ARE ACID CLEANED.
VENDOR
130°C
2
3
4
FILTER-COALESCER
1.73 MMKJ/HR (481 KW) 10.8 kPa (g)
DESIGN PRESS.
8
FSA-901D
LUBE OIL COOLER
DUTY
9
10
11
1-LC-252D (HX901-1)
ITEM NO.
3. USE HOSE AND PNEUMATIC TRANSFER PUMP TO COLLECT LUBE OIL IN DRUMS.
K
K
VENT TO SAFE LOCATION
TAG NO.
SET POINT
VAHH-5601D
V/F
PDI
3/4"-VG-A1-2645D
* 3.0
901D
RO 5601D
J
PDI-903D(MAX)
FA-901D FLA
903D
V/F
8"-VG-A1-2638D
J
A1
RT
33
34
149291
149291
SHT 6
SHT 6
FROM D-R 149291 SHT 6
149291
149770
SHT 6
SHT 2 149770
586D
H DWG NO. 1134
3"-FG-B1-6333-IE
FE-930D
NOTE-2
INTERFACE
B149370
20
317-962 SHT 1
PT
V/F
586D
DWG NO. 1303
CENTRIFUGAL
TURBINE
(TR586)
TO 1-K-253D UCP
FG. FILOT VENT
SEAL VENT
SEAL VENT
2"-VG-A1-2642D
Z3
(TPO586)
G
2"-VG-A1-2641D
T3
586D
TO 1-K-253D UCP
2"-VG-A1-2646D
W3
COMPRESSOR
317-962 SHT 2
H
2"-VG-A1-2640D
V3
PDT
V/F
2
SHT 3
V/F
I
SHT 2
HP COMPRESSOR TRAIN- 'D'
NOTE-1
FUEL GAS
SEAL VENT
DUCT
1
3
PACKACE
EXHAUST
AIR/GAS VENT
AIR INTAKE DUCT
SEAL VENT
M
8"-VG-A1-2638D
LUBE OIL VENT
5601D
(RT586)
G
2"-VG-A1-2647D
U3
DWG NO. 1303
2"-VG-A1-2648D
AA3 AE3
INST. AIR DWG NO. 1140
1"x1/2"
1"-A1-A3-5116D
K3
317-962
B149370
SHT-1
SHT 3
1"-VG-A1-2649D
30
F
F
REFER SOLAR P&ID's: 49901-B149370 SHT 1-3. (FUEL GAS SYSTEM) 49901-149291 SHT 1-6. (LUBE OIL SYSTEM) 49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN) 49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM) 49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)
SEAL GAS 317-962 SHT-1
REFER DRESSER-RAND P&ID's:
126
164
3/4"x1"
B149471
SHT 2
SHT 3
22
65
3/4"x1"
G3
3/4"x1"
B149770
B149770
SHT 2
SHT 2
D1
F1
A1
A1
1"
WATER
1"-DW-A1-2256D
HP. CASING DRAIN
LP. CASING DRAIN
2"-DH-A1-2268D
RESERVOIR DRAIN
CONN.
HYDRAULIC STARTER
AIR INLET DUCT DRAIN
LUBE OIL DRAIN
LUBE OIL DRAIN
1"-DH-A1-2266D
1"-DH-A1-2265D
1/4" 1"-DH-A1-2264D
LUBE OIL FILTER DRAIN
SEAL GAS HEATER
CONDENSATE DRAIN
SHT 6
V/F
2"
2"
VENDOR FURNISHED
126 VENDOR
26
19/1
21
H3
WASH
ODD
LEGEND:
2"
NOTE-3
*
COOLER
VENDOR
(SOLAR)
(SOLAR)
FURNISHED
2"
2"-DW-A1-2351D ODD
64
3/4"x1"
1/4"x3/4"
C
B149770
SHT 6 54
126
B149291
149291
126
D
E
317-962 SHT 1-3. (GAS SEAL SYSTEM)
AG3
V/F
1"-C-A3-8138D (EXTENDED)
98
2"-DW-A1-2316D
E
CO2 SYSTEM
SHT 5
COMBUSTOR DRAINS
J3
1.5"-C-A3-8137D (MAIN)
97 149746
EXHAUST COLLECTOR &
1"-P-E1-1160D
1"-DW-A1-2267D
DWG NO. 1056
2"
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
VF
FSA-901D
6"x4"
VSHH
VAHH 5601D
I
4"-LO-A10-9501D
6"x4"
LUBE OIL TANK VENT
4"-LO-A10-9501D
I
4"-VG-A1-2639D
MOTOR S/D
V/F
A10 NOTE-2
1-LC-252D
AIR/GAS VENT
NOTE-2
LUBE OIL TANK DRAIN
B
14.3.97
AS - BUILT
1
18.10.96
REVISRD AS MARKED
0
20.3.96
APPROVED FOR CONSTRUCTION
Rev.
Date
Company; ODD
ODD
SDH
SA
Description of revision
DD-MM-YY
ISH
MSP
AC
PH
JUY
EIL
EIL
WORLEY
SHI
LOC
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
ODD
ODD
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
TO CDH
2"-DH-A1-2269D
Worley
Basic Engineering:
DWG NO. 1137
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
2
5
0
Rev.
2
4
1
1
3
5
6
B
Path\File name\Initials: A
Document title:
HP COMPRESSOR TRAIN-D INTERFACES
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131356
16
15
12
13
14
9
10
11
8
6
7
5
2
3
4
1
NOTES 1-V-251E
ITEM NO.:
L
1-AC-251E
H.P. INLET SCRUBBER
ITEM NAME:
H.P. INTERSTAGE COOLER
2110 mm(ID) x 3025 mm(T/T) 5500 kPa(g)
SIZE: DESIGN PRESS : DESIGN TEMP. :
DUTY: 25.936 MMKJ/Hr (7.204 MW) 5500 kPa(g)
180C
LINING :
180C
1.
UCP
2.
UIC
3.
EPOXY (INTERNAL) FROM 1-P-356E 12MM SS TUBING
K
DWG NO. 1153
REFER
LEGEND
UNIT
CONTROL
ANTISURCE
P&ID
No.
3713-00-02-41-0110
&
3713-00-02-41-0111
FOR
4.
DELETED
5.
DELETED
6.
LOCATE
7.
DELETED
L
PANEL
CONTROLLER
NOTES.
K
1.5G2.5 5500 PSV 0301E
DWG NO. 1136
I
NOTE-8 TAH
TAH
TI
PALL
TI
0303E
0304E
TT
PSLL
TT
0301E
0303E
0304E
0301E
TAL
UCP
UCP
CSO
V/F
0311E
1.5G2.5
TIC
TSHH
SS
INST.
0307E
D1
PIPING
I/P
3/4"
*
0304E
PAL
A1
CSO
3/4" CSC
2" 2"-P-D1-1066E
2"-P-D1-1067E
FT 0301E
S/D
V/F
PT 0306E
PSLL
PI
I
0312E
0309E
H
V/F
PI
TI
0305E
0303E
S/D
M
I
DUAL
13.
THIS
I
UIC-0301E
2"-P-D1-1051E
0303E
TI
PSLL
PALL
0305E
0307E
0307E
WAFER
SHALL
TAG.
NOTE-9
0302E
TYPE.
BE
I
UTILISED
PSHH
PAHH
0308E
0308E
NO.
BY
SET
SOLAR
FOR
LUBE
OIL
PUMP
PAL-0304E PALL-0307E
PB
PB
0301E
0302E
TAH-0306E
50
TAL-0306E
UCP
CONTROL
I
POINT
4400 750 900 800 2300
PAH-0304E
NOTE-9
8"-P-D1-1037E
10"x12"
12"x16"
J
ROOM.
PALL-0303E
XI
SPEED
1-K-253E TRIP
PLATE
PSLL
I
XI
I
GOVERNOR
M
TOL
CONTROL
PAHH-0308E
V/F
2"
16"-P-D1-1017E
ON
FROM VSHH-0302E
FROM VSHH-0301E
I
DWG NO. 1002
AVAILABLE
UCP.
SYSTEM VENDOR REQUIREMENT. 12.
UCP
FROM HP COMPRESSOR SUCTION HEADER
BE
0302E
PAL
NOTE-13
G
SHALL
COMPRESSOR
VAHH
0301E
PI 0306E
AS
10. USE 20 MESH PER VENDOR REQUIREMENT.
DWG NO. 1404
M
VAHH
PAH
V/F
PT 0310E
INDICATIONS
WELL
CONTROL
NOTE-8
UCP
THESE AS
LOCAL
0302E
MOTOR
I
16"-P-D1-1030E
D1
3/4"
PT
POINT.
9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN
3/4"
VSHH
MOTOR 0301E
0304E
TAP-OFF
11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR
*
VSHH
V/F
TO
NOTE-12
3/4" PAH
TOL
1-AC-251E
12"-P-D1-1031E-IS
PIC
CLOSE
TO 1-V-252E
16"-P-D1-1030E
TS
ALL DCS
12"-P-D1-1032E
CSO
I
8.
TY
V/F
0302E
FV-0301E
DWG NO. 1404 TAL
0306E
NOTE-10
PSV
0306E
NOTE-11
ST-0301E
5500
FROM TT-0306E
TAH
I PDI
FIRE CASE
4"-SV-A1-2506E
TO HP FLARE
4"-SV-A1-2505E
FIRE CASE
NOTE-8
4"-FL-A1-2406E
J
kPa(g) kPa(g) kPa(g) kPa(g) kPa(g)
H
C
44
C
TAHH-0307E
170
C
LAH-0301E
400MM
FROM
BTL
LAL-0301E
200MM
FROM
BTL
LAHH-0304E
465MM
FROM
BTL
LALL-0303E
150MM
FROM
BTL
TAH-0301E
55
C
TAL-0301E
45
C
TAH-0304E
165
C
PAH-0306E
4250 kPa(g) 3200 kPa(g)
PAL-0306E
G
VAHH-0301E LSHH
F LAH
0301E
LAL
LT
LG
0301E
0302E
LIC
LAHH
0304E
1-V-251E
1-DGT-253E
V/F
0304E
1-K-253E
VAHH-0302E
PDI-0311E(MAX)
ST
ON 2nd STAGE LALL 0303E
SIC
COMPR. DISCHARGE
V/F
BIAS
OVERRIDE
LSS
VENDOR'S SCOPE (SOLAR)
XV-0302E
I/P
LSLL-0303E
0302E
ZIO
0302E
0302E
XV
ZSO
ZSC
V/F
0301E
V/F
ZSO 0301E
CONTROL PANEL
FC
3/4"
PB 0306E
PB 0305E
D1 A1
B
ESD SIGNAL
14.3.97
AS - BUILT
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
FO
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
4"
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
NORMAL STOP
3/4"
METHANOL 12MM SS TUBING NNF
FAST STOP
D1
DWG NO. 1150
E1
Rev.
Date
Description of revision
DD-MM-YY
Company;
3/4"
XI
1-K-253E TRIP
PB
PB
UA
USD
0304E
0303E
0301E
0302E
START MACHINE
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
CLOSE
I
START PRESSUR1SATION
COMMON
COMMON
ALARM
TRIP
M/C PARAMETER
XV-4601E, XV-0302E, XV-0401E, XV-0402E
Worley
Basic Engineering:
ON 1-K-253E TRIP
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
M/C PARAMETER
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
ITEM NO.:
1-DGT-253E
ITEM NAME: A
1-K-253E
HP COMPRESSOR
CAPACITY : DIFF. PR. :
3
HP COMPRESSOR
GAS TURBINE DRIVER
1st STAGE
15
14
13
12
11
10
9
1
Document title:
3
2
5
0
Rev.
2
4
1
1
4
0
3
B
HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'E')
Company's document No.:
3107 kPa
16
7
Path\File name\Initials:
75450 Nm3/hr (GUARANTEE)
9.219 MW
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
PLC-1 (NORMAL S/D)
SS TUBING
EIL
CONSORTIUM
Contractor:
0301E
V/F
I
EIL
ISH
PETECHIM/VIETSOPETRO
VIETSOVPETRO
1-K-253E UCP
I
FROM PLC-1/2 (FAST STOP) INST. DRAIN
E
3
PIPING INST.
TO COH
2"-DH-A1-2201E
NC
COOLER VENDOR'S SCOPE OF SUPPLY
B
3/4"
2"
C
VENDOR'S SCOPE OF SUPPLY (SOLAR)
V/F
SURGE CONTROL
DWG NO. 1003
3/4"
A1 D1
FV
0301E
FROM STATION
1"
V/F *
I
LV
2"-P-D1-1029E FC
UCP
0301E
0302E
DWG NO. 1136
0301E
FY
LY 0301E
0302E
ZIO
UCP
I
14"-P-D1-1037E
IAS ZSC
0301E
NOTE-6
I/P
0302E
V/F
S
0301E
S
TO HP FLARE
CMR
V/F
I
CMR
ZIC SOV 0301E
1-K-253E TRIP
D
I
UCP
CLOSE FROM
LEGEND:
DWG NO. 1404
0304E
I
E
ZIC
F
kPa
FROM PIC-0410E
LSLL 0303E
0301E
SOV
20
0301E
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
TO
TO
TAHH 0307E
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
REFERS
REFERS
Path\File name\Initials: 8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131403
16
15
12
13
14
ITEM NO. ITEM NAME L
SIZE : DESIGN PRESS : DESIGN TEMP :
9
10
11
8
180 C
5
H.P. DISCHARGE SCRUBBER 1122 mm (ID) X 2415 mm(T/T) 14000 kPa(g)
L
1. REFER LEGEND P&ID No.
°
3713-00-02-41-0110 &
EPOXY (INTERNAL)
°
EPOXY (INTERNAL)
TO 1-DGT-253E SPEED CONTROL
1
NOTES:
65 C
180 C
°
2
3
4
1-V-253E
1-AC-252E H.P. DISCHARGE COOLER DUTY: 22.236 MMKJ/H (6.177 MW) 14000 kPa(g)
LINING :
6
7
1-V-252E H.P. INTERSTAGE SCRUBBER 1710 mm (ID)X 2750 mm(T/T) 8400 kPa(g)
3713-00-02-41-0111 FOR NOTES.
2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.
DWG NO. 1403
V/F
FY
FV
0401E
FO
IS
NO POCKETS
NOTE-7
2J3 14000
3" F1 E1
PSV
D1 F1
J
RO 0401E
CSO
4"-P-F1-1125E-IS
NNF
SS
F1
INST. PIPING UCP
UCP
I
I
TAH
TAHH
PAHH
TI
0405E
0409E
0408E
FT 0402E
PT
V/F
V/F
1E2 8400
G
PSV 0401E
2"-P-D1-1044E
CSO
F
DWG NO. 1136
FIRE CASE
2"-P-D1-1071E
CASE
TAH TAL
TT 0401E
NOTE-3
3"-FL-A1-2407E
FIRE
3"-SV-A1-2507E
TIC-0306E
0306E
3"-SV-A1-2508E
DWG NO. 1403
TI 0401E
1E2 8400
PSV 0402E
CSO
PI
PAH
0401E
PAL
NOTE-5
NOTE-3 PID 0412E
TSHH
PSHH
TT
FT
0409E
0408E
0401E
VENT
3/4"
D1
2"
3/4"
0412E
0412E
12"-P-D1-1032E
DWG NO. 1403
TAH TAL
PIPING
F1
INST.
SS
NO.
SET
PALL-0407E PALL-0412E VENT
2"
0402E
VSHH
*
FROM
8"-P-E1-1035E
0401E
VSHH-0401E
M
1-K-253E TRIP VSHH
VSHH-0402E
M
I
1-V-253E
FROM
0402E
PB
I
0401E
0407E
0401E
MOTOR
I
NOTE-4
S/D
I
0402E
0402E
NOTE-4
C
55
C
LSHH
LT
LG
0402E
0406E
I
LAH-0401E
290
MM
FROM
BTL
LAL-0401E
130
MM
FROM
BTL
LAHH-0404E
774
MM
FROM
BTL
50
MM
FROM
BTL
LAHH-0408E
465
MM
FROM
BTL
LALL-0407E
150
MM
FROM
BTL
LAH-0402E
400
MM
FROM
BTL
LAL-0402E
200
MM
FROM
BTL
PAH-0401E
4250 kPa(g) 3200 kPa(g)
TAH-0401E
LAHH
PAH-0405E
0408E
PAL-0405E
50 44
H
C C
13000 kPa(g) 10500 kPa(g)
TAH-0408E
PB
MOTOR
C
35
TAHH-0409E
TAL-0401E
I
VAHH
C
50
TAL-0406E
PAL-0401E
0408E VAHH
PSLL
172
TAH-0406E
LALL-0403E
M
NO POCKETS
3/4"
*
POINT
13200 kPa(g) 4500 kPa(g) 2300 kPa(g)
PAHH-0409E
CSC
3/4" 3/4"
I
TAG.
0407E TT 0406E
V/F
UCP
165
C
VAHH-0401E
G
VAHH-0402E
S/D
XI
XI
0401E
0402E
LIC 0402E
V/F
V/F
PSLL
PT
0411E
LSLL
LALL
0407E
0407E
PDI-0412E(MAX)
20
kPa
0405E
PI 0405E
LAH
I
LAL
XV-0402E
CLOSE
PAH
F
PAL
NOTE-3 TI
2"-P-D1-1041E
TOP
TI 0406E
TAHH-0405E
PALL
NOTE-8
FROM 1-AC-251E
CSO
PUMP CONTROL.
PI
PSLL
UCP
2"
TSHH 0409E TI
F1
3/4"
J
8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL TAHH 0409E
0408E
PALL
CSC
CSO
0404E
6"-P-F1-1042E-IS
0407E
UCP
A1
SYSTEM VENDOR REQUIREMENT. 7. DUAL PLATE WAFER TYPE.
CSO
1-AC-252E
0401E
TT
PSV
UCP
CC
NOTE-6
3"-P-D1-1069E
NO POCKETS
DWG NO. 1146
TO HP FLARE
H
I
V/F
0405E
8"-P-F1-1034E-IS
TO FUEL GAS SKID
6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR 14000
A1
3/4"
TS
21.05
5. USE 20 MESH PER VENDOR REQUIREMENT.
8"-P-E1-1070E
2J3
6"-P-FI-1073E-IS
12"-P-D1-1033E
ST-0401E
0402E
IN LOCAL CONTROL ROOM.
F1
V/F
RO
K
4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE
PT
2"
I
I
0402E
ENTRY
M
NO POCKETS
TI 0404E
1-K-253E TRIP
LAH
LT
LG
0401E
LAL
0401E
0405E
I SOV 0401E CMR
ZIC
ZIO
0401E
0401E
LY
S
LSLL
LALL
0403E
0403E
0402E
D TO CONDENSATE
XV
ZSC
ZSO
0401E
0401E
0401E
0401E
DWG NO. 1008
FC
0402E
1"
1"
I
LV
3/4"
I/P
I/P 0401E
ACCUMULATOR
1-K-254E LY
LY
IAS
CLOSE XV-0401E
2"
LEGEND:
E1 A1
D1 F1
2"-DH-A1-2203E
LIC
0404E
3/4"
2"-P-D1-1036E
SS TUBING
NC
FC
FC
3/4"
B1 D1
*
INST. DRAIN
3/4"
3/4" 2"
VENDOR'S SCOPE OF SUPPLY (SOLAR) COOLER VENDOR'S SCOPE OF SUPPLY
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
NC D1
2"-DH-A1-2202E
C FROM
LSLL-0407E, 1-K-253E TRIP
I 0402E
CMR
B
ZIC
ZIO
0402E
0402E
IAS
XV
ZSC
ZSO
0402E
0402E
0402E
DWG NO. 1124
3/4"
COMPANY
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
Detailed Engineering:
ENGINEERS INDIA LIMITED
SS TUBING
NEW DELHI - INDIA
Worley
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
2"-P-E1-1074E
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
Rev.
FC
3
1-V-254E
ITEM NO.
14
13
12
11
3
2
Path\File name\Initials: 10
5
0
2
4
1
1
4
0
4
B
HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-E
Company's document No.:
8743 kPa
15
1
Document title:
2nd STAGE 67696 Nm3/hr
CAPACITY : DIFF. PRESS :
7
Path\File name\Initials:
H.P. COMPRESSOR
ITEM NAME
16
EIL
CONSORTIUM
Contractor:
A1 E1
A
VIETSOVPETRO
DWG NO. 1154
EIL
ISH
PETECHIM/VIETSOPETRO
Basic Engineering:
S
TO OILY WATER TREATMENT
12MM SS TUBING
Company;
INST. DRAIN
TO CDH
SOV
FROM 1-P-357E
A1
E
VENDOR'S SCOPE
V/F
DWG NO. 1137
1-V-252E
FROM
LSLL-0403E, LSHH-0807 PSHH-0805, 1-K-253E TRIP
LAHH
0404E
TO CDH
0402E
LSHH
6"x8"
I
CC 0401E
E
10"x12"
PI
DWG NO. 1137
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
NOTE-3
I
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
6"-P-F1-1043E-IS
12MM SS TUBING
DWG NO. 1150
0403E
53.79
3/4"
METHANOL
DWG NO. 1005
NO POCKETS
70.99
0403E
NOTE-2
V/F
8"-P-E1-1038E
0401E
RO
0401E
IS
DCS AS WELL AS COMPRESSOR UCP.
GAS HEADER
PIC 0401E
E1
ZSC
0401E
10"-P-D1-1070E
V/F
0401E
V/F
ZSO
UCI-0401E
I/P
DWG NO. 1136
I
V/F
CMR
6"-SV-A1-2509E
S
TO HP FLARE
I
I SOV
0403E
6"-SV-A1-2516E
V/F
ZIC 0401E
UCP
6"-FL-A1-2408E
ZIO 0401E
UCP
K
3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON
TO DISCHARGE
UCP
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131404
16
15
12
13
14
9
10
11
8
GLYCOL FLASH DRUN
L
6
7
5
1-F-311C/D
1-V-311B
DES. TEMPERATURE °C: 75
DES. PRESSURE kPa(g):700
DES. PRESSURE kPa(g): 700
1.
DIMENSION-864 O/DIA x 1522 T/T
DIMENSION-230 I/DIA x 1235 T/F.F
DES. TEMPERATURE °C: 75
1
NOTE:
GLYCOL CHARCOAL FILTER
GLYCOL CARTRIDGE FILTER
DIMENSION 1300 I/DIA x 3900 T/T
2
3
4
1-F-312B
TO
BE
LOCATED
CLOSE
TO
L
PCV-1010B
DES. TEMPERATURE °C: 75
DES. PRESSURE kPa(g): 700 TO LP PLARE
4"-FL-A1-2414B-IS
K
1009B
K
2"
2"-P-A1-1080B 2"x1"
3/4"
FO
1"
1010B
2"x1"
2"x1"
1001B
2"x1 1/2"
PSV
1"X1"
1004B
700
2"
2"x1"
3/4" 2"
DWG NO. 1110
G
XV-0903B
PT
PI
PSHH
PSLL
1009B
1010B
1011B
1022B
2"
2"x3/4"
I LSHH
M
F
LI 1011B
LAL
LT
I
1011B
SG LSLL 1010B
CLOSE XV-0903B
LG
LT 1001B
LALL 0101B
TI 1009B
PSV
1"X1"
1003B
700
2"
2"
2"
1"
2"
2"x1"
BTL
FROM
BTL
mm
FROM
BTL
350
mm
FROM
BTL
LAH-1001B
550
mm
FROM
BTL
LAL-1001B
450
mm
FROM
BTL
PAH-1009B
400 kPa (g) 300 kPa (g)
CSO
I
PDI-1007B(MAX.) PDI-1008B(MAX.)
H
2"x1 1/2"
PI
3/4"
G 2"x3/4"
CSO
F
PI 1016C
2"x1"
1-F-312B
3/4"
2"
2"
2"x3/4"
2"
E
2"x1"
2"
1-F-311C
1" 2"x1"
NO
NO
D
2"
1"
2"-GL-A2-8257B-IH
2"x1"
1" 2"x1"
2"-DV-A1-2341B
C
FROM
mm
650
LAL-1011B
FB
H 50mm
E
mm
350
LAH-1011B
1013B
CLOSE XV-0903B
1002B
650
LALL-1010B
FB
2"
LAHH
3"
3"x2"
NC
2"x1"
1003B
1 1/2" F 2"
1005B
1-F-311D
2"x1"
2"x3/4"
1003B
700
PSV
1"
1-V-311B
LAH
2" NC
H 50mm
2"x3/4"
2"-GL-A2-8248A-IS
2"-GL-A2-8220B-IH
I CLOSE
2"-GL-A2-8245B-IH
CONDENSER
I CLOSE XV-0903B
2"-P-A1-1116B-IS
FROM OVER HEAD
PALL 1022B
2"-GL-A2-8251B-IS
PAL
2"-P-A1-1117B-IS 2"
PAHH 1011B
H 50mm
PAH
J
POINT
LAHH-1003B
PAL-1009B
NC
2"-GL-A2-8246B-IH
PI 1009B
H 50mm
LC
2"
2"-GL-A2-8252B-IS
2"-GL-A2-8249B-IS
2"-P-A1-1118B-IS
FB
3/4"
3"-GL-A2-8254B-IS
2"x1 1/2"
SET
500 kPa(g) 200 kPa(g)
PALL-1022B
DWG NO. 1510
1016D
2"-GL-A2-8250B-IH
2"
FB
NO.
PAHH-1011B
ACCUMULATOR
2"x1"
2"
2"
2"-GL-A2-8253B-IS
CSO
3/4"
4"x2"
PI
3/4"
H
TO LV 1001B DWG NO. 1110
H 50mm
FB
GAS SYSTEM
NOTE-1
FB
700
LO LO
2"x1"
DWG NO. 1110
LAL
PSV
4"
1"
2"-FG-A1-6377B-IH
TO GLYCOL
4"x2 1/2"
2"-FL-A1-2414B-IS
1 1/2" G 2 1/2" 1002B
4"x2 1/2"
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
FB
I
LAH
LIC 1001B
FC
TAG. LO
4"-SV-A1-2528B-IS
700
4"
4"-SV-A1-2527B-IS
FROM LP FUEL
2"
PSV
J
SET @345 kPa(g)
PCV
2"-FG-A1-6374B-IH
1 1/2" G 2 1/2"
DWG NO. 1110
SET @355 kPa(g)
PCV
1"
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
PDI
PDI
1007B
1008B
TO LEAN/RICH GLYCOL HEAT
DWG NO. 1110
EIL
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
EXCHANGER
2"-GL-A2-8231B-IH
EIL
ISH
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
2"-GL-A2-8216B-IH
3/4"
Worley
Basic Engineering:
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B FROM GLYCOL
TO
REGENERATOR
DRAIN SYSTEM
2"-DH-A1-2237B DWG NO. 1110
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
DWG NO. 1510
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification: TP8
3
DWG NO. 1137
1
3
3
1
0
2"-DW-A1-2236B
Document title:
4
1
1
4
1
0
B
GAS DEHYDRATION UNIT TRAIN-"B"
Company's document No.: Path\File name\Initials:
16
Rev.
2
Path\File name\Initials:
TO CDH
A
7
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131410
16
15
12
13
14
L
ITEM NAME
DESIGN TEMP.
6
7
5
1
NOTES:
L
1. QUICK CLOSING VALVE AT SKID EDGE.
VENDOR VENDOR
2. PIPES ARE ACID CLEANED.
VENDOR
130°C
2
3
4
FILTER-COALESCER
1.73 MMKJ/HR (481 KW) 10.8 kPa (g)
DESIGN PRESS.
8
FSA-901E
LUBE OIL COOLER
DUTY
9
10
11
1-LC-252E (HX901-1)
ITEM NO.
3. USE HOSE AND PNEUMATIC TRANSFER PUMP TO COLLECT LUBE OIL IN DRUMS.
K
K
VENT TO SAFE LOCATION
TAG NO.
SET POINT
VAHH-5601E
V/F
PDI
3/4"-VG-A1-2645E
* 3.0
901E
RO 5601E
J
PDI-903E(MAX)
FA-901E FLA
903E
V/F
8"-VG-A1-2638E
J
A1
RT
33
34
149291
149291
SHT 6
SHT 6
FROM D-R 149291 SHT 6
149291
149770
SHT 6
SHT 2 149770
586E
H DWG NO. 1134
3"-FG-B1-6334-IE
FE-930E
NOTE-2
INTERFACE
B149370
20
317-962 SHT 1
PT
V/F
586E
DWG NO. 1403
CENTRIFUGAL
TURBINE
(TR586)
TO 1-K-253E UCP
FG. FILOT VENT
SEAL VENT
SEAL VENT
2"-VG-A1-2642E
Z3
(TPO586)
G
2"-VG-A1-2641E
T3
586E
TO 1-K-253E UCP
2"-VG-A1-2646E
W3
COMPRESSOR
317-962 SHT 2
H
2"-VG-A1-2640E
V3
PDT
V/F
2
SHT 3
V/F
I
SHT 2
HP COMPRESSOR TRAIN- 'E'
NOTE-1
FUEL GAS
SEAL VENT
DUCT
1
3
PACKACE
EXHAUST
AIR/GAS VENT
AIR INTAKE DUCT
SEAL VENT
M
8"-VG-A1-2638E
LUBE OIL VENT
5601E
(RT586)
G
2"-VG-A1-2647E
U3
DWG NO. 1403
2"-VG-A1-2648E
AA3 AE3
INST. AIR DWG NO. 1140
1"x1/2"
1"-A1-A3-5116E
K3
317-962
B149370
SHT-1
SHT 3
1"-VG-A1-2649E
30
F
F
REFER SOLAR P&ID's: 49901-B149370 SHT 1-3. (FUEL GAS SYSTEM) 49901-149291 SHT 1-6. (LUBE OIL SYSTEM) 49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN) 49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM) 49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)
SEAL GAS 317-962 SHT-1
REFER DRESSER-RAND P&ID's:
126
164
3/4"x1"
B149471
SHT 2
SHT 3
22
65
3/4"x1"
G3
3/4"x1"
B149770
B149770
SHT 2
SHT 2
D1
F1
A1
A1
1"
WATER
1"-DW-A1-2256E
HP. CASING DRAIN
LP. CASING DRAIN
2"-DH-A1-2268E
RESERVOIR DRAIN
CONN.
HYDRAULIC STARTER
AIR INLET DUCT DRAIN
LUBE OIL DRAIN
LUBE OIL DRAIN
1"-DH-A1-2266E
1"-DH-A1-2265E
1/4" 1"-DH-A1-2264E
LUBE OIL FILTER DRAIN
SEAL GAS HEATER
CONDENSATE DRAIN
SHT 6
V/F
2"
2"
VENDOR FURNISHED
126 VENDOR
26
19/1
21
H3
WASH
ODD
LEGEND:
2"
NOTE-3
*
COOLER
VENDOR
(SOLAR)
(SOLAR)
FURNISHED
2"
2"-DW-A1-2351E ODD
64
3/4"x1"
1/4"x3/4"
C
B149770
SHT 6 54
126
B149291
149291
126
D
E
317-962 SHT 1-3. (GAS SEAL SYSTEM)
AG3
V/F
1"-C-A3-8138E (EXTENDED)
98
2"-DW-A1-2316E
E
CO2 SYSTEM
SHT 5
COMBUSTOR DRAINS
J3
1.5"-C-A3-8137E (MAIN)
97 149746
EXHAUST COLLECTOR &
1"-P-E1-1160E
1"-DW-A1-2267E
DWG NO. 1056
2"
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
VF
FSA-901E
6"x4"
VSHH
VAHH 5601E
I
4"-LO-A10-9501E
6"x4"
LUBE OIL TANK VENT
4"-LO-A10-9501E
I
4"-VG-A1-2639E
MOTOR S/D
V/F
A10 NOTE-2
1-LC-252E
AIR/GAS VENT
NOTE-2
LUBE OIL TANK DRAIN
B
14.3.97
AS - BUILT
1
18.10.96
REVISRD AS MARKED
0
20.3.96
APPROVED FOR CONSTRUCTION
Rev.
Date
Company; ODD
ODD
SDH
SA
Description of revision
DD-MM-YY
ISH
MSP
AC
PH
JUY
EIL
EIL
WORLEY
SHI
LOC
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
ODD
ODD
Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
TO CDH
2"-DH-A1-2269E
Worley
Basic Engineering:
DWG NO. 1137
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
SCALE
Type of document
CCP-WT/95
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
3
7
1
3
2
5
0
Rev.
2
4
1
1
4
5
6
B
Path\File name\Initials: A
Document title:
HP COMPRESSOR TRAIN-E INTERFACES
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131456
16
15
12
13
14
9
10
11
GLYCOL ACCUMULATOR
L
8
6
7
1-P-311C/D
1-V-312B
REFER
TO
NOTE
41-0111
DES. TEMPERATURE °C 150
FOR
DUTY kw 10.5 (INSTALLED)
DWG NO. 1110
3 4
3"-GL-A2-8244B-IH
OF
2.
PORTABLE
FROM GLYCOL
"
2"
4"x2"
2"
STORAGE TANK
2"
2"-GL-A2-8222B
DWG NO. 1116
(BALANCE LINE)
TP10
S 50mm
PUMP
1-V-312B
TI
LG
LT
1008B
1004B
1013B
LALL
1007B
1007B
I
LAH
LI
NO.
SET
POINT
LALL-1007B
200
PAH-0908B/10B PALL-0907B/09B
13200 kPa(g) 11000 kPa(g)
mm
FROM
BTL
K
TAHH-0908B
65 °C
FAL-0901B
2805 kg/HR
LAH-1013B
450
mm
FROM
BTL
LAL-1013B
250
mm
FROM
BTL
50 °C
1013B
LAL
J
TRIP PUMPS
FROM FILTER
1-P-311C/D
RELIEF VALES
4"-GL-A2-8253B-IS
I
I
DWG NO. 1410
TI
FROM LEAN/RICH
1004B
GLYCOL
1 2
2"-GL-A2-8242B-IS
"x1"
2"
A2
F2 PSV
1400
2"
2"x1"
0903B
CSO
2"-GL-A2-8213B-IS
FB
1 2
"x1"
A2
F2
14000
2"
2"x1"
PSV
2"x1/2"
H
CSO
0904B
2"-GL-F2-8255B-IS
PI
TI
0904B
0905B
H F2
2"-GL-F2-8207B-IS
2"
1-P-311B
CSO
2"
G
PI 0905B
PSLL
2"
TAH
3/4"
CSO NC
LOW POINT
2"
PALL
0909B
VSHH
0909B
TRIP PUMPS
I
0901B
M
1005
3/4"-AI-A3-5139B
M F2
F2
XI
TSHH 0908B
1"-C-A1-8108B
D
PSLL 0907B
1"
1"
NOTE-1
TY
XI
0906B
0903B I
A2
XI 0902B
3"
1"
PB
3"
I
3"
1"
LSLL 1007B A2
"
F
0901B
1-P-311D
A2
0901B
TRIP FROM
A1
1 2
0908B
P
3"x2"
3"x2"
1-P-311C
STOP
2"x1
0903B
NC
1006
E
2"-GL-E2-8208B-IS
PB
E
0910B
TAHH
STOP
VAHH
DAMPNER
"
PULSATION
1 2
PUMPS
TI
PB
FAN
DAMPNER
PAH
DAMPNER
PULSATION
2"x1 1"
TRIP
1-P-311C/D
1007
TRIP
I
0908B
I FROM
I
TRIP PUMPS 1-P-311D
PULSATION
DAMPNER
PAH
TSHH
VSHH-0901B
PULSATION 0908B
M
0901B
PSH
1-P-311C
TIC 0906B
G TT 0908B
PSLL
0907B
I
0908B
F
TT 0906B
0906B
2"-GL-F2-8209B
PSH
TE 0906B
PI
PALL
0907B
NOTE-2
E2
2"x1/2" 2"-GL-F2-8256B-IS
3"-GL-A2-8219B-IS
FB
SPARE
This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
POINT.
2"-GL-A2-8214B-IS
LSLL
M
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.
L
NO.3713-00-02-
INJECTION
VAHH-0901B
J
DWG NO. 1110
P&ID
CHEMICAL
CONNECTION
TAH-0906B
HEAT EXCHANGER
LEGEND
OF
DUTY kw 100
TAG.
K
-44
DETAILS
DES. PRESSURE kPa(g) 14000
DIFFERENTIAL TEMPERATURE 12750 kPa
DES. PRESSURE kPa(g) FULL VACUUM/350
1
NOTES: 1.
FLOW 3300 kg/hr
DES. TEMPERATURE °C 150
2
3
4
LEAN GLYCOL COOLER
GLYCOL CIRCULATION PUMPS
DIMENSION 915 I/DIA X 2200 T/T
5
1-AC-311B
3"
STOP
PSLL 0909B
FAL 0901B
3"-GL-A2-8212B-IS
FT
FE
0901B
0901B
TP2
LEAN GLYCOL TO GLYCOL CONTACTOR DWG NO. 1109
B
14.3.97
AS - BUILT
3
20.11.96
REVISRD AS MARKED
SA
SDH
2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC
1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC
0
10.1.96
APPROVED FOR ENGG.
MSP
GRR
E
03.11.95
ISSUED FOR COMPANY'S APPROVAL
GRR
SS
D
15.10.95
ISSUED FOR CLIENT'S APPROVAL
GRR
SS
C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS
NL/SS
AC
B
11.9.95
TITLE BLK REV. FOR COMMENTS
GB/NL SS/AC
A
31.8.95
ISSUED FOR KICK OFF MEETING
WORLEY
SHI
Rev.
Date
Description of revision
DD-MM-YY
Company;
C
TP9
DWG NO. 1410
EIL
COMPANY
PETECHIM/VIETSOPETRO
VIETSOVPETRO
2"-DH-A1-2237B
GLYCOL DRAIN
TP6
EIL
ISH
CONSORTIUM
Contractor:
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES
TP3 Detailed Engineering:
ENGINEERS INDIA LIMITED NEW DELHI - INDIA
1"x3/4" B
CENTRAL COMPRESSION PLATFORM WHITE TIGER FIELD
Company's contract No.:
1"-AI-A3-5117B
CONTAINER
CHEMICAL
SCALE
Type of document
CCP-WT/95
ACCESS FOR
2"-GL-A2-8217B
AMTL. FOAM
DWG NO. 1149
Limited
PETROVIETNAM GAS UTILISATION PROJECT
Project name:
INST. AIR DWG NO. 1140
Worley
Basic Engineering:
PIPING & INSTRUMENTATION DIAGRAM
Contractor's document identification:
1"-C-A1-8108B
3
7
1
3
3
1
0
Rev.
2
4
1
1
5
1
0
B
Path\File name\Initials: A
Document title:
GAS DEHYDRATION UNIT TRAIN-"B"
Company's document No.: Path\File name\Initials:
16
15
14
13
12
11
10
9
8
7
6
5
4
DISTRIBUTION CODE:
Page(s) 37131510
PIPING AND INSTRUMENTATION DIAGRAM
CENTRAL COMPRESSOR PLATFORM
Flow Sheet & Instrument Legend Sheet1
17. Slop Caisson System
Flow Sheet & Instrument Legend Sheet2
18. Closed Drain Header System
1. Gas inlet 211A/B
19. White Condensate System
2. HP Compressor Suction Manifold
20. Inlet Metering
3. Train A
21. Export and Gaslift Metering
4. Train B
22. White and Black Condensate Metering
5. Train C
23. Fuel Gas Export Metering
6. Train D
24. Utility Air / Instrument Air System
7. Train E
25. Inert Gas System
8. HP Compressor Discharge Manifold
26. Service Water System
9. LP COMPRESSOR
27. Fire Water Pump System-Pump “A”
10. Glycol Regeneration Skid Train A
28. Fire Water Pump System-Pump “B”
11. Glycol Regeneration Skid Train B
29. Diesel Storage System
12. Flare System
30. Glycol Storage & Transfer Pumps
13. HP/LP Flare Scrubbers
31. Corrosion Inhibitor System
14. Fuel Gas Booster Compressor
32. Antifoam Chemical Storage and INJ.Pumps
15. Fuel Gas Skid
33. Methanol Storage and INJ.Pumps
16. Oily Water Separator
24.12.2009