This includes setting out of a building in survey subjectFull description
practical polytechnic by using lab sheet
transportation engineering
setting out reportFull description
survey
surveyFull description
surveyFull description
6 Setting Out Civil 3D For งานสำรวจทาง
Full description
Amali kerja ukurFull description
Lab 1- Normal Consistency and Setting Time
A high school physics book for students to use. This book will challenge you and push you beyond your ability.Descripción completa
Bridge Building Lab Report analyzing tension, strain, etc. when building model bridges with sensors on them.
Musical Theater
autismDescrição completa
Deskripsi lengkap
stanleyDescripción completa
Descripción: La agenda Setting forma parte de las teorías de la comunicación. Este capítulo se lo encara desde la forma de construcción de la opinión publica con la aplicación de la teoría citada.
FAKULTI KEJURUTERAAN AWAM UNIVERSITI TEKNOLOGI MARA LABORATORY MANUAL
COURSE
SURVEYING
COURSE CODE
ECG345
LEVEL OF OPENNESS
2
CATEGORY
PARTIALLY OPEN ENDED
DEGREE OF OPEN‐ENDED (%)
66
PERIOD OF ACTIVITY
6 WEEKS
TITLE
ROAD AND BUILDING SETTING OUT
Introduction Level 2 laboratory activities refer to the condition where only theproblem the problem is is guided and given. Students are required to find the ways & means means and provide the answers to answers to the given assignment using the group creativity and innovativeness. The activity will enable the students to appreciate independent learning and prepare them for a much harder task of open ended laboratory activities. In this laboratory activity, the students need to tabulate and analyze setting –out data.
Objectives
PREAMBLE
The objective of this laboratory is to obtain setting out points for a simple circular curve by pre-computation and hence execute the fieldwork based on the data computed. Learning Outcomes At the end of the lab oratory activities, students stude nts should be able to: 1) Form effective teamwork, 2) Communicate effectively through laboratory reports and oral communication, 3) Use of critical thinking in solving problems related to survey data 4) Prepare appropriate survey equipment involved. 5) To tabulate the setting –out data into the proper table. 6) Analyze setting –out data.
SEPT 2017 – JAN 2018
FAKULTI KEJURUTERAAN AWAM UNIVERSITI TEKNOLOGI MARA LABORATORY MANUAL
Problem Statement
PROBLEM STATEMENT
There are many accidents that have been reported that involved at some of the road curvature in UiTM Pasir Gudang. As a surveyor, your team is asked to review the existing setting out and compared with the actual construction plans for improvement purposes. Using the suitable equipments and method, collect the suitable data at existing road curve and use the data as a guided to tabulate the existing setting out and identify the important parameters.
Apparatus The group must identify the availability of the chosen apparatus in the lab before the right procedures can be identified.
Procedures
WAYS & MEANS
The group is required to search for the relevant procedure to carry out the test based on the available apparatus in your laboratory. The document must be made ready for verification by the instructor during the laboratory activity. Data Acquisition The pre-computation data will be tabulated in the tables given below to ease the verification and presentation of the technical report. The original table can be determined from appendix 1(a).
Result, Analysis and Conclusion
RESULTS
The group is required to submit the technical report of the laboratory results highlighting the apparatus used, the procedures undertaken for the test, data acquisition process. Analysis carried out and the relevancy of the setout output to address the given problem. The format of the technical report is left to the creativity discretion of the group. The report must be submitted on week 11
SEPT 2017 – JAN 2018
FAKULTI KEJURUTERAAN AWAM UNIVERSITI TEKNOLOGI MARA LABORATORY MANUAL