BUILDING COST INFORMATION CENTRE ELEMENTAL COST ANALYSIS - FORM 1
JOB TITLE LOCATION
: :
CLIENT : TENDER DATE : INFORMATION ON TOTAL PROJECT Project and Contract information Contract :
Project Details and Site Conditions :
Market Conditions: Contract Particulars :
Competitive Tender List
Cost fluctuation Yes No
Type of Contract : Basis of Tender : Bills Of Quantities
Open/Selected Competition
Government
Bills of Appr. Quant.
Negotiated
Private
Sched. of Rates/ Spec. & Drawings
Serial
Provisional Sums Prime Cost Sums Preliminaries Contigencies Contract Sum
Contract Period Stip. By Client: Contract Period Offered by Builders:
: RM
Int(JV)/L
RM RM RM RM RM
weeks
Number Of Tenders Issue : Number of Tenders Received : ANALYSIS OF SINGLE BUILDING Design / Shape Information Accommodation and Design Features:
Areas:
m2
Functional Unit:
Lower Ground Floor Ground Floor Upper Floor GROSS FLOOR AREA
0
m2 m2 m2 m2
0
m2 m2 m2 m2 m2
External Wall Area Gross Floor Area
Design/Shape:
Percentage of Gross Floor Area:
= =
a) Below Ground Floor Construction
#DIV/0!
Usable Area Circulation Area Ancillary Area Internal Division GROSS FLOOR AREA Floor spaces not enclosed Roof Area (Structural and Plant Rooms)
Contract Sum Provisional Sum Prime Cost Sum Preliminaries Contigencies
m2 m2
b) Single Storey Construction c) 2-Storey Construction
%
Av, Below Ground Floor
m m
d) 3-storey Construction
%
At Ground Floor Above Ground Floor
m e) 4-storey Construction
%
Brief Cost Information Functional Unit Cost excluding external works: (RM/m2) #DIV/0!
:RM :RM :RM :RM :RM
Contract Sum Less Contingencies
Storey Height
%
being being
###### % of remainder % Contract Sum
RM
THE INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTRE
0
ELEMENTAL COST ANALYSIS - FORM 2
0 SUMMARY OF ELEMENT COSTS
GROSS FLOOR AREA :
Total Cost
m2 Cost per
TENDER DATE : Preliminaries Shown Separately Element Element Element Reinforced Rein-
0-Jan-00 Formwork
THE INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTRE
0
ELEMENTAL COST ANALYSIS - FORM 2
0 SUMMARY OF ELEMENT COSTS
GROSS FLOOR AREA :
Element
Total Cost of Element RM
1 Substructure 1.A. Piling 1.B. Work Below Lowest Floor Finish -
Group Element Total :
-
P.C. Sum Allowed nos
Tm3
5.L. 5.L. Builde Builder's r's Work Work in in Connec Connectio tion n with with Services -
Sub-total excluding External Works,
Preliminaries and Contingencies 6. External works 6.A 6.A. Site ite wor work k 6.B 6.B. Drai rainage nage 6.C. 6.C. Exte Extern rnal al ser servi vice cess 6.D. 6.D. Ancill Ancillary ary buildi buildings ngs 6.E. 6.E. Recrea Recreatio tional nal facili facilitie tiess
-
Group Element Total :
-
Preliminaries TOTAL (less Contigencies)
-
INSTITUTION OF SURVEYORS, MALAYSIA BUILDING COST INFORMATION CENTRE ELEMENTAL COST ANALYSIS - FORM 3
M2
m² m² m²
Fire Fire Figh Fightin ting g Inst Install allati ation on Lift Lift & Convey Conveyor or Insta Installa llatio tion n Commun Communica icatio tion n Installa Installatio tion n Spec Specia iall Inst Instal alla lati tion on Builde Builder's r's Profi Profitt and Attend Attendanc ancee on Services
Group Element Total :
Formwork
m² m² m² m²
5.E. 5.E. Electr Electrica icall And Teleph Telephone one Installation 5.F. 5.F. 5.G. 5.G. 5.H. 5.H. 5.J. 5.J. 5.K. 5.K.
0-Jan-00
m² m² m²
Finishes Internal Wall Finishes In Internal Floor Finishes In Internal Ceiling Finishes Exte Extern rnal al fini finish shes es
Group Element Total : 4. Fittings and Furnishings 5. Services 5.A. 5.A. Sanita Sanitary ry Instal Installat lation ion 5.B. 5.B. Plumbi Plumbing ng Instal Installat lation ion 5.C. 5.C. Refu Refuse se Disp Dispos osal al 5.D. 5.D. Air-Co Air-Condi nditio tionin ning g & Ventil Ventilati ation on System
Cost per m2 GFA RM
TENDER DATE : Preliminaries Shown Separately Element Element Element Reinforced Reinunit Unit Rate Ratio/ Concrete forcement Quantity RM m2 GFA m3 KG m m²
Group Element Total : 2. Superstructure 2.A. Frame 2.B. Upper floor 2.C. Roof 2.D. Stairs 2.E. External Walls 2.F. Windows and External doors 2.G. 2.G. Intern Internal al Walls Walls & Partit Partition ionss 2.H. Internal Doors
3. 3.A. 3.B. 3.C. 3.E. 3.E.
m2
0
Tender Sum
INSTITUTION OF SURVEYORS, MALAYSIA BUILDING COST INFORMATION CENTRE ELEMENTAL COST ANALYSIS - FORM 3
0 0
BRIEF SPECIFICATION
GROSS FLOOR AREA :
0
TENDER DATE :
ELEMENT
1
Substructure
1A 1B
Pili Piling ng Work Below Lowest Floor Finish
2
Superstructure
2.A. 2.B. 2.B. 2.C . 2.D.
F ram e Uppe Upperr flo floor or Roof Stairs
0-Jan-00
SPECIFICATION
Not Not appl applic icab able le Reinforced Vibrated Quality Control Concrete pad footing, column stump,ground beam, ground floor slab
Reinforced Concrete column, beam, upstand beam and curved beam. Reinforced Concrete suspended floor slab Reinforced Concrete suspended roof slab and Alang-alang traditional roof Rein Reinfo forc rced ed Conc Concre rete te stai stairc rcas asee with with ceme cement nt and and sand sand scre screed ed to rece receiv ivee ston stonee fini finish sh,, timber and mild steel handrails and balusters.
2.E. External Walls 2.G. Windows and External doors
Half clay brickwork Timber fixed glass panel window, timber flush door and fire-rated door
2.I. 2.I. 2.J.
Intern Internal al Walls Walls & Partit Partition ionss Internal Doors
Half Half clay clay brickw brickwork ork Stainless steel butt hinges, close door, mortise lock, dead lock, mild steel flush bolt, mild steel pull handle and and toilet indicator indicator
3
Finishes
3.A. 3.A. 3.B. 3.B. 3.C . 3.D.
Intern Internal al wall wall Finis Finishes hes Intern Internal al floor floor Finis Finishes hes Internal ceiling Finishes Painting & Decoration
3.E. 3.E. Exte Extern rnal al fini finish shes es 4
Fittings and Furnishings
5 5A
Services Sani Sanita tary ry Inst Instal alla lati tion on
5B
5L
Plumbing Installation Refuse Disposal Air conditioning Installation Electrical And Telephone Installation Fire Fighting Installation Lift and Conveyor Installation Communication Installation Special Installation Builder's Profit and Attendance on Services Builder's Work in Connection with Services
6
Externanal Works
5C 5D 5E 5F 5G 5H 5J 5K
6.A. 6.A. Site Site work work 6.B. Drainage 6.C. External services 6.D. 6.D. Ancill Ancillary ary buil buildin dings gs 6.E Recrea Recreatio tional nal facili facilitie tiess
Plaster and paint, ceramic tiles, stone and pebble wash Cement and sand paving, stone, slate, marble, kempas tible, and carpet. Cement and sand plaster and paint One undercoat and two coat of 'JOTASHIELD' arcylic paint or other equivalent Plaster and paint, ceramic tiles, stone and pebble wash Built in furniture, loose furnitures and fittings, decorative ceiling, interior designer's floor and wall finishes, decorative and arch lighting, artifacts
Pedestal water closet, siphon-jet pedestal water closet, wall hung was basin, urinal, toilet roll holder, self-rimming under counter top wash basin, handspray controlled bidet, single bowl sink, stainless steel hand dispenser, frameless mirror, hook and stopper, floor trap, handicap water closet, handicap grab bar. Cold water piping installation, piping sanitary and fibre glass water storage tank
Not applicable As specified by M&E Engineer As specified by M&E Engineer As specified by M&E Engineer
Swimming pool and pool bar In connection with mechanical and electrical services In connection with mechanical and electrical services
Site clearance and temporary works,roadworks and carpark,rubble stone wall, rubble feature wall, pony-tail railing and planter box Surface water drainage Water reticulation Guard house, refuse chamber, hose reel water tank and pump room, gen set and switc room