Exposição do sistema de dominação dos seres humanos e suas relações com a realidade existente.Descrição completa
Olá, aqui você encontrará alguns de nossos projetos que foram desenvolvidos no decorrer dos anos de atuação da empresa no mercado. Nós somos uma companhia que atua em diferentes ramos do set…Descrição completa
Descripción completa
Descripción: d
business stratégie, business model innovation, business model design
Pipa ITS 2013Deskripsi lengkap
Descrição completa
fab issue #419 features "That old-fashioned feeling: Retro porn makes a comeback" and the 2011 fab gay sex survey.Full description
A very good book on CADD
St-st & Cs field erect
Stainless 304L & 316
15
Units
To T otal
20
0 0 0 0 0 0 0 0 0 0 0 0 0
0.49
Units
T ot otal
25
Units
0 0 0 0 0 0 0 0 0 0 0 0 0
0.52
20
0.92
11
0.18
4
T ot otal
40
Units
10.4 10.1 0.72 0 2.92 0 0 0 0 0 4 0 0
0.59
80
0.94
48
0.22
10
Total
50
Units
Total
80
Units
185 196 12.5 0 57.6 0 0 0 0 0 50 0 0
0.72
400
1.12
359
0.34
75
Total
100
Units
288 402 25.5 0 91.2 0 0 0 0 0 83 0 0
0.79
600
1.21
352
0.38
95
Total
Stainless Steel Erection Hours Wall thickness Field handling pipework.. Handle & erect fab spool pieces. Pipe cutting Pipe bevelling Tack & buttweld Slip on flanges & weld Socket weld O'lets Install vents or drains Bending 1 x 90deg Hydrotesting Supports
Wall thickness Handling & erect straight run pipe. Handle & erect fab spool pieces. Pipe cutting Pipe bevelling Tack & buttweld Slip on flanges & weld Hydrotesting Supports
600 Units T otal
5m/m 2.79 4.13 5.6 4.4 11.3
Total manhours.
700 Units
5m/m
0 0 0 0 0 0 0 0
3.28
6
4.76
5
7.6
2
6
1
12.5
2
1
12
0
Total
900 Units Total
5m/m
19.7 23.8 15.2 6 25 0 12 0
3.65
100
5.2
61
8.3
16
7.4
10
13.8
16
1
100
101.68
1200 Units
6m/m
Total
1500 Units
6m/m
Total
1700 Units T otal
6m/m
6m/m
365 317 133 74 221 0 100 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0
0
0
0
1209.8
0
0
0
0 1311.48
Carbon Steel
15
Units Total
20 Units Total
25
Units Total
40 Units Total
50
Units Total
80
Units Total
100 Units Total
Field Erection Handling & erect straight run Handling & erect fab spools sch 10-60. Handling & erect fab spools sch 80-100. Handling & erect fab spools sch 120-160. Make on screw fittings & valves. Field handling valves & install. < 600# Field erection bolt ups < 600# Attaching flanges screw type. Attaching flanges slip on type. Attaching flanges weld neck. Man B/W Tig root run sched 40 pipe. Man B/W Tig root run sched 80 pipe. Man B/W Tig root run sched 160 pipe. Man B/W Tig root run sched 160 pipe. Man B/W Tig root run sched 160 pipe. Olet type welds. Mark cut & bevel < 80. Threading pipe including cut. Bending Pressure test 10% of piping manhours.