KP-00+++-CQ712-G0011_Rev.A_ITP for for Cathodic Protection ( CP )Description complète
KP-00+++-CQ712-G0011_Rev.A_ITP for for Cathodic Protection ( CP )Full description
Some people don't know what is ITP. With this sample, I hope everyone clear about ITP.
Descripción: Mobile Scraper Traps Inspection and Test Plan NAWCPF-MSBI-NCPF-360-QC-ITP-84003_Rev C03
Inspection Test Plan(ITP) Painting WorksDescrição completa
pressure vesselFull description
dasar insulation test
Specification for Piping fabricationFull description
itp
Date ITP No.: Rev. Page
INSPECTION AND TEST PLAN
Job No. :
Client :
Project :
ITP For :
References
Le ge n d
C l i en en t P r o j e c t s N u m b e r :
A
:
RKM Inspector Client inspector
B
:
Applicable Codes:
C
:
Third Party Inspector
AWS D1.1
H
:
Hold Point
W
:
Witness Point
M
:
Monitoring
R
:
Review Document
NSF Procedures:
RI
:
Report Issuance
RT
:
Radiographic Test
UT
:
Ultrasonic Test
NSF- MAT- 001
Store control
MT
:
Magnetic Particle Test
NSF-PRO- 001
Weld control
PT
:
Liquid Penetrant Test
NSF-QCD-008
N.D.T control
HV
:
Hardness Test
NSF -QCD-005
Ultra sonic Examination
VT
:
Visual Test
NSF-TEC-001
Handling and Packing
DT
:
Dimensional Check
NSF-QCD-007
Magnetic particle Examination
HT
:
Hydrostatic Test
NSF-PRO-003
Painting Control
DFT
:
Dry Film Thickness check
NSF-GEN-001
Fabrication
PWHT
:
Postweld Heat Treatment
NSF-QCD-004
Radiographic Examination
WPS
:
Welding Procedure Specification
PQR
:
Procedure Qualification Record
WPQ
:
Welder Performance Qualification
TG
:
Tightening Check
AI
: Authorized Inspector
Prepared By
Name Signature Date
Approved By
Customer Approval
Ow ner Approval
: : :
Fabrication
5/10/2012 GC-ITP-000 0 of
Date ITP No. : Rev. Page
INSPECTION AND TEST PLAN
Job No. :
Client :
Project :
Dw g No. :
ITP For :
1
Rev. :
5/10/2012 GC-ITP-000 0
: : :
of
Fabrication
Item No. :
S
Inspection e r
Activity Description . #
%
Accept Acceptanc ance e Crit Criteri eria a
Verify Verifying ing Docume Document nt
T ype
A
I
APPROVAL
1
Drawing approval
100%
Drawing specs
client approval
2
100% Material certificate check
100%
EN 10025
client approval
H
3
WPS's,WPQ's,PQR AND NDT
100%
AWS D1.1
client approval
H
H
II
MATERIAL PREPARATION
1
100% Material check for confirmity and visual
100%
EN 10025
Material Ce Certificate
VT&DT
H
2
Marking,Cutting,Rolling and Edge preparation
100%
WPS&Approved Drawings
ITP
DT
M
III
FABRICATION ASSEMBLY
100%
WPS&Approved Drawings,AWS D1.1
ITP
VT&DT
H
ITP
VT
H
1
Correct Joint design
2
Check identification
100%
Work order , Drawings
3
Qualified welder check
100%
W elder List
W elder List
4
Check Fitup&Tack welds
100%
WPS&Approved Drawings,AWS D1.1
ITP
VT&DT
H
5
Drilling check
Approved Drawing
ITP
VT&DT
H
AWS D1.1(table 6.1)
visual Report
VT&DT
H
UT Report
UT
H&RI
MT Report
MT
H&RI
IV 1
2
3
50%
R
NDT Visual check for Complete welds(Dynamic or static ) 100%
UT FOR BUTT WELD FULL PENETRATION SPLICE JOINTS FOR THICKNESS ≥ 8 MM (Dynamic or static ) MT FOR SINGLE WALL WALL CJP
<
8MM FROM BOTH
SIDES(Dynamic or static )
AWS D1.1(table 6.2,table 100% 6.3)
100%
AWS D1.1
Sign Date
B
Sign Date
C
Sign Date
Remarks & Reports No.
Date ITP No. : Rev. Page
INSPECTION AND TEST PLAN
Job No. :
Client :
Project :
Dwg No. :
ITP For :
1
Rev. :
5/10/2012 GC-ITP-000 0
: : :
3
Activity Description . #
FOR DOUBLE WALL CJP < 8MM AT TWO STAGES : 1st step 100% MT AFTER ROOT PASS DIRECTLY MAX 3 MM -2nd step 100% MT( AFTER FILLING + CAP )(Dynamic or static )
%
100%
10% OF THE LENGTH UT FOR BUTT WELDS WELDS FULL PENTRATION FOR THICKNESS ≥ 8 MM OF ALL WELDS ≥ 1000 MM , 5% OF THE LENGTH UT FOR BUTT WELDS FULL PENTRATION FOR THICKNESS ≥ 8 MM FOR ALL WELDS <
Accept Acceptanc ance e Crit Criteri eria a
Verifyi Verifying ng Docum Document ent
Type
A
AWS D1.1
MT Report
MT
H&RI
AWS D1.1 table 6.2
UT Report
UT
H&RI
AWS D1.1 table 6.3
UT Report
UT
H&RI
AWS D1.1
MT Report
MT
H&RI
AWS D1.1
MT Report
MT
H&RI
AWS D1.1
MT Report
MT
H&RI
AWS D1.1
UT Report
UT
H&RI
1000 MM (For static loads)
50% OF THE LENGTH UT FOR BUTT WELDS FULL PENTRATION FOR THICKNESS ≥ 8 MM OF ALL WELDS (For Dynamic Loads)
50%
10% OF THE LENGTH MT FOR FILLET& P.P WELDS WELDS FOR ALL WELDS ≥ 1000 MM , 5% OF THE LENGTH MT FOR FILLET& P.P WELDS FOR ALL WELDS < 1000 MM (For static loads) 100% OF THE LENGTH MT FOR FILLET& P.P WELDS WELDS FOR ALL WELDS (For Dynamic Loads)
100%
MT for the root pass for all welds greater than 100% 38 mm UT lamination test for all plates or sections sections TH≥ 23 mm restrained at a tee junction by a butt 100% weld