Home
Add Document
Sign In
Register
Inspection Test Plan for Civil Works
Home
Inspection Test Plan for Civil Works
inspection test plan for civil works...
Author:
benzeer-a-a
80 downloads
966 Views
1MB Size
Report
DOWNLOAD .PDF
Recommend Documents
Inspection Test Plan for Fabrication
Inspection Test Plan(ITP) Painting Works
Inspection Test Plan(ITP) Painting WorksDescrição completa
Inspection and Test Plan for Cathodic Protection Works
KP-00+++-CQ712-G0011_Rev.A_ITP for for Cathodic Protection ( CP )Description complète
Inspection and Test Plan for Cathodic Protection Works
KP-00+++-CQ712-G0011_Rev.A_ITP for for Cathodic Protection ( CP )Full description
Inspection and Test Plan
Inspection and Test Plan civil works
Inspection and test Plan
Site inspectionFull description
Inspection Test Plan
Inspection Test Plan
5 Inspection Test Plan for Roof Waterproofing
Inspection and Test Plan for Pressure Vessel
Inspection and Test Plan for Pressure Vessel
QC Inspection and Test Plan
Description complète
Inspection and Test Plan-2
plym
Inspection Test Plan- Piping Fabrication
Inspection and Test Plan Concrete
Can be used for Concreting
ITP Inspection Test Plan Format
Inspection Test Plan(ITP) Tiling Works Floor & Wall
Inspection Test Plan(ITP) Tiling Works Floor & WallFull description
Method Statement for Civil Works
Method of statement for civil worksFull description
Method Statement for Civil Works
Method of statement for civil works
Takreer - Daewoo - Civil Works - Quality Plan.
DAEWOO - Quality Plan - Civil Works.
Inspection-and-Test-Plan-for-Pressure-Safety-Valve.pdf
ITP
Inspection Test Plan for Fabrication & Erection 2016
ITPFull description
(ANX-1) Inspection Test Plan (ITP) List
Sample - Inspection & Test Plan (ITP)
Some people don't know what is ITP. With this sample, I hope everyone clear about ITP.
Inspection and Test Plan - Mobile Scraper Traps
Descripción: Mobile Scraper Traps Inspection and Test Plan NAWCPF-MSBI-NCPF-360-QC-ITP-84003_Rev C03
Handbook of Mechanical Works Inspection
OMMEN S RESOLUTION S EET[ CRS ]
CONTR CT NUMBER
GC1 105200
CONTR CT TITLE
EPIC FOR UPGRADA ION OF AC UPS UNITS IN NGL3, MESAIEED
QP EXT RNAL TRANSMITTAL REFEREN E
EDM/GC12105200/ XT/TN/0510
DA E
DOCUMENT NUMBER
3513‐M3GE‐1‐25‐0001
DO UMENT REVISION
DOCUMENT TITLE
INSPECTION AND TEST PLAN FOR CI IL WORKS
No.
1
QP COMMENTS
QP PROJECT NUM ER
513
0‐Oct‐2013
CONTRACT R RESPON E
CODE 1 – APPROVED – MAY PROCE D (RE‐SUBMISSION DOCUMENT SUBMITTE FOR AFC STAMPING/SIGNATURE REQUIRED)
age 1 of 1
INSPECTION TEST PLAN FOR CIVIL WORKS CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL 3, MESAIEED
Sl.No
1
Test/Inspection Acti vit y
Activity Report
Acc eptanc e
Crit eria
Parameter s
Verifying Documents
Responsibility
Site Survey Report
Site Super visor/Engr.
RAY PROJECTS / DOPET
QP
Remarks
EXCAVATION WORKS
1.1
Setting out
AFC Drawing
1.2
Expolortary Excavation
Approved Procedure
1.3
Excavation
Approved Procedure
C ompac tio n
S pec if ic ati ons
Compaction Test
Spec if ications
1.4 1.5 2 2.1
Drawi ng No
3513-M3GE-1-50-0001
Site Super visor/Engr. Site survey Report 35 13-M3 GE -1 -5 0-0 004
W
M
Site Super visor/Engr. FD te st Re por t
Q.C E ngi nee r
W /H
95% Compaction
FD test Report
Q.C Engineer
H
W /H
S urv ey Co ordi nat es , L ev el s,
Thi rd pa rty FD Te st Re port
Q. C Engi ne er
H
W
FD Test Report
Q.C Engineer
Ins pe cti on R eques t
S ite S uper v is or/E ngr.
H
H/ W
H/ W
MAR/Delivery Ticket
Q.C Engineer
H
H/W
H/W
Water test report
Site Super visor/Engr.
H
W
H
W
M
M
M
M
H
W
M
Sub Contractor
W /H
BLINDING CONCRETE SRC15
2.2 2.3
Vi sua l Ins pec ti on
A FC Dra wing
Compaction Test
Specifications
Inspection for Pouring
Site Inspection
Concrete Pouring
Mix no
3 513 -M3 GE -1 -50 -0 00 4
After Reviewing Third party Test report
3513-MS-CIV-0001
SRC15-NS25G60C15
M W/H
Sub Contractor
2.4
2.5
3
Curing
Water test report
Application of Bitumen Primer
Specifications Ref:3513-MSCIV-0003 Specifications Ref:3513-MSCIV-0003
l-l l, SO3 - less than 1000 mg/l, Alkali carbonates &bicarbonates - less than 500 mg/l , TDS -less than 2000mg/l , Ph - 6.5 to 9
CONCRETE PROTECTION
3.1 3.2 3.3 3.4
DOC. NO. 3513-M3GE-1-25-0001
Laying of Bitumen Sheet Screeding
Specifications Ref:3513-MSCIV-0003
Installation of Bitu board
Specifications Ref:3513-MSCIV-0003
After completion Visual Inspection After completion Visual Inspection
Material Approval (Poly Prime Site Super visor/Engr. SB) Material Approval (Bitustick XL Site Super visor/Engr. 1.6mm thick)
3513-M3GE-1-14-0008
After completion Visual Inspection
AFC 3513-M3GE-1-50-0004
Site Super visor/Engr.
3513-M3GE-1-14-0008
After completion Visual Inspection
Material Approval (Bituboard FS 4mm thick)
Q.C Engineer
3513-M3GE-1-14-0008 3513-M3GE-1-14-0008
REV. A
PAGE 2 OF 6
INSPECTION TEST PLAN FOR CIVIL WORKS CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL 3, MESAIEED
Sl.No 8
Activity Report
Test/Inspection Acti vit y
Acc eptanc e
Crit eria
Drawi ng No
Parameter s
35 13-M3 GE -1 -7 1-0 005
M oi sture c onte nt l es s tha n 4 %
Verifying Documents
Responsibility
Specifications Fi el d Te st s
Site Super Visor/Engr. Q .C E ngi nee r
RAY PROJECTS / DOPET
QP
WALL PAINTING Inspection of Surfaces Ins pe cti on f or Mo is ture
8.1 8.2
Application of Primer
8.3
Application of Puttyfiller
8.4
Application of Primer
8.5
Visual Inspection S pec if ic ati ons Specifications Ref :3513MS-CIV-0007 Specifications Ref :3513MS-CIV-0007 Specifications Ref :3513MS-CIV-0007
H H
W W
M M
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
Application of First coat
Specifications
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
Application of 2nd Coat
Specifications
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
9.1
Verification of opening size
Dimension/AFC Drawings
3513-M3GE-1-71-0001, 3513-M3GE-1-71-0002
AFC Drawings
Site Super Visor/Engr.
9.2
Fabrication
Specifications
AFC Drawings
Site Super Visor/Engr.
M
M
M
9.3
Installation
Specifications
AFC Drawings
Site Super Visor/Engr.
H
W
M
3513-M3GE-1-69-0001 , 3513-M3GE-1-69-0002, 3513-M3GE-1-69-0003
AFC Drawings
Site Super Visor/Engr.
H/W
W
M
8.6 8.7
9
INSTALALTION OF DOORS & WINDOWS
9.4
Opening Directions
AFC Drawings
9.5
Sealent application
Visual Inspection
Material Approvals
Q.C Engineer
M
M
M
9.6
Installation of hardwares
Specifications
3513-M3GE-1-14-0008
Materials Approvals
Q.C Engineer
M
M
M
10.1
Prepration of Surfaces
Smooth Surface
3513-M3GE-1-14-0008
Approved Procedure
Site Super Visor/Engr.
M
10.2
Application of Primer
Specifications
3513-M3GE-1-14-0008
Material Approvals
Q.C Engineer
H/W
W
M
10.3
Application of Coating
Specifications
3513-M3GE-1-14-0008
Material Approval
Q.C Engineer
H/W
W
M
10
FLOOR COATING M
Remarks
INSPECTION TEST PLAN FOR CIVIL WORKS CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL 3, MESAIEED
Sl.No 8
Test/Inspection Acti vit y
Activity Report
Acc eptanc e
Crit eria
Drawi ng No
Parameter s
35 13-M3 GE -1 -7 1-0 005
M oi sture c onte nt l es s tha n 4 %
RAY PROJECTS / DOPET
Verifying Documents
Responsibility
Specifications Fi el d Te st s
Site Super Visor/Engr. Q .C E ngi nee r
QP
WALL PAINTING Inspection of Surfaces Ins pe cti on f or Mo is ture
8.1 8.2
Application of Primer
8.3
Application of Puttyfiller
8.4
Application of Primer
8.5
Visual Inspection S pec if ic ati ons Specifications Ref :3513MS-CIV-0007 Specifications Ref :3513MS-CIV-0007 Specifications Ref :3513MS-CIV-0007
H H
W W
M M
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
Application of First coat
Specifications
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
Application of 2nd Coat
Specifications
3513-M3GE-1-71-0005
Material Appr./Procedure
Q.C Engineer
H
W
M
9.1
Verification of opening size
Dimension/AFC Drawings
3513-M3GE-1-71-0001, 3513-M3GE-1-71-0002
AFC Drawings
Site Super Visor/Engr.
9.2
Fabrication
Specifications
AFC Drawings
Site Super Visor/Engr.
M
M
M
9.3
Installation
Specifications
AFC Drawings
Site Super Visor/Engr.
H
W
M
3513-M3GE-1-69-0001 , 3513-M3GE-1-69-0002, 3513-M3GE-1-69-0003
AFC Drawings
Site Super Visor/Engr.
H/W
W
M
8.6 8.7
9
INSTALALTION OF DOORS & WINDOWS
9.4
Opening Directions
AFC Drawings
9.5
Sealent application
Visual Inspection
Material Approvals
Q.C Engineer
M
M
M
9.6
Installation of hardwares
Specifications
3513-M3GE-1-14-0008
Materials Approvals
Q.C Engineer
M
M
M
10.1
Prepration of Surfaces
Smooth Surface
3513-M3GE-1-14-0008
Approved Procedure
Site Super Visor/Engr.
M
10.2
Application of Primer
Specifications
3513-M3GE-1-14-0008
Material Approvals
Q.C Engineer
H/W
W
M
10.3
Application of Coating
Specifications
3513-M3GE-1-14-0008
Material Approval
Q.C Engineer
H/W
W
M
10
Remarks
FLOOR COATING M
W-Witness, H-Hold,R-Review,M-Monitoring, TP-Third Party Reviewed by: KARUPPIAH
Approved by:
Prepared by: PREMNATH
DOC. NO. 3513-M3GE-1-25-0001
REV. A
PAGE 5 OF 6
GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED REQUEST FOR INSPECTION (RFI) Date :
Discipline:
RFI No :
Civil
Mechanical
Electrical
Instrumentation
Location: Doc. /Drawing No:
Rev: Rev: Rev:
Date of Inspection: Description of activities for Inspection:
Time of Inspection:
commissioning
GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED REQUEST FOR INSPECTION (RFI) Date :
Discipline:
RFI No :
Civil
Mechanical
Electrical
Instrumentation
commissioning
Location: Doc. /Drawing No:
Rev: Rev: Rev:
Date of Inspection:
Time of Inspection:
Description of activities for Inspection:
1. Site Engineer:
Name:
Si nature:
Date:
Signature:
Date:
2. Contractor QA/QC Comments:
Name: Approved
Approved with Comments
Rejected
3. QP comments:
Name:
Signature:
Date: DOPET/An Civil/RFI . Rev 0 - 27.10.13
DOC. NO. 3513-M3GE-1-25-0001
REV. A
PAGE 6 OF 6
×
Report "Inspection Test Plan for Civil Works"
Your name
Email
Reason
-Select Reason-
Pornographic
Defamatory
Illegal/Unlawful
Spam
Other Terms Of Service Violation
File a copyright complaint
Description
×
Sign In
Email
Password
Remember me
Forgot password?
Sign In
Our partners will collect data and use cookies for ad personalization and measurement.
Learn how we and our ad partner Google, collect and use data
.
Agree & close