Simplification List – TOP Items Subcontracting in MRP
May, May, 2016 20 16
Customer
Subcontracting in MRP
TOP Item: General Information See the following central SAP Note related to the Simplification Item: 2268044
TOP Item Information General Presentation
Simplification List Item Description SAP ERP had three different ways of planning parts to be provided to a subcontractor: • Planning subcontracting demand together with internal demand in the make-to-stock planning segment (3.0 logic) • Separating subcontracting demand and stock into single subcontracting planning segments and planning uncovered subcontracting demand together with internal demand in the make-to-stock planning segment (4.0 logic) • Planning the demand of each subcontractor separately using subcontracting MRP areas (available from SAP ERP release 4.5) In SAP S/4HANA 1511, the 4.0 logic was removed while the 4.5 logic was simplified. The SAP S/4HANA MRP uses default planning parameters if MRP area –specific material master records do not exist. You only have to create an MRP area for every subcontractor. Of course, it is still possible to create MRP area/supplier-specific material master data if required.
Business Impact
Specific
The default way of planning parts to be provided to subcontractors is based on MRP areas. A subcontracting MRP area should be created for every subcontractor. You do not have to create an MRP area-specific material master record for every part to be provided to the subcontractor but of course this is possible if you want to overrule the default planning parameters.
Required and Recommended Action(s) If you have several subcontractors requiring the same component materials and if you do not yet use MRP areas to plan the required components then proceed as follows: • Create MRP areas for e very subcontractor (can be done before or after upgrade) • Run regenerative MRP after the upgrade
Subcontracting in MRP
Component @ plant
TOP Item: Item Overview Presentation
MRP Area St.Loc St.Loc
ERP
TOP Item Information
Supplier
Subcontracting w/o MRP areas •
•
General
Only straight forward process: Exact lot size and stock transfer Only special procurement key in material master of component
Subcontracting with MRP areas •
Full sourcing and lot sizing functionality
•
Material data on MRP area required for components
•
Different ways to model subcontracting for MRP
Presentation S/4 HANA
Specific
• Subcontracting with MRP areas •
•
Full sourcing and lot sizing functionality For straight forward process no material data on MRP area required
•
for subcontracting in MRP Full functionality, nearly no additional effort One solution
Subcontracting in MRP
TOP Item: Item Overview Presentation SAP S/4HANA – Subcontracting processes in MRP •
TOP Item Information
• •
The transformation of subcontracting processes in MRP require the following steps Preparation
General Presentation Specific
In SAP S/4HANA, the planning of subcontracting demand using subcontracting planning segments was removed while the planning of subcontracting demand using subcontracting MRP areas was simplified MRP uses default planning parameters if MRP area-specific material master records do not exist MRP areas have to be created for every subcontractor
•
Conversion Process
Synchronization
ERP: S/4 Pre-Checks
Analyze Business Process
Pre-Check and SUM
Implement S/4 Pre-Checks There are no explicit prechecks regarding this functionality
Check which suppliers are currently used in subcontracting processes E.g. by using SC Stock Monitor (transaction ME2O)
Trigger conversion process to S/4 HANA
•
•
Post Processing Maintain, re-plan and check •
Maintain MRP areas for suppliers currently used in subcontracting processes
•
Run regenerative MRP after upgrade
•
Check result
Subcontracting in MRP
TOP Item: Item Overview Presentation Synchronization
Preparation
TOP Item Information General
Analyze Business Process
Implement Pre-Checks
Conversion
- Pre-Check - SUM
Post Processing / Test
Maintain Subcontracting MRP Areas
Task: • Implement S/4 pre-checks according to the SAP S/4HANA Conversion Guide chapter “Pre-Checks” • There are no explicit pre-checks regarding this functionality
Presentation Specific
ERP
SAP S/4 HANA
Re-Plan MRP
Test
Subcontracting in MRP
TOP Item: Item Overview Presentation Synchronization
Preparation
TOP Item Information General
Analyze Business Process
Implement Pre-Checks
Conversion
- Pre-Check - SUM
Post Processing / Test
Maintain Subcontracting MRP Areas
Task: • Check which suppliers are currently used in subcontracting processes • E.g. by using the Subcontracting Stock Monitor (transaction ME2O)
Presentation Specific
ERP
SAP S/4 HANA
Re-Plan MRP
Test
Subcontracting in MRP
TOP Item: Item Overview Presentation Synchronization
Preparation
TOP Item Information
Analyze Business Process
Implement Pre-Checks
Conversion
- Pre-Check - SUM
Post Processing / Test
Maintain Subcontracting MRP Areas
Task: • Conversion process must be triggered according to the SAP S/4HANA Conversion Guide
General Presentation Specific
ERP
SAP S/4 HANA
Re-Plan MRP
Test
Subcontracting in MRP
TOP Item: Item Overview Presentation Synchronization
Preparation
TOP Item Information
Analyze Business Process
Implement Pre-Checks
Conversion
Post Processing / Test
- Pre-Check - SUM
Maintain Subcontracting MRP Areas
Re-Plan MRP
Test
Task: • Maintain subcontracting MRP areas in customizing for all SC suppliers for which provision stocks and requirements are to be planned separately
General
•
Presentation
•
Specific
•
ERP
The customizing entry for the supplier is sufficient to trigger stock transfer reservations from plant to the SC MRP area for all components to be provided to this supplier Material assignments are only required for special functional needs regarding the provision process (usage of purchase requisitions/orders, SC 3rd party order processing, lot sizing, etc.)
Run regenerative MRP
SAP S/4 HANA
Subcontracting in MRP
TOP Item Information General Presentation Specific
TOP Item: Item Overview Presentation
Total transformation time • The total transformation time for subcontracting processes in MRP depends on different factors such as: • MRP and MRP area customizing consistency including field attributes • Number of used subcontracting suppliers