The main objective of the Training and Placement Management System is to manage the details of Training,Student,Techinical Skill,Placement ,Placement Cell. It manages all the information about Trai...
mixed useFull description
yo
Full description
Project Synopsis on efficient Face Recognition AlgorithmFull description
Full description
project work
project synopsisFull description
Holistic development of visual impairedFull description
adhoora hai completer kar dena mera pura ho jayega tab me complete kar sungaFull description
Soccer training for Goalkeepers written by some german. very good
Full description
PANJAB UNIVERSITY SWAMI SARVANAND GIRI REGIONAL CENTRE HOSHIARPUR
A Project Synopsis For Industrial Training At GURU GOBIND SINGH SUPER THERMAL PLANT ROOPNAGAR
“
ELECTRICAL AND ELECTRONICS ENGINEERING
Submitted By : Anoop Singh Roll NO. SG9413
Guru Gobind Singh Super Thermal Power Plant is a coal-based plant. The requirement of coal for four units based on specific fuel consumption of 0.60 kg / kWh. The conveying and crushing system will have the same capacity as that of the unloading system. The coal comes in as large pieces. This coal is fed to primary crushers, which reduce the size of coal pieces from 400mm to 150mm. Then the coal is sent to secondary crusher through forward conveyors where it is crushed from 150mm to 200mm as required at the mills. Then the coal is sent to boilers with the help of primary fans. The coal is burnt in the boiler. Boiler includes the pipes carrying water through them; heat produced from the combustion of coal is used to convert water in pipes into steam. This steam generated is used to run the turbine. When turbine rotates, the shaft of generator, which is mechanically coupled to the shaft of turbine, gets rotated so, three phase electric supply is produced. The basic requirements are:♣
Fuel (coal)
♣
Boiler
♣
Steam turbine
♣
Generator
♣
Ash handling system
♣
Unit auxiliaries
CONTRIBTION OF THE PLANT
Guru Gobind Singh Super Thermal Power Plant, in addition to indirect contribution in various facts of state economy, is also responsible for:
Narrowing the gap between power demand and power availability of the state.
Providing employment potentials to thousands of workers.
Covering the backward surrounding area into fully developed Industrial Township.
Providing additional relief to agricultural pumping sets to meet the irrigation needs for enhancing the agriculture production.
Reliability and improvement in continuity of supply and system voltage.
Achieving cent percent rural electrification of the state.