A control sheet for defined scope of workFull description
SEMINARFull description
Full description
Proof of Work Experience Template for SISS Application, 2016-2017
With the rapid growth in the information technology and computer industry, there is high demand for Java Developer skilled personnel in India.
Uniform Building By Law
COMPANY NAME DEPARTMENT NAME
COMPANY LOGO
COMPANY NAME
PROJECT NAME Scope of Work (SOW)
[MONTH – YEAR] Date
Revision
Description
Author
Approved
Page 1 of 5
COMPANY NAME DEPARTMENT NAME
PROYECT TAME Scope of Work (SOW) This document has been revised as indicated below. Changes after revision A are identified by vertical bars at the right side of the page, with additions identified with underline and deletions with strikethrough. Please replace all pages of this scope of work and destroy the superseded copies. Rev . No.
Originator (name)
Rev. Date
Revision Description
New Issue
APPROVALS
SIGNATURES
Entire Document Re-issued
DATE
Originator: Lead Project Engineer: MTS Superintendant: Relevant Manager:
Page 2 of 5
COMPANY NAME DEPARTMENT NAME
1. Description of Work - General General information about the project (the work) Example: The described work, consist of re-locating the Fire Protection System ( FPS) FPS) at the central warehouse, which has interferes with the shelves and walkway in the mezzanine. The pipes to be relocated are specified in the attached drawing. The contractor shall supply the personnel, materials and equipment required to modify fire system.
2. The Work includes: What shall include the work. Example: 1. Field survey for work identification identificati on (measurement in the field). 2. Dismantle the pipeline that has interference 3. Supply all the material needed to do the work. 4. Adjust the existing FPS, to accommodate new pipe location. 5. Reinstall the pipes at at the new location 6. Paint the line
Any changes in the scope of the project will be managed between the client and the contractor.
3. Description of Work – Specific Specific description for the work. Example: This Project consists of the FPS modification the Central Warehouse, which main pipes and branches interferes with the shelves and walkways. The system is constituted by pipes of 6, 4, 2- ½ Sch. 40, 22- ½ Sch 10, 1- ½ Sch. 40. Welded and Victaulic fittings. Changes shall be: a. The main pipe 6 and 4 inches respectively will be relocated to a higher point at the center of the warehouse, to avoid the interference with the top of the shelves. b. The branches of 2- ½” with sprinklers will be relocated to reduce the proximity with the shelves and the walkway. c. The pipe of 1- ½” next to the door will be removed from the current location and placed behind the columns, keep it away from the walkway on the mezzanine.
See the attached drawing -FP1.0 REV.0 -FP2.0 REV.0 -FP1.1 REV.1 Page 3 of 5
COMPANY NAME DEPARTMENT NAME
-FP2.1 REV.1 Design Requirements 5.1 Specifications Specifications that the contractor shall follow up to do the work. XXXX-XXX-XX Design Criteria Criteri a Fire Protection
5.2 Reference Standards Standard that the contractor shall follow up to do the work. Example: NFPA 13 Standard for installation of sprinkler systems
7. Schedule Contractor shall perform the work in a timely and competent manner, in accordance with the industry professional standards, construction practices and local laws, orders, codes and regulations. For the tasks to perform, the client has made an approximate schedule for this project. a. Design and Approvals (Starting with signing of contract of work) X-X Weeks b. Dismantle the system (Starting with the Design for Construction Approval) X-X Weeks c. Field Fabrication (Starting with the Design for Construction Constructio n Approval) X-X Weeks d. Installation and Paint X-X Weeks e. Delivering X-X Weeks
8. Support Documentation Additional information that the contractor should need it.
Page 4 of 5
COMPANY NAME DEPARTMENT NAME
9. Contact Information Contractor shall coordinate the work with XXXXX. XXXXX. Contractor shall attend to the coordination meetings as required. Contractor shall provide progress reports for the project. Project lead or Manager Information: Name Position E-mail Phone number Encharge information: Name Position E-mail Phone number