CONDOLINK SDN BHD SHO MONTHLY REPORT
PROPOSED SITE CLEARANCE AND EARTHWORK (PACKAGE 4 - EASTERN DIVISION) AT PROPOSED INTEGRATED INTEGRATED TOWNSHIP DEVELOPMENT DEVELOPMENT OF BANDAR BUKIT RAJA (STAGE 1) ON LOTS 19, 25, 27, 52,1635, 13046 AND 13047 MUKIM KAPAR, DAERAH KLANG, SELANGOR DARUL EHSAN
CONDOLINK SDN BHD SAFETY AND HEALTH OFFICER MONTHLY REPORT Project
:
Monthly Report for the month of: Ref:
No.
Earthwork (Pack. 4), Bkt Raja, Sime Darby April-13
Occupational Safety and Health Act 1994 (Safety and Health Officer) Regulations 1997, Regulations 19 (to be submitted before the 10th of a preceeding month)
Description
No.
Type
Remarks/Action Taken
1 No.and Type of Accident
NIL
NIL
NIL
2 No.and Type of Near-misses
NIL
NIL
NIL
3 No.and Type of Dangerous occurrence
NIL
NIL
NIL
4 No.and Type of Occupational poisoning
NIL
NIL
NIL
5 No.and Type of Occupational diseases
NIL
NIL
NIL
6 Liable Liable to caus cause e bodil bodily y inju injury ry by: by: a. Machinery b. Plant c. Equipment d. Substance
Lorry,backpusher,back hoe etc
9 a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p.
Any work related to safety, health and environmental which has been carried out by any persons, or group of persons, engaged by the employer in order to promote safety, health environmental in the place of work. Company Company appoint new new safety officer officer as OSHA 1994, FMA FMA 1967 and Sime Darby requireme requirements. nts. Regulate Regulate EHS meeting meeting and toolbox toolbox talk once once a month. month. Fogging Fogging fortnight fortnightly ly stress stress at 'kongsi' 'kongsi' and office office area. area. Had EHS Committee Committee and Emergency Emergency Response Response Team at site. Will train the committee committee and team team time to time. Water bowser keep on running running during during hot and windy day. day. Worry of complaint complaint from public and and local authority. authority. Silt trap trap and wash through through regularly regularly maintain maintained ed and reinstate reinstate Safety promoti promoting-now ng-now in progress progress and will will raise up more signages signages at workplace workplace area, site office, office, 'kongsi', 'kongsi', store and hazardous area. Start conduct conduct safety, safety, health health and environmental environmental training training based based on Sime Darby requiremen requirements. ts. Took water water sampling on monthly monthly basis basis by our environmental environmental consultan consultant-Envi t-Environmen ronmental tal Science Science Sdn Bhd. Noise and air will be monitored every three month. Workshop for lorry to do maintenance has been erected. They must change the black oil and repair at the the concrete base. More signage signages s have been been raised at at site office, office, 'kongsi' 'kongsi' and working working area. Livest Livestocks ocks had been been removed removed from site. site. SIRIM audit had been conducted on 29-30th August 2012. This IMS IMS audit conclude Safety & Health, Environmental and also Quality. DOE visit on 12th September September 2012. 2012. DOE advise Condolink Condolink to make protectio protection n on slope and platform. platform. No ncr given. Drowning Drowning hazard hazard - signage signage has been putted putted at all pond pond area. No swimming swimming and and fishing allowed. allowed. Condolink Condolink and and Sime Darby do not take any responsibility if accident happen there. Sime Darby EHS EHS Department Department has been audit site site on 4th December 2012. 2012. Observation Observation on environment environmental al has been given.
10 Any outstand outstanding ing matter matter arising from from the previous previous report. report. a. All company & subcontract subcontractor or operators operators must have legal and valid driving license license to operate the machine/vehicl machine/vehicle. e. DOSH & JPJ normally will stress on this issue. b. Having problem problem with local local residents residents who were stayed stayed in site area. They They must obey the the regulation regulation such as
12 Action to be taken on report a. An employer employer or any person in charge charge of a place of work after receiving receiving the report report under regulation regulation 19, 19, shall not later than two weeks after the receipt discuss the report with the safety and health officer. b. An employer employer or any person in charge charge of a place of work shall countersign countersign the the report in order order to confirm that he has received it. c. The report report shall be kept in good condition condition at least least for a period of ten years years for the purpose of inspection inspection or investigation by the officer if necessary.
13 Repo Report rts s raised raised by: by:
Singature:
Name: Positi Position on : Safety Safety & Healt Health h Office Officer r Date:
8/5/2013
14 Rema Remark rks s by by:
Singature:
Name:
Safety Statistics as of 1/4/2013 - 30/4/2013 Description
This Month
Total Safe Man hours work Indirect Worker (Staff) Direct Worker (Sub-con) Workforce (per day)
Cumulative Previous
Cumulative
205972
205972
19744
19744
186228
186228
842
842
No of Lost Time Injuries (LTI)
0
0
0
Lost Working Days
0
0
0
Medical Treatment
0
0
0
First Aid Cases
0
0
0
Property Damaged
0
0
0
Near Miss
0
0
0
Total Working Days
487
487
LTI Free days
487
487
LTI Frequency
0
0
0
LTI Severity
0
0
0
ACCIDENT STATISTIC
NO
TYPE
2013
JAN
FEB
MAR
APR
-
-
-
-
MAY
JUN
JUL
AUG
SEP
OCT
NOV
TOTAL
Remarks
0
-
DEC
1
Fatality
2
Major injury
-
-
-
-
0
-
3
Minor injury
-
-
-
-
0
-
4
Near misses
-
-
-
-
0
-
5
Vehicle accident
-
-
-
-
0
-
Total
0
0
0
0
0
-
TOTAL TOTAL
Remark Remarks s
MEDICAL TREATMENT STATISTIC
NO
TYPE
2013
JAN
FEB
MAR
APR
1
Demam
-
-
-
-
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
0
-
2
Batuk
-
-
-
-
0
-
3
Selsema
-
-
-
-
0
-
4
Gatal-gatal
-
-
-
-
0
-
5
Cirit birit
-
-
-
-
0
-
Total
0
0
0
0
0
-