Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Originator APOL
Revision Date th January 19 2011
SITE SURVEY REPORT
KODECO ENERGY TEMPORARY SHIP TANKER
Rev
Date
Description Descripti on
Prep.
Jan-19-11
Site Survey at Keppel Tuas Shipyard
Yannes
KODECO Energy Temporary Ship Tanker
Review
App
Page 1 of 9
Project FSO. URWASI
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Originator APOL
Revision Date th January 19 2011
ACCOMMODATION
Figure 1: Provide accommodation for min. 72 Persons from Company, will be modified on existing room at the vessel.
KODECO Energy Temporary Ship Tanker
Page 2 of 9
Project FSO. URWASI
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Originator APOL
Revision Date th January 19 2011
MOORING EQUIPMENTS
Figure 2: Additional chain stopper and Quick Release Hook will be add at aft and fwd area and shall be providing with tensions meter.
KODECO Energy Temporary Ship Tanker
Page 3 of 9
Project FSO. URWASI
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Originator APOL
Revision Date th January 19 2011
METERING SKID
Figure 3: Location for metering skid shall be provide, there is fr ee space on fr. 52 near from ladder area. CRUDE OIL IMPORT & EXPORT
Figure 4: Cargo line for import and export shall be redesign due to modification on Ballast Tank 1 & 5.
KODECO Energy Temporary Ship Tanker
Page 4 of 9
Project FSO. URWASI
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Originator APOL
Revision Date th January 19 2011
CARGO CONTROL ROOM
Figure 5: Cargo control room shall have full visibility of the deck forward. CARGO OIL WASHING
Figure 6: Crude Oil Washing shall be suitable with sufficient viscosity of crude oil and will be use in waxy crude service need to be added due to modification on W ater Ballast Tank 1 & 5 wing.
KODECO Energy Temporary Ship Tanker
Page 5 of 9
Project FSO. URWASI
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Originator APOL
Revision Date th January 19 2011
HEATING COIL
Figure 7: Heating coils need to be re-calculate and required in Cargo Oil Tanks and Slop tanks to maintain cargo temperature, and need to be added on WBT 1 & 5 due to modify to Cargo Oil Tank. Also for heating coil manifold and hydraulics valve on new Cargo Oil Tanks.
KODECO Energy Temporary Ship Tanker
Page 6 of 9
Project FSO. URWASI
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Originator APOL
Revision Date th January 19 2011
STRIPPING LINE & CARGO LINE
Figure 8: Modification on Ballast line, Cargo line & Stri pping line inside the tanks due to modification on Water Ballast Tank 1 & 5 wing. CAFETARIA ROOM
KODECO Energy Temporary Ship Tanker
Page 7 of 9
Project FSO. URWASI
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Originator APOL
Revision Date th January 19 2011
Figure 9: Existing recreation room and officer’s room shall be modified for accommodation and cafeteria for more than 34 persons of FSO crew. HELIDECK
KODECO Energy Temporary Ship Tanker
Page 8 of 9
Project FSO. URWASI
Document Number AP-TH/1-I-2011
Discipline ENGINEERING
Doc. Type SURVEY REPORT
PT. ARPENI PRATAMA OCEAN LINE, Tbk.
Originator APOL
Revision Date th January 19 2011
Figure 10: Location for heli-deck will be positioning at aft area, also need to be consider about gangway and ladder. Aft construction on below main deck also needs to be analyzed whether it needs to be reinforced or not. SEWAGE TREATMENT PLAN
Figure 11: Sewage Treatment Plan shall be modify for additional FSO crew, also need to be consider to give additional sewage system onboard.
KODECO Energy Temporary Ship Tanker
Page 9 of 9
d E u n e g i t n o e f o e u r i n n d g a P t l i a o n n f d o e r t a o i l f f d o l e a s d i i g n n g a p n i d p p e o , s e i x t i i s o n t i n i n g g o a f t f l m o a a d i n i n d g e p c i k p . e ( 1 2 " ) w i l l b e r e p l a c e d t o f r . 5 2 . M e t e r i n g s p e c i f i c a t i o n n e e d t o b e v e r i f i e d