ANALISA HARGA SATUAN
NO.
URAIAN
KOEF.
SAT.
1
2
3
4
HARGA SATUAN
JUMLAH HARGA
BAHAN
UPAH
BAHAN
5
6
7=(3x5)
1 1 M3 bongkar beton Pekerja Setengah Terampil
4.3300
org
Mandor
0.3330
org
45,000.00 70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
2 1 M2 Bongkar dinding bata Pekerja Setengah Terampil
1.0000
org
Mandor
0.0900
org
45,000.00 70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
3 1 M² Pekerjaan Pengukuran (Site) Tukang Batu Terampil
0.0100
org
Pekerja Terampil
0.0200
org
Peralatan
0.5000
lot
50,000.00 45,000.00 2000
1000 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 4 1 M' Pekerjaan Pasangan Bouwplank Kayu Kelas III
0.0050
m3
1,500,000.00
7,500.00
papan kelas III
0.0050
m3
1,500,000.00
7,500.00
Paku 5-7
0.0380
Kg
12,500.00
Ongkos Pasang
0.1550
ls
475.00 20,000.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 5 1 M3 Pekerjaan galian tanah biasa sedalam Max. 1 m' Pekerja setengah terampil
0.4000
org
Mandor
0.0400
org
Alat bantu
0.0500
lot
45,000.00 70,000.00 2,000.00
100.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 6 1 M3 Pekerjaan galian tanah biasa sedalam Max. 2 m' Pekerja setengah terampil
0.5260
org
Mandor
0.0520
org
Alat bantu
0.0500
lot
45,000.00 70,000.00 2,000.00
100.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 7 1 M3 Pekerjaan galian tanah pondasi straus Pekerja setengah terampil
0.9440
org
Mandor
0.0940
org
Alat bantu
0.0500
lot
45,000.00 70,000.00 2,000.00
100.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 8 1 M3 Urugan tanah kembali Pekerja
0.1920
org
Mandor
0.0190
org
Alat bantu
0.1000
lot
45,000.00 70,000.00 2,000.00
200.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 9 1 M3 Pekerjaan Pemadatan tanah setiap 20 cm Pekerja terampil
0.5000
org
Mandor
0.0500
org
Alat bantu ( sewa stamper )
0.1250
lot
45,000.00 70,000.00 25,000.00
3,125.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan
10 1 M3 Urugan pasir urug Pasir urug
1.2000
m3
Pekerja
0.1500
org
mandor
0.0100
org
95,000.00
114,000.00 45,000.00 70,000.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 11 1 M3 Lantai kerja ad. 1 : 3 : 5 PC ( 50 kg )
3.9560
zak
63,500.00
Pasir beton
0.5500
m3
125,000.00
251,206.00 68,750.00
Split pecah mesin 2/3
0.9300
m3
140,000.00
130,200.00
Peralatan
0.0750
lot
2,000.00
Pekerja
2.0000
org
45,000.00
Tukang batu setengah terampil
0.5000
org
50,000.00
Kepala tukang batu
0.0500
org
55,000.00
Mandor
0.0100
org
150.00
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
12 1 M3 Pekerjaan cor beton Site Mix. Ad. 1 : 2 : 3 PC ( 50 kg )
6.8000
zak
63,500.00
431,800.00
Split pecah mesin 2/3
0.8300
m3
140,000.00
116,200.00
Pasir beton
0.5400
m3
125,000.00
Pekerja
1.5000
org
45,000.00
Tukang batu setengah terampil
0.5000
org
50,000.00
Kepala tukang batu
0.0500
org
55,000.00
Mandor
0.0100
org
Peralatan
0.0700
lot
67,500.00
70,000.00 2,000.00
140.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 13 1 Kg Pasang besi beton terpasang U-24 Besi U-24
1.0500
kg
8,500.00
Kawat beton
0.0100
kg
13,000.00
8,925.00
Tukang besi beton setengah terampil
0.0250
org
50,000.00
Tukang besi terampil
0.0150
org
50,000.00
Kepala tukang besi
0.0100
org
55,000.00
Mandor
0.0050
org
Peralatan
0.0200
lot
130.00
70,000.00 2,000.00
40.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 14 1 Kg Pasang besi beton terpasang U-39 Besi U-39
1.0500
kg
10,000.00
Kawat beton
0.0100
kg
13,000.00
10,500.00
Tukang besi beton setengah terampil
0.0250
org
50,000.00
Tukang besi terampil
0.0150
org
50,000.00
Kepala tukang besi
0.0100
org
55,000.00
Mandor
0.0050
org
Peralatan
0.0200
lot
130.00
70,000.00 2,000.00
40.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 15 1 M2 Pasang stoot werk Kayu stoot (2x pakai) 50 %
9.0000
btg
20,000.00
180,000.00
Papan albasiah (2x pakai) 75 %
0.0160
m3
1,500,000.00
24,000.00
Paku 5 - 7 cm
0.5000
kg
12,500.00
Pekerja
0.1500
org
45,000.00
Tukang kayu terampil
0.2000
org
50,000.00
Kepala tukang kayu
0.2000
org
55,000.00
Mandor
0.0170
org
6,250.00
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
16 1 M2 Pasang bekisting dengan papan Kaso 5/7 (2x pakai) 25 % kayu kelas III
0.0170
m3
1,500,000.00
25,500.00
Papan kelas III (2x pakai) 50 %
0.0240
m3
1,500,000.00
36,000.00
Paku
0.4000
kg
12,500.00
Pekerja
0.1200
org
45,000.00
Tukang kayu terampil
0.1500
org
50,000.00
Kepala tukang kayu
0.1500
org
55,000.00
Mandor
0.0500
org
70,000.00
tukang kayu setengah terampilr cetakan)
0.1200
org
5,000.00
50,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
17 1 M3 Pasang aanstamping batu belah Batu belah
1.2000
m3
100,000.00
Pasir urug
0.1000
m3
95,000.00
120,000.00
Pekerja
0.5000
org
45,000.00
Tukang batu setengah terampil
0.5625
org
50,000.00
Kepala tukang batu
0.0750
org
55,000.00
Mandor
0.0563
Org
9,500.00
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
18 1 M3 Pasang pondasi batu belah ad. 1 : 5 Batu belah
1.2000
m3
100,000.00
120,000.00
Pc ( 50 Kg )
1.0800
sak
63,500.00
68,580.00
Pasir pasang
0.4300
m3
115,000.00
Pekerja
1.2500
org
45,000.00
Tukang batu setengah terampil
0.5000
org
50,000.00
Kepala tukang batu
0.1125
org
55,000.00
Mandor
0.0169
Org
49,450.00
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
19 1 M2 Pasang bata merah ad. 1 : 5 Bata merah
70.0000
Bh
650.00
45,500.00
Pc ( 50 Kg )
0.2074
sak
63,500.00
13,169.90
Pasir pasang
0.0580
m3
115,000.00
Pekerja setengah terampil
0.3218
org
45,000.00
Tukang batu setengah terampil
0.1805
org
50,000.00
Kepala tukang batu
0.0158
org
55,000.00
Mandor
0.0083
Org
6,670.00
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
20 1 M2 Pasang bata merah ad. 1 : 3 Bata merah
70.0000
Bh
650.00
45,500.00
Pc ( 50 Kg )
0.4200
sak
63,500.00
26,670.00
Pasir pasang
0.0540
m3
115,000.00
Pekerja setengah terampil
0.4290
org
45,000.00
Tukang batu setengah terampil
0.2140
org
50,000.00
Kepala tukang batu
0.0210
org
55,000.00
Mandor
0.0110
Org
6,210.00
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
21 1 M2 Pasang plesteran + acian ad. 1 : 5 Pc ( 50 Kg )
0.1000
sak
63,500.00
Pasir pasang
0.0190
m3
115,000.00
6,350.00
Pekerja setengah terampil
0.2860
org
45,000.00
Tukang batu setengah terampil
0.2140
org
50,000.00
Kepala tukang batu
0.0210
org
55,000.00
Mandor
0.0200
Org
2,185.00
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
22 1 M2 Pasang plesteran + acian ad. 1 : 3 Pc ( 50 Kg )
0.1600
sak
63,500.00
Pasir pasang
0.0190
m3
115,000.00
10,160.00
Pekerja setengah terampil
0.2860
org
45,000.00
Tukang batu setengah terampil
0.2140
org
50,000.00
Kepala tukang batu
0.0210
org
55,000.00
Mandor
0.0200
Org
2,185.00
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
23 1 M2 Pengecatan Dinding sekualitas Sanlex ( 3x ) Cat tembok sekulitas Sanlex
0.1750
Kg
12,000.00
2,100.00
Plamur tembok
0.1600
Kg
20,000.00
3,200.00
Rol cat
0.0100
Bh
25,000.00
250.00
Amplas
0.5000
Lbr
4,000.00
2,000.00
Pekerja setengah terampil
0.1040
org
45,000.00
Tukang Cat setengah terampil
0.1820
org
50,000.00
Kepala Tukang Cat
0.0195
Org
55,000.00
Mandor
0.0100
Org
Steger Werk
0.0450
lot
70,000.00 250,000.00
11,250.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 24 1 M2 Zinkromat Zinkromat
0.2000
Kg
25,000.00
5,000.00
Amplas besi
0.4000
Lbr
4,000.00
1,600.00
Minyak cat thiner
0.1500
Kg
15,000.00
2,250.00
Kuas 3"
0.0500
bh
12,000.00
Pekerja setengah terampil
0.1600
Org
45,000.00
Tukang cat terampil
0.1800
org
50,000.00
Kepala Tukang Cat
0.0300
Org
55,000.00
Mandor
0.0030
Org
600.00
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
25 1 Kg Pek. Erection Konstruksi kuda-kuda besi Pekerja terampil
0.0010
org
45,000.00
Tukang besi profil terampil
0.0010
org
50,000.00
Kepala tukang besi profil
0.0002
org
55,000.00
Mandor
0.0001
org
70,000.00
Operator alat besar
0.0020
org
85,000.00
Pembantu operator
0.0200
org
Sewa alat
0.0002
ls
Bahan bakar solar
0.0100
lt
9,000.00
90.00
Pelumas
0.0010
lt
25,000.00
25.00
Alat bantu
0.0002
lot
75,000.00 200,000.00
2,000.00
0.40 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 26 1 Kg Pekerjaan Plat Besi Plat besi
1.0500
Kg
Pekerja terampil
0.0600
org
12,000.00 45,000.00
12,600.00
Tukang besi profil terampil
0.0040
org
50,000.00
Kepala tukang besi profil
0.0010
org
55,000.00
Mandor
0.0002
org
Peralatan & bahan tambahan (Oksigen,solar, kawat las listrik, dll)
0.1250
lot
70,000.00 100,000
12,500.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 27 1 Kg Pekerjaan besi siku Besi siku
1.0500
Kg
Pekerja terampil
0.0600
org
10,000.00 45,000.00
10,500.00
Tukang besi profil terampil
0.0040
org
50,000.00
Kepala tukang besi profil
0.0010
org
55,000.00
Mandor
0.0002
org
Peralatan & bahan tambahan (Oksigen,solar, kawat las listrik, dll)
0.1250
lot
70,000.00 100,000
12,500.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan
28 1 Kg Pekerjaan besi IWF Besi IWF
1.0500
Kg
Pekerja terampil
0.0600
org
9,000.00 45,000.00
9,450.00
Tukang besi profil terampil
0.0040
org
50,000.00
Kepala tukang besi profil
0.0010
org
55,000.00
Mandor
0.0002
org
Peralatan & bahan tambahan (Oksigen,solar, kawat las listrik, dll)
0.1250
lot
70,000.00 100,000
12,500.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 29 1 Kg Pekerjaan besi C lipped chanel Besi lipped chanel
1.0500
Kg
Pekerja terampil
0.0600
org
10,000.00 45,000.00
10,500.00
Tukang besi profil terampil
0.0040
org
50,000.00
Kepala tukang besi profil
0.0010
org
55,000.00
Mandor
0.0002
org
Peralatan & bahan tambahan (Oksigen,solar, kawat las listrik, dll)
0.1250
lot
70,000.00 100,000
12,500.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 30 1 m' pipa PVC Type Aw Ø 3" Pipa PVC Ø 3"
0.2500
bt
45,000.00
Peralatan
0.0550
set
5,000.00
Tukang Pipa
0.1420
orang
Mandor
0.0142
orang
11,250.00 275.00 50,000.00 70,000.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 31 1 m' pasang saluran air grevel Galian tanah
0.1500
m3
20,900.00
Grafel beton dia. 30 cm
1.0000
m1
350.00
3,135.00 350.00
Pas. Bata 1 : 5
0.7000
m2
90,295.90
63,207.13
Plesteran + Acian 1 : 5
0.7000
m2
38,470.00
Tambahan Upah
0.0500
ls
26,929.00 5,000.00 Jumlah
2% Keuntungan Max. Jumlah Dibulatkan 32 1 M2 Penutup atap zincalumn dan insulasi peredam Penutup Zincalume metal sheet lapis PVC
1.0500
m2
130,000.00
136,500.00
Insulasi Peredam
1.0500
m2
50,000.00
52,500.00
Paku anti karat
0.0290
kg
12,500.00
Pekerja
0.1000
org
45,000.00
Tukang kayu setengah terampil
0.2000
org
50,000.00
Kepala tukang kayu
0.0020
org
55,000.00
Mandor
0.0050
org
362.50
70,000.00 Jumlah 2% Keuntungan Max. Jumlah Dibulatkan
33 1 m3 pondasi straus pile dia, 30 cm Besi Beton U-24 Beton Sitemix ad. 1 : 2 : 3
104.9833
kg
12,200.00
1.0000
m3
725,800.00
1,280,796.26 725,800.00 Jumlah Dibulatkan
34 I m3 poer beton 120 x 120 Bekisting Besi Beton U-24 Beton Sitemix ad. 1 : 2 : 3
3.3333
m2
99,000.00
329,996.70
144.7417
kg
12,200.00
1,765,848.74
1.0000
m3
725,800.00
725,800.00 Jumlah Dibulatkan
35 I m3 poer beton 100 x 100 Bekisting Besi Beton U-24 Beton Sitemix ad. 1 : 2 : 3
4.0000
m2
99,000.00
396,000.00
160.2685
kg
12,200.00
1,955,275.70
1.0000
m3
725,800.00
725,800.00 Jumlah Dibulatkan
36 1 m3 kolom 50/30 Bekisting
10.6667
m2
99,000.00
1,056,003.30
Besi Beton U-24
89.1883
kg
12,200.00
1,088,097.26
1.0000
m3
725,800.00
Beton Sitemix ad. 1 : 2 : 3
725,800.00 Jumlah Dibulatkan
37 1 m3 kolom 30/20 Bekisting Besi Beton U-24 Beton Sitemix ad. 1 : 2 : 3
16.6667
m2
99,000.00
1,650,003.30
142.5722
kg
12,200.00
1,739,380.84
1.0000
m3
725,800.00
725,800.00 Jumlah Dibulatkan
38 1 M3 Membuat kolom praktis Bekisting papan Besi U-24 Beton Site Mix ad. 1 : 2 : 3
10.6667
m2
99,000.00
1,056,003.30
191.3723
Kg
12,200.00
2,334,742.06
1.0000
m3
725,800.00
725,800.00 Jumlah Dibulatkan
39 1 m3 balok beton 20/40 Bekisting Besi Beton U-24 Beton Sitemix ad. 1 : 2 : 3
9.5000
m2
99,000.00
940,500.00
133.2500
kg
12,200.00
1,625,650.00
1.0000
m3
725,800.00
725,800.00 Jumlah Dibulatkan
40 1 M3 Ring balk 15/20 Bekisting papan Besi U-24 Beton Site Mix ad. 1 : 2 : 3
13.3333
m2
99,000.00
1,319,996.70
154.6083
Kg
12,200.00
1,886,221.26
1.0000
m3
725,800.00
725,800.00 Jumlah Dibulatkan
41 1 M3 Membuat Plat lantai t. 12 cm Bekisting papan
8.3333
m2
99,000.00
824,996.70
Stoot werk
8.3333
m2
243,900.00
2,032,491.87 1,070,889.16
Besi U-24 Beton Site Mix ad. 1 : 2 : 3
87.7778
Kg
12,200.00
1.0000
m3
725,800.00
725,800.00 Jumlah Dibulatkan
DAFTAR HARGA BAHAN DAN BANGUNAN
JUMLAH HARGA
JUMLAH
NO.
UPAH
TOTAL
8=(3X6)
9= (7+8)
JENIS BAHAN BANGUNAN
A.
AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
1
SATUAN
Pasir Urug
m3
194,850.00
194,850.00
2
Pasir Pasang
m3
23,310.00
23,310.00
3
Pasir Beton
m3
218,160.00
4
Batu Pecah 2 : 3
m3
4,363.20
5
Batu Belah Pondasi
m3
222,523.20
6
Bata Merah Bakar
bh
222,500.00
7
Grevel U 30 mm
bh
8
Besi beton dia. 30 cm
bh
9
Semen PC 50kg
zak
51,300.00
B.
BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA
1,026.00
1
Plamir Tembok
52,326.00
2
Cat Tembok Sanlex
kg
52,300.00
3
Rool Cat tembok + Bak cat
bh
45,000.00 6,300.00
45,000.00 6,300.00
kg
4
Kwas 3"
bh
500.00
500.00
5
Terpentin
lt
900.00
900.00
6
Thiner A
lt
1,000.00
7
Ampelas
lbr
2,400.00
8
Meni Kayu / Besi
kg
48.00
9
Cat Kayu / Besi Glotex
kg
10
Zinkromat
kg
2,448.00 2,400.00
3,100.00
C.
BAHAN KAYU BERIKUT BAHAN JADINYA
7,500.00
1
Kayu papan kelas III
7,500.00
2
Kayu Kaso kelas III
m3
475.00
3
kayu stoot
btg
18,575.00
D.
BAHAN LOGAM DAN BAHAN JADINYA
371.50
1
Besi beton U-24 rata - rata
18,946.50
2
Besi beton U-39 Ulir
kg
18,900.00
3
Besi siku
Kg
m3
3,100.00 kg
4
Besi IWF
Kg
18,000.00
18,000.00
5
Besi C Lipped Chanel
Kg
2,800.00
2,800.00
6
Plat besi
kg
100.0000
7
Kawat Beton
kg
20,900.00
8
Kawat las listrik
Kg
9
418.00 21,318.00
Pipa GIV steel Ø 1½"
btg
10
Pipa GIV steel Ø 1"
btg
21,300.00 E.
BAHAN PAKU DAN MUR BAUT
23,670.00
23,670.00
1
Paku 1 s/d 3 cm
kg
3,640.00
3,640.00
2
Paku 4 s/d 7 cm
kg
100.00
3
Paku 8 s/d 12 cm
kg
27,410.00
4
Paku gypsum
kg
27,958.20
F.
BAHAN PERPIPAAN
27,900.00
1
Pipa PVC type AW Ø 3"
42,480.00
42,480.00
G.
BAHAN PENUTUP ATAP
6,580.00
6,580.00
1
Penutup Zincalume metal sheet lapis PVC
m2
100.00
2
Insulasi Peredam
m2
548.20 btg
49,160.00 983.20
M.
BAHAN ELECTRICAL
50,143.20
1
Instalasi titik lampu / stop kontak
ttk
50,100.00
2
Down light + lampu XL 23 watt
bh
3
Lampu TL 2 x 36 watt
bh
4
Kabel NYM 3 x 2,5 mm²
m'
8,640.00
8,640.00
1,330.00
1,330.00 200.00 10,170.00 203.40 10,373.40 10,300.00
22,500.00
22,500.00
3,500.00
3,500.00 3,125.00 29,125.00 582.50 29,707.50 29,700.00
114,000.00 6,750.00 700.00
6,750.00 700.00 121,450.00 2,429.00 123,879.00 123,800.00 251,206.00 68,750.00 130,200.00 150.00
90,000.00
90,000.00
25,000.00
25,000.00
2,750.00
2,750.00
700.00
700.00 568,756.00 11,375.12 580,131.12 580,100.00 431,800.00 116,200.00 67,500.00
67,500.00
67,500.00
25,000.00
25,000.00
2,750.00
2,750.00
700.00
700.00 140.00 711,590.00 14,231.80 725,821.80 725,800.00 8,925.00 130.00
1,250.00
1,250.00
750.00
750.00
550.00
550.00
350.00
350.00 40.00 11,995.00 239.90 12,234.90 12,200.00 10,500.00 130.00
1,250.00
1,250.00
750.00
750.00
550.00
550.00
350.00
350.00 40.00 13,570.00 271.40 13,841.40 13,800.00 180,000.00 24,000.00 6,250.00
6,750.00
6,750.00
10,000.00
10,000.00
11,000.00
11,000.00
1,190.00
1,190.00 239,190.00 4,783.80 243,973.80 243,900.00
25,500.00 36,000.00 5,000.00 5,400.00
5,400.00
7,500.00
7,500.00
8,250.00
8,250.00
3,500.00
3,500.00
6,000.00
6,000.00 97,150.00 1,943.00 99,093.00 99,000.00 120,000.00 9,500.00
22,500.00
22,500.00
28,125.00
28,125.00
4,125.00
4,125.00
3,941.00
3,941.00 188,191.00 3,763.82 191,954.82 191,900.00 120,000.00 68,580.00 49,450.00
56,250.00
56,250.00
25,000.00
25,000.00
6,187.50
6,187.50
1,183.00
1,183.00 326,650.50 6,533.01 333,183.51 333,100.00 45,500.00 13,169.90 6,670.00
14,481.00
14,481.00
9,025.00
9,025.00
869.00
869.00
581.00
581.00 90,295.90 1,805.92 92,101.82 92,100.00 45,500.00 26,670.00 6,210.00
19,305.00
19,305.00
10,700.00
10,700.00
1,155.00
1,155.00
770.00
770.00 110,310.00 2,206.20 112,516.20 112,500.00 6,350.00 2,185.00
12,870.00
12,870.00
10,700.00
10,700.00
1,155.00
1,155.00
1,400.00
1,400.00 34,660.00 693.20 35,353.20 35,300.00
10,160.00 2,185.00 12,870.00
12,870.00
10,700.00
10,700.00
1,155.00
1,155.00
1,400.00
1,400.00 38,470.00 769.40 39,239.40 39,200.00 2,100.00 3,200.00 250.00 2,000.00
4,680.00
4,680.00
9,100.00
9,100.00
1,072.50
1,072.50
700.00
700.00 11,250.00 34,352.50 687.05 35,039.55 35,000.00 5,000.00 1,600.00 2,250.00 600.00
7,200.00
7,200.00
9,000.00
9,000.00
1,650.00
1,650.00
210.00
210.00 27,510.00 550.20 28,060.20 28,000.00
45.00
45.00
50.00
50.00
11.00
11.00
7.00
7.00
170.00
170.00
1,500.00
1,500.00
40.00
40.00 90.00 25.00 0.40 1,938.40 38.77 1,977.17 1,900.00 12,600.00
2,700.00
2,700.00
200.00
200.00
55.00
55.00
14.00
14.00 12,500.00 28,069.00 561.38 28,630.38 28,600.00 10,500.00
2,700.00
2,700.00
200.00
200.00
55.00
55.00
14.00
14.00 12,500.00 25,969.00 519.38 26,488.38 26,400.00
9,450.00 2,700.00
2,700.00
200.00
200.00
55.00
55.00
14.00
14.00 12,500.00 24,919.00 498.38 25,417.38 25,400.00 10,500.00
2,700.00
2,700.00
200.00
200.00
55.00
55.00
14.00
14.00 12,500.00 25,969.00 519.38 26,488.38 26,400.00 11,250.00 275.00
7,100.00 994.00
7,100.00 994.00 19,619.00 392.38 20,011.38 20,000.00
3,135.00 350.00 63,207.13 26,929.00 250.00
250.00 93,871.13 1,877.42 95,748.55 95,700.00 136,500.00 52,500.00 362.50
4,500.00
4,500.00
10,000.00
10,000.00
110.00
110.00
350.00
350.00 204,322.50 4,086.45 208,408.95 208,400.00 1,280,796.26 725,800.00 2,006,596.26 2,006,500.00 329,996.70 1,765,848.74 725,800.00 2,821,645.44 2,821,600.00 396,000.00 1,955,275.70 725,800.00 3,077,075.70 3,077,000.00
1,056,003.30 1,088,097.26 725,800.00 2,869,900.56 2,869,900.00 1,650,003.30 1,739,380.84 725,800.00 4,115,184.14 4,115,100.00 1,056,003.30 2,334,742.06 725,800.00 4,116,545.36 4,116,500.00 940,500.00 1,625,650.00 725,800.00 3,291,950.00 3,291,900.00 1,319,996.70 1,886,221.26 725,800.00 3,932,017.96 3,932,000.00 824,996.70 2,032,491.87 1,070,889.16 725,800.00 4,654,177.73 4,654,100.00
AN
DAFTAR HARGA UPAH
HARGA SATUAN
NO.
JENIS PEKERJA BANGUNAN
HARGA UPAH
SATUAN WAKTU
1
Mandor
70,000.00 1 ORANG /HR/8 JAM
95,000.00
2
Pekerja Terampil
45,000.00 1 ORANG /HR/8 JAM
115,000.00
3
Pekerja Setengah Terampil
45,000.00 1 ORANG /HR/8 JAM
125,000.00
4
Pekerja
45,000.00 1 ORANG /HR/8 JAM
140,000.00
5
Kepala Tukang Kayu
55,000.00 1 ORANG /HR/8 JAM
100,000.00
6
Tukang Kayu Terampil
50,000.00 1 ORANG /HR/8 JAM
650.00
7
Tukang kayu Setengah terampil
50,000.00 1 ORANG /HR/8 JAM
350.00
8
Kepala Tukang Batu
55,000.00 1 ORANG /HR/8 JAM
65,000.00
9
Tukang Batu Terampil
50,000.00 1 ORANG /HR/8 JAM
63,500.00
10
Tukang Batu Setengah Terampil
50,000.00 1 ORANG /HR/8 JAM
11
Tukang pipa
50,000.00 1 ORANG /HR/8 JAM
12
Kepala tukang cat
55,000.00 1 ORANG /HR/8 JAM
20,000.00
13
Tukang Cat Terampil
50,000.00 1 ORANG /HR/8 JAM
12,000.00
14
Tukang cat Setengah Terampil
50,000.00 1 ORANG /HR/8 JAM
25,000.00
15
Tukang Besi Beton Setengah Terampil
50,000.00 1 ORANG /HR/8 JAM
12,000.00
16
Tukang Besi Beton terampil
50,000.00 1 ORANG /HR/8 JAM
8,000.00
17
Kepala Tukang Besi
55,000.00 1 ORANG /HR/8 JAM
15,000.00
18
Tukang Besi Profil Setengah Terampil
50,000.00 1 ORANG /HR/8 JAM
4,000.00
19
Tukang Besi profil terampil
50,000.00 1 ORANG /HR/8 JAM
10,000.00
20
Kepala Tukang Besi profil
55,000.00 1 ORANG /HR/8 JAM
45,000.00
21
Operator Alat Berat
85,000.00 1 ORANG /HR/8 JAM
25,000.00
22
Pembantu Operator
75,000.00 1 ORANG /HR/8 JAM
1,500,000.00 1,500,000.00 20,000.00
Sukabumi, 23 Juli 2013 Penawar, ………….
8,500.00 10,000.00 10,000.00 9,000.00 10,000.00 12,000.00 13,000.00 15,000.00 32,000.00 20,000.00
12,500.00 12,500.00 12,500.00 12,500.00
45,000.00
130,000.00 50,000.00
25,000.00 125,000.00 100,000.00 4,000.00
……………. Direktur
RENCANA ANGGARAN BIAYA REHAB FUNGSIONAL KOLAM RENANG PASAR SENI KOTA SUKABUMI REKAPITULASI
NO.
URAIAN PEKERJAAN
I
PEKERJAAN PERSIAPAN
II
PEKERJAAN BONGKARAN
III
PEKERJAAN GALIAN TANAH & PONDASI
IV
PEKERJAAN BETON
V
PEKERJAAN DINDING
VI
PEKERJAAN KONSTRUKSI BAJA
VII
PEKERJAAN ATAP
VIII
PEKERJAAN PENGECATAN
IX
PEKERJAAN TALANG AIR & SALURAN
X
PEKERJAAN INSTALASI LISTRIK
JUMLAH PPn ( 10 % ) JUMLAH TOTAL DIBULATKAN
TERBILANG :
BIAYA
NANG PASAR SENI I
NO. JUMLAH HARGA ( Rp. )
1
I
10,810,400 2,128,150.00 57,474,692.00 219,684,407.00 39,467,879.00 392,656,046.00 551,843,200.00 10,758,300.00 9,573,500.00 4,925,000.00
1,299,321,574 129,932,157 1,429,253,731 1,429,253,000
1 2 3 4 5 6 7
II
1
97
2
III
Sukabumi, 23 Juli 2013 Penawar, ………….
1 2 3 4 5 6 7
……………. Direktur IV
1 2 3 4 5
6 7 8 9
V
1 2 3 4
VI
1 2 3 4 5
6
7
8
9
10 11 12 13 14 15 16 17 18 19
VII
1
VIII
1
IX
1 2
3 4
X
1 2 3
RENCANA ANGGARAN BIAYA REHAB FUNGSIONAL KOLAM RENANG PASAR SENI KOTA SUKABUMI
URAIAN
VOLUME
SAT.
2
3
4
PEKERJAAN PERSIAPAN
Pek. Pembersihan site dan pengukuran
1,035.00
m2
Mobilisasi dan demobilisasi
1.00
ls
Pengadaan direksikeet
1.00
ls
Identitas kegiatan
1.00
ls
Administrasi
1.00
ls
Pek. Pasangan Bouwplank
176.00
m'
Air & Listrik Kerja
1.00
ls
Pek. Bongkaran beton
5.51
m3
Pek. Bongkaran Dinding Bata
17.25
m3
Pek. Galian Tanah Pondasi
129.59
m3
Pek. Galian Tanah Foot plat Kedalaman 1,5 m
23.04
m3
Pek. Galian Tanah straus pile
20.16
m3
Pek. Pondasi Batu Kali ad. 1 : 5
56.69
m3
Pek. Pondasi Talud ad. 1 : 5
45.6
m3
Pek. Timbunan Tanah Kembali
43.2
m3
Pek. Urugan Tanah
120.87
m3
Pek. Strauss Pile Diameter 30 cm ad. 1 : 2 : 3
5.93
m3
Pek. Pondasi Footplat 120 x120 ad. 1 : 2 : 3
11.09
m3
Pek. Pondasi Footplat 100x100 cm ad. 1 : 2 : 3
6.05
m3
Pek. Kolom K1 dan Pedestal 50 x 30 cm ad. 1 : 2 : 3
14.18
m3
Pek. Kolom K2 dan Pedestal 30 x 20 cm ad. 1 : 2 : 3
3.84
m3
Jumlah I
PEKERJAAN BONGKARAN
Jumlah II
PEKERJAAN GALIAN TANAH & PONDASI
Jumlah III
PEKERJAAN BETON
Pek. Kolom Praktis ad. 1 : 2 : 3
3.85
m3
Pek. Balok Beton 20/40 ad. 1 : 2 : 3
7.86
m3
Pek. Ring Balok 15/20 ad. 1 : 2 : 3
1.17
m3
Pek. dak Beton ad. 1 : 2 : 3
11.83
m3
Pek. pasangan dinding bata merah 1 : 3
26.79
m2
Pek. pasangan dinding bata merah 1 : 5
384.23
m2
Pek. plesteran dan acian 1 : 3
6.7
m2
Pek. plesteran dan acian 1 : 5
22.77
m2
Pek. Kolom IWF 400
7,260.00
Kg
Pek. Balok Gelagar IWF 300
5,138.00
Kg
Pek. Balok Anak IWF 150
392
Kg
Pek. Balok Support IWF 200
725.33
Kg
- Pipa Circular Bar Struktur Utama dia 1,5" pipa Gif Steel
5,305.96
Kg
- Pipa Circular Bar Struktur Pembagi (diagonal) dia 1" pipa Gif Steel
3,880.13
Kg
- Pipa Circular Bar Struktur Utama dia 1,5" pipa Gif Steel
1,026.96
Kg
- Pipa Circular Bar Struktur Pembagi (diagonal) dia 1" pipa Gif Steel
317.12
Kg
- Pipa Circular Bar Struktur Utama dia 1,5" pipa Gif Steel
584.08
Kg
- Pipa Circular Bar Struktur Pembagi (diagonal) dia 1" pipa Gif Steel
330.12
Kg
- Pipa Circular Bar Struktur Utama dia 1,5" pipa Gif Steel
421.52
Kg
- Pipa Circular Bar Struktur Pembagi (diagonal) dia 1" pipa Gif Steel
202.08
Kg
- Pipa Circular Bar Struktur Utama dia 1,5" pipa Gif Steel
310.03
Kg
- Pipa Circular Bar Struktur Pembagi (diagonal) dia 1" pipa Gif Steel
273.13
Kg
Pek. Gording CNP 100
3,344.90
Kg
Pek. Pengikat Gording Besi Siku 50,50,5
220.8
Kg
Pek. Pengikat Rangka Gording Mur Baut M8
462.00
bh
Pek. Base Plat 200.250.12
210.24
Kg
Pek. Rainforcement Plat
151.37
Kg
Pek. Mur Baut M24
492.00
bh
Pek. Mur Baut M16
816.00
bh
Pek. Anchor Bolt
216.00
bh
Pek. Zincromate
108.50
m2
Pek. Erection Baja dan pengerjaan
19,911.13
Kg
Jumlah IV
PEKERJAAN DINDING
Jumlah V PEKERJAAN KONSTRUKSI BAJA
Pek. Rangka Atap SF 1 Space frame,
Pek. Rangka Atap SF 2 Space frame,
Pek. Rangka Atap Girder L1,
Pek. Rangka Atap Girder L2,
Pek. Rangka Atap Girder L3,
Jumlah VI
PEKERJAAN ATAP
Pek. Penutup zincalume Ex.Isodec + Insulation setara isodec
2,648.00
m2
307.38
m2
118.00
m'
Pipa PVC 3 " setara Wavin
103.00
m'
Elbow 3 "
48.00
bh
Pek. Saluran Lingkungan Gravel 30 Cm
52.00
m'
Pek. Saluran Lingkungan buis 30 Cm
3.00
m'
Pek. Instalasi Titik Lampu
25.00
titk
Pek. Kabel NYM 3x2.5 mm setara eterna
6.00
rol
Pek. Lampu TL 2 x 36 watt TKO
25.00
bh
Jumlah VII
PEKERJAAN PENGECATAN
Pek. Pengecatan dinding sek. Sanlex
Jumlah VIII
PEKERJAAN TALANG AIR & SALURAN
Pek.Talang Air PVC lebar 40 cm + rangka Besi hollow 50,50,5 Pek. Pipa Pembuangan Air Hujan
Jumlah IX
PEKERJAAN INSTALASI LISTRIK
Jumlah X
ARAN BIAYA
M RENANG PASAR SENI ABUMI
REKAPITULA
HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
NO.
5
6=3x5
1 1 2 3
2,400
2,484,000
4
1,000,000
1,000,000
5
2,000,000
2,000,000
6
500,000
500,000
7
500,000
500,000
8
18,900
3,326,400
9
1,000,000
10
1,000,000
11
10,810,400
12 13 14 15
222,500.00
1,225,975.00
16
52,300.00
902,175.00
17 18
2,128,150.00
19 20 21 22
50,100.00
6,492,459.00
23
21,300.00
490,752.00
24
50,100.00
1,010,016.00
25
333,100.00
18,883,439.00
26
333,100.00
15,189,360.00
27
10,300.00
444,960.00
28
123,800.00
14,963,706.00
29 30
57,474,692.00
31 32 33 34
2,006,500.00
11,898,545.00
35
2,821,600.00
31,291,544.00
36
3,077,000.00
18,615,850.00
37
2,869,900.00
40,695,182.00
38
4,115,100.00
15,801,984.00
39
4,116,500.00
15,848,525.00
40
3,291,900.00
25,874,334.00
41
3,932,000.00
4,600,440.00
4,654,100.00
55,058,003.00
219,684,407.00
112,500.00
3,013,875.00
92,100.00
35,387,583.00
39,200.00
262,640.00
35,300.00
803,781.00
39,467,879.00
8,500.00
61,710,000.00
8,500.00
43,673,000.00
8,700.00
3,410,400.00
8,300.00
6,020,239.00 -
14,000.00
74,283,440.00
12,500.00
48,501,625.00 -
15,000.00
15,404,400.00
12,500.00
3,964,000.00 -
15,000.00
8,761,200.00
12,500.00
4,126,500.00
15,000.00
6,322,800.00
12,500.00
2,526,000.00
-
15,000.00
4,650,450.00
12,500.00
3,414,125.00
14,000.00
46,828,600.00
13,000.00
2,870,400.00
1,000.00
462,000.00
18,000.00
3,784,320.00
20,000.00
3,027,400.00
2,500.00
1,230,000.00
2,000.00
1,632,000.00
24,000.00
5,184,000.00
28,000.00
3,038,000.00
1,900.00
37,831,147.00
392,656,046.00
208,400.00
551,843,200.00
551,843,200.00
35,000.00
10,758,300.00
10,758,300.00
15,000.00
1,770,000.00 -
20,000.00
2,060,000.00
10,000.00
480,000.00
95,700.00
4,976,400.00
95,700.00
287,100.00
9,573,500.00
25,000.00
625,000.00
300,000.00
1,800,000.00
100,000.00
2,500,000.00
4,925,000.00
REKAPITULASI HARGA SATUAN PEKERJAAN
URAIAN
JUMLAH HARGA
2
3
1 M3 bongkar beton 1 M2 Bongkar dinding bata 1 M² Pekerjaan Pengukuran (Site)
222,500.00 52,300.00 2,400.00
1 M' Pekerjaan Pasangan Bouwplank
18,900.00
1 M3 Pekerjaan galian tanah biasa sedalam Max. 1 m'
21,300.00
1 M3 Pekerjaan galian tanah biasa sedalam Max. 2 m'
27,900.00
1 M3 Pekerjaan galian tanah pondasi straus
50,100.00
1 M3 Urugan tanah kembali
10,300.00
1 M3 Pekerjaan Pemadatan tanah setiap 20 cm
29,700.00
1 M3 Urugan pasir urug
123,800.00
1 M3 Lantai kerja ad. 1 : 3 : 5
580,100.00
1 M3 Pekerjaan cor beton Site Mix. Ad. 1 : 2 : 3
725,800.00
1 Kg Pasang besi beton terpasang U-24
12,200.00
1 Kg Pasang besi beton terpasang U-39
13,800.00
1 M2 Pasang stoot werk
243,900.00
1 M2 Pasang bekisting dengan papan
99,000.00
1 M3 Pasang aanstamping batu belah
191,900.00
1 M3 Pasang pondasi batu belah ad. 1 : 5
333,100.00
1 M2 Pasang bata merah ad. 1 : 5
92,100.00
1 M2 Pasang bata merah ad. 1 : 3
112,500.00
1 M2 Pasang plesteran + acian ad. 1 : 5
35,300.00
1 M2 Pasang plesteran + acian ad. 1 : 3
39,200.00
1 M2 Pengecatan Dinding sekualitas Sanlex ( 3x )
35,000.00
1 M2 Zinkromat
28,000.00
1 Kg Pek. Erection Konstruksi kuda-kuda besi
1,900.00
1 Kg Pekerjaan Plat Besi
28,600.00
1 Kg Pekerjaan besi siku
26,400.00
1 Kg Pekerjaan besi IWF
25,400.00
1 Kg Pekerjaan besi C lipped chanel
26,400.00
1 m' pipa PVC Type Aw Ø 3"
20,000.00
1 m' pasang saluran air grevel
95,700.00
1 M2 Penutup atap zincalumn dan insulasi peredam
208,400.00
1 m3 pondasi straus pile dia, 30 cm
2,006,500.00
I m3 poer beton 120 x 120
2,821,600.00
I m3 poer beton 100 x 100
3,077,000.00
1 m3 kolom 50/30
2,869,900.00
1 m3 kolom 30/20
4,115,100.00
1 M3 Membuat kolom praktis
4,116,500.00
1 m3 balok beton 20/40
3,291,900.00
1 M3 Ring balk 15/20
3,932,000.00
1 M3 Membuat Plat lantai t. 12 cm
4,654,100.00