HARGA SATUAN PEKERJAAN
Kegi Kegiat atan an
: Per Peren enca cana naan an Pemb Pemban angu guna nan n Inf Infra rast stru rukt ktur ur Tahu Tahun n Angg Anggar aran an 2009 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Peke Pekerj rjaa aan n
: Ra Raudat udath hul Atfa Atfall
Lokasi
: Tembilahan
No.
PEKERJAAN
A
ELEKTRIKAL
1
PEKERJAAN MAIN PO POWER
- PEKERJAAN GENSET
SAT
lot
HARGA
Rp
768,500,000.00
- Generator Generator Set 500 500 kVA Open Open type, type, Prime Power Power rating rating 1500 1500 rpm. rpm. Water cooled, Turbocharged - after cooled , four stroke, v-12, Brushless generator , 4 wire , wy e, drip proof, Lengkap dengan Vibration Demper, SILENCER, radiator dan Power Power Command. Dll
- PEKER PEKERJA JAAN AN TRAF TRAFO O Transformator 500 kVA, Oil type
unit
Rp
235,750,000.00
- PEKERJA PEKERJAAN AN TANKI TANKI SOLAR SOLAR - PE P EKERJAAN TANKI 10.000 L
lot
Rp
69,700,000.00
- PE PEKERJAAN TANKI 1000 L
lot
Rp
30,000,000.00
- INSTALASI DAN PEMIPAAN BAHAN BAKAR GENSET termasuk :
lot
Rp
12,500,000.00
- Pompa Pompa Elektr Elektrik ik - Pompa Pompa Manua Manuall - Panel Panel Pomp Pompa a - Pengka Pengkabel belan an - Valv Valve e - Stra Strain iner er - Check Check valve valve - WLC - Aksesoris Aksesoris & Alat Alat bantu bantu
2
PEKERJAAN PANEL
Panel ATS & AMF Genset
unit
- Panel Utama Tegangan Menengah (PUTM)
unit
Rp
112,500,000.00
- Panel Utama Tegangan Rendah (PUTR) / LVMDP
unit
Rp
376,500,000.00
Incoming Cubicle + ATS terdiri dari : - Prot Protec ecti tion on MCCB MCCB - Gear Geared ed Moto Motorr - Time Delayed Delayed Under Under Voltage Voltage Trip - Shun Shuntt Tri Trip p - Auxi Auxilliar iary - Ready Ready to to Close Close Contac Contactt - Electr Electrica icall Closing Closing Relea Release se - Plat Plat Inter Interloc lockk Elektr Elektris is - Auto Automa mati ticc Contro Controll
- Inte Interl rloc ockk Mekan Mekanis is - Lamp Lampu u Ind Indik ikat ator or - Ampere Ampere Meter Meter 500/5 500/5 A - Volt Meter 0-500 A + Selector Selector Switch Switch - Freque Frequency ncy Mete Meterr 50/60 50/60 Hz - Cos Cos Phi Phi Mete Meterr - kWh Mete Meterr 4P, 4P, 3P - Box Panel Panel + Accesso Accessorie riess - Grou Ground ndin ing g Syste System m
- Capasitor Bank, 350 kVAR terdiri dari :
Unit
Rp
65,500,000.00
- LP - DF ( Panel Penerangan )
Unit
Rp
3,750,000.00
- Grounding system
Lot
Rp
1,750,000.00
- SDP
Unit
Rp
58,500,000.00
- LP - S1A PANEL PENERANGAN SELASAR KANAN LT.1
Unit
Rp
9,750,000.00
- LP - S1B PANEL PENERANGAN SELASAR KIRI LT.1
Unit
Rp
9,750,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
11,500,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
10,900,000.00
- LP - 3 PANEL PENERANGAN LT.Mezanine
Unit
Rp
8,250,000.00
- LP - KUBAH KUBAH PANEL PENERA PENERANGAN NGAN LT ATAP KUBAH KUBAH + photo photo cell cell ( auto auto
Unit
Rp
16,700,000.00
- LP - MENARA PANEL PENERANGAN MENARA
Unit
Rp
7,500,000.00
- SDP
Unit
Rp
35,500,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
12,250,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
12,250,000.00
- LP - 3 PANEL PENERANGAN LT.3
Unit
Rp
10,500,000.00
- LP - PENERANGAN LUAR + photo cell ( auto/manual )
Unit
Rp
7,500,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
8,700,000.00
- LP - PENERANGAN LUAR + photo cell ( auto/manual )
Unit
Rp
7,500,000.00
- SDP
Unit
Rp
27,450,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
11,900,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
11,500,000.00
- LP - PENERANGAN LUAR + photo cell ( auto/manual )
Unit
Rp
8,750,000.00
- Capasi Capasitor tor Bank, Bank, 7 x 50 kVAR kVAR - Main Protection Protection MCCB 252-630 252-630 A, A, 4P,3F , 45kA - Harm Harmon onik ik Filt Filter er - Protection Protection MCCB 252-630 A, 4P,3F 4P,3F , 45kA - Automa Automatic tic Regul Regulato atorr 12 Step Step - Cont Contac acto torr - Term Termin inal al Cove Coverr - Box panel panel + Accesso Accessorie riess - Grou Ground ndin ing g Syste System m
- PEKERJA PEKERJAAN AN PANEL PANEL RUANG RUANG GENS GENSET ET
3
P EK EK ER ERJAAN P AN ANE L GE DU DUNG - PANE PANELL MESJ MESJID ID
- P AN ANE L SMU
- PANEL TK
- PANEL MI
- P AN ANE L MT S
- Inte Interl rloc ockk Mekan Mekanis is - Lamp Lampu u Ind Indik ikat ator or - Ampere Ampere Meter Meter 500/5 500/5 A - Volt Meter 0-500 A + Selector Selector Switch Switch - Freque Frequency ncy Mete Meterr 50/60 50/60 Hz - Cos Cos Phi Phi Mete Meterr - kWh Mete Meterr 4P, 4P, 3P - Box Panel Panel + Accesso Accessorie riess - Grou Ground ndin ing g Syste System m
- Capasitor Bank, 350 kVAR terdiri dari :
Unit
Rp
65,500,000.00
- LP - DF ( Panel Penerangan )
Unit
Rp
3,750,000.00
- Grounding system
Lot
Rp
1,750,000.00
- SDP
Unit
Rp
58,500,000.00
- LP - S1A PANEL PENERANGAN SELASAR KANAN LT.1
Unit
Rp
9,750,000.00
- LP - S1B PANEL PENERANGAN SELASAR KIRI LT.1
Unit
Rp
9,750,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
11,500,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
10,900,000.00
- LP - 3 PANEL PENERANGAN LT.Mezanine
Unit
Rp
8,250,000.00
- LP - KUBAH KUBAH PANEL PENERA PENERANGAN NGAN LT ATAP KUBAH KUBAH + photo photo cell cell ( auto auto
Unit
Rp
16,700,000.00
- LP - MENARA PANEL PENERANGAN MENARA
Unit
Rp
7,500,000.00
- SDP
Unit
Rp
35,500,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
12,250,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
12,250,000.00
- LP - 3 PANEL PENERANGAN LT.3
Unit
Rp
10,500,000.00
- LP - PENERANGAN LUAR + photo cell ( auto/manual )
Unit
Rp
7,500,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
8,700,000.00
- LP - PENERANGAN LUAR + photo cell ( auto/manual )
Unit
Rp
7,500,000.00
- SDP
Unit
Rp
27,450,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
11,900,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
11,500,000.00
- LP - PENERANGAN LUAR + photo cell ( auto/manual )
Unit
Rp
8,750,000.00
- Capasi Capasitor tor Bank, Bank, 7 x 50 kVAR kVAR - Main Protection Protection MCCB 252-630 252-630 A, A, 4P,3F , 45kA - Harm Harmon onik ik Filt Filter er - Protection Protection MCCB 252-630 A, 4P,3F 4P,3F , 45kA - Automa Automatic tic Regul Regulato atorr 12 Step Step - Cont Contac acto torr - Term Termin inal al Cove Coverr - Box panel panel + Accesso Accessorie riess - Grou Ground ndin ing g Syste System m
- PEKERJA PEKERJAAN AN PANEL PANEL RUANG RUANG GENS GENSET ET
3
P EK EK ER ERJAAN P AN ANE L GE DU DUNG - PANE PANELL MESJ MESJID ID
- P AN ANE L SMU
- PANEL TK
- PANEL MI
- P AN ANE L MT S
- SDP
Unit
Rp
32,750,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
12,250,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
12,250,000.00
- LP - 3 PANEL PENERANGAN LT.3
Unit
Rp
10,450,000.00
- SDP
Unit
Rp
32,750,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
12,450,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
11,950,000.00
- LP - 3 PANEL PENERANGAN LT.3
Unit
Rp
11,950,000.00
- SDP
Unit
Rp
32,750,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
12,250,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
11,900,000.00
- LP - 3 PANEL PENERANGAN LT.3
Unit
Rp
11,900,000.00
- SDP
Unit
Rp
32,750,000.00
- LP - 1 PANEL PENERANGAN LT.1
Unit
Rp
12,250,000.00
- LP - 2 PANEL PENERANGAN LT.2
Unit
Rp
11,900,000.00
- LP - 3 PANEL PENERANGAN LT.3
Unit
Rp
11,900,000.00
Unit
Rp
3,750,000.00
Unit
Rp
34,500,000.00
- PP-H PANEL ELECTRIC PUMP ( System Auto manual )
Unit
Rp
37,500,000.00
- PP-D PANEL DIESEL PUMP ( System Auto manual )
Unit
Rp
37,500,000.00
- PP-J PANEL JOCKEY PUMP ( System Auto manual )
Unit
Rp
27,500,000.00
- Grounding system
Lot
Rp
1,750,000.00
- PANEL MA
- PANE PANELL ASRA ASRAMA MA PUT PUTRA RA
- PANE PANELL ASRA ASRAMA MA PUT PUTRI RI
- PEKERJA PEKERJAAN AN PANEL PANEL RUA RUANG NG POMPA POMPA PANEL PENERANGAN - LP - DF ( Panel Penerangan )
PANEL SDP POMPA - SDP - POMPA
PANEL POMPA HIDRANT
PANEL DISTRIBUSI POMPA AIR BERSIH - PP-AB-1 PANEL ELECTRIC PUMP ( System Auto manual )
Unit
- PP-AB-2 PANEL ELECTRIC PUMP ( System Auto manual )
Unit
- PP-DW P AN ANEL P om ompa Deep Well ( System Auto manual )
Unit
- Grounding system
Lot
- PEKERJA PEKERJAAN AN PANEL PANEL SELAS SELASAR AR & SITE SITE PLAN
3
- PANEL PENERANGAN PENERANGAN selasar selasar & Koridor Koridor ( System System Auto manual manual + Phot
Unit
- PANEL LAMPU SOROT ( System Auto manual + Photo Cell)
Unit
- PANE PANELL PENE PENERA RANG NGAN AN LUAR LUAR ( Syst System em Auto Auto manu manual al + Phot Photo o Cell Cell )
Unit Unit
P EK EK ER ERJAAN K AB ABE L FEE DE DER - N2XSEFGbY 3 x 70 mm 2
m
- N2XSY 3 x 70 mm 2
m
- NYY 14 x 1 x 240 mm2
m
- NYFGBY 2 (4 x 240) mm2
m
- NYFGBY 4 x 240 mm2
m
- NYY 4 x 150 mm2
m
4
5
- NYY NYY 4 x 95 mm mm2 2
m
- NYY NYY 4 x 70 mm mm2 2
m
- NYY NYY 4 x 50 mm mm2 2
m
- NYFGBY 4 x 25 mm2
m
- NYY NYY 4 x 6 mm2 mm2
m
- NYY NYY 2 ( 3 x 6 ) mm mm2 2
m
PEKE PEKERJ RJAA AAN N INST INSTAL ALAS ASII PENE PENERA RANG NGAN AN - Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
ttk
- Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
ttk
- Instalasi Instalasi LP.SOROT LP.SOROT NYFGBY NYFGBY 4 x 4 mm
ttk
- Instalasi LP. TAMAN
ttk
- Instalasi Stop Kontak AC NYM 4 x 6 mm + pipa conduit
ttk
- Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
ttk
- Instalasi Exhoust Fan Fan NYM 3 x 2,5 mm + pipa conduit
ttk
- Instalasi Penerangan Luar NYY 3 x 2,5 mm + pipa conduit
ttk
P EK EK ER ERJAAN AR ARMATURE LA LAMP U - Lampu ML 2 x 36 Watt M5
6
7
9
bh
- Lampu Down Light RD175 2 x 18 WATT
bh
- Lampu Lampu Kolom Kolom ( Type interi interior or )
bh
- Lampu Lampu Kolom Kolom ( Type exteri exterior or )
bh
- Lampu Lampu WASHTA WASHTAFLE FLE 18 WATT, WATT, GMS
bh
- Lampu Gantung Stelo Globe C12 HL
bh
- Lampu TMX 1 x 36 Watt
bh
- Lampu Lampu TL 2 x 36 WATT, WATT, TKO
bh
- Lampu Baret 36 Watt
bh
- Lampu DOWN LIGHT 36 WATT, PL-C
bh
- Lampu TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
bh
- Lampu Lampu BLB-AL BLB-AL 1 x 18 WATT, WATT,
bh
- LP. Sorot 500 watt + cover pelindung
bh
- LP. Sorot 250 watt + cover pelindung
bh
- Lampu TAMAN GL TOP ACR GRILL T= 2.5 M + pondasi tiang
bh
PEKE PEKERJ RJAA AAN N SA SAKLA KLAR & STOP TOP KO KONTAK TAK - Saklar Tunggal
bh
- Saklar Ganda
bh
- Saklar 12 grid
bh
- Saklar 6 grid
bh
- Saklar 8 grid
bh
- Saklar Hotel
bh
- Stop Kontak 250 VA, 13 A
bh
- Outlet Stop Kontak AC
ttk
PEKE PEKERJ RJAA AAN N AIR AIR COND CONDIT ITIO IONE NER R - AC Split Komplit set , 5 PK LT.1
unit
- AC Split Split Kompli Komplitt set , 2.5 PK
unit unit
- AC Split Komplit set , 2 PK LT.1
unit
- AC Split Komplit set , 1 PK LT.1
unit
PEKERJAAN EX EXHOUST FA FAN - Exhaust Exhaust Fan, 1200 CFM Dia 16 " , 75 W 1 Phase, Phase, Wall Wall mounted mounted Type,
unit
- Exhaust Fan, 300 CFM, 8 ", 18 W, FV-20TGU1
unit
#
P EK ERJAAN K ABE L T RAY - Standard Tray Ukuran 30 cm x 10 cm x 3 mtr
#
m
Rp
254,660,000.00
PEKERJAAN PENANGKAL PETIR - Kabel NYY 70 mm2 dan Peralatan Bantu - LPI-system radius Protector 100 m Lampu Obstruction 60 Watt + Phot Pentanahan terdiri dari :
m unit lot
- Bak Kontrol 40 x 40 x 40 cm - 3 x Copper rod 5/8" x 5 meter atau Tahanan Pentanahan maks. < 5 ohm - Material Bantu - Klem-klem
#
- Jasa Instalasi dan Material Bantu
lot
- Tiang di atas Bangunan + Support
lot
- Izin Depnaker
lot
SOUND SYSTEM - PERALATAN UTAMA
unit
- Monitor Panel - Power Amply 2 x 240 watt - AM/FM TUNER - DVD PLAYER + MP3 + USB - Modular digital matrix Mixer 12 channel - 28-Band grapic Equalizer - Wired handheld Microphone + Tiang mic - Wireless handheld condensor Microphone + Tiang mic - Wireless receiver - Cabinet Rack - Aksesoris & alat bantu
- PEKERJAAN INSTALASI & FIXTURES - Horn Speaker 50 watt
bh
Rp
11,000,000.00
- Ceiling Speaker 3 Watt
bh
Rp
15,925,000.00
- Instalasi Sound System
ttk
Rp
19,565,000.00
- Terminal box
bh
Rp
375,000.00
- outlet Mic
bh
Rp
180,000.00
set
Rp
215,000,000.00
set
Rp
389,000,000.00
B
MEKANIKAL
1
PEKERJAAN POMPA
- ELECTRIC FIRE PUMP CAP. 750 USGPM FIRETROL FTA 1300 Electric Fire Pump Controller to FM Approved UL Listed. Wye Delta Starting Open Transtion NEMA 2 Enclosure Freestendig Including : - 1 nos Suction and Discharge Gauges 3.1/2" - 1 nos Automatic Air Release Valve 3/4 " - 1 Casing Relief Valve - 1 nos Consent Discharge Increaser 4 x 6"
- DIESEL FIRE PUMP CAP. 750 USGPM Diesel Engine Fire pump to FM Approved UL Listed Head
Exchanger Cooled mounted on baseplate including : - 2 sets 12 Volt Lead Acid Battery cables & Racks - 1 set Flexible Connector & industrial type silencer - 1 unit Fuel Tank Vol. 150 Gallone. Supplied loose - 1 unit FIRETROL FTA 1100 Diesel Fire Pump Controller to FM Approved UL Listed, NEMA 2 Enclosure Free Standing Accessories - 1 nos Suction and Discharge gauges 3 ,1/2" - 1 nos Automatic Air Release Valve 3/4 " - 1 nos Consentric Discharge Increaser 4x5" - 1 nos Main Relief Valve 4" - 1 nos Closed Waste Cone 4 x 6" - 1 unit Flowmeter "Gerand"
- JOCKEY PUMP
set
Rp
48,700,000.00
unit
Rp
97,000,000.00
unit
Rp
18,500,000.00
unit
Rp
3,750,000.00
unit
Rp
4,750,000.00
Cap. 25 USGPM at 105 Mtr Head
- Pompa Air Bersih Kap.
: 720 L/m
Head
: 40 m
Type
: Centrifugal End Suction
Daya
: 7,5 kW
- Pressure Tank Kap.
: 500 L
- Sand Filter Tank Kap.
: 200 L/m
- Carbon Filter Tank Kap.
: 500 L/m
Sumur Bor ( ARTESIS ) c/w:
lot
BY OTHER
- Submersible Pump Kap.
: 150 L/m
Head
: 70 m
Daya
: 3 kw
- Panel - Pengkabelan - Bak kontrol 1 x 1 x 1 m - Pemipaan, Valve, accessories, dll
PIPA
- PIPA GIP Pipa GIP Medium Class - dia. 4"
m
Rp
152,880,000.00
- dia. 2"
m
Rp
191,935,000.00
- dia. 1"
m
Rp
93,627,000.00
- dia. 1/2"
m
Rp
90,060,000.00
- PIPA PVC
Pipa PVC Class AW - dia. 6"
m
Rp
138,288,200.00
- dia. 4"
m
Rp
278,473,000.00
- dia. 2"
m
Rp
37,744,000.00
- dia. 1 1/2"
m
Rp
17,892,000.00
- dia. 8"
m
Rp
1,596,000.00
- dia. 6"
m
Rp
342,250,000.00
- dia. 4"
m
Rp
213,325,000.00
- dia. 2,5"
m
Rp
16,957,500.00
- dia. 2"
m
Rp
180,000.00
- dia. 6"
bh
Rp
27,000,000.00
- dia. 4"
bh
Rp
21,000,000.00
- dia. 2"
bh
Rp
4,050,000.00
- dia. 1
bh
Rp
20,550,000.00
- dia. 1/2"
bh
- PIPA BSP SCH-40
VALVE
- Gate Valve
- Floating Valve - Floating Valve dia. 2"
bh
Rp
1,300,000.00
- Floating Valve dia. 1"
bh
Rp
27,600,000.00
- dia. 4"
bh
Rp
9,500,000.00
- Check Valve dia. 2"
bh
Rp
965,000.00
- dia. 4"
bh
Rp
10,900,000.00
- Strainer dia. 2"
bh
Rp
1,345,000.00
- dia. 4"
bh
Rp
4,940,000.00
- Fleksible Connection dia. 2"
bh
Rp
1,068,000.00
- Chek Valve
- Strainer
- Flexible Conection
- Foot Valve - dia. 4"
bh
Rp
3,500,000.00
- Foot Valve dia. 2"
bh
Rp
650,000.00
- Pressure Gauge
bh
Rp
1,176,000.00
- Pressure Switch
bh
Rp
2,125,000.00
- Safety Relieve valve
bh
Rp
7,540,000.00
unit
Rp
43,875,000.00
unit
Rp
238,000,000.00
- Pressure Control
SEPTIC TANK Type
: BF-08 ( BIOFIL )
TANKI FIBER - Tangki Fiber 2000 L
PERLENGKAPAN
- Roof Drain
bh
Rp
67,200,000.00
unit
Rp
15,000,000.00
- Siamese Connection (Size 4"x2,5"x2,5")
bh
Rp
2,150,000.00
- Pillar Hydrant (Size 4"x2,5"x2,5")
bh
Rp
58,100,000.00
- Hydrant Box Type Outdoor (Size 125x75x18) complit set
bh
Rp
66,500,000.00
- Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder)
bh
Rp
61,250,000.00
- Bak Kontrol 80x80x80 cm
bh
Rp
18,525,000.00
- Bak kontrol (500 x 500 x 700 mm)
PERLENGKAPAN HIDRANT
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Mesjid
Lokasi
: Tembilahan
No.
PEKERJAAN
III
ELEKTRIKAL
1
PEKERJAAN PANEL GEDUNG
3
VOL
SAT
HARGA
TOTAL
-
SDP
1.00
Unit
Rp
58,500,000.00
Rp
58,500,000.00
-
LP - S1A PANEL PENERANGAN SELASAR KANAN LT.1
1.00
Unit
Rp
9,750,000.00
Rp
9,750,000.00
-
LP - S1B PANEL PENERANGAN SELASAR KIRI LT.1
1.00
Unit
Rp
9,750,000.00
Rp
9,750,000.00
-
LP - 1 PANEL PENERANGAN LT.1
1.00
Unit
Rp
11,500,000.00
Rp
11,500,000.00
-
LP - 2 PANEL PENERANGAN LT.2
1.00
Unit
Rp
10,900,000.00
Rp
10,900,000.00
-
LP - 3 PANEL PENERANGAN LT.Mezanine
1.00
Unit
Rp
8,250,000.00
Rp
8,250,000.00
-
LP - KUBAH PANEL PENERANGAN LUAR + photo cell ( auto/manual )
1.00
Unit
Rp
16,700,000.00
Rp
16,700,000.00
-
LP - MENARA PANEL PENERANGAN MENARA
1.00
Unit
Rp
7,500,000.00
Rp
7,500,000.00
-
Grounding system
1.00
Lot
Rp
6,550,000.00
Rp
6,550,000.00
m
Rp
137,500.00
Rp
21,312,500.00
165.00
m
Rp
137,500.00
Rp
22,687,500.00
30.00
m
Rp
137,500.00
Rp
4,125,000.00
35.00
m
Rp
137,500.00
Rp
4,812,500.00
40.00
m
Rp
137,500.00
Rp
5,500,000.00
75.00
m
Rp
137,500.00
Rp
10,312,500.00
160.00
m
Rp
35,200.00
Rp
5,632,000.00
PEKERJAAN KABEL FEEDER GEDUNG dari SDP ke : -
LP - S1A - NYY 4 x 25 mm2
-
- NYY 4 x 25 mm2 -
LP - 1 - NYY 4 x 25 mm2
-
LP - 2 - NYY 4 x 25 mm2
-
LP - MEZANINE - NYY 4 x 25 mm2
-
LP - KUBAH - NYY 4 x 25 mm2
-
LP - MENARA - NYY 4 x 6 mm2
4
155.00
LP - S1B
PEKERJAAN INSTALASI PENERANGAN a Instalasi LT.1 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
712.00
ttk
Rp
187,500.00
Rp
133,500,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
57.00
ttk
Rp
197,500.00
Rp
11,257,500.00
b Instalasi LT.2 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
312.00
ttk
Rp
187,500.00
Rp
58,500,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
30.00
ttk
Rp
197,500.00
Rp
5,925,000.00
c Instalasi LT.Mezanine -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
354.00
ttk
Rp
187,500.00
Rp
66,375,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
5.00
ttk
Rp
197,500.00
Rp
987,500.00
32.00
ttk
Rp
290,000.00
Rp
9,280,000.00
24.00
ttk
Rp
425,000.00
Rp
10,200,000.00
16.00
ttk
Rp
280,000.00
Rp
4,480,000.00
c Instalasi LT.Atap Kubah -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
c Instalasi Menara -
Instalasi Penerangan NYY 4 x 4 mm + pipa conduit
c Instalasi Penerangan Luar 5
Instalasi Penerangan NYY 4 x 4 mm + pipa conduit
PEKERJAAN ARMATURE LAMPU a Lantai.1 -
LP.ML 2 x 36 Watt M5
106.00
bh
Rp
755,000.00
Rp
80,030,000.00
-
Lampu Down Light RD175 2 x 18 WATT
395.00
bh
Rp
280,000.00
Rp
110,600,000.00
-
Lampu Kolom ( Type interior )
3.00
bh
Rp
650,000.00
Rp
1,950,000.00
-
Lampu Kolom ( Type exterior )
203.00
bh
Rp
650,000.00
Rp
131,950,000.00
-
LP. WASHTAFLE 18 WATT, GMS
5.00
bh
Rp
1,075,000.00
Rp
5,375,000.00
21,140,000.00
b. Lantai.2 -
LP.ML 2 x 36 Watt M5
28.00
bh
Rp
755,000.00
Rp
-
Lampu Down Light RD175 2 x 18 WATT
102.00
bh
Rp
280,000.00
Rp
28,560,000.00
-
Lampu Kolom ( Type interior )
173.00
bh
Rp
650,000.00
Rp
112,450,000.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Mesjid
Lokasi
: Tembilahan
No.
PEKERJAAN
-
VOL
SAT
HARGA
TOTAL
Lampu Gantung Stelo Globe C12 HL
4.00
bh
Rp
6,250,000.00
Rp
25,000,000.00
LP. WASHTAFLE 18 WATT, GMS
5.00
bh
Rp
1,075,000.00
Rp
5,375,000.00
c. Lantai Mezanine -
Lampu TMX 1 x 36 Watt
-
Lampu Down Light RD175 2 x 18 WATT
64.00
bh
Rp
755,000.00
Rp
48,320,000.00
189.00
bh
Rp
280,000.00
Rp
-
52,920,000.00
Lampu Kolom ( Type interior )
8.00
bh
Rp
650,000.00
Rp
5,200,000.00
Lampu Gantung Stelo Globe C12 HL
8.00
bh
Rp
6,250,000.00
Rp
50,000,000.00
-
LP. WASHTAFLE 18 WATT, GMS
5.00
bh
Rp
425,000.00
Rp
2,125,000.00
-
LP. GANTUNG 1 x 36 WATT ( HLG WRB STELLO GLOBE )
80.00
bh
Rp
315,000.00
Rp
25,200,000.00
-
Gantungan khusus lampu kubah dia = 15 meter ( pipa stainless stell pabrikasi )
1.00
set
Rp
7,500,000.00
Rp
27,500,000.00
d Lantai Atap Kubah -
Lampu Sorot 250 Watt
16.00
bh
Rp
810,000.00
Rp
12,960,000.00
-
Lampu Sorot 500 Watt
16.00
bh
Rp
9,750,000.00
Rp
156,000,000.00
e Menara
6
-
Lampu Sorot 250 Watt
-
Lampu Kolom ( Type interior )
f
Penerangan Luar
-
Lampu Taman 2 x 150 watt tiang antik t = 3,5m + Pondasi
4.00
bh
Rp
810,000.00
Rp
3,240,000.00
20.00
bh
Rp
650,000.00
Rp
13,000,000.00
16.00
Unit
Rp
850,000.00
Rp
13,600,000.00
PEKERJAAN SAKLAR & STOP KONTAK a Lantai.1 -
Saklar Tunggal
62.00
bh
Rp
40,000.00
Rp
2,480,000.00
-
Saklar Ganda
36.00
bh
Rp
45,000.00
Rp
1,620,000.00
-
Saklar 12 grid
3.00
bh
Rp
150,000.00
Rp
450,000.00
-
Saklar 6 grid
2.00
bh
Rp
95,000.00
Rp
190,000.00
-
Saklar Hotel
-
Stop Kontak 250 VA, 13 A
5.00
bh
Rp
50,000.00
Rp
250,000.00
57.00
bh
Rp
55,000.00
Rp
3,135,000.00
b. Lantai.2 -
Saklar Tunggal
9.00
bh
Rp
40,000.00
Rp
360,000.00
-
Saklar Ganda
16.00
bh
Rp
45,000.00
Rp
720,000.00
-
Saklar 8 grid
2.00
bh
Rp
125,000.00
Rp
250,000.00
-
Saklar Hotel
5.00
bh
Rp
50,000.00
Rp
250,000.00
-
Stop Kontak 250 VA, 13 A
30.00
bh
Rp
55,000.00
Rp
1,650,000.00
c Lantai Mezanine -
Saklar 8 grid
1.00
bh
Rp
125,000.00
Rp
125,000.00
-
Saklar Hotel
2.00
bh
Rp
50,000.00
Rp
100,000.00
-
Stop Kontak 250 VA, 13 A
5.00
bh
Rp
45,000.00
Rp
225,000.00
c Menara
8
-
Saklar Hotel
5.00
bh
Rp
50,000.00
Rp
250,000.00
-
Stop Kontak 250 VA, 13 A
2.00
bh
Rp
55,000.00
Rp
110,000.00
17,457,000.00
PEKERJAAN AIR CONDITIONER a Lantai.1 -
AC Split Komplit set , 2 PK
-
AC Split Komplit set , 2.5 PK
2.00
unit
Rp
8,728,500.00
Rp
10.00
unit
Rp
9,836,000.00
Rp
-
AC Split Komplit set , 5 PK R.Serba guna
98,360,000.00
4.00
unit
Rp
36,659,700.00
Rp
146,638,800.00
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
16.00
ttk
Rp
325,000.00
Rp
5,200,000.00
Outlet Stop Kontak AC
16.00
ttk
Rp
45,000.00
Rp
720,000.00
b Lantai.2
10
-
AC Split Komplit set , 2 PK
-
AC Split Komplit set , 2.5 PK
2.00
unit
Rp
8,728,500.00
Rp
17,457,000.00
10.00
unit
Rp
11,311,500.00
Rp
113,115,000.00
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
2.00
ttk
Rp
325,000.00
Rp
650,000.00
Outlet Stop Kontak AC
2.00
ttk
Rp
45,000.00
Rp
90,000.00
PEKERJAAN PENANGKAL PETIR 1 Kabel NYY 70 mm2 dan Peralatan Bantu
m
Rp
150,000.00
Rp
22,500,000.00
2 LPI-system radius Protector 100 m Lampu Obstruction 60 Watt + Photo Cell + Instalasi
1.00
unit
Rp
27,750,000.00
Rp
27,750,000.00
3 Pentanahan terdiri dari :
1.00
lot
Rp
6,500,000.00
Rp
6,500,000.00
-
Bak Kontrol 40 x 40 x 40 cm
150.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerj aan
: Mesjid
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
-
3 x Copper rod 5/8" x 5 meter atau Tahanan Pentanahan maks. < 5 ohm
-
Material Bantu
-
Klem-klem
SAT
HARGA
TOTAL
4 Jasa Instalasi dan Material Bantu
1.00
lot
Rp
6,250,000.00
Rp
5 Tiang di atas Bangunan + Support
1.00
lot
Rp
1,150,000.00
Rp
1,150,000.00
6 Izin Depnaker
1.00
lot
Rp
25,000,000.00
Rp
25,000,000.00
1.00
unit
Rp
57,600,000.00
Rp
57,600,000.00
3
6,250,000.00
SOUND SYSTEM PERALATAN UTAMA -
Monitor Panel
-
Power Amply 2 x 240 watt
-
AM/ FM TUNER
-
DVD PLAYER + MP3 + USB
-
Modular digital matrix Mixer 12 channel
-
28-Band grapic Equalizer
-
Wired handheld Microphone + Tiang mic
-
Wireless handheld condensor Microphone + Tiang mic
-
Wireless receiver
-
Cabinet Rack
-
Aksesoris & alat bantu
PEKERJAAN INSTALASI & FIXTURES -
Horn Speaker 50 watt
4.00
bh
Rp
2,750,000.00
Rp
11,000,000.00
-
Ceiling Speaker 3 Watt
91.00
bh
Rp
175,000.00
Rp
15,925,000.00
-
Instalasi Sound System
91.00
ttk
Rp
215,000.00
Rp
19,565,000.00
-
Terminal box
3.00
bh
Rp
125,000.00
Rp
375,000.00
-
outlet Mic
4.00
bh
Rp
45,000.00
Rp
180,000.00
Rp 2,052,429,800.00
Pekerjaan Elektrikal
IV 1
MEKANIKAL PEKERJAAN INTALASI PEMIPAAN .
a
TOILET A Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
36.00
m
Rp
115,000.00
Rp
4,140,000.00
- dia. 1"
72.00
m
Rp
50,500.00
Rp
3,636,000.00
280.00
m
Rp
35,000.00
Rp
9,800,000.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
2.00
bh
Rp
450,000.00
Rp
900,000.00
- dia. 6"
36.00
m
Rp
151,300.00
Rp
5,446,800.00
- dia. 4"
30.00
m
Rp
75,500.00
Rp
2,265,000.00
- dia. 2"
60.00
m
Rp
28,000.00
Rp
1,680,000.00
- dia. 1 1/2"
36.00
m
Rp
21,300.00
Rp
766,800.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
2.00
unit
Rp
48,750,000.00
Rp
97,500,000.00
- dia. 2"
36.00
m
Rp
115,000.00
Rp
4,140,000.00
- dia. 1"
72.00
m
Rp
50,500.00
Rp
3,636,000.00
280.00
m
Rp
35,000.00
Rp
9,800,000.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
2.00
bh
Rp
450,000.00
Rp
900,000.00
- dia. 6"
36.00
m
Rp
151,300.00
Rp
5,446,800.00
- dia. 4"
30.00
m
Rp
75,500.00
Rp
2,265,000.00
- dia. 2"
60.00
m
Rp
28,000.00
Rp
1,680,000.00
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 2" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories Septic Tank (biofil) Type b
: BF-08 ( BIOFIL )
TOILET B Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 2" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Mesjid
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
- dia. 1 1/2" Fitting & Accessories
SAT
HARGA
TOTAL
36.00
m
Rp
21,300.00
Rp
766,800.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
2.00
unit
Rp
48,750,000.00
Rp
97,500,000.00
18,170,000.00
Septic Tank (biofil) Type c
: BF-08 ( BIOFIL )
TOILET C Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
158.00
m
Rp
115,000.00
Rp
- dia. 1"
24.00
m
Rp
50,500.00
Rp
1,212,000.00
288.00
m
Rp
35,000.00
Rp
10,080,000.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
2.00
bh
Rp
450,000.00
Rp
900,000.00
60.00
m
Rp
28,000.00
Rp
1,680,000.00
1.00
lot
Rp
500,000.00
Rp
500,000.00
- dia. 2"
36.00
m
Rp
115,000.00
Rp
4,140,000.00
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000.00
- dia. 1/2"
36.00
m
Rp
35,000.00
Rp
1,260,000.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
1.00
bh
Rp
450,000.00
Rp
450,000.00
- dia. 6"
36.00
m
Rp
151,300.00
Rp
5,446,800.00
- dia. 4"
30.00
m
Rp
75,500.00
Rp
2,265,000.00
- dia. 2"
60.00
m
Rp
28,000.00
Rp
1,680,000.00
- dia. 1 1/2"
36.00
m
Rp
21,300.00
Rp
766,800.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
1.00
unit
Rp
48,750,000.00
Rp
48,750,000.00
- dia. 2"
72.00
m
Rp
115,000.00
Rp
8,280,000.00
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000.00
1.00
lot
Rp
750,000.00
Rp
750,000.00
- dia. 2"
6.00
bh
Rp
450,000.00
Rp
2,700,000.00
- dia. 1"
10.00
bh
Rp
190,000.00
Rp
1,900,000.00
Floating Valve 1"
10.00
bh
Rp
650,000.00
Rp
6,500,000.00
10.00
unit
Rp
4,250,000.00
Rp
42,500,000.00
1.00
ls
Rp
1,750,000.00
Rp
1,750,000.00
- Pipa PVC Class AW dia 6"
48.00
m
Rp
151,300.00
Rp
7,262,400.00
- Pipa PVC Class AW dia 4"
956.00
m
Rp
75,500.00
Rp
72,178,000.00 8,400,000.00
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 2" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
- dia. 2" Fitting & Accessories d
TOILET D Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
- dia. 2" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories Septic Tank (biofil) Type
d
: BF-08 ( BIOFIL )
LANT AI.AT AP Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
Pekerjaan Tangki - Tangki Fiber 2000 L - Bantalan Tanki (dg besi UNP.100 ) e
Pemipaan Air Hujan
- Roof Drain
2
24.00
bh
Rp
350,000.00
Rp
- Fitting & Accessories
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- Bak kontrol (500 x 500 x 700 mm)
2.00
unit
Rp
750,000.00
Rp
1,500,000.00
8.00
bh
Rp
1,250,000.00
Rp
10,000,000.00
PEMADAM API RINGAN -
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) Pekerjaan Mekanikal
546,926,200.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerj aan
: Mesj id
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
TOTAL ME
TOTAL
Rp
2,599,356,000
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: SMU Unggulan
Lokasi
: Tembilahan
No.
III 1
3
PEKERJAAN
VOL
SAT
HARGA
TOTAL
ELEKTRIKAL PEKERJAAN PANEL GEDUNG -
SDP
1.00
Unit
Rp
35,500,000.00
Rp
35,500,000.00
-
LP - 1 PANEL PENERANGAN LT.1
1.00
Unit
Rp
12,250,000.00
Rp
12,250,000.00
-
LP - 2 PANEL PENERANGAN LT.2
1.00
Unit
Rp
12,250,000.00
Rp
12,250,000.00
-
LP - 3 PANEL PENERANGAN LT.3
1.00
Unit
Rp
10,500,000.00
Rp
10,500,000.00
-
LP - PANEL PENERANGAN LUAR
1.00
Unit
Rp
7,500,000.00
Rp
7,500,000.00
-
Grounding system
1.00
Lot
Rp
4,750,000.00
Rp
4,750,000.00
90.00
m
Rp
495,000.00
Rp
44,550,000.00
95.00
m
Rp
495,000.00
Rp
47,025,000.00
100.00
m
Rp
495,000.00
Rp
49,500,000.00
50.00
m
Rp
35,200.00
Rp
1,760,000.00
PEKERJAAN KABEL FEEDER GEDUNG dari SDP ke : -
LP - 1 - NYY 4 x 95 mm2
-
LP - 2 - NYY 4 x 95 mm2
-
LP - 3 - NYY 4 x 95 mm2
-
LP - Penerangan Luar - NYY 4 x 6 mm2
4
PEKERJAAN INSTALASI PENERANGAN a Instalasi LT.1 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
184.00
ttk
Rp
187,500.00
Rp
34,500,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
27.00
ttk
Rp
197,500.00
Rp
5,332,500.00
b Instalasi LT.2 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
136.00
ttk
Rp
187,500.00
Rp
25,500,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
21.00
ttk
Rp
197,500.00
Rp
4,147,500.00
c Instalasi LT.3 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
33.00
ttk
Rp
187,500.00
Rp
6,187,500.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
8.00
ttk
Rp
197,500.00
Rp
1,580,000.00
33.00
ttk
Rp
290,000.00
Rp
9,570,000.00
f Instalasi Penerangan Luar -
5
Instalasi Penerangan NYY 3 x 2,5 mm + pipa conduit
PEKERJAAN ARMATURE LAMPU a Lantai.1 -
Lampu Baret 36 Watt
66.00
bh
Rp
235,000.00
Rp
15,510,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
106.00
bh
Rp
280,000.00
Rp
29,680,000.00
-
LP. Baret Tangga 36 WATT, Bulat
7.00
bh
Rp
235,000.00
Rp
1,645,000.00
-
LP. WASHTAFLE 18 WATT, GMS
5.00
bh
Rp
1,075,000.00
Rp
5,375,000.00
b. Lantai.2 -
Lampu Baret 36 Watt
60.00
bh
Rp
235,000.00
Rp
14,100,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
68.00
bh
Rp
280,000.00
Rp
19,040,000.00
-
LP. Baret Tangga 36 WATT, Bulat
2.00
bh
Rp
235,000.00
Rp
470,000.00
-
LP. WASHTAFLE 18 WATT, GMS
6.00
bh
Rp
1,075,000.00
Rp
6,450,000.00
c. Lantai.3 -
Lampu Baret 36 Watt
26.00
bh
Rp
235,000.00
Rp
6,110,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
6.00
bh
Rp
280,000.00
Rp
1,680,000.00
-
LP. Baret Tangga 36 WATT, Bulat
1.00
bh
Rp
235,000.00
Rp
235,000.00
33.00
bh
Rp
750,000.00
Rp
24,750,000.00
d. Penerangan Luar 6
Lampu TAMAN GL TOP ACR GRILL T= 2.5 M + pondasi tiang
PEKERJAAN SAKLAR & STOP KONTAK a Lantai.1 -
Saklar Tunggal
18.00
bh
Rp
40,000.00
Rp
720,000.00
-
Saklar Ganda
24.00
bh
Rp
45,000.00
Rp
1,080,000.00
-
Saklar Hotel
1.00
bh
Rp
50,000.00
Rp
50,000.00
27.00
bh
Rp
55,000.00
Rp
1,485,000.00
- Stop Kontak 250 VA, 13 A
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: SMU Unggulan
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
TOTAL
b. Lantai.2 -
Saklar Tunggal
21.00
bh
Rp
40,000.00
Rp
840,000.00
-
Saklar Ganda
18.00
bh
Rp
45,000.00
Rp
810,000.00
-
Saklar Hotel
- Stop Kontak 250 VA, 13 A
1.00
bh
Rp
50,000.00
Rp
50,000.00
21.00
bh
Rp
55,000.00
Rp
1,155,000.00
c Lantai.3
7
-
Saklar Tunggal
8.00
bh
Rp
40,000.00
Rp
320,000.00
-
Saklar Ganda
4.00
bh
Rp
45,000.00
Rp
180,000.00
-
Saklar Hotel
1.00
bh
Rp
50,000.00
Rp
50,000.00
-
Stop Kontak 250 VA, 13 A
8.00
bh
Rp
55,000.00
Rp
440,000.00
PEKERJAAN KABEL TRAY
8
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.1
135.00
m
Rp
170,000.00
Rp
22,950,000.00
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.2
135.00
m
Rp
170,000.00
Rp
22,950,000.00
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.3
38.00
m
Rp
170,000.00
Rp
6,460,000.00
PEKERJAAN AIR CONDITIONER a Lantai.1 -
AC Split Komplit set , 2 PK
2.00
unit
Rp
8,728,500.00
Rp
17,457,000.00
-
AC Split Komplit set , 1 PK
2.00
unit
Rp
4,620,500.00
Rp
9,241,000.00
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
2.00
ttk
Rp
325,000.00
Rp
650,000.00
-
Outlet Stop Kontak AC
2.00
ttk
Rp
45,000.00
Rp
90,000.00
-
AC Split Komplit set , 5 PK LT.1
4.00
unit
Rp
36,659,700.00
Rp
146,638,800.00
-
Instalasi Stop Kontak AC NYM 4 x 6 mm + pipa conduit
4.00
ttk
Rp
325,000.00
Rp
1,300,000.00
-
Outlet Stop Kontak AC
4.00
ttk
Rp
45,000.00
Rp
180,000.00
b Lantai.2 -
AC Split Komplit set , 2 PK
2.00
unit
Rp
8,728,500.00
Rp
17,457,000.00
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
2.00
ttk
Rp
325,000.00
Rp
650,000.00
-
Outlet Stop Kontak AC
2.00
ttk
Rp
45,000.00
Rp
90,000.00
c Lantai.3 -
AC Split Komplit set , 5 PK LT.1
7.00
unit
Rp
36,659,700.00
Rp
256,617,900.00
-
Instalasi Stop Kontak AC NYM 4 x 6 mm + pipa conduit
7.00
ttk
Rp
325,000.00
Rp
2,275,000.00
-
Outlet Stop Kontak AC
7.00
ttk
Rp
45,000.00
Rp
315,000.00
Rp
949,949,200.00
Pekerjaan Elektrikal IV 1
MEKANIKAL PEKERJAAN INTALASI PEMIPAAN .
a
LANTAI.1 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
10.00
m
Rp
115,000.00
Rp
1,150,000.00
- dia. 1"
150.00
m
Rp
50,500.00
Rp
7,575,000.00
90.00
m
Rp
32,500.00
Rp
2,925,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
2.00
bh
Rp
190,000.00
Rp
380,000.00
36.00
m
Rp
151,300.00
Rp
5,446,800.00
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
- dia. 6"
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: SMU Unggulan
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
TOTAL
- dia. 4"
36.00
m
Rp
75,000.00
Rp
2,700,000.00
- dia. 2"
56.00
m
Rp
28,000.00
Rp
1,568,000.00
- dia. 1 1/2"
42.00
m
Rp
21,300.00
Rp
894,600.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
3.00
unit
Rp
43,875,000.00
Rp
131,625,000.00
- dia. 2"
10.00
m
Rp
115,000.00
Rp
1,150,000.00
- dia. 1"
150.00
m
Rp
50,500.00
Rp
7,575,000.00
90.00
m
Rp
32,500.00
Rp
2,925,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
2.00
bh
Rp
190,000.00
Rp
380,000.00
- dia. 6"
10.00
m
Rp
151,300.00
Rp
1,513,000.00
- dia. 4"
36.00
m
Rp
75,000.00
Rp
2,700,000.00
- dia. 2"
56.00
m
Rp
28,000.00
Rp
1,568,000.00
- dia. 1 1/2"
42.00
m
Rp
21,300.00
Rp
894,600.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- dia. 2"
10.00
m
Rp
115,000.00
Rp
1,150,000.00
- dia. 1"
150.00
m
Rp
50,500.00
Rp
7,575,000.00
90.00
m
Rp
32,500.00
Rp
2,925,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
2.00
bh
Rp
190,000.00
Rp
380,000.00
- dia. 6"
10.00
m
Rp
151,300.00
Rp
1,513,000.00
- dia. 4"
36.00
m
Rp
75,000.00
Rp
2,700,000.00
- dia. 2"
56.00
m
Rp
28,000.00
Rp
1,568,000.00
- dia. 1 1/2"
42.00
m
Rp
21,300.00
Rp
894,600.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- dia. 2"
24.00
m
Rp
115,000.00
Rp
2,760,000.00
- dia. 1"
24.00
m
Rp
50,500.00
Rp
1,212,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
- dia. 2"
2.00
bh
Rp
450,000.00
Rp
900,000.00
- dia. 1"
4.00
bh
Rp
190,000.00
Rp
760,000.00
Floating Valve 1"
4.00
bh
Rp
650,000.00
Rp
2,600,000.00
- Tangki Fiber 2000 L
4.00
unit
Rp
4,250,000.00
Rp
17,000,000.00
- Bantalan 4 Unit Tanki (dg besi UNP.100 )
1.00
ls
Rp
1,750,000.00
Rp
1,750,000.00
- Pipa PVC Class AW dia 6"
48.00
m
Rp
151,300.00
Rp
7,262,400.00
- Pipa PVC Class AW dia 4"
260.00
m
Rp
75,000.00
Rp
19,500,000.00 8,400,000.00
Fitting & Accessories Septic Tank (biofil) Type b
: BF-08 ( BIOFIL )
LANTAI.2 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories c
LANTAI.3 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories d
LANTAI.ATAP Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
Pekerjaan Tangki
e
Pemipaan Air Hujan
- Roof Drain
2
24.00
bh
Rp
350,000.00
Rp
- Fitting & Accessories
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
- Bak kontrol (500 x 500 x 700 mm)
2.00
unit
Rp
750,000.00
Rp
1,500,000.00
PEMADAM API RINGAN -
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.1
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.2
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.3
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: SMU Unggulan
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
Pekerjaan Mekanikal
TOTAL
Rp TOTAL ME
287,820,000.00
Rp 1,237,769,200.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Raudathul Atfal
Lokasi
: Tembilahan
No.
III
PEKERJAAN
VOL
SAT
HARGA
TOTAL
ELEKTRIKAL
1
PEKERJAAN PANEL GEDUNG
2
-
LP - 1 PANEL PENERANGAN LT.1
1.00
Unit
Rp
8,700,000.00
Rp
-
LP - PENERANGAN LUAR
1.00
Unit
Rp
7,500,000.00
Rp
8,700,000.00 7,500,000.00
-
Grounding system
1.00
Lot
Rp
3,100,000.00
Rp
3,100,000.00
PEKERJAAN INSTALASI PENERANGAN a Instalasi Penerangan Gedung -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
67.00
ttk
Rp
187,500.00
Rp
12,562,500.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
17.00
ttk
Rp
197,500.00
Rp
3,357,500.00
15.00
ttk
Rp
187,500.00
Rp
2,812,500.00
b Instalasi Penerangan Luar 3
Instalasi Penerangan NYY 3 x 2,5 mm + pipa conduit
PEKERJAAN ARMATURE LAMPU
4
-
LP. TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
26.00
bh
Rp
755,000.00
Rp
19,630,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
31.00
bh
Rp
280,000.00
Rp
8,680,000.00
-
LP. BLB-AL 1 x 18 WATT,
10.00
bh
Rp
425,000.00
Rp
4,250,000.00
-
Lampu TAMAN GL TOP ACR GRILL T= 2.5 M + pondasi tiang
15.00
bh
Rp
750,000.00
Rp
11,250,000.00
PEKERJAAN SAKLAR & STOP KONTAK
5
-
Saklar Tunggal
4.00
bh
Rp
40,000.00
Rp
160,000.00
-
Saklar Ganda
12.00
bh
Rp
45,000.00
Rp
540,000.00
-
Stop Kontak 250 VA, 13 A
17.00
bh
Rp
55,000.00
Rp
935,000.00
65.00
m
Rp
170,000.00
Rp
11,050,000.00
PEKERJAAN KABEL TRAY -
6
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr
PEKERJAAN AIR CONDITIONER a Lantai.1 -
AC Split Komplit set , 2 PK LT.1
2.00
unit
Rp
8,728,500.00
Rp
17,457,000.00
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
2.00
ttk
Rp
325,000.00
Rp
650,000.00
-
Outlet Stop Kontak AC
2.00
ttk
Rp
45,000.00
Rp
90,000.00
Rp
112,724,500.00
Pekerjaan Elektrikal IV
MEKANIKAL
1
PEKERJAAN INTALASI PEMIPAAN . Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 1"
24.00
m
Rp
50,500.00
Rp
1,212,000.00
- dia. 1/2"
36.00
m
Rp
32,500.00
Rp
1,170,000.00
1.00
lot
Rp
750,000.00
Rp
750,000.00
2.00
bh
Rp
190,000.00
Rp
380,000.00
- dia. 4"
24.00
m
Rp
75,000.00
Rp
1,800,000.00
- dia. 2"
24.00
m
Rp
28,000.00
Rp
672,000.00
- dia. 1 1/2"
24.00
m
Rp
21,300.00
Rp
511,200.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
2.00
unit
Rp
43,875,000.00
Rp
87,750,000.00
24.00
m
Rp
50,500.00
Rp
1,212,000.00
1.00
lot
Rp
250,000.00
Rp
250,000.00
- dia. 1"
2.00
bh
Rp
190,000.00
Rp
380,000.00
Floating Valve 1"
2.00
bh
Rp
650,000.00
Rp
1,300,000.00
2.00
unit
Rp
4,250,000.00
Rp
8,500,000.00
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories Septic Tank (biofil) Type d
: BF-08 ( BIOFIL )
LANT AI.AT AP Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 1" - Fitting & Accessories Gate Valve
Pekerjaan Tangki - Tangki Fiber 2000 L
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Raudathul Atfal
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
- Bantalan Tanki (dg besi UNP.100 ) e
HARGA
TOTAL
1.00
ls
Rp
1,750,000.00
Rp
1,750,000.00
- Pipa PVC Class AW dia 6"
24.00
m
Rp
151,300.00
Rp
3,631,200.00
- Pipa PVC Class AW dia 4"
220.00
m
Rp
75,000.00
Rp
16,500,000.00 4,550,000.00
Pemipaan Air Hujan
- Roof Drain
2
SAT
13.00
bh
Rp
350,000.00
Rp
- Fitting & Accessories
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- Bak kontrol (500 x 500 x 700 mm)
2.00
unit
Rp
750,000.00
Rp
1,500,000.00
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
Rp
143,818,400.00
Rp
256,542,900.00
PEMADAM API RINGAN
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) Pekerjaan Mekanikal
TOTAL ME
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Ibtidaiyah
Lokasi
: Tembilahan
No.
III 1
3
Uraian Pekerjaan
Vol.
Sat.
Harga Satuan
Jumlah
( Rp)
( Rp)
ELEKTRIKAL PEKERJAAN PANEL GEDUNG -
SDP
1.00
Unit
Rp
27,450,000.00
Rp
27,450,000.00
-
LP - 1 PANEL PENERANGAN LT.1
1.00
Unit
Rp
11,900,000.00
Rp
11,900,000.00
-
LP - 2 PANEL PENERANGAN LT.2
1.00
Unit
Rp
11,500,000.00
Rp
11,500,000.00
-
LP - PENERANGAN LUAR
1.00
Unit
Rp
8,750,000.00
Rp
8,750,000.00
-
Grounding system
1.00
Lot
Rp
3,250,000.00
Rp
3,250,000.00
85.00
m
Rp
341,000.00
Rp
28,985,000.00
90.00
m
Rp
341,000.00
Rp
30,690,000.00
90.00
m
Rp
35,200.00
Rp
3,168,000.00
PEKERJAAN KABEL FEEDER GEDUNG dari SDP ke : -
LP - 1 - NYY 4 x 70 mm2
-
LP - 2 - NYY 4 x 70 mm2
-
LP - PENERANGAN LUAR - NYY 4 x 6 mm2
4
PEKERJAAN INSTALASI PENERANGAN a Instalasi LT.1 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
97.00
ttk
Rp
187,500.00
Rp
18,187,500.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
35.00
ttk
Rp
197,500.00
Rp
6,912,500.00
b Instalasi LT.2 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
98.00
ttk
Rp
187,500.00
Rp
18,375,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
34.00
ttk
Rp
197,500.00
Rp
6,715,000.00
19.00
ttk
Rp
290,000.00
Rp
5,510,000.00
C Instalasi Penerangan Luar -
5
Instalasi Penerangan NYY 3 x 2,5 mm + pipa conduit
PEKERJAAN ARMATURE LAMPU a Lantai.1 -
LP. TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
47.00
bh
Rp
755,000.00
Rp
35,485,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
50.00
bh
Rp
280,000.00
Rp
14,000,000.00
b. Lantai.2 -
LP. TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
48.00
bh
Rp
755,000.00
Rp
36,240,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
50.00
bh
Rp
280,000.00
Rp
14,000,000.00
19.00
bh
Rp
750,000.00
Rp
14,250,000.00
520,000.00
c. Penerangan Luar 6
Lampu TAMAN GL TOP ACR GRILL T= 2.5 M + pondasi tiang
PEKERJAAN SAKLAR & STOP KONTAK a Lantai.1 -
Saklar Tunggal
13.00
bh
Rp
40,000.00
Rp
-
Saklar Ganda
13.00
bh
Rp
45,000.00
Rp
585,000.00
-
Stop Kontak 250 VA, 13 A
35.00
bh
Rp
55,000.00
Rp
1,925,000.00
520,000.00
b. Lantai.2
7
8
-
Saklar Tunggal
13.00
bh
Rp
40,000.00
Rp
-
Saklar Ganda
12.00
bh
Rp
45,000.00
Rp
540,000.00
-
Stop Kontak 250 VA, 13 A
34.00
bh
Rp
55,000.00
Rp
1,870,000.00
PEKERJAAN KABEL TRAY -
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.1
80.00
m
Rp
170,000.00
Rp
13,600,000.00
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.2
72.00
m
Rp
170,000.00
Rp
12,240,000.00
PEKERJAAN AIR CONDITIONER a Lantai.1 -
AC Split Komplit set , 2 PK LT.1
6.00
unit
Rp
8,728,500.00
Rp
52,371,000.00
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
6.00
ttk
Rp
325,000.00
Rp
1,950,000.00
-
Outlet Stop Kontak AC
6.00
ttk
Rp
45,000.00
Rp
270,000.00
b Lantai.2 -
AC Split Komplit set , 2 PK LT.1
5.00
unit
Rp
8,728,500.00
Rp
43,642,500.00
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
5.00
ttk
Rp
325,000.00
Rp
1,625,000.00
-
Outlet Stop Kontak AC
5.00
ttk
Rp
45,000.00
Rp
225,000.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Ibtidaiyah
Lokasi
: Tembilahan
No.
9
Uraian Pekerjaan
Vol.
Sat.
Harga Satuan
Jumlah
( Rp)
( Rp)
-
AC Split Komplit set , 5 PK LT.1
5.00
unit
Rp
36,659,700.00
Rp
183,298,500.00
-
Instalasi Stop Kontak AC NYM 4 x 6 mm + pipa conduit
5.00
ttk
Rp
325,000.00
Rp
1,625,000.00
-
Outlet Stop Kontak AC
5.00
ttk
Rp
45,000.00
Rp
225,000.00
PEKERJAAN EXHOUST FAN -
Exhaust Fan, 300 CFM, 8 ", 18 W, FV-20TGU1 Toilet LT. 1
13.00
unit
Rp
750,000.00
Rp
9,750,000.00
-
Exhaust Fan, 300 CFM, 8 ", 18 W, FV-20TGU1 Toilet LT. 2
13.00
unit
Rp
750,000.00
Rp
9,750,000.00
-
Instalasi Exhaust Fan NYM 3 x 2,5 mm + pipa conduit LT.1
13.00
ttk
Rp
250,000.00
Rp
3,250,000.00
-
Instalasi Exhaust Fan NYM 3 x 2,5 mm + pipa conduit LT.2
13.00
ttk
Rp
250,000.00
Rp
3,250,000.00
Rp
638,400,000.00
1,150,000.00
Pekerjaan Elektrikal IV 1
MEKANIKAL PEKERJAAN INTALASI PEMIPAAN .
a
LANTAI.1 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
10.00
m
Rp
115,000.00
Rp
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000.00
- dia. 1/2"
36.00
m
Rp
32,500.00
Rp
1,170,000.00
1.00
lot
Rp
1,750,000.00
Rp
1,750,000.00
1.00
bh
Rp
190,000.00
Rp
190,000.00
- dia. 6"
18.00
m
Rp
151,300.00
Rp
2,723,400.00
- dia. 4"
72.00
m
Rp
75,000.00
Rp
5,400,000.00
- dia. 2"
30.00
m
Rp
28,000.00
Rp
840,000.00
- dia. 1 1/2"
36.00
m
Rp
21,300.00
Rp
766,800.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
2.00
unit
Rp
43,875,000.00
Rp
87,750,000.00
- dia. 2"
10.00
m
Rp
115,000.00
Rp
1,150,000.00
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000.00
- dia. 1/2"
36.00
m
Rp
32,500.00
Rp
1,170,000.00
1.00
lot
Rp
1,750,000.00
Rp
1,750,000.00
1.00
bh
Rp
190,000.00
Rp
190,000.00
- dia. 6"
6.00
m
Rp
151,300.00
Rp
907,800.00
- dia. 4"
72.00
m
Rp
75,000.00
Rp
5,400,000.00
- dia. 2"
30.00
m
Rp
28,000.00
Rp
840,000.00
- dia. 1 1/2"
36.00
m
Rp
21,300.00
Rp
766,800.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- dia. 2"
24.00
m
Rp
115,000.00
Rp
2,760,000.00
- dia. 1"
24.00
m
Rp
50,500.00
Rp
1,212,000.00
1.00
lot
Rp
1,750,000.00
Rp
1,750,000.00
- dia. 2"
2.00
bh
Rp
450,000.00
Rp
900,000.00
- dia. 1"
4.00
bh
Rp
190,000.00
Rp
760,000.00
Floating Valve 1"
4.00
bh
Rp
250,000.00
Rp
1,000,000.00
4.00
unit
Rp
4,250,000.00
Rp
17,000,000.00
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories Septic Tank (biofil) Type b
: BF-08 ( BIOFIL )
LANTAI.2 Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories
d
LANTAI.A TAP Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
Pekerjaan Tangki - Tangki Fiber 2000 L
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Ibtidaiyah
Lokasi
: Tembilahan
No.
Uraian Pekerjaan
Vol.
- Bantalan Tanki (dg besi UNP.100 ) e
Jumlah
( Rp)
( Rp)
1.00
ls
Rp
1,750,000.00
Rp
1,750,000.00
- Pipa PVC Class AW dia 6"
50.00
m
Rp
151,300.00
Rp
7,565,000.00
- Pipa PVC Class AW dia 4"
276.00
m
Rp
75,000.00
Rp
20,700,000.00
Pemipaan Air Hujan
- Roof Drain
2
Harga Satuan
Sat.
45.00
bh
Rp
350,000.00
Rp
15,750,000.00
- Fitting & Accessories
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- Bak kontrol (500 x 500 x 700 mm)
2.00
unit
Rp
750,000.00
Rp
1,500,000.00
PEMADAM API RINGAN
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.1
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.2
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
Rp
206,447,800.00
Rp
844,847,800
Pekerjaan Elektrikal
TOTAL ME
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Tsanawiyah
Lokasi
: Tembilahan
No.
III 1
3
PEKERJAAN
VOL
SAT
HARGA
TOTAL
ELEKTRIKAL PEKERJAAN PANEL GEDUNG -
SDP
1.00
Unit
Rp
32,750,000.00
Rp
32,750,000
-
LP - 1 PANEL PENERANGAN LT.1
1.00
Unit
Rp
12,250,000.00
Rp
12,250,000
-
LP - 2 PANEL PENERANGAN LT.2
1.00
Unit
Rp
12,250,000.00
Rp
12,250,000
-
LP - 3 PANEL PENERANGAN LT.3
1.00
Unit
Rp
10,450,000.00
Rp
10,450,000
-
LP - PENERANGAN LUAR
1.00
Unit
Rp
7,500,000.00
Rp
7,500,000
-
Grounding system
1.00
Lot
Rp
4,250,000.00
Rp
4,250,000
115.00
m
Rp
264,000.00
Rp
30,360,000
120.00
m
Rp
264,000.00
Rp
31,680,000
125.00
m
Rp
264,000.00
Rp
33,000,000
125.00
m
Rp
35,200.00
Rp
4,400,000
PEKERJAAN KABEL FEEDER GEDUNG dari SDP ke : -
LP - 1 - NYY 4 x 50 mm2
-
LP - 2 - NYY 4 x 50 mm2
-
LP - 3 - NYY 4 x 50 mm2
-
LP - PENERANGAN LUAR - NYY 4 x 6 mm2
4
PEKERJAAN INSTALASI PENERANGAN a Instalasi LT.1 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
89.00
ttk
Rp
187,500.00
Rp
16,687,500
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
18.00
ttk
Rp
197,500.00
Rp
3,555,000
b Instalasi LT.2 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
98.00
ttk
Rp
187,500.00
Rp
18,375,000
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
17.00
ttk
Rp
197,500.00
Rp
3,357,500
c Instalasi LT.3 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
107.00
ttk
Rp
187,500.00
Rp
20,062,500
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
16.00
ttk
Rp
197,500.00
Rp
3,160,000
15.00
ttk
Rp
290,000.00
Rp
4,350,000
C Instalasi Penerangan Luar -
5
Instalasi Penerangan NYY 3 x 2,5 mm + pipa conduit
PEKERJAAN ARMATURE LAMPU a Lantai.1 -
LP. TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
32.00
bh
Rp
755,000.00
Rp
24,160,000
-
LP. DOWN LIGHT 18 WATT, PL-C
50.00
bh
Rp
280,000.00
Rp
14,000,000
-
LP. Baret Tangga 36 WATT, Bulat
3.00
bh
Rp
235,000.00
Rp
705,000
-
LP. WASHTAFLE 18 WATT, GMS
4.00
bh
Rp
1,075,000.00
Rp
4,300,000
b. Lantai.2 -
LP. TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
33.00
bh
Rp
755,000.00
Rp
24,915,000
-
LP. DOWN LIGHT 18 WATT, PL-C
58.00
bh
Rp
280,000.00
Rp
16,240,000
-
LP. Baret Tangga 36 WATT, Bulat
3.00
bh
Rp
235,000.00
Rp
705,000
-
LP. WASHTAFLE 18 WATT, GMS
4.00
bh
Rp
1,075,000.00
Rp
4,300,000
c. Lantai.3 -
LP. TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
42.00
bh
Rp
755,000.00
Rp
31,710,000
-
LP. DOWN LIGHT 18 WATT, PL-C
58.00
bh
Rp
280,000.00
Rp
16,240,000
-
LP. Baret Tangga 36 WATT, Bulat
3.00
bh
Rp
235,000.00
Rp
705,000
-
LP. WASHTAFLE 18 WATT, GMS
4.00
bh
Rp
1,075,000.00
Rp
4,300,000
15.00
bh
Rp
750,000.00
Rp
11,250,000
600,000
c. Penerangan Luar -
6
Lampu TAMAN GL TOP ACR GRILL T= 2.5 M + pondasi tiang
PEKERJAAN SAKLAR & STOP KONTAK a Lant ai.1 -
Saklar Tunggal
15.00
bh
Rp
40,000.00
Rp
-
Saklar Ganda
9.00
bh
Rp
45,000.00
Rp
405,000
-
Saklar Hotel
3.00
bh
Rp
50,000.00
Rp
150,000
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Tsanawiyah
Lokasi
: Tembilahan
No.
PEKERJAAN - Stop Kontak 250 VA, 13 A
VOL
SAT
HARGA
TOTAL
18.00
bh
Rp
55,000.00
Rp
990,000
400,000
b. Lantai.2 -
Saklar Tunggal
10.00
bh
Rp
40,000.00
Rp
-
Saklar Ganda
10.00
bh
Rp
45,000.00
Rp
450,000
-
Saklar Hotel
3.00
bh
Rp
50,000.00
Rp
150,000
17.00
bh
Rp
55,000.00
Rp
935,000
280,000
- Stop Kontak 250 VA, 13 A c Lant ai.3 -
Saklar Tunggal
-
Saklar Ganda
-
Saklar Hotel
- Stop Kontak 250 VA, 13 A 7
7.00
bh
Rp
40,000.00
Rp
10.00
bh
Rp
45,000.00
Rp
450,000
3.00
bh
Rp
50,000.00
Rp
150,000
16.00
bh
Rp
55,000.00
Rp
880,000
16,490,000
PEKERJAAN KABEL TRAY
8
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.1
97.00
m
Rp
170,000.00
Rp
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.2
97.00
m
Rp
170,000.00
Rp
16,490,000
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.3
106.00
m
Rp
170,000.00
Rp
18,020,000
PEKERJAAN AIR CONDITIONER a Lant ai.1 -
AC Split Komplit set , 2 PK LT.1
6.00
unit
Rp
8,728,500.00
Rp
52,371,000
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
6.00
ttk
Rp
325,000.00
Rp
1,950,000
-
Outlet Stop Kontak AC
6.00
ttk
Rp
45,000.00
Rp
270,000 26,185,500
b Lant ai.2 -
AC Split Komplit set , 2 PK LT.1
3.00
unit
Rp
8,728,500.00
Rp
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
3.00
ttk
Rp
325,000.00
Rp
975,000
-
Outlet Stop Kontak AC
3.00
ttk
Rp
45,000.00
Rp
135,000
c Lant ai.3 -
AC Split Komplit set , 5 PK LT.1
2.00
unit
Rp
36,659,700.00
Rp
73,319,400
-
Instalasi Stop Kontak AC NYM 4 x 6 mm + pipa conduit
2.00
ttk
Rp
325,000.00
Rp
650,000
-
Outlet Stop Kontak AC
2.00
ttk
Rp
45,000.00
Rp
90,000
Rp
614,753,400
2,300,000
Pekerjaan Elektrikal IV 1
MEKANIKAL PEKERJAAN INTALASI PEMIPAAN .
a
LANTAI.1 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
20.00
m
Rp
115,000.00
Rp
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000
- dia. 1/2"
60.00
m
Rp
35,000.00
Rp
2,100,000
1.00
lot
Rp
2,750,000.00
Rp
2,750,000
3.00
bh
Rp
190,000.00
Rp
570,000
- dia. 6"
24.00
m
Rp
151,300.00
Rp
3,631,200
- dia. 4"
66.00
m
Rp
75,000.00
Rp
4,950,000
- dia. 2"
80.00
m
Rp
28,000.00
Rp
2,240,000
- dia. 1 1/2"
40.00
m
Rp
21,300.00
Rp
852,000
1.00
lot
Rp
3,750,000.00
Rp
3,750,000
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Tsanawiyah
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
TOTAL
Septic Tank (biofil) Type b
: BF-08 ( BIOFIL )
5.00
unit
Rp
43,875,000.00
Rp
219,375,000
- dia. 2"
20.00
m
Rp
115,000.00
Rp
2,300,000
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000
- dia. 1/2"
60.00
m
Rp
35,000.00
Rp
2,100,000
1.00
lot
Rp
2,750,000.00
Rp
2,750,000
3.00
bh
Rp
190,000.00
Rp
570,000
- dia. 6"
15.00
m
Rp
151,300.00
Rp
2,269,500
- dia. 4"
60.00
m
Rp
75,000.00
Rp
4,500,000
- dia. 2"
66.00
m
Rp
28,000.00
Rp
1,848,000
- dia. 1 1/2"
40.00
m
Rp
21,300.00
Rp
852,000
1.00
lot
Rp
3,750,000.00
Rp
3,750,000
- dia. 2"
20.00
m
Rp
115,000.00
Rp
2,300,000
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000
- dia. 1/2"
60.00
m
Rp
35,000.00
Rp
2,100,000
1.00
lot
Rp
2,750,000.00
Rp
2,750,000
3.00
bh
Rp
190,000.00
Rp
570,000
- dia. 6"
15.00
m
Rp
151,300.00
Rp
2,269,500
- dia. 4"
60.00
m
Rp
75,000.00
Rp
4,500,000
- dia. 2"
66.00
m
Rp
28,000.00
Rp
1,848,000
- dia. 1 1/2"
40.00
m
Rp
21,300.00
Rp
852,000
1.00
lot
Rp
3,750,000.00
Rp
3,750,000
- dia. 2"
108.00
m
Rp
115,000.00
Rp
12,420,000
- dia. 1"
54.00
m
Rp
50,500.00
Rp
2,727,000
1.00
lot
Rp
2,750,000.00
Rp
2,750,000
- dia. 2"
6.00
bh
Rp
450,000.00
Rp
2,700,000
- dia. 1"
10.00
bh
Rp
190,000.00
Rp
1,900,000
Floating Valve 1"
10.00
bh
Rp
650,000.00
Rp
6,500,000
10.00
unit
Rp
4,250,000.00
Rp
42,500,000
1.00
ls
Rp
1,750,000.00
Rp
1,750,000
- Pipa PVC Class AW dia 6"
72.00
m
Rp
151,300.00
Rp
10,893,600
- Pipa PVC Class AW dia 4"
258.00
m
Rp
75,000.00
Rp
19,350,000
LANTAI.2 Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories c
LANTAI.3 Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories d
LANTAI.ATAP Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
Pekerjaan Tangki - Tangki Fiber 2000 L - Bantalan Tanki (dg besi UNP.100 ) e
Pemipaan Air Hujan
- Roof Drain
2
20.00
bh
Rp
350,000.00
Rp
7,000,000
- Fitting & Accessories
1.00
lot
Rp
2,750,000.00
Rp
2,750,000
- Bak kontrol (500 x 500 x 700 mm)
3.00
unit
Rp
750,000.00
Rp
2,250,000
PEMADAM API RINGAN -
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.1
2.00
bh
Rp
1,250,000.00
Rp
2,500,000
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.2
2.00
bh
Rp
1,250,000.00
Rp
2,500,000
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.3
2.00
bh
Rp
1,250,000.00
Rp
2,500,000
Rp
412,841,800
Rp
1,027,595,200
Pekerjaan Mekanikal TOTAL ME
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Aliyah
Lokasi
: Tembilahan
No.
III
1
3
PEKERJAAN
VOL
SAT
HARGA
TOTAL
ELEKTRIKAL
PEKERJAAN PANEL GEDUNG
-
SDP
1.00
Unit
Rp
32,750,000.00
Rp
32,750,000.00
-
LP - 1 PANEL PENERANGAN LT.1
1.00
Unit
Rp
12,450,000.00
Rp
12,450,000.00
-
LP - 2 PANEL PENERANGAN LT.2
1.00
Unit
Rp
11,950,000.00
Rp
11,950,000.00
-
LP - 3 PANEL PENERANGAN LT.3
1.00
Unit
Rp
11,950,000.00
Rp
11,950,000.00
-
LP - PENERANGAN LUAR
1.00
Unit
Rp
7,250,000.00
Rp
7,250,000.00
-
Grounding system
1.00
Lot
Rp
3,950,000.00
Rp
3,950,000.00
115.00
m
Rp
264,000.00
Rp
30,360,000.00
120.00
m
Rp
264,000.00
Rp
31,680,000.00
125.00
m
Rp
264,000.00
Rp
33,000,000.00
125.00
m
Rp
35,200.00
Rp
4,400,000.00
PEKERJAAN KAB EL FEE DER GEDUN G
dari SDP ke : -
LP - 1 - NYY 4 x 50 mm2
-
LP - 2 - NYY 4 x 50 mm2
-
LP - 3 - NYY 4 x 50 mm2
-
LP - PENERANGAN LUAR - NYY 4 x 6 mm2
4
PEKERJAAN INSTALASI PENERANGAN
a Instalasi LT.1 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
89.00
ttk
Rp
187,500.00
Rp
16,687,500.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
18.00
ttk
Rp
197,500.00
Rp
3,555,000.00
b Instalasi LT.2 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
98.00
ttk
Rp
187,500.00
Rp
18,375,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
17.00
ttk
Rp
197,500.00
Rp
3,357,500.00
c Instalasi LT.3 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
107.00
ttk
Rp
187,500.00
Rp
20,062,500.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
16.00
ttk
Rp
197,500.00
Rp
3,160,000.00
18.00
ttk
Rp
290,000.00
Rp
5,220,000.00
C Instalasi Penerangan Luar -
5
Instalasi Penerangan NYY 3 x 2,5 mm + pipa conduit
PEKERJAAN ARMATURE LAMPU
a Lantai.1 -
LP. TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
32.00
bh
Rp
755,000.00
Rp
24,160,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
50.00
bh
Rp
280,000.00
Rp
14,000,000.00
-
LP. Baret Tangga 36 WATT, Bulat
3.00
bh
Rp
235,000.00
Rp
705,000.00
-
LP. WASHTAFLE 18 WATT, GMS
4.00
bh
Rp
1,075,000.00
Rp
4,300,000.00
b. Lantai.2 -
LP. TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
33.00
bh
Rp
755,000.00
Rp
24,915,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
58.00
bh
Rp
280,000.00
Rp
16,240,000.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Aliyah
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
TOTAL
-
LP. Baret Tangga 36 WATT, Bulat
3.00
bh
Rp
235,000.00
Rp
705,000.00
-
LP. WASHTAFLE 18 WATT, GMS
4.00
bh
Rp
1,075,000.00
Rp
4,300,000.00
c. Lantai.3 -
LP. TL 2 x 18 WATT, TKI MIRROR LOUVRE M2
42.00
bh
Rp
755,000.00
Rp
31,710,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
58.00
bh
Rp
280,000.00
Rp
16,240,000.00
-
LP. Baret Tangga 36 WATT, Bulat
3.00
bh
Rp
235,000.00
Rp
705,000.00
-
LP. WASHTAFLE 18 WATT, GMS
4.00
bh
Rp
1,075,000.00
Rp
4,300,000.00
18.00
bh
Rp
750,000.00
Rp
13,500,000.00
15.00
bh
Rp
40,000.00
Rp
600,000.00
c. Penerangan Luar -
6
Lampu TAMAN GL TOP ACR GRILL T= 2.5 M + pondasi tiang
PEKERJAAN SAKLAR & STO P KO NTAK
a Lantai.1 -
Saklar Tunggal
-
Saklar Ganda
9.00
bh
Rp
45,000.00
Rp
405,000.00
-
Saklar Hotel
3.00
bh
Rp
50,000.00
Rp
150,000.00
18.00
bh
Rp
55,000.00
Rp
990,000.00
- Stop Kontak 250 VA, 13 A
b. Lantai.2 -
Saklar Tunggal
10.00
bh
Rp
40,000.00
Rp
400,000.00
-
Saklar Ganda
10.00
bh
Rp
45,000.00
Rp
450,000.00
-
Saklar Hotel
3.00
bh
Rp
50,000.00
Rp
150,000.00
17.00
bh
Rp
55,000.00
Rp
935,000.00
7.00
bh
Rp
40,000.00
Rp
280,000.00
10.00
bh
Rp
45,000.00
Rp
450,000.00
3.00
bh
Rp
50,000.00
Rp
150,000.00
16.00
bh
Rp
55,000.00
Rp
880,000.00
- Stop Kontak 250 VA, 13 A
c Lantai.3 -
Saklar Tunggal
-
Saklar Ganda
-
Saklar Hotel
- Stop Kontak 250 VA, 13 A
7
8
PEKERJAAN KABEL TRAY
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.1
97.00
m
Rp
170,000.00
Rp
16,490,000.00
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.2
97.00
m
Rp
170,000.00
Rp
16,490,000.00
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.3
106.00
m
Rp
170,000.00
Rp
18,020,000.00
PEKERJAAN AIR CONDITIONER
a Lantai.1 -
AC Split Komplit set , 2 PK LT.1
6.00
unit
Rp
8,728,500.00
Rp
52,371,000.00
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
6.00
ttk
Rp
325,000.00
Rp
1,950,000.00
-
Outlet Stop Kontak AC
6.00
ttk
Rp
45,000.00
Rp
270,000.00
b Lantai.2 -
AC Split Komplit set , 2 PK LT.1
3.00
unit
Rp
8,728,500.00
Rp
26,185,500.00
-
Instalasi Stop Kontak AC NYM 3 x 2,5 mm + pipa conduit
3.00
ttk
Rp
325,000.00
Rp
975,000.00
-
Outlet Stop Kontak AC
3.00
ttk
Rp
45,000.00
Rp
135,000.00
c Lantai.3 -
AC Split Komplit set , 5 PK LT.1
2.00
unit
Rp
36,659,700.00
Rp
73,319,400.00
-
Instalasi Stop Kontak AC NYM 4 x 6 mm + pipa conduit
2.00
ttk
Rp
325,000.00
Rp
650,000.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Aliyah
Lokasi
: Tembilahan
No.
PEKERJAAN -
VOL
Outlet Stop Kontak AC
2.00
SAT ttk
HARGA Rp
45,000.00
Pekerjaan Elektrikal
IV
1
TOTAL Rp
90,000.00
Rp
618,723,400.00
MEKANIKAL
PEKERJAAN INTALASI PEMIPAAN .
a
LANTAI.1 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
20.00
m
Rp
115,000.00
Rp
2,300,000.00
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000.00
- dia. 1/2"
60.00
m
Rp
35,000.00
Rp
2,100,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
3.00
bh
Rp
190,000.00
Rp
570,000.00
- dia. 6"
24.00
m
Rp
151,300.00
Rp
3,631,200.00
- dia. 4"
66.00
m
Rp
75,000.00
Rp
4,950,000.00
- dia. 2"
80.00
m
Rp
28,000.00
Rp
2,240,000.00
- dia. 1 1/2"
40.00
m
Rp
21,300.00
Rp
852,000.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
5.00
unit
Rp
43,875,000.00
Rp
219,375,000.00
20.00
m
Rp
115,000.00
Rp
2,300,000.00
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000.00
- dia. 1/2"
60.00
m
Rp
35,000.00
Rp
2,100,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
3.00
bh
Rp
190,000.00
Rp
570,000.00
- dia. 6"
15.00
m
Rp
151,300.00
Rp
2,269,500.00
- dia. 4"
60.00
m
Rp
75,000.00
Rp
4,500,000.00
- dia. 2"
66.00
m
Rp
28,000.00
Rp
1,848,000.00
- dia. 1 1/2"
40.00
m
Rp
21,300.00
Rp
852,000.00
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories
Septic Tank (biofil)
Type
b
: BF-08 ( BIOFIL )
LANTAI.2 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Aliyah
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
Fitting & Accessories
c
SAT
HARGA
TOTAL
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- dia. 2"
20.00
m
Rp
115,000.00
Rp
2,300,000.00
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000.00
- dia. 1/2"
60.00
m
Rp
35,000.00
Rp
2,100,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
3.00
bh
Rp
190,000.00
Rp
570,000.00
- dia. 6"
15.00
m
Rp
151,300.00
Rp
2,269,500.00
- dia. 4"
60.00
m
Rp
75,000.00
Rp
4,500,000.00
- dia. 2"
66.00
m
Rp
28,000.00
Rp
1,848,000.00
- dia. 1 1/2"
40.00
m
Rp
21,300.00
Rp
852,000.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- dia. 2"
108.00
m
Rp
115,000.00
Rp
12,420,000.00
- dia. 1"
54.00
m
Rp
50,500.00
Rp
2,727,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
- dia. 2"
6.00
bh
Rp
450,000.00
Rp
2,700,000.00
- dia. 1"
10.00
bh
Rp
190,000.00
Rp
1,900,000.00
Floating Valve 1"
10.00
bh
Rp
250,000.00
Rp
2,500,000.00
10.00
unit
Rp
4,250,000.00
Rp
42,500,000.00
1.00
ls
Rp
1,750,000.00
Rp
1,750,000.00
- Pipa PVC Class AW dia 6"
72.00
m
Rp
151,300.00
Rp
10,893,600.00
- Pipa PVC Class AW dia 4"
258.00
m
Rp
75,000.00
Rp
19,350,000.00
LANTAI.3 Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories
d
LANTAI.ATAP Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
Pekerjaan Tangki - Tangki Fiber 2000 L - Bantalan Tanki (dg besi UNP.100 )
e
Pemipaan Air Hujan
- Roof Drain
2
20.00
bh
Rp
350,000.00
Rp
7,000,000.00
- Fitting & Accessories
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- Bak kontrol (500 x 500 x 700 mm)
3.00
unit
Rp
750,000.00
Rp
2,250,000.00
- Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.1
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
- Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.2
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
- Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.3
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
Rp
409,841,800.00
Rp
1,028,565,200.00
PEMADAM API RINGAN
Pekerjaan Mekanikal
TOTAL ME
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Madrasah Aliyah
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
TOTAL
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Asrama Putri
Lokasi
: Tembilahan
No.
III 1
3
PEKERJAAN
VOL
SAT
HARGA
TOTAL
ELEKTRIKAL PEKERJAAN PANEL GEDUNG -
SDP
1.00
Unit
Rp
32,750,000.00
Rp
32,750,000.00
-
LP - 1 PANEL PENERANGAN LT.1
1.00
Unit
Rp
12,250,000.00
Rp
12,250,000.00
-
LP - 2 PANEL PENERANGAN LT.2
1.00
Unit
Rp
11,900,000.00
Rp
11,900,000.00
-
LP - 3 PANEL PENERANGAN LT.3
1.00
Unit
Rp
11,900,000.00
Rp
11,900,000.00
-
LP - PENERANGAN LUAR
1.00
Unit
Rp
7,500,000.00
Rp
7,500,000.00
-
Grounding system
1.00
Lot
Rp
4,150,000.00
Rp
4,150,000.00
30.00
m¹
Rp
132,000.00
Rp
3,960,000.00
35.00
m¹
Rp
132,000.00
Rp
4,620,000.00
40.00
m¹
Rp
132,000.00
Rp
5,280,000.00
40.00
m
Rp
35,200.00
Rp
1,408,000.00
PEKERJAAN KABEL FEEDER GEDUNG dari SDP ke : -
LP - 1 - NYY 4 x 25 mm2
-
LP - 2 - NYY 4 x 25 mm2
-
LP - 3 - NYY 4 x 25 mm2
-
LP - PENERANGAN LUAR - NYY 4 x 6 mm2
4
PEKERJAAN INSTALASI PENERANGAN a Instalasi LT.1 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
135.00
ttk
Rp
187,500.00
Rp
25,312,500.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
32.00
ttk
Rp
197,500.00
Rp
6,320,000.00
b Instalasi LT.2 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
134.00
ttk
Rp
187,500.00
Rp
25,125,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
31.00
ttk
Rp
197,500.00
Rp
6,122,500.00
c Instalasi LT.3 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
122.00
ttk
Rp
187,500.00
Rp
22,875,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
31.00
ttk
Rp
197,500.00
Rp
6,122,500.00
11.00
ttk
Rp
290,000.00
Rp
3,190,000.00
C Instalasi Penerangan Luar -
5
Instalasi Penerangan NYY 3 x 2,5 mm + pipa conduit
PEKERJAAN ARMATURE LAMPU a Lant ai.1 -
Lampu Baret 36 Watt
26.00
bh
Rp
235,000.00
Rp
6,110,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
97.00
bh
Rp
280,000.00
Rp
27,160,000.00
-
LP. Baret Tangga 36 WATT, Bulat
1.00
bh
Rp
235,000.00
Rp
235,000.00
-
LP. WASHTAFLE 18 WATT, GMS
11.00
bh
Rp
1,075,000.00
Rp
11,825,000.00
b. Lantai.2 -
Lampu Baret 36 Watt
22.00
bh
Rp
235,000.00
Rp
5,170,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
102.00
bh
Rp
280,000.00
Rp
28,560,000.00
-
LP. Baret Tangga 36 WATT, Bulat
1.00
bh
Rp
235,000.00
Rp
235,000.00
-
LP. WASHTAFLE 18 WATT, GMS
9.00
bh
Rp
1,075,000.00
Rp
9,675,000.00
c. Lantai.3 -
Lampu Baret 36 Watt
22.00
bh
Rp
235,000.00
Rp
5,170,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
90.00
bh
Rp
280,000.00
Rp
25,200,000.00
-
LP. Baret Tangga 36 WATT, Bulat
1.00
bh
Rp
235,000.00
Rp
235,000.00
-
LP. WASHTAFLE 18 WATT, GMS
9.00
bh
Rp
1,075,000.00
Rp
9,675,000.00
11.00
bh
Rp
750,000.00
Rp
8,250,000.00
c. Penerangan Luar 6
Lampu TAMAN GL TOP ACR GRILL T= 2.5 M + pondasi tiang
PEKERJAAN SAKLAR & STOP KONTAK a Lant ai.1 -
Saklar Tunggal
28.00
bh
Rp
40,000.00
Rp
1,120,000.00
-
Saklar Ganda
17.00
bh
Rp
45,000.00
Rp
765,000.00
-
Saklar Hotel
1.00
bh
Rp
50,000.00
Rp
50,000.00
-
Stop Kontak 250 VA, 13 A
32.00
bh
Rp
55,000.00
Rp
1,760,000.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Asrama Putri
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
TOTAL
b. Lantai.2 -
Saklar Tunggal
23.00
bh
Rp
40,000.00
Rp
920,000.00
-
Saklar Ganda
15.00
bh
Rp
45,000.00
Rp
675,000.00
-
Saklar Hotel
1.00
bh
Rp
50,000.00
Rp
50,000.00
-
Stop Kontak 250 VA, 13 A
31.00
bh
Rp
55,000.00
Rp
1,705,000.00
c Lantai.3
7
-
Saklar Tunggal
24.00
bh
Rp
40,000.00
Rp
960,000.00
-
Saklar Ganda
15.00
bh
Rp
45,000.00
Rp
675,000.00
-
Saklar Hotel
1.00
bh
Rp
50,000.00
Rp
50,000.00
-
Stop Kontak 250 VA, 13 A
31.00
bh
Rp
55,000.00
Rp
1,705,000.00
PEKERJAAN KABEL TRAY -
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.1
58.00
m¹
Rp
170,000.00
Rp
9,860,000.00
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.2
58.00
m¹
Rp
170,000.00
Rp
9,860,000.00
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.3
58.00
m¹
Rp
170,000.00
Rp
9,860,000.00
Rp
368,300,500.00
1,150,000.00
n Elektrikal IV
MEKANIKAL
1
PEKERJAAN INTALASI PEMIPAAN . a
LANTAI.1 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
10.00
m
Rp
115,000.00
Rp
- dia. 1"
110.00
m
Rp
50,500.00
Rp
5,555,000.00
- dia. 1/2"
132.00
m
Rp
32,500.00
Rp
4,290,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
3.00
bh
Rp
190,000.00
Rp
570,000.00
- dia. 6"
44.00
m
Rp
151,300.00
Rp
6,657,200.00
- dia. 4"
80.00
m
Rp
75,000.00
Rp
6,000,000.00
- dia. 2"
56.00
m
Rp
28,000.00
Rp
1,568,000.00
- dia. 1 1/2"
45.00
m
Rp
21,300.00
Rp
958,500.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
4.00
unit
Rp
43,875,000.00
Rp
175,500,000.00
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories Septic Tank (biofil) Type b
LANTAI.2
: BF-08 ( BIOFIL )
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Asrama Putri
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
TOTAL
Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
10.00
m
Rp
115,000.00
Rp
1,150,000.00
- dia. 1"
95.00
m
Rp
50,500.00
Rp
4,797,500.00
115.00
m
Rp
32,500.00
Rp
3,737,500.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
3.00
bh
Rp
190,000.00
Rp
570,000.00
- dia. 6"
24.00
m
Rp
151,300.00
Rp
3,631,200.00
- dia. 4"
80.00
m
Rp
75,000.00
Rp
6,000,000.00
- dia. 2"
60.00
m
Rp
28,000.00
Rp
1,680,000.00
- dia. 1 1/2"
45.00
m
Rp
21,300.00
Rp
958,500.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- dia. 2"
10.00
m
Rp
115,000.00
Rp
1,150,000.00
- dia. 1"
95.00
m
Rp
50,500.00
Rp
4,797,500.00
115.00
m
Rp
32,500.00
Rp
3,737,500.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
3.00
bh
Rp
190,000.00
Rp
570,000.00
- dia. 6"
24.00
m
Rp
151,300.00
Rp
3,631,200.00
- dia. 4"
80.00
m
Rp
75,000.00
Rp
6,000,000.00
- dia. 2"
60.00
m
Rp
28,000.00
Rp
1,680,000.00
- dia. 1 1/2"
45.00
m
Rp
21,300.00
Rp
958,500.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- dia. 2"
72.00
m
Rp
115,000.00
Rp
8,280,000.00
- dia. 1"
36.00
m
Rp
50,500.00
Rp
1,818,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
- dia. 2"
4.00
bh
Rp
450,000.00
Rp
1,800,000.00
- dia. 1"
8.00
bh
Rp
190,000.00
Rp
1,520,000.00
Floating Valve 1"
8.00
bh
Rp
250,000.00
Rp
2,000,000.00
- Tangki Fiber 2000 L
8.00
unit
Rp
4,250,000.00
Rp
34,000,000.00
- Bantalan Tanki (dg besi UNP.100 )
1.00
ls
Rp
1,750,000.00
Rp
1,750,000.00
- Pipa PVC Class AW dia 6"
60.00
m
Rp
151,300.00
Rp
9,078,000.00
- Pipa PVC Class AW dia 4"
130.00
m
Rp
75,000.00
Rp
9,750,000.00
17.00
bh
Rp
350,000.00
Rp
5,950,000.00
- Fitting & Accessories
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- Bak kontrol (500 x 500 x 700 mm)
3.00
unit
Rp
750,000.00
Rp
2,250,000.00
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories c
LANTAI.3 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories d
LANTAI.ATAP Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
Pekerjaan Tangki
e
Pemipaan Air Hujan
- Roof Drain
2
PEMADAM API RINGAN -
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.1
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.2
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.3
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
Rp
358,994,100.00
Rp
727,294,600.00
Pekerjaan Mekanikal TOTAL ME
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Ruang Utilitas
Lokasi
: Tembilahan
No.
1
PEKERJAAN
VOL
SAT
HARGA
TOTAL
PEKERJAAN PERALATAN UTAMA a
PEKERJAAN GENSET
1.00
lot
Rp
768,500,000.00
Rp
768,500,000.00
Generator Set 500 kVA Open type, Prime Power rating 1500 rpm. Water cooled, Turbocharged - after cooled , four stroke, v-12, Brushless generator , 4 wire , wye, drip proof, Lengkap dengan Vibration Demper, SILENCER, radiator dan Power Command. Dll
b
c
2
PEKERJAAN TANKI ( pekerjaan termasuk setting & instal ) a. PEKERJAAN TANKI 10.000 L
1.00
lot
Rp
69,700,000.00
Rp
69,700,000.00
b. PEKERJAAN TANKI 1000 L
2.00
lot
Rp
15,000,000.00
Rp
30,000,000.00
c. INSTALASI DAN PEMIPAAN BAHAN BAKAR GENSET termasuk :
1.00
lot
Rp
12,500,000.00
Rp
12,500,000.00
1.00
unit
Rp
235,750,000.00
Rp
235,750,000.00
-
Pompa Elektrik
-
Pompa Manual
-
Panel Pompa
-
Pengkabelan
-
Valve
-
Strainer
-
Check valve
-
WLC
-
Aksesoris & Alat bantu
Transformator 500 kVA, Oil type
PEKERJAAN PANEL
a
Panel Utama Tegangan Menengah (PUTM)
1.00
unit
Rp
112,500,000.00
Rp
112,500,000.00
b
Panel Utama Tegangan Rendah (PUTR) / LVMDP
1.00
unit
Rp
376,500,000.00
Rp
376,500,000.00
1.00
Unit
Rp
65,500,000.00
Rp
65,500,000.00
Incoming Cubicle + ATS terdiri dari :
c
-
Protection MCCB
-
Geared Motor
-
Time Delayed Under Voltage Trip
-
Shunt Trip
-
Auxiliary
-
Ready to Close Contact
-
Electrical Closing Release
-
Plat Interlock Elektris
-
Automatic Control
-
Interlock Mekanis
-
Lampu Indikator
-
Ampere Meter 500/5 A
-
Volt Meter 0-500 A + Selector Switch
-
Frequency Meter 50/60 Hz
-
Cos Phi Meter
-
k Wh Meter 4P, 3P
-
Box Panel + Accessories
-
Grounding System
Capasitor Bank, 350 kVAR terdiri dari : -
Capasitor Bank, 7 x 50 kVAR
-
Main Protection MCCB 252-630 A, 4P,3F , 45kA
-
Harmonik Filter
-
Protection MCCB 252-630 A, 4P,3F , 45kA
-
Automatic Regulator 12 Step
-
Contactor
-
T ermina l Co ver
-
Box panel + Accessories
-
Grounding System
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Ruang Utilitas
Lokasi
: Tembilahan
No. d
2
PEKERJAAN
VOL
SAT
HARGA
TOTAL
Pekerjaan Panel Penerangan Ruang Genset -
LP - DF ( Panel Penerangan )
1.00
Unit
Rp
3,750,000.00
Rp
3,750,000.00
-
Grounding system
1.00
Lot
Rp
1,750,000.00
Rp
1,750,000.00
128.00
m
Rp
286,000.00
Rp
36,608,000.00
22.00
m
Rp
286,000.00
Rp
6,292,000.00
30.00
m
Rp
4,466,000.00
Rp
133,980,000.00
25.00
m
Rp
4,466,000.00
Rp
111,650,000.00
20.00
m
Rp
4,466,000.00
Rp
89,320,000.00
1.00
lot
Rp
7,150,000.00
Rp
7,150,000.00
208.00
m
Rp
3,852,000.00
Rp
801,216,000.00
373.00
m
Rp
1,276,000.00
Rp
475,948,000.00
203.00
m
Rp
1,276,000.00
Rp
259,028,000.00
408.00
m
Rp
1,276,000.00
Rp
520,608,000.00
230.00
m
Rp
1,276,000.00
Rp
293,480,000.00
260.00
m
Rp
1,276,000.00
Rp
331,760,000.00
335.00
m
Rp
1,276,000.00
Rp
427,460,000.00
365.00
m
Rp
132,000.00
Rp
48,180,000.00
225.00
m
Rp
132,000.00
Rp
29,700,000.00
PEKERJAAN KABEL FEEDER + KABEL BC a
Dari Gardu PLN ke PUTM
b
Dari PUTM ke Transformator
-
-
N2XSEFGbY 3 x 70 mm 2
N2XSY 3 x 70 mm 2
c
Dari Transformator ke PUTR / LVMDP
d
Dari Genset.1dan2 ke panel sincron genset
e
Dari Panel Genset ke PUTR
-
-
-
NYY 14 x 1 x 240 mm2
NYY 14 x 1 x 240 mm2
NYY 14 x 1 x 240 mm2
f
Aksesoris & alat bantu
g
Dari PUTR ke : SDP GEDUNG SMU - NYFGBY 2 (4 x 240) mm2 SDP GEDUNG SMU - NYFGBY 4 x 240 mm2 SDP ASRAMA PUTRI - NYFGBY 4 x 240 mm2 SDP ASRAMA PUTRA - NYFGBY 4 x 240 mm2 SDP MA - NYFGBY 4 x 240 mm2 SDP MTS - NYFGBY 4 x 240 mm2 SDP MI - NYFGBY 4 x 240 mm2 SDP TK - NYFGBY 4 x 25 mm2 LP PJU - NYFGBY 4 x 25 mm2
3
4
PEKERJAAN INSTALASI PENERANGAN -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
15.00
ttk
Rp
187,500.00
Rp
2,812,500.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
4.00
ttk
Rp
197,500.00
Rp
790,000.00
15.00
bh
Rp
350,000.00
Rp
5,250,000.00
PEKERJAAN ARMATURE LAMPU -
5
6
7
PEKERJAAN SAKLAR & STOP KONTAK ( ex. PANASONIC ) -
Saklar Ganda
5.00
bh
Rp
45,000.00
Rp
225,000.00
-
Stop Kontak 250 VA, 13 A
4.00
bh
Rp
55,000.00
Rp
220,000.00
PEKERJAAN EXHOUST FAN -
Exhaust Fan, 1200 CFM Dia 16 " , 75 W 1 Phase, Wall mounted Type, FV-40
4.00
unit
Rp
1,750,000.00
Rp
7,000,000.00
-
Instalasi Exhoust Fan Fan NYM 3 x 2,5 mm + pipa conduit
4.00
ttk
Rp
250,000.00
Rp
1,000,000.00
-
Saklar Ganda
1.00
bh
Rp
45,000.00
Rp
45,000.00
10.00
m
Rp
170,000.00
Rp
1,700,000.00
1,120,000.00
PEKERJAAN KABEL TRAY -
8
LP. TL 2 x 36 WATT, TKO
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr
PEMIPAAN AIR HUJAN - Pipa PVC Class AW dia 2"
9
40.00
m
Rp
28,000.00
Rp
- Fitting & Accessories
1.00
lot
Rp
500,000.00
Rp
500,000.00
- Roof Drain
6.00
bh
Rp
350,000.00
Rp
2,100,000.00
4.00
bh
Rp
1,250,000.00
Rp
5,000,000.00
Rp
5,276,592,500.00
PEMADAM API RINGAN -
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder)
Pekerjaan Mekanikal dan Elektrikal
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Ruang Utilitas
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA TOTAL ME
TOTAL Rp
5,276,592,500.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Asrama Putra
Lokasi
: Tembilahan
No.
PEKERJAAN
III
ELEKTRIKAL
1
PEKERJAAN PANEL GEDUNG
3
VOL
SAT
HARGA
TOTAL
-
SDP
1.00
Unit
Rp
32,750,000.00
Rp
-
LP - 1 PANEL PENERANGAN LT.1
1.00
Unit
Rp
12,250,000.00
Rp
32,750,000.00 12,250,000.00
-
LP - 2 PANEL PENERANGAN LT.2
1.00
Unit
Rp
11,900,000.00
Rp
11,900,000.00
-
LP - 3 PANEL PENERANGAN LT.3
1.00
Unit
Rp
11,900,000.00
Rp
11,900,000.00
-
LP - PENERANGAN LUAR
1.00
Unit
Rp
7,500,000.00
Rp
7,500,000.00
-
Grounding system
1.00
Lot
Rp
4,150,000.00
Rp
4,150,000.00
30.00
m¹
Rp
132,000.00
Rp
3,960,000.00
35.00
m¹
Rp
132,000.00
Rp
4,620,000.00
40.00
m¹
Rp
132,000.00
Rp
5,280,000.00
40.00
m
Rp
35,200.00
Rp
1,408,000.00
PEKERJAAN KABEL FEEDER GEDUNG dari SDP ke : -
LP - 1 - NYY 4 x 25 mm2
-
LP - 2 - NYY 4 x 25 mm2
-
LP - 3 - NYY 4 x 25 mm2
-
LP - PENERANGAN LUAR - NYY 4 x 6 mm2
4
PEKERJAAN INSTALASI PENERANGAN a Instalasi LT.1 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
135.00
ttk
Rp
187,500.00
Rp
25,312,500.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
32.00
ttk
Rp
197,500.00
Rp
6,320,000.00
b Instalasi LT.2 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
134.00
ttk
Rp
187,500.00
Rp
25,125,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
31.00
ttk
Rp
197,500.00
Rp
6,122,500.00
c Instalasi LT.3 -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
122.00
ttk
Rp
187,500.00
Rp
22,875,000.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
31.00
ttk
Rp
197,500.00
Rp
6,122,500.00
11.00
ttk
Rp
290,000.00
Rp
3,190,000.00
C Instalasi Penerangan Luar -
5
Instalasi Penerangan NYY 3 x 2,5 mm + pipa conduit
PEKERJAAN ARMATURE LAMPU a Lantai.1 -
Lampu Baret 36 Watt
26.00
bh
Rp
235,000.00
Rp
6,110,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
97.00
bh
Rp
280,000.00
Rp
27,160,000.00
-
LP. Baret Tangga 36 WATT, Bulat
1.00
bh
Rp
235,000.00
Rp
235,000.00
-
LP. WASHTAFLE 18 WATT, GMS
11.00
bh
Rp
1,075,000.00
Rp
11,825,000.00
b. Lantai.2 -
Lampu Baret 36 Watt
22.00
bh
Rp
235,000.00
Rp
5,170,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
102.00
bh
Rp
280,000.00
Rp
28,560,000.00
-
LP. Baret Tangga 36 WATT, Bulat
1.00
bh
Rp
235,000.00
Rp
235,000.00
-
LP. WASHTAFLE 18 WATT, GMS
9.00
bh
Rp
1,075,000.00
Rp
9,675,000.00
c. Lantai.3 -
Lampu Baret 36 Watt
22.00
bh
Rp
235,000.00
Rp
5,170,000.00
-
LP. DOWN LIGHT 18 WATT, PL-C
90.00
bh
Rp
280,000.00
Rp
25,200,000.00
-
LP. Baret Tangga 36 WATT, Bulat
1.00
bh
Rp
235,000.00
Rp
235,000.00
-
LP. WASHTAFLE 18 WATT, GMS
9.00
bh
Rp
1,075,000.00
Rp
9,675,000.00
11.00
bh
Rp
750,000.00
Rp
8,250,000.00
c. Penerangan Luar 6
Lampu TAMAN GL TOP ACR GRILL T= 2.5 M + pondasi tiang
PEKERJAAN SAKLAR & STOP KONTAK
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Asrama Putra
Lokasi
: Tembilahan
No.
PEKERJAAN
VOL
SAT
HARGA
TOTAL
a Lantai.1 -
Saklar Tunggal
28.00
bh
Rp
40,000.00
Rp
1,120,000.00
-
Saklar Ganda
17.00
bh
Rp
45,000.00
Rp
765,000.00
-
Saklar Hotel
1.00
bh
Rp
50,000.00
Rp
50,000.00
-
Stop Kontak 250 VA, 13 A
32.00
bh
Rp
55,000.00
Rp
1,760,000.00
b. Lantai.2 -
Saklar Tunggal
23.00
bh
Rp
40,000.00
Rp
920,000.00
-
Saklar Ganda
15.00
bh
Rp
45,000.00
Rp
675,000.00
-
Saklar Hotel
-
Stop Kontak 250 VA, 13 A
1.00
bh
Rp
50,000.00
Rp
50,000.00
31.00
bh
Rp
55,000.00
Rp
1,705,000.00
c Lantai.3
7
-
Saklar Tunggal
24.00
bh
Rp
40,000.00
Rp
960,000.00
-
Saklar Ganda
15.00
bh
Rp
45,000.00
Rp
675,000.00
-
Saklar Hotel
-
Stop Kontak 250 VA, 13 A
1.00
bh
Rp
50,000.00
Rp
50,000.00
31.00
bh
Rp
55,000.00
Rp
1,705,000.00
PEKERJAAN KABEL TRAY -
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.1
58.00
m¹
Rp
170,000.00
Rp
9,860,000.00
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.2
58.00
m¹
Rp
170,000.00
Rp
9,860,000.00
-
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr LT.3
58.00
m¹
Rp
170,000.00
Rp
9,860,000.00
Rp 368,300,500.00
n Elektrikal IV
MEKANIKAL
1
PEKERJAAN INTALASI PEMIPAAN . a
LANTAI.1 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 2"
10.00
m¹
Rp
115,000.00
Rp
1,150,000.00
- dia. 1"
110.00
m¹
Rp
50,500.00
Rp
5,555,000.00
- dia. 1/2"
132.00
m¹
Rp
35,000.00
Rp
4,620,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
3.00
bh
Rp
190,000.00
Rp
570,000.00
- dia. 6"
44.00
m¹
Rp
151,300.00
Rp
6,657,200.00
- dia. 4"
80.00
m¹
Rp
75,000.00
Rp
6,000,000.00
- dia. 2"
56.00
m¹
Rp
28,000.00
Rp
1,568,000.00
- dia. 1 1/2"
45.00
m¹
Rp
21,300.00
Rp
958,500.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
4.00
unit
Rp
43,875,000.00
Rp
175,500,000.00
- dia. 2"
10.00
m¹
Rp
115,000.00
Rp
1,150,000.00
- dia. 1"
95.00
m¹
Rp
50,500.00
Rp
4,797,500.00
115.00
m¹
Rp
35,000.00
Rp
4,025,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
3.00
bh
Rp
190,000.00
Rp
570,000.00
- dia. 6"
24.00
m¹
Rp
151,300.00
Rp
3,631,200.00
- dia. 4"
80.00
m¹
Rp
75,000.00
Rp
6,000,000.00
- dia. 2"
60.00
m¹
Rp
28,000.00
Rp
1,680,000.00
- Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories Septic Tank (biofil) Type b
: BF-08 ( BIOFIL )
LANTAI.2 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Asrama Putra
Lokasi
: Tembilahan
No.
PEKERJAAN - dia. 1 1/2"
SAT
HARGA
TOTAL
45.00
m¹
Rp
21,300.00
Rp
958,500.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- dia. 2"
10.00
m¹
Rp
115,000.00
Rp
1,150,000.00
- dia. 1"
95.00
m¹
Rp
50,500.00
Rp
4,797,500.00
115.00
m¹
Rp
35,000.00
Rp
4,025,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
3.00
bh
Rp
190,000.00
Rp
570,000.00
- dia. 6"
24.00
m¹
Rp
151,300.00
Rp
3,631,200.00
- dia. 4"
80.00
m¹
Rp
75,000.00
Rp
6,000,000.00
- dia. 2"
60.00
m¹
Rp
28,000.00
Rp
1,680,000.00
- dia. 1 1/2"
45.00
m¹
Rp
21,300.00
Rp
958,500.00
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- dia. 2"
72.00
m¹
Rp
115,000.00
Rp
8,280,000.00
- dia. 1"
36.00
m¹
Rp
50,500.00
Rp
1,818,000.00
1.00
lot
Rp
2,750,000.00
Rp
2,750,000.00
- dia. 2"
4.00
bh
Rp
450,000.00
Rp
1,800,000.00
- dia. 1"
8.00
bh
Rp
190,000.00
Rp
1,520,000.00
Floating Valve 1"
8.00
bh
Rp
650,000.00
Rp
5,200,000.00
- Tangki Fiber 2000 L
8.00
unit
Rp
4,250,000.00
Rp
34,000,000.00
- Bantalan Tanki (dg besi UNP.100 )
1.00
ls
Rp
1,750,000.00
Rp
1,750,000.00
- Pipa PVC Class AW dia 6"
60.00
m¹
Rp
151,300.00
Rp
9,078,000.00
- Pipa PVC Class AW dia 4"
130.00
m¹
Rp
75,000.00
Rp
9,750,000.00
17.00
bh
Rp
350,000.00
Rp
5,950,000.00
- Fitting & Accessories
1.00
lot
Rp
3,750,000.00
Rp
3,750,000.00
- Bak kontrol (500 x 500 x 700 mm)
3.00
unit
Rp
750,000.00
Rp
2,250,000.00
Fitting & Accessories c
VOL
LANTAI.3 Pemipaan Air Bersih Pipa GIP Medium Class
- dia. 1/2" - Fitting & Accessories Gate Valve
- dia. 1" Pemipaan Air Kotor, Bekas & Vent Pipa PVC Class AW
Fitting & Accessories d
LANTAI .ATAP Pemipaan Air Bersih Pipa GIP Medium Class
- Fitting & Accessories Gate Valve
Pekerjaan Tangki
e
Pemipaan Air Hujan
- Roof Drain
2
PEMADAM API RINGAN -
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.1
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.2
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
-
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) LT.3
2.00
bh
Rp
1,250,000.00
Rp
2,500,000.00
Rp 363,099,100.00
n Mekanikal
TOTAL ME
Rp 731,399,600.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan : Ruang Pompa Lokasi
: Tembilahan
No.
1
PEKERJAAN
VOL
SAT
HARGA
TOTAL
PEKERJAAN PANEL a Pekerjaan Panel Penerangan Ruang Pompa -
LP - DF ( Panel Penerangan )
1.00
Unit
Rp
3,750,000.00
Rp
3,750,000.00
-
Grounding system
1.00
Lot
Rp
1,500,000.00
Rp
1,500,000.00
b PANEL SDP POMPA
c
-
SDP - POMPA
1.00
Unit
Rp
34,500,000.00
Rp
34,500,000.00
-
Grounding system
1.00
Lot
Rp
1,750,000.00
Rp
1,750,000.00
PANEL POMPA HIDRANT -
PP-H PANEL ELECTRIC PUMP ( System Auto manual )
1.00
Unit
Rp
37,500,000.00
Rp
37,500,000.00
-
PP-D PANEL DIESEL PUMP ( System Auto manual )
1.00
Unit
Rp
37,500,000.00
Rp
37,500,000.00
-
PP-J PANEL JOCKEY PUMP ( System Auto manual )
1.00
Unit
Rp
27,500,000.00
Rp
27,500,000.00
-
Grounding system
1.00
Lot
Rp
1,750,000.00
Rp
1,750,000.00
d PANEL DISTRIBUSI POMPA AIR BERSIH
2
-
PP-AB-1 PANEL ELECTRIC PUMP ( System Auto manual )
1.00
Unit
Rp
17,500,000.00
Rp
17,500,000.00
-
PP-AB-2 PANEL ELECTRIC PUMP ( System Auto manual )
1.00
Unit
Rp
17,500,000.00
Rp
17,500,000.00
-
PP-DW PANEL Pompa Deep Well ( System Auto manual )
1.00
Unit
Rp
7,800,000.00
Rp
7,800,000.00
-
Grounding system
1.00
Lot
Rp
1,750,000.00
Rp
1,750,000.00
25.00
m
Rp
792,000.00
Rp
19,800,000.00
24.00
m
Rp
35,200.00
Rp
844,800.00
20. 00
m
Rp
49,500.00
Rp
990,000.00
19. 00
m
Rp
49,500.00
Rp
940,500.00
30.00
m
Rp
35,200.00
Rp
1,056,000.00
PEKERJAAN KABEL FEEDER + KABEL BC a Dari SDP POMPA ke : a. Panel Pompa Elektrik Hidrant -
NYY 4 x 150 mm2
b Panel Pompa Jokey -
NYY 4 x 6 mm2
c Panel Distribusi Pompa Air Bersih ( PAB-1 ) -
NYY 2 ( 3 x 6 ) mm2
d. Panel Distribusi Pompa Air Bersih ( PAB-2 ) -
NYY 2 ( 3 x 6 ) mm2
e. Panel Distribusi Pompa Deep Well 3
4
PEKERJAAN INSTALASI PENERANGAN -
Instalasi Penerangan NYM 3 x 2,5 mm + pipa conduit
5.00
ttk
Rp
187,500.00
Rp
937,500.00
-
Instalasi Stop Kontak NYM 3 x 2,5 mm + pipa conduit
2.00
ttk
Rp
197,500.00
Rp
395,000.00
5.00
bh
Rp
755,000.00
Rp
3,775,000.00
PEKERJAAN ARMATURE LAMPU -
5
NYY 4 x 6 mm2
LP. TL 2 x 36 WATT, TKO
PEKERJAAN SAKLAR & STOP KONTAK ( ex. PANASONIC ) -
Saklar Ganda
- Stop Kontak 250 VA, 13 A 6
7
bh
Rp
45,000.00
Rp
90,000.00
bh
Rp
55,000.00
Rp
110,000.00
PEKERJAAN EXHOUST FAN -
Exhaust Fan, 1200 CFM Dia 16 " , 75 W 1 Phase, Wall mounted Typ
2.00
unit
Rp
1,750,000.00
Rp
3,500,000.00
-
Instalasi Exhoust Fan Fan NYM 3 x 2,5 mm + pipa conduit
2.00
ttk
Rp
350,000.00
Rp
700,000.00
-
Saklar Ganda
1.00
bh
Rp
45,000.00
Rp
45,000.00
15.00
m
Rp
170,000.00
Rp
2,550,000.00
2.00
unit
Rp
48,500,000.00
Rp
97,000,000.00
1.00
unit
Rp
18,500,000.00
Rp
18,500,000.00
PEKERJAAN KABEL TRAY -
8
2.00 2.00
Standard Tray Ukuran 30 cm x 10 cm x 3 mtr
PEKERJAAN PERALATAN UTAMA a Pompa Distribusi Air Bersih (PAB-1 & PAB-2) Kap.
: 720 L/m
Head
: 40 m
Type
: Centrifugal End Suction
Daya
: 7,5 kW
b Pressure Tank Kap.
: 500 L
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan : Ruang Pompa Lokasi
: Tembilahan
No.
PEKERJAAN
c Sand Filter
SAT
HARGA
TOTAL
1.00
unit
Rp
3,750,000.00
Rp
3,750,000.00
1.00
unit
Rp
4,750,000.00
Rp
4,750,000.00
1.00
lot
BY OTHER
- Pipa GIP Medium Class dia 4" Header
4.00
m
Rp
245,000.00
Rp
980,000.00
- Pipa GIP Medium Class dia 2"
8.00
m
Rp
115,000.00
Rp
920,000.00
- Fitting & Accessories
1.00
lot
Rp
550,000.00
Rp
550,000.00
- Pipa GIP Medium Class dia 4"
620.00
m
Rp
245,000.00
Rp
151,900,000.00
- Pipa GIP Medium Class dia 2"
685.00
m
Rp
115,000.00
Rp
78,775,000.00
1.00
lot
Rp
23,500,000.00
Rp
23,500,000.00
- Gate Valve dia. 4"
2.00
bh
Rp
5,750,000.00
Rp
11,500,000.00
- Gate Valve dia. 2"
2.00
bh
Rp
975,000.00
Rp
1,950,000.00
- Check Valve dia. 2"
2.00
bh
Rp
965,000.00
Rp
1,930,000.00
- Strainer dia. 2"
2.00
bh
Rp
1,967,000.00
Rp
3,934,000.00
- Fleksible Connection dia. 2"
4.00
bh
Rp
534,000.00
Rp
2,136,000.00
- Floating Valve dia. 2"
2.00
bh
Rp
1,650,000.00
Rp
3,300,000.00
- Foot Valve dia. 2"
2.00
bh
Rp
650,000.00
Rp
1,300,000.00
- Pressure Gauge
3.00
bh
Rp
168,000.00
Rp
504,000.00
- Pressure Switch
2.00
bh
Rp
425,000.00
Rp
850,000.00
- Accessories
1.00
lot
Rp
4,500,000.00
Rp
4,500,000.00
1,120,000.00
Kap.
: 200 L/m
d Carbon Filter Kap.
: 500 L/m
e Sumur Bor ( ARTESIS ) c/w: -
VOL
Submersible Pump Kap. : 150 L/m Hea : 70 m Daya : 3 kw
9
-
Panel
-
Pengkabelan
-
Bak kontrol 1 x 1 x 1 m
-
Pemipaan, Valve, accessories, dll
PEKERJAAN INTALASI PEMIPAAN R.POMPA a. Pemipaan Pompa Air Bersih
b. Pipa Pengisian Tanki Atas
- Fitting & Accessories d. Valves
10
PEMIPAAN AIR HUJAN - Pipa PVC Class AW dia 2"
11
40.00
m
Rp
28,000.00
Rp
- Fitting & Accessories
1.00
lot
Rp
250,000.00
Rp
250,000.00
- Roof Drain
6.00
bh
Rp
350,000.00
Rp
2,100,000.00
1.00
bh
Rp
1,250,000.00
Rp
1,250,000.00
PEMADAM API RINGAN -
Fire Extinguisher, kap. 5 Kg, (Dry Chemical Powder) Pekerjaan Mekanikal dan Elektrikal
Rp 642,032,800.00 TOTAL ME
Rp 642,032,800.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan : Selasar & Site Plan Lokasi
: Tembilahan
No.
Uraian Pekerjaan
Vol.
Sat.
Harga Satuan
Jumlah
SELASAR & SITE PLAN 1
2
PEKERJAAN PANEL -
PANEL LAMPU SOROT ( System Auto manual + Photo Cell)
2.00
Unit
Rp
37,750,000.00
Rp
75,500,000.00
-
PANEL PENERANGAN selasar & Koridor ( System Auto manual + Photo Cell )
2.00
Unit
Rp
39,500,000.00
Rp
79,000,000.00
-
PANEL PENERANGAN PJU ( System Auto manual + Photo Cell )
1.00
Unit
Rp
35,500,000.00
Rp
35,500,000.00
-
Grounding system
1.00
Lot
Rp
1,750,000.00
Rp
1,750,000.00
11.00
ttk
Rp
308,000.00
Rp
3,388,000.00
81.00
ttk
Rp
385,000.00
Rp
31,185,000.00
7.00
ttk
Rp
605,000.00
Rp
4,235,000.00
81.00
bh
Rp
800,000.00
Rp
64,800,000.00
4.00
bh
Rp
9,750,000.00
Rp
39,000,000.00
PEKERJAAN INSTALASI PENERANGAN a Site Plan ( Penerangan Luar ) -
Instalasi LP.SOROT NYFGBY 4 x 4 mm
b Selasar, Koridor, & Tempat Parkir -
Instalasi LP. TAMAN NYFGBY 4 x 4 mm
c PJU 3
Instalasi LP. PJU NYFGBY 4 x 4 mm
PEKERJAAN ARMATURE LAMPU a Site Plan ( Penerangan Luar ) - LP. TAMAN 250 WATT t = 3 m -
LP. SOROT HPIT 500 WATT
-
LP. SOROT HPIT 250 WATT
7.00
bh
Rp
810,000.00
Rp
5,670,000.00
-
LP. PJU TIANG TUNGGAL 1 X 250 WATT OCTAGONAL 9 M + PONDASI
7.00
bh
Rp
9,750,000.00
Rp
68,250,000.00
-
LP. PJU TIANG GANDA 2 X 250 WATT OCTAGONAL 9 M + PONDASI
5.00
bh
Rp
11,250,000.00
Rp
56,250,000.00
Rp
464,528,000.00
Pekerjaan Mekanikal dan Elektrikal TOTAL ME
Rp 464,528,000.00
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Pemadam Kebakaran
Lokasi
: Tembilahan
No.
Uraian Pekerjaan
1
Vol.
Sat.
Harga Satuan
Jumlah
PEKERJAAN PERALATAN UTAMA a
ELECTRIC FIRE PUMP
1.00
set
Rp
215,000,000.00
Rp
215,000,000.00
1.00
set
Rp
389,000,000.00
Rp
389,000,000.00
1.00
set
Rp
48,700,000.00
Rp
48,700,000.00
1.00
unit
Rp
18,700,000.00
Rp
18,700,000.00
1,596,000.00
CAP. 750 USGPM FIRETROL FTA 1300 Electric Fire Pump Controller to FM Approved UL Listed. Wye Delta Starting Open Transtion NEMA 2 Enclosure Freestendig Including : - 1 nos Suction and Discharge Gauges 3.1/2" - 1 nos Automatic Air Release Valve 3/4" - 1 Casing Relief Valve - 1 nos Consent Discharge Increaser 4 x 6" b
DIESEL FIRE PUMP CAP. 750 USGPM Diesel Engine Fire pump to FM Approved UL Listed Head Exchanger Cooled mounted on baseplate including : - 2 sets 12 Volt Lead Acid Battery cables & Racks - 1 set Flexible Connector & industrial type silencer - 1 unit Fuel Tank Vol. 150 Gallone. Supplied loose - 1 unit FIRETROL FTA 1100 Diesel Fire Pump Controller to FM Approved UL Listed, NEMA 2 Enclosure Free Standing Accessories - 1 nos Suction and Discharge gauges 3,1/2" - 1 nos Automatic Air Release Valve 3/4" - 1 nos Consentric Discharge Increaser 4x5" - 1 nos Main Relief Valve 4" - 1 nos Closed Waste Cone 4 x 6" - 1 unit Flowmeter "Gerand"
c
JOCKEY PUMP Cap. 25 USGPM at 105 Mtr Head
d 2
Pressure Tank, Cap. 500 L PEMIPAAN RUANG POMPA a. Pemipaan Pemadam Kebakaran Pipa BSP SCH-40 - dia. 8" ( HEADER )
3.00
m
Rp
532,000.00
Rp
- dia. 6"
20.00
m
Rp
462,500.00
Rp
9,250,000.00
- dia. 4"
20.00
m
Rp
265,000.00
Rp
5,300,000.00
2.00
m
Rp
148,750.00
Rp
297,500.00
- dia. 2,5"
Kegiatan
: Perencanaan Pembangunan Infrastruktur Tahun Anggaran 2009
Pekerjaan
: Detail Engineering Design (DED) Islamic Center dan SMA Unggulan Tembilahan
Sub Pekerjaan
: Pemadam Kebakaran
Lokasi
: Tembilahan
No.
Uraian Pekerjaan
Vol.
- dia. 2"
Sat.
Harga Satuan
Jumlah
2.00
m
Rp
90,000.00
Rp
180,000.00
- dia. 6"
4.00
bh
Rp
6,750,000.00
Rp
27,000,000.00
- dia. 4"
2.00
bh
Rp
4,750,000.00
Rp
9,500,000.00
- dia. 2"
2.00
bh
Rp
975,000.00
Rp
1,950,000.00
- dia. 1
4.00
bh
Rp
198,000.00
Rp
792,000.00
- dia. 1/2"
4.00
bh
Rp
167,000.00
Rp
668,000.00
- dia. 4"
2.00
bh
Rp
4,750,000.00
Rp
9,500,000.00
- dia. 2"
1.00
bh
Rp
965,000.00
Rp
965,000.00
- dia. 4"
2.00
bh
Rp
5,450,000.00
Rp
10,900,000.00
- dia. 2"
1.00
bh
Rp
1,345,000.00
Rp
1,345,000.00
- dia. 4"
4.00
bh
Rp
1,235,000.00
Rp
4,940,000.00
- dia. 2"
2.00
bh
Rp
534,000.00
Rp
1,068,000.00
- dia. 4"
2.00
bh
Rp
1,750,000.00
Rp
3,500,000.00
- dia. 2"
1.00
bh
Rp
650,000.00
Rp
650,000.00
g - Pressure gauge
4.00
bh
Rp
168,000.00
Rp
672,000.00
h - Pressure Switch
3.00
bh
Rp
425,000.00
Rp
1,275,000.00
b. Valves Gate Valve
c
Check Valve
d Strainer
e Fleksible Connection
f
3
Foot Valve
i
- Safety Relieve valve
1.00
bh
Rp
7,540,000.00
Rp
7,540,000.00
j
- Fitting, Accessories+ Support gantungan pipa
1.00
lot
Rp
4,500,000.00
Rp
4,500,000.00
PEMIPAAN LUAR BANGUNAN -
Pipa BSP SCH-40 dia 6"
720.00
m
Rp
462,500.00
Rp
333,000,000.00
-
Pipa BSP SCH-40 dia 4"
785.00
m
Rp
265,000.00
Rp
208,025,000.00
-
Pipa BSP SCH-40 dia 21/2"
112.00
m
Rp
148,750.00
Rp
16,660,000.00
-
Fitting & Accessories
1.00
lot
Rp
12,500,000.00
Rp
12,500,000.00
-
Siamese Connection (Size 4"x2,5"x2,5")
1.00
bh
Rp
2,150,000.00
Rp
2,150,000.00
-
Pillar Hydrant (Size 4"x2,5"x2,5")
14.00
bh
Rp
4,150,000.00
Rp
58,100,000.00
-
Hydrant Box Type Outdoor (Size 125x75x18) complit set
14.00
bh
Rp
4,750,000.00
Rp
66,500,000.00
-
Gate Valve dia 4"
14.00
bh
Rp
4,750,000.00
Rp
66,500,000.00
-
Check Valve dia 4"
1.00
bh
Rp
4,750,000.00
Rp
4,750,000.00
-
Accessories
1.00
lot
Rp
7,500,000.00
Rp
7,500,000.00
-
Bak Kontrol 80x80x80 cm
15.00
bh
Rp
1,235,000.00
Rp
18,525,000.00
Rp
1,568,998,500
Rp
1,568,998,500
Pekerjaan Mekanikal dan Elektrikal
TOTAL ME
SUMMARY PROJECK : ( DED ) ISLAMIC CENTER DAN SMA UNGGUL TEMBILAHAN
NO
DESCRIPTION
AMOUNT
KETERANGAN
I
II
1 PEKERJAAN HIDRANT
Rp
1,568,998,500.00
2 PEKERJAAN SITE PLANT
Rp
464,528,000.00
3 PEKERJAAN GROUNTANK
Rp
642,032,800.00
4 PEKERJAAN ASRAMA PUTRA
Rp
731,399,600.00
5 PEKERJAAN RUANG GENSET
Rp
5,276,592,500.00
6 PEKERJAAN ASRAMA PUTRI
Rp
727,294,600.00
7 PEKERJAAN M.A.
Rp
1,028,565,200.00
8 PEKERJAAN M.T.S.
Rp
1,027,595,200.00
9 PEKERJAAN M.I.
Rp
844,847,800.00
10 PEKERJAAN T.K.
Rp
256,542,900.00
11 PEKERJAAN S.M.U.
Rp
1,237,769,200.00
12 PEKERJAAN MESJID
Rp
2,599,356,000.00
TOTAL MECHANIKAL DAN ELECTRIKAL
Rp
16,405,522,300.00
spesifikasi material A
lamic Center Dan SMA Unggul Tembilaha MERK
1
DESCRIPTION PEKERJAAN GENSET
2
PEKERJAAN TRAFO
Traffindo,Unindo
3
PEKERJAAN TANKI SOLAR
Lokal -Pabrik
4
PEKERJAAN PANEL
Oni Panel - Setara
5
PEKERJAAN ARMATURE LAMPU
Artolite,Oni
6
PEKERJAAN INSTALASI PENERANGAN
Suppreme,Kabelmetal
7
PEKERJAAN SAKLAR & STOP KONTAK
Clippsal
8
PEKERJAAN AIR CONDITIONER
AICOOL,DAIKIN
9
PEKERJAAN EXHOUST FAN
Cke
10
PEKERJAAN KABEL TRAY
Oni Tray - Setara
11
PIPA CONDUIT
Clippsal
12
SOUND SYSTEM
Lokal -Pabrik
13
PEKERJAAN INSTALLASI & FIXTURE
Toa
14
ELECTRIC FIRE PUMP
Aurora, Patterson,Firebank
15
DIESEL FIRE PUMP
Aurora, Patterson,Firebank
16 JOCKEY PUMP
Perkins,Mitsubishi
Aurora, Patterson,Firebank
17
POMPA AIR BERSIH
Ebara,Groundfoss
18
PERSSURE TANK
Lokal -Pabrik
19
SAND FILTER TANK
Lokal -Pabrik
20
CARBON FILTER TANK
Lokal -Pabrik
21
SUMUR BOR ( ARTESSIS ) c/w
Groundfoss
22
PENGKABELAN
Kabelmetal
23
PIPA GIP
Bakrie,Spindo
24
PIPA PVC
Wavin,Vinillon
25
PIPA BSP SCH-40
Spindo,Bakrie