Home
Add Document
Sign In
Register
Pre Concreting Checklist
Home
Pre Concreting Checklist
concrete...
Author:
bill_lee_242
24 downloads
520 Views
195KB Size
Report
DOWNLOAD .PDF
Recommend Documents
Post Concreting Checklist
Inspection form for Post Concreting Works
Pre Monsoon Checklist
Full description
Concrete Pre-Pour Checklist
Concrete Pre-Pour Checklist
Pre Construction Checklist
pre
HSE Pre-Qualification Checklist
Full description
Hotel Pre Opening Checklist
Form Checklist Pre Job Activity
Form Checklist Pre Job ActivityFull description
Hotel Pre Opening Checklist[1]
Full description
Hot Weather Concreting
Full description
Form Checklist Pre Erection Girder
checklist girderFull description
Method Statement - Concreting Work
Full description
Marsellos Cold Weather Concreting
Full description
Checklist and Countdown for Pre-opening Actions
Checklist and Countdown for Pre-opening ActionsDescripción completa
Sample Pre-Startup Safety Review Checklist
New Plant Installation requirements
SPECIAL CONCRETES AND CONCRETING METHODS.pdf
Method Statement of Concreting Work
Full description
Checklist
checklistDescripción completa
Checklist
Checklist
checklist
Checklist
ChecklistDescripción completa
Checklist
Method Statement Slab & Beam Concreting
method
P07-F06 Method Statement for Concreting
Method Statement for concreting (to be edited)
Pre
preFull description
PROJECT TITLE:
PROJECT OWNER:
WORK TITLE:
PRE-CONCRETING INSPECTION CHECK LIST
CONSULTANT:
DATE LOCATION BUILDING ELEMENT OF STR GRADE OF CONCRETE CONCRETE SUPPLIER START OF INSPECTION FINISH OF INSPECTION
CONTRACTOR:
SUBMITTAL DESCRIPTION No. 1 RFI 2 Shop Drawing 3 Method of Statement 4 Mix Design SETTING OUT DESCRIPTION No. 1 Gridline Position (tolerance ±6mm if ≥ 3m; tolerance ±3mm if < 3m) 2 Structural Finish Level (SFL) 3 Verticality WORKS BELOW LOWEST FLOOR LEVEL DESCRIPTION No. 1 Remove Stagnant Water and Soft Soil 2 Sand or Hardcore 3 Anti Termite Treatment (if needed) 4 Lean Concrete FORM WORK DESCRIPTION No. 1 Free from Cracks, Defects and Rubbish 2 Tight Joint and Gaps (seal if must) 3 Adequate Supported and Propped (rib max 300mm) 5 Dimension (Length, Width & Height) 6 Concrete Level Marked REINFORCEMENT DESCRIPTION No. 1 Correct Grade, Size, Number and Spacing 2 Adequate Lapping, Chairs and Spacer 3 Rebar Securely and Properly Tied in Place 4 Covers as Required 5 Free from Oil, Dust, Soil, and Loose Rust 6 Adequate Starter Bar (if needed) CONCRETING DESCRIPTION No. 1 Correct Grade and from Approved Supplier 2 Placing within 2 Hours from Dispatching (check DO) 3 Sufficient Slump (as per approved mix design) 4 Sufficient Sample 5 MEP Opening/ Embedded (if any) EQUIPMENT & TOOLS DESCRIPTION No. 1 Slump Test Tools (cone, bar, platform & tape meter) 2 Sample Cube Tools (cube, bar, cart, shove, trowel) 3 Crane with Concrete Container or Concrete Pump 4 Concrete Vibrator (with min. 1 stand by) 5 Concreting Recorder (forms & tools) 6 Curing Material (compund/ goni/ carpet) 7 Lighting (for night concreting). INSPECTED BY: VERIFIED BY:
DATE:
DATE:
: : : : : : : :
OK
NO
REMARKS
OK
NO
REMARKS
OK
NO
REMARKS
OK
NO
REMARKS
OK
NO
REMARKS
OK
NO
REMARKS
OK
NO
REMARKS
×
Report "Pre Concreting Checklist"
Your name
Email
Reason
-Select Reason-
Pornographic
Defamatory
Illegal/Unlawful
Spam
Other Terms Of Service Violation
File a copyright complaint
Description
×
Sign In
Email
Password
Remember me
Forgot password?
Sign In
Our partners will collect data and use cookies for ad personalization and measurement.
Learn how we and our ad partner Google, collect and use data
.
Agree & close