Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected] PDS / PDMS PIPING
PT. TRIPATRA ENGINERS AND CONTRACTORS
PIPE STRESS ANALYSIS MANUAL
CAESAR II
MANSYUR USMAN MANSYUR USMAN
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
PIPE STRESS ANALYSIS MANUAL
CAESAR II
MANSYUR
[email protected]
PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
CARA BUAT FILE BARU FILE>NEW
KASIH NAMA> BROWSE>MAKE NEW FOLDE>OK
CANCEL
PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
TOOLS>MAKE UNITS FILES
CREATE A NEW UNITS FILE>NEW UNITS FILE NAME (KASIH NAMA UNITNYA)
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
UBAH SATUAN YANG MAU DIGUNAKAN> KASIH NAMA UNITS FILE LABEL OK/SAVE
CANCEL
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
TOOLS>CONFIGURE/SETUP
PILIH DATABASE DEFINITION>GANTI UNIT FILE NAME YANG MAU DIPAKAI.
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
PILIH COMPUTATIONAL CONTROL.
GANTI (NEW JOB) AMBIENT TEMPERATURE SESUAI DATA T AMBIENT DARI CLIENT PADA DESIGN BASIS.
PILIH SIF’S AND STRESSES.
CENTANG PADA (NEW JOB) LIBERAL EXPANSION STRESS ALLOWABLE.
PILIH GEOMETRY DIRECTIVES.
CENTANG Z-AXIS VERTIKAL JIKA ARAH AXIS Z DARI CLIENT ARAHNYA VERTIKAL LALU KLIK EXIT W/SAVE.
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
JIKA INGIN MENGUBAH SATUAN YANG LAIN PILIH TOOLS>CONVERT INPUT TO NEW UNITS
ENTER THE NAME OF THE UNITS FILE TO USE
OK>CANCEL
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
PDS / PDMS PIPING
INPUT DATA DAN MODELING 1. MASUKKAN T1 (T DESIGN) T2 (T OPERATING/SERVICE) T3 (T AMBIENT) ATAU T4, T5 … JIKA ADA DIMANA T2 < T1 2. MASUKKAN PRESSURE P1 (P1 = DESIGN, P2 = OPERATING/SERVICE) 3. MASUKKAN HYDRO PRESSURE = 1,5 x P1 4. MASUKKAN FLUID DENSITY (JENIS FLUIDA YANG DI HANDLE) 5. TENTUKAN JENIS MATERIAL, CARANYA DARI LINE NUMBER DI DRAWING ISOMETRIC KITA DAPAT JENIS MATERIAL KEMUDIAN KITA CARI DATA MATERIAL DI PMC(PIPING MATERIAL CLASS) PADA CONTOH INI KITA PAKAI G 48 DATA PMC
KEMUDIAN KITA LIHAT CODE MATERIAL G 48 UNTUK INPUT KE CAESAR YAITU : TP 321(1) 5. MASUKKAN DIAMETER PIPA DAN LIHAT WT/SCH PIPA PADA PMC DI ATAS MISAL PIPA 8” MATERIAL G 48 RATING 900 SCH :14, 27 MM 6. CENTANG ALLOWABLE STRESS 7. MASUKKAN NILAI INSULATION THICKNESS & INSULATION DENSITY (JIKA ADA DATANYA)
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
INPUT DATA RIGID (UNTUK FLANGE DARI NOZZLE EQUIPMENT)
KLIK RIGID (RIGID ADALAH BERAT UNTUK DATA VALVE, FLANGE, STRAINER, CONTROL VALVE, FLOW ELEMENT (FE) )
MASUKKAN NILAI RIGID/BERAT DARI FLANGE PADA CASE INI KITA PAKAI FLANGE RATING 900 DAN SATUAN BERAT NEWTON, LALU LIHAT DI PIPE DATA UNTUK BERAT DAN PANJANG FLANGE TERSEBUT
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
DARI PIPE DATA PRO KITA CARI FLANGE JENIS WELDNECK FLANGE JENIS RTJ (KARENA RATINGNYA >=900 MAKA JENISNYA RTJ JIKA RATING <900 PILIH JENIS RF). BERAT (RIGIDNYA) = FLANGE WT + S/BOLTS&NITS WT = 80 + 23.73 LALU HASILNYA KITA CONVERT KE NEWTON KARENA DISATUAN CAESAR. KITA PAKAI SATUAN NEWTON, JIKA WAKTU KITA BIKIN SATUAN DI CAESAR PAKAI KG MAKA TIDAK PERLU DI CONVERT KE NEWTON. UNTUK PANJANG FLANGE KITA PEROLEH = 169, 86 = 170 MM
LALU KLIK RESTRAIN. PADA NODE 20 PILIH TYPE ANC (ANCHOR) DAN KASIH CNODE = 21 KARENA, FLANGE (SYSTEM) TERIKAT PADA EQUIPMENT PADA CNODE TERSEBUT
INPUT DATA RIGID ( FLANGE YANG CONNECTION KE VALVE/KOMPONEN LAIN)
PADA NODE 60-70 ADALAH FLANGE YANG KE VALVE. KLIK RIGID ( CARI DARI PIPE DATA PRO FLANGE 6” RTJ 900)DAN JUGA PANJANGNYA (TIDAK ADA RESTRAIN KARENA TIDAK TERIKAT TERSAMBUNG DGN EQUIPMENT)
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
INPUT DATA RIGID (VALVE)
DARI NODE 70 - 80
LIHAT DARI PIPE DATA PRO VALVE 6” RTJ 900 PILIH FLANGE GLOBE VALVE JENIS RTJ 9 00# 6” DIPEROLEH RIGID 332 KG = 3320 N PANJANG = 612.78 = 613 MM KLIK RIGID DAN ISI BERAT YANG DIPEROLEH DARI PIPE DATA DAN ISI PANJANGNYA SESUAI ARAHNYA DI GAMBAR ISOMETRIC KALAU PADA CASE INI ARAHNYA KE Y (NORTH) JIKA ARAHNYA KE SOUTH MAKA NILAI Y PADA CAESAR ADALAH NEGATIF = -Y KALAU VALVE INI NILAINYA = +Y. BEGITU JUGA UNTUK NILAI SUMBU X DAN Z.
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
INPUT DATA ELBOW
ELBOW 90 NODE 90 – 100
ISI PANJANG DAN ARAHNYA LALU CENTANG BEND (DATA LAINNYA AKAN TERISI AUTOMATIS) ELBOW 45 DARI NODE 670-680
KLIK EDIT DELTAS DISAMPING DY
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
LALU ISI LENGTH (DARI GAMBAR ISOMETRIC) LALU ISI NILAI COS 45 (PADA CASE INI ARAHNYA DARI NODE 670 – 680 ARAHNYA KE –X DAN –Y , MAKA NILAINYA COS X DAN Y = INPUT DATA REDUCER
NODE 320 – 330
CENTANG REDUCER LALU MASUKKAN NILAINYA PADA DIAMETER 2 & THICKNESS 2 (SCH DIDAPAT DARI DATA PMC).
INPUT DATA DISPLACEMENT
NODE 10 – 20 DIMANA PADA EQUIPMENT TERJADI PERGERAKAN APAKAH ITU KE ARAH X, Y, Z DIMANA NODE YANG DI INPUT ADALAH CNODE YANG MENGHUBUNGKAN EQUIPMENT DENGAN PIPA DISINI CNODE = 11
CENTANG DISPLACEMENT LALU ISI NODE YANG MENGALAMI PERGERAKAN DAN ISI BESARAN PERGERAKANNYA (DATA DI DAPAT DARI DESIGN BASIS)
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
INPUT DATA UNIFORM LOAD
UNIFORM LOAD ADALAH PERGERAKAN YANG DIAKIBATKAN OLEH GEMPA ATAU BENCANA ALAM (DATANYA DI DAPAT DARI CIVIL)
CENTANG UNIFORM LOAD LALU ISI BESAR VEKTOR1, VEKTOR2, VEKTOR3
INPUT DATA SIFS &TEES NODE 520 - 530
CENTANG SIFS & TEES LALU ISI NODE, LALU PILIH TYPE SAMBUNGAN TEE
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
INPUT DATA PSV (RELIEF VALVE) NODE 3650 - 3655
NODE 870 - 875
DATA PSV VENDOR
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
UNTIK PSV 1 KLIK FORCES/MOMENTS MASUKKAN NILAINYA YANG DIPEROLEH DARI VENDOR DISINI MISALNYA = 2574 N (CONVERT KE SATUAN YANG ANDA GUNAKAN JIKA ANDA TIDAK MENGGUNAKAN N MISAL KG) UNTUK NILAI FX (HORIZONTAL) = 2 x FY (VERTIKAL) FX = 2574 FY = 2 x 2574 TENTUKAN ARAHNYA JIKA ARAH TAKANAN BALIK PSV ( HORIZONTAL) SEARAH DENGAN SUMBU KOORDINAT HORIZANTAL MAKA NILAINYA POSITIP TETAPI JIKA BERLAWANAN MAKA NILAINYA NEGATIF DISINI NILAI PSV HIRIZONTAL KE ARAH –X DAN TEKANAN BA LIKNYA KE ARAH +X JADI NILAI FX = + KEMUDIAN KLIK RIGID UNTUK MEMASUKKAN BERATNYA (KARENA ARAH PSV ADA 2 YAITU VERTIKAL (NODE 3650-3665) DAN HORIZANTAL (NODE 3653660) DARI DATA VENDOR DIPEROLEH WT-LBS = 50 (CONVERT KE SATUAN YANG DIGUNAKAN) MAKA NILAI RIGIDNYA = 50 /2 = 25, JADI 25 UNTUK RIGID HORIZONTAL ,DAN 25 UNTUK RIGID VERTIKAL.
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
PSV 2 CARANYA SAMA SEPERTI PSV 1 DAN DATA VENDORNYA SAMA SEPERTI PSV I JUGA, HANYA ARAH PERGERAKAN TEKANAN BALIK PSV HORIZONTAL BERLAWANAN ARAH DENGAN ARAH SUMBU HORIZANTAL , DIMANA ARAH HORIZONTAL PSV SEARAH SUMBU X JADI TEKANAN BALIKNYA BERLAWANAN DENGAN ARAHNYA YAITU = - X
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
INPUT DATA RESTRAIN
RESTRAIN DIGUNAKAN UNTUK DATA SUPPORT, CONTOH DI BAWAH INI NODE 3270 – 3280. MASUKKAN NILAI PANJANGNYA DAN ARAHNYA, LALU KLIK RESTRAIN, KEMUDIAN ISI NODE TEMPAT SUPPORT DAN ISI JENIS SUPPORTNYA DAN APABILA SUPPORT TERSEBUT BERHUBUNGAN DENGAN EQUIPMENT ATAU STRUCTURE ISI CNODENYA : - GAP ADALAH CELAH UNTUK JENIS SUPPORT GUIDE. - MUD ADALAH KOEFISIEN GESEKAN ANTARA PIPA DENGAN SUPPORT. - STIFFINER ADALAH PENGUAT ATAU PEMBUAT KAKU PADA SUPPORT STRUCTURE SEHINGGA MEMBUAT STRUCTURE KAKU ATAU KUAT TERHADAP GERAKAN ATAU BEBAN PIPA. - SUPPORT RX, RY, RZ UNTUK MENGURANGI MOMENT PUTAR PIPA CONTOH-CONTOH SUPPORT
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
INPUT DATA HANGERS
NODE 700 – 720 (PADA NODE 720 ADALAH NODE HANGERS DAN BEND). CENTANG HANGERS, LALU ISI DATA (JIKA ADA DATA DARI VE NDOR KALAU TIDAK ADA ISI SAJA HANGER TABLE ATAU ISI SEPERTI DI BAWAH INI).
INPUT DATA EXPANSION JOINT
NODE 672-673 CENTANG EXPANSION JOINT LALU ISI DATA SEPERTI GAMBAR DI BAWAH INI (DATA DARI VENDOR).
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
INPUT DATA WIND CARA PERTAMA INPUT WIND CENTANG WIND / WAVE. PILIH WIND LALU ISI WIND SHAPE FACTOR.
LALU KLIK ANALYSIS > STATICS
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
PDS / PDMS PIPING
KLIK WIND LOADS. PADA CASE INI KITA MEMASUKKAN 4 FACTOR ANGIN (ARAH ANGIN HANYA PADA ARAH SUMBU HORIZONTAL). PILIH 1 PADA EDITING WIND CASE. PILIH ASCE#7 WIND LOAD PARAMETER. LALU PILIH ARAH ANGIN. X WIND DIRECTION COSINE (OR VECTOR) ISI = 1. LALU ISI BASIC WIND SPEED (M./SEC) DARI DATA STRUCTURE.
PILIH 2 PADA EDITING WIND CASE. PILIH ASCE#7 WIND LOAD PARAMETER. LALU PILIH ARAH ANGIN. X WIND DIRECTION COSINE (OR VECTOR) ISI = -1. LALU ISI BASIC WIND SPEED (M./SEC) DARI DATA STRUCTURE.
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
PILIH 3 PADA EDITING WIND CASE. PILIH ASCE#7 WIND LOAD PARAMETER. LALU PILIH ARAH ANGIN. Z WIND DIRECTION COSINE (OR VECTOR) ISI = 1. LALU ISI BASIC WIND SPEED (M./SEC) DARI DATA STRUCTURE.
PILIH 4 PADA EDITING WIND CASE. PILIH ASCE#7 WIND LOAD PARAMETER. LALU PILIH ARAH ANGIN. Z WIND DIRECTION COSINE (OR VECTOR) ISI = -1. LALU ISI BASIC WIND SPEED (M./SEC) DARI DATA STRUCTURE.
PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
PDS / PDMS PIPING
CARA KEDUA UNTUK INPUT WIND CENTANG USER DEFINED WIND PRESSURE VS ELEVATION
LALU KLIK USER WIND WIND PROFILE. PROFILE.
LALU ISI NILAI PRESSURE VS ELEVATION (DATA DARI STRUCTURE). LALU SAVE/CONTINUE.
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected] PDS / PDMS PIPING
PT. TRIPATRA ENGINERS AND CONTRACTORS
CARA KETIGA UNTUK INPUT WIND CENTANG USER DEFINED WIND VELOCITY VS
ELEVATION.
LALU KLIK USER WIND WIND PROFILE. PROFILE.
LALU ISI NILAI VELOCITY VS ELEVATION (DATA DARI STRUCTURE). LALU SAVE/CONTINUE.
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
INPUT DATA WAVE
KLIK WIND/WAVE. CENTANG WAVE. LALU ISI DATA WAVE (DATA DARI STRUCTURE).
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
KOMBINASI CASE – CASE
KLIK ANALYSIS>STATICS MUNCUL CASE DARI CAESAR.
LALU UBAH CASE DI ATAS MENJADI SEPERTI DI BAWAH INI : BUAT LOAD CASE DAN STRESS TYPE : HYD : HYDORSTATICS OPE : OPERARTING SUS : SUSTAIN OCC : OCCASIONAL EXP : EXPANSION
PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
UBAH SATUAN YANG DIGUNAKAN PADA COMB METHOD -ALGEBRAIC -SCALAR -ABSOLUT -SRSS
PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
DISINI TIDAK MUNCUL NILAI DISPLACEMENT (D1, D2, D3) KARENA PADA CASE INI TIDAK ADA INPUT DISPLACEMENT. SATUAN YANG DIGUNAKAN JIKA CASE DITAMBAH DENGAN SATU CASE WIND, MAKA SATUANNYA ADALAH SCALAR (SCR) , SEPERIT : L6 (SUS) + L11(WIND1) = SCR L6 (SUS) + L11(WIND1) + L12(WIND2) = ABS L6 (SUS) + L11(WIN1) + L12(WIND2) + L13 (WIND3) = ABS UNTUK LOAD CYCLES DAPAT DILIHAT PADA TABEL (APABILA MAU DIISI) NATURAL CASE DITEMPATKAN DIATAS DAN KOMBINASI HARUS DIBUAT DIBAWAH SUSTAIN (W+P1)
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
LAIN – LAIN CARA MENGUBAH MODEL MENJADI DRAWING ISOMETRIC DI AUTOCAD
KLIK ICON GENERATE STRESS ISOMETRIC
OK
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
KLIK CREATE ISOMETRIC DRAWING
PILIH USE DEFAULT STYLE OK
PILIH VIEW SALAH SATU GAMBAR BILA INGIN MELIHAT HASILNYA
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
MENAMPILKAN ANIMASI CASE
KLIK OUTPUT>ANIMATION>STATIC
PILIH CASE YANG MAU DILIHAT. KLIK ICON MOTION UNTUK MENJALANKAN. KLIK ICON STOP MENGHENTIKAN.
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
KLIK ICON BATCH RUN
LALU PILIH OPTION>GRAPHICAL
OUTPUT
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
PILIH LOAD CASE YANG MAU DITAMPILKAN. LALU KLIK SHOW UNTUK MELIHAT JENIS ANALISA YANG MAU DITAMPILKAN GRAPHICALNYA (UBAH UKURAN SCALE YANG DIINGINKAN JIKA INGIN MELIHAT PERGERAKAN PIPA YANG LEBIH BEASR).
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
-ANALISA COMPLICAN
1. SUSTAIN (BERAT (w) DAN PRESURE (P) (W+P) 2. SUSTAIN KOMBINASI DGN OPERATING 3. SUSTAIN KOMBINASI DGN OCCASIONAL
-UNTUK DISPLACEMENT :
1. SUSTAIN (W+P) 2. SUSTAIN + OCCASIONAL
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
-UNTUK RESTRAIN SUMMARY :
1. OPERATING 2. OPERATING + OCCASIONAL
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected] PDS / PDMS PIPING
PT. TRIPATRA ENGINERS AND CONTRACTORS
CARA ANALISA LINEAR DARI NON LINEAR 1. MENGGANTI RESTRAIN (MENGGANTI SUPPORT) -UNTUK MENJADIKAN LINEAR, MAKA PADA SUPPORT YANG DIPASANG VERTIKAL DAN HORIZONTAL DIJADIKAN JENIS SUPPORT DOUBLE ACTING SEMUA PADA SUPPORT YANG ADA PADA CASE INI, SEPERTI DIBAWAH INI :
KEMUDIAN KITA ANALISA MELIHAT HASILNYA
RESTRAIN
SUMMARY
EXTENDED
UNTUK
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
KITA LIHAT PADA RIGID +Z (SUMBU VERTIKAL) JANGAN RIGID ANCHOR, KEMUDIAN KITA BANDINGKAN FZ DAN MZ, JIKA FZ = + DAN DZ = - (JIKA FZ TIDAK SAMA DENGAN Z) MAKA TERMASUK NON LINEAR SEPERTI DIBAWAH INI JIKA FZ = + DAN DZ = + ATAU FZ = - DAN DZ = - MAKA ITU TERMASUK LINEAR
CONTOH LINEAR NILAI FZ = DZ = -
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
CARA MEMBUAT LINEAR MAKA SUPPORT PADA NODE 5040 DIUBAH MENJADI SUPPORT Z (SELURUH SUPPORT Y+ DIUBAH MENJADI SUPPORT Y DAN X (GUIDE)
KITA ANALISA DULU STRESSNYA, APABILA STRESSNYA MASUK MAKA CARA INI DAPAT DIPAKAI TETAPI JIKA NILAI STRESSNYA TIDAK MASUK MAKA KITA PAKAI CARA KEDUA YAITU YAITU MENGUBAH LOAD CASE
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
SETELAH DIANALISA TERNYATA STRESSNYA MASUK, MAKA SELANJUTNYA ANALISA RESTRAIN SUMMARY LEBIH LENGKAPNYA DENGAN ANALISA RESTRAIN SUMMARY EXTENDED UNTUK MELIHAT HASILNYA
PADA NODE
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
PDS / PDMS PIPING
-KITA LIHAT PADA NODE 5040 YANG SUDAH DIUBAH JENIS SUPPORTNYA BANDINGKAN NILAI FZ DENGAN DZ, JIKA SUDAH SAMA MAKA SUDAH SUDAH LINEAR SEPERTI GAMBAR DI ATAS 2.DENGAN MENGUBAH LOAD CASE
-MASUK KE ANALYSIS>STATICS TAMPILKAN CASE ASLI DARI CAESAR DENGAN CARA KLIK RECOMMEND
-KITA UBAH CASE DI ATAS MENJADI SEPERTI DI BAWAH INI
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
DARI CASE 15 KITA AKAN MUNCULKAN NATURAL CASE KOMBINASI CASE DIBUAT DIBAWAH CASE : W+P1 (SUSTAIN) - L5-L2 = D1 - L6-L2 = D2 - L7-L2 = D3 - L8-L2 = U1 - L9-L2 = U2 - L10-L2 = U3 - L11-L2 = F1 - L12-L2 = WIN1 - L13-L2 = WIN2 - L2-L14 = T1 - L3-L14 = T2 - L4-L14 = T3
DENGN
SELANJUTNYA KITA BUAT CASE YANG MAU DIANALISA DI BAWAH CASE GABUNGAN GEMPA (UNIFORM LOAD) SEPERTI DIBAWAH INI YANG HITAM.
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
KOMBINASI CASE UNTUK MEMUNCULKAN STRESS -SUSTAIN + OCCASIONAL
- EXPANSION + OCCASIONAL
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
KOMBINASI UNTUK MEMUNCULKAN RESRTAIN SUMMARY - OPERATING + OCCASIONAL
PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
PDS / PDMS PIPING
CARA ANALISA POMPA PADA CASE INI ADA 2 POMPA (INPUT TEMPERATURE = T1 – T4) PADA CAESARNYA MAKA STEP SKENARIO POMPA A POMPA B ON ON ON OFF OFF ON KET T1 = TEMPERATURE DESIGN T2 = TEMPERATURE OPERATING/SERVICE T3 = TEMPERATU AMBIENT (LINGKUNGAN JIKA POMPA MATI) + 0,1 T4 = TEMPERATU AMBIENT (LINGKUNGAN JIKA POMPA MATI) + 0,1 (ATAU + 0,2) UNTUK STEP SKENARIO 3 POMPA (INPUT TEMPERATURE = T1 – T5) POMPA A POMPA B POMPA C ON ON ON ON ON OFF ON OFF ON OFF ON ON KET T1 = TEMPERATURE DESIGN T2 = TEMPERATURE OPERATING/SERVICE T3 = TEMPERATU AMBIENT (LINGKUNGAN JIKA POMPA MATI)+ 0,1 T4 = TEMPERATU AMBIENT (LINGKUNGAN JIKA POMPA MATI) + 0,1 T5 = TEMPERATU AMBIENT (LINGKUNGAN JIKA POMPA MATI) + 0,1 TEMPERATURE OFF = TEMPERATURE AMBIENT + 0,1(ATAU + 0,2) 1. DARI NODE 100 – 180 (DARI FLANGE SAMPAI GATE VAVE) PADA SUCTION DAN NODE 7000 – 380 (DARI FLANGE SAMPAI GATE VAVE) PADA DISCHARGE POMPA B YANG OFF DITUTUP PADA VALVE UNTUK YANG WARNA MERAH ADALAH T4
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
MAKA BUKAPADA ELEMENT DARI LIST INPUT T4 DARI NODE 100 – 180 DAN NODE 7000 – 380 HARUS DIUBAH MANJADI TEMPERTUR OFF (AMBIENT + 0,1) YAITU MISAL 30,1 DARI NODE 100 – 180 DAN NODE 7000 – 380 PADA POMPA B YANG OFF DITUTUP PADA VALVE
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
2. DARI NODE 200 - 520 (DARI FLANGE SAMPAI GATE VAVE) PADA SUCTION DAN DISCHARGE POMPA A YANG OFF DITUTUP PADA VALVE UNTUK YANG WARNA MERAH ADALAH T3
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
MAKA BUKAPADA ELEMENT DARI LIST INPUT T3 DARI NODE 200 – 520 DAN HARUS DIUBAH MANJADI TEMPERTUR OFF (AMBIENT + 0,1) YAITU MISAL 30,1 DARI NODE 200 - 520 PADA POMPA A YANG OFF DITUTUP PADA VALVE PADA SUCTION DAN DISCHARGE
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
KEMUDIAN DIJALANKAN ANALISA - PERTAMA LIHAT CODE COMPLICANCE (UNTUK STRESS) APABILA OK LANJUTKAN ANALISA - DISPLACEMENT DAN APABILA OK BARU LANJUTKAN ANALISA - RESTRAIN SUMMARY UNTUK ANALISA POMPA
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
KITA CARI DULU NODE SUCTION POMPA B SEPERTI DI BAWAH INI YAITU PADA NODE 280 KARENA 280 ADA RESTRAIN YANG DI ANC
KEMUDIAN KITA LIHAT NODE DISCHARGE POMPA B YAITU PADA NODE 450 KARENA RETRAIN ANC
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
KITA LANJUTKA KE ANALISA HASIL ANALISA RESTRAIN SUMMARY
SELANJUTNYA HASILNYA PADA NODE SUCTION POMPA B PADA NODE 280 KITA COPY DARI FX SAMPAI MZ
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
KITA COPY KE PROGRAM YANG DIBUAT DI EXCEL TETAPI SEBELUMNYA KITA MASUKKAN NILAI ALLOWABLE ACCORDING TO VENDOR DATA PADA PROGRAM EXCEL TERSEBUT
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
DARI VENDOR DATA DIDAPAT N1 = SUCTION DAN 2 = DISCHARGE KEMUDIAN BANDINGKAN SUMBU KOORDINAT DARI CAESAR
MAKA NILAI FY, MY DARI VENDOR DISESUAIKAN DENGAN CAESAR YAITU FY , MY VENDOR = FZ, MZ CAESAR FZ, MZ VENDOR = FY, MY CAESAR FX, MX VENDOR = FX, MX CAESAR MAKA PADA EXCEL DI INPUT SEPERTI INI
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
KEMUDIAN KITA COPY DARI ANALISA RESTRAIN SUMMARY DARI LOAD CASE SAMPAI MZ DISOROT SEMUA PADA NODE 280 LALU CTR+C
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
LALU KITA COPY KE EXCEL DENGAN CTR+V
TAPI KITA JADIKAN DULU TOTAL MAXIMUM KARENA DI CASE INI PADA CAESAR KITA PAKAI SATUAN KG SEDANGKAN DARI VENDOR MEMAKAI SATUAN NEWTON DENGAN MENGALIKAN 10
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected] PDS / PDMS PIPING
PT. TRIPATRA ENGINERS AND CONTRACTORS
ATAU CARA KE DUA KITA LANGSUNG SAJA BANDINGKAN NILAI DARI VENDOR DENGAN NILAI MAX DARI RESTRAIN SUMMARYNYA SEPERTI DIBAWAH INI
TERNYATA HASILNYA BELUM TERPENUHI KARENA NILAI MOMENT (M) DARI CAESAR MASIH LEBIH BESAR DARIPADA NILAI MOMENT (M) VENDOR DATA, SEDANGKAN NILAI GAYA (F) SUDAH TERPENUHI KARENA NILAI F CAESAR < NILAI F VENDOR DATA UNTUK MENGATASI MAKA DISEKITAR SUCION SUPPORTNYA JENIS SUPPORT RX ATAU RY ATAU RZ
KITA
PASANG
PADA
ANALISA PADA DISCHARGE POMPA (N2) (LANGKAH – LANGKAHNYA SAMA SEPERTI ANALISA SUCTION) ARAH F DAN M PADA CAESAR SAMA DENGAN ARAH F DAN M PADA CAESAR SEHINGGA FX, FY, FZ CAESAR = FX, FY, FZ VENDOR DATA DAN MX, MY, MZ CAESAR = MX, MY, MZ VENDOR DATA
DIMANA POSISI NODE DISCHAREG PADA POMPA B ADALAH PADA NODE 450 SEHINGGA HASIL ANALISA RESTRAIN SUMMARY
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected] PDS / PDMS PIPING
PT. TRIPATRA ENGINERS AND CONTRACTORS
TERNYATA HASILNYA BELUM TERPENUHI KARENA NILAI MOMENT (M) DARI CAESAR MASIH LEBIH BESAR DARIPADA NILAI MOMENT (M) VENDOR DATA, SEDANGKAN NILAI GAYA (F) SUDAH TERPENUHI KARENA NILAI F CAESAR < NILAI F VENDOR DATA UNTUK MENGATASI MAKA DISEKITAR SUCION SUPPORTNYA JENIS SUPPORT RX ATAU RY ATAU RZ
KITA
PASANG
PADA
APABILA F YANG TIDAK TERPENUHI MISAL FY TINGGI MAKA BISA DIPASANG SUPPORT JENIS Y- ATAU FY BERNILAI NEGATIF MAKA GANTI SUPPORT Y+ BEGITU JUGA YANG LAIN HARUS DIPASANG SUPPORT YANG BERLAWANAN
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
ANALISA FLANGE - UNTUK PIPA YANG BERDIAMETER >=10” - UNTUK TEKANAN P >= 40 BAR 1. CARA CAESAR II PILIH FLANGENYA
PILIH FLANGE KLIK FROM KARENA FLANGENYA MENUJU ARAH ALIRAN SEDANGKAN JIKA FLANGE DI ATAS VALVE ITU YANG DIPILIH (PADA GAMBAR) MAKA PILIH TO
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
ISI DIAMATER GASKET LALU READ FROM FILE
PILIH ASME 1996, LALU OK
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
PILIH RATING 150 LALU PILIH GRADE MISAL 1 : 1 (HARUS BERDASRKAN ASME B16.5)
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
LALU OK
BATCH RUN LALU TUTUP PILIH ANALISA>STATIC
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
PADA LOAD CASE OPTION GESER ANAK PANAH KEKANAN LALU PILIH FLANGE ANALYSIS TEMPERATURE UBAH ANALISA RESTRAIN SUMMARY PADA L2 DARI FLANGE ANALYSIS TEMPERATURE MENJADI T1 (T YANG PALING TINGGI)
LALU RUN ANALYSIS
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
OK>OK>OK LALU PILIH CASE YANG PILIH TADI YAITU CASE NO 2 SEPERTI GAMBAR DI BAWAH INI PILIH FLANGE P EQ UNTUK STANDARD REPORT LALU VIEW REPORT
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
SEPERTI INI HASILNYA
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
PDS / PDMS PIPING
2. CARA ANALISA ENGINEER SELURUH FLANGENYA HARUS DI ANCHOR (ANC) PILIH FLANGE SEPERTI INI, DIMANA NODE 620 DIKASIH ANC LALU BUAT CNODE MISAL CNODE 621
LALU PADA INPUT FROM 620 DIGANTI DENGAN CNODE 621
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
LALU PADA NODE 630 DI ANC DAN DIKASIH CNODE 631
PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
LALU PADA FROM NODE 630 DIGANTI DENGAN NILAI CNODE 631
Manual Manual Pipe Stress Analysis with Caesar II PT. TRIPATRA ENGINERS AND CONTRACTORS
By :
[email protected] PDS / PDMS PIPING
Manual Manual Pipe Stress Analysis with Caesar II
By :
[email protected]
PT. TRIPATRA ENGINERS AND CONTRACTORS
PDS / PDMS PIPING
Cara Membuat Report
- Lihat case yang mau diambil reportnya (tabel 1 Max Piping Stress) - Jalankan Batch run - Pilih Load Case Analyzed, pada standard report pilih Stress Summary >View Report, lihat hasilnya dibawah lalu copy ke report di Ms-Word - Untuk case selanjutnya caranya sama
- Untuk tabel 2 (Max Piping Displacement) - Pilih Load Case Analyzed, pada standard report pilih Displacement >View Report, lihat hasilnya dibawah lalu copy ke report di Ms-Word - Untuk case selanjutnya caranya sama