Formats of Assessment - AFF Fall 2018 TAMUDescripción completa
civil
Full description
Full description
Full description
Full description
ITP for pilingFull description
Piling Specification
PT3 English New FormatFull description
MARUTI VENDOR AUDIT
Leading ISO Consultant offers document kit for ISO 14001 certification. Now introduces partial document kit like ISO 14001 manual, procedure, audit checklist, SOPs, templates. formats etc,.
method statementFull description
r.c. pile
Example of safe work method statement for piling worksFull description
asas
DLL sa Filipino sa Piling LarangFull description
hirarc pilingFull description
Method statement piling works
LARSEN & TOUBRO LIMITED FORMAT NO: CON-01/BMR/R0
ECC DIVISION B&F(OC)
SITE LOCATION :
STRUCTURE :
DATE :
REF.DRAWING & REV No. :
CHECK LIST FOR CONCRETE INSPECTION
SLNO
DESCRIPTION
1
Check for required grade of concrete __________ As per Drawing
2
Check for Slumpcone / Cube moulds available at site
3
Check for sufficient no of vibrators,needles available
4
Check for sufficient No. of transit mixers available
5
Check for Crane & bucket /concrete pump are available
6
Check for Sufficient no of skilled / Unskilled persons available
7
Check for safety protection like barricades / platform arrangement
8
Chec Check k for for avai availa labl blit ity y of ligh lighti ting ng arra arrang ngem emen entt
9
Chec Check k for for Slum Slump p obse observ rved ed at site site sati satisf sfac acto tory ry
10
Check for Compaction of concerete is properly done
11
Check for finishing of concrete is properly done
Engineer
YES
NO
REMARKS
Client Engineer
L&T ECCD
GC
LARSEN & TOUBRO LIMITED ECC DIVISION FORMAT N CON-0
BUILDINGS & FACTORIES OC
CONCRETE POUR CARD
SITE LOCATION :
DATE
:
STRUCTURE :
GRADE OF CONCRETE :
REF.DRAWING & REV.No.
Rec.No.
Vehicle No.
Quantity in Cum.
Cumulative Qty Concrete Concrete No.of Cubes Slump in mm in Cum. Starting Time Finishing Time Taken
Founding level Casing top RL Ground RL Cut off Level Total Depth from(toc to FL)
Rebar cage fabricated as per Drg No.
YES
NO
REMARKS
Approval of bar bending schedule Bar tied as specified Lapping as per design/drawing Provision of cover blocks All arrangement for cage lowering ready sufficient number of spacers provided to prevent buckling of cage while lowering NOTE :
ENGINEER
CLIENT ENGINEER
L & T ECCD
GC
LARSEN & TOUBRO LIMITED FORMAT No.
ECC DIVISION B&F(OC)
PL-04/BMR/R0
TREMIE CHART Location / Structure : Pile No.
:
Date
:
Dia of Pile
:
Founding Level
:
Pile Depth
:
Pretube Top Level
:
Final Sounding
:
Concrete Top Level
:
Cut off Level
:
A ) FIXING rem e
pe
Sl.No.
Length
Cumulative Length
Remarks
A ) REMOVAL
Concrete Theoritical Built Up
SL.No. Per Batch
Engineer L&T ECCD
Theoritical Sounding
Actual Sounding
Tremie Length
Tremie Removed
Tremie in Concrete
Remarks
Cumulative
Client Engineer GC
LARSEN & TOUBRO LIMITED ECC DIVISION B&F(OC)
FOARMAT No.PL-05/BMR/R0
PILE POUR CARD SITE LOCATION :
DATE :
STRUCTURE :
PILE No :
DIA OF PILE : PILING DETAILS DETAILS
RL
Remarks
Detail Ground Level Liner Top Level Concrete cut off Level Pile Founding Level Grade of Concrete Detail Boring Started Boring Completed Cage Lowering Started Cage Lowering Completed Tremie Lowering Started Tremie Lowering Completed Flushing Started Flushing Completed Concrete Started Concrete Completed