PERANCANGAN STRUKTUR KUDA-KUDA KUDA BAJA TIPE GABLE
Afret Nobel, ST Akan Ahli Struktur
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
Daftar Isi 1.
2.
Pendahuluan ................................................................................................................................... 4 1.1
Peraturan umum ..................................................................................................................... 4
1.2
Ketentuan umum .................................................................................................................... 4
Perencanaan Gording ...................................................................................................................... 5 2.1
Pembebanan gording .............................................................................................................. 5
2.1.1
Beban mati ...................................................................................................................... 5
2.1.2
Beban hidup .................................................................................................................... 5
2.1.3
Beban angin ..................................................................................................................... 5
2.2
Analisis pembebanan .............................................................................................................. 5
2.2.1
Akibat beban mati ........................................................................................................... 5
2.2.2
Akibat beban hidup ......................................................................................................... 5
2.2.3
Akibat beban angin.......................................................................................................... 6
2.3
Kombinasi pembebanan.......................................................................................................... 6
2.4
Cek profil gording .................................................................................................................... 7
2.4.1
Tinjauan terhadap tekuk lokal pelat sayap ..................................................................... 7
2.4.2
Tinjauan terhadap tekuk lokal pelat badan..................................................................... 8
2.4.3
...................................................................................... 8 Tinjauan terhadap tekuk lateral
2.4.4
Kombinasi antara geser dan lentur ................................................................................. 9
Kontrol kuat geser nominal gording tanpa pengaku lateral: .......................................................... 9 Kuat geser badan tanpa adanya pengaku: ...................................................................................... 9 2.4.5
Kontrol lendutan ............................................................................................................. 9
3.
Perhitungan batang tarik (Trackstang) .......................................................................................... 11
4.
Perhitungan Ikatan Angin .............................................................................................................. 12
5.
Perhitungan Kuda-kuda (Gable) .................................................................................................... 13 5.1
Pembebanan pada balok gable ............................................................................................. 13
5.1.1
Beban gording ............................................................................................................... 14
5.1.2
Tekanan angin pada bidang atap .................................................................................. 15
5.1.3
Tekanan angin pada bidang dinding ............................................................................. 15
5.1.4
Gambar skema pembebanan ........................................................................................ 16
5.2
Kontrol profil kuda-kuda gable.............................................................................................. 17
5.2.1
Rafter ............................................................................................................................. 17
5.2.2
Kolom ............................................................................................................................ 21
5.3
Perencanaan peletakan ......................................................................................................... 26 Page 2 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com 5.3.1
Kontrol tegangan yang timbul: ...................................................................................... 26
5.3.2
............................................................................................. 26 Penentuan jumlah angkur
5.4
5.4.1
Data baut ....................................................................................................................... 27
5.4.2
Data plat ujung baut ...................................................................................................... 27
5.4.3
Beban rencana............................................................................................................... 27
5.4.4
Menentukan letak garis netral ...................................................................................... 27
5.4.5
Menentukan tegangan lentur yang terjadi ................................................................... 28
5.4.6
Menentukan gaya-gaya yang terjadi ............................................................................. 28
5.4.7
Perencanaan pengaku penumpu beban ....................................................................... 30
5.5
6.
7.
Perencanaan sambungan rafter puncak ............................................................................... 27
Perencanaan sambungan rafter dengan kolom .................................................................... 31
5.5.1
Data baut ....................................................................................................................... 32
5.5.2
Data plat ujung baut ...................................................................................................... 32
5.5.3
Beban rencana............................................................................................................... 32
5.5.4
Menentukan letak garis netral ...................................................................................... 32
5.5.5
Menentukan tegangan lentur yang terjadi ................................................................... 33
5.5.6
Menentukan gaya-gaya yang terjadi ............................................................................. 33
5.5.7
Perencanaan pengaku penumpu beban ....................................................................... 35
Perhitungan Pondasi ..................................................................................................................... 38 6.1
Data Perencanaan ................................................................................................................. 38
6.2
Rencana pondasi ................................................................................................................... 38
6.3
Dimensi pondasi .................................................................................................................... 38
6.4
Kuat lentur pondasi ............................................................................................................... 38
6.5
Kuat geser pondasi ................................................................................................................ 40
6.5.1
Geser satu arah ............................................................................................................. 40
6.5.2
Geser pons..................................................................................................................... 41
Kesimpulan .................................................................................................................................... 43
Page 3 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
1. Pendahuluan 1.1
Peraturan umum 1. Rangkuman PPIUG 1983 2. SK SNI 03-1729-2002 tentang Perencanaan Struktur Baja untuk Bangunan Gedung 3. Tabel profil PT. GUNUNG GARUDA STEEL
1.2
Ketentuan umum 1. Mutu baja yang digunakan adalah BJ 37 -
fy = 240 Mpa
-
fu = 370 Mpa
2. Alat sambung yang digunakan
: Baut HTB
3. Jenis bangunan
: bangunan industri
-
Jarak antar kuda-kuda
: 6 meter
-
Bentang kuda-kuda
: 30 meter
-
Jarak antar gording (horizontal)
: 1 meter
-
Kemiringan atap
: 10°
4. Bentuk atap
: atap pelana
5. Profil kuda-kuda
: Gable IWF
6. Profil gording
: Lipped channel
7. Berat penutup atap
: 0.20 kN/m2
8. Beban angin
: 0.30 kN/m2
9. Beban orang
: 1.00 kN/m2
Figure 1 Layout kuda-kuda gable
Page 4 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
2. Perencanaan Gording 2.1
Pembebanan gording
2.1.1 Beban mati -
Profil yang digunakan adalah Lipped Channel 125x50x20 (3.2)
-
Berat sendiri gording = 0.068 kN/m
-
Berat penutup atap = q atap x jarak miring gording = 0.2 kN/m2 x 1.015 m = 0.203 kN/m
-
Total beban mati = 0.068 + 0.203 = 0.271 kN/m
2.1.2 Beban hidup -
Beban air hujan ql = 40 – 0.8 α ≥ 0.2kN/m2 = 40 – 0.8 (10) = 0.32 kN/m2 qah = ql x jarak antar gording = 0.32 kN/m2 x 1.015 m = 0.325 kN/m
-
Beban orang + peralatan = 1.00 kN
2.1.3 Beban angin -
Beban angin, P = 0.30 kN/m2 (nilai minimum untuk bangunan yang jauh dari tepi laut)
2.2
-
Beban angin tekan, Wt = 0.1 x 0.30 kN/m2 x 1.015 m = 0.030 kN/m
-
Beban angin hisap, Wh = -0.4 x 0.30 kN/m2 x 1.015 m = -0.122 kN/m
Analisis pembebanan
2.2.1 Akibat beban mati -
M1 = 0.07 x qd x l2 = 0.07 x 0.271 kN/m x 62 m = 0.682 kNm
-
M2 = 0.125 x qd x l2 = 0.125 x 0.271 kN/m x 62 m = 1.218 kNm
-
V1 = 0.375 x qd x l = 0.375 x 0.271 kN/m x 6 m = 0.609 kN
-
V2 = 0.625 x qd x l = 0.625 x 0.271 kN/m x 6 m = 1.015 kN
2.2.2 Akibat beban hidup a. Beban air hujan -
M1 = 0.07 x qah x l2 = 0.07 x 0.325 kN/m x 62 m = 0.819 kNm
-
M2 = 0.125 x qah x l2 = 0.125 x 0.325 kN/m x 62 m = 1.462 kNm
-
V1 = 0.375 x qah x l = 0.375 x 0.325 kN/m x 6 m = 0.731 kN
-
V2 = 0.625 x qah x l = 0.625 x 0.325 kN/m x 6 m = 1.219 kN Page 5 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com b. Beban orang, P = 100 kN/m x Cos 10° = 0.985 kN -
M1 = 0.098 x P x l = 0.098 x 0.985 kN x 6 m = 0.579 kNm
-
M2 = 0.375 x P x l = 0.375 x 0.985 kN x 6 m = 2.216 kNm
-
V1 = 0.31 x P = 0.31 x 0.985 kN = 0.305 kN
-
V2 = 0.69 x P = 0.69 x 0.985 kN = 0.680 kN
2.2.3 Akibat beban angin a. Angin tekan -
M1 = 0.07 x qw x l2 = 0.07 x 0.030 kN/m x 62 m = 0.077 kNm
-
M2 = 0.125 x qw x l2 = 0.125 x 0.030 kN/m x 62 m = 0.137 kNm
-
V1 = 0.375 x qw x l = 0.375 x 0.030 kN/m x 6 m = 0.069 kN
-
V2 = 0.625 x qw x l = 0.625 x 0.030 kN/m x 6 m = 0.114 kN
b. Angin hisap
2.3
-
M1 = 0.07 x qw x l2 = 0.07 x 0.122 kN/m x 62 m = 0.307 kNm
-
M2 = 0.125 x qw x l2 = 0.125 x 0.122 kN/m x 62 m = 0.548 kNm
-
V1 = 0.375 x qw x l = 0.375 x 0.122 kN/m x 6 m = 0.274 kN
-
V2 = 0.625 x qw x l = 0.625 x 0.122 kN/m x 6 m = 0.457 kN
Kombinasi pembebanan Table 1 Momen Tabel 1. Momen Beban
M
Beban mati (DL) Beban hidup (LL) Beban hujan (qah) Beban angin (qw)
Tabel 2. Gaya Geser Beban Beban mati (DL) Beban hidup (LL) Beban hujan (qah) Beban angin (qw)
1.218 2.216 1.462 0.548
M (kNm) Mx = M.cosα My = M.sinα 1.200 0.212 2.182 0.385 1.440 0.254 0.540 0.095
Table 2 Gaya lintang V 1.015 0.680 1.219 0.457
V (kNm) Vx = V.cosα Vy = V.sinα 1.000 0.176 0.669 0.118 1.200 0.212 0.450 0.079
Page 6 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com Table 3 Kombinasi pembebanan Tabel 3. Kombinasi pembebanan Kombinasi Mx My 1,4DL 1.679 0.296 1,2Dl+1,6LL+0.5qah 5.363 0.946 1,2DL+1,6LL+0.8qw 4.049 0.714 1,2Dl+1,3qw+0.5qah 2.861 0.505 0,9DL+1,3qw 1.782 0.314 Used Load 5.363 0.946
2.4
Vx
Vy 1.400 2.630 2.455 2.385 1.485 2.630
0.247 0.464 0.433 0.420 0.262 0.464
Cek profil gording Dicoba dimensi gording C150.50.20x3.2 A w Sx Sy Ix Iy rx ry
Zx
= = = = = = = =
7.81 6.76 37.4 8.19 280 28 5.71 1.81
cm2 Kg/m cm3 cm3 cm4 cm4 cm cm
fy E G fr H B tw C tf = (b x tf) (H – tf) + tw (0.5H – tf) (0.5H – tf)
=240 =200,000 =80,000 =70 =150 =50 =3.2 =20 =3.2
Mpa Mpa Mpa Mpa mm mm mm mm mm
= (50 x 3.2) (150 – 3.2) + 3.2 (0.5x150-3.2) (0.5x150-3.2) = 39.98 cm3 2.4.1 Tinjauan terhadap tekuk lokal pelat sayap -
λ = B/t = 50/3.2 = 15.625
-
λp = 170/√fy = 170/√240 = 10.973
-
λr=370/ fy-fr =370/ 240-70 =28.378
-
Karena λp < λ < λr, maka pelat sayap tidak kompak
-
Mp = Zx . fy = (39.98 x 103) x 240 = 9.596 kNm
-
Mr = Sx (fy-fr) = (37.4 x 103) (240 -70) = 6.358 kNm
-
Mn = Mp-(Mp-Mr) λ − λ p λ r − λ p
=9.596-(9.596-6.358) 15.625-10.973 =8.731kNm 28.378-10.973 Page 7 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com 2.4.2 Tinjauan terhadap tekuk lokal pelat badan
2.4.3
-
λ = H/tw = (150-3.2x2)/3.2 = 44.88
-
λp = 1680/√fy = 1680/√240 = 108.44
-
λr = 2550/√fy = 2550/√240 = 164.60
-
Karena λ < λp , maka pelat sayap kompak
-
Mn = Mp = Zx (fy) = (39.98 x 103) x 240 = 9.56 kNm
Tinjauan terhadap tekuk lateral -
Lb (jarak antar pengaku/sokongan lateral) = 2000 mm
-
Lp = 1.76 ry √(E/fy) = 1.76 (57.1) √(200,000/240) = 919.60 mm
-
fl = fy – fr = 240 – 70 = 170 Mpa
-
3 3 3 3 J=∑bt =(50×3.2 ×3)+(3.2×150 )+(3.2(20-3.2) =3606mm4 3 3
-
X1 = (π / Sx)
-
X1 = (π / (37.4×103))
-
Iw = Iy
4
-
E.G.J .A 2
2 H t
X 2 = 4 Zx
200,000×80,000×3606,15× 781 2
= 28×104
4
(150 − 2×3.2)2 =1443467200 mm6
2
2
Gj
=12608,71 Nmm
3 Iw = 4 39.98×10 Iy 80,000×3606.15
1443467200 280,000
= 3.3 x10-4 N/mm2
-
-
Lr = ry X1
fl
1+
1+ X 2× fl 2
Lr = 5.7112608,71 1+ 1+ (3.3×10−4) ×1702 = 2768.14 mm 170
Karena Lp < L < Lr, maka penampang termasuk bentang menengah
Page 8 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
Mn = Cb(Mp − (Mp − Mr )) Lb − Lp Lr − Lp
-
=9.596-(9.596-6.358) 2000-919,6 =10,01kNm 2768,14-919,6
Kuat lentur penampang diambil yang terkecil dari 3 tinjauan di atas, Mn = 8.73 kNm 2.4.4 Kombinasi antara geser dan lentur Kontrol kuat geser nominal gording tanpa pengaku lateral: -
Kn = 5 + 5/(a/h2)2 = 5
-
h/tw = (150-2x3.2)/3.2 = 44.88
Batas-batas : -
1.10√(kn*E/fy) = 1.10√(5*200,000/240) = 71.00
-
1.37√(kn*E/fy) = 1.37√(5*200,000/240) = 88.43
Maka penampang mengalami leleh geser Kuat geser badan tanpa adanya pengaku: -
Aw = h.tw = (150-2x3.2) 3.2 = 459.52 mm2
-
Vn = 0.6 fy Aw = 0.6 (240) (459.52) = 66.17 kN
-
Vu = 2.63 kN
Mu/θMn+0.625xVu/θVn ≤ 1.375 5.37/0.9(8.73) +0.625x2.63/0.75(66,17) =0,72 ≤ 1.375 (OK)
-
2.4.5 Kontrol lendutan qdx = 0,271 x Sin 10° = 0.047 kN/m Px = 1,00 x Sin 10° = 0.174 kN/m 4 Px × L3 5×0,047×60004 0.174×60003 = 384× E × Iy 48× E × Iy 384× 200,000× (28×104) 48× 200,000× (28×104)
δ x = 5× qdx × L
δ x = 14.18 mm qdy = 0,271 x Cos 10° = 0.267 kN/m Py = 1,00 x Cos 10° = 0.985 kN/m
Page 9 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
4 3 4 3 5 × 0,267 × 6000 0.985 × 6000 5× qdy × L Py × L δ x= = 384× E × Ix 48× E × Ix 384× 200,000× (280×104) 48× 200,000× (280×104)
δ x = 8,041 mm
δ = δ dx2 +δ dy2 ≤ L
240
δ = 14,1782 +8,0412 ≤ 6000
240
⇔16,30 < 25,00(OK )
‡ Kesimpulan : profil Lipped Channel 125x50x20 (3.2) memenuhi persyaratan.
Page 10 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Perancangan Struktur Baja
3. Perhitungan batang tarik (Trackstang) Batang tarik (Trackstang) berfungsi untuk mengurangi lendutan gording pada arah sumbu x (miting atap) sekaligus untuk mengurangi tegangan lendutan yang timbul pada arah x. Beban-beban yang dipikul oleh trackstang yaitu beban-beban yang sejajar bidang atap (sumbu x), maka gaya yang bekerja adalah gaya tarik Gx dan Px. Gx = Berat sendiri gording + penutup atap sepanjang gording arah sumbu x Px = Beban berguna arah sumbu x P total = Gx + Px = (ql. L) + Px Karena batang tarik dipasang dua buah, jadi per batang tarik adalah: P
= P tot/2
= (ql. L) + Px = {(0,642 x 6) + (1 x sin 10°)}/2 = 2,013 kN
P ≤ σ = 160 Mpa, dimana diambil σ = σ Fn
σ
=
Fn
= P = 2,013x1000 = 12,58 mm2
Fbr
= 125% x Fn = 1,25 x 12,58 = 15,73 mm2
Fbr
= ¼ π d2, dimana:
σ
160
d = 4.Fbr = 4 x15,73 = 4,47 mm
π
π
Maka, batang tarik yang dipakai adalah Ø 5 mm.
Page 11 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Perancangan Struktur Baja
4. Perhitungan Ikatan Angin Ikatan angin hanya bekerja menahan gaya normal (axial) tarik saja. Adapun cara kerjanya adalah apabila salah satu ikatan angin bekerja sebagai batang tarik, maka yang lainnya tidak menahan apa-apa. Sebaliknya apabila arah angin berubah, maka secara bergantian betang tersebut bekerja sebagai batang tarik.
Figure 2 Pembebanan pada ikatan angin N dicari dengan syarat keseimbangan, sedangkan P = gaya/tekanan angin. tg β = 7,62 = 1,27 → β = arc tg 1,27 = 51,78° 6
P = (0,25 x 7,62) = 1,91 kN ∑H = 0,
→ Nx = P → N cos β = P
N = P = = 1,91 = 2,60 kN cos β cos51,78
N = 2,6x1000 = 16,26 mm2 σ = N → Fn = σ Fn 160 Fbr
= 125% x Fn = 1,25 x 16,26 = 20,33 mm2
Fbr
= ¼ π d2, dimana:
d = 4.Fbr = 4 x20,33 = 5,09 mm
π
π
Maka, batang tarik yang dipakai adalah Ø 6 mm.
Page 12 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
5. Perhitungan Kuda-kuda (Gable) 5.1
Pembebanan pada balok gable
Figure 3 Gambar distribusi pembebanan Pembebanan pada balok gable akibat beban-beban yang dipikul oleh gording terpanjang yaitu = 6 meter.
Kaki kuda-kuda
Kaki kuda-kuda
2,03 m 15,23 m
Figure 4 Pembebanan yang dipikul oleh gording
Page 13 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
Balok yang direncanakan menggunakan IWF 700x300x12x14 dengan data penampang sebagai berikut: H = 700 mm
A = 235.50 mm2
rx = 29.3 cm
B = 300 mm
Ix = 201,000 cm4
ry = 6.78 cm
t1 = 13 mm
Iy = 10,800 cm4
Sx = 5.760 cm3 Sy = 722 cm3
t2 = 24 mm
Figure 5 Penampang baja IWF Pembebanan pada balok gable akibat beban-beban yang dipikul oleh 1 gording dengan bentang 6 meter: 5.1.1 Beban gording •
Gording P1 (karena terletak pada ujung balok, maka menerima beban setengah jarak gording = 0.508 m)
-
Berat sendiri penutup atap
:
6 m x 20 kg/m2 x 0.508 m
=
60.96 kg
-
Berat sendiri gording
:
6 m x 6.76 kg/m
=
40.56 kg
-
Berat sendiri balok
:
0.508 m x 185 kg/m
=
93.98 kg
-
Berat alat penyambung
:
10% x BS
=
9.398 kg
-
Beban hidup
:
=
100 kg
•
Gording P2 s/d P15 (karena terletak pada tengah balok, maka menerima beban satu kali jarak gording = 1.016 m)
-
Berat sendiri penutup atap
:
6 m x 20 kg/m2 x 1.016m
=
121.92 kg
-
Berat sendiri gording
:
6 m x 6.76 kg/m
=
40.56 kg
-
Berat sendiri balok
:
1.016 m x 185 kg/m
=
187.96 kg
-
Berat alat penyambung
:
10% x BS
=
18.796 kg
-
Beban hidup
:
=
100 kg
Page 14 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
Dengan cara yang sama untuk mempermudah perhitungan beban-beban pada gording dilakukan secara tabel sebagai berikut: Table 4 Tabel pembebanan pada gording No 1 2 3 4 Σ
Pembebanan Berat penutup atap Berat gording Berat sendiri balok Berat alat sambung
P1 (kg) P2 s/d P15 60.96 121.92 40.56 40.56 93.98 187.96 9.94 18.80 205.44 369.24
Beban merata akibat beban mati:
q=
∑P 0.5L
q=
2(205.4)+14(369.24) 5580.16 = =372.01kg/m 0.5(30) 15
Beban merata akibat beban hidup : Dipilih yang terbesar antara beban orang atau beban air hujan, Beban orang = 100 kg Beban air hujan qah = 40 – 0.8 α ≥ 20 kg/m2 = 40 – 0.8 x 10 = 32 kg/m2 P
= qah x jarak antar gording x jarak antar kuda-kuda = 32 kg/m2 x 1.016 m x 6 m = 195.07 kg
Maka dipilih beban akibat air hujan = 195.07 kg q=
16(195.07) 3121.15 = =208.08kg/m 0.5(30) 15
5.1.2 Tekanan angin pada bidang atap Tekanan angin = 30 kg/m2 Koefisien angin tekan Ctk = 0.1 → Wt = 0.1 x 30 kg/m2 x 6 m = 18 kg/m Koefisien angin hisap Chs = -0.4 → Wh = -0.4 x 30 kg/m2 x 6 m = -72 kg/m 5.1.3 Tekanan angin pada bidang dinding Koefisien angin tekan Ctk = 0.9 → Wt = 0.9 x 30 kg/m2 x 6 m = 162 kg/m Koefisien angin hisap Chs = -0.4 → Wh = -0.4 x 30 kg/m2 x 6 m = -72 kg/m
Page 15 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Perancangan Struktur Baja
5.1.4 Gambar skema pembebanan
Figure 6 Skema pembebanan akibat beban mati
Figure 7 Skema pembebanan akibat beban hidup
Figure 8 Skema pembebanan akibat beban angin kiri Page 16 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com 5.2
Kontrol profil kuda-kuda gable
5.2.1 Rafter Modulus elastisitas (E)
=
200,000.00 Mpa
Modulus geser (G)
=
80,000.00 Mpa
Tegangan leleh (fy)
=
240.00 Mpa
Tegangan putus (fu)
=
70.00 Mpa
Data beban dan geometri struktur: Momen maksimum (Mu)
=
461,990,771.00 Nmm
Gaya geser maksimum (Vu)
=
100,867.80 N
Gaya aksial (Nu)
=
110,134.97 N
M1x
=
182,417,847.00 Nmm
M2x
=
461,990,771.00 Nmm
MA
=
461,990,771.00 Nmm
MB
=
172,164,923.00 Nmm
MC
=
88,367,983.00 Nmm
Lx
=
15,287.33 Mm
Ly
=
1,019.00 mm
Data profil: H = 700 mm
A = 235.50 mm2
rx = 29.3 cm
B = 300 mm
Ix = 201,000 cm4
ry = 6.78 cm
t1 = 13 mm
Iy = 10,800 cm4
Sx = 5.760 cm3
t2 = 24 mm
r = 28.00 mm
Sy = 722 cm3
Efek kolom: Menentukan panjang tekuk rafter (Jepit-jepit): Lkx = (15,287.33 x 0.5) = 7,643.67 mm Lky = (1,019.00 x 0.5) = 509.58 mm Menentukan parameter kelangsingan rafter:
Page 17 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com fy = 1 7,643.67 240 = 0.29 λcx = π1 Lkx π E rx 293 200,000
λ cy = π1 Lky ry
fy = 1 509,58 240 = 0.08 E π 67.8 200,000
Menentukan daya dukung nominal rafter: Jika, λc < =0.25 maka ω = 1.00 Jika, 0.25 < λc < 1.2 maka ω = 1.43/(1.6-0.67 λc) Jika, λc ≥ 1.2 maka ω = 1.25 λc2
Nnx = Ag × fy ω x = 5,559,938.28 N Nny = Ag × fyω y = 5,652,000.00 N Digunakan Nn minimum = 5,559,938.28 N ϕNn = 0.85 x 5,559,938.28 = 4,725,947.54 N (Nu/ ϕNn)<1…OK Efek balok: Menentukan konstanta-konstanta untuk profil WF simetris: h1 = tf + r = 24 + 28
=
52.00 mm
h2 = ht – 2(h1) = 700 – 2 (52)
=
596.00 mm
h = ht – tf = 700 – 24
=
676.00 mm
J = Σbt /3
=
3,242,281.33 mm
Iw = (Iy.h2)/4 = (108,000.6762)/4
=
1.23E+13 mm6
Zx = (b.tf)(h-tf)+tw(0.5h-tf)(0.5h-tf)
=
6,352,372.00 mm3
X 1 = π EGJA Zx 2
=
12,223.05 Mpa
3
(
X 2 = 4 Zx
2 Iw
GJ
)
=
2.74E-04 mm2/N2
Iy
Menentukan kuat nominal lentur penampang dengan pengaruh tekuk lokal. Kontrol penampang, termasuk kompak, tidak kompak atau langsing Untuk tekuk lokal pelat sayap: Page 18 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com λ = bf/2tf
=
6.25
λp = 170/√fy
=
10.97
λr = 370/√(fy - fr)
=
28.38
λ < λ p, maka Penampang Kompak Untuk tekuk lokal pelat badan: λ = (h - 2tf)/tw
=
48.31
λp = 1680/√fy
=
108.44
λr = 2550/√fy
=
164.60
λ < λ p, maka Penampang Kompak Menentukan batasan momen plastis, Mp: Mp = Zx fy
=
1,524,569,280.00
Nmm
Mr = Sx(fy - fr)
=
979,200,000.00
Nmm
Maka, Mn
=
1,524,569,280.00
Nmm
Menentukan kuat nominal lentur penampang dengan pengaruh tekuk lateral Kontrol penampang, termasuk bentang pendek, menengah atau panjang Panjang Lb = jarak antar pengaku/sokongan lateral = Ly fl = fy - fr
=
170.00
MPa
Lb
=
1,019.16
mm
Lp = 1.76*ry*√(E/fy)
=
344.06
mm
Lr = ry*(X1/fL)*√(1+√(1+X2*fL2))
=
9,722.10
mm
maka, termasuk bentang: Bentang menengah Cb =
2.30
Untuk bentang menengah, Mn = Cb*(Mp - (Mp - Mr) *(Lb - Lp)/(Lr - Lp))
=
1,524,569,280.00
Nmm Page 19 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com Momen nominal yang paling menentukan
=
1,524,569,280.00
Nmm
Menentukan faktor perbesaran momen: Momen lentur terhadap sumbu x Ditinjau untuk kondisi portal tak bergoyang (braced) Ncrb = Ab fy/λcx2
=
67,908,245.28 N
βm=M1x/M2x
=
0.39
Cmx = 0,6-0,4βm≤1
=
0.44
δbx = (Cmx/(1-(Nu/Ncrb)))≥1
=
1.00
Ditinjau untuk kondisi portal bergoyang (unbraced): Ncrs = Ab fy/λcx2
=
67,908,245.28 N
δsx = 1/(1-(Nu/Ncrs))
=
1.00
Mux = δbx Mntux + δsx Mltux
=
895,438,647.15
Nu/фNn
=
0.02
Interaksi aksial & momen
=
0.35
Menentukan momen ultimit (Mu):
Kontrol kuat geser nominal tanpa pengaku: Ketebalan minimum pelat badan tanpa adanya pengaku; h2/tw≤6,36√E/fy
h2/tw =
6,36√E/fy
=
45.85 183.60
Kuat geser pelat badan tanpa adanya pengaku; Aw = tw x ht
=
9,100.00
Vn = 0,6 fy Aw
=
1,310,400.00 N
Vu/фVn <1, OK
=
0.10
Kesimpulan, Profil; 700x300x13x24
=
mm2
AMAN Page 20 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com 5.2.2 Kolom Modulus elastisitas (E)
=
200,000.00 Mpa
Modulus geser (G)
=
80,000.00 Mpa
Tegangan leleh (fy)
=
240.00 Mpa
Tegangan putus (fu)
=
70.00 Mpa
Data beban dan geometri struktur: Momen maksimum (Mu)
=
461,990,771.00 Nmm
Gaya geser maksimum (Vu)
=
95,575,51 N
Gaya aksial (Nu)
=
130,502.06 N
M1x
=
461,990,771.00 Nmm
M2x
=
461,990,771.00 Nmm
MA
=
432,697,393.00 Nmm
MB
=
216,348,696.70 Nmm
MC
=
324,523,045.00 Nmm
Lx
=
5,000.00 Mm
Ly
=
1,000.00 mm
Panjang rafter
=
15,287.33 mm
Data profil: H = 700 mm
A = 235.50 mm2
rx = 29.3 cm
B = 300 mm
Ix = 201,000 cm4
ry = 6.78 cm
t1 = 13 mm
Iy = 10,800 cm4
Sx = 5.760 cm3
t2 = 24 mm
r = 28.00 mm
Sy = 722 cm3
Efek kolom: Menentukan nilai perbandingan kekakuan pada rangka: Untuk lentur terhadap sumbu x :
∑ I
column L Gix = =10.00( for hinge) ∑ I beam L
Page 21 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Gjx =
Perancangan Struktur Baja
∑ I
column L = 3.06 ∑ I beam L
Untuk lentur terhadap sumbu y :
Giy =
Gjy =
∑ I
column L =10.00( for hinge) ∑ I beam L
∑ I
column L = 3.06 ∑ I beam L
Menurut Smith, 1996, faktor panjang tekuk dapat ditentukan tanpa nomogram, tetapi dengan menggunakan rumus dan untuk portal bergoyang adalah: Kx = 1.6Gix × Gjx + 4.0(Gix + Gjx) = 2.30 Gix + Gjx + 7.5 Ky = 1.6Giy × Gjy + 4.0(Giy + Gjy ) = 2.30 Giy + Gjy + 7.5
Menentukan panjang tekuk Kolom: Lkx = (5,000.00 x 2.30) = 11,494.73 mm Lky = (1,000.00 x 2.30 = 2,298.95 mm Menentukan parameter kelangsingan rafter: fy = 1 7,643.67 240 = 0.43 λcx = π1 Lkx π 293 200,000 rx E fy = 1 509,58 240 = 0.37 λ cy = π1 Lky π 67.8 200,000 ry E
Menentukan daya dukung nominal rafter: Jika, λc < =0.25 maka ω = 1.00 Jika, 0.25 < λc < 1.2 maka ω = 1.43/(1.6-0.67 λc) Jika, λc ≥ 1.2 maka ω = 1.25 λc2
Nnx = Ag × fyω x = 5,175,027.76 N Nny = Ag × fyω y = 5,332,641,52N Page 22 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com Digunakan Nn minimum = 5,175,027.76 N ϕNn = 0.85 x 5,175,027.76 = 4,398,773.60 N (Nu/ ϕNn)<1…OK Efek balok: Menentukan konstanta-konstanta untuk profil WF simetris: h1 = tf + r = 24 + 28
=
52.00 mm
h2 = ht – 2(h1) = 700 – 2 (52)
=
596.00 mm
h = ht – tf = 700 – 24
=
676.00 mm
=
3,242,281.33 mm
J = ∑ bt
3 3
=
1.23E+13 mm6
Zx = (b.tf)(h-tf)+tw(0.5h-tf)(0.5h-tf)
=
6,352,372.00 mm3
X 1 = π EGJA Zx 2
=
12,223.05 Mpa
Iw = Iy.h
2 4
(
X 2 = 4 Zx
2 =108,000× 676
4
=
2 Iw
GJ
)
2.74E-04 mm2/N2
Iy
Menentukan kuat nominal lentur penampang dengan pengaruh tekuk lokal. Kontrol penampang, termasuk kompak, tidak kompak atau langsing Untuk tekuk lokal pelat sayap: λ = bf/2tf
=
6.25
λp = 170/√fy
=
10.97
λr = 370/√(fy - fr)
=
28.38
λ < λ p, maka Penampang Kompak Untuk tekuk lokal pelat badan: Ny = A fy
=
56,520.00
Nu/ϕNy
=
2.57
λ = h/tw
=
52.00 Page 23 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com λp = 1680/√fy
=
38,73
λr = 2550/√fy
=
-147.89
λ r< λ , maka Penampang langsing Menentukan batasan momen plastis, Mp: Mp = Zx fy
=
1,524,569,280.00
Nmm
Mr = Sx(fy - fr)
=
979,200,000.00
Nmm
Maka, Mn
=
1,373,089,538.93
Nmm
Menentukan kuat nominal lentur penampang dengan pengaruh tekuk lateral Kontrol penampang, termasuk bentang pendek, menengah atau panjang Panjang Lb = jarak antar pengaku/sokongan lateral = Ly fl = fy - fr
=
170.00
MPa
Lb
=
5,000
mm
Lp = 1.76*ry*√(E/fy)
=
344.06
mm
Lr = ry*(X1/fL)*√(1+√(1+X2*fL2))
=
9,722.10
mm
maka, termasuk bentang: Bentang menengah Cb =
1.74
Untuk bentang menengah, Mn = Cb*(Mp - (Mp - Mr) *(Lb - Lp)/(Lr - Lp))
=
1,524,569,280.00
Nmm
Momen nominal yang paling menentukan
=
1,524,569,280.00
Nmm
Menentukan faktor perbesaran momen: Momen lentur terhadap sumbu x Ditinjau untuk kondisi portal tak bergoyang (braced) Ncrb = Ab fy/λcx2
=
30,028,134.88
βm=M1x/M2x
=
0
N
Page 24 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com Cmx = 0,6-0,4βm≤1
=
0.60
δbx = (Cmx/(1-(Nu/Ncrb)))≥1
=
1.00
Ditinjau untuk kondisi portal bergoyang (unbraced): Ncrs = Ab fy/λcx2
=
30,028,134.88
δsx = 1/(1-(Nu/Ncrs))
=
1.00
Mux = δbx Mntux + δsx Mltux
=
895,438,647.15
Nu/фNn
=
0.03
Interaksi aksial & momen
=
0.74
N
Menentukan momen ultimit (Mu):
Kontrol kuat geser nominal tanpa pengaku: Ketebalan minimum pelat badan tanpa adanya pengaku; h2/tw≤6,36√E/fy
h2/tw =
6,36√E/fy
=
45.85 183.60
Kuat geser pelat badan tanpa adanya pengaku; Aw = tw x ht
=
9,100.00
Vn = 0,6 fy Aw
=
1,310,400.00 N
Vu/фVn <1, OK
=
0.10
Kesimpulan, Profil; 700x300x13x24
=
mm2
AMAN
Page 25 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com 5.3
Perencanaan peletakan
Gaya-gaya pada kolom Gaya aksial (Nu)
= 130,502
N
Gaya geser (Vu)
= 95,575.51
N
Figure 9 Detail base plat 5.3.1 Kontrol tegangan yang timbul: Nu σb = ≤ σ 'b = 25 Mpa F F = a . b = 800 x 400 = 320,000 mm2
σb =
130,502 = 0.41 Mpa < 25 Mpa 320,000
5.3.2 Penentuan jumlah angkur Diambil diameter angkur = 19 mm fub = 370 Mpa
Vd = φ fVn = φ f r1 fub Ab = 0.75× 0.5×370× (0.25π192) = 39,339.61 N Vu < nVd .
95,575.51< n×39,339.61→n = 2.43buah Digunakan 4 Ø 19 mm angkur.
Page 26 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com 5.4
Perencanaan sambungan rafter puncak
Figure 10 Sambungan rafter puncak 5.4.1 Data baut Tegangan putus, fub
= (Baut A490) 780
Mpa
Diameter baut, db
= (7/8 “) atau 22.23
mm
Luas baut, Ab
= 388.28
mm2
Jumlah baut, n
= 12
Buah
Tegangan leleh, fy
= 240
Mpa
Tegangan putus, fup
= 370
Mpa
Lebar plat, b
= 300
mm
Tinggi plat, h
= 711
mm
Tebal plat, t
= 24
mm
Gaya geser, Vu
= 20,926.26
N
Momen, Mu
= 182,417,847.00
Nmm
5.4.2 Data plat ujung baut
5.4.3 Beban rencana
5.4.4 Menentukan letak garis netral Jarak antar baut: S1 = 1.5db – 3db = (1.5 x 22.23) - (3 x 22.23) = 33.35 mm – 66.69 mm S = 2.5db – 7db = (2.5 x 22.23) – (7 x 22.23) = 55.58 mm – 155.61 mm Sehingga digunakan S1 = 65 mm Page 27 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Perancangan Struktur Baja
Jarak vertikal antar baut, g = 116.20 mm
δ = 2 Ab = 2 × 388.28 = 6.68 mm g 116.20
δ x0.5x =b'(h − x)0.5(h − x) 3.34x2 =112.50(h2 − 2hx + x2) 0 =112.50(505,521−1,422x + x2) X = 606.48 mm H – x = 711 – 606.48 = 104.52 mm
σ (h − x) σ3= 1 x ⇔ σ 3 = 0.17σ1 5.4.5 Menentukan tegangan lentur yang terjadi
( 3 ) x) + (0.5σ3b'(h − x)( 2 3 )(h − x) = Mu
(0.5σ1δ x 2
819,363.34σ1 + 819,363.34σ3 =182,417,847 Mpa
819,363.34σ +141,211.09σ =182,417,847 Mpa 1 1 960,574.09σ =182,417,847 Mpa 1
σ1 =189.91Mpa σ2 =
σ1( x − S1) 102,829.40 x
=
606.84
=169.55 Mpa
σ3=32.73Mpa 5.4.6 Menentukan gaya-gaya yang terjadi Gaya tarik maksimum yang terjadi pada baut: Gaya terbesar yang dipikul baris baut terbawah
Tu = δ gσ = 6.68×116.20×169.55 =131,666.65 N 2 Page 28 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Perancangan Struktur Baja
Gaya yang dipikul satu baut terbawah:
Tu1 = 0.5Tu = 0.5×131,666.65 = 65,833.33 N Kuat tarik rencana satu baut:
Td = φ f × 0.75F A = 0.75× 0.75× 780×388.28 =170,357.28N ub b Tu < ϕf Tn …(OK) Gaya geser yang terjadi pada baut:
Vu1=Vu = 20,926.26 =1,743.86 N n 12
Vd =φ f r1 fub Abm
φVn = 0.75×0.4×800×380.29×1=90,857.22 N Vu1< ϕf Vn …(OK) Gaya tumpu yang terjadi
Vu1=Vu = 20,926.26 =1,743.86 N n 12
Rd = 2,4φ f db fupTp
φ fRn = 2.4×0.75×22.23×24×370 =355,324.32 N Vu1< ϕf Rn …(OK) Kombinasi gaya geser dan tarik
fuv =
Vu 20,926.26 < r1φ f fubm = < 0.4× 0.75× 780×1 nA 4,659.34 b
4.59 < 234 … (OK)
ft = 0.75 fub = 0.75× 780 = 585 Mpa Page 29 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
Td =φ f ft Ab
φ f Tn = 0.75×585×388.28 =170,357.28 N Tu =131,666.65 =10,927.22 N n 12 Td> Tu/n …(OK) 5.4.7 Perencanaan pengaku penumpu beban 5.4.7.1 Cek terhadap kuat leleh pelat badan
φ Rb = (5k + N ) fy ×tw > Ru φ Rb = (5(13 + 28) + 24)240×13 > 20,926.26 Rb = 0.75× 714,480 > 20,926.26 N Rb = 535,860 > 20,926.26 → OK 5.4.7.2 Cek terhadap kuat tekuk dukung pelat badan
N tw 1.5 E× fy×tf > Ru tw d tf
φ Rb = 0.79tw2 1+3
24 13 1.5 200,000×240×24 > Ru 13 700 24
φ Rb = 0.79×132 1+3
(
)
φ Rb =1,308,340.55 > Ru Rb = 0.75×1,308,340.55 > 20,926.26 N Rb = 981,255.41> 20,926.26 → OK 5.4.7.3 Cek terhadap kuat tekuk lateral pelat badan
3
( L/bf )3
3 ( h /tw) > Ru φ Rb = Cr×E×tw ×tf 1+0.4 h2
Page 30 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com 3 ( 700/13) φ Rb = 3.25×200,000×13 ×24 1+0.4
7002
3 > Ru 3 (1000/300)
φ Rb = 79,737.65 > Ru Rb = 0.75× 79,737.65 > 20,926.26 N Rb = 59,803.24 > 20,926.26 N → OK 5.4.7.4 Cek terhadap kuat tekuk lentur pelat badan
3
φ Rb = 24.08tw
Efy > Ru
h
3
φ Rb = 24.08×13 700
200,000×240 > 20,926.26 N
φ Rb = 523,611.43 > 20,926.26 N Rb = 0.75×523,611.43 > 20,926.26 N Rb = 392,708.57 > 20,926.26 N → OK
Kesimpulan : Sambungan aman dan pelat badan tidak perlu diberi pengaku. 5.5
Perencanaan sambungan rafter dengan kolom
Figure 11 Detail sambungan rafter kolom Page 31 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
Figure 12 Distribusi tegangan pada sambungan 5.5.1 Data baut Tegangan putus, fub
= (Baut A490) 780
Mpa
Diameter baut, db
= (7/8 “) atau 22.23
mm
Luas baut, Ab
= 388.12
mm2
Jarak baut ke tepi atas, S
= 65
mm
Jumlah baut, n
= 12
Buah
Tegangan leleh, fy
= 240
Mpa
Tegangan putus, fup
= 370
Mpa
Lebar plat, b
= 300
mm
Tinggi plat, h
= 711
mm
Tebal plat, t
= 24
mm
Gaya geser, Vu
= 100,867.80
N
Momen, Mu
= 461,990,771.00
Nmm
5.5.2 Data plat ujung baut
5.5.3 Beban rencana
5.5.4 Menentukan letak garis netral Jarak vertikal antar baut, g = 116.20 mm
δ = 2 Ab = 2 × 388.12 = 6.68 mm g 116.20
δ x0.5x =b'(h − x)0.5(h − x) 3.34x2 =112.50(h2 − 2hx + x2)
Page 32 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Perancangan Struktur Baja
0 =112.50(505,521−1,422x + x2) X = 606.50 mm H – x = 711 – 605.84 = 104.50 mm
σ (h − x) σ3= 1 x ⇔ σ 3 = 0.17σ1 5.5.5 Menentukan tegangan lentur yang terjadi
( 3 ) x) + (0.5σ3b'(h − x)( 2 3 )(h − x) = Mu
(0.5σ1δ x 2
819,081.79σ1 + 819,081.79σ 3 = 461,990,771.00 Mpa
819,081.79σ +141,134.23σ = 461,990,771.00 Mpa 1 1 960,216.02σ = 461,990,771.00 Mpa 1
σ1 = 481.13 Mpa σ2 =
σ1( x − S1) 260,531.11 x
=
606.50
= 429.57Mpa
σ3=82.90Mpa 5.5.6 Menentukan gaya-gaya yang terjadi Gaya tarik maksimum yang terjadi pada baut: Gaya terbesar yang dipikul baris baut terbawah
Tu = δ gσ 2 = 6.68×116.20× 429.57 = 333,449.80 N Gaya yang dipikul satu baut terbawah:
Tu1 = 0.5Tu = 0.5×333,449.80 =166,724.90 N Kuat tarik rencana satu baut:
Td = φ f × 0.75Fub Ab = 0.75× 0.75× 780×388.12 =170,288.74 N Page 33 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Perancangan Struktur Baja
Tu < ϕf Tn …(OK) Gaya geser yang terjadi pada baut:
Vu1 =Vu =100,867.80 = 8,405.65 N n 12
Vd =φ f r1 fub Abm
φVn = 0.75×0.4×780×380.29×1=90,820.66 N Vu1< ϕf Vn …(OK) Gaya tumpu yang terjadi
Vu1 =Vu =100,867.80 = 8,405.65 N n 12
Rd = 2,4φ f db fupTp
φ fRn = 2.4×0.75×22.23×24×370 =355,324.32N Vu1< ϕf Rn …(OK) Kombinasi gaya geser dan tarik
fuv =
Vu 100,867.80 < r1φ f fubm = < 0.4× 0.75× 780×1 nA 4,657.47 b
22.11 < 240 … (OK)
ft = 0.75 fub = 0.75× 780 = 585 Mpa
Td =φ f ft Ab
φ f Tn = 0.75×585×388.12 =170,288.74 N Tu = 333,449.80 = 27,787.48 N n 12 Page 34 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com Td> Tu/n …(OK) 5.5.7 Perencanaan pengaku penumpu beban 5.5.7.1 Cek terhadap kuat leleh pelat badan
φ Rb = (5k + N ) fy ×tw > Ru φ Rb = (5(13 + 28) + 24)240×13 >100,867.80 N Rb = 0.75× 714,480.00 >100,867.80N Rb = 535,860.00 >100,867.80N → OK 5.5.7.2 Cek terhadap kuat tekuk dukung pelat badan
N d
φ Rb = 0.79tw2 1+3
tw tf
24 13 1.5 200,000×240×24 > Ru 13 700 24
φ Rb = 0.79×132 1+3
1.5 E× fy×tf > Ru tw
(
)
φ Rb =1,308,340.55 > Ru Rb = 0.75×1,308,340.55 >100,867.80N Rb = 981,255.41 >100,867.80N → OK 5.5.7.3 Cek terhadap kuat tekuk lateral pelat badan
3 φ Rb = Cr×E×tw ×tf h2
3 1+0.4 ( h / tw) > Ru ( L/bf )3
3 700/13) ( 3.25×200,000×133×24 φ Rb = 1+0.4 > Ru 3 7002 1000/300 ( )
φ Rb = 79,737.65 > Ru Rb = 0.75× 79,737.65 >100,867.80N
Page 35 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Perancangan Struktur Baja
Rb = 59,803.24 <100,867.80N →Tidak OK 5.5.7.4 Cek terhadap kuat tekuk lentur pelat badan
3
φ Rb = 24.08tw
Efy > Ru
h
3
φ Rb = 24.08×13 700
200,000×240 >100,867.80N
φ Rb = 523,611.43 >100,867.80N Rb = 0.75×523,611.43 >100,867.80N Rb = 392,708.57 >100,867.80N → OK 5.5.7.5 Ukuran pengaku
Ru −φ Rb ≤ As × fy
100,867.80 − 59,803.24 ≤ As × 240 41,064.56 ≤ As × 240
As ≥
41,064.56 240
As ≥171.10 mm2
5.5.7.6 Lebar pengaku
1 bs > ×bf − 0.5tw 3
1 bs > ×300 − 0.5×13 3 bs > 93.50 ≈ 95 mm 5.5.7.7 Tebal pengaku
93.50 ≤ 0.56 200,000 ts 240
Page 36 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
www.LaporanTeknikSipil.wordpress.com
Perancangan Struktur Baja
93.50 ≤16.70 ts ts ≥ 93.50 = 5.78 ≈ 6.00 mm 16.70 Gunakan pelat pengaku dimensi 95 x 10 mm Kesimpulan : Sambungan aman.
Page 37 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
6. Perhitungan Pondasi 6.1
6.2
Data Perencanaan Kuat tekan beton (f’c)
=
25
mPa
Kuat tarik baja tulangan (fy)
=
400
mPa
Daya dukung tanah ( σ )
=
250
kN/m2
Berat jenis tanah( γ )
=
18
kN/m2
Rencana pondasi
Figure 13 Rencana pondasi 6.3
Dimensi pondasi
Dimensi pondasi dihitungan dari beban tidak terfaktor : Kedalaman pondasi (z)
=
1,5
m
σ = σ − zγ
=
223
kN/m2
eksentritas (e), tidak ada momen, maka
=
0
=
1.0
m
=
189.02
kN/m2
Tegangan efektif tanah ( σ )
σ ≥ ∑2 + ∑ P
P×e
1 6 b3
b
Dipakai b =
∑ P + ∑ P × e = 189.02 b2
1 6 b3
12
< dari Tegangan efektif tanah ( σ ) dipakai dimensi pondasi 6.4
OK =
1,00x1,00
Kuat lentur pondasi Kombinasi beban Page 38 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com Beban Aksial = (1.2 × 126.63 + 1.6 × 62.39)
= 251.78
kN
σ max =
P 251.78 = b2 1.002
= 251.78
kN/m2
σ min =
P 251.78 = b2 1.002
= 251.78
kN/m2
= 251.78
kN/m2
= 11.33
kNm
σ = σ max −
0, 3 0,3 × (σ max − σ min ) = 251, 78 − × ( 251.78 − 251.78 ) 1, 00 1.00
M = σ × B × 0,302 2 M = 251.78 ×1.00 × 0,302 2
σ max
σ min σ
σ max
Figure 14 Perhitungan momen pada pondasi Lebar Pondasi (B)
=
1000
mm
Tebal pondasi
=
300
mm
Tebal selimut beton
=
75
mm
jarak dari tepi beton ke tulangan
=
100
mm
Jarak dari beton tertekan ke tulangan tarik (d)
=
200
mm
Momen rencana (Mu)
=
11.33
kNm
Faktor reduksi momen ( φ )
=
0,80
=
663.66
a
φ M n = As f y d − 2
Dipakai 5D13 1 As = π 132 × 5 4
mm2
Page 39 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
a= a=
As f y 0,85 fc'b 663.66 × 400 0,85 × 25 ×1000
φ M n = 0,8 × 663.66 × 400 ( 200 − 12.49 )
=
12.49
mm
=
39.82
kNm
>Mu OK Tulangan minimum : ration Tulangan minimum untuk plat ( ρmin )
=
0,0018
Asmin = 0, 0018 × 1000 × 300
=
540
mm2
As > OK Tulangan maksimum As max = 0, 75 ×
( 0,85 f ) β
As max = 0,75 ×
( 0,85 × 25) β
' c
1
fy
600 bd ( 600 + f y ) w 1
400
600 200 ×1000 ( 600 + 400 )
=
4064.06
mm2
As < OK Dipakai tulangan 5D13 ⇔ D13 – 200 Tulangan susut diambil 20% dari tulangan lentur 6.5
Kuat geser pondasi
1000
6.5.1 Geser satu arah
σ max
σ
Figure 15 Gaya geser satu arah pondasi Tegangan geser yang terjadi
(
V = σ +σ u max
) 2 × B ×100 Page 40 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com V = ( 251.78 + 251.78 ) 2 × 1000 ×100 u
=
25.18
kN
=
125
kN
Kuat geser yang disumbangkan oleh beton
φVc = φ
f c' 6
bd = 0,75
25 200 ×1000 6
> Vu OK Tidak diperlukan tulangan geser
h h+d/2
1750
6.5.2 Geser pons
Figure 16 Daerah gaya geser pons pada pondasi Sisi panjang kolom (h)
=
800
mm
sisi pendek kolon (b)
=
400
mm
perbandingan h dan b ( β c )
=
2
mm
Jarak dari beton tertekan ke tulangan tarik (d)
=
200
mm
(h+d)
=
1000
mm
(b+d)
=
600
mm
bo = 2 × ( ( h + d ) + ( b + d ) )
=
3200
mm
α (Untuk kolom tengah)
=
40
σ% = (σ max + σ min ) 2 = ( 251.78 + 251.78) 2
=
251.78
kN/m2
=
100.71
kN
s
Gaya geser pons
σ% ( B 2 − ( h + d ) × ( b + d ) ) = 251.78 (1.002 − 1.0 × 0.6 ) Kuat geser pons beton
Page 41 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com 2 V = 1 + c1 β c
f' b d c 0 6
2 25 × 3200 × 200 V = 1 + c1 2 6
=
1066.67
kN
=
6000
kN
V = 1/ 3 25 × 3200 × 200 c3
=
1066.67
kN
dipakai Vc min
=
1066.67
kN
ϕVc = 0.75 x Vc
=
800
kN
α d f' b d V = s + 2 c 0 c2 b 12 0
40 × 200 25 × 3200 × 200 V = + 2 c 2 3200 12
V = 1/ 3 f ' cb d c3 0
Vc > Vu OK Maka tidak diperlukan tulangan geser.
Page 42 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
7. Kesimpulan Item
Ukuran
Dimensi gording
C150.50.20x3.2
Dimensi batang tarik (trackstang)
Ø 5 mm
Dimensi ikatan angin
Ø 6 mm
Dimensi profil gable
WF 700.300.13.24
Dimensi baut pada sambungan puncak
12 Ø 7/8”
Dimensi baut pada sambungan rafter dengan kolom
12 Ø 7/8”
Dimensi base plat
400 x 800 (tebal 24 mm)
Dimensi angkur
4 Ø 19
Dimensi pondasi
1000 x 1000 mm
Tulangan pondasi
5D13 ≈ D13-200 mm
Page 43 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
Referensi Syahril A. Rahim & Mulia, Diktat Perancangan Stukrur Baja Nobel, afret. 2011. Catatan kuliah Perancangan Struktur Baja semester 4 SNI 03-1729-2002. Tata Cara Perencanaan Struktur Baja Untuk Bangunan Gedung. Setiawan, Agus. 2008. Perencanaan Struktur Baja dengan Metode LRFD (Berdasarkan SNI 03-1729-2002) Jurnal, Perancangan Struktur Baja
Page 44 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel
Perancangan Struktur Baja
www.LaporanTeknikSipil.wordpress.com
Tentang Penulis Afret Nobel adalah alumni Diploma Teknik Sipil Universitas Gadjah Mada Angkatan 2005 dan Alumni Ekstensi Teknik Sipil Universitas Indonesia Angkatan 2009. Papanya seorang petani dan Mamanya pedagang. www.LaporanTeknikSipil.wordpress.com
Anda diperbolehkan untuk mengirimkan lewat pos dan email dan memberikan buku elektronik ini kepada siapa saja yang Anda inginkan, selama Anda tidak mengubah, atau mengedit isinya dan format digitalnya. Sebenarnya, kami akan sangat senang bila Anda membuat duplikat buku elektronik ini sebanyak-banyaknya. Tetapi bagaimanapun, hak untuk membuat buku dalam bentuk cetak atas naskah ini untuk dijual adalah tindakan yang tidak dibenarkan.
Kiranya buku ini masih jauh dari kesempurnaan, oleh karena itu, saran dan kritik yang membangun sangat kami harapkan.
Page 45 of 45
Twitter: @AfretNobel | facebook: http://www.facebook.com/afretnobel