Introduction Pre Launch Optimization Process has been defined in order to achieve the following goals •To have a well defined approach towards RF Network Rollout. •To ensure a Quality network handover to Customer. •To Define Role and Responsibilities of Profiles involved in Radio Network Optimization of Cluster.
Key activities There will following Key Activities under PLO Process: • Cluster design and Drive Test route design • Cluster Readiness for Pre Launch Optimization • Drive Test, Cluster Optimization & Exclusion Management
• Customer Approval & Pre Launch Optimization report submission
KEY CHANGES IN THE PROCESS AS PER NEW SDU STRUCTURE
•This process is meant for the Green field Rollout. •In future, if any green field rollout takes place, the existing SDU setup is going to support their respective responsibilities as per the documented process.
•Definition of Cluster & DT route Design •Approval of Customer for Cluster and DT route Design Circle Planning and •Sharing the Customer Observation on PLO WCC Optimization Team Report to Cluster Radio Optimization Engineer •Customer Signoff of PLO WCC Report •Verification of Alarm free sites in Cluster •Perform Drive Test Cluster Radio •Perform Cluster Optimization Optimization Engineer •Exclusion Management & reporting (if applicable) •Final PLO report Preparation •Alarm Rectification on Sites (if observed) Cluster Service Delivery Unit Engineer •Hardware Support if required during Optimization Communication Service •Approve the Cluster and DT Route Design Provider (Customer) •Approve the final PLO WCC Report
Cluster PLO Report The final Cluster Sign off Report should capture the following items. • The Agreed Cluster & Drive Test Route Design signed by Customer. • List of the AT sites of the cluster among the total cluster sites with there respective AT certificates.
• Alarm Log of the Sites to justify that there were no alarms during PLO. • Drive Test Log and the record of Optimization activities. • Exclusion Justification Report if any dully signed by customer. • Final Cluster Sites KPI report with Drive test Plots.