WCDMA FLEXI BTS SITE FOLDER Circle Strategic Partner Date of a. Installation b. Commissioning c. Integration Site Name Site ID SACFA ID Site Location a. Latitude b. Longitude
GUJARAT Nokia Siemens Networks a. 07-02-2013 b. 09-02-2013 c. 09-02-2013 AHDjodhtrvlW GU3G1966 GU3G1966
Indus Acquired Ahmedabad Jodhpur Village iste on Building of Manas Complex,Opp Star bazar,Jodhpur,Survey No 121 paiki,Block No 168,Moje Jodhpur,Tal and Dist Ahmedabad.
Site Type ( GBT/RTT/RTP/IBS) Shared Site? Sharing Partner ( Other Operator /3rd Party) IP Vendor Site Configuration Site Address
RTP YES Vodafone
City Site Owner Name Subcon Name PTID Engineer a. Name b. PTID Number
Ahmedabad
Indus Acquired Ahmedabad Jodhpur Village iste on Building of Manas Complex,Opp Star bazar,Jodhpur,Survey No 121 paiki,Block No 168,Moje Jodhpur,Tal and Dist Ahmedabad.
NICETEL a. Aditya b. ZEPP/T/TL3/046231
Documents to be submitted along with completed Site Folder. 1. RFI Checklist, completed & signs Copy 2. SDR 3. As-built Drawing. 4. Commissioning Report 5. VSWR Graph 6. MRN Copy 7. Self Assessment Checklist 8. AT Completion Certificates 9. 12 Nos. of Site Photographs. Photo1- Cable Routing (Grounding & Power Cables) Photo 2- EMP Grounding Protection (Showing Cable Routing & termination at IGB) Photo 3- BTS Installation & Its Cabling Photo 4- DCDB & DDF Installation & Cable Routing Photo 5/6- Feeder Grounding & Weather Proofing (@ antenna & BTS End) Photo 7- Feeder Routing on HCT, Clearly showing entry to Roxteck. Photo 8- Feeder Routing on VCT (Vertical Cable Tray) Photo 9/10- Antenna Installation (Two Views covering all sectors) Photo 11- Complete Site View (From Main Gate with name plate if available) Photo 12- Site is clean (Snap of site covering complete view)
1 Reference documents 1.1 Reference Document List NSN PRODUCT DOCUMENTATION EASY GUIDE TO FLEXI WCDMA BTS INSTALLATION SiSo INDIA 3G IMPLEMENTATION WORK INSTRUCTIONS WCDMA FLEXI BTS TI IMPLEMENTATION GUIDE PROJECT SPECIFIC DOCUMENTATION WCDMA BTS Implementation Check List WCDMA BTS Punch List
1.2 Site Specific Document List All Nokia Siemens Network site-specific documents and any differences from the standard documents are to be listed in the following table and the documents attached in SiteID_Implementation.zip file. (As-build drawings also in Site ID_ Implementation. zip file) DOCUMENT NUMBER 1
DOCUMENT NAME TOOL TALK
2
COMM REPORT
3
SELF ASSISMENT
4
OHS
5
WORK PERMIT
6
MRN
7
SITE PHOTO
ATTACHED
2 Site Specific Installation Data 2.1 Site Configuration-Node B RF Sub Module RF SUB MODULE TYPE
BTS INSTALLATION
Room Shelter / Container
FRGF
FRGP FRGM FRGG ANY OTHER
Outdoor Distributed Non Distributed
BTS INSTALLATION Type
CONFIGURATION AND RF OUTPUT POWER
Existing Cabinet Type Stack type
20 W
Wall Mounted
40 W
*
60 W
Pole Mounted 19 Inch Rack Four Post Type Any Other
Note: * RF output power is one carrier’s output RF power
2.2 Site Configuration-Node B System Sub Module
SYSTEM SUB MODULE TYPE
BTS INSTALLATION Room
FSIA FSMB
Shelter / Container
FSMC FSMD ANY OTHER
BTS INSTALLATION Type
NSN Fiber Cable Length
Existing Cabinet Type Stack on RF Module type Wall Mounted
Outdoor Pole Mounted 19 Inch Rack Four Post Type Any Other
2 mtr. 30 mtr. 100 mtr.
2.3 Site Configuration-Transmission Sub Module TRANSMISSION SUB MODULE TYPE
REMARKS
FTPB FTEB FTFA FTHA FTIA FTIB FTJA FTOA ANY OTHER
2.4 Transmission 2.4.1 Transmission Media TYPE STM 1 E1: 120 ohm 75 ohm
ETHERNET
REMARKS (Capacity, Number of E1s,Connector Type)
2.4.2 General Information
Radio Link Details
Dir 1
Dir 2
Dir 3
MW link Directed to (Site Code/Site Name) Capacity/Configuration Frequency Band and Polarization TX Frequency
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
TX Power (Max.)
NA
NA
NA
TX Power ON
NA
NA
NA
RX Level
NA
NA
NA
2.4.3 Information on FIU, MW Antenna and Flex bus EQUIPMENT DETAIL
MW 1
MW 2
MW 3
MW 4
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
ODU Sl.No.
NA
NA
NA
NA
IDU (FIU) Sl.No.
NA
NA
NA
NA
Flex Bus Type (RG223/RG214) No.of Grounding Kits used for IF cables IF Cable Length Used IDU Grounding Done ODU Grounding Done
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
MW Antenna Polarization OD Unit (7Ghz/15Ghz/18G hz/ MW Antenna size (0.3m/0.6m/1.2m/ 1.8m) MW Antenna Height
3 Antenna and Feeder System Installation & Commissioning 3.1 Antenna and Feeder System General Information 3.1.1 Antenna Configuration SECTOR 1
SECTOR 2
SECTOR 3
Frequency Range of Antenna
1920-2170
1920-2170
1920-2170
No. of Ports of Antenna
4
4
4
2
2
2
Andrew
Andrew
Andrew
Antenna
No. of Ports Used Dual Beam Antenna
Antenna Make Modal No. Direction
20
120
220
Mechanical Tilt
0
0
0
Electrical Tilt Mounting Height
6 Parallel(2g )
6 Parallel(2g )
6 Parallel(2 g)
3.1.2 Masthead Amplifier and Bias-T Configuration Bias Tee in use SRC in use BIAS-TEE TYPE & SERIAL NUMBER Sector 1 Type
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
NA
NA
NA
NA
Sector 1 S.N.
NA
NA
NA
NA
Sector 2 Type
NA
NA
NA
NA
Sector 2 S.N.
NA
NA
NA
NA
Sector 3 Type
NA
NA
NA
NA
Sector 3 S.N.
NA
NA
NA
NA
MHA in use SRC in use MHA TYPE & SERIAL NUMBER Sector 1 Type
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
NA
NA
NA
NA
Sector 1 S.N.
NA
NA
NA
NA
Sector 2 Type
NA
NA
NA
NA
Sector 2 S.N.
NA
NA
NA
NA
Sector 3 Type
NA
NA
NA
NA
Sector 3 S.N.
NA
NA
NA
NA
7.5.3 Antenna and Feeder System AT/Self Assessment Checklist Deliveries are complete & checked, shortcomings recorded. Equipment is not damaged. Antenna steelworks grounding checked. Feeder cable routes checked. Antenna mounting height checked according to the final site configuration. Mechanical/electrical tilt angle checked according to the final site configuration. Antenna mounting clamps checked, all screws tightened. Connectors mounted according to the mounting instruction of the connector manufacturer. Feeders grounded and groundings weatherproofed according to grounding instructions. Feeder cables marked correctly.
Completed
Remarks
Ok Ok Ok Ok Ok Ok Ok Ok Ok
Jumper cables marked correctly.
Ok
3.1.3 Feeder System Configuration Sector Configuration
Sector configuration Feeder system configuration Line marked Feeder cable type Feeder cable Installed feeder length in meter No. of grounding kit in pcs EMP installed?(yes/no)
Node B Feeder system configuration 3 Sector type 6 Sector type Sector 1 Sector 2 TX1 RX1 RX1 DIV TX2 RX2 RX2 DIV M1 D1 M2 D2 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Jumper cable length in meter
External jumper Internal jumper Antenna jumper connecter type Node B-Feeder cable Feeder cable-Antenna or MHA Mha-Antenna RF module-System module Node B,optical cable RF- module Antenna
Jumper cable length in meter
Sector 3 TX1 RX1 RX1 DIV M3 D3 NA NA NA NA NA NA NA NA NA NA Jumper cable length in meter
5
5
5
5
3
3
− − − − −
− − − − −
− − − − −
− − − − −
− − − − −
− − − − −
−
−
−
−
−
−
4 Antenna and Feeder System Commissioning Information Antenna lines sweep test results are saved in SiteID_Implementation.zip file and paper copies included in Site Folder.
Antenna lines sweep test FILE DATA Antenna lines sweep test results Antenna lines sweep test results
FILE NAME SiteID_AntennaLineTest_yyyymmdd.pdf Included this section in Site Folder
Note: Feeder line length is sum of feeder’s length and jumpers’ length.
SECTOR 1 Return Loss (max) DTF VSWR Return Loss (max) DTF VSWR SECTOR 3 Return Loss (max) DTF VSWR
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
NA
NA
−
−
−
−
−
−
NA
NA
−
−
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
NA
NA
−
−
−
−
−
−
NA
NA
−
−
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
NA
NA
−
−
−
−
−
−
NA
NA
−
−
Note: Return loss value has to comply Nokia Flexi WCDMA Antenna System User Manual. SECTOR 4 Return Loss (max) DTF VSWR SECTOR 5 Return Loss (max) DTF VSWR SECTOR 6
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
NA
NA
−
−
−
−
−
−
NA
NA
−
−
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
NA
NA
−
−
−
−
−
−
NA
NA
−
−
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
Return Loss (max) DTF VSWR
NA
NA
−
−
−
−
−
−
NA
NA
−
−
8 Node B installation 8.1 Site Ready checklist Installation phase
Completed
Lightning protection for antenna system checked. Cable ladder/support structure from antenna to entry point to cabinets checked. BTS cabinet position and layout in accordance with Planning Cable ladder position and cable access to top proper side of cabinets for antenna feeder cables, power, and PCM cables checked. Flexi WCDMA BTS equipment grounding busbar or ground cables installed and connected to the main site grounding system. Availability of power supply checked. Alarm systems installed with cables labeled and run to the Alarm Terminal Block location.
Remarks
NA
8.2 Module & Flexi WCDMA BTS Plug-In Unit Inventory
INSTALLATION PHASE Flexi WCDMA BTS plug-in units scanned to file, soft and hard copy attached in Site Folder.
COMPLETED
8.3 Site Install Preparation
INSTALLATION PHASE
Initials & SDR #
Site survey report is available and complete.
Site layout according to drawing.
Grounding bus bar for Flexi WCDMA BTS is available. ` Emplacement for BTS is ready and conforms to Nokia Siemens standards.
Power supply and interface cables ready and conforms to Nokia Siemens Standards. Transmission equipment and cables ready and conform to Nokia Siemens standards
Feeders and antenna ready and conform to Nokia Siemens standards
BTS delivery is complete and conform to Nokia Siemens standards
8.4 Cabinet Installation (if applicable) INSTALLATION PHASE
Initials & SDR #
BTS level after installation.
Door panel installed.
8.5 Cabling Modules in Cabinet Installation INSTALLATION PHASE
Initials & SDR #
Grounding cables connected from the BTS to the equipment ground bar.
Modules are installed.
External power cables are connected.
Bus cables are connected.
Internal power cables are connected.
RF cables are connected.
Antenna jumper cables are connected.
Transmission cables and sub-modules are connected.
Optional cables (Site support interface, FPA interface, LMP, LMU cables) are connected as needed. Cables are routed correctly.
8.6 Finish Installation INSTALLATION PHASE
Initials
All cables related to BTS are properly labeled.
All connectors are tightened with the correct torque recommendation.
Unit install completed.
All spare dummy panels and unused pieces packaged for return to Nokia Siemens. Doors installed.
4.1.1 Node-B Information ITEM
VALUE
Authentication Server Name
Ahmedabad
Authentication Server IP
10
131
1
BTS Name
AHDjodhtrvlW
BTS ID
GU3G1966
BTS IP Address
10
131
39
RNC Name
Ahmedabad
RNC ID
Ahmedabad
RNC IP
10
131
1
194
266
193
Real Tilt 1 IP Real Tilt 2 IP
8.7 DC LINE OVP OVP TYPE FSES FSEC ANY OTHER
INSTALLATION TYPE WITH FMAA KIT ON MODULE CASING WITH POLE KIT FPIA ON CABLE TRAY ANY OTHER
8.8 DIPLEXER DIPLEXER TYPE SINGLE DIPLEXER TWIN DIPLEXER ANY OTHER
INSTALLATION TYPE ON WALL INSTALLATION ON POLE INSTALLATION ON CABLE TRAY ANY OTHER
8.9 PDU/DCDB PDU TYPE INDOOR OUTDOOR ANY OTHER
INSTALLATION TYPE IN FCIA IN 19 INCH CABINET IN EXISTING STACK ON POLE ANY OTHER
4.2 WCDMA FLEXI BTS COMMISSIONING 4.2.1 Commissioning Files All next files have to be saved in SiteID_Implementation.zip file if applicable.
COMMISSIONING FILES FILE DATA
File Name
TRS parameters (xml) FlexBus Commissioning Report (txt) FlexBus parameters (xml)
SiteID_TRSparam_yyyymmdd.xml
BTS parameters (xml) BTS & TRS Commissioning Report (txt)
SiteID_BTSparam_yyyymmdd.xml
SiteID _FBcomreport _yymmdd.txt SiteID_FBparam_yymmdd.xml
SiteID_BTScomreport_yyyymmdd.txt
4.2.2 HW Information and BTS tests TRS units’ product codes and serial numbers are added in BTS HW Report file BTS dummy units’ and cabinet parts’ product codes and serial numbers are added in BTS HW Report file BTS WCDMA Loop Test results included in Commissioning Report.txt file BTS WCDMA Transmitter Output Power Level Test results included in Commissioning Report.txt file
4.2.3 Remote Access Test TEST
INITIALS / DATE
COMMENTS
Iub Test External Alarm Tests* BTS Restart Launch & connection BTS Manager from NEMU * Note: External Alarm (EAC) setting and test result are show in BTS Commissioning Report (txt) and Work Instruction.
4.2.4 Antenna Line (Site Master) and Output RF Power Measurement Equipments MANUFACTURER
MODEL
SERIAL NUMBER
DATE OF LAST CALIBRATION FROM ACCREDITED LAB
4.2.5 External Alarm Details Alarm No.
Alarm Details
OK/NOT OK
Remarks
1
RECTIFIER MAINS FAILURE
Ok
NA
2
RECTIFIER MODULE FAILURE
Ok
NA
3
RECTIFIER MAJOR FAULT
Ok
NA
4
RECTIFIER MINOR FAULT
Ok
NA
5
HIGH ROOM TEMPERATURE
Ok
NA
6
SHELTER DOOR OPEN
Ok
NA
7
SMOKE DETECTED IN SHELTER
Ok
NA
8
AIR CONDITION FAILED
Ok
NA
9
LOW FUEL
Ok
NA
10
DG ON LOAD
Ok
NA
11
DG ON NO LOAD
Ok
NA
12
DG FAILS TO START
Ok
NA
WBTS Integration 4.2.6 Scrambling Codes ITEM Scrambling Code for Cell 1 Scrambling Code for Cell 2 Scrambling Code for Cell 3
VALUE
4.2.7 Test Handset Details NOTE: Fill the information of all 3G or GSM handsets used for test calls
MODEL
SERIAL NUMBER
PHONE NUMBER
SIM NUMBER
4.2.8 Voice Call (MOC Call) Success CELL 1
OK
NA
INITIALS / DATE
COMMENTS
CELL 1 CELL 2 CELL 3
4.2.9 Voice /VideoCall (MTC Call) Success CELL 1
OK
NA
INITIALS / DATE
COMMENTS
INITIALS / DATE
COMMENTS
CELL 1 CELL 2 CELL 3
4.2.10 CELL 1 CELL 1 CELL 2 CELL 3
PS Data Call Success OK
NA
4.2.11
Softer Handover Success
CELL
OK
NA
INITIALS / DATE
COMMENTS
Cell 1 – Cell 2 Cell 1 – Cell 3 Cell 2 – Cell 1 Cell 2 – Cell 3 Cell 3 – Cell 1 Cell 3 – Cell 2
5 WBTS Site Inventory 5.1 Site Photos All next photos have to be attached in SiteID_Implementation.zip file. Any taken extra informative photos are listed here and attached in SiteID_Implementation.zip file.
SITE PHOTOS FILE DATA
FILE NAME
Room/Site overview
SiteID_overview_yyyymmdd.jpg
Site profile
SiteID_SiteProfile_yyyymmdd.jpg
Cell 1 profile
SiteID_Cell1Profile_yyyymmdd.jpg
Cell 2 profile
SiteID_Cell2Profile_yyyymmdd.jpg
Cell 3 profile 12 No’s of Site Photographs
SiteID_Cell3Profile_yyyymmdd.jpg SiteID_Extraphotos_yyyymmdd_x.jpg
5.2 Site Inventory New unit Serial Number
Module Name
Module Name / Version
RF MODULE
FRGQ 1
RY120901006
RF MODULE
FRGQ 2
RY120900996
RF MODULE
FRGQ 3
RY120900980-
FSIA
L1104107810
SYSTEM MODULE TRANSMISSION MODULE
5.3 Changes to Site Inventory (If Any) New unit
Old unit
NSN Fault Report Number
Serial Number
Name / Version
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
Name / Version
Serial Number
6 Site Acceptance Documents 6.1 Summary of Documents Enclosed 6.1.1 WCDMA FLEXI BTS Site Documents inside SiteID_Implementation.zip file. The Next files are saved in SiteID_Implementation.zip file. The file is saved in CD-Rom.
SITE IMPLEMENTATION ZIP FILE FILE DATA Signed Customer – NSN Site Acceptance Certificate (Scanned) Signed Partner – NSN Site Acceptance Certificate (Scanned) Signed page of WCDMA Flexi BTS Implementation Check List (Scanned) Complete WCDMA BTS Site Folder Commissioning files
FILE NAME SiteID_CustomerNSN_S.A.C_yyyymmdd.pdf SiteID_Partner-NSN_S.A.C _yyyymmdd.pdf
Site Photos 3G NI-DOC-WCDMA BTS Punch List Power System Data(If Any)
As shown in Site Photos list
Transmission System Data
SiteID_TransmissionSystem_yyyymmdd
As-build Drawings
SiteID_As-Build_yyyymmdd.dwg
SiteID_CheckListApproval_yyyymmdd.pdf SiteID_SiteFolder_yyyymmdd.doc As shown in Commissioning files list
SiteID_PunchList_yyyymmdd.pdf SiteID_PowerSystem_yyyymmdd
6.1.2 WCDMA FLEXI BTS Site Folder and Attached Documents SITE FOLDER AND ATTACHED DOCUMENTS DOCUMENT NAME
WCDMA FLEXI BTS Site Folder
WCDMA FLEXI BTS Implementation Check List (Inside NSN Copy) WCDMA FLEXI BTS Packing Lists Power System for 3G Installation and Commissioning (if new is installed) Factory test report (included in the HW delivery) SiteID Implementation.zip file in CD-ROM
8. Site Punch List The site punch list is represented by the list of those defects as NOT OK during the commissioning and acceptance testing the Node B (WCDMA BTS). All these defects should be attended and cleared before the Node B operational. The punch list format is given below: Punch List SL. NO.
Severity level
Description of pending work(Defect)
Raised by:
Completed by:
1
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
2
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
3
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
4
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
5
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
6
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
7
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
8
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
9
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
10
Sig:__________ Name:________ Date:_________
Sig:__________ Name:________ Date:_________
CERTIFICATE OF COMPLETION BETWEEN PARTNER AND NSN Site acceptance certificate for telecom implementation works PO NUMBER:
26426139
SITE ID:
GU3G1966
SITE ADDRESS: Indus Acquired Ahmedabad Jodhpur Village iste on Building of Manas Complex,Opp Star bazar,Jodhpur,Survey No 121 paiki,Block No 168,Moje Jodhpur,Tal and Dist Ahmedabad.
AHDjodhtrvlW
SITE NAME:
STAGE
COMPLETE (Initials/Signature)
WCDMA FLEXI BTS Site Installation
COMPLETE
WCDMA FLEXI BTS Site Commissioning
COMPLETE
WCDMA FLEXI BTS Site Integration
COMPLETE
WCDMA FLEXI BTS Site Implementation Zip File
COMPLETE
Site Folder and Attached Documents
COMPLETE
Partner states that the whole of supplies detailed above have been inspected, implemented, tested and unless otherwise stated conform to the specified requirements in the contract or order identified above.
PARTNER REPRESENTATIVE:_____________________________________ DATE: ____ / ____ / ________ ( ) NSN REPRESENTATIVE: _________________________________________ DATE: ____ / ____ / ______ ( )
WCDMA FLEXI BTS SITE PUNCH LIST BETWEEN CUSTOMER AND NSN SITE DATA Item
Data
Site ID
GU3G1966
Site Name
AHDjodhtrvlW
Installed by / Date
ANAND 7, 2013
Commissioned by / Date
ANAND 9, 2013
Integrated by / Date
ANAND 9, 2013
PUNCH LIST Select the correct check number and point to check in Flexi BTS Implementation Check List. Type the description of point to check and your comments for failure description. When completed, type what was done.
Chec k no.
Defect/Failure Description
Owner
Raised by /date
Completed by / date
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
PUNCH LIST APPROVED Customer REPRESENTATIVE ____________________________________ DATE: ____ / ____ / ________ ( )
NSN REPRESENTATIVE:
____________________________________ DATE: ____ / ____ / ________
(
)
****************************************************************************************** Commissioning report Feb 9, 2013 ****************************************************************************************** ****************************************************************************************** Report identification ****************************************************************************************** Date: 2013.02.09 Author: welcom NTP connection: No NTP connection Commissioning type: Reconfiguration Commissioned elements: BTS, TRS BTS state: BTS commissioned ****************************************************************************************** TRS commissioning parameters ****************************************************************************************** **************************************************************************************** Site properties **************************************************************************************** Name: ahdjodhtrvlw Location: AHEMADABAD Description: FSIA+FIIB+FRGP BTS ID: 1966 A2EA: IP addresses TRS: 10.131.39.225 / 29 BTS: 10.131.39.226 RNC: 10.131.1.193 NTP server 1: 10.131.1.194 **************************************************************************************** Security **************************************************************************************** Authentication LDAP server Address: Port Allow only secure connection: Yes Automatic certificate management CMP/CA server: Port Certificate repository: Port TLS for OAM interface Mode: Probing BTS firewall Enable ping and traceroute:
Yes
**************************************************************************************** Physical layer configuration **************************************************************************************** FIIB Unit properties PDH interfaces type: E1 Interface In use CRC IF 1 No Yes IF 2 No Yes IF 3 No Yes IF 4 No Yes Interface type: Ethernet Interface In use Speed and duplex Max. capacity (Mbit/s) EIF 1 No Autodetect 1000 EIF 2 Yes Autodetect 1000 EIF 3 No 100 Mbit/s full duplex 1000 Transport mode: Iub IP
**************************************************************************************** Quality of service **************************************************************************************** Queue weights Per Hop Behavior Queue weight Expedited Forwarding Strict Assured Forwarding 4 10000 Assured Forwarding 3 1000 Assured Forwarding 2 100 Assured Forwarding 1 10 Best Effort 1 Traffic type settings Traffic type Per Hop Behavior SG1 Expedited Forwarding SG2 Assured Forwarding 4 SG3 Assured Forwarding 3 SG4 Assured Forwarding 2 SG5 Assured Forwarding 1 SG6 Best Effort 0 DCN Assured Forwarding 1 NBAP Assured Forwarding 4 BFD Assured Forwarding 4 ICMP Assured Forwarding 4 TOP Expedited Forwarding CES1 Expedited Forwarding
VLAN priority DSCP 6 46 5 34 4 26 3 18 1 10 0 1 10 5 34 5 34 5 34 6 46 6 46
CES2 CES3 CES4
Expedited Forwarding Expedited Forwarding Expedited Forwarding
6 6 6
**************************************************************************************** IP Interfaces **************************************************************************************** Settings MTU:
1500
Transport Ethernet interface Address: Bandwidth: 10.0 Mbit/ s Traffic shaping type: WFQ Total shaper information rate: 10.0 Mbit/ s Total shaper burst size: 1522 octets Shaper information rate: 100.0 Mbit/ s Shaper burst size: 1522 octets Committed information rate: 2.7 Mbit/ s QoS enabled: Yes Ethernet overhead included: No Bidirectional forwarding detection BFD session 1 in use: No BFD session 2 in use: No VLAN Configurations VLAN ID: 461 Address: 10.131.23.226 / 29 CES over PSN dedicated VLAN: No Shaper information rate: 1000.0 Mbit/ s Shaper burst size: 1522 octets Committed information rate: 2.7 Mbit/ s QoS enabled: Yes Bidirectional forwarding detection BFD session 1 in use: No BFD session 2 in use: No VLAN Mappings VLAN type IP interface User plane 1 VLAN 461 User plane 2 VLAN 461 Control plane VLAN 461 Management plane VLAN 461 Timing over Packet VLAN 461 Flexi packet radio VLAN 461 CES over PSN VLAN 461
**************************************************************************************** CES Over PSN **************************************************************************************** CES over PSN settings: Minimum UDP port: 49152 Required bandwidth: 0.00 Mbit/s
**************************************************************************************** Iub IP **************************************************************************************** Far end SCTP address: Far end SCTP subnet: 10.131.0.0 / 26 Minimum SCTP port: 49908 Minimum UDP port: 49152 CAC committed bit rate: 2.7 Mbit/s Signaling bit rate: 200 kbit/s DCN bit rate: 100 kbit/s **************************************************************************************** Timing over Packet **************************************************************************************** Timing over Packet in use: Yes Master clock: 10.131.1.217 Message rate: 16 times/ second **************************************************************************************** Synchronization **************************************************************************************** Timing sources
Priority Interface SSM enabled Msg timeout (s) Status 1 Synchronous Ethernet EIF 2 Yes 5 2 Timing over Packet **************************************************************************************** BTS routing **************************************************************************************** Default gateway: Static routes Destination
10.131.23.225 Netmask
Bits Gateway
Forwarding table Destination Netmask Bits Gateway 10.131.39.224 255.255.255.248 29 BTS subnet 10.131.23.224 255.255.255.248 29 VLAN interface 461 Default gateway 10.131.23.225 **************************************************************************************** IP filtering **************************************************************************************** Exception rules Rule name Far endpoint ****************************************************************************************** BTS commissioning parameters ****************************************************************************************** File version ID: WN6.0 **************************************************************************************** BTS settings **************************************************************************************** BTS name: ahdjodhtrvlw BTS configuration name: 1+1+1 BTS ID: 1966 Time zone: (GMT+5.5) Asia/Kolkata GPS in use: No External 2.048 MHz Synchronisation in use: No External 2.048 MHz synchronization output in use in HO mode: No Forward synchronization in co-siting: No Activate security for Ethernet ports: No Transmission synchronization (TDM/SyncE/ToP) in use: Yes Maximum association retransmissions: 5 Maximum path retransmissions: 5 Enter BTS to test state: No ************************************************************************************** Module locations ************************************************************************************** FSIA 1: AHEMADABAD FRGQ1: FRGQ2: FRGQ3: ************************************************************************************** Passive units **************************************************************************************
**************************************************************************************** Local cell resources **************************************************************************************** Single cell solution in use:No ************************************************************************************** Local cell 119661 ************************************************************************************** FRGQ1 ANT 1 FRGQ1 ANT 2 MIMO type: SingleTX Virtual antenna mapping in use: No Carrier power: 40W License: Requires Flexi WCDMA BTS 40W Power License ************************************************************************************** Local cell 119662 ************************************************************************************** FRGQ2 ANT 1 FRGQ2 ANT 2 MIMO type: SingleTX Virtual antenna mapping in use: No Carrier power: 40W License: Requires Flexi WCDMA BTS 40W Power License ************************************************************************************** Local cell 119663 ************************************************************************************** FRGQ3 ANT 1 FRGQ3 ANT 2 MIMO type: SingleTX Virtual antenna mapping in use: No Carrier power: 40W License: Requires Flexi WCDMA BTS 40W Power License ************************************************************************************** Modules not defined ************************************************************************************** **************************************************************************************** Local cell settings **************************************************************************************** RNC type: NSN Intelligent shutdown in use: No **************************************************************************************** WCDMA carrier candidates and local cell groups settings
**************************************************************************************** ************************************************************************************** Local cell group Group 1 ************************************************************************************** ************************************************************************************ Local cell 119661 ************************************************************************************ Default carrier: 10807 Allowed carrier: 10807 HSPA mapping: ************************************************************************************ Local cell 119662 ************************************************************************************ Default carrier: 10807 Allowed carrier: 10807 HSPA mapping: ************************************************************************************ Local cell 119663 ************************************************************************************ Default carrier: 10807 Allowed carrier: 10807 HSPA mapping: ************************************************************************************ Baseband (BB) allocation ************************************************************************************ Minimum licensed BB capacity: 0% Maximum HW BB capacity: 100% **************************************************************************************** HSPA settings **************************************************************************************** ************************************************************************************** HSDPA settings ************************************************************************************** HSDPA resource allocation: BTS ************************************************************************************ HSDPA Iub delay threshold values ************************************************************************************ Minimum: 50
Middle: 150 Maximum: 250 ************************************************************************************ Fault Management for HSDPA Licences ************************************************************************************ HSDPA 16 QAM support license in use: Yes HSDPA proportional fair resource packet (PFRP) scheduler license in use: Yes HSDPA shared scheduler for BTS license in use: Yes ************************************************************************************** HSUPA settings ************************************************************************************** ************************************************************************************ Local cell group Group 1 ************************************************************************************ Minimum HSUPA users: 0 Minimum baseband decoding capacity: 0 ************************************************************************************ Happy bit ratio measurement ************************************************************************************ Small transmission filtering in use: Yes User Equipment Power Headroom (UPH) filtering in use: Yes UPH threshold: 10 **************************************************************************************** HSPA Quality of Service settings **************************************************************************************** -------------------------------------------------------------------SPI class HSPA scheduling weight HSDPA congestion control policy -------------------------------------------------------------------15 0 Control data over GBR 14 0 Control data over GBR 13 0 Control data over GBR 12 40 Control all data 11 35 Control all data 10 30 Control all data 9 25 Control all data 8 20 Control all data 7 15 Control all data 6 10 Control all data 5 9 Control all data 4 8 Control all data 3 6 Control all data 2 5 Control all data 1 2 Control all data
0
1
Control all data
**************************************************************************************** Antenna line management **************************************************************************************** ************************************************************************************** FR1-ANT1 ************************************************************************************** 3GPP/AISG Communication in Use: Yes DC Voltage in Use: No ************************************************************************************** FR1-ANT2 ************************************************************************************** DC Voltage in Use: No ************************************************************************************** FR2-ANT1 ************************************************************************************** 3GPP/AISG Communication in Use: Yes DC Voltage in Use: Yes ************************************************************************************** FR2-ANT2 ************************************************************************************** DC Voltage in Use: Yes ************************************************************************************** FR3-ANT1 ************************************************************************************** 3GPP/AISG Communication in Use: Yes DC Voltage in Use: Yes ************************************************************************************** FR3-ANT2 ************************************************************************************** DC Voltage in Use: Yes **************************************************************************************** Antenna line settings **************************************************************************************** ************************************************************************************** FRGQ1 ANT 1 **************************************************************************************
************************************************************************************ Antenna settings ************************************************************************************ Feeder loss: -1.0 PHS filter in use: No PHS filter delay: Multiradio combiner in use: No Combiner type: Feeder voltage: Cable length: Velocity factor: Multiplexer usage: None Diplexer amount: 1 Diplexer delay: Diplexer loss: User-defined RTT delay: Yes RTT delay: 8.2 Additional RX gain: 0.0 Uplink delay: 0 ************************************************************************************** FRGQ1 ANT 2 ************************************************************************************** ************************************************************************************ Antenna settings ************************************************************************************ Feeder loss: -1.0 PHS filter in use: No PHS filter delay: Multiradio combiner in use: No Combiner type: Feeder voltage: Cable length: Velocity factor: Multiplexer usage: None Diplexer amount: 1 Diplexer delay: Diplexer loss: User-defined RTT delay: Yes RTT delay: 8.2 Additional RX gain: 0.0 Uplink delay: 0 ************************************************************************************** FRGQ2 ANT 1 ************************************************************************************** ************************************************************************************
Antenna settings ************************************************************************************ Feeder loss: -1.0 PHS filter in use: No PHS filter delay: Multiradio combiner in use: No Combiner type: Feeder voltage: Cable length: Velocity factor: Multiplexer usage: None Diplexer amount: 1 Diplexer delay: 0 Diplexer loss: 0.0 User-defined RTT delay: Yes RTT delay: 8.2 Additional RX gain: 0.0 Uplink delay: 0 ************************************************************************************** FRGQ2 ANT 2 ************************************************************************************** ************************************************************************************ Antenna settings ************************************************************************************ Feeder loss: -1.0 PHS filter in use: No PHS filter delay: Multiradio combiner in use: No Combiner type: Feeder voltage: Cable length: Velocity factor: Multiplexer usage: None Diplexer amount: 1 Diplexer delay: 0 Diplexer loss: 0.0 User-defined RTT delay: Yes RTT delay: 8.2 Additional RX gain: 0.0 Uplink delay: 0 ************************************************************************************** FRGQ3 ANT 1 ************************************************************************************** ************************************************************************************ Antenna settings ************************************************************************************
Feeder loss: -1.0 PHS filter in use: No PHS filter delay: Multiradio combiner in use: No Combiner type: Feeder voltage: Cable length: Velocity factor: Multiplexer usage: None Diplexer amount: 1 Diplexer delay: 0 Diplexer loss: 0.0 User-defined RTT delay: Yes RTT delay: 8.2 Additional RX gain: 0.0 Uplink delay: 0 ************************************************************************************** FRGQ3 ANT 2 ************************************************************************************** ************************************************************************************ Antenna settings ************************************************************************************ Feeder loss: -1.0 PHS filter in use: No PHS filter delay: Multiradio combiner in use: No Combiner type: Feeder voltage: Cable length: Velocity factor: Multiplexer usage: None Diplexer amount: 1 Diplexer delay: 0 Diplexer loss: 0.0 User-defined RTT delay: Yes RTT delay: 8.2 Additional RX gain: 0.0 Uplink delay: 0 **************************************************************************************** System Module external fault and control settings **************************************************************************************** ************************************************************************************** External fault lines ************************************************************************************** **************************************************************************************
External control lines ************************************************************************************** **************************************************************************************** Radio Module external fault and control settings **************************************************************************************** ************************************************************************************** External fault lines ************************************************************************************** **************************************************************************************** Modules **************************************************************************************** Module Product code Serial number FSIA1 472269A _EMPTY_ CORE_FSIA1 084991A.102 L1104107810 FRGQ1 472261A CORE_FRGQ 1 084946A.106 RY120901006 FRGQ2 472261A CORE_FRGQ 2 084946A.106 RY120900996 FRGQ3 472261A CORE_FRGQ 3 084946A.106 RY120900980 **************************************************************************************** States **************************************************************************************** BTS state: BTS commissioned ************************************************************************************** IUB links ************************************************************************************** ************************************************************************************ FSIA 1 ************************************************************************************ SAAL2: Disconnected ************************************************************************************** Local cell 119661 ************************************************************************************** State: Enabled Blocking state: Unblocked Operational state: Enabled Availability: Inactive ************************************************************************************** Local cell 119662
************************************************************************************** State: Enabled Blocking state: Unblocked Operational state: Enabled Availability: Inactive ************************************************************************************** Local cell 119663 ************************************************************************************** State: Enabled Blocking state: Unblocked Operational state: Enabled Availability: Inactive **************************************************************************************** SW configuration **************************************************************************************** SW package version: WN6.0 22.12-298 M ****************************************************************************************** Additional site settings ****************************************************************************************** **************************************************************************************** Certificates in BTS **************************************************************************************** ************************************************************************************** BTS certificate ************************************************************************************** Issued by: Flexi BTS Issued to: Flexi BTS Valid from: 01-Jan-1999 Valid to: 01-Feb-2108 Serial number: 00 bb 25 89 b6 7c fb bc 17 Fingerprint: 28 55 94 8d 96 26 5d 1a 74 91 b5 49 1f 17 83 2f d2 cc bb 04 **************************************************************************************** RET settings **************************************************************************************** ****************************************************************************************** BTS tests ****************************************************************************************** **************************************************************************************** Site tests ****************************************************************************************
**************************************************************************************** WCDMA loop test **************************************************************************************** **************************************************************************************** EAC functionality test **************************************************************************************** **************************************************************************************** Test models **************************************************************************************** **************************************************************************************** BER test **************************************************************************************** ****************************************************************************************** Active Faults ****************************************************************************************** **************************************************************************************** Critical - Synchronisation lost. **************************************************************************************** Time: Jan 1, 2004 12:02:39 AM Source: TRS: NE Code: 61058 **************************************************************************************** Critical - LOS on unit 1, ethernet interface 2. **************************************************************************************** Time: Jan 1, 2004 12:02:38 AM Source: TRS: Unit 1 / EIF 2 Code: 61029 ****************************************************************************************** End of Commissioning report ******************************************************************************************
MATERIAL REQUISITION NOTE MRN DATE
Mail id
CONTAC PROJEC T No T
WBS ID
Delivery Address
11/26/2 012
[email protected] 9825000 082
NS
N.00085 545
M CODE
Description of Material
UNIT
Quantity
WBS ID
Indus Acquired Ahmedabad Jodhpur Village iste on Building of Manas Complex,Opp Star bazar,Jodhpur,Su rvey No 121 paiki,Block No 168,Moje Jodhpur,Tal and Dist Ahmedabad. Remarks
472269 A 472261 A
SYSTEM MODULE (FSIA INDOOR) FRGQ FLEXIRFMODULE2100MHZ TRIPLE60W (TOC) FTFB TRANSPORT FLEXBUS AND ETHERNET FMCA FLEXI 3U MOUNTING COVERS FRONT&BACK OPTICAL FIBER CABLE ARMOURED-40mtr FPKA FLEXI POLE KIT
EA
1
EA
1
N.00085 545 N.00085 545
Received against MMS3G0236 Received against MMS3G0236
EA
1
NSG0138/AHD
EA
2
N.00085 545 N.00085 545
EA
1
Gaurav8128681083
EA
2
472285A, FSES FLEXI SYSTEM EXTERNAL OVP FMFA FLEXI MOUNTING KIT- FLOOR WALL&POLE FOSB
EA
1
EA
1
EA
2
RODENT PLATE
EA
1
BTS LABEL SET
EA
2
DBXLH-6565EC-VTM
EA
3
GROUNDING CABLE 16 SQ MM GREEN 2 CORE 16SQ MM FLEXIBLE CABLE POWER CABLE BLUE 16SQMM 16 SQ MM CABLE BLACK
M
9
M
53
M
10
M
10
CABLE TIE 4.8 *186 MM (6")
BAG
2
N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545
301515 861 301514 238 301586 672 301514 038 301514 288 301514 237 301588 307 301500 892 301513 158 301512 294 301501 062 301511 889 301505 397 301500 899
Nice Tele
301514 775 301511 879 301511 878 602500 266 301515 616 301515 615
16 SQ MM CU RING TYPE LUG RS INSULATION TAPE 19*10M BLUE RS INSULATION TAPE 19*10M BLACK PLYSAFE SELF AMALGAMATINGTAPE25X0 .75X9.1 1/2" JUMPER 12M -RA 7/16M-STRAIGHT 7/16M 1/2" JUMPER 8M (RA 7/16M-STRAIGHT 7/16M)
EA
16
EA
1
EA
6
EA
3
EA
2
EA
4
N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545 N.00085 545
Nokia Siemens Networks
OHS Permit System
Nokia Siemens Networks
OHS Permit System Owner Country Project
OHS Services BU India Entire Services BU including Contractor APPROVAL
Activity Prepared Authorization
Name Arvind Pathak OHS Head, Services BU- India, NSN Murray Ward, Head- Global Services, NSN
Signature
Date
CHANGE HISTORY
Re Re visi visi on on Pag Revisi Dat e Description Aut on No. e No. of Revision hor
PERMIT FOR ELECTRICAL WORK
6.2
PERMIT NO.:
6.3
Permit Valid Period (Exact Timing) from: Date -28-NOV-12 Time - 04:00 PM TO: Date 02–NOV-12 Time -7:00 pm
6.4
Location of Work: -
Indus Acquired Ahmedabad Jodhpur Village iste on Building of Manas Complex,Opp Star bazar,Jodhpur,Survey No 121 paiki,Block No 168,Moje Jodhpur,Tal and Dist Ahmedabad. NSN-Site ID & Site Owner/Details: AHDjodhtrvlW / GU3G1966 6.5
Name of the Company to be carrying out the work (Contractor/NSN)/Address/Phone No/Email ID:
6.6 6.7
Gaurav Saini/Nicetel/Ahmedabad/8128681083/
[email protected]
6.8 6.9 6.10 6.11 6.12 6.13 6.14 6.15 DESCRIPTION OF WORK TO BE CARRIED OUT 6.16 (Note: Only the work listed below may be carried out under this permit) 6.17 6.18 FSIB module installation
6.19 ANTICIPATED HAZARDS ASSOCIATED WITH THIS WORK 6.20 Accidently one may fall from height ,
6.21
6.22 Electric shocks may injure oneself if one don’t pay attention properly
6.23
6.24 Tools used can cause injury due to use of them without manner
6.25
6.26 Overhead Electric Cables
6.27
6.28
6.29
CONTROL MEASURES TO BE IMPLEMENTED (Pre work requirements, Work requirements and Post work requirements) Place a symbol in any one column against the audit query. Any comment or remark in the last column will add value to the audit since it can be used while taking corrective action for improvement S. ITEM Yes No Remarks N 1 Work is within the restricted approach boundary and there is a work plan 2
3
Work is within the prohibited approach boundary, it is very hazardous and there is a work plan Request to shut down equipment was made
4
Conducted a shock hazard analysis
5
Shock protection boundaries have been determined
6
Flash hazard analysis has been made and the results are
known 7
Flash protection boundary has been determined
8
Personal protective equipment including tools needed for the
job have been determined and are available 9
Unqualified persons are restricted from the work area
10
Safe work practices that need to be employed have been
considered 11
Job can be done safely
12
Electrical equipments/wires and cables is inspected for signs
of damaged 13
All electrical equipment is grounded or earthed
14
Electrical equipment, including wires and cables is inspected
for signs of damaged or interference daily or before use
Names and signature with date, of the Persons to be carrying out the work: I have read the permit and understand the nature and extent of the work. I agree to comply with all safety precautions. Name 1. Anand Tiwati(Engg) Date: 09- 02- 13 2. LOKESH KUMRAVAT(Tech) 3. MUKESH (Tech) 4. RANJEET(Tech)
Name/Designation/Company/Contact No./signature/date, of the Persons (Team Lead) issuing and approving the permit:
Completion of Work: Work completed: All safeguards returned to normal: Requirements after work complied with: Any other Feedback/Comments : Signature & Name Anand Tiwari
6.30 PERMIT FOR WORKING AT HEIGHT 6.31 6.32 PERMIT NO.: 6.33 Permit Valid Period (Exact Timing) from: Date -28 - NOV-12 Time 04:00 PM TO: Date - 02–NOV12 Time -6:00 pm
6.34 Location of Work: :Indus Acquired Ahmedabad Jodhpur Village iste on Building of Manas Complex,Opp Star bazar,Jodhpur,Survey No 121 paiki,Block No 168,Moje Jodhpur,Tal and Dist Ahmedabad. NSN-Site ID & Site Owner/Details: AHDjodhtrvlW / GU3G1966
6.35 Name of the Company to be carrying out the work (Contractor/NSN)/Address/Phone No/Email ID / 6.36 6.37 Gaurav Saini/Nicetel/Ahmedabad/8128681083/
[email protected]
6.38 6.39 DESCRIPTION OF WORK TO BE CARRIED OUT 6.40 (Note: Only the work listed below may be carried out under this permit) 6.41 6.42 FRGP Module Installation
6.43 6.44 HAZARDS ASSOCIATED WITH THIS WORK 6.45 Falling Objects
6.46 Yes
6.47 Risk of Falling Persons
6.48 Yes
6.49 High Winds
6.50 Yes
6.51 Overhead Electric Cables
6.52 Yes
6.53 Unguarded Edges
6.54 Yes
6.55 Unsecured Ladders
6.56 Yes
6.57 Lack of Space
6.58 Yes
6.59 Manual Handling of Loads
6.60 Yes
6.61 Approximate height work will be carried out:
6.62 -
6.63 Employees unfamiliar with work at height.
6.64 No
6.65 6.66 6.67 6.68 6.69 6.70 6.71 CONTROL MEASURES TO BE IMPLEMENTED (Pre work requirements, Work requirements and Post work requirements) Place a symbol in any one column against the audit query. Any comment or remark in the last column will add value to the audit since it can be used while taking corrective action for improvement
S. N 1 2
ITEM
Yes
Safety harness with life line used Double lanyard full body Safety harness secured to a fixed structure / strong anchoring point. Safety net used Steel scaffolding / platform rightly erected / used
7 8
Safe access to work place / working platform with handrails and toe guard provided. Helmet, shoe, hand gloves and other required PPE’s are used Good house keeping is maintained in and around area. Ambulance/Emergency vehicle available.
9 10
First aid centre will qualified personnel available. Rescue equipment and trained rescue team available
11
Ladder used (straight/ extension) to reach the work location. Risk assessment available Adequate lighting provided for night work. Is activity carried out in the presence of a NSN engineer
3 4 5 6
12 13 14 15
Is activity carried out in the presence of a Safety Officer/Trained Safety Personnel?
No
Remarks
No Hand Gloves
108 Available any time when called
Names and signature with date, of the Persons to be carrying out the work: I have read the permit and understand the nature and extent of the work. I agree to comply with all safety precautions. Name: 1. Anand Tiwari(Eng) Date: 09- 02- 13 2. LOKESH KUMRAVAT(Tech) 3. MUKESH (Tech) 4. RANJEET(Tech)
Name/Designation/Company/Contact No./signature/date, of the Persons (Team Lead) issuing and approving the permit: Completion of Work: Work completed: All safeguards returned to normal: Requirements after work complied with: Any other Feedback/Comments : Signature & Name: Anand Tiwari
Site ID:
Site Quality Checklist for Telecom Implement
Site Name:
Subcon:
GU3G1966
AHDjodhtrvlW NICETEL Audit Result
Item Number
Desc ripti
Severity Level
Score
OK / NG
Dated: Audito r: PTID R e s Subco n/
Re ctif ed
Remarks
5001-6000
IMPLEMENTATION GENERAL
5101-5200
HEALTH & SAFETY PERSONAL
5,102 5,105
Personal Protective Equipment "PPE" (helmet, harness, etc.) on site and used when necessary Correct tool kit (e.g. drill machine, etc.) used and in safe condition
5201-5300
HEALTH & SAFETY ACCESS
5,218
Safe access to BTS and poles granted.
5401-5500
LOGISTICS / DELIVERY
5,401 5,404
Delivery received on time. Equipment delivered without damages.
4 4
NA NA
5,405
Delivery according to order.
4
NA
5,406
Overall delivery complete (no element's pieces are missing).
4
NA
6001-6500
IMPLEMENTATION BTS
6001-6100
INSTALLATION
6,001
Cabinet installed according to specifications.
2
6,002
Top Cover,Door and locks are properly installed & working OK.
3
6,003
Cable entry kits / bridging kits and sealing installed correctly .(Only OD Cabinet).
3
6,006
Plinth air guide installation done correctly.(Pole Installation)
1
WIP
2
WIP
1
3
6,011
OVP boxes for remote RF DC cable installed correctly-Applicable for Tower Top Solution (ESMA/ESMB at one place & RF Sector modules are at different location).
2
6,012
Internal Plug-in unit / Modules installed correctly and to Project / customer configuration.
2
6,013 6,014 6,019 6,021 6101-6200 6,101 6,102 6,103 6,104 6,108 6,109 6,110
Dummy panels installed correctly. (Applicable for Flexi OD Sites). Doors ground straps (Green wire for earthing) installed correctly. Wrist straps /ESD Straps used during installation. Used correctly. Site is clean and tidy
3 3
Vodafone Scope
Ok Ok Ok
MS16
Ok Ok
MS16
Ok
MS16
Ok Ok
MS16
MS16 MS16
MS16
MS16 WIP
2
Ok
MS16
Ok Ok
MS16
MS16
2
Ok Ok Ok
3
Ok
MS16
4
CABLING Internal cables installed correctly. Cabinet (and all its elements) grounding done correctly (cable, position, stops washer, etc…) AC/DC supply power cables installed according to specification External alarms cabling done correctly. Unused and used connectors are covered whit IP seals.(BTS Connector sealing) Cables between BTS modules are routed via correct cable entries. Flexi BTS modules are grounded to the plinth. (Applicable for Stack, Pole & Wall Installations only).
2 2 1 2
MS16
MS16 MS16
NA 2
6,111
Cable ties installed properly (no sharp or jagged edges) .Proper trimming done.
4
6,112
Optical Cable Routing Proper From System Module to RF Module
2
6,113
All connector tightened according to specification
6201-6300
COMMISSIONING
6,201
Master clock set correctly (DAC value measured with frequency counter & Master clock set correctly).
6,202 6,203 6,204 6,205 6,207 6,208 6,209 6,210 6,212 6,213 6,218 6,221 6301-6400
6,301 6,302 6,303 6,304 6,305 6,306 6,307
All measurements are within specified range All measurements executed with calibrated instruments. Batteries check and measurements OK (Batteries check and measurements OK, All alarms tested, working correctly and cleared). All alarms tested, working correctly and cleared. Time slot settings done according to specification. Hardware database loaded and verified correct. Software loaded and verified correct Software at current Customer Equipment Release Note (ERN) version OK LMP connection working properly. IP address, NE-name and ID are correct BTS Commissioning Parameters correct, as per IP Plan All Plug-in-units working - visual check
Test calls in all sectors/timeslots successful Alarm transmission towards OMC successful HWDB download from OMC to BSC correct Correct Radio Network parameters incl. Transmission data available Transmission link working properly BTS Auto recovery after power breakdown working properly Management connection verified from OMC/NOC and working correctly Softer handovers completed by walk around, where practicable, or cell lock down
6501-6600
IMPLEMENTATION ALARM PANEL / DDF SYSTEM
6,503 6,505 6,506 6,507 6551-6600
6,551 6,552
MS16
Ok Ok
MS16 MS16
NA 2 NA
2
NA
2
NA 2 NA
2
NA
1
NA
2
NA
1
NA
3
NA
3
NA
1
NA
3
NA
2
INTEGRATION
6,308
6501-6550
2
Ok
NA
2
NA
2
NA
2
NA
1
NA
1
NA
1
NA
1
NA
3
INSTALLATION
Labeling done according to specifications. (External alarm number marking on Wire & index of alarms stick beside DDF Box). DDF rack/Frame/Box installed correctly. DDF module installed correctly DDF is grounded to the grounding busbar
4 1 1 2
CABLING Cables preparations (stripping cutting ...) according to specifications. Cables labeled correctly.
2 3
Ok
MS16
Ok Ok Ok
MS16
Ok NG
MS16
MS16 MS16
Rectified
MS16
6,555 6,557
Cable installed over specified route. Connections done correctly according to specifications.
6601-6700
IMPLEMENTATION OF POWER SYSTEM
6601-6650
INSTALLATION
6,602 6,603 6,613 6,614
Number of rectifier according to configuration. Number of batteries according to configuration. Bus bar installed correctly (extended to ground connection). Labeling done correctly( Between SMPS to BTS)
6,615
OVP installed correctly
6651-6670
CABLING
6,651 6,652
6,654
6,655 6,661 6671-6690
6,671
6,677 6701-7000 6701-6750
6,701 6,703 6,704 6,705 6,708 6751-6800
6,751 6,752 6,753 6,754 6,755 6,756 6,757 6,758
Main site grounding cable installed correctly. Cabinet (and all its elements) grounding done correctly
DC cable installed correctly.(Between SMPS to BTS)
All connector tightened according to specification. Bus Bar
4 2
Ok Ok
MS16 MS16
Vodafone Scope
3
Vodafone Scope
3
Vodafone Scope
1 4
NG
Rectified
MS16
2
Vodafone Scope
2
Vodafone Scope
2
1
2
Ok Ok
MS16 (From Customer DC Source to BTS)
MS16 (NSN Implemented part)
Vodafone Scope
1
COMMISSIONING
Input voltage within specific range (Input voltage as per specific range. (Line to neutral), (neutral to earth) & (line to earth voltage) to be checked & recorded in site folder). All Modules are working properly and loads are shared.
Vodafone Scope 2 Vodafone Scope
2
IMPLEMENTATION ANTENNA SYSTEM (INSTALLATION) INSTALLATION
Correct antenna types on each sector as per planning documents. Tilting (mechanical &/or electrical) done according to specifications Antennas orientation according to specification Antennas properly mounted and secured.(Mount Poles are 90 deg to ground) Antennas Heights according to specification.
2
Ok
MS16
3
Ok
MS16
2
Ok
MS16 Vodafone Scope
2 2
Ok
MS16
3
Ok
MS16
3
Ok
MS16
4
Ok
MS16
2
Ok
MS16
2
Ok
MS16
2
Ok
MS16
3
Ok
MS16
3
Ok
MS16
INSTALLATION
Jumper installed correctly Feeder and/or jumpers installed correctly through cable entry Feeder and/or jumpers labeled correctly Connectors installed and tightened correctly.(With Specified Torque) EMPs properly installed and grounded All connectors tightened to specified torque setting Waterproof on connectors according to specifications Grounding kits number and positioning according to specifications
6,759
6,760
6801-6850
6,801
Grounding kits installed according to specification
Feeder installed correctly (bending, clamps, radius, etc…)
Measured Commissioning results & parameters are within specified range (Measured Commissioning results & parameters are within specified range (VSWR, Power, Insertion loss). Measures executed with calibrated instruments (Power meter & site master)
7001-7800
IMPLEMENTATION TRANSMISSION SYSTEM
7001-7100
TRANSMISSION RACKs INSTALLATION
7,002 7,003 7201-7300
7,201 7,202 7,203 7,204
2
Rack(s) installed at specified position as per site layout. Rack(s) grouted correctly & Rack(s) grounded correctly, to check horizontal & vertical. Rack(s) grounded correctly
2
3 3 2
Indoor Unit installed at specified position as per site plan. Indoor Unit grounded correctly Indoor Unit power connection correct Indoor Unit labelled correctly
3 2 2 4
Installation done like shown in the site planning documentation (pole, direction, height,…)
3
7,302
Alignment unit and antenna are installed properly and screws are tightened,Side Strut installed properly for Antenna dia >=1.2
2
7,303
Antenna polarisation according to specifications, The serial number of the antenna is recorded in site folder
1
7,304
Coupler & Waveguide is properly mounted (Separate antenna or HSB configuration)
2
7,308 7,309
The serial number of the antenna is recorded (Antenna & ODU) OU is installed properly (screws are tightened, sealing is in right position) Enough space left for removing Outdoor Unit. OU is grounded properly Outdoor Unit labeled according to specifications
7,310
Installation according to planning data (frequency, polarization, signal, etc).
7501-7600
CABLING between ODU & IDU
7,501 7,502 7,503 7,506 7,507 7,508 7601-7700
7,601
MS16 (Vodafone Scope, Incase accepted by
NA
NA NA NA
INDOOR UNIT (FIU/SDH/MUX) INSTALLATION
7,301
7,307
Ok
NA
OUTDOOR UNIT INSTALLATION (including Microwave dish)
7,306
MS16
2
7301-7400
7,305
Ok
COMMISSIONING
6,802
7,001
2
Cables properly installed. All connectors tightened properly Q1 bus cable properly installed. Cables entry glands sealing done properly.(At WFT) Cables labeled according to specifications OU connector is sealed according to specifications
3 2 4 2 4 1
2 2 3 2 4 2
NA NA NA NA
NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA
COMMISSIONING / INTEGRATION
Transmit frequency checked (according to planning data)
1
NA
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001 7,603 7,606 7,608 7,609 7,610 7,612 7,613 7,614 7,615 7,616 7,617 7,618
BER test with the hardware loop passed
Page 52 of 63 NA
2
Radio alarms checked, No active alarms on the link Recieve level correct (within +/- 4 dB from calculated receive signal) All tests passed and radio levels within specified limits Identification data correct of microwave link. Link Q1 address set and integrated
NA
3
NA
2
NA
2
NA
4
NA
2
Interleave setting (default OFF)
NA
2
ALCQ setting (default OFF)
NA
2
Operating mode and station type set correctly Fade margin test results within specified limits Customer Specific Commissioning & Parameters correct All microwave commissioning data and results correct
NA
2
NA
2
NA
2
NA
3
FINAL CHECK/ACCEPTANCE
Left over/ excess material reconsilled and accounted for, list in site folder. Site is cleaned properly and housekeeping done. Material Delivery Vs utilised measured and recorded in site folder. with all site details with Site Survey Report, Site Lay-out Plan, SDR Copy, Self TI Acceptance Certificate done with subcontractor/ authorities/customer Assessment Checklist,). according to specifications. Self Assessement quality audit done by sub con, loaded in E-pm, 100% punch points cleared, check list copy is available on site in site folder.
4
Ok
3
NG
4
Ok
MS16
3
Ok
MS16
3
Ok
MS16
3
Ok
MS16
4
Total SQI Score
MS16
Rectified
After Rectification SQI
Doc No-NSN/SE-India/Quality Assessment/Ver.7.0 Preapared by Checked
Auditted By:
Date
Designation Mobile #
Subcon Representative Name, contact no. & Signature : Project Engineer (PETI) Name, contact no. & Signature :
Auditted By:
Tarachand
ANAND TIWARI
PE
Designation Mobile #
MS16
0 o
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001
Page 53 of 63
3G-RFI CHECKLIST SITE NAME:- AHDjodhtrvlW SITE ID:- GU3G1966 Description Feeder single Length(M) Jumper required 1.5M/5M/8M/12M No. Feeder clamp DC power cable for SYS module(Blue &Black) Mtr. DC Power cable for RF module (Mtr) Grounding Cable (Mtr) MCB Availability As per solution Earthing Availability At Site 2G BTS Type (U-ID,U-OD,FID,F-OD) Shelter Type (Indoor/Cage/Open) Tower Type- RTP/RTT/GBT EMF sign Board- YES/No
Sec-1 N/A 6M(FRGP)/ 6M(FRGP) N/A 2 Mtr Each
Sec-2 N/A 6M(FRGP)/ 6M(FRGP)
Sec-3 N/A 6M(FRGP)/ 6M(FRGP)
31Mtr(FRGP) , 34Mtr(FRGP), 28Mtr(FRGP) 5Mtr(FRGP) / 6Mtr.(FRGG) 16 Amp 32 Amp 1 1 Yes F-ID Indoor RTP YES
16 Amp 1
16 Amp 1
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001
Page 54 of 63
BSC / BTS / Repeater - Site Inspection Checklist V5 GU3G1966
Vodafone Site ID
AHDjodhtrvlW
Name & Address of the site
Gorav 8128681083
Contact Persons Name & No. Location of Control room & Contact No.
Notes : Every positive answer gets full marks for the question and every negative answer would get Zero marks. Mark 'NA' if the question is Not Applicable for any particular site. Comment / explanation should be given for where a corrective action is requried. Weightage for different critical safety requirement is 2, 1 and 0.5. In case any activity description is not applicable for the Cellsite, then the points would be automatically deducted from the total score to calculate the achieved percentage. Every observation made on the site should be classified as A, B or C depending on the criticality / hazard Potential (for more details refer procedure).
Sr. No.
Description
1
Access
1.1
Is there a safe access to the Site / Tower?
1.2 1.3 1.4 1.5
Are walkway routes free of tripping & slipping hazards & obstacles? Is safe access to the Antennas and Elements possible? Is BTS / Pole access path lighting working and illuminating sufficiently? Are there proper railing / barricade all across the site/place of work?
2
Security
2.1
Is there a Security guard / care taker at the Cellsite? Is there a process to restrict unauthorized entry to the site? Is the compound wall / barbed wire maintained in good condition? Is the barbed wire fencing earthed in a ring protection?
2.2 2.3 3 3.1 3.2 3.3
Question Weightag e
Achieve d Score
1
1
1
0
2
2
1
1
0.5
0.5
0.5
0
0.5
0.5
1
1
0.5
0.5
1
1
1
NA
1
1
0.5
0.5
Structural / Tower In case of RTT - mention type of structure (Framed or load bearing), of the building/premises & building age? In case of RTT, whether structural stability certificate available for the building? Is the tower truly vertical, all nuts & bolts in place ? Wherever possible ensure bolts tightened with proper torque.
3.4
Any nuts & bolts missing? Give numbers missing.
3.5
Is the base plate grouted with chemical grout?
Comment / Explanatio ns
Criticali ty (A / B / C)
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001 3.6
Is the base plate encased with concrete? If yes, to what height from the base plate level?
3.7 3.8 3.9
3.10'
3.11 3.12 3.13 3.14 3.15 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9
0.5
0.5
Are the tower erection drawings and foundation drawings available for verification?
1
0
In case of GBT site is there is any settlement of soil observed after compaction?
1
NA
1
NA
2
2
2
2
1
1
0.5
0.5
0.5
0.5
0.5
0.5
0.5
NA
0.5
NA
1
NA
1
NA
2
NA
0.5
NA
1
NA
0.5
NA
0.5
NA
Are the Poles for RTP site properly founded and rungs for climbing properly installed? Does the Vertical Climbing Ladder have adequate safety provisions, e.g., FPS (starting from 2 mt level upto the top of ladder), ladder rungs at equal distances, adequately supported from bottom etc? Is there suitable working space & rest platform near each mount provided with safe access and railing? Is the Aviation lamp fixed and functional? If not, give reasons? Are the cables laid properly through center of the tower legs and dressed properly? Is the vertical cable tray completed with grouting at lower end for fixity? Is there any Bee Hive / Bird nest on the tower which may create additional risk while working on the tower? Shelter Is the access stair / ladder provided and grouted properly? Are safety instructions (Do's & Don’t's), general rules and warnings displayed at the site and maintained in good condition? Is the internal cable-tray fixed and earthed? Is there ISI marked insulated rubber-matting available in front of electrical panel? Is there a Fire / Smoke Detection System installed inside the shelter? Is it connected to DC power source and to the OMCR? Are all doors, latches and locking systems working properly? Is the shelter free of combustible/inflammable materials? Is there an emergency lamp inside the shelter? Is it maintained in working condition ? Is there a Danger board actions to be taken in case of electric shocks displayed?
4.10'
Is the Shelter (roofs & walls) completely leak proof?
0.5
NA
4.11
Is there any hole (made for laying power cable etc.) in the floor / wall causing unwanted ingress of rats/snakes etc? Ensure that all cable passes are sealed.
1
NA
Page 55 of 63
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001 5 5.1 5.2
Electricals Is the Electrical installations line-diagram displayed at the site? Is the Electricity Board Mains kept enclosed in order to protect unauthorized / accidental contact?
1
1
2
2
5.3
Are there any Re-Wireable type fuses used?
1
1
5.4
What is the Incoming switch / MCB make and rating? Check for adequacy.
1
1
5.5
What is the make and rating of ELCB - ensure that the rating of ELCB is adequate ?
2
2
1
1
0.5
0.5
2
2
1
1
0.5
0
0.5
NA
1
1
5.6 5.7 5.8 5.9 5.10 5.11 5.12
Is ELCB working and checks conducted on a quaterly basis ? Is armoured cable in PVC conduit used for the electrical cable connected from DG to shelter? Is the cable laid properly? Is there a 3 pin, 5 Amps / 15 Amps, plug & socket provided with adequate earthing? Are the plugs not overloaded with multiple adapters & the pins not blackened? Is the electrical wiring fire retardant - FRLS / HFFR insulation type? Check & record incoming Voltage - R phase, Y phase, B phase and Neutral Phase Are there any holes / gaps and loose connections in MCB DB?
5.13
Are the cable glands correctly fitted and sealed?
1
1
5.14
Is the Class B SPD installed in the Electrical Main panel?
1
1
5.15
Is there Class C SPD installed in the PIU?
1
0
5.16
Are there any temporary electrical joints provided for wire extensions? If it cannot be elimintated then is proper taping & insulation done? Are there any visible damage to any electrical cable?
2
NA
5.17
Is there any overhead high tension power line crossing the site? Specify precautions maintained.
1
NA
5.18
Are all terminal connections free of loose connections to avoid sparks?
0.5
0.5
5.19
Is fuse puller unit available for SMPS?
0.5
0.5
0.5
0.5
0.5
0
0.5
0.5
1
1
5.20 5.21 5.22 5.23
Is armored cable of adequate rating being used for temporary elecrtricity board power connections? Is the Horizontal cable tray with pendulum-support grouted in PCC blocks? Are all incoming and outgoing cables properly tagged? Is the switch for the lamp outside the shelter wall covered with a flap to prevent it from water contact
Page 56 of 63
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001 during rain? 6 6.1
6.2 6.3
Earthing Is there proper body earthing for all electrical equipment / panels / distribution boards & metal support frames like Cable tray, battery metal racks etc? Is the shelter earthed to ground to avoid static electricity shocks? Are there 3 nos. earth pits provided and continuity tested periodically?
2
2
1
1
0.5
0
6.4
Are the earth pits provided with hinged cover?
6.5
Is Earthing done using 25x3 MM GI strips? Is the interconnection of earth pits done with 25x6 MM GI strip? Is the annual checkup & record of earth resistance values displayed? Is Battery bank / power plant installed, commissioned and positive earthing done?
1
0
1
1
1
1
1
NA
6.9
Is DG set provided with double body earthing?
2
NA
6.10
Is the Tower earthing done at all four legs and provided with ring Protection?
2
2
6.11
Is the Meter Box properly fixed and earthing done?
2
2
1
1
1
1
1
NA
2
NA
6.6 6.7 6.8
6.12 6.13 7 7.1 7.2
Are there 2 no. Lightning Arrestor installed and earthed? Are there 2 nos. Earth bar for RF feeder and IF Earthing?
0.5
AC / PIU / UPS / Battery / DG Is there 2 no. Aircon? Are they functioning alternatively as per set timer? Are the AC units connected through MCBs and not with domestic type plug point?
7.3
Is there an AMC for the installed PIU, DG, ACs etc?
0.5
NA
7.4
Is the DG set located in a proper & ventilated area?
0.5
0.5
7.5
If in enclosed space – whether exhaust pipe leading beyond roof by at least 2m?
1
1
7.6
Is the DG Fuel inlet closed and secured?
1
1
1
NA
1
NA
0.5
0.5
1
1
7.9
Is there any visible leakage of diesel around DG set & separate container kept to collect the leaking diesel? Is the DG battery voltage checked/measured and recorded? Is the DG hour meter properly protected?
7.10
Are the battery terminals safely covered?
7.7 7.8
Page 57 of 63
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001 7.11 7.12 8 8.1 8.2 8.3 8.4
Is there a Danger board displayed in front of the DG set, PIU & Battery bank? Are the DG Emergency Stop & Other Alarm working properly ?
Is there a 2.5 kg ABC or CO2 type Fire extinguisher available at the site which is easily accessible and is placed at 1 mtr height above ground level? Is it in working condition and periodically maintained? Is the man In-charge trained for usage of the fire extinguishers? In case of a RTT site, whether alternate entrance/exit available? Is the battery backup extended to the Fire Alarm system? In case of BSC site is there a Gas Based Fire Suppression system installed and maintained?
9
Emergency plan
9.2 9.3 9.4 10 10.1 10.2 10.3 10.4 10.5
10.6
10.7
10.8
0.5
2
2
1
0
1
1
0.5
NA
1
0
2
NA
0.5
0.5
1
0
1
0
0.5
0
0.5
0.5
1
1
2
2
0.5
NA
0.5
0.5
0.5
0.5
2
NA
1
NA
Fire Fighting
8.5
9.1
0.5
Is there a danger notice & list of Emergency Contact no. displayed in English / Hindi / local language? Is the Security guard / caretaker trained on basic Safety at site? Is there an access for fire fighting vehicle to reach the site? Distance of the nearest fire station and approx. response time in peak hours? General Is the site premises maintained in clean, healthy and sanitary condition? Is there any dense vegetation growth or waste dump noticed? In case of RTT site is the parapet wall provided of adequate height? Is the Work Permit System for Height Work & Electrical Isolation followed ? Is there a Pest Control contract in place for the site (for GBT sites)? Look for vegetation growth in the site area. Whether clearance of Municipal / Gram Panchayat obtained (records to be maintained)? Is a signage indicating "Use Safety Harness, Use Safety Helmet with Chin Stay, Ensure Work Permit" displayed near the tower ladder to reinforce the implementation of rules displayed near the tower ladder? If the guard room is available / guard is staying on the Cell site are adequate facilities available ? - check for temperory electrical connections, use of cooking gas, housekeeping in guard room, etc Is the portable ladder (Aluminum ladder with rubber shoes) available inside the shelter for overhead works?
Page 58 of 63
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001 10.9
Are adequate PPE used during work at Cellsite? Is the Register maintained for PPE usage in Cell Site ?
TOTAL SCORE ACHIEVED TOTAL PERCENTAGE
2
2
70
59
Page 59 of 63
84.29%
Any Unsafe Actions Observed (Please give appropriate details) : -
Any Positve Observations : -
Name of Person to be appreciated for the positive points observed on the site : -
Additional Expalanation or Comments :
Name of Inspector
Mobile No:
8128681087
Date :
6-2-13
Deepak Signature Follow Up Actions : -
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001
Page 60 of 63
Photo1- Cable Routing (Grounding & Power Cables)
Photo 2- EMP Grounding Protection (Showing Cable Routing & termination at IGB) EMP not installed because it’s OFC / RRH site Photo 3- BTS Installation & Its Cabling
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001
Photo 4- Power Cable termination at DCDB end along with labeling.
Photo 5- DDF Installation including cable routing and labeling. DDF not installed because it’s a Sharing site Photo 6- Feeder Grounding & Weather Proofing (@ antenna & BTS End)
Page 61 of 63
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001
Photo 7- Feeder Routing on HCT, Clearly showing entry to Roxtec
Photo 8- Feeder Routing on VCT (Vertical Cable Tray) Feeder not Installed because Fiber site Photo 9/10- Antenna Installation (Two Views covering all sectors)
Page 62 of 63
WCDMA FLEXI BTS SITE FOLDER Document-SiSo-India/Site Folder/Flexi WCDMA BTS/Ver001
Photo 11- Complete Site View (From Main Gate with name plate if available)
Photo 12- Site is clean (Snap of site covering complete view)
Page 63 of 63