PROCESS OPTIMIZATION - CHECK LIST Shop:
Weld
Group Leader:
Date:
Zone:
H79
Team Leader:
Part No:
Zone:
H79
Associate:
Sl.no
Status
Check Points
OK NG NA
1
Associate movemen movement/ t/ no.of walk walk step is reasonable reasonable
2
Operation is done within the Strike zone(within reach of hands)
3
Associate is is not waiting waiting for the part /Mc/ Container Container
4
Cycle time of the process matches / within the Engg design cycle time
6
No additional operations/Over Processing found w.r.to Engg process design. Associate has has no bending; bending; no no stretching; stretching; no weight weight lifting(>15Kg) lifting(>15Kg);; no abnormal posture.
7
Associate is is involved for doing process optimzatio optimzation n kaizens recently. recently.
8
Associate is is trained sufficiently sufficiently in the process process
9
No recent defect outflow from the process to Firewall/Customer.
POKA YOKE EVALUATION 10
All Failure modes are are enlisted specific to the the process. process.
11
All the Failure Failure modes modes are addresse addressed d by Poka Poka Yoke.
12
Associate is is aware how how to inspect inspect each Poka Poka yoke to confirm its effectiveness.
13
Each Poka yoke is effective and robust.
STANDARD OPERATION 14
All Operations Operations in the the weld shop have have 100% 100% SOP
15
Associate awarene awareness ss about about Standard Standard Operation Operation is better. better.
16
All SOPs are controlled controlled and displaye displayed d near to to the operators. operators.
17
SOPs have work instructions, work parameters, standards, quality key points, safety keypoints and material flow.
18
Associate does does tip dressing dressing properly properly as per standard. standard.
19
Associates wear Safety Safety PPE as as mentioned mentioned in the the SOP.
TPM & 5S
`
20
TPM Standards are arrived specific to the Jig & machine.
21
Associate is is able to demostrate demostrate the TPM check points points one by by one as per sheet.
22
5S Standards are available & associates got trained.
23
Associate is is able to demostrate demostrate as per 5S 5S check sheet. sheet.
MATERIAL FLOW 24
Raw Material FG trolleys and Child parts are placed at designated locations.
25
No swarf/ debris on the shop floor.
26
Child Parts/Parts SNP is fixed and been followed
28
The day production is equal to the day plan given by PPC. (Confirm for any over production/ under production) Fixed route for Transportation of Trolleys.
29
Dedicated Quarantine Area to keep the defective parts is in use.
30
Each Associate's skill matrix cum training plan is displayed.
31
Each Line's layout with material IN and OUT flow is displayed.