XYZPVT. LTD. NEW PRODUCT DEVELOPMENT PROPOSAL PROPOSAL Sheet No. : 02 of 05
NPD NO. DATE
ANNEXURE I Sr No
Quality system requirements
1 2 3 4 5 6 7 8 9 10
Part Submission Warrant Special/Critical Characteristics Process Flow chart Process FMEA Control Plan Attribute Chart SPC studies Gauge R & R Inspections Reports Raw Material Quality plan
11 12
Raw material test certificates Inspection, Fixtures, Checking aids details Appearance approval reports Design engineering approval Calibration certificates Design FMEA Product Test Reports Advance shipment notification PPAP submission Quality system assessment audit by customer (if yes, please specify frequency of audit) In case of any other requirements, please specify below
13 14 15 16 17 18 19 20
21
DATE :
Required by Customer Yes No
Remarks
Please Attach any specific format for the Quality System Requirements as per Sr no.1 to 17 if given by the Customer
CUSTOMER REPRESENTATIVE REPRESENTATIVE
Format No. : FM???? XYZ PVT. LTD. NEW PRODUCT DEVELOPMENT PROPOSAL Sheet No. 03 of 05
NPD No. : Date :
A. DESIGN & DEVELOPMENT 1.
Lead time for concept and Product Design
2.
Lead time for Design of prototype
3
Lead time for design finalisation finalisatio n a) Product Design b) Parts Design c) Release of BOM
4.
Design & Testing expenditure ( If any ) PREPARED BY, NAME : SIGNATURE : _____________
Date :
B. INFORMATION PERTAINING TO TOOLINGS
1.
Nos. & Estimated Cost of Jig & Fixtures
2.
Nos. & Estimated Cost of Moulds
3.
Nos. & Estimated Cost of Gauges
4.
Nos. & Estimated Cost of Crates
5.
Cost for other infrastructure, infrastructure, if required