PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
KETERSEDIAAN versus KEBUTUHAN AIR DI SWS ( oleh: Johanes Wibowo)
BANDAR LAMPUNG, 8 MARET 2005
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Topik Bahasan: • Ketersediaan air vs kebutuhan air • Daerah rawan banjir dan pengelolaan banjir
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Isi Bahasan: (1) Pendahuluan (2) Iklim (3) Sistem sungai (4) Daerah irigasi (5) Daerah rawan banjir dan rawa (6) O&P (7) Neraca air SWS Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
(1) Pendahuluan
a. Penduduk SWS • 4,6 juta (2003) • Di DAS Skp 52%, DAS Spt 32%, DAS Bdl-Kld 12%, sisanya 4% di DAS Kbs-Jepara • Bag. hulu 9%, Tengah 41%, Hilir 50%
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
b. Tujuan pengelolaan SDA: • POACME konservasi SDA, pendayagunaan SDA, dan pengendalian daya rusak air (UU 7/2004 Pasal 1, Butir 8) • Dasar: asas kelestarian, keseimbangan, kemanfaatan umum, keterpaduan dan keserasian, keadilan, kemandirian, serta transparansi dan akuntabilitas (UU 7/2004 Pasal 2) • Cara: menyeluruh, terpadu, berwawasan lingkungan untuk mewujudkan kemanfaatan SDA sebesar-besar kemakmuran rakyat (UU 7/2004 Pasal 3) Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
(2) Iklim a. Stasiun curah hujan BPSDA SS: 25 lokasi, di seluruh SWS (mulai l967) b. Ms.hujan: Nopember – Maret; Ms.kemarau: April – Oktober c. Curah hujan tahunan: 1600-2500 mm (Rata-rata 1860 mm) d. Bag.hulu: 2200 – 2500 mm/tahun; Bag.tengah dan hilir: 1700-188 mm/tahun e. Curah hujan SWS 1977-2004 memberikan trend menurun. f. (Lihat Isohyet Hujan) 3000
2500
Annual Rainfall (mm)
2000
1500
1000
500
0 1976
1980
1984
1988
1992
1996
2000
2004
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
(2) Iklim (lanjutan) g. Stasiun klimatologi: saat ini ada 6 Sta. h. Dgn data terdahulu dr 2 stasiun diperoleh nilai ET referensi 4-5 mm/hari (Penman). i. Diperkirakan ET aktual 1000 mm/tahun. MONTHLY TEMPERATURE ( O C )
WIND VELOCITY ( km/day )
26.0
40.0
25.6
37.5
25.2
35.0
24.8
32.5
24.4
30.0
24.0
27.5 25.0
23.6
Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.
Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.
SUNSHINE DURATION ( hours )
RELATIVE HUMIDITY ( % ) 89.0
10.0
88.0
8.0
87.0
6.0
86.0
4.0
85.0
2.0
84.0
ETo = 4 - 5 mm/hari
0.0
Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.
Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
(3) Sistem sungai a. Sistem sungai t.a. sungai utama (Orde 1), dengan anakanak sungainya (Orde 2, 3, 4 dst); b. Arah utama sistem sungai di SWS SS umumnya ke timur / timur laut / tenggara, kecuali sebag kecil yang ada di DAS Bdl-Kld; c. Terdapat 2 buah sungai utama yg besar (Seputih & Sekampung); 2 buah sungai utama sedang (Kambas – Jepara/Penet); sisanya sungai kecil
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
d. Terdapat 4 DAS dgn luas 1,464 juta Ha; dgn 42 bh Sub-DAS
DAS Seputih 719.060 ha
DAS KambasJepara 182.600 ha DAS Sekampung 478.540 ha DAS Bdl-Kld 83.500 ha Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
e. Bagian (Region) Hulu – Tengah - Hilir
DAS Seputih 719.060 ha
Hulu 100.100 ha
Tengah 275.900 ha
Hilir DAS Kambas1.087.700haJepara 182.600 ha
DAS Sekampung 478.540 ha
Department of Public Works
DAS Bdl-Kld 83.500 ha European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
f. Panjang Panjang total sungai Orde 1 sampai Orde 3: kurang lebih 4000 km; g. Kepadatan sungai SWS: 0,28 km/km2 Jumlah sungai (bh) DAS
Panjang (km)
Orde. 1
Orde. 2
Orde. 3
Orde. 4
Orde. 5
Orde. 1
Orde. 2
Orde. 3
Orde. 1-3
Seputih
1
33
101
86
43
282
815
910
2008
Sekampung
1
25
44
59
28
307
534
531
1371
Kbs-Jpr
12
11
6
1
0
184
173
40
397
Bdl-Kld
32
9
2
0
0
201
49
15
265
Total SWS
46
78
153
146
71
974
1571
1495
4041
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
h. Morphologi dan aliran Sekampung Alur bag.hulu berdaya tampung cukup besar; bag. Tengah dgn kapasitas Q25-Q50, sedang bag hilir kapasitas Q5-Q10. Run-off yang masuk sungai (sebelum diversi) sebesar 4000 MCM (setara 127 m3/dt); sumbangan dr hulu 28%, tengah 24% dan hilir 48%. Debit keluar dari muara 1950 MCM (63,3 m3/dt). Lokasi
Q tahun normal (m3/dt) Tahunan
M.Hjn
Q probabilitas 80% (m3/dt)
M.Kmr
Tahunan
M.Hjn
M.Kmr
Kunyir
14,7
16,6
12,9
7,1
7,9
6,3
Argoguruh
44,3
62,4
26,1
17,6
24,0
11,1
Sukaraja Tiga
23,5
35,4
11,7
5,7
8,8
2,6
Muara
63,3
93,9
32,6
20,5
29,3
11,7
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
h. Morphologi dan aliran Seputih Sama dgn Sekampung, alur bag.hulu berdaya tampung besar; bag. Tengah dgn kapasitas Q25-Q50, sedang bag hilir kapasitas Q5-Q10. Run-off yang masuk sungai (sebelum diversi) sebesar 5570 MCM (setara 177 m3/dt); sumbangan dr hulu 4%, tengah 25% dan hilir 71%. Debit keluar dari muara 4800 MCM (150,9 m3/dt). Lokasi
Q tahun normal (m3/dt) Tahunan
Segalamider
M.Hjn
Q probabilitas 80% (m3/dt)
M.Kmr
Tahunan
M.Hjn
M.Kmr
6,4
6,9
5,9
3,9
5,3
2,4
Ajibaru
14,9
21,2
8,7
5,9
8,3
3,4
Buyut Udik
32,8
48,2
17,4
8,9
14,9
3,0
150,9
228,6
73,2
43,3
76,2
10,3
Muara Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
i. Infrastruktur hidrolik di Sekampung Bendungan Batutegi No. Uraian 1 Reservoir - Luas DAS - Elevasi air banjir (FWL) - Elevasi air normal (HWL) - Elevasi minimum untuk PLTA (MPL) - Elevasi minimum untuk irigasi 2 Bangunan Utama - Tipe Dam - Panjang puncak - Elevasi puncak - Lebar puncak 3 Spillway - Banjir rencana (PMF) - Lebar - Elevasi puncak 4 Intake Irigasi - Debit maksimum (HWL. El + 274 m) - Elevasi dasar 5 PLTA - Kapasitas terpasang - Turbin Department of design head
Dimensi
Keterangan
424,0 km2 + 281,5 m + 274,0 m Vol : 688 MCM + 226,0 m Vol : 90 MCM + 208,0 m Vol : 23 MCM Urugan batu 701,0 m + 283,0 m 12,0 m 1.930 m3/s 52,0 m EL. + 274,0 m 180,0 m3/s EL + 201,24 m 2 x 14 MW 90 m Francis European Union
Public Works
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Bendung Argoguruh No. Uraian 1 Bendung a. Bendung lama - Elevasi puncak - Panjang b. Bendung tambahan - Elevasi puncak - Panjang c. Debit banjir rencana 2 Pintu penguras - Lebar - Elevasi pintu tertinggi - Elevasi pintu terendah 3 Intake a. Feeder Canal 1 - Jumlah pintu - Kapasitas b. Feeder Canal 1 - Jumlah pintu - Lebar pintu - Kapasitas Department of 4 Daerah layanan Public Works
Dimensi
Keterangan Tipe Ogee 1935
75,0 m El + 59,0 m 1978 55,0 m El + 59,05 m 1.300 m3/det Pintu elektris 5.9 m El + 59,05 m El + 58,25 m Manual & elektris 5 buah @ 2,55 m x 2,1 m 44,0 m3/det 8 buah @ 2,55 m @ 2,55 m x 2,1 m 72,5 m3/det 55,648 Ha Luas fungsi 2004
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
European Union
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Bendung karet Jabung
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
J. Infrastruktur hidrolik di Seputih Bendung Ajibaru No. Uraian Dimensi Keterangan 1 Bendung Radial, elektris - Jumlah pintu 5 buah - Lebar pintu 6,45 m - Tinggi pintu 3,1 m - Tahun dibangun 1974 - Debit banjir rencan836 m3/det 2 Pintu penguras Operasi: elektris - Lebar @ 2,0 m 2 pintu 3 Intake Operasi: elektris - Jumlah pintu 5 buah - Lebar pintu @ 2,5 m 3 - Kapasitas 33,0 m /det 4 Daerah layanan 14.471 Ha Luas fungsi 2004
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Bangunan pengendali drainasi Seputih Surabaya
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
k. Infrastruktur hidrolik di Pengubuan Bendung Pengubuan
No. Uraian 1 Bendung - Elevasi puncak - Panjang 2 Pintu penguras - Lebar - Elevasi dasar 3 Intake - Jumlah pintu - Lebar pintu - Kapasitas 4 Daerah layanan
Dimensi
Keterangan
+ 79,5 m 25,0 m 1,5m x 2,2m 2 buah
3 buah 1,2m x 1,5m 2 buah 9,2 m3/dt 3.500 Ha
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
l. Infrastruktur hidrolik di Jepara / Penet Bendungan Way Jepara No. Uraian 1 Reservoir - Luas DAS - Elevasi air banjir - Elevasi air tinggi - Elevasi air rendah - Kapasitas tampung 2 Bangunan Utama/Dam - Tipe Dam - Panjang puncak - Tinggi dam - Lebar puncak 3 Spillway - Tipe spillway - Banjir rencana (PMF) - Lebar - Elevasi puncak 4 Intake Irigasi - Jumlah pintu - Kapasitas - Daerah layanan Department of Public Works 5 Dibangun Tahun
Dimensi
Keterangan
106,4 km2 + 37,9 m + 36,5 m Vol : 34,85 MCM + 26,5 m Vol : 12,6 MCM 21,6 MCM Urugan tanah 96,4 m 16,4 m 6,0 m 3
Open side
280 m /s 85,0 m EL. + 36,63 Pintu sorong 5 buah 3 20 m /s 5.100 Ha 1974
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
European Union
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
m. Infrastruktur hidrolik di sungai orde 2, 3 dst, berupa bendung, tanggul banjir, outlet drainasi, dlsb
Bd.Way Guring
Department of Public Works
Bd.Padangratu II
Bd.Way Nenep II
Bd.Garongan European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
(4). Daerah irigasi a. Luas DI di SWS: Fungsional 189 ribu ha; Potensial 233 ribu ha (Termasuk LLD). Dlm bentuk irigasi teknis, semi-teknis, sederhana. b. Irigasi teknis besar 43%, teknis medium 15%, 23% irigasi semi-teknis & desa, 19% LLD. (UU 7/2004 Pasal 41 ?)
Department of Public Works
Ukuran daerah irigasi
Jumlah (bh)
Luas Fungsional (1000 ha)
Besar
6
109.2
Medium
46
28.36
Kecil-Medium
46
7.73
Desa
469
43.46
Total
567
188.75
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
European Union
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Daerah Irigasi Besar Sistem Irigasi Sekampung Sistem Irigasi Seputih
58.640 ha Termasuk Bekri & Rumbia 14.470 ha
Sistem Irigasi Pengubuan
3.500 ha
Sistem Irigasi Jepara
5.100 ha
Rawa Sragi & Seputih Surabaya Total
27.490 ha 109.200 ha
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
(5) Daerah rawa & rawan banjir
a. Daerah rawa yang ada di SWS seluas 62.060 ha, dan luas yang dikembangkan adalah 28.590 ha, termasuk Rawa Kijing / Rawa Bulok. •
Rawa Sragi, fungsional: 25.230 ha (*)
•
Rawa Sido Rahayu, daerah pertanian, belum dikemb. ( 2.400 ha) (*)
•
Rawa Sulan, daerah pertanian, belm dikemb. (2.000 ha)
•
Rawa Galih, sebag utk pertanian, belum dikemb (1.900 ha)
•
Rawa Kijing, pertanian & permukiman,1100 ha fung (pada 6000 ha) (*)
•
Rawa Seputih Surabaya, fung: 2.260 ha (pada 3930 ha)
•
Rawa Tulang Bawang Hilir, 50% Rawa pedalaman, 50% R.pantai, 10% lahan tambak rakyat (7.400 ha)
•
Rawa Terusan & Lebong, hutan rawa (5.700 ha)
•
Rawa Bumi Nabung, daerah pertanian padi, belum dikemb. (1.300 ha) (*)
•
Rawa Betik, daerah pertanian, belum dikemb. (2.800 ha)
•
RawaGOOD Tanjung Kramat, dahulu lahan RESOURCE pertanian, belum dikemb (3.400 ha) GOVERNANCE in WATER MANAGEMENT PROJECT
Department of Public Works
European Union
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNGR.Tl.Bwg.Hilir
R.Terusan & Lebong R.Bumi Nabung R.Spt.Srby
R.Tg.Kramat
Rawa Betik
Rawa Galih Rawa Sulan Rawa Kijing
Rawa Sido Rahayu
Rawa Sragi
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
b. Kendala pengembangan budi daya tani di rawa: • Dalam kondisi alamiah: terdapat genangan karena drainase terhambat, run-off dan rembesan yang tinggi dr sekitar; • Dalam kondisi sudah dikembangkan: ketersediaan air rendah, tanah harus mengalami proses pematangan, dan masalah O&P jaringan.
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
c. Daerah Rawan Banjir • Terdapat 4 kategori daerah rawan banjir Kode F0 F1 F2 F3
Tipe
Lokasi
Bah Musiman, debit aliran tinggi & drainase jelek Musiman, debit aliran tinggi & efek pembendungan Banjir pasang laut Total
Hulu Tengah & hilir
Luas (Ha) Spt Skp 420
Total 420
52.310
48.460
100.770
Hilir
30.760
41.760
72.520
Pantai
7.720 90.790
3310 93.950
11.030 184.740
• Overlap antara daerah rawa & rawan banjir Rawan Bjr Skp Spt Total
Rawa 35.000 ha 14.430 ha 49.430 ha
Non-rawa Total 37% 58.950 ha 63% 93.950 ha 16% 76.360 ha 84% 90.790 ha 27% 135.310 ha 73% 184.740 ha
Department of Public Works
100% 100% 100% European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING Flood prone total lowland non-lowland Flood prone area lowland for SWS – WAY SEKAMPUNG Rawa Bumi Nabung (ha) (%) WAY (ha) (%) SEPUTIH (ha) (%) % 1,300 ha
104º30'E
105º30'E
# Y DAS Sekampung 35,000 37 58,950 63 93,950 100 DAS Seputih 14,430 16 76,360 84 90,790 100 Total 49,430 27 135,310 73 184,740 100 Note: 10,900 ha of flood prone areas (6% total) is subject to regular, 3-4 weeks, deep inundation (up to 2 m), causing for significant damage to crops and, to a lesser extent, housing and infrastructure
S #
Reno Basuki
S #
Tanggul Angin # S S #
Bulusari
S #
S #
Sukaraja Nuban # S
RAMAN WEIR
Ú Ê
METRO
##S Y
Kesumadadi
Bangurejo # S
S #
S #
SUKADANA
Ú Ê
##S Y
GARONGAN S Pekalongan WEIR # Donomulyo S # Sumber Gede S #
G. ULUWAISAMANG
Trimurjo
S Bantul #
S #
Sendang Agung S #
S Banarjoyo #
S #
S #
Pringsewu
9,400,000 mN
S #
Rantau Tijang
S # S #
S #
Pagelaran
Gadingrejo
5
G. TANGGAMUS Pardasuka
KIT BU
KOTA AGUNG
3
S #
Gedong Tataan
G. BETUNG
Jatibaru
BANDAR LAMPUNG
S #
##S Y
S Waway # Karya
2
S Kedondong #
S #
G. PESAWARAN (G. Ratai)
# Y
S Sribawono #
Raharjo
ng pu am ek yS Wa
Pulau Panggung # S
Flood prone area
S Mataram Baru #
S Pugung #
Natar
SWS Seputih-Sekampung boundary Lowland
Laut Jawa
Way Jepara
4
Railway River order II
S #
JEPARA DAM
Main road
Kabupaten boundary
S Way Jepara #
Ú Ê
KAB. LAMPUNG SELATAN
S Sukoharjo #
City/Town Dam/Weir
River order I
Labuhan Ratu
Braja Harjosari
ARGOGURUH WEIR
Kalirejo # S
G. RINDINGAN
Talang Padang# S
S # KAB. LAMPUNG TIMUR
Tanjung Harapan
S Margototo #
Ú Ê
5º00'S
S #
AJIBARU WEIR
S #
Ú Ê
Trans Sumatra road
Taman Fajar
Raman Utara
S #
SUGIH
Tambah Subur
Rukti Harjo
Kota Gajah
##S Y GUNUNG
19.5 km
LEGEND: # Y
S #
13
Suko Binangun
Tanjung Harapan
S #
6.5
S #
S #
S #
KAB. TANGGAMUS
9
12
S #
h
0
Map Projection Details: Transverse Mercator Projection Spheroid: WGS 84; Description: UTM South; Zone 48 Central Meridian: 105; Prime Meridian: 0 False Easting: 500000; Northing: 10000000 Reference Latitude: 0; Scaling Factor: 1
Besar
Negri Kepayungan
Ú Ê
S Surabaya #
S #
S Terbanggi #
S #
BATUTEGI DAM
p uti Se ay
S #
S #
S #
Handuyungratu
Gaya Baru
E
Scale 1 : 650,000
7
Jatidatar Mataram
KAB. LAMPUNG TENGAHKurnia Mataram
Donoarun
Ú Ê
8
W
S #
S #
JABUNG WEIR
Ú Ê
S #
Location ........ ha
Labuhan Maringgai
Wana
Rawa Sido Rahayu 800 ha
Flood prone area subject to regular, 3-4 weeks, deep inundation (up to 2 m), causing for significant damage to crops and, to a lesser extent, housing and infrastructure. Feasibility studies proposed
S Negri #
Agung
Jabung
S Panjang #
AN RIS BA
5º30'S
9,450,000 mN
Gunungbatin Ilir
Tanjungratu Ilir
Gunungsugih
Ú Ê
G. TEBAK
11
N
S 6.5
10
S #
Bandarjaya
Negara Ajitua
6
Bumi Nabung S Ilir #
Kota BaruWaya river 700 ha PENGUBUAN WEIR S Negri Katon #
KAB. TULANG BAWANG
4º30'S
(ha) (ha) (ha) DAS Sekampung Y # 25,230 25,230 25,230 100 1 Rawa Sragi 0 2,400 1,470 2 Rawa Sido Rahayu 61 3 Rawa Sulan 0 2,000 2,000 100 4 Rawa Galih 0 1,900 1,160 61 5 Rawa Kijing (Bulok area) 1,100 6,000 5,140 86 DAS Seputih 6 Rawa Lower Tl. Bawang 0 7,400 1,430 19 7 Rawa Terusan 0 4,400 3,570 81 8 Rawa Lebong 0 1,300 1,250 96 9 Rawa Tanjung Kramat 0 3,400 1,700 50 KAB. 10 Rawa Seputih Surabaya 2,260 3,930 3,420 87 LAMPUNG 11 Rawa Bumi Nabung 0 1,300 840 65 # UTARA Y 12 Rawa Betik 0 2,800 2,220 79 Total 28,590 62,060 49,430 80 S # Kalibalangan Note: Lowlands refer to former swamps reclaimed for rice cultivation
S Pasir # Sakti
Tanjungan S # 105ºE
Banda Aceh
5ºN MALAYSIA S #
Medan
Rawa Kijing 1,100 ha
1
g un mp La luk Te
100ºE S #
106º00'E
Wa yK am bas
total pot.
W
Lowlands
No. 9,500,000 mN
105º00'E
Funct. Potent. area area
S #
Sidomulyo
Rawa Sragi 6,000-8,000 ha Palas
S #
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT
PROJECT MANAGEMENT UNIT (PMU) LAMPUNG SINGAPORE
##S Y
Pekanbaru S #
KALIANDA
0º S #
Lowland and Flood Prone Areas
Padang Jambi #S
G. RAJABASA
SWS Seputih - Sekampung
S #
9,350,000 mN
Palembang S #
Bengkulu
#
LAMPUNG 5ºS
S #
Department450,000 of mE Public Works
Date : 03:Dec:2004 Sources: PMU Lampung
S Bakauheni #
Bandar Lampung
Scale: 650,000 500,000 mE
550,000 mE
600,000 mE
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
F1 : Seasonnal flooding (wet season Jan-Feb) caused by high river water discharge and poor drainage conditions Area: 52,310 ha in middle region (alluvial plains) F2 : Seasonnal flooding (wet season Jan-Feb) caused by high river water discharge blocked by tide (backwater) Area: 30,760 ha in lower region (former swamps)
LEGEND:
[ %
Watershed boundary
Ú Ê
SWS Seputih-Sekampung boundary
9,500,000mN # City/Town Y
Dam/Weir Trans Sumatra road Railway
Gunung Batin Q5 : 239 m3/s Q10 : 299 m3/s Q25 : 380 m3/s Q50 : 444 m3/s Q100 : 513 m3/s
River order I River order II
% U
# Y
Kurnia Mataram Y #
Tanjungratu Ilir
Peak Discharge Lower W. Tatayan Q5 : 50 m3/s Q10 : 66 m3/s Q25 : 88 m3/s Q50 : 106 m3/s Q100 : 125 m3/s
ay
# Y Kalibalangan
# Y
RIVER MOUTH
# Y Surabaya
tih pu Se
F1
ng du an
# Terbanggi Y Besar
F1
# Dono Arum Y
F1 Haji Pemanggilan
# Y Negara
Ú Ê
# GunungY Sugih
Tanggul Angin
ú
# Y
# Y
Bangunrejo
G. ULUWAISAMANG # Y # Y
# Kalirejo Y
500,000mE
Peak Discharge Banyuwangi Q5 : 25 m3/s Q10 : 33 m3/s Q25 : 45 m3/s Q50 : 55 m3/s Q100 : 65 m3/s
Peak Discharge Lower W. Waya Q5 : 75 m3/s Q10 : 97 m3/s Q25 : 128 m3/s Q50 : 153 m3/s Q100 : 180 m3/s
Trimurjo
Peak Discharge Buyut Udik Q5 : 459 m3/s Q10 : 563 m3/s Q25 : 702 m3/s Q50 : 813 m3/s Q100 : 929 m3/s
520,000mE
Sendang Agung
Peak Discharge Lower W. Sukadana Q5 : 117 m3/s Q10 : 150 m3/s Q25 : 194 m3/s Q50 : 230 m3/s Q100 : 269 m3/s
Taman Fajar
Raman Utara Y #
Peak Discharge Lower W. Pegadungan 4º45'S Q5 : 498 m3/s Q10 : 609 m3/s Q25 : 758 m3/s Q50 : 875 m3/s Q100 : 949 m3/s
# Y
5º00'S
Sukaraja Nuban
# Y
RAMAN WEIR
F1
Ú Ê
4 % U 2 METRO % U [ % 1 % U
#
5 % U
# Y
SUGIH
# Y Bulusari
6 % U
Kota Gajah
[ GUNUNG %
Ajitua
Ratu
F1
# Y
AJIBARU WEIR
# Haduyang Y
# Tambah Subur Y
#Ruktiharjo Y
Bandarjaya
F2
Kab: Lampung Tengah Kec: Rumbia Village: Rumbia River: Way Seputih Average inund. depth: 2.0-3.0 m (Mar, 2001) Inundated area: 800 ha Average inundation: 15 days
# Y
Tanjung Harapan
W
# Y
Y Kesumadadi
480,000mE
#Reno Basuki Y
Suko # Binangun Y
F1
460,000mE
F2 Gaya Baru
Gunung Batin Ilir
# Y
Kab: Lampung Tengah Kec: Padang Ratu Village: Kota Baru River: Way Waya Average inund. depth: 1.0-1.5 m (every two years) Inundated area: 300 ha Average inundation: 2 days
F1
#
Ú Ê
Peak Discharge Segala Mider Q5 : 59 m3/s Q10 : 77 m3/s Q25 : 102 m3/s Q50 : 123 m3/s 9,420,000mN Q100 : 145 m3/s
F3
Y Jatidatar Mataram
Peak Discharge Ajibaru Weir Q5 : 153 m3/s Q10 : 193 m3/s Q25 : 249 m3/s Q50 : 294 m3/s Q100 : 342 m3/s
Negri Kepayungan
F2
Bumi # Nabung Ilir Y
% U
9,440,000mN
F2
ú
% U
Peak Discharge Lower W. 4º30'S Seputih Q5 : 1742 m3/s Q10 : 2051 m3/s Q25 : 2461 m3/s Q50 : 2781 m3/s Q100 : 3115 m3/s
F1
n sa ru Te Way
Peak Discharge Terbanggi Besar Q5 : 196 m3/s Q10 : 247 m3/s Q25 : 316 m3/s Q50 : 371 m3/s Q100 : 430 m3/s
% U
% U
Peak Discharge Lower W. Terusan Q5 : 472 m3/s Q10 : 579 m3/s Q25 : 721 m3/s Q50 : 834 m3/s Q100 : 953 m3/s
Flooded area identified by interpretation of LANDSAT TM7, Jan 2002 images Peak Discharge
Bridge
% U
Kab: Lampung Tengah Kec: Terusan Nyunyai Village: Gunung Batin Baru River: Way Terusan Average inund. depth: 2.0 m (every two years) Inundated area: 400 ha Average inundation: 2 wks
F3 : Seasonnal tidal flooding (2-4 wks/year, during highest sea water levels) Area: 7,720 ha in coastal region
4 Flood protection works % U ú
Flood protection works - DAS Seputih No. River Kota/Kabupaten Structure Dimension W. Batanghari Kodya Metro Embankment 5,500 m 1 Slope protection 0m Drain flaps 41 units 9,480,000mN Check dam 0 units Culvert 41 units 0 units Washing steps W. Bunut Kodya Metro Embankment 12,000 m 2 Slope protection 6,500 m Drain flaps 61 units Check dam 0 units Culvert 61 units Washing steps 0 units Embankment W. Sukadana Lampung Timur 1,600 m 3 Slope protection 1,300 m 6 units Drain flaps 0 units Check dam Culvert 6 units 3 units Washing steps W. Raman Lampung Timur 800 m Embankment 4 Slope protection 1,500 m 9,460,000mN 1 units Drain flaps 0 units Check dam 0 units Culvert 1 units Washing steps W. Waya Lampung Tengah Embankment 800 m 5 Srimulyo Slope protection 1,500 m 1 units Drain flaps 0 units Check dam 0 units Culvert 1 units Washing steps W. Waya Lampung Tengah Embankment 740 m 6 0m Slope protection PENGUBUAN 2 units Drain flaps WEIR 0 units Check dam # Y 2 units Culvert 0 units Washing steps
105º45'E
Ú Ê
# Pekalongan Y
[ 3 SUKADANA%
% U
GARONGAN WEIR Donomulyo
# Y
Peak Discharge Raman Fajar Q5 : 76 m3/s Q10 : 98 m3/s Q25 : 130 m3/s Q50 : 155 m3/s Q100 : 182 m3/s
#Bantul Y
Kab: Lampung Timur Kec: Pekalongan Village: Tulus Rejo River: Way Bunut Average inund. depth: 1.0 m (every two years) Inundated area: 150 ha Average inundation: 3 days
Kab: Lampung Tengah Kec: Seputih Raman Village: Rukti Endah River: Way Raman Average inund. depth: 1.0-1.5 m (every two years) Inundated area: 300 ha Average inundation: 10 days
Kab: Lampung Timur Kec: Purbolinggo Village: Tegal Ombo River: Way Sukadana Average inund. depth: 1.0-1.5 m (every two years) Inundated area: 750 ha Average inundation: 2 wks
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT
PROJECT MANAGEMENT UNIT (PMU) LAMPUNG
Flood Prone Areas DAS Seputih
5º15'S
SWS Seputih - Sekampung 580,000mE
Scale 1 : 400,000
105º30'E
Wa y Peg a
12 km
Peak Discharge Seputih Surabaya Q5 : 933 m3/s Q10 : 1120 m3/s Q25 : 1368 m3/s Q50 : 1563 m3/s Q100: 1768 m3/s
560,000mE
8
ú
4
Peak Discharge Lower W. Pengubuan Q5 : 344 m3/s Q10 : 425 m3/s Q25 : 535 m3/s Q50 : 622 m3/s Q100 : 714 m3/s
540,000mE
E S
0
105º15'E
ú
W
105º00'E
F0 : Incidental flooding caused by extreme high run-off in short time (flash floods) Area: 0 ha in upper region (mountainous, steep slope)
600,000mE
FLOOD PRONE AREAS
104º45'E
N
Date : 25:Oct:2004 Sources: PMU Lampung (Landsat TM7, Jan 2002; Topography Map BAKOSURTANAL; field cross checks)
Scale: 400,000
104º45'E
105º00'E
G. ULUWAISAMANG
Ú Ê
Ú Ê
Flooded area identified by interpretation of LANDSAT TM7, Jan 2002 images
ú
# Y Sidomulyo
# Palas Y
Peak Discharge Sidomulyo Q5 : 38 m3/s Q10 : 50 m3/s Q25 : 67 m3/s Q50 : 81 m3/s Q100 : 96 m3/s
E
4
8
12 km
Scale 1 : 400,000 LEGEND: [ Y# City/Town %
Ú Ê
Dam/Weir Trans Sumatra road Railway River order I River order II
RIVER MOUTH
F2
N
0
5º30'S
F3
[%KALIANDA 5º45'S
Peak Discharge Bunut Q5 : 1205 m3/s Q10 : 1435 m3/s Q25 : 1740 m3/s Q50 : 1978 m3/s Q100 : 2229 m3/s
G. RAJABASA Watershed boundary SWS Seputih-Sekampung boundary
9 Flood protection works % U ú Bridge
Kab: Lampung Selatan Kec: Palas Village: Suka Randeg River: Way Cempaka Average inund. depth: 2.0-2.5 m (Jan, 2002)) Inundated area: 2000 ha Average inundation: 1 month 560,000mE
500,000mE
F3 : Seasonnal tidal flooding (2-4 wks/year, during highest sea water levels) Area: 3,310 ha in coastal region
# Y
# Tanjungan Y
ú
Peak Discharge Lower W. Ketibung Q5 : 163 m3/s Q10 : 206 m3/s Q25 : 265 m3/s Q50 : 313 m3/s Q100 : 363 m3/s
S
F2 : Seasonnal flooding (wet season Jan-Feb) caused by high river water discharge blocked by tide (backwater) Area: 41,760 ha in lower region (former swamps)
Pasir Sakti
# Asahan Y
Kab: Tanggamus Kec: Pringsewu Village: Blitarejo River: Way Bulok Average inund. depth: 1.5 m (every two years) Inundated area: 220 ha Average inundation: 1-2 wks
F1 : Seasonnal flooding (wet season Jan-Feb) caused by high river water discharge and poor drainage conditions Area: 48,460 ha in middle region (alluvial plains)
480,000mE
460,000mE
F1
F1
Panjang Y #
F0 : Incidental flooding caused by extreme high run-off in short time (flash floods) Area: 420 ha in upper region (mountainous, steep slope)
SWS Seputih - Sekampung
Ú Ê
Peak Discharge Jabung Weir Q5 : 1008 m3/s Q10 : 1207 m3/s Q25 : 1471 m3/s Q50 : 1679 m3/s Q100 : 1896 m3/s
# Jabung Y
G. PEASWARAN (G. Ratai)
FLOOD PRONE AREAS
Flood Prone Areas DAS Sekampung
Waway Karya Y #
BANDAR LAMPUNG G. BETUNG
W
PROJECT MANAGEMENT UNIT (PMU) LAMPUNG
JABUNG WEIR
Jatibaru
# Y
WAY SEMAH (flash flood occured on 09 Jan 2004)
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT
Pugung Raharjo
# Gedong Tatan Y
F0
% U
Date : 25:Oct:2004 Sources: - Landsat TM7, Jan 2002 - Topography map BAKOSURTANAL Scale: 400,000 - field survey July 2004
ú
# Y
9 % U
% U
Peak Discharge Lower W. Bekarang Q5 : 76 m3/s Q10 : 98 m3/s Q25 : 130 m3/s Q50 : 155 m3/s Q100 : 182 m3/s
Natar
No. River 7 W. Bulok
9,360,000mN
LAMPUNG PROVINCE
# Kedondong Y
Flood protection works - DAS Sekampung
% U
Bandar #S Lampung
S #
[ %
# Y
Kab: Tanggamus Kec: Pringsewu Village: Pujodadi River: Way Napal Average inund. depth: 1 m (every two years) Inundated area: 600 ha Average inundation: 1 wk
S #
6ºS
F1
Gadingrejo Y #
G. TANGGAMUS
Kabupaten Structure Dimension Tanggamus Embankment 17,500 m Slope protection 600 m Drain flaps 8 units Check dam 0 units Culvert 8 units Washing steps 4 units 9,380,000mN W. Napal Tanggamus 5,000 m Embankment 8 0m Slope protection 6 units Drain flaps 0 units Check dam 6 units Culvert 0 units Washing steps W. Bulok. Tanggamus Embankment 3,000 m 9 Sukamara Slope protection 200 m Drain flaps 5 units Check dam 0 units Culvert 5 units Washing steps 0 units
Metro
Kalianda#S
# Y
7 % U
Pardasuka
Sukadana
S #
To SUKADANA
9,400,000mN
Gunung Sugih S #
Kotaagung
Margototo
F1
NGISON WEIR
S #
S #
# Y
Pringsewu
Ú Ê 8 % U
PH.020
Kotabumi
Li wa
5ºS
# Y
F1
ú TEBU WEIR # Y
# Rantau Y Pagelaran Tijang
S #
S #
5º15'S
SukoharjoY #
# Y
# Y
Menggala
Blambangan Umpu
Peak Discharge Sukaraja Tiga Q5 : 889 m3/s Q10 : 1069 m3/s Q25 : 1308 m3/s Q50 : 1495 m3/s Q100 : 1693 m3/s
ARGOGURUH WEIR
G. RINDINGAN Pulau # Y Panggung
F1
5º00'S
Tanjung Harapan
# Y Way Sekam p ung
540,000mE
Ú Ê
BATUTEGI DAM
# Y
105º45'E 105ºE
104ºE 4ºS
Banarjoyo
ú
Peak Discharge Bulokarta Q5 : 270 m3/s Q10 : 336 m3/s Q25 : 426 m3/s Q50 : 497 m3/s Q100 : 573 m3/s
Sumber Gede
ú
9,420,000mN
Peak Discharge Tegres Q5 : 83 m3/s Q10 : 108 m3/s Q25 : 141 m3/s Q50 : 168 m3/s Q100 : 197 m3/s
To GU NUN SUGIH G
Peak Discharge Pujo Rahayu Q5 : 483 m3/s Q10 : 592 m3/s Q25 : 737 m3/s Q50 : 852 m3/s Q100 : 973 m3/s
Peak Discharge Argoguruh Q5 : 587 m3/s Q10 : 714 m3/s Q25 : 884 m3/s Q50 : 1019 m3/s Q100 : 1160 m3/s
105º30'E
Kab: Lampung Timur Kec: Sekampung Udik Village: Pugung Raharjo River: Way Sekampung Average inund. depth: 1.5-2.0 m (Jan, 2002) Inundated area: 400 ha Average inundation: 2 wks
# Y 580,000mE
Peak Discharge Jurak Q5 : 205 m3/s Q10 : 258 m3/s Q25 : 329 m3/s Q50 : 386 m3/s Q100 : 447 m3/s
9,440,000mN
105º15'E
Kab: Lampung Selatan Kec: Gedong Tataan Village: Bagelen River: Way Semah Average inund. depth: 0.3-1 m (Jan, 2004) Inundated area: 420 ha Average inundation: 2-3 days
520,000mE
104º30'E
Bakauheni
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
d. Pengelolaan daerah rawa & rawan banjir • Untuk daerah yg perlu penanganan segera: mitigasi dengan secara teknik (jaringan drainasi, tanggul banjir & pintu outlet). 5 lokasi: Rawa Kijing/Bulok (1100 ha), sebagian daerah Rawa Sragi (8000 ha), Rawa Sido Rahayu (800 ha), Bumi Nabung (1300 ha), dan Sub-DAS Waya di Ds.Kotabaru (700 ha) {+ Bandar Lampung} • Untuk daerah yang sudah dilengkapi dgn infrastruktur pengendalian: O&P • Untuk daerah yang lain: Upaya non-teknik dgn pendekatan hidup harmonis dengan banjir Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
e. Sistem peringatan dini banjir • Untuk memberikan peringatan akan datangnya banjir kepada masyarakat di daerah rawan banjir • Dilakukan dengan memantau pergerakan muka air. Prioritas pada Sekampung & Seputih. • Ditetapkan 6 titik pengamatan, 3 titik di Skp (Pujorahayu, Argoguruh, Bungkuk), dan 3 titik di Spt (Ajibaru, Buyut Udik, Seputih Surabaya). • Arus informasi: Lapangan Task Force Balai PSDA Kepala Balai Dinas Pengairan Satkorlak
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
(6) Operasi & Pemeliharaan a. Berdasar UU no.7/2004: b. O&P di tingkat tersier menajdi tanggung jawab petani/P3A c. Organisasi O&P: •
Dinas Pengairan Provinsi Balai PSDA
•
Dinas Pengairan Kab/Kota Cabang / Ranting Dinas/UPTD
d. Tugas Balai PSDA
Department of Public Works
•
Operasi: pengelolaan data, perencanaan, pengawasan, monitoring & evaluasi
•
Pemeliharaan: pengelolaan data, perencanaan, pelaksanaan, pengawasan, monitoring & evaluasi
•
Pengendalian & pengamanan banjir, kekeringan
•
Kualitas air: monitoring & evaluasi
•
Peningkatan kesadaran publik
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
European Union
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
e. Biaya O & P Table 8.1 - Routine maintenance and minor repair costs for irrigation and drainage schemes
Scheme
Annual Minor Repair costs Total Routine Annual Routine Maintenance (25% of routine maintenance, Mainte costs (in mill Rp) in mill Rp) nance, Minor Funct. Repair (in mill area (ha) Main Main & Tert. Main Tert. Main & Rp) Tert system System system System Tert (Dinas)
Unit cost in Rp*1,000/ha Large (irrig +drainage) 106.210 Medium 28.360 Small to medium 7.730 Small schemes 43.460 Total (rounded) 185.760
106 11.258 3.006 819 4.607 19.691
(P3A) 61 6.462 1.725 470 2.644 11.302
(D+P3A) (Dinas) 167 17.720 4.732 1.290 7.251 30.993
27 2.815 752 205 1.152 4.923
(P3A) 15 1.616 431 118 661 2.826
(D+P3A)
(D+P3A)
42 4.430 1.183 322 1.813 7.748
209 22.150 5.915 1.612 9.064 38.700
Notes: Large schemes : Unit costs for routine maintenance of main system is collected from BAPPEDA Lampung Province. Other unit costs are based on inventory of existing allocated funds fiscal year 2003-2004 Small-medium schemes : Unit costs for routine maintenance are based on assesment by BALAI and Project staff. Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
(7) Neraca Air a. Kebutuhan air irigasi • Dgn pola tanam: MT1=padi, MT2=padi dan palawija, kebutuhan air irigasi adalah: DAS Seputih
Musim hujan (m3/dt)
Musim Kmr (m3/dt)
55,9
9,4
144,7
24,6
Kambas - Jepara
16,3
2,8
Bandar Lampung - Kalianda
19,4
3,3
236,3
40,1
Sekampung
Total keb.air irigasi SWS (saat ini)
Catatan: kebutuhan setelah 10 tahun yad menjadi 264 m3/dt (ms.hujan) dan 44 m3/dt (ms.kemarau) Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
b. Kebutuhan air untuk Non-irigasi • Mencakup air untuk PDAM, industri, prosesing unit pertanian/perkebunan, pertambangan dan untuk konservasi lingkungan. • Tidak mencakup air bersih penduduk di permu-kiman yang umumnya menggunakan air tanah. • Kebutuhan air non-irigasi besarnya 14 m3/dt sepanjang tahun. • Pertumbuhan kebutuhan air non-irigasi: PDAM 4% /tahun, Industri 5% / tahun. Setelah 10 th men-datang, total kebutuhan air non-irigasi menjadi 16,4 m3/dt.
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
c. Neraca Air SWS • Model neraca air hanya dibuat untuk DAS Spt & Skp karena Spt-Skp mencakup 82% Area, 84% penduduk • Model neraca air I: dgn unit terkecil Region • Model neraca air II: dgn unit terkecil Sub-DAS • Parameter yang ditinjau: (i) ketersediaan air run-off, (ii) kebutuhan air potensial, (iii) aliran masuk-keluar bagian yg ditinjau, (iv) suplai air aktual. • Hasil analisis yang diamati: (i) faktor k, dan (ii) ratio suplai – demand (kebutuhan). • Q balance = Qin (-Qout) + Qrun - Qsup
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Faktor k & S/D
k
Deficit
S/D
Sufficiency
> 100%
Tdk ada
> 80%
Sufficient
70-100%
Minor
50-80%
Insufficient
50-70%
Substansial
<50%
<50%
Highly insuff.
Parah DAS
Q run 50% (m3/dt)
Q run 80% (m3/dt)
Bagian Hulu
35,6
24,9
Bagian Tengah
29,9
9,5
Bagian Hilir
61,2
19,3
6,4
3,8
45,0
12,8
125,3
37,9
Bd.Lampung-Kalianda
17,0
6,0
Kambas-Jepara
31,0
10,0
351,4
124,2
Run-off:
Sekampung
Seputih Bagian Hulu Bagian Tengah Bagian Hilir
Department of Public Works
Total SWS Spt-Skp
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
European Union
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG WATER ALLOCATION ANALYSIS OF SEKAMPUNG (Without Intervention) Dry year - At present
Contoh model neraca air II Sub-DAS Batutegi (SK-01) CA (km2) 433,3 Resv.(ha) 2.100 Run-off (MCM) Wtr.Demand (MCM) Wet S. Dry S. Wet S. Dry S. 170 120 15 16 290 31
Hasil modelling ini sesuai dgn model I Sub-DAS Ilahan (SK-02) Irr.Density (ha/sq.km) 11 Cp'ty(MCM) 119 CA (km2) 388,1 Irr.A (ha) 4.446 Run-off (MCM) Wtr.Demand (MCM) K factor Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 154 23 119 21 65% 56% 177 140 63% Run-off at div. (MCM) Wtr.Supply (MCM) Ratio (Suppl/Demand) Wet S. 77
Dry S.
Wet S.
11
77
89
Dry S.
Wet S.
0
65%
77
Wet S.
0%
56
55%
CA (km2)
Bulok (SK-15) 565,5
Irr.A (ha)
Irr.Density (ha/sq.km) 17.883
Run-off (MCM) Wtr.Demand (MCM) Wet S. Dry S. Wet S. Dry S. 109 20 481 84 130 565 Run-off at div. (MCM) Wtr.Supply (MCM) Wet S. Dry S. Wet S. Dry S. 88 16 72 6 104 78
Cp'ty(MCM)
Dry S. 27
Severe Outflow (MCM) Wet S. Dry S. 79 37 116
CA (km2) 821,4 Run-off (MCM) Wet S. Dry S. 500 191 691
Env.demand: 31 OK
Bulokarto
32 477
Gatel Village
K factor Wet S. Dry S. 18% 20% 18% Severe Ratio (Suppl/Demand) Outflow (MCM) Wet S. Dry S. Wet S. Dry S. 15% 7% 37 14 14% 52
Sub-DAS Semah (SK-14) Irr.Density (ha/sq.km) 12 CA (km2) 254,2 Irr.A (ha) 3.140 Cp'ty(MCM) 84 Run-off (MCM) Wtr.Demand (MCM) K factor Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 49 9 85 15 35% 37% 58 99 35% Ratio (Suppl/Demand) Run-off at div. (MCM) Wtr.Supply (MCM) Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 30 6 30 2 35% 16% 35 32 32%
Severe Outflow (MCM) Wet S. Dry S. 14 7 21
CA (km2) 1.694,7 Run-off (MCM) Wet S. Dry S. 616 242 859
CA (km2) 2.139,7 Run-off (MCM) Wet S. Dry S. 640 255 895 40,6 16,2
Env.demand: 31 OK
Wtr.Supply (MCM) Wet S. Dry S. 1,4 1,4 2,8 Sub-DAS Kandis (SK-13) Irr.Density (ha/sq.km) 2 CA (km2) 435,9 Irr.A (ha) 670 Cp'ty(MCM) 18 Run-off (MCM) Wtr.Demand (MCM) K factor Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 79 15 18 3 65% 64% 94 22 64% Modrt ?? Run-off at div. (MCM) Wtr.Supply (MCM) Ratio (Suppl/Demand) Outflow (MCM) Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 12 2 22 1 65% 21% 21 14 14 23 64% 35
Sub-DAS Skp.Anak (SK-03) CA (km2) 190,8 Irr.A (ha) Run-off (MCM) Wtr.Dema Wet S. Dry S. Wet S. 29 4 24 34 2 Run-off at div. (MCM) Wtr.Supp Wet S. Dry S. Wet S. 17 3 17 20 1
Env.demand: 31 Sekampung Irrigation OK Irr.A (ha) 58.640 Cp'ty(MCM) 1820 Wtr.Demand (MCM) K factor m3/s Wet S. Dry S. Wet S. Dry S.
PDAM W.Rilau
Department of Public Works
m3/s
Jurak
82
Sub-DAS Tebu (SK-16) Irr.Density (ha/sq.km) 26 Cp'ty(MCM) 210 CA (km2) 307,8 Irr.A (ha) 7.885 Run-off (MCM) Wtr.Demand (MCM) K factor Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 67 10 192 33 28% 25% 77 225 27% Run-off at div. (MCM) Wtr.Supply (MCM) Ratio (Suppl/Demand) Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 54 8 0 0 0% 0% 62 0 0% Sub-DAS
Modrt Outflow (MCM)
Dry S.
Vol (MCM) 700 Outflow (MCM) Wet S. Dry S. 155 104 259 Outflow BTG (MCM) 445 164 609 28,2 10,4 19,3
1.312
Argoguruh CA (km2) 2.139,7 Run-off (MCM) Wet S. Dry S. 242 57 299
CA (km2) 2.484,3 Run-off (MCM) Wet S. Dry S. 300 94
227
49%
1.539 Wtr.Supply (MCM) Wet S. Dry S. 397 196 593
Env.demand 59 Not OK Sub-DAS Argogrh SK-04 CA (km2) 344,6 Run-off (MCM) Wet S. Dry S. 67 12 79 Env.demand: 59
112%
58% Ratio (Suppl/Demand) Wet S. Dry S. 30% 87% 39%
Outflow (MCM) Wet S. Dry S. 59 37 74
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
European Union
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Close up model neraca air II Sub-DAS Bulok (SK-15) CA (km2)
565,5
Irr.A (ha)
Irr.Density (ha/sq.km) 17.883 Cp'ty(MCM)
Bulokarto
32 477
Gatel Village
Run-off (MCM) Wtr.Demand (MCM) K factor Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 109 20 481 84 18% 20% 130 565 18% Severe Run-off at div. (MCM) Wtr.Supply (MCM) Ratio (Suppl/Demand) Outflow (MCM) Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 88 16 72 6 15% 7% 37 14 104 78 14% 52 Sub-DAS Semah (SK-14) Irr.Density (ha/sq.km) 12 CA (km2) 254,2 Irr.A (ha) 3.140 Cp'ty(MCM) 84 Run-off (MCM) Wtr.Demand (MCM) K factor Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 49 9 85 15 35% 37% 58 99 35% Run-off at div. (MCM) Wtr.Supply (MCM) Ratio (Suppl/Demand) Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. 30 6 30 2 35% 16% 35 32 32%
Severe Outflow (MCM) Wet S. Dry S. 14 7 21
CA (km2) 1.694,7 Run-off (MCM) Wet S. Dry S. Env.demand 616 242 31 859 OK
CA (km2) 2.139,7 Run-off (MCM) Wet S. Dry S. Env.demand 640 255 31 895 OK 40,6 16,2 m3/s
Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING Hasil model neraca air I for SWS WAY SEPUTIH – WAY SEKAMPUNG Table 2.10.a - Water balance for DAS Sekampung (1 out of 2 years) Now Description Upper region Middle region Lower region Wet S. Dry S. Wet S. Dry S. Wet S. Dry S.
INFLOW RUN-OFF river SUPPLY DEMAND Irrigation Drinking water PDAM Industry/plant/mining Environmental flow Total demand BALANCE K factor Deficit S-D factor
Qin (m3/s) Qrun (m3/s) Qsup (m3/s) Qdem (m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s)
Match between S and D
0,0 52,5 10,9
0,0 18,7 4,4
41,6 44,2 15,0
16,1 15,7 4,4
70,8 90,8 67,7
6,9 0,0 0,0 0,0 6,9 45,6 100% None >80% Suffici ent
1,2 0,0 0,0 0,0 1,2 17,5
46,5 0,1 0,0 2,0 48,6 37,2 70% Minor 31% Highly Insuff.
7,9 0,1 0,0 2,0 10,0 21,8
91,3 0,0 0,0 3,8 95,1 66,5
Balance = Qin + Qrun - Qdem (m3/s) Water balance is based on 50% probability
>100%
None >80% Suffici ent
27,4 31,6 25,0
15,5 0,0 0,0 3,8 19,3 39,7 >100% >100% 90% None None Minor 44% 71% >80% Highly Insuffi Suffici Insuff. cient ent
Wet S. Dry S. Wet S. Dry S. Wet S. Dry S. Qin (m3/s) Qrun (m3/s) Qsup (m3/s) Qdem (m3/s) (m3/s) (m3/s) (m3/s) (m3/s) (m3/s)
Deficit S-D factor Match between S and D
Department of
Balance Qin + Qrun - Qdem (m3/s) Public=Works Water balance is based on 80% probability
after 10 years Upper region Middle region Lower region
Wet S. Dry S. Wet S. Dry S. Wet S. Dry S.
Wet S. Dry S. Wet S. Dry S. Wet S. Dry S.
0,0 52,5
0,0 18,7
0,0 38,0 6,3 6,9 0,0 0,0 0,0 6,9 31,1 65% Subst antial >80% Suffici ent
0,0 11,9 -0,2
31,7 16,2 7,3
12,1 2,8 -1,2
40,6 32,7 44,0
16,2 5,8 10,1
1,2 46,5 7,9 91,3 15,5 0,0 0,1 0,1 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 2,0 2,0 3,8 3,8 1,2 48,6 10,0 95,1 19,3 10,7 -0,7 4,9 -21,8 2,7 56% 28% 27% 52% 36% Subst Subst Severe Severe Severe antial antial -17% 15% -12% 46% 52% Highly Highly Highly Highly Highly Insuff. Insuff. Insuff. Insuff. Insuff.
41,6 44,2
16,1 15,7
70,8 90,8
27,4 31,6
6,9 1,2 46,5 7,9 107,3 18,2 0,0 0,0 2,2 2,2 0,0 0,0 0,0 0,0 0,0 0,0 0,1 0,1 0,0 0,0 2,0 2,0 3,8 3,8 6,9 1,2 50,7 12,1 111,1 22,0 45,6 17,5 35,1 19,7 50,5 37,0 100% >100% 70% >100% >100% 90% None None Minor None None Minor
K factor (= discharge / irrigation demand) Value Deficit > 100 %None 70-100 %Minor 50-70 %Substantial < 50 % Severe
Table 2.10.b - Water balance for DAS Sekampung (4 out of 5 years) Now Description Upper region Middle region Lower region
INFLOW RUN-OFF river SUPPLY DEMAND Irrigation Drinking water PDAM Industry/plant/mining Environmental flow Total demand BALANCE K factor
after 5 years Upper region Middle region Lower region
0,0 52,5
0,0 18,7
41,6 44,2
16,1 15,7
70,8 90,8
27,4 31,6
6,9 1,2 46,5 7,9 117,5 19,9 0,0 0,0 2,6 2,6 0,0 0,0 0,0 0,0 0,0 0,0 0,1 0,1 0,0 0,0 2,0 2,0 3,8 3,8 6,9 1,2 51,2 12,5 121,4 23,8 45,6 17,5 34,6 19,3 40,2 35,2 100% >100% 70% >100% 97% 82% None None Minor None Minor Minor
S-D factor (= supply / demand) indicating match between actual supply and demand Value Water availibility > 80% Sufficient 50-80% Insufficient < 50% Highly insufficient
after 5 years Upper region Middle region Lower region
after 10 years Upper region Middle region Lower region
Wet S. Dry S. Wet S. Dry S. Wet S. Dry S.
Wet S. Dry S. Wet S. Dry S. Wet S. Dry S.
0,0 38,0
0,0 11,9
31,7 16,2
12,1 2,8
40,6 32,7
16,2 5,8
6,9 1,2 46,5 7,9 107,3 18,2 0,0 0,0 2,2 2,2 0,0 0,0 0,0 0,0 0,0 0,0 0,1 0,1 0,0 0,0 2,0 2,0 3,8 3,8 6,9 1,2 50,7 12,1 111,2 22,1 31,1 10,7 -2,8 2,8 -37,9 -0,1 65% 56% 28% 27% 52% 36% Subst Subst Subst Severe Severe Severe antial antial antial
K factor (= discharge / irrigation demand) Value Deficit > 100 %None 70-100 %Minor 50-70 %Substantial < 50 % Severe
0,0 38,0
0,0 11,9
12,1 2,8
40,6 32,7
16,2 5,8
6,9 1,2 46,5 7,9 117,5 19,9 0,0 0,0 2,6 2,6 0,0 0,0 0,0 0,0 0,0 0,0 0,1 0,1 0,0 0,0 2,0 2,0 3,8 3,8 6,9 1,2 51,2 12,5 121,4 23,8 31,1 10,7 -3,3 2,4 -48,1 -1,8 65% 56% 28% 27% 48% 33% Subst Subst Severe Severe Severe Severe antial antial
S-D factor (= supply / demand) indicating match between actual supply and demand Value Water availibility
GOOD GOVERNANCE in WATER RESOURCE> 80% MANAGEMENT PROJECT Sufficient 50-80% Insufficient < 50% Highly insufficient
31,7 16,2
European Union
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Resume model neraca air I DAS / Bagian
Area
Penduduk
Irigasi (%)
Deficit air sekarang dan y.a.d
4.000
3
Sustansial
48
30.000
24
Parah
981.000
41
93.000
73
2.408.000
100
127.000
100
(Ha)
(%)
(Jiwa)
(%)
(Ha netto)
82.100
17
280.000
12
Tengah
131.800
28
1.147.000
Hilir
264.600
55
Total Skp
478.500
100
18.000
3
71.000
5
0
0
Tengah
144.100
20
252.000
17
19.000
49
Tdk ada
Minor
Hilir
557.000
77
1.143.000
78
20.000
51
Substansial
Parah
Total Spt
719.100
1.466.000
100
39.000
100
Sekampung Hulu
Substansial
Parah
Seputih Hulu
Department of Public Works
100
Tdk ada
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
(8) Kesimpulan dan rekomendasi strategi kebijakan dalam bidang SDA a. Pada saat ini neraca air di SWS Spt Skp sudah dalam kondisi yang kritis. Deficit neraca air yang parah terjadi di daerah yang padat penduduknya, dan pada daerah dengan kepadatan daerah irigasi yang tinggi. b. Diperlukan upaya agar decifit air tidak menjadi semakin parah, dengan cara (i) tidak menambah pendaya gunaan air untuk irigasi, (ii) mengatur kembali prioritas pendaya gunaan air, (iii) meningkatkan efisiensi penggunaan air, (iv), meningkatkan upaya konservasi sumber daya air, c. Untuk mengatasi dampak kerusakan akibat banjir yang terus meningkat, diperlukan perumusan kembali upaya pengendalian daya rusak air secara teknis dan non-teknis. Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT
PRESENTATION on INTEGRATED RIVER BASIN MANAGEMENT PLANNING for SWS WAY SEPUTIH – WAY SEKAMPUNG
Terima Kasih Department of Public Works
European Union
GOOD GOVERNANCE in WATER RESOURCE MANAGEMENT PROJECT