IP CCTV System Design Guide, Camera Installations, Network Video RecorderFull description
IP BSS Engineering Guide(GBSS19.1_01)
Fleischmann HO 4175 BR 50 Upgrade / Umbau Guide - English and German. Complete instructions how to install a digital decoder.Descripción completa
ZTE C300 / C320 Upgrade GuideDescrição completa
RecoverPoint 5.1 Customer Installation and Upgrade GuideDescripción completa
ZTE C300 / C320 Upgrade GuideFull description
ZTE C300 / C320 Upgrade Guide
Full description
Full description
necFull description
Deskripsi lengkap
Descripción: AS A PRIME CONTRACTOR FOR PROJECT LAND 106, BAE SYSTEMS AUSTRALIA WAS RESPONSIBLE FOR THE UPGRADE OF 433 AUSTRALIAN ARMY M113A1 VEHICLES TO AS4 STANDARDS, ENABLING ACTIVE SERVICE TO 2020 AND BEYOND.
How to Upgrade UMPT
SAP UpgradeFull description
Full description
内部公开 Internal Use Only▲
NEC iPasolink-200 All IP Upgrade Guide Attention: 1. This guide is to introduce how to upgrade all IP in iPasolink-200 equipments. 2. Make sure that equipments are in power off status during the dismantle & install process. 3. Please be gentle enough to avoid breaking equipments during the dismantle & install process. 4. There may be some mismatching in actual situation. Please do following operations cautiously and accordingly.
1
iPasolink-200 License Importing Login the Web LCT interface. S/W License Setup -> Import License Key. Click “Setup”.
Import the License key correspondingly.
<以上所有信息均为中兴通讯股份有限公司所有,不得外传> All Rights reserved, No Spreading abroad without Permission of ZTE
第1页
内部公开 Internal Use Only▲
After importing, check the S/W License Information.
<以上所有信息均为中兴通讯股份有限公司所有,不得外传> All Rights reserved, No Spreading abroad without Permission of ZTE
第2页
内部公开 Internal Use Only▲
2
iPasolink-200 Cards Dismantle & install
There are total 4 slots in iPasolink-200 which can insert AUX, STM-1, E1, CLK and Power cards. Notice that the CLK card is concealed under the AUX card.
2.1 Top Cover Board You need to open the top cover board if you want to change any card in iPasolink-200. The top cover board is fixed by 9 screws. At first, you should remove 4 screws on both sides.
<以上所有信息均为中兴通讯股份有限公司所有,不得外传> All Rights reserved, No Spreading abroad without Permission of ZTE
第3页
内部公开 Internal Use Only▲
Remove another 5 screws on the panel.
Hold the top cover board and pull it up gently to remove it.
<以上所有信息均为中兴通讯股份有限公司所有,不得外传> All Rights reserved, No Spreading abroad without Permission of ZTE
第4页
内部公开 Internal Use Only▲
2.2 AUX Card Remove 3 screws fixed on the panel of AUX card.
Remove one screw which is fixed between the AUX card and main board.
After removing all screws, pull it up gently to dismantle the AUX card.
2.3 CLK Card After removing the AUX card, you can find the CLK card which is installed right under the AUX card. <以上所有信息均为中兴通讯股份有限公司所有,不得外传> All Rights reserved, No Spreading abroad without Permission of ZTE
第5页
内部公开 Internal Use Only▲
CLK card is fixed on the main board by a screw. Remove this screw and pull it up gently to dismantle the CLK card.
2.4 STM-1/E1 Card There is one holding screw on the panel of STM-1/E1 card. Besides, there are another 3 screws fixed between the STM-1/E1 card and main board.
After removing all screws, pull it up gently to dismantle the STM-1/E1 card. <以上所有信息均为中兴通讯股份有限公司所有,不得外传> All Rights reserved, No Spreading abroad without Permission of ZTE
第6页
内部公开 Internal Use Only▲
2.5 Power Unit There is one holding screw on the panel of power unit.
There is another screw fixed between the power unit and main board.
After removing all screws, pull it up gently to dismantle the power unit.
2.6 Fan Unit Fan unit is on the right side of iPasolink-200 equipments. If you want to remove it, you just need to screw off the holding screw and take it out gently.
<以上所有信息均为中兴通讯股份有限公司所有,不得外传> All Rights reserved, No Spreading abroad without Permission of ZTE
第7页
内部公开 Internal Use Only▲
3
Equipment Clock Setting
After Dismantle & install cards, login the Web LCT interface. Provisioning -> Equipment Clock / Synchronization -> Equipment Clock Setting. Click “Modify”.
Enable the Sync ETH. Choose “Master” CLK mode in near end IDU. Choose “Slave” in far end.
Disable the external clock.
<以上所有信息均为中兴通讯股份有限公司所有,不得外传> All Rights reserved, No Spreading abroad without Permission of ZTE
第8页
内部公开 Internal Use Only▲
<以上所有信息均为中兴通讯股份有限公司所有,不得外传> All Rights reserved, No Spreading abroad without Permission of ZTE