Specification / Requisition Document No. : B127-LS-EL-0005
Rev. A
Sheet : 1 of 3
Project No. : 2090 / 1764
Document Title : Load List for B-127 Cluster Well Platform.
A
INFORMATION Pre-Bid
S2
SAK
NMC
SBL
Revision
Issued for
PEM Status Level
Prepared by/ Date
Checked by/ Date
Approved by/ Date
Project : B-127 CLUSTER WELL PLATFORM PROJECT Client
: OIL & NATURAL GAS CORPORATION LTD
PC1764001-00 Aker Powergas Pvt. Ltd.
© 2010 Aker Solutions www.akersolutions.com
Aker Powergas Pvt Ltd Revision Record Sheet Sheet : 2 of 3
Document No. : B127-LS-EL-0005
Rev. A
Document Title : Load List for B-127 Cluster Well Platform.
Project : B-127 CLUSTER WELL PLATFORM PROJECT
Client : OIL & NATURAL GAS CORPORATION LTD
Project No. : 2090/1764
Date 23.03.2012
PC1764002-00
Details of Revision PREBID ISSUED FOR INFORMATION.
Load List.doc
Rev. A
Specification / Requisition Document No. : B127-LS-EL-0005
Rev.
Sheet : 3 of 3
Project No. : 2090/1764 Document Title : Load List for B-127 Cluster Well Platform. Enter the Rev of each document enclosed under the current revision of this EDL. Even if document is not revised, repeat the Document Rev under the current revision of EDL. Document Title
Document Number
Document Rev
No. Sheets
EDL Rev. of
A
Load List for B-127 Well Platform
B127-LS-EL-0001
6
A
Load List for B-157 Well Platform
B127-LS-EL-0002
5
A
Load List for B-55-5 Well Platform
B127-LS-EL-0003
5
A
Load List for ZC Well Platform
B127-LS-EL-0004
5
A
PC1764001-00
B
C
0
1
2
PROJECT : B-127 CLUSTER WELL PLATFORM PROJECT ELECTRICAL LOAD LIST FOR B127 PLATFORM.
Notes: 1
This is preliminary load list.The load data is based on the experience on similar ONGC Projects.
2
Nav Aid wattage is calculated based on current data available from vendor and average current drawn specified for the same in previous similar projects.
Reference Documents:1
Electrical Design Criteria for Well Platforms , SECTION 3.5 , Vol. II Rev 4
2
Functional Specification for Solar Power System - FS 4007, Rev. 3
3
Functional Specification for Navigational Aids System - FS 4003, Rev. 4
OIL AND NATURAL GAS CORPORATION LTD. INDIA
Aker Power Gas Pvt. Ltd.
PC8012301-00
CLIENT : ONGC
S2 PEM STATUS
23.03.2012 SAK MADE BY & DATE
23.03.2012 NMC BY & DATE
23.03.2012 SBL APP BY & DATE
ISSUED FOR ENQUIRY
A REV
STATUS
Page 1 of 6
DOCUMENT NO:
B-127-LS-EL-0001
TITLE :
ELECTRICAL LOAD LIST FOR B127 PLATFORM.
SHT 1 OF 6 REV A
ELECTRICAL LOAD LIST (B127 - System I : 24V DC ) NAV-AIDS SYSTEM
Aker Powergas Pvt. Ltd.
Client:
1
Load Description
Nav Aid Lanterns
Qty.
Rated Voltage
ON
OFF
ON
OFF
ON
4
24
0.4
0.5
0.4
0.50
1.2
TOTAL
1.20
OFF
Duty Cycle
AV. Lamp current incl. Surge
Flasher Quiescent current (A)
12.00
0.13
3.33
0.005
0.13
0.005
Total Daily load = 30.42 AH/DAY
P: PRELIMINARY
D: DESIGN APPROVED
2090/1764
DOC NO.:
B-127-LS-EL-0001
DATE:
3/23/2012
REV :
A
ONGC
Morse code "U" Nav-Aids Lanterns 15 Sec. Sr. No.
PROJECT NO
F: FINAL
SH. 2 OF 6
AV. Daily power Average daily AV. Daily drain including power drain @ power drain battery worse charge/discharge, @ 24V case(Ah/Day) efficiency
7.22
7.6
7.60
30.42
30.42
Status
P
Remarks
ELECTRICAL LOAD LIST (B127: 24V DC )
Aker Powergas Pvt. Ltd. Client:
PROJECT NO DOC NO.: DATE:
2090/1764 B-127-LS-EL-0001 3/23/2012
REV :
A
ONGC Duty Average Energy Run Up Total Energy Unit Load @ Cycle/ Current Time In Consumed in Consumed in 24V DC Load 24V Load Drawn @ 24V Hrs./Day (Amp.) Ah/Day WH/Day DC (Amp.) Factor (Amp.)
Qty.
Rated Voltage
Unit Load (Watt)
Total Load (Watt)
4
24
50
200
0.25
2.0833
50
2.083333333
8.333333 0.01042 0.086805556
P
2.1 Electronic transmitter (FT, TT, PT, LT)
44
24
0.5
22
24
22.0000
528
0.020833333
0.916667
1
0.916666667
P
2.2 Isolating barriers
61
24
1.6
97.6
24
97.6000
2342.4
0.066666667
4.066667
1
4.066666667
P
2.3 PLC System
1
24
300
300
24
300.0000
7200
12.5
12.5
1
12.5
P
2.4 Patch Panel
2
24
100
200
24
200.0000
4800
4.166666667
8.333333
1
8.333333333
P
2.5 Ethernet switches
20
24
5
100
24
100.0000
2400
0.208333333
4.166667
1
4.166666667
P
2.6 Magnetically latched, pulse operated SOV
6
24
15
90
1
3.7500
90
0.625
3.75
0.04167
0.15625
P
2.7 Multivariable Transmitter
9
24
35
315
24
315.0000
7560
1.458333333
13.125
1
13.125
P
2.8 Coriolis Flow Meter
0
24
7
0
24
0.000
0
0.292
0.000
1
0.000
P
2.9 Pressure Switch
22
24
1.2
26.4
0.01
0.0110
0.264
0.0500
1.1000
0.0004
0.0005
P
2.10 Limit Switch
0
24
1.2
0
0.01
0.0000
0
0.0500
0.0000
0.0004
0.0000
P
2.11 Solenoid Valve
15
24
24
360
0.01
0.1500
3.6
1.0000
15.0000
0.0004
0.0063
P
3.1 Hydrogen Detectors
3
24
4.6
13.8
24
13.8000
331.2
0.191666667
0.575
1
0.575
P
3.2 HC Gas Detectors
23
24
7.5
172.5
24
172.5000
4140
0.3125
7.1875
1
7.1875
P
3.3 H2S Gas Detectors
23
24
4.2
96.6
24
96.600
2318.4
0.175
4.025
1.000
4.025
P
3.4 Heat Detectors
10
24
0.25
2.5
24
2.500
60
0.010
0.104
1.000
0.104
P
3.5 Relays and timers
0
24
10
0
24
0.0000
0
0.416666667
0
1
0
P
3.6 Flashing beacons
4
24
33.6
134.4
0.25
1.4000
33.6
1.4
5.6
0.01042 0.058333333
P
Run-Up time of 0.25hr/day is assumed.
3.7 Electronic hooter
4
24
6
24
0.25
0.2500
6
0.25
1
0.01042 0.010416667
P
Run-Up time of 0.25hr/day is assumed.
3.8 Smoke Detectors
20
24
0.25
5
24
5.000
120
0.010
0.208
1.000
0.208
P
3.9 F&G PLC
1
24
300
300
24
300.0000
7200
12.5
12.5
1
12.5
P
Sr. No.
Load Description
1
Illumination for Level Gauge
2
WELL HEAD PLC
3
4
Status
Remarks
Run-Up time of 0.25hr/day is assumed.
Run-Up time of 1 hr/day is assumed.
F&G PLC
DCS
Page 3 of 6
ELECTRICAL LOAD LIST (B127: 24V DC )
Aker Powergas Pvt. Ltd. Client:
PROJECT NO DOC NO.: DATE:
2090/1764 B-127-LS-EL-0001 3/23/2012
REV :
A
ONGC
4.1 Wet Gas Meter
0
24
35
0
24
0.0000
0
1.458333333
0
1
0
P
4.2 Electronic transmitter (FT, TT, PT, LT)
65
24
0.5
32.5
24
32.5000
780
0.020833333
1.354167
1
1.354166667
P
4.3 Pig detectors
6
24
1.2
7.2
0.01
0.0030
0.072
0.0500
0.3000
0.0004
0.0001
P
4.4 Isolating barriers
70
24
1.6
112
24
112.0000
2688
0.066666667
4.666667
1
4.666666667
P
4.5 Limit Switch
48
24
1.2
57.6
0.01
0.0240
0.576
0.0500
2.4000
0.0004
0.0010
P
4.6 Solenoid Valve
1
24
24
24
0.01
0.0100
0.24
1.0000
1.0000
0.0004
0.0004
P
4.7 Coriolis Flow Meter
1
24
7
7
24
7.000
168
0.292
0.292
1
0.292
P
5.1 Electronic transmitter (FT, TT, PT, LT)
4
24
0.5
2
24
2.0000
48
0.020833333
0.083333
1
0.083333333
P
5.2 Isolating barriers
4
24
1.6
6.4
24
6.4000
153.6
0.066666667
0.266667
1
0.266666667
P
5.3 Pressure Switch
50
24
1.2
60
0.01
0.0250
0.6
0.0500
2.5000
0.0004
0.0010
P
5.4 Solenoid Valve
24
24
24
576
0.01
0.2400
5.76
1.0000
24.0000
0.0004
0.0100
P
5.5 Electronic hooter
1
24
6
6
0.25
0.0625
1.5
0.25
0.25
5.6 PLC System
1
24
300
300
24
300.0000
7200
12.5
12.5
1
12.5
P
6.1 Solenoid Valve
1
24
24
24
0.01
0.0100
0.24
1.0000
1.0000
0.0004
0.0004
P
6.2 Limit Switch
4
24
1.2
4.8
0.01
0.0020
0.048
0.0500
0.2000
0.0004
0.0001
P
6.3 Pressure Switch
1
24
1.2
1.2
0.01
0.0005
0.012
0.0500
0.0500
0.0004
0.0000
P
6.4 Detectors
4
24
1.2
4.8
0.01
0.0020
0.048
0.0500
0.2000
0.0004
0.0001
P
6.5 Hooter
1
24
9.6
9.6
0.01
0.0040
0.096
0.4000
0.4000
0.0004
0.0002
P
6.6 Panel (Internal Load)
1
24
9.6
9.6
0.01
0.0040
0.096
0.4000
0.4000
0.0004
0.0002
P
Flow Computer
2
24
7
14
24
14.000
336
0.292
0.583
1.000
0.583
P
2,107
50,567
5
6
7
SDP PLC
0.01042 0.002604167
P
CO2 Snuffing system
3,719
155
88
Note : These instrumentation loads will be fed from 24V DC power supply from Sagar Laxmi Platform and shall not be considered while designing Solar Power System. TOTAL AVERAGE DEMAND: TOTAL PEAK DEMAND:
97 171
Amps Amps
Page 4 of 6
ELECTRICAL LOAD LIST (B127 - 6.9kV LOADS)
Aker Powergas Pvt. Ltd. Client:
Equipment Sr. No. No.
1
PGC-PM-01
Description
PGC Main Motor
Vendor
PGC
Load
C
Feeder
Motor
PROJECT NO DOC NO.: DATE:
2090/1764 B-127-LS-EL-0001 3/23/2012
REV :
A
ONGC Rating in Load kW Factor
3000
0.89
P.F. ( LAG) Efficiency at at Absorbed Load, kW absorbed absorbed load load
2670
0.90
SH. 5 OF 6
0.92
Input Power Continuous (A)
Stand by (B)
Intermittent (C)
100%
0
20
2902.17
1405.59
0.00
0.00
0.00
0.00
Remarks
Preliminary
ELECTRICAL LOAD LIST (B127 - 440V LOADS)
Aker Powergas Pvt. Ltd. Client:
Equipmen Sr. No. t No.
Description
Vendor
Load
Feeder
PROJECT NO DOC NO.: DATE:
2090/1764 B-127-LS-EL-0001 3/23/2012
REV :
A
ONGC Rating in Load kW Factor
Absorbed Load, kW
P.F. ( LAG) Efficiency at at absorbed absorbed load load
Input Power Continuous (A)
Stand by (B)
Intermittent (C)
100%
0
20
Remarks
A)
PGC Auxillary Load
1
OCI Transfer Pump
PGC
C
Motor
2.2
0.89
1.958
0.90
0.92
2.13
1.03
0.00
0.00
0.00
0.00
Preliminary
2
OCI Injection Pump
PGC
C
Motor
0.37
0.89
0.3293
0.90
0.92
0.36
0.17
0.00
0.00
0.00
0.00
Preliminary
3
OCI Injection Pump
PGC
S
Motor
0.37
0.89
0.3293
0.90
0.92
0.00
0.00
0.36
0.17
0.00
0.00
Preliminary
4
Crude Condensate Pump
PGC
C
Motor
2.2
0.89
1.958
0.90
0.92
2.13
1.03
0.00
0.00
0.00
0.00
Preliminary
I
Ligting
20 (25kVA)
0.85
17
1.00
0.950
0.00
0.00
0.00
0.00
17.89
0.00
Preliminary
B)
Lighting Transformer Package
C)
HPU (B-59 S/S)
Package
C
Supply
75
0.85
63.75
0.90
0.900
70.83
34.31
0.00
0.00
0.00
0.00
Preliminary
D)
HVAC
Package
C
Supply
75
0.85
63.75
0.90
0.900
70.83
34.31
0.00
0.00
0.00
0.00
Preliminary
SH. 6 OF 6
PROJECT : B-127 CLUSTER WELL PLATFORM PROJECT ELECTRICAL LOAD LIST FOR B157 WELL PLATFORM
Notes: 1
This is preliminary load list.The load data is based on the experience on similar ONGC Projects.
2
Nav Aid wattage is calculated based on current data available from vendor and average current drawn specified for the same in previous similar projects.
Reference Documents:1
Electrical Design Criteria for Well Platforms , SECTION 3.5 , Vol. II Rev 4
2
Functional Specification for Hybrid Power System - FS 4007A, Rev. 0
3
Functional Specification for Navigational Aids System - FS 4003, Rev. 4
OIL AND NATURAL GAS CORPORATION LTD. INDIA
Aker Power Gas Pvt. Ltd.
PC8012301-00
CLIENT : ONGC
S2 PEM STATUS
23.03.2012 SAK MADE BY & DATE
23.03.2012 NMC BY & DATE
23.03.2012 SBL APP BY & DATE
ISSUED FOR ENQUIRY
A REV
STATUS
Page 1 of 5
DOCUMENT NO:
B-127-LS-EL-0002
TITLE :
ELECTRICAL LOAD LIST FOR B157 WELL PLATFORM.
SHT 1 OF 5 REV A
ELECTRICAL LOAD LIST (B157 - System I : 24V DC ) TELEMETRY & WELL HEAD SYSTEM
Aker Powergas Pvt. Ltd. Client: Sr. No. 1
Load Description
Qty.
Rated Voltage
Unit Load (Watt)
PROJECT NO DOC NO.: DATE: REV :
2090/1764 B-127-LS-EL-0002 3/23/2012 A
ONGC Total Load (Watt)
Run Up Time In Hrs./Day
Energy Consumed in Ah/Day
Total Energy Unit Load Load 24V Consumed @ 24V DC DC in WH/Day (Amp.) (Amp.)
Duty Cycle/ Load Factor
Average Current Drawn @ 24V (Amp.)
Status
RTU PLC
1.1
Wet Gas Meter
1
24
35
35
24
35.000
840
1.458
1.458
1
1.458
P
1.2
Electronic Transmitter (FT, TT, PT, LT)
13
24
0.5
6.5
24
6.500
156
0.021
0.271
1
0.271
P
1.3
Pig Detectors
1
24
1.2
1.2
0.01
0.001
0.012
0.050
0.050
0.00042
0.000
P
1.4
Isolating Barriers
13
24
1.6
20.8
24
20.800
499.2
0.067
0.867
1
0.867
P
1.5
PLC System
1
24
300
300
24
300.000
7200
12.500
12.500
1
12.500
P
1.6
Microwave Radio during Transmit Micro Radio during Receive Microwave Radio during Sleep Mode
1
24
272
272
24
272.000
6528
11.333
11.333
1
11.333
P
2
Remarks
WELL HEAD PLC
2.1
Electronic Transmitter (FT, TT, PT, LT)
10
24
0.5
5
24
5.000
120
0.021
0.208
1.000
0.208
P
2.2
Isolating Barriers
10
24
1.6
16
24
16.000
384
0.067
0.667
1.000
0.667
P
2.3
PLC System
1
24
300
300
24
300.000
7200
12.500
12.500
1.000
12.500
P
2.4
Patch Panel
2
24
100
200
24
200.000
4800
4.167
8.333
1.000
8.333
P
2.5
Ethernet Switches
20
24
5
100
24
100.000
2400
0.208
4.167
1.000
4.167
P
2.6
Magnetically Latched, pulse operated SOV
6
24
15
90
1
3.750
90
0.625
3.750
0.042
0.156
P
TOTAL
1,347
1,260
30,218
57
53
10% MARGIN
135
126
3,022
6
5
TOTAL (WITH 10% MARGIN )
1,482
1,386
33,240
63
58
TOTAL AVERAGE DEMAND: TOTAL PEAK DEMAND:
P: PRELIMINARY
D: DESIGN APPROVED
58 63
Amps Amps
C: CERTIFIED
F : Final
Page 2 of 5
Run-Up time of 0.25 hr/day is assumed.
ELECTRICAL LOAD LIST (B157 - System II : 24V DC ) LIGHTING, CO2 SNUFFING SYSTEM
Aker Powergas Pvt. Ltd. Client:
Unit Load Total @ 24V Load 24V DC DC (Amp.) (Amp.)
4.167
0.010
0.043
P
1.0000
1.0000
0.0004
0.0004
P
0.048
0.0500
0.2000
0.0004
0.0001
P
0.0005
0.012
0.0500
0.0500
0.0004
0.0000
P
0.01
0.0020
0.048
0.0500
0.2000
0.0004
0.0001
P
9.6
0.01
0.0040
0.096
0.4000
0.4000
0.0004
0.0002
P
9.6
9.6
0.01
0.0040
0.096
0.4000
0.4000
0.0004
0.0002
P
24
60
120
3
15.000
360
2.500
5.000
0.125
0.625
P
2
24
60
120
3
15.000
360
2.500
5.000
0.125
0.625
P
2
24
60
120
3
15.000
360
2.500
5.000
0.125
0.625
P
1
24
51
51
24
51.000
1224
2.125
2.125
1
2.125
P
100
0.25
1.042
25
2.083
24
24
0.01
0.0100
0.24
24
1.2
4.8
0.01
0.0020
1
24
1.2
1.2
0.01
2.4 Detectors
4
24
1.2
4.8
2.5 Hooter
1
24
9.6
2.6 Panel (Internal Load)
1
24
3.1 Electrical/Telemetry Room Lighting
2
3.2 Battery Room Lighting 3.3 Bunk House
24
50
2.1 Solenoid Valve
1
24
2.2 Limit Switch
4
2.3 Pressure Switch
2
Co2 Snuffing System
3
4
A
Status
2
Illumination for Level Gauge
3/23/2012
REV : Average Current Drawn @ 24V (Amp.)
Energy Consumed in WH/Day
1
B-127-LS-EL-0002
DATE:
Duty Cycle/ Load Factor
Energy Consumed in Ah/Day
Rated Voltage
Load Description
2090/1764
DOC NO.:
ONGC Run Up Time In Hrs./Day
Qty.
Sr. No.
PROJECT NO
Unit Load Total Load (Watt) (Watt)
Remarks
Run-Up time of 0.25hr/day is assumed.
Lighting System
Down Hole Instrument
TOTAL
565
98
2,330
24
5
10% MARGIN
57
10
233
2
1
TOTAL (WITH 10% MARGIN )
622
108
2,563
26
6
TOTAL AVERAGE DEMAND:
6
Amps
TOTAL PEAK DEMAND:
26
Amps
P: PRELIMINARY
D: DESIGN APPROVED
F: FINAL
SH. 3 OF 5
Electrical Design Basis Section 3.5, Clause No. 3.5.7.8 Electrical Design Basis Section 3.5, Clause No. 3.5.7.8 Electrical Design Basis Section 3.5, Clause No. 3.5.7.8
ELECTRICAL LOAD LIST (B157 - System III : 24V DC ) FIRE & GAS, SDP PLC SYSTEM
Aker Powergas Pvt. Ltd. Client:
Sr. No.
Load Description
PROJECT NO
2090/1764
DOC NO.:
B-127-LS-EL-0002
DATE:
3/23/2012
REV :
A
ONGC
Qty.
Rated Voltage
Unit Load (Watt)
Total Load (Watt)
Run Up Time In Hrs./Day
Average Energy Unit Load Energy Total Load Duty Cycle/ Current Consume @ 24V 24V DC Consumed Load Drawn @ d in DC (Amp.) Factor in WH/Day 24V Ah/Day (Amp.) (Amp.)
Status
Remarks
1
FIRE AND GAS PLC
1.1
Hydrogen Detectors
3
24
4.6
13.8
24
13.800
331.2
0.192
0.575
1.000
0.575
P
1.2
HC Gas Detectors
8
24
7.5
60
24
60.000
1440
0.313
2.500
1.000
2.500
P
1.3
H2S Gas Detectors
8
24
4.2
33.6
24
33.600
806.4
0.175
1.400
1.000
1.400
P
1.4
Heat Detectors
10
24
0.25
2.5
24
2.500
60
0.010
0.104
1.000
0.104
P
1.5
Smoke Detectors
20
24
0.25
5
24
5.000
120
0.010
0.208
1.000
0.208
P
1.6
Flashing beacons
4
24
33.6
134.4
0.25
1.400
33.6
1.400
5.600
0.010
0.058
P
Run-Up time of 0.25hr/day is assumed.
1.8
Electronic hooter
4
24
6
24
0.25
0.250
6
0.250
1.000
0.010
0.010
P
Run-Up time of 0.25hr/day is assumed.
1.9
Relays & Timers
0
24
6
0
0.25
0.000
0
0.250
0.000
0.010
0.000
P
Run-Up time of 0.25hr/day is assumed.
1.10
F&G PLC
1
24
300
300
24
300.000
7200
12.500
12.500
1.000
12.500
P
2
SDP PLC
2.1
Pressure Switch
8
24
1.2
9.6
0.01
0.004
0.096
0.050
0.400
0.0004
0.0002
P
2.2
Solenoid Valve
1
24
24
24
0.01
0.010
0.24
1.000
1.000
0.0004
0.0004
P
2.3
Limit Switch
2
24
1.2
2.4
0.01
0.001
0.024
0.050
0.100
0.0004
0.0000
P
2.4
PLC System
1
24
300
300
24
300.000
7200
12.500
12.500
1.0000
12.5000
P
717 72 789
17,198 1,720 18,918
TOTAL 10% MARGIN TOTAL (WITH 10% MARGIN ) TOTAL AVERAGE DEMAND: TOTAL PEAK DEMAND:
P: PRELIMINARY
D: DESIGN APPROVED
910 91 1,001 33 42
Amps Amps
C: CERTIFIED
F : Final
SH. 4 OF 5
38 4 42
30 3 33
ELECTRICAL LOAD LIST (B157 - System IV : 24V DC ) NAV-AIDS SYSTEM
Aker Powergas Pvt. Ltd. Client:
1
Load Description
Nav Aid Lanterns
Qty.
Rated Voltage
ON
OFF
ON
OFF
ON
OFF
Duty Cycle
4
24
0.4
0.5
0.4
0.50
1.2
12.00
0.13
TOTAL
1.20
AV. Flasher AV. Daily Lamp Quiescen power current t current drain @ incl. 24V (A) Surge
3.33
0.13
D: DESIGN APPROVED
0.005
0.005
Total Daily load = 30.42 AH/DAY
P: PRELIMINARY
2090/1764 B-127-LS-EL-0002
DATE:
3/23/2012
REV :
A
ONGC
Morse code "U" Nav-Aids Lanterns 15 Sec. Sr. No.
PROJECT NO DOC NO.:
F: FINAL
SH. 5 OF 5
7.22
AV. Daily power Average daily drain including power drain @ battery worse charge/dischar case(Ah/Day) ge, efficiency
7.6
7.60
30.42
30.42
Status
P
Remarks
PROJECT : B-127 CLUSTER WELL PLATFORM PROJECT ELECTRICAL LOAD LIST FOR B55-5 WELL PLATFORM.
Notes: 1
This is preliminary load list. The load data is based on the experience on similar ONGC Projects.
2
Nav Aid wattage is calculated based on current data available from vendor and average current drawn specified for the same in previous similar projects.
Reference Documents:1
Electrical Design Criteria for Well Platforms , SECTION 3.5 , Vol. II Rev 4
2
Functional Specification for Hybrid Power System - FS 4007A, Rev. 0
3
Functional Specification for Navigational Aids System - FS 4003, Rev. 4
OIL AND NATURAL GAS CORPORATION LTD. INDIA
Aker Power Gas Pvt. Ltd.
PC8012301-00
CLIENT : ONGC
S2 PEM STATUS
23.03.2012 SAK MADE BY & DATE
23.03.2012 NMC BY & DATE
23.03.2012 SBL APP BY & DATE
ISSUED FOR ENQUIRY
A REV
STATUS
Page 1 of 5
DOCUMENT NO:
B-127-LS-EL-0003
TITLE :
ELECTRICAL LOAD LIST FOR B-55-5 WELL PLATFORM.
SHT 1 OF 5 REV A
ELECTRICAL LOAD LIST (B55-5 - System I : 24V DC ) TELEMETRY, WELL HEAD PLC SYSTEM
Aker Powergas Pvt. Ltd. Client: Sr. No. 1
Load Description
Qty.
Rated Voltage
Unit Load (Watt)
PROJECT NO DOC NO.: DATE: REV :
2090/1764 B-127-LS-EL-0003 3/23/2012 A
ONGC Total Load (Watt)
Run Up Time In Hrs./Day
Energy Consumed in Ah/Day
Total Energy Unit Load Load 24V Consumed @ 24V DC DC in WH/Day (Amp.) (Amp.)
Duty Cycle/ Load Factor
Average Current Drawn @ 24V (Amp.)
Status
RTU PLC
1.1
Wet Gas Meter
1
24
35
35
24
35.000
840
1.458
1.458
1
1.458
P
1.2
Electronic Transmitter (FT, TT, PT, LT)
13
24
0.5
6.5
24
6.500
156
0.021
0.271
1
0.271
P
1.3
Pig Detectors
1
24
1.2
1.2
0.01
0.001
0.012
0.050
0.050
0.00042
0.000
P
1.4
Isolating Barriers
13
24
1.6
20.8
24
20.800
499.2
0.067
0.867
1
0.867
P
1.5
PLC System
1
24
300
300
24
300.000
7200
12.500
12.500
1
12.500
P
1.6
Microwave Radio during Transmit Micro Radio during Receive Microwave Radio during Sleep Mode
1
24
272
272
24
272.000
6528
11.333
11.333
1
11.333
P
2
Remarks
WELL HEAD PLC
2.1
Electronic Transmitter (FT, TT, PT, LT)
10
24
0.5
5
24
5.000
120
0.021
0.208
1.000
0.208
P
2.2
Isolating Barriers
10
24
1.6
16
24
16.000
384
0.067
0.667
1.000
0.667
P
2.3
PLC System
1
24
300
300
24
300.000
7200
12.500
12.500
1.000
12.500
P
2.4
Patch Panel
2
24
100
200
24
200.000
4800
4.167
8.333
1.000
8.333
P
2.5
Ethernet Switches
20
24
5
100
24
100.000
2400
0.208
4.167
1.000
4.167
P
2.6
Magnetically Latched, pulse operated SOV
6
24
15
90
1
3.750
90
0.625
3.750
0.042
0.156
P
TOTAL
1,347
1,260
30,218
57
53
10% MARGIN
135
126
3,022
6
5
TOTAL (WITH 10% MARGIN )
1,482
1,386
33,240
63
58
TOTAL AVERAGE DEMAND: TOTAL PEAK DEMAND:
P: PRELIMINARY
D: DESIGN APPROVED
58 63
Amps Amps
C: CERTIFIED
F : Final
Page 2 of 5
Run-Up time of 0.25 hr/day is assumed.
ELECTRICAL LOAD LIST (B55-5 - System II : 24V DC ) LIGHTING, CO2 SNUFFING SYSTEM
Aker Powergas Pvt. Ltd. Client:
Unit Load Total @ 24V Load 24V DC DC (Amp.) (Amp.)
4.167
0.010
0.043
P
1.0000
1.0000
0.0004
0.0004
P
0.048
0.0500
0.2000
0.0004
0.0001
P
0.0005
0.012
0.0500
0.0500
0.0004
0.0000
P
0.01
0.0020
0.048
0.0500
0.2000
0.0004
0.0001
P
9.6
0.01
0.0040
0.096
0.4000
0.4000
0.0004
0.0002
P
9.6
9.6
0.01
0.0040
0.096
0.4000
0.4000
0.0004
0.0002
P
24
60
120
3
15.000
360
2.500
5.000
0.125
0.625
P
2
24
60
120
3
15.000
360
2.500
5.000
0.125
0.625
P
2
24
60
120
3
15.000
360
2.500
5.000
0.125
0.625
P
1
24
51
51
24
51.000
1224
2.125
2.125
1
2.125
P
100
0.25
1.042
25
2.083
24
24
0.01
0.0100
0.24
24
1.2
4.8
0.01
0.0020
1
24
1.2
1.2
0.01
2.4 Detectors
4
24
1.2
4.8
2.5 Hooter
1
24
9.6
2.6 Panel (Internal Load)
1
24
3.1 Electrical/Telemetry Room Lighting
2
3.2 Battery Room Lighting 3.3 Bunk House
24
50
2.1 Solenoid Valve
1
24
2.2 Limit Switch
4
2.3 Pressure Switch
2
Co2 Snuffing System
3
4
A
Status
2
Illumination for Level Gauge
3/23/2012
REV : Average Current Drawn @ 24V (Amp.)
Energy Consumed in WH/Day
1
B-127-LS-EL-0003
DATE:
Duty Cycle/ Load Factor
Energy Consumed in Ah/Day
Rated Voltage
Load Description
2090/1764
DOC NO.:
ONGC Run Up Time In Hrs./Day
Qty.
Sr. No.
PROJECT NO
Unit Load Total Load (Watt) (Watt)
Remarks
Run-Up time of 0.25hr/day is assumed.
Lighting System
Down Hole Instrument
TOTAL
565
98
2,330
24
5
10% MARGIN
57
10
233
2
1
TOTAL (WITH 10% MARGIN )
622
108
2,563
26
6
TOTAL AVERAGE DEMAND:
6
Amps
TOTAL PEAK DEMAND:
26
Amps
P: PRELIMINARY
D: DESIGN APPROVED
F: FINAL
SH. 3 OF 5
Electrical Design Basis Section 3.5, Clause No. 3.5.7.8 Electrical Design Basis Section 3.5, Clause No. 3.5.7.8 Electrical Design Basis Section 3.5, Clause No. 3.5.7.8
ELECTRICAL LOAD LIST (B55-5 - System III : 24V DC ) FIRE & GAS, SDP PLC SYSTEM
Aker Powergas Pvt. Ltd. Client:
Sr. No.
Load Description
1
FIRE AND GAS PLC
1.1
Hydrogen Detectors
PROJECT NO
2090/1764
DOC NO.:
B-127-LS-EL-0003
DATE:
3/23/2012
REV :
A
ONGC
Qty.
Rated Voltage
Unit Load (Watt)
Total Load (Watt)
Run Up Time In Hrs./Day
3
24
4.6
13.8
24
Average Energy Unit Load Energy Total Load Duty Cycle/ Current Consume @ 24V 24V DC Consumed Load Drawn @ d in DC (Amp.) Factor in WH/Day 24V Ah/Day (Amp.) (Amp.)
13.800
331.2
0.192
0.575
1.000
0.575
Status
Remarks
P
1.2
HC Gas Detectors
8
24
7.5
60
24
60.000
1440
0.313
2.500
1.000
2.500
P
1.3
H2S Gas Detectors
8
24
4.2
33.6
24
33.600
806.4
0.175
1.400
1.000
1.400
P
1.4
Heat Detectors
10
24
0.25
2.5
24
2.500
60
0.010
0.104
1.000
0.104
P
1.5
Smoke Detectors
43
24
0.25
10.75
24
10.750
258
0.010
0.448
1.000
0.448
P
1.6
Flashing beacons
4
24
33.6
134.4
0.25
1.400
33.6
1.400
5.600
0.010
0.058
P
Run-Up time of 0.25hr/day is assumed.
1.8
Electronic hooter
4
24
6
24
0.25
0.250
6
0.250
1.000
0.010
0.010
P
Run-Up time of 0.25hr/day is assumed.
1.9
Relays & Timers
0
24
6
0
0.25
0.000
0
0.250
0.000
0.010
0.000
P
Run-Up time of 0.25hr/day is assumed.
1.10
F&G PLC
1
24
300
300
24
300.000
7200
12.500
12.500
1.000
12.500
P
2
SDP PLC
2.1
Pressure Switch
8
24
1.2
9.6
0.01
0.004
0.096
0.050
0.400
0.0004
0.0002
P
2.2
Solenoid Valve
1
24
24
24
0.01
0.010
0.24
1.000
1.000
0.0004
0.0004
P
2.3
Limit Switch
2
24
1.2
2.4
0.01
0.001
0.024
0.050
0.100
0.0004
0.0000
P
2.4
PLC System
1
24
300
300
24
300.000
7200
12.500
12.500
1.0000
12.5000
P
723 72 795
17,336 1,734 19,070
TOTAL 10% MARGIN TOTAL (WITH 10% MARGIN ) TOTAL AVERAGE DEMAND: TOTAL PEAK DEMAND:
P: PRELIMINARY
D: DESIGN APPROVED
916 92 1,008 34 43
Amps Amps
C: CERTIFIED
F : Final
SH. 4 OF 5
39 4 43
31 3 34
ELECTRICAL LOAD LIST (B55- 5 System IV : 24V DC ) NAV-AIDS SYSTEM
Aker Powergas Pvt. Ltd. Client:
1
Load Description
Nav Aid Lanterns
Qty.
Rated Voltage
ON
OFF
ON
OFF
ON
OFF
Duty Cycle
4
24
0.4
0.5
0.4
0.50
1.2
12.00
0.13
TOTAL
1.20
0.13
AV. Flasher AV. Daily Lamp Quiescen power current t current drain @ incl. 24V (A) Surge
3.33
0.005
0.005
Total Daily load = 30.42 AH/DAY
P: PRELIMINARY
2090/1764
DOC NO.:
B-127-LS-EL-0003
DATE:
3/23/2012
REV :
A
ONGC
Morse code "U" Nav-Aids Lanterns 15 Sec. Sr. No.
PROJECT NO
D: DESIGN APPROVED
F: FINAL
SH. 5 OF 5
7.22
AV. Daily power Average daily drain including power drain @ battery worse charge/dischar case(Ah/Day) ge, efficiency
7.6
7.60
30.42
30.42
Status
P
Remarks
PROJECT : B-127 CLUSTER WELL PLATFORM PROJECT ELECTRICAL LOAD LIST FOR ZC WELL PLATFORM
Notes: 1
This is preliminary load list.The load data is based on the experience on similar ONGC Projects.
2
Nav Aid wattage is calculated based on current data available from vendor and average current drawn specified for the same in previous similar projects.
Reference Documents:1
Electrical Design Criteria for Well Platforms , SECTION 3.5 , Vol. II Rev 4
2
Functional Specification for Hybrid Power System - FS 4007A, Rev. 0
3
Functional Specification for Navigational Aids System - FS 4003, Rev. 4
OIL AND NATURAL GAS CORPORATION LTD. INDIA
Aker Power Gas Pvt. Ltd.
PC8012301-00
CLIENT : ONGC
S2 PEM STATUS
23.03.2012 SAK MADE BY & DATE
23.03.2012 NMC BY & DATE
23.03.2012 SBL APP BY & DATE
ISSUED FOR ENQUIRY
A REV
STATUS
Page 1 of 5
DOCUMENT NO:
B-127-LS-EL-0004
TITLE :
ELECTRICAL LOAD LIST FOR ZC WELL PLATFORM.
SHT 1 OF 5 REV A
ELECTRICAL LOAD LIST (ZC - System I : 24V DC ) TELEMETRY & WELL HEAD SYSTEM
Aker Powergas Pvt. Ltd. Client: Sr. No. 1
Load Description
Qty.
Rated Voltage
Unit Load (Watt)
PROJECT NO DOC NO.: DATE: REV :
2090/1764 B-127-LS-EL-0004 3/23/2012 A
ONGC Total Load (Watt)
Run Up Time In Hrs./Day
Energy Consumed in Ah/Day
Total Energy Unit Load Load 24V Consumed @ 24V DC DC in WH/Day (Amp.) (Amp.)
Duty Cycle/ Load Factor
Average Current Drawn @ 24V (Amp.)
Status
1
0
P
1
1.166666667
P
0.0004
0.0001
P
RTU PLC
1.1
Wet Gas Meter
0
24
35
0
24
0.0000
0
1.2
Electronic transmitter (FT, TT, PT, LT)
56
24
0.5
28
24
28.0000
672
1.3
Pig detectors
5
24
1.2
6
0.01
0.0025
0.06
1.458333
0
0.020833 1.166667 0.0500
0.2500
1.4
Isolating barriers
56
24
1.6
89.6
24
89.6000
2150.4
1
3.733333333
P
1.5
Limit Switch
46
24
1.2
55.2
0.01
0.0230
0.552
0.0500
2.3000
0.0004
0.0010
P
1.6
PLC System
1
24
300
300
24
300.0000
7200
12.5
12.5
1
12.5
P
1.7
Microwave Radio during Transmit Micro Radio during Receive Microwave Radio during sleep mode
1
24
272
272
24
272.000
6528
11.333
11.333
1
11.333
P
1.5
1
1.5
P
1
5.333333333
P
1
12.5
P
1
8.333333333
P
2
Remarks
0.066667 3.733333
WELL HEAD PLC
2.1
Electronic transmitter (FT, TT, PT, LT)
72
24
0.5
36
24
36.0000
864
0.020833
2.2
Isolating barriers
80
24
1.6
128
24
128.0000
3072
0.066667 5.333333
2.3
PLC System
1
24
300
300
24
300.0000
7200
2.4
Patch Panel
2
24
100
200
24
200.0000
4800
4.166667 8.333333 0.208333 4.166667
12.5
2.5
Ethernet switches
20
24
5
100
24
100.0000
2400
2.6
Magnetically latched, pulse operated SOV
6
24
15
90
1
3.7500
90
2.7
Multivariable Transmitter
13
24
35
455
24
455.0000
10920
2.8
Coriolis Flow Meter
2
24
7
14
24
14.000
336
0.292
2.9
Pressure Switch
25
24
1.2
30
0.01
0.0125
0.3
0.0500
0.625
12.5
1
4.166666667
P
0.04167
0.15625
P
1
18.95833333
P
0.583
1
0.583
P
1.2500
0.0004
0.0005
P
3.75
1.458333 18.95833
2.10 Limit Switch
2
24
1.2
2.4
0.01
0.0010
0.024
0.0500
0.1000
0.0004
0.0000
P
2.11 Solenoid Valve
8
24
24
192
0.01
0.0800
1.92
1.0000
8.0000
0.0004
0.0033
P
TOTAL
2,299
1,927
46,236
96
81
10% MARGIN
230
193
4,624
10
8
TOTAL (WITH 10% MARGIN )
2,529
2,120
50,860
106
89
TOTAL AVERAGE DEMAND: TOTAL PEAK DEMAND:
P: PRELIMINARY
D: DESIGN APPROVED
89 106
Amps Amps
C: CERTIFIED
F : Final Page 2 of 5
Run-Up time of 0.25 hr/day is assumed.
ELECTRICAL LOAD LIST (ZC - System II : 24V DC ) LIGHTING, CO2 SNUFFING SYSTEM SYSTEM
Aker Powergas Pvt. Ltd.
Client: Sr. No.
Load Description
1
Illumination for Level Gauge
2
Co2 Snuffing System
Qty.
Rated Unit Load Voltage (Watt)
PROJECT NO
2090/1764
DOC NO.:
B-127-LS-EL-0004
DATE:
3/23/2012
REV :
A
ONGC Total Load (Watt)
Energy Unit Load Total Energy Run Up Consume @ 24V Load 24V Time In Consumed d in DC DC Hrs./Day in Ah/Day WH/Day (Amp.) (Amp.)
Duty Cycle/ Load Factor
Average Current Drawn @ 24V (Amp.)
11
24
50
550
0.25
5.7292
137.5
2.1 Solenoid Valve
1
24
24
24
0.01
0.0100
0.24
1.0000
1.0000
0.0004
0.0004
P
2.2 Limit Switch
4
24
1.2
4.8
0.01
0.0020
0.048
0.0500
0.2000
0.0004
0.0001
P
2.3 Pressure Switch
1
24
1.2
1.2
0.01
0.0005
0.012
0.0500
0.0500
0.0004
0.0000
P
2.4 Detectors
4
24
1.2
4.8
0.01
0.0020
0.048
0.0500
0.2000
0.0004
0.0001
P
2.5 Hooter
1
24
9.6
9.6
0.01
0.0040
0.096
0.4000
0.4000
0.0004
0.0002
P
2.6 Panel (Internal Load)
1
24
9.6
9.6
0.01
0.0040
0.096
0.4000
0.4000
0.0004
0.0002
P
3.1 Electrical/Telemetry Room Lighting
2
24
60
120
3
15.000
360
2.500
5.000
0.125
0.625
P
3.2 Battery Room Lighting
2
24
60
120
3
15.000
360
2.500
5.000
0.125
0.625
P
3.3 Bunk House
2
24
60
120
3
15.000
360
2.500
5.000
0.125
0.625
P
2
24
7
14
24
14.000
336
0.292
0.583
1.000
0.583
P
3
4
2.083333 22.91667 0.010417 0.23871528
Status
P
Remarks
Run-Up time of 0.25hr/day is assumed.
Lighting System
Flow Computer
TOTAL
964
51
1,219
41
3
10% MARGIN
96
5
122
4
0
TOTAL (WITH 10% MARGIN )
1,060
56
1,341
45
3
TOTAL AVERAGE DEMAND:
3
Amps
TOTAL PEAK DEMAND:
45
Amps
P: PRELIMINARY
D: DESIGN APPROVED
F: FINAL
SH. 3 OF 5
Electrical Design Basis Section 3.5, Clause No. 3.5.7.8 Electrical Design Basis Section 3.5, Clause No. 3.5.7.8 Electrical Design Basis Section 3.5, Clause No. 3.5.7.8
ELECTRICAL LOAD LIST (ZC - System III : 24V DC ) FIRE & GAS, SDP PLC SYSTEM
Aker Powergas Pvt. Ltd. Client:
Sr. No.
Load Description
PROJECT NO
2090/1764
DOC NO.:
B-127-LS-EL-0004
DATE:
3/23/2012
REV :
A
ONGC
Qty.
Rated Voltage
Unit Load (Watt)
Total Load (Watt)
Run Up Time In Hrs./Day
Average Energy Unit Load Energy Total Load Duty Cycle/ Current Consume @ 24V 24V DC Consumed Load Drawn @ d in DC (Amp.) Factor in WH/Day 24V Ah/Day (Amp.) (Amp.)
Status
Remarks
1
FIRE AND GAS PLC
1.1
Hydrogen Detectors
3
24
4.6
13.8
24
13.8000
331.2
0.191667
0.575
1
0.575
P
1.2
HC Gas Detectors
32
24
7.5
240
24
240.0000
5760
0.3125
10
1
10
P
1.3
H2S Gas Detectors
32
24
4.2
134.4
24
134.400
3225.6
0.175
5.600
1.000
5.600
P
1.4
Heat Detectors
10
24
0.25
2.5
24
2.500
60
0.010
0.104
1.000
0.104
P
1.5
Relays and timers
0
24
10
0
24
0.0000
0
0.416667
0
1
0
P
1.6
Flashing beacons
4
24
33.6
134.4
0.25
1.4000
33.6
1.4
5.6
0.01041667 0.058333
P
Run-Up time of 0.25hr/day is assumed.
1.8
Electronic hooter
4
24
6
24
0.25
0.2500
6
0.25
1
0.01041667 0.010417
P
Run-Up time of 0.25hr/day is assumed.
1.9
Smoke Detectors
20
24
0.25
5
24
5.000
120
0.010
0.208
1.000
0.208
P
1.10
F&G PLC
1
24
300
300
24
300.0000
7200
12.5
12.5
1
12.5
P
2
SDP PLC
2.1
Pressure Switch
68
24
1.2
81.6
0.01
0.0340
0.816
0.0500
3.4000
0.0004
0.0014
P
2.2
Solenoid Valve
22
24
24
528
0.01
0.2200
5.28
1.0000
22.0000
0.0004
0.0092
P
2.3
Electronic hooter
3
24
6
18
0.25
0.1875
4.5
0.25
0.75
2.4
PLC System
1
24
300
300
24
300.0000
7200
12.5
12.5
1,782 178 1,960
998 100 1,098
23,947 2,395 26,342
C: CERTIFIED
F : Final
TOTAL 10% MARGIN TOTAL (WITH 10% MARGIN ) TOTAL AVERAGE DEMAND: TOTAL PEAK DEMAND:
P: PRELIMINARY
D: DESIGN APPROVED
46 83
Amps Amps
SH. 4 OF 5
75 8 83
0.01041667 0.007813 1
12.5 42 4 46
P P
ELECTRICAL LOAD LIST (ZC - System IV : 24V DC ) NAV-AIDS SYSTEM
Aker Powergas Pvt. Ltd. Client:
1
Load Description
Nav Aid Lanterns
Qty.
Rated Voltage
ON
OFF
ON
OFF
ON
OFF
Duty Cycle
4
24
0.4
0.5
0.4
0.50
1.2
12.00
0.13
TOTAL
1.20
0.13
AV. Flasher AV. Daily Lamp Quiescen power current t current drain @ incl. 24V (A) Surge
3.33
0.005
0.005
Total Daily load = 30.42 AH/DAY
P: PRELIMINARY
2090/1764 B-127-LS-EL-0004
DATE:
3/23/2012
REV :
A
ONGC
Morse code "U" Nav-Aids Lanterns 15 Sec. Sr. No.
PROJECT NO DOC NO.:
D: DESIGN APPROVED
F: FINAL
SH. 1 OF 1
7.22
AV. Daily power Average daily drain including power drain @ battery worse charge/dischar case(Ah/Day) ge, efficiency
7.6
7.60
30.42
30.42
Status
P
Remarks