Form No. JI 2004-FORM-HSE-002
Petrofac
Job Safety Analysis Activity:
Topographical Survey EFFLUENT WATER INJECTION NK-PH-I AND CENTRAL SEAWATER INJECTION NK-PH-II
Project:
Work Area:
Site/Facility:
JSA No: JI 2004-JSA-001 Rev A Project No: EF 1071 & 1082 KOC Permit No & Date:
In Case of Emergency, contact KOC @ 160
PPE & Tools:
Hard Hat, Safety Shoes, Safety Goggles/ Glasses, Hand Gloves, Overall, Dust Mask, Total Station & GPS, Hand Tools & Measuring tapes
SEQUENCE OF JOB STEPS
RISK RATING
POTENTIAL HAZARDS
MITIGATION MEASURES
RESIDUAL RISK RATING
Ensure and obtain EOD clearance certificate for the area from Company Ensure all personnel have undergone Project HSE Induction and EOD training. All personnel shall comply with KOC HSEMS Procedure for manual handling of Loads (DOC NO KOC.SA.003) Obtain required permit to work from Company Presence of EOD Non-compliance of KOC procedure, F & S Regulations
Pre - work
Conduct Tool Box talk. Ensure the equipment is in good condition and well suited for the specific work/ activity.
HSEMS
Untrained peoples
Ensure driver of the vehicle have completed Defensive Drive training by the Contractor.
Equipment Failure
Strictly follow Company driving procedures, Kuwait Ministry of Interior Traffic regulations 3(D) MEDIUM
Driving
Obtain mark up drawings and clearly identify the day’s scope of work & designated access routes.
2(B) LOW
Do not drive in Foggy/ Dusty/ rainy weather condition in case of poor visibility
Getting lost in the field (Fog / Sand storm / Rains)
Provide rain coat to personnel in case of rains
Inadequate Lighting at work location ( Early morning Hour work and night work)
For early morning works/ night works, ensure sufficient lighting arrangements/ lighting towers are in place at the work areas as applicable Ensure that the Emergency Numbers are posted at site, and personnel are informed in the TBT once per week
Manual Handling/ Transportation of survey Equipments
Equipment not safe for the working area/ Environment Back Strain
4 (D) HIGH
Trips and Falls
Page 1 of 2
Ensure proper communication means available Mobile Phone – outside Live Plant areas) and in case of any emergency contact PIL Construction: 97205041,PILHSE: 97205041,PILHSE: 97218253/97216597, 97218253/97216597, PMC Lead: 60683179, PMC HSE: 60630965 and/or KOC Emergency # 160 Use the correct equipment meant for the job as mentioned in the JSA / Permit Ensure that the equipment is in safe working condition and inspected. Be sure that the load is in the safe lifting capability of the person and ensure that the center of gravity is close to him. If required call 97273246/97203826 for assistance Closely watch the surroundings while performing the activity.
JSA No. JI-2004-JSA-001 Rev A
2(B) LOW
Form No. JI 2004-FORM-HSE-002 Activity may be limited to the approved area and use designated walkways for vehicles and walking, roads and not jump any obstructions/ barricades.
Taking readings in Survey Equipment
Marking of base lines / fixing bench marks
During set up or working, the equipment may fall down
Hitting with other equipments, services, walkways Injury during handling pegs, concrete.
Personnel injury due to poor housekeeping
Post Work Injury / Accidents due to improper marking / barricading
3(C) MEDIUM
Equipment shall be handled by well trained personnel only. Ensure the equipment is fixed and placed well Restrict personnel movement for smooth working.
2(A) LOW
3(C) MEDIUM
Activity may be limited to the approved area Closely watch the surrounding while performing the activity and make sure about any other equipment, service within that activity.
2(A) LOW
3(C) MEDIUM
Ensure the work place is maintained clear of debris, waste and other rubbish and make the place clean and tidy. Clearly mark, barricade the peg marks, bench marks with reflective tapes etc.
2(A) LOW
3(C) MEDIUM
Do not feed or befriend with stray animals / wild life and make sure the team always stay together. Ensure Buddy system is implemented For welfare facility/ short breaks, contractors existing office facility at point A or proposed pioneer office at CIPF shall be used Ensure availability of ample quantity of fresh water Do not touch any company assets without proper authorization. Do not touch any unidentified objects. immediately stop the activity, inform Company representative.
2(A) LOW
Animal/ Reptile bites
Additional hazards
Heat Stress/ Extreme Cold Un identified Objects exposure
Worksite Supervisor (Subcontractor or Petrofac)
Approved by (Petrofac HSE)
Reviewed by (Worley Parsons)
Name:
Name:
Name:
Company:
Company: Petrofac International Ltd
Company: Worley Parsons Kuwait LLC
Designation:
Designation:
Designation:
Signature:
Signature:
Date:
Date:
Signature:
Date:
Page 2 of 2
JSA No. JI-2004-JSA-001 Rev A