STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TAHUN 2017
PEMERINTAH KOTA MOJOKERTO TAHUN 2016
DAFTAR ISI STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TA 2017
PEMERINTAH KOTA MOJOKERTO 2016
DAFTAR ISI Peraturan Walikota Nomor 35 Tahun 2016 Tentang Standart Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto Tahun 2017 Standar Biaya Umum (SBU) Tahun Anggaran 2017 .............................................. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Honorarium Penanggung Jawab Pengelola Keuangan/Barang Honorarium Pengadaan Barang / Jasa Honorarium Penerima Hasil Pekerjaan Honorarium Pengelolaan Barang Milik Daerah Honorarium Pengurus Gaji Honorarium Pengelola Penerimaan Daerah Honorarium Penunjang Penelitian / Perekayasaan Honorarium Personil Pendukung Kegiatan Seminar/ Rakor/ Sosialisasi/ Diseminasi / FGD / Bintek (Kegiatan Sejenis) Honorarium Panitia Pelaksana Kegiatan Seminar/ Rakor/ Sosialisasi/ Diseminasi/ Bintek Honorarium Pegawai Pemerintah Dengan Perjanjian Kerja (Non Pegawai Negeri) Honorarium Tim Pelaksana Kegiatan Dan Sekretariat Tim Pelaksana Kegiatan Honorarium Tim Anggaran Pemerintah Kota Mojokerto Honorarium Tim Pembahasan Dan Penetapan Raperda Kota Mojokerto Honorarium Tim Penyusunan Jurnal Honorarium Tim Penyusunan Buletin / Majalah / Tabloid Honorarium Tim Pengelola Website Pemerintah Kota Mojokerto Vakasi & Honorarium Penyelenggaraan Ujian Honorarium Pengajar Diklat Satuan Biaya Uang Lembur Dan Uang Makan Lembur PNS Honorarium Satpam, Pengemudi, Petugas Kebersihan, Dan Pramubakti (Non PNS) Satuan Biaya Diklat Satuan Biaya Latihan Prajabatan Honorarium Panitia Seleksi Terbuka Jabatan Pimpinan Tinggi Pratama Satuan Biaya Penerjemahan Dan Pengetikan Satuan Biaya Bantuan Beasiswa Program Gelar / Non-Gelar Dalam Negeri Satuan Biaya Makanan Penambah Daya Tahan Tubuh/Ekstra Puding Satuan Biaya Konsumsi Rapat Satuan Biaya Pemeliharaan Gedung/ Bangunan Dalam Negeri Satuan Biaya Pakaian Dinas Dan/Atau Kerja Satuan Biaya Perjalanan Dinas Honorarium Lain – lain
Honorarium/ Jasa Non PNS Tahun Anggaran 2017 ........................................... 42 ANALISA HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO 2017 Daftar Rekapitulasi HSPK Fisik ............................................................................. 53 Daftar Rekapitulasi HSPK Non Fisik ............................................................................. 73
Lampiran HSPK Fisik Konstruksi BANGUNAN GEDUNG A. Persiapan &Tanah ………………….. ........................................................................... 75 Pekerjaan Persiapan ………………….. .............................................................................. 75 Pekerjaan Tanah ……………………….. .............................................................................. 77
B. Pekerjaan Pondasi ………………….. ........................................................................... 80 Pekerjaan Pondasi …………............ .............................................................................. 80
C. Struktur Utama ……………………… ............................................................................. 82 Pekerjaan Beton ………………………… .............................................................................. 82 Pekerjaan Cetakan Beton (Bekisting) .......................................................................... 86
D. Pekerjaan Dinding dan Plesteran ....................................................................... 91 Pekerjaan Dinding ……………………… .............................................................................. 91 Pekerjaan Plesteran …………………… .............................................................................. 93
E. Pekerjaan Penutup Lantai & Dinding .................................................................. 97 Pekerjaan Penutup Lantai ………….. .............................................................................. 97 Pekerjaan Penutup Dinding ……….. .............................................................................. 99
F. Pekerjaan Kayu ………………………. ............................................................................ 103 Pekerjaan Kusen, Pintu, Jendela, & Jalusi ................................................................... 103 Pekerjaan Kuda - Kuda & Rangka Atap ....................................................................... 106 Pekerjaan Rangka Langit - Langit & Listplank ............................................................. 108 Pekerjaan Rangka Dinding Partisi .............................................................................. 111
G. Pekerjaan Finishing ……………….. ............................................................................ 113 Pekerjaan Penutup Atap & Langit - Langit .................................................................. 113 Pekerjaan Sanitair ……………………… .............................................................................. 119 Pekerjaan Besi & Allumunium ……. .............................................................................. 124 Pekerjaan Kunci & Kaca …………….. .............................................................................. 128 Pekerjaan Pengecatan………………. .............................................................................. 131 Pekerjaan Instalasi Listrik …………… ............................................................................. 134
INFRASTRUKTUR JALAN & PENGAIRAN H. Pekerjaan Paving Dan Perkerasan Jalan ............................................................. 137 Perkerasan Paving Pengadaan Agregat ..................................................................... 137 Pekerjaan Drainase (Div. 2)…………. ............................................................................. 140 Pekerjaan Tanah (Div. 3) …………….. ............................................................................ 142 Pelebaran Perkerasan & Bahu Jalan (Div. 4) ................................................................ 144 Perkerasan Non Aspal (Div. 5)…….. ............................................................................. 145 Perkerasan Aspal (Div. 6) …………… .............................................................................. 147 Pekerjaan Struktur (Div. 7)………….. ............................................................................. 152 Pengembalian Kondisi & Pek. Minor (Div. 8) ............................................................... 154 Biaya Pemakaian Alat Berat ……….. .............................................................................. 156 I. Pengairan ………………………………... ........................................................................... 160 Pekerjaan Pembersihan & Persiapan .......................................................................... 160 Pekerjaan Pengerukan ………………. .............................................................................. 160 Pekerjaan Pasangan ………………….. .............................................................................. 162 Pekerjaan Cerucuk & Turap…………. ............................................................................. 163 Pekerjaan Drainase …………………… .............................................................................. 164
Lampiran HSPK Fisik Non Konstruksi SARANA & PRASARANA KOTA J. Penerangan Jalan Umum ……………… ..................................................................... 169 Pekerjaan Penerangan Jalan Umum (PJU) .................................................................. 169 Pekerjaan Elektrikal …………………… .............................................................................. 173 Pemasangan Tiang PJU …………….. .............................................................................. 176
K. Sarana Lalu Lintas ………………….. ............................................................................ 184 Pekerjaan Rambu-rambu Lalu Lintas .......................................................................... 184
L. Taman dan Kebersihan …………… ........................................................................... 193 Pekerjaan Taman ……………………… .............................................................................. 193 Pemeliharaan Taman ………………... .............................................................................. 196
SERVICE KENDARAAN M. Service Kendaraan ……………….. ............................................................................ 198 Service Ringan Truk Besar …………………….. ................................................................... 198 Service Sedang Truk Besar …………. .............................................................................. 198 Service Berat Truk Besar ……………. .............................................................................. 198 Service Ringan Buldozer ……………………… ..................................................................... 199 Service Ringan Escavator ……………………….................................................................... 199 Service Ringan Wheel Loader ……………….. ................................................................... 199
Lampiran HSPK Non Fisik BIAYA OPERASIONAL KEGIATAN … ........................................................................... 200 Alat Tulis Kantor (ATK) Peserta …. .............................................................................. 201 ATK Administrasi Kegiatan …………. .............................................................................. 201 Jilid dan Penggandaan (Modul) … .............................................................................. 201 Biaya Dokumentasi ………………..... .............................................................................. 202 Perlengkapan Dekorasi dan Sound System ................................................................. 202 Publikasi ………… …………. ……………. .............................................................................. 202 Hadiah / Penghargaan Kegiatan Lomba ...................................................................... 203
PERATURAN WALIKOTA MOJOKERTO
NOMOR 35 TAHUN 2016 TANGGAL 24 JUNI 2016
TENTANG STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TAHUN 2017
WALIKOTA MOJOKERTO
PERATURAN WALIKOTA MOJOKERTO NOMOR 35TAHUN 2016 TENTANG STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TAHUN 2017 DENGAN RAHMAT TUHAN YANG MAHA ESA WALIKOTA MOJOKERTO, Menimbang
:
a.
bahwa dalam rangka penyusunan Rencana Kegiatan dan Anggaran Satuan Kerja Perangkat Daerah (RKA-SKPD) Tahun Anggaran 2017 agar dapat disusun dengan kerangka pengeluaran jangka
menengah
daerah,
penganggaran
terpadu
dan
penganggaran berdasarkan prestasi kerja, maka Pemerintah Kota Mojokerto perlu membuat Standar Harga Satuan Pokok Kegiatan (HSPK) Pemerintah Kota Mojokerto; b.
bahwa sehubungan dengan maksud huruf a dan guna kelancaran pelaksanaan penyusunan, maka perlu menetapkan Standar Harga Satuan Pokok Kegiatan (HSPK) Pemerintah Kota Mojokerto Tahun 2017 dengan menuangkannya dalam suatu Peraturan Walikota Mojokerto.
Mengingat
:
1.
Undang-Undang Nomor 17 Tahun 1950 tentang Pembentukan Daerah-Daerah Kota Kecil Dalam Lingkungan Propinsi Jawa Timur / Jawa Tengah / Jawa Barat sebagaimana telah diubah dengan
Undang-Undang
Nomor
13
Tahun
1954
tentang
Pengubahan Undang-Undang Nomor 16 dan 17 Tahun 1950 tentang Pembentukan Kota-Kota Besar dan Kota-Kota Kecil di Jawa (Lembaran Negara Republik Indonesia Tahun 1954 Nomor 40, Tambahan Lembaran Negara Republik Indonesia Nomor 551);
2.
Undang-Undang Nomor 33 Tahun 2004 tentang Perimbangan Keuangan antara Pemerintah Pusat dan Pemerintahan Daerah (Lembaran Negara Republik Indonesia Tahun 2004 Nomor 126, Tambahan Lembaran Negara Republik Indonesia Nomor 4438) ;
3.
Undang-Undang Nomor 23 Tahun 2014 tentang Pemerintahan Daerah (Lembaran Negara Republik Indonesia Tahun 2014 Nomor 244, Tambahan Lembaran Negara Republik Indonesia Nomor 5587) sebagaimana telah diubah dengan Undang-Undang Nomor 9 Tahun 2015 tentang Perubahan Kedua atas Undang-Undang Nomor 23 Tahun 2014 tentang Pemerintahan Daerah (Lembaran Negara Republik Indonesia Tahun 2014 Nomor 58, Tambahan Lembaran Negara Republik Indonesia Nomor 5679) ;
4.
Peraturan Pemerintah Nomor 47 Tahun 1982 tentang Perubahan Batas Wilayah Kotamadya Daerah Tingkat II Mojokerto (Lembaran Negara Republik Indonesia Tahun 1982 Nomor 74, Tambahan Lembaran Negara Republik Indonesia Nomor 3242) ;
5.
Peraturan Pemerintah Nomor 58 Tahun 2005 tentang Pengelolaan Keuangan Daerah (Lembaran Negara Republik Indonesia Tahun 2005 Nomor 140, Tambahan Lembaran Negara Republik Indonesia Nomor 4578) ;
6.
Keputusan Presiden Nomor 42 Tahun 2002 tentang Pedoman Pelaksanaan
Anggaran
Pendapatan
dan
Belanja
Negara
sebagaimana telah diubah dengan Keputusan Presiden Nomor 72 Tahun 2004 tentang Perubahan Keputusan Presiden Nomor 42 Tahun 2002 tentang Pedoman Pelaksanaan Anggaran Pendapatan dan Belanja Negara; 7.
Peraturan Presiden Nomor 54 tahun 2010 tentang Pengadaan Barang/Jasa
Pemerintah
sebagaimana
telah
diubah
dengan
Peraturan Presiden Nomor 172 Tahun 2014 tentang Perubahan Ketiga atas Peraturan Presiden Nomor 54 tahun 2010 tentang Pengadaan Barang/Jasa Pemerintah (Lembaran Negara Republik Indonesia Tahun 2014 Nomor 368, Tambahan Lembaran Negara Republik Indonesia Nomor 5642) ; 8.
Peraturan Menteri Dalam Negeri Nomor 13 Tahun 2006 tentang Pedoman Pengelolaan Keuangan Daerah sebagaimana telah
diubah dengan Peraturan Menteri Dalam Negeri Nomor 21 Tahun 2011 tentang Perubahan Kedua atas Peraturan Menteri Dalam Negeri Nomor 13 Tahun 2006 tentang Pedoman Pengelolaan Keuangan Daerah ; 9.
Peraturan Menteri Keuangan Nomor 71/PMK.02/2013 tentang Pedoman Standar Biaya, Standar Struktur Biaya, dan Indeksasi Dalam Penyusunan Rencana Kerja dan Anggaran Kementerian Negara/Lembaga sebagaimana telah diubah dengan Peraturan Menteri Keuangan Nomor 51/PMK.02/2014 tentang Perubahan Atas Peraturan Menteri Keuangan Nomor 71/PMK.02/2013 tentang Pedoman Standar Biaya, Standar Struktur Biaya, dan Indeksasi Dalam Penyusunan Rencana Kerja dan Anggaran Kementerian Negara/Lembaga ;
10.
Peraturan Menteri Keuangan Nomor 33/PMK.02/2016 tentang Standar Biaya Masukan Tahun Anggaran 2017 ;
11. Peraturan Menteri Dalam Negeri Nomor 19 Tahun 2016 tentang Pedoman Pengelolaan Barang Milik Daerah (Berita Negara Republik Indonesia Tahun 2016 Nomor 547) ; 12. Peraturan Daerah Kota Mojokerto Nomor 7 Tahun 2007 tentang Pedoman Pengelolaan Keuangan sebagaimana diubah dengan Peraturan Daerah Kota Mojokerto Nomor 5 Tahun 2009 tentang Perubahan atas Peraturan Daerah Kota Mojokerto Nomor 7 Tahun 2007 tentang Pokok-pokok Pengelolaan Keuangan Daerah; 13. Peraturan Daerah Kota Mojokerto Nomor 5 Tahun 2010 tentang Pengelolaan Barang Milik Pemerintah Kota Mojokerto. MEMUTUSKAN :
Menetapkan
: PERATURAN WALIKOTA MOJOKERTO TENTANG STANDAR HARGA SATUAN
POKOK
KEGIATAN
(HSPK)
PEMERINTAH
KOTA
MOJOKERTO TAHUN 2017 Pasal 1 Standar Harga Satuan Pokok Kegiatan (HSPK) Pemerintah Kota Mojokerto Tahun 2017 berlaku bagi seluruh Satuan Kerja Perangkat
Daerah di Lingkungan Pemerintah Kota Mojokerto, sebagaimana dinyatakan dalam Lampiran Peraturan Walikota ini. Pasal 2 (1)
Standar Harga Satuan Pokok Kegiatan (HSPK) sebagaimana dimaksud dalam Pasal 1 terdiri atas Standar Biaya Umum, Rekapitulasi Standard Kegiatan Non Fisik, Rekapitulasi Standar Kegiatan Fisik dan Uraian Analisa Kegiatan Fisik Konstruksi.
(2)
Untuk Uraian lain yang belum termasuk dalam ayat (1) berpedoman pada Petunjuk Teknis dan/atau ketentuan yang berlaku lainnya. Pasal 3
Standar Harga Satuan Pokok Kegiatan (HSPK) sebagaimana dimaksud dalam Pasal 1 dan Pasal 2 merupakan salah satu pedoman dalam Penyusunan Rencana Kegiatan dan Anggaran Satuan Kerja Perangkat Daerah (RKA-SKPD) Tahun Anggaran 2017 dalam penyusunan dan pelaksanaan Anggaran Pendapatan dan Belanja Daerah Kota Mojokerto Tahun Anggaran 2017. Pasal 4 Standar Harga Satuan Pokok Kegiatan (HSPK) sebagaimana dimaksud dalam Pasal 1 adalah : a.
Merupakan salah satu acuan dalam penyusunan Rencana Kegiatan Anggaran (RKA) dan Dokumen Pelaksanaan Kegiatan Anggaran (DPA) Satuan Kerja Perangkat Daerah (SKPD) di Lingkungan Pemerintah Kota Mojokerto;
b.
Merupakan pembakuan biaya kegiatan fisik dan/atau non fisik melalui analisis yang distandarkan untuk jenis komponen kegiatan dengan menggunakan standard barang, harga satuan barang, dan upah/honorarium sebagai elemen penyusunnya;
c.
Merupakan Standar Harga Tertinggi terhadap Barang dan Jasa yang didalamnya
termasuk
Pajak
Pertambahan
Nilai
dan
dapat
dinegosiasikan kembali untuk memperoleh harga yang lebih menguntungkan bagi Pemerintah Kota Mojokerto; d.
Merupakan standar biaya yang berfungsi sebagai batas tertinggi
dalam
penyusunan
anggaran,
yang
dalam
pelaksanaannya
mengacu pada kondisi nyata yang ada di lapangan; d.
Merupakan salah satu pedoman untuk mengevaluasi harga penawaran calon penyedia barang/jasa; Pasal 5
(1)
Dalam hal harga satuan upah dan bahan yang dipakai dalam analisa pekerjaan lebih rendah dari harga yang ada di pasaran, maka yang dipakai adalah harga satuan upah dan bahan yang berlaku di pasaran, berdasarkan hasil survey dan ditetapkan oleh dinas/ instansi yang membidangi barang/ jasa tersebut.
(2)
Dalam hal harga satuan upah dan bahan yang dicantunkan dalam buku Standar Harga Satuan Pokok Kegiatan (HSPK) ini lebih tinggi dari harga yang ada di pasaran, maka harga yang digunakan dalam pelaksanaan anggaran/ kegiatan adalah harga satuan upah dan bahan yang berlaku di pasaran.
(3)
Dinas/Instansi
sebagaimana
dimaksud
pada
ayat
(1)
akan
ditetapkan lebih lanjut dengan Keputusan Walikota. Pasal 6 Peraturan Walikota ini mulai berlaku pada tanggal diundangkan. Agar setiap orang mengetahuinya, memerintahkan pengundangan Peraturan Walikota ini dengan penempatannya dalam Berita Daerah Kota Mojokerto.
Ditetapkan di Mojokerto pada tanggal
13
Desember
WALIKOTA MOJOKERTO
ttd. MAS’UD YUNUS BERITA DAERAH KOTA MOJOKERTO TAHUN 2015 NOMOR 33 Diundangkan di Mojokerto pada tanggal 1
Juli
2015
SEKRETARIS DAERAH KOTA MOJOKERTO
2016
STANDAR BIAYA UMUM (SBU) STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TA 2017
PEMERINTAH KOTA MOJOKERTO 2016
STANDAR BIAYA UMUM (SBU) PEMERINTAH KOTA MOJOKERTO TAHUN ANGGARAN 2017 NO 1
KODE BARANG 2 1.10 1.10.28 1.10.28.01 1.10.28.01.01
1.10.28.01.01.001 1 2 3
1.10.28.01.01.001.001 1.10.28.01.01.001.002 1.10.28.01.01.001.003
NAMA BARANG 3 Standar Biaya Umum Standar Biaya Umum Standar Biaya Umum (SBU) Honorarium Penanggung Jawab Pengelola Keuangan/Barang
MERK / UKURAN 4
Honorarium Penanggung Jawab Pengelola Barang Pengelola Barang Pengurus Barang Pengelola Pembantu Pengurus Barang Pengelola
SATUAN 5
HARGA 6
OB OB OB
2,000,000.00 950,000.00 850,000.00
1.10.28.01.01.002
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
1
1.10.28.01.01.002.001
625,000.00
1.10.28.01.01.002.002
Nilai pagu dana sd. Rp. 100 juta Nilai pagu dana di atas Rp. 100 juta sd. Rp. 250 juta
OB
2
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB ) Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
OB
762,500.00
3
1.10.28.01.01.002.003
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 250 juta sd. Rp. 500 juta
OB
900,000.00
4
1.10.28.01.01.002.004
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 500 juta sd. Rp. 1 miliar
OB
1,037,500.00
5
1.10.28.01.01.002.005
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 1 miliar sd. Rp. 2,5 miliar
OB
1,212,500.00
6
1.10.28.01.01.002.006
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 2,5 miliar sd. Rp. 5 miliar
OB
1,387,500.00
7
1.10.28.01.01.002.007
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 5 miliar sd. Rp. 10 miliar
OB
1,562,500.00
8
1.10.28.01.01.002.008
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 10 miliar sd. Rp. 25 miliar
OB
1,975,000.00
9
1.10.28.01.01.002.009
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 25 miliar sd. Rp. 50 miliar
OB
2,387,500.00
10 1.10.28.01.01.002.010
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 50 miliar sd. Rp.75 miliar
OB
2,812,500.00
11 1.10.28.01.01.002.011
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp.75 miliar sd. Rp.100 miliar
OB
3,225,000.00
12 1.10.28.01.01.002.012
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
OB
3,850,000.00
13 1.10.28.01.01.002.013
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp.100 miliar sd. Rp. 250 miliar Nilai pagu dana di atas Rp. 250 miliar sd. Rp. 500 miliar
OB
4,475,000.00
14 1.10.28.01.01.002.014
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 500 miliar sd. Rp. 750 miliar
OB
5,100,000.00
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
1
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
15 1.10.28.01.01.002.015
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 750 miliar sd. Rp. 1 triliun
OB
5,725,000.00
16 1.10.28.01.01.002.016
Honorarium Pengguna Anggaran / Pengguna Barang ( PA / PB )
Nilai pagu dana di atas Rp. 1 triliun
OB
6,975,000.00
Nilai pagu dana sd. Rp. 100 juta
OB
612,500.00
Nilai pagu dana di atas Rp. 100 juta sd. Rp. 250 juta
OB
750,000.00
Nilai pagu dana di atas Rp. 250 juta sd. Rp. 500 juta
OB
887,500.00
Nilai pagu dana di atas Rp. 500 juta sd. Rp. 1 miliar
OB
1,025,000.00
Nilai pagu dana di atas Rp. 1 miliar sd. Rp. 2,5 miliar
OB
1,187,500.00
Nilai pagu dana di atas Rp. 2,5 miliar sd. Rp. 5 miliar
OB
1,375,000.00
Nilai pagu dana di atas Rp. 5 miliar sd. Rp. 10 miliar
OB
1,500,000.00
Nilai pagu dana di atas Rp. 10 miliar sd. Rp. 25 miliar
OB
1,937,500.00
Nilai pagu dana di atas Rp. 25 miliar sd. Rp. 50 miliar
OB
2,337,500.00
Nilai pagu dana di atas Rp. 50 miliar sd. Rp.75 miliar
OB
2,750,000.00
Nilai pagu dana di atas Rp.75 miliar sd. Rp. 100 miliar
OB
3,187,500.00
Nilai pagu dana di atas Rp.100 miliar sd. Rp. 250 miliar Nilai pagu dana di atas Rp. 250 miliar sd. Rp. 500 miliar
OB
3,750,000.00
OB
4,375,000.00
Nilai pagu dana di atas Rp. 500 miliar sd. Rp. 750 miliar
OB
5,000,000.00
Nilai pagu dana di atas Rp. 750 miliar sd. Rp. 1 triliun
OB
5,625,000.00
Nilai pagu dana di atas Rp. 1 triliun
OB
6,812,500.00
1.10.28.01.01.003
1
1.10.28.01.01.003.001
2
1.10.28.01.01.003.002
3
1.10.28.01.01.003.003
4
1.10.28.01.01.003.004
5
1.10.28.01.01.003.005
6
1.10.28.01.01.003.006
7
1.10.28.01.01.003.007
8
1.10.28.01.01.003.008
9
1.10.28.01.01.003.009
10 1.10.28.01.01.003.010
11 1.10.28.01.01.003.011
12 1.10.28.01.01.003.012
13 1.10.28.01.01.003.013
14 1.10.28.01.01.003.014
15 1.10.28.01.01.003.015
16 1.10.28.01.01.003.016
Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB) Honorarium Kuasa Pengguna Anggaran / Kuasa Pengguna Barang (KPA/KPB)
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
2
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
1.10.28.01.01.004
Honorarium Pejabat Pengelola Keuangan Daerah (PPKD)/ Pejabat Penatausahaan Barang
1.10.28.01.01.004.001
PPKD/PPB
1.10.28.01.01.005
Honorarium Pejabat Pembuat Komitmen (PPK) - (Diberikan tiap bulan per paket pekerjaan selama masa pelaksanaan pekerjaan)
1
1.10.28.01.01.005.001
Pejabat Pembuat Komitmen (PPK)
2
1.10.28.01.01.005.002
Pejabat Pembuat Komitmen (PPK)
3
1.10.28.01.01.005.003
4
1
SATUAN 5
HARGA 6
OB
1,875,000.00
Nilai pagu dana sd. Rp. 100 juta Nilai pagu dana di atas Rp. 100 juta sd. Rp. 250 juta
OB
600,000.00
OB
737,500.00
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 250 juta sd. Rp. 500 juta
OB
875,000.00
1.10.28.01.01.005.004
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 500 juta sd. Rp. 1 miliar
OB
1,000,000.00
5
1.10.28.01.01.005.005
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 1 miliar sd. Rp. 2,5 miliar
OB
1,175,000.00
6
1.10.28.01.01.005.006
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 2,5 miliar sd. Rp. 5 miliar
OB
1,337,500.00
7
1.10.28.01.01.005.007
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 5 miliar sd. Rp. 10 miliar
OB
1,387,500.00
8
1.10.28.01.01.005.008
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 10 miliar sd. Rp. 25 miliar
OB
1,912,500.00
9
1.10.28.01.01.005.009
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 25 miliar sd. Rp. 50 miliar
OB
2,312,500.00
10 1.10.28.01.01.005.010
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 50 miliar sd. Rp.75 miliar
OB
2,712,500.00
11 1.10.28.01.01.005.011
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp.75 miliar sd. Rp. 100 miliar
OB
3,112,500.00
12 1.10.28.01.01.005.012
Pejabat Pembuat Komitmen (PPK)
OB
3,725,000.00
13 1.10.28.01.01.005.013
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp.100 miliar sd. Rp. 250 miliar Nilai pagu dana di atas Rp. 250 miliar sd. Rp. 500 miliar
OB
4,325,000.00
14 1.10.28.01.01.005.014
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 500 miliar sd. Rp. 750 miliar
OB
4,925,000.00
15 1.10.28.01.01.005.015
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 750 miliar sd. Rp. 1 triliun
OB
5,537,500.00
16 1.10.28.01.01.005.016
Pejabat Pembuat Komitmen (PPK)
Nilai pagu dana di atas Rp. 1 triliun
OB
6,737,500.00
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
3
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
1.10.28.01.01.006
Honorarium Direksi Lapangan / Pengawas Lapangan - (Diberikan tiap bulan per paket pekerjaan selama masa pengawasan pekerjaan)
1
1.10.28.01.01.006.001
312,500.00
1.10.28.01.01.006.002
Nilai pagu dana sd. Rp. 100 juta Nilai pagu dana di atas Rp. 100 juta sd. Rp. 250 juta
OB
2
Direksi Lapangan / Pengawas Lapangan Direksi Lapangan / Pengawas Lapangan
OB
437,500.00
3
1.10.28.01.01.006.003
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 250 juta sd. Rp. 500 juta
OB
562,500.00
4
1.10.28.01.01.006.004
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 500 juta sd. Rp. 1 miliar
OB
687,500.00
5
1.10.28.01.01.006.005
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 1 miliar sd. Rp. 2,5 miliar
OB
750,000.00
6
1.10.28.01.01.006.006
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 2,5 miliar sd. Rp. 5 miliar
OB
875,000.00
7
1.10.28.01.01.006.007
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 5 miliar sd. Rp. 10 miliar
OB
1,000,000.00
8
1.10.28.01.01.006.008
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 10 miliar sd. Rp. 25 miliar
OB
1,125,000.00
9
1.10.28.01.01.006.009
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 25 miliar sd. Rp. 50 miliar
OB
1,250,000.00
10 1.10.28.01.01.006.010
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 50 miliar sd. Rp.75 miliar
OB
1,750,000.00
11 1.10.28.01.01.006.011
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp.75 miliar sd. Rp. 100 miliar
OB
2,000,000.00
12 1.10.28.01.01.006.012
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 100 miliar sd. Rp. 250 miliar
OB
2,500,000.00
13 1.10.28.01.01.006.013
Direksi Lapangan / Pengawas Lapangan
Nilai pagu dana di atas Rp. 250 miliar sd. Rp. 500 miliar
OB
3,125,000.00
1.10.28.01.01.007
Honorarium Pejabat Pelaksana Teknis Kegiatan (PPTK) - (Diberikan tiap bulan per rekening kegiatan selama masa pelaksanaan pekerjaan)
1
1.10.28.01.01.007.001
462,500.00
1.10.28.01.01.007.002
Nilai pagu dana sd. Rp. 100 juta Nilai pagu dana di atas Rp. 100 juta sd. Rp. 250 juta
OB
2
Pejabat Pelaksana Teknis Kegiatan (PPTK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
OB
575,000.00
3
1.10.28.01.01.007.003
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 250 juta sd. Rp. 500 juta
OB
700,000.00
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
4
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
4
1.10.28.01.01.007.004
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 500 juta sd. Rp. 1 miliar
OB
812,500.00
5
1.10.28.01.01.007.005
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 1 miliar sd. Rp. 2,5 miliar
OB
900,000.00
6
1.10.28.01.01.007.006
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 2,5 miliar sd. Rp. 5 miliar
OB
1,037,500.00
7
1.10.28.01.01.007.007
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 5 miliar sd. Rp. 10 miliar
OB
1,187,500.00
8
1.10.28.01.01.007.008
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 10 miliar sd. Rp. 25 miliar
OB
1,487,500.00
9
1.10.28.01.01.007.009
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 25 miliar sd. Rp. 50 miliar
OB
1,887,500.00
10 1.10.28.01.01.007.010
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 50 miliar sd. Rp.75 miliar
OB
2,237,500.00
11 1.10.28.01.01.007.011
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp.75 miliar sd. Rp. 100 miliar
OB
2,587,500.00
12 1.10.28.01.01.007.012
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 100 miliar sd. Rp. 250 miliar
OB
3,112,500.00
13 1.10.28.01.01.007.013
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 250 miliar sd. Rp. 500 miliar
OB
3,637,500.00
14 1.10.28.01.01.007.014
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 500 miliar sd. Rp. 750 miliar
OB
4,162,500.00
15 1.10.28.01.01.007.015
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 750 miliar sd. Rp. 1 triliun
OB
4,625,000.00
16 1.10.28.01.01.007.016
Pejabat Pelaksana Teknis Kegiatan (PPTK)
Nilai pagu dana di atas Rp. 1 triliun
OB
5,675,000.00
1.10.28.01.01.008
Honorarium Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
1
1.10.28.01.01.008.001
500,000.00
1.10.28.01.01.008.002
Nilai pagu dana sd. Rp. 100 juta Nilai pagu dana di atas Rp. 100 juta sd. Rp. 250 juta
OB
2
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD) Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
OB
600,000.00
3
1.10.28.01.01.008.003
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 250 juta sd. Rp. 500 juta
OB
712,500.00
4
1.10.28.01.01.008.004
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 500 juta sd. Rp. 1 miliar
OB
825,000.00
5
1.10.28.01.01.008.005
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 1 miliar sd. Rp. 2,5 miliar
OB
962,500.00
6
1.10.28.01.01.008.006
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 2,5 miliar sd. Rp. 5 miliar
OB
1,100,000.00
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
5
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
7
1.10.28.01.01.008.007
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 5 miliar sd. Rp. 10 miliar
OB
1,237,500.00
8
1.10.28.01.01.008.008
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 10 miliar sd. Rp. 25 miliar
OB
1,562,500.00
9
1.10.28.01.01.008.009
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 25 miliar sd. Rp. 50 miliar
OB
1,900,000.00
10 1.10.28.01.01.008.010
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 50 miliar sd. Rp.75 miliar
OB
2,225,000.00
11 1.10.28.01.01.008.011
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp.75 miliar sd. Rp. 100 miliar
OB
2,550,000.00
12 1.10.28.01.01.008.012
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 100 miliar sd. Rp. 250 miliar
OB
3,050,000.00
13 1.10.28.01.01.008.013
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 250 miliar sd. Rp. 500 miliar
OB
3,537,500.00
14 1.10.28.01.01.008.014
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 500 miliar sd. Rp. 750 miliar
OB
3,987,500.00
15 1.10.28.01.01.008.015
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 750 miliar sd. Rp. 1 triliun
OB
4,525,000.00
16 1.10.28.01.01.008.016
Pejabat Penatausahaan Keuangan (PPK-SKPD/PPK-PPKD)
Nilai pagu dana di atas Rp. 1 triliun
OB
5,525,000.00
Nilai pagu dana sd. Rp. 100 juta Nilai pagu dana di atas Rp. 100 juta sd. Rp. 250 juta
OB
425,000.00
OB
525,000.00
1.10.28.01.01.009
Honorarium Bendahara Pengeluaran
1
1.10.28.01.01.009.001
Bendahara Pengeluaran
2
1.10.28.01.01.009.002
Bendahara Pengeluaran
3
1.10.28.01.01.009.003
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 250 juta sd. Rp. 500 juta
OB
625,000.00
4
1.10.28.01.01.009.004
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 500 juta sd. Rp. 1 miliar
OB
712,500.00
5
1.10.28.01.01.009.005
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 1 miliar sd. Rp. 2,5 miliar
OB
837,500.00
6
1.10.28.01.01.009.006
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 2,5 miliar sd. Rp. 5 miliar
OB
962,500.00
7
1.10.28.01.01.009.007
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 5 miliar sd. Rp. 10 miliar
OB
1,075,000.00
8
1.10.28.01.01.009.008
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 10 miliar sd. Rp. 25 miliar
OB
1,362,500.00
9
1.10.28.01.01.009.009
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 25 miliar sd. Rp. 50 miliar
OB
1,650,000.00
10 1.10.28.01.01.009.010
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 50 miliar sd. Rp.75 miliar
OB
1,937,500.00
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
6
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
11 1.10.28.01.01.009.011
Bendahara Pengeluaran
Nilai pagu dana di atas Rp.75 miliar sd. Rp. 100 miliar
OB
2,225,000.00
12 1.10.28.01.01.009.012
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 100 miliar sd. Rp. 250 miliar
OB
2,650,000.00
13 1.10.28.01.01.009.013
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 250 miliar sd. Rp. 500 miliar
OB
3,087,500.00
14 1.10.28.01.01.009.014
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 500 miliar sd. Rp. 750 miliar
OB
3,512,500.00
15 1.10.28.01.01.009.015
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 750 miliar sd. Rp. 1 triliun
OB
3,950,000.00
16 1.10.28.01.01.009.016
Bendahara Pengeluaran
Nilai pagu dana di atas Rp. 1 triliun
OB
4,800,000.00
OB
325,000.00
OB
387,500.00
1.10.28.01.01.010
Honorarium Bendahara Pengeluaran Pembantu Bendahara Pengeluaran Pembantu Nilai pagu dana sd. Rp. 100 juta Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. 100 juta sd. Rp. 250 juta
1
1.10.28.01.01.010.001
2
1.10.28.01.01.010.002
3
1.10.28.01.01.010.003
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 250 juta sd. Rp. 500 juta
OB
462,500.00
4
1.10.28.01.01.010.004
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 500 juta sd. Rp. 1 miliar
OB
537,500.00
5
1.10.28.01.01.010.005
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 1 miliar sd. Rp. 2,5 miliar
OB
625,000.00
6
1.10.28.01.01.010.006
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 2,5 miliar sd. Rp. 5 miliar
OB
712,500.00
7
1.10.28.01.01.010.007
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 5 miliar sd. Rp. 10 miliar
OB
800,000.00
8
1.10.28.01.01.010.008
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 10 miliar sd. Rp. 25 miliar
OB
1,012,500.00
9
1.10.28.01.01.010.009
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 25 miliar sd. Rp. 50 miliar
OB
1,225,000.00
10 1.10.28.01.01.010.010
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 50 miliar sd. Rp.75 miliar
OB
1,437,500.00
11 1.10.28.01.01.010.011
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp.75 miliar sd. Rp. 100 miliar
OB
1,662,500.00
12 1.10.28.01.01.010.012
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 100 miliar sd. Rp. 250 miliar
OB
1,975,000.00
13 1.10.28.01.01.010.013
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 250 miliar sd. Rp. 500 miliar
OB
2,300,000.00
14 1.10.28.01.01.010.014
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 500 miliar sd. Rp. 750 miliar
OB
2,612,500.00
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
7
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
15 1.10.28.01.01.010.015
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 750 miliar sd. Rp. 1 triliun
OB
2,937,500.00
16 1.10.28.01.01.010.016
Bendahara Pengeluaran Pembantu
Nilai pagu dana di atas Rp. 1 triliun
OB
3,575,000.00
1.10.28.01.01.011
Honorarium Staf Pengelola / Pembuat Dokumen / Pembantu Bendahara Pengeluaran
1
1.10.28.01.01.011.001
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana sd. Rp. 100 Pembantu Bendahara Pengeluaran juta
OB
250,000.00
2
1.10.28.01.01.011.002
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 100 juta sd. Rp. 250 juta
OB
300,000.00
3
1.10.28.01.01.011.003
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 250 juta sd. Rp. 500 juta
OB
362,500.00
4
1.10.28.01.01.011.004
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 500 juta sd. Rp. 1 miliar
OB
425,000.00
5
1.10.28.01.01.011.005
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. 1 Pembantu Bendahara Pengeluaran miliar sd. Rp. 2,5 miliar
OB
500,000.00
6
1.10.28.01.01.011.006
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 2,5 miliar sd. Rp. 5 miliar
OB
562,500.00
7
1.10.28.01.01.011.007
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. 5 Pembantu Bendahara Pengeluaran miliar sd. Rp. 10 miliar
OB
637,500.00
8
1.10.28.01.01.011.008
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 10 miliar sd. Rp. 25 miliar
OB
800,000.00
9
1.10.28.01.01.011.009
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 25 miliar sd. Rp. 50 miliar
OB
975,000.00
10 1.10.28.01.01.011.010
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 50 miliar sd. Rp.75 miliar
OB
1,150,000.00
11 1.10.28.01.01.011.011
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp.75 Pembantu Bendahara Pengeluaran miliar sd. Rp. 100 miliar
OB
1,325,000.00
12 1.10.28.01.01.011.012
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 100 miliar sd. Rp. 250 miliar
OB
1,575,000.00
13 1.10.28.01.01.011.013
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 250 miliar sd. Rp. 500 miliar
OB
1,837,500.00
14 1.10.28.01.01.011.014
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 500 miliar sd. Rp. 750 miliar
OB
2,087,500.00
15 1.10.28.01.01.011.015
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. Pembantu Bendahara Pengeluaran 750 miliar sd. Rp. 1 triliun
OB
2,350,000.00
16 1.10.28.01.01.011.016
Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. 1 Pembantu Bendahara Pengeluaran triliun
OB
2,850,000.00
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
8
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
1.10.28.01.02
Honorarium Pengadaan Barang / Jasa
1
1.10.28.01.02.001 1.10.28.01.02.001.001
Honorarium Kepala ULP Kepala ULP
OB
1,000,000.00
1
1.10.28.01.02.002 1.10.28.01.02.002.001
Honorarium Sekretaris Sekretaris
OB
750,000.00
1.10.28.01.02.003
Honorarium Staf Pendukung ULP
1.10.28.01.02.003.001
Staf Pendukung ULP
OB
600,000.00
1.10.28.01.02.004
Honorarium Pejabat Pengadaan Barang/Jasa - (1 (satu) Orang Pejabat Pengadaan mendapatkan satu honor per bulan)
1.10.28.01.02.004.001
Pejabat Pengadaan Barang/Jasa
1.10.28.01.02.005
Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) Konstruksi Honorarium Kelompok Kerja Unit Nilai pagu pengadaan Layanan Pengadaan (Ulp) - Konstruksi sampai dengan Rp.200 juta
1
1
Pagu dana adalah pagu pengadaan langsung yang dikelola oleh Pejabat Pengadaan
OB
750,000.00
OP
680,000.00
1
1.10.28.01.02.005.001
2
1.10.28.01.02.005.002
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 200 juta sd. Rp. 500 juta
OP
850,000.00
3
1.10.28.01.02.005.003
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 500 juta sd. Rp. 1 miliar
OP
1,020,000.00
4
1.10.28.01.02.005.004
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 1 milyar sd. Rp. 2,5 miliar
OP
1,270,000.00
5
1.10.28.01.02.005.005
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 2,5 miliar sd. Rp. 5 miliar
OP
1,520,000.00
6
1.10.28.01.02.005.006
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 5 miliar sd. Rp. 10 miliar
OP
1,780,000.00
7
1.10.28.01.02.005.007
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 10 miliar sd. Rp. 25 miliar
OP
2,120,000.00
8
1.10.28.01.02.005.008
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 25 miliar sd. Rp. 50 miliar
OP
2,450,000.00
9
1.10.28.01.02.005.009
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 50 miliar sd. Rp. 75 miliar
OP
2,790,000.00
10 1.10.28.01.02.005.010
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 75 miliar sd. Rp. 100 miliar Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 100 miliar sd Rp. 250 miliar
OP
3,130,000.00
OP
3,580,000.00
11 1.10.28.01.02.005.011
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
9
NO 1
KODE BARANG 2
12 1.10.28.01.02.005.012
13 1.10.28.01.02.005.013
14 1.10.28.01.02.005.014
15 1.10.28.01.02.005.015
1.10.28.01.02.006
1
1.10.28.01.02.006.001
2
1.10.28.01.02.006.002
3
1.10.28.01.02.006.003
4
1.10.28.01.02.006.004
5
1.10.28.01.02.006.005
6
1.10.28.01.02.006.006
7
1.10.28.01.02.006.007
8
1.10.28.01.02.006.008
9
1.10.28.01.02.006.009
10 1.10.28.01.02.006.010
11 1.10.28.01.02.006.011
12 1.10.28.01.02.006.012
13 1.10.28.01.02.006.013
14 1.10.28.01.02.006.014
15 1.10.28.01.02.006.015
NAMA BARANG 3
MERK / UKURAN 4
Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 250 miliar sd. Rp. 500 milyar Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 500 miliar sd. Rp. 750 milyar Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 750 miliar sd. Rp. 1 trilyun Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas Layanan Pengadaan (Ulp) - Konstruksi Rp. 1 triliun
Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi Honorarium Kelompok Kerja Unit Layanan Pengadaan (Ulp) – Non Konstruksi
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
10
SATUAN 5
HARGA 6
OP
4,030,000.00
OP
4,490,000.00
OP
4,940,000.00
OP
5,560,000.00
Nilai pagu pengadaan sampai dengan Rp.200 juta
OP
760,000.00
Nilai pagu pengadaan di atas Rp. 200 juta sd. Rp. 500 juta
OP
760,000.00
Nilai pagu pengadaan di atas Rp. 500 juta sd. Rp. 1 miliar
OP
920,000.00
Nilai pagu pengadaan di atas Rp. 1 milyar sd. Rp. 2,5 miliar
OP
1,140,000.00
Nilai pagu pengadaan di atas Rp. 2,5 miliar sd. Rp. 5 miliar
OP
1,370,000.00
Nilai pagu pengadaan di atas Rp. 5 miliar sd. Rp. 10 miliar
OP
1,600,000.00
Nilai pagu pengadaan di atas Rp. 10 miliar sd. Rp. 25 miliar
OP
1,910,000.00
Nilai pagu pengadaan di atas Rp. 25 miliar sd. Rp. 50 miliar
OP
2,210,000.00
Nilai pagu pengadaan di atas Rp. 50 miliar sd. Rp. 75 miliar
OP
2,520,000.00
Nilai pagu pengadaan di atas Rp. 75 miliar sd. Rp. 100 miliar Nilai pagu pengadaan di atas Rp. 100 miliar sd Rp. 250 miliar Nilai pagu pengadaan di atas Rp. 250 miliar sd. Rp. 500 milyar Nilai pagu pengadaan di atas Rp. 500 miliar sd. Rp. 750 milyar Nilai pagu pengadaan di atas Rp. 750 miliar sd. Rp. 1 trilyun Nilai pagu pengadaan di atas Rp. 1 triliun
OP
2,820,000.00
OP
3,230,000.00
OP
3,640,000.00
OP
4,040,000.00
OP
4,450,000.00
OP
5,010,000.00
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
1.10.28.01.02.007
Honorarium Kelompok Kerja Jasa lainnya dan Konsultansi Unit Layanan Pengadaan (Ulp) – Non Konstruksi
1
1.10.28.01.02.007.001
Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi di atas Rp. 50 Pengadaan (Ulp) – Non Konstruksi juta sd. Rp. 200 juta
OP
450,000.00
2
1.10.28.01.02.007.002
OP
480,000.00
3
1.10.28.01.02.007.003
OP
600,000.00
4
1.10.28.01.02.007.004
OP
720,000.00
5
1.10.28.01.02.007.005
OP
910,000.00
6
1.10.28.01.02.007.006
OP
1,090,000.00
7
1.10.28.01.02.007.007
OP
1,270,000.00
8
1.10.28.01.02.007.008
OP
1,510,000.00
9
1.10.28.01.02.007.009
Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp. 200 juta sd. Rp.250 juta Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp.250 juta sd. Rp.500juta Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp.500 juta sd. Rp. 1 miliar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp. 1 milyar sd. Rp.2,5 miliar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp.2,5 miliar sd. Rp.5 miliar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp. 5 miliar sd. Rp. 10 miliar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp. 10 miliar sd. Rp.25 miliar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp.25 miliar sd. Rp.50 miliar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp.50 miliar sd. Rp.75 miliar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp.75 miliar sd. Rp100 miliar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp100 miliar sd Rp250 miliar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp250 miliar sd. Rp. 500 milyar
OP
1,750,000.00
OP
1,990,000.00
OP
2,230,000.00
OP
2,560,000.00
OP
2,880,000.00
10 1.10.28.01.02.007.010
11 1.10.28.01.02.007.011
12 1.10.28.01.02.007.012
13 1.10.28.01.02.007.013
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
11
NO 1
KODE BARANG 2
14 1.10.28.01.02.007.014
15 1.10.28.01.02.007.015
16 1.10.28.01.02.007.016
1.10.28.01.03
NAMA BARANG 3
MERK / UKURAN 4
Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp 500 miliar sd. Rp.750 milyar Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp 750 miliar sd. Rp. 1 trilyun Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di Pengadaan (Ulp) – Non Konstruksi atas Rp. 1 triliun
SATUAN 5
HARGA 6
OP
3,200,000.00
OP
3,520,000.00
OP
3,960,000.00
Pagu dana adalah pagu pengadaan langsung yang dikelola oleh Pejabat Penerima Hasil Pekerjaan
OB
470,000.00
Honorarium Penerima Hasil Pekerjaan Honorarium Pejabat Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa (1 (satu) Pejabat Penerima hasil pekerjaan mendapatkan satu honor per bulan).
1
1.10.28.01.03.001
2
1.10.28.01.03.001.001
Pejabat Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
1.10.28.01.03.002
Honorarium Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
1
1.10.28.01.03.002.001
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan sampai dengan Rp.200 juta
OP
420,000.00
2
1.10.28.01.03.002.002
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp.200juta sd. Rp.500juta
OP
520,000.00
3
1.10.28.01.03.002.003
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp.500 juta sd. Rp. 1 miliar
OP
620,000.00
4
1.10.28.01.03.002.004
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp. 1 milyar sd. Rp.2,5 miliar
OP
770,000.00
5
1.10.28.01.03.002.005
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp.2,5 miliar sd. Rp.5 miliar
OP
910,000.00
6
1.10.28.01.03.002.006
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp. 5 miliar sd. Rp. 10 miliar
OP
1,060,000.00
7
1.10.28.01.03.002.007
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp. 10 miliar sd. Rp.25 miliar
OP
1,260,000.00
8
1.10.28.01.03.002.008
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp.25 miliar sd. Rp.50 miliar
OP
1,450,000.00
9
1.10.28.01.03.002.009
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp.50 miliar sd. Rp.75 miliar
OP
1,650,000.00
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
12
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
10 1.10.28.01.03.002.010
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp.75 miliar sd. Rp100 miliar
OP
1,840,000.00
11 1.10.28.01.03.002.011
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp100 miliar sd Rp250 miliar
OP
2,100,000.00
12 1.10.28.01.03.002.012
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
OP
2,370,000.00
13 1.10.28.01.03.002.013
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
OP
2,630,000.00
14 1.10.28.01.03.002.014
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp250 miliar sd. Rp. 500 milyar Nilai pagu pengadaan di atas Rp 500 miliar sd. Rp. 750 milyar Nilai pagu pengadaan di atas Rp 750 miliar sd. Rp. 1 trilyun
OP
2,890,000.00
15 1.10.28.01.03.002.015
Panitia Penerima Hasil Pekerjaan/Pengadaan Barang/Jasa
Nilai pagu pengadaan di atas Rp. 1 triliun
OP
3,250,000.00
Nilai Aset sd. 1 Miliar
OB
725,000.00
Nilai Aset diatas 1 Miliar sd. 5 Miliar Nilai Aset diatas 5 Milliar
OB
787,000.00
OB
850,000.00
OB OB
625,000.00 687,000.00
OB
750,000.00
OB OB
300,000.00 400,000.00
OB
500,000.00
OB OB
375,000.00 500,000.00
OB
625,000.00
OB
350,000.00
1.10.28.01.04 1.10.28.01.04.001
1
1.10.28.01.04.001.001
2
1.10.28.01.04.001.002
3
1.10.28.01.04.001.003
Honorarium Pengelolaan Barang Milik Daerah Honorarium Pejabat Penatausahaan (Nilai Asset diluar Asset Barang Milik Daerah Tanah, Gedung, Jalan) Pejabat Penatausahaan Pengguna Barang Pejabat Penatausahaan Pengguna Barang Pejabat Penatausahaan Pengguna Barang
1.10.28.01.04.002
Honorarium Pengurus (Nilai Asset diluar Asset Penatausahaan Barang Milik Daerah Tanah, Gedung, Jalan)
1 2
1.10.28.01.04.002.001 1.10.28.01.04.002.002
Pengurus Barang Pengguna Pengurus Barang Pengguna
3
1.10.28.01.04.002.003
Pengurus Barang Pengguna
1.10.28.01.04.003
Honorarium Pembantu (Nilai Asset diluar Asset Penatausahaan Barang Milik Daerah Tanah, Gedung, Jalan)
1 2
1.10.28.01.04.003.001 1.10.28.01.04.003.001
Pembantu Pengurus Barang Pembantu Pengurus Barang
3
1.10.28.01.04.003.002
Pembantu Pengurus Barang
1.10.28.01.04.004
Honorarium Pembantu (Nilai Asset diluar Asset Penatausahaan Barang Milik Daerah Tanah, Gedung, Jalan)
1 2
1.10.28.01.04.004.001 1.10.28.01.04.004.002
Pengurus Barang Pembantu Pengurus Barang Pembantu
3
1.10.28.01.04.004.003
Pengurus Barang Pembantu
1
1.10.28.01.05 1.10.28.01.05.001 1.10.28.01.05.001.001
Honorarium Pengurus Gaji Honorarium Pengurus Gaji Pengurus Gaji
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
Nilai Aset sd. 1 Miliar Nilai Aset diatas 1 Miliar sd. 5 Miliar Nilai Aset diatas 5 Milliar
Nilai Aset sd. 1 Miliar Nilai Aset diatas 1 Miliar sd. 5 Miliar Nilai Aset diatas 5 Milliar
Nilai Aset sd. 1 Miliar Nilai Aset diatas 1 Miliar sd. 5 Miliar Nilai Aset diatas 5 Milliar
13
NO 1
KODE BARANG 2 1.10.28.01.06
NAMA BARANG 3
MERK / UKURAN 4
1.10.28.01.06.001
Honorarium Pengelola Penerimaan Daerah Honorarium Bendahara Penerimaan
1
1.10.28.01.06.001.001
Bendahara Penerimaan
2
1.10.28.01.06.001.002
Bendahara Penerimaan
3
1.10.28.01.06.001.003
Bendahara Penerimaan
4
1.10.28.01.06.001.004
Bendahara Penerimaan
1.10.28.01.06.002 1
1.10.28.01.06.002.001
Honorarium Bendahara Penerimaan Pembantu Bendahara Penerimaan Pembantu
2
1.10.28.01.06.002.002
Bendahara Penerimaan Pembantu
3
1.10.28.01.06.002.003
Bendahara Penerimaan Pembantu
4
1.10.28.01.06.002.004
Bendahara Penerimaan Pembantu
1.10.28.01.07
Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan Honorarium Penunjang Penelitian / Perekayasaan
1.10.28.01.07.001 1
1.10.28.01.07.001.001
2
1.10.28.01.07.001.002
3
1.10.28.01.07.001.003
4
1.10.28.01.07.001.004
5
1.10.28.01.07.001.005
6
1.10.28.01.07.001.006
7
1.10.28.01.07.001.007
8
1.10.28.01.07.001.008
9
1.10.28.01.07.001.009
10 1.10.28.01.07.001.010 11 1.10.28.01.07.001.011
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
14
SATUAN 5
HARGA 6
Target pendapatan sd. 500 juta Target pendapatan diatas 500 juta sd. 1 Miliar Target pendapatan diatas 1 Milliar sd. 5 Milliar Target pendapatan diatas 5 Milliar
OB
375,000.00
OB
625,000.00
OB
875,000.00
OB
1,000,000.00
Target pendapatan sd. 500 juta Target pendapatan diatas 500 juta sd. 1 Miliar Target pendapatan diatas 1 Milliar sd. 5 Milliar Target pendapatan diatas 5 Milliar
OB
312,500.00
OB
437,500.00
OB
625,000.00
OB
750,000.00
Peneliti Utama ( Maksimum 4 Jam / hari ) Peneliti Madya ( Maksimum 4 Jam / hari ) Peneliti Muda ( Maksimum 4 Jam / hari ) Peneliti Pertama ( Maksimum 4 Jam / hari ) Peneliti (Non Fungsional Peneliti) Pembantu Peneliti/Perekayasa Koordinator Peneliti/Perekayasa Sekretariat Penelitian/Perekayasa Pengolah Data
OJ
60,000.00
OJ
50,000.00
OJ
40,000.00
OJ
35,000.00
OJ
30,000.00
OJ
25,000.00
OB
420,000.00
OB
300,000.00
Petugas Survey Pembantu Lapangan
Penelitian Orang/Resp onden OH
1,540,000.00 8,000.00 80,000.00
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
1.10.28.01.08
Honorarium Personil Pendukung Kegiatan Seminar/ Rakor/ Sosialisasi/ Diseminasi / FGD / Bintek (Kegiatan Sejenis)
1.10.28.01.08.001
Honorarium Narasumber/Pembahas
1
1.10.28.01.08.001.001
OJ
2,500,000.00
2
1.10.28.01.08.001.002
Menteri / pejabat setingkat Menteri/ Pejabat Negara Lainnya/yang disetarakan Pejabat Eselon I / yang disetarakan
OJ
1,750,000.00
3
1.10.28.01.08.001.003
Pejabat Eselon II / yang disetarakan
OJ
1,000,000.00
4
1.10.28.01.08.001.004
OJ
900,000.00
5
1.10.28.01.08.001.005
OJ
1,700,000.00
6
1.10.28.01.08.001.006
Pejabat Eselon III ke bawah / yang disetarakan Pakar/Praktisi/Pembicara Khusus/Tenaga Ahli Penyuluh
OJ
250,000.00
1
1.10.28.01.08.002 1.10.28.01.08.002.001
Honorarium Moderator Moderator
OH
700,000.00
1
1.10.28.01.08.003 1.10.28.01.08.003.001
Honorarium Pembawa Acara Pembawa Acara
OH
250,000.00
1
1.10.28.01.08.004 1.10.28.01.08.004.001
Honorarium Pembaca Doa Pembaca Doa
OH
200,000.00
1.10.28.01.09
Honorarium Panitia Pelaksana Kegiatan Seminar/ Rakor/ Sosialisasi/ Diseminasi/ Bintek
1.10.28.01.09.001
Honorarium Panitia Seminar/ Rakor/ Sosialisasi/ Diseminasi/ Bintek
1.10.28.01.09.001.001 1.10.28.01.09.001.002 1.10.28.01.09.001.003 1.10.28.01.09.001.004 1.10.28.01.09.001.005
Pengarah Penanggung Jawab Ketua / Wakil Ketua Sekretaris Anggota
OK OK OK OK OK
500,000.00 450,000.00 400,000.00 300,000.00 300,000.00
1.10.28.01.10
Honorarium Pegawai Pemerintah Dengan Perjanjian Kerja (Non Pegawai Negeri)
1.10.28.01.10.001
Honorarium Pegawai Pemerintah Dengan Perjanjian Kerja (Non Pegawai Negeri)
1
1.10.28.01.10.001.001
OB
1,800,000
2
1.10.28.01.10.001.002
OB
2,000,000
3
1.10.28.01.10.001.003
Honorarium Pegawai Pemerintah SLTA Dengan Perjanjian Kerja (Non Pegawai Negeri) Honorarium Pegawai Pemerintah SarjanaMuda Dengan Perjanjian Kerja (Non Pegawai Negeri) Honorarium Pegawai Pemerintah Sarjana Dengan Perjanjian Kerja (Non Pegawai Negeri)
OB
2,200,000
1 2 3 4 5
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
15
NO 1 4
1 2 3 4 5 6 7 8
1 2 3 4 5 6
1 2
KODE BARANG 2
Honorarium Pegawai Pemerintah Master ( S.2) Dengan Perjanjian Kerja (Non Pegawai Negeri)
1.10.28.01.11
1.10.28.01.11.001
Honorarium Tim Pelaksana Kegiatan Dan Sekretariat Tim Pelaksana Kegiatan Yang Ditetapkan Oleh Walikota
1.10.28.01.11.001.001 1.10.28.01.11.001.002 1.10.28.01.11.001.003 1.10.28.01.11.001.004 1.10.28.01.11.001.005 1.10.28.01.11.001.006 1.10.28.01.11.001.007 1.10.28.01.11.001.008
Pengarah 1 Pengarah 2 Pengarah 3 Penanggung Jawab/Koordinator Ketua Wakil Ketua Sekretaris Anggota
1.10.28.01.11.002
Yang Ditetapkan Oleh PA/KPA
1.10.28.01.11.002.001 1.10.28.01.11.002.002 1.10.28.01.11.002.003 1.10.28.01.11.002.004 1.10.28.01.11.002.005 1.10.28.01.11.002.006
Pengarah Penanggung Jawab Ketua/Koordinator Wakil Ketua Sekretaris Anggota
1.10.28.01.11.003 1.10.28.01.11.003.001 1.10.28.01.11.003.002
1.10.28.01.12.001 1.10.28.01.12.001.001 1.10.28.01.12.001.002 1.10.28.01.12.001.003 1.10.28.01.12.001.004 1.10.28.01.12.001.005 1.10.28.01.12.001.006 1.10.28.01.12.002
1 2 3
MERK / UKURAN 4
1.10.28.01.10.001.004
1.10.28.01.12
1 2 3 4 5 6
NAMA BARANG 3
1.10.28.01.12.002.001 1.10.28.01.12.002.002 1.10.28.01.12.002.003
SATUAN 5
HARGA 6
OB
2,300,000
OB OB OB OB OB OB OB OB
750,000.00 725,000.00 725,000.00 700,000.00 650,000.00 600,000.00 500,000.00 500,000.00
OB OB OB OB OB OB
500,000.00 450,000.00 400,000.00 350,000.00 300,000.00 300,000.00
Honorarium Sekretariat Tim Pelaksana Kegiatan Ketua/Wakil Anggota
OB OB
250,000.00 220,000.00
Honorarium Tim Anggaran Pemerintah Kota Mojokerto Honorarium Tim Anggaran Pemerintah Kota Mojokerto Pembina 1 Pembina 2 Ketua Wakil Ketua Sekretaris Anggota
OB OB OB OB OB OB
2,500,000.00 2,000,000.00 1,750,000.00 1,500,000.00 1,500,000.00 1,300,000.00
Honorarium Sekretariat Tim Anggaran Pemerintah Kota Mojokerto Koordinator Sekretaris Anggota
OB OB OB
700,000.00 500,000.00 500,000.00
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
Koordinator Bidang/Urusan apabila diperlukan
Koordinator Bidang/Urusan apabila diperlukan
16
NO 1
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 2 3 4 5 6 7
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
1.10.28.01.12.003
Honorarium Tim Pembahasan Dan Penetapan Rancangan Prioritas Dan Plafon Anggaran Sementara Anggaran Pendapatan Dan Belanja Daerah
1.10.28.01.12.003.001 1.10.28.01.12.003.002 1.10.28.01.12.003.003 1.10.28.01.12.003.004 1.10.28.01.12.003.005 1.10.28.01.12.003.006 1.10.28.01.12.003.007
Pengarah Penanggung Jawab Koordinator Ketua Wakil Ketua Sekretaris Anggota
1.10.28.01.12.004
Honorarium Tim Pembahasan Dan Penetapan Rancangan Kebijakan Umum Anggaran Pendapatan Dan Belanja Daerah
1.10.28.01.12.004.001 1.10.28.01.12.004.002 1.10.28.01.12.004.003 1.10.28.01.12.004.004 1.10.28.01.12.004.005 1.10.28.01.12.004.006 1.10.28.01.12.004.007
Pengarah Penanggung Jawab Koordinator Ketua Wakil Ketua Sekretaris Anggota
1.10.28.01.12.005
Honorarium Tim Pembahasan Dan Penetapan Rancangan Peraturan Daerah Tentang Anggaran Pendapatan Dan Belanja Daerah
1.10.28.01.12.005.001 1.10.28.01.12.005.002 1.10.28.01.12.005.003 1.10.28.01.12.005.004 1.10.28.01.12.005.005 1.10.28.01.12.005.006 1.10.28.01.12.005.007
Pengarah Penanggung Jawab Koordinator Ketua Wakil Ketua Sekretaris Anggota
1.10.28.01.12.006
Honorarium Tim Pembahasan Dan Penetapan Rancangan Peraturan Daerah Tentang Laporan Keterangan Pertanggungjawaban Walikota
1.10.28.01.12.006.001 1.10.28.01.12.006.002 1.10.28.01.12.006.003 1.10.28.01.12.006.004 1.10.28.01.12.006.005 1.10.28.01.12.006.006 1.10.28.01.12.006.007
Pengarah Penanggung Jawab Koordinator Ketua Wakil Ketua Sekretaris Anggota
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
17
SATUAN 5
HARGA 6
OK OK OK OK OK OK OK
2,100,000.00 2,000,000.00 1,900,000.00 1,800,000.00 1,700,000.00 1,600,000.00 1,500,000.00
OK OK OK OK OK OK OK
2,100,000.00 2,000,000.00 1,900,000.00 1,800,000.00 1,700,000.00 1,600,000.00 1,500,000.00
OK OK OK OK OK OK OK
3,600,000.00 3,500,000.00 3,400,000.00 3,300,000.00 3,200,000.00 3,100,000.00 3,000,000.00
OK OK OK OK OK OK OK
3,600,000.00 3,500,000.00 3,400,000.00 3,300,000.00 3,200,000.00 3,100,000.00 3,000,000.00
NO 1
1 2 3 4 5 6 7 8
1 2 3
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
Honorarium Tim Koordinasi Penanggulangan Kemiskinan (TKPK)
1.10.28.01.12.007.001 1.10.28.01.12.007.002 1.10.28.01.12.007.003 1.10.28.01.12.007.004 1.10.28.01.12.007.005 1.10.28.01.12.007.006 1.10.28.01.12.007.007 1.10.28.01.12.007.008
Penanggungjawab Ketua Wakil Ketua Sekretaris Wakil Sekretaris Ketua Pokja/Program Wakil Ketua Pokja/Program Anggota
OB OB OB OB OB OB OB OB
750,000.00 700,000.00 650,000.00 600,000.00 550,000.00 525,000.00 500,000.00 500,000.00
1.10.28.01.12.008
Honorarium Sekretariat Tim Koordinasi Penanggulangan Kemiskinan (TKPK) Kepala Wakil Kepala Anggota
OB OB OB
500,000.00 400,000.00 300,000.00
OB
700,000.00
OB
600,000.00
OB OB
500,000.00 400,000.00
OB OB OB OB OB
2,000,000.00 1,750,000.00 1,500,000.00 1,250,000.00 1,000,000.00
1.10.28.01.12.008.001 1.10.28.01.12.008.002 1.10.28.01.12.008.003
Honorarium Koordinator Aplikasi Keuangan Pada Satuan Kerja Perangkat Daerah
1
1.10.28.01.12.009.001
2
1.10.28.01.12.009.002
3 4
1.10.28.01.12.009.003 1.10.28.01.12.009.004
Koordinator pemerintah Kota Mojokerto (SKPKD) Wakil Koordinator pemerintah Kota Mojokerto (SKPKD) Koordinator pada SKPD Anggota pada SKPD (Pemberian Honorarium ini tidak boleh melebihi bendahara pengeluaran/bendahara pengeluaran pembantu)
1
HARGA 6
1.10.28.01.12.007
1.10.28.01.12.009
1 2 3 4 5
SATUAN 5
1.10.28.01.12.010
Honorarium Tim Penyusunan, Penetapan dan Perubahan Rencana Kerja Pembangunan Daerah (RKPD) Kota Mojokerto
1.10.28.01.12.010.001 1.10.28.01.12.010.002 1.10.28.01.12.010.003 1.10.28.01.12.010.004 1.10.28.01.12.010.005
Pembina I Pembina II Ketua Sekretaris Anggota
1.10.28.01.12.011
Honorarium Tim Pelaksana kegiatan Fasilitasi Penyelesaian Perselisihan Hubungan Industrial
1.10.28.01.12.011.001
Penanggungjawab Tim Mediasi
500,000.00 Orang/Kasus
2
1.10.28.01.12.011.002
Mediator Hubungan Industrial
400,000.00 Orang/Kasus
3
1.10.28.01.12.011.003
Anggota Tim Mediasi
300,000.00 Orang/Kasus
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
18
NO 1
1 2 3 4 5 6 7
1 2 3 4 5 6 7
KODE BARANG 2
1 2 3 4 5 6
MERK / UKURAN 4
SATUAN 5
HARGA 6
1.10.28.01.13
Honorarium Tim Pembahasan Dan Penetapan Raperda Kota Mojokerto
1.10.28.01.13.001
Honorarium Tim Pembahasan Dan Penetapan Raperda Kota Mojokerto
1.10.28.01.13.001.001 1.10.28.01.13.001.002 1.10.28.01.13.001.003 1.10.28.01.13.001.004 1.10.28.01.13.001.005 1.10.28.01.13.001.006 1.10.28.01.13.001.007
Pengarah Penanggung Jawab Koordinator Ketua Wakil Ketua Sekretaris Anggota
1.10.28.01.14
Honorarium Tim Penyusunan Jurnal
1.10.28.01.14.001
Honorarium Tim Penyusunan Jurnal
1.10.28.01.14.001.001 1.10.28.01.14.001.002 1.10.28.01.14.001.003 1.10.28.01.14.001.004 1.10.28.01.14.001.005 1.10.28.01.14.001.006 1.10.28.01.14.001.007
Penanggung Jawab Redaktur Penyunting/Editor Desain Grafis Fotografer Sekretariat Pembuat artikel
Oter Oter Oter Oter Oter Oter Halaman
500,000.00 400,000.00 300,000.00 180,000.00 180,000.00 150,000.00 200,000.00
1.10.28.01.15
Honorarium Tim Penyusunan Buletin / Majalah / Tabloid Honorarium Tim Penyusunan Buletin / Majalah Penanggung Jawab Redaktur Penyunting/Editor Desain Grafis Fotografer Sekretariat Pembuat artikel
Oter Oter Oter Oter Oter Oter Halaman
400,000.00 300,000.00 250,000.00 180,000.00 180,000.00 150,000.00 100,000.00
OB OB OB OB OB Halaman
500,000 450,000 400,000 350,000 300,000 100,000
Siswa/ MataUjian Siswa/ Mata Ujian
5,000.00
1.10.28.01.15.001 1 2 3 4 5 6 7
NAMA BARANG 3
1.10.28.01.15.001.001 1.10.28.01.15.001.002 1.10.28.01.15.001.003 1.10.28.01.15.001.004 1.10.28.01.15.001.005 1.10.28.01.15.001.006 1.10.28.01.15.001.007
OK OK OK OK OK OK OK
1.10.28.01.16
Honorarium Tim Pengelola Website Pemerintah Kota Mojokerto
1.10.28.01.16.001
Honorarium Tim Pengelola Website Pemerintah Kota Mojokerto
1.10.28.01.16.001.001 1.10.28.01.16.001.002 1.10.28.01.16.001.003 1.10.28.01.16.001.004 1.10.28.01.16.001.005 1.10.28.01.16.001.006
Penanggung Jawab Redaktur Editor Web Admin Web Developer Pembuat Artikel
1.10.28.01.17
Pendidikan Dasar Pendidikan Menengah
1
1.10.28.01.17.001 1.10.28.01.17.001.001
Vakasi & Honorarium Penyelenggaraan Ujian Vakasi Pemeriksaan Hasil Ujian
2
1.10.28.01.17.001.002
Pemeriksaan Hasil Ujian
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
19
3,600,000.00 3,500,000.00 3,400,000.00 3,300,000.00 3,200,000.00 3,100,000.00 3,000,000.00
7,500.00
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
1.10.28.01.17.002
Honorarium Penyelenggaraan Ujian
1
1.10.28.01.17.002.001
Penyusunan/pembuatan bahan Ujian Pendidikan Dasar
2 3
1.10.28.01.17.002.002 1.10.28.01.17.002.003
Pengawas Ujian Pendidikan Dasar Penyusunan/pembuatan bahan Ujian Pendidikan Menengah
4
1.10.28.01.17.002.004
Pengawas Ujian
1 2 3
1.10.28.01.18 1.10.28.01.18.001 1.10.28.01.18.001.001 1.10.28.01.18.001.002 1.10.28.01.18.001.003
Honorarium Pengajar Diklat Honorarium Pengajar Diklat Pengajar dari dalam SKPD Pengajar dari luar SKPD Penyusun Materi/Naskah
1.10.28.01.19
Satuan Biaya Uang Lembur Dan Uang Makan Lembur PNS
1 2 3 4
1.10.28.01.19.001 1.10.28.01.19.001.001 1.10.28.01.19.001.002 1.10.28.01.19.001.003 1.10.28.01.19.001.004
Uang Lembur Uang Lembur Uang Lembur Uang Lembur Uang Lembur
1 2 3
1.10.28.01.19.002 1.10.28.01.19.002.001 1.10.28.01.19.002.002 1.10.28.01.19.002.003
Uang Makan Lembur Uang Makan Lembur Uang Makan Lembur Uang Makan Lembur
1.10.28.01.20
Honorarium Satpam, Pengemudi, Petugas Kebersihan, Dan Pramubakti (Non PNS)
1.10.28.01.20.001
Honorarium Satpam, Pengemudi, Petugas Kebersihan, Dan Pramubakti (Non PNS)
1
1.10.28.01.20.001.001
2
1.10.28.01.20.001.002
Satpam/Penjaga Kantor dan Pengemudi Petugas Kebersihan dan Pramubakti
1.10.28.01.21 1.10.28.01.21.001 1
1.10.28.01.21.001.001
2
1.10.28.01.21.001.002
3
1.10.28.01.21.001.003
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
150,000.00
OJ OJ Per Materi
200,000.00 300,000.00 150,000.00
Golongan I Golongan II Golongan III Golongan IV
OJ OJ OJ OJ
13,000.00 17,000.00 20,000.00 25,000.00
Golongan I dan II Golongan III Golongan IV
OH OH OH
30,000.00 32,000.00 36,000.00
OB
1,800,000.00
OB
1,700,000.00
Peserta/ Angkatan Peserta/ Angkatan Peserta/ Angkatan
32,000,000.00
Internal PEMDA
Diklat Pimpinan Tk. II Diklat Pimpinan Tk. III Diklat Pimpinan Tk. IV
20
HARGA 6
Naskah/ pelajaran OH Naskah/ pelajaran OH
Pendidikan Menengah
Satuan Biaya Diklat Satuan Biaya Diklat Pimpinan/ Struktural Satuan Biaya Diklat Pimpinan/ Struktural Satuan Biaya Diklat Pimpinan/ Struktural Satuan Biaya Diklat Pimpinan/ Struktural
SATUAN 5
240,000.00 190,000.00 270,000.00
22,000,000.00 18,000,000.00
NO 1
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
1.10.28.01.22
Satuan Biaya Latihan Prajabatan
1.10.28.01.22.001
Satuan Biaya Latihan Prajabatan
1
1.10.28.01.22.001.001
Satuan Biaya Latihan Prajabatan
Golongan I dan Golongan II
2
1.10.28.01.22.001.002
Satuan Biaya Latihan Prajabatan
Golongan III
1.10.28.01.23
Honorarium Panitia Seleksi Terbuka Jabatan Pimpinan Tinggi Pratama
1.10.28.01.23.001
Honorarium Panitia Seleksi Terbuka Jabatan Pimpinan Tinggi Pratama
1.10.28.01.23.001.001 1.10.28.01.23.001.002 1.10.28.01.23.001.003
Ketua Sekretaris Anggota
1.10.28.01.24 1.10.28.01.24.001
Satuan Biaya Penerjemahan Dan Pengetikan Dari Bahasa Asing Ke Indonesia
1
1.10.28.01.24.001.001
Dari Bahasa Asing Ke Indonesia
2
1.10.28.01.24.001.002
Dari Bahasa Asing Ke Indonesia
3
1.10.28.01.24.001.003
Dari Bahasa Asing Ke Indonesia
4
1.10.28.01.24.001.004
Dari Bahasa Asing Ke Indonesia
Dari Bahasa Mandarin, Belanda Dari Bahasa Prancis, Jerman
5
1.10.28.01.24.001.005
Dari Bahasa Asing Ke Indonesia
Dari Bahasa Asing Lainnya
1.10.28.01.25.002
Dari Bahasa Indonesia Ke Asing
1
1.10.28.01.25.002.001
Dari Bahasa Indonesia Ke Asing
Dari Bahasa Indonesia
2
1.10.28.01.25.002.002
Dari Bahasa Indonesia Ke Asing
Ke Bahasa Jepang
3
1.10.28.01.25.002.003
Dari Bahasa Indonesia Ke Asing
4
1.10.28.01.25.002.004
Dari Bahasa Indonesia Ke Asing
Ke Bahasa Mandarin, Belanda Ke Bahasa Prancis, Jerman
5
1.10.28.01.25.002.005
Dari Bahasa Indonesia Ke Asing
Ke Bahasa Asing Lainnya
1.10.28.01.25.003
Dari Bahasa Indonesia Ke Bahasa Daerah/Lokal - dan sebaliknya
1.10.28.01.25.003.001
Dari Bahasa Indonesia Ke Bahasa Daerah/Lokal
1
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
Bahasa Inggris ke Bahasa Indonesia Dari Bahasa Jepang
21
SATUAN 5
HARGA 6
Peserta/ Angkatan Peserta/ Angkatan
8,000,000.00
OB OB OB
2,500,000.00 2,400,000.00 2,300,000.00
9,500,000.00
Halaman Jadi Halaman Jadi Halaman Jadi Halaman Jadi Halaman Jadi
152,000.00
Halaman Jadi Halaman Jadi Halaman Jadi Halaman Jadi Halaman Jadi
152,000.00
Halaman Jadi
120,000.00
238,000.00 238,000.00 173,000.00 173,000.00
238,000.00 238,000.00 173,000.00 173,000.00
NO 1
KODE BARANG 2 1.10.28.01.26
NAMA BARANG 3
MERK / UKURAN 4
SATUAN 5
HARGA 6
1
1.10.28.01.26.001.001
Satuan Biaya Bantuan Beasiswa Program Gelar / Non-Gelar Dalam Negeri Program Diploma I,III, Dan Diploma IV / Strata I Biaya Hidup dan Biaya Operasional
2
1.10.28.01.26.001.002
Biaya Hidup dan Biaya Operasional
Diploma IV dan Strata I
OT
17,010,000.00
3
1.10.28.01.26.001.003
Uang Buku dan Referensi per tahun
Diploma I
OT
1,330,000.00
4
1.10.28.01.26.001.004
Uang Buku dan Referensi per tahun
Diploma III
OT
1,590,000.00
5
1.10.28.01.26.001.005
Uang Buku dan Referensi per tahun
Diploma IV dan Strata I
OT
1,850,000.00
1.10.28.01.26.002
OT
20,690,000.00
1.10.28.01.26.001
Diploma I dan Diploma III
OT
16,070,000.00
1
1.10.28.01.26.002.001
Program Strata 2 / Sp-1 Dan Strata 3 / Sp-2 Biaya Hidup dan Biaya Operasional Strata 2 dan Spesialis 1
2
1.10.28.01.26.002.002
Biaya Hidup dan Biaya Operasional
Strata 3 dan Spesialis 2
OT
21,320,000.00
3
1.10.28.01.26.002.003
Uang Buku dan Referensi per tahun
Strata 2 dan Spesialis 1
OT
2,120,000.00
4
1.10.28.01.26.002.004
Uang Buku dan Referensi per tahun
Strata 3 dan Spesialis 2
OT
2,380,000.00
1.10.28.01.27
Satuan Biaya Makanan Penambah Daya Tahan Tubuh/Ekstra Puding
1.10.28.01.27.001
Satuan Biaya Makanan Penambah Daya Tahan Tubuh/Ekstra Puding
1.10.28.01.27.001.001
Satuan Biaya Makanan Penambah Daya Tahan Tubuh/Ekstra Puding
OH
15,000.00
1.10.28.01.28
Satuan Biaya Konsumsi Rapat
1.10.28.01.28.001
Rapat Koordinasi Tingkat Menteri / Skpd/ Tamu-Tamu Dari Luar Daerah /Forpimda Makan Kudapan (Snack)
Orang/Kali Orang/Kali
100,000.00 46,000.00
M2/Tahun
159,000.00
M2/Tahun
122,000.00
M2/Tahun
10,000.00
1
1 2
1.10.28.01.28.001.001 1.10.28.01.28.001.002 1.10.28.01.29
Satuan Biaya Pemeliharaan Gedung/ Bangunan Dalam Negeri
1.10.28.01.29.001
Satuan Biaya Pemeliharaan Gedung/ Bangunan Dalam Negeri
1
1.10.28.01.29.001.001
2
1.10.28.01.29.001.002
3
1.10.28.01.29.001.003
Pemeliharaan Gedung / Bangunan Bertingkat Pemeliharaan Gedung / Bangunan Tidak Bertingkat Halaman Gedung / Bangunan Kantor
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
22
NO 1
KODE BARANG 2 1.10.28.01.30 1.10.28.01.30.001
1 2 3 4 5
1.10.28.01.30.001.001 1.10.28.01.30.001.002 1.10.28.01.30.001.003 1.10.28.01.30.001.004 1.10.28.01.30.001.005
NAMA BARANG 3
MERK / UKURAN 4
Satuan Biaya Pakaian Dinas Dan/Atau Kerja Satuan Biaya Pakaian Dinas Dan/Atau Kerja Pakaian Kerja Dokter Pakaian Dinas Pegawai/ Perawat Pakaian Seragam Mahasiswa Pakaian Kerja Sopir/Pesuruh Pakaian Kerja Satpam Satuan biaya pakaian kerja satpam diperuntukan bagi satpam, sudah termasuk perlengkapannya (sepatu, baju PDL, kopel, ikat pinggang, tali kurt dan peluit, kaos kaki, topi, kaos security, dan atribut lainnya)
1.10.28.01.31
Satuan Biaya Perjalanan Dinas
1 2 3
1.10.28.01.31.001 1.10.28.01.31.001.001 1.10.28.01.31.001.002 1.10.28.01.31.001.003
Uang Harian Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov.
4 5 6 7 8 9
1.10.28.01.31.001.004 1.10.28.01.31.001.005 1.10.28.01.31.001.006 1.10.28.01.31.001.007 1.10.28.01.31.001.008 1.10.28.01.31.001.009
Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov.
10 11 12 13 14 15 16
1.10.28.01.31.001.010 1.10.28.01.31.001.011 1.10.28.01.31.001.012 1.10.28.01.31.001.013 1.10.28.01.31.001.014 1.10.28.01.31.001.015 1.10.28.01.31.001.016
Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa
17 18 19 20 21 22
1.10.28.01.31.001.017 1.10.28.01.31.001.018 1.10.28.01.31.001.019 1.10.28.01.31.001.020 1.10.28.01.31.001.021 1.10.28.01.31.001.022
Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa
23 24 25 26 27 28
1.10.28.01.31.001.023 1.10.28.01.31.001.024 1.10.28.01.31.001.025 1.10.28.01.31.001.026 1.10.28.01.31.001.027 1.10.28.01.31.001.028
Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
29 30 31 32
1.10.28.01.31.001.029 1.10.28.01.31.001.030 1.10.28.01.31.001.031 1.10.28.01.31.001.032
Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Honorer/Non PNS/Masyarakat Sopir PNS/Non PNS Ketua DPRD Wakil Ketua DPRD Anggota DPRD Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Honorer/Non PNS/Masyarakat Ketua DPRD Wakil Ketua DPRD Anggota DPRD Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV
23
SATUAN 5
HARGA 6
Orang/Stel Orang/Stel Orang/Stel Orang/Stel Orang/Stel
610,000.00 460,000.00 400,000.00 390,000.00 850,000.00
OH OH OH
600,000.00 550,000.00 500,000.00
OH OH OH OH OH OH
400,000.00 350,000.00 300,000.00 250,000.00 200,000.00 200,000.00
OH OH OH OH OH OH OH
150,000.00 500,000.00 475,000.00 450,000.00 1,700,000.00 1,600,000.00 1,500,000.00
OH OH OH OH OH OH
1,200,000.00 1,000,000.00 750,000.00 600,000.00 500,000.00 400,000.00
OH OH OH OH OH OH
1,500,000.00 1,400,000.00 1,300,000.00 2,200,000.00 2,100,000.00 2,000,000.00
OH OH OH OH
1,500,000.00 1,250,000.00 1,000,000.00 800,000.00
NO 1
KODE BARANG 2
NAMA BARANG 3
33 1.10.28.01.31.001.033 34 1.10.28.01.31.001.034
Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
35 1.10.28.01.31.001.035 36 1.10.28.01.31.001.036 37 1.10.28.01.31.001.037
Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
1 2
1.10.28.01.31.002 1.10.28.01.31.002.001 1.10.28.01.31.002.002
3 4
1.10.28.01.31.002.003 1.10.28.01.31.002.004
MERK / UKURAN 4 Golongan II dan I Personil Honorer/Non PNS/Masyarakat Ketua DPRD Wakil Ketua DPRD Anggota DPRD
Uang Representasi Walikota/Wakil Walikota Sekretaris Daerah (Eselon II A)/Pimpinan DPRD Anggota DPRD Eselon II B
1.10.28.01.31.003
Uang Saku Study Banding/Kegiatan yang Fasilitas Penginapan dan Konsumsi nya disediakan oleh Penyelenggara
1 2 3
1.10.28.01.31.003.001 1.10.28.01.31.003.002 1.10.28.01.31.003.003
Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov.
4 5 6 7 8 9
1.10.28.01.31.003.004 1.10.28.01.31.003.005 1.10.28.01.31.003.006 1.10.28.01.31.003.007 1.10.28.01.31.003.008 1.10.28.01.31.003.009
Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov.
10 11 12 13 14 15
1.10.28.01.31.003.010 1.10.28.01.31.003.011 1.10.28.01.31.003.012 1.10.28.01.31.003.013 1.10.28.01.31.003.014 1.10.28.01.31.003.015
Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa
16 17 18 19 20 21
1.10.28.01.31.003.016 1.10.28.01.31.003.017 1.10.28.01.31.003.018 1.10.28.01.31.003.019 1.10.28.01.31.003.020 1.10.28.01.31.003.021
Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa
22 23 24 25 26 27
1.10.28.01.31.003.022 1.10.28.01.31.003.023 1.10.28.01.31.003.024 1.10.28.01.31.003.025 1.10.28.01.31.003.026 1.10.28.01.31.003.027
Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
28 29 30 31 32 33
1.10.28.01.31.003.028 1.10.28.01.31.003.029 1.10.28.01.31.003.030 1.10.28.01.31.003.031 1.10.28.01.31.003.032 1.10.28.01.31.003.033
Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
34 1.10.28.01.31.003.034 35 1.10.28.01.31.003.035
Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Honorer/Non PNS/Masyarakat Ketua DPRD Wakil Ketua DPRD Anggota DPRD Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Honorer/Non PNS/Masyarakat Ketua DPRD Wakil Ketua DPRD Anggota DPRD Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Honorer/Non PNS/Masyarakat Ketua DPRD Wakil Ketua DPRD
24
SATUAN 5
HARGA 6
OH OH
700,000.00 600,000.00
OH OH OH
2,000,000.00 1,900,000.00 1,800,000.00
OH OH
250,000.00 200,000.00
OH OH
150,000.00 150,000.00
OH OH OH
450,000.00 400,000.00 350,000.00
OH OH OH OH OH OH
275,000.00 250,000.00 200,000.00 150,000.00 125,000.00 100,000.00
OH OH OH OH OH OH
350,000.00 325,000.00 300,000.00 1,200,000.00 1,100,000.00 1,000,000.00
OH OH OH OH OH OH
700,000.00 600,000.00 500,000.00 350,000.00 350,000.00 350,000.00
OH OH OH OH OH OH
1,000,000.00 900,000.00 800,000.00 1,450,000.00 1,400,000.00 1,350,000.00
OH OH OH OH OH OH
1,000,000.00 850,000.00 600,000.00 500,000.00 400,000.00 400,000.00
OH OH
1,350,000.00 1,250,000.00
NO 1
KODE BARANG 2
36 1.10.28.01.31.003.036
NAMA BARANG 3
MERK / UKURAN 4
Ibu Kota / Luar Jawa
1.10.28.01.31.004
Uang Saku Diklat Luar Daerah
1 2 3
1.10.28.01.31.004.001 1.10.28.01.31.004.002 1.10.28.01.31.004.003
Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov.
4 5 6 7 8 9
1.10.28.01.31.004.004 1.10.28.01.31.004.005 1.10.28.01.31.004.006 1.10.28.01.31.004.007 1.10.28.01.31.004.008 1.10.28.01.31.004.009
Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov.
10 11 12 13 14 15
1.10.28.01.31.004.010 1.10.28.01.31.004.011 1.10.28.01.31.004.012 1.10.28.01.31.004.013 1.10.28.01.31.004.014 1.10.28.01.31.004.015
Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Kota Dalam Prov. Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa
16 17 18 19 20 21
1.10.28.01.31.004.016 1.10.28.01.31.004.017 1.10.28.01.31.004.018 1.10.28.01.31.004.019 1.10.28.01.31.004.020 1.10.28.01.31.004.021
Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa
22 23 24 25 26 27
1.10.28.01.31.004.022 1.10.28.01.31.004.023 1.10.28.01.31.004.024 1.10.28.01.31.004.025 1.10.28.01.31.004.026 1.10.28.01.31.004.027
Luar Jatim Di Jawa Luar Jatim Di Jawa Luar Jatim Di Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
28 29 30 31 32 33
1.10.28.01.31.004.028 1.10.28.01.31.004.029 1.10.28.01.31.004.030 1.10.28.01.31.004.031 1.10.28.01.31.004.032 1.10.28.01.31.004.033
Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
34 1.10.28.01.31.004.034 35 1.10.28.01.31.004.035 36 1.10.28.01.31.004.036
Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa Ibu Kota / Luar Jawa
1.10.28.01.31.005
Uang Saku Diklat Dalam Daerah
1 2 3
1.10.28.01.31.005.001 1.10.28.01.31.005.002 1.10.28.01.31.005.003
Uang Saku Diklat Dalam Daerah Uang Saku Diklat Dalam Daerah Uang Saku Diklat Dalam Daerah
4 5 6 7 8 9
1.10.28.01.31.005.004 1.10.28.01.31.005.005 1.10.28.01.31.005.006 1.10.28.01.31.005.007 1.10.28.01.31.005.008 1.10.28.01.31.005.009
Uang Saku Diklat Dalam Daerah Uang Saku Diklat Dalam Daerah Uang Saku Diklat Dalam Daerah Uang Saku Diklat Dalam Daerah Uang Saku Diklat Dalam Daerah Uang Saku Diklat Dalam Daerah
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
25
SATUAN 5
HARGA 6
Anggota DPRD
OH
1,150,000.00
Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Honorer/Non PNS/Masyarakat Ketua DPRD Wakil Ketua DPRD Anggota DPRD Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Honorer/Non PNS
OH OH OH
300,000.00 275,000.00 250,000.00
OH OH OH OH OH OH
175,000.00 150,000.00 125,000.00 100,000.00 75,000.00 75,000.00
OH OH OH OH OH OH
250,000.00 225,000.00 200,000.00 600,000.00 550,000.00 500,000.00
OH OH OH OH OH OH
350,000.00 300,000.00 200,000.00 150,000.00 140,000.00 100,000.00
Ketua DPRD Wakil Ketua DPRD Anggota DPRD Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Honorer/Non PNS/Masyarakat Ketua DPRD Wakil Ketua DPRD Anggota DPRD
OH OH OH OH OH OH
500,000.00 450,000.00 400,000.00 750,000.00 700,000.00 650,000.00
OH OH OH OH OH OH
500,000.00 400,000.00 250,000.00 200,000.00 175,000.00 150,000.00
OH OH OH
650,000.00 600,000.00 550,000.00
Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Honorer/Non PNS/Masyarakat
OH OH OH
225,000.00 200,000.00 175,000.00
OH OH OH OH OH OH
120,000.00 100,000.00 80,000.00 60,000.00 50,000.00 50,000.00
NO 1
KODE BARANG 2
10 1.10.28.01.31.005.010 11 1.10.28.01.31.005.011 12 1.10.28.01.31.005.012 1.10.28.01.31.006 1
1.10.28.01.31.006.001
2
1.10.28.01.31.006.002
3
1.10.28.01.31.006.003
4
1.10.28.01.31.006.004
5
1.10.28.01.31.006.005
6
1.10.28.01.31.006.006
7
1.10.28.01.31.006.007
8
1.10.28.01.31.006.008
9
1.10.28.01.31.006.009
10 1.10.28.01.31.006.010 11 1.10.28.01.31.006.011
12 1.10.28.01.31.006.012 13 1.10.28.01.31.006.013
1.10.28.01.31.007 1 2 3
1.10.28.01.31.007.001 1.10.28.01.31.007.002 1.10.28.01.31.007.003
4
1.10.28.01.31.007.004
5
1.10.28.01.31.007.005
6 7 8 9
1.10.28.01.31.007.006 1.10.28.01.31.007.007 1.10.28.01.31.007.008 1.10.28.01.31.007.009
10 1.10.28.01.31.007.010
NAMA BARANG 3
MERK / UKURAN 4
Uang Saku Diklat Dalam Daerah Uang Saku Diklat Dalam Daerah Uang Saku Diklat Dalam Daerah
Ketua DPRD Wakil Ketua DPRD Anggota DPRD
Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto Biaya Transportasi Di Dalam Kota Mojokerto
Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
SATUAN 5 OH OH OH
HARGA 6 175,000.00 150,000.00 125,000.00
Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A Eselon II/ B
Menggunakan Fasilitas Kendaraan Dinas Roda Empat
Eselon III (Ka. SKPD/Kabag pada Setda) Eselon III (bukan Ka. SKPD)
Orang
100,000.00
Eselon IV
Orang
90,000.00
Golongan III dan IV
Orang
85,000.00
Golongan II dan I
Orang
80,000.00
Honorer / Non PNS
Orang
75,000.00
Peserta Pelatihan/ Sosialisasi/ Bintek dan Sejenis nya/Masyarakat Pimpinan DPRD
Orang
75,000.00
Anggota DPRD yang tidak menggunakan kendaraan dinas roda empat
Menggunakan Fasilitas Kendaraan Dinas Roda Empat Orang 100,000.00
Walikota A Wakil Walikota A A
Sekretaris Daerah/ Eselon II/A Eselon II/ B
Menggunakan Fasilitas Kendaraan Dinas Roda Empat
A A
Eselon III (Ka. SKPD/Kabag pada Setda) Eselon III ( bukan Ka. SKPD)
Orang
150,000.00
Eselon IV
Orang
150,000.00
Golongan III dan IV
Orang
150,000.00
Golongan II dan I
Orang
150,000.00
Personil Honorer dan peserta Pelatihan/ Sosialisasi/ Bintek / Masyarakat
Orang
150,000.00
A A A A A
26
NO 1
KODE BARANG 2
11 1.10.28.01.31.007.011 12 1.10.28.01.31.007.012
13 1.10.28.01.31.007.013 14 1.10.28.01.31.007.014 15 1.10.28.01.31.007.015 16 1.10.28.01.31.007.016 17 1.10.28.01.31.007.017 18 1.10.28.01.31.007.018 19 1.10.28.01.31.007.019 20 1.10.28.01.31.007.020 21 1.10.28.01.31.007.021 22 1.10.28.01.31.007.022
23 1.10.28.01.31.007.023 24 1.10.28.01.31.007.024
25 1.10.28.01.31.007.025 26 1.10.28.01.31.007.026 27 1.10.28.01.31.007.027 28 1.10.28.01.31.007.028 29 1.10.28.01.31.007.029 30 1.10.28.01.31.007.030 31 1.10.28.01.31.007.031 32 1.10.28.01.31.007.032 33 1.10.28.01.31.007.033 34 1.10.28.01.31.007.034
35 1.10.28.01.31.007.035 36 1.10.28.01.31.007.036
NAMA BARANG 3
MERK / UKURAN 4
Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA A Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA A Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA
Menggunakan Fasilitas Kendaraan Dinas Roda Empat Orang 150,000.00
Wakil Walikota B B
Sekretaris Daerah/ Eselon II/A Eselon II/ B
Menggunakan Fasilitas Kendaraan Dinas Roda Empat
B B
Eselon III (Ka. SKPD/Kabag pada Setda) Eselon III ( bukan Ka. SKPD)
Orang
200,000.00
Eselon IV
Orang
200,000.00
Golongan III dan IV
Orang
200,000.00
Golongan II dan I
Orang
200,000.00
Personil Honorer dan peserta Pelatihan/ Sosialisasi/ Bintek / Masyarakat Pimpinan DPRD
Orang
200,000.00
B B B B B
Anggota DPRD yang tidak menggunakan kendaraan dinas roda empat Walikota
Menggunakan Fasilitas Kendaraan Dinas Roda Empat Orang 200,000.00
C Wakil Walikota C C
Sekretaris Daerah/ Eselon II/A Eselon II/ B
Menggunakan Fasilitas Kendaraan Dinas Roda Empat
C C
Eselon III (Ka. SKPD/Kabag pada Setda) Eselon III ( bukan Ka. SKPD)
Orang
250,000.00
Eselon IV
Orang
250,000.00
Golongan III dan IV
Orang
250,000.00
Golongan II dan I
Orang
250,000.00
Personil Honorer dan peserta Pelatihan/ Sosialisasi/ Bintek / Masyarakat Pimpinan DPRD
Orang
250,000.00
C C C C C
Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA C Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA C
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
Anggota DPRD yang tidak menggunakan kendaraan dinas roda empat Walikota
HARGA 6
B
Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA B Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA B Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA
Pimpinan DPRD
SATUAN 5
27
Anggota DPRD yang tidak menggunakan kendaraan dinas roda empat
Menggunakan Fasilitas Kendaraan Dinas Roda Empat Orang 250,000.00
NO 1
KODE BARANG 2
37 1.10.28.01.31.007.037 38 1.10.28.01.31.007.038 39 1.10.28.01.31.007.039 40 1.10.28.01.31.007.040 41 1.10.28.01.31.007.041 42 1.10.28.01.31.007.042 43 1.10.28.01.31.007.043 44 1.10.28.01.31.007.044 45 1.10.28.01.31.007.045 46 1.10.28.01.31.007.046
47 1.10.28.01.31.007.047 48 1.10.28.01.31.007.048
NAMA BARANG 3 Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA
MERK / UKURAN 4
SATUAN 5
HARGA 6
Walikota D Wakil Walikota D D
Sekretaris Daerah/ Eselon II/A Eselon II/ B
Menggunakan Fasilitas Kendaraan Dinas Roda Empat
D D
Eselon III (Ka. SKPD/Kabag pada Setda) Eselon III ( bukan Ka. SKPD)
Orang
350,000.00
Eselon IV
Orang
350,000.00
Golongan III dan IV
Orang
350,000.00
Golongan II dan I
Orang
350,000.00
Personil Honorer dan peserta Pelatihan/ Sosialisasi/ Bintek / Masyarakat Pimpinan DPRD
Orang
350,000.00
D D D D D
Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA D Biaya Transportasi Luar Kota Mojokerto Di Jawa Timur ZONA D
Anggota DPRD yang tidak menggunakan kendaraan dinas roda empat
Menggunakan Fasilitas Kendaraan Dinas Roda Empat Orang 350,000.00
1.10.28.01.31.008
Biaya Transportasi yang disesuaikan dengan Fasilitas Transportasi menurut kelasnya
1
1.10.28.01.31.008.001
Moda Transportasi (Pesawat Udara)
Walikota
Orang
Bisnis
2
1.10.28.01.31.008.002
Moda Transportasi (Pesawat Udara)
Wakil Walikota
Orang
Bisnis
3
1.10.28.01.31.008.003
Moda Transportasi (Pesawat Udara)
Orang
Bisnis
4
1.10.28.01.31.008.004
Moda Transportasi (Pesawat Udara)
Sekretaris Daerah/ Eselon II/A Eselon II/ B
Orang
Ekonomi
5
1.10.28.01.31.008.005
Moda Transportasi (Pesawat Udara)
Eselon III
Orang
Ekonomi
6
1.10.28.01.31.008.006
Moda Transportasi (Pesawat Udara)
Eselon IV
Orang
Ekonomi
7
1.10.28.01.31.008.007
Moda Transportasi (Pesawat Udara)
Golongan III dan IV
Orang
Ekonomi
8
1.10.28.01.31.008.008
Moda Transportasi (Pesawat Udara)
Golongan II dan I
Orang
Ekonomi
9
1.10.28.01.31.008.009
Moda Transportasi (Pesawat Udara)
Personil Non PNSD
Orang
Ekonomi
10 1.10.28.01.31.008.010
Moda Transportasi (Pesawat Udara)
Ketua DPRD
Orang
Bisnis
11 1.10.28.01.31.008.011
Moda Transportasi (Pesawat Udara)
Wakil Ketua DPRD
Orang
Bisnis
12 1.10.28.01.31.008.012
Moda Transportasi (Pesawat Udara)
Anggota DPRD
Orang
Ekonomi
13 1.10.28.01.31.008.013 14 1.10.28.01.31.008.014 15 1.10.28.01.31.008.015
Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut)
Walikota Wakil Walikota Sekretaris Daerah/ Eselon II/A
Orang Orang Orang
Kelas IB Kelas IB Kelas IB
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
28
NO 1 16 17 18 19 20 21 22 23 24 25
KODE BARANG 2 1.10.28.01.31.008.016 1.10.28.01.31.008.017 1.10.28.01.31.008.018 1.10.28.01.31.008.019 1.10.28.01.31.008.020 1.10.28.01.31.008.021 1.10.28.01.31.008.022 1.10.28.01.31.008.023 1.10.28.01.31.008.024 1.10.28.01.31.008.025
NAMA BARANG 3
MERK / UKURAN 4
Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut) Moda Transportasi (Kapal Laut) Moda Transportasi (Kereta Api / Bus)
Eselon II/ B Eselon III Eselon IV Golongan III dan IV Golongan II dan I Personil Non PNSD Ketua DPRD Wakil Ketua DPRD Anggota DPRD Walikota
SATUAN 5
HARGA 6
Orang Orang Orang Orang Orang Orang Orang Orang Orang Orang
Kelas IIA Kelas IIA Kelas IIA Kelas IIA Kelas IIA Kelas IIA Kelas IB Kelas IB Kelas IB Eksekutif
26 1.10.28.01.31.008.026
Moda Transportasi (Kereta Api / Bus) Wakil Walikota
Orang
Eksekutif
27 1.10.28.01.31.008.027
Orang
Eksekutif
28 1.10.28.01.31.008.028
Moda Transportasi (Kereta Api / Bus) Sekretaris Daerah/ Eselon II/A Moda Transportasi (Kereta Api / Bus) Eselon II/ B
Orang
Eksekutif
29 1.10.28.01.31.008.029
Moda Transportasi (Kereta Api / Bus) Eselon III
Orang
Eksekutif
30 1.10.28.01.31.008.030
Moda Transportasi (Kereta Api / Bus) Eselon IV
Orang
Eksekutif
31 1.10.28.01.31.008.031
Moda Transportasi (Kereta Api / Bus) Golongan III dan IV
Orang
Eksekutif
32 1.10.28.01.31.008.032
Moda Transportasi (Kereta Api / Bus) Golongan II dan I
Orang
Eksekutif
33 1.10.28.01.31.008.033
Moda Transportasi (Kereta Api / Bus) Personil Non PNSD
Orang
Eksekutif
34 1.10.28.01.31.008.034
Moda Transportasi (Kereta Api / Bus) Ketua DPRD
Orang
Eksekutif
35 1.10.28.01.31.008.035
Moda Transportasi (Kereta Api / Bus) Wakil Ketua DPRD
Orang
Eksekutif
36 1.10.28.01.31.008.036
Moda Transportasi (Kereta Api / Bus) Anggota DPRD
Orang
Eksekutif
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1.10.28.01.31.009
Satuan Biaya Penginapan - Satuan Biaya Penginapan Merupakan Alokasi Biaya Tertinggi Penginapan (At Cost )
1.10.28.01.31.009.001 1.10.28.01.31.009.002 1.10.28.01.31.009.003 1.10.28.01.31.009.004 1.10.28.01.31.009.005 1.10.28.01.31.009.006 1.10.28.01.31.009.007 1.10.28.01.31.009.008 1.10.28.01.31.009.009 1.10.28.01.31.009.010 1.10.28.01.31.009.011 1.10.28.01.31.009.012 1.10.28.01.31.009.013 1.10.28.01.31.009.014 1.10.28.01.31.009.015 1.10.28.01.31.009.016 1.10.28.01.31.009.017 1.10.28.01.31.009.018 1.10.28.01.31.009.019 1.10.28.01.31.009.020 1.10.28.01.31.009.021
Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
Aceh Sumatra Utara Riau Kepulauan Riau Jambi Sumatra Barat Sumatra Selatan Lampung Bengkulu Bangka Belitung Banten Jawa Barat D.K.I. Jakarta JawaTengah D.I.Yogyakarta JawaTimur Bali Nusa Tenggara Barat NusaTenggara Timur Kalimantan Barat Kalimantan Tengah
29
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
4,420,000.00 4,960,000.00 3,820,000.00 4,275,000.00 4,000,000.00 5,236,000.00 4,680,000.00 3,960,000.00 1,300,000.00 3,335,000.00 4,763,000.00 3,700,000.00 8,720,000.00 4,150,000.00 4,700,000.00 4,400,000.00 4,890,000.00 3,500,000.00 3,000,000.00 2,400,000.00 3,000,000.00
NO 1 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
KODE BARANG 2 1.10.28.01.31.009.022 1.10.28.01.31.009.023 1.10.28.01.31.009.024 1.10.28.01.31.009.025 1.10.28.01.31.009.026 1.10.28.01.31.009.027 1.10.28.01.31.009.028 1.10.28.01.31.009.029 1.10.28.01.31.009.030 1.10.28.01.31.009.031 1.10.28.01.31.009.032 1.10.28.01.31.009.033 1.10.28.01.31.009.034 1.10.28.01.31.009.035 1.10.28.01.31.009.036 1.10.28.01.31.009.037 1.10.28.01.31.009.038 1.10.28.01.31.009.039 1.10.28.01.31.009.040 1.10.28.01.31.009.041 1.10.28.01.31.009.042 1.10.28.01.31.009.043 1.10.28.01.31.009.044 1.10.28.01.31.009.045 1.10.28.01.31.009.046 1.10.28.01.31.009.047 1.10.28.01.31.009.048 1.10.28.01.31.009.049 1.10.28.01.31.009.050 1.10.28.01.31.009.051 1.10.28.01.31.009.052 1.10.28.01.31.009.053 1.10.28.01.31.009.054 1.10.28.01.31.009.055 1.10.28.01.31.009.056 1.10.28.01.31.009.057 1.10.28.01.31.009.058 1.10.28.01.31.009.059 1.10.28.01.31.009.060 1.10.28.01.31.009.061 1.10.28.01.31.009.062 1.10.28.01.31.009.063 1.10.28.01.31.009.064 1.10.28.01.31.009.065 1.10.28.01.31.009.066 1.10.28.01.31.009.067 1.10.28.01.31.009.068 1.10.28.01.31.009.069 1.10.28.01.31.009.070 1.10.28.01.31.009.071 1.10.28.01.31.009.072 1.10.28.01.31.009.073 1.10.28.01.31.009.074 1.10.28.01.31.009.075 1.10.28.01.31.009.076 1.10.28.01.31.009.077 1.10.28.01.31.009.078 1.10.28.01.31.009.079 1.10.28.01.31.009.080 1.10.28.01.31.009.081
NAMA BARANG 3
MERK / UKURAN 4
Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Negara/ Eselon I Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon II/DPRD Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
Kalimantan Selatan Kalimantan Timur Kalimantan Utara Sulawesi Utara Gorontalo Sulawesi Barat Sulawesi Selatan Sulawesi Tengah Sulawesi Tenggara Maluku Maluku Utara Papua Papua Barat Aceh Sumatra Utara Riau Kepulauan Riau Jambi Sumatra Barat Sumatra Selatan Lampung Bengkulu Bangka Belitung Banten Jawa Barat D.K.I. Jakarta JawaTengah D.I.Yogyakarta JawaTimur Bali Nusa Tenggara Barat NusaTenggara Timur Kalimantan Barat Kalimantan Tengah Kalimantan Selatan Kalimantan Timur Kalimantan Utara Sulawesi Utara Gorontalo Sulawesi Barat Sulawesi Selatan Sulawesi Tengah Sulawesi Tenggara Maluku Maluku Utara Papua Papua Barat Aceh Sumatra Utara Riau Kepulauan Riau Jambi Sumatra Barat Sumatra Selatan Lampung Bengkulu Bangka Belitung Banten Jawa Barat D.K.I. Jakarta
30
SATUAN 5 OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
HARGA 6 4,250,000.00 4,000,000.00 4,000,000.00 3,827,000.00 1,650,000.00 1,575,000.00 4,820,000.00 2,030,000.00 1,850,000.00 3,000,000.00 3,110,000.00 2,850,000.00 2,750,000.00 1,625,000.00 1,518,000.00 1,500,000.00 1,625,000.00 1,500,000.00 1,330,000.00 1,563,000.00 1,625,000.00 988,000.00 1,688,000.00 1,788,000.00 1,760,000.00 1,490,000.00 1,480,000.00 1,688,000.00 1,370,000.00 1,810,000.00 1,994,000.00 1,313,000.00 1,538,000.00 1,950,000.00 2,100,000.00 2,188,000.00 2,188,000.00 1,950,000.00 1,438,000.00 1,288,000.00 1,550,000.00 1,625,000.00 1,375,000.00 1,288,000.00 1,520,000.00 2,188,000.00 1,863,000.00 1,063,000.00 879,000.00 1,085,000.00 813,000.00 925,000.00 1,113,000.00 788,000.00 875,000.00 900,000.00 1,063,000.00 1,000,000.00 800,000.00 992,000.00
NO 1 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141
KODE BARANG 2 1.10.28.01.31.009.082 1.10.28.01.31.009.083 1.10.28.01.31.009.084 1.10.28.01.31.009.085 1.10.28.01.31.009.086 1.10.28.01.31.009.087 1.10.28.01.31.009.088 1.10.28.01.31.009.089 1.10.28.01.31.009.090 1.10.28.01.31.009.091 1.10.28.01.31.009.092 1.10.28.01.31.009.093 1.10.28.01.31.009.094 1.10.28.01.31.009.095 1.10.28.01.31.009.096 1.10.28.01.31.009.097 1.10.28.01.31.009.098 1.10.28.01.31.009.099 1.10.28.01.31.009.100 1.10.28.01.31.009.101 1.10.28.01.31.009.102 1.10.28.01.31.009.103 1.10.28.01.31.009.104 1.10.28.01.31.009.105 1.10.28.01.31.009.106 1.10.28.01.31.009.107 1.10.28.01.31.009.108 1.10.28.01.31.009.109 1.10.28.01.31.009.110 1.10.28.01.31.009.111 1.10.28.01.31.009.112 1.10.28.01.31.009.113 1.10.28.01.31.009.114 1.10.28.01.31.009.115 1.10.28.01.31.009.116 1.10.28.01.31.009.117 1.10.28.01.31.009.118 1.10.28.01.31.009.119 1.10.28.01.31.009.120 1.10.28.01.31.009.121 1.10.28.01.31.009.122 1.10.28.01.31.009.123 1.10.28.01.31.009.124 1.10.28.01.31.009.125 1.10.28.01.31.009.126 1.10.28.01.31.009.127 1.10.28.01.31.009.128 1.10.28.01.31.009.129 1.10.28.01.31.009.130 1.10.28.01.31.009.131 1.10.28.01.31.009.132 1.10.28.01.31.009.133 1.10.28.01.31.009.134 1.10.28.01.31.009.135 1.10.28.01.31.009.136 1.10.28.01.31.009.137 1.10.28.01.31.009.138 1.10.28.01.31.009.139 1.10.28.01.31.009.140 1.10.28.01.31.009.141
NAMA BARANG 3
MERK / UKURAN 4
Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon III/Gol.IV Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Pejabat Eselon IV/Gol.III Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
JawaTengah D.I.Yogyakarta JawaTimur Bali Nusa Tenggara Barat NusaTenggara Timur Kalimantan Barat Kalimantan Tengah Kalimantan Selatan Kalimantan Timur Kalimantan Utara Sulawesi Utara Gorontalo Sulawesi Barat Sulawesi Selatan Sulawesi Tengah Sulawesi Tenggara Maluku Maluku Utara Papua Papua Barat Aceh Sumatra Utara Riau Kepulauan Riau Jambi Sumatra Barat Sumatra Selatan Lampung Bengkulu Bangka Belitung Banten Jawa Barat D.K.I. Jakarta JawaTengah D.I.Yogyakarta JawaTimur Bali Nusa Tenggara Barat NusaTenggara Timur Kalimantan Barat Kalimantan Tengah Kalimantan Selatan Kalimantan Timur Kalimantan Utara Sulawesi Utara Gorontalo Sulawesi Barat Sulawesi Selatan Sulawesi Tengah Sulawesi Tenggara Maluku Maluku Utara Papua Papua Barat Aceh Sumatra Utara Riau Kepulauan Riau Jambi
31
SATUAN 5 OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
HARGA 6 949,000.00 1,013,000.00 1,063,000.00 990,000.00 1,000,000.00 938,000.00 1,125,000.00 938,000.00 904,000.00 1,188,000.00 775,000.00 863,000.00 688,000.00 1,075,000.00 847,000.00 1,125,000.00 750,000.00 740,000.00 750,000.00 950,000.00 950,000.00 546,000.00 510,000.00 450,000.00 638,000.00 500,000.00 520,000.00 700,000.00 400,000.00 560,000.00 400,000.00 718,000.00 560,000.00 610,000.00 450,000.00 788,000.00 563,000.00 910,000.00 580,000.00 550,000.00 538,000.00 659,000.00 540,000.00 688,000.00 500,000.00 550,000.00 479,000.00 400,000.00 580,000.00 650,000.00 563,000.00 667,000.00 480,000.00 550,000.00 600,000.00 546,000.00 510,000.00 450,000.00 638,000.00 500,000.00
NO 1 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170
KODE BARANG 2
NAMA BARANG 3
MERK / UKURAN 4
1.10.28.01.31.009.142 1.10.28.01.31.009.143 1.10.28.01.31.009.144 1.10.28.01.31.009.145 1.10.28.01.31.009.146 1.10.28.01.31.009.147 1.10.28.01.31.009.148 1.10.28.01.31.009.149 1.10.28.01.31.009.150 1.10.28.01.31.009.151 1.10.28.01.31.009.152 1.10.28.01.31.009.153 1.10.28.01.31.009.154 1.10.28.01.31.009.155 1.10.28.01.31.009.156 1.10.28.01.31.009.157 1.10.28.01.31.009.158 1.10.28.01.31.009.159 1.10.28.01.31.009.160 1.10.28.01.31.009.161 1.10.28.01.31.009.162 1.10.28.01.31.009.163 1.10.28.01.31.009.164 1.10.28.01.31.009.165 1.10.28.01.31.009.166 1.10.28.01.31.009.167 1.10.28.01.31.009.168 1.10.28.01.31.009.169 1.10.28.01.31.009.170
Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II Gol. I / II
Sumatra Barat Sumatra Selatan Lampung Bengkulu Bangka Belitung Banten Jawa Barat D.K.I. Jakarta JawaTengah D.I.Yogyakarta JawaTimur Bali Nusa Tenggara Barat NusaTenggara Timur Kalimantan Barat Kalimantan Tengah Kalimantan Selatan Kalimantan Timur Kalimantan Utara Sulawesi Utara Gorontalo Sulawesi Barat Sulawesi Selatan Sulawesi Tengah Sulawesi Tenggara Maluku Maluku Utara Papua Papua Barat
1.10.28.01.32 1.10.28.01.32.001
Honorarium Lain - lain Honorarium Unit Kerja Sekretariat DPRD Kota Mojokerto
1
1.10.27.01.32.001.001
2
1.10.27.01.32.001.002
3
1.10.27.01.32.001.003
Honorarium Tenaga Ahli DPRD Honorarium Pengukuh Sumpah/Pejabat yang melantik Honorarium Rohaniawan
1.10.27.01.32.002
Tunjangan Kelangkaan Profesi (Pembinaan dan Pengawasan Bagi APIP dan Aparatur Pendukung Di Lingkungan Inspektorat Kota Mojokerto)
1 2
1.10.27.01.32.002.001 1.10.27.01.32.002.002
Inspektur Sekretaris dan Inspektur pembantu
3 4 5 6 7
1.10.27.01.32.002.003 1.10.27.01.32.002.004 1.10.27.01.32.002.005 1.10.27.01.32.002.006 1.10.27.01.32.002.007
Auditor Madya Auditor Muda Kasubag Auditor Pertama Staf penunjang oprasional
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
32
Penanggungjawab/APIP Wakil Penanggungjawab/APIP Pengendali Teknis / APIP Anggota / APIP Anggota / APIP Anggota / APIP Anggota / APIP
SATUAN 5
HARGA 6
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
520,000.00 700,000.00 400,000.00 560,000.00 400,000.00 718,000.00 560,000.00 610,000.00 450,000.00 788,000.00 563,000.00 910,000.00 580,000.00 550,000.00 538,000.00 659,000.00 540,000.00 688,000.00 500,000.00 550,000.00 479,000.00 400,000.00 580,000.00 650,000.00 563,000.00 667,000.00 480,000.00 550,000.00 600,000.00
OB
2,750,000.00
OK
1,500,000.00
OK
500,000.00
OB OB
1,800,000.00 1,500,000.00
OB OB OB OB OB
1,000,000.00 900,000.00 900,000.00 700,000.00 700,000.00
NO 1
KODE BARANG 2
1 2 3 4
1.10.27.01.32.003 1.10.27.01.32.001.001 1.10.27.01.32.001.002 1.10.27.01.32.001.003 1.10.27.01.32.001.004
5
1.10.27.01.32.001.005
6
1.10.27.01.32.001.006
7 8
1.10.27.01.32.001.007 1.10.27.01.31.001.008
NAMA BARANG 3
MERK / UKURAN 4
Honorarium Lain - nya Honorarium tunjangan Kesehatan PMK Uang jaga/piket Hari Raya Uang kejadian kebakaran Honorarium Pengawas Pengangkut Sampah Honorarium Pengawas Penyapu Jalan Honorarium Pengawas Pemelihara Taman Honorarium Pemelihara PJU Honorarium Pengawas Pemelihara Saluran
Standart Biaya Umum (SBU) Pemerintah Kota Mojokerto 2017
33
SATUAN 5
HARGA 6
OB OK Regu/Keg OB
400,000.00 100,000.00 500,000.00 250,000.00
OB
250,000.00
OB
250,000.00
OB OB
250,000.00 250,000.00
PENJELASAN STANDAR BIAYA UMUM YANG BERFUNGSI SEBAGAI BATAS TERTINGGI DALAM PENYUSUNAN TA 2017 1
HONORARIUM PENANGGUNG JAWAB PENGELOLA KEUANGAN/BARANG 1.1.HONORARIUM PENANGGUNG JAWAB PENGELOLA BARANG 1.1.Pengelola Barang Pengelola Barang adalah Sekretaris Daerah Kota 1.2. Pengurus Barang Pengelola Pengurus Barang Pengelola adalah Kepala Bidang yang mengelola aset pada SKPKD (Satuan Kerja Pengelola Keuangan Daerah) 1.3. Pembantu Pengurus Barang Pengelola Pembantu Pengurus Barang Pengelola adalah staf yang ditunjuk untuk membantu pengurus barang pengelola 1.2.PENGGUNA ANGGARAN (PA) / PENGGUNA BARANG (PB) a. Honorarium PA/PB diberikan dengan anggaran yang dikelola b. Apabila PA/PB ikut dalam Tim Pelaksana Kegiatan maka PA/PB dapat menerima Honorarium tersebut 1.3.KUASA PENGGUNA ANGGARAN (KPA) / KUASA PENGGUNA BARANG (KPB) a. Honorarium KPA/KPB diberikan dengan anggaran yang dikelola b. Apabila KPA/KPB ikut dalam Tim Pelaksana Kegiatan maka KPA/KPB dapat menerima Honorarium tersebut 1.4.PEJABAT PENGELOLA KEUANGAN DAERAH (PPKD) /PEJABAT PENATAUSAHAAN BARANG(PPB) a. Kepala satuan kerja pengelola keuangan daerah yang mempunyai tugas melaksanakan pengelolaan APBD dan bertindak sebagai bedahara umum daerah 1.5.PEJABAT PEMBUAT KOMITMEN (PPK) a. PPK dapat diberikan honorarium setiap bulan sesuai dengan paket pekerjaan yang dikelola selama masa pelaksanaan pekerjaan, dengan tetap memegang prinsip efisiensi anggaran
1.6.DIREKSI LAPANGAN / PENGAWAS LAPANGAN a. Direksi Lapangan / Pengawas Lapangan ditetapkan dengan Ketetapan Pejabat yang berwenang, dapat diberikan honorarium setiap bulan sesuai dengan Paket Pekerjaan yang diawasi dengan tetap memegang prinsip efisiensi anggaran 1.7.PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) a. PPTK ditetapkan dengan keputusan pejabat yang berwenang, untuk melaksanakan 1 (satu) atau beberapa kegiatan b. PPTK dapat diberikan honorarium setiap bulan untuk masing-masing kegiatan dan sebanyakbanyaknya 10 (sepuluh) rekening kegiatan
Penjelasan SBU Tahun 2017
34
1.8.PEJABAT PENATAUSAHAAN KEUANGAN SKPD/PPKD (PPK-SKPD/PPKD) a. PPK-SKPD/PPKD dapat diberikan honorarium setiap bulan sesuai dengan pagu anggaran yang dikelola SKPD b. Dalam hal PPK-SKPD/PPKD bertindak sebagai Tim Pelaksana Kegiatan tetap dapat menerima tim tersebut 1.9.BENDAHARA PENGELUARAN a. Bendahara Pengeluaran dapat diberikan honorarium setiap bulan sesuai dengan pagu anggaran yang dikelola b. Dalam hal bendahara pengeluaran bertindak sebagai anggota tim pelaksana kegiatan tetap dapat diberikan honorarium tim tersebut 1.10.BENDAHARA PENGELUARAN PEMBANTU a. Bendahara Pengeluaran Pembantu dapat diberikan honorarium setiap bulan sesuai dengan pagu anggaran yang dikelola KPA b. Dalam hal Bendahara Pengeluaran Pembantu bertindak sebagai anggota tim pelaksana kegiatan tetap dapat diberikan honorarium tim tersebut 1.11.STAF PENGELOLA / PEMBUAT DOKUMEN / PEMBANTU BENDAHARA PENGELUARAN a. Staf Pengelola / Pembuat Dokumen / Pembantu Bendahara Pengeluaran dapat diberikan honorarium setiap bulan sesuai dengan pagu anggaran yang dikelola b. Dalam satu rekening kegiatan paling banyak dibantu oleh 2 (dua) staf pengelola c. Dalam hal staf pengelola / Pembuat Dokumen / Pembantu Bendahara Pengeluaran diberika tugas lain antara lain sebagai anggota Tim Pelaksana Kegiatan, Pejabat Pengadaan, Pejabat Penerima Hasil Pekerjaan, Koordinator/anggota aplikasi keuangan SKPD, Pengurus Barang, Pengolah Barang tetap dapat menerima honorarium tersebut. 2
HONORARIUM PENGADAAN BARANG/JASA/ ULP A. Honorarium diberikan kepada pegawai negeri yang diangkat oleh Pengguna/Kuasa Pengguna Barang/Jasa untuk melaksanakan pemilihan penyedia barang/jasa melalui penunjukkan langsung/pengadaan langsung untuk paket pengadaan barang/pekerjaan konstruksi/jasa lainnya yang bernilai paling tinggi Rp. 200.000.000; (dua ratus juta rupiah). Untuk paket pengadaan jasa konsultasi yang bernilai paling tinggi Rp. 50.000.000; (lima puluh juta rupiah). B. Susunan keanggotaan perangkat unit layanan pengadaan barang/jasa ditetapkan oleh walikota, yang terdiri dari kepala ULP, sekretaris ULP, dan kelompok kerja ULP C. Honorarium diberikan kepada kelompok kerja ULP yang ditugaskan oleh kepala ULP untuk melaksanakan pemilihan penyedian barang/jasa sesuai dengan ketentuan yang berlaku. Catatan : Dalam hal pejabat / pengadaan barang / jasa dan kelompok kerja ULP telah ditetapkan sebagai jabatan fungsional dan telah diberikan tunjangan jabatan fungsionalnya, maka pemberian honorarium untuk Pejabat Pengadaan Barang/Jasa dan Kelompok Kerja ULP dinyatakan tidak berlaku.
Penjelasan SBU Tahun 2017
35
3
HONORARIUM PENERIMA HASIL PEKERJAAN Honorarium diberikan kepada pegawai negeri yang ditunjuk oleh PA/KPA untuk melakukan penilaian terhadap hasil pekerjaan yang telah diselesaikan dan menerima penyerahan pekerjaan setelah seluruh hasil pekerjaan dilaksanakan sesuai dengan ketentuan kontrak. Honorarium Pejabat Penerima Hasil Pekerjaan diberikan per bulan, sedangkan honorarium Panitia Penerima Hasil Pekerjaan diberikan per paket pekerjaan. Satu orang Pejabat Penerima Hasil Pekerjaan hanya dapat menerima 1 (satu) Honor dalam 1 (satu) bulan dalam satu SKPD dapat ditunjuk sebanyak-banyak nya 3 (tiga) orang Pejabat Penerima Hasil Pekerjaan.
4
HONORARIUM PENGELOLAAN BARANG MILIK DAERAH Honorarium Pengelolaan Barang Milik Daerah diberikan kepada pejabat/pegawai di lingkungan pengguna barang dan kuasa pengguna barang yang melakukan tugas rutin selaku pengurus/penyimpan barang berdasarkan surat keputusan pengguna barang.
5
PENGURUS GAJI Membantu tugas perbendaharaan pada bendahara pengeluaran dalam pengurusan gaji.
6
BENDAHARA PENERIMAAN Pegawai Negeri Sipil yang ditetapkan oleh Walikota untuk Menerima, menyimpan, menyetorkan, menatausahakan, dan mempertanggungjawabkan uang pendapatan daerah.
7
BENDAHARA PENERIMAAN PEMBANTU Pegawai Negeri Sipil yang ditetapkan oleh Walikota untuk Membantu tugas perbendaharaan pada bendahara penerimaan.
8
HONORARIUM PENUNJANG PENELITIAN / PEREKAYASAAN Honorarium peneliti dberikan kepada pegawai negeri dan non pegawai negeri yang terdiri dari pembantu peneliti/perekayasa, coordinator peneliti/perekayasa, secretariat peneliti/perekayasaan, pengolah data, petugas survey, pembantu lapangan yang berdasarkan surat perintah pejabat yang berwenang diberi tugas untuk menunjang kegiatan penelitian /perekayasaan yang dilakukan oleh fungsional peneliti/perekayasa. Terhadap pembantu peneliti/perekayasa sebagaimana tersebut diatas yang berstatus pegawai negeri tidak diberikan uang lembur dan uang makan lembur. Catatan : 1. Dalam hal penelitian/perekayasaan dilakukan bersama-sama dengan pegawai negeri (non fungsional peneliti/perekayasa), kepada pegawai negeri (non fungsional peneliti/perekayasa) atas penugasan penelitian yang dilakukan di luar jam kerja normal diberikan honorarium paling tinggi sebesar 85% (delapan puluh lima persen) dari honorarium kelebihan jam. perekayasaan untuk perekayasa perrtama. 2. Honorarium penunjang penelitian / perekayasaan diberikan secara selektif dengan mempertimbangkan prinsip efisiensi dan efektifitas.
Penjelasan SBU Tahun 2017
36
9
HONORARIUM NARASUMBER SEMINAR/RAKOR/SOSIALISASI/DISEMINASI/ FOCUS GROUP DISCUSSION/ KEGIATAN SEJENIS a. Honorarium Narasumber Pakar/Praktisi/Pembicara Khusus/Tenaga ahli - Honorarium narasumber dapat diberikan kepada PNS dengan melihat kemampuan yang bersangkutan memberikan informasi / pengetahuan kepada pegawai negeri lainnya/masyarakat dengan ketentuan sebagai berikut: 1) Berasal dari luar lingkup SKPD penyelenggara; dan 2) Berasal dari lingkup SKPD penyelenggara sepanjang peserta yang menjadi sasaran utama kegiatan berasal dari luar lingkup SKPD penyelenggara / masyarakat. Honorarium narasumber Pakar/Praktisi/Pembicara Khusus/Tenaga ahli diberikan kepada Non PNS dengan melihat kemampuan yang bersangkutan. b. Honorarium Moderator Honorarium moderator diberikan kepada pegawai negeri/non pegawai negeri yang melaksanakan tugas sebagai moderator pada kegiatan seminar /rakor / sosialisasi/ diseminasi / focus group discussion / kegiatan sejenis. Pelaksanaan kegiatan seminar /rakor / sosialisasi/ diseminasi / focus group discussion / kegiatan sejenis dapat menggunakan jasa moderator dalam hal diperlukan. Catatan : Satuan jam yang digunakan untuk kegiatan seminar /rakor / sosialisasi/ diseminasi / focus group discussion / kegiatan sejenis, setara dengan jam pelajaran, paling kurang 45 (empat puluh lima) menit.
10
HONORARIUM PANITIA SEMINAR/RAKOR/SOSIALISASI/DISEMINASI/ FOCUS GROUP DISCUSSION/ KEGIATAN SEJENIS Honorarium dapat diberikan kepada pegawai negeri yang diberi tugas sebagai panitia untuk melaksanakan kegiatan Seminar/Rakor/Sosialisasi/Diseminasi/ Focus Group Discussion/ Kegiatan Sejenis sepanjang peserta yang menjadi sasaran utama kegiatan berasal dari luar lingkup unit SKPD penyelenggara/masyarakat. Dalam hal pelaksanaan kegiatan Seminar/Rakor/Sosialisasi/Diseminasi/ Focus Group Discussion/ Kegiatan Sejenis non pegawai memerlukan tambahan panitia yang berasal dari non pegawai negeri harus dilakukan secara selektif dengan mempertimbangkan urgensi, dengan besaran honorarium mengacu pada besaran honorarium untuk anggota panitia.
11
HONORARIUM PENYULUH NON PEGAWAI NEGERI Honorarium diberikan kepada non pegawai negeri yang ditunjuk untuk melakukan penyuluhan berdasarkan surat keputusan pejabat yang berwenang.
12
HONORARIUM TIM PELAKSANA KEGIATAN Honorarium tim pelaksana kegiatan dapat diberikan kepada pegawai negeri atau non pegawai yang diberi tugas untuk melaksanakan kegiatan berdasarkan surat keputusan Walikota/ PA/ KPA. Ketentuan pembentukan tim adalah sebagai berikut : a) mempunyai keluaran (output) jelas dan terukur; b) bersifat koordinatif baik internal maupun eksternal SKPD; c) bersifat temporer, pelaksanaannya perlu diprioritaskan atau di luar jam kerja; d) merupakan perangkapan fungsi atau tugas tertentu kepada pegawai negeri di samping tugas pokoknya sehari-hari; e) dilakukan secara selektif, efektif, dan efisien. Honorarium Sekretariat Tim Pelaksana Kegiatan Honorarium diberikan kepada pegawai negeri/non pegawai negeri yang diberi tugas untuk melaksanakan kegiatan administratif yang berfungsi untuk menunjang kegiatan tim pelaksana kegiatan. Sekretariat hanya dapat dibentuk untuk menunjang tim pelaksana kegiatan yang ditetapkan oleh Walikota/ PA/ KPA.
Penjelasan SBU Tahun 2017
37
13
HONORARIUM TIM PENYUSUNAN JURNAL Honorarium tim penyusunan jurnal dapat diberikan kepada pegawai negeri yang diberi tugas untuk menyusun dan menerbitkan jurnal berdasarkan surat keputusan pejabat yang berwenang. Unsur sekretariat adalah pembantu umum, pelaksana dan yang sejenis, dan tidak berupa struktur organisasi tersendiri.
14
HONORARIUM TIM PENYUSUNAN BULETIN/MAJALAH Honorarium tim penyusunan buletin/majalah dapat diberikan kepada pegawai negeri yang diberi tugas untuk menyusun dan menerbitkan buletin/majalah, berdasarkan surat keputusan pejabat yang berwenang. Majalah adalah terbitan berkala yang isinya berbagai liputan jurnalistik, pandangan tentang topik aktual yang patut diketahui pembaca. Buletin adalah media cetak berupa selebaran atau majalah berisi warta singkat atau pernyataan tertulis yang diterbitkan secara periodik yang ditujukan untuk lembaga atau kelompok profesi tertentu.
15
HONORARIUM TIM PENGELOLA WEBSITE PEMERINTAH KOTA MOJOKERTO Honorarium tim pengelola website dapat diberikan kepada pegawai negeri yang diberi tugas untuk mengelola website, berdasarkan surat keputusan pejabat yang berwenang. Website yang dimaksud di sini adalah yang dikelola oleh Pemerintah Kota Mojokerto
16
VAKASI PENYELENGGARA UJIAN Vakasi/honorarium penyelenggara ujian pada tingkat pendidikan dasar dan menengah, tidak diberikan untuk penyelenggaraan ujian yang bersifat latihan dan ujian lokal. Satuan biaya pengawas ujian untuk pengawas ujian tingkat pendidikan dasar dan menengah sudah termasuk uang transport. Vakasi penyelenggara ujian pada tingkat pendidikan tinggi diberikan untuk ujian semester dan ujian akhir. Honorarium penguji pendadaran/skripsi diberikan kepada dosen penguji skripsi.
17
SATUAN BIAYA KERJA LEMBUR PNS Uang Lembur merupakan kompensasi bagi pegawai negeri yang melakukan kerja lembur berdasarkan surat perintah dari pejabat yang berwenang. Kerja lembur adalah segala pekerjaan yang harus dilakukan oleh Pegawai Negeri Sipil pada waktu – waktu tertentu di luar waktu jam kerja sebagaimana telah ditetapkan bagi tiap-tiap instansi dan kantor Pemerintah. Kerja lembur tiap – tiap kali selama paling sedikit 1 (satu) jam penuh dapat diberikan uang lembur. Uang makan diberikan setelah kerja lembur minimal 2 (dua) jam berturut – turut dan diberikan maksimal 2 (dua) kali dalam hal kerja lembur dilaksanakan 8 (delapan) jam atau lebih dalam sehari. Uang lembur pada hari libur kerja sebesar 200% (dua ratus persen) dari besarnya uang lembur.
18
HONORARIUM SATPAM, PENGEMUDI, PETUGAS KEBERSIHAN, DAN PRAMUBAKTI Satuan biaya honorarium diperuntukkan bagi non pegawai negeri yang ditunjuk untuk melakukan kegiatan sesuai dengan tugas dan fungsinya, berdasarkan surat keputusan pejabat yang berwenang/kontrak kerja. Untuk satpam, pengemudi, Petugas Kebersihan, dan pramubakti dengan melalui jasa pihak ketiga/diborongkan, alokasi honorarium dapat ditambah paling banyak sebesar 15% (lima belas persen) dari satuan biaya, besaran tersebut tidak termasuk seragam dan perlengkapan.
Penjelasan SBU Tahun 2017
38
19
SATUAN BIAYA DIKLAT PIMPINAN/STRUKTURAL Satuan biaya yang digunakan untuk perencanaan kebutuhan biaya diklat penjenjangan untuk pejabat/pegawai yang akan/telah menduduki jabatan tertentu. Satuan biaya sudah termasuk biaya observasi lapangan, namun belum termasuk biaya perjalanan dinas peserta. Apabila dalam pelaksanaan anggaran terjadi perubahan tarif biaya diklat pimpinan, satuan biaya dapat mengacu pada Peraturan Pemerintah yang mengatur tentang tarif diklat pimpinan tersebut.
20
SATUAN BIAYA LATIHAN PRAJABATAN Satuan biaya latihan prajabatan merupakan satuan biaya yang digunakan untuk perencanaan kebutuhan biaya latihan prajabatan bagi calon pegawai negeri sebagai syarat untuk diangkat sebagai pegawai negeri. Satuan biaya ini sudah termasuk biaya observasi lapangan, namun belum ternmasuk biaya perjalanan dinas peserta.
21
SATUAN BIAYA PEMELIHARAAN SARANA KANTOR Satuan biaya pemeliharaan sarana kantor digunakan untuk mempertahankan barang inventaris/peralatan kantor (yang digunakan langsung oleh pegawai, khususnya meja dan kursi), personal computer/Notebook, Printer, AC Split, dan Genset agar berada dalam kondisi normal (beroperasi dengan baik). Untuk biaya pemeliharaan genset belum termasuk kebutuhan bahan bakar minyak.
22
SATUAN BIAYA PEMELIHARAAN KENDARAAN Satuan biaya pemeliharaan dan operasional kendaraan dinas digunakan untuk mempertahankan kendaraan dinas agar tetap dalam kondisi normal dan siap pakai sesuai dengan peruntukannya termasuk biaya bahan bakar. Satuan biaya tersebut belum termasuk biaya pengurusan Surat Tanda Nomor Kendaraan (STNK). Catatan: Yang dimaksud kendaraan operasional dalam lingkungan kantor adalah kendaraan yang digunakan hanya terbatas dalam lingkungan kantor.
23
SATUAN BIAYA PENERJEMAHAN DAN PENGETIKAN Satuan biaya yang digunakan untuk perencanaan kebutuhan biaya penerjemahan dan pengetikan, dibayarkan kepada pihak/orang yang menerjemahkan naskah asli ke dalam bahasa yang diinginkan.
24
SATUAN BIAYA BANTUAN BEASISWA PROGRAM GELAR / NON-GELAR DALAM NEGERI Satuan biaya bantuan beasiswa program gelar/non gelar dalam negeri merupakan satuan biaya yang digunakan untuk perencanaan kebutuhan biaya bantuan mahasiswa program gelar / non gelar dalam negeri bagi pegawai negeri yang ditugaskan untuk melanjutkan pendidikan Diploma I, Diploma III, Diploma IV, atau Strata I (satu), dan pendidikan Pasca Sarjana ( Strata 2 (dua) atau Strata 3 (tiga) ) yang terdiri dari biaya hidup dan biaya operasional, uang buku dan referensi per tahun. Biaya untuk pendidikan ditanggung oleh pemerintah secara at cost sedangkan untuk biaya riset program dapat dialokasikan bantuan biaya riset sesuai kemampuan keuangan Kota Mojokerto masing-masing, yang dalam pengusulannya dilampiri dengan Terms of Reference (TOR), Rincian Anggaran Biaya (RAB), dan Surat Pernyataan Tanggung Jawab Mutlak (SPTJM). Khusus tenaga pengajar biasa pada perguruan tinggi yang ditugaskan mengikuti pendidikan fakultas pasca sarjana, besaran tunjangan tugas belajar merujuk Keputusan Presiden Nomor 57 tahun 1986 tentang Tunjangan Belajar Bagi Tenaga Pengajar Biasa Pada Perguruan Tinggi Yang Ditugaskan Mengikuti Pendidikan Pada Fakultas Pasca Sarjana.
Penjelasan SBU Tahun 2017
39
25
SATUAN BIAYA MAKANAN PENAMBAH DAYA TAHAN TUBUH/EKSTRA PUDING Satuan biaya yang digunakan untuk perencanaan kebutuhan biaya pengadaan makanan/minuman bagi pegawai negeri sebagai penambah daya tahan tubuh, hanya diberikan kepada pegawai negeri yang jenis pekerjaannya dapat memberikan dampak buruk bagi kesehatan pegawai tersebut.
26
SATUAN BIAYA KONSUMSI RAPAT Satuan biaya yang digunakan untuk perencanaan kebutuhan biaya pengadaan konsumsi makanan termasuk minuman dan kudapan untuk rapat/pertemuan yang diselenggarakan di kantor. Rapat Koordinasi Tingkat Menteri/SKPD/Tamu-tamu dari Luar Daerah/FORPIMDA adalah rapat koordinasi yang pesertanya Rapat Koordinasi Tingkat Menteri/SKPD /Tamu-tamu dari Luar/ FORPIMDA.
27
SATUAN BIAYA PEMELIHARAAN GEDUNG/BANGUNAN DALAM NEGERI Satuan biaya digunakan untuk pemeliharaan rutin dengan maksud menjaga/ mempertahankan gedung dan bangunan kantor di dalam negeri agar tetap dalam kondisi semula atau perbaikan dengan tingkat kerusakan kurang dari atau sama dengan 2% (dua persen).
28
SATUAN BIAYA PENGADAAN PAKAIAN DINAS DAN/ATAU PAKAIAN KERJA Satuan biaya yang digunakan untuk perencanaan kebutuhan biaya pengadaan pakaian dinas, pakaian seragam dan/atau kerja resmi. a. Satuan Biaya Pakaian Dinas Dokter Satuan biaya pakaian dinas dokter diperuntukkan bagi dokter dan penyediaannya secara selektif. Pakaian dinas dapat diberikan berupa 1 (satu) potong jas untuk dokter Satuan biaya tersebut sudah termasuk ongkos jahit. b. Satuan Biaya Pakaian Dinas dan/atau Kerja Resmi Pegawai/Perawat Hanya dapat dialokasikan dengan ketentuan: 1) bagi satuan kerja yang pada awal pembentukannya terdapat ketentuan yang mewajibkanpenggunaan pakaian seragam (pengaturannya setingkat Peraturan Presiden), pakaian dinas dapat dialokasikan meskipun belum memiliki ijin prinsip dari Menteri Pendayagunaan Aparatur Negara dan Reformasi Birokrasi; 2) bagi satuan kerja yang pada awal pembentukannya tidak terdapat ketentuan yang mewajibkan penggunaan pakaian seragam (setingkat Peraturan Presiden) tetapi mempunyai tugas dan fungsi berkaitan dengan pelayanan langsung kepada masyarakat, keamanan, penegak keadilan, atau pemeriksaan dapat mengalokasikan biaya untuk pakaian dinas setelah memiliki ijin prinsip dari Menteri Pendayagunaan Aparatur Negara dan Reformasi Birokrasi; 3) diberikan paling banyak 2 (dua) stel per tahun; 4) pakaian perawat di peruntukkan bagi perawat dan penyediaannya secara selektif. Pakaian dimaksud diberikan 1 (satu) stel per tahun. c. Satuan Biaya Pakaian Kerja Sopir/Pesuruh Satuan biaya pakaian sopir/pesuruh diperuntukkan bagi sopir/pesuruh yang diangkat berdasarkan surat keputusan pejabat yang berwenang. Pakaian sopir/pesuruh dapat diberikan paling banyak 2 (dua) stel per tahun. Satuan biaya tersebut sudah termasuk ongkos jahit. d. Satuan Biaya Pakaian Kerja Satpam Pakaian satpam sudah termasuk perlengkapannya (sepatu, baju PDL, kopel, ikat pinggang, tali kurt dan peluit, kaos kaki, topi, kaos security dan atribut lainnya). Pakaian satpam dapat diberikan paling banyak 2 (dua) stel per tahun.
Penjelasan SBU Tahun 2017
40
29
ZONA PERJALANAN DINAS A. Zona A meliputi: Kabupaten Mojokerto, Kabupaten Jombang, Kabupaten Sidoarjo, Kota Surabaya, Kabupaten Gresik. B. Zona B meliputi: Kabupaten Lamongan, Kabupaten Nganjuk, Kabupaten Kediri, Kota Kediri, Kabupaten Pasuruan, Kota Pasuruan, Kabupaten Malang, Kota Malang, Kota Batu, Kabupaten Madiun, Kota Madiun. C. Zona C meliputi: Kabupaten Blitar, Kota Blitar, Kabupaten Tulungagung, Kabupaten Probolinggo, Kota Probolinggo, Kabupaten Tuban, Kabupaten Bojonegoro, Kabupaten Ponorogo, Kabupaten Magetan, Kabupaten Ngawi.
30
D. Zona D meliputi: Kabupaten Trenggalek, Kabupaten Lumajang, Kabupaten Jember, Kabupaten Bondowoso, Kabupaten SituBondo, Kabupaten Banyuwangi, Kabupaten Bangkalan, Kabupaten Sampang, Kabupaten Pamekasan, Kabupaten Sumenep, Pacitan. KETERANGAN SATUAN A. OB: ORANG BULAN B. OK: ORANG KEGIATAN
C. OJ: ORANG JAM D. OP: ORANG PAKET E. OH: ORANG HARI F. OTER: ORANG TERBIT G. OT: ORANG TAHUN
Penjelasan SBU Tahun 2017
41
UPAH / JASA STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TA 2017
PEMERINTAH KOTA MOJOKERTO 2016
STANDAR UPAH / JASA PEMERINTAH KOTA MOJOKERTO TAHUN ANGGARAN 2017 NO 1
KODE BARANG 2 1.11.29 1.11.29.01 1.11.29.01.01
NAMA BARANG 3 Standar Upah dan Jasa Standar Upah dan Jasa Kegiatan Fisik dan Non Fisik Biaya Kegiatan Fisik (Jasa Konstruksi)
1 2 3 4 5 6 7 8 9 10
1.11.29.01.01.001 1.11.29.01.01.001.001 1.11.29.01.01.001.002 1.11.29.01.01.001.003 1.11.29.01.01.001.004 1.11.29.01.01.001.005 1.11.29.01.01.001.006 1.11.29.01.01.001.007 1.11.29.01.01.001.008 1.11.29.01.01.001.009 1.11.29.01.01.001.010
Mandor & Kepala Tukang Mandor Kepala Tukang Listrik Kepala Tukang Kayu Kepala Tukang Cat Kepala Tukang Batu Kepala Tukang Besi Kepala Tukang Pipa Kepala Tukang Gali Tanah Kepala Tukang Las Kepala Tukang Taman
OH OH OH OH OH OH OH OH OH OH
130,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1.11.29.01.01.002 1.11.29.01.01.002.001 1.11.29.01.01.002.002 1.11.29.01.01.002.003 1.11.29.01.01.002.004 1.11.29.01.01.002.005 1.11.29.01.01.002.006 1.11.29.01.01.002.007 1.11.29.01.01.002.008 1.11.29.01.01.002.009 1.11.29.01.01.002.010 1.11.29.01.01.002.011 1.11.29.01.01.002.012 1.11.29.01.01.002.013 1.11.29.01.01.002.014
Tukang & Pekerja Tukang Listrik Tukang Kayu Tukang Cat Tukang Batu Tukang Aspal Bor Master Tukang Besi Tukang Pipa Tukang Gali Tanah Tukang Gali Jalan Tukang Gali Lumpur Tukang Las Tukang Taman Pekerja
OH OH OH OH OH OH OH OH OH OH OH OH OH OH
110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 90,000.00
1.11.29.01.01.003
Buah
247,800.00
Unit Unit Unit Set
4,383,700.00 2,577,700.00 1,108,800.00 2,158,800.00
OH OH OH OH OH OH OH OH OH OH OH OH
110,000.00 100,000.00 85,000.00 85,000.00 100,000.00 85,000.00 110,000.00 85,000.00 85,000.00 120,000.00 85,000.00 425,000.00
1
1.11.29.01.01.003.001
Upah Konstruksi Pekerjaan Dinas Perhubungan Pasang dan Stel 1 pesawat Kontroller
2 3 4 5
1.11.29.01.01.003.002 1.11.29.01.01.003.003 1.11.29.01.01.003.004 1.11.29.01.01.003.005
Erection RPPJ Portal Biaya Penyambungan PLN Pengecatan RPPJ Portal Biaya Programming
1.11.29.01.02 1.11.29.01.02.001 1 1.11.29.01.02.001.001 2 1.11.29.01.02.001.002 3 1.11.29.01.02.001.003 4 1.11.29.01.02.001.004 5 1.11.29.01.02.001.005 6 1.11.29.01.02.001.006 7 1.11.29.01.02.001.007 8 1.11.29.01.02.001.008 9 1.11.29.01.02.001.009 10 1.11.29.01.02.001.010 11 1.11.29.01.02.001.011 12 1.11.29.01.02.001.012
Standar Upah / Jasa Tahun 2017
MERK / UKURAN 4
Gapura
Jasa Non Konstruksi Jasa Non Konstruksi Lainnya Sopir Mekanik Pembantu Sopir Pembantu Mekanik Juru ukur Pembantu Juru Ukur Operator Alat Berat Operator Alat Ringan Pembantu Operator Alat Berat Surveyor Geodesi Pembantu Surveyor Colter dan Kalibrasi
42
SATUAN 5
HARGA 6
1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8 9
1.11.29.01.03.004 1.11.29.01.03.004.001 1.11.29.01.03.004.002 1.11.29.01.03.004.003 1.11.29.01.03.004.004 1.11.29.01.03.004.005 1.11.29.01.03.004.006 1.11.29.01.03.004.007 1.11.29.01.03.004.008 1.11.29.01.03.004.009 1.11.29.01.03.004.010 1.11.29.01.03.004.011
Pemeliharaan AC Ganti Kompresor Ganti Kompresor Ganti Kompresor Isi Freon Isi Freon Isi Freon Isi Freon Pemeliharaan Pemeliharaan Pemeliharaan Pemeliharaan
1.11.29.01.03.019
Pemeliharaan Peralatan Kantor
1.11.29.01.03.019.001 1.11.29.01.03.019.002 1.11.29.01.03.019.003 1.11.29.01.03.019.004 1.11.29.01.03.019.005 1.11.29.01.03.019.006 1.11.29.01.03.019.007 1.11.29.01.03.019.008 1.11.29.01.03.019.009
Pemeliharaan Mesin Fax Pemeliharaan Telpon Pemeliharaan Telpon Wireless Pemeliharaan Printer Desk Jet Pemeliharaan Printer Laser Mono Pemeliharaan Printer Laser Colour Pemeliharaan PC Komputer Pemeliharaan Note Book Service Monitor Komputer
1.10.28.01.24 1.10.28.01.24.001
AC Windows 2 PK AC Windows 1,5 PK AC Windows 1 PK AC Split 5 PK AC Split 2 – 2,5 PK AC Split 1,5 – 2 PK AC Split 0,5 – 1 PK AC Split 2 PK AC Split 1 PK AC Split/Multi 2 PK AC Windows 1 PK
1
1.10.28.01.24.001.001
Satuan Biaya Pemeliharaan Satuan Biaya Pemeliharaan Sarana Kantor Inventaris Kantor
2
1.10.28.01.24.001.002
3
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit
4,000,000.00 2,000,000.00 1,000,000.00 400,000.00 350,000.00 200,000.00 175,000.00 100,000.00 75,000.00 75,000.00 75,000.00
Buah Buah Buah Buah Buah Buah Buah Buah Buah
55,000.00 50,000.00 75,000.00 50,000.00 40,000.00 50,000.00 75,000.00 100,000.00 50,000.00
Personal Komputer/Notebook
Pegawai/ Tahun Unit/Tahun
730,000.00
1.10.28.01.24.001.003
Printer
Unit/Tahun
690,000.00
4
1.10.28.01.24.001.004
AC Split
Unit/Tahun
610,000.00
5
1.10.28.01.24.001.005
Genset lebih kecil dari 50 KVa
Unit/Tahun
7,190,000.00
6
1.10.28.01.24.001.006
Genset 75 KVA
Unit/Tahun
8,640,000.00
7
1.10.28.01.24.001.007
Genset 100 KVA
Unit/Tahun
10,150,000.00
8
1.10.28.01.24.001.008
Genset 125 KVA
Unit/Tahun
10,780,000.00
9
1.10.28.01.24.001.009
Genset 150 KVA
Unit/Tahun
13,260,000.00
10 1.10.28.01.24.001.010
Genset 175 KVA
Unit/Tahun
14,810,000.00
11 1.10.28.01.24.001.011
Genset 200 KVA
Unit/Tahun
15,850,000.00
12 1.10.28.01.24.001.012
Genset 250 KVA
Unit/Tahun
16,790,000.00
Standar Upah / Jasa Tahun 2017
43
80,000.00
13 1.10.28.01.24.001.013
Genset 275 KVA
Unit/Tahun
17,760,000.00
14 1.10.28.01.24.001.014
Genset 300 KVA
Unit/Tahun
20,960,000.00
15 1.10.28.01.24.001.015
Genset 350 KVA
Unit/Tahun
22,960,000.00
16 1.10.28.01.24.001.016
Genset 450 KVA
Unit/Tahun
25,620,000.00
17 1.10.28.01.24.001.017
Genset 500 KVA
Unit/Tahun
31,770,000.00
Unit/tahun
37,580,000.00
1.10.28.01.24.002 1
1.10.28.01.24.002.001
Satuan Biaya Pemeliharaan Kendaraan Satuan Biaya Pemeliharaan Kendaraan Pejabat
2
1.10.28.01.24.002.002
Roda Empat
Operasional
Unit/tahun
32,770,000.00
3
1.10.28.01.24.002.003
Double Gardan
Operasional
Unit/tahun
35,130,000.00
4
1.10.28.01.24.002.004
Roda Dua
Operasional
Unit/tahun
3,450,000.00
1.11.29.01.03.020
Pemeliharaan Ban (Kendaraan Bermotor) Tambal Ban
1
1.11.29.01.03.020.001
1
1.11.29.01.04 1.11.29.01.04.001 1.11.29.01.04.001.001
2
1.11.29.01.04.001.002
3 4
1.11.29.01.04.001.003 1.11.29.01.04.001.004 1.11.29.01.04.002
Biaya Kegiatan Non Fisik Jasa Kegiatan Ceremony Jasa Master of Ceremony (MC) Profesional Jasa Master of Ceremony (MC) Non Profesional Jasa Pembaca Do'a Jasa Pembaca Al Qur'an
1 2 3 4 5 6 7 8
1.11.29.01.04.002.001 1.11.29.01.04.002.002 1.11.29.01.04.002.003 1.11.29.01.04.002.004 1.11.29.01.04.002.005 1.11.29.01.04.002.006 1.11.29.01.04.002.007 1.11.29.01.04.002.008
Jasa Kegiatan Olahraga & Kebudayaan Jasa Atlet Jasa Official Jasa Juri Profesional / Juri Propinsi Jasa Juri Internal Pemda Jasa Pelatih Seni Jasa Pelatih Olah Raga Jasa Instruktur Senam Wasit Per Paket Pertandingan
9
1.11.29.01.04.002.009
Wasit Perorangan
10 1.11.29.01.04.002.010
Jasa Juri Profesional
11 1.11.29.01.04.002.011 12 1.11.29.01.04.002.012
Biaya Make Up & Sanggul Biaya Make Up & Sanggul Untuk Pengantin
Standar Upah / Jasa Tahun 2017
Kegiatan Batikku Batikmu, Pemilihan Gus dan Yuk (Duta Wisata), Pemilihan Gus dan Yuk Cilik
44
Buah
25,000.00
Per Acara
500,000.00
Per Acara
250,000.00
Per Acara Per Acara
200,000.00 150,000.00
OH OH OH OH OJ OJ OK Per pertandinga n Per pertandinga n OJ
100,000.00 200,000.00 1,000,000.00 350,000.00 150,000.00 150,000.00 150,000.00 300,000.00
Orang Orang
350,000.00 750,000.00
50,000.00
1,250,000.00
13 14 15 16 17 18 19
1.11.29.01.04.002.013 1.11.29.01.04.002.014 1.11.29.01.04.002.015 1.11.29.01.04.002.016 1.11.29.01.04.002.017 1.11.29.01.04.002.018 1.11.29.01.04.002.019
20 21 22 23
1.11.29.01.04.002.020 1.11.29.01.04.002.021 1.11.29.01.04.002.022 1.11.29.01.04.002.023
24 1.11.29.01.04.002.024 25 1.11.29.01.04.002.025 26 1.11.29.01.04.002.026
Rias Pengantin Bentuk Basahan Rias Pengantin Bentuk Solo Rias Pengantin Bentuk Muslim Rias Karakter Pekohan Rias Cantik Bersanggul Rias Cantik Tanpa Sanggul Biaya Pembuatan Slempang Gus dan Yuk Bunga Melati Tibo Dhodho Bunga Melati Mondholan Bunga Melati Ceplok Mawar Bunga Melati putih Jasminum Sambac
Orang Orang Orang Orang Orang Orang Buah
1,000,000.00 1,000,000.00 1,000,000.00 350,000.00 400,000.00 300,000.00 310,350.00
Buah Buah Buah Buah
248,300.00 186,250.00 62,100.00 186,250.00
Bunga Melati Cunduk Mentul Kalung Melati Hand Bouguest
Buah Buah Buah
68,350.00 124,150.00 744,800.00
1.11.29.01.04.003
Jasa Operasional Antar Instansi
1
1.11.29.01.04.003.001
OH
100,000.00
2
1.11.29.01.04.003.002
Jasa Anggota Satgas Pengamanan Kepolisian / TNI Jasa Pengamanan Linmas (Hansip)
OH
75,000.00
3 4 5 6 7 8 9
1.11.29.01.04.003.003 1.11.29.01.04.003.004 1.11.29.01.04.003.005 1.11.29.01.04.003.006 1.11.29.01.04.003.007 1.11.29.01.04.003.008 1.11.29.01.04.003.009
Jasa Pelatih Paskibra Jasa Asst. Pelatih Paskibra Jasa Petugas Seleksi Paskibra Jasa Pembina Purna Paskibra Jasa Pengawal / Patwal Jasa Komandan Upacara Jasa Perwira Upacara
OH OH OH OH OH OH OH
400,000.00 150,000.00 150,000.00 100,000.00 100,000.00 150,000.00 200,000.00
1.11.29.01.04.004
Jasa Kegiatan Humas dan Protokol
1 2 3 4
1.11.29.01.04.004.001 1.11.29.01.04.004.002 1.11.29.01.04.004.003 1.11.29.01.04.004.004
OB OB OB OB
300,000.00 600,000.00 500,000.00 350,000.00
5 6 7
1.11.29.01.04.004.005 1.11.29.01.04.004.006 1.11.29.01.04.004.007
Jasa Penyusun Naskah Sambutan Koordinator Anggota Pembuat naskah Pidato Kepala Daerah Penyusun Release Pengelola Media Sosial Pengelola Videotrone
OB OB OB
350,000.00 350,000.00 350,000.00
1 2 3
1.11.29.01.04.005 1.11.29.01.04.005.001 1.11.29.01.04.005.002 1.11.29.01.04.005.003
Jasa Petugas Arsip Jasa Pemilah Arsip Jasa Bendel Arsip Jasa Angkut Arsip
OB OH OH
350,000.00 35,000.00 35,000.00
1.11.29.01.04.006
Jasa Pengiriman Surat/ Dokumen/ Barang Jasa Kurir Barang Jasa Pos Luar Kota Luar Propinsi Jasa Pos Dalam Kota Jasa Kurir Surat Tenaga Kurir
Per Alamat Surat Surat Per Alamat Per Kegiatan
5,000.00 3,500.00 2,000.00 750.00 35,000.00
OH Orang Kegiatan Orang Kegiatan
50,000.00 100,000.00
1 2 3 4 5
1.11.29.01.04.006.001 1.11.29.01.04.006.002 1.11.29.01.04.006.003 1.11.29.01.04.006.004 1.11.29.01.04.006.005
1 2
1.11.29.01.04.007 1.11.29.01.04.007.001 1.11.29.01.04.007.002
3
1.11.29.01.04.007.003
Standar Upah / Jasa Tahun 2017
Jasa Petugas Kesehatan Jasa Tenaga Paramedis Kepala/ Supervisor Regu Penyemprotan Nyamuk/Lalat Petugas Epidemologi
45
75,000.00
4
1.11.29.01.04.007.004
Petugas Penyemprot Nyamuk / Lalat
5
1.11.29.01.04.007.005
6
1.11.29.01.04.007.006
7 8 9 10 11
1.11.29.01.04.007.007 1.11.29.01.04.007.008 1.11.29.01.04.007.009 1.11.29.01.04.007.010 1.11.29.01.04.007.011
12 13 14 15
1.11.29.01.04.007.012 1.11.29.01.04.007.013 1.11.29.01.04.007.014 1.11.29.01.04.007.015
Pelayanan Kesehatan Masyarakat Miskin (Jamkesmas) Pelayanan Kesehatan Masyarakat Miskin (Jamkesmas) Dokter umum Dokter Kejiwaan Perawat Umum Perawat Jiwa Petugas tindak lanjut pelayanan kesehatan Fasilitator Tenaga Komunikator Tenaga Verifikator Honor Dokter Spesialis (Keg. Penyuluhan & Pemeriksaan)
75,000.00
APBN
Orang Kegiatan OH
APBD
OH
35,000.00
OH OH OH OH OB
150,000.00 200,000.00 100,000.00 125,000.00 1,000,000.00
OK OB OB OK
700,000.00 1,250,000.00 1,250,000.00 2,000,000.00
OB OH
500,000.00 150,000.00
1.11.29.01.04.007
Jasa Kegiatan Jurnalistik (Lingkungan Humas & Protokol)
1.11.29.01.04.007.001 1.11.29.01.04.007.002
Jasa Peliputan Kegiatan Humas & Protokol Jasa Peliputan Inspeksi Mendadak dan Jumpa Pers
1.11.29.01.04.009
Jasa Kegiatan Dinas Perhubungan
1 2 3
1.11.29.01.04.009.001 1.11.29.01.04.009.002 1.11.29.01.04.009.003
4
1.11.29.01.04.009.004
5
1.11.29.01.04.009.005
Jasa Technical Support Network Jasa Network Administrator Jasa Instalasi, setting dan pointing radio Jasa Pemasangan dan Pembongkaran Tower Jasa Pengecatan Tower Monopole Upah dan Bahan
6
1.11.29.01.04.009.006
7
1.11.29.01.04.009.007
8
1.11.29.01.04.009.008
1
Jasa Pengecetan Tower Triangle beton Upah dan Bahan ulir 13 SII Jasa Penggantian Kawat Seling Tower Upah dan Bahan Monopole Jasa Penggantian Kawat Seling Tower Upah dan Bahan Triangle
1.11.29.01.04.010
Jasa Pelaksana Kegiatan Lainnya
1 2 3 4 5
1.11.29.01.04.010.001 1.11.29.01.04.010.002 1.11.29.01.04.010.003 1.11.29.01.04.010.004 1.11.29.01.04.010.005
6 7 8 9 10 11 12 13 14 15 16 17
1.11.29.01.04.010.006 1.11.29.01.04.010.007 1.11.29.01.04.010.008 1.11.29.01.04.010.009 1.11.29.01.04.010.010 1.11.29.01.04.010.011 1.11.29.01.04.010.012 1.11.29.01.04.010.013 1.11.29.01.04.010.014 1.11.29.01.04.010.015 1.11.29.01.04.010.016 1.11.29.01.04.010.017
Jasa Pemandu Bahasa Asing Jasa Surveyor Jasa Pembantu Surveyor Jasa Surveyor Jasa Verifikasi Nota Pertimbangan Pangkat Jasa Petugas Kebersihan Kegiatan Jasa Petugas penjaga TMP Jasa Petugas Kebersihan kantor Jasa Petugas Keamanan Jasa Petugas Keamanan Jasa Pramusaji Jasa Laundry Kesehatan Jasa Juru Masak Rawat Inap Jasa TAGANA ( Tanggap Bencana ) Jasa Petugas Sandi Jasa Operator Finger Print Pengawas Lapangan TPS
Standar Upah / Jasa Tahun 2017
46
Kegiatan
50,000.00
OB OB Per Radio
1,750,000.00 3,500,000.00 2,500,000.00
Per Meter
100,000.00
Per Meter
75,000.00
Per Meter
125,000.00
Per Meter
175,000.00
Per Meter
250,000.00
OH OH OH Orang Titik OH
250,000.00 50,000.00 40,000.00 8,000.00 50,000.00
OH OB OB OB OH OH OB OB OB OB OB OB
50,000.00 1,800,000.00 1,700,000.00 1,800,000.00 75,000.00 50,000.00 1,250,000.00 1,250,000.00 200,000.00 300,000.00 150,000.00 150,000.00
18 1.11.29.01.04.010.018 19 1.11.29.01.04.010.019 20 1.11.29.01.04.010.020 21 22 23 24
1.11.29.01.04.010.021 1.11.29.01.04.010.022 1.11.29.01.04.010.023 1.11.29.01.04.010.024
25 26 27 28
1.11.29.01.04.010.025 1.11.29.01.04.010.026 1.11.29.01.04.010.027 1.11.29.01.04.010.028
Petugas Analisa Data Base (ADB) Kependudukan Petugas Entry Data Kependudukan (Non PNS) Jasa EntryData
Jasa Sopir Angkutan Orang (Rental) Honor Dokter Terapis
31 1.11.29.01.04.010.031
Honor Ast. Narasumber
1
1.11.29.01.05 1.11.29.01.05.001 1.11.29.01.05.001.001
2
1.11.29.01.05.001.002
3
1.11.29.01.05.001.003
4
1.11.29.01.05.001.004
5
1.11.29.01.05.001.005
6
1.11.29.01.05.001.006
7
1.11.29.01.05.001.007
8
1.11.29.01.05.001.008
9
1.11.29.01.05.001.009
10 1.11.29.01.05.001.010 11 1.11.29.01.05.001.011 12 1.11.29.01.05.001.012 13 1.11.29.01.05.001.013 14 1.11.29.01.05.001.014 15 1.11.29.01.05.001.015
1
1.11.29.01.05.002 1.11.29.01.05.002.001
2
1.11.29.01.05.002.002
3
1.11.29.01.05.002.003
Standar Upah / Jasa Tahun 2017
SLB/Berkebutuhan Khusus Kegiatan Pelatihan yang menggunakan Alat Peraga/Bahan Praktek
Biaya Jasa Konsultansi Tenaga Ahli Pembina Kepala Ahli Pembina Kepala S1 (Pengalaman Kerja 21 Th) Ahli Pembina Kepala S1 (Pengalaman Kerja 22 Th) Ahli Pembina Kepala S1 (Pengalaman Kerja 23 Th) Ahli Pembina Kepala S1 (Pengalaman Kerja 24 Th) Ahli Pembina Kepala S1 (Pengalaman Kerja 25 Th) Ahli Pembina Kepala S2 (Pengalaman Kerja 17 Th) Ahli Pembina Kepala S2 (Pengalaman Kerja 18 Th) Ahli Pembina Kepala S2 (Pengalaman Kerja 19 Th) Ahli Pembina Kepala S2 (Pengalaman Kerja 20 Th) Ahli Pembina Kepala S2 (Pengalaman Kerja 21Th) Ahli Pembina Kepala S3 (Pengalaman Kerja 13 Th) Ahli Pembina Kepala S3 (Pengalaman Kerja 14 Th) Ahli Pembina Kepala S3 (Pengalaman Kerja 15 Th) Ahli Pembina Kepala S3 (Pengalaman Kerja 16 Th) Ahli Pembina Kepala S3 (Pengalaman Kerja 17 Th) Tenaga Ahli Kepala Ahli Kepala S1 (Pengalaman Kerja 17 Th) Ahli Kepala S1 (Pengalaman Kerja 18 Th) Ahli Kepala S1 (Pengalaman Kerja 19 Th) 47
350,000.00
OB
1,600,000.00
Per Lembar
Administrator Website Operator Website Upah Penyiar Radio Gema FM Pemberian Jaminan Sosial bagi Kegiatan Dinas Sosial Disabilitas Berat Honorarium Tutor paket C Honorarium Tutor paket B Honorarium Pengelola Paket B/C Honorarium Penyelenggara Paket B/C
29 1.11.29.01.04.010.029 30 1.11.29.01.04.010.030
OB
1,500.00
OB OB OJ OB
400,000.00 150,000.00 30,000.00 700,000.00
OB OB OB OB
300,000.00 250,000.00 200,000.00 175,000.00
OH Orang/Anak
150,000.00 850,000.00
OH
250,000.00
OB
41,700,000.00
OB
43,200,000.00
OB
44,700,000.00
OB
46,200,000.00
OB
47,700,000.00
OB
47,550,000.00
OB
49,350,000.00
OB
51,150,000.00
OB
52,950,000.00
OB
54,900,000.00
OB
52,500,000.00
OB
54,450,000.00
OB
56,400,000.00
OB
58,500,000.00
OB
60,450,000.00
OB
35,700,000.00
OB
37,200,000.00
OB
38,700,000.00
4
1.11.29.01.05.002.004
5
1.11.29.01.05.002.005
6
1.11.29.01.05.002.006
7
1.11.29.01.05.002.007
8
1.11.29.01.05.002.008
9
1.11.29.01.05.002.009
10 1.11.29.01.05.002.010 11 1.11.29.01.05.002.011 12 1.11.29.01.05.002.012
1
1.11.29.01.05.003 1.11.29.01.05.003.001
2
1.11.29.01.05.003.002
3
1.11.29.01.05.003.003
4
1.11.29.01.05.003.004
5
1.11.29.01.05.003.005
6
1.11.29.01.05.003.006
7
1.11.29.01.05.003.007
8
1.11.29.01.05.003.008
9
1.11.29.01.05.003.009
10 1.11.29.01.05.003.010 11 1.11.29.01.05.003.011 12 1.11.29.01.05.003.012
1
1.11.29.01.05.004 1.11.29.01.05.004.001
2
1.11.29.01.05.004.002
3
1.11.29.01.05.004.003
4
1.11.29.01.05.004.004
5
1.11.29.01.05.004.005
6
1.11.29.01.05.004.006
7
1.11.29.01.05.004.007
8
1.11.29.01.05.004.008
Standar Upah / Jasa Tahun 2017
OB
40,200,000.00
OB
40,200,000.00
OB
42,000,000.00
OB
43,950,000.00
OB
45,750,000.00
OB
44,550,000.00
OB
46,500,000.00
OB
48,450,000.00
OB
50,550,000.00
Kerja 13
OB
29,700,000.00
Kerja 14
OB
31,200,000.00
Kerja 15
OB
32,700,000.00
Kerja 16
OB
34,200,000.00
Kerja 9
OB
33,000,000.00
Kerja 10
OB
34,800,000.00
Kerja 11
OB
36,600,000.00
Kerja 12
OB
38,400,000.00
Kerja 5
OB
36,600,000.00
Kerja 6
OB
38,550,000.00
Kerja 7
OB
40,500,000.00
Kerja 8
OB
42,600,000.00
OB
23,700,000.00
OB
25,200,000.00
OB
26,700,000.00
OB
28,200,000.00
OB
25,650,000.00
OB
27,450,000.00
OB
29,250,000.00
OB
31,050,000.00
Ahli Kepala S1 (Pengalaman Kerja 20 Th) Ahli Kepala S2 (Pengalaman Kerja 13 Th) Ahli Kepala S2 (Pengalaman Kerja 14 Th) Ahli Kepala S2 (Pengalaman Kerja 15 Th) Ahli Kepala S2 (Pengalaman Kerja 16 Th) Ahli Kepala S3 (Pengalaman Kerja 9 Th) Ahli Kepala S3 (Pengalaman Kerja 10 Th) Ahli Kepala S3 (Pengalaman Kerja 11 Th) Ahli Kepala S3 (Pengalaman Kerja 12 Th) Tenaga Ahli Utama Ahli Utama S1 (Pengalaman Th) Ahli Utama S1 (Pengalaman Th) Ahli Utama S1 (Pengalaman Th) Ahli Utama S1 (Pengalaman Th) Ahli Utama S2 (Pengalaman Th) Ahli Utama S2 (Pengalaman Th) Ahli Utama S2 (Pengalaman Th) Ahli Utama S2 (Pengalaman Th) Ahli Utama S3 (Pengalaman Th) Ahli Utama S3 (Pengalaman Th) Ahli Utama S3 (Pengalaman Th) Ahli Utama S3 (Pengalaman Th)
Tenaga Ahli Madya Ahli Madya S1 (Pengalaman Kerja 9 Th) Ahli Madya S1 (Pengalaman Kerja 10 Th) Ahli Madya S1 (Pengalaman Kerja 11 Th) Ahli Madya S1 (Pengalaman Kerja 12 Th) Ahli Madya S2 (Pengalaman Kerja 5 Th) Ahli Madya S2 (Pengalaman Kerja 6 Th) Ahli Madya S2 (Pengalaman Kerja 7 Th) Ahli Madya S2 (Pengalaman Kerja 8 Th)
48
9
1.11.29.01.05.004.009
10 1.11.29.01.05.004.010 11 1.11.29.01.05.004.011 12 1.11.29.01.05.004.012
Ahli Madya S3 (Pengalaman Kerja 1 Th) Ahli Madya S3 (Pengalaman Kerja 2 Th) Ahli Madya S3 (Pengalaman Kerja 3 Th) Ahli Madya S3 (Pengalaman Kerja 4 Th)
OB
28,650,000.00
OB
30,600,000.00
OB
32,550,000.00
OB
34,650,000.00
1
1.11.29.01.05.005 1.11.29.01.05.005.001
Tenaga Ahli Muda Ahli Muda S1 (Pengalaman Kerja 5 Th)
OB
17,700,000.00
2
1.11.29.01.05.005.002
Ahli Muda S1 (Pengalaman Kerja 6 Th)
OB
19,200,000.00
3
1.11.29.01.05.005.003
Ahli Muda S1 (Pengalaman Kerja 7 Th)
OB
20,700,000.00
4
1.11.29.01.05.005.004
Ahli Muda S1 (Pengalaman Kerja 8 Th)
OB
22,200,000.00
5
1.11.29.01.05.005.005
Ahli Muda S2 (Pengalaman Kerja 1 Th)
OB
18,300,000.00
6
1.11.29.01.05.005.006
Ahli Muda S2 (Pengalaman Kerja 2 Th)
OB
20,100,000.00
7
1.11.29.01.05.005.007
Ahli Muda S2 (Pengalaman Kerja 3 Th)
OB
22,050,000.00
8
1.11.29.01.05.005.008
Ahli Muda S2 (Pengalaman Kerja 4 Th)
OB
23,850,000.00
1
1.11.29.01.05.006 1.11.29.01.05.006.001
OB
14,700,000.00
2
1.11.29.01.05.006.002
Tenaga Ahli Pratama Ahli Pratama S1 (Pengalaman Kerja 3 Th) Ahli Pratama S1 (Pengalaman Kerja 4 Th)
OB
16,200,000.00
1.11.29.01.05.007
Tenaga Pendukung Biaya Langsung Personil (Untuk Supporting Staff)
1 2
1.11.29.01.05.007.001 1.11.29.01.05.007.002
Office Manager Site Office Manager/Administrator
OB OB
8,500,000.00 7,700,000.00
3 4 5 6 7 8 9 10
1.11.29.01.05.007.003 1.11.29.01.05.007.004 1.11.29.01.05.007.005 1.11.29.01.05.007.006 1.11.29.01.05.007.007 1.11.29.01.05.007.008 1.11.29.01.05.007.009 1.11.29.01.05.007.010
Bilingual Secretary Secretary Computer Operator / Typist Drafter (Manual) Messenger Office Boy Driver Office Guard / Security Office
OB OB OB OB OH OH OH OH
8,400,000.00 5,200,000.00 4,600,000.00 3,850,000.00 2,750,000.00 2,500,000.00 2,950,000.00 2,700,000.00
1.11.29.01.05.008
1
1.11.29.01.05.008.001
Tenaga Pendukung Biaya Langsung Personil (Untuk Tenaga Sub Profesional) Software Programer / Implementer
2
1.11.29.01.05.008.002
Software Programer / Implementer
3
1.11.29.01.05.008.003
Software Programer / Implementer
4
1.11.29.01.05.008.004
Hardware Technician
5
1.11.29.01.05.008.005
Hardware Technician
Standar Upah / Jasa Tahun 2017
49
D3 / SO Pendidikan dan Pengalaman lebih dari 3 Th
OB
9,800,000.00
S1 Pendidikan dan Pengalaman 0 - 3 Th S2 Pendidikan dan Pengalaman 0 - 1 Th D3 / SO Pendidikan dan Pengalaman lebih dari 3 Th
OB
9,800,000.00
OB
9,800,000.00
OB
8,200,000.00
S1 Pendidikan dan Pengalaman 0 - 3 Th
OB
8,200,000.00
6
1.11.29.01.05.008.006
Hardware Technician
1 2
1.11.29.01.06 1.11.29.01.06.001 1.11.29.01.06.001.001 1.11.29.01.06.001.002
Biaya Oprasional Kegiatan Biaya Parkir Berlangganan Biaya Parkir Berlangganan Roda 2 Biaya Parkir Berlangganan Roda 4
1
1.11.29.01.06.002 1.11.29.01.06.002.001
Biaya Tambah Daya Listrik Pasang Listrik Baru
2
1.11.29.01.06.002.002
Pasang Listrik Baru
3
1.11.29.01.06.002.003
Biaya Tambah Daya Listrik
4
1.11.29.01.06.002.004
Biaya Tambah Daya Listrik
5
1.11.29.01.06.002.005
Biaya Tambah Daya Listrik
6
1.11.29.01.06.002.006
Biaya Tambah Daya Listrik
1
1.11.29.01.06.003 1.11.29.01.06.003.001
Biaya Publikasi Iklan Advetorial Creatorial Bisnis
2
1.11.29.01.06.003.002
Iklan Advetorial Creatorial Bisnis
3
1.11.29.01.06.003.003
Iklan Advetorial Creatorial CSR
4
1.11.29.01.06.003.004
Iklan Advetorial Creatorial CSR
5
1.11.29.01.06.003.005
Iklan Advetorial Corporate Image/Liputan Event
6
1.11.29.01.06.003.006
7
1.11.29.01.06.003.007
Iklan Advetorial Corporate Image/Liputan Event Iklan Advetorial Corporate Image/Liputan Event
8
1.11.29.01.06.003.008
Iklan Advetorial Corporate Image/Liputan Event
9
1.11.29.01.06.003.009
S2 Pendidikan dan Pengalaman 0 - 1 Th
OB
Per Tahun Per Tahun
8,200,000.00
15,000.00 25,000.00
1300 KWh (Belum termasuk b. Instalasi) 2200 KWh (Belum termasuk b. Instalasi) Dari 450 KWh ke 900 KWh (sudah termasuk biaya instalasi) Dari 900 KWh ke 1300 KWh (sudah termasuk biaya instalasi) Dari 1300 KWh ke 2200 KWh (sudah termasuk biaya instalasi) Dari 2200 KWh ke 3500 Kwh (sudah termasuk biaya instalasi)
Paket
1,107,600.00
Paket
1,874,500.00
Paket
450,000.00
Paket
800,000.00
Paket
1,200,000.00
Paket
1,499,000.00
1/2 Halaman (7 kol x 245 mm) Full Colour. Nasional. Jawa Pos 1 Halaman (7 kol x 520 mm) Full Colour. Nasional. Jawa Pos 1/2 Halaman (7 kol x 245 mm) Full Colour. Nasional. Jawa Pos 1 Halaman (7 kol x 520 mm) Full Colour. Nasional. Jawa Pos 3 kol x 260 mm, Full Colour, Nasional, Jawa Pos
Per Tayang
214,481,300.00
Per Tayang
414,583,800.00
Per Tayang
203,697,300.00
Per Tayang
393,615,000.00
Per Tayang
39,541,300.00
Per Tayang
54,519,000.00
Per Tayang
113,231,700.00
Per Tayang
204,296,400.00
Iklan Advetorial Corporate Image/Liputan Event
4 kol x 260 mm, Full Colour, Nasional Jawa Pos 1/2 Halaman (7 kol x 260 mm) Full Colour. Nasional. Jawa Pos 1 Halaman (7 kol x 520 mm) Full Colour. Nasional. Jawa Pos 3 kol x 260 mm, Full Colour, Jawa Timur, Jawa Pos
Per Tayang
29,955,500.00
10 1.11.29.01.06.003.010
Iklan Advetorial Corporate Image/Liputan Event
4 kol x 260 mm, Full Colour, Jawa Timur, Jawa Pos
Per Tayang
43,735,000.00
11 1.11.29.01.06.003.011
Iklan Advetorial Corporate Image/Liputan Event
86,870,900.00
12 1.11.29.01.06.003.012
Iklan Advetorial Corporate Image/Liputan Event
1/2 Halaman (7 kol x 260 Per Tayang mm) Full Colour. Jawa Timur. Jawa Pos 1 Halaman (7 kol x 520 mm) Per Tayang Full Colour. Jawa Timur. Jawa Pos
Standar Upah / Jasa Tahun 2017
50
156,367,600.00
13 1.11.29.01.06.003.013
Iklan Advetorial Politik dan Pemerintahan
3 kol x 260 mm, Full Colour, Nasional, Jawa Pos
Per Tayang
39,541,300.00
14 1.11.29.01.06.003.014
Iklan Advetorial Politik dan Pemerintahan Iklan Advetorial Politik dan Pemerintahan
Per Tayang
54,519,000.00
Per Tayang
113,231,700.00
Per Tayang
204,296,400.00
Per Tayang
29,955,500.00
16 1.11.29.01.06.003.016
Iklan Advetorial Politik dan Pemerintahan
17 1.11.29.01.06.003.017
Iklan Advetorial Politik dan Pemerintahan
4 kol x 260 mm, Full Colour, Nasional Jawa Pos 1/2 Halaman (7 kol x 260 mm) Full Colour. Nasional. Jawa Pos 1 Halaman (7 kol x 520 mm) Full Colour. Nasional. Jawa Pos 3 kol x 260 mm, Full Colour, Jawa Timur, Jawa Pos
18 1.11.29.01.06.003.018
Iklan Advetorial Politik dan Pemerintahan
4 kol x 260 mm, Full Colour, Jawa Timur, Jawa Pos
Per Tayang
43,735,000.00
19 1.11.29.01.06.003.019
Iklan Advetorial Politik dan Pemerintahan
86,870,900.00
20 1.11.29.01.06.003.020
Iklan Advetorial Politik dan Pemerintahan
21 1.11.29.01.06.003.021
Display
1/2 Halaman (7 kol x 260 Per Tayang mm) Full Colour. Jawa Timur. Jawa Pos 1 Halaman (7 kol x 520 mm) Per Tayang Full Colour. Jawa Timur. Jawa Pos BW, Min. 40 mmk, Kompas mmk
22 1.11.29.01.06.003.022
Display
FC, Min. 810 mmk, kompas
mmk
236,100.00
23 1.11.29.01.06.003.023
Advetorial
BW, Min 810 mmk, Kompas
mmk
181,000.00
24 1.11.29.01.06.003.024
Advetorial
FC, Min 810 mmk, Kompas
mmk
240,900.00
25 1.11.29.01.06.003.025
Iklan Cetak Untuk Pengumuman
Per Tayang
445,852,300.00
26 1.11.29.01.06.003.026
Iklan Cetak Untuk Pengumuman
Per Tayang
494,559,500.00
27 1.11.29.01.06.003.027 28 1.11.29.01.06.003.028
Iklan Cetak Untuk Pengumuman Iklan Cetak Untuk Pengumuman
Per Tayang Per Tayang
86,173,300.00 16,219,400.00
29 1.11.29.01.06.003.029
Iklan Cetak Untuk Pengumuman
Per Tayang
12,014,400.00
30 1.11.29.01.06.003.030
Iklan Cetak Untuk Pengumuman
Per Tayang
222,925,600.00
31 1.11.29.01.06.003.031
Iklan Cetak Untuk Pengumuman
Jawa Pos, Terbit Minggu, Nasional, Full Halaman Jawa Pos, Terbit Senin Sabtu, Nasional, Full Halaman Surya, Full Halaman Birawa, Berwarna, Full Halaman Birawa, Hitam Putih, Full Halaman Jawa Pos, Terbit Minggu, Nasional, 1/2 Halaman Jawa Pos, Terbit Senin Sabtu, Nasional, 1/2 Halaman
Per Tayang
247,279,800.00
32 1.11.29.01.06.003.032 33 1.11.29.01.06.003.033
Iklan Cetak Untuk Pengumuman Iklan Cetak Untuk Pengumuman
Per Tayang Per Tayang
43,086,700.00 8,410,100.00
34 1.11.29.01.06.003.034
Iklan Cetak Untuk Pengumuman
Per Tayang
6,607,900.00
35 1.11.29.01.06.003.035
Biaya Produksi Iklan Layanan Masyarakat di Radio
Surya, 1/2 Halaman Birawa, Berwarna, 1/2 Halaman Birawa, Hitam Putih, 1/2 Halaman Biaya Produksi Iklan Layanan Masyarakat di Radio
Menit
2,979,050.00
36 1.11.29.01.06.003.036 37 1.11.29.01.06.003.037 38 1.11.29.01.06.003.038
Biaya Siar Iklan Radio Biaya Iklan Televisi Slide Biaya Iklan Televisi Slide
Radio Lokal Media Televisi Lokal Media Televisi Nasional
Menit 30 Detik 30 Detik
124,150.00 2,396,500.00 11,982,200.00
Biaya Dokumentasi Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital
1R 2R 3R 4R
Lembar Lembar Lembar Lembar
1,900.00 2,100.00 2,700.00 3,300.00
15 1.11.29.01.06.003.015
1 2 3 4
1.11.29.01.06.004 1.11.29.01.06.004.001 1.11.29.01.06.004.002 1.11.29.01.06.004.003 1.11.29.01.06.004.004
Standar Upah / Jasa Tahun 2017
51
156,367,600.00
176,200.00
5 6 7 8 9 10 11 12 13 14 15
1.11.29.01.06.004.005 1.11.29.01.06.004.006 1.11.29.01.06.004.007 1.11.29.01.06.004.008 1.11.29.01.06.004.009 1.11.29.01.06.004.010 1.11.29.01.06.004.011 1.11.29.01.06.004.012 1.11.29.01.06.004.013 1.11.29.01.06.004.014 1.11.29.01.06.004.015
Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital Cetak Foto Digital
1
1.11.29.01.06.005 1.11.29.01.06.005.001
2 3 4
1.11.29.01.06.005.002 1.11.29.01.06.005.003 1.11.29.01.06.005.004
Biaya Penggandaan Transfer Gambar ke VCD 1 Master + 2 Copy Transfer Gambar ke VCD Penggandaan VCD/CD Rekam/Shooting Karya Seni
1.11.29.01.07
5R 6R 8R 10R/A4 16R 20R 24R Pasphoto, 2x3 Pasphoto, 3x4 Pasphoto, 4x6 Pasphoto, 5x5
Lembar Lembar Lembar Lembar Lembar Lembar Lembar 12 pcs 10 pcs 8 pcs 4 pcs
5,100.00 8,100.00 15,100.00 26,500.00 98,600.00 138,200.00 156,200.00 15,700.00 15,700.00 15,700.00 15,700.00
Per Keping
72,100.00
Per Keping Per Keping Kegiatan
54,100.00 10,900.00 961,200.00
OH
1,000,000.00
OH
400,000.00
1
1.11.29.01.07.001 1.11.29.01.07.001.001
2
1.11.29.01.07.001.002
Bantuan Uang Transport dan Uang Saku dalam Kegiatan Uang Transport Uang Transport Pemateri Pemerintah Pusat Uang Transport Pemateri Pemprov
3
1.11.29.01.07.001.003
Uang Transport Pemateri Pihak Ketiga
OH
300,000.00
4 5 6 7 8 9
1.11.29.01.07.001.004 1.11.29.01.07.001.005 1.11.29.01.07.001.006 1.11.29.01.07.001.007 1.11.29.01.07.001.008 1.11.29.01.07.001.009
Uang Transport Pemateri Pemkot Transport Panitia (dalam kota) Transport Panitia (luar kota) Transport Peserta (Dalam Kota) Transport Peserta (Luar Kota) Transport Tim seleksi
OH OH OH OH OH OH
100,000.00 50,000.00 75,000.00 80,000.00 100,000.00 100,000.00
1 2 3 4 5 6 7
1.11.29.01.08 1.11.29.01.08.002 1.11.29.01.08.002.001 1.11.29.01.08.002.002 1.11.29.01.08.002.003 1.11.29.01.08.002.004 1.11.29.01.08.002.005 1.11.29.01.08.002.006 1.11.29.01.08.002.007
Upah/Jasa Lain-lain Upah/Jasa Lain-lain Jasa Petugas korsik Petugas Koor Petugas keamanan Petugas Kesehatan Petugas Kebersihan Petugas Pengibar Bendera Jasa Komandan Upacara & Dan Kompi
OH OH OH OH OH OH OH
250,000.00 100,000.00 100,000.00 100,000.00 50,000.00 100,000.00 150,000.00
OH OH OH
100,000.00 150,000.00 150,000.00
OH
100,000.00
8 1.11.29.01.08.002.008 9 1.11.29.01.08.002.009 10 1.11.29.01.08.002.010 11 1.11.29.01.08.002.011 12 13 14 15 16
1.11.29.01.08.002.012 1.11.29.01.08.002.013 1.11.29.01.08.002.014 1.11.29.01.08.002.015 1.11.29.01.08.002.016
17 1.11.29.01.08.002.017
Standar Upah / Jasa Tahun 2017
Pengatur Barisan Uang saku wartawan jumpa pers Uang saku wartawan peliputan inspeksi mendadak Jasa Pembaca UUD 1945/Panca Prasetya KORPRI Biaya Jahit Pakaian Biaya Jahit Pakaian Jasa Laundry Cuci + Setrika Jasa Cucian Korden Pemasangan Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor Pemasangan dan Akomodasi Warning Light Solar Cell
52
Potong Stell Kg m Buah
100,000.00 200,000.00 7,300.00 7,300.00 5,791,100.00
Ls
5,720,000.00
REKAPITULASI
HSPK FISIK KONTRUKSI & FISIK NON KONSTRUKSI
STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TA 2017
PEMERINTAH KOTA MOJOKERTO 2016
REKAPITULASI HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO 2016 KODE BARANG 2.01 2.01.01 2.01.01.01 2.01.01.01.01 2.01.01.01.01.001 2.01.01.01.01.002
URAIAN KEGIATAN HSPK FISIK KONSTRUKSI BANGUNAN GEDUNG A. PEKERJAAN PERSIAPAN & TANAH Pekerjaan Persiapan 1 m' Pembuatan Pagar Sementara Dari Kayu Tinggi 2 M 1 m' Pembuatan Pagar Sementara Seng Gelombang Tinggi 2 M
SAT
m2 m'
542,300.00 638,900.00
2.01.01.01.01.003 2.01.01.01.01.004 2.01.01.01.01.005
m' m' m2
141,800.00 82,600.00 1,873,300.00
2.01.01.01.01.006 2.01.01.01.01.007 2.01.01.01.01.008 2.01.01.01.01.009 2.01.01.01.01.010 2.01.01.01.01.011 2.01.01.01.01.012 2.01.01.01.01.013 2.01.01.01.01.014 2.01.01.01.01.015 2.01.01.01.01.016
1 m' Pembuatan Pagar Sementara Kawat Duri Tinggi 1,8 M 1 m' Pengukuran Dan Pemasangan Bowplank 1 m2 Pekerjaan Pembuatan Kantor Sementara Dengan Lantai Plesteran 1 m2 Pekerjaan Pembuatan Gudang Semen Dan Peralatan 1 m2 Pekerjaan Pembuatan Bedeng Kerja 1 m2 Pekerjaan Pembersihan Lapangan Dan Perataan 1 m2 Pembuatan Stegger dari Bambu 1 m2 Pekerjaan Pembuatan Jalan Sementara 1 m3 Pekerjaan Pembongkaran Beton (Manual) 1 m3 Pembongkaran Beton (Menggunakan Alat) 1 m3 Pembongkaran Pasangan Batu Kali (Manual) 1 M3 Pembongkaran Pasangan Batu Kali (Menggunakan Alat) 1 m3 Pekerjaan Pembongkaran Tembok Batu Bata 1 m2 Pekerjaan Pembongkaran Penutup Atap Tidak Dipakai Kembali
m2 m2 m2 m2 m2 m3 m3 m3 m3 m3 m2
1,764,300.00 1,788,200.00 15,500.00 60,300.00 144,200.00 643,300.00 449,200.00 211,000.00 187,000.00 482,500.00 11,600.00
2.01.01.01.01.017
1 m2 Pekerjaan Pembongkaran Penutup Atap Dan Dipakai Kembali
m2
23,300.00
2.01.01.01.01.018 2.01.01.01.01.019 2.01.01.01.02 2.01.01.01.02.001 2.01.01.01.02.002 2.01.01.01.02.003 2.01.01.01.02.004 2.01.01.01.02.005 2.01.01.01.02.006 2.01.01.01.02.007 2.01.01.01.02.008 2.01.01.01.02.009
1 m2 Pembongkaran Paving 1 Unit Papan Nama Proyek Pekerjaan Tanah 1 m3 Pekerjaan Galian Tanah Biasa Sedalam 1 Meter 1 m3 Pekerjaan Galian Tanah Biasa Sedalam 2 Meter 1 m3 Pekerjaan Galian Tanah Biasa Sedalam 3 Meter 1 m3 Pekerjaan Galian Tanah Keras Sedalam 1 Meter 1 m3 Pekerjaan Galian Tanah Cadas Sedalam 1 Meter 1 m3 Pekerjaan Galian Tanah Lumpur Sedalam 1 Meter 1 m2 Pekerjaan Pekerjaan Stripping Tebing Setinggi 1 M 1 m3 Pekerjaan Pembuangan Hasil Galian Sejauh 30 M 1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Biasa Sedalam 1 M
m2 Unit
19,300.00 1,144,400.00
m3 m3 m3 m3 m3 m3 m2 m3 m3
70,800.00 86,900.00 103,200.00 94,200.00 142,800.00 113,900.00 5,200.00 31,000.00 23,600.00
2.01.01.01.02.010
1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Biasa Sedalam 2 M
m3
29,000.00
2.01.01.01.02.011
1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Biasa Sedalam 3 M
m3
34,400.00
2.01.01.01.02.012
m3
31,400.00
m3
47,600.00
m3
38,000.00
2.01.01.01.02.015 2.01.01.01.02.016 2.01.01.01.02.017
1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Keras Sedalam 1 M 1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Cadas Sedalam 1 M 1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Lumpur Sedalam 1 M 1 m3 Pekerjaan Pemadatan Tanah Setiap 20 Cm 1 m3 Pekerjaan Pemadatan Tanah Dengan Alat 1 m3 Pekerjaan Pemasangan Lapisan Pudel Campuran 1Kp : 3Pp : 7 Tl
m3 m3 m3
51,500.00 53,900.00 349,100.00
2.01.01.01.02.018 2.01.01.01.02.019 2.01.01.01.02.020 2.01.01.01.02.021 2.01.01.01.02.022
1 m2 Pekerjaan Pemasangan Lapisan Ijuk Tebal 10 Cm 1 m3 Pekerjaan Pengurugan Pasir Urug 1 m3 Pengurugan Sirtu Padat 1 m3 Pengurugan Sirtu Dengan Menggunakan Sirtu Ngoro 1 m3 Pekerjaan Pengurugan Dengan Tanah Urug
m2 m3 m3 m3 m3
134,300.00 221,600.00 258,300.00 315,600.00 182,900.00
2.01.01.01.02.013 2.01.01.01.02.014
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
53
JUMLAH HARGA
KODE BARANG 2.01.01.02 2.01.01.02.01 2.01.01.02.01.001
URAIAN KEGIATAN
2.01.01.02.01.010 2.01.01.02.01.011
B. PEKERJAAN PONDASI Pondasi 1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 3 Pp) 1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 4 Pp) 1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 5 Pp) 1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 6 Pp) 1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 8 Pp) 1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 3 Kp : 10 Pp) 1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1/4 Pc : 1 Kp : 4 Pp) 1 m3 Pekerjaan Pemasangan Batu Kosong (Aanstamping) 1 m3 Pekerjaan Pasang Pondasi Siklop, 60% Beton Campuran 1 Pc : 2 Pb : 3 Kr Dan 40% Batu Belah 1 m3 Pekerjaan Pasang Pondasi Sumuran, Diameter 100 Cm 1 m' Pekerjaan Pembuatan Lubang Strouss Pile Diameter 20 cm
2.01.01.02.01.012
1 m' Pekerjaan Pembuatan Lubang Strouss Pile Diameter 30 cm
2.01.01.03 2.01.01.03.01 2.01.01.03.01.001
2.01.01.03.01.013 2.01.01.03.01.014 2.01.01.03.01.015 2.01.01.03.01.016
C. STRUKTUR UTAMA Pekerjaan Beton 1 m3 Pekerjaan Lantai Kerja K-100 F’C = 7,4 Mpa Slump (3-6) Cm, W/C = 0,87 Membuat 1 m3 Beton Mutu F’C = 7,4 Mpa (K 100), Slump (12+/-2) Cm, W/C = 0,87 Membuat 1 m3 Beton Mutu F’C = 9,8 Mpa (K 125), Slump (12+/-2) Cm, W/C = 0,78 Membuat 1 m3 Beton Mutu F’C = 12,2 Mpa (K 150), Slump (12+/-2) Cm, W/C = 0,72 Membuat 1 m3 Beton Mutu F’C = 14,5 Mpa (K 175), Slump (12+/-2) Cm, W/C = 0,66 Membuat 1 m3 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12+/-2) Cm, W/C = 0,61 Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225), Slump (12+/-2) Cm, W/C = 0,58 Membuat 1 m3 Beton Mutu F’C = 21,7 Mpa (K 250), Slump (12+/-2) Cm, W/C = 0,56 Membuat 1 m3 Beton Mutu F’C = 24,0 Mpa (K 275), Slump (12+/-2) Cm, W/C = 0,53 Membuat 1 m3 Beton Mutu F’C = 26,4 Mpa (K 300), Slump (12+/-2) Cm, W/C = 0,52 Membuat 1 m3 Beton Mutu F’C = 28,8 Mpa (K 325), Slump (12+/-2) Cm, W/C = 0,49 Membuat 1 m3 Beton Mutu F’C = 31,2 Mpa (K 350), Slump (12+/-2) Cm, W/C = 0,48 1 Kg Pekerjaan Pembesian Dengan Besi Polos 1 Kg Pekerjaan Pembesian Dengan Besi Ulir 1 Kg Pekerjaan Pemasangan Wiremesh (Jaring Kawat Baja) 1 m3 Membuat Pondasi Beton Bertulang (150 Kg Besi+Bekisting)
2.01.01.03.01.017
SAT
JUMLAH HARGA
m3
978,200.00
m3
911,200.00
m3
864,800.00
m3
832,100.00
m3
787,400.00
m3
724,400.00
m3
691,300.00
m3 m3
460,500.00 2,771,100.00
m3 Titik
987,100.00 42,900.00
Titik
50,600.00
m3
966,900.00
m3
1,045,300.00
m3
1,096,300.00
m3
1,136,400.00
m3
1,183,700.00
m3
1,229,100.00
m3
1,262,700.00
m3
1,285,400.00
m3
1,324,100.00
m3
1,336,200.00
m3
1,434,300.00
m3
1,450,100.00
Kg Kg Kg m3
15,500.00 16,000.00 19,000.00 5,114,800.00
1 m3 Membuat Sloof Beton Bertulang (200 Kg Besi+Bekisting)
m3
6,341,600.00
2.01.01.03.01.018
1 m3 Membuat Kolom Beton Bertulang (300 Kg Besi+Bekisting)
m3
10,889,700.00
2.01.01.03.01.019
1 m3 Membuat Balok Beton Bertulang (200 Kg Besi+Bekisting)
m3
8,567,500.00
2.01.01.02.01.002 2.01.01.02.01.003 2.01.01.02.01.004 2.01.01.02.01.005 2.01.01.02.01.006 2.01.01.02.01.007 2.01.01.02.01.008 2.01.01.02.01.009
2.01.01.03.01.002 2.01.01.03.01.003 2.01.01.03.01.004 2.01.01.03.01.005 2.01.01.03.01.006 2.01.01.03.01.007 2.01.01.03.01.008 2.01.01.03.01.009 2.01.01.03.01.010 2.01.01.03.01.011 2.01.01.03.01.012
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
54
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.01.01.03.01.020 2.01.01.03.01.021
1 m3 Membuat Plat Beton Bertulang (150 Kg Besi+Bekisting) 1 m3 Membuat Dinding Beton Bertulang (150 Kg Besi+Bekisting)
m3 m3
7,930,200.00 7,543,800.00
2.01.01.03.01.022
1 m3 Membuat Dinding Beton Bertulang (200 Kg Besi+Bekisting)
m3
7,735,200.00
2.01.01.03.01.023 2.01.01.03.01.024 2.01.01.03.02 2.01.01.03.02.001 2.01.01.03.02.002 2.01.01.03.02.003 2.01.01.03.02.004 2.01.01.03.02.005 2.01.01.03.02.006 2.01.01.03.02.007 2.01.01.03.02.008
1 m' Membuat Kolom Praktis Beton Bertulang (11 X 11) Cm 1 m' Membuat Ring Balok Beton Bertulang (10 X 15) Cm Pekerjaan Cetakan Beton (Bekisting) 1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi 1 m2 Pekerjaan Pasang Bekisting Untuk Sloof 1 m2 Pekerjaan Pasang Bekisting Untuk Kolom 1 m2 Pekerjaan Pasang Bekisting Untuk Balok 1 m2 Pekerjaan Pasang Bekisting Untuk Lantai 1 m2 Pekerjaan Pasang Bekisting Untuk Dinding 1 m2 Pekerjaan Pasang Bekisting Untuk Tangga 1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi (2 Kali Pakai)
m' m'
83,400.00 123,100.00
m2 m2 m2 m2 m2 m2 m2 m2
322,200.00 351,300.00 558,000.00 578,300.00 653,600.00 557,600.00 499,100.00 161,100.00
2.01.01.03.02.009 2.01.01.03.02.010 2.01.01.03.02.011 2.01.01.03.02.012 2.01.01.03.02.013
1 m2 Pekerjaan Pasang Bekisting Untuk Sloof (2 Kali Pakai) 1 m2 Pekerjaan Pasang Bekisting Untuk Kolom (2 Kali Pakai) 1 m2 Pekerjaan Pasang Bekisting Untuk Balok (2 Kali Pakai) 1 m2 Pekerjaan Pasang Bekisting Untuk Lantai (2 Kali Pakai) 1 m2 Pekerjaan Pasang Bekisting Untuk Dinding (2 Kali Pakai)
m2 m2 m2 m2 m2
175,600.00 279,000.00 289,100.00 326,800.00 278,800.00
2.01.01.03.02.014 2.01.01.03.02.015
1 m2 Pekerjaan Pasang Bekisting Untuk Tangga (2 Kali Pakai) 1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi (3 Kali Pakai)
m2 m2
249,600.00 107,800.00
2.01.01.03.02.016 2.01.01.03.02.017 2.01.01.03.02.018 2.01.01.03.02.019 2.01.01.03.02.020
1 m2 Pekerjaan Pasang Bekisting Untuk Sloof (3 Kali Pakai) 1 m2 Pekerjaan Pasang Bekisting Untuk Kolom (3 Kali Pakai) 1 m2 Pekerjaan Pasang Bekisting Untuk Balok (3 Kali Pakai) 1 m2 Pekerjaan Pasang Bekisting Untuk Lantai (3 Kali Pakai) 1 m2 Pekerjaan Pasang Bekisting Untuk Dinding (3 Kali Pakai)
m2 m2 m2 m2 m2
117,100.00 186,400.00 193,200.00 218,300.00 186,100.00
2.01.01.03.02.021 2.01.01.04 2.01.01.04.01 2.01.01.04.01.001
1 m2 Pekerjaan Pasang Bekisting Untuk Tangga (3 Kali Pakai) D. PEKERJAAN PASANGAN DINDING DAN PLESTERAN Pekerjaan Dinding 1 m2 Pekerjaan Pemasangan Batu Merah Tbl 1 Bata (1 Pc : 2 Ps)
m2
166,400.00
m2
319,200.00
2.01.01.04.01.002
1 m2 Pekerjaan Pemasangan Batu Merah Tbl 1/2 Bata (1 Pc : 2 Ps)
m2
153,700.00
2.01.01.04.01.003
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 3 Ps)
m2
301,400.00
2.01.01.04.01.004
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 3 Ps)
m2
145,300.00
2.01.01.04.01.005
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 4 Ps)
m2
289,500.00
2.01.01.04.01.006
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 4 Ps)
m2
140,500.00
2.01.01.04.01.007
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 5 Ps)
m2
283,300.00
2.01.01.04.01.008
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 5 Ps)
m2
137,400.00
2.01.01.04.01.009
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 6 Ps)
m2
281,000.00
2.01.01.04.01.010
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 6 Ps)
m2
135,800.00
2.01.01.04.01.011
1 m2 Pekerjaan Pemasangan Dinding Terawang (Roster) Ukuran (12 X 11 X 24) Cm, Campuran Spesi 1 Pc : 3 Pp 1 m2 Pekerjaan Pemasangan Dinding Terawang (Roster) Ukuran (12 X 11 X 24) Cm, Campuran Spesi 1 Pc : 4 Pp 1 m2 Pasangan Dinding bata beton ringan; Campuran Spesi 1:3
m2
328,100.00
m2
323,000.00
m2
255,400.00
2.01.01.04.01.012 2.01.01.04.01.013
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
55
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.01.01.04.01.014
1 m2 Pasangan Dinding bata beton ringan; Campuran Spesi 1:4
m2
255,900.00
2.01.01.04.02 2.01.01.04.02.001 2.01.01.04.02.002 2.01.01.04.02.003 2.01.01.04.02.004 2.01.01.04.02.005 2.01.01.04.02.006 2.01.01.04.02.007 2.01.01.04.02.008 2.01.01.04.02.009 2.01.01.04.02.010 2.01.01.04.02.011 2.01.01.04.02.012 2.01.01.04.02.013 2.01.01.04.02.014 2.01.01.04.02.015 2.01.01.04.02.016 2.01.01.04.02.017 2.01.01.04.02.018
Pekerjaan Plesteran 1 m2 Pekerjaan Plesteran 1 Pc : 1 Ps Tebal 15 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 2 Ps Tebal 15 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps Tebal 15 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 4 Ps Tebal 15 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 5 Ps Tebal 15 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 6 Ps Tebal 15 Mm 1 m2 Pekerjaan Plesteran 1Pc : ½Kp : 3Pp Tebal 15 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 2 Ps Tebal 20 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps Tebal 20 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 4 Ps Tebal 20 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 5 Ps Tebal 20 Mm 1 m2 Pekerjaan Plesteran 1 Pc : 6 Ps Tebal 20 Mm 1 m2 Pekerjaan berapen 1SP : 5PP tebal 15 mm 1 m' Pekerjaan Plesteran Skoning 1Pc : 3Ps Lebar 10 Cm 1 m' Pekerjaan Benangan 1 m2 Pekerjaan Plesteran Ciprat 1Pc:2Ps 1 m2 Pekerjaan Finishing Siar Pasangan Batu Bata Merah 1 m2 Pekerjaan Finishing Siar Pasangan Dinding Conblock Ekspose
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m' m' m2 m2 m2
81,200.00 72,000.00 67,900.00 65,200.00 63,700.00 62,400.00 64,100.00 96,300.00 90,900.00 87,200.00 85,200.00 83,500.00 40,200.00 60,700.00 21,100.00 51,000.00 29,800.00 14,300.00
2.01.01.04.02.019
1 m2 Pekerjaan Finishing Siar Pasangan Batu Kali Adukan 1 Pc : 2 Ps
m2
62,500.00
2.01.01.04.02.020 2.01.01.05 2.01.01.05.01 2.01.01.05.01.001 2.01.01.05.01.002 2.01.01.05.01.003 2.01.01.05.01.004 2.01.01.05.01.005 2.01.01.05.01.006 2.01.01.05.01.007 2.01.01.05.01.008 2.01.01.05.01.009 2.01.01.05.01.010
1 m2 Pekerjaan Acian E. PEKERJAAN PENUTUP LANTAI & DINDING Penutup Lantai 1 m2 Pekerjaan Pasang Lantai Granit Ukuran 60X60 Cm 1 m2 Pekerjaan Pasang Lantai Granit Ukuran 40X40 Cm 1 m2 Pekerjaan Pasangan Lantai Keramik Polos Uk.40X40 Cm 1 m2 Pekerjaan Pasangan Lantai Keramik Polos Uk.30X30 Cm 1 m2 Pekerjaan Pasangan Lantai Keramik Polos Uk.20X20 Cm 1 m2 Pekerjaan Pasangan Lantai Keramik Motif Uk.40X40 Cm 1 m2 Pekerjaan Pasangan Lantai Keramik Motif Uk. 30X30 Cm 1 m2 Pekerjaan Pasangan Lantai Keramik Motif Uk. 20X20 Cm 1 m2 Pekerjaan Pasangan Lantai Marmer Ex. Tulungagung 1 m2 Pekerjaan Pasangan Lantai Marmer Ex. Lampung/ Sulsel
m2
37,800.00
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
530,500.00 431,400.00 218,300.00 218,400.00 227,200.00 219,100.00 222,300.00 225,600.00 591,800.00 753,400.00
2.01.01.05.01.011 2.01.01.05.01.012 2.01.01.05.01.013 2.01.01.05.02 2.01.01.05.02.001
1 m2 Pekerjaan Pasangan Lantai Parquet 1 m2 Pekerjaan Pasangan Lantai Karpet 1 m2 Pemasangan Underlayer (Pelapis Bawah Karpet) Penutup Dinding 1 m2 Pekerjaan Pasangan Dinding Keramik Polos Uk.20X25 Cm
m2 m2 m2
192,000.00 73,600.00 114,400.00
m2
318,800.00
2.01.01.05.02.002
1 m2 Pekerjaan Pasangan Dinding Keramik Polos Uk.20X20 Cm
m2
254,100.00
2.01.01.05.02.003
1 m2 Pekerjaan Pasangan Dinding Keramik Polos Uk.10X20 Cm
m2
266,200.00
2.01.01.05.02.004
1 m2 Pekerjaan Pasangan Dinding Keramik Motif Uk.20X25 Cm
m2
334,100.00
2.01.01.05.02.005
1 m2 Pekerjaan Pasangan Dinding Keramik Motif Uk.20X20 Cm
m2
252,600.00
2.01.01.05.02.006
1 m2 Pekerjaan Pasangan Dinding Keramik Motif Uk.10X20 Cm
m2
264,600.00
2.01.01.05.02.007 2.01.01.05.02.008 2.01.01.05.02.009 2.01.01.05.02.010 2.01.01.05.02.011 2.01.01.05.02.012 2.01.01.05.02.013
1 m' Pekerjaan Pasangan Plint Keramik 7X20 Cm 1 m' Pekerjaan Pasangan Plint Keramik 10X10 Cm 1 m' Pekerjaan Pasangan Plint Keramik 5X20 Cm 1 m' Pekerjaan Pasangan Plint Marmer Tinggi 10 Cm 1 m2 Pekerjaan Pemasangan Batu Palimanan 1 m2 Pekerjaan Pemasangan Batu Candi 1 m2 Pekerjaan Pemasangan Batu Ampyang
m' m' m' m' m2 m2 m2
50,600.00 38,800.00 64,600.00 218,700.00 297,500.00 290,400.00 177,100.00
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
56
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.01.01.05.02.014
1 m2 Pekerjaan Pemasangan Batu Gilang Ex Jember (Beraturan)
m2
382,500.00
2.01.01.05.02.015
1 m2 Pekerjaan Pemasangan Batu Gilang Ex Jember (Tak Beraturan)
m2
283,300.00
2.01.01.05.02.016
1 m2 Pekerjaan Pemasangan Batu Gilang Ex Cirebon (Simetris)
m2
311,600.00
2.01.01.05.02.017
1 m2 Pekerjaan Pemasangan Batu Gilang Ex Cirebon Asimetris
m2
276,200.00
2.01.01.05.02.018 2.01.01.06 2.01.01.06.01 2.01.01.06.01.001 2.01.01.06.01.002 2.01.01.06.01.003 2.01.01.06.01.004 2.01.01.06.01.005 2.01.01.06.01.006 2.01.01.06.01.007 2.01.01.06.01.008 2.01.01.06.01.009 2.01.01.06.01.010 2.01.01.06.01.011 2.01.01.06.01.012 2.01.01.06.01.013 2.01.01.06.01.014 2.01.01.06.01.015 2.01.01.06.01.016
1 m2 Pekerjaan Pemasangan Wall Paper F. PEKERJAAN KAYU Kusen, Pintu, Jendela, Dan Jalusi 1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Jati 1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Kamper 1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Kruing 1 m2 Pekerjaan Pasang Pintu Klamp Kayu Jati 1 m2 Pekerjaan Pasang Pintu Klamp Kayu Kamper 1 m2 Pekerjaan Pasang Pintu Klamp Kayu Kruing 1 m2 Pekerjaan Pasang Daun Pintu Panil Kayu Jati 1 m2 Pekerjaan Pasang Pintu Panil Kayu Kamper 1 m2 Pekerjaan Pasang Pintu Panil Kayu Kruing 1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu Jati 1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu Kamper 1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu Kruing 1 m2 Pekerjaan Pasang Pintu/Jendela Jalusi Kayu Jati 1 m2 Pekerjaan Pasang Pintu/Jendela Jalusi Kayu Kamper 1 m2 Pekerjaan Pasang Pintu/Jendela Jalusi Kayu Kruing 1 m2 Pekerjaan Pasang Pintu Plywood Rangkap, Rangka Kayu Jati
m2
520,500.00
m3 m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
26,702,000.00 14,476,200.00 12,576,800.00 1,014,100.00 626,700.00 549,400.00 1,329,800.00 942,400.00 865,100.00 890,400.00 657,900.00 611,500.00 1,840,400.00 1,220,600.00 1,096,900.00 1,057,800.00
2.01.01.06.01.017
1 m2 Pekerjaan Pasang Pintu Plywood Rangkap, Rangka Kamper
m2
809,900.00
2.01.01.06.01.018
1 m2 Pekerjaan Pasang Pintu Plywood Rangkap, Rangka Kruing
m2
760,400.00
2.01.01.06.01.019
1 m2 Pekerjaan Pasang Pintu Teakwood Rangkap, Rangka Kayu Jati
m2
1,054,400.00
2.01.01.06.01.020
m2
812,200.00
m2
763,900.00
2.01.01.06.01.022
1 m2 Pekerjaan Pasang Pintu Teakwood Rangkap, Rangka Kayu Kamper 1 m2 Pekerjaan Pasang Pintu Teakwood Rangkap, Rangka Kayu Kruing 1 m2 Pekerjaan Pasang Pintu Tripleks Rangkap, Rangka Kayu Kamper
m2
761,500.00
2.01.01.06.01.023
1 m2 Pekerjaan Pasang Pintu Tripleks Rangkap, Rangka Kayu Kruing
m2
713,200.00
2.01.01.06.01.024
1 m2 Pekerjaan Pasang Pintu Lapis Aluminium, Rangka Kamper
m2
756,500.00
2.01.01.06.02 2.01.01.06.02.001 2.01.01.06.02.002
Kuda - Kuda Dan Rangka Atap 1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Jati Bentang 6 m 1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Kamper Bentang 6 M
m3 m3
25,576,000.00 13,350,200.00
2.01.01.06.02.003
1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Kruing Bentang 6 M
m3
11,450,800.00
2.01.01.06.02.004
1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Meranti Bentang 6 M
m3
9,598,700.00
2.01.01.06.02.005 2.01.01.06.02.006 2.01.01.06.02.007 2.01.01.06.02.008 2.01.01.06.02.009 2.01.01.06.02.010 2.01.01.06.02.011
1 m3 Pekerjaan Pemasangan Gording Kayu Jati 1 m3 Pekerjaan Pemasangan Gording Kayu Kamper 1 m3 Pekerjaan Pemasangan Gording Kayu Kruing 1 m3 Pekerjaan Pemasangan Gording Kayu Meranti 1 m2 Pekerjaan Pasang Rangka Atap Genteng Kodok 1 m2 Pekerjaan Pasang Rangka Atap Genteng Keramik 1 m2 Pekerjaan Pasang Rangka Atap Genteng Beton
m3 m3 m3 m3 m2 m2 m2
26,770,200.00 14,544,400.00 12,645,000.00 10,792,900.00 117,700.00 154,100.00 170,300.00
2.01.01.06.01.021
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
57
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.01.01.06.03 2.01.01.06.03.001
Rangka Langit - Langit Dan Listplank 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Jati (100x100)
m2
226,000.00
2.01.01.06.03.002
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Jati (50x100)
m2
282,500.00
2.01.01.06.03.003
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Jati (60x60)
m2
292,300.00
2.01.01.06.03.004
m2
164,300.00
2.01.01.06.03.005
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kamper (100x100) 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kamper (50x100)
m2
203,300.00
2.01.01.06.03.006
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kamper (60x60)
m2
208,500.00
2.01.01.06.03.007
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kruing (100x100)
m2
140,900.00
2.01.01.06.03.008
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kruing (50x100)
m2
173,200.00
2.01.01.06.03.009
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kruing (60x60)
m2
176,600.00
2.01.01.06.03.010
m2
124,700.00
2.01.01.06.03.011
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Meranti (100x100) 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Meranti (50x100)
m2
152,500.00
2.01.01.06.03.012
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Meranti (60x60)
m2
154,700.00
2.01.01.06.03.013 2.01.01.06.03.014 2.01.01.06.03.015 2.01.01.06.03.016 2.01.01.06.03.017
1 m' Pekerjaan Pasang Listplank Kayu Jati 3/20 1 m' Pekerjaan Pasang Listplank Kayu Kamper 3/20 1 m' Pekerjaan Pasang Listplank Kayu Jati 3/30 1 m' Pekerjaan Pasang Listplank Kayu Kamper 3/30 1 m' Pekerjaan Pasang Listplank Kayu Kamper 2 X 3/20 Cm (Double)
m' m' m' m' m'
266,000.00 161,400.00 269,200.00 162,600.00 223,100.00
2.01.01.06.03.018
1 m' Pekerjaan Pasang Listplank Kayu Kamper 2 X 2/20 Cm (Double)
m'
128,700.00
2.01.01.06.03.019
1 m' Pekerjaan Pasang Listplank Kayu Borneo 2 X 2/20 Cm (Double)
m'
100,300.00
2.01.01.06.04 2.01.01.06.04.001 2.01.01.06.04.002
Rangka Dinding Partisi 1 m2 Pekerjaan Pasang Rangka Dinding Pemisah Kayu Jati 1 m2 Pekerjaan Pasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Jati 1 m2 Pekerjaan Pasang Dinding Pemisah Plywood Rangkap Rangka Kayu Jati 1 m2 Pekerjaan Pasang Rangka Dinding Pemisah Kayu Kamper
m2 m2
668,400.00 808,700.00
m2
818,200.00
m2
357,200.00
m2
497,500.00
m2
507,000.00
m2 m2
308,800.00 449,100.00
m2
458,600.00
m2
433,100.00
2.01.01.06.04.003 2.01.01.06.04.004 2.01.01.06.04.005 2.01.01.06.04.006 2.01.01.06.04.007 2.01.01.06.04.008 2.01.01.06.04.009 2.01.01.06.04.010
1 m2 Pekerjaan Pasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Kamper 1 m2 Pekerjaan Pasang Dinding Pemisah Plywood Rangkap Rangka Kayu Kamper 1 m2 Pekerjaan Pasang Rangka Dinding Pemisah Kayu Kruing 1 m2 Pekerjaan Pasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Kruing 1 m2 Pekerjaan Pasang Dinding Pemisah Plywood Rangkap Rangka Kayu Kruing 1 m2 Pekerjaan Pasang Dinding Pemisah Gypsum Rangkap Rangka Kayu Kruing
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
58
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.01.01.07 2.01.01.07.01 2.01.01.07.01.001
G. PEKERJAAN FINSHING Penutup Atap Dan langit - Langit 1 m2 Pekerjaan Pasang Atap Genteng Karang Pilang Ex. Nglayur
m2
92,400.00
2.01.01.07.01.002
1 m2 Pekerjaan Pasang Atap Genteng Karang Pilang Ex. Wisma
m2
131,200.00
2.01.01.07.01.003 2.01.01.07.01.004 2.01.01.07.01.005 2.01.01.07.01.006 2.01.01.07.01.007 2.01.01.07.01.008 2.01.01.07.01.009 2.01.01.07.01.010 2.01.01.07.01.011
1 m2 Pekerjaan Pasang Atap Genteng Kodok Ex. Trenggalek 1 m2 Pekerjaan Pasang Atap Genteng Kodok Ex. Nglayur 1 m2 Pekerjaan Pasang Atap Genteng Keramik Glazzur 1 m2 Pekerjaan Pasang Atap Genteng Beton 1 m2 Pekerjaan Pasang Atap Genteng Metal 1 m2 Pasang Atap Sirap Kayu 1 m2 Pasang Atap Seng Gelombang 1 m2 Pekerjaan Pasang Atap Roof Light Fiber Glass 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 5 Mm (2,5 X 0,92) 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 5 Mm (2 X 0,92)
m2 m2 m2 m2 m2 m2 m2 m2 m2
97,500.00 102,500.00 220,100.00 100,900.00 170,800.00 653,700.00 74,600.00 63,300.00 89,200.00
m2
89,900.00
1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 5 Mm (1,8 X 0,92) 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (3 X 1,05)
m2
94,800.00
m2
66,500.00
m2
72,000.00
m2
68,900.00
m2
70,100.00
m2
77,900.00
2.01.01.07.01.019 2.01.01.07.01.020 2.01.01.07.01.021
1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (2,7 X 1,05) 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (2,4 X 1,05) 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (2,1 X 1,05) 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (1,5 X 1,05) 1 m' Pekerjaan Pasang Wuwung Genteng Palentong 1 m' Pekerjaan Pasang Wuwung Genteng Kodok 1 m' Pekerjaan Pasang Wuwung Genteng Karang Pilang Ex. Nglayur
m' m' m'
168,000.00 167,000.00 124,700.00
2.01.01.07.01.022 2.01.01.07.01.023 2.01.01.07.01.024 2.01.01.07.01.025 2.01.01.07.01.026 2.01.01.07.01.027 2.01.01.07.01.028 2.01.01.07.01.029
1 m' Pekerjaan Pasang Bubungan Genteng Keramik/ Glazzur 1 m' Pekerjaan Pasang Nok Genteng Beton 1 m' Pemasangan Nok Genteng Metal 1 m' Pasang Nok Sirap 1 m' Pasang Nok Atap Seng 1 m' Pekerjaan Pasang Nok Stel Rata 0.92 M 1 m' Pekerjaan Pasang Nok Stel Rata 1.05 M 1 m' Pekerjaan Pemasangan Wuwung Stel Gelombang Kecil 0.92 M
m' m' m' m2 m2 m' m' m'
211,500.00 138,000.00 78,900.00 87,500.00 55,800.00 68,500.00 75,800.00 132,400.00
2.01.01.07.01.030
1 m' Pekerjaan Pemasangan Wuwung Stel Gelombang Kecil 1.05 M
m'
146,300.00
2.01.01.07.01.031
1 m' Pekerjaan Pemasangan Wuwung Stel Gelombang Kecil 1.08 M
m'
157,200.00
2.01.01.07.01.032 2.01.01.07.01.033 2.01.01.07.01.034 2.01.01.07.01.035 2.01.01.07.01.036 2.01.01.07.01.037 2.01.01.07.01.038 2.01.01.07.01.039
1 M2 Pekerjaan Water Proofing Membran 1 M2 Pekerjaan Water Proofing Coating 1 m2 Pekerjaan Langit - Langit Asbes Tebal 4 Mm 1 m2 Pekerjaan Langit - Langit Asbes Tebal 5 Mm 1 m2 Pekerjaan Langit - Langit Asbes Tebal 6 Mm 1 m2 Pekerjaan Langit - Langit Tripleks Uk. 120X240,Tbl 3 Mm 1 m2 Pekerjaan Langit - Langit Tripleks Uk. 120X240,Tbl 4 Mm 1 m2 Pekerjaan Langit - Langit Tripleks Uk. 120X240, Tbl 6 Mm
m2 m2 m2 m2 m2 m2 m2 m2
201,200.00 144,800.00 53,700.00 54,100.00 59,700.00 49,700.00 55,100.00 61,200.00
2.01.01.07.01.040 2.01.01.07.01.041
1 m2 Pekerjaan Langit - Langit Lambrizing Kayu, Tebal 9 Mm 1 m2 Pekerjaan Langit - Langit Gypsum Board, (120X240) Tebal 9 Mm
m2 m2
494,200.00 53,900.00
2.01.01.07.01.042 2.01.01.07.01.043
1 m' Pekerjaan List Langit - Langit Kayu Profil 1 m' Pekerjaan List Langit - Langit Gypsum
m' m'
18,300.00 42,800.00
2.01.01.07.01.012 2.01.01.07.01.013 2.01.01.07.01.014 2.01.01.07.01.015 2.01.01.07.01.016 2.01.01.07.01.017 2.01.01.07.01.018
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
59
KODE BARANG
URAIAN KEGIATAN
2.01.01.07.02 2.01.01.07.02.001 2.01.01.07.02.002 2.01.01.07.02.003 2.01.01.07.02.004 2.01.01.07.02.005 2.01.01.07.02.006 2.01.01.07.02.007 2.01.01.07.02.008
Sanitair Pekerjaan Pemasangan 1 Buah Kloset Duduk Pekerjaan Pemasangan 1 Buah Kloset Jongkok Porselen Pekerjaan Pemasangan 1 Buah Kloset Jongkok Teraso Pekerjaan Pemasangan 1 Buah Urinoir Pekerjaan Pemasangan 1 Buah Wastafel Pekerjaan Pemasangan 1 Buah Bak Mandi Fiberglass Pekerjaan Pemasangan 1 Buah Bak Mandi Teraso Pekerjaan Pemasangan 1 Buah Bak Mandi Batu Bata Volume 0.3 m3
2.01.01.07.02.009
2.01.01.07.03.007 2.01.01.07.03.008 2.01.01.07.03.009
Pekerjaan Pemasangan 1 Buah Bak Cuci Piring Stainless Steel Dan Accessories Pekerjaan Pemasangan 1 Buah Floor Drain Pekerjaan Pemasangan 1 Buah Bak Kontrol Pasangan Batu Bata Uk 30 X 30 Cm, Tinggi 35 Cm Pekerjaan Pemasangan 1 Buah Bak Kontrol Pasangan Batu Bata Uk. 45 X 45 Cm, Tinggi 50 Cm Pekerjaan Pemasangan 1 Buah Bak Kontrol Pasangan Batu Bata Uk. 60 X 60 Cm, Tinggi 65 Cm 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1/2" 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 3/4" 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1" 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1 1/2" 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 3" 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 4" Pekerjaan Pemasangan 1 Buah Kran Air Ø 3/4" Atau 1/2" 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 1/2" 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 3/4" 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 1" 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 1 1/2" 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 2" 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 2 1/2" 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 3" 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 4" 1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 2" 1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 3" 1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 4" Pekerjaan Besi & Allumunium 1 Kg Pemasangan Besi Profil IWF 1 Kg Pemasangan Besi Siku 1 Kg Pemasangan Besi Profil C 100 Kg Pekerjaan Perakitan Besi Profil 1 Cm Pekerjaan Pengelasan Dengan Las Listrik 1 m2 Pemasangan Rangka Besi Hollow 1.40.40.2 Mm, Modul 60.120 Dinding Partisi Penutup Kalsiboard 1 m' Pekerjaan Kusen Alluminium 4" 1 m' Pekerjaan Kusen Alluminium 3" 1 m2 Pasang Rangka Atap Galvalume Untuk Genteng Asbes/Spandex
2.01.01.07.03.010
SAT
JUMLAH HARGA
Buah Buah Buah Buah Buah Buah Buah Buah
2,150,200.00 663,600.00 474,600.00 2,607,700.00 927,400.00 1,027,800.00 608,300.00 2,004,800.00
Buah
424,300.00
Buah Buah
32,600.00 477,600.00
Buah
727,400.00
Buah
903,000.00
m' m' m' m' m' m' Buah m' m' m' m' m' m' m' m' m' m' m'
63,900.00 74,400.00 103,700.00 161,600.00 335,500.00 479,100.00 52,800.00 25,000.00 28,000.00 32,300.00 49,900.00 74,100.00 84,600.00 129,100.00 177,400.00 44,100.00 83,500.00 107,200.00
Kg Kg Kg Kg Kg m2
28,600.00 27,000.00 28,600.00 40,300.00 5,200.00 194,800.00
m' m' m2
133,200.00 119,000.00 235,200.00
1 m2 Pasang Rangka Atap Galvalume Untuk Genteng Biasa/Metal
m2
264,700.00
2.01.01.07.03.011
1 m2 Pasang Rangka Langit-Langit Hollow 40.40.2, Modul 60.60
m2
89,400.00
2.01.01.07.03.012 2.01.01.07.03.013
1 m2 Pekerjaan Pasang Pintu Kaca Rangka Alluminium 1 m2 Pekerjaan Pemasangan Pintu Alluminium Strip Lebar 8 Cm
m2 m2
655,400.00 1,165,900.00
2.01.01.07.03.014 2.01.01.07.03.015 2.01.01.07.03.016 2.01.01.07.03.017 2.01.01.07.03.018
1 m2 Pekerjaan Pemasangan Rolling Door Besi 1 m2 Pekerjaan Pemasangan Rolling Door Alumunium 1 m2 Pekerjaan Pemasangan Pintu Besi Lipat 1 m2 Pekerjaan Pasang Jendela Nako Dan Teralis 1 m2 Pekerjaan Pasang Terali Besi Strip
m2 m2 m2 m2 m2
565,000.00 717,700.00 741,900.00 390,200.00 589,000.00
2.01.01.07.02.010 2.01.01.07.02.011 2.01.01.07.02.012 2.01.01.07.02.013 2.01.01.07.02.014 2.01.01.07.02.015 2.01.01.07.02.016 2.01.01.07.02.017 2.01.01.07.02.018 2.01.01.07.02.019 2.01.01.07.02.020 2.01.01.07.02.021 2.01.01.07.02.022 2.01.01.07.02.023 2.01.01.07.02.024 2.01.01.07.02.025 2.01.01.07.02.026 2.01.01.07.02.027 2.01.01.07.02.028 2.01.01.07.02.029 2.01.01.07.02.030 2.01.01.07.02.031 2.01.01.07.03 2.01.01.07.03.001 2.01.01.07.03.002 2.01.01.07.03.003 2.01.01.07.03.004 2.01.01.07.03.005 2.01.01.07.03.006
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
60
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.01.01.07.03.019
1 m' Pekerjaan Pasang Talang Datar/Jurai Seng Bjls 28 Lebar 90
m'
309,400.00
2.01.01.07.03.020 2.01.01.07.03.021
1 m' Pekerjaan Pasang Talang Miring Seng Bjls 28 1 m' Pekerjaan Pasang Talang 1/2 Lingkaran D-15 Cm Seng Bjls 30 Lebar 45 Cm 1 m2 Pekerjaan Pemasangan Fitrase Ex. Corais & Aquirlda 1 m2 Pekerjaan Pemasangan Sun Screen 1 m2 Pekerjaan Pemasangan Vertical Blind Dan Venetions Blind
m' m'
205,900.00 111,400.00
m2 m2 m2
151,200.00 417,300.00 221,000.00
m2 m2 Unit
139,400.00 689,800.00 432,900.00
Unit
1,572,500.00
2.01.01.07.03.029 2.01.01.07.03.030
1 m2 Pekerjaan Pemasangan Kawat Nyamuk 1 m2 Pekerjaan Pemasangan Pagar Model Brc/Pmg A Pekerjaan Pemasangan Pasang Tiang Pagar Model Pmg 2" Tinggi 1,5 M Pekerjaan Pasang 1 Unit Daun Pintu Swing Ganda Type Brc/Pmg Uk. (1,2M X 3M) 1 m' Railing Tangga Besi Hollow 1 m2 Kanopi rangka besi hollow & Penutup atap Polycarbonate
m' m2
319,600.00 558,300.00
2.01.01.07.03.031 2.01.01.07.03.032 2.01.01.07.04 2.01.01.07.04.001 2.01.01.07.04.002 2.01.01.07.04.003 2.01.01.07.04.004 2.01.01.07.04.005 2.01.01.07.04.006 2.01.01.07.04.007 2.01.01.07.04.008
1 m2 Pembuatan & Pemasangan Pagar Besi Hollow 1 m2 Pembuatan & Pemasangan Pagar Besi Tempa Pekerjaan Kunci Dan Kaca Pekerjaan Pemasangan 1 Buah Kunci Tanam Antik Pekerjaan Pemasangan 1 Buah Kunci Tanam Biasa Pekerjaan Pemasangan 1 Buah Kunci Tanam Kamar Mandi Pekerjaan Pemasangan 1 Buah Kunci Silinder Pekerjaan Pemasangan 1 Buah Engsel Pintu Pekerjaan Pemasangan 1 Buah Engsel Jendela Kupu-Kupu Pekerjaan Pemasangan 1 Buah Engsel Angin Pekerjaan Pemasangan 1 Buah Engsel Hidrolis Pintu Almunium
m2 m2
590,600.00 700,100.00
Buah Buah Buah Buah Buah Buah Buah Buah
240,000.00 172,100.00 142,900.00 126,100.00 65,200.00 45,600.00 47,000.00 281,500.00
2.01.01.07.04.009 2.01.01.07.04.010 2.01.01.07.04.011 2.01.01.07.04.012 2.01.01.07.04.013 2.01.01.07.04.014 2.01.01.07.04.015 2.01.01.07.04.016 2.01.01.07.04.017 2.01.01.07.04.018 2.01.01.07.04.019 2.01.01.07.05 2.01.01.07.05.001
Pekerjaan Pemasangan Spring Knip Pemasangan 1 Buah Kait Angin Pemasangan 1 Buah Door Closer Pemasangan 1 Buah Kunci Slot Pemasangan 1 Buah Door Holder Pemasangan 1 Buah Door Stopper Pekerjaan Pemasangan 1 Buah Rel Pintu Dorong Pemasangan 1 m2 Kaca Tebal 3 Mm Pemasangan 1 m2 Kaca Tebal 5 Mm Pemasangan 1 m2 Kaca Tebal 8 Mm 1 Buah Pemasangan Grendel Biasa (Besar) Pengecatan 1 m2 Pekerjaan Mengerok Cat Lama Permukaan Kayu Secara Manual
Stel Buah Buah Buah Buah Buah Buah m2 m2 m2 Buah
76,200.00 52,200.00 241,500.00 51,300.00 93,000.00 40,900.00 505,200.00 145,700.00 159,800.00 267,600.00 41,800.00
m2
14,700.00
2.01.01.07.05.002 2.01.01.07.05.003 2.01.01.07.05.004
m2 m2 m2
13,200.00 47,600.00 57,100.00
m2
74,400.00
2.01.01.07.05.006 2.01.01.07.05.007
1 m2 Pekerjaan Mendempul Dan Menggosok Kayu 1 m2 Pekerjaan Pengecatan Bidang Kayu Lama 1 m2 Pekerjaan Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 2 Lapis Cat Penutup 1 m2 Pekerjaan Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 3 Lapis Cat Penutup 1 m2 Pekerjaan Pelaburan Bidang Kayu Dengan Pelitur 1 m2 Pekerjaan Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter
m2 m2
66,700.00 30,100.00
2.01.01.07.05.008 2.01.01.07.05.009
1 m2 Pekerjaan Pelaburan Bidang Kayu Dengan Vernis 1 m2 Pekerjaan Mengikis/Mengerok Permukaan Cat Tembok Lama
m2 m2
44,600.00 14,800.00
2.01.01.07.05.010
1 m2 Pekerjaan Pencucian Bidang Permukaan Tembok Yang Pernah Dicat 1 m2 Pekerjaan Mengapur Dinding Tembok Baru Sampai Baik 3 Kali
m2
14,100.00
m2
5,800.00
2.01.01.07.03.022 2.01.01.07.03.023 2.01.01.07.03.024 2.01.01.07.03.025 2.01.01.07.03.026 2.01.01.07.03.027 2.01.01.07.03.028
2.01.01.07.05.005
2.01.01.07.05.011
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
61
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.01.01.07.05.012
1 m2 Pekerjaan Mengapur Dinding Tembok Lama Sampai Baik 3 Kali
m2
2,500.00
2.01.01.07.05.013
1 m2 Pekerjaan Pengecatan Tembok Baru 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Interior 1 m2 Pekerjaan Pengecatan Tembok Lama 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Interior 1 M2 Pengecatan Tembok Exterior 1 m2 Pekerjaan Pengerokan Karat Pada Permukaan Baja Secara Manual 1 m2 Pekerjaan Pengecatan Permukaan Baja Dengan Meni Besi
m2
22,000.00
m2
16,800.00
m2 m2
72,200.00 14,700.00
m2
32,100.00
1 m2 Pekerjaan Pengecatan Permukaan Baja Dengan Meni Besi Dan Perancah 1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Manual 4 Lapis 1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Manual 3 Lapis 1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Manual 1 Lapis Mutakhir 1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Semprot Dengan Sistem 3 Lapis Cat Mutakhir 1 m2 Pekerjaan Pengecatan Plafond Instalasi Listrik Pemasangan 1 Titik Stop Kontak Pemasangan 1 Titik Lampu (Menggunakan Kabel Nya) Pemasangan 1 Titik Lampu (Menggunakan Kabel Nym) Pekerjaan Pemasangan Saklar Tunggal Per Titik Pekerjaan Pemasangan Saklar Ganda Per Titik 1 Unit Pemasangan Lampu 1 x 18 Watt (Lengkap) 1 Unit Pemasangan Lampu 1 x 36 Watt (Lengkap) 1 Buah Pemasangan Lampu Sl 18 Watt 1 Buah Pemasangan Lampu Sl 23 Watt 1 Buah Pemasangan Lampu Pijar 25 Watt 1 Buah Pemasangan Lampu Down Light + Fitting 1 Titik Pemasangan Box Panel 1 Titik Pasangan Instalasi antena TV H. PAVING & PERKERASAN JALAN Perkerasan Paving 1 m2 Pemasangan Tegel Trotoar 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Abu-Abu Segi Enam (K-300) 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Bewarna Segi Enam (K-300) 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Abu - Abu Persegi Panjang (K - 300) 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Bewarna Persegi Panjang (K-300) 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu-Abu Segi Enam (K-300) 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Bewarna Segi Enam (K-300) 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu - Abu Persegi Panjang (K-300) 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Bewarna Persegi Panjang (K-300) 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu - Abu Persegi Panjang (K-175) Untuk Jalan Lingkungan Hidup 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu - Abu Persegi Panjang (K-200) Untuk Jalan Lingkungan Hidup 1 m' Pekerjaan Pemasangan Kanstin Uk. 15.35.50 (K-300) 1 m' Pekerjaan Pemasangan Kanstin Uk. 15.25.40 (K-300)
m2
64,900.00
m2
66,700.00
m2
152,500.00
m2
35,700.00
m2
184,500.00
m2
27,000.00
2.01.01.07.05.014 2.01.01.07.05.015 2.01.01.07.05.016 2.01.01.07.05.017 2.01.01.07.05.018 2.01.01.07.05.019 2.01.01.07.05.020 2.01.01.07.05.021 2.01.01.07.05.022 2.01.01.07.05.023 2.01.01.07.06 2.01.01.07.06.001 2.01.01.07.06.002 2.01.01.07.06.003 2.01.01.07.06.004 2.01.01.07.06.005 2.01.01.07.06.006 2.01.01.07.06.007 2.01.01.07.06.008 2.01.01.07.06.009 2.01.01.07.06.010 2.01.01.07.06.011 2.01.01.07.06.012 2.01.01.07.06.013 2.01.02.01 2.01.02.01.01 2.01.02.01.01.001 2.01.02.01.01.002 2.01.02.01.01.003 2.01.02.01.01.004 2.01.02.01.01.005 2.01.02.01.01.006 2.01.02.01.01.007 2.01.02.01.01.008 2.01.02.01.01.009 2.01.02.01.01.010 2.01.02.01.01.011 2.01.02.01.01.012 2.01.02.01.01.013
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
62
Titik Titik Titik Titik Titik Buah Buah Buah Buah Buah Buah Titik Titik
159,300.00 213,800.00 265,100.00 42,500.00 48,100.00 210,300.00 326,300.00 47,900.00 55,100.00 15,200.00 120,400.00 1,031,400.00 282,400.00
m2 m2
347,900.00 197,700.00
m2
186,900.00
m2
175,200.00
m2
186,900.00
m2
163,400.00
m2
175,200.00
m2
163,400.00
m2
175,200.00
m2
136,500.00
m2
146,700.00
m' m'
142,700.00 129,900.00
KODE BARANG
URAIAN KEGIATAN
2.01.02.01.01.014 2.01.02.01.02 2.01.02.01.02.001 2.01.02.01.02.002 2.01.02.01.02.003 2.01.02.01.02.004 2.01.02.01.02.005 2.01.02.01.02.006 2.01.02.01.02.007 2.01.02.01.02.008 2.01.02.01.02.009 2.01.02.01.02.010 2.01.02.01.02.011 2.01.02.01.03 2.01.02.01.03.001 2.01.02.01.03.002 2.01.02.01.03.003
1 m' Pekerjaan Pemasangan Stopper/ Uskup (K-300) Pengadaan Agregat 1 m3 Pengadaan Agregat Kelas A 1 m3 Pengadaan Agregat Kelas B 1 m3 Pengadaan Agregat Kelas S 1 m3 Pengadaan Lapis Pondasi Agregat (Cbr 60%) 1 m3 Pengadaan Lapis Permukaan Agregat (Cbr 60%) 1 m3 Pengadaan Agregat Kelas C 1 m3 Pengadaan Agregat Halus 1 m3 Pengadaan Agregat Lolos Screen (0-5) 1 m3 Pengadaan Agregat Lolos Screen (5-9.5) 1 m3 Pengadaan Agregat Lolos Screen (9.5-19) 1 m3 Pengadaan Agregat Pecah Kasar Pekerjaan Drainase (Divisi 2) 1 m3 Galian Untuk Selokan Drainase Dan Saluran Air 1 m3 Pasangan Batu Dengan Mortar 1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. Dalam 35-45 Cm
2.01.02.01.03.004
SAT
JUMLAH HARGA
m'
45,600.00
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
296,100.00 280,100.00 271,200.00 286,600.00 254,600.00 261,700.00 211,300.00 270,000.00 224,300.00 231,900.00 261,700.00
m3 m3 m'
50,300.00 794,500.00 808,800.00
1 M' Gorong-Gorong Pipa Beton Bertulang, Diameter 55-65 Cm
m'
1,132,200.00
2.01.02.01.03.005
1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. Dalam 75-85 Cm
m'
2,326,600.00
2.01.02.01.03.006
1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. Dalam 95-105 Cm
m'
2,925,400.00
2.01.02.01.03.007
1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan Dia. Dalam 20 Cm
m'
273,800.00
2.01.02.01.03.008
1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan Dia. Dalam 25 Cm
m'
300,000.00
2.01.02.01.03.009
1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan Dia. Dalam 30 Cm
m'
326,600.00
2.01.02.01.03.010 2.01.02.01.04 2.01.02.01.04.001 2.01.02.01.04.002 2.01.02.01.04.003 2.01.02.01.04.004 2.01.02.01.04.005 2.01.02.01.04.006 2.01.02.01.04.007
1 m3 Bahan Porous Untuk Bahan Penyaring (Filter) Pekerjaan Tanah (Divisi 3) 1 m3 Galian Biasa (Termasuk Pembuangan Sisa Galian) 1 m3 Galian Batu Lunak (Termasuk Pembuangan Sisa Galian) 1 m3 Galian Batu (Termasuk Pembuangan Sisa Galian) 1 m3 Galian Struktur Dengan Kedalaman 0-2 Meter 1 m3 Galian Struktur Dengan Kedalaman 2-4 Meter 1 m3 Galian Struktur Dengan Kedalaman 4-6 Meter 1 m3 Galian Perkerasan Beraspal Dengan Cold Milling Machine (Termasuk Pembuangan Sisa Galian) 1 m3 Galian Perkerasan Beraspal Tanpa Cold Milling Machine (Termasuk Pembuangan Sisa Galian) 1 m2 Penyiapan Badan Jalan 1 Buah Pemotongan Pohon Pilihan Diameter 15 – 30 Cm (Termasuk Pembuangan Dengan Dump Truck) 1 Buah Pemotongan Pohon Pilihan Diameter 30 – 50 Cm (Termasuk Pembuangan Dengan Dump Truck) 1 Buah Pemotongan Pohon Pilihan Diameter 50 – 75 Cm (Termasuk Pembuangan Dengan Dump Truck) 1 Buah Pemotongan Pohon Pilihan Diameter > 75 Cm (Termasuk Pembuangan Dengan Dump Truck) 1 m3 Galian Perkerasan Berbutir (Termasuk Pembuangan Dengan Dump Truck) 1 m2 Pemasangan Geotekstile Pekerjaan Pelebaran Perkerasan Dan Bahu Jalan (Divisi 4) 1 m3 Lapis Pondasi Agregat Kelas A 1 m3 Lapis Pondasi Agregat Kelas B 1 Ton Semen Untuk Lapis Pondasi Semen Tanah 1 m3 Lapis Pondasi Semen Tanah (Untuk Pelebaran Perkerasan Dan Bahu Jalan) 1 m2 Agregat Penutup Burtu
m3
335,200.00
m3 m3 m3 m3 m3 m3 m3
131,700.00 209,400.00 246,700.00 21,200.00 22,100.00 24,800.00 236,300.00
m3
1,004,100.00
2.01.02.01.04.008 2.01.02.01.04.009 2.01.02.01.04.010 2.01.02.01.04.011 2.01.02.01.04.012 2.01.02.01.04.013 2.01.02.01.04.014 2.01.02.01.04.015 2.01.02.01.05 2.01.02.01.05.001 2.01.02.01.05.002 2.01.02.01.05.003 2.01.02.01.05.004 2.01.02.01.05.005
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
63
m2 Buah
700.00 164,900.00
Buah
198,400.00
Buah
265,200.00
Buah
483,800.00
m3
169,100.00
m2
49,300.00
m3 m3 Ton m3
768,400.00 747,800.00 2,352,400.00 695,900.00
m2
13,000.00
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.01.02.01.05.006 2.01.02.01.05.007 2.01.02.01.05.008 2.01.02.01.05.009 2.01.02.01.06 2.01.02.01.06.001 2.01.02.01.06.002 2.01.02.01.06.003 2.01.02.01.06.004 2.01.02.01.06.005 2.01.02.01.06.006 2.01.02.01.06.007
1 Liter Bahan Aspal Untuk Pekerjaan Pelaburan 1 Liter Lapis Resap Pengikat 1 m3 Lapis Pondasi Agregat Kelas S 1 m2 Lapisan Perkerasan 5-10 Cm (Padat Digilas) Pekerjaan Pekerasan Non Aspal (Divisi 5) 1 m3 Lapis Pondasi Agregat Kelas A 1 m3 Lapis Pondasi Agregat Kelas B 1 m3 Lapis Permukaan Agregat Tanpa Penutup Aspal 1 m3 Lapis Pondasi Semen Tanah 1 Ton Semen Untuk Lapis Pondasi Semen Tanah 1 m3 Lapis Pondasi Bawah Beton Kurus 1 m3 Lapis Pondasi Atas Bersemen (Cement Treated Base) (Ctb)
Liter Liter m3 m2
14,000.00 15,000.00 717,400.00 70,100.00
m3 m3 m3 m3 Ton m3 m3
765,300.00 728,600.00 566,300.00 609,500.00 2,415,400.00 1,642,100.00 785,600.00
2.01.02.01.06.008 2.01.02.01.06.009 2.01.02.01.07 2.01.02.01.07.001 2.01.02.01.07.002 2.01.02.01.07.003 2.01.02.01.07.004 2.01.02.01.07.005 2.01.02.01.07.006 2.01.02.01.07.007
1 m3 Lapis Pondasi Bawah (Cement Treated Sub Base) (Ctsb) 1 m3 Lapis Pondasi Agregat Tanpa Penutup Aspal Pekerjaan Pekerasan Aspal (Divisi 6) 1 Liter Lapis Resap Pengikat-Aspal Cair 1 Liter Lapis Perekat-Aspal Cair 1 m2 Agregat Penutup Burtu 1 m2 Agregat Penutup Burda 1 Ton Latasir Kelas A (Ss-A) 1 Ton Latasir Kelas B (Ss-B) 1 Ton Lataston Lapis Aus (Hrs-Wc) (Gradasi Senjang/Semi Senjang)
m3 m3
835,300.00 538,400.00
Liter Liter m2 m2 Ton Ton Ton
13,800.00 13,500.00 23,100.00 36,800.00 1,714,100.00 1,441,200.00 1,584,200.00
2.01.02.01.07.008
1 Ton Lataston Lapis Aus Perata (Hrs-Wc(L)) (Gradasi Senjang/Semi Senjang) 1 Ton Lataston Lapis Pondasi (Hrs-Base) (Gradasi Senjang/Semi Senjang) 1 Ton Lataston Lapis Pondasi Perata (Hrs-Base(L)) (Gradasi Senjang/Semi Senjang) 1 Ton Laston Lapis Aus (Ac-Wc) 1 Ton Laston Lapis Aus Perata (Ac-Wc(L)) 1 Ton Laston Lapis Antara (Ac-Bc) 1 Ton Laston Lapis Antara Perata (Ac-Bc(L)) 1 Ton Laston Lapis Pondasi (Ac-Base) 1 Ton Laston Lapis Pondasi Perata (Ac-Base(L)) 1 m3 Campuran Aspal Dingin Untuk Pelapisan 1 m3 Lapis Permukaan Penetrasi Macadam 1 m3 Lapis Pondasi/Perata Penetrasi Macadam 1 Liter Lapis Resap Pengikat-Aspal Emulsi 1 Liter Lapis Perekat-Aspal Emulsi 1 Liter Bahan Aspal Untuk Pekerjaan Pelaburan 1 Liter Aspal Cair Emulsi Untuk Precoated 1 Liter Aspal Emulsi Untuk Precoated Pekerjaan Struktur (Divisi 7) 1 m3 Beton Mutu Tinggi Fc’=45 Mpa 1 m3 Beton Mutu Tinggi Fc’=35 Mpa 1 m3 Beton Mutu Sedang Fc’=30 Mpa 1 m3 Beton Mutu Sedang Fc’= 25 Mpa 1 m3 Beton Mutu Sedang Fc’= 20 Mpa 1 m3 Beton Mutu Rendah Fc’= 15 Mpa 1 m3 Beton Siklop Fc’=15 Mpa 1 m3 Beton Mutu Rendah Fc’= 10 Mpa 1 Kg Anyaman Kawat Yang Dilas (Welded Wire Mesh) 1 Kg Pemasangan Jembatan Rangka Baja Pekerjaan Pengembalian Kondisi Dan Pekerjaan Minor (Divisi 8)
Ton
1,584,200.00
Ton
1,401,600.00
Ton
1,401,600.00
Ton Ton Ton Ton Ton Ton m3 m3 m3 Liter Liter Liter Liter Liter
1,375,000.00 1,412,100.00 1,347,000.00 1,347,000.00 1,245,200.00 1,245,200.00 2,753,700.00 1,819,300.00 1,925,700.00 14,800.00 8,800.00 12,900.00 30,100.00 48,400.00
m3 m3 m3 m3 m3 m3 m3 m3 Kg Kg
3,515,700.00 3,333,600.00 3,324,900.00 2,403,000.00 2,319,300.00 1,619,800.00 1,135,800.00 1,379,100.00 19,700.00 1,800.00
m3 m3 m3
704,100.00 703,200.00 421,100.00
2.01.02.01.07.009 2.01.02.01.07.010 2.01.02.01.07.011 2.01.02.01.07.012 2.01.02.01.07.013 2.01.02.01.07.014 2.01.02.01.07.015 2.01.02.01.07.016 2.01.02.01.07.017 2.01.02.01.07.018 2.01.02.01.07.019 2.01.02.01.07.020 2.01.02.01.07.021 2.01.02.01.07.022 2.01.02.01.07.023 2.01.02.01.07.024 2.01.02.01.08 2.01.02.01.08.001 2.01.02.01.08.002 2.01.02.01.08.003 2.01.02.01.08.004 2.01.02.01.08.005 2.01.02.01.08.006 2.01.02.01.08.007 2.01.02.01.08.008 2.01.02.01.08.009 2.01.02.01.08.010 2.01.02.01.09 2.01.02.01.09.001 2.01.02.01.09.002 2.01.02.01.09.003
1 m3 Pondasi Agregat Kls. A Untuk Pekerjaan Minor 1 m3 Pondasi Agregat Kls. B Untuk Pekerjaan Minor 1 m3 Agregat Utk. Lapis Pond. Jalan-Tanpa Penutup Aspal Utk. Pek. Minor
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
64
KODE BARANG 2.01.02.01.09.004 2.01.02.01.09.005 2.01.02.01.09.006 2.01.02.01.09.007 2.01.02.01.09.008 2.01.02.01.09.009 2.01.02.01.09.010 2.01.02.01.09.011 2.01.02.01.09.012 2.01.02.01.09.013 2.01.02.01.10 2.01.02.01.10.001 2.01.02.01.10.002 2.01.02.01.10.003 2.01.02.01.10.004 2.01.02.01.10.005 2.01.02.01.10.006 2.01.02.01.10.007 2.01.02.01.10.008 2.01.02.01.10.009 2.01.02.01.10.010 2.01.02.01.10.011 2.01.02.01.10.012 2.01.02.01.10.013 2.01.02.01.10.014 2.01.02.01.10.015 2.01.02.01.10.016 2.01.02.01.10.017 2.01.02.01.10.018 2.01.02.01.10.019 2.01.02.01.10.020 2.01.02.01.10.021 2.01.02.01.10.022 2.01.02.01.10.023 2.01.02.01.10.024 2.01.02.01.10.025 2.01.02.01.10.026 2.01.02.01.10.027 2.01.02.01.10.028 2.01.02.01.10.029 2.01.02.01.10.030 2.01.02.01.10.031 2.01.02.01.10.032 2.01.02.01.10.033 2.01.02.01.10.034 2.01.02.01.10.035 2.01.02.01.10.036 2.01.02.01.10.037 2.01.02.01.10.038 2.01.02.01.10.039 2.01.02.01.10.040 2.01.02.01.10.041 2.01.02.01.10.042 2.01.02.01.10.043 2.01.02.01.10.044 2.01.02.01.10.045 2.01.02.01.10.046 2.01.02.01.10.047 2.01.02.01.10.048 2.01.02.01.10.049 2.01.02.01.10.050
URAIAN KEGIATAN 1 m3 Waterbound Macadam Utk. Pekerjaan Minor 1 m3 Lapis Pondasi Agregat Kelas S Untuk Pekerjaan Minor 1 m3 Camp. Aspal Panas Utk. Pek. Minor 1 m3 Penetrasi Macadam Utk. Pek. Minor 1 m3 Camp. Aspal Dingin Utk. Pek. Minor 1 Liter Residu Bitumen Untuk Pek.Minor 1 Bh Patok Pengarah 1 Bh Patok Kilometer 1 Bh Patok Hektometer 1 Bh Paku Jalan Biaya Pemakaian Alat Berat 1 Jam Pemakaian Asphalt Mixing Plant 1 Jam Pemakaian Asphalt Finisher 1 Jam Pemakaian Asphalt Sprayer 1 Jam Pemakaian Bulldozer 100-150 Hp 1 Jam Pemakaian Compressor 4000-6500 L\M 1 Jam Pemakaian Concrete Mixer 0.3-0.6 m3 1 Jam Pemakaian Crane 10-15 Ton 1 Jam Pemakaian Dump Truck 3.5 Ton 1 Jam Pemakaian Dump Truck 10 Ton 1 Jam Pemakaian Excavator 80-140 Hp 1 Jam Pemakaian Flat Bed Truck 3-4 m3 1 Jam Pemakaian Generator Set 1 Jam Pemakaian Motor Grader >100 Hp 1 Jam Pemakaian Track Loader 75-100 Hp 1 Jam Pemakaian Wheel Loader 1.0-1.6 m3 1 Jam Pemakaian Three Wheel Roller 6-8 T 1 Jam Pemakaian Tandem Roller 6-8 T. 1 Jam Pemakaian Tire Roller 8-10 T. 1 Jam Pemakaian Vibratory Roller 5-8 T. 1 Jam Pemakaian Concrete Vibrator 1 Jam Pemakaian Stone Crusher 1 Jam Pemakaian Water Pump 70-100 Mm 1 Jam Pemakaian Water Tanker 3000-4500 L. 1 Jam Pemakaian Pedestrian Roller 1 Jam Pemakaian Tamper 1 Jam Pemakaian Jack Hammer 1 Jam Pemakaian Fulvi Mixer 1 Jam Pemakaian Concrete Pump 1 Jam Pemakaian Trailer 20 Ton 1 Jam Pemakaian Pile Driver + Hammer 1 Jam Pemakaian Crane On Track 35 Ton 1 Jam Pemakaian Welding Set 1 Jam Pemakaian Bore Pile Machine 1 Jam Pemakaian Asphalt Liquid Mixer 1 Jam Pemakaian Tronton 1 Jam Pemakaian Cold Milling 1 Jam Pemakaian Rock Drill Breaker 1 Jam Pemakaian Cold Recycler 1 Jam Pemakaian Hot Recycler 1 Jam Pemakaian Aggregat (Chip) Spreader 1 Jam Pemakaian Asphalt Distributor 1 Jam Pemakaian Slip Form Paver 1 Jam Pemakaian Concrete Pan Mixer 1 Jam Pemakaian Concrete Breaker 1 Jam Pemakaian Aspahlt Tanker 1 Jam Pemakaian Cement Tanker 1 Jam Pemakaian Condrete Mixer (350) 1 Jam Pemakaian Vibrating Rammer 1 Jam Pemakaian Truk Mixer (Agitator) 1 Jam Pemakaian Bore Pile Machine
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
65
SAT
JUMLAH HARGA
m3 m3 m3 m3 m3 Liter Buah Buah Buah Buah
355,600.00 717,400.00 3,172,000.00 1,815,900.00 2,554,600.00 14,200.00 196,900.00 575,400.00 283,100.00 412,500.00
Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam
9,960,400.00 593,100.00 63,300.00 1,174,500.00 224,600.00 193,300.00 599,600.00 336,200.00 636,200.00 708,300.00 642,700.00 599,900.00 716,300.00 629,700.00 579,300.00 275,800.00 372,100.00 603,300.00 442,900.00 51,700.00 904,700.00 44,800.00 343,400.00 70,700.00 47,500.00 33,700.00 1,793,900.00 347,700.00 674,500.00 313,500.00 782,400.00 142,300.00 1,096,300.00 43,500.00 701,700.00 2,088,800.00 357,000.00 7,862,400.00 9,075,700.00 664,900.00 469,300.00 637,800.00 846,700.00 1,116,600.00 733,200.00 674,000.00 94,100.00 51,400.00 824,700.00 1,265,900.00
KODE BARANG 2.01.02.01.10.051 2.01.02.01.10.052 2.01.02.01.10.053 2.01.02.02 2.01.02.02.01 2.01.02.02.01.001 2.01.02.02.01.002 2.01.02.02.01.003 2.01.02.02.01.004 2.01.02.02.01.005 2.01.02.02.01.006 2.01.02.02.01.007 2.01.02.02.02 2.01.02.02.02.001 2.01.02.02.02.002 2.01.02.02.02.003 2.01.02.02.02.004
URAIAN KEGIATAN 1 Jam Pemakaian Crane On Track 75-100 Ton 1 Jam Pemakaian Blending Equipment 1 Jam Pemakaian Asphalt Liquid Mixer I. PEKERJAAN PENGAIRAN Pekerjaan Pembersihan Dan Persiapan 1 m2 pekerjaan pekerjaan pembersihan stripping/kosrekan 1m2 tebas tebang berupa dan membersihkan lokasi dari tanaman/tumbuhan diameter < 15 cm Mencabut 1 tunggul pohon tanaman keras dia. >15 cm dan membuang sisa tunggul kayu dan akar-akarnya 1 m2 pekerjaan Gebalan Rumput 1 m2 pekerjaan pembabatan rumput 1m¹ uitset trase saluran
SAT
JUMLAH HARGA
Jam Jam Jam
837,300.00 365,800.00 141,400.00
m2 m2
6,200.00 7,900.00
Buah
25,300.00
m2 m2 m'
37,000.00 800.00 3,000.00
m'
37,900.00
m3 m3 m3 m3
188,300.00 130,900.00 188,300.00 23,900.00
2.01.02.02.02.005
Pasang 1 m' profil melintang galian tanah Pekerjaan Pengerukan 1 m3 Pengerukan Saluran (manual) 1 m3 Pengerukan Saluran (alat berat) 1 m3 Pengerukan dan Pembuangan Wallet 1 m3 pekerjaan pengangkutan material/ hasil galian sejauh 3 m s/d 5 m 1 m3 pekerjaan pengangkutan material/ hasil galian sejauh 5 m
m3
25,900.00
2.01.02.02.02.006
1 m3 pekerjaan pengangkutan material/ hasil galian sejauh 10 m
m3
27,600.00
2.01.02.02.02.007
1 m3 pekerjaan pengangkutan material/ hasil galian sejauh 30 m
m3
34,400.00
2.01.02.02.02.008
1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 50 m
m3
40,700.00
2.01.02.02.02.009
1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 100 m
m3
57,900.00
2.01.02.02.02.010
1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 200 m
m3
91,700.00
2.01.02.02.02.011
1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 300 m
m3
125,500.00
2.01.02.02.02.012
1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 400 m
m3
159,200.00
2.01.02.02.02.013
1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 500 m
m3
188,200.00
2.01.02.02.02.014
1 m3 pekerjaan pengangkutan material kelokasi sejauh > 500 m, untuk setiap kenaikan 100 m 1 m3 Pekerjaan angkutan material/ sisa galian sejauh 1 km (dengan dump truck) 1 m3 Pekerjaan tanah dihampar, diratakan dan dirapihkan 1 m3 Pekerjaan angkutan material/ sisa galian sejauh 3 km (dengan dump truck) 1 m3 Pekerjaan angkutan material/ sisa galian sejauh 5 km (dengan dump truck) 1 m3 Pekerjaan angkutan material/ sisa galian sejauh 10 km (dengan dump truck) 1 m3 Pekerjaan angkutan material/ sisa galian sejauh 20 km (dengan dump truck) 1 m3 Pekerjaan angkutan material/ sisa galian sejauh 30 km (dengan dump truck) Pekerjaan Pasangan 1 m3 Pekerjaan Pasangan Batu Bata, Campuran (1 Pc : 3 PP) 1 m3 Pekerjaan Pasangan Batu Bata, Campuran (1 Pc : 4 PP) 1 m3 Pekerjaan Pasangan Batu Bata, Campuran (1 Pc : 5 PP) 1 m3 Pekerjaan Pasangan Batu Bata, Campuran (1 Pc : 6 PP) 1 M3 Pembuatan Bronjong dengan kawat galvanis
m3
34,000.00
m3
35,700.00
m3 m3
30,300.00 58,200.00
m3
80,700.00
m3
136,500.00
m3
248,800.00
m3
360,800.00
m3 m3 m3 m3 m3
1,229,300.00 1,181,100.00 1,155,800.00 1,148,200.00 711,400.00
2.01.02.02.02.015 2.01.02.02.02.016 2.01.02.02.02.017 2.01.02.02.02.018 2.01.02.02.02.019 2.01.02.02.02.020 2.01.02.02.02.021 2.01.02.02.03 2.01.02.02.03.001 2.01.02.02.03.002 2.01.02.02.03.003 2.01.02.02.03.004 2.01.02.02.03.005
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
66
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.01.02.02.04 2.01.02.02.04.001
Pekerjaan Cerucuk Dan Turap Pekerjaan pemancangan 1 m panjang cerucuk gelam dia. 8–10 cm
m'
40,600.00
2.01.02.02.04.002
Pekerjaan pemancangan 1 m panjang cerucuk bambu dia. 8–10 cm
m'
43,400.00
2.01.02.02.04.003
Pekerjaan pemancangan 1 m pancang beton bertulang dia. 25/25 cm
m'
207,200.00
2.01.02.02.04.004
Pekerjaan pemancangan 1 m pancang beton bertulang dia. 30/30 cm
m'
291,300.00
2.01.02.02.04.005
Pekerjaan pemancangan 1 m pancang beton bertulang dia. 40/40 cm
m'
264,700.00
2.01.02.02.04.006 2.01.02.02.04.007 2.01.02.02.04.008 2.01.02.02.04.009 2.01.02.02.04.010 2.01.02.02.05 2.01.02.02.05.001
1 m' Pekerjaan Pemasangan Turap Bambu tinggi 1,5 m 1 m' Pekerjaan Pemasangan Turap Bambu tinggi 2,75 m Pengeringan/pemompaan Air per 1 jam 1 m2 Pekerjaan Pemasangan Turap Papan tebal 3 cm 1 m3 Pekerjaan Timbunan Pasir dalam Karung Pekerjaan Drainase 1 m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia 12" 1m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia 8 " 1m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia 6 " 1m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa Galvanis Dia 6" untuk saluran 1 Unit Pemasangan U Ditch ukuran 400.400.1200, 60 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 400.500.1200, 60 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 400.600.1200, 60 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 500.500.1200, 60 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 500.600.1200, 60 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 500.700.1200, 60 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 600.600.1200, 60 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 600.700.1200, 60 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 600.800.1200, 60 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 800.800.1200, 80 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 800.900.1200, 100 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 800.1000.1200, 100 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 1000.1000.1200, 100 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 1000.1200.1200, 100 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 1200.1000.1200, 100 mm dengan beban gandar 5 Ton 1 Unit Pemasangan U Ditch ukuran 1200.1200.1200, 120 mm dengan beban gandar 5 Ton 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.3 m (K-175) Tebal = 5 cm 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.4 m (K-175) Tebal = 5 cm
m' m' Jam m2 m3
67,600.00 124,000.00 17,900.00 283,700.00 253,800.00
m'
769,400.00
m'
421,400.00
m'
301,100.00
m'
496,200.00
Unit
542,000.00
Unit
641,100.00
Unit
685,900.00
Unit
636,500.00
Unit
696,800.00
Unit
825,600.00
Unit
777,800.00
Unit
863,000.00
Unit
1,096,800.00
Unit
1,389,600.00
Unit
1,799,100.00
Unit
2,017,500.00
Unit
1,986,300.00
Unit
2,694,600.00
Unit
2,692,700.00
Unit
3,590,400.00
2.01.02.02.05.002 2.01.02.02.05.003 2.01.02.02.05.004 2.01.02.02.05.005 2.01.02.02.05.006 2.01.02.02.05.007 2.01.02.02.05.008 2.01.02.02.05.009 2.01.02.02.05.010 2.01.02.02.05.011 2.01.02.02.05.012 2.01.02.02.05.013 2.01.02.02.05.014 2.01.02.02.05.015 2.01.02.02.05.016 2.01.02.02.05.017 2.01.02.02.05.018 2.01.02.02.05.019 2.01.02.02.05.020 2.01.02.02.05.021 2.01.02.02.05.022
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
67
m'
545,300.00
m'
700,900.00
KODE BARANG
URAIAN KEGIATAN
SAT m'
855,900.00
m'
1,078,200.00
m'
1,773,900.00
m'
2,449,400.00
Lokasi Unit Lokasi Buah m' m' Unit m' m'
742,700.00 179,700.00 380,000.00 1,100.00 4,500.00 115,800.00 1,630,900.00 78,500.00 4,000.00
2.02.03.01.01.010 2.02.03.01.01.011 2.02.03.01.01.012 2.02.03.01.01.013 2.02.03.01.01.014 2.02.03.01.01.015 2.02.03.01.01.016 2.02.03.01.01.017 2.02.03.01.01.018 2.02.03.01.01.019 2.02.03.01.01.020 2.02.03.01.01.021 2.02.03.01.01.022 2.02.03.01.01.023 2.02.03.01.01.024 2.02.03.01.01.025 2.02.03.01.01.026 2.02.03.01.01.027 2.02.03.01.01.028 2.02.03.01.01.029 2.02.03.01.01.030 2.02.03.01.01.031 2.02.03.01.01.032 2.02.03.01.01.033 2.02.03.01.01.034 2.02.03.01.02 2.02.03.01.02.001 2.02.03.01.02.002 2.02.03.01.02.003 2.02.03.01.02.004 2.02.03.01.02.005 2.02.03.01.02.006 2.02.03.01.02.007 2.02.03.01.02.008
1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.5 m (K-175) Tebal = 5 cm 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.6 m (K-175) Tebal = 6 cm 1 m' Pekerjaan Gorong-Gorong Buis Beton Bertulang diameter = 0.8 m (K-225) tebal = 8 cm 1 m' Pekerjaan Gorong - Gorong Buis Beton Bertulang Diameter = 1.00 m (K-225) tebal = 10 cm HSPK FISIK NON KONSTRUKSI SARANA DAN PRASARANA KOTA J. PEKERJAAN PENERANGAN JALAN UMUM Pekerjaan Penerangan Jalan Umum (PJU) 1 Lokasi Persiapan Pemasangan PJU 1 Unit Pembuatan Rambu Lalu Lintas Untuk PJU 1 Lokasi Pengukuran Titik lampu PJU 1 Buah Pemasangan Konektor Kabel 1 m Pemasangan dan Penarikan Kabel 1 m Pemasangan Kabel Bawah Tanah 1 Unit Pemasangan Panel Meter 1 m Pemasangan PVC untuk Kabel Tanam 1 m Pemasangan Kabel dalam Pipa Pekerjaan Instalasi Jaringan Bawah Tanah 1 Unit Pembuatan dan Pemasangan Terminal Dalam Tiang 1 Unit Perakitan Panel Penerangan Jalan Umum (PJU) 1 Unit Pemasangan Panel Lampu PJU 1 Unit Pemasangan Panel Tempat Ballast 1 Buah Panel Tempat Ballast untuk Lampu Sorot 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 2,5 m 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 3 m 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 7 m 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 8.5 m 1 Unit Roll Pipa 1,5" 1 Unit Roll Pipa 2" 1 Unit Roll Pipa 3" 1 Unit Roll Pipa 4" 1 Buah Pemasangan Ornamen Lampu PJU panjang 1,5 m 1 Buah Pemasangan Ornamen Lampu PJU panjang 2 m 1 Buah Pemasangan Ornamen Lampu PJU panjang 3 m 1 Buah Pemasangan Ornamen Lampu PJU Panjang 6 m 1 Unit Pemasangan Panel Lampu PJU 1 Phase 1 Unit Pemasangan Panel Lampu PJU 3 Phase 6600VA 1 Unit Pemasangan Panel Lampu PJU 3 Phase 10600VA 1 Unit Pemasangan Panel Lampu PJU 3 Phase 13200VA 1 Unit Pemasangan Panel Lampu PJU 3 Phase 16500VA 1 Unit Pemasangan Panel Lampu PJU 3 Phase 23000VA 1 Unit Pemasangan Panel Lampu PJU 3 Phase 33000VA Elektrikal 1 Unit Pembongkaran Instalasi Kabel 1 Unit Bongkar Panel 1 Unit Bongkar Kap Lampu Taman 1 Unit Bongkar Tiang Lampu Tanam 1 m Pemasangan/Penarikan Kabel NYFGBY 4x 6 mm 1 m Pemasangan/Penarikan Kabel NYFGBY 4x 10 mm 1 m Pemasangan/Penarikan Kabel NYFGBY 4x 16 mm 1 m Pemasangan/Penarikan Kabel NYFGBY/NYRGBY 4 x 2,5 mm
Unit Unit Unit Unit Buah m' m' m' m' m' Unit Unit Unit Unit Buah Buah Buah Buah Unit Unit Unit Unit Unit Unit Unit
316,100.00 165,000.00 168,000.00 126,000.00 348,900.00 53,100.00 63,800.00 85,000.00 148,800.00 180,600.00 105,200.00 113,000.00 146,800.00 190,300.00 725,600.00 796,800.00 1,006,500.00 1,481,800.00 4,936,500.00 5,802,100.00 5,851,100.00 5,864,100.00 5,879,500.00 6,001,300.00 6,468,500.00
Unit Unit Unit Unit m' m' m' m'
60,600.00 121,200.00 287,300.00 383,300.00 99,600.00 134,200.00 161,900.00 72,400.00
2.02.03.01.02.009 2.02.03.01.02.010 2.02.03.01.02.011 2.02.03.01.02.012
1 m Pemasangan/Penarikan Kabel NYFGBY/NYRGBY 4 x 4 mm 1 m Pemasangan/Penarikan Kabel NYY 4 x 2.5 mm 1 m Pemasangan/Penarikan Kabel NYY 4 x 4 mm 1 m Pemasangan/Penarikan Kabel NYY 4 x 6 mm
m' m' m' m'
86,600.00 62,400.00 78,900.00 92,300.00
2.01.02.02.05.023 2.01.02.02.05.024 2.01.02.02.05.025 2.01.02.02.05.026 2.02 2.02.03 2.02.03.01 2.02.03.01.01 2.02.03.01.01.001 2.02.03.01.01.002 2.02.03.01.01.003 2.02.03.01.01.004 2.02.03.01.01.005 2.02.03.01.01.006 2.02.03.01.01.007 2.02.03.01.01.008 2.02.03.01.01.009
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
68
JUMLAH HARGA
KODE BARANG 2.02.03.01.02.013 2.02.03.01.02.014 2.02.03.01.02.015 2.02.03.01.02.016 2.02.03.01.02.017 2.02.03.01.02.018 2.02.03.01.02.019 2.02.03.01.02.020 2.02.03.01.02.021 2.02.03.01.02.022 2.02.03.01.02.023 2.02.03.01.03 2.02.03.01.03.001 2.02.03.01.03.002 2.02.03.01.03.003 2.02.03.01.03.004 2.02.03.01.03.005 2.02.03.01.03.006 2.02.03.01.03.007 2.02.03.01.03.008 2.02.03.01.03.009 2.02.03.01.03.010 2.02.03.01.03.011 2.02.03.01.03.012 2.02.03.01.03.013 2.02.03.01.03.014 2.02.03.01.03.015 2.02.03.01.03.016 2.02.03.01.03.017 2.02.03.01.03.018 2.02.03.01.03.019 2.02.03.01.03.020 2.02.03.01.03.021 2.02.03.01.03.022 2.02.03.01.03.023 2.02.03.01.03.024 2.02.03.01.03.025 2.02.03.01.03.026 2.02.03.01.03.027 2.02.03.01.03.028 2.02.03.01.03.029
URAIAN KEGIATAN
SAT
JUMLAH HARGA
1 m Pemasangan/Penarikan kabel NYY 4 x 10 mm2 1 m Pemasangan/Penarikan Kabel NYY 4 x 16 mm 1 m Pemasangan/Penarikan Kabel NYY 4 x 25 mm 1 m Pemasangan/Penarikan Kabel NYY 4 x 35 mm 1 m Pemasangan/Penarikan Kabel NYM 2x1,5 mm 1 m Pemasangan/Penarikan Kabel NYM 2x2,5 mm 1 Unit Pemasangan/Penarikan Kabel Twisted 2 x 10 mm 1 Unit Pemasangan/Penarikan Kabel Twisted 2 x 16 mm 1 m Pemasangan / Penarikan Kabel Twisted 4x16 mm 1 m Memasang Dan Merangkai Lampu Hias Non Neon 1 m Memasang Dan Merangkai Lampu Hias Circle Light Pemasangan Tiang PJU 1 Unit Pengecatan Tiang PJU 1 Unit Pemasangan Tiang Cabang 1 Biasa 5 m 1 Unit Pemasangan Tiang Cabang 1 Biasa 7 m 1 Unit Pemasangan Tiang Cabang 1 Biasa 9 m 1 Unit Pemasangan Tiang Cabang 2 Biasa 7 m 1 unit Pemasangan Tiang Cabang 2 Biasa 9 m 1 Unit Pemasangan Tiang Cabang 4 Biasa 9 m 1 m3 Pondasi Biasa PJU untuk 5 meter 1 m3 Pondasi Biasa PJU 7 m atau 9 m 1 m3 Pondasi Strous PJU 1 Unit Pemasangan Tiang Oktagonal 5m Single Hot Dipped Galvanized dengan Flenders 1 Unit Pemasangan Tiang Oktagonal 5m Double Hot Dipped Galvanized dengan Flenders 1 Unit Pemasangan Tiang Oktagonal 7m Single Hot Dipped Galvanized dengan Flenders 1 Unit Pemasangan Tiang Oktagonal 7m Double Hot Dipped Galvanized dengan Flenders 1 Unit Pemasangan Tiang Oktagonal 9m Single Hot Dipped Galvanized dengan Flenders 1 Unit Pemasangan Tiang Oktagonal 9m Double Hot Dipped Galvanized dengan Flenders 1 Unit Pemasangan Tiang Oktagonal 12m Single Hot Dipped Galvanized dengan Flenders 1 Unit Pemasangan Tiang Oktagonal 12m Double Hot Dipped Galvanized dengan Flenders 1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 5 m Cabang 1, Sistem Flenders 1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 7 m Cabang 1, Sistem Flenders 1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 7 m Cabang 2, Sistem Flenders 1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 9 m Cabang 1, Sistem Flenders 1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 9 m Cabang 2, Sistem Flenders 1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 9 m Cabang 4, Sistem Flenders 1 Unit Pembuatan & Pemasangan Tiang Galvanish 9 m Dekoratif
m' m' m' m' m' m' Unit Unit m' m' m'
122,700.00 140,500.00 199,700.00 258,900.00 16,100.00 21,300.00 12,900.00 29,000.00 47,000.00 60,300.00 61,700.00
Unit Unit Unit Unit Unit Unit Unit m3 m3 m3 Unit
170,800.00 1,867,800.00 2,376,600.00 2,993,200.00 2,525,100.00 3,392,800.00 3,653,600.00 1,200,400.00 1,405,600.00 1,957,600.00 3,198,100.00
Unit
4,243,800.00
Unit
4,654,300.00
Unit
5,633,100.00
Unit
5,633,100.00
Unit
6,888,100.00
Unit
8,377,200.00
Unit
9,442,600.00
Unit
2,717,900.00
Unit
3,196,100.00
Unit
3,440,900.00
Unit
4,098,900.00
Unit
4,708,200.00
Unit
5,197,800.00
Unit
6,226,300.00
1 Unit Pemasangan Lampu HPS 70W/220V Lengkap Armateur, Balast & Capasitor 1 Unit Pemasangan Lampu HPS 150W/220V Lengkap Armateur, Balast, Ignitor & Capasitor 1 Unit Pemasangan Lampu HPS 250W/220V Lengkap Armateur, Balast, Ignitor & Capasitor 1 Unit Pemasangan Lampu HPS 400W/220V Lengkap Armateur, Balast, Ignitor & Capasitor
Unit
1,969,800.00
Unit
2,801,800.00
Unit
5,569,200.00
Unit
5,992,900.00
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
69
KODE BARANG
URAIAN KEGIATAN
SAT
1 Unit Pemasangan Lampu Sorot 80 W Lengkap Armateur, Ignitor, Capasitor 1 Unit Pemasangan Lampu Sorot 150 W Lengkap Armateur, Ignitor, Capasitor 1 Unit Pemasangan Lampu Sorot 250 W Lengkap Armateur, Ignitor, Capasitor 1 Unit Pemasangan Lampu Mercury HPLN 80 W 1 Unit Pemasangan Lampu Mercury HPLN 125 watt/220 V 1 Unit Pemasangan Lampu Mercury HPLN 250w/220v Dengan Ballast
Unit
3,883,000.00
Unit
2,229,600.00
Unit
2,411,300.00
Unit Unit Unit
422,300.00 494,000.00 606,000.00
1 Unit Pemasangan Lampu Sorot HPIT MNF-300 250 W/220 V Lengkap Armateur, Ignitor, Capasitor 1 Unit Pemasangan Lampu SL 23 W 1 Unit Pemasangan Lampu SL 18 Watt K. SARANA LALU LINTAS Rambu - Rambu Lalu Lintas 1 m3 Pekerjaan Bekisting Pondasi Rambu Lalu Lintas 1 Unit Pekerjaan Pemotongan dan Pengeboran untuk Rambu-Rambu Lalu Lintas 1 Unit Pekerjaan Perakitan dan Penyetelan untuk Rambu-Rambu Lalu Lintas 1 Unit pengadaan angkur untuk dudukan box control 1 Unit Ongkos Angkut ke Lokasi (Rambu, Delineator, RPPJ) 1 Unit Ongkos Angkut ke Lokasi (Pagar Pengaman Jalan) 1 Unit Ongkos Angkut ke Lokasi (Warning Light, Alat Pemberi Isyarat Lalu Lintas, Marka) 1 Unit Ongkos Angkut ke Lokasi (Paku Jalan) 1 unit Pekerjaan Pengeboran dan Pemasangan Paku Jalan 1 unit Pekerjaan Pengeboran dan Pemasangan Paku Jalan Bulat (Tempered) 1 m' Penggelaran Kabel 1 m Pemasangan Pipa PVC untuk Alat Pemberi Isyarat Lalu Lintas
Unit
8,430,000.00
Unit Unit
253,200.00 246,000.00
m3 Unit
73,500.00 9,100.00
Unit
45,600.00
Unit Unit Unit Unit
599,400.00 18,300.00 64,200.00 1,495,700.00
Unit m' Unit
3,200.00 36,000.00 50,400.00
m' m'
5,000.00 3,800.00
m2 m2 Unit m' m'
204,300.00 113,400.00 39,000.00 9,200.00 40,000.00
m'
48,700.00
m'
28,000.00
m'
33,200.00
2.02.03.02.01.026
1 m2 Gali dan tutup aspal 1 m2 Pekerjaan Cat Besi 1 Unit Pekerjaan Pengecatan Tiang dan Patok Pengaman 1 m' Ongkos Pekerjaan Pengecatan Zebra Cross / Marka Jalan 1 m' Pengadaan dan Pemasangan Marka Jalan ukuran 3 x 120 mm (Thermoplastic) 1 m' Pengadaan dan Pemasangan Marka Jalan ukuran 3 x 120 mm (Coldplastic) 1 m' Pengadaan dan Pemasangan Marka Jalan ukuran 2 x 120 mm (Thermoplastic) 1 m' Pengadaan dan Pemasangan Marka Jalan ukuran 2 x 120 mm (Coldplastic) 1 Unit Pengadaan dan Pemasangan Warning Light (Lampu Peringatan) Pengadaan dan Pemasangan Lampu Peringatan Tenaga Surya (Warning Light Solar Cell) Tiang Lengkung Pengadaan dan Pemasangan Lampu Peringatan Tenaga Surya (Warning Light Solar Cell) Tiang Lurus 1 Unit Pengadaan dan Pemasangan Alat Pengendali Isyarat Lalu Lintas Persimpangan 3 Kaki 1 Unit Pengadaan dan Pemasangan Alat Pengendali Isyarat Lalu Lintas Persimpangan 4 Kaki 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 45 x 45 cm
2.02.03.02.01.027 2.02.03.02.01.028
2.02.03.01.03.030 2.02.03.01.03.031 2.02.03.01.03.032 2.02.03.01.03.033 2.02.03.01.03.034 2.02.03.01.03.035 2.02.03.01.03.036 2.02.03.01.03.037 2.02.03.01.03.038 2.02.03.02 2.02.03.02.01 2.02.03.02.01.001 2.02.03.02.01.002 2.02.03.02.01.003 2.02.03.02.01.004 2.02.03.02.01.005 2.02.03.02.01.006 2.02.03.02.01.007 2.02.03.02.01.008 2.02.03.02.01.009 2.02.03.02.01.010 2.02.03.02.01.011 2.02.03.02.01.012 2.02.03.02.01.013 2.02.03.02.01.014 2.02.03.02.01.015 2.02.03.02.01.016 2.02.03.02.01.017 2.02.03.02.01.018 2.02.03.02.01.019 2.02.03.02.01.020 2.02.03.02.01.021 2.02.03.02.01.022 2.02.03.02.01.023 2.02.03.02.01.024 2.02.03.02.01.025
JUMLAH HARGA
Unit
74,046,900.00
Unit
44,073,200.00
Unit
38,531,900.00
Unit
241,490,400.00
Unit
284,296,700.00
Unit
987,600.00
1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 60 x 60 cm
Unit
1,168,200.00
1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 75 x 75 cm
Unit
1,662,700.00
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
70
KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
2.02.03.02.01.029
1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 90 x 90 cm
Unit
2,186,500.00
2.02.03.02.01.030
Unit
8,081,300.00
Unit
6,344,700.00
2.02.03.02.01.032
1 Unit Pengadaan dan Pemasangan Pagar Pengaman Jalan 4 m (Terminal End Masuk Kedalam Tanah) 1 Unit Pengadaan dan Pemasangan Pagar Pengaman Jalan 4 m (Terminal End Lengkung) 1 Unit Pengadaan dan Pemasangan Paku Jalan Ukuran 10 x 10 x 2 cm
Unit
312,700.00
2.02.03.02.01.033
1 Unit Pengadaan dan Pemasangan Paku Jalan Ukuran 10 x 12 x 2 cm
Unit
347,800.00
2.02.03.02.01.034
1 Unit Pengadaan dan Pemasangan Paku Jalan Bulat (Tempered)
Unit
364,500.00
2.02.03.02.01.035
1 Unit Pengadaan dan Pemasangan Patok Tikungan Pipa Plastik
Unit
823,200.00
2.02.03.02.01.036 2.02.03.02.01.037 2.02.03.02.01.038
1 Unit Pengadaan dan Pemasangan Patok Tikungan Pipa Besi 1 Unit Pengadaan dan Pemasangan Cermin Tikungan 1 Unit Pengadaan dan Pemasangan RPPJ 120 x 180 (Overhead)
Unit Unit Unit
685,000.00 5,769,400.00 16,649,900.00
2.02.03.02.01.039
1 Unit Pengadaan dan Pemasangan RPPJ 120 x 240 (Overhead)
Unit
17,307,200.00
2.02.03.02.01.040
Unit
51,634,800.00
2.02.03.02.01.041
1 Unit Pengadaan dan Pemasangan RPPJ Portal Bentang 9 m' s/d 11 m' 1 Unit Pengadaan dan Pemasangan RPPJ Portal Bentang 18 m'
Unit
146,484,200.00
2.02.03.03 2.02.03.03.01 2.02.03.03.01.001
L. TAMAN & KEBERSIHAN Taman 1 m3 Penyiapan Bibit Tanaman/ Pemutaran Tanaman (Vol 0.063 m3)
m3
39,700.00
2.02.03.03.01.002 2.02.03.03.01.003 2.02.03.03.01.004 2.02.03.03.01.005 2.02.03.03.01.006 2.02.03.03.01.007 2.02.03.03.01.008 2.02.03.03.01.009 2.02.03.03.01.010 2.02.03.03.01.011 2.02.03.03.01.012 2.02.03.03.01.013 2.02.03.03.01.014 2.02.03.03.01.015 2.02.03.03.01.016 2.02.03.03.01.017 2.02.03.03.01.018 2.02.03.03.01.019
1 m3 Tanah Taman (Terolah) Pengapuran dan Pengecatan 1 Batang Pohon 1 m2 Membabat/ Merapikan Rumput Tinggi < 20 cm 1 m2 Membabat/ Merapikan Rumput 20 cm < Tinggi < 50 cm 1 m2 Membabat/ Merapikan Rumput Tinggi > 50 cm Ringan 1 m2 Membabat/ Merapikan Rumput Tinggi > 50 cm Berat 1 m2 Menanam Rumput Manila Sistem Tandur 1 m2 Menanam Rumput Lamur 1 m2 Mengolah Tanah (Mencangkul) Sedalam 30 cm 1 m2 Ongkos kerja Menanam Tanaman Pagar 1 Batang Penanaman Pohon Pelindung Mahoni t = 1.5 m 1 m2 Ongkos Menanam Semak Hias (15 Batang) 1 Batang Pemijahan Bibit Taman (Batang Pohon) 1 Batang Penanaman Pohon Pelindung Tanjung t = 1.5 m 1 Batang Penanaman Pohon Pelindung Spathodea t = 1.5 m 1 Batang Penanaman Pohon Pelindung Sono t = 1.5 m 1 Batang Penanaman Pohon Pelindung Bintaro t = 1.5 m Perawatan 1000 Batang Mangrove
m3 Batang m2 m2 m2 m2 m2 m2 m2 m2 Batang m2 Batang Batang Batang Batang Batang 1000 Batang
206,200.00 18,700.00 2,100.00 3,200.00 5,200.00 7,400.00 49,900.00 21,200.00 11,500.00 11,700.00 201,900.00 38,900.00 11,600.00 202,400.00 161,500.00 293,900.00 184,700.00 21,825,300.00
2.02.03.03.01.020
Penanaman 1000 Batang Mangrove
1000 Batang
30,102,500.00
2.02.03.03.01.021 2.02.03.03.01.022 2.02.03.03.01.023 2.02.03.03.01.024 2.02.03.03.01.025 2.02.03.03.01.026 2.02.03.03.01.027 2.02.03.03.01.028
Penanaman 1 Batang Mangrove Perawatan 1 Batang Mangrove (Batang Pohon) 1 Batang Penanaman Pohon Semak ex. Agave T = 1 m 1 Batang Penanaman Pohon Semak ex. Anglonema 1 Batang Penanaman Pohon Semak ex. Bougenvile 1 Batang Penanaman Pohon Semak ex. Cendrawasih 1 Batang Penanaman Pohon Semak ex. Drasena 1 Batang Penanaman Pohon Semak ex. Elfak Merah
2.02.03.02.01.031
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
71
Batang Batang Pohon Pohon Pohon Pohon Pohon Pohon
15,500.00 19,300.00 151,400.00 135,600.00 116,200.00 68,800.00 84,100.00 97,900.00
KODE BARANG 2.02.03.03.02 2.02.03.03.02.001 2.02.03.03.02.002 2.02.03.03.02.003 2.02.03.03.02.004 2.02.03.03.02.005 2.02.03.03.02.006 2.02.03.03.02.007 2.02.04 2.02.04.01 2.02.04.01.01 2.02.04.01.01.001 2.02.04.01.01.002 2.02.04.01.01.003 2.02.04.01.01.004 2.02.04.01.01.005 2.02.04.01.01.006 2.02.04.01.01.007 2.02.04.01.01.008 2.02.04.01.02 2.02.04.01.02.001 2.02.04.01.02.002 2.02.04.01.02.003 2.02.04.01.02.004 2.02.04.01.02.005 2.02.04.01.03 2.02.04.01.03.001 2.02.04.01.03.002 2.02.04.01.04 2.02.04.01.04.001 2.02.04.01.04.002 2.02.04.01.05 2.02.04.01.05.001 2.02.04.01.05.002 2.02.04.01.05.003 2.02.04.01.05.004 2.02.04.01.06 2.02.04.01.06.001 2.02.04.01.06.002
URAIAN KEGIATAN Pemeliharaan Taman 1 m2 Penyapuan Taman 1 m2 Penyiraman Taman 1 m2 Pemotongan Rumput 1 m2 Pemangkasan Semak Hias 1 m2 Pemupukan, Pemberantasan Hama, dan Pendangiran 1 m2 Angkut Sampah Taman 1 m2 Pemberantasan Hama Rayap/Termite Control PERAWATAN KENDARAAN M. SERVICE KENDARAAN Service Ringan Truck Besar Service Radiator Tune Up (Tahun) Ganti Pangkon Mesin (Tahun) Ganti Oli Lengkap (Tahun) Ganti / Penyetelan Nozzle Ganti Master Rem Set Ganti Master Kopling Set Ganti Cross Joint Service Sedang Truck Besar Overhoul Master Rem dan Ganti Kampas Rem Overhoul Master Kopling dan Ganti Kampas Kopling (Tahun) Ganti Bearing Roda Lengkap Depan & Belakang Ganti Per Skur Klep Service Berat Truck Besar Membongkar / Ganti Seker dan Ring Seker Set Over Houl Set Service Ringan Buldoser Service tip 250 HM (Hour Machine) Service tiap 1000 HM (Hour Machine) Service Ringan Eskavator Service tiap 250 HM (Hour Machine) Service tiap 500 HM (Hour Machine) Service tiap 1000 HM (Hour Machine) Service tiap 2000 HM (Hour Machine) Service Ringan Whell Loader Service tiap 250 HM (Hour Machine) Service tiap 1000 HM (Hour Machine)
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
72
SAT
JUMLAH HARGA
m2 m2 m2 m2 m2 m2 m2
200.00 200.00 200.00 300.00 1,000.00 200.00 74,200.00
Unit Unit Unit Unit Unit Unit Unit Unit
640,000.00 2,530,000.00 660,000.00 1,045,000.00 91,700.00 352,000.00 484,000.00 330,000.00
Unit Unit Unit Unit Unit
1,430,000.00 1,815,000.00 3,520,000.00 2,090,000.00 990,000.00
Unit Unit
5,005,000.00 31,662,500.00
set set
1,595,000.00 2,090,000.00
set set set set
1,595,000.00 1,870,000.00 2,090,000.00 2,640,000.00
set set
1,595,000.00 2,090,000.00
REKAPITULASI HSPK NON FISIK
STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TA 2017
PEMERINTAH KOTA MOJOKERTO 2016
REKAPITULASI HARGA SATUAN POKOK KEGIATAN (HSPK) NON FISIK PEMERINTAH KOTA MOJOKERTO 2017 KODE BARANG
URAIAN KEGIATAN
SAT
JUMLAH HARGA
1
2
3
4
2.03 2.03.01
HSPK NON FISIK Harga Satuan Pokok Pekerjaan Non Fisik
2.03.01.01 2.03.01.01.01 2.03.01.01.01.001 2.03.01.01.01.002 2.03.01.01.01.003 2.03.01.01.01.004
Biaya Operasional Kegiatan Alat Tulis Kantor (ATK) Peserta Alat Tulis Kantor (ATK) PesertaTipe I Alat Tulis Kantor (ATK) PesertaTipe II Alat Tulis Kantor (ATK) Peserta Tipe III Alat Tulis Kantor (ATK) PesertaTipe IV
2.03.01.01.02 2.03.01.01.02.001 2.03.01.01.02.002 2.03.01.01.02.003 2.03.01.01.02.004 2.03.01.01.02.005
ATK Administrasi Kegiatan ATK Administrasi Kegiatan Tipe I ATK Administrasi Kegiatan Tipe II ATK Administrasi Kegiatan Tipe III ATK Administrasi Kegiatan Tipe IV ATK Administrasi Kegiatan Tipe V
2.03.01.01.03 2.03.01.01.03.001 2.03.01.01.03.002 2.03.01.01.03.003 2.03.01.01.03.004 2.03.01.01.03.005
Jilid dan Penggandaan (Modul) Jilid dan Penggandaan Tipe I (Modul) Jilid dan Penggandaan Tipe II (Modul) Jilid dan Penggandaan Tipe III (Laporan) Jilid dan Penggandaan Tipe IV (Laporan) Jilid dan Penggandaan Tipe V (Laporan)
2.03.01.01.04 2.03.01.01.04.001 2.03.01.01.04.002 2.03.01.01.04.003
Biaya Dokumentasi Biaya Dokumentasi Tipe I Biaya Dokumentasi Tipe II Biaya Dokumentasi Tipe III
2.03.01.01.05
Perlengkapan Dekorasi dan Sound System
2.03.01.01.05.001
Peserta/Keg Peserta/Keg Peserta/Keg Peserta/Keg
9,550.00 14,650.00 125,650.00 254,400.00
Per Keg Per Keg Per Keg Per Keg Per Keg
113,688.00 188,645.00 192,413.00 350,182.50 270,220.00
Peserta/Keg Peserta/Keg Peserta/Keg Peserta/Keg Peserta/Keg
29,150.00 54,150.00 29,150.00 54,150.00 79,150.00
Per Keg Per Keg Per Keg
133,150.00 166,150.00 1,565,500.00
Perlengkapan Dekorasi dan Sound System Tipe I
Per Hari
7,932,300.00
2.03.01.01.05.002
Perlengkapan Dekorasi dan Sound System Tipe II
Per Hari
21,136,800.00
2.03.01.01.05.003
Perlengkapan Dekorasi dan Sound System Tipe III
Per Hari
28,539,400.00
2.03.01.01.05.004
Perlengkapan Dekorasi dan Sound System Tipe IV
Per Hari
37,020,800.00
2.03.01.01.06 2.03.01.01.06.001 2.03.01.01.06.002
Publikasi Publikasi Tipe I Publikasi Tipe II
Per Keg Per Keg
1,245,278.00 4,133,430.00
REKAPITULASI HSPK NON FISIK 2017
73
2.03.01.01.07 2.03.01.01.07.001 2.03.01.01.07.002 2.03.01.01.07.003 2.03.01.01.07.004 2.03.01.01.07.005 2.03.01.01.07.006 2.03.01.01.07.007
Hadiah / Penghargaan Kegiatan Lomba Hadiah / Penghargaan Kegiatan Lomba Tipe I Hadiah / Penghargaan Kegiatan Lomba Tipe II Hadiah / Penghargaan Kegiatan Lomba Tipe III Hadiah / Penghargaan Kegiatan Lomba Tipe IV Hadiah / Penghargaan Kegiatan Lomba Tipe V Hadiah / Penghargaan Kegiatan Lomba Tipe VI Hadiah / Penghargaan Kegiatan Lomba Tipe VII
REKAPITULASI HSPK NON FISIK 2017
74
Paket/Keg Paket/Keg Paket/Keg Paket/Keg Paket/Keg Paket/Keg Paket/Keg
16,302,700.00 31,611,600.00 13,302,700.00 19,681,800.00 6,302,700.00 11,681,800.00 51,313,100.00
ANALISA HSPK FISIK
STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TA 2017
PEMERINTAH KOTA MOJOKERTO 2016
ANALISA HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO 2016 KODE BARANG 2.01 2.01.01 2.01.01.01 2.01.01.01.01 2.01.01.01.01.001 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.049 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.05.002.035 1.08.23.01.01.026.017 1.08.23.01.01.006.006 2.01.01.01.01.002 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.049 1.08.23.01.01.002.001 1.08.23.01.01.007.004 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.05.002.035 1.08.23.01.01.026.017 1.08.23.01.01.006.006 2.01.01.01.01.003
URAIAN KEGIATAN HSPK FISIK KONSTRUKSI BANGUNAN GEDUNG A. PEKERJAAN PERSIAPAN & TANAH Pekerjaan Persiapan 1 m' Pembuatan Pagar Sementara Dari Kayu Tinggi 2 M Mandor Kepala Tukang Tukang Kayu Pekerja Dolken Kayu Gelam Ø 8-10/400 Cm Semen Portland Pasir Beton Kerikil Beton Kayu Meranti 5/7 Paku Biasa 2" - 5" Meni Besi
0.0200 0.0200 0.2000 0.4000 1.2500 0.1250 0.0050 0.0090 0.0720 0.0600 0.4000
1 m' Pembuatan Pagar Sementara Seng Gelombang Tinggi 2 M Mandor Kepala Tukang Tukang Kayu Pekerja Dolken Kayu Gelam Ø 8-10/400 Cm Semen Portland Seng Gelombang Pasir Beton Kerikil Beton Kayu Meranti 5/7 Paku Biasa 2" - 5" Meni Besi
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.049 1.08.23.01.01.002.001 1.08.23.01.01.019.014 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.026.017
1 m' Pembuatan Pagar Sementara Kawat Duri Tinggi 1,8 M Mandor Kepala Tukang Tukang Kayu Pekerja Dolken Kayu Gelam Ø 8-10/400 Cm Semen Portland Kawat Berduri 50 M Pasir Beton Koral Beton Paku Biasa 2" - 5"
2.01.01.01.01.004
1 m' Pengukuran Dan Pemasangan Bowplank
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.046 1.08.23.01.05.002.046 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Sengon Papan Kayu Sengon 5/7 Paku Biasa 2" - 5"
2.01.01.01.01.005
1 m2 Pekerjaan Pembuatan Kantor Sementara Dengan Lantai Plesteran Mandor Kepala Tukang Tukang Kayu Tukang Batu Pekerja Dolken Kayu Gelam Ø 8-10/400 Cm Kayu Meranti 5/7 Paku Biasa 2" - 5"
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.05.002.049 1.08.23.01.05.002.035 1.08.23.01.01.026.017
KOEF
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT
HARGA SATUAN
m2
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 23,900.00 77,500.00 257,650.00 245,400.00 5,740,300.00 21,000.00 54,250.00
542,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 23,900.00 77,500.00 78,950.00 257,650.00 245,400.00 5,740,300.00 21,000.00 54,250.00
638,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 23,900.00 77,500.00 106,600.00 257,650.00 245,400.00 21,000.00
141,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 3,174,050.00 3,174,050.00 21,000.00
82,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 90,000.00 23,900.00 5,740,300.00 21,000.00
1,873,300.00
O.H O.H O.H O.H Batang Zak m3 m3 m3 Kg ltr m'
0.0200 0.0200 0.4000 0.2000 1.2500 0.0625 1.2000 0.0050 0.0090 0.0720 0.0600 0.4500
O.H O.H O.H O.H Batang Zak Lembar m3 m3 m3 Kg Kg m'
0.0200 0.0200 0.3000 0.2000 1.0000 0.0500 0.5000 0.0050 0.0090 0.0600
O.H O.H O.H O.H Batang Zak Roll m3 m3 Kg m'
0.0050 0.0100 0.1000 0.1000 0.0070 0.0120 0.0200
O.H O.H O.H O.H m3 m3 Kg m2
0.0500 0.3000 2.0000 1.0000 2.0000 1.2500 0.1800 0.0800
75
O.H O.H O.H O.H O.H Batang m3 Kg
JUMLAH HARGA
2,600.00 2,400.00 22,000.00 36,000.00 29,875.00 9,687.50 1,288.25 2,208.60 413,301.60 1,260.00 21,700.00
2,600.00 2,400.00 44,000.00 18,000.00 29,875.00 4,843.75 94,740.00 1,288.25 2,208.60 413,301.60 1,260.00 24,412.50
2,600.00 2,400.00 33,000.00 18,000.00 23,900.00 3,875.00 53,300.00 1,288.25 2,208.60 1,260.00
650.00 1,200.00 11,000.00 9,000.00 22,218.35 38,088.60 420.00
6,500.00 36,000.00 220,000.00 110,000.00 180,000.00 29,875.00 1,033,254.00 1,680.00
KODE BARANG 1.08.23.01.01.008.006 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.005.010 1.08.23.01.01.007.009 1.08.23.01.01.003.010 1.08.23.01.01.003.001 1.08.23.01.01.063.011 1.08.23.01.05.002.081
URAIAN KEGIATAN Besi Plat Strip Semen Portland Pasir Pasang Pasir Beton Koral Beton Bata Merah Seng Plat Jendela Nako Kaca Polos Tebal 3 Mm Kunci Tanam Biasa Plywood 4 Mm
2.01.01.01.01.006 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.049 1.08.23.01.05.002.035 1.08.23.01.01.026.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.007.004 1.08.23.01.01.007.009
1 m2 Pekerjaan Pembuatan Gudang Semen Dan Peralatan Mandor Kepala Tukang Tukang Kayu Pekerja Dolken Kayu Gelam Ø 8-10/400 Cm Kayu Meranti 5/7 Paku Biasa 2" - 5" Semen Portland Pasir Beton Koral Beton Seng Gelombang Seng Plat
2.01.01.01.01.007
1 m2 Pekerjaan Pembuatan Bedeng Kerja
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.049 1.08.23.01.05.002.035 1.08.23.01.01.026.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.007.004 1.08.23.01.05.002.081
Mandor Kepala Tukang Tukang Kayu Pekerja Dolken Kayu Gelam Ø 8-10/400 Cm Kayu Meranti 5/7 Paku Biasa 2" - 5" Semen Portland Pasir Beton Koral Beton Seng Gel. Bjls 30 Plywood Tbl. 4 Mm
2.01.01.01.01.008 1.11.29.01.01.001.001 1.11.29.01.01.002.014
1 m2 Pekerjaan Pembersihan Lapangan Dan Perataan Mandor Pekerja
2.01.01.01.01.009
1 m2 Pembuatan Stegger dari Bambu
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.106 1.08.23.01.01.999.009
Mandor Kepala Tukang Tukang Kayu Pekerja Bambu Diameter 8/600 Cm Tali Ijuk
2.01.01.01.01.010
1 m2 Pekerjaan Pembuatan Jalan Sementara
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.005.006 1.08.23.01.01.005.009 1.08.23.01.01.004.002
Mandor Pekerja Batu Belah Batu Pecah Pasir Pasang
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF 1.1000 0.8750 0.1500 0.1000 0.1500 30.0000 0.2500 0.2000 0.0800 0.1500 0.0600
SAT Kg Zak m3 m3 m3 Buah Lembar Daun m2 Buah Lembar m2
0.0500 0.2000 2.0000 1.0000 1.7000 0.2100 0.3000 0.2625 0.0300 0.0500 1.5000 0.2500
O.H O.H O.H O.H Batang m3 Kg Zak m3 m3 Lembar Lembar m2
0.0500 0.2000 2.0000 1.0000 1.2500 0.1860 0.3000 0.4500 0.0300 0.0500 1.5000 1.3500
O.H O.H O.H O.H Batang m3 Kg Zak m3 m3 Lembar Lembar m2
0.0500 0.1000
O.H O.H m2
0.0130 0.2500 0.0170 0.0020 1.0000 0.2500
O.H O.H O.H O.H Batang Kg m2
0.0050 1.0000 0.1500 0.0900 0.0100
76
O.H O.H m3 m3 m3
HARGA SATUAN 13,500.00 77,500.00 244,750.00 257,650.00 245,400.00 950.00 50,750.00 25,850.00 112,150.00 74,400.00 126,350.00
JUMLAH HARGA 14,850.00 67,812.50 36,712.50 25,765.00 36,810.00 28,500.00 12,687.50 5,170.00 8,972.00 11,160.00 7,581.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 23,900.00 5,740,300.00 21,000.00 77,500.00 257,650.00 245,400.00 78,950.00 50,750.00
1,764,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 23,900.00 5,740,300.00 21,000.00 77,500.00 257,650.00 245,400.00 78,950.00 126,350.00
1,788,200.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
15,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,650.00 19,800.00
60,300.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 193,250.00 245,400.00 244,750.00
144,200.00
6,500.00 24,000.00 220,000.00 90,000.00 40,630.00 1,205,463.00 6,300.00 20,343.75 7,729.50 12,270.00 118,425.00 12,687.50
6,500.00 24,000.00 220,000.00 90,000.00 29,875.00 1,067,695.80 6,300.00 34,875.00 7,729.50 12,270.00 118,425.00 170,572.50
6,500.00 9,000.00
1,690.00 30,000.00 1,870.00 180.00 21,650.00 4,950.00
650.00 90,000.00 28,987.50 22,086.00 2,447.50
KODE BARANG 2.01.01.01.01.011
URAIAN KEGIATAN 1 m3 Pekerjaan Pembongkaran Beton (Manual)
1.11.29.01.01.001.001 1.11.29.01.01.002.014
Mandor Pekerja
2.01.01.01.01.012
1 m3 Pembongkaran Beton (Menggunakan Alat)
1.11.29.01.01.002.014 1.11.29.01.01.001.001 E05 E26
Pekerja Mandor Compressor Jack Hammer
2.01.01.01.01.013
1 m3 Pembongkaran Pasangan Batu Kali (Manual) Mandor Pekerja
1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.01.014 1.11.29.01.01.002.014 1.11.29.01.01.001.001 E26 2.01.01.01.01.015 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.01.016 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.01.017
1 m2 Pembongkaran Paving
1.11.29.01.01.001.001 1.11.29.01.01.002.014
Mandor Pekerja
2.01.01.01.01.019
1 Unit Papan Nama Proyek
1.11.29.01.01.002.014 1.11.29.01.01.002.002 1.11.29.01.01.002.003 1.11.29.01.01.001.003 1.11.29.01.01.001.001 1.08.23.01.05.002.027 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.01.006.006 1.08.23.01.01.006.014 1.08.23.01.01.036.001 1.08.23.01.01.042.005 1.08.23.01.01.006.016 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009
Pekerja Tukang Kayu Tukang Cat Kepala Tukang Mandor Kayu Papan Kayu Balok Paku 4 s/d 7 cm Cat Meni Plamir Kayu Amplas Kayu Kuas cat Cat kayu Semen Portland Pasir Beton Batu Split Pecah Mesin 3/5
2.01.01.01.02 2.01.01.01.02.001
Pekerjaan Tanah 1 m3 Pekerjaan Galian Tanah Biasa Sedalam 1 Meter Mandor Pekerja
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
O.H O.H
OH OH Jam Jam m3
0.2050 2.0480
O.H O.H m3
1.3770 0.1722 1.2049
OH OH Jam m3
0.2500 5.0000
1 m2 Pekerjaan Pembongkaran Penutup Atap Tidak Dipakai Kembali Mandor Pekerja
2.01.01.01.01.018
SAT m3
m3 1.7858 0.1489 1.0417 1.0417
1 m3 Pekerjaan Pembongkaran Tembok Batu Bata Mandor Pekerja
1.11.29.01.01.001.001 1.11.29.01.01.002.014
1.11.29.01.01.001.001 1.11.29.01.01.002.014
0.3330 6.6670
1 M3 Pembongkaran Pasangan Batu Kali (Menggunakan Alat) Pekerja Mandor Jack Hammer
1 m2 Pekerjaan Pembongkaran Penutup Atap Dan Dipakai Kembali Mandor Pekerja
KOEF
O.H O.H m2
0.0375 0.0750
O.H O.H m2
0.0750 0.1500
O.H O.H m2
0.0100 0.2000
O.H O.H Unit
0.6300 1.0000 0.5000 0.1000 0.1000 0.0250 0.0900 0.6000 0.7500 0.3000 2.0000 0.2000 0.4000 0.6250 0.0600 0.1000
OH OH OH OH OH m3 m3 kg kg kg lbr bh kg Zak m3 m3
m3 0.0250 0.7500
77
O.H O.H
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
JUMLAH HARGA 643,300.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 224,642.53 33,726.95
449,200.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
211,000.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 33,726.95
187,000.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
482,500.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
11,600.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
23,300.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
19,300.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 110,000.00 120,000.00 130,000.00 7,084,500.00 5,811,950.00 21,000.00 54,250.00 36,600.00 5,600.00 13,100.00 77,500.00 77,500.00 257,650.00 245,400.00
1,144,400.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
70,800.00
43,290.00 600,030.00
160,722.00 19,357.00 234,010.13 35,133.37
26,650.00 184,320.00
123,930.00 22,386.00 40,637.61
32,500.00 450,000.00
4,875.00 6,750.00
9,750.00 13,500.00
1,300.00 18,000.00
56,700.00 110,000.00 55,000.00 12,000.00 13,000.00 177,112.50 523,075.50 12,600.00 40,687.50 10,980.00 11,200.00 2,620.00 31,000.00 48,437.50 15,459.00 24,540.00
3,250.00 67,500.00
KODE BARANG 2.01.01.01.02.002 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.003 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.004 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.005 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.006 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.007 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.008 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.009 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.010 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.011 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.012 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.013 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.01.01.02.014 1.11.29.01.01.001.001 1.11.29.01.01.002.014
URAIAN KEGIATAN 1 m3 Pekerjaan Galian Tanah Biasa Sedalam 2 Meter Mandor Pekerja
KOEF
0.0450 0.9000
1 m3 Pekerjaan Galian Tanah Biasa Sedalam 3 Meter Mandor Pekerja
O.H O.H m3
0.0670 1.0500
1 m3 Pekerjaan Galian Tanah Keras Sedalam 1 Meter Mandor Pekerja
O.H O.H m3
0.0320 1.0000
1 m3 Pekerjaan Galian Tanah Cadas Sedalam 1 Meter Mandor Pekerja
O.H O.H m3
0.0600 1.5000
1 m3 Pekerjaan Galian Tanah Lumpur Sedalam 1 Meter Mandor Pekerja 1 m2 Pekerjaan Pekerjaan Stripping Tebing Setinggi 1 M Mandor Pekerja
O.H O.H m3
0.0450 1.2000
O.H O.H m2
0.0050 0.0500
1 m3 Pekerjaan Pembuangan Hasil Galian Sejauh 30 M Mandor Pekerja 1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Biasa Sedalam 1 M Mandor Pekerja
O.H O.H m3
0.0100 0.3300
O.H O.H m3
0.0084 0.2500
1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Biasa Sedalam 2 M Mandor Pekerja
O.H O.H m3
0.0150 0.3000
1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Biasa Sedalam 3 M Mandor Pekerja
O.H O.H m3
0.0224 0.3500
1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Keras Sedalam 1 M Mandor Pekerja
O.H O.H m3
0.0107 0.3334
1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Cadas Sedalam 1 M Mandor Pekerja
O.H O.H m3
0.0200 0.5000
1 m3 Pekerjaan Pengurugan Kembali Galian Tanah Lumpur Sedalam 1 M Mandor Pekerja
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m3
O.H O.H m3
0.0150 0.4000
78
O.H O.H
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
JUMLAH HARGA 86,900.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
103,200.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
94,200.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
142,800.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
113,900.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
5,200.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
31,000.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
23,600.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
29,000.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
34,400.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
31,400.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
47,600.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
38,000.00
5,850.00 81,000.00
8,710.00 94,500.00
4,160.00 90,000.00
7,800.00 135,000.00
5,850.00 108,000.00
650.00 4,500.00
1,300.00 29,700.00
1,092.00 22,500.00
1,950.00 27,000.00
2,912.00 31,500.00
1,391.00 30,006.00
2,600.00 45,000.00
1,950.00 36,000.00
KODE BARANG 2.01.01.01.02.015
URAIAN KEGIATAN 1 m3 Pekerjaan Pemadatan Tanah Setiap 20 Cm
1.11.29.01.01.001.001 1.11.29.01.01.002.014
Mandor Pekerja
2.01.01.01.02.016
1 m3 Pekerjaan Pemadatan Tanah Dengan Alat
1.11.29.01.01.001.001 1.11.29.01.01.002.014 E25
Mandor Pekerja Stamper
2.01.01.01.02.017
1 m3 Pekerjaan Pemasangan Lapisan Pudel Campuran 1Kp : 3Pp : 7 Tl Mandor Kepala Tukang Tukang Batu Pekerja Kapur Padam Pasir Pasang Tanah Liat
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.012 1.08.23.01.01.004.002 1.08.23.01.01.004.008 2.01.01.01.02.018
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
JUMLAH HARGA 51,500.00
Nilai HSPK (Dibulatkan): 0.0500 O.H 130,000.00 0.5000 O.H 90,000.00 0.0500 Unit/hari 47,508.36
53,900.00
0.0500 0.5000
SAT m3 O.H O.H m3
m3 0.0800 0.0400 0.4000 0.8000 0.1350 0.4000 0.9480
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.999.009
1 m2 Pekerjaan Pemasangan Lapisan Ijuk Tebal 10 Cm Mandor Pekerja Ijuk
2.01.01.01.02.019
1 m3 Pekerjaan Pengurugan Pasir Urug
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.004.003
Mandor Pekerja Pasir Urug
2.01.01.01.02.020
1 m3 Pengurugan Sirtu Padat
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.004.004
Mandor Pekerja Sirtu
2.01.01.01.02.021 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.004.006
1 m3 Pengurugan Sirtu Dengan Menggunakan Sirtu Ngoro Mandor Pekerja Sirtu Ngoro (Truck 3 - 4 M3)
2.01.01.01.02.022
1 m3 Pekerjaan Pengurugan Dengan Tanah Urug
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.004.007
Mandor Pekerja Tanah Urug
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H O.H m3 m3 m3 m2
0.0150 0.1500 6.0000
O.H O.H Kg m3
0.0100 0.3000 1.2000
O.H O.H m3 m3
0.0250 0.2500 1.2000
O.H O.H m3 m3
0.0250 0.2500 0.3000
m3 0.0100 0.3000 1.2000
79
O.H O.H m3
O.H O.H m3
6,500.00 45,000.00
6,500.00 45,000.00 2,375.42
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 120,150.00 244,750.00 109,500.00
349,100.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 19,800.00
134,300.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 161,050.00
221,600.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 193,750.00
258,300.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 966,100.00
315,600.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 128,850.00
182,900.00
10,400.00 4,800.00 44,000.00 72,000.00 16,220.25 97,900.00 103,806.00
1,950.00 13,500.00 118,800.00
1,300.00 27,000.00 193,260.00
3,250.00 22,500.00 232,500.00
3,250.00 22,500.00 289,830.00
1,300.00 27,000.00 154,620.00
KODE BARANG 2.01.01.02 2.01.01.02.01 2.01.01.02.01.001 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.006 2.01.01.02.01.002 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.006 2.01.01.02.01.003 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.006 2.01.01.02.01.004 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.006 2.01.01.02.01.005 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.006
URAIAN KEGIATAN B. PEKERJAAN PONDASI Pondasi 1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 3 Pp) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Kali Pecah 15/20 Cm
KOEF
0.0750 0.0750 0.7500 1.5000 5.0500 0.4850 1.2000
1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 4 Pp) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Kali Pecah 15/20 Cm
0.0750 0.0750 0.7500 1.5000 4.0750 0.5200 1.2000
0.0750 0.0750 0.7500 1.5000 3.4000 0.5440 1.2000
Mandor Kepala Tukang Tukang Batu Pekerja Batu Kali Pecah 15/20 Cm Semen Portland Kapur Pasang Pasir Pasang
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 193,250.00
978,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 193,250.00
911,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 193,250.00
864,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 193,250.00
832,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 193,250.00
787,400.00
Nilai HSPK (Dibulatkan):
724,400.00
O.H O.H O.H O.H Zak m3 m3
O.H O.H O.H O.H Zak m3 m3
O.H O.H O.H O.H Zak m3 m3 m3
0.0750 0.0750 0.7500 1.5000 2.9250 0.5610 1.2000
1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 8 Pp) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Kali Pecah 15/20 Cm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.006 1.08.23.01.01.002.001 1.08.23.01.01.002.012 1.08.23.01.01.004.002
m3
m3
1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 6 Pp) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Kali Pecah 15/20 Cm
1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 3 Kp : 10 Pp)
HARGA SATUAN
m3
1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 5 Pp) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Kali Pecah 15/20 Cm
2.01.01.02.01.006
SAT
O.H O.H O.H O.H Zak m3 m3 m3
0.0750 0.0750 0.7500 1.5000 2.2750 0.5840 1.2000
O.H O.H O.H O.H Zak m3 m3 m3
0.0750 0.0750 0.7500 1.5000 1.2000 1.5250 0.1470 0.4920
80
O.H O.H O.H O.H m3 Zak m3 m3
130,000.00 120,000.00 110,000.00 90,000.00 193,250.00 77,500.00 120,150.00 244,750.00
JUMLAH HARGA
9,750.00 9,000.00 82,500.00 135,000.00 391,375.00 118,703.75 231,900.00
9,750.00 9,000.00 82,500.00 135,000.00 315,812.50 127,270.00 231,900.00
9,750.00 9,000.00 82,500.00 135,000.00 263,500.00 133,144.00 231,900.00
9,750.00 9,000.00 82,500.00 135,000.00 226,687.50 137,304.75 231,900.00
9,750.00 9,000.00 82,500.00 135,000.00 176,312.50 142,934.00 231,900.00
9,750.00 9,000.00 82,500.00 135,000.00 231,900.00 118,187.50 17,662.05 120,417.00
KODE BARANG 2.01.01.02.01.007
URAIAN KEGIATAN 1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1/4 Pc : 1 Kp : 4 Pp)
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.006 1.08.23.01.01.002.001 1.08.23.01.01.002.012 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Batu Kali Pecah 15/20 Cm Semen Portland Kapur Pasang Pasir Pasang
2.01.01.02.01.008
1 m3 Pekerjaan Pemasangan Batu Kosong (Aanstamping) Mandor Kepala Tukang Tukang Batu Pekerja Batu Kali Pecah 15/20 Cm Pasir Pasang
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.006 1.08.23.01.01.004.002 2.01.01.02.01.009
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.006 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.019.017 1.08.23.01.01.012.006 2.01.01.02.01.010 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.006 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 2.01.01.02.01.011 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.09.27.01.01.999.001 2.01.01.02.01.012 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.09.27.01.01.999.001
KOEF
0.0750 0.0750 0.7500 1.5000 1.2000 1.0250 0.1310 0.5230
0.0390 0.0390 0.3900 0.7800 1.2000 0.4320
1 m3 Pekerjaan Pasang Pondasi Siklop, 60% Beton Campuran 1 Pc : 2 Pb : 3 Kr Dan 40% Batu Belah Mandor Kepala Tukang Tukang Batu Pekerja Batu Kali Pecah 15/20 Cm Semen Portland Pasir Beton Kerikil Beton Kawat Beton Besi Beton Polos 1 m3 Pekerjaan Pasang Pondasi Sumuran, Diameter 100 Cm Mandor Kepala Tukang Tukang Batu Pekerja Batu Kali Pecah 15/20 Cm Semen Portland Pasir Beton Kerikil Beton
0.0200 0.4000 0.4000
9,750.00 9,000.00 82,500.00 135,000.00 231,900.00 79,437.50 15,739.65 128,004.25
m3
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 193,250.00 244,750.00
460,500.00
O.H O.H O.H O.H m3 m3
81
Nilai HSPK (Dibulatkan):
5,070.00 4,680.00 42,900.00 70,200.00 231,900.00 105,732.00 2,771,100.00
O.H O.H O.H O.H m3 Zak m3 m3 Roll kg
130,000.00 120,000.00 110,000.00 90,000.00 193,250.00 77,500.00 257,650.00 245,400.00 432,250.00 13,050.00
22,100.00 10,200.00 93,500.00 306,000.00 92,760.00 375,875.00 80,386.80 114,847.20 31,122.00 1,644,300.00
m3
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 193,250.00 77,500.00 257,650.00 245,400.00
987,100.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 10,650.00
42,900.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 10,650.00
50,600.00
O.H O.H O.H O.H m3 Zak m3 m3
O.H O.H jam Titik
0.0240 0.4800 0.4000
JUMLAH HARGA 691,300.00
130,000.00 120,000.00 110,000.00 90,000.00 193,250.00 77,500.00 120,150.00 244,750.00
Titik
1 m' Pekerjaan Pembuatan Lubang Strouss Pile Diameter 30 cm Mandor Pekerja Sewa Alat Bantu Strouss Pile
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
0.1700 0.0850 0.8500 3.4000 0.4800 4.8500 0.3120 0.4680 0.0720 126.0000
HARGA SATUAN Nilai HSPK (Dibulatkan):
O.H O.H O.H O.H m3 Zak m3 m3
m3
0.1190 0.0800 0.8000 2.4000 0.4500 4.8500 0.3120 0.4680
1 m' Pekerjaan Pembuatan Lubang Strouss Pile Diameter 20 cm Mandor Pekerja Sewa Alat Bantu Strouss Pile
SAT m3
O.H O.H jam
15,470.00 9,600.00 88,000.00 216,000.00 86,962.50 375,875.00 80,386.80 114,847.20
2,600.00 36,000.00 4,260.00
3,120.00 43,200.00 4,260.00
KODE BARANG 2.01.01.03 2.01.01.03.01 2.01.01.03.01.001 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.002 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.003 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.004 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.005 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.006 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001
URAIAN KEGIATAN C. STRUKTUR UTAMA Pekerjaan Beton 1 m3 Pekerjaan Lantai Kerja K-100 F’C = 7,4 Mpa Slump (3-6) Cm, W/C = 0,87 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar Membuat 1 m3 Beton Mutu F’C = 7,4 Mpa (K 100), Slump (12+/-2) Cm, W/C = 0,87 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
0.0600 0.0200 0.2000 1.2000 5.7500 0.6379 0.7608 200.0000
SAT
HARGA SATUAN
m3
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
966,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,045,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,096,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,136,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,183,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,229,100.00
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.0830 0.0280 0.2750 1.6500 6.1750 0.6208 0.7400 215.0000
Membuat 1 m3 Beton Mutu F’C = 9,8 Mpa (K 125), Slump (12+/-2) Cm, W/C = 0,78 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.0830 0.0280 0.2750 1.6500 6.9000 0.5915 0.7497 215.0000
Membuat 1 m3 Beton Mutu F’C = 12,2 Mpa (K 150), Slump (12+/-2) Cm, W/C = 0,72 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.0830 0.0280 0.2750 1.6500 7.4750 0.5708 0.7534 215.0000
Membuat 1 m3 Beton Mutu F’C = 14,5 Mpa (K 175), Slump (12+/-2) Cm, W/C = 0,66 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.0830 0.0280 0.2750 1.6500 8.1500 0.5428 0.7623 215.0000
Membuat 1 m3 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12+/-2) Cm, W/C = 0,61 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.0830 0.0280 0.2750 1.6500 8.8000 0.5222 0.7638 215.0000
82
O.H O.H O.H O.H Zak m3 m3 Liter
JUMLAH HARGA
7,800.00 2,400.00 22,000.00 108,000.00 445,625.00 164,354.94 186,700.32 30,000.00
10,790.00 3,360.00 30,250.00 148,500.00 478,562.50 159,949.12 181,596.00 32,250.00
10,790.00 3,360.00 30,250.00 148,500.00 534,750.00 152,399.98 183,976.38 32,250.00
10,790.00 3,360.00 30,250.00 148,500.00 579,312.50 147,066.62 184,884.36 32,250.00
10,790.00 3,360.00 30,250.00 148,500.00 631,625.00 139,852.42 187,068.42 32,250.00
10,790.00 3,360.00 30,250.00 148,500.00 682,000.00 134,544.83 187,436.52 32,250.00
KODE BARANG 2.01.01.03.01.007 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.008 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.009 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.010 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.011 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001 2.01.01.03.01.012 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.01.999.001
URAIAN KEGIATAN Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225), Slump (12+/-2) Cm, W/C = 0,58 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar Membuat 1 m3 Beton Mutu F’C = 21,7 Mpa (K 250), Slump (12+/-2) Cm, W/C = 0,56 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
SAT m3
0.0830 0.0280 0.2750 1.6500 9.2750 0.4986 0.7755 215.0000
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.0830 0.0280 0.2750 1.6500 9.6000 0.4943 0.7697 215.0000
Membuat 1 m3 Beton Mutu F’C = 24,0 Mpa (K 275), Slump (12+/-2) Cm, W/C = 0,53 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.0830 0.0280 0.2750 1.6500 10.1500 0.4885 0.7600 215.0000
Membuat 1 m3 Beton Mutu F’C = 26,4 Mpa (K 300), Slump (12+/-2) Cm, W/C = 0,52 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.0830 0.0280 0.2750 1.6500 10.3250 0.4864 0.7562 215.0000
Membuat 1 m3 Beton Mutu F’C = 28,8 Mpa (K 325), Slump (12+/-2) Cm, W/C = 0,49 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.1050 0.0350 0.3500 2.1000 10.9750 0.4786 0.7452 215.0000
Membuat 1 m3 Beton Mutu F’C = 31,2 Mpa (K 350), Slump (12+/-2) Cm, W/C = 0,48 Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Beton Kerikil Air Tawar
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H O.H Zak m3 m3 Liter m3
0.1050 0.0350 0.3500 2.1000 11.2000 0.4764 0.7408 215.0000
83
O.H O.H O.H O.H Zak m3 m3 Liter
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
JUMLAH HARGA 1,262,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,285,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,324,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,336,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,434,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 257,650.00 245,400.00 150.00
1,450,100.00
10,790.00 3,360.00 30,250.00 148,500.00 718,812.50 128,464.29 190,307.70 32,250.00
10,790.00 3,360.00 30,250.00 148,500.00 744,000.00 127,356.40 188,884.38 32,250.00
10,790.00 3,360.00 30,250.00 148,500.00 786,625.00 125,862.03 186,504.00 32,250.00
10,790.00 3,360.00 30,250.00 148,500.00 800,187.50 125,320.96 185,571.48 32,250.00
13,650.00 4,200.00 38,500.00 189,000.00 850,562.50 123,311.29 182,872.08 32,250.00
13,650.00 4,200.00 38,500.00 189,000.00 868,000.00 122,744.46 181,792.32 32,250.00
KODE BARANG 2.01.01.03.01.013
URAIAN KEGIATAN 1 Kg Pekerjaan Pembesian Dengan Besi Polos
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.012.006 1.08.23.01.01.019.017
Mandor Kepala Tukang Tukang Besi Pekerja Besi Beton Polos Kawat Beton
2.01.01.03.01.014
1 Kg Pekerjaan Pembesian Dengan Besi Ulir
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.012.007 1.08.23.01.01.019.017
Mandor Kepala Tukang Tukang Besi Pekerja Besi Beton Ulir Kawat Beton
2.01.01.03.01.015
1 Kg Pekerjaan Pemasangan Wiremesh (Jaring Kawat Baja) Mandor Kepala Tukang Tukang Besi Pekerja Jaring Kawat Baja Kawat Beton
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.008.039 1.08.23.01.01.019.017 2.01.01.03.01.016 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.007 1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.01.012.006 1.08.23.01.01.019.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 2.01.01.03.01.017 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.007 1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.01.012.006 1.08.23.01.01.019.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 2.01.01.03.01.018 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.007 1.11.29.01.01.002.002 1.11.29.01.01.002.004
KOEF
0.0004 0.0007 0.0070 0.0070 1.0500 0.0006
O.H O.H O.H O.H Kg Roll Kg
0.0004 0.0007 0.0070 0.0070 1.0500 0.0006
O.H O.H O.H O.H Kg Roll Kg
0.0010 0.0020 0.0250 0.0250 1.0200 0.0020
1 m3 Membuat Pondasi Beton Bertulang (150 Kg Besi+Bekisting) Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Kerikil 1 m3 Membuat Sloof Beton Bertulang (200 Kg Besi+Bekisting) Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Kerikil
O.H. O.H. O.H. O.H. kg Roll m3
0.2650 0.2620 1.0500 1.3000 0.2750 5.3000 0.2000 1.5000 0.4000 157.5000 0.0900 8.4000 0.5400 0.8100
O.H O.H O.H O.H O.H O.H m3 Kg liter Kg Roll Zak m3 m3 m3
0.2830 0.3230 1.4000 1.5600 0.2750 5.6500 0.2700 2.0000 0.6000 210.0000 0.1200 8.4000 0.5400 0.8100
1 m3 Membuat Kolom Beton Bertulang (300 Kg Besi+Bekisting) Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT Kg
O.H O.H O.H O.H O.H O.H m3 Kg liter Kg Roll Zak m3 m3 m3
0.3530 0.4030 2.1000 1.6500 0.2750
84
O.H O.H O.H O.H O.H
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 13,050.00 432,250.00
JUMLAH HARGA 15,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 13,550.00 432,250.00
16,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 12,500.00 432,250.00
19,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 13,050.00 432,250.00 77,500.00 257,650.00 245,400.00
5,114,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 13,050.00 432,250.00 77,500.00 257,650.00 245,400.00
6,341,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 110,000.00
10,889,700.00
52.00 84.00 770.00 630.00 13,702.50 259.35
52.00 84.00 770.00 630.00 14,227.50 259.35
130.00 240.00 2,750.00 2,250.00 12,750.00 864.50
34,450.00 31,440.00 115,500.00 143,000.00 30,250.00 477,000.00 1,162,390.00 31,500.00 6,120.00 2,055,375.00 38,902.50 651,000.00 139,131.00 198,774.00
36,790.00 38,760.00 154,000.00 171,600.00 30,250.00 508,500.00 1,569,226.50 42,000.00 9,180.00 2,740,500.00 51,870.00 651,000.00 139,131.00 198,774.00
45,890.00 48,360.00 231,000.00 181,500.00 30,250.00
KODE BARANG 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.01.012.006 1.08.23.01.01.019.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
URAIAN KEGIATAN Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Kerikil Kayu Meranti Balok Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
2.01.01.03.01.019
1 m3 Membuat Balok Beton Bertulang (200 Kg Besi+Bekisting) Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Kerikil Kayu Meranti Balok Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.007 1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.01.012.006 1.08.23.01.01.019.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.01.020 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.007 1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.01.012.006 1.08.23.01.01.019.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.01.021 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.007 1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.01.012.006 1.08.23.01.01.019.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001
KOEF 7.0500 0.4000 4.0000 2.0000 315.0000 0.1800 8.4000 0.5400 0.8100 0.1500 3.5000 20.0000
m3 0.3180 0.3330 1.4000 1.6500 0.2750 6.3500 0.3200 3.2000 1.6000 210.0000 0.1200 8.4000 0.5400 0.8100 0.1400 2.8000 16.0000
1 m3 Membuat Plat Beton Bertulang (150 Kg Besi+Bekisting) Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Kerikil Kayu Meranti Balok Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
O.H O.H O.H O.H O.H O.H m3 Kg liter Kg Roll Zak m3 m3 m3 Lembar Batang m3
0.2650 0.2650 1.0500 1.3000 0.2750 5.3000 0.3200 3.2000 1.6000 157.5000 0.0900 8.4000 0.5400 0.8100 0.1200 2.8000 32.0000
1 m3 Membuat Dinding Beton Bertulang (150 Kg Besi+Bekisting) Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT O.H m3 Kg liter Kg Roll Zak m3 m3 m3 Lembar Batang
85
O.H O.H O.H O.H O.H O.H m3 Kg liter Kg Roll Zak m3 m3 m3 Lembar Batang m3
0.2650 0.2620 1.0500 1.3000 0.2750 5.3000 0.2400 3.2000 1.6000 157.5000 0.0900 8.4000 0.5400
O.H O.H O.H O.H O.H O.H m3 Kg liter Kg Roll Zak m3
HARGA SATUAN 90,000.00 5,811,950.00 21,000.00 15,300.00 13,050.00 432,250.00 77,500.00 257,650.00 245,400.00 6,753,300.00 174,400.00 23,900.00
JUMLAH HARGA 634,500.00 2,324,780.00 84,000.00 30,600.00 4,110,750.00 77,805.00 651,000.00 139,131.00 198,774.00 1,012,995.00 610,400.00 478,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 13,050.00 432,250.00 77,500.00 257,650.00 245,400.00 6,753,300.00 174,400.00 23,900.00
8,567,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 13,050.00 432,250.00 77,500.00 257,650.00 245,400.00 6,753,300.00 174,400.00 23,900.00
7,930,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 13,050.00 432,250.00 77,500.00 257,650.00
7,543,800.00
41,340.00 39,960.00 154,000.00 181,500.00 30,250.00 571,500.00 1,859,824.00 67,200.00 24,480.00 2,740,500.00 51,870.00 651,000.00 139,131.00 198,774.00 945,462.00 488,320.00 382,400.00
34,450.00 31,800.00 115,500.00 143,000.00 30,250.00 477,000.00 1,859,824.00 67,200.00 24,480.00 2,055,375.00 38,902.50 651,000.00 139,131.00 198,774.00 810,396.00 488,320.00 764,800.00
34,450.00 31,440.00 115,500.00 143,000.00 30,250.00 477,000.00 1,394,868.00 67,200.00 24,480.00 2,055,375.00 38,902.50 651,000.00 139,131.00
KODE BARANG 1.08.23.01.01.005.009 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
URAIAN KEGIATAN Kerikil Kayu Meranti Balok Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
2.01.01.03.01.022
1 m3 Membuat Dinding Beton Bertulang (200 Kg Besi+Bekisting) Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Kerikil Kayu Meranti Balok Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.007 1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.01.012.006 1.08.23.01.01.019.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.01.023 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.007 1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.01.012.006 1.08.23.01.01.019.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009 2.01.01.03.01.024
KOEF 0.8100 0.1600 2.8000 24.0000
1 m' Membuat Kolom Praktis Beton Bertulang (11 X 11) Cm Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Kerikil
m3 0.2830 0.3230 1.4000 1.5600 0.2750 5.6500 0.2500 3.0000 1.2000 210.0000 0.1200 8.4000 0.5400 0.8100 0.1050 2.5000 14.0000
O.H O.H O.H O.H O.H O.H m3 Kg liter Kg Roll Zak m3 m3 m3 Lembar Batang m'
0.0030 0.0060 0.0200 0.0200 0.0200 0.0600 0.0020 0.0100 3.0000 0.0180 0.1000 0.0060 0.0090
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.01.012.006 1.08.23.01.01.019.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.009
1 m' Membuat Ring Balok Beton Bertulang (10 X 15) Cm Mandor Kepala Tukang Tukang Kayu Tukang Batu Tukang Besi Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Kerikil
2.01.01.03.02 2.01.01.03.02.001
Pekerjaan Cetakan Beton (Bekisting) 1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m3 m3 Lembar Batang
m' 0.0150 0.0100 0.0330 0.0330 0.0330 0.2970 0.0030 0.0200 3.6000 0.0020 0.1375 0.0090 0.0150
O.H O.H O.H O.H O.H O.H m3 Kg Kg Roll Zak m3 m3
m2 0.0260 0.0260 0.2600 0.5200 0.0400 0.3000 0.1000
86
O.H O.H O.H O.H O.H O.H m3 Kg Kg Roll Zak m3 m3
O.H O.H O.H O.H m3 Kg liter
HARGA SATUAN 245,400.00 6,753,300.00 174,400.00 23,900.00
JUMLAH HARGA 198,774.00 1,080,528.00 488,320.00 573,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 13,050.00 432,250.00 77,500.00 257,650.00 245,400.00 6,753,300.00 174,400.00 23,900.00
7,735,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 13,050.00 432,250.00 77,500.00 257,650.00 245,400.00
83,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 110,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 13,050.00 432,250.00 77,500.00 257,650.00 245,400.00
123,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00
322,200.00
36,790.00 38,760.00 154,000.00 171,600.00 30,250.00 508,500.00 1,452,987.50 63,000.00 18,360.00 2,740,500.00 51,870.00 651,000.00 139,131.00 198,774.00 709,096.50 436,000.00 334,600.00
390.00 720.00 2,200.00 2,200.00 2,200.00 5,400.00 11,623.90 210.00 39,150.00 7,780.50 7,750.00 1,545.90 2,208.60
1,950.00 1,200.00 3,630.00 3,630.00 3,630.00 26,730.00 17,435.85 420.00 46,980.00 864.50 10,656.25 2,318.85 3,681.00
3,380.00 3,120.00 28,600.00 46,800.00 232,478.00 6,300.00 1,530.00
KODE BARANG 2.01.01.03.02.002
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Bekisting Untuk Sloof
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting
2.01.01.03.02.003
1 m2 Pekerjaan Pasang Bekisting Untuk Kolom
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Kayu Meranti Balok Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
2.01.01.03.02.004
1 m2 Pekerjaan Pasang Bekisting Untuk Balok
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
2.01.01.03.02.005
1 m2 Pekerjaan Pasang Bekisting Untuk Lantai
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
2.01.01.03.02.006
1 m2 Pekerjaan Pasang Bekisting Untuk Dinding
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
2.01.01.03.02.007
1 m2 Pekerjaan Pasang Bekisting Untuk Tangga
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014
Mandor Kepala Tukang Tukang Kayu Pekerja
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0260 0.0260 0.2600 0.5200 0.0450 0.3000 0.1000
SAT m2 O.H O.H O.H O.H m3 Kg liter m2
0.0330 0.0330 0.3300 0.6600 0.0400 0.4000 0.2000 0.0150 0.3500 2.0000
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0330 0.0330 0.3300 0.6600 0.0400 0.4000 0.2000 0.0180 0.3500 2.0000
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0330 0.0330 0.3300 0.6600 0.0400 0.4000 0.2000 0.0150 0.3500 6.0000
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0330 0.0330 0.3300 0.6600 0.0300 0.4000 0.2000 0.0200 0.3500 3.0000
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0330 0.0330 0.3300 0.6600
87
O.H O.H O.H O.H
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00
JUMLAH HARGA 351,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
558,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
578,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
653,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
557,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00
499,100.00
3,380.00 3,120.00 28,600.00 46,800.00 261,537.75 6,300.00 1,530.00
4,290.00 3,960.00 36,300.00 59,400.00 232,478.00 8,400.00 3,060.00 101,299.50 61,040.00 47,800.00
4,290.00 3,960.00 36,300.00 59,400.00 232,478.00 8,400.00 3,060.00 121,559.40 61,040.00 47,800.00
4,290.00 3,960.00 36,300.00 59,400.00 232,478.00 8,400.00 3,060.00 101,299.50 61,040.00 143,400.00
4,290.00 3,960.00 36,300.00 59,400.00 174,358.50 8,400.00 3,060.00 135,066.00 61,040.00 71,700.00
4,290.00 3,960.00 36,300.00 59,400.00
KODE BARANG 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
URAIAN KEGIATAN Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
2.01.01.03.02.008
1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi (2 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 2.01.01.03.02.009 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 2.01.01.03.02.010 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.02.011 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.02.012 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
KOEF 0.0300 0.4000 0.1500 0.0150 0.3500 2.0000
1 m2 Pekerjaan Pasang Bekisting Untuk Sloof (2 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting 1 m2 Pekerjaan Pasang Bekisting Untuk Kolom (2 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Kayu Meranti Balok Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1 m2 Pekerjaan Pasang Bekisting Untuk Balok (2 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1 m2 Pekerjaan Pasang Bekisting Untuk Lantai (2 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
88
SAT m3 Kg liter m3 Lembar Batang m2
0.0130 0.0130 0.1300 0.2600 0.0200 0.1500 0.0500
O.H O.H O.H O.H m3 Kg liter m2
0.0130 0.0130 0.1300 0.2600 0.0225 0.1500 0.0500
O.H O.H O.H O.H m3 Kg liter m2
0.0165 0.0165 0.1650 0.3300 0.0200 0.2000 0.1000 0.0075 0.1750 1.0000
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0165 0.0165 0.1650 0.3300 0.0200 0.2000 0.1000 0.0090 0.1750 1.0000
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0165 0.0165 0.1650 0.3300 0.0200 0.2000 0.1000 0.0075 0.1750 3.0000
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang
HARGA SATUAN 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
JUMLAH HARGA 174,358.50 8,400.00 2,295.00 101,299.50 61,040.00 47,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00
161,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00
175,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
279,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
289,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
326,800.00
1,690.00 1,560.00 14,300.00 23,400.00 116,239.00 3,150.00 765.00
1,690.00 1,560.00 14,300.00 23,400.00 130,768.88 3,150.00 765.00
2,145.00 1,980.00 18,150.00 29,700.00 116,239.00 4,200.00 1,530.00 50,649.75 30,520.00 23,900.00
2,145.00 1,980.00 18,150.00 29,700.00 116,239.00 4,200.00 1,530.00 60,779.70 30,520.00 23,900.00
2,145.00 1,980.00 18,150.00 29,700.00 116,239.00 4,200.00 1,530.00 50,649.75 30,520.00 71,700.00
KODE BARANG 2.01.01.03.02.013 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.02.014 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.02.015 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 2.01.01.03.02.016 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 2.01.01.03.02.017 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.02.018 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Bekisting Untuk Dinding (2 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1 m2 Pekerjaan Pasang Bekisting Untuk Tangga (2 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
0.0165 0.0165 0.1650 0.3300 0.0150 0.2000 0.1000 0.0100 0.1750 1.5000
SAT m2 O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0165 0.0165 0.1650 0.3300 0.0150 0.2000 0.0750 0.0075 0.1750 1.0000
1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi (3 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting 1 m2 Pekerjaan Pasang Bekisting Untuk Sloof (3 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting 1 m2 Pekerjaan Pasang Bekisting Untuk Kolom (3 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Kayu Meranti Balok Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1 m2 Pekerjaan Pasang Bekisting Untuk Balok (3 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
89
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0087 0.0087 0.0867 0.1734 0.0134 0.1000 0.0334
O.H O.H O.H O.H m3 Kg liter m2
0.0087 0.0087 0.0867 0.1734 0.0150 0.1000 0.0334
O.H O.H O.H O.H m3 Kg liter m2
0.0110 0.0110 0.1100 0.2200 0.0134 0.1334 0.0667 0.0050 0.1167 0.6667
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0110 0.0110 0.1100 0.2200 0.0134 0.1334 0.0667
O.H O.H O.H O.H m3 Kg liter
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
JUMLAH HARGA 278,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
249,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00
107,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00
117,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
186,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00
193,200.00
2,145.00 1,980.00 18,150.00 29,700.00 87,179.25 4,200.00 1,530.00 67,533.00 30,520.00 35,850.00
2,145.00 1,980.00 18,150.00 29,700.00 87,179.25 4,200.00 1,147.50 50,649.75 30,520.00 23,900.00
1,131.00 1,044.00 9,537.00 15,606.00 77,880.13 2,100.00 511.02
1,131.00 1,044.00 9,537.00 15,606.00 87,179.25 2,100.00 511.02
1,430.00 1,320.00 12,100.00 19,800.00 77,880.13 2,801.40 1,020.51 33,766.50 20,352.48 15,934.13
1,430.00 1,320.00 12,100.00 19,800.00 77,880.13 2,801.40 1,020.51
KODE BARANG 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
URAIAN KEGIATAN Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
2.01.01.03.02.019
1 m2 Pekerjaan Pasang Bekisting Untuk Lantai (3 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.02.020 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049 2.01.01.03.02.021 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.04.001.006 1.08.23.01.05.002.031 1.08.23.01.05.002.102 1.08.23.01.05.002.049
KOEF 0.0060 0.1167 0.6667
1 m2 Pekerjaan Pasang Bekisting Untuk Dinding (3 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1 m2 Pekerjaan Pasang Bekisting Untuk Tangga (3 Kali Pakai) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Bekisting Meranti Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Meranti Multipleks 9 Mm Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m3 Lembar Batang m2
0.0110 0.0110 0.1100 0.2200 0.0134 0.1334 0.0667 0.0050 0.1167 2.0000
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0110 0.0110 0.1100 0.2200 0.0100 0.1334 0.0667 0.0067 0.1167 1.0000
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang m2
0.0110 0.0110 0.1100 0.2200 0.0100 0.1334 0.0500 0.0050 0.1167 0.6667
90
O.H O.H O.H O.H m3 Kg liter m3 Lembar Batang
HARGA SATUAN 6,753,300.00 174,400.00 23,900.00
JUMLAH HARGA 40,519.80 20,352.48 15,934.13
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
218,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
186,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00 15,300.00 6,753,300.00 174,400.00 23,900.00
166,400.00
1,430.00 1,320.00 12,100.00 19,800.00 77,880.13 2,801.40 1,020.51 33,766.50 20,352.48 47,800.00
1,430.00 1,320.00 12,100.00 19,800.00 58,119.50 2,801.40 1,020.51 45,247.11 20,352.48 23,900.00
1,430.00 1,320.00 12,100.00 19,800.00 58,119.50 2,801.40 765.00 33,766.50 20,352.48 15,934.13
KODE BARANG 2.01.01.04 2.01.01.04.01 2.01.01.04.01.001 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.01.04.01.002 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.01.04.01.003 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.01.04.01.004 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.01.04.01.005 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.01.04.01.006 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010
URAIAN KEGIATAN D. PEKERJAAN PASANGAN DINDING DAN PLESTERAN Pekerjaan Dinding 1 m2 Pekerjaan Pemasangan Batu Merah Tbl 1 Bata (1 Pc : 2 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22
KOEF
0.0300 0.0200 0.2000 0.6000 1.0875 0.0800 140.0000
1 m2 Pekerjaan Pemasangan Batu Merah Tbl 1/2 Bata (1 Pc : 2 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 3 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 3 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 4 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 4 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
91
SAT
HARGA SATUAN
m2
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
319,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
153,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
301,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
145,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
289,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
140,500.00
O.H O.H O.H O.H Zak m3 buah m2
0.0150 0.0100 0.1000 0.3000 0.4738 0.0380 70.0000
O.H O.H O.H O.H Zak m3 buah m2
0.0300 0.0200 0.2000 0.6000 0.8238 0.0910 140.0000
O.H O.H O.H O.H Zak m3 buah m2
0.0150 0.0100 0.1000 0.3000 0.3593 0.0400 70.0000
O.H O.H O.H O.H Zak m3 buah m2
0.0300 0.0200 0.2000 0.6000 0.6638 0.0930 140.0000
O.H O.H O.H O.H Zak m3 buah m2
0.0150 0.0100 0.1000 0.3000 0.2875 0.0430 70.0000
O.H O.H O.H O.H Zak m3 buah
JUMLAH HARGA
3,900.00 2,400.00 22,000.00 54,000.00 84,281.25 19,580.00 133,000.00
1,950.00 1,200.00 11,000.00 27,000.00 36,719.50 9,300.50 66,500.00
3,900.00 2,400.00 22,000.00 54,000.00 63,844.50 22,272.25 133,000.00
1,950.00 1,200.00 11,000.00 27,000.00 27,845.75 9,790.00 66,500.00
3,900.00 2,400.00 22,000.00 54,000.00 51,444.50 22,761.75 133,000.00
1,950.00 1,200.00 11,000.00 27,000.00 22,281.25 10,524.25 66,500.00
KODE BARANG 2.01.01.04.01.007 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.01.04.01.008 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.01.04.01.009 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.01.04.01.010 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.01.04.01.011
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.034.002 1.08.23.01.01.002.001 1.08.23.01.01.004.002 2.01.01.04.01.012
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.034.002 1.08.23.01.01.002.001 1.08.23.01.01.004.002 2.01.01.04.01.013 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014
URAIAN KEGIATAN 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 5 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 5 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Bata (1 Pc : 6 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 6 Ps) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Bata Merah Uk.5 X 11 X 22 1 m2 Pekerjaan Pemasangan Dinding Terawang (Roster) Ukuran (12 X 11 X 24) Cm, Campuran Spesi 1 Pc : 3 Pp Mandor Kepala Tukang Tukang Batu Pekerja Terawang (Roster) Semen Portland Pasir Pasang 1 m2 Pekerjaan Pemasangan Dinding Terawang (Roster) Ukuran (12 X 11 X 24) Cm, Campuran Spesi 1 Pc : 4 Pp Mandor Kepala Tukang Tukang Batu Pekerja Terawang (Roster) Semen Portland Pasir Pasang 1 m2 Pasangan Dinding bata beton ringan; Campuran Spesi 1:3 Mandor Kepala Tukang Tukang Batu Pekerja
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
SAT m2
0.0300 0.0200 0.2000 0.6000 0.5550 0.1020 140.0000
O.H O.H O.H O.H Zak m3 buah m2
0.0150 0.0100 0.1000 0.3000 0.2420 0.0450 70.0000
O.H O.H O.H O.H Zak m3 buah m2
0.0300 0.0200 0.2000 0.6000 0.4625 0.1220 140.0000
O.H O.H O.H O.H Zak m3 buah m2
0.0150 0.0100 0.1000 0.3000 0.2080 0.0490 70.0000
O.H O.H O.H O.H Zak m3 buah m2
0.0150 0.0100 0.1000 0.3000 30.0000 0.3500 0.0320
O.H O.H O.H O.H buah Zak m3 m2
0.0150 0.0100 0.1000 0.3000 30.0000 0.2750 0.0350
O.H O.H O.H O.H buah Zak m3 m2
0.0150 0.0100 0.1000 0.3000
92
O.H O.H O.H O.H
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
JUMLAH HARGA 283,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
137,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
281,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
135,800.00
Nilai HSPK (Dibulatkan):
328,100.00
130,000.00 120,000.00 110,000.00 90,000.00 8,400.00 77,500.00 244,750.00 Nilai HSPK (Dibulatkan):
3,900.00 2,400.00 22,000.00 54,000.00 43,012.50 24,964.50 133,000.00
1,950.00 1,200.00 11,000.00 27,000.00 18,755.00 11,013.75 66,500.00
3,900.00 2,400.00 22,000.00 54,000.00 35,843.75 29,859.50 133,000.00
1,950.00 1,200.00 11,000.00 27,000.00 16,120.00 11,992.75 66,500.00
1,950.00 1,200.00 11,000.00 27,000.00 252,000.00 27,125.00 7,832.00 323,000.00
130,000.00 120,000.00 110,000.00 90,000.00 8,400.00 77,500.00 244,750.00
1,950.00 1,200.00 11,000.00 27,000.00 252,000.00 21,312.50 8,566.25
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00
255,400.00 1,950.00 1,200.00 11,000.00 27,000.00
KODE BARANG 1.08.23.01.01.005.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
URAIAN KEGIATAN Bata beton ringan Semen PC Pasir Pasang
2.01.01.04.01.014 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
1 m2 Pasangan Dinding bata beton ringan; Campuran Spesi 1:4 Mandor Kepala Tukang Batu Tukang Batu Kasar Pekerja Bata beton ringan Semen PC Pasir Pasang
2.01.01.04.02 2.01.01.04.02.001
Pekerjaan Plesteran 1 m2 Pekerjaan Plesteran 1 Pc : 1 Ps Tebal 15 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.002
1 m2 Pekerjaan Plesteran 1 Pc : 2 Ps Tebal 15 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.003
1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps Tebal 15 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.004
1 m2 Pekerjaan Plesteran 1 Pc : 4 Ps Tebal 15 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.005
1 m2 Pekerjaan Plesteran 1 Pc : 5 Ps Tebal 15 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF 0.1127 0.3790 0.3640
0.0150 0.0100 0.1000 0.3000 0.1127 0.3098 0.3880
HARGA SATUAN 850,150.00 77,500.00 244,750.00
JUMLAH HARGA 95,811.91 29,372.50 89,089.00
m2
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 850,150.00 77,500.00 244,750.00
255,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
81,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
72,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
67,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
65,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
63,700.00
O.H O.H O.H O.H M3 zak m3
m2 0.0150 0.0150 0.1500 0.3000 0.3876 0.0160
O.H O.H O.H O.H Zak m3 m2
0.0150 0.0150 0.1500 0.3000 0.2556 0.0200
O.H O.H O.H O.H Zak m3 m2
0.0150 0.0150 0.1500 0.3000 0.1944 0.0230
O.H O.H O.H O.H Zak m3 m2
0.0150 0.0150 0.1500 0.3000 0.1560 0.0240
O.H O.H O.H O.H Zak m3 m2
0.0150 0.0150 0.1500 0.3000 0.1296 0.0260
93
SAT M3 Zak m3
O.H O.H O.H O.H Zak m3
1,950.00 1,200.00 11,000.00 27,000.00 95,811.91 24,009.50 94,963.00
1,950.00 1,800.00 16,500.00 27,000.00 30,039.00 3,916.00
1,950.00 1,800.00 16,500.00 27,000.00 19,809.00 4,895.00
1,950.00 1,800.00 16,500.00 27,000.00 15,066.00 5,629.25
1,950.00 1,800.00 16,500.00 27,000.00 12,090.00 5,874.00
1,950.00 1,800.00 16,500.00 27,000.00 10,044.00 6,363.50
KODE BARANG 2.01.01.04.02.006
URAIAN KEGIATAN 1 m2 Pekerjaan Plesteran 1 Pc : 6 Ps Tebal 15 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.007 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.012 1.08.23.01.01.004.002
1 m2 Pekerjaan Plesteran 1Pc : ½Kp : 3Pp Tebal 15 Mm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Kapur Pasang Pasir Pasang
2.01.01.04.02.008
1 m2 Pekerjaan Plesteran 1 Pc : 2 Ps Tebal 20 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.009
1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps Tebal 20 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.010
1 m2 Pekerjaan Plesteran 1 Pc : 4 Ps Tebal 20 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.011
1 m2 Pekerjaan Plesteran 1 Pc : 5 Ps Tebal 20 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.012
1 m2 Pekerjaan Plesteran 1 Pc : 6 Ps Tebal 20 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0150 0.0150 0.1500 0.3000 0.1104 0.0270
SAT m2 O.H O.H O.H O.H Zak m3 m2
0.0180 0.0120 0.1200 0.3600 0.1440 0.0030 0.0130
m2 0.0220 0.0200 0.2000 0.4000 0.3408 0.0270
O.H O.H O.H O.H Zak m3 m2
0.0220 0.0200 0.2000 0.4000 0.2592 0.0310
O.H O.H O.H O.H Zak m3 m2
0.0220 0.0200 0.2000 0.4000 0.2080 0.0320
O.H O.H O.H O.H Zak m3 m2
0.0220 0.0200 0.2000 0.4000 0.1728 0.0350
O.H O.H O.H O.H Zak m3 m2
0.0220 0.0200 0.2000 0.4000 0.1472 0.0360
94
O.H O.H O.H O.H Zak m3 m3
O.H O.H O.H O.H Zak m3
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
JUMLAH HARGA 62,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 120,150.00 244,750.00
64,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
96,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
90,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
87,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
85,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
83,500.00
1,950.00 1,800.00 16,500.00 27,000.00 8,556.00 6,608.25
2,340.00 1,440.00 13,200.00 32,400.00 11,160.00 360.45 3,181.75
2,860.00 2,400.00 22,000.00 36,000.00 26,412.00 6,608.25
2,860.00 2,400.00 22,000.00 36,000.00 20,088.00 7,587.25
2,860.00 2,400.00 22,000.00 36,000.00 16,120.00 7,832.00
2,860.00 2,400.00 22,000.00 36,000.00 13,392.00 8,566.25
2,860.00 2,400.00 22,000.00 36,000.00 11,408.00 8,811.00
KODE BARANG 2.01.01.04.02.013
URAIAN KEGIATAN 1 m2 Pekerjaan berapen 1SP : 5PP tebal 15 mm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.014 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
1 m' Pekerjaan Plesteran Skoning 1Pc : 3Ps Lebar 10 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.015
1 m' Pekerjaan Benangan
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.016
1 m2 Pekerjaan Plesteran Ciprat 1Pc:2Ps
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
2.01.01.04.02.017
1 m2 Pekerjaan Finishing Siar Pasangan Batu Bata Merah Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 2.01.01.04.02.018 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 2.01.01.04.02.019 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002
KOEF
0.0080 0.0080 0.0750 0.1500 0.1296 0.0260
O.H O.H O.H O.H Zak m3 m'
0.0040 0.0400 0.4000 0.0800 0.0125 0.0130
O.H O.H O.H O.H Zak m3 m'
0.0040 0.0400 0.0400 0.0800 0.0125 0.0130
O.H O.H O.H O.H Zak m3 m2
0.0150 0.0100 0.1000 0.3000 0.1080 0.0060
O.H O.H O.H O.H Zak m3 m2
0.0080 0.0080 0.0750 0.1500 0.0777
1 m2 Pekerjaan Finishing Siar Pasangan Dinding Conblock Ekspose Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland 1 m2 Pekerjaan Finishing Siar Pasangan Batu Kali Adukan 1 Pc : 2 Ps Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m2
95
O.H O.H O.H O.H Zak m2
0.0040 0.0040 0.0350 0.0700 0.0400
O.H O.H O.H O.H Zak m2
0.0150 0.0150 0.1500 0.3000 0.1585 0.0120
O.H O.H O.H O.H Zak m3
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
JUMLAH HARGA 40,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
60,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
21,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
51,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00
29,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00
14,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00
62,500.00
1,040.00 960.00 8,250.00 13,500.00 10,044.00 6,363.50
520.00 4,800.00 44,000.00 7,200.00 968.75 3,181.75
520.00 4,800.00 4,400.00 7,200.00 968.75 3,181.75
1,950.00 1,200.00 11,000.00 27,000.00 8,370.00 1,468.50
1,040.00 960.00 8,250.00 13,500.00 6,021.75
520.00 480.00 3,850.00 6,300.00 3,100.00
1,950.00 1,800.00 16,500.00 27,000.00 12,283.75 2,937.00
KODE BARANG 2.01.01.04.02.020
URAIAN KEGIATAN 1 m2 Pekerjaan Acian
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0100 0.0100 0.1000 0.2000 0.0813
96
SAT m2 O.H O.H O.H O.H Zak
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00
JUMLAH HARGA 37,800.00 1,300.00 1,200.00 11,000.00 18,000.00 6,300.75
KODE BARANG 2.01.01.05 2.01.01.05.01 2.01.01.05.01.001 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.013.042 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.002.007 2.01.01.05.01.002 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.013.038 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.002.007 2.01.01.05.01.003 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.014 2.01.01.05.01.004 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.015 2.01.01.05.01.005 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.013.012 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.002.007 2.01.01.05.01.006 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.007
URAIAN KEGIATAN E. PEKERJAAN PENUTUP LANTAI & DINDING Penutup Lantai 1 m2 Pekerjaan Pasang Lantai Granit Ukuran 60X60 Cm Mandor Kepala Tukang Tukang Batu Pekerja Ubin Granit 60X60 Semen Portland Pasir Pasang Semen Warna
KOEF
0.0120 0.0120 0.1200 0.2400 1.0500 0.2400 0.0450 1.5000
1 m2 Pekerjaan Pasang Lantai Granit Ukuran 40X40 Cm Mandor Kepala Tukang Tukang Batu Pekerja Ubin Granit 40X40 Semen Portland Pasir Pasang Semen Warna
HARGA SATUAN
m2
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 419,750.00 77,500.00 244,750.00 14,900.00
530,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 322,900.00 77,500.00 244,750.00 14,900.00
431,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 55,350.00
218,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 51,850.00
218,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 58,150.00 77,500.00 244,750.00 14,900.00
227,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 56,100.00
219,100.00
O.H O.H O.H O.H m2 Zak m3 Kg m2
0.0130 0.0130 0.1250 0.2500 1.0608 0.2450 0.0450 1.3000
1 m2 Pekerjaan Pasangan Lantai Keramik Polos Uk.40X40 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Keramik Polos 40X40 Cm
O.H O.H O.H O.H m2 Zak m3 Kg m2
0.0350 0.0350 0.3500 0.7000 0.2450 1.3000 0.0450 1.0608
1 m2 Pekerjaan Pasangan Lantai Keramik Polos Uk.30X30 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Keramik Polos 30X30 Cm
O.H O.H O.H O.H Zak Kg m3 m2 m2
0.0350 0.0350 0.3500 0.7000 0.2500 1.5000 0.0450 1.0683
1 m2 Pekerjaan Pasangan Lantai Keramik Polos Uk.20X20 Cm Mandor Kepala Tukang Tukang Batu Pekerja Keramik Polos 20X20 Cm Semen Portland Pasir Pasang Semen Warna
O.H O.H O.H O.H Zak Kg m3 m2 m2
0.0350 0.0350 0.3500 0.7000 1.0600 0.2600 0.0450 1.6200
1 m2 Pekerjaan Pasangan Lantai Keramik Motif Uk.40X40 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Keramik Motif 40X40 Cm
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT
97
O.H O.H O.H O.H m2 Zak m3 Kg m2
0.0350 0.0350 0.3500 0.7000 0.2450 1.3000 0.0450 1.0608
O.H O.H O.H O.H Zak Kg m3 m2
JUMLAH HARGA
1,560.00 1,440.00 13,200.00 21,600.00 440,737.50 18,600.00 11,013.75 22,350.00
1,690.00 1,560.00 13,750.00 22,500.00 342,532.32 18,987.50 11,013.75 19,370.00
4,550.00 4,200.00 38,500.00 63,000.00 18,987.50 19,370.00 11,013.75 58,715.28
4,550.00 4,200.00 38,500.00 63,000.00 19,375.00 22,350.00 11,013.75 55,391.36
4,550.00 4,200.00 38,500.00 63,000.00 61,639.00 20,150.00 11,013.75 24,138.00
4,550.00 4,200.00 38,500.00 63,000.00 18,987.50 19,370.00 11,013.75 59,510.88
KODE BARANG 2.01.01.05.01.007 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.006 2.01.01.05.01.008 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.013.005 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.002.007 2.01.01.05.01.009 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.044 2.01.01.05.01.010
URAIAN KEGIATAN 1 m2 Pekerjaan Pasangan Lantai Keramik Motif Uk. 30X30 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Keramik Motif 30X30 Cm 1 m2 Pekerjaan Pasangan Lantai Keramik Motif Uk. 20X20 Cm Mandor Kepala Tukang Tukang Batu Pekerja Keramik Motif 20X20 Cm Semen Portland Pasir Pasang Semen Warna 1 m2 Pekerjaan Pasangan Lantai Marmer Ex. Tulungagung Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Marmer Tulungagung; 30 X 60 Cm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.045
1 m2 Pekerjaan Pasangan Lantai Marmer Ex. Lampung/ Sulsel Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Marmer Lampung; 30 X 60 Cm (A)
2.01.01.05.01.011
1 m2 Pekerjaan Pasangan Lantai Parquet
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.058 1.08.23.01.01.043.013
Mandor Kepala Tukang Tukang Kayu Pekerja Parqueti Jati Lem
2.01.01.05.01.012
1 m2 Pekerjaan Pasangan Lantai Karpet
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.040.001 1.08.23.01.01.043.013
Mandor Kepala Tukang Tukang Kayu Pekerja Karpet Lem
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0350 0.0350 0.3500 0.7000 0.2500 1.5000 0.0450 1.0683
SAT m2 O.H O.H O.H O.H Zak Kg m3 m2 m2
0.0350 0.0350 0.3500 0.7000 1.0600 0.2600 0.0450 1.6200
O.H O.H O.H O.H m2 Zak m3 Kg m2
0.0350 0.0350 0.3500 0.7000 0.2048 0.6500 0.0450 1.0600
O.H O.H O.H O.H Zak Kg m3 m2 m2
0.0350 0.0350 0.3500 0.7000 0.2048 0.6500 0.0450 1.0600
O.H O.H O.H O.H Zak Kg m3 m2 m2
0.0350 0.0350 0.3500 0.7000 1.0500 0.6000
O.H O.H O.H O.H m2 Kg m2
0.0090 0.0170 0.1700 0.1700 1.0500 0.3500
98
O.H O.H O.H O.H m2 Kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 55,550.00
JUMLAH HARGA 222,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 56,650.00 77,500.00 244,750.00 14,900.00
225,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 419,750.00
591,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 572,250.00
753,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 59,400.00 32,300.00
192,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 23,850.00 32,300.00
73,600.00
4,550.00 4,200.00 38,500.00 63,000.00 19,375.00 22,350.00 11,013.75 59,344.07
4,550.00 4,200.00 38,500.00 63,000.00 60,049.00 20,150.00 11,013.75 24,138.00
4,550.00 4,200.00 38,500.00 63,000.00 15,872.00 9,685.00 11,013.75 444,935.00
4,550.00 4,200.00 38,500.00 63,000.00 15,872.00 9,685.00 11,013.75 606,585.00
4,550.00 4,200.00 38,500.00 63,000.00 62,370.00 19,380.00
1,170.00 2,040.00 18,700.00 15,300.00 25,042.50 11,305.00
KODE BARANG 2.01.01.05.01.013 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.040.005 1.08.23.01.01.043.013 2.01.01.05.02 2.01.01.05.02.001 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.022 2.01.01.05.02.002 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.012 2.01.01.05.02.003 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.012 2.01.01.05.02.004 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.017 2.01.01.05.02.005 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.005
URAIAN KEGIATAN 1 m2 Pemasangan Underlayer (Pelapis Bawah Karpet) Mandor Kepala Tukang Tukang Kayu Pekerja Foam Lapisan Karpet Lem Kayu
KOEF
0.0060 0.0120 0.1200 0.1200 1.0500 0.3500
Penutup Dinding 1 m2 Pekerjaan Pasangan Dinding Keramik Polos Uk.20X25 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Dinding Keramik 20X25 Cm (Polos) 1 m2 Pekerjaan Pasangan Dinding Keramik Polos Uk.20X20 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Dinding Keramik 20X20 Cm (Polos) 1 m2 Pekerjaan Pasangan Dinding Keramik Polos Uk.10X20 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Dinding Keramik 10X20 Cm (Polos) 1 m2 Pekerjaan Pasangan Dinding Keramik Motif Uk.20X25 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Dinding Keramik 20X25 Cm (Motif) 1 m2 Pekerjaan Pasangan Dinding Keramik Motif Uk.20X20 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Dinding Keramik 20X20 Cm (Motif)
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
99
SAT m2 O.H O.H O.H O.H m2 kg
m2 0.0450 0.0450 0.4500 0.9000 0.2325 1.9400 0.0180 1.0500
O.H O.H O.H O.H Zak Kg m3 m2 m2
0.0450 0.0450 0.4500 0.9000 0.2325 1.9400 0.0180 1.0500
O.H O.H O.H O.H Zak Kg m3 m2 m2
0.0450 0.0450 0.4500 0.9000 0.2325 2.7500 0.0180 1.0500
O.H O.H O.H O.H Zak Kg m3 m2 m2
0.0450 0.0450 0.4500 0.9000 0.2325 1.9400 0.0180 1.0500
O.H O.H O.H O.H Zak Kg m3 m2 m2
0.0450 0.0450 0.4500 0.9000 0.2325 1.9400 0.0180 1.0500
O.H O.H O.H O.H Zak Kg m3 m2
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 73,250.00 32,300.00
JUMLAH HARGA 114,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 119,700.00
318,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 58,150.00
254,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 58,150.00
266,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 134,350.00
334,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 56,650.00
252,600.00
780.00 1,440.00 13,200.00 10,800.00 76,912.50 11,305.00
5,850.00 5,400.00 49,500.00 81,000.00 18,018.75 28,906.00 4,405.50 125,685.00
5,850.00 5,400.00 49,500.00 81,000.00 18,018.75 28,906.00 4,405.50 61,057.50
5,850.00 5,400.00 49,500.00 81,000.00 18,018.75 40,975.00 4,405.50 61,057.50
5,850.00 5,400.00 49,500.00 81,000.00 18,018.75 28,906.00 4,405.50 141,067.50
5,850.00 5,400.00 49,500.00 81,000.00 18,018.75 28,906.00 4,405.50 59,482.50
KODE BARANG 2.01.01.05.02.006 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.005
URAIAN KEGIATAN 1 m2 Pekerjaan Pasangan Dinding Keramik Motif Uk.10X20 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Dinding Keramik 10X20 Cm (Motif)
2.01.01.05.02.007
1 m' Pekerjaan Pasangan Plint Keramik 7X20 Cm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.028
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Plint Keramik 7X20 Cm
2.01.01.05.02.008
1 m' Pekerjaan Pasangan Plint Keramik 10X10 Cm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.002.007 1.08.23.01.01.004.002 1.08.23.01.01.013.032
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Semen Warna Pasir Pasang Plint Keramik 10X10 Cm
2.01.01.05.02.009
1 m' Pekerjaan Pasangan Plint Keramik 5X20 Cm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.013.025 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.002.007
Mandor Kepala Tukang Tukang Batu Pekerja Plint Keramik 5X20 Cm Semen Portland Pasir Pasang Semen Warna
2.01.01.05.02.010 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.002.007 1.08.23.01.01.013.046
1 m' Pekerjaan Pasangan Plint Marmer Tinggi 10 Cm Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Semen Warna Plint Marmer
2.01.01.05.02.011
1 m2 Pekerjaan Pemasangan Batu Palimanan
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.024
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Palimanan
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0450 0.0450 0.4500 0.9000 0.2325 2.7500 0.0180 1.0500
SAT m2 O.H O.H O.H O.H Zak Kg m3 m2 m'
0.0050 0.0090 0.0900 0.0900 0.0285 0.0250 0.0030 5.3000
O.H Kg O.H O.H Zak Kg m3 buah m'
0.0050 0.0090 0.0900 0.0900 0.0285 0.0500 0.0030 10.6000
O.H Kg O.H O.H Zak Kg m3 buah m'
0.0050 0.0090 0.0900 0.0900 5.3000 0.0143 0.0015 0.0130
O.H Kg O.H O.H buah Zak m3 Kg m'
0.0420 0.0420 0.4200 0.8400 0.4213 0.0320 1.3000 0.1100
O.H Kg O.H O.H Zak m3 Kg m2 m2
0.0350 0.0350 0.3500 0.7000 0.2938 0.0350 1.1000
100
O.H O.H O.H O.H Zak m3 m2
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 56,650.00
JUMLAH HARGA 264,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 5,200.00
50,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 14,900.00 244,750.00 1,450.00
38,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,150.00 77,500.00 244,750.00 14,900.00
64,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 14,900.00 241,550.00
218,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 141,700.00
297,500.00
5,850.00 5,400.00 49,500.00 81,000.00 18,018.75 40,975.00 4,405.50 59,482.50
650.00 1,080.00 9,900.00 8,100.00 2,208.75 372.50 734.25 27,560.00
650.00 1,080.00 9,900.00 8,100.00 2,208.75 745.00 734.25 15,370.00
650.00 1,080.00 9,900.00 8,100.00 43,195.00 1,108.25 367.13 193.70
5,460.00 5,040.00 46,200.00 75,600.00 32,650.75 7,832.00 19,370.00 26,570.50
4,550.00 4,200.00 38,500.00 63,000.00 22,769.50 8,566.25 155,870.00
KODE BARANG 2.01.01.05.02.012
URAIAN KEGIATAN 1 m2 Pekerjaan Pemasangan Batu Candi
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.040
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Candi
2.01.01.05.02.013
1 m2 Pekerjaan Pemasangan Batu Ampyang
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.043
Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Ampyang
2.01.01.05.02.014
1 m2 Pekerjaan Pemasangan Batu Gilang Ex Jember (Beraturan) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Gilang Ex Jember Beraturan
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.015 2.01.01.05.02.015 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.016 2.01.01.05.02.016 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.021 2.01.01.05.02.017 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.022
KOEF
0.0350 0.0350 0.3500 0.7000 0.2938 0.0350 1.1000
O.H O.H O.H O.H Zak m3 m2 m2
0.0350 0.0350 0.3500 0.7000 0.2938 0.0350 1.1000
O.H O.H O.H O.H Zak m3 m2 m2
0.0350 0.0350 0.3500 0.7000 0.2938 0.0350 1.1000
1 m2 Pekerjaan Pemasangan Batu Gilang Ex Jember (Tak Beraturan) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Gilang Ex Jember Tak Beraturan
O.H O.H O.H O.H Zak m3 m2 m2
0.0350 0.0350 0.3500 0.7000 0.2938 0.0350 1.1000
1 m2 Pekerjaan Pemasangan Batu Gilang Ex Cirebon (Simetris) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Gilang Ex Cirebon Beraturan
O.H O.H O.H O.H Zak m3 m2 m2
0.0350 0.0350 0.3500 0.7000 0.2938 0.0350 1.1000
1 m2 Pekerjaan Pemasangan Batu Gilang Ex Cirebon Asimetris Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Gilang Ex Cirebon Tak Beraturan
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m2
O.H O.H O.H O.H Zak m3 m2 m2
0.0350 0.0350 0.3500 0.7000 0.2938 0.0350 1.1000
101
O.H O.H O.H O.H Zak m3 m2
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 135,250.00
JUMLAH HARGA 290,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 32,300.00
177,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 219,000.00
382,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 128,850.00
283,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 154,600.00
311,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 122,400.00
276,200.00
4,550.00 4,200.00 38,500.00 63,000.00 22,769.50 8,566.25 148,775.00
4,550.00 4,200.00 38,500.00 63,000.00 22,769.50 8,566.25 35,530.00
4,550.00 4,200.00 38,500.00 63,000.00 22,769.50 8,566.25 240,900.00
4,550.00 4,200.00 38,500.00 63,000.00 22,769.50 8,566.25 141,735.00
4,550.00 4,200.00 38,500.00 63,000.00 22,769.50 8,566.25 170,060.00
4,550.00 4,200.00 38,500.00 63,000.00 22,769.50 8,566.25 134,640.00
KODE BARANG 2.01.01.05.02.018
URAIAN KEGIATAN 1 m2 Pekerjaan Pemasangan Wall Paper
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.040.006 1.08.23.01.01.043.003
Mandor Kepala Tukang Cat Tukang Cat Pekerja Wall Paper Perekat (Lem Kayu Fox)
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0025 0.0020 0.2000 0.0200 2.4000 0.2000
102
SAT m2 O.H O.H O.H O.H m' kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 202,650.00 48,950.00
JUMLAH HARGA 520,500.00 325.00 240.00 22,000.00 1,800.00 486,360.00 9,790.00
KODE BARANG 2.01.01.06 2.01.01.06.01 2.01.01.06.01.001
URAIAN KEGIATAN F. PEKERJAAN KAYU Kusen, Pintu, Jendela, Dan Jalusi 1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Jati
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.002 1.08.23.01.01.026.017 1.08.23.01.01.043.013
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Balok Paku Biasa Lem Kayu
2.01.01.06.01.002 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.017 1.08.23.01.01.026.017 1.08.23.01.01.043.013
1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Balok Paku Biasa Lem Kayu
2.01.01.06.01.003
1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Kruing
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.020 1.08.23.01.01.026.017 1.08.23.01.01.043.013
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Balok Paku Biasa Lem Kayu
2.01.01.06.01.004
1 m2 Pekerjaan Pasang Pintu Klamp Kayu Jati
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.001 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Papan Paku Biasa
2.01.01.06.01.005 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.011 1.08.23.01.01.026.017
1 m2 Pekerjaan Pasang Pintu Klamp Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Papan Paku Biasa
2.01.01.06.01.006
1 m2 Pekerjaan Pasang Pintu Klamp Kayu Kruing
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.022 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Papan Paku Biasa
2.01.01.06.01.007
1 m2 Pekerjaan Pasang Daun Pintu Panil Kayu Jati Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Papan Lem Kayu
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.001 1.08.23.01.01.043.013
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.3500 2.1000 21.0000 7.0000 1.1000 1.2500 1.0000
SAT
HARGA SATUAN
m3
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 21,000.00 32,300.00
26,702,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 10,163,750.00 21,000.00 32,300.00
14,476,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,437,000.00 21,000.00 32,300.00
12,576,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 21,000.00
1,014,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 11,592,800.00 21,000.00
626,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 9,660,650.00 21,000.00
549,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 32,300.00
1,329,800.00
O.H O.H O.H O.H m3 kg kg m3
0.3500 2.1000 21.0000 7.0000 1.1000 1.2500 1.0000
O.H O.H O.H O.H m3 kg kg m3
0.3500 2.1000 21.0000 7.0000 1.1000 1.2500 1.0000
O.H O.H O.H O.H m3 kg kg m2
0.0180 0.1050 1.0500 0.3500 0.0400 0.0500
O.H O.H O.H O.H m3 kg m2
0.0180 0.1050 1.0500 0.3500 0.0400 0.0500
O.H O.H O.H O.H m3 kg m2
0.0180 0.1050 1.0500 0.3500 0.0400 0.0500
O.H O.H O.H O.H m3 kg m2
0.0500 0.3000 3.0000 1.0000 0.0400 0.5000
103
O.H O.H O.H O.H m3 kg
JUMLAH HARGA
45,500.00 252,000.00 2,310,000.00 630,000.00 23,405,910.00 26,250.00 32,300.00
45,500.00 252,000.00 2,310,000.00 630,000.00 11,180,125.00 26,250.00 32,300.00
45,500.00 252,000.00 2,310,000.00 630,000.00 9,280,700.00 26,250.00 32,300.00
2,340.00 12,600.00 115,500.00 31,500.00 851,124.00 1,050.00
2,340.00 12,600.00 115,500.00 31,500.00 463,712.00 1,050.00
2,340.00 12,600.00 115,500.00 31,500.00 386,426.00 1,050.00
6,500.00 36,000.00 330,000.00 90,000.00 851,124.00 16,150.00
KODE BARANG 2.01.01.06.01.008
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Pintu Panil Kayu Kamper
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.011 1.08.23.01.01.043.013
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Papan Lem Kayu
2.01.01.06.01.009
1 m2 Pekerjaan Pasang Pintu Panil Kayu Kruing
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.022 1.08.23.01.01.043.013
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Papan Lem Kayu
2.01.01.06.01.010
1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu Jati Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Papan Lem Kayu
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.001 1.08.23.01.01.043.013 2.01.01.06.01.011 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.011 1.08.23.01.01.043.013 2.01.01.06.01.012 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.022 1.08.23.01.01.043.013 2.01.01.06.01.013 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.001 1.08.23.01.01.043.013 2.01.01.06.01.014 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.011 1.08.23.01.01.043.013
0.0500 0.3000 3.0000 1.0000 0.0400 0.5000
1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Papan Lem Kayu 1 m2 Pekerjaan Pasang Pintu/Jendela Jalusi Kayu Jati Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Papan Lem Kayu 1 m2 Pekerjaan Pasang Pintu/Jendela Jalusi Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Papan Lem Kayu
104
SAT m2 O.H O.H O.H O.H m3 kg m2
0.0500 0.3000 3.0000 1.0000 0.0400 0.5000
1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Papan Lem Kayu
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H O.H m3 kg m2
0.0400 0.2400 2.4000 0.8000 0.0240 0.3000
O.H O.H O.H O.H m3 kg m2
0.0400 0.2400 2.4000 0.8000 0.0240 0.3000
O.H O.H O.H O.H m3 kg m2
0.0400 0.2400 2.4000 0.8000 0.0240 0.3000
O.H O.H O.H O.H m3 kg m2
0.0500 0.3000 3.0000 1.0000 0.0640 0.5000
O.H O.H O.H O.H m3 Kg m2
0.0500 0.3000 3.0000 1.0000 0.0640 0.5000
O.H O.H O.H O.H m3 Kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 11,592,800.00 32,300.00
JUMLAH HARGA 942,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 9,660,650.00 32,300.00
865,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 32,300.00
890,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 11,592,800.00 32,300.00
657,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 9,660,650.00 32,300.00
611,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 32,300.00
1,840,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 11,592,800.00 32,300.00
1,220,600.00
6,500.00 36,000.00 330,000.00 90,000.00 463,712.00 16,150.00
6,500.00 36,000.00 330,000.00 90,000.00 386,426.00 16,150.00
5,200.00 28,800.00 264,000.00 72,000.00 510,674.40 9,690.00
5,200.00 28,800.00 264,000.00 72,000.00 278,227.20 9,690.00
5,200.00 28,800.00 264,000.00 72,000.00 231,855.60 9,690.00
6,500.00 36,000.00 330,000.00 90,000.00 1,361,798.40 16,150.00
6,500.00 36,000.00 330,000.00 90,000.00 741,939.20 16,150.00
KODE BARANG 2.01.01.06.01.015 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.022 1.08.23.01.01.043.013 2.01.01.06.01.016 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.081 1.08.23.01.05.002.001 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.01.017 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.081 1.08.23.01.05.002.011 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.01.018 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.081 1.08.23.01.05.002.022 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.01.019 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.091 1.08.23.01.05.002.001 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.01.020 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.091 1.08.23.01.05.002.011 1.08.23.01.01.026.017 1.08.23.01.01.043.013
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Pintu/Jendela Jalusi Kayu Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Papan Lem Kayu 1 m2 Pekerjaan Pasang Pintu Plywood Rangkap, Rangka Kayu Jati Mandor Kepala Tukang Tukang Kayu Pekerja Plywood Uk. 4' X 8' X 4 Mm Kayu Jati Papan Paku Biasa Lem Kayu 1 m2 Pekerjaan Pasang Pintu Plywood Rangkap, Rangka Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Plywood Uk. 4' X 8' X 4 Mm Kayu Kamper Papan Paku Biasa Lem Kayu 1 m2 Pekerjaan Pasang Pintu Plywood Rangkap, Rangka Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Plywood Uk. 4' X 8' X 4 Mm Kayu Kruing Papan Paku Biasa Lem Kayu 1 m2 Pekerjaan Pasang Pintu Teakwood Rangkap, Rangka Kayu Jati Mandor Kepala Tukang Tukang Kayu Pekerja Teakwood Uk. 4' X 8' X 4 Mm Kayu Jati Papan Paku Biasa Lem Kayu
0.0500 0.3000 3.0000 1.0000 0.0640 0.5000
SAT m2 O.H O.H O.H O.H m3 Kg m2
0.0400 0.2400 2.4000 0.8000 1.0000 0.0256 0.0300 0.5000
O.H O.H O.H O.H Lembar m3 Kg kg m2
0.0400 0.2400 2.4000 0.8000 1.0000 0.0256 0.0300 0.5000
O.H O.H O.H O.H lembar m3 kg kg m2
0.0400 0.2400 2.4000 0.8000 1.0000 0.0256 0.0300 0.5000
O.H O.H O.H O.H lembar m3 kg kg m2
0.0400 0.2400 2.4000 0.8000 1.0000 0.0250 0.0300 0.3000
1 m2 Pekerjaan Pasang Pintu Teakwood Rangkap, Rangka Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Teakwood Uk. 4' X 8' X 4 Mm Kayu Kamper Papan Paku Biasa Lem Kayu
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H O.H lembar m3 kg kg m2
0.0400 0.2400 2.4000 0.8000 1.0000 0.0250 0.0300 0.3000
105
O.H O.H O.H O.H lembar m3 kg kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 9,660,650.00 32,300.00
JUMLAH HARGA 1,096,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 126,350.00 21,278,100.00 21,000.00 32,300.00
1,057,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 126,350.00 11,592,800.00 21,000.00 32,300.00
809,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 126,350.00 9,660,650.00 21,000.00 32,300.00
760,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 142,100.00 21,278,100.00 21,000.00 32,300.00
1,054,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 142,100.00 11,592,800.00 21,000.00 32,300.00
812,200.00
6,500.00 36,000.00 330,000.00 90,000.00 618,281.60 16,150.00
5,200.00 28,800.00 264,000.00 72,000.00 126,350.00 544,719.36 630.00 16,150.00
5,200.00 28,800.00 264,000.00 72,000.00 126,350.00 296,775.68 630.00 16,150.00
5,200.00 28,800.00 264,000.00 72,000.00 126,350.00 247,312.64 630.00 16,150.00
5,200.00 28,800.00 264,000.00 72,000.00 142,100.00 531,952.50 630.00 9,690.00
5,200.00 28,800.00 264,000.00 72,000.00 142,100.00 289,820.00 630.00 9,690.00
KODE BARANG 2.01.01.06.01.021 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.091 1.08.23.01.05.002.022 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.01.022 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.079 1.08.23.01.05.002.011 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.01.023 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.079 1.08.23.01.05.002.022 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.01.024 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.078 1.08.23.01.05.002.011 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.02 2.01.01.06.02.001 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.002 1.08.23.01.01.008.006 1.08.23.01.01.026.017 2.01.01.06.02.002 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.017 1.08.23.01.01.008.006 1.08.23.01.01.026.017
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Pintu Teakwood Rangkap, Rangka Kayu Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Teakwood Uk. 4' X 8' X 4 Mm Kayu Kruing Papan Paku Biasa Lem Kayu
KOEF
0.0400 0.2400 2.4000 0.8000 1.0000 0.0250 0.0300 0.3000
1 m2 Pekerjaan Pasang Pintu Tripleks Rangkap, Rangka Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Tripleks 4 mm Kayu Kamper Papan Paku Biasa Lem Kayu 1 m2 Pekerjaan Pasang Pintu Tripleks Rangkap, Rangka Kayu Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Tripleks 4 mm Kayu Kruing Papan Paku Biasa Lem Kayu 1 m2 Pekerjaan Pasang Pintu Lapis Aluminium, Rangka Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Tripleks + Lapis Aluminium 4 Mm Kayu Kamper Papan Paku Biasa Lem Kayu Kuda - Kuda Dan Rangka Atap 1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Jati Bentang 6 m Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Balok Besi Plat Strip Paku Biasa
O.H O.H O.H O.H lembar m3 kg kg m2
0.0400 0.2400 2.4000 0.8000 1.0000 0.0250 0.0300 0.3000
O.H O.H O.H O.H lembar m3 kg kg m2
0.0400 0.2400 2.4000 0.8000 1.0000 0.0250 0.0300 0.3000
O.H O.H O.H O.H lembar m3 kg kg m2
0.0400 0.2400 2.4000 0.8000 1.0000 0.0250 0.0300 0.3000
O.H O.H O.H O.H Lembar m3 kg kg
m3 0.2000 1.2000 12.0000 4.0000 1.1000 15.0000 5.6000
1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Kamper Bentang 6 M Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Balok Besi Plat Strip Paku Biasa
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m2
O.H O.H O.H O.H m3 Kg kg m3
0.2000 1.2000 12.0000 4.0000 1.1000 15.0000 5.6000
106
O.H O.H O.H O.H m3 Kg kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 142,100.00 9,660,650.00 21,000.00 32,300.00
JUMLAH HARGA 763,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 91,400.00 11,592,800.00 21,000.00 32,300.00
761,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 91,400.00 9,660,650.00 21,000.00 32,300.00
713,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 86,350.00 11,592,800.00 21,000.00 32,300.00
756,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 13,500.00 21,000.00
25,576,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 10,163,750.00 13,500.00 21,000.00
13,350,200.00
5,200.00 28,800.00 264,000.00 72,000.00 142,100.00 241,516.25 630.00 9,690.00
5,200.00 28,800.00 264,000.00 72,000.00 91,400.00 289,820.00 630.00 9,690.00
5,200.00 28,800.00 264,000.00 72,000.00 91,400.00 241,516.25 630.00 9,690.00
5,200.00 28,800.00 264,000.00 72,000.00 86,350.00 289,820.00 630.00 9,690.00
26,000.00 144,000.00 1,320,000.00 360,000.00 23,405,910.00 202,500.00 117,600.00
26,000.00 144,000.00 1,320,000.00 360,000.00 11,180,125.00 202,500.00 117,600.00
KODE BARANG 2.01.01.06.02.003 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.020 1.08.23.01.01.008.006 1.08.23.01.01.026.017 2.01.01.06.02.004
URAIAN KEGIATAN 1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Kruing Bentang 6 M Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Balok Besi Plat Strip Paku Biasa
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.031 1.08.23.01.01.008.006 1.08.23.01.01.026.017
1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Meranti Bentang 6 M Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Meranti Balok Besi Plat Strip Paku Biasa
2.01.01.06.02.005
1 m3 Pekerjaan Pemasangan Gording Kayu Jati
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.002 1.08.23.01.01.008.006 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Balok Besi Plat Strip Paku Biasa
2.01.01.06.02.006
1 m3 Pekerjaan Pemasangan Gording Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Balok Besi Plat Strip Paku Biasa
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.017 1.08.23.01.01.008.006 1.08.23.01.01.026.017 2.01.01.06.02.007 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.020 1.08.23.01.01.008.006 1.08.23.01.01.026.017 2.01.01.06.02.008 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.031 1.08.23.01.01.008.006 1.08.23.01.01.026.017
0.2000 1.2000 12.0000 4.0000 1.1000 15.0000 5.6000
SAT m3 O.H O.H O.H O.H m3 Kg kg m3
0.2000 1.2000 12.0000 4.0000 1.1000 15.0000 5.6000
O.H O.H O.H O.H m3 Kg kg m3
0.3350 2.0100 20.1000 6.7000 1.1000 15.0000 3.0000
O.H O.H O.H O.H m3 Kg kg m3
0.3350 2.0100 20.1000 6.7000 1.1000 15.0000 3.0000
1 m3 Pekerjaan Pemasangan Gording Kayu Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Balok Besi Plat Strip Paku Biasa
O.H O.H O.H O.H m3 Kg kg m3
0.3350 2.0100 20.1000 6.7000 1.1000 15.0000 3.0000
1 m3 Pekerjaan Pemasangan Gording Kayu Meranti Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Meranti Balok Besi Plat Strip Paku Biasa
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H O.H m3 Kg kg m3
0.3350 2.0100 20.1000 6.7000 1.1000 15.0000 3.0000
107
O.H O.H O.H O.H m3 Kg kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,437,000.00 13,500.00 21,000.00
JUMLAH HARGA 11,450,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 6,753,300.00 13,500.00 21,000.00
9,598,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 13,500.00 21,000.00
26,770,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 10,163,750.00 13,500.00 21,000.00
14,544,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,437,000.00 13,500.00 21,000.00
12,645,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 6,753,300.00 13,500.00 21,000.00
10,792,900.00
26,000.00 144,000.00 1,320,000.00 360,000.00 9,280,700.00 202,500.00 117,600.00
26,000.00 144,000.00 1,320,000.00 360,000.00 7,428,630.00 202,500.00 117,600.00
43,550.00 241,200.00 2,211,000.00 603,000.00 23,405,910.00 202,500.00 63,000.00
43,550.00 241,200.00 2,211,000.00 603,000.00 11,180,125.00 202,500.00 63,000.00
43,550.00 241,200.00 2,211,000.00 603,000.00 9,280,700.00 202,500.00 63,000.00
43,550.00 241,200.00 2,211,000.00 603,000.00 7,428,630.00 202,500.00 63,000.00
KODE BARANG 2.01.01.06.02.009 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.025 1.08.23.01.01.026.017 2.01.01.06.02.010 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.023 1.08.23.01.05.002.025 1.08.23.01.01.026.017 2.01.01.06.02.011 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.023 1.08.23.01.05.002.025 1.08.23.01.01.026.017 2.01.01.06.03 2.01.01.06.03.001 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.005 1.08.23.01.01.026.017 2.01.01.06.03.002 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.005 1.08.23.01.01.026.017 2.01.01.06.03.003 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.005 1.08.23.01.01.026.017 2.01.01.06.03.004 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.013 1.08.23.01.01.026.017
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Rangka Atap Genteng Kodok Mandor Kepala Tukang Tukang Kayu Pekerja Kaso/Reng Kayu Kruing Paku Biasa
KOEF
0.0050 0.0100 0.1000 0.1000 0.0120 0.1500
1 m2 Pekerjaan Pasang Rangka Atap Genteng Keramik Mandor Kepala Tukang Tukang Kayu Pekerja Kaso Kruing 5X7 Reng Kruing 2X3 Paku Biasa
O.H O.H O.H O.H m3 Kg m2
0.0050 0.0100 0.1000 0.1000 0.0140 0.0036 0.2500
1 m2 Pekerjaan Pasang Rangka Atap Genteng Beton Mandor Kepala Tukang Tukang Kayu Pekerja Kaso Kruing (5X7) Cm Reng Kruing (3X4) Cm Paku Biasa
O.H O.H O.H O.H m3 m3 Kg m2
0.0050 0.0100 0.1000 0.1000 0.0140 0.0057 0.2500
Rangka Langit - Langit Dan Listplank 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Jati (100x100) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (jati) Paku Biasa
O.H O.H O.H O.H m3 m3 Kg
m2 0.0750 0.0250 0.2500 0.1500 0.0120 0.1000
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Jati (50x100) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (jati) Paku Biasa
O.H O.H O.H O.H m3 Kg m2
0.0750 0.0300 0.3000 0.1500 0.0154 0.2000
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Jati (60x60) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (jati) Paku Biasa
O.H O.H O.H O.H m3 Kg m2
0.0100 0.0300 0.3000 0.2000 0.0163 0.2500
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kamper (100x100) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (Kamper) Paku Biasa
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m2
O.H O.H O.H O.H m3 Kg m2
0.0750 0.0250 0.2500 0.1500 0.0120 0.1000
108
O.H O.H O.H O.H m3 Kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 7,728,550.00 21,000.00
JUMLAH HARGA 117,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 7,084,500.00 7,728,550.00 21,000.00
154,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 7,084,500.00 7,728,550.00 21,000.00
170,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 14,181,900.00 21,000.00
226,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 14,181,900.00 21,000.00
282,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 14,181,900.00 21,000.00
292,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 9,040,800.00 21,000.00
164,300.00
650.00 1,200.00 11,000.00 9,000.00 92,742.60 3,150.00
650.00 1,200.00 11,000.00 9,000.00 99,183.00 27,822.78 5,250.00
650.00 1,200.00 11,000.00 9,000.00 99,183.00 44,052.74 5,250.00
9,750.00 3,000.00 27,500.00 13,500.00 170,182.80 2,100.00
9,750.00 3,600.00 33,000.00 13,500.00 218,401.26 4,200.00
1,300.00 3,600.00 33,000.00 18,000.00 231,164.97 5,250.00
9,750.00 3,000.00 27,500.00 13,500.00 108,489.60 2,100.00
KODE BARANG 2.01.01.06.03.005 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.013 1.08.23.01.01.026.017 2.01.01.06.03.006 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.013 1.08.23.01.01.026.017 2.01.01.06.03.007 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.023 1.08.23.01.01.026.017 2.01.01.06.03.008 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.023 1.08.23.01.01.026.017 2.01.01.06.03.009 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.023 1.08.23.01.01.026.017 2.01.01.06.03.010 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.035 1.08.23.01.01.026.017 2.01.01.06.03.011 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.035 1.08.23.01.01.026.017
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kamper (50x100) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (Kamper) Paku Biasa
KOEF
0.0750 0.0300 0.3000 0.1500 0.0154 0.2000
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kamper (60x60) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (Kamper) Paku Biasa
O.H O.H O.H O.H m3 Kg m2
0.0100 0.0300 0.3000 0.2000 0.0163 0.2500
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kruing (100x100) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (Kruing) Paku Biasa
O.H O.H O.H O.H m3 Kg m2
0.0750 0.0250 0.2500 0.1500 0.0120 0.1000
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kruing (50x100) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (Kruing) Paku Biasa
O.H O.H O.H O.H m3 Kg m2
0.0750 0.0300 0.3000 0.1500 0.0154 0.2000
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kruing (60x60) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (Kruing) Paku Biasa
O.H O.H O.H O.H m3 Kg m2
0.0100 0.0300 0.3000 0.2000 0.0163 0.2500
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Meranti (100x100) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (Meranti) Paku Biasa
O.H O.H O.H O.H m3 Kg m2
0.0750 0.0250 0.2500 0.1500 0.0120 0.1000
1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Meranti (50x100) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (Meranti) Paku Biasa
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m2
O.H O.H O.H O.H m3 Kg m2
0.0750 0.0300 0.3000 0.1500 0.0154 0.2000
109
O.H O.H O.H O.H m3 Kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 9,040,800.00 21,000.00
JUMLAH HARGA 203,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 9,040,800.00 21,000.00
208,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 7,084,500.00 21,000.00
140,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 7,084,500.00 21,000.00
173,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 7,084,500.00 21,000.00
176,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,740,300.00 21,000.00
124,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,740,300.00 21,000.00
152,500.00
9,750.00 3,600.00 33,000.00 13,500.00 139,228.32 4,200.00
1,300.00 3,600.00 33,000.00 18,000.00 147,365.04 5,250.00
9,750.00 3,000.00 27,500.00 13,500.00 85,014.00 2,100.00
9,750.00 3,600.00 33,000.00 13,500.00 109,101.30 4,200.00
1,300.00 3,600.00 33,000.00 18,000.00 115,477.35 5,250.00
9,750.00 3,000.00 27,500.00 13,500.00 68,883.60 2,100.00
9,750.00 3,600.00 33,000.00 13,500.00 88,400.62 4,200.00
KODE BARANG 2.01.01.06.03.012 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.035 1.08.23.01.01.026.017
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Meranti (60x60) Mandor Kepala Tukang Tukang Kayu Pekerja Kaso 5X7 Cm (Meranti) Paku Biasa
2.01.01.06.03.013
1 m' Pekerjaan Pasang Listplank Kayu Jati 3/20
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.001 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Papan Paku Biasa
2.01.01.06.03.014 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.011 1.08.23.01.01.026.017
1 m' Pekerjaan Pasang Listplank Kayu Kamper 3/20 Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Papan Paku Biasa
2.01.01.06.03.015
1 m' Pekerjaan Pasang Listplank Kayu Jati 3/30
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.001 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Papan Paku Biasa
2.01.01.06.03.016
1 m' Pekerjaan Pasang Listplank Kayu Kamper 3/30 Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Papan Paku Biasa
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.011 1.08.23.01.01.026.017 2.01.01.06.03.017 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.011 1.08.23.01.01.026.017 2.01.01.06.03.018 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.011 1.08.23.01.01.026.017
KOEF
0.0100 0.0300 0.3000 0.2000 0.0163 0.2500
O.H O.H O.H O.H m3 Kg m'
0.0050 0.0200 0.2000 0.1000 0.0108 0.1000
O.H O.H O.H O.H m3 Kg m'
0.0050 0.0200 0.2000 0.1000 0.0108 0.1000
O.H O.H O.H O.H m3 Kg m'
0.0050 0.0200 0.2000 0.1000 0.0110 0.0500
O.H O.H O.H O.H m3 Kg m'
0.0050 0.0200 0.2000 0.1000 0.0110 0.0500
1 m' Pekerjaan Pasang Listplank Kayu Kamper 2 X 3/20 Cm (Double) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Papan Paku Biasa 1 m' Pekerjaan Pasang Listplank Kayu Kamper 2 X 2/20 Cm (Double) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Papan Paku Biasa
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m2
110
O.H O.H O.H O.H m3 Kg m'
0.0750 0.0250 0.2500 0.1500 0.0145 0.0600
O.H O.H O.H O.H m3 Kg m'
0.0500 0.0100 0.1000 0.1000 0.0086 0.0600
O.H O.H O.H O.H m3 Kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,740,300.00 21,000.00
JUMLAH HARGA 154,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 21,000.00
266,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 11,592,800.00 21,000.00
161,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 21,000.00
269,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 11,592,800.00 21,000.00
162,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 11,592,800.00 21,000.00
223,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 11,592,800.00 21,000.00
128,700.00
1,300.00 3,600.00 33,000.00 18,000.00 93,566.89 5,250.00
650.00 2,400.00 22,000.00 9,000.00 229,803.48 2,100.00
650.00 2,400.00 22,000.00 9,000.00 125,202.24 2,100.00
650.00 2,400.00 22,000.00 9,000.00 234,059.10 1,050.00
650.00 2,400.00 22,000.00 9,000.00 127,520.80 1,050.00
9,750.00 3,000.00 27,500.00 13,500.00 168,095.60 1,260.00
6,500.00 1,200.00 11,000.00 9,000.00 99,698.08 1,260.00
KODE BARANG 2.01.01.06.03.019 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.037 1.08.23.01.01.026.017 2.01.01.06.04 2.01.01.06.04.001 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.002 1.08.23.01.01.026.017 2.01.01.06.04.002 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.002 1.08.23.01.05.002.091 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.04.003 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.002 1.08.23.01.05.002.081 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.04.004 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.017 1.08.23.01.01.026.017 2.01.01.06.04.005 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.017 1.08.23.01.05.002.091 1.08.23.01.01.026.017 1.08.23.01.01.043.013
URAIAN KEGIATAN 1 m' Pekerjaan Pasang Listplank Kayu Borneo 2 X 2/20 Cm (Double) Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Borneo Papan Paku Biasa Rangka Dinding Partisi 1 m2 Pekerjaan Pasang Rangka Dinding Pemisah Kayu Jati Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Balok Paku Biasa 1 m2 Pekerjaan Pasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Jati Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Balok Teakwood 4 Mm, Uk. 120 X 240 Cm Paku Biasa Lem Kayu
0.0500 0.0100 0.1000 0.1000 0.0088 0.0600
SAT m' O.H O.H O.H O.H m3 Kg
m2 0.0080 0.0450 0.4500 0.1500 0.0280 0.1500
O.H O.H O.H O.H m3 kg m2
0.0080 0.0450 0.4500 0.1500 0.0280 0.8600 0.1500 0.5600
1 m2 Pekerjaan Pasang Dinding Pemisah Plywood Rangkap Rangka Kayu Jati Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Balok Plywood 4 Mm, Uk. 120 X 240 Cm Paku Biasa Lem Kayu
O.H O.H O.H O.H m3 Lembar kg kg m2
0.0100 0.0600 0.6000 0.2000 0.0280 0.8600 0.1500 0.5600
1 m2 Pekerjaan Pasang Rangka Dinding Pemisah Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Balok Paku Biasa 1 m2 Pekerjaan Pasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Balok Teakwood 4 Mm, Uk. 120 X 240 Cm Paku Biasa Lem Kayu
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H O.H m3 Lembar kg kg m2
0.0080 0.0450 0.4500 0.1500 0.0280 0.1500
O.H O.H O.H O.H m3 kg m2
0.0080 0.0450 0.4500 0.1500 0.0280 0.8600 0.1500 0.5600
111
O.H O.H O.H O.H m3 Lembar kg kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,103,950.00 21,000.00
JUMLAH HARGA 100,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 21,000.00
668,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 142,100.00 21,000.00 32,300.00
808,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 126,350.00 21,000.00 32,300.00
818,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 10,163,750.00 21,000.00
357,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 10,163,750.00 142,100.00 21,000.00 32,300.00
497,500.00
6,500.00 1,200.00 11,000.00 9,000.00 71,314.76 1,260.00
1,040.00 5,400.00 49,500.00 13,500.00 595,786.80 3,150.00
1,040.00 5,400.00 49,500.00 13,500.00 595,786.80 122,206.00 3,150.00 18,088.00
1,300.00 7,200.00 66,000.00 18,000.00 595,786.80 108,661.00 3,150.00 18,088.00
1,040.00 5,400.00 49,500.00 13,500.00 284,585.00 3,150.00
1,040.00 5,400.00 49,500.00 13,500.00 284,585.00 122,206.00 3,150.00 18,088.00
KODE BARANG 2.01.01.06.04.006 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.017 1.08.23.01.05.002.081 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.04.007 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.020 1.08.23.01.01.026.017 2.01.01.06.04.008 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.020 1.08.23.01.05.002.091 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.04.009 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.020 1.08.23.01.05.002.081 1.08.23.01.01.026.017 1.08.23.01.01.043.013 2.01.01.06.04.010 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.020 1.08.23.01.01.025.001 1.08.23.01.01.026.017 1.08.23.01.01.043.013
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Dinding Pemisah Plywood Rangkap Rangka Kayu Kamper Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kamper Balok Plywood 4 Mm, Uk. 120 X 240 Cm Paku Biasa Lem Kayu
KOEF
0.0100 0.0600 0.6000 0.2000 0.0280 0.8600 0.1500 0.5600
1 m2 Pekerjaan Pasang Rangka Dinding Pemisah Kayu Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Balok Paku Biasa 1 m2 Pekerjaan Pasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Balok Teakwood 4 Mm, Uk. 120 X 240 Cm Paku Biasa Lem Kayu
O.H O.H O.H O.H m3 Lembar kg kg m2
0.0080 0.0450 0.4500 0.1500 0.0280 0.1500
O.H O.H O.H O.H m3 kg m2
0.0080 0.0450 0.4500 0.1500 0.0280 0.8600 0.1500 0.5600
1 m2 Pekerjaan Pasang Dinding Pemisah Plywood Rangkap Rangka Kayu Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Balok Plywood 4 Mm, Uk. 120 X 240 Cm Paku Biasa Lem Kayu
O.H O.H O.H O.H m3 Lembar kg kg m2
0.0100 0.0600 0.6000 0.2000 0.0280 0.8600 0.1500 0.5600
1 m2 Pekerjaan Pasang Dinding Pemisah Gypsum Rangkap Rangka Kayu Kruing Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Kruing Balok Papan Gypsum Paku Biasa Lem Kayu
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m2
112
O.H O.H O.H O.H m3 Lembar kg kg m2
0.0100 0.0600 0.6000 0.2000 0.0280 0.8600 0.1500 0.5600
O.H O.H O.H O.H m3 Lembar kg kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 10,163,750.00 126,350.00 21,000.00 32,300.00
JUMLAH HARGA 507,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,437,000.00 21,000.00
308,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,437,000.00 142,100.00 21,000.00 32,300.00
449,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,437,000.00 126,350.00 21,000.00 32,300.00
458,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,437,000.00 96,650.00 21,000.00 32,300.00
433,100.00
1,300.00 7,200.00 66,000.00 18,000.00 284,585.00 108,661.00 3,150.00 18,088.00
1,040.00 5,400.00 49,500.00 13,500.00 236,236.00 3,150.00
1,040.00 5,400.00 49,500.00 13,500.00 236,236.00 122,206.00 3,150.00 18,088.00
1,300.00 7,200.00 66,000.00 18,000.00 236,236.00 108,661.00 3,150.00 18,088.00
1,300.00 7,200.00 66,000.00 18,000.00 236,236.00 83,119.00 3,150.00 18,088.00
KODE BARANG 2.01.01.07 2.01.01.07.01 2.01.01.07.01.001 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.016 2.01.01.07.01.002 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.017 2.01.01.07.01.003 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.021 2.01.01.07.01.004 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.023 2.01.01.07.01.005
URAIAN KEGIATAN G. PEKERJAAN FINSHING Penutup Atap Dan langit - Langit 1 m2 Pekerjaan Pasang Atap Genteng Karang Pilang Ex. Nglayur Mandor Kepala Tukang Tukang Kayu Pekerja Genteng Karang Pilang Ex. Nglayur
KOEF
0.0080 0.0075 0.0750 0.1500 25.0000
1 m2 Pekerjaan Pasang Atap Genteng Karang Pilang Ex. Wisma Mandor Kepala Tukang Tukang Kayu Pekerja Genteng Karang Pilang Ex. Wisma
0.0080 0.0075 0.0750 0.1500 25.0000
1 m2 Pekerjaan Pasang Atap Genteng Kodok Ex. Nglayur Mandor Kepala Tukang Tukang Kayu Pekerja Genteng Kodok Ex. Nglayur
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.024 2.01.01.07.01.006
1 m2 Pekerjaan Pasang Atap Genteng Beton
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.018 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Genteng Beton Paku Biasa
2.01.01.07.01.007
1 m2 Pekerjaan Pasang Atap Genteng Metal
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.028 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Genteng Metal Paku Biasa
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
HARGA SATUAN
m2
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 2,750.00
92,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 4,300.00
131,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 2,950.00
97,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 3,150.00
102,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 12,300.00
220,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 6,250.00 21,000.00
100,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 133,600.00 21,000.00
170,800.00
O.H O.H O.H O.H Buah m2
1 m2 Pekerjaan Pasang Atap Genteng Kodok Ex. Trenggalek Mandor Kepala Tukang Tukang Kayu Pekerja Genteng Kodok Ex. Trenggalek
1 m2 Pekerjaan Pasang Atap Genteng Keramik Glazzur Mandor Kepala Tukang Tukang Kayu Pekerja Genteng Keramik Glazzur ex. Kanmuri
SAT
O.H O.H O.H O.H Buah m2
0.0080 0.0080 0.0750 0.1500 25.0000
O.H O.H O.H O.H Buah m2
0.0080 0.0080 0.0750 0.1500 25.0000
O.H O.H O.H O.H Buah m2
0.0800 0.0800 0.0750 0.1500 14.5000
O.H O.H O.H O.H Buah m2
0.0100 0.0100 0.1000 0.2000 11.0000 0.0300
O.H O.H O.H O.H Buah kg m2
0.0010 0.0100 0.1000 0.2000 1.0200 0.2000
113
O.H O.H O.H O.H Lembar kg
JUMLAH HARGA
1,040.00 900.00 8,250.00 13,500.00 68,750.00
1,040.00 900.00 8,250.00 13,500.00 107,500.00
1,040.00 960.00 8,250.00 13,500.00 73,750.00
1,040.00 960.00 8,250.00 13,500.00 78,750.00
10,400.00 9,600.00 8,250.00 13,500.00 178,350.00
1,300.00 1,200.00 11,000.00 18,000.00 68,750.00 630.00
130.00 1,200.00 11,000.00 18,000.00 136,272.00 4,200.00
KODE BARANG 2.01.01.07.01.008
URAIAN KEGIATAN 1 m2 Pasang Atap Sirap Kayu
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.030 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Atap Sirap Paku Biasa
2.01.01.07.01.009
1 m2 Pasang Atap Seng Gelombang
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.007.004 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Seng Gelombang Paku Biasa
2.01.01.07.01.010
1 m2 Pekerjaan Pasang Atap Roof Light Fiber Glass Mandor Kepala Tukang Tukang Kayu Pekerja Roof Light Fiber Glass Paku Biasa
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.025.004 1.08.23.01.01.026.017 2.01.01.07.01.011 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.012 1.08.23.01.01.026.011 2.01.01.07.01.012 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.013 1.08.23.01.01.026.011 2.01.01.07.01.013 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.014 1.08.23.01.01.026.011 2.01.01.07.01.014 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.006 1.08.23.01.01.026.011
KOEF
0.0080 0.0250 0.2500 0.1660 30.0000 0.2000
O.H O.H O.H O.H Lembar Kg m2
0.0060 0.0060 0.0600 0.1200 0.7000 0.0200
O.H O.H O.H O.H Lembar Kg m2
0.0070 0.0070 0.0670 0.1400 0.6000 0.0500
1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 5 Mm (2,5 X 0,92) Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Gelombang Tb.5 Mm (2.5 X 0.92) Paku Pancing 60X230 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 5 Mm (2 X 0,92) Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Gelombang Tb.5 Mm (2.00 X 0.92) Paku Pancing 60X230 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 5 Mm (1,8 X 0,92) Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Gelombang Tb.5 Mm (1.8 X 0.92) Paku Pancing 60X230 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (3 X 1,05) Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Gelombang Tb.4 Mm (3.00 X 1.05) Paku Pancing 60X230
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m2
114
O.H O.H O.H O.H Lembar Kg m2
0.0080 0.0080 0.0750 0.1400 0.5000 0.1200
O.H O.H O.H O.H Lembar kg m2
0.0070 0.0070 0.0700 0.1400 0.6000 0.1200
O.H O.H O.H O.H Lembar kg m2
0.0070 0.0070 0.0700 0.1400 0.7500 0.1200
O.H O.H O.H O.H Lembar kg m2
0.0070 0.0070 0.0700 0.1400 0.3500 0.1200
O.H O.H O.H O.H Lembar kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 20,100.00 21,000.00
JUMLAH HARGA 653,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 78,950.00 21,000.00
74,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 67,550.00 21,000.00
63,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 125,550.00 29,750.00
89,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 107,200.00 29,750.00
89,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 92,250.00 29,750.00
94,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 116,900.00 29,750.00
66,500.00
1,040.00 3,000.00 27,500.00 14,940.00 603,000.00 4,200.00
780.00 720.00 6,600.00 10,800.00 55,265.00 420.00
910.00 840.00 7,370.00 12,600.00 40,530.00 1,050.00
1,040.00 960.00 8,250.00 12,600.00 62,775.00 3,570.00
910.00 840.00 7,700.00 12,600.00 64,320.00 3,570.00
910.00 840.00 7,700.00 12,600.00 69,187.50 3,570.00
910.00 840.00 7,700.00 12,600.00 40,915.00 3,570.00
KODE BARANG 2.01.01.07.01.015 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.007 1.08.23.01.01.026.011 2.01.01.07.01.016 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.008 1.08.23.01.01.026.011 2.01.01.07.01.017 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.009 1.08.23.01.01.026.011 2.01.01.07.01.018 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.011 1.08.23.01.01.026.011 2.01.01.07.01.019
URAIAN KEGIATAN 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (2,7 X 1,05) Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Gelombang Tb.4 Mm (2.70 X 1.05) Paku Pancing 60X230 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (2,4 X 1,05) Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Gelombang Tb.4 Mm (2.40 X 1.05) Paku Pancing 60X230 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (2,1 X 1,05) Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Gelombang Tb.4 Mm (2.10 X 1.05) Paku Pancing 60X230 1 m2 Pekerjaan Pasang Atap Asbes Gelombang Tebal 4 Mm (1,5 X 1,05) Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Gelombang Tb.4 Mm (1.5 X 1.05) Paku Pancing 60X230
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.014.003
1 m' Pekerjaan Pasang Wuwung Genteng Palentong Mandor Kepala Tukang Tukang Kayu Pekerja Semen Portland Pasir Pasang Wuwung Genteng Palentong
2.01.01.07.01.020
1 m' Pekerjaan Pasang Wuwung Genteng Kodok
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.014.001
Mandor Kepala Tukang Tukang Kayu Pekerja Semen Portland Pasir Pasang Wuwung Kodok Genteng
2.01.01.07.01.021
1 m' Pekerjaan Pasang Wuwung Genteng Karang Pilang Ex. Nglayur Mandor Kepala Tukang Tukang Kayu Pekerja Semen Portland Pasir Pasang Wuwung Karang Pilang Ex. Nglayur
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.014.004
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0070 0.0070 0.0700 0.1400 0.4200 0.1200
SAT m2 O.H O.H O.H O.H Lembar kg m2
0.0070 0.0070 0.0670 0.1400 0.4400 0.1200
O.H O.H O.H O.H Lembar kg m2
0.0070 0.0070 0.0670 0.1400 0.5100 0.1200
O.H O.H O.H O.H Lembar kg m2
0.0070 0.0070 0.0670 0.1400 0.8000 0.1200
O.H O.H O.H O.H Lembar kg m'
0.0020 0.0200 0.2000 0.4000 0.2000 0.0320 5.0000
m' 0.0020 0.0200 0.2000 0.4000 0.2000 0.0320 5.0000
115
O.H O.H O.H O.H Zak m3 Buah
O.H O.H O.H O.H Zak m3 Buah m'
0.0020 0.0200 0.2000 0.4000 0.2000 0.0320 5.0000
O.H O.H O.H O.H Zak m3 Buah
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 110,450.00 29,750.00
JUMLAH HARGA 72,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 99,000.00 29,750.00
68,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 87,850.00 29,750.00
70,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 65,700.00 29,750.00
77,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 16,800.00
168,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 16,600.00
167,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 8,150.00
124,700.00
910.00 840.00 7,700.00 12,600.00 46,389.00 3,570.00
910.00 840.00 7,370.00 12,600.00 43,560.00 3,570.00
910.00 840.00 7,370.00 12,600.00 44,803.50 3,570.00
910.00 840.00 7,370.00 12,600.00 52,560.00 3,570.00
260.00 2,400.00 22,000.00 36,000.00 15,500.00 7,832.00 84,000.00
260.00 2,400.00 22,000.00 36,000.00 15,500.00 7,832.00 83,000.00
260.00 2,400.00 22,000.00 36,000.00 15,500.00 7,832.00 40,750.00
KODE BARANG 2.01.01.07.01.022 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.014.029
URAIAN KEGIATAN 1 m' Pekerjaan Pasang Bubungan Genteng Keramik/ Glazzur Mandor Kepala Tukang Tukang Kayu Pekerja Semen Portland Pasir Pasang Genteng Bubungan Glazzur
2.01.01.07.01.023
1 m' Pekerjaan Pasang Nok Genteng Beton
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.009 1.08.23.01.01.026.017 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.002.007
Mandor Kepala Tukang Tukang Kayu Pekerja Nok Genteng Beton Paku Biasa Semen Portland Pasir Pasang Semen Warna
2.01.01.07.01.024
1 m' Pemasangan Nok Genteng Metal
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.014.039 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Nok Genteng Metal Paku Biasa
2.01.01.07.01.025
1 m' Pasang Nok Sirap
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.007.016 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Seng Plat 3" X 6" Bjls 28 Paku Biasa
2.01.01.07.01.026
1 m' Pasang Nok Atap Seng
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.007.016 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja Seng Plat 3" X 6" Bjls 28 Paku Biasa
2.01.01.07.01.027
1 m' Pekerjaan Pasang Nok Stel Rata 0.92 M
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.027 1.08.23.01.01.026.021
Mandor Kepala Tukang Tukang Kayu Pekerja Nok Stel Seng 92 Cm Paku Skrup
2.01.01.07.01.028
1 m' Pekerjaan Pasang Nok Stel Rata 1.05 M
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.028 1.08.23.01.01.026.021
Mandor Kepala Tukang Tukang Kayu Pekerja Nok Stel Seng 105 Cm Paku Skrup
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0020 0.0200 0.2000 0.4000 0.2000 0.0320 5.0000
SAT m' O.H O.H O.H O.H Zak m3 Buah m'
0.0200 0.0200 0.2000 0.4000 3.5000 0.0500 0.2700 0.0320 1.0000
O.H O.H O.H O.H Buah Kg Zak m3 Kg m'
0.0130 0.0150 0.1500 0.2500 1.1000 0.0500
O.H O.H O.H O.H Buah kg m2
0.0060 0.0250 0.2500 0.1250 0.4000 0.1000
O.H O.H O.H O.H Lembar kg m2
0.0060 0.0070 0.0700 0.1500 0.3000 0.0400
O.H O.H O.H O.H Lembar kg m'
0.0040 0.0130 0.1500 0.1000 1.1000 0.0240
O.H O.H O.H O.H Lembar Buah m'
0.0040 0.0130 0.1250 0.0840 1.1000 0.0240
116
O.H O.H O.H O.H Lembar Buah
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 25,500.00
JUMLAH HARGA 211,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 8,650.00 21,000.00 77,500.00 244,750.00 14,900.00
138,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 32,100.00 21,000.00
78,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 107,200.00 21,000.00
87,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 107,200.00 21,000.00
55,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 36,500.00 32,300.00
68,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 46,950.00 32,300.00
75,800.00
260.00 2,400.00 22,000.00 36,000.00 15,500.00 7,832.00 127,500.00
2,600.00 2,400.00 22,000.00 36,000.00 30,275.00 1,050.00 20,925.00 7,832.00 14,900.00
1,690.00 1,800.00 16,500.00 22,500.00 35,310.00 1,050.00
780.00 3,000.00 27,500.00 11,250.00 42,880.00 2,100.00
780.00 840.00 7,700.00 13,500.00 32,160.00 840.00
520.00 1,560.00 16,500.00 9,000.00 40,150.00 775.20
520.00 1,560.00 13,750.00 7,560.00 51,645.00 775.20
KODE BARANG 2.01.01.07.01.029 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.029 1.08.23.01.01.026.021 2.01.01.07.01.030 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.030 1.08.23.01.01.026.021 2.01.01.07.01.031
URAIAN KEGIATAN 1 m' Pekerjaan Pemasangan Wuwung Stel Gelombang Kecil 0.92 M Mandor Kepala Tukang Tukang Kayu Pekerja Wuwung Stel Gelombang 0.92 Paku Skrup
KOEF
0.0040 0.0130 0.1250 0.0840 2.4000 0.0240
1 m' Pekerjaan Pemasangan Wuwung Stel Gelombang Kecil 1.05 M Mandor Kepala Tukang Tukang Kayu Pekerja Wuwung Stel Gelombang 1.05 Paku Skrup
O.H O.H O.H O.H Lembar Buah m'
0.0040 0.0130 0.1250 0.0840 2.1000 0.0240
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.031 1.08.23.01.01.026.021
1 m' Pekerjaan Pemasangan Wuwung Stel Gelombang Kecil 1.08 M Mandor Kepala Tukang Tukang Kayu Pekerja Wuwung Stel Gelombang 1.08 Paku Skrup
2.01.01.07.01.032
1 M2 Pekerjaan Water Proofing Membran
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.08.23.01.01.031.001 2.01.01.04.02.003 1.08.23.01.01.031.001
Pekerja Tukang Batu Waterproofing Membrane Mortar 1:3 Pengetesan (10 % Material)
2.01.01.07.01.033
1 M2 Pekerjaan Water Proofing Coating
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.08.23.01.01.031.002 1.08.23.01.01.042.005
Pekerja Tukang Batu Waterproofing Coating Kuas 3 "
2.01.01.07.01.034
1 m2 Pekerjaan Langit - Langit Asbes Tebal 4 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.037 1.08.23.01.01.026.002
Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Semen Tebal 4 mm Paku Asbes
2.01.01.07.01.035
1 m2 Pekerjaan Langit - Langit Asbes Tebal 5 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.034 1.08.23.01.01.026.002
Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Semen Tebal 5 mm Paku Asbes
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m'
O.H O.H O.H O.H Lembar Buah m'
0.0040 0.0130 0.1250 0.0840 2.0500 0.0240
O.H O.H O.H O.H Lembar Buah m2
0.2000 0.6000 1.1000 1.0000 0.1000
O.H O.H m2 m2 Set m2
0.2000 0.6000 1.0000 0.2500
m2 0.0040 0.0070 0.0700 0.0300 1.1000 0.0100
O.H O.H O.H O.H m2 Kg m2
0.0040 0.0070 0.0700 0.0300 1.1000 0.0100
117
O.H O.H kg bh
O.H O.H O.H O.H m2 Kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 45,100.00 32,300.00
JUMLAH HARGA 132,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 58,150.00 32,300.00
146,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 64,900.00 32,300.00
157,200.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 41,100.00 67,900.00 41,100.00
201,200.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 57,500.00 13,100.00
144,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 37,800.00 40,450.00
53,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 38,150.00 40,450.00
54,100.00
520.00 1,560.00 13,750.00 7,560.00 108,240.00 775.20
520.00 1,560.00 13,750.00 7,560.00 122,115.00 775.20
520.00 1,560.00 13,750.00 7,560.00 133,045.00 775.20
18,000.00 66,000.00 45,210.00 67,900.00 4,110.00
18,000.00 66,000.00 57,500.00 3,275.00
520.00 840.00 7,700.00 2,700.00 41,580.00 404.50
520.00 840.00 7,700.00 2,700.00 41,965.00 404.50
KODE BARANG 2.01.01.07.01.036
URAIAN KEGIATAN 1 m2 Pekerjaan Langit - Langit Asbes Tebal 6 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.022.038 1.08.23.01.01.026.002
Mandor Kepala Tukang Tukang Kayu Pekerja Asbes Semen Tebal 6 mm Paku Asbes
2.01.01.07.01.037
1 m2 Pekerjaan Langit - Langit Tripleks Uk. 120X240,Tbl 3 Mm Mandor Kepala Tukang Tukang Kayu Pekerja Tripleks (122 X 244) 3 Mm Paku Tripleks
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.073 1.08.23.01.01.026.015 2.01.01.07.01.038 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.072 1.08.23.01.01.026.015 2.01.01.07.01.039 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.071 1.08.23.01.01.026.015 2.01.01.07.01.040 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.001 1.08.23.01.01.026.015 2.01.01.07.01.041
0.0040 0.0070 0.0700 0.0300 1.1000 0.0100
0.0050 0.0100 0.1000 0.1000 0.3750 0.0300
0.0050 0.0100 0.1000 0.1000 0.3750 0.0300
1 m' Pekerjaan List Langit - Langit Kayu Profil
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.055 1.08.23.01.01.026.017
Mandor Kepala Tukang Tukang Kayu Pekerja List Kayu Profil Paku Biasa
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
O.H O.H O.H O.H Lembar Kg
O.H O.H O.H O.H Lembar Kg m2
0.0050 0.0100 0.1000 0.1000 0.3750 0.0300
1 m2 Pekerjaan Langit - Langit Lambrizing Kayu, Tebal 9 Mm Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Jati Papan Paku Tripleks
2.01.01.07.01.042
O.H O.H O.H O.H m2 Kg
m2
1 m2 Pekerjaan Langit - Langit Tripleks Uk. 120X240, Tbl 6 Mm Mandor Kepala Tukang Tukang Kayu Pekerja Tripleks (122 X 244) 6 Mm Paku Tripleks
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.025.001 1.08.23.01.01.026.013
SAT m2
m2
1 m2 Pekerjaan Langit - Langit Tripleks Uk. 120X240,Tbl 4 Mm Mandor Kepala Tukang Tukang Kayu Pekerja Tripleks (122 X 244) 4 Mm Paku Tripleks
1 m2 Pekerjaan Langit - Langit Gypsum Board, (120X240) Tebal 9 Mm Mandor Kepala Tukang Tukang Kayu Pekerja Gypsum Board Tb. 9 Mm Paku Skrup
KOEF
O.H O.H O.H O.H Lembar Kg m2
0.0400 0.0800 0.8000 0.8000 0.0150 0.0100
O.H O.H O.H O.H m3 Kg m2
0.0050 0.0050 0.0500 0.1000 0.3640 0.1100
O.H O.H O.H O.H Lembar Kg m'
0.0030 0.0050 0.0500 0.0500 0.5250 0.0100
118
O.H O.H O.H O.H Lonjor Kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 43,200.00 40,450.00
JUMLAH HARGA 59,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 72,500.00 22,700.00
49,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 86,950.00 22,700.00
55,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 103,050.00 22,700.00
61,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,278,100.00 22,700.00
494,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 96,650.00 27,100.00
53,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 13,550.00 21,000.00
18,300.00
520.00 840.00 7,700.00 2,700.00 47,520.00 404.50
650.00 1,200.00 11,000.00 9,000.00 27,187.50 681.00
650.00 1,200.00 11,000.00 9,000.00 32,606.25 681.00
650.00 1,200.00 11,000.00 9,000.00 38,643.75 681.00
5,200.00 9,600.00 88,000.00 72,000.00 319,171.50 227.00
650.00 600.00 5,500.00 9,000.00 35,180.60 2,981.00
390.00 600.00 5,500.00 4,500.00 7,113.75 210.00
KODE BARANG 2.01.01.07.01.043
URAIAN KEGIATAN 1 m' Pekerjaan List Langit - Langit Gypsum
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.025.002 1.08.23.01.01.025.014
Mandor Kepala Tukang Tukang Kayu Pekerja List Gypsum Tepung Gypsum
2.01.01.07.02 2.01.01.07.02.001
Sanitair Pekerjaan Pemasangan 1 Buah Kloset Duduk
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.028.003 1.08.23.01.01.028.003
Mandor Kepala Tukang Tukang Batu Pekerja Kloset Duduk Setara Ina Komplit Peralatan (6% Dari Harga Bahan)
2.01.01.07.02.002
Pekerjaan Pemasangan 1 Buah Kloset Jongkok Porselen Mandor Kepala Tukang Tukang Batu Pekerja Kloset Jongkok Porselen Semen Portland Pasir Pasang
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.028.010 1.08.23.01.01.002.001 1.08.23.01.01.004.002 2.01.01.07.02.003 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.028.011 1.08.23.01.01.005.010 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Pekerjaan Pemasangan 1 Buah Kloset Jongkok Teraso Mandor Kepala Tukang Tukang Batu Pekerja Kloset Jongkok Teraso Batu Bata Semen Portland Pasir Pasang
2.01.01.07.02.004
Pekerjaan Pemasangan 1 Buah Urinoir
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.028.013 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.028.013
Mandor Kepala Tukang Tukang Batu Pekerja Urinoir Semen Portland Pasir Pasang Peralatan (30% Dari Harga Bahan)
2.01.01.07.02.005
Pekerjaan Pemasangan 1 Buah Wastafel
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.23.01.01.028.021 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.028.021
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Wastafel Setara Ina Semen Portland Pasir Pasang Peralatan (12% Dari Harga Bahan)
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0030 0.0060 0.0600 0.0600 1.0500 0.1500
SAT m' O.H O.H O.H O.H m' Kg
Buah 0.1600 0.0010 1.1000 3.3000 1.0000 0.0600
O.H O.H O.H O.H Buah Set Buah
0.1600 1.5000 1.5000 1.0000 1.0000 0.1500 0.0100
O.H O.H O.H O.H Buah Zak m3 Buah
0.1100 0.3000 1.5000 1.0000 1.0000 7.0000 0.1500 0.0100
O.H O.H O.H O.H Buah Buah Zak m3 Buah
0.1000 0.1000 1.0000 1.0000 1.0000 0.1500 0.0100 0.3000
O.H O.H O.H O.H set Zak m3 set Buah
0.1000 0.1500 1.4500 1.2000 1.0000 0.1500 0.0100 0.1200
119
O.H O.H O.H O.H set Zak m3 set
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 27,100.00 8,500.00
JUMLAH HARGA 42,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 1,614,450.00 1,614,450.00
2,150,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 193,750.00 77,500.00 244,750.00
663,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 148,550.00 950.00 77,500.00 244,750.00
474,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 1,822,000.00 77,500.00 244,750.00 1,822,000.00
2,607,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 548,950.00 77,500.00 244,750.00 548,950.00
927,400.00
390.00 720.00 6,600.00 5,400.00 28,455.00 1,275.00
20,800.00 120.00 121,000.00 297,000.00 1,614,450.00 96,867.00
20,800.00 180,000.00 165,000.00 90,000.00 193,750.00 11,625.00 2,447.50
14,300.00 36,000.00 165,000.00 90,000.00 148,550.00 6,650.00 11,625.00 2,447.50
13,000.00 12,000.00 110,000.00 90,000.00 1,822,000.00 11,625.00 2,447.50 546,600.00
13,000.00 18,000.00 159,500.00 108,000.00 548,950.00 11,625.00 2,447.50 65,874.00
KODE BARANG 2.01.01.07.02.006 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.999.006 1.08.23.01.01.999.006
URAIAN KEGIATAN Pekerjaan Pemasangan 1 Buah Bak Mandi Fiberglass Mandor Kepala Tukang Tukang Batu Pekerja Bak Fiberglass Peralatan (12% Dari Harga Bahan)
2.01.01.07.02.007
Pekerjaan Pemasangan 1 Buah Bak Mandi Teraso
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.999.007 1.08.23.01.01.002.001 1.08.23.01.01.004.002
Mandor Kepala Tukang Tukang Batu Pekerja Bak Teraso Semen Portland Pasir Pasang
2.01.01.07.02.008
Pekerjaan Pemasangan 1 Buah Bak Mandi Batu Bata Volume 0.3 m3 Mandor Kepala Tukang Tukang Batu Pekerja Batu Bata Semen Portland Pasir Pasang Keramik Porselen Semen Warna
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.010 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.013.032 1.08.23.01.01.002.007 2.01.01.07.02.009
KOEF
0.1100 0.5400 2.7000 1.8000 1.0000 0.1200
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.028.030 1.08.23.01.01.028.034 2.01.01.07.02.010
Pekerjaan Pemasangan 1 Buah Floor Drain
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.028.035
Mandor Kepala Tukang Tukang Batu Pekerja Floor Drain + Accessories
2.01.01.07.02.011
Pekerjaan Pemasangan 1 Buah Bak Kontrol Pasangan Batu Bata Uk 30 X 30 Cm, Tinggi 35 Cm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.010 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.009 1.08.23.01.01.012.006 1.08.23.01.01.004.001
Mandor Kepala Tukang Tukang Batu Pekerja Batu Bata Semen Portland Pasir Pasang Kerikil Beton Besi Beton Pasir Beton
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
O.H O.H O.H O.H buah set Buah
0.1100 0.0700 0.7500 2.1000 1.0000 0.1500 0.0100
Pekerjaan Pemasangan 1 Buah Bak Cuci Piring Stainless Steel Dan Accessories Mandor Kepala Tukang Tukang Batu Pekerja Bak Cuci Stainless Steel + Accessories Water Drain + Asesories
SAT Buah
O.H O.H O.H O.H buah Zak m3 Buah
0.3000 0.3000 3.0000 6.0000 150.0000 3.0000 0.3000 360.0000 6.0000
O.H O.H O.H O.H buah Zak m3 Buah kg Buah
0.0150 0.0300 0.3000 0.0300 1.0000 1.0000
O.H O.H O.H O.H Buah set Buah
0.0050 0.0100 0.1000 0.0100 1.0000
Buah
0.0110 0.0720 0.7200 2.1600 40.0000 1.1000 0.0700 0.0700 1.6000 0.0600
120
O.H O.H O.H O.H buah
O.H O.H O.H O.H buah Zak m3 m3 Kg m3
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 437,200.00 437,200.00
JUMLAH HARGA 1,027,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 300,000.00 77,500.00 244,750.00
608,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 950.00 77,500.00 244,750.00 1,450.00 14,900.00
2,004,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 364,250.00 18,800.00
424,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 18,800.00
32,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 950.00 77,500.00 244,750.00 245,400.00 13,050.00 257,650.00
14,300.00 64,800.00 297,000.00 162,000.00 437,200.00 52,464.00
14,300.00 8,400.00 82,500.00 189,000.00 300,000.00 11,625.00 2,447.50
39,000.00 36,000.00 330,000.00 540,000.00 142,500.00 232,500.00 73,425.00 522,000.00 89,400.00
1,950.00 3,600.00 33,000.00 2,700.00 364,250.00 18,800.00
650.00 1,200.00 11,000.00 900.00 18,800.00 477,600.00
1,430.00 8,640.00 79,200.00 194,400.00 38,000.00 85,250.00 17,132.50 17,178.00 20,880.00 15,459.00
KODE BARANG 2.01.01.07.02.012
URAIAN KEGIATAN Pekerjaan Pemasangan 1 Buah Bak Kontrol Pasangan Batu Bata Uk. 45 X 45 Cm, Tinggi 50 Cm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.010 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.009 1.08.23.01.01.012.006 1.08.23.01.01.004.001
Mandor Kepala Tukang Tukang Batu Pekerja Batu Bata Semen Portland Pasir Pasang Kerikil Beton Besi Beton Pasir Beton
2.01.01.07.02.013
Pekerjaan Pemasangan 1 Buah Bak Kontrol Pasangan Batu Bata Uk. 60 X 60 Cm, Tinggi 65 Cm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.005.010 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.009 1.08.23.01.01.012.006 1.08.23.01.01.004.001
Mandor Kepala Tukang Tukang Batu Pekerja Batu Bata Semen Portland Pasir Pasang Kerikil Beton Besi Beton Pasir Beton
2.01.01.07.02.014
1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1/2" Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Galvanis 1/2" (Medium B) Perlengkapan
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.07.001.024 1.08.24.02.07.001.024 2.01.01.07.02.015
0.0160 0.0110 1.1500 3.2000 70.0000 1.9250 0.1300 0.0200 2.6000 0.0900
O.H O.H O.H O.H buah Zak m3 m3 Kg m3
O.H O.H O.H O.H buah Zak m3 m3 Kg m3 m'
0.0270 0.0090 0.0900 0.0540 0.2000 0.0584
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.07.001.025 1.08.24.02.07.001.025 2.01.01.07.02.016
1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.07.001.026 1.08.24.02.07.001.026
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Galvanis 1" (Medium B) Perlengkapan
2.01.01.07.02.017
1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1 1/2" Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Galvanis 1 1/2" (Medium B) Perlengkapan
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT Buah
Buah
0.0160 0.0110 1.1500 3.2000 123.0000 2.8500 0.1840 0.0330 4.8500 0.1200
1 m' Pekerjaan Pasang Pipa Galvanis Diameter 3/4" Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Galvanis 3/4" (Medium B) Perlengkapan
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.07.001.028 1.08.24.02.07.001.028
KOEF
O.H O.H O.H O.H Batang Set m'
0.0270 0.0090 0.0900 0.0540 0.2000 0.0584
m' 0.0270 0.0090 0.0900 0.0540 0.2000 0.0584
121
O.H O.H O.H O.H Batang Set
O.H O.H O.H O.H Batang Set m'
0.0054 0.0180 0.1800 0.1080 0.2000 0.0584
O.H O.H O.H O.H Batang Set
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 950.00 77,500.00 244,750.00 245,400.00 13,050.00 257,650.00 Nilai HSPK (Dibulatkan):
JUMLAH HARGA 727,400.00
2,080.00 1,320.00 126,500.00 288,000.00 66,500.00 149,187.50 31,817.50 4,908.00 33,930.00 23,188.50 903,000.00
130,000.00 120,000.00 110,000.00 90,000.00 950.00 77,500.00 244,750.00 245,400.00 13,050.00 257,650.00
2,080.00 1,320.00 126,500.00 288,000.00 116,850.00 220,875.00 45,034.00 8,098.20 63,292.50 30,918.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 172,450.00 172,450.00
63,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 212,950.00 212,950.00
74,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 326,550.00 326,550.00
103,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 500,050.00 500,050.00
161,600.00
3,510.00 1,080.00 9,900.00 4,860.00 34,490.00 10,071.08
3,510.00 1,080.00 9,900.00 4,860.00 42,590.00 12,436.28
3,510.00 1,080.00 9,900.00 4,860.00 65,310.00 19,070.52
702.00 2,160.00 19,800.00 9,720.00 100,010.00 29,202.92
KODE BARANG 2.01.01.07.02.018
URAIAN KEGIATAN 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 3"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.07.001.031 1.08.24.02.07.001.031
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Galvanis 3" (Medium B) Perlengkapan
2.01.01.07.02.019
1 m' Pekerjaan Pasang Pipa Galvanis Diameter 4"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.07.001.032 1.08.24.02.07.001.032
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Galvanis 4" (Medium B) Perlengkapan
2.01.01.07.02.020 1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.23.01.01.062.002 1.08.23.01.01.999.010
Pekerjaan Pemasangan 1 Buah Kran Air Ø 3/4" Atau 1/2" Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Kran Air Ex. Omco Seal Tape
2.01.01.07.02.021
1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 1/2"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.017 1.08.24.02.06.001.017
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Aw Ø 1/2" Pjg 6 Meter Perlengkapan
2.01.01.07.02.022
1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 3/4"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.018 1.08.24.02.06.001.018
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Aw Ø 3/4" Pjg 6 Meter Perlengkapan
2.01.01.07.02.023
1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 1"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.019 1.08.24.02.06.001.019
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Aw Ø 1" Pjg 6 Meter Perlengkapan
2.01.01.07.02.024
1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 1 1/2"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.021 1.08.24.02.06.001.021
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Aw Ø 1 1/2" Pjg 6 Meter Perlengkapan
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0054 0.0180 0.1800 0.1080 0.2000 0.0584
SAT m' O.H O.H O.H O.H Batang Set m'
0.0068 0.0225 0.2250 0.1350 0.2000 0.0584
O.H O.H O.H O.H Batang Set Buah
0.0050 0.0100 0.1000 0.0100 1.0000 1.0000
O.H O.H O.H O.H Buah roll m'
0.0018 0.0060 0.0600 0.0360 0.2000 0.0584
O.H O.H O.H O.H Batang Set m'
0.0018 0.0060 0.0600 0.0360 0.2000 0.0584
O.H O.H O.H O.H Batang Set m'
0.0018 0.0060 0.0600 0.0360 0.2000 0.0584
m' 0.0018 0.0060 0.0600 0.0360 0.2000 0.0584
122
O.H O.H O.H O.H Batang Set
O.H O.H O.H O.H Batang Set
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 1,172,950.00 1,172,950.00
JUMLAH HARGA 335,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 1,697,300.00 1,697,300.00
479,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 32,250.00 6,800.00
52,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 54,900.00 54,900.00
25,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 66,600.00 66,600.00
28,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 83,400.00 83,400.00
32,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 151,200.00 151,200.00
49,900.00
702.00 2,160.00 19,800.00 9,720.00 234,590.00 68,500.28
884.00 2,700.00 24,750.00 12,150.00 339,460.00 99,122.32
650.00 1,200.00 11,000.00 900.00 32,250.00 6,800.00
234.00 720.00 6,600.00 3,240.00 10,980.00 3,206.16
234.00 720.00 6,600.00 3,240.00 13,320.00 3,889.44
234.00 720.00 6,600.00 3,240.00 16,680.00 4,870.56
234.00 720.00 6,600.00 3,240.00 30,240.00 8,830.08
KODE BARANG 2.01.01.07.02.025
URAIAN KEGIATAN 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 2"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.022 1.08.24.02.06.001.022
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Aw Ø 2" Perlengkapan
2.01.01.07.02.026
1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 2 1/2"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.023 1.08.24.02.06.001.023
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Aw Ø 2 1/2" Perlengkapan
2.01.01.07.02.027
1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 3"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.024 1.08.24.02.06.001.024
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Aw Ø 3" Perlengkapan
2.01.01.07.02.028
1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 4"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.025 1.08.24.02.06.001.025
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Aw Ø 4" Perlengkapan
2.01.01.07.02.029
1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 2"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.049 1.08.24.02.06.001.049
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Class D Dia. 2" Perlengkapan
2.01.01.07.02.030
1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 3"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.051 1.08.24.02.06.001.051
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Class D Dia. 3" Perlengkapan
2.01.01.07.02.031
1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 4"
1.11.29.01.01.001.001 1.11.29.01.01.001.007 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.052 1.08.24.02.06.001.052
Mandor Kepala Tukang Pipa Tukang Pipa Pekerja Pipa Pvc Class D Dia. 4" Perlengkapan
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0027 0.0090 0.0900 0.0540 0.2000 0.0584
SAT m' O.H O.H O.H O.H Batang Set m'
0.0018 0.0060 0.0600 0.0360 0.2000 0.0584
O.H O.H O.H O.H Batang Set m'
0.0041 0.0135 0.1350 0.0810 0.2000 0.0584
O.H O.H O.H O.H Batang Set m'
0.0041 0.0135 0.1350 0.0810 0.2000 0.0584
O.H O.H O.H O.H Batang Set m'
0.0027 0.0090 0.0900 0.0540 0.2000 0.0584
O.H O.H O.H O.H Batang Set m'
0.0041 0.0135 0.1350 0.0810 0.2000 0.0584
O.H O.H O.H O.H Batang Set m'
0.0041 0.0135 0.1350 0.0810 0.2000 0.0584
123
O.H O.H O.H O.H Batang Set
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 224,100.00 224,100.00
JUMLAH HARGA 74,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 285,500.00 285,500.00
84,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 405,600.00 405,600.00
129,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 592,600.00 592,600.00
177,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 107,900.00 107,900.00
44,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 229,300.00 229,300.00
83,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 321,000.00 321,000.00
107,200.00
351.00 1,080.00 9,900.00 4,860.00 44,820.00 13,087.44
234.00 720.00 6,600.00 3,240.00 57,100.00 16,673.20
533.00 1,620.00 14,850.00 7,290.00 81,120.00 23,687.04
533.00 1,620.00 14,850.00 7,290.00 118,520.00 34,607.84
351.00 1,080.00 9,900.00 4,860.00 21,580.00 6,301.36
533.00 1,620.00 14,850.00 7,290.00 45,860.00 13,391.12
533.00 1,620.00 14,850.00 7,290.00 64,200.00 18,746.40
KODE BARANG 2.01.01.07.03 2.01.01.07.03.001
URAIAN KEGIATAN Pekerjaan Besi & Allumunium 1 Kg Pemasangan Besi Profil IWF
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.008.032
Mandor Kepala Tukang Tukang Besi Pekerja Besi Profil IWF
2.01.01.07.03.002
1 Kg Pemasangan Besi Siku
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.008.030
Mandor Kepala Tukang Tukang Besi Pekerja Besi Siku
2.01.01.07.03.003
1 Kg Pemasangan Besi Profil C
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.008.058
Mandor Kepala Tukang Tukang Besi Pekerja Besi Profil C
2.01.01.07.03.004
100 Kg Pekerjaan Perakitan Besi Profil
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.04.001.006 1.08.23.01.04.002.001
Mandor Kepala Tukang Tukang Besi Pekerja Solar Minyak Pelumas
2.01.01.07.03.005
1 Cm Pekerjaan Pengelasan Dengan Las Listrik
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.019.020 1.08.23.01.04.001.006 1.08.23.01.04.002.001 E32
Mandor Kepala Tukang Tukang Besi Pekerja Kawat Las Solar Industri Minyak Pelumas Sewa Alat Pengelasan
2.01.01.07.03.006
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.035.008 1.08.23.01.01.025.007 1.08.23.01.01.035.008
1 m2 Pemasangan Rangka Besi Hollow 1.40.40.2 Mm, Modul 60.120 Dinding Partisi Penutup Kalsiboard Mandor Kepala Tukang Tukang Besi Pekerja Rangka Metal Hollow 40.40.2 Mm Kalsiboard Accesorries
2.01.01.07.03.007
1 m' Pekerjaan Kusen Alluminium 4"
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.024.024 1.08.23.01.01.026.021 1.08.23.01.01.043.007
Mandor Kepala Tukang Tukang Kayu Pekerja Profil Alluminium 4" Skrup Fixer Sealant
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0030 0.0060 0.0600 0.0600 1.1500
SAT
HARGA SATUAN
Kg
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 13,500.00
28,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 12,100.00
27,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 13,500.00
28,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 15,300.00 42,300.00
40,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 37,200.00 15,300.00 42,300.00 142,346.33
5,200.00
O.H O.H O.H O.H kg Kg
0.0030 0.0060 0.0600 0.0600 1.1500
O.H O.H O.H O.H kg Kg
0.0030 0.0060 0.0600 0.0600 1.1500
O.H O.H O.H O.H kg Kg
0.0050 0.0010 0.1000 0.1000 1.0000 0.1000
O.H O.H O.H O.H ltr ltr Kg
0.0002 0.0002 0.0020 0.0040 0.0400 0.0300 0.0040 0.0170
O.H O.H O.H O.H kg liter liter Jam m2
0.0130 0.0250 0.2500 0.2500 0.8750 0.8600 0.2500
O.H O.H O.H O.H Btg Lembar Set m'
0.0021 0.0043 0.0430 0.0430 1.1000 0.0080 0.0600
124
O.H O.H O.H O.H m Buah Tube
Nilai HSPK (Dibulatkan):
JUMLAH HARGA
390.00 720.00 6,600.00 5,400.00 15,525.00
390.00 720.00 6,600.00 5,400.00 13,915.00
390.00 720.00 6,600.00 5,400.00 15,525.00
650.00 120.00 11,000.00 9,000.00 15,300.00 4,230.00
26.00 24.00 220.00 360.00 1,488.00 459.00 169.20 2,419.89 194,800.00
130,000.00 120,000.00 110,000.00 90,000.00 36,400.00 115,300.00 36,400.00
1,690.00 3,000.00 27,500.00 22,500.00 31,850.00 99,158.00 9,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 111,450.00 32,300.00 15,500.00
133,200.00 273.00 516.00 4,730.00 3,870.00 122,595.00 258.40 930.00
KODE BARANG 2.01.01.07.03.008
URAIAN KEGIATAN 1 m' Pekerjaan Kusen Alluminium 3"
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.024.023 1.08.23.01.01.026.021 1.08.23.01.01.043.007
Mandor Kepala Tukang Tukang Kayu Pekerja Profil Alluminium 3" Skrup Fixer Sealant
2.01.01.07.03.009
1 m2 Pasang Rangka Atap Galvalume Untuk Genteng Asbes/Spandex Mandor Kepala Tukang Tukang Besi Pekerja C-75 , 0.8 C-75 , 0.6 Baut (Screw Driver) Dynabolt Reng Talang Jurai
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.035.001 1.08.23.01.01.035.002 1.08.23.01.01.027.020 1.08.23.01.01.027.021 1.08.23.01.01.035.003 1.08.23.01.01.035.010 2.01.01.07.03.010 1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.035.001 1.08.23.01.01.035.002 1.08.23.01.01.027.020 1.08.23.01.01.027.021 1.08.23.01.01.035.003 1.08.23.01.01.035.010 2.01.01.07.03.011 1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.035.008 1.08.23.01.01.035.008 2.01.01.07.03.012 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.024.024 1.08.23.01.01.003.005 1.08.23.01.01.043.007 2.01.01.07.03.013 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.024.024 1.08.23.01.01.023.009
KOEF
0.0021 0.0043 0.0430 0.0430 1.1000 0.0080 0.0600
O.H O.H O.H O.H m Buah Tube m2
0.0500 0.0100 0.4500 0.2000 0.2480 0.3720 28.0000 1.6000 0.6000 0.1240
1 m2 Pasang Rangka Atap Galvalume Untuk Genteng Biasa/Metal Mandor Kepala Tukang Tukang Besi Pekerja C-75 , 0.8 C-75 , 0.6 Baut (Screw Driver) Dynabolt Reng Talang Jurai
Oh Oh Oh Oh Batang Batang Buah Buah Batang m' m2
0.0500 0.0100 0.4500 0.2000 0.2480 0.3720 38.0000 1.6000 0.9000 0.1240
1 m2 Pasang Rangka Langit-Langit Hollow 40.40.2, Modul 60.60 Mandor Kepala Tukang Tukang Besi Pekerja Tak Terampil Hollow 4/4 Zincromate Accesorries
Oh Oh Oh Oh Batang Batang bh bh Batang m' m2
0.0180 0.0350 0.3500 0.3500 0.1038 0.2500
1 m2 Pekerjaan Pasang Pintu Kaca Rangka Alluminium Mandor Kepala Tukang Tukang Kayu Pekerja Profil Alluminium Kaca Rayban 5 Mm Sealant
O.H O.H O.H O.H Btg
m2 0.0050 0.0090 0.0850 0.0850 4.4000 1.1000 0.2700
1 m2 Pekerjaan Pemasangan Pintu Alluminium Strip Lebar 8 Cm Mandor Kepala Tukang Tukang Kayu Pekerja Profil Alluminium Allumunium Strip
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m'
125
O.H O.H O.H O.H m m2 Tube m2
0.0042 0.0085 0.0850 0.0850 4.4000 14.6000
O.H O.H O.H O.H m m
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 98,550.00 32,300.00 15,500.00
JUMLAH HARGA 119,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 103,350.00 99,850.00 1,500.00 12,900.00 48,350.00 45,100.00
235,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 103,350.00 99,850.00 1,500.00 12,900.00 48,350.00 45,100.00
264,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 36,400.00 36,400.00
89,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 111,450.00 129,200.00 15,500.00
655,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 111,450.00 45,000.00
1,165,900.00
273.00 516.00 4,730.00 3,870.00 108,405.00 258.40 930.00
6,500.00 1,200.00 49,500.00 18,000.00 25,630.80 37,144.20 42,000.00 20,640.00 29,010.00 5,592.40
6,500.00 1,200.00 49,500.00 18,000.00 25,630.80 37,144.20 57,000.00 20,640.00 43,515.00 5,592.40
2,340.00 4,200.00 38,500.00 31,500.00 3,778.32 9,100.00
650.00 1,080.00 9,350.00 7,650.00 490,380.00 142,120.00 4,185.00
546.00 1,020.00 9,350.00 7,650.00 490,380.00 657,000.00
KODE BARANG 2.01.01.07.03.014
URAIAN KEGIATAN 1 m2 Pekerjaan Pemasangan Rolling Door Besi
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.024.001
Mandor Kepala Tukang Tukang Besi Pekerja Rolling Door Besi Komplit
2.01.01.07.03.015 1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.024.003
1 m2 Pekerjaan Pemasangan Rolling Door Alumunium Mandor Kepala Tukang Tukang Besi Pekerja Rolling Door Aluminium Komplit
2.01.01.07.03.016
1 m2 Pekerjaan Pemasangan Pintu Besi Lipat
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.024.010
Mandor Kepala Tukang Tukang Besi Pekerja Pintu Besi Lipat
2.01.01.07.03.017
1 m2 Pekerjaan Pasang Jendela Nako Dan Teralis
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.003.010 1.08.23.01.01.026.021 1.08.23.01.01.008.011
Mandor Kepala Tukang Tukang Kayu Pekerja Jendela Nako 15 X 70 (Rangka + Kaca 5 Mm) Paku Skrup Besi Strip
2.01.01.07.03.018
1 m2 Pekerjaan Pasang Terali Besi Strip
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.012 1.11.29.01.01.002.014 1.08.23.01.01.008.006 2.01.01.07.03.005
Mandor Kepala Tukang Tukang Las Pekerja Besi Strip (Besi Teralis Jendela) Pengelasan
2.01.01.07.03.019 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.007.016 1.08.23.01.01.026.017 1.08.23.01.05.002.037
1 m' Pekerjaan Pasang Talang Datar/Jurai Seng Bjls 28 Lebar 90 Mandor Kepala Tukang Tukang Kayu Pekerja Seng Plat 3" X 6" Bjls 28 Paku Biasa Kayu Borneo Papan
2.01.01.07.03.020
1 m' Pekerjaan Pasang Talang Miring Seng Bjls 28
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.007.016 1.08.23.01.01.026.017 1.08.23.01.05.002.037 1.08.23.01.01.006.006
Mandor Kepala Tukang Tukang Kayu Pekerja Seng Plat 3" X 6" Bjls 28 Paku Biasa Kayu Borneo Papan Meni Besi
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0600 0.1200 1.2000 1.2000 1.0000
SAT m2 O.H O.H O.H O.H m2 m2
0.0500 0.1000 1.0000 1.0000 1.0000
O.H O.H O.H O.H m2 m2
0.0220 0.0440 0.4400 0.4400 1.0000
O.H O.H O.H O.H m2 m2
0.0010 0.0200 0.2000 0.2000 7.7000 0.0400 1.1667
O.H O.H O.H O.H Daun Buah Batang m2
0.0830 0.1670 1.6700 1.6700 6.1770 27.0800
m' 0.0010 0.0200 0.2000 0.2000 1.0500 0.0150 0.0190
O.H O.H O.H O.H m' Kg m3 m'
0.0013 0.0250 0.4000 0.1500 0.5000 0.0150 0.0096 0.2500
126
O.H O.H O.H O.H Kg cm
O.H O.H O.H O.H Lembar Kg m3 Kg
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 302,750.00
JUMLAH HARGA 565,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 499,150.00
717,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 645,800.00
741,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 25,850.00 32,300.00 126,250.00
390,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 13,500.00 5,200.00
589,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 107,200.00 21,000.00 8,103,950.00
309,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 107,200.00 21,000.00 8,103,950.00 54,250.00
205,900.00
7,800.00 14,400.00 132,000.00 108,000.00 302,750.00
6,500.00 12,000.00 110,000.00 90,000.00 499,150.00
2,860.00 5,280.00 48,400.00 39,600.00 645,800.00
130.00 2,400.00 22,000.00 18,000.00 199,045.00 1,292.00 147,295.88
10,790.00 20,040.00 183,700.00 150,300.00 83,389.50 140,816.00
130.00 2,400.00 22,000.00 18,000.00 112,560.00 315.00 153,975.05
169.00 3,000.00 44,000.00 13,500.00 53,600.00 315.00 77,797.92 13,562.50
KODE BARANG 2.01.01.07.03.021 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.007.009 1.08.23.01.01.026.017 1.08.23.01.01.008.006 2.01.01.07.03.022
URAIAN KEGIATAN 1 m' Pekerjaan Pasang Talang 1/2 Lingkaran D-15 Cm Seng Bjls 30 Lebar 45 Cm Mandor Kepala Tukang Tukang Kayu Pekerja Seng Plat 3" X 6" Bjls Paku Biasa Besi Strip
1.11.29.01.01.001.001 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.003.015
1 m2 Pekerjaan Pemasangan Fitrase Ex. Corais & Aquirlda Mandor Tukang Kayu Pekerja Fitrase
2.01.01.07.03.023
1 m2 Pekerjaan Pemasangan Sun Screen
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.003.016
Mandor Kepala Tukang Tukang Kayu Pekerja Sun Screen
2.01.01.07.03.024 1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.003.012
1 m2 Pekerjaan Pemasangan Vertical Blind Dan Venetions Blind Mandor Kepala Tukang Tukang Besi Pekerja Venetions Blinds & Vertical Blind (Tirai)
2.01.01.07.03.025
1 m2 Pekerjaan Pemasangan Kawat Nyamuk
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.019.012 2.01.01.07.03.005 1.08.23.01.01.008.006
Mandor Kepala Tukang Tukang Kayu Pekerja Kawat Nyamuk Pengelasan Baja Strip
2.01.01.07.03.026
1 m2 Pekerjaan Pemasangan Pagar Model Brc/Pmg A Tukang Besi Tukang Batu Pekerja Pagar Brc
1.11.29.01.01.002.002 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.024.015 2.01.01.07.03.027 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.24.02.07.003.001 2.01.01.07.03.028 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.024.008
0.0080 0.0300 0.3000 0.1500 1.0500 0.0100 0.5000
SAT m' O.H O.H O.H O.H Lembar Kg Kg m2
0.0400 0.2500 0.1300 2.0000
O.H O.H O.H m2 m2
0.0040 0.0800 0.8000 0.0800 1.0000
O.H O.H O.H O.H m2 m2
0.0180 0.0350 0.3500 0.3500 1.0000
O.H O.H O.H O.H m2 m2
0.0005 0.0100 0.1000 0.1000 1.1000 11.1100 1.7160
O.H O.H O.H O.H m2 cm kg m2
0.0170 1.0500 1.0500 1.0000
Pekerjaan Pemasangan Pasang Tiang Pagar Model Pmg 2" Tinggi 1,5 M Tukang Besi Pekerja Pipa Besi Ø 2" (Steinnless)
O.H O.H O.H Unit Unit
0.5000 0.5000 1.0000
Pekerjaan Pasang 1 Unit Daun Pintu Swing Ganda Type Brc/Pmg Uk. (1,2M X 3M) Tukang Besi Pekerja Pintu Swing Ganda Brc/Pmg Ukuran 1.20 X 3.00
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
127
O.H O.H Batang Unit
1.0500 1.0500 1.0000
O.H O.H unit
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 50,750.00 21,000.00 13,500.00
JUMLAH HARGA 111,400.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 53,400.00
151,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 312,000.00
417,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 144,500.00
221,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 33,850.00 5,200.00 13,500.00
139,400.00
Nilai HSPK (Dibulatkan): 110,000.00 110,000.00 90,000.00 477,900.00
689,800.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 332,850.00
432,900.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 1,362,450.00
1,572,500.00
1,040.00 3,600.00 33,000.00 13,500.00 53,287.50 210.00 6,750.00
5,200.00 27,500.00 11,700.00 106,800.00
520.00 9,600.00 88,000.00 7,200.00 312,000.00
2,340.00 4,200.00 38,500.00 31,500.00 144,500.00
65.00 1,200.00 11,000.00 9,000.00 37,235.00 57,772.00 23,166.00
1,870.00 115,500.00 94,500.00 477,900.00
55,000.00 45,000.00 332,850.00
115,500.00 94,500.00 1,362,450.00
KODE BARANG 2.01.01.07.03.029
URAIAN KEGIATAN 1 m' Railing Tangga Besi Hollow
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.008.059 1.08.23.01.01.027.018 1.08.23.01.01.006.001
Mandor Kepala Tukang Tukang Besi Pekerja Besi Hollow 40.40 Mur baut Cat besi
2.01.01.07.03.030
1 m2 Kanopi rangka besi hollow & Penutup atap Polycarbonate Mandor Kepala Tukang Tukang Besi Pekerja Besi Hollow 40.40 Polycarbonate t. 8 mm Paku payung
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.008.059 1.08.23.01.01.054.004 1.08.23.01.01.026.001 2.01.01.07.03.031 1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.23.01.01.008.059 1.08.23.01.01.019.017 2.01.01.07.03.032 1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.08.24.02.07.002.022 1.08.23.01.01.019.017 2.01.01.07.04 2.01.01.07.04.001 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.063.008 2.01.01.07.04.002 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.063.010 2.01.01.07.04.003 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.063.009
KOEF
0.0080 0.0080 0.0750 0.1500 1.0345 6.0000 1.0000
1 m2 Pembuatan & Pemasangan Pagar Besi Hollow Mandor Kepala Tukang Besi Tukang Besi Konstruksi Pekerja Besi Hollow 40.40 Kawat Bendrat
O.H O.H O.H O.H Btg bh Kg m2
0.0080 0.0080 0.0750 0.1500 1.7242 0.0404 6.0000
O.H O.H O.H O.H Btg m2 bh m2
0.0520 0.1050 1.0500 1.0500 1.7242 0.0020
1 m2 Pembuatan & Pemasangan Pagar Besi Tempa Mandor Kepala Tukang Besi Tukang Besi Konstruksi Pekerja Besi tempa Kawat Bendrat
O.H O.H O.H O.H Btg Roll m2
0.0520 0.1050 1.0500 1.0500 1.2000 0.0020
Pekerjaan Kunci Dan Kaca Pekerjaan Pemasangan 1 Buah Kunci Tanam Antik Mandor Kepala Tukang Tukang Kayu Pekerja Kunci Tanam Antik
O.H O.H O.H O.H m2 Roll
Buah 0.0030 0.0600 0.6000 0.0600 1.0000
Pekerjaan Pemasangan 1 Buah Kunci Tanam Biasa Mandor Kepala Tukang Tukang Kayu Pekerja Kunci Tanam Biasa 2X Putar
O.H O.H O.H O.H Buah Buah
0.0050 0.0500 0.5000 0.0100 1.0000
Pekerjaan Pemasangan 1 Buah Kunci Tanam Kamar Mandi Mandor Kepala Tukang Tukang Kayu Pekerja Kunci Tanam Kamar Mandi
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m'
O.H O.H O.H O.H Buah Buah
0.0030 0.0500 0.5000 0.0050 1.0000
128
O.H O.H O.H O.H Buah
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 209,000.00 1,350.00 71,500.00
JUMLAH HARGA 319,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 209,000.00 4,132,950.00 1,200.00
558,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 209,000.00 432,250.00
590,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 391,600.00 432,250.00
700,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 161,050.00
240,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 109,500.00
172,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 81,100.00
142,900.00
1,040.00 960.00 8,250.00 13,500.00 216,210.50 8,100.00 71,500.00
1,040.00 960.00 8,250.00 13,500.00 360,357.80 166,971.18 7,200.00
6,760.00 12,600.00 115,500.00 94,500.00 360,357.80 864.50
6,760.00 12,600.00 115,500.00 94,500.00 469,920.00 864.50
390.00 7,200.00 66,000.00 5,400.00 161,050.00
650.00 6,000.00 55,000.00 900.00 109,500.00
390.00 6,000.00 55,000.00 450.00 81,100.00
KODE BARANG 2.01.01.07.04.004
URAIAN KEGIATAN Pekerjaan Pemasangan 1 Buah Kunci Silinder
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.063.015
Mandor Kepala Tukang Tukang Kayu Pekerja Kunci Silinder
2.01.01.07.04.005
Pekerjaan Pemasangan 1 Buah Engsel Pintu
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.059.006
Mandor Kepala Tukang Tukang Kayu Pekerja Engsel Pintu Kuningan 3"
2.01.01.07.04.006 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.059.010
Pekerjaan Pemasangan 1 Buah Engsel Jendela Kupu-Kupu Mandor Kepala Tukang Tukang Kayu Pekerja Engsel Jendela Kupu-Kupu Kuningan 2.5"
2.01.01.07.04.007
Pekerjaan Pemasangan 1 Buah Engsel Angin
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.059.017
Mandor Kepala Tukang Tukang Kayu Pekerja Engsel Angin Kuningan 2"
2.01.01.07.04.008 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.08.23.01.01.059.011
Pekerjaan Pemasangan 1 Buah Engsel Hidrolis Pintu Almunium Kepala Tukang Tukang Kayu Engsel Hidrolis Pintu Alluminium
2.01.01.07.04.009
Pekerjaan Pemasangan Spring Knip
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.999.011
Mandor Kepala Tukang Tukang Kayu Pekerja Spring Knip
2.01.01.07.04.010
Pemasangan 1 Buah Kait Angin
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.065.001
Mandor Kepala Tukang Tukang Kayu Pekerja Kait Angin
2.01.01.07.04.011
Pemasangan 1 Buah Door Closer
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.065.007
Mandor Kepala Tukang Tukang Kayu Pekerja Door Closer
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0030 0.0500 0.5000 0.0050 1.0000
SAT Buah O.H O.H O.H O.H Buah Buah
0.0008 0.0150 0.1500 0.0150 1.0000
O.H O.H O.H O.H Stel Buah
0.0005 0.0100 0.1000 0.0100 1.0000
O.H O.H O.H O.H Stel Buah
0.0005 0.0200 0.2000 0.1000 1.0000
O.H O.H O.H O.H Stel Buah
0.0130 0.1250 1.0000
O.H O.H Stel Stel
0.0005 0.0200 0.2000 0.1000 1.0000
O.H O.H O.H O.H buah Buah
0.0005 0.0200 0.1400 0.0800 1.0000
O.H O.H O.H O.H Buah Buah
0.0030 0.0500 0.5000 0.0500 1.0000
129
O.H O.H O.H O.H Buah
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 64,250.00
JUMLAH HARGA 126,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 45,400.00
65,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 32,450.00
45,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 13,550.00
47,000.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 266,150.00
281,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 42,700.00
76,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 27,100.00
52,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 175,650.00
241,500.00
390.00 6,000.00 55,000.00 450.00 64,250.00
104.00 1,800.00 16,500.00 1,350.00 45,400.00
65.00 1,200.00 11,000.00 900.00 32,450.00
65.00 2,400.00 22,000.00 9,000.00 13,550.00
1,560.00 13,750.00 266,150.00
65.00 2,400.00 22,000.00 9,000.00 42,700.00
65.00 2,400.00 15,400.00 7,200.00 27,100.00
390.00 6,000.00 55,000.00 4,500.00 175,650.00
KODE BARANG 2.01.01.07.04.012
URAIAN KEGIATAN Pemasangan 1 Buah Kunci Slot
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.063.016
Mandor Kepala Tukang Tukang Kayu Pekerja Kunci Slot
2.01.01.07.04.013
Pemasangan 1 Buah Door Holder
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.065.009
Mandor Kepala Tukang Tukang Kayu Pekerja Door Holder
2.01.01.07.04.014
Pemasangan 1 Buah Door Stopper
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.065.008
Mandor Kepala Tukang Tukang Kayu Pekerja Door Stopper
2.01.01.07.04.015
Pekerjaan Pemasangan 1 Buah Rel Pintu Dorong
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.065.013
Mandor Kepala Tukang Tukang Kayu Pekerja Rel Pintu Dorong
2.01.01.07.04.016
Pemasangan 1 m2 Kaca Tebal 3 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.003.001 1.08.23.01.01.043.007
Mandor Kepala Tukang Tukang Kayu Pekerja Kaca Tebal 3 Mm Sealant
2.01.01.07.04.017
Pemasangan 1 m2 Kaca Tebal 5 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.003.002 1.08.23.01.01.043.007
Mandor Kepala Tukang Tukang Kayu Pekerja Kaca Tebal 5 Mm Sealant
2.01.01.07.04.018
Pemasangan 1 m2 Kaca Tebal 8 Mm
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.003.003 1.08.23.01.01.043.007
Mandor Kepala Tukang Tukang Kayu Pekerja Kaca Tebal 8 Mm Sealant
2.01.01.07.04.019
1 Buah Pemasangan Grendel Biasa (Besar)
1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.061.002
Tukang Kayu Pekerja Grendel Biasa (Besar)
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0010 0.0200 0.2000 0.0200 1.0000
SAT Buah O.H O.H O.H O.H Buah Buah
0.0030 0.0500 0.5000 0.0500 1.0000
O.H O.H O.H O.H Buah Buah
0.0050 0.0100 0.1000 0.0100 1.0000
O.H O.H O.H O.H Buah Buah
0.0030 0.0600 0.6000 0.0600 1.0000
O.H O.H O.H O.H buah m2
0.0008 0.0150 0.1500 0.0150 1.1000 0.1667
O.H O.H O.H O.H buah Tube m2
0.0008 0.0150 0.1500 0.0150 1.1000 0.1667
O.H O.H O.H O.H buah Tube m2
0.0009 0.0170 0.1700 0.0170 1.1000 0.2334
O.H O.H O.H O.H buah Tube Buah
0.1200 0.0600 1.0000
130
O.H O.H Buah
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 25,000.00
JUMLAH HARGA 51,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 27,100.00
93,000.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 27,100.00
40,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 426,250.00
505,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 112,150.00 15,500.00
145,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 125,000.00 15,500.00
159,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 219,600.00 15,500.00
267,600.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 23,200.00
41,800.00
130.00 2,400.00 22,000.00 1,800.00 25,000.00
390.00 6,000.00 55,000.00 4,500.00 27,100.00
650.00 1,200.00 11,000.00 900.00 27,100.00
390.00 7,200.00 66,000.00 5,400.00 426,250.00
104.00 1,800.00 16,500.00 1,350.00 123,365.00 2,583.85
104.00 1,800.00 16,500.00 1,350.00 137,500.00 2,583.85
117.00 2,040.00 18,700.00 1,530.00 241,560.00 3,617.70
13,200.00 5,400.00 23,200.00
KODE BARANG 2.01.01.07.05 2.01.01.07.05.001 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.03.05.015.040 2.01.01.07.05.002
URAIAN KEGIATAN Pengecatan 1 m2 Pekerjaan Mengerok Cat Lama Permukaan Kayu Secara Manual Mandor Pekerja Sabun Batangan
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.046 1.08.23.01.01.006.031
1 m2 Pekerjaan Mendempul Dan Menggosok Kayu Mandor Kepala Tukang Cat Tukang Cat Pekerja Dempul Minyak Cat Kayu
2.01.01.07.05.003
1 m2 Pekerjaan Pengecatan Bidang Kayu Lama
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.014 1.08.23.01.01.006.016 1.08.23.01.01.006.016
Mandor Kepala Tukang Cat Tukang Cat Pekerja Plamur Kayu Cat Kayu Dasar Setara Emco Cat Kayu Penutup Setara Emco
2.01.01.07.05.004
1 m2 Pekerjaan Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 2 Lapis Cat Penutup Mandor Kepala Tukang Cat Tukang Cat Pekerja Cat Meni Kayu Plamur Kayu Kuas Pengencer Ampelas Cat Kayu Dasar Cat Kayu Penutup 2 Kali
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.037 1.08.23.01.01.006.014 1.08.23.01.01.042.005 1.08.23.01.01.006.033 1.08.23.01.01.036.001 1.08.23.01.01.006.016 1.08.23.01.01.006.016 2.01.01.07.05.005
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.037 1.08.23.01.01.006.014 1.08.23.01.01.042.005 1.08.23.01.01.006.033 1.08.23.01.01.036.001 1.08.23.01.01.006.016 1.08.23.01.01.006.016 2.01.01.07.05.006 1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.041 1.08.23.01.01.006.041 1.08.23.01.01.036.001
0.0080 0.1500 0.0500
SAT
HARGA SATUAN
m2
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 3,950.00
14,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 48,350.00 24,500.00
13,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 36,600.00 77,500.00 77,500.00
47,600.00
Nilai HSPK (Dibulatkan):
57,100.00
O.H O.H Buah m2
0.0025 0.0040 0.0400 0.0400 0.0800 0.0200
O.H O.H O.H O.H Kg Liter m2
0.0025 0.0075 0.0750 0.0700 0.1500 0.1700 0.1700
1 m2 Pekerjaan Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 3 Lapis Cat Penutup Mandor Kepala Tukang Cat Tukang Cat Pekerja Cat Meni Kayu Plamur Kayu Kuas Pengencer Ampelas Cat Kayu Dasar Cat Kayu Penutup 2 Kali 1 m2 Pekerjaan Pelaburan Bidang Kayu Dengan Pelitur Mandor Kepala Tukang Cat Tukang Cat Pekerja Politur Kayu Dasar Politur Kayu Penutup Kertas Gosok
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
131
O.H O.H O.H O.H Kg Kg Kg m2
0.0030 0.0060 0.0090 0.0700 0.2000 0.1500 0.0100 0.0300 0.2000 0.1700 0.2600
O.H O.H O.H O.H Kg Kg bh Kg lembar Kg Kg m2
0.0030 0.0040 0.1050 0.0700 0.2000 0.1500 0.0100 0.0300 0.2000 0.1700 0.3500
O.H O.H O.H O.H Kg Kg bh Kg lembar Kg Kg m2
0.0030 0.0160 0.0600 0.0400 0.1500 0.3720 2.0000
O.H O.H O.H O.H Liter Liter lembar
130,000.00 120,000.00 110,000.00 90,000.00 38,650.00 36,600.00 13,100.00 29,650.00 5,600.00 77,500.00 77,500.00 Nilai HSPK (Dibulatkan):
JUMLAH HARGA
1,040.00 13,500.00 197.50
325.00 480.00 4,400.00 3,600.00 3,868.00 490.00
325.00 900.00 8,250.00 6,300.00 5,490.00 13,175.00 13,175.00
390.00 720.00 990.00 6,300.00 7,730.00 5,490.00 131.00 889.50 1,120.00 13,175.00 20,150.00 74,400.00
130,000.00 120,000.00 110,000.00 90,000.00 38,650.00 36,600.00 13,100.00 29,650.00 5,600.00 77,500.00 77,500.00
390.00 480.00 11,550.00 6,300.00 7,730.00 5,490.00 131.00 889.50 1,120.00 13,175.00 27,125.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 82,450.00 82,450.00 5,600.00
66,700.00 390.00 1,920.00 6,600.00 3,600.00 12,367.50 30,671.40 11,200.00
KODE BARANG 2.01.01.07.05.007 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.006.043 2.01.01.07.05.008 1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.042 1.08.23.01.01.006.046 1.08.23.01.01.036.001 2.01.01.07.05.009 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.999.012 2.01.01.07.05.010 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.03.05.015.040 2.01.01.07.05.011 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.002.012 2.01.01.07.05.012 1.11.29.01.01.001.005 1.11.29.01.01.002.003 1.11.29.01.01.002.004 1.08.23.01.01.002.012 2.01.01.07.05.013
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.052 1.08.23.01.01.006.027 1.08.23.01.01.006.026 2.01.01.07.05.014
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.027 1.08.23.01.01.006.026
URAIAN KEGIATAN 1 m2 Pekerjaan Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter Mandor Pekerja Residu Atau Teer 1 m2 Pekerjaan Pelaburan Bidang Kayu Dengan Vernis Mandor Kepala Tukang Cat Tukang Cat Pekerja Vernis Dempul Kertas Gosok 1 m2 Pekerjaan Mengikis/Mengerok Permukaan Cat Tembok Lama Mandor Pekerja Soda Api 1 m2 Pekerjaan Pencucian Bidang Permukaan Tembok Yang Pernah Dicat Mandor Pekerja Sabun Batangan
0.0060 0.1000 0.3500
SAT m2 O.H O.H Liter m2
0.0030 0.0160 0.1600 0.1600 0.1500 0.0500 0.1000
O.H O.H O.H O.H Liter Kg Lembar m2
0.0030 0.1500 0.0500
O.H O.H Kg m2
0.0030 0.1500 0.0500
1 m2 Pekerjaan Mengapur Dinding Tembok Baru Sampai Baik 3 Kali Mandor Kepala Tukang Tukang Cat Pekerja Kapur Pasang 1 m2 Pekerjaan Mengapur Dinding Tembok Lama Sampai Baik 3 Kali Kepala Tukang Tukang Cat Tukang Batu Kapur Pasang 1 m2 Pekerjaan Pengecatan Tembok Baru 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Interior Mandor Kepala Tukang Cat Tukang Cat Pekerja Plamur Tembok Cat Tembok Dasar Cat Tembok Penutup (5 Kg) 1 m2 Pekerjaan Pengecatan Tembok Lama 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Interior Mandor Kepala Tukang Cat Tukang Cat Pekerja Cat Tembok Dasar Cat Tembok
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H Buah m2
0.0100 0.0010 0.0070 0.0390 0.0010
O.H O.H O.H O.H m3 m2
0.0004 0.0180 0.0040 0.0005
O.H O.H O.H m3 m2
0.0030 0.0063 0.0630 0.0200 0.1000 0.1000 0.0520
O.H O.H O.H O.H Kg Kg Galon m2
0.0030 0.0042 0.0420 0.0280 0.1200 0.0360
132
O.H O.H O.H O.H Kg Galon
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 58,000.00
JUMLAH HARGA 30,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 48,700.00 48,350.00 5,600.00
44,600.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 18,700.00
14,800.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 3,950.00
14,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 120,150.00
5,800.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 110,000.00 120,150.00
2,500.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 16,250.00 30,950.00 141,700.00 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 30,950.00 141,700.00
780.00 9,000.00 20,300.00
390.00 1,920.00 17,600.00 14,400.00 7,305.00 2,417.50 560.00
390.00 13,500.00 935.00
390.00 13,500.00 197.50
1,300.00 120.00 770.00 3,510.00 120.15
48.00 1,980.00 440.00 60.08 22,000.00
390.00 756.00 6,930.00 1,800.00 1,625.00 3,095.00 7,368.40 16,800.00
390.00 504.00 4,620.00 2,520.00 3,714.00 5,101.20
KODE BARANG 2.01.01.07.05.015
URAIAN KEGIATAN 1 M2 Pengecatan Tembok Exterior
1.11.29.01.01.002.014 1.11.29.01.01.002.003 1.08.23.01.01.006.022
Pekerja Tukang Cat Cat Tembok Exterior Setara Dulux Weathershield (2,5 Liter) Cat Dasar (Alkali) Ampelas Rol Cat
1.08.23.01.01.006.027 1.08.23.01.01.036.001 1.08.23.01.01.042.001 2.01.01.07.05.016 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.03.05.015.040 2.01.01.07.05.017 1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.006 1.08.23.01.01.042.005 2.01.01.07.05.018 1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.006 1.08.23.01.01.006.033 1.08.23.01.01.042.005 1.08.23.01.05.002.054 2.01.01.07.05.019 1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.037 1.08.23.01.01.006.038 1.08.23.01.01.006.001 1.08.23.01.01.042.005 1.08.23.01.01.006.033 2.01.01.07.05.020 1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.037 1.08.23.01.01.006.038 1.08.23.01.01.006.001 1.08.23.01.01.042.005 1.08.23.01.01.006.033
KOEF
1 m2 Pekerjaan Pengerokan Karat Pada Permukaan Baja Secara Manual Mandor Pekerja Sabun Batangan
kg lbr bh
30,950.00 5,600.00 28,450.00
4,952.00 2,800.00 284.50
m2
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 3,950.00
14,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 54,250.00 13,100.00
32,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 54,250.00 29,650.00 13,100.00 4,052,000.00
64,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 38,650.00 34,900.00 71,500.00 13,100.00 29,650.00
66,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 38,650.00 34,900.00 71,500.00 13,100.00 29,650.00
152,500.00
O.H O.H Buah
O.H O.H O.H O.H Kg Buah m2
0.0075 0.0225 0.2250 0.2500 0.1000 0.0100 0.0100 0.0020
O.H O.H O.H O.H Kg Ltr Buah m3 m2
0.0013 0.0250 0.2500 0.2500 0.1000 0.1000 0.0800 0.0100 0.0100
1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Manual 3 Lapis Mandor Kepala Tukang Cat Tukang Cat Pekerja Cat Dasar Cat Antara Cat Penutup Kuas Pengencer
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
0.1600 0.5000 0.0100
0.0025 0.0200 0.2000 0.0200 0.1000 0.0100
1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Manual 4 Lapis Mandor Kepala Tukang Cat Tukang Cat Pekerja Meni A Meni B Cat Besi Kuas Pengencer
O.H O.H O.H O.H Kg Kg Kg Buah Ltr m2
0.0200 0.0800 0.8000 0.4000 0.1100 0.1700 0.0800 0.0100 0.0100
133
JUMLAH HARGA 72,200.00
O.H O.H Galon
m2
1 m2 Pekerjaan Pengecatan Permukaan Baja Dengan Meni Besi Dan Perancah Mandor Kepala Tukang Cat Tukang Cat Pekerja Meni Besi Pengencer Kuas Cat Perancah Kayu
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 328,500.00
0.2000 0.3000 0.0400
0.0080 0.1500 0.0500
1 m2 Pekerjaan Pengecatan Permukaan Baja Dengan Meni Besi Mandor Kepala Tukang Cat Tukang Cat Pekerja Meni Besi Kuas Cat
SAT m2
O.H O.H O.H O.H Kg Kg Kg Buah Ltr
18,000.00 33,000.00 13,140.00
1,040.00 13,500.00 197.50
325.00 2,400.00 22,000.00 1,800.00 5,425.00 131.00
975.00 2,700.00 24,750.00 22,500.00 5,425.00 296.50 131.00 8,104.00
169.00 3,000.00 27,500.00 22,500.00 3,865.00 3,490.00 5,720.00 131.00 296.50
2,600.00 9,600.00 88,000.00 36,000.00 4,251.50 5,933.00 5,720.00 131.00 296.50
KODE BARANG 2.01.01.07.05.021 1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.001 1.08.23.01.01.042.005 1.08.23.01.01.006.033 2.01.01.07.05.022
URAIAN KEGIATAN 1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Manual 1 Lapis Mutakhir Mandor Kepala Tukang Cat Tukang Cat Pekerja Cat Penutup Kuas Pengencer
KOEF
0.0030 0.0120 0.0600 0.0600 0.3000 0.0100 0.0100
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.001
1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Semprot Dengan Sistem 3 Lapis Cat Mutakhir Mandor Kepala Tukang Cat Tukang Cat Pekerja Cat Besi Dasar
2.01.01.07.05.023
1 m2 Pekerjaan Pengecatan Plafond
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.039.005 1.08.23.01.01.006.052 1.08.23.01.01.006.026 1.08.23.01.01.036.001 1.08.23.01.01.042.005
Mandor Kepala Tukang Cat Tukang Cat Pekerja Kapi Plamur Tembok Cat Tembok Kertas Gosok Kuas Cat
2.01.01.07.06 2.01.01.07.06.001
Instalasi Listrik Pemasangan 1 Titik Stop Kontak
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.001.005 1.08.24.02.06.001.061 1.08.23.03.06.003.001 1.08.23.03.06.999.005
Kepala Tukang Tukang Listrik Pekerja Kabel Nya 1 X 2,5 Ex. Supreme Pipa Pralon 5/8 Stop Kontak Ex. Broco T Doos Pvc
2.01.01.07.06.002
Pemasangan 1 Titik Lampu (Menggunakan Kabel Nya) Kepala Tukang Tukang Listrik Pekerja Kabel Nya 1 X 2,5 Ex. Supreme Pipa Pralon 5/8 Saklar Ex. Broco Fiting Plafond Ex. Broco T Doos Pvc
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.001.005 1.08.24.02.06.001.061 1.08.23.03.06.004.001 1.08.23.03.06.008.002 1.08.23.03.06.999.005 2.01.01.07.06.003 1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.004.001 1.08.23.03.06.001.024 1.08.24.02.06.001.061 1.08.23.03.06.999.005 1.08.23.03.06.008.002
O.H O.H O.H O.H Kg Buah Ltr m2
0.2000 0.2000 0.7000 0.4000 0.3000
0.0040 0.0060 0.0600 0.0800 0.0500 0.1000 0.0480 0.5000 0.0100
0.0050 0.5000 0.0500 15.0000 0.2000 1.0000 1.0000
134
390.00 1,440.00 6,600.00 5,400.00 21,450.00 131.00 296.50 184,500.00
26,000.00 24,000.00 77,000.00 36,000.00 21,450.00
m2
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 11,600.00 16,250.00 141,700.00 5,600.00 13,100.00
27,000.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 4,950.00 10,200.00 17,750.00 5,150.00
159,300.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 4,950.00 10,200.00 14,450.00 21,700.00 5,150.00
213,800.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 14,450.00 16,750.00 10,200.00 5,150.00 21,700.00
265,100.00
O.H O.H O.H O.H Buah Kg Galon lembar Buah
O.H O.H O.H m' Batang Buah Buah
O.H O.H O.H m' Batang Buah Buah Buah Titik
0.0500 0.5000 0.3000 1.0000 7.5000 1.0000 1.0000 1.0000
Nilai HSPK (Dibulatkan):
JUMLAH HARGA 35,700.00
130,000.00 120,000.00 110,000.00 90,000.00 71,500.00
Titik 0.0500 0.5000 0.3000 15.0000 1.0000 1.0000 1.0000 1.0000
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 71,500.00 13,100.00 29,650.00
O.H O.H O.H O.H kg
Titik
Pemasangan 1 Titik Lampu (Menggunakan Kabel Nym) Kepala Tukang Tukang Listrik Pekerja Saklar Ex. Broco Kabel Nym 2 X 2,5 Ex. Supreme Pipa Pralon 5/8 T Doos Pvc Fiting Plafon
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m2
O.H O.H O.H Buah m' Batang Buah Buah
520.00 720.00 6,600.00 7,200.00 580.00 1,625.00 6,801.60 2,800.00 131.00
600.00 55,000.00 4,500.00 74,250.00 2,040.00 17,750.00 5,150.00
6,000.00 55,000.00 27,000.00 74,250.00 10,200.00 14,450.00 21,700.00 5,150.00
6,000.00 55,000.00 27,000.00 14,450.00 125,625.00 10,200.00 5,150.00 21,700.00
KODE BARANG 2.01.01.07.06.004
URAIAN KEGIATAN Pekerjaan Pemasangan Saklar Tunggal Per Titik
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.004.001
Kepala Tukang Tukang Listrik Pekerja Saklar Tunggal Ex. Broco
2.01.01.07.06.005
Pekerjaan Pemasangan Saklar Ganda Per Titik
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.004.002
Kepala Tukang Tukang Listrik Pekerja Saklar Ganda Ex. Broco
2.01.01.07.06.006
1 Unit Pemasangan Lampu 1 x 18 Watt (Lengkap)
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.040
Kepala Tukang Tukang Listrik Pekerja Lampu Tl 1 x 18 Watt
2.01.01.07.06.007
1 Unit Pemasangan Lampu 1 x 36 Watt (Lengkap)
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.042
Kepala Tukang Tukang Listrik Pekerja Lampu Tl 1 x 36 Watt
2.01.01.07.06.008
1 Buah Pemasangan Lampu Sl 18 Watt
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.056
Kepala Tukang Tukang Listrik Pekerja Lampu Sl 18 Watt
2.01.01.07.06.009
1 Buah Pemasangan Lampu Sl 23 Watt
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.057
Kepala Tukang Tukang Listrik Pekerja Lampu Sl 23 Watt
2.01.01.07.06.010
1 Buah Pemasangan Lampu Pijar 25 Watt
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.028
Kepala Tukang Tukang Listrik Pekerja Lampu Pijar 25 Watt
2.01.01.07.06.011
1 Buah Pemasangan Lampu Down Light + Fitting
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.093
Kepala Tukang Tukang Listrik Pekerja Lampu Down Light + Fitting
2.01.01.07.06.012
1 Titik Pemasangan Box Panel
1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.24.03.01.999.032 1.08.24.03.01.017.003 1.08.24.03.01.017.002 1.08.23.03.06.001.029
Kepala Tukang Tukang Listrik Pekerja Box panel PVC isi 4 MCB MCB 6 A MCB 4 A Kabel NYM 3 x 2,5 mm2
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0500 0.2000 0.0010 1.0000
SAT Titik O.H O.H O.H Buah Titik
0.0500 0.2000 0.0010 1.0000
O.H O.H O.H Buah Buah
0.0050 0.0200 0.0100 1.0000
O.H O.H O.H Set Buah
0.0050 0.0200 0.0100 1.0000
O.H O.H O.H Set Buah
0.0050 0.0200 0.0100 1.0000
O.H O.H O.H Buah Buah
0.0050 0.0200 0.0100 1.0000
O.H O.H O.H Buah Buah
0.0050 0.0200 0.0100 1.0000
O.H O.H O.H Buah Buah
0.0050 0.0200 0.0100 1.0000
O.H O.H O.H Buah Titik
1.0000 1.0000 0.5000 1.0000 2.0000 2.0000 6.0000
135
O.H O.H O.H bh bh bh m
HARGA SATUAN Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 14,450.00
JUMLAH HARGA 42,500.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 20,000.00
48,100.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 206,550.00
210,300.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 322,550.00
326,300.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 44,200.00
47,900.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 51,400.00
55,100.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 11,500.00
15,200.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 116,700.00
120,400.00
Nilai HSPK (Dibulatkan): 120,000.00 110,000.00 90,000.00 386,600.00 55,400.00 63,800.00 21,900.00
1,031,400.00
6,000.00 22,000.00 90.00 14,450.00
6,000.00 22,000.00 90.00 20,000.00
600.00 2,200.00 900.00 206,550.00
600.00 2,200.00 900.00 322,550.00
600.00 2,200.00 900.00 44,200.00
600.00 2,200.00 900.00 51,400.00
600.00 2,200.00 900.00 11,500.00
600.00 2,200.00 900.00 116,700.00
120,000.00 110,000.00 45,000.00 386,600.00 110,800.00 127,600.00 131,400.00
KODE BARANG 2.01.01.07.06.013
URAIAN KEGIATAN 1 Titik Pasangan Instalasi antena TV
1.11.29.01.01.001.001 1.11.29.01.01.001.002 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.001.211 1.08.23.03.06.999.002 1.08.24.03.01.047.007
Mandor Kepala Tukang listrik Tukang Listrik Pekerja Kabel Antena Isolasi Klem
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.1000 0.1000 0.0200 0.0500 10.0000 0.5000 0.0300
136
SAT Titik O.H O.H O.H O.H m bh bh
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 24,500.00 10,450.00 15,500.00
JUMLAH HARGA 282,400.00 13,000.00 12,000.00 2,200.00 4,500.00 245,000.00 5,225.00 465.00
KODE BARANG 2.01.02.01 2.01.02.01.01 2.01.02.01.01.001
URAIAN KEGIATAN H. PAVING & PERKERASAN JALAN Perkerasan Paving 1 m2 Pemasangan Tegel Trotoar
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.004.002 1.08.23.01.01.002.001 1.08.23.01.01.002.012 1.08.23.01.01.013.034
Mandor Kepala Tukang Tukang Batu Pekerja Pasir Pasang Portland Cement Kapur Pasang Tegel Trotoar
2.01.02.01.01.002
1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Abu-Abu Segi Enam (K-300) Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Abu - Abu Tebal 8 Cm (Segi Enam) K300
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.009
2.01.02.01.01.003 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.010
KOEF
0.0250 0.0250 0.2500 0.5000 0.0100 0.1140 0.0120 1.0000
1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Bewarna Segi Enam (K-300) Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Bewarna Tebal 8 Cm (Segi Enam) K300
2.01.02.01.01.004
1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Abu - Abu Persegi Panjang (K - 300)
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.007
Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Abu - Abu Tebal 8 Cm Persegi Panjang K-300
2.01.02.01.01.005
1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Bewarna Persegi Panjang (K-300)
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.008
Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Bewarna Tebal 8 Cm Persegi Panjang K-300
2.01.02.01.01.006
1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu-Abu Segi Enam (K-300) Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Abu - Abu Tebal 6 Cm (Segi Enam) K300
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.005
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
HARGA SATUAN
m2
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 244,750.00 77,500.00 120,150.00 256,400.00
347,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 99,533.87
197,700.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 111,243.74
186,900.00
Nilai HSPK (Dibulatkan):
175,200.00
O.H O.H O.H O.H m3 Zak m3 m2 m2
0.0125 0.0125 0.2500 0.7500 1.0000
O.H O.H O.H O.H m2
m2 0.0125 0.0125 0.2500 0.5000 1.0000
O.H O.H O.H O.H m2
m2
0.0125 0.0125 0.2500 0.5000 1.0000
137
SAT
O.H O.H O.H O.H m2
m2
0.0125 0.0125 0.2500 0.5000 1.0000
0.0125 0.0125 0.2500 0.5000 1.0000
130,000.00 120,000.00 110,000.00 90,000.00 99,533.87
Nilai HSPK (Dibulatkan):
JUMLAH HARGA
3,250.00 3,000.00 27,500.00 45,000.00 2,447.50 8,835.00 1,441.80 256,400.00
1,625.00 1,500.00 27,500.00 67,500.00 99,533.87
1,625.00 1,500.00 27,500.00 45,000.00 111,243.74
1,625.00 1,500.00 27,500.00 45,000.00 99,533.87
186,900.00
O.H O.H O.H O.H m2
130,000.00 120,000.00 110,000.00 90,000.00 111,243.74
1,625.00 1,500.00 27,500.00 45,000.00 111,243.74
m2
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 87,824.01
163,400.00
O.H O.H O.H O.H m2
1,625.00 1,500.00 27,500.00 45,000.00 87,824.01
KODE BARANG 2.01.02.01.01.007 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.006
URAIAN KEGIATAN 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Bewarna Segi Enam (K-300) Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Bewarna Tebal 6 Cm (Segi Enam) K300
2.01.02.01.01.008
1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu - Abu Persegi Panjang (K-300)
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.003
Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Abu - Abu Tebal 6 Cm Persegi Panjang K-300
2.01.02.01.01.009
1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Bewarna Persegi Panjang (K-300)
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.004
Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Bewarna Tebal 6 Cm Persegi Panjang K-300
2.01.02.01.01.010
1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu - Abu Persegi Panjang (K-175) Untuk Jalan Lingkungan Hidup Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Abu - Abu Tebal 6 Cm (Persegi Panjang) K-175
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.001
2.01.02.01.01.011
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.055.002
2.01.02.01.01.012 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.055.014
0.0125 0.0125 0.2500 0.5000 1.0000
1 m' Pekerjaan Pemasangan Kanstin Uk. 15.35.50 (K-300) Mandor Kepala Tukang Tukang Batu Pekerja/Buruh Terampil Portland Cement Pasir Pasang Kanstin Uk. 15.35.50
138
SAT m2 O.H O.H O.H O.H m2
m2
0.0125 0.0125 0.2500 0.5000 1.0000
1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu - Abu Persegi Panjang (K-200) Untuk Jalan Lingkungan Hidup Mandor Kepala Tukang Tukang Batu Pekerja Paving Stone Abu - Abu Tebal 6 Cm (Persegi Panjang) K-200
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H O.H m2
m2
0.0125 0.0125 0.2500 0.5000 1.0000
O.H O.H O.H O.H m2
m2
0.0125 0.0125 0.2500 0.5000 1.0000
O.H O.H O.H O.H m2
m2
0.0125 0.0125 0.2500 0.5000 1.0000
0.0010 0.0100 0.1000 0.2000 0.4500 0.0010 2.0000
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 99,533.87
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 87,824.01
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 99,533.87
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 60,850.00
Nilai HSPK (Dibulatkan):
JUMLAH HARGA 175,200.00 1,625.00 1,500.00 27,500.00 45,000.00 99,533.87
163,400.00
1,625.00 1,500.00 27,500.00 45,000.00 87,824.01
175,200.00
1,625.00 1,500.00 27,500.00 45,000.00 99,533.87
136,500.00
1,625.00 1,500.00 27,500.00 45,000.00 60,850.00
146,700.00
O.H O.H O.H O.H m2
130,000.00 120,000.00 110,000.00 90,000.00 71,050.00
1,625.00 1,500.00 27,500.00 45,000.00 71,050.00
m'
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 38,650.00
142,700.00
O.H O.H O.H O.H Zak m3 Buah
130.00 1,200.00 11,000.00 18,000.00 34,875.00 244.75 77,300.00
KODE BARANG 2.01.02.01.01.013 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.055.015 2.01.02.01.01.014
URAIAN KEGIATAN 1 m' Pekerjaan Pemasangan Kanstin Uk. 15.25.40 (K-300) Mandor Kepala Tukang Tukang Batu Pekerja/Buruh Terampil Portland Cement Pasir Pasang Kanstin Uk. 15.25.40
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.004.002 1.08.23.01.01.055.011
1 m' Pekerjaan Pemasangan Stopper/ Uskup (K300) Mandor Kepala Tukang Tukang Batu Pekerja/Buruh Terampil Pasir Pasang Stopper/Uskup
2.01.02.01.02 2.01.02.01.02.001
Pengadaan Agregat 1 m3 Pengadaan Agregat Kelas A
1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB Hs1 E15 E52
Pekerja Mandor Agregat Pecah Kasar Agregat Halus Lapis Pondasi A Wheel Loader Blending Equipment
2.01.02.01.02.002
1 m3 Pengadaan Agregat Kelas B
1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB Hs1 E15 E52
Pekerja Mandor Agregat Pecah Kasar Fraksi Lolos Scalping Screen 0-50 Mm Wheel Loader Blending Equipment
2.01.02.01.02.003
1 m3 Pengadaan Agregat Kelas S
1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB Hs4 Hs1 E15 E52
Pekerja Mandor Agregat Pecah Kasar Agregat Lolos # 1 " Fraksi Lolos Scalping 0-37,5 Mm, Screen 0-37,5 Mm Wheel Loader Blending Equipment
2.01.02.01.02.004
1 m3 Pengadaan Lapis Pondasi Agregat (Cbr 60%)
1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB Hs4 Hs5
Pekerja Mandor Agregat Pecah Kasar Agregat Lolos # 1 " Fraksi Lolos Scalping 0-37,5 Mm (Screen 0-37,5 Mm) Wheel Loader Blending Equipment
E15 E52
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0010 0.0100 0.1000 0.2000 0.4500 0.0010 2.5000
SAT m' O.H O.H O.H O.H Zak m3 buah m'
0.0010 0.0100 0.1000 0.2000 0.0010 0.1670
O.H O.H O.H O.H m3 m2
m3 0.0090 0.0045 0.7335 0.3166 0.0315 0.0482
OH OH m3 m3 jam jam m3
0.0090 0.0045 0.4158 0.6342 0.0315 0.0482
OH OH m3 m3 jam jam m3
139
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 25,800.00
JUMLAH HARGA 129,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 244,750.00 90,200.00
45,600.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 211,267.47 579,263.86 365,846.01
296,100.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 211,267.47 579,263.86 365,846.01
280,100.00
271,200.00
130.00 1,200.00 11,000.00 18,000.00 34,875.00 244.75 64,500.00
130.00 1,200.00 11,000.00 18,000.00 244.75 15,063.40
810.00 585.00 191,945.39 66,887.28 18,246.81 17,633.78
810.00 585.00 108,808.31 133,985.83 18,246.81 17,633.78
0.0090 0.0045 0.1890 0.1922 0.6689
OH OH m3 m3 m3
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 224,256.44 211,267.47
0.0315 0.0482
jam jam
579,263.86 365,846.01
18,246.81 17,633.78
m3
286,600.00
18,246.81 17,633.78
0.0090 0.0045 0.2520 0.2231 0.5750
OH OH m3 m3 m3
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 224,256.44 231,883.05
0.0315 0.0482
jam jam
579,263.86 365,846.01
810.00 585.00 49,458.32 43,102.09 141,316.81
810.00 585.00 65,944.43 50,031.61 133,332.76
KODE BARANG 2.01.02.01.02.005 1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB 1.08.23.01.01.004.003 E15 E52
URAIAN KEGIATAN 1 m3 Pengadaan Lapis Permukaan Agregat (Cbr 60%) Pekerja Mandor Agregat 5-10 & 10-20 Pasir Urug Wheel Loader Blending Equipment
2.01.02.01.02.006
1 m3 Pengadaan Agregat Kelas C
HSAB
Agregat Pecah Kasar
2.01.02.01.02.007
1 m3 Pengadaan Agregat Halus
Hs1
Agregat Primary Crusher
2.01.02.01.02.008
1 m3 Pengadaan Agregat Lolos Screen (0-5)
Hs2
Agregat Pecah Mesin (0-5)
2.01.02.01.02.009
1 m3 Pengadaan Agregat Lolos Screen (5-9.5)
Hs4
Agregat Pecah Mesin (5-9.5)
2.01.02.01.02.010
1 m3 Pengadaan Agregat Lolos Screen (9.5-19)
Hs5
Agregat Pecah Mesin (9.5-19)
2.01.02.01.02.011
1 m3 Pengadaan Agregat Pecah Kasar
HSAB
Agregat Pecah Kasar
2.01.02.01.03 2.01.02.01.03.001 1.11.29.01.01.002.014 1.11.29.01.01.001.001 E10 E08
Pekerjaan Drainase (Divisi 2) 1 m3 Galian Untuk Selokan Drainase Dan Saluran Air Pekerja Mandor Excavator Dump Truck
2.01.02.01.03.002
1 m3 Pasangan Batu Dengan Mortar
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.005.006 1.08.23.01.01.002.001 1.08.23.01.01.004.002 E06
Pekerja Tukang Mandor Batu Semen Pasir Conc. Mixer
2.01.02.01.03.003
1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. Dalam 35-45 Cm Pekerja Tukang Mandor Beton K-300 Baja Tulangan Urugan Porus Mat. Pilihan Tamper Flat Bed Truck
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 2.01.02.01.08.004 1.08.23.01.01.012.007 2.01.02.01.03.010 1.08.23.01.01.004.004 E25 E11
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0090 0.0045 0.4788 0.5712 0.0315 0.0482
SAT m3 OH OH m3 m3 jam jam m3
1.0000
m3 m3
1.0000
m3 m3
1.0000
m3 m3
1.0000
m3 m3
1.0000
m3 m3
1.0000
m3
m3 0.0044 0.0011 0.0076 0.1321
OH OH jam jam m3
0.5738 0.1722 0.0574 1.0800 4.0250 0.4829 0.4017
140
OH jam OH m3 Zak m3 jam m'
0.3334 0.1334 0.0667 0.1052 11.5682 0.1239 0.8128 1.0092 0.1540
OH OH OH m3 Kg m3 m3 jam jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 161,050.00 579,263.86 365,846.01
JUMLAH HARGA 254,600.00
Nilai HSPK (Dibulatkan): 261,684.24
261,700.00
Nilai HSPK (Dibulatkan): 211,267.47
211,300.00
Nilai HSPK (Dibulatkan): 270,016.11
270,000.00
Nilai HSPK (Dibulatkan): 224,256.44
224,300.00
Nilai HSPK (Dibulatkan): 231,883.05
231,900.00
Nilai HSPK (Dibulatkan): 261,684.24
261,700.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 708,337.30 336,248.16
50,300.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 193,250.00 77,500.00 244,750.00 193,324.87
794,500.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 2,403,000.00 13,550.00 335,200.00 193,750.00 47,508.36 642,709.22
808,800.00
810.00 585.00 125,294.41 91,991.76 18,246.81 17,633.78
261,684.24
211,267.47
270,016.11
224,256.44
231,883.05
261,684.24
396.00 143.00 5,383.36 44,418.38
51,642.00 18,942.00 7,462.00 208,710.00 311,937.50 118,189.78 77,658.60
30,006.00 14,674.00 8,671.00 252,795.60 156,749.11 41,531.28 157,480.00 47,945.44 98,977.22
KODE BARANG 2.01.02.01.03.004 1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 2.01.02.01.08.004 1.08.23.01.01.012.007 2.01.02.01.03.010 1.08.23.01.01.004.004 E25 E11 2.01.02.01.03.005 1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 2.01.02.01.08.004 1.08.23.01.01.012.007 2.01.02.01.03.010 1.08.23.01.01.004.004 E25 E11 2.01.02.01.03.006 1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 2.01.02.01.08.004 1.08.23.01.01.012.007 2.01.02.01.03.010 1.08.23.01.01.004.004 E25 E11 2.01.02.01.03.007 1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.08.006 2.01.02.01.03.010 1.08.23.01.01.004.004 E25 E25 E11 2.01.02.01.03.008 1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.08.006 2.01.02.01.03.010 1.08.23.01.01.004.004 E25 E25 E11
URAIAN KEGIATAN 1 M' Gorong-Gorong Pipa Beton Bertulang, Diameter 55-65 Cm Pekerja Tukang Mandor Beton K-300 Baja Tulangan Timbunan Porus Mat. Pilihan Tamper Flat Bed Truck
KOEF
0.7000 0.2000 0.1000 0.1461 16.0607 0.1449 1.0630 1.3157 0.2310
1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. Dalam 75-85 Cm Pekerja Tukang Mandor Beton K-300 Baja Tulangan Urugan Porus Mat. Pilihan Tamper Flat Bed Truck 1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. Dalam 95-105 Cm Pekerja Tukang Mandor Beton K-300 Baja Tulangan Urugan Porus Mat. Pilihan Tamper Flat Bed Truck 1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan Dia. Dalam 20 Cm Pekerja Mandor Beton K-175 Urugan Porus Mat. Pilihan Tamper Tamper Flat Bed Truck 1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan Dia. Dalam 25 Cm Pekerja Mandor Beton K-175 Urugan Porus Mat. Pilihan Tamper Tamper Flat Bed Truck
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
141
SAT m' OH OH OH m3 Kg m3 m3 Jam Jam m'
2.0000 0.2500 0.2500 0.2898 31.8707 0.3103 1.9114 2.3776 0.5774
OH OH OH m3 Kg m3 m3 Jam Jam m'
2.0000 0.2500 0.2500 0.4085 44.9248 0.4158 2.3100 2.8834 0.5774
OH OH OH m3 Kg m3 m3 Jam Jam m'
0.2500 0.0500 0.0542 0.0662 0.2277 0.0037 0.2744 0.1205
OH OH m3 m3 m3 jam jam jam m'
0.2500 0.0500 0.0644 0.0714 0.2593 0.0045 0.3124 0.1205
OH OH m3 m3 m3 jam jam jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 2,403,000.00 13,550.00 335,200.00 193,750.00 47,508.36 642,709.22
JUMLAH HARGA 1,132,200.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 2,403,000.00 13,550.00 335,200.00 193,750.00 47,508.36 642,709.22
2,326,600.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 2,403,000.00 13,550.00 335,200.00 193,750.00 47,508.36 642,709.22
2,925,400.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 1,619,800.00 335,200.00 193,750.00 47,508.36 47,508.36 642,709.22
273,800.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 1,619,800.00 335,200.00 193,750.00 47,508.36 47,508.36 642,709.22
300,000.00
63,000.00 22,000.00 13,000.00 351,078.30 217,622.49 48,570.48 205,956.25 62,506.75 148,465.83
180,000.00 27,500.00 32,500.00 696,389.40 431,847.99 104,012.56 370,333.75 112,955.88 371,100.30
180,000.00 27,500.00 32,500.00 981,625.50 608,731.04 139,376.16 447,562.50 136,985.61 371,100.30
22,500.00 6,500.00 87,793.16 22,190.24 44,116.88 175.78 13,036.29 77,446.46
22,500.00 6,500.00 104,315.12 23,933.28 50,239.38 213.79 14,841.61 77,446.46
KODE BARANG 2.01.02.01.03.009 1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.08.006 2.01.02.01.03.010 1.08.23.01.01.004.004 E25 E25 E11 2.01.02.01.03.010 1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB 1.08.23.01.01.004.002 E25 2.01.02.01.04 2.01.02.01.04.001 1.11.29.01.01.002.014 1.11.29.01.01.001.001 E10 E08 2.01.02.01.04.002 1.11.29.01.01.002.014 1.11.29.01.01.001.001 E05 E26 E15 E10 E08 2.01.02.01.04.003 1.11.29.01.01.002.014 1.11.29.01.01.001.001 E05 E26 E15 E10 E08 2.01.02.01.04.004 1.11.29.01.01.002.014 1.11.29.01.01.001.001 E10 E04 2.01.02.01.04.005 1.11.29.01.01.002.014 1.11.29.01.01.001.001 E10 E04 2.01.02.01.04.006 1.11.29.01.01.002.014 1.11.29.01.01.001.001 E10 E04
URAIAN KEGIATAN 1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan Dia. Dalam 30 Cm Pekerja Mandor Beton K-175 Urugan Porus Mat. Pilihan Tamper Tamper Flat Bed Truck 1 m3 Bahan Porous Untuk Bahan Penyaring (Filter) Pekerja Mandor Agregat Kasar Pasir Tamper
0.2500 0.0500 0.0746 0.0767 0.2921 0.0054 0.3519 0.1205
SAT m' OH OH m3 m3 m3 jam jam jam m3
0.4000 0.1000 0.5500 0.5500 0.1607
Pekerjaan Tanah (Divisi 3) 1 m3 Galian Biasa (Termasuk Pembuangan Sisa Galian) Pekerja Mandor Excavator Dump Truck 1 m3 Galian Batu Lunak (Termasuk Pembuangan Sisa Galian) Pekerja Mandor Compressor Jack Hammer Wheel Loader Excavator Dump Truck 1 m3 Galian Batu (Termasuk Pembuangan Sisa Galian) Pekerja Mandor Compressor Jack Hammer Wheel Loader Excavator Dump Truck
OH OH m3 m3 Jam
m3 0.0074 0.0037 0.0256 0.3344
OH OH Jam Jam m3
0.0638 0.0080 0.0558 0.0558 0.0558 0.0558 0.3461
OH OH Jam Jam Jam Jam Jam m3
0.0844 0.0106 0.0738 0.0738 0.0738 0.0738 0.3678
1 m3 Galian Struktur Dengan Kedalaman 0-2 Meter Pekerja Mandor Excavator Bulldozer
OH OH Jam Jam Jam Jam Jam m3
0.0030 0.0008 0.0052 0.0146
1 m3 Galian Struktur Dengan Kedalaman 2-4 Meter Pekerja Mandor Excavator Bulldozer
OH OH Jam Jam m3
0.0083 0.0009 0.0058 0.0146
1 m3 Galian Struktur Dengan Kedalaman 4-6 Meter Pekerja Mandor Excavator Bulldozer
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
OH OH Jam Jam m3
0.0149 0.0013 0.0087 0.0146
142
OH OH Jam Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 1,619,800.00 335,200.00 193,750.00 47,508.36 47,508.36 642,709.22
JUMLAH HARGA 326,600.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 244,750.00 47,508.36
335,200.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 708,337.30 336,248.16
131,700.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 224,642.53 33,726.95 579,263.86 708,337.30 336,248.16
209,400.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 224,642.53 33,726.95 579,263.86 708,337.30 336,248.16
246,700.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 708,337.30 1,174,456.56
21,200.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 708,337.30 1,174,456.56
22,100.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 708,337.30 1,174,456.56
24,800.00
22,500.00 6,500.00 120,837.08 25,709.84 56,594.38 256.55 16,718.19 77,446.46
36,000.00 13,000.00 143,926.33 134,612.50 7,634.59
666.00 481.00 18,133.43 112,441.39
5,742.00 1,040.00 12,535.05 1,881.96 32,322.92 39,525.22 116,375.49
7,596.00 1,378.00 16,578.62 2,489.05 42,749.67 52,275.29 123,672.07
270.00 104.00 3,683.35 17,147.07
747.00 117.00 4,108.36 17,147.07
1,341.00 169.00 6,162.53 17,147.07
KODE BARANG 2.01.02.01.04.007
1.11.29.01.01.002.014 1.11.29.01.01.001.001 E36 E08 2.01.02.01.04.008
URAIAN KEGIATAN 1 m3 Galian Perkerasan Beraspal Dengan Cold Milling Machine (Termasuk Pembuangan Sisa Galian) Pekerja Mandor Cold Milling Dump Truck
KOEF
0.0106 0.0053 0.0371 0.4673
1.11.29.01.01.002.014 1.11.29.01.01.001.001 E26 E05 E08
1 m3 Galian Perkerasan Beraspal Tanpa Cold Milling Machine (Termasuk Pembuangan Sisa Galian) Pekerja Mandor Jack Hammer Compresor Dump Truck
2.01.02.01.04.009
1 m2 Penyiapan Badan Jalan
1.11.29.01.01.002.014 1.11.29.01.01.001.001 E13 E19
Pekerja Mandor Motor Grader Vibro Roller
2.01.02.01.04.010
1 Buah Pemotongan Pohon Pilihan Diameter 15 – 30 Cm (Termasuk Pembuangan Dengan Dump Truck) Pekerja Mandor Dump Truck Chainsaw
1.11.29.01.01.002.014 1.11.29.01.01.001.001 E08 1.09.27.01.02.999.003 2.01.02.01.04.011
1.11.29.01.01.002.014 1.11.29.01.01.001.001 E08 1.09.27.01.02.999.003 2.01.02.01.04.012
1.11.29.01.01.002.014 1.11.29.01.01.001.001 E08 1.09.27.01.02.999.003 2.01.02.01.04.013
1.11.29.01.01.002.014 1.11.29.01.01.001.001 E08 1.09.27.01.02.999.003 2.01.02.01.04.014 1.11.29.01.01.002.014 1.11.29.01.01.001.001 E26 E05 E08
OH OH Jam Jam m3
0.0477 0.0239 2.4097 2.4097 1.1127
0.0004 0.0001 0.0006 0.0005
1 Buah Pemotongan Pohon Pilihan Diameter 30 – 50 Cm (Termasuk Pembuangan Dengan Dump Truck) Pekerja Mandor Dump Truck Chainsaw 1 Buah Pemotongan Pohon Pilihan Diameter 50 – 75 Cm (Termasuk Pembuangan Dengan Dump Truck) Pekerja Mandor Dump Truck Chainsaw 1 Buah Pemotongan Pohon Pilihan Diameter > 75 Cm (Termasuk Pembuangan Dengan Dump Truck) Pekerja Mandor Dump Truck Chainsaw 1 m3 Galian Perkerasan Berbutir (Termasuk Pembuangan Dengan Dump Truck) Pekerja Mandor Jack Hammer Compresor Dump Truck
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m3
0.2143 0.0358 0.2678 0.2678 0.2260
143
m2
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 716,346.34 442,904.36
700.00
OH OH Jam jam
OH OH Jam Jam
OH OH Jam Jam
OH OH Jam Jam Buah
0.6667 0.0667 1.0844 1.0844
1,004,100.00
4,293.00 3,107.00 81,271.84 541,321.11 374,143.33
Buah
0.5000 0.0500 0.4970 1.0000
Nilai HSPK (Dibulatkan):
954.00 689.00 77,493.07 157,128.77
90,000.00 130,000.00 33,726.95 224,642.53 336,248.16
Buah
0.5000 0.0500 0.2982 1.0000
90,000.00 130,000.00 2,088,761.99 336,248.16
JUMLAH HARGA 236,300.00
OH OH Jam Jam Jam
Buah
0.5000 0.0500 0.1988 1.0000
HARGA SATUAN Nilai HSPK (Dibulatkan):
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 336,248.16 46,600.00 Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 336,248.16 46,600.00 Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 336,248.16 46,600.00 Nilai HSPK (Dibulatkan):
36.00 13.00 429.81 221.45 164,900.00
45,000.00 6,500.00 66,846.14 46,600.00 198,400.00
45,000.00 6,500.00 100,269.20 46,600.00 265,200.00
45,000.00 6,500.00 167,115.34 46,600.00 483,800.00
OH OH Jam Jam
90,000.00 130,000.00 336,248.16 46,600.00
60,003.00 8,671.00 364,627.51 50,533.04
m3
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 33,726.95 224,642.53 336,248.16
169,100.00
OH OH Jam Jam Jam
19,287.00 4,654.00 9,032.08 60,159.27 75,992.09
KODE BARANG 2.01.02.01.04.015
URAIAN KEGIATAN 1 m2 Pemasangan Geotekstile
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.032.001 E11
Mandor Pekerja Geotekstile Filler Flat Bed Truck
2.01.02.01.05 2.01.02.01.05.001
Pekerjaan Pelebaran Perkerasan Dan Bahu Jalan (Divisi 4) 1 m3 Lapis Pondasi Agregat Kelas A
1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.02.001 E15 E08 E13 E17 E23
Pekerja Mandor Agregat A Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker
2.01.02.01.05.002
1 m3 Lapis Pondasi Agregat Kelas B
1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.02.002 E15 E08 E13 E17 E23
Pekerja Mandor Agregat B Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker
2.01.02.01.05.003
1 Ton Semen Untuk Lapis Pondasi Semen Tanah
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.002.001 E08
Pekerja Mandor Semen Dump Truck
2.01.02.01.05.004 1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.004.004 E15 E08 E13 E19 E18 E23 E36
1 m3 Lapis Pondasi Semen Tanah (Untuk Pelebaran Perkerasan Dan Bahu Jalan) Pekerja Mandor Tanah Timbunan (M08) Wheel Loader Dump Truck Motor Grader Vibratory Roller P. Tyre Roller Water Tanker Cold Milling
2.01.02.01.05.005
1 m2 Agregat Penutup Burtu
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.005.002 E15 E08 E18
Pekerja Mandor Chipping (Agregat Batu Pecah) Wheel Loader Dump Truck P. Tyre Roller
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0048 0.0381 1.0000 0.0334
SAT m2 OH OH m2 jam
m3 0.0085 0.0013 1.2587 0.0085 1.1117 0.0094 0.0119 0.0141
OH OH m3 Jam Jam Jam Jam Jam m3
0.0085 0.0013 1.2587 0.0085 1.1117 0.0094 0.0108 0.0141
OH OH m3 Jam Jam Jam Jam Jam Ton
0.3473 0.0232 26.2500 0.8438
OH OH Zak Jam m3
0.0081 0.0012 1.2000 0.0081 1.1758 0.0094 0.0268 0.0065 0.0141 0.0168
OH OH m3 Jam Jam Jam Jam Jam Jam Jam m2
0.0004 0.0001 0.0176 0.0002 0.0201 0.0007
144
OH OH m3 Jam Jam Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 23,800.00 642,709.22
JUMLAH HARGA 49,300.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 296,100.00 579,263.86 336,248.16 716,346.34 372,124.41 343,415.25
768,400.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 280,100.00 579,263.86 336,248.16 716,346.34 372,124.41 343,415.25
747,800.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 77,500.00 336,248.16
2,352,400.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 193,750.00 579,263.86 336,248.16 716,346.34 442,904.36 603,287.59 343,415.25 2,088,761.99
695,900.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 322,050.00 579,263.86 336,248.16 603,287.59
13,000.00
624.00 3,429.00 23,800.00 21,466.49
765.00 169.00 372,701.07 4,923.74 373,807.08 6,733.66 4,428.28 4,842.16
765.00 169.00 352,561.87 4,923.74 373,807.08 6,733.66 4,018.94 4,842.16
31,257.00 3,016.00 2,034,375.00 283,726.20
729.00 156.00 232,500.00 4,692.04 395,360.59 6,733.66 11,869.84 3,921.37 4,842.16 35,091.20
36.00 13.00 5,668.08 115.85 6,758.59 422.30
KODE BARANG 2.01.02.01.05.006
URAIAN KEGIATAN 1 Liter Bahan Aspal Untuk Pekerjaan Pelaburan
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.003 1.08.23.01.01.001.015 E41 E05
Pekerja Mandor Aspal Minyak Tanah Asphalt Distributor Air Compresor
2.01.02.01.05.007
1 Liter Lapis Resap Pengikat
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.003 1.08.23.01.01.001.015 E41 E05
Pekerja Mandor Aspal Kerosene Asp. Distributor Air Compresor
2.01.02.01.05.008
1 m3 Lapis Pondasi Agregat Kelas S
1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.02.003 E15 E08 E13 E17 E23
Pekerja Mandor Agregat S Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker
2.01.02.01.05.009
1 m2 Lapisan Perkerasan 5-10 Cm (Padat Digilas)
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.005.004 1.08.23.01.01.005.006 1.08.23.01.01.001.003 E19
Mandor Pekerja Batu Pecah Mesin (3/5 Cm Dan 4/6 Cm) Batu Kali Belah 15/20 Cm Aspal Panas Ac 60/70 (Termasuk Angkutan) Mesin Gilas
2.01.02.01.06 2.01.02.01.06.001
Pekerjaan Pekerasan Non Aspal (Divisi 5) 1 m3 Lapis Pondasi Agregat Kelas A
1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.02.001 E15 E08 E13 E17 E23
Pekerja Mandor Agregat A Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker
2.01.02.01.06.002
1 m3 Lapis Pondasi Agregat Kelas B
1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.02.002 E15 E08 E13 E17 E23
Pekerja Mandor Agregat B Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0003 0.0001 1.0791 0.0524 0.0003 0.0003
SAT Liter OH OH Kg Liter Jam Jam Liter
0.0003 0.0001 0.6345 0.4840 0.0003 0.0003
OH OH Kg liter Jam Jam m3
0.0085 0.0013 1.2587 0.0085 1.0715 0.0043 0.0054 0.0141
OH OH m3 jam jam Jam jam jam m2
0.0380 0.0950 0.0400 0.1000 1.5000 0.0150
O.H O.H m3 m3 Kg Jam
m3 0.0085 0.0013 1.2587 0.0085 1.1117 0.0043 0.0134 0.0141
OH OH m3 jam jam Jam jam jam m3
0.0085 0.0013 1.2587 0.0085 1.0715 0.0043 0.0054 0.0141
145
OH OH m3 jam jam Jam jam jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 12,000.00 14,650.00 469,327.93 224,642.53
JUMLAH HARGA 14,000.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 12,000.00 14,650.00 469,327.93 224,642.53
15,000.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 271,200.00 579,263.86 336,248.16 716,346.34 372,124.41 343,415.25
717,400.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 315,600.00 193,250.00 12,000.00 442,904.36
70,100.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 296,100.00 579,263.86 336,248.16 716,346.34 372,124.41 343,415.25
765,300.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 280,100.00 579,263.86 336,248.16 716,346.34 372,124.41 343,415.25
728,600.00
27.00 13.00 12,949.20 767.66 140.80 67.39
27.00 13.00 7,614.00 7,090.60 140.80 67.39
765.00 169.00 341,359.44 4,923.74 360,289.91 3,080.29 2,009.47 4,842.16
4,940.00 8,550.00 12,624.00 19,325.00 18,000.00 6,643.57
765.00 169.00 372,701.07 4,923.74 373,807.08 3,080.29 4,986.47 4,842.16
765.00 169.00 352,561.87 4,923.74 360,289.91 3,080.29 2,009.47 4,842.16
KODE BARANG 2.01.02.01.06.003 1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB E15 E08 E13 E17 E23
URAIAN KEGIATAN 1 m3 Lapis Permukaan Agregat Tanpa Penutup Aspal Pekerja Mandor Agregat Kelas C1 (m28) Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker
2.01.02.01.06.004
1 m3 Lapis Pondasi Semen Tanah
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.004.004 1.08.23.01.01.001.016
Pekerja Mandor Tanah Timbunan (M08) Curing Membran (77 % Aspal + 33 % Kerosene
0.0255 0.0013 1.2000 1.3334
OH OH m3 liter
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 193,750.00 14,074.50
1.08.23.01.01.005.002 E15 E08 E13 E19 E18 E23 E27
Chipping (Agregat Batu Pecah) Wheel Loader Dump Truck Motor Grader Vibrator Roller P. Tyre Roller Water Tanker Fulvi Mixer
0.0058 0.0085 0.9578 0.0043 0.0108 0.0036 0.0141 0.0067
m3 Jam Jam Jam Jam Jam Jam Jam
322,050.00 579,263.86 336,248.16 716,346.34 442,904.36 603,287.59 343,415.25 1,793,938.59
1,867.89 4,923.74 322,058.49 3,080.29 4,783.37 2,171.84 4,842.16 12,019.39
2.01.02.01.06.005
1 Ton Semen Untuk Lapis Pondasi Semen Tanah
Ton
2,415,400.00
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.002.001 E08
Pekerja Mandor Semen Dump Truck
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 77,500.00 336,248.16
2.01.02.01.06.006
1 m3 Lapis Pondasi Bawah Beton Kurus
1,642,100.00
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 1.08.23.01.01.004.002 HSAB 1.08.23.01.05.002.101 1.08.23.01.05.002.054 1.08.23.01.01.026.017 E15 E43 E49 E20 E23 E42
Pekerja Tukang Mandor Semen Pasir Agregat Kasar Multiplex 12 Mm Kayu Acuan Paku Wheel Loader Batching Plant Truck Mixer Concrete Vibrator Water Tank Truck Conc. Paver
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 244,750.00 261,684.24 186,650.00 4,052,000.00 21,000.00 579,263.86 846,746.59 824,650.57 51,650.18 343,415.25 637,808.89
2.01.02.01.06.007
1 m3 Lapis Pondasi Atas Bersemen (Cement Treated Base) (Ctb) Pekerja Tukang Mandor Semen Agregat Kasar Wheel Loader Batching Plant Dump Truck Vibrator Roller Water Tank Truck
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 261,684.24 579,263.86 846,746.59 336,248.16 442,904.36 343,415.25
785,600.00
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 HSAB E15 E43 E08 E19 E23
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0085 0.0013 1.2587 0.0085 0.6517 0.0043 0.0108 0.0141
SAT m3 OH OH m3 Jam Jam Jam Jam Jam m3
0.3473 0.0232 26.2500 1.0313
OH OH Zak Jam m3
0.2152 0.0574 0.0144 7.7388 0.4991 0.8837 0.1600 0.0960 0.2500 0.0245 0.0503 0.1952 0.0503 0.0422 0.0038
OH OH OH Zak m3 m3 Lbr m3 Kg jam jam jam jam jam jam m3
0.1507 0.0431 0.0216 2.1782 1.2587 0.0245 0.0754 0.5096 0.0055 0.0422
146
OH OH OH Zak m3 jam jam jam jam jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 579,263.86 336,248.16 716,346.34 372,124.41 343,415.25
JUMLAH HARGA 566,300.00
609,500.00
765.00 169.00 329,381.95 4,923.74 219,132.93 3,080.29 4,018.94 4,842.16
2,295.00 169.00 232,500.00 18,766.94
31,257.00 3,016.00 2,034,375.00 346,772.73
19,368.00 6,314.00 1,872.00 599,757.00 122,154.73 231,250.36 29,864.00 388,992.00 5,250.00 14,191.96 42,591.35 160,971.79 2,598.00 14,492.12 2,423.67
13,563.00 4,741.00 2,808.00 168,810.50 329,381.95 14,191.96 63,844.69 171,352.06 2,435.97 14,492.12
KODE BARANG 2.01.02.01.06.008 1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 HSAB E15 E43 E08 E19 E23
URAIAN KEGIATAN 1 m3 Lapis Pondasi Bawah (Cement Treated Sub Base) (Ctsb) Pekerja Tukang Mandor Semen Agregat Kasar Wheel Loader Batching Plant Dump Truck Vibrator Roller Water Tank Truck
2.01.02.01.06.009
1 m3 Lapis Pondasi Agregat Tanpa Penutup Aspal
1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.02.004 E15 E08 E13 E17 E23
Pekerja Mandor Lps Pondasi Agr Wheel Loader Dump Truck Motor Grader Tandem Vibro Roller Water Tanker
2.01.02.01.07 2.01.02.01.07.001
Pekerjaan Pekerasan Aspal (Divisi 6) 1 Liter Lapis Resap Pengikat-Aspal Cair
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.003 1.08.23.01.01.001.015 E41 E05
Pekerja Mandor Aspal Kerosene Asp. Distributor Compressor
2.01.02.01.07.002
1 Liter Lapis Perekat-Aspal Cair
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.003 1.08.23.01.01.001.015 E41 E05
Pekerja Mandor Aspal Kerosene Asp. Distributor Compressor
2.01.02.01.07.003
1 m2 Agregat Penutup Burtu
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.005.002 E15 E08 E18
Pekerja Mandor Chipping (Agregat Batu Pecah) Wheel Loader Dump Truck P. Tyre Roller
2.01.02.01.07.004
1 m2 Agregat Penutup Burda
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.005.002 E15 E08 E18
Pekerja Mandor Chipping (Agregat Batu Pecah) Wheel Loader Dump Truck P. Tyre Roller
2.01.02.01.07.005
1 Ton Latasir Kelas A (Ss-A)
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.004.004 1.08.23.01.01.004.001 1.08.23.01.01.002.001
Pekerja Mandor Pasir Kasar Pasir Halus Semen
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.1507 0.0431 0.0216 2.8188 1.2587 0.0245 0.0754 0.5096 0.0055 0.0422
SAT m3 OH OH OH Zak m3 jam jam jam jam jam m3
0.0085 0.0013 1.2587 0.0085 0.4864 0.0032 0.0031 0.0141
OH OH m3 jam jam Jam jam jam
Liter 0.0003 0.0001 0.6790 0.3708 0.0003 0.0003
OH OH Kg liter Jam Jam Liter
0.0003 0.0001 0.8488 0.2060 0.0003 0.0003
OH OH Kg liter Jam Jam m2
0.0304 0.0016 0.0123 0.0107 0.0288 0.0006
OH OH m3 Jam Jam Jam m2
0.0507 0.0026 0.0186 0.0178 0.0445 0.0011
OH OH m3 Jam Jam Jam Ton
0.0201 0.0029 0.2086 0.4172 0.7875
147
OH OH m3 m3 Zak
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 261,684.24 579,263.86 846,746.59 336,248.16 442,904.36 343,415.25
JUMLAH HARGA 835,300.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 286,600.00 579,263.86 336,248.16 716,346.34 372,124.41 343,415.25
538,400.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 12,000.00 14,650.00 469,327.93 224,642.53
13,800.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 12,000.00 14,650.00 469,327.93 224,642.53
13,500.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 322,050.00 579,263.86 336,248.16 603,287.59
23,100.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 322,050.00 579,263.86 336,248.16 603,287.59
36,800.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 193,750.00 257,650.00 77,500.00
1,714,100.00
13,563.00 4,741.00 2,808.00 218,457.00 329,381.95 14,191.96 63,844.69 171,352.06 2,435.97 14,492.12
765.00 169.00 360,743.42 4,923.74 163,551.11 2,292.31 1,153.59 4,842.16
27.00 13.00 8,148.00 5,432.22 140.80 67.39
27.00 13.00 10,185.60 3,017.90 140.80 67.39
2,736.00 208.00 3,961.22 6,198.12 9,683.95 361.97
4,563.00 338.00 5,990.13 10,310.90 14,963.04 663.62
1,809.00 377.00 40,416.25 107,491.58 61,031.25
KODE BARANG 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18
URAIAN KEGIATAN Aspal Wheel Loader Amp Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
2.01.02.01.07.006
1 Ton Latasir Kelas B (Ss-B)
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.004.004 1.08.23.01.01.004.001 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18
Pekerja Mandor Pasir Kasar Pasir Halus Semen Aspal Wheel Loader Amp Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
2.01.02.01.07.007
1 Ton Lataston Lapis Aus (Hrs-Wc) (Gradasi Senjang/Semi Senjang) Pekerja Mandor Agregat 5-10 & 10-15 Lolos Screen2 Ukuran (0-5) Pasir Halus Semen Aspal Wheel Loader Amp Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs4 Hs2 1.08.23.01.01.004.001 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18 2.01.02.01.07.008 1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs4 Hs2 1.08.23.01.01.004.001 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18 2.01.02.01.07.009 1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs4 Hs2 1.08.23.01.01.004.001 1.08.23.01.01.002.001 1.08.23.01.01.001.003
KOEF 103.0000 0.0096 0.0201 0.0201 0.0233 0.0387 0.0318 0.0109
0.0201 0.0029 0.0140 0.0140 0.7875 92.7000 0.0096 0.0201 0.0201 0.0311 0.0290 0.0238 0.0082
HARGA SATUAN 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
JUMLAH HARGA 1,236,000.00 5,560.93 200,204.04 12,058.58 7,834.58 22,952.92 11,833.56 6,575.83
Ton
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 193,750.00 257,650.00 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
1,441,200.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 224,256.44 270,016.11 257,650.00 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
1,584,200.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 224,256.44 270,016.11 257,650.00 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
1,584,200.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 224,256.44 270,016.11 257,650.00 77,500.00 12,000.00
1,401,600.00
OH OH m3 m3 Zak Kg Jam Jam Jam Jam Jam Jam Jam Ton
0.0191 0.0028 0.2441 0.1539 0.2482 0.5775 75.1900 0.0096 0.0201 0.0201 0.7054 0.0191 0.0157 0.0044
1 Ton Lataston Lapis Aus Perata (Hrs-Wc(L)) (Gradasi Senjang/Semi Senjang) Pekerja Mandor Agregat 5-10 & 10-15 Lolos Screen2 Ukuran (0-5) Pasir Halus Semen Aspal Wheel Loader Amp Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
OH OH m3 m3 m3 Zak Kg Jam Jam Jam Jam Jam Jam Jam Ton
0.0191 0.0028 0.2441 0.1539 0.2482 0.5775 75.1900 0.0096 0.0201 0.0201 0.7054 0.0191 0.0157 0.0044
1 Ton Lataston Lapis Pondasi (Hrs-Base) (Gradasi Senjang/Semi Senjang) Pekerja Mandor Agregat 5-10 & 10-15 Lolos Screen2 Ukuran (0-5) Pasir Halus Semen Aspal
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT Kg Jam Jam Jam Jam Jam Jam Jam
148
OH OH m3 m3 m3 Zak Kg Jam Jam Jam Jam Jam Jam Jam Ton
0.0041 0.0006 0.2958 0.1405 0.2266 0.3938 61.8000
OH OH m3 m3 m3 Zak Kg
1,809.00 377.00 2,712.50 3,607.10 61,031.25 1,112,400.00 5,560.93 200,204.04 12,058.58 10,457.32 17,199.87 8,856.56 4,946.96
1,719.00 364.00 54,741.00 41,555.48 63,948.73 44,756.25 902,280.00 5,560.93 200,204.04 12,058.58 237,189.46 11,328.19 5,842.35 2,654.47
1,719.00 364.00 54,741.00 41,555.48 63,948.73 44,756.25 902,280.00 5,560.93 200,204.04 12,058.58 237,189.46 11,328.19 5,842.35 2,654.47
369.00 78.00 66,335.06 37,937.26 58,383.49 30,519.50 741,600.00
KODE BARANG E15 E01 E12 E08 E02 E17 E18 2.01.02.01.07.010
URAIAN KEGIATAN Wheel Loader Amp Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
KOEF 0.0096 0.0201 0.0201 0.7054 0.0041 0.0158 0.0050
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs4 Hs2 1.08.23.01.01.004.001 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18
1 Ton Lataston Lapis Pondasi Perata (Hrs-Base(L)) (Gradasi Senjang/Semi Senjang) Pekerja Mandor Agregat 5-10 & 10-15 Lolos Screen2 Ukuran (0-5) Pasir Halus Semen Aspal Wheel Loader Amp Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
2.01.02.01.07.011
1 Ton Laston Lapis Aus (Ac-Wc)
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs5 Hs2 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18
Pekerja Mandor Lolos Screen2 Ukuran (9.5-19,0) Lolos Screen2 Ukuran (0-5) Semen Aspal Wheel Loader Amp Genset Dump Truck Asp. Finisher Tandem Roller P. Tyre Roller
2.01.02.01.07.012
1 Ton Laston Lapis Aus Perata (Ac-Wc(L))
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs5 Hs2 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18
Pekerja Mandor Lolos Screen2 Ukuran (9.5-19,0) Lolos Screen2 Ukuran (0-5) Semen Aspal Wheel Loader Amp Genset Dump Truck Asp. Finisher Tandem Roller P. Tyre Roller
2.01.02.01.07.013
1 Ton Laston Lapis Antara (Ac-Bc)
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs5 Hs2 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12
Pekerja Mandor Lolos Screen2 Ukuran (9.5-19,0) Lolos Screen2 Ukuran (0-5) Semen Aspal Wheel Loader Amp Genset
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
0.0041 0.0006 0.2958 0.1405 0.2266 0.3938 61.8000 0.0096 0.0201 0.0201 0.7054 0.0041 0.0158 0.0050
SAT Jam Jam Jam Jam Jam Jam Jam
HARGA SATUAN 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
JUMLAH HARGA 5,560.93 200,204.04 12,058.58 237,189.46 2,431.71 5,879.57 3,016.44
Ton
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 224,256.44 270,016.11 257,650.00 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
1,401,600.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 231,883.05 270,016.11 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
1,375,000.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 231,883.05 270,016.11 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
1,412,100.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 231,883.05 270,016.11 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53
1,347,000.00
OH OH m3 m3 m3 Zak Kg Jam Jam Jam Jam Jam Jam Jam Ton
0.0287 0.0029 0.2979 0.3524 0.2468 59.7400 0.0096 0.0201 0.0201 0.7054 0.0138 0.0136 0.0059
OH OH m3 m3 Zak Kg Jam Jam Jam Jam Jam Jam Jam Ton
0.0287 0.0029 0.2979 0.3524 0.2468 62.8300 0.0096 0.0201 0.0201 0.7054 0.0138 0.0136 0.0059
OH OH m3 m3 Zak Kg Jam Jam Jam Jam Jam Jam Jam Ton
0.0287 0.0029 0.3482 0.3127 0.2363 57.6800 0.0096 0.0201 0.0201
149
OH OH m3 m3 Zak Kg Jam Jam Jam
369.00 78.00 66,335.06 37,937.26 58,383.49 30,519.50 741,600.00 5,560.93 200,204.04 12,058.58 237,189.46 2,431.71 5,879.57 3,016.44
2,583.00 377.00 69,077.96 95,153.68 19,127.00 716,880.00 5,560.93 200,204.04 12,058.58 237,189.46 8,184.76 5,060.89 3,559.40
2,583.00 377.00 69,077.96 95,153.68 19,127.00 753,960.00 5,560.93 200,204.04 12,058.58 237,189.46 8,184.76 5,060.89 3,559.40
2,583.00 377.00 80,741.68 84,434.04 18,313.25 692,160.00 5,560.93 200,204.04 12,058.58
E08 E02 E17 E18
KODE BARANG
URAIAN KEGIATAN Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
2.01.02.01.07.014
1 Ton Laston Lapis Antara Perata (Ac-Bc(L))
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs5 Hs2 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18
Pekerja Mandor Lolos Screen2 Ukuran (9.5-19,0) Lolos Screen2 Ukuran (0-5) Semen Aspal Wheel Loader Amp Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
2.01.02.01.07.015
1 Ton Laston Lapis Pondasi (Ac-Base)
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs5 Hs4 Hs2 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18
Pekerja Mandor Lolos Screen2 Ukuran (9.5-19,0) Lolos Screen2 Ukuran (5-9,5) Lolos Screen2 Ukuran (0-5) Semen Aspal Wheel Loader Amp Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
2.01.02.01.07.016
1 Ton Laston Lapis Pondasi Perata (Ac-Base(L))
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs5 Hs4 Hs2 1.08.23.01.01.002.001 1.08.23.01.01.001.003 E15 E01 E12 E08 E02 E17 E18
Pekerja Mandor Lolos Screen2 Ukuran (9.5-19,0) Lolos Screen2 Ukuran (5-9,5) Lolos Screen2 Ukuran (0-5) Semen Aspal Wheel Loader Amp Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller
2.01.02.01.07.017
1 m3 Campuran Aspal Dingin Untuk Pelapisan
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs2 1.08.23.01.01.001.004 E06 E17 E08
Pekerja Mandor Lolos Screen2 Ukuran (0-5) Aspal Emulsi Conc. Mixer Tandem Roller Dump Truck
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF 0.7054 0.0110 0.0109 0.0047
0.0287 0.0029 0.3482 0.3127 0.2363 57.6800 0.0096 0.0201 0.0201 0.7054 0.0110 0.0109 0.0047
SAT Jam Jam Jam Jam
HARGA SATUAN 336,248.16 593,098.82 372,124.41 603,287.59
JUMLAH HARGA 237,189.46 6,524.09 4,056.16 2,835.45
Ton
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 231,883.05 270,016.11 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
1,347,000.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 231,883.05 224,256.44 270,016.11 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
1,245,200.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 231,883.05 224,256.44 270,016.11 77,500.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 593,098.82 372,124.41 603,287.59
1,245,200.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 270,016.11 14,000.00 193,324.87 372,124.41 336,248.16
2,753,700.00
OH OH m3 m3 Zak Kg Jam Jam Jam Jam Jam Jam Jam Ton
0.0287 0.0029 0.1317 0.2982 0.2417 0.2494 49.4400 0.0096 0.0201 0.0201 0.7054 0.0092 0.0091 0.0052
OH OH m3 m3 m3 Zak Kg Jam Jam Jam Jam Jam Jam Jam Ton
0.0287 0.0029 0.1317 0.2982 0.2417 0.2494 49.4400 0.0096 0.0201 0.0201 0.7054 0.0092 0.0091 0.0052
OH OH m3 m3 m3 Zak Kg Jam Jam Jam Jam Jam Jam Jam m3
0.1429 0.0120 1.3489 153.3000 0.0834 0.0241 0.6061
150
OH OH m3 Kg jam jam jam
2,583.00 377.00 80,741.68 84,434.04 18,313.25 692,160.00 5,560.93 200,204.04 12,058.58 237,189.46 6,524.09 4,056.16 2,835.45
2,583.00 377.00 30,539.00 66,873.27 65,262.89 19,328.50 593,280.00 5,560.93 200,204.04 12,058.58 237,189.46 5,456.51 3,386.33 3,137.10
2,583.00 377.00 30,539.00 66,873.27 65,262.89 19,328.50 593,280.00 5,560.93 200,204.04 12,058.58 237,189.46 5,456.51 3,386.33 3,137.10
12,861.00 1,560.00 364,224.73 2,146,200.00 16,123.29 8,968.20 203,800.01
KODE BARANG 2.01.02.01.07.018
URAIAN KEGIATAN 1 m3 Lapis Permukaan Penetrasi Macadam
1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB Hs2 1.08.23.01.01.001.003 E15 E08 E16 E03
Pekerja Mandor Agregat Kasar Agregat Halus Aspal Wheel Loader Dump Truck 3-Wheel Roller Asp. Sprayer
2.01.02.01.07.019
1 m3 Lapis Pondasi/Perata Penetrasi Macadam
1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB Hs2 1.08.23.01.01.001.003 E15 E08 E16 E03
Pekerja Mandor Agregat Kasar Agregat Halus Aspal Wheel Loader Dump Truck 3-Wheel Roller Asp. Sprayer
2.01.02.01.07.020
1 Liter Lapis Resap Pengikat-Aspal Emulsi
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.004 E41 E05
Pekerja Mandor Aspal Emulsi Asp. Distributor Compressor
2.01.02.01.07.021
1 Liter Lapis Perekat-Aspal Emulsi
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.004 1.08.23.01.01.999.001 E41 E05 E34
Pekerja Mandor Aspal Emulsi Air Asphalt Distributor Compressor Asphalt Liquid Mixer
2.01.02.01.07.022
1 Liter Bahan Aspal Untuk Pekerjaan Pelaburan
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.003 1.08.23.01.01.001.015 E41 E05
Pekerja Mandor Aspal Kerosene Asp. Distributor Compresor
2.01.02.01.07.023
1 Liter Aspal Cair Emulsi Untuk Precoated
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.003 1.08.23.01.01.001.015 E43
Pekerja Mandor Aspal Kerosene Pan Mixer
2.01.02.01.07.024
1 Liter Aspal Emulsi Untuk Precoated
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.004 1.08.23.01.01.001.015 E43
Pekerja Mandor Aspal Emulsi Kerosene Pan Mixer
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0203 0.0021 1.6691 0.1479 98.5858 0.0071 0.3491 0.0435 0.3788
SAT m3 OH OH m3 m3 Kg Jam Jam Jam Jam m3
0.0203 0.0021 1.7747 0.2465 103.0000 0.0071 0.3491 0.0406 0.3788
OH OH m3 m3 Kg Jam Jam Jam Jam Liter
0.0003 0.0001 1.0403 0.0003 0.0003
OH OH Kg Jam Jam Liter
0.0003 0.0001 0.5202 1.0000 0.0003 0.0003 0.0250
OH OH Kg Liter Jam Jam Jam Liter
0.0003 0.0001 0.9761 0.0660 0.0003 0.0003
OH OH Kg Ltr Jam Jam Liter
0.1429 0.0286 0.9761 0.0660 0.0010
OH OH Kg liter Jam Liter
0.2858 0.0572 0.9779 0.0495 0.0010
151
OH OH Kg Liter Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 270,016.11 12,000.00 579,263.86 336,248.16 275,762.18 63,258.38
JUMLAH HARGA 1,819,300.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 270,016.11 12,000.00 579,263.86 336,248.16 275,762.18 63,258.38
1,925,700.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 14,000.00 469,327.93 224,642.53
14,800.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 14,000.00 150.00 469,327.93 224,642.53 43,530.07
8,800.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 12,000.00 14,650.00 469,327.93 224,642.53
12,900.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 12,000.00 14,650.00 846,746.59
30,100.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 14,000.00 14,650.00 846,746.59
48,400.00
1,827.00 273.00 436,777.16 39,935.38 1,183,029.60 4,112.77 117,384.23 11,995.65 23,962.27
1,827.00 273.00 464,411.01 66,558.97 1,236,000.00 4,112.77 117,384.23 11,195.94 23,962.27
27.00 13.00 14,564.20 140.80 67.39
27.00 13.00 7,282.80 150.00 140.80 67.39 1,088.25
27.00 13.00 11,713.20 966.90 140.80 67.39
12,861.00 3,718.00 11,713.20 966.90 846.75
25,722.00 7,436.00 13,690.60 725.18 846.75
KODE BARANG 2.01.02.01.08 2.01.02.01.08.001
URAIAN KEGIATAN Pekerjaan Struktur (Divisi 7) 1 m3 Beton Mutu Tinggi Fc’=45 Mpa
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 1.08.23.01.01.004.001 HSAB 1.08.23.01.05.002.054 1.08.23.01.01.026.017 E06 E49 E23
Pekerja Tukang Mandor Semen Pasir Beton Agregat Kasar Kayu Perancah Paku Con. Pan. Mixer Truck Mixer Water Tank Truck
2.01.02.01.08.002
1 m3 Beton Mutu Tinggi Fc’=35 Mpa
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 1.08.23.01.01.004.001 HSAB 1.08.23.01.05.002.054 1.08.23.01.01.026.017 E06 E49 E23
Pekerja Tukang Mandor Semen Pasir Beton Agregat Kasar Kayu Perancah Paku Con Pan Mixer Truck Mixer Water Tanker
2.01.02.01.08.003
1 m3 Beton Mutu Sedang Fc’=30 Mpa
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 1.08.23.01.01.004.001 HSAB 1.08.23.01.05.002.054 1.08.23.01.01.026.017 E43 E49 E23
Pekerja Tukang Mandor Semen Pasir Beton Agregat Kasar Kayu Perancah Paku Pan. Mixer Truck Mixer Water Tanker
2.01.02.01.08.004
1 m3 Beton Mutu Sedang Fc’= 25 Mpa
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 1.08.23.01.01.004.001 HSAB 1.08.23.01.05.002.054 1.08.23.01.01.026.017 E06 E49 E23
Pekerja Tukang Mandor Semen Pasir Beton Agregat Kasar Kayu Perancah Paku Con Pan Mixer Truck Mixer Water Tanker
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.1148 0.2582 0.0144 14.8835 0.4346 0.7440 0.4000 4.8000 0.1005 0.3163 0.0382
SAT
HARGA SATUAN
m3
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 257,650.00 261,684.24 4,052,000.00 21,000.00 193,324.87 824,650.57 343,415.25
3,515,700.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 257,650.00 261,684.24 4,052,000.00 21,000.00 193,324.87 824,650.57 343,415.25
3,333,600.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 257,650.00 261,684.24 4,052,000.00 21,000.00 846,746.59 824,650.57 343,415.25
3,324,900.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 257,650.00 261,684.24 4,052,000.00 21,000.00 193,324.87 824,650.57 343,415.25
2,403,000.00
OH OH OH Zak m3 m3 m3 Kg jam jam jam m3
0.1148 0.2582 0.0144 12.3085 0.5024 0.7440 0.4000 4.8000 0.1005 0.3163 0.0382
OH OH OH Zak m3 m3 m3 Kg jam jam jam m3
0.1148 0.2582 0.0144 11.7420 0.5145 0.7440 0.4000 3.2000 0.1005 0.3163 0.0382
OH OH OH Zak m3 m3 m3 Kg jam jam jam m3
0.1148 0.1578 0.0144 11.7420 0.5097 0.7440 0.2000 1.6000 0.1005 0.3163 0.0382
152
OH OH OH Zak m3 m3 m3 Kg jam jam jam
JUMLAH HARGA
10,332.00 28,402.00 1,872.00 1,153,471.25 111,974.69 194,693.07 1,620,800.00 100,800.00 19,429.15 260,836.98 13,118.46
10,332.00 28,402.00 1,872.00 953,908.75 129,443.36 194,693.07 1,620,800.00 100,800.00 19,429.15 260,836.98 13,118.46
10,332.00 28,402.00 1,872.00 910,005.00 132,560.93 194,693.07 1,620,800.00 67,200.00 85,098.03 260,836.98 13,118.46
10,332.00 17,358.00 1,872.00 910,005.00 131,324.21 194,693.07 810,400.00 33,600.00 19,429.15 260,836.98 13,118.46
KODE BARANG 2.01.02.01.08.005
URAIAN KEGIATAN 1 m3 Beton Mutu Sedang Fc’= 20 Mpa
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 1.08.23.01.01.004.001 HSAB 1.08.23.01.05.002.054 1.08.23.01.01.026.017 E06 E49 E23
Pekerja Tukang Mandor Semen Pasir Beton Agregat Kasar Kayu Perancah Paku Con Pan. Mixer Truck Mixer Water Tanker
2.01.02.01.08.006
1 m3 Beton Mutu Rendah Fc’= 15 Mpa
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 1.08.23.01.01.004.001 HSAB 1.08.23.01.05.002.054 1.08.23.01.01.026.017 E06 E23
Pekerja Tukang Mandor Semen Pasir Beton Agregat Kasar Kayu Perancah Paku Conc. Mixer Water Tanker
2.01.02.01.08.007
1 m3 Beton Siklop Fc’=15 Mpa
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 1.08.23.01.01.004.001 HSAB 1.08.23.01.01.005.006 E06 E23 E20
Pekerja Tukang Mandor Semen Pasir Beton Agregat Kasar Batu Belah Conc. Mixer Water Tanker Concrete Vibrator
2.01.02.01.08.008
1 m3 Beton Mutu Rendah Fc’= 10 Mpa
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.002.001 1.08.23.01.01.004.001 HSAB 1.08.23.01.05.002.054 1.08.23.01.01.026.017 E06 E23
Pekerja Tukang Mandor Semen Pasir Beton Agregat Kasar Kayu Perancah Paku Conc. Mixer Water Tanker
2.01.02.01.08.009
1 Kg Anyaman Kawat Yang Dilas (Welded Wire Mesh) Pekerja Tukang Mandor Baja Tulangan Kawat Beton
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.012.007 1.08.23.01.01.019.017
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.1148 0.1578 0.0144 10.5575 0.5412 0.7440 0.2000 1.6000 0.1005 0.3163 0.0382
SAT m3 OH OH OH Zak m3 m3 m3 Kg jam jam jam m3
0.1951 0.1951 0.0976 8.1885 0.5024 0.9053 0.1000 0.8000 0.6828 0.0382
OH OH OH Zak m3 m3 m3 Kg jam jam m3
1.1704 0.0976 0.0976 5.7320 0.3517 0.6337 0.6518 0.6828 0.0382 0.6828
OH OH OH Zak m3 m3 m3 jam jam jam m3
0.1951 0.1951 0.0976 7.7765 0.5113 0.9053 0.0500 0.4000 0.6828 0.0382
OH OH OH Zak m3 m3 m3 Kg jam jam Kg
0.0300 0.0100 0.0050 1.1000 0.0008
153
OH OH OH Kg Roll
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 257,650.00 261,684.24 4,052,000.00 21,000.00 193,324.87 824,650.57 343,415.25
JUMLAH HARGA 2,319,300.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 257,650.00 261,684.24 4,052,000.00 21,000.00 193,324.87 343,415.25
1,619,800.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 257,650.00 261,684.24 193,250.00 193,324.87 343,415.25 51,650.18
1,135,800.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 77,500.00 257,650.00 261,684.24 4,052,000.00 21,000.00 193,324.87 343,415.25
1,379,100.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 13,550.00 432,250.00
19,700.00
10,332.00 17,358.00 1,872.00 818,206.25 139,440.18 194,693.07 810,400.00 33,600.00 19,429.15 260,836.98 13,118.46
17,559.00 21,461.00 12,688.00 634,608.75 129,443.36 236,902.74 405,200.00 16,800.00 132,002.22 13,118.46
105,336.00 10,736.00 12,688.00 444,230.00 90,615.51 165,829.30 125,960.35 132,002.22 13,118.46 35,266.74
17,559.00 21,461.00 12,688.00 602,678.75 131,736.45 236,902.74 202,600.00 8,400.00 132,002.22 13,118.46
2,700.00 1,100.00 650.00 14,905.00 345.80
KODE BARANG 2.01.02.01.08.010
URAIAN KEGIATAN 1 Kg Pemasangan Jembatan Rangka Baja
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.05.002.054 E31
Pekerja Tukang Mandor Kayu Perancah Crane On Track
2.01.02.01.09
Pekerjaan Pengembalian Kondisi Dan Pekerjaan Minor (Divisi 8) 1 m3 Pondasi Agregat Kls. A Untuk Pekerjaan Minor Pekerja Mandor Agregat Pecah Kasar Wheel Loader Dump Truck Pedestrian Roller Water Tanker
2.01.02.01.09.001 1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB E15 E08 E24 E23 2.01.02.01.09.002 1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB E15 E08 E24 E23 2.01.02.01.09.003 1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB E15 E08 E24 E23 2.01.02.01.09.004 1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB Hs2 E15 E08 E16 2.01.02.01.09.005 1.11.29.01.01.002.014 1.11.29.01.01.001.001 2.01.02.01.02.003 E15 E08 E13 E17 E23
KOEF
0.0023 0.0006 0.0002 0.0002 0.0009
1 m3 Pondasi Agregat Kls. B Untuk Pekerjaan Minor Pekerja Mandor Agregat Kasar Wheel Loader Dump Truck Pedestrian Roller Water Tanker
OH OH OH m3 jam
m3 0.0254 0.0011 1.2587 0.0071 1.0695 0.0527 0.0141
OH OH m3 jam jam jam jam m3
0.0152 0.0011 1.2587 0.0071 1.0695 0.0527 0.0141
1 m3 Agregat Utk. Lapis Pond. Jalan-Tanpa Penutup Aspal Utk. Pek. Minor Pekerja Mandor Agregat Kelas C (m28) Wheel Loader Dump Truck Pedestrian Roller Water Tanker
OH OH m3 jam jam jam jam m3
0.0183 0.0013 1.2000 0.0085 0.2729 0.0527 0.0141
1 m3 Waterbound Macadam Utk. Pekerjaan Minor Pekerja Mandor Agregat Kasar Agregat Halus Wheel Loader Dump Truck 3-Wheel Roller
OH OH m3 Jam Jam Jam Jam m3
0.0234 0.0015 0.9350 0.1650 0.0102 0.1509 0.0268
1 m3 Lapis Pondasi Agregat Kelas S Untuk Pekerjaan Minor Pekerja Mandor Agregat S Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT Kg
OH OH m3 m3 Jam Jam Jam m3
0.0085 0.0013 1.2587 0.0085 1.0715 0.0043 0.0054 0.0141
154
OH OH m3 jam jam Jam jam jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 4,052,000.00 782,416.52
JUMLAH HARGA 1,800.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 579,263.86 336,248.16 70,747.94 343,415.25
704,100.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 579,263.86 336,248.16 70,747.94 343,415.25
703,200.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 579,263.86 336,248.16 70,747.94 343,415.25
421,100.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 270,016.11 579,263.86 336,248.16 275,762.18
355,600.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 271,200.00 579,263.86 336,248.16 716,346.34 372,124.41 343,415.25
717,400.00
207.00 66.00 26.00 810.40 704.17
2,286.00 143.00 329,381.95 4,112.77 359,617.41 3,728.42 4,842.16
1,368.00 143.00 329,381.95 4,112.77 359,617.41 3,728.42 4,842.16
1,647.00 169.00 314,021.08 4,923.74 91,762.12 3,728.42 4,842.16
2,106.00 195.00 244,674.76 44,552.66 5,908.49 50,739.85 7,390.43
765.00 169.00 341,359.44 4,923.74 360,289.91 3,080.29 2,009.47 4,842.16
KODE BARANG 2.01.02.01.09.006
URAIAN KEGIATAN 1 m3 Camp. Aspal Panas Utk. Pek. Minor
KOEF
SAT m3
1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB Hs2 1.08.23.01.01.001.014 1.08.23.01.01.001.003 E15 E01 E12 E08 E24
Pekerja Mandor Agregat Kasar Agregat Halus Filler Aspal Wheel Loader Amp Genset Dump Truck Pedestrian Roller
0.1584 0.0159 0.7731 0.5271 25.3000 156.9750 0.0302 0.0555 0.0555 0.7482 0.1976
OH OH m3 m3 Kg Kg Jam Jam Jam Jam Jam
2.01.02.01.09.007
1 m3 Penetrasi Macadam Utk. Pek. Minor
1.11.29.01.01.002.014 1.11.29.01.01.001.001 HSAB 1.08.23.01.01.001.003 E15 E08 E16 E03
Pekerja Mandor Agregat Kasar Aspal Wheel Loader Dump Truck 3-Wheel Roller Asp. Sprayer
2.01.02.01.09.008
1 m3 Camp. Aspal Dingin Utk. Pek. Minor
1.11.29.01.01.002.014 1.11.29.01.01.001.001 Hs2 1.08.23.01.01.001.004 E06 E24 E08
Pekerja Mandor Agregat Halus Aspal Emulsi Conc. Mixer Pedestrian Roller Dump Truck
2.01.02.01.09.009
1 Liter Residu Bitumen Untuk Pek.Minor
1.11.29.01.01.002.014 1.11.29.01.01.001.001 1.08.23.01.01.001.003 1.08.23.01.01.001.015 E03 E05 E08
Pekerja Mandor Aspal Kerosene Asphalt Sprayer Compresor Dump Truck
2.01.02.01.09.010
1 Bh Patok Pengarah
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 2.01.02.01.08.006 1.08.23.01.01.012.007 E08
Pekerja Tukang Mandor Beton K-175 Baja Tulangan Dump Truck
2.01.02.01.09.011
1 Bh Patok Kilometer
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 2.01.02.01.08.006 1.08.23.01.01.012.007 E08
Pekerja Tukang Mandor Beton K-175 Baja Tulangan Dump Truck
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
m3 0.0243 0.0025 1.7556 99.2728 0.0086 0.4527 0.0118 0.0359
OH OH m3 Kg Jam Jam Jam Jam m3
0.1653 0.0276 1.1684 140.7000 0.0964 0.1976 0.6489
OH OH m3 Kg jam jam jam Liter
0.0005 0.0001 0.9858 0.1430 0.0004 0.0004 0.0004
OH OH Kg Liter Jam Jam Jam Buah
0.1676 0.0838 0.0210 0.0355 4.6512 0.1466
OH OH OH m3 Kg Jam Buah
0.1179 0.0472 0.0236 0.1512 18.9000 0.1650
155
OH OH OH m3 Kg Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 270,016.11 2,300.00 12,000.00 579,263.86 9,960,399.88 599,929.53 336,248.16 70,747.94
JUMLAH HARGA 3,172,000.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 261,684.24 12,000.00 579,263.86 336,248.16 275,762.18 63,258.38
1,815,900.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 270,016.11 14,000.00 193,324.87 70,747.94 336,248.16
2,554,600.00
Nilai HSPK (Dibulatkan): 90,000.00 130,000.00 12,000.00 14,650.00 63,258.38 224,642.53 336,248.16
14,200.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 1,619,800.00 13,550.00 336,248.16
196,900.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 1,619,800.00 13,550.00 336,248.16
575,400.00
14,256.00 2,067.00 202,308.08 142,325.49 58,190.00 1,883,700.00 17,493.77 552,802.19 33,296.09 251,580.88 13,979.79
2,187.00 325.00 459,412.85 1,191,273.60 4,981.67 152,219.54 3,253.99 2,270.98
14,877.00 3,588.00 315,486.82 1,969,800.00 18,636.52 13,979.79 218,191.43
45.00 13.00 11,829.60 2,094.95 25.30 89.86 134.50
15,084.00 9,218.00 2,730.00 57,502.90 63,023.76 49,293.98
10,611.00 5,192.00 3,068.00 244,913.76 256,095.00 55,480.95
KODE BARANG 2.01.02.01.09.012
URAIAN KEGIATAN 1 Bh Patok Hektometer
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 2.01.02.01.08.006 1.08.23.01.01.012.007 E08
Pekerja Tukang Mandor Beton K-175 Baja Tulangan Dump Truck
2.01.02.01.09.013
1 Bh Paku Jalan
1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 2.01.02.01.08.006 1.08.24.03.01.999.006
Pekerja Tukang Mandor Beton K-175 Paku Jalan
2.01.02.01.10 2.01.02.01.10.001
Biaya Pemakaian Alat Berat 1 Jam Pemakaian Asphalt Mixing Plant
E01
Asphalt Mixing Plant
2.01.02.01.10.002
1 Jam Pemakaian Asphalt Finisher
E02
Asphalt Finisher
2.01.02.01.10.003
1 Jam Pemakaian Asphalt Sprayer
E03
Asphalt Sprayer
2.01.02.01.10.004
1 Jam Pemakaian Bulldozer 100-150 Hp
E04
Bulldozer 100-150 Hp
2.01.02.01.10.005
1 Jam Pemakaian Compressor 4000-6500 L\M
E05
Compressor 4000-6500 L\M
2.01.02.01.10.006
1 Jam Pemakaian Concrete Mixer 0.3-0.6 m3
E06
Concrete Mixer 0.3-0.6 m3
2.01.02.01.10.007
1 Jam Pemakaian Crane 10-15 Ton
E07
Crane 10-15 Ton
2.01.02.01.10.008
1 Jam Pemakaian Dump Truck 3.5 Ton
E08
Dump Truck 3.5 Ton
2.01.02.01.10.009
1 Jam Pemakaian Dump Truck 10 Ton
E09
Dump Truck 10 Ton
2.01.02.01.10.010
1 Jam Pemakaian Excavator 80-140 Hp
E10
Excavator 80-140 Hp
2.01.02.01.10.011
1 Jam Pemakaian Flat Bed Truck 3-4 m3
E11
Flat Bed Truck 3-4 m3
2.01.02.01.10.012
1 Jam Pemakaian Generator Set
E12
Generator Set
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.1179 0.0472 0.0236 0.0630 7.8750 0.1650
SAT Buah OH OH OH m3 Kg Jam Buah
0.2500 0.1000 0.0500 0.0630 1.0000
OH OH OH m3 Set
Jam 1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
156
Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 1,619,800.00 13,550.00 336,248.16
JUMLAH HARGA 283,100.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 1,619,800.00 270,500.00
412,500.00
Nilai HSPK (Dibulatkan): 9,960,399.88
9,960,400.00
Nilai HSPK (Dibulatkan): 593,098.82
593,100.00
Nilai HSPK (Dibulatkan): 63,258.38
63,300.00
Nilai HSPK (Dibulatkan): 1,174,456.56
1,174,500.00
Nilai HSPK (Dibulatkan): 224,642.53
224,600.00
Nilai HSPK (Dibulatkan): 193,324.87
193,300.00
Nilai HSPK (Dibulatkan): 599,629.55
599,600.00
Nilai HSPK (Dibulatkan): 336,248.16
336,200.00
Nilai HSPK (Dibulatkan): 636,189.67
636,200.00
Nilai HSPK (Dibulatkan): 708,337.30
708,300.00
Nilai HSPK (Dibulatkan): 642,709.22
642,700.00
Nilai HSPK (Dibulatkan): 599,929.53
599,900.00
10,611.00 5,192.00 3,068.00 102,047.40 106,706.25 55,480.95
22,500.00 11,000.00 6,500.00 102,047.40 270,500.00
9,960,399.88
593,098.82
63,258.38
1,174,456.56
224,642.53
193,324.87
599,629.55
336,248.16
636,189.67
708,337.30
642,709.22
599,929.53
KODE BARANG 2.01.02.01.10.013
URAIAN KEGIATAN 1 Jam Pemakaian Motor Grader >100 Hp
E13
Motor Grader >100 Hp
2.01.02.01.10.014
1 Jam Pemakaian Track Loader 75-100 Hp
E14
Track Loader 75-100 Hp
2.01.02.01.10.015
1 Jam Pemakaian Wheel Loader 1.0-1.6 m3
E15
Wheel Loader 1.0-1.6 m3
2.01.02.01.10.016
1 Jam Pemakaian Three Wheel Roller 6-8 T
E16
Three Wheel Roller 6-8 T
2.01.02.01.10.017
1 Jam Pemakaian Tandem Roller 6-8 T.
E17
Tandem Roller 6-8 T.
2.01.02.01.10.018
1 Jam Pemakaian Tire Roller 8-10 T.
E18
Tire Roller 8-10 T.
2.01.02.01.10.019
1 Jam Pemakaian Vibratory Roller 5-8 T.
E19
Vibratory Roller 5-8 T.
2.01.02.01.10.020
1 Jam Pemakaian Concrete Vibrator
E20
Concrete Vibrator
2.01.02.01.10.021
1 Jam Pemakaian Stone Crusher
E21
Stone Crusher
2.01.02.01.10.022
1 Jam Pemakaian Water Pump 70-100 Mm
E22
Water Pump 70-100 Mm
2.01.02.01.10.023
1 Jam Pemakaian Water Tanker 3000-4500 L.
E23
Water Tanker 3000-4500 L.
2.01.02.01.10.024
1 Jam Pemakaian Pedestrian Roller
E24
Pedestrian Roller
2.01.02.01.10.025
1 Jam Pemakaian Tamper
E25
Tamper
2.01.02.01.10.026
1 Jam Pemakaian Jack Hammer
E26
Jack Hammer
2.01.02.01.10.027
1 Jam Pemakaian Fulvi Mixer
E27
Fulvi Mixer
2.01.02.01.10.028
1 Jam Pemakaian Concrete Pump
E28
Concrete Pump
2.01.02.01.10.029
1 Jam Pemakaian Trailer 20 Ton
E29
Trailer 20 Ton
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
1.0000
SAT Jam Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
157
Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 716,346.34
JUMLAH HARGA 716,300.00
Nilai HSPK (Dibulatkan): 629,742.82
629,700.00
Nilai HSPK (Dibulatkan): 579,263.86
579,300.00
Nilai HSPK (Dibulatkan): 275,762.18
275,800.00
Nilai HSPK (Dibulatkan): 372,124.41
372,100.00
Nilai HSPK (Dibulatkan): 603,287.59
603,300.00
Nilai HSPK (Dibulatkan): 442,904.36
442,900.00
Nilai HSPK (Dibulatkan): 51,650.18
51,700.00
Nilai HSPK (Dibulatkan): 904,696.53
904,700.00
Nilai HSPK (Dibulatkan): 44,775.19
44,800.00
Nilai HSPK (Dibulatkan): 343,415.25
343,400.00
Nilai HSPK (Dibulatkan): 70,747.94
70,700.00
Nilai HSPK (Dibulatkan): 47,508.36
47,500.00
Nilai HSPK (Dibulatkan): 33,726.95
33,700.00
Nilai HSPK (Dibulatkan): 1,793,938.59
1,793,900.00
Nilai HSPK (Dibulatkan): 347,672.93
347,700.00
Nilai HSPK (Dibulatkan): 674,548.97
674,500.00
716,346.34
629,742.82
579,263.86
275,762.18
372,124.41
603,287.59
442,904.36
51,650.18
904,696.53
44,775.19
343,415.25
70,747.94
47,508.36
33,726.95
1,793,938.59
347,672.93
674,548.97
KODE BARANG 2.01.02.01.10.030
URAIAN KEGIATAN 1 Jam Pemakaian Pile Driver + Hammer
E30
Pile Driver + Hammer
2.01.02.01.10.031
1 Jam Pemakaian Crane On Track 35 Ton
E31
Crane On Track 35 Ton
2.01.02.01.10.032
1 Jam Pemakaian Welding Set
E32
Welding Set
2.01.02.01.10.033
1 Jam Pemakaian Bore Pile Machine
E33
Bore Pile Machine
2.01.02.01.10.034
1 Jam Pemakaian Asphalt Liquid Mixer
E34
Asphalt Liquid Mixer 1.000 Liter
2.01.02.01.10.035
1 Jam Pemakaian Tronton
E35
Tronton
2.01.02.01.10.036
1 Jam Pemakaian Cold Milling
E36
Cold Milling
2.01.02.01.10.037
1 Jam Pemakaian Rock Drill Breaker
E37
Rock Drill Breaker
2.01.02.01.10.038
1 Jam Pemakaian Cold Recycler
E38
Cold Recycler
2.01.02.01.10.039
1 Jam Pemakaian Hot Recycler
E39
Hot Recycler
2.01.02.01.10.040
1 Jam Pemakaian Aggregat (Chip) Spreader
E40
Aggregat (Chip) Spreader
2.01.02.01.10.041
1 Jam Pemakaian Asphalt Distributor
E41
Asphalt Distributor
2.01.02.01.10.042
1 Jam Pemakaian Slip Form Paver
E42
Slip Form Paver
2.01.02.01.10.043
1 Jam Pemakaian Concrete Pan Mixer
E43
Concrete Pan Mixer
2.01.02.01.10.044
1 Jam Pemakaian Concrete Breaker
E44
Concrete Breaker
2.01.02.01.10.045
1 Jam Pemakaian Aspahlt Tanker
E45
Aspahlt Tanker
2.01.02.01.10.046
1 Jam Pemakaian Cement Tanker
E46
Cement Tanker
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
1.0000
SAT Jam Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
158
Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 313,507.18
JUMLAH HARGA 313,500.00
Nilai HSPK (Dibulatkan): 782,416.52
782,400.00
Nilai HSPK (Dibulatkan): 142,346.33
142,300.00
Nilai HSPK (Dibulatkan): 1,096,336.92
1,096,300.00
Nilai HSPK (Dibulatkan): 43,530.07
43,500.00
Nilai HSPK (Dibulatkan): 701,660.91
701,700.00
Nilai HSPK (Dibulatkan): 2,088,761.99
2,088,800.00
Nilai HSPK (Dibulatkan): 356,979.81
357,000.00
Nilai HSPK (Dibulatkan): 7,862,407.50
7,862,400.00
Nilai HSPK (Dibulatkan): 9,075,714.83
9,075,700.00
Nilai HSPK (Dibulatkan): 664,945.73
664,900.00
Nilai HSPK (Dibulatkan): 469,327.93
469,300.00
Nilai HSPK (Dibulatkan): 637,808.89
637,800.00
Nilai HSPK (Dibulatkan): 846,746.59
846,700.00
Nilai HSPK (Dibulatkan): 1,116,632.38
1,116,600.00
Nilai HSPK (Dibulatkan): 733,172.51
733,200.00
Nilai HSPK (Dibulatkan): 673,972.51
674,000.00
313,507.18
782,416.52
142,346.33
1,096,336.92
43,530.07
701,660.91
2,088,761.99
356,979.81
7,862,407.50
9,075,714.83
664,945.73
469,327.93
637,808.89
846,746.59
1,116,632.38
733,172.51
673,972.51
KODE BARANG 2.01.02.01.10.047
URAIAN KEGIATAN 1 Jam Pemakaian Condrete Mixer (350)
E47
Condrete Mixer (350)
2.01.02.01.10.048
1 Jam Pemakaian Vibrating Rammer
E48
Vibrating Rammer
2.01.02.01.10.049
1 Jam Pemakaian Truk Mixer (Agitator)
E49
Truk Mixer (Agitator)
2.01.02.01.10.050
1 Jam Pemakaian Bore Pile Machine
E50
Bore Pile Machine
2.01.02.01.10.051
1 Jam Pemakaian Crane On Track 75-100 Ton
E51
Crane On Track 75-100 Ton
2.01.02.01.10.052
1 Jam Pemakaian Blending Equipment
E52
Blending Equipment
2.01.02.01.10.053
1 Jam Pemakaian Asphalt Liquid Mixer
E34a
Asphalt Liquid Mixer 20.000 Liter
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
1.0000
SAT Jam Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
Jam Jam
1.0000
159
Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 94,077.69
JUMLAH HARGA 94,100.00
Nilai HSPK (Dibulatkan): 51,436.78
51,400.00
Nilai HSPK (Dibulatkan): 824,650.57
824,700.00
Nilai HSPK (Dibulatkan): 1,265,933.96
1,265,900.00
Nilai HSPK (Dibulatkan): 837,331.66
837,300.00
Nilai HSPK (Dibulatkan): 365,846.01
365,800.00
Nilai HSPK (Dibulatkan): 141,438.66
141,400.00
94,077.69
51,436.78
824,650.57
1,265,933.96
837,331.66
365,846.01
141,438.66
KODE BARANG 2.01.02.02 2.01.02.02.01 2.01.02.02.01.001 1.11.29.01.01.001.001 1.11.29.01.01.002.014
URAIAN KEGIATAN I. PEKERJAAN PENGAIRAN Pekerjaan Pembersihan Dan Persiapan 1 m2 pekerjaan pekerjaan pembersihan stripping/kosrekan Mandor Pekerja
KOEF
0.0060 0.0600
SAT
HARGA SATUAN
m2
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
6,200.00
Nilai HSPK (Dibulatkan):
7,900.00
O.H O.H
2.01.02.02.01.002
1m2 tebas tebang berupa dan membersihkan lokasi dari tanaman/tumbuhan diameter < 15 cm
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.001.015
Mandor Pekerja Minyak Tanah
2.01.02.02.01.003
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.09.27.01.02.999.003
Mencabut 1 tunggul pohon tanaman keras dia. >15 cm dan membuang sisa tunggul kayu dan akar-akarnya Mandor Pekerja Chainsaw
2.01.02.02.01.004
1 m2 pekerjaan Gebalan Rumput
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.05.19.02.04.025.010
Mandor Pekerja Gebalan Rumput
2.01.02.02.01.005
1 m2 pekerjaan pembabatan rumput
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.09.27.01.02.999.019
Mandor Pekerja Alat potong rumput
2.01.02.02.01.006
1m¹ uitset trase saluran
1.11.29.01.02.001.005 1.11.29.01.02.001.006 1.11.29.01.01.002.014 1.09.27.01.02.003.003
Juru Ukur Pembantu Juru Ukur Pekerja/Buruh Terampil Waterpass
0.0040 0.0040 0.0120 0.0040
1.09.27.01.02.003.002
Theodolit
0.0040 Unit / Hari
2.01.02.02.01.007
Pasang 1 m' profil melintang galian tanah
1.11.29.01.01.001.001 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.11.29.01.02.001.005 1.11.29.01.02.001.006 1.08.23.01.05.002.046 1.08.23.01.05.002.046 1.08.23.01.01.026.017 1.09.27.01.02.003.003
Mandor Tukang Kayu Pekerja Juru Ukur Pembantu Juru Ukur Kaso Papan Paku Biasa Waterpass
2.01.02.02.02 2.01.02.02.02.001
Pekerjaan Pengerukan 1 m3 Pengerukan Saluran (manual)
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.020.001 1.08.23.03.01.999.005 1.09.27.02.01.001.010
Mandor Pekerja Glangsing Tali Rafia Sewa Pick Up
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
m2
0.0075 0.0750 0.0100
O.H O.H Liter Buah
0.0200 O.H 0.2000 O.H 0.1000 Unit/ hari
130,000.00 90,000.00 14,650.00 Nilai HSPK (Dibulatkan):
780.00 5,400.00
975.00 6,750.00 146.50 25,300.00
130,000.00 90,000.00 46,600.00
2,600.00 18,000.00 4,660.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 24,250.00
37,000.00
Nilai HSPK (Dibulatkan): 0.0007 O.H 130,000.00 0.0070 O.H 90,000.00 0.0070 Unit/hari 12,450.00
800.00
m2 0.0100 0.1000 1.1000
O.H O.H m2 m2
m'
Nilai HSPK (Dibulatkan): O.H 110,000.00 O.H 90,000.00 O.H 90,000.00 Unit / Hari 6,250.00
0.0060 0.0200 0.0600 0.0200 0.0200 0.0025 0.0042 0.2000 0.0040
91.00 630.00 87.15 3,000.00 440.00 360.00 1,080.00 25.00 1,114.40
Nilai HSPK (Dibulatkan): O.H 130,000.00 O.H 110,000.00 O.H 90,000.00 O.H 110,000.00 O.H 90,000.00 m3 3,174,050.00 m3 3,174,050.00 Kg 21,000.00 Unit/hari 6,250.00
37,900.00
m3
0.0950 1.7160 4.0000 0.3600 0.0020
1,300.00 9,000.00 26,675.00
278,600.00
m'
160
JUMLAH HARGA
Nilai HSPK (Dibulatkan): O.H 130,000.00 O.H 90,000.00 Buah 3,250.00 Buah 21,700.00 Unit/Hari 372,450.00
780.00 2,200.00 5,400.00 2,200.00 1,800.00 7,935.13 13,331.01 4,200.00 25.00
188,300.00 12,350.00 154,440.00 13,000.00 7,812.00 744.90
KODE BARANG 2.01.02.02.02.002
URAIAN KEGIATAN 1 m3 Pengerukan Saluran (alat berat)
1.11.29.01.01.001.001 1.11.29.01.01.002.014 E08 E10
Mandor Pekerja Sewa Truk Excavator
2.01.02.02.02.003
1 m3 Pengerukan dan Pembuangan Wallet
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.020.001 1.08.23.03.01.999.005 1.09.27.02.01.001.010
Mandor Pekerja Glangsing Tali Rafia Sewa Pick Up
2.01.02.02.02.004
1 m3 pekerjaan pengangkutan material/ hasil galian sejauh 3 m s/d 5 m Mandor Pekerja
1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.02.02.02.005 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.02.02.02.006 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.02.02.02.007 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.02.02.02.008 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.02.02.02.009 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.02.02.02.010 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.02.02.02.011 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.02.02.02.012 1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.01.02.02.02.013 1.11.29.01.01.001.001 1.11.29.01.01.002.014
KOEF
0.0070 0.2260 0.0100 0.1500
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 336,248.16 708,337.30
JUMLAH HARGA 130,900.00
Nilai HSPK (Dibulatkan): O.H 130,000.00 O.H 90,000.00 Buah 3,250.00 Buah 21,700.00 Unit/Hari 372,450.00
188,300.00
O.H O.H Jam Jam m3
0.0950 1.7160 4.0000 0.3600 0.0020
m3 0.0124 0.2480
1 m3 pekerjaan pengangkutan material/ hasil galian sejauh 5 m Mandor Pekerja
O.H O.H m3
0.0134 0.2680
1 m3 pekerjaan pengangkutan material/ hasil galian sejauh 10 m Mandor Pekerja
O.H O.H m3
0.0143 0.2860
1 m3 pekerjaan pengangkutan material/ hasil galian sejauh 30 m Mandor Pekerja
O.H O.H m3
0.0178 0.3560
1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 50 m Mandor Pekerja 1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 100 m Mandor Pekerja 1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 200 m Mandor Pekerja 1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 300 m Mandor Pekerja 1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 400 m Mandor Pekerja 1 m3 Pekerjaan Pengangkutan Material Ke Lokasi Sejauh 500 m Mandor Pekerja
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m3
161
O.H O.H m3
0.0211 0.4220
O.H O.H m3
0.0300 0.6000
O.H O.H m3
0.0475 0.9500
O.H O.H m3
0.0650 1.3000
O.H O.H m3
0.0825 1.6500
O.H O.H m3
0.0975 1.9500
O.H O.H
910.00 20,340.00 3,362.48 106,250.59
12,350.00 154,440.00 13,000.00 7,812.00 744.90
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
23,900.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
25,900.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
27,600.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
34,400.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
40,700.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
57,900.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
91,700.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
125,500.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
159,200.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
188,200.00
1,612.00 22,320.00
1,742.00 24,120.00
1,859.00 25,740.00
2,314.00 32,040.00
2,743.00 37,980.00
3,900.00 54,000.00
6,175.00 85,500.00
8,450.00 117,000.00
10,725.00 148,500.00
12,675.00 175,500.00
KODE BARANG 2.01.02.02.02.014
URAIAN KEGIATAN 1 m3 pekerjaan pengangkutan material kelokasi sejauh > 500 m, untuk setiap kenaikan 100 m
1.11.29.01.01.001.001 1.11.29.01.01.002.014
Mandor Pekerja
2.01.02.02.02.015
1 m3 Pekerjaan angkutan material/ sisa galian sejauh 1 km (dengan dump truck) Dump truck
E08 2.01.02.02.02.016 1.11.29.01.01.001.001 1.11.29.01.01.002.014 E04 2.01.02.02.02.017 E08 2.01.02.02.02.018 E08 2.01.02.02.02.019 E08 2.01.02.02.02.020 E08 2.01.02.02.02.021 E08 2.01.02.02.03 2.01.02.02.03.001 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.02.02.03.002 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.02.02.03.003 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010
0.0176 0.3520
0.1063
1 m3 Pekerjaan tanah dihampar, diratakan dan dirapihkan Mandor Pekerja Bulldozer 1 m3 Pekerjaan angkutan material/ sisa galian sejauh 3 km (dengan dump truck) Dump truck
SAT m3
0.1730
2,288.00 31,680.00
m3
Nilai HSPK (Dibulatkan): 336,248.16
35,700.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 1,174,456.56
30,300.00
Nilai HSPK (Dibulatkan): 336,248.16
58,200.00
Nilai HSPK (Dibulatkan): 336,248.16
80,700.00
Nilai HSPK (Dibulatkan): 336,248.16
136,500.00
Nilai HSPK (Dibulatkan): 336,248.16
248,800.00
Nilai HSPK (Dibulatkan): 336,248.16
360,800.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
1,229,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
1,181,100.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
1,155,800.00
Jam
O.H O.H Jam
Jam m3
0.2400
1 m3 Pekerjaan angkutan material/ sisa galian sejauh 10 km (dengan dump truck) Dump truck
Jam m3
0.4060
1 m3 Pekerjaan angkutan material/ sisa galian sejauh 20 km (dengan dump truck) Dump truck
Jam m3
0.7400
1 m3 Pekerjaan angkutan material/ sisa galian sejauh 30 km (dengan dump truck) Dump truck
Jam m3
1.0730
Pekerjaan Pasangan 1 m3 Pekerjaan Pasangan Batu Bata, Campuran (1 Pc : 3 PP) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Bata 1 m3 Pekerjaan Pasangan Batu Bata, Campuran (1 Pc : 4 PP) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Bata 1 m3 Pekerjaan Pasangan Batu Bata, Campuran (1 Pc : 5 PP) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Bata
162
Jam
m3 0.2400 0.2400 1.2000 2.4000 3.3000 0.3700 500.0000
O.H O.H O.H O.H Zak m3 buah m3
0.2400 0.2400 1.2000 2.4000 2.6625 0.3750 500.0000
O.H O.H O.H O.H Zak m3 buah m3
0.2400 0.2400 1.2000 2.4000 2.2250 0.4100 500.0000
JUMLAH HARGA 34,000.00
130,000.00 90,000.00
m3 0.0076 0.0764 0.0191
HARGA SATUAN Nilai HSPK (Dibulatkan):
O.H O.H
m3
1 m3 Pekerjaan angkutan material/ sisa galian sejauh 5 km (dengan dump truck) Dump truck
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H O.H Zak m3 buah
35,743.18
988.00 6,876.00 22,432.12
58,170.93
80,699.56
136,516.75
248,823.64
360,794.28
31,200.00 28,800.00 132,000.00 216,000.00 255,750.00 90,557.50 475,000.00
31,200.00 28,800.00 132,000.00 216,000.00 206,343.75 91,781.25 475,000.00
31,200.00 28,800.00 132,000.00 216,000.00 172,437.50 100,347.50 475,000.00
KODE BARANG 2.01.02.02.03.004 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.002.001 1.08.23.01.01.004.002 1.08.23.01.01.005.010 2.01.02.02.03.005 1.11.29.01.01.002.014 1.11.29.01.01.002.004 1.11.29.01.01.001.001 1.08.23.01.01.019.024 1.08.23.01.01.005.006 2.01.02.02.04 2.01.02.02.04.001 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.11.29.01.02.001.007 1.08.23.01.05.002.049 1.09.27.01.02.999.022 E30 1.09.27.01.02.999.023 2.01.02.02.04.002 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.11.29.01.02.001.007 1.08.23.01.05.002.106 1.09.27.01.02.999.022 E30 1.09.27.01.02.999.023 2.01.02.02.04.003 1.11.29.01.01.001.001 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.011.001 1.09.27.01.02.999.022 E30 1.09.27.01.02.999.023 2.01.02.02.04.004 1.11.29.01.01.001.001 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.24.03.01.020.006 1.09.27.01.02.999.022 E30 1.09.27.01.02.999.023
URAIAN KEGIATAN 1 m3 Pekerjaan Pasangan Batu Bata, Campuran (1 Pc : 6 PP) Mandor Kepala Tukang Tukang Batu Pekerja Semen Portland Pasir Pasang Batu Bata 1 M3 Pembuatan Bronjong dengan kawat galvanis Pekerja Tukang Mandor Kawat Bronjong Batu Belah
SAT m3
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 77,500.00 244,750.00 950.00
JUMLAH HARGA 1,148,200.00
0.2400 0.2400 1.2000 2.4000 1.8750 0.4900 500.0000
O.H O.H O.H O.H Zak m3 buah
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 130,000.00 251,200.00 193,250.00
711,400.00
Nilai HSPK (Dibulatkan): 0.0030 O.H 130,000.00 0.0300 O.H 90,000.00 0.0050 O.H 120,000.00 0.2625 Btg 23,900.00 0.0050 Unit/hari 29,900.00 0.0400 Jam 313,507.18 0.2500 Unit/hari 71,900.00
40,600.00
m3 2.0334 0.7334 0.0250 1.0000 1.0000
Pekerjaan Cerucuk Dan Turap Pekerjaan pemancangan 1 m panjang cerucuk gelam dia. 8–10 cm Mandor Pekerja Operator Kayu gelam Sewa Tripod Sewa Alat pancang Hammer Sewa Alat penyambung tiang pancang
OH OH OH m3 M3
m'
Pekerjaan pemancangan 1 m panjang cerucuk bambu dia. 8–10 cm Mandor Pekerja Operator Bambu bongkotan Sewa Tripod Sewa Alat pancang Hammer Sewa Alat penyambung tiang pancang
m'
Nilai HSPK (Dibulatkan): 0.0040 O.H 130,000.00 0.0360 O.H 90,000.00 0.0060 O.H 120,000.00 0.2625 Btg 21,650.00 0.0060 Unit/hari 29,900.00 0.0480 Jam 313,507.18 0.2500 Unit/hari 71,900.00
Pekerjaan pemancangan 1 m pancang beton bertulang dia. 25/25 cm Mandor Tukang Batu Pekerja Tiang Pancang beton tulang 25x25 cm Sewa Tripod Sewa Alat pancang Hammer Alat penyambung tiang pancang
m'
Nilai HSPK (Dibulatkan): 0.0250 O.H 130,000.00 0.0312 O.H 110,000.00 0.2500 O.H 90,000.00 1.0300 m' 78,500.00 0.0312 Unit/hari 29,900.00 0.2496 Jam 313,507.18 0.2500 Unit/hari 71,900.00
Pekerjaan pemancangan 1 m pancang beton bertulang dia. 30/30 cm Mandor Tukang Batu Pekerja Tiang Pancang beton tulang 30x30 cm Sewa Tripod Sewa Alat pancang Hammer Alat penyambung tiang pancang
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
m'
Nilai HSPK (Dibulatkan): 0.0250 O.H 130,000.00 0.0312 O.H 110,000.00 0.2500 O.H 90,000.00 1.0300 m' 160,150.00 0.0312 Unit/hari 29,900.00 0.2496 Jam 313,507.18 0.2500 Unit/hari 71,900.00
163
31,200.00 28,800.00 132,000.00 216,000.00 145,312.50 119,927.50 475,000.00
183,006.00 80,674.00 3,250.00 251,200.00 193,250.00
390.00 2,700.00 600.00 6,273.75 149.50 12,540.29 17,975.00 43,400.00 520.00 3,240.00 720.00 5,683.13 179.40 15,048.34 17,975.00 207,200.00 3,250.00 3,432.00 22,500.00 80,855.00 932.88 78,251.39 17,975.00 291,300.00 3,250.00 3,432.00 22,500.00 164,954.50 932.88 78,251.39 17,975.00
KODE BARANG 2.01.02.02.04.005 1.11.29.01.01.001.001 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.011.002 1.09.27.01.02.999.022 E30 1.09.27.01.02.999.023 2.01.02.02.04.006 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.106 1.08.23.01.05.002.111 1.08.23.01.01.019.017 2.01.02.02.04.007
URAIAN KEGIATAN Pekerjaan pemancangan 1 m pancang beton bertulang dia. 40/40 cm Mandor Tukang Batu Pekerja Tiang Pancang beton tulang 40x40 cm Sewa Tripod Sewa Alat pancang Hammer Alat penyambung tiang pancang
KOEF
HARGA SATUAN Nilai HSPK (Dibulatkan): 0.0250 O.H 130,000.00 0.0312 O.H 110,000.00 0.2500 O.H 90,000.00 1.0300 m' 200,800.00 0.0312 Unit/hari 29,900.00 0.0312 Unit/hari 313,507.18 0.2500 Unit/hari 71,900.00
1 m' Pekerjaan Pemasangan Turap Bambu tinggi 1,5 m Mandor Kepala Tukang Tukang Kayu Pekerja Bambu Bongkotan Gedeg Guling Kawat
1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.106 1.08.23.01.05.002.111 1.08.23.01.01.019.017
1 m' Pekerjaan Pemasangan Turap Bambu tinggi 2,75 m Mandor Kepala Tukang Tukang Kayu Pekerja Bambu Bongkotan Gedeg Guling Kawat
2.01.02.02.04.008
Pengeringan/pemompaan Air per 1 jam
1.11.29.01.02.001.008 1.11.29.01.02.001.002 1.08.23.01.04.001.006 E22
Operator Pompa Mekanik Solar Pompa air
2.01.02.02.04.009 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.05.002.045 1.08.23.01.01.026.017
1 m2 Pekerjaan Pemasangan Turap Papan tebal 3 cm Mandor Kepala Tukang Tukang Kayu Pekerja Kayu Papan Paku biasa 2" - 5"
2.01.02.02.04.010
1 m3 Pekerjaan Timbunan Pasir dalam Karung
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.004.003 1.08.23.01.01.020.001 1.08.23.01.05.002.108
Mandor Pekerja Pasir Urug Glangsing Keranjang
2.01.02.02.05 2.01.02.02.05.001
Pekerjaan Drainase 1 m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia 12"
1.11.29.01.01.001.001 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.030 1.08.23.01.01.043.011 1.08.23.01.01.036.001 1.09.27.01.02.999.010
Mandor Tukang Pipa Pekerja Pipa PVC AW dia 12" Lem PVC Amplas Gergaji Besi
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m'
m' 0.0070 0.0020 0.0220 0.2730 0.5450 0.2725 0.0044
O.H O.H O.H O.H Batang Lembar Roll m'
0.0130 0.0040 0.0400 0.5000 1.0000 0.5000 0.0080
O.H O.H O.H O.H btg Lembar Roll Jam
0.0420 0.0420 0.5000 0.0420
O.H O.H Ltr jam m2
0.0250 0.0080 0.0800 1.0000 0.0300 0.3000
O.H O.H O.H O.H m3 kg m3
0.0100 0.2880 1.0000 20.0000 0.0500
O.H O.H m3 Buah Buah
m'
0.0100 O.H 0.0400 O.H 0.2400 O.H 0.1750 Batang 0.6667 Buah 0.4000 Lembar 0.0100 Unit/Hari
164
JUMLAH HARGA 264,700.00 3,250.00 3,432.00 22,500.00 206,824.00 932.88 9,781.42 17,975.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,650.00 94,600.00 432,250.00
67,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,650.00 94,600.00 432,250.00
124,000.00
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00 15,300.00 44,775.19
17,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 5,811,950.00 21,000.00
283,700.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 161,050.00 3,250.00 9,900.00
253,800.00
Nilai HSPK (Dibulatkan):
769,400.00
130,000.00 110,000.00 90,000.00 3,929,200.00 77,750.00 5,600.00 39,150.00
910.00 240.00 2,420.00 24,570.00 11,799.25 25,778.50 1,901.90
1,690.00 480.00 4,400.00 45,000.00 21,650.00 47,300.00 3,458.00
3,780.00 4,620.00 7,650.00 1,880.56
3,250.00 960.00 8,800.00 90,000.00 174,358.50 6,300.00
1,300.00 25,920.00 161,050.00 65,000.00 495.00
1,300.00 4,400.00 21,600.00 687,610.00 51,835.93 2,240.00 391.50
KODE BARANG 2.01.02.02.05.002
URAIAN KEGIATAN 1m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia 8 "
1.11.29.01.01.001.001 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.028 1.08.23.01.01.043.011 1.08.23.01.01.036.001 1.09.27.01.02.999.010
Mandor Tukang Pipa Pekerja Pipa PVC dia 8" AW Lem PVC Amplas Gergaji Besi
2.01.02.02.05.003
1m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia 6 "
1.11.29.01.01.001.001 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.06.001.027 1.08.23.01.01.043.011 1.08.23.01.01.036.001 1.09.27.01.02.999.010
Mandor Tukang Pipa Pekerja Pipa PVC dia 6" AW Lem PVC Amplas Gergaji Besi
2.01.02.02.05.004
1m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa Galvanis Dia 6" untuk saluran Mandor Tukang Pipa Pekerja Pipa Galvanis Dia 6" Medium B Gergaji Besi
1.11.29.01.01.001.001 1.11.29.01.01.002.008 1.11.29.01.01.002.014 1.08.24.02.07.001.034 1.09.27.01.02.999.010
0.0100 0.2400 0.0400 0.1750 0.6667 0.4000 0.0100
1 Unit Pemasangan U Ditch ukuran 400.400.1200, 60 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.004 E07
Mandor Operator Terampil Pekerja U Ditch uk. 400.400.1200 Sewa Crane
2.01.02.02.05.006
1 Unit Pemasangan U Ditch ukuran 400.500.1200, 60 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.005 E07
Mandor Operator Terampil Pekerja U Ditch uk. 400.500.1200 Sewa Crane
2.01.02.02.05.007
1 Unit Pemasangan U Ditch ukuran 400.600.1200, 60 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.006 E07
Mandor Operator Terampil Pekerja U Ditch uk. 400.600.1200 Sewa Crane
2.01.02.02.05.008
1 Unit Pemasangan U Ditch ukuran 500.500.1200, 60 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.007 E07
Mandor Operator Terampil Pekerja U Ditch uk. 500.500.1200 Sewa Crane
O.H O.H O.H Batang Buah Lembar Buah
O.H O.H O.H Batang Buah Lembar Buah m'
0.0100 0.2400 0.0400 0.1750 0.0100
O.H O.H O.H Batang Buah Unit
0.0004 0.0150 0.0033 1.0000 0.0150
O.H O.H O.H Buah Jam Unit
0.0004 0.0163 0.0036 1.0000 0.0163
O.H O.H O.H Buah Jam Unit
0.0004 0.0175 0.0039 1.0000 0.0175
O.H O.H O.H Buah Jam Unit
0.0005 0.0188 0.0042 1.0000 0.0188
165
SAT m'
m'
0.0100 0.2400 0.0400 0.1750 0.6667 0.4000 0.0100
2.01.02.02.05.005
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
O.H O.H O.H Buah Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 1,918,100.00 77,750.00 5,600.00 39,150.00 Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 1,230,200.00 77,750.00 5,600.00 39,150.00 Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 2,654,100.00 39,150.00 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 530,850.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 629,000.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 672,900.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 622,550.00 599,629.55
JUMLAH HARGA 421,400.00
1,300.00 26,400.00 3,600.00 335,667.50 51,835.93 2,240.00 391.50 301,100.00
1,300.00 26,400.00 3,600.00 215,285.00 51,835.93 2,240.00 391.50 496,200.00
1,300.00 26,400.00 3,600.00 464,467.50 391.50 542,000.00
52.00 1,800.00 297.00 530,850.00 8,994.44 641,100.00
52.00 1,956.00 324.00 629,000.00 9,773.96 685,900.00
52.00 2,100.00 351.00 672,900.00 10,493.52 636,500.00
65.00 2,256.00 378.00 622,550.00 11,273.04
KODE BARANG 2.01.02.02.05.009
URAIAN KEGIATAN 1 Unit Pemasangan U Ditch ukuran 500.600.1200, 60 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.008 E07
Mandor Operator Terampil Pekerja U Ditch uk. 500.600.1200 Sewa Crane
2.01.02.02.05.010
1 Unit Pemasangan U Ditch ukuran 500.700.1200, 60 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.009 E07
Mandor Operator Terampil Pekerja U Ditch uk. 500.700.1200 Sewa Crane
2.01.02.02.05.011
1 Unit Pemasangan U Ditch ukuran 600.600.1200, 60 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.010 E07
Mandor Operator Terampil Pekerja U Ditch uk. 600.600.1200 Sewa Crane
2.01.02.02.05.012
1 Unit Pemasangan U Ditch ukuran 600.700.1200, 60 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.011 E07
Mandor Operator Terampil Pekerja U Ditch uk. 600.700.1200 Sewa Crane
2.01.02.02.05.013
1 Unit Pemasangan U Ditch ukuran 600.800.1200, 60 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.012 E07
Mandor Operator Terampil Pekerja U Ditch uk. 600.800.1200 Sewa Crane
2.01.02.02.05.014
1 Unit Pemasangan U Ditch ukuran 800.800.1200, 80 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.013 E07
Mandor Operator Terampil Pekerja U Ditch uk. 800.800.1200 Sewa Crane
2.01.02.02.05.015
1 Unit Pemasangan U Ditch ukuran 800.900.1200, 100 mm dengan beban gandar 5 Ton
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.015 E07
Mandor Operator Terampil Pekerja U Ditch uk. 800.900.1200 Sewa Crane
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0005 0.0200 0.0044 1.0000 0.0200
O.H O.H O.H Buah Jam Unit
0.0005 0.0213 0.0047 1.0000 0.0213
O.H O.H O.H Buah Jam Unit
0.0007 0.0300 0.0066 1.0000 0.0300
O.H O.H O.H Buah Jam Unit
0.0007 0.0317 0.0070 1.0000 0.0317
O.H O.H O.H Buah Jam Unit
0.0008 0.0334 0.0074 1.0000 0.0334
O.H O.H O.H Buah Jam Unit
0.0010 0.0450 0.0099 1.0000 0.0450
O.H O.H O.H Buah Jam Unit
0.0011 0.0469 0.0103 1.0000 0.0469
166
SAT Unit
O.H O.H O.H Buah Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 681,950.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 809,800.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 755,550.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 839,500.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 1,072,000.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 1,356,150.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 1,764,250.00 599,629.55
JUMLAH HARGA 696,800.00
65.00 2,400.00 396.00 681,950.00 11,992.59 825,600.00
65.00 2,556.00 423.00 809,800.00 12,772.11 777,800.00
91.00 3,600.00 594.00 755,550.00 17,988.89 863,000.00
91.00 3,804.00 630.00 839,500.00 19,008.26 1,096,800.00
104.00 4,008.00 666.00 1,072,000.00 20,027.63 1,389,600.00
130.00 5,400.00 891.00 1,356,150.00 26,983.33 1,799,100.00
143.00 5,628.00 927.00 1,764,250.00 28,122.63
KODE BARANG 2.01.02.02.05.016
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.016 E07 2.01.02.02.05.017
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.018 E07 2.01.02.02.05.018
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.020 E07 2.01.02.02.05.019
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.022 E07 2.01.02.02.05.020
1.11.29.01.01.001.001 1.11.29.01.02.001.007 1.11.29.01.01.002.014 1.08.23.01.01.066.065 E07 2.01.02.02.05.021 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 2.01.01.03.01.005 2.01.01.03.02.020 1.09.27.01.02.999.007 1.09.27.01.02.999.013 2.01.02.02.05.022 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 2.01.01.03.01.005 2.01.01.03.02.020 1.09.27.01.02.999.007 1.09.27.01.02.999.013
URAIAN KEGIATAN 1 Unit Pemasangan U Ditch ukuran 800.1000.1200, 100 mm dengan beban gandar 5 Ton Mandor Operator Terampil Pekerja U Ditch uk. 800.1000.1200 Sewa Crane 1 Unit Pemasangan U Ditch ukuran 1000.1000.1200, 100 mm dengan beban gandar 5 Ton Mandor Operator Terampil Pekerja U Ditch uk. 1000.1000.1200 Sewa Crane 1 Unit Pemasangan U Ditch ukuran 1000.1200.1200, 100 mm dengan beban gandar 5 Ton Mandor Operator Terampil Pekerja U Ditch uk. 1000.1200.1200 Sewa Crane 1 Unit Pemasangan U Ditch ukuran 1200.1000.1200, 100 mm dengan beban gandar 5 Ton Mandor Operator Terampil Pekerja U Ditch uk. 1200.1000.1200 Sewa Crane 1 Unit Pemasangan U Ditch ukuran 1200.1200.1200, 120 mm dengan beban gandar 5 Ton Mandor Operator Terampil Pekerja U Ditch uk. 1200.1200.1200 Sewa Crane 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.3 m (K-175) Tebal = 5 cm Mandor Kepala Tukang Tukang Batu Pekerja Beton K - 175 Bekisting Linggis Kayu Pemikul dan Tampar 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.4 m (K-175) Tebal = 5 cm Mandor Kepala Tukang Tukang Batu Pekerja Beton K - 175 Bekisting Linggis Kayu Pemikul dan Tampar
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
167
KOEF
0.0011 0.0488 0.0107 1.0000 0.0488
SAT Unit
O.H O.H O.H Buah Jam Unit
0.0014 0.0625 0.0138 1.0000 0.0625
O.H O.H O.H Buah Jam Unit
0.0015 0.0667 0.0147 1.0000 0.0667
O.H O.H O.H Buah Jam Unit
0.0019 0.0850 0.0187 1.0000 0.0850
O.H O.H O.H Buah Jam Unit
0.0020 0.0900 0.0198 1.0000 0.0900
O.H O.H O.H Buah Jam m'
0.0290 0.0120 0.1160 0.5810 0.0550 2.1980 0.0500 0.0500
O.H O.H O.H O.H m3 m2 Buah Unit m'
0.0370 0.0150 0.1490 0.7440 0.0710 2.8260 0.0530 0.0530
O.H O.H O.H O.H m3 m2 Buah Unit
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 1,981,250.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 1,939,900.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 2,645,100.00 599,629.55 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 90,000.00 2,629,600.00 599,629.55 Nilai HSPK (Dibulatkan):
JUMLAH HARGA 2,017,500.00
143.00 5,856.00 963.00 1,981,250.00 29,261.92 1,986,300.00
182.00 7,500.00 1,242.00 1,939,900.00 37,476.85 2,694,600.00
195.00 8,004.00 1,323.00 2,645,100.00 39,995.29 2,692,700.00
247.00 10,200.00 1,683.00 2,629,600.00 50,968.51 3,590,400.00
130,000.00 120,000.00 90,000.00 3,523,600.00 599,629.55
260.00 10,800.00 1,782.00 3,523,600.00 53,966.66
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 1,183,700.00 186,100.00 6,100.00 12,450.00
545,300.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 1,183,700.00 186,100.00 6,100.00 12,450.00
700,900.00
3,770.00 1,440.00 12,760.00 52,290.00 65,103.50 409,047.80 305.00 622.50
4,810.00 1,800.00 16,390.00 66,960.00 84,042.70 525,918.60 323.30 659.85
KODE BARANG 2.01.02.02.05.023 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 2.01.01.03.01.005 2.01.01.03.02.020 1.09.27.01.02.999.007 1.09.27.01.02.999.013 2.01.02.02.05.024 1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 2.01.01.03.01.005 2.01.01.03.02.020 1.09.27.01.02.999.007 1.09.27.01.02.999.013
URAIAN KEGIATAN 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.5 m (K-175) Tebal = 5 cm Mandor Kepala Tukang Tukang Batu Pekerja Beton K - 175 Bekisting Linggis Kayu Pemikul dan Tampar 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.6 m (K-175) Tebal = 6 cm Mandor Kepala Tukang Tukang Batu Pekerja Beton K - 175 Bekisting Linggis Kayu Pemikul dan Tampar
2.01.02.02.05.025
1 m' Pekerjaan Gorong-Gorong Buis Beton Bertulang diameter = 0.8 m (K-225) tebal = 8 cm
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 2.01.01.03.01.007 2.01.01.03.01.014 2.01.01.03.02.020 1.09.27.01.02.999.007 1.09.27.01.02.999.013
Mandor Kepala Tukang Tukang Batu Pekerja Buis Beton K - 225 Besi Tulangan Bekisting Linggis Kayu Pemikul dan Tampar
2.01.02.02.05.026
1 m' Pekerjaan Gorong - Gorong Buis Beton Bertulang Diameter = 1.00 m (K-225) tebal = 10 cm Mandor Kepala Tukang Tukang Batu Pekerja Buis Beton K - 225 Besi Tulangan Bekisting (0.2 x VI. D) Linggis Kayu Pemikul dan Tampar
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 2.01.01.03.01.007 2.01.01.03.01.014 2.01.01.03.02.020 1.09.27.01.02.999.007 1.09.27.01.02.999.013
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0460 0.0180 0.1820 0.9120 0.0860 3.4540 0.0560 0.0560
O.H O.H O.H O.H m3 m2 Buah Unit m'
0.0660 0.0260 0.2630 1.3150 0.1240 4.1450 0.0590 0.0590
O.H O.H O.H O.H m3 m2 Buah Unit m'
0.1190 0.0480 0.4770 2.3860 0.2210 11.0500 5.5260 0.0630 0.0630
168
SAT m'
O.H O.H O.H O.H m3 Kg m2 Buah Unit m'
0.1860 0.0750 0.7460 3.7300 0.3450 17.2500 6.9080 0.0670 0.0670
O.H O.H O.H O.H m3 Kg m2 Buah Unit
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 1,183,700.00 186,100.00 6,100.00 12,450.00
JUMLAH HARGA 855,900.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 1,183,700.00 186,100.00 6,100.00 12,450.00
1,078,200.00
Nilai HSPK (Dibulatkan):
1,773,900.00
130,000.00 120,000.00 110,000.00 90,000.00 1,262,700.00 16,000.00 186,100.00 6,100.00 12,450.00 Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 1,262,700.00 16,000.00 186,100.00 6,100.00 12,450.00
5,980.00 2,160.00 20,020.00 82,080.00 101,798.20 642,789.40 341.60 697.20
8,580.00 3,120.00 28,930.00 118,350.00 146,778.80 771,384.50 359.90 734.55
15,470.00 5,760.00 52,470.00 214,740.00 279,056.70 176,800.00 1,028,388.60 384.30 784.35 2,449,400.00
24,180.00 9,000.00 82,060.00 335,700.00 435,631.50 276,000.00 1,285,578.80 408.70 834.15
KODE BARANG 2.02 2.02.03 2.02.03.01 2.02.03.01.01 2.02.03.01.01.001
URAIAN KEGIATAN HSPK FISIK NON KONSTRUKSI SARANA DAN PRASARANA KOTA J. PEKERJAAN PENERANGAN JALAN UMUM Pekerjaan Penerangan Jalan Umum (PJU) 1 Lokasi Persiapan Pemasangan PJU
2.02.03.01.01.002 2.02.03.01.01.003 1.09.26.01.02.003.004
Pembuatan Rambu Lalu Lintas Untuk PJU Pengukuran Titik Lampu PJU Cuci Cetak Film
2.02.03.01.01.002
1 Unit Pembuatan Rambu Lalu Lintas Untuk PJU
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.05.002.029 1.08.23.01.05.002.028 1.08.23.01.01.026.017
Mandor Pekerja (Buruh Tak Terampil) Kayu Usuk Meranti Kayu Papan Meranti Paku Usuk
2.02.03.01.01.003
1 Lokasi Pengukuran Titik lampu PJU
1.11.29.01.02.001.005 1.11.29.01.02.001.011
Juru Ukur Pembantu Juru Ukur
2.02.03.01.01.004
1 Buah Pemasangan Konektor Kabel
1.11.29.01.01.002.001
Tukang Listrik
2.02.03.01.01.005
1 m Pemasangan dan Penarikan Kabel
1.11.29.01.01.002.014
Pekerja (Buruh Tak Terampil)
2.02.03.01.01.006
1 m Pemasangan Kabel Bawah Tanah
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014
Mandor Tukang Gali Jalan Pekerja (Buruh Tak Terampil)
2.02.03.01.01.007
1 Unit Pemasangan Panel Meter
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.08.23.01.01.008.055 1.08.24.03.01.014.004
Mandor Tukang Listrik Beugel/ Baut Panel Meter
2.02.03.01.01.008
1 m Pemasangan PVC untuk Kabel Tanam
1.11.29.01.01.002.014 1.08.24.02.06.001.022
Pekerja (Buruh Tak Terampil) Pipa PVC 2" AW
2.02.03.01.01.009
1 m Pemasangan Kabel dalam Pipa Pekerjaan Instalasi Jaringan Bawah Tanah Mandor Pekerja (Buruh Tak Terampil)
1.11.29.01.01.001.001 1.11.29.01.01.002.014 2.02.03.01.01.010 1.11.29.01.01.002.012 1.11.29.01.01.002.014 1.08.24.03.01.016.001 1.08.23.03.06.016.002 1.08.23.01.01.008.003
KOEF
2.0000 1.0000 1.0000
HARGA SATUAN
Lokasi
Nilai HSPK (Dibulatkan): 179,700.00 380,000.00 3,300.00
742,700.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 58,150.00 155,000.00 21,000.00
179,700.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00
380,000.00
Nilai HSPK (Dibulatkan): 110,000.00
1,100.00
Nilai HSPK (Dibulatkan): 90,000.00
4,500.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 90,000.00
115,800.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 79,150.00 1,376,750.00
1,630,900.00
Nilai HSPK (Dibulatkan): 90,000.00 224,100.00
78,500.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00
4,000.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 67,300.00 159,400.00 316,450.00
316,100.00
Unit Lokasi Lembar Unit
0.1250 0.2500 1.0000 0.5000 0.2500
OH OH Batang Batang Kg Lokasi
1.0000 3.0000
OH OH Buah
0.0100
OH m'
0.0500
OH m'
0.0250 0.5000 0.7500
OH OH OH Unit
0.5000 1.0000 1.0000 1.0000
OH OH Pasang Unit m'
0.2500 0.2500
O.H lonjor m'
0.0100 0.0300
1 Unit Pembuatan dan Pemasangan Terminal Dalam Tiang Tukang Las Pekerja (Buruh Tak Terampil) Terminal Kabel 4 jalur Sekering MCB Thermis 4 - 10 Amp Plat Baja 1.2 mm
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT
OH OH Unit
0.1250 0.2500 1.0000 1.0000 0.1680
169
OH OH Buah Buah Lembar
JUMLAH HARGA
359,400.00 380,000.00 3,300.00
16,250.00 22,500.00 58,150.00 77,500.00 5,250.00
110,000.00 270,000.00
1,100.00
4,500.00
3,250.00 45,000.00 67,500.00
65,000.00 110,000.00 79,150.00 1,376,750.00
22,500.00 56,025.00
1,300.00 2,700.00
13,750.00 22,500.00 67,300.00 159,400.00 53,163.60
KODE BARANG 2.02.03.01.01.011 1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014
URAIAN KEGIATAN 1 Unit Perakitan Panel Penerangan Jalan Umum (PJU) Mandor Tukang Listrik Pekerja (Buruh Tak Terampil)
2.02.03.01.01.012
1 Unit Pemasangan Panel Lampu PJU
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil)
2.02.03.01.01.013
1 Unit Pemasangan Panel Tempat Ballast
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil)
2.02.03.01.01.014
1 Buah Panel Tempat Ballast untuk Lampu Sorot
2.02.03.01.01.013 1.08.24.03.01.014.005
Pemasangan Panel Tempat Ballast Panel ballast ukuran 25 x 15 x 10 cm
2.02.03.01.01.015
1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 2,5 m Pemasangan dan Penarikan Kabel Kabel NYM 2x2.5 mm
2.02.03.01.01.005 1.08.23.03.06.001.024 2.02.03.01.01.016 2.02.03.01.01.005 1.08.23.03.06.001.024 2.02.03.01.01.017 2.02.03.01.01.005 1.08.23.03.06.001.024 2.02.03.01.01.018 2.02.03.01.01.005 1.08.23.03.06.001.024 2.02.03.01.01.019
0.5000 0.5000 0.5000
SAT Unit OH OH OH Unit
0.4000 0.4000 0.8000
OH OH OH Unit
0.3000 0.3000 0.6000
1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m Pemasangan dan Penarikan Kabel Kabel NYM 2x2.5 mm 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 7 m Pemasangan dan Penarikan Kabel Kabel NYM 2x2.5 mm
2.02.03.01.01.005 1.08.23.03.06.001.024
1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 8.5 m Pemasangan dan Penarikan Kabel Kabel NYM 2x2.5 mm
2.02.03.01.01.020
1 Unit Roll Pipa 1,5"
1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.09.27.01.02.999.024
Tukang Besi Pekerja (Buruh Tak Terampil) Sewa Alat Bantu Roll Pipa
2.02.03.01.01.021
1 Unit Roll Pipa 2"
1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.09.27.01.02.999.024
Tukang Besi Pekerja (Buruh Tak Terampil) Sewa Alat Bantu Roll Pipa
2.02.03.01.01.022
1 Unit Roll Pipa 3"
1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.09.27.01.02.999.024
Tukang Besi Pekerja (Buruh Tak Terampil) Sewa Alat Bantu Roll Pipa
OH OH OH Buah
1.0000 1.0000
1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 3 m Pemasangan dan Penarikan Kabel Kabel NYM 2x2.5 mm
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
Unit Unit m'
2.5000 2.5000
m m1 m'
3.0000 3.0000
m m1 m'
4.0000 4.0000
m m1 m'
7.0000 7.0000
m m1 m'
8.5000 8.5000
m m1 Unit
0.1067 0.2133 1.0000
OH OH Jam Unit
0.1333 0.2667 1.0000
OH OH Jam Unit
0.2500 0.5000 1.0000
170
OH OH Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00
JUMLAH HARGA 165,000.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00
168,000.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00
126,000.00
Nilai HSPK (Dibulatkan): 126,000.00 222,900.00
348,900.00
Nilai HSPK (Dibulatkan): 4,500.00 16,750.00
53,100.00
Nilai HSPK (Dibulatkan): 4,500.00 16,750.00
63,800.00
Nilai HSPK (Dibulatkan): 4,500.00 16,750.00
85,000.00
Nilai HSPK (Dibulatkan): 4,500.00 16,750.00
148,800.00
Nilai HSPK (Dibulatkan): 4,500.00 16,750.00
180,600.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 74,300.00
105,200.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 74,300.00
113,000.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 74,300.00
146,800.00
65,000.00 55,000.00 45,000.00
52,000.00 44,000.00 72,000.00
39,000.00 33,000.00 54,000.00
126,000.00 222,900.00
11,250.00 41,875.00
13,500.00 50,250.00
18,000.00 67,000.00
31,500.00 117,250.00
38,250.00 142,375.00
11,737.00 19,197.00 74,300.00
14,663.00 24,003.00 74,300.00
27,500.00 45,000.00 74,300.00
KODE BARANG 2.02.03.01.01.023
URAIAN KEGIATAN 1 Unit Roll Pipa 4"
1.11.29.01.01.002.007 1.11.29.01.01.002.014 1.09.27.01.02.999.024
Tukang Besi Pekerja (Buruh Tak Terampil) Sewa Alat Bantu Roll Pipa
2.02.03.01.01.024
1 Buah Pemasangan Ornamen Lampu PJU panjang 1,5 m Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Pipa Galvanis 2'' Medium A Besi Beugel/Baut (Ornamen) Roll Pipa 2" Sewa Alat Bantu Penerangan Jalan Umum
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.24.02.07.001.040 1.08.23.01.01.008.055 2.02.03.01.01.021 1.09.27.01.02.999.025 2.02.03.01.01.025 1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.24.02.07.001.040 1.08.23.01.01.008.055 2.02.03.01.01.021 1.09.27.01.02.999.025 2.02.03.01.01.026 1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.24.02.07.001.040 1.08.23.01.01.008.055 1.08.23.01.01.008.007 2.02.03.01.01.021 1.09.27.01.02.999.025 2.02.03.01.01.027
0.4000 0.8000 1.0000
0.1250 0.2000 0.6000 0.2500 2.0000 1.0000 2.0000
2.02.03.01.01.028
1 Unit Pemasangan Panel Lampu PJU 1 Phase
2.02.03.01.01.011 2.02.03.01.01.012 1.08.24.03.01.999.022 1.08.23.03.06.999.006 1.08.24.03.01.017.022 1.08.24.03.01.017.014 1.08.24.03.01.017.020 1.08.23.03.06.012.007 1.08.24.03.01.999.023 1.08.23.01.01.008.055
Perakitan Panel PJU Pemasangan Panel PJU Panel PJU Time Switch MCB 63 A -1 Phase MCB 6 A -1 Phase MCB 40 A -1 Phase Magnet Kontaktor ex. Mitsubishi SN 50 Grounding Roud Besi Beugel/Baut (Ornamen)
2.02.03.01.01.029
1 Unit Pemasangan Panel Lampu PJU 3 Phase 6600VA Perakitan Panel PJU Pemasangan Panel PJU Panel PJU Pilot Lamp MCB 16 A - 3 Phase
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
OH OH Jam
O.H O.H O.H Btg Pasang Unit Jam Buah
0.1250 0.2000 0.6000 0.3334 2.0000 1.0000 2.0000
1 Buah Pemasangan Ornamen Lampu PJU panjang 3 m Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Pipa Galvanish Dim. 2'' Besi Beugel/Baut (Ornamen) Plat Baja tebal 5 mm Roll Pipa 2" Sewa Alat Bantu Penerangan Jalan Umum
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.24.02.07.001.040 1.08.23.01.01.008.055 1.08.23.01.01.012.002 2.02.03.01.01.021 1.09.27.01.02.999.025
SAT Unit
Buah
1 Buah Pemasangan Ornamen Lampu PJU panjang 2 m Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Pipa Galvanish Dim. 2'' Kelas A Besi Beugel/Baut (Ornamen) Roll Pipa 2" Sewa Alat Bantu Penerangan Jalan Umum
1 Buah Pemasangan Ornamen Lampu PJU Panjang 6 m Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Pipa Galvanish Dim. 2'' Besi Beugel/Baut (Ornamen) Besi Beton 12 mm Roll Pipa 2" Sewa Alat Bantu Penerangan Jalan Umum
2.02.03.01.01.011 2.02.03.01.01.012 1.08.24.03.01.999.022 1.08.23.03.06.002.094 1.08.24.03.01.017.034
KOEF
O.H O.H O.H Btg Pasang Unit Jam Buah
0.1250 0.2000 0.6000 0.5000 2.0000 5.0000 1.0000 2.0000
O.H O.H O.H Btg Pasang Kg Unit Jam Buah
0.1250 0.2000 0.6000 1.0000 3.0000 0.3300 1.0000 2.0000
O.H O.H O.H Btg Pasang Ljr Unit Jam Unit
1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 4.0000 1.0000 1.0000 1.0000
Unit Unit Buah Buah Buah Buah Buah Buah Unit Pasang Unit
1.0000 1.0000 1.0000 3.0000 2.0000
171
Unit Unit Buah Buah Buah
HARGA SATUAN Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 74,300.00
JUMLAH HARGA 190,300.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 853,750.00 79,150.00 113,000.00 74,300.00
725,600.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 853,750.00 79,150.00 113,000.00 74,300.00
796,800.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 853,750.00 79,150.00 13,500.00 113,000.00 74,300.00
1,006,500.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 853,750.00 79,150.00 111,300.00 113,000.00 74,300.00
1,481,800.00
Nilai HSPK (Dibulatkan): 165,000.00 168,000.00 1,872,300.00 502,000.00 240,300.00 107,200.00 142,100.00 779,600.00 454,500.00 79,150.00
4,936,500.00
Nilai HSPK (Dibulatkan): 165,000.00 168,000.00 1,872,300.00 96,100.00 425,000.00
5,802,100.00
44,000.00 72,000.00 74,300.00
16,250.00 22,000.00 54,000.00 213,437.50 158,300.00 113,000.00 148,600.00
16,250.00 22,000.00 54,000.00 284,640.25 158,300.00 113,000.00 148,600.00
16,250.00 22,000.00 54,000.00 426,875.00 158,300.00 67,500.00 113,000.00 148,600.00
16,250.00 22,000.00 54,000.00 853,750.00 237,450.00 36,729.00 113,000.00 148,600.00
165,000.00 168,000.00 1,872,300.00 502,000.00 240,300.00 107,200.00 568,400.00 779,600.00 454,500.00 79,150.00
165,000.00 168,000.00 1,872,300.00 288,300.00 850,000.00
KODE BARANG 1.08.24.03.01.017.014 1.08.23.03.06.012.007 1.08.23.03.06.999.006 1.08.24.03.01.999.023 1.08.23.01.01.008.055
URAIAN KEGIATAN MCB 6 A - 1 Phase Magnet Kontaktor SN 50 Time Switch Grounding roud Besi Beugel/Baut (Ornamen)
2.02.03.01.01.030
1 Unit Pemasangan Panel Lampu PJU 3 Phase 10600VA Perakitan Panel PJU Pemasangan Panel PJU Panel PJU Pilot Lamp MCB 20 A - 3 Phase MCB 10 A - 1 Phase Magnet Kontaktor SN 50 Time Switch Grounding roud Besi Beugel/Baut (Ornamen)
2.02.03.01.01.011 2.02.03.01.01.012 1.08.24.03.01.999.022 1.08.23.03.06.002.094 1.08.24.03.01.017.035 1.08.24.03.01.017.015 1.08.23.03.06.012.007 1.08.23.03.06.999.006 1.08.24.03.01.999.023 1.08.23.01.01.008.055 2.02.03.01.01.031 2.02.03.01.01.011 2.02.03.01.01.012 1.08.24.03.01.999.022 1.08.23.03.06.002.094 1.08.24.03.01.017.036 1.08.24.03.01.017.016 1.08.23.03.06.012.007 1.08.23.03.06.999.006 1.08.24.03.01.999.023 1.08.23.01.01.008.055 2.02.03.01.01.032 2.02.03.01.01.011 2.02.03.01.01.012 1.08.24.03.01.999.022 1.08.23.03.06.002.094 1.08.24.03.01.017.037 1.08.24.03.01.017.016 1.08.23.03.06.012.007 1.08.23.03.06.999.006 1.08.24.03.01.999.023 1.08.23.01.01.008.055 2.02.03.01.01.033 2.02.03.01.01.011 2.02.03.01.01.012 1.08.24.03.01.999.022 1.08.23.03.06.002.094 1.08.24.03.01.017.038 1.08.24.03.01.017.017 1.08.23.03.06.012.007 1.08.23.03.06.999.006 1.08.24.03.01.999.023 1.08.23.01.01.008.055
KOEF 6.0000 1.0000 1.0000 1.0000 1.0000
Unit 1.0000 1.0000 1.0000 3.0000 2.0000 6.0000 1.0000 1.0000 1.0000 1.0000
1 Unit Pemasangan Panel Lampu PJU 3 Phase 13200VA Perakitan Panel PJU Pemasangan Panel PJU Panel PJU Pilot Lamp MCB 25 A - 3 Phase MCB 16 A - 1 Phase Magnet Kontaktor SN 50 Time Switch Grounding roud Besi Beugel/Baut (Ornamen)
Unit Unit Buah Buah Buah Buah Buah Buah Unit Pasang Unit
1.0000 1.0000 1.0000 3.0000 2.0000 6.0000 1.0000 1.0000 1.0000 1.0000
1 Unit Pemasangan Panel Lampu PJU 3 Phase 16500VA Perakitan Panel PJU Pemasangan Panel PJU Panel PJU Pilot Lamp MCB 35 A - 3 Phase MCB 16 A - 1 Phase Magnet Kontaktor SN 50 Time Switch Grounding roud Besi Beugel/Baut (Ornamen)
Unit Unit Buah Buah Buah Buah Buah Buah Unit Pasang Unit
1.0000 1.0000 1.0000 3.0000 2.0000 6.0000 1.0000 1.0000 1.0000 1.0000
1 Unit Pemasangan Panel Lampu PJU 3 Phase 23000VA Perakitan Panel PJU Pemasangan Panel PJU Panel PJU Pilot Lamp MCB 40 A - 3 Phase MCB 20 A - 1 Phase Magnet Kontaktor SN 50 Time Switch Grounding roud Besi Beugel/Baut (Ornamen)
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT Buah Buah Buah Unit Pasang
Unit Unit Buah Buah Buah Buah Buah Buah Unit Pasang Unit
1.0000 1.0000 1.0000 3.0000 2.0000 6.0000 1.0000 1.0000 1.0000 1.0000
172
Unit Unit Buah Buah Buah Buah Buah Buah Unit Pasang
HARGA SATUAN 107,200.00 779,600.00 502,000.00 454,500.00 79,150.00
JUMLAH HARGA 643,200.00 779,600.00 502,000.00 454,500.00 79,150.00
Nilai HSPK (Dibulatkan): 165,000.00 168,000.00 1,872,300.00 96,100.00 449,500.00 107,200.00 779,600.00 502,000.00 454,500.00 79,150.00
5,851,100.00
Nilai HSPK (Dibulatkan): 165,000.00 168,000.00 1,872,300.00 96,100.00 456,000.00 107,200.00 779,600.00 502,000.00 454,500.00 79,150.00
5,864,100.00
Nilai HSPK (Dibulatkan): 165,000.00 168,000.00 1,872,300.00 96,100.00 463,700.00 107,200.00 779,600.00 502,000.00 454,500.00 79,150.00
5,879,500.00
Nilai HSPK (Dibulatkan): 165,000.00 168,000.00 1,872,300.00 96,100.00 497,300.00 116,300.00 779,600.00 502,000.00 454,500.00 79,150.00
6,001,300.00
165,000.00 168,000.00 1,872,300.00 288,300.00 899,000.00 643,200.00 779,600.00 502,000.00 454,500.00 79,150.00
165,000.00 168,000.00 1,872,300.00 288,300.00 912,000.00 643,200.00 779,600.00 502,000.00 454,500.00 79,150.00
165,000.00 168,000.00 1,872,300.00 288,300.00 927,400.00 643,200.00 779,600.00 502,000.00 454,500.00 79,150.00
165,000.00 168,000.00 1,872,300.00 288,300.00 994,600.00 697,800.00 779,600.00 502,000.00 454,500.00 79,150.00
KODE BARANG 2.02.03.01.01.034 2.02.03.01.01.011 2.02.03.01.01.012 1.08.24.03.01.999.022 1.08.23.03.06.002.094 1.08.24.03.01.017.039 1.08.24.03.01.017.018 1.08.23.03.06.012.007 1.08.23.03.06.999.006 1.08.24.03.01.999.023 1.08.23.01.01.008.055
URAIAN KEGIATAN 1 Unit Pemasangan Panel Lampu PJU 3 Phase 33000VA Perakitan Panel PJU Pemasangan Panel PJU Panel PJU Pilot Lamp MCB 50 A - 3 Phase MG MCB 25 A - 1 Phase Magnet Kontaktor SN 50 Time Switch Grounding roud Besi Beugel/Baut (Ornamen)
2.02.03.01.02 2.02.03.01.02.001
Elektrikal 1 Unit Pembongkaran Instalasi Kabel
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil)
2.02.03.01.02.002
1 Unit Bongkar Panel
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil)
2.02.03.01.02.003
1 Unit Bongkar Kap Lampu Taman
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.09.27.01.02.999.025
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Sewa Alat Penerangan Jalan Umum (PJU)
2.02.03.01.02.004
1 Unit Bongkar Tiang Lampu Tanam
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.09.27.01.02.999.025
Mandor Pekerja (Buruh Tak Terampil) Sewa Alat Penerangan Jalan Umum (PJU)
2.02.03.01.02.005
1 m Pemasangan/Penarikan Kabel NYFGBY 4x 6 mm Galian Tanah Keras Urugan Tanah Kembali Pemasangan Kabel dalam Pipa Pekerjaan Instalasi Jaringan Bawah Tanah Kabel NYFGBY 4x6 mm Batu Bata Merah Kelas 1 Pasir Urug
2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.009 1.08.23.03.06.001.160 1.08.23.01.01.005.010 1.08.23.01.01.004.003 2.02.03.01.02.006 2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.009 1.08.23.03.06.001.161 1.08.23.01.01.005.010 1.08.23.01.01.004.003
KOEF
1.0000 1.0000 1.0000 3.0000 2.0000 6.0000 1.0000 1.0000 1.0000 1.0000
Unit Unit Buah Buah Buah Buah Buah Buah Unit Pasang
Unit 0.0200 0.2000 0.4000
O.H O.H O.H Unit
0.0400 0.4000 0.8000
O.H O.H O.H Unit
0.1000 1.0000 1.0000 1.0000
O.H O.H O.H Jam Unit
0.3000 3.0000 1.0000
1 m Pemasangan/Penarikan Kabel NYFGBY 4x 10 mm Galian Tanah Keras Urugan Tanah Kembali Pemasangan Kabel dalam Pipa Pekerjaan Instalasi Jaringan Bawah Tanah Kabel NYFGBY 4x10 mm Batu Bata Merah Kelas 1 Pasir Urug
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT Unit
173
O.H O.H Jam m'
0.0800 0.0400 1.0000
m3 m3 m
1.0000 5.0000 0.1000
m' Buah m3 m'
0.0800 0.0400 1.0000
m3 m3 m
1.0000 5.0000 0.1000
m' Buah m3
HARGA SATUAN Nilai HSPK (Dibulatkan): 165,000.00 168,000.00 1,872,300.00 96,100.00 711,700.00 122,700.00 779,600.00 502,000.00 454,500.00 79,150.00
JUMLAH HARGA 6,468,500.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00
60,600.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00
121,200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 74,300.00
287,300.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 74,300.00
383,300.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,000.00
99,600.00
66,300.00 950.00 161,050.00
66,300.00 4,750.00 16,105.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,000.00
134,200.00
100,850.00 950.00 161,050.00
100,850.00 4,750.00 16,105.00
165,000.00 168,000.00 1,872,300.00 288,300.00 1,423,400.00 736,200.00 779,600.00 502,000.00 454,500.00 79,150.00
2,600.00 22,000.00 36,000.00
5,200.00 44,000.00 72,000.00
13,000.00 110,000.00 90,000.00 74,300.00
39,000.00 270,000.00 74,300.00
7,536.00 944.00 4,000.00
7,536.00 944.00 4,000.00
KODE BARANG 2.02.03.01.02.007 2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.009 1.08.23.03.06.001.162 1.08.23.01.01.005.010 1.08.23.01.01.004.003 2.02.03.01.02.008 2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.009 1.08.23.03.06.001.158 1.08.23.01.01.005.010 1.08.23.01.01.004.003 2.02.03.01.02.009 2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.009 1.08.23.03.06.001.159 1.08.23.01.01.005.010 1.08.23.01.01.004.003 2.02.03.01.02.010
URAIAN KEGIATAN 1 m Pemasangan/Penarikan Kabel NYFGBY 4x 16 mm Galian Tanah Keras Urugan Tanah Kembali Pemasangan Kabel dalam Pipa Pekerjaan Instalasi Jaringan Bawah Tanah Kabel NYFGBY 4x16 mm Batu Bata Merah Kelas 1 Pasir Urug 1 m Pemasangan/Penarikan Kabel NYFGBY/NYRGBY 4 x 2,5 mm Galian Tanah Keras Urugan Tanah Kembali Pemasangan Kabel dalam Pipa Pekerjaan Instalasi Jaringan Bawah Tanah Kabel NYFGBY/NYRGBY 4x2,5 mm Batu Bata Merah Kelas 1 Pasir Urug 1 m Pemasangan/Penarikan Kabel NYFGBY/NYRGBY 4 x 4 mm Galian Tanah Keras Urugan Tanah Kembali Pemasangan Kabel dalam Pipa Pekerjaan Instalasi Jaringan Bawah Tanah Kabel NYFGBY/NYRGBY 4x4 mm Batu Bata Merah Kelas 1 Pasir Urug
2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.005 1.08.23.03.06.001.090 1.08.23.01.01.005.010 1.08.23.01.01.004.003
1 m Pemasangan/Penarikan Kabel NYY 4 x 2.5 mm Galian Tanah Keras Urugan Tanah Kembali Pemasangan dan Penarikan Kabel Kabel NYY 4 x 2.5 mm Batu Bata Merah Kelas 1 Pasir Urug
2.02.03.01.02.011
1 m Pemasangan/Penarikan Kabel NYY 4 x 4 mm
2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.005 1.08.23.03.06.001.092 1.08.23.01.01.005.010 1.08.23.01.01.004.003
Galian Tanah Keras Urugan Tanah Kembali Pemasangan dan Penarikan Kabel Kabel NYY 4 x 4 mm Batu Bata Merah Kelas 1 Pasir Urug
2.02.03.01.02.012
1 m Pemasangan/Penarikan Kabel NYY 4 x 6 mm
2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.005 1.08.23.03.06.001.093 1.08.23.01.01.005.010 1.08.23.01.01.004.003
Galian Tanah Keras Urugan Tanah Kembali Pemasangan dan Penarikan Kabel Kabel NYY 4 x 6 mm Batu Bata Merah Kelas 1 Pasir Urug
2.02.03.01.02.013
1 m Pemasangan/Penarikan kabel NYY 4 x 10 mm2 Galian Tanah Keras Urugan Tanah Kembali Pemasangan dan Penarikan Kabel Kabel NYY 4 x 10 mm Batu Bata Merah Kelas 1 Pasir Urug
2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.005 1.08.23.03.06.001.094 1.08.23.01.01.005.010 1.08.23.01.01.004.003
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
SAT m'
0.0800 0.0400 1.0000
m3 m3 m
1.0000 5.0000 0.1000
m' Buah m3 m'
0.0800 0.0400 1.0000
m3 m3 m
1.0000 5.0000 0.1000
m' Buah m3 m'
0.0800 0.0400 1.0000
m3 m3 m
1.0000 5.0000 0.1000
m' Buah m3 m'
0.0800 0.0400 1.0000 1.0000 5.0000 0.1000
m3 m3 m m' Buah m3 m'
0.0800 0.0400 1.0000 1.0000 5.0000 0.1000
m3 m3 m m' Buah m3 m'
0.0800 0.0400 1.0000 1.0000 5.0000 0.1000
m3 m3 m m' Buah m3 m'
0.0800 0.0400 1.0000 1.0000 5.0000 0.1000
174
m3 m3 m m' Buah m3
HARGA SATUAN Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,000.00
JUMLAH HARGA 161,900.00
128,550.00 950.00 161,050.00
128,550.00 4,750.00 16,105.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,000.00
72,400.00
39,050.00 950.00 161,050.00
39,050.00 4,750.00 16,105.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,000.00
86,600.00
53,250.00 950.00 161,050.00
53,250.00 4,750.00 16,105.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,500.00 28,600.00 950.00 161,050.00
62,400.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,500.00 45,100.00 950.00 161,050.00
78,900.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,500.00 58,500.00 950.00 161,050.00
92,300.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,500.00 88,850.00 950.00 161,050.00
122,700.00
7,536.00 944.00 4,000.00
7,536.00 944.00 4,000.00
7,536.00 944.00 4,000.00
7,536.00 944.00 4,500.00 28,600.00 4,750.00 16,105.00
7,536.00 944.00 4,500.00 45,100.00 4,750.00 16,105.00
7,536.00 944.00 4,500.00 58,500.00 4,750.00 16,105.00
7,536.00 944.00 4,500.00 88,850.00 4,750.00 16,105.00
KODE BARANG 2.02.03.01.02.014 2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.005 1.08.23.03.06.001.095 1.08.23.01.01.005.010 1.08.23.01.01.004.003 2.02.03.01.02.015 2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.005 1.08.23.03.06.001.096 1.08.23.01.01.005.010 1.08.23.01.01.004.003 2.02.03.01.02.016 2.01.01.01.02.004 2.01.01.01.02.009 2.02.03.01.01.005 1.08.23.03.06.001.097 1.08.23.01.01.005.010 1.08.23.01.01.004.003 2.02.03.01.02.017 2.02.03.01.01.005 1.08.23.03.06.001.023 2.02.03.01.02.018 2.02.03.01.01.005 1.08.23.03.06.001.024 2.02.03.01.02.019 2.02.03.01.01.005 1.08.23.03.06.001.210 2.02.03.01.02.020 2.02.03.01.01.005 1.08.23.03.06.001.211 2.02.03.01.02.021 2.02.03.01.01.005 1.08.23.03.06.001.212 2.02.03.01.02.022 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.005 2.02.03.01.02.023 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.050
URAIAN KEGIATAN 1 m Pemasangan/Penarikan Kabel NYY 4 x 16 mm Galian Tanah Keras Urugan Tanah Kembali Pemasangan dan Penarikan Kabel Kabel NYY 4 x 16 mm Batu Bata Merah Kelas 1 Pasir Urug
KOEF
0.0800 0.0400 1.0000 1.0000 5.0000 0.1000
1 m Pemasangan/Penarikan Kabel NYY 4 x 25 mm Galian Tanah Keras Urugan Tanah Kembali Pemasangan dan Penarikan Kabel Kabel NYY 4 x 25 mm Batu Bata Merah Kelas 1 Pasir Urug
m3 m3 m m' Buah m3 m'
0.0800 0.0400 1.0000 1.0000 5.0000 0.1000
1 m Pemasangan/Penarikan Kabel NYY 4 x 35 mm Galian Tanah Keras Urugan Tanah Kembali Pemasangan dan Penarikan Kabel Kabel NYY 4 x 35 mm Batu Bata Merah Kelas 1 Pasir Urug
m3 m3 m m' Buah m3 m'
0.0800 0.0400 1.0000 1.0000 5.0000 0.1000
1 m Pemasangan/Penarikan Kabel NYM 2x1,5 mm Pemasangan dan Penarikan Kabel Kabel NYM 2 x 1,5 mm2
m3 m3 m m' Buah m3 m'
1.0000 1.0000
1 m Pemasangan/Penarikan Kabel NYM 2x2,5 mm Pemasangan dan Penarikan Kabel Kabel NYM 2x2,5 mm2
m m' m'
1.0000 1.0000
1 Unit Pemasangan/Penarikan Kabel Twisted 2 x 10 mm Pemasangan dan Penarikan Kabel Kabel Twisted 2x10 mm 1 Unit Pemasangan/Penarikan Kabel Twisted 2 x 16 mm Pemasangan dan Penarikan Kabel Kabel Twisted 2x16 mm 1 m Pemasangan / Penarikan Kabel Twisted 4x16 mm Pemasangan dan Penarikan Kabel Kabel Twisted 4x16 mm 1 m Memasang Dan Merangkai Lampu Hias Non Neon Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu Hias Non Neon 1 m Memasang Dan Merangkai Lampu Hias Circle Light Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu Circle Light (Twicle Light)
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m'
175
m m' Unit
1.0000 1.0000
m m' Unit
1.0000 1.0000
m m' m'
1.0000 1.0000
m m' m'
0.0100 0.1000 1.0000
O.H O.H Buah m'
0.0100 0.1000 1.0000
O.H O.H Roll
HARGA SATUAN Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,500.00 106,650.00 950.00 161,050.00
JUMLAH HARGA 140,500.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,500.00 165,850.00 950.00 161,050.00
199,700.00
Nilai HSPK (Dibulatkan): 94,200.00 23,600.00 4,500.00 225,050.00 950.00 161,050.00
258,900.00
Nilai HSPK (Dibulatkan): 4,500.00 11,600.00
16,100.00
Nilai HSPK (Dibulatkan): 4,500.00 16,750.00
21,300.00
Nilai HSPK (Dibulatkan): 4,500.00 8,400.00
12,900.00
Nilai HSPK (Dibulatkan): 4,500.00 24,500.00
29,000.00
Nilai HSPK (Dibulatkan): 4,500.00 42,500.00
47,000.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 50,150.00
60,300.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 51,600.00
61,700.00
7,536.00 944.00 4,500.00 106,650.00 4,750.00 16,105.00
7,536.00 944.00 4,500.00 165,850.00 4,750.00 16,105.00
7,536.00 944.00 4,500.00 225,050.00 4,750.00 16,105.00
4,500.00 11,600.00
4,500.00 16,750.00
4,500.00 8,400.00
4,500.00 24,500.00
4,500.00 42,500.00
1,100.00 9,000.00 50,150.00
1,100.00 9,000.00 51,600.00
KODE BARANG 2.02.03.01.03 2.02.03.01.03.001
URAIAN KEGIATAN Pemasangan Tiang PJU 1 Unit Pengecatan Tiang PJU
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.001 1.08.23.03.05.001.015 1.08.23.01.01.036.001 1.09.27.01.02.999.025
Mandor Kepala Tukang Cat Tukang Cat Pekerja (Buruh Tak Terampil) Cat Besi Sikat Baja Ampelas Sewa Alat Bantu
2.02.03.01.03.002
1 Unit Pemasangan Tiang Cabang 1 Biasa 5 m
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.020.001 E07
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Cabang Biasa 1-5 m Sewa Crane
2.02.03.01.03.003
1 Unit Pemasangan Tiang Cabang 1 Biasa 7 m
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.020.002 E07
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Cabang Biasa 1-7 m Sewa Crane
2.02.03.01.03.004
1 Unit Pemasangan Tiang Cabang 1 Biasa 9 m
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.020.003 E07
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Cabang Biasa 1-9 m Sewa Crane
2.02.03.01.03.005
1 Unit Pemasangan Tiang Cabang 2 Biasa 7 m
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.020.004 E07
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Cabang Biasa 2-7 m Sewa Crane
2.02.03.01.03.006
1 unit Pemasangan Tiang Cabang 2 Biasa 9 m
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.020.005 E07
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Cabang Biasa 2-9 m Sewa Crane
2.02.03.01.03.007
1 Unit Pemasangan Tiang Cabang 4 Biasa 9 m
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.020.016 E07
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Cabang Biasa 4-9 m Sewa Crane
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.1000 0.0250 0.2500 0.1500 0.3000 1.0000 0.5652 1.0000
SAT
HARGA SATUAN
Unit
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 71,500.00 14,900.00 5,600.00 74,300.00
170,800.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 90,000.00 1,433,550.00 599,629.55
1,867,800.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 90,000.00 1,942,400.00 599,629.55
2,376,600.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 90,000.00 2,559,000.00 599,629.55
2,993,200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 90,000.00 2,090,850.00 599,629.55
2,525,100.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 90,000.00 2,958,550.00 599,629.55
3,392,800.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 90,000.00 3,219,350.00 599,629.55
3,653,600.00
OH OH OH OH Kg Buah Lembar Unit Unit
0.1300 0.2500 0.2500 0.7500 1.0000 0.5000
OH OH OH OH Unit Jam Unit
0.1300 0.2500 0.2500 0.7500 1.0000 0.5000
OH OH OH OH Unit Jam Unit
0.1300 0.2500 0.2500 0.7500 1.0000 0.5000
OH OH OH OH Unit Jam Unit
0.1300 0.2500 0.2500 0.7500 1.0000 0.5000
OH OH OH OH Unit Jam Unit
0.1300 0.2500 0.2500 0.7500 1.0000 0.5000
OH OH OH OH Unit Jam Unit
0.1300 0.2500 0.2500 0.7500 1.0000 0.5000
176
OH OH OH OH Unit Jam
JUMLAH HARGA
13,000.00 3,000.00 27,500.00 13,500.00 21,450.00 14,900.00 3,165.12 74,300.00
16,900.00 27,500.00 22,500.00 67,500.00 1,433,550.00 299,814.78
16,900.00 27,500.00 22,500.00 67,500.00 1,942,400.00 299,814.78
16,900.00 27,500.00 22,500.00 67,500.00 2,559,000.00 299,814.78
16,900.00 27,500.00 22,500.00 67,500.00 2,090,850.00 299,814.78
16,900.00 27,500.00 22,500.00 67,500.00 2,958,550.00 299,814.78
16,900.00 27,500.00 22,500.00 67,500.00 3,219,350.00 299,814.78
KODE BARANG 2.02.03.01.03.008
URAIAN KEGIATAN 1 m3 Pondasi Biasa PJU untuk 5 meter
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.008.067 1.08.24.02.06.001.022 1.08.23.01.01.004.003 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.003 1.08.23.01.01.005.002 1.09.27.01.02.999.025 E19 E06
Mandor Kepala Tukang Tukang Batu Pekerja (Buruh Tak Terampil) Angker Besi D.19 mm Pipa PVC AW Dia 2" Pasir Urug Kayu Bekisting Meranti Paku Reng Semen PC Pasir Cor/Beton Batu Pecah Mesin 2/3 Cm Batu Pecah Mesin 1/2 Cm Sewa Alat Bantu (1 Set @ 3 Alat ) Sewa Vibrator Roller Sewa Concrete Mixer
2.02.03.01.03.009
1 m3 Pondasi Biasa PJU 7 m atau 9 m
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.008.067 1.08.24.02.06.001.022 1.08.23.01.01.004.003 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.003 1.08.23.01.01.005.002 1.09.27.01.02.999.025 E19 E06
Mandor Kepala Tukang Tukang Batu Pekerja (Buruh Tak Terampil) Angker Besi D.19 mm Pipa PVC Class C.D 2" Pasir Urug Kayu Meranti Bekisting Paku Reng Semen PC Pasir Cor/Beton Batu Pecah Mesin 2/3 Cm Batu Pecah Mesin 1/2 Cm Sewa Alat Bantu (1 Set @ 3 Alat ) Sewa Vibrator Roller Sewa Concrete Mixer
2.02.03.01.03.010
1 m3 Pondasi Strous PJU
1.11.29.01.01.001.001 1.11.29.01.01.001.005 1.11.29.01.01.002.004 1.11.29.01.01.002.014 1.08.23.01.01.008.067 1.08.24.02.06.001.022 1.08.23.01.01.004.003 1.08.23.01.05.002.045 1.08.23.01.01.026.017 1.08.23.01.01.002.001 1.08.23.01.01.004.001 1.08.23.01.01.005.003 1.08.23.01.01.012.005 1.08.23.01.01.019.017 1.08.23.01.01.005.003 1.08.23.01.01.005.002 1.09.27.01.02.999.025 1.09.27.01.01.999.001 E19 E06
Mandor Kepala Tukang Tukang Batu Pekerja (Buruh Tak Terampil) Angker Besi D.19 mm Pipa PVC Class C.D 2" Pasir Urug Kayu Meranti Bekisting Paku Reng Semen PC Pasir Cor/Beton Batu Kerikil Beton Besi Beton Dia. 6" Kawat Ikat Beton Batu Pecah Mesin 2/3 Cm Batu Pecah Mesin 1/2 Cm Sewa Alat Bantu (1 Set @ 3 Alat ) Sewa Alat Bantu Strous Pile Sewa Vibrator Roller Sewa Concrete Mixer
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0650 0.0300 0.1250 0.2500 4.0000 2.0000 0.0640 0.0500 0.5000 2.3594 0.1784 0.0407 0.1889 0.1767 0.0077 0.0077
SAT m3 OH OH OH OH Buah m m3 m3 Kg Zak m3 m3 m3 Jam Jam Jam m3
0.0650 0.0300 0.1250 0.1250 4.0000 2.0000 0.0960 0.0500 0.5000 3.6259 0.3365 0.0407 0.3770 0.2709 0.0153 0.0153
OH OH OH OH Buah m m3 m3 Kg Zak m3 m3 m3 Jam Jam Jam m3
0.0670 0.0300 0.1250 0.5000 4.0000 2.0000 0.0960 0.0500 0.5000 4.3849 0.4882 0.0863 9.5400 0.0070 0.3770 0.0407 0.2709 1.2000 0.0153 0.0153
177
OH OH OH OH Buah m m3 m3 Kg Zak m3 m3 Batang Roll m3 m3 Jam Jam Jam Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 18,000.00 224,100.00 161,050.00 5,811,950.00 21,000.00 77,500.00 257,650.00 315,600.00 322,050.00 74,300.00 442,904.36 193,324.87
JUMLAH HARGA 1,200,400.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 18,000.00 224,100.00 161,050.00 5,811,950.00 21,000.00 77,500.00 257,650.00 315,600.00 322,050.00 74,300.00 442,904.36 193,324.87
1,405,600.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 18,000.00 224,100.00 161,050.00 5,811,950.00 21,000.00 77,500.00 257,650.00 315,600.00 39,750.00 432,250.00 315,600.00 322,050.00 74,300.00 10,650.00 442,904.36 193,324.87
1,957,600.00
8,450.00 3,600.00 13,750.00 22,500.00 72,000.00 448,200.00 10,307.20 290,597.50 10,500.00 182,853.50 45,964.76 12,844.92 60,835.25 13,128.81 3,410.36 1,488.60
8,450.00 3,600.00 13,750.00 11,250.00 72,000.00 448,200.00 15,460.80 290,597.50 10,500.00 281,007.25 86,699.23 12,844.92 121,412.85 20,127.87 6,776.44 2,957.87
8,710.00 3,600.00 13,750.00 45,000.00 72,000.00 448,200.00 15,460.80 290,597.50 10,500.00 339,829.75 125,784.73 27,236.28 379,215.00 3,025.75 118,981.20 13,107.44 20,127.87 12,780.00 6,776.44 2,957.87
KODE BARANG 2.02.03.01.03.011
URAIAN KEGIATAN 1 Unit Pemasangan Tiang Oktagonal 5m Single Hot Dipped Galvanized dengan Flenders
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.018.021
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders Sewa Crane
E07
KOEF
2.02.03.01.03.012
1 Unit Pemasangan Tiang Oktagonal 5m Double Hot Dipped Galvanized dengan Flenders
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.018.023
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Oktagonal 5 m Double Hot Dipped Galvanized dengan Flenders Sewa Crane
E07 2.02.03.01.03.013
1 Unit Pemasangan Tiang Oktagonal 7m Single Hot Dipped Galvanized dengan Flenders
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.018.001
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Oktagonal 7 m Single Hot Dipped Galvanized dengan Flenders Sewa Crane
E07
1 Unit Pemasangan Tiang Oktagonal 7m Double Hot Dipped Galvanized dengan Flenders
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.018.002
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Oktagonal 7 m Double Hot Dipped Galvanized dengan Flenders Sewa Crane
2.02.03.01.03.015
1 Unit Pemasangan Tiang Oktagonal 9m Single Hot Dipped Galvanized dengan Flenders
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.018.007
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders Sewa Crane
E07
1 Unit Pemasangan Tiang Oktagonal 9m Double Hot Dipped Galvanized dengan Flenders
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.018.008
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders Sewa Crane
E07
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
178
JUMLAH HARGA 3,198,100.00
OH OH OH OH Unit
130,000.00 110,000.00 90,000.00 90,000.00 2,763,900.00
16,900.00 27,500.00 22,500.00 67,500.00 2,763,900.00
0.5000
Jam
599,629.55
299,814.78
Unit
Nilai HSPK (Dibulatkan):
4,243,800.00
0.1300 0.2500 0.2500 0.7500 1.0000
OH OH OH OH Unit
130,000.00 110,000.00 90,000.00 90,000.00 3,809,600.00
16,900.00 27,500.00 22,500.00 67,500.00 3,809,600.00
0.5000
Jam
599,629.55
299,814.78
Nilai HSPK (Dibulatkan):
4,654,300.00
0.1300 0.2500 0.2500 0.7500 1.0000
OH OH OH OH Unit
130,000.00 110,000.00 90,000.00 90,000.00 4,220,100.00
16,900.00 27,500.00 22,500.00 67,500.00 4,220,100.00
0.5000
Jam
599,629.55
299,814.78
Unit
Nilai HSPK (Dibulatkan):
5,633,100.00
0.1300 0.2500 0.2500 0.7500 1.0000
OH OH OH OH Unit
130,000.00 110,000.00 90,000.00 90,000.00 5,198,900.00
16,900.00 27,500.00 22,500.00 67,500.00 5,198,900.00
0.5000
Jam
599,629.55
299,814.78
Unit
2.02.03.01.03.016
HARGA SATUAN Nilai HSPK (Dibulatkan):
0.1300 0.2500 0.2500 0.7500 1.0000
Unit
2.02.03.01.03.014
E07
SAT Unit
Nilai HSPK (Dibulatkan):
5,633,100.00
0.1300 0.2500 0.2500 0.7500 1.0000
OH OH OH OH Unit
130,000.00 110,000.00 90,000.00 90,000.00 5,198,900.00
16,900.00 27,500.00 22,500.00 67,500.00 5,198,900.00
0.5000
Jam
599,629.55
299,814.78
Unit
Nilai HSPK (Dibulatkan):
6,888,100.00
0.1300 0.2500 0.2500 0.7500 1.0000
OH OH OH OH Unit
130,000.00 110,000.00 90,000.00 90,000.00 6,453,850.00
16,900.00 27,500.00 22,500.00 67,500.00 6,453,850.00
0.5000
Jam
599,629.55
299,814.78
KODE BARANG 2.02.03.01.03.017
URAIAN KEGIATAN 1 Unit Pemasangan Tiang Oktagonal 12m Single Hot Dipped Galvanized dengan Flenders
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.018.013
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Oktagonal 12 m Single Hot Dipped Galvanized dengan Flenders Sewa Crane
E07 2.02.03.01.03.018
1 Unit Pemasangan Tiang Oktagonal 12m Double Hot Dipped Galvanized dengan Flenders
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.11.29.01.01.002.014 1.08.24.03.01.018.014
Mandor Tukang Listrik Tenaga Terampil Pekerja (Buruh Tak Terampil) Tiang Oktagonal 12 m Double Hot Dipped Galvanized dengan Flenders Sewa Crane
E07 2.02.03.01.03.019
1.11.29.01.01.001.001 1.11.29.01.01.002.012 1.11.29.01.01.002.001 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.11.29.01.01.002.014 2.02.03.01.01.010 1.08.24.02.07.001.029 1.08.24.02.07.001.031 1.08.24.02.07.001.032 1.08.23.01.01.008.075 E07 1.09.27.01.02.999.025 2.02.03.01.03.020
1.11.29.01.01.001.001 1.11.29.01.01.002.012 1.11.29.01.01.002.001 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.11.29.01.01.002.014 2.02.03.01.01.010 1.08.24.02.07.001.029 1.08.24.02.07.001.031 1.08.24.02.07.001.032 1.08.23.01.01.008.075 E07 1.09.27.01.02.999.025 2.02.03.01.03.021
1.11.29.01.01.001.001 1.11.29.01.01.002.012 1.11.29.01.01.002.001 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.11.29.01.01.002.014
1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 5 m Cabang 1, Sistem Flenders Mandor Tukang Las Tukang Listrik Tukang Cat Tenaga Terampil Pekerja (Buruh Tak Terampil) Pembuatan dan Pemasangan Terminal Dalam Tiang Pipa Galvanis 2" Medium B Pipa Galvanis 3" Medium B Pipa Galvanis 4" Medium B Plat Besi 1,5 cm, Uk. 30 x 30 cm Sewa Crane Sewa Alat Bantu
SAT Unit
130,000.00 110,000.00 90,000.00 90,000.00 7,943,000.00
16,900.00 27,500.00 22,500.00 67,500.00 7,943,000.00
0.5000
Jam
599,629.55
299,814.78
Unit
Nilai HSPK (Dibulatkan):
9,442,600.00
0.1300 0.2500 0.2500 0.7500 1.0000
OH OH OH OH Unit
130,000.00 110,000.00 90,000.00 90,000.00 9,008,400.00
16,900.00 27,500.00 22,500.00 67,500.00 9,008,400.00
0.5000
Jam
599,629.55
299,814.78
0.5000 0.5000 0.5000 0.2500 0.5000 2.0000 1.0000
OH OH OH OH OH OH Unit
0.3334 0.3334 0.3334 13.0000 0.5000 4.0000
Btg Batang Batang Kg Jam Jam
0.5000 0.5000 0.5000 0.2500 0.5000 2.0000 1.0000
OH OH OH OH OH OH Unit
0.3334 0.5000 0.5000 13.0000 0.5000 4.0000
Btg Batang Batang Kg Jam Jam Unit
0.5000 0.5000 0.5000 0.2500 0.5000 2.0000
179
JUMLAH HARGA 8,377,200.00
OH OH OH OH Unit
Unit
1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 7 m Cabang 2, Sistem Flenders Mandor Tukang Las Tukang Listrik Tukang Cat Tenaga Terampil Pekerja (Buruh Tak Terampil)
HARGA SATUAN Nilai HSPK (Dibulatkan):
0.1300 0.2500 0.2500 0.7500 1.0000
Unit
1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 7 m Cabang 1, Sistem Flenders Mandor Tukang Las Tukang Listrik Tukang Cat Tenaga Terampil Pekerja (Buruh Tak Terampil) Pembuatan dan Pemasangan Terminal Dalam Tiang Pipa Galvanish 2" Medium B Pipa Galvanish 3" Medium B Pipa Galvanish 4" Medium B Plat Besi 1,5 cm, Uk. 30 x 30 cm Sewa Crane Sewa Alat Bantu
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
OH OH OH OH OH OH
Nilai HSPK (Dibulatkan):
2,717,900.00
130,000.00 110,000.00 110,000.00 110,000.00 90,000.00 90,000.00 316,100.00
65,000.00 55,000.00 55,000.00 27,500.00 45,000.00 180,000.00 316,100.00
734,450.00 1,172,950.00 1,697,300.00 13,500.00 599,629.55 74,300.00
244,865.63 391,061.53 565,879.82 175,500.00 299,814.78 297,200.00
Nilai HSPK (Dibulatkan):
3,196,100.00
130,000.00 110,000.00 110,000.00 110,000.00 90,000.00 90,000.00 316,100.00
65,000.00 55,000.00 55,000.00 27,500.00 45,000.00 180,000.00 316,100.00
734,450.00 1,172,950.00 1,697,300.00 13,500.00 599,629.55 74,300.00
244,865.63 586,475.00 848,650.00 175,500.00 299,814.78 297,200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 110,000.00 110,000.00 90,000.00 90,000.00
3,440,900.00
65,000.00 55,000.00 55,000.00 27,500.00 45,000.00 180,000.00
KODE BARANG 2.02.03.01.01.010 1.08.24.02.07.001.029 1.08.24.02.07.001.031 1.08.24.02.07.001.032 1.08.23.01.01.008.075 E07 1.09.27.01.02.999.025 2.02.03.01.03.022
1.11.29.01.01.001.001 1.11.29.01.01.002.012 1.11.29.01.01.002.001 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.11.29.01.01.002.014 2.02.03.01.01.010 1.08.24.02.07.001.029 1.08.24.02.07.001.031 1.08.24.02.07.001.032 1.08.24.02.07.001.033 1.08.23.01.01.008.075 E07 1.09.27.01.02.999.025 2.02.03.01.03.023
1.11.29.01.01.001.001 1.11.29.01.01.002.012 1.11.29.01.01.002.001 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.11.29.01.01.002.014 2.02.03.01.01.010 1.08.24.02.07.001.029 1.08.24.02.07.001.031 1.08.24.02.07.001.032 1.08.24.02.07.001.033 1.08.23.01.01.008.075 E07 1.09.27.01.02.999.025 2.02.03.01.03.024
1.11.29.01.01.001.001 1.11.29.01.01.002.012 1.11.29.01.01.002.001 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.11.29.01.01.002.014 2.02.03.01.01.010 1.08.24.02.07.001.029 1.08.24.02.07.001.031 1.08.24.02.07.001.032 1.08.24.02.07.001.033 1.08.23.01.01.008.075 E07 1.09.27.01.02.999.025
URAIAN KEGIATAN Pembuatan dan Pemasangan Terminal Dalam Tiang Pipa Galvanish 2" Medium B Pipa Galvanish 3" Medium B Pipa Galvanish 4" Medium B Plat Besi 1,5 cm, Uk. 30 x 30 cm Sewa Crane Sewa Alat Bantu 1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 9 m Cabang 1, Sistem Flenders Mandor Tukang Las Tukang Listrik Tukang Cat Tenaga Terampil Pekerja (Buruh Tak Terampil) Pembuatan dan Pemasangan Terminal Dalam Tiang Pipa Galvanish 2" Medium B Pipa Galvanish 3" Medium B Pipa Galvanish 4" Medium B Pipa Galvanish 5" Medium B Plat Besi 1,5 cm, Uk. 30 x 30 cm Sewa Crane Sewa Alat Bantu
SAT Unit
0.6667 0.5000 0.5000 13.0000 0.5000 4.0000
Btg Batang Batang Kg Jam Jam Unit
1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 9 m Cabang 2, Sistem Flenders Mandor Tukang Las Tukang Listrik Tukang Cat Tenaga Terampil Pekerja (Buruh Tak Terampil) Pembuatan dan Pemasangan Terminal Dalam Tiang Pipa Galvanish 2" Medium B Pipa Galvanish 3" Medium B Pipa Galvanish 4" Medium B Pipa Galvanish 5" Medium B Plat Besi 1,5 cm, Uk. 30 x 30 cm Sewa Crane Sewa Alat Bantu
0.5000 0.5000 0.5000 0.2500 0.5000 2.0000 1.0000
OH OH OH OH OH OH Unit
0.3334 0.3334 0.5000 0.5000 13.0000 0.5000 4.0000
Btg Batang Batang Btg Kg Jam Jam Unit
1 Unit Pembuatan & Pemasangan Tiang Lengkung Galvanish 9 m Cabang 4, Sistem Flenders Mandor Tukang Las Tukang Listrik Tukang Cat Tenaga Terampil Pekerja (Buruh Tak Terampil) Pembuatan dan Pemasangan Terminal Dalam Tiang Pipa Galvanish 2" Medium B Pipa Galvanish 3" Medium B Pipa Galvanish 4" Medium B Pipa Galvanish 5" Medium B Plat Besi 1,5 cm, Uk. 30 x 30 cm Sewa Crane Sewa Alat Bantu
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF 1.0000
0.5000 0.7500 0.5000 0.2500 0.5000 2.0000 1.0000
OH OH OH OH OH OH Unit
0.6667 0.5000 0.5834 0.5000 13.0000 0.5000 4.0000
Btg Batang Batang Btg Kg Jam Jam Unit
180
0.5000 0.7500 0.5000 0.2500 0.5000 2.0000 1.0000
OH OH OH OH OH OH Unit
1.3334 0.5000 0.5834 0.5000 13.0000 0.5000 4.0000
Btg Batang Batang Btg Kg Jam Jam
HARGA SATUAN 316,100.00
JUMLAH HARGA 316,100.00
734,450.00 1,172,950.00 1,697,300.00 13,500.00 599,629.55 74,300.00
489,657.82 586,475.00 848,650.00 175,500.00 299,814.78 297,200.00
Nilai HSPK (Dibulatkan):
4,098,900.00
130,000.00 110,000.00 110,000.00 110,000.00 90,000.00 90,000.00 316,100.00
65,000.00 55,000.00 55,000.00 27,500.00 45,000.00 180,000.00 316,100.00
734,450.00 1,172,950.00 1,697,300.00 2,196,400.00 13,500.00 599,629.55 74,300.00
244,865.63 391,061.53 848,650.00 1,098,200.00 175,500.00 299,814.78 297,200.00
Nilai HSPK (Dibulatkan):
4,708,200.00
130,000.00 110,000.00 110,000.00 110,000.00 90,000.00 90,000.00 316,100.00
65,000.00 82,500.00 55,000.00 27,500.00 45,000.00 180,000.00 316,100.00
734,450.00 1,172,950.00 1,697,300.00 2,196,400.00 13,500.00 599,629.55 74,300.00
489,657.82 586,475.00 990,204.82 1,098,200.00 175,500.00 299,814.78 297,200.00
Nilai HSPK (Dibulatkan):
5,197,800.00
130,000.00 110,000.00 110,000.00 110,000.00 90,000.00 90,000.00 316,100.00
65,000.00 82,500.00 55,000.00 27,500.00 45,000.00 180,000.00 316,100.00
734,450.00 1,172,950.00 1,697,300.00 2,196,400.00 13,500.00 599,629.55 74,300.00
979,315.63 586,475.00 990,204.82 1,098,200.00 175,500.00 299,814.78 297,200.00
KODE BARANG 2.02.03.01.03.025 1.11.29.01.01.001.001 1.11.29.01.01.002.012 1.11.29.01.01.002.001 1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.11.29.01.01.002.014 2.02.03.01.01.010 2.02.03.01.01.021 2.02.03.01.01.022 2.02.03.01.01.023 1.08.24.02.07.001.026 1.08.24.02.07.001.029 1.08.24.02.07.001.031 1.08.24.02.07.001.032 1.08.24.02.07.001.033 1.08.23.01.01.008.075 E07 1.09.27.01.02.999.025 2.02.03.01.03.026 1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.095 1.09.27.01.02.999.025
URAIAN KEGIATAN 1 Unit Pembuatan & Pemasangan Tiang Galvanish 9 m Dekoratif Mandor Tukang Las Tukang Listrik Tukang Cat Tenaga Terampil Pekerja (Buruh Tak Terampil) Pembuatan dan Pemasangan Terminal Dalam Tiang Roll Pipa 2" Roll Pipa 3" Roll Pipa 4" Pipa Galvanish 1" Medium B Pipa Galvanish 2" Medium B Pipa Galvanish 3" Medium B Pipa Galvanish 4" Medium B Pipa Galvanish 5" Medium B Plat Besi 1,5 cm, Uk. 30 x 30 cm Sewa Crane Sewa Alat Bantu 1 Unit Pemasangan Lampu HPS 70W/220V Lengkap Armateur, Balast & Capasitor Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu HPS 70 W/220 V Lengkap Armateur, Balast & Capasitor Sewa Alat Bantu Penerangan Jalan Umum
2.02.03.01.03.027
1 Unit Pemasangan Lampu HPS 150W/220V Lengkap Armateur, Balast, Ignitor & Capasitor
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.096
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor Sewa Alat Bantu Penerangan Jalan Umum
1.09.27.01.02.999.025
KOEF
1 Unit Pemasangan Lampu HPS 250W/220V Lengkap Armateur, Balast, Ignitor & Capasitor
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.097
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu HPS 250W/220V Lengkap Armatur Ballast & Capasitor 32uf Sewa Alat Bantu Penerangan Jalan Umum
2.02.03.01.03.029
1 Unit Pemasangan Lampu HPS 400W/220V Lengkap Armateur, Balast, Ignitor & Capasitor
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.09.26.01.99.003.001
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu HPS 400 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor Sewa Alat Bantu Penerangan Jalan Umum
1.09.27.01.02.999.025
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
0.5000 0.7500 0.5000 0.2500 1.0000 2.5000 1.0000
OH OH OH OH OH OH Unit
2.0000 1.0000 1.0000 3.0000 0.6667 0.5000 0.5000 0.5000 15.0000 0.5000 4.0000
Unit Unit Unit m1 Btg Batang Batang Btg Kg Jam Jam Unit
JUMLAH HARGA 6,226,300.00
113,000.00 146,800.00 190,300.00 326,550.00 734,450.00 1,172,950.00 1,697,300.00 2,196,400.00 13,500.00 599,629.55 74,300.00
226,000.00 146,800.00 190,300.00 979,650.00 489,657.82 586,475.00 848,650.00 1,098,200.00 202,500.00 299,814.78 297,200.00 1,969,800.00
74,300.00
0.2500 0.2500 0.7500 1.0000
O.H O.H O.H Buah
1.0000
Jam
74,300.00 Nilai HSPK (Dibulatkan):
65,000.00 82,500.00 55,000.00 27,500.00 90,000.00 225,000.00 316,100.00
32,500.00 27,500.00 67,500.00 1,768,000.00
2,801,800.00
0.2500 0.2500 0.7500 1.0000
O.H O.H O.H Buah
130,000.00 110,000.00 90,000.00 2,600,000.00
32,500.00 27,500.00 67,500.00 2,600,000.00
1.0000
Jam
74,300.00
74,300.00
Unit
Nilai HSPK (Dibulatkan):
5,569,200.00
0.2500 0.2500 0.7500 1.0000
O.H O.H O.H Buah
130,000.00 110,000.00 90,000.00 5,367,400.00
32,500.00 27,500.00 67,500.00 5,367,400.00
1.0000
Jam
74,300.00
74,300.00
Unit
181
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 110,000.00 110,000.00 90,000.00 90,000.00 316,100.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 1,768,000.00
Unit
2.02.03.01.03.028
1.09.27.01.02.999.025
SAT Unit
Nilai HSPK (Dibulatkan):
5,992,900.00
0.2500 0.2500 0.7500 1.0000
O.H O.H O.H Buah
130,000.00 110,000.00 90,000.00 5,791,100.00
32,500.00 27,500.00 67,500.00 5,791,100.00
1.0000
Jam
74,300.00
74,300.00
KODE BARANG 2.02.03.01.03.030 1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.098 1.09.27.01.02.999.025 2.02.03.01.03.031 1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.099 1.09.27.01.02.999.025 2.02.03.01.03.032
URAIAN KEGIATAN 1 Unit Pemasangan Lampu Sorot 80 W Lengkap Armateur, Ignitor, Capasitor Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu HPP 133 CONFORT 80 W / 220 V Sewa Alat Bantu Penerangan Jalan Umum 1 Unit Pemasangan Lampu Sorot 150 W Lengkap Armateur, Ignitor, Capasitor Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu MNF 100 / HPIT 150 W Sewa Alat Bantu Penerangan Jalan Umum
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.100 1.09.27.01.02.999.025
1 Unit Pemasangan Lampu Sorot 250 W Lengkap Armateur, Ignitor, Capasitor Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu MNF 100 / HPIT 250 W Sewa Alat Bantu Penerangan Jalan Umum
2.02.03.01.03.033
1 Unit Pemasangan Lampu Mercury HPLN 80 W
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.101 1.08.23.03.06.002.102 1.08.23.03.06.015.006 1.09.27.01.02.999.025
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Bola Lampu Mercury HPLN 80 Watt/220 V Ballast BHL 80 watt Kap Lampu Hijau Sewa Alat Bantu Penerangan Jalan Umum
2.02.03.01.03.034
1 Unit Pemasangan Lampu Mercury HPLN 125 watt/220 V Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Bola Lampu HPLN 125 Watt/220 V Ballast BHL 125 watt Kap Lampu Hijau 125 watt Sewa Alat Bantu Penerangan Jalan Umum
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.103 1.08.23.03.06.002.104 1.08.23.03.06.015.006 1.09.27.01.02.999.025 2.02.03.01.03.035 1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.105 1.08.23.03.06.002.106 1.08.23.03.06.015.006 1.09.27.01.02.999.025 2.02.03.01.03.036
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.107 1.08.23.03.06.002.106 1.08.23.03.06.002.108 1.09.27.01.02.999.025
0.2500 0.2500 0.7500 1.0000 1.0000
SAT Unit O.H O.H O.H Buah Jam Unit
0.2500 0.2500 0.7500 1.0000 1.0000
O.H O.H O.H Buah Jam Unit
0.2500 0.2500 0.7500 1.0000 1.0000
O.H O.H O.H Buah Jam Unit
0.2500 0.2500 0.7500 1.0000 1.0000 1.0000 1.0000
O.H O.H O.H Buah Buah Buah Jam Unit
0.2500 0.2500 0.7500 1.0000 1.0000 1.0000 1.0000
1 Unit Pemasangan Lampu Mercury HPLN 250w/220v Dengan Ballast Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu HPLN 250w/220v Ballast BHL 250 watt Kap Lampu Hijau 250 watt Sewa Alat Bantu Penerangan Jalan Umum
O.H O.H O.H Buah Buah Buah Jam Unit
0.2500 0.2500 0.7500 1.0000 1.0000 1.0000 1.0000
1 Unit Pemasangan Lampu Sorot HPIT MNF-300 250 W/220 V Lengkap Armateur, Ignitor, Capasitor Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu HPIT MNF-300, 250 W / 220 V Ballast BHL 250 watt Armature 250 watt Sewa Alat Bantu Penerangan Jalan Umum
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
182
O.H O.H O.H Buah Buah Buah Jam Unit
0.2500 0.2500 0.7500 1.0000 1.0000 1.0000 2.0000
O.H O.H O.H Buah Buah Buah Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 3,681,200.00 74,300.00
JUMLAH HARGA 3,883,000.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 2,027,800.00 74,300.00
2,229,600.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 2,209,500.00 74,300.00
2,411,300.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 32,700.00 148,900.00 38,900.00 74,300.00
422,300.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 73,300.00 180,000.00 38,900.00 74,300.00
494,000.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 70,800.00 294,500.00 38,900.00 74,300.00
606,000.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 2,209,500.00 294,500.00 5,649,900.00 74,300.00
32,500.00 27,500.00 67,500.00 3,681,200.00 74,300.00
32,500.00 27,500.00 67,500.00 2,027,800.00 74,300.00
32,500.00 27,500.00 67,500.00 2,209,500.00 74,300.00
32,500.00 27,500.00 67,500.00 32,700.00 148,900.00 38,900.00 74,300.00
32,500.00 27,500.00 67,500.00 73,300.00 180,000.00 38,900.00 74,300.00
32,500.00 27,500.00 67,500.00 70,800.00 294,500.00 38,900.00 74,300.00 8,430,000.00
32,500.00 27,500.00 67,500.00 2,209,500.00 294,500.00 5,649,900.00 148,600.00
KODE BARANG 2.02.03.01.03.037
URAIAN KEGIATAN 1 Unit Pemasangan Lampu SL 23 W
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.057 1.09.27.01.02.999.025
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu Essential 23 Watt ex. Phillips Sewa Alat Bantu Penerangan Jalan Umum
2.02.03.01.03.038
1 Unit Pemasangan Lampu SL 18 Watt
1.11.29.01.01.001.001 1.11.29.01.01.002.001 1.11.29.01.01.002.014 1.08.23.03.06.002.056 1.09.27.01.02.999.025
Mandor Tukang Listrik Pekerja (Buruh Tak Terampil) Lampu Essential 18 Watt ex. Phillips Sewa Alat Bantu Penerangan Jalan Umum
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.2500 0.2500 0.7500 1.0000 1.0000
SAT Unit O.H O.H O.H Buah Jam Unit
0.2500 0.2500 0.7500 1.0000 1.0000
183
O.H O.H O.H Buah Jam
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 51,400.00 74,300.00
JUMLAH HARGA 253,200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 44,200.00 74,300.00
246,000.00
32,500.00 27,500.00 67,500.00 51,400.00 74,300.00
32,500.00 27,500.00 67,500.00 44,200.00 74,300.00
KODE BARANG 2.02.03.02 2.02.03.02.01 2.02.03.02.01.001 1.11.29.01.01.001.001 1.11.29.01.01.001.003 1.11.29.01.01.002.002 1.11.29.01.01.002.014 1.08.23.01.01.026.017 1.08.23.01.05.002.045 1.08.23.01.04.001.006
URAIAN KEGIATAN K. SARANA LALU LINTAS Rambu - Rambu Lalu Lintas 1 m3 Pekerjaan Bekisting Pondasi Rambu Lalu Lintas Mandor Kepala Tukang Tukang Kayu Pekerja Paku Biasa Kayu Papan Minyak Bekisting
KOEF
0.0033 0.0167 0.1667 0.0667 0.3000 0.0067 0.1000
2.02.03.02.01.002
1 Unit Pekerjaan Pemotongan dan Pengeboran untuk Rambu-Rambu Lalu Lintas
1.11.29.01.01.001.001 1.11.29.01.01.001.006 1.11.29.01.01.002.014 1.09.27.01.02.999.010 1.02.04.02.07.003.031
Mandor Kepala Tukang Pekerja Gergaji Besi Mata Bor Besi
2.02.03.02.01.003
1 Unit Pekerjaan Perakitan dan Penyetelan untuk Rambu-Rambu Lalu Lintas Mandor Pekerja Alat Bantu Penyetelan
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.999.014 2.02.03.02.01.004 2.01.01.03.01.005 1.08.23.01.01.008.068 2.02.03.02.01.005 1.11.29.01.02.001.001 1.11.29.01.01.002.014 1.08.23.01.04.001.006 1.09.27.02.01.001.010 2.02.03.02.01.006 1.11.29.01.02.001.001 1.11.29.01.01.002.014 1.08.23.01.04.001.006 1.09.27.02.01.001.010
m3
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 90,000.00 21,000.00 5,811,950.00 15,300.00
O.H O.H O.H O.H Kg m3 Liter
0.0750 0.3750 0.2500
0.3800 4.0000
Nilai HSPK (Dibulatkan):
1 Unit Ongkos Angkut ke Lokasi (Pagar Pengaman Jalan) Sopir Terampil Pekerja Solar Sewa Kendaraan
2.02.03.02.01.007
1 Unit Ongkos Angkut ke Lokasi (Warning Light, Alat Pemberi Isyarat Lalu Lintas, Marka)
1.11.29.01.02.001.001 1.11.29.01.01.002.014 1.08.23.01.04.001.006 1.09.27.02.01.001.010
Sopir Terampil Pekerja Solar Sewa Kendaraan
2.02.03.02.01.008
1 Unit Ongkos Angkut ke Lokasi (Paku Jalan)
1.11.29.01.02.001.001 1.11.29.01.01.002.014 1.08.23.01.04.001.006 1.09.27.02.01.001.010
Sopir Terampil Pekerja Solar Sewa Kendaraan
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 8,500.00
45,600.00
Nilai HSPK (Dibulatkan): 1,183,700.00 37,400.00
599,400.00
Nilai HSPK (Dibulatkan): O.H 120,000.00 O.H 90,000.00 Liter 15,300.00 Unit/Hari 372,450.00
18,300.00
O.H O.H Ls
m3 Buah
Nilai HSPK (Dibulatkan): O.H 120,000.00 O.H 90,000.00 Liter 15,300.00 Unit/Hari 372,450.00
0.7776 O.H 3.1104 O.H 54.4315 Liter 0.7776 Unit/Hari
Nilai HSPK (Dibulatkan):
9,750.00 33,750.00 2,125.00
449,806.00 149,600.00
1,140.00 3,429.00 10,200.51 3,538.28 64,200.00 4,008.00 12,006.00 35,701.02 12,439.83 1,495,700.00
120,000.00 90,000.00 15,300.00 372,450.00
93,312.00 279,936.00 832,801.95 289,617.12
Nilai HSPK (Dibulatkan): O.H 120,000.00 O.H 90,000.00 Liter 15,300.00 Unit/Hari 372,450.00
3,200.00
Unit
184
9,100.00
Unit
Unit
0.0017 0.0067 0.1167 0.0017
429.00 2,004.00 18,337.00 6,003.00 6,300.00 38,940.07 1,530.00
182.00 2,700.00 6,075.00 39.15 69.60
Unit
0.0334 0.1334 2.3334 0.0334
73,500.00
130,000.00 120,000.00 90,000.00 39,150.00 69,600.00
Unit
0.0095 0.0381 0.6667 0.0095
JUMLAH HARGA
O.H O.H O.H buah buah
Unit
1 Unit Ongkos Angkut ke Lokasi (Rambu, Delineator, RPPJ) Sopir Terampil Pekerja Solar Sewa Kendaraan
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
HARGA SATUAN
Unit
0.0014 0.0225 0.0675 0.0010 0.0010
1 Unit pengadaan angkur untuk dudukan box control Beton Cor Angkur Dia. 25 mm
SAT
204.00 603.00 1,785.51 633.17
KODE BARANG 2.02.03.02.01.009 1.11.29.01.01.002.014 2.02.03.02.01.010
URAIAN KEGIATAN 1 unit Pekerjaan Pengeboran dan Pemasangan Paku Jalan Pekerja
1.11.29.01.01.002.014
1 unit Pekerjaan Pengeboran dan Pemasangan Paku Jalan Bulat (Tempered) Pekerja
2.02.03.02.01.011
1 m' Penggelaran Kabel
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.999.014
Mandor Pekerja Alat Bantu
2.02.03.02.01.012 1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.999.014
1 m Pemasangan Pipa PVC untuk Alat Pemberi Isyarat Lalu Lintas Mandor Pekerja Alat Bantu
2.02.03.02.01.013
1 m2 Gali dan tutup aspal
1.11.29.01.01.002.014 1.08.23.01.01.001.001 1.08.23.01.01.005.001 1.08.23.01.04.001.006 1.09.27.01.02.999.031 E26 E25
Pekerja Aspal AC 60-70 Batu Pecah 0,5-1 Solar Alat Bantu Pengaspalan Drill Stamper
2.02.03.02.01.014
1 m2 Pekerjaan Cat Besi
1.11.29.01.01.002.003 1.11.29.01.01.002.014 1.08.23.01.01.006.001 1.08.23.01.01.006.006 1.08.23.01.01.006.031 1.08.23.01.01.042.005 1.08.23.01.01.036.001
Tukang Cat Pekerja Cat Besi Cat Meni Besi Minyak Cat Kuas Tangan Kertas Ampelas
2.02.03.02.01.015
1 Unit Pekerjaan Pengecatan Tiang dan Patok Pengaman Pekerjaan Cat Besi
2.02.03.02.01.014 2.02.03.02.01.016 1.11.29.01.01.002.014 2.02.03.02.01.017 1.08.24.03.01.052.003 1.08.24.03.01.052.002 2.02.03.02.01.016 2.02.03.02.01.018 1.08.24.03.01.052.001 1.08.24.03.01.052.002 2.02.03.02.01.016 2.02.03.02.01.019 1.08.24.03.01.052.003 1.08.24.03.01.052.002 2.02.03.02.01.016
KOEF
0.4000
O.H Unit
0.5600
O.H m'
0.0100 0.0320 0.1000
O.H O.H Ls m'
0.0050 0.0270 0.0850
O.H O.H Ls m2
0.4333 2.5000 0.0120 0.5000 1.0000 1.1669 1.1669
O.H Kg m3 Liter Ls Jam Jam m2
0.3400 0.2000 0.4250 0.1250 0.7500 0.1000 0.2000
O.H O.H Kg Kg Liter Buah Lembar Unit
0.3439
1 m' Ongkos Pekerjaan Pengecatan Zebra Cross / Marka Jalan Pekerja 1 m' Pengadaan dan Pemasangan Marka Jalan ukuran 3 x 120 mm (Thermoplastic) Thermoplastic Glassbeads Ongkos Pengecatan
m2 m'
0.1025
O.H m'
0.9000 0.1000 1.0000
1 m' Pengadaan dan Pemasangan Marka Jalan ukuran 3 x 120 mm (Coldplastic) Coldplastic Glassbeads Ongkos Pengecatan
Kg Kg m' m'
0.9000 0.1000 1.0000
1 m' Pengadaan dan Pemasangan Marka Jalan ukuran 2 x 120 mm (Thermoplastic) Thermoplastic Glassbeads Ongkos Pengecatan
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m'
Kg Kg m2 m'
0.5400 0.0720 1.0000
185
Kg Kg m'
HARGA SATUAN Nilai HSPK (Dibulatkan): 90,000.00
JUMLAH HARGA 36,000.00
Nilai HSPK (Dibulatkan): 90,000.00
50,400.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 8,500.00
5,000.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 8,500.00
3,800.00
Nilai HSPK (Dibulatkan): 90,000.00 15,300.00 270,500.00 15,300.00 21,400.00 33,726.95 47,508.36
204,300.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 71,500.00 54,250.00 24,500.00 13,100.00 5,600.00
113,400.00
Nilai HSPK (Dibulatkan): 113,400.00
39,000.00
Nilai HSPK (Dibulatkan): 90,000.00
9,200.00
Nilai HSPK (Dibulatkan): 31,000.00 28,500.00 9,200.00
40,000.00
Nilai HSPK (Dibulatkan): 40,700.00 28,500.00 9,200.00
48,700.00
Nilai HSPK (Dibulatkan): 31,000.00 28,500.00 9,200.00
28,000.00
36,000.00
50,400.00
1,300.00 2,880.00 850.00
650.00 2,430.00 722.50
38,997.00 38,250.00 3,246.00 7,650.00 21,400.00 39,355.98 55,437.51
37,400.00 18,000.00 30,387.50 6,781.25 18,375.00 1,310.00 1,120.00
38,998.26
9,225.00
27,900.00 2,850.00 9,200.00
36,630.00 2,850.00 9,200.00
16,740.00 2,052.00 9,200.00
KODE BARANG 2.02.03.02.01.020 1.08.24.03.01.052.001 1.08.24.03.01.052.002 2.02.03.02.01.016 2.02.03.02.01.021
URAIAN KEGIATAN 1 m' Pengadaan dan Pemasangan Marka Jalan ukuran 2 x 120 mm (Coldplastic) Coldplastic Glassbeads Ongkos Pengecatan
KOEF
0.5400 0.0720 1.0000
1.08.24.02.06.001.017 1.08.24.03.01.999.024 1.08.24.03.01.999.025
1 Unit Pengadaan dan Pemasangan Warning Light (Lampu Peringatan) Pipa Pengaman PVC Armatur Box Lampu Kontrol WL dengan Konfigurasi (Double Flasher)
1.08.23.03.06.001.090 1.08.24.03.01.048.003 1.08.24.03.01.048.004 1.08.24.03.01.002.015 1.08.24.03.01.999.014 1.08.24.03.01.999.004 1.08.24.03.01.020.015 2.02.03.02.01.011 2.02.03.02.01.012 2.02.03.02.01.013 2.01.01.01.02.004 2.01.01.03.01.005 2.01.01.03.01.005 2.02.03.02.01.004
Kabel NYY 4 x 2.5 mm ex. Supreme Set Terminal Kabel Terminal Kabel Box Lampu 2 Aspek Diameter 30 cm (Pijar) Pasang dan Stel Box Lampu Patok Pengaman dengan Delineator Tiang Lengkung Penggelaran kabel Penanaman Pipa Pelindung Gali dan Tutup Aspal Gali dan Tutup Tanah Keras Pengecoran Tiang Lengkung (4 buah) Pengecoran Patok Pengaman (3 buah) Pengadaan angkur untuk dudukan box control
2.01.01.03.01.005 2.02.03.02.01.015 1.11.29.01.01.005.025 2.02.03.02.01.007
Beton setara K-175 Pengecatan Tiang dan Patok Pengaman Biaya Penyambungan PLN Ongkos Angkut Lampu Peringatan ke Lokasi
2.02.03.02.01.022
Pengadaan dan Pemasangan Lampu Peringatan Tenaga Surya (Warning Light Solar Cell) Tiang Lengkung Baterai VRLA Deep Cyle PV Lampu 2 Aspek dia. 30 cm (Pijar) Controller Solar Cell 50 WP Patok Pengaman Tiang Lengkung Galian Tanah Pengecoran Pemasangan dan Akomodasi
1.08.24.03.01.999.011 1.08.24.03.01.002.015 1.08.24.03.01.999.001 1.08.24.03.01.056.003 1.08.24.03.01.999.004 1.08.24.03.01.020.015 2.01.01.01.02.004 2.01.01.03.01.005 1.09.26.01.99.003.002 2.02.03.02.01.023
1.08.24.03.01.999.011 1.08.24.03.01.002.015 1.08.24.03.01.999.001 1.08.24.03.01.056.003 1.08.24.03.01.999.004 1.08.24.03.01.020.014 2.01.01.01.02.004 2.01.01.03.01.005 1.09.26.01.99.003.002 2.02.03.02.01.024
1.08.23.01.01.004.003 1.08.23.01.01.008.052 1.08.23.01.01.008.053 1.08.24.02.06.001.017 1.08.24.03.01.999.024 1.08.23.03.06.001.091 1.08.23.03.06.001.090
Pengadaan dan Pemasangan Lampu Peringatan Tenaga Surya (Warning Light Solar Cell) Tiang Lurus Baterai VRLA Deep Cyle PV Lampu 2 Aspek dia. 30 cm (Pijar) Controller Solar Cell 50 WP Patok Pengaman Tiang Lurus Galian Tanah Pengecoran Pemasangan dan Akomodasi 1 Unit Pengadaan dan Pemasangan Alat Pengendali Isyarat Lalu Lintas Persimpangan 3 Kaki Pasir Urug Besi Bulat 1" Besi Bulat 1.25" Pipa Pengaman PVC Armatur Box Lampu Kabel NYY 4 x 3 mm ex. Supreme Kabel NYY 4 x 2.5 mm ex. Supreme
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT m' Kg Kg m2 Unit
JUMLAH HARGA 33,200.00
Nilai HSPK (Dibulatkan): 54,900.00 120,200.00 8,301,300.00
74,046,900.00
21,978.00 2,052.00 9,200.00
40.0000 8.0000 1.0000
Batang Buah Buah
300.0000 3.0000 3.0000 4.0000 22.0000 3.0000 2.0000 460.0000 160.0000 2.5000 100.0000 1.8700 0.3100 1.0000
m' Buah Buah Buah Buah Buah Buah m' m' m3 m3 m3 m3 Buah
28,600.00 23,200.00 26,700.00 4,637,200.00 61,500.00 401,900.00 5,812,000.00 5,000.00 3,800.00 204,300.00 94,200.00 1,183,700.00 1,183,700.00 599,400.00
8,580,000.00 69,600.00 80,100.00 18,548,800.00 1,353,000.00 1,205,700.00 11,624,000.00 2,300,000.00 608,000.00 510,750.00 9,420,000.00 2,213,519.00 366,947.00 599,400.00
0.3800 15.0000 1.0000 1.0000
m3 Buah Unit set
1,183,700.00 39,000.00 2,577,700.00 1,495,700.00
449,806.00 585,000.00 2,577,700.00 1,495,700.00
Unit
1.0000 2.0000 1.0000 1.0000 3.0000 1.0000 2.4000 0.6000 1.0000
pcs Unit Unit Unit pcs Unit m3 m3 Ls Unit
1.0000 1.0000 1.0000 1.0000 3.0000 1.0000 2.4000 0.6000 1.0000
pcs Unit Unit Unit pcs Unit m3 m3 Ls Unit
2.5000 2.0000 2.0000 40.0000 15.0000 60.0000 400.0000
186
HARGA SATUAN Nilai HSPK (Dibulatkan): 40,700.00 28,500.00 9,200.00
m3 Batang Batang Batang Buah m m
Nilai HSPK (Dibulatkan): 3,284,700.00 4,637,200.00 9,403,100.00 8,437,000.00 401,900.00 5,812,000.00 94,200.00 1,183,700.00 5,720,000.00 Nilai HSPK (Dibulatkan): 3,284,700.00 4,637,200.00 9,403,100.00 8,437,000.00 401,900.00 4,907,900.00 94,200.00 1,183,700.00 5,720,000.00 Nilai HSPK (Dibulatkan): 161,050.00 82,000.00 143,000.00 54,900.00 120,200.00 37,350.00 28,600.00
2,196,000.00 961,600.00 8,301,300.00
44,073,200.00
3,284,700.00 9,274,400.00 9,403,100.00 8,437,000.00 1,205,700.00 5,812,000.00 226,080.00 710,220.00 5,720,000.00 38,531,900.00
3,284,700.00 4,637,200.00 9,403,100.00 8,437,000.00 1,205,700.00 4,907,900.00 226,080.00 710,220.00 5,720,000.00 241,490,400.00
402,625.00 164,000.00 286,000.00 2,196,000.00 1,803,000.00 2,241,000.00 11,440,000.00
KODE BARANG 1.08.24.03.01.999.020 1.08.24.03.01.048.004 1.08.24.03.01.002.016 1.08.24.03.01.002.013 1.08.24.03.01.999.003
URAIAN KEGIATAN Pembatas Arus Listrik Terminal Kabel Box Lampu 2 Aspek Dia. 20 cm (Pijar) Box Lampu 3 Aspek Dia. 30 cm (Pijar) Kontroller 4 Phase 2 Pedestrian dan Box Luar
KOEF 1.0000 8.0000 8.0000 9.0000 1.0000
SAT Buah Buah Buah Buah set
1.08.24.03.01.999.004 1.08.24.03.01.999.026 1.08.24.03.01.020.013 1.08.24.03.01.020.012 2.02.03.02.01.011 2.02.03.02.01.012 2.02.03.02.01.013 2.01.01.01.02.004 2.01.01.03.01.005 2.01.01.03.01.005 2.01.01.03.01.005 1.08.24.03.01.048.003 1.08.24.03.01.999.014 1.11.29.01.01.005.008 2.02.03.02.01.004 2.02.03.02.01.015 2.02.03.02.01.017 1.11.29.01.01.005.025 1.11.29.01.01.005.028
Patok Pengaman dengan Delineator Rambu Tabel 15 plus Pasang Tiang Lurus Octogonal Tiang Over Head Octogonal Penggelaran Kabel Pemasangan Pipa PVC Gali dan Tutup Aspal Gali dan Tutup Tanah Keras Pengecoran Tiang Over Head Pengecoran Tiang Lurus Pengecoran Tiang Patok Pengaman Pasang dan Stel Terminal Kabel Pasang dan Stel Box Lampu Pasang dan Stel 1 Pesawat & Sekring Pembuatan Dudukan Box Kontrol Pengecatan Patok Pengaman Pengecatan Marka dan Zebra Cross Biaya Penyambungan PLN Biaya Programming
9.0000 3.0000 3.0000 3.0000 460.0000 160.0000 100.0000 100.0000 1.4000 0.8200 2.2400 8.0000 15.0000 1.0000 1.0000 21.0000 100.0000 1.0000 1.0000
Buah set Batang Batang m m m2 m3 m3 m3 m3 Set Set Set Buah Buah m' Set Set
2.02.03.02.01.025
1 Unit Pengadaan dan Pemasangan Alat Pengendali Isyarat Lalu Lintas Persimpangan 4 Kaki Pasir Urug Besi Bulat 1" Besi Bulat 1.25" Pipa Pengaman PVC Armatur Box Lampu Kabel NYY 4 x 3 mm Kabel NYY 4 x 2.5 mm Pembatas Arus Listrik Terminal Kabel Box Lampu 2 Aspek Dia. 20 cm (Pijar) Box Lampu 3 Aspek Dia. 30 cm (Pijar) Kontroller 4 Phase 2 Pedestrian dan & Luar Patok Pengaman dengan Delineator Rambu Tabel no. 15 plus Pemasangan Tiang Lurus Octogonal Tiang Over Head Octogonal Penggelaran Kabel Pemasangan Pipa PVC Gali dan Tutup Aspal Gali dan Tutup Tanah Keras Pengecoran Tiang Over Head Pengecoran Tiang Lurus Pengecoran Tiang Patok Pengaman Pasang dan Stel Terminal Kabel Pasang dan Stel Box Lampu Pasang dan Stel 1 Pesawat & Sekring Pembuatan Dudukan Box Kontrol Pengecatan Tiang dan Patok Pengaman Pengecatan Marka dan Zebra Cross Biaya Penyambungan PLN Biaya Programming
1.08.23.01.01.004.003 1.08.23.01.01.008.052 1.08.23.01.01.008.053 1.08.24.02.06.001.017 1.08.24.03.01.999.024 1.08.23.03.06.001.091 1.08.23.03.06.001.090 1.08.24.03.01.999.020 1.08.24.03.01.048.004 1.08.24.03.01.002.016 1.08.24.03.01.002.013 1.08.24.03.01.999.003 1.08.24.03.01.999.004 1.08.24.03.01.999.026 1.08.24.03.01.020.013 1.08.24.03.01.020.012 2.02.03.02.01.011 2.02.03.02.01.012 2.02.03.02.01.013 2.01.01.01.02.004 2.01.01.03.01.005 2.01.01.03.01.005 2.01.01.03.01.005 1.08.24.03.01.048.003 1.08.24.03.01.999.014 1.11.29.01.01.005.008 2.02.03.02.01.004 2.02.03.02.01.015 2.02.03.02.01.017 1.11.29.01.01.005.025 1.11.29.01.01.005.028 2.02.03.02.01.026 1.08.23.01.01.008.006 1.08.23.01.01.008.056 1.08.23.01.01.027.015 1.08.24.02.07.001.039 1.08.24.03.01.050.001
Unit
3.0000 2.0000 2.0000 50.0000 20.0000 60.0000 500.0000 1.0000 10.0000 8.0000 12.0000 1.0000 12.0000 4.0000 4.0000 4.0000 560.0000 200.0000 100.0000 120.0000 1.8700 1.1000 2.7500 10.0000 20.0000 1.0000 1.0000 27.0000 100.0000 1.0000 1.0000
1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 45 x 45 cm Plat Strip uk. 4 x 30 mm Angkur Besi Siku Ukuran 30 x 30 x 3 mm Mur Baut 10 cm Pipa Galvanis 1.5" Medium A Tutup Pipa Diameter 1.5"
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
m3 Batang Batang Batang Buah m m Buah Buah buah buah set Buah set Batang Batang m m m3 m3 m3 m3 m3 set Buah set Buah Buah m' Set Set Unit
0.6000 0.6000 4.0000 0.5000 1.0000
187
Kg m Buah Btg Buah
HARGA SATUAN 56,700.00 26,700.00 3,259,550.00 5,925,200.00 44,922,000.00
JUMLAH HARGA 56,700.00 213,600.00 26,076,400.00 53,326,800.00 44,922,000.00
401,900.00 873,300.00 5,975,750.00 8,216,650.00 5,000.00 3,800.00 204,300.00 94,200.00 1,183,700.00 1,183,700.00 1,183,700.00 23,200.00 61,500.00 247,800.00 599,400.00 39,000.00 40,000.00 2,577,700.00 2,158,800.00
3,617,100.00 2,619,900.00 17,927,250.00 24,649,950.00 2,300,000.00 608,000.00 20,430,000.00 9,420,000.00 1,657,180.00 970,634.00 2,651,488.00 185,600.00 922,500.00 247,800.00 599,400.00 819,000.00 4,000,000.00 2,577,700.00 2,158,800.00
Nilai HSPK (Dibulatkan):
284,296,700.00
161,050.00 82,000.00 143,000.00 54,900.00 120,200.00 37,350.00 28,600.00 56,700.00 26,700.00 3,259,550.00 5,925,200.00 44,922,000.00 401,900.00 873,300.00 5,975,750.00 8,216,650.00 5,000.00 3,800.00 204,300.00 94,200.00 1,183,700.00 1,183,700.00 1,183,700.00 23,200.00 61,500.00 247,800.00 599,400.00 39,000.00 40,000.00 2,577,700.00 2,158,800.00
483,150.00 164,000.00 286,000.00 2,745,000.00 2,404,000.00 2,241,000.00 14,300,000.00 56,700.00 267,000.00 26,076,400.00 71,102,400.00 44,922,000.00 4,822,800.00 3,493,200.00 23,903,000.00 32,866,600.00 2,800,000.00 760,000.00 20,430,000.00 11,304,000.00 2,213,519.00 1,302,070.00 3,255,175.00 232,000.00 1,230,000.00 247,800.00 599,400.00 1,053,000.00 4,000,000.00 2,577,700.00 2,158,800.00
Nilai HSPK (Dibulatkan): 13,500.00 30,000.00 6,150.00 625,800.00 5,900.00
987,600.00 8,100.00 18,000.00 24,600.00 312,900.00 5,900.00
KODE BARANG 1.08.24.03.01.054.002 2.02.03.02.01.014 2.02.03.02.01.002 2.01.01.07.03.005 2.02.03.02.01.003 2.01.01.03.01.005 2.01.01.01.02.001 2.01.01.01.02.009 2.01.01.01.02.019 2.02.03.02.01.001 2.02.03.02.01.005 2.02.03.02.01.027 1.08.23.01.01.008.006 1.08.23.01.01.008.056 1.08.23.01.01.027.015 1.08.24.02.07.001.039 1.08.24.03.01.050.001 1.08.24.03.01.054.002 2.02.03.02.01.014 2.02.03.02.01.002 2.01.01.07.03.005 2.02.03.02.01.003 2.01.01.03.01.005 2.01.01.01.02.001 2.01.01.01.02.009 2.01.01.01.02.019 2.02.03.02.01.001 2.02.03.02.01.005 2.02.03.02.01.028 1.08.23.01.01.008.031 1.08.23.01.01.027.015 1.08.24.02.07.001.040 1.08.24.03.01.054.002 1.08.24.03.01.999.027 2.02.03.02.01.014 2.02.03.02.01.002 2.01.01.07.03.005 2.02.03.02.01.003 2.01.01.03.01.005 2.01.01.01.02.001 2.01.01.01.02.019 2.02.03.02.01.001 2.02.03.02.01.005
URAIAN KEGIATAN Daun Rambu Alluminium 1,8 mm dengan reflektive sheeting Cat Belakang Daun Rambu Pemotongan dan Pengeboran Pengelasan Perakitan dan Penyetelan Cor Pondasi Beton Galian Tanah Urugan Kembali Galian Tanah Urugan Pasir di Bawah Pondasi Bekisting Pondasi Ongkos Angkut ke Lokasi 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 60 x 60 cm Plat Strip uk. 4 x 30 mm Angkur Besi Siku Ukuran 30 x 30 x 3 mm Mur Baut 10 cm Pipa Galvanis 1.5" Medium A Tutup Pipa Diameter 1.5" Daun Rambu Alluminium 1,8 mm dengan reflektive sheeting Cat Belakang Daun Rambu Pemotongan dan Pengeboran Pengelasan Perakitan dan Penyetelan Cor Pondasi Beton Galian Tanah Urugan Kembali Galian Tanah Urugan Pasir di Bawah Pondasi Bekisting Pondasi Ongkos Angkut ke Lokasi 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 75 x 75 cm Besi siku L 30.30.3 Mur Baut 10 cm Pipa Galvanis 2" Medium A Daun Rambu Alluminium 1,8 mm dengan reflektive sheeting Sticker perlengkapan jalan Cat Belakang Daun Rambu Pemotongan dan Pengeboran Pengelasan Perakitan dan Penyetelan Cor Pondasi Beton Galian Tanah dan Urug Kembali Urugan Pasir di Bawah Pondasi Bekisting Pondasi Ongkos Angkut ke Lokasi
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
188
KOEF 0.2000
SAT m2
HARGA SATUAN 1,015,200.00
JUMLAH HARGA 203,040.00
0.2000 1.0000 14.3000 1.0000 0.1100 0.2500 0.2500 0.0400 1.1200 1.0000
m2 Unit cm Unit m3 m3 m3 m3 m3 Buah
113,400.00 9,100.00 5,200.00 45,600.00 1,183,700.00 70,800.00 23,600.00 221,600.00 73,500.00 18,300.00
22,680.00 9,100.00 74,360.00 45,600.00 130,207.00 17,700.00 5,900.00 8,864.00 82,320.00 18,300.00
Unit
1,168,200.00
0.6000 0.6000 4.0000 0.5000 1.0000 0.3600
m m Buah Btg Buah m2
Nilai HSPK (Dibulatkan): 13,500.00 30,000.00 6,150.00 625,800.00 5,900.00 1,015,200.00
0.3600 1.0000 14.3100 1.0000 0.1100 0.2500 0.2500 0.0400 1.1200 1.0000
m2 Unit cm Unit m3 m3 m3 m3 m3 Buah
113,400.00 9,100.00 5,200.00 45,600.00 1,183,700.00 70,800.00 23,600.00 221,600.00 73,500.00 18,300.00
40,824.00 9,100.00 74,412.00 45,600.00 130,207.00 17,700.00 5,900.00 8,864.00 82,320.00 18,300.00
Unit
1,662,700.00
8,400.00 63,504.00 9,100.00 74,412.00 45,600.00 130,207.00 17,700.00 8,864.00 82,320.00 18,300.00
3.2640 4.0000 0.6667 0.5625
kg Buah Btg m2
Nilai HSPK (Dibulatkan): 12,100.00 6,150.00 853,750.00 1,015,200.00
1.0000 0.5600 1.0000 14.3100 1.0000 0.1100 0.2500 0.0400 1.1200 1.0000
Buah m2 Unit cm Unit m3 m3 m3 m2 Buah
8,400.00 113,400.00 9,100.00 5,200.00 45,600.00 1,183,700.00 70,800.00 221,600.00 73,500.00 18,300.00
8,100.00 18,000.00 24,600.00 312,900.00 5,900.00 365,472.00
39,494.40 24,600.00 569,195.13 571,050.00
KODE BARANG 2.02.03.02.01.029 1.08.23.01.01.008.031 1.08.23.01.01.027.015 1.08.24.02.07.001.040 1.08.24.03.01.050.002 1.08.24.03.01.054.002 1.08.24.03.01.999.027 2.02.03.02.01.014 2.02.03.02.01.002 2.01.01.07.03.005 2.02.03.02.01.003 2.01.01.03.01.005 2.01.01.01.02.001 2.01.01.01.02.019 2.02.03.02.01.001 2.02.03.02.01.005 2.02.03.02.01.030
1.08.23.01.01.008.052 1.08.23.01.01.008.056 1.08.23.01.01.027.012 1.08.23.01.01.027.013 1.08.23.01.01.027.014 1.08.24.03.01.999.010 1.08.24.03.01.020.011 1.08.24.03.01.048.002 2.01.01.01.02.001 2.01.01.01.02.009 2.01.01.01.02.019 2.02.03.02.01.001 2.01.01.03.01.005 2.02.03.02.01.006
URAIAN KEGIATAN 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 90 x 90 cm Besi siku L 30.30.3 Mur Baut 10 cm Pipa Galvanis 2" Medium A Tutup Pipa Dia 2" Daun Rambu Alluminium 1,8 mm dengan reflektive sheeting Sticker perlengkapan jalan Cat Belakang Daun Rambu Pemotongan dan Pengeboran Pengelasan Perakitan dan Penyetelan Cor Pondasi Beton Galian Tanah dan Urug Kembali Urugan Pasir di Bawah Pondasi Bekisting Pondasi Ongkos Angkut ke Lokasi 1 Unit Pengadaan dan Pemasangan Pagar Pengaman Jalan 4 m (Terminal End Masuk Kedalam Tanah) Besi Pengikat Baja Profil Desain Angkur Besi Siku Ukuran 30 x 30 x 3 mm Mur Baut Beam 12 x 25 mm Mur Baut Blocking 16 x 30 mm Mur Baut Post 16 x 48 mm Lempengan Besi Baja Profil Desain Galvanis Tiang Penyangga Besi Struktur Pengendali Terminal End (Sleeve Beam) Galian Tanah Urugan Kembali Galian Tanah Urugan Pasir di Bawah Pondasi Bekisting Pondasi Cor Pondasi Beton Ongkos Angkut ke Lokasi
2.02.03.02.01.031
1 Unit Pengadaan dan Pemasangan Pagar Pengaman Jalan 4 m (Terminal End Lengkung)
1.08.23.01.01.008.052 1.08.23.01.01.008.056 1.08.23.01.01.027.012 1.08.23.01.01.027.013 1.08.23.01.01.027.014 1.08.24.03.01.999.010 1.08.24.03.01.020.011 1.08.24.03.01.048.002 2.01.01.01.02.001 2.01.01.01.02.009 2.01.01.01.02.019 2.02.03.02.01.001 2.01.01.03.01.005 2.02.03.02.01.006
Besi Pengikat Baja Profil Desain Angkur Besi Siku Ukuran 30 x 30 x 3 mm Mur Baut Beam 12 x 25 mm Mur Baut Blocking 16 x 30 mm Mur Baut Post 16 x 48 mm Lempengan Besi Baja Profil Desain Galvanis Tiang Penyangga Besi Struktur Pengendali Terminal End (Sleeve Beam) Galian Tanah Urugan Kembali Galian Tanah Urugan Pasir di Bawah Pondasi Bekisting Pondasi Cor Pondasi Beton Ongkos Angkut ke Lokasi
2.02.03.02.01.032
1 Unit Pengadaan dan Pemasangan Paku Jalan Ukuran 10 x 10 x 2 cm Alluminium Alloy (10 x 10 x 2 cm) Reflektor (mata Kucing) Lem mixed Epoxy Adhesive Pengeboran dan Pemasangan Paku Jalan Ongkos Angkut ke Lokasi
1.08.23.01.01.023.007 1.08.24.03.01.999.028 1.08.23.01.01.043.015 2.02.03.02.01.009 2.02.03.02.01.008
KOEF
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT Unit
4.3930 8.0000 0.6667 1.0000 1.0000
kg Buah Btg Unit m2
HARGA SATUAN Nilai HSPK (Dibulatkan): 12,100.00 6,150.00 853,750.00 13,000.00 1,015,200.00
1.0000 0.8100 1.0000 14.3100 1.0000 0.1100 0.2500 0.0400 1.1200 1.0000
Buah m2 Unit cm Unit m3 m3 m3 m2 Buah
8,400.00 113,400.00 9,100.00 5,200.00 45,600.00 1,183,700.00 70,800.00 221,600.00 73,500.00 18,300.00
Unit
3.0000 5.2500 10.0000 14.0000 3.0000 1.0000 3.0000 2.0000 3.9200 3.9200 0.4600 13.6300 1.1900 1.0000
Buah m' Buah Buah Buah Batang Batang Buah m3 m3 m3 m3 m3 Buah Unit
3.0000 2.2500 10.0000 14.0000 3.0000 1.0000 3.0000 2.0000 1.6800 1.6800 0.2000 5.8400 0.5100 1.0000
Buah m' Buah Buah Buah Batang Batang Buah m3 m3 m3 m3 m3 Buah Unit
1.0000 2.0000 0.1300 1.0000 1.0000
189
Buah Buah Kg ls ls
Nilai HSPK (Dibulatkan): 82,000.00 30,000.00 8,400.00 9,050.00 7,800.00 1,092,300.00 847,200.00 431,600.00 70,800.00 23,600.00 221,600.00 73,500.00 1,183,700.00 64,200.00 Nilai HSPK (Dibulatkan):
JUMLAH HARGA 2,186,500.00
8,400.00 91,854.00 9,100.00 74,412.00 45,600.00 130,207.00 17,700.00 8,864.00 82,320.00 18,300.00
53,155.30 49,200.00 569,195.13 13,000.00 1,015,200.00
8,081,300.00
246,000.00 157,500.00 84,000.00 126,700.00 23,400.00 1,092,300.00 2,541,600.00 863,200.00 277,536.00 92,512.00 101,936.00 1,001,805.00 1,408,603.00 64,200.00 6,344,700.00
82,000.00 30,000.00 8,400.00 9,050.00 7,800.00 1,092,300.00 847,200.00 431,600.00 70,800.00 23,600.00 221,600.00 73,500.00 1,183,700.00 64,200.00
246,000.00 67,500.00 84,000.00 126,700.00 23,400.00 1,092,300.00 2,541,600.00 863,200.00 118,944.00 39,648.00 44,320.00 429,240.00 603,687.00 64,200.00
Nilai HSPK (Dibulatkan): 63,669.00 93,500.00 175,800.00 36,000.00 3,200.00
312,700.00 63,669.00 187,000.00 22,854.00 36,000.00 3,200.00
KODE BARANG 2.02.03.02.01.033 1.08.23.01.01.023.008 1.08.24.03.01.999.028 1.08.23.01.01.043.015 2.02.03.02.01.009 2.02.03.02.01.008 2.02.03.02.01.034 1.08.24.03.01.999.006 1.08.23.01.01.043.015 2.02.03.02.01.010 2.02.03.02.01.008 2.02.03.02.01.035
URAIAN KEGIATAN 1 Unit Pengadaan dan Pemasangan Paku Jalan Ukuran 10 x 12 x 2 cm Alluminium Alloy (10 x 12 x 2 cm) Reflektor (mata Kucing) Lem mixed Epoxy Adhesive Pengeboran dan Pemasangan Paku Jalan Ongkos Angkut ke Lokasi
KOEF
1.0000 2.0000 0.1300 1.0000 1.0000
1 Unit Pengadaan dan Pemasangan Paku Jalan Bulat (Tempered) Paku Jalan Bulat Lem mixed Epoxy Adhesive Pengeboran dan Pemasangan Paku Jalan Bulat (Tempered) Ongkos Angkut ke Lokasi
SAT Unit Buah Buah Kg Unit Unit Unit
HARGA SATUAN Nilai HSPK (Dibulatkan): 98,700.00 93,500.00 175,800.00 36,000.00 3,200.00
JUMLAH HARGA 347,800.00
364,500.00
98,700.00 187,000.00 22,854.00 36,000.00 3,200.00
1.0000 0.2300 1.0000
Buah Kg Unit
Nilai HSPK (Dibulatkan): 270,500.00 175,800.00 50,400.00
1.0000
Unit
3,200.00
3,200.00
Unit
823,200.00
270,500.00 40,434.00 50,400.00
1.08.24.03.01.055.002 1.08.24.03.01.999.029
1 Unit Pengadaan dan Pemasangan Patok Tikungan Pipa Plastik Delineator Pipa Plastik Reflektor High Intensity Grade uk. 10 x 20 cm
1.0000 2.0000
Buah Buah
Nilai HSPK (Dibulatkan): 383,600.00 97,000.00
1.08.23.01.01.006.001 2.01.01.03.01.005 2.01.01.01.02.001 2.01.01.01.02.009 2.01.01.01.02.019 2.02.03.02.01.001 2.02.03.02.01.005
Cat Cor Pondasi Beton Galian Tanah Urugan Kembali Galian Tanah Urugan Pasir di Bawah Pondasi Bekisting Beton Patok Tikungan Ongkos Angkut ke Lokasi
0.3400 0.1000 0.1800 0.1800 0.0400 0.8000 1.0000
Kg m3 m3 m3 m3 m3 Buah
71,500.00 1,183,700.00 70,800.00 23,600.00 221,600.00 73,500.00 18,300.00
24,310.00 118,370.00 12,744.00 4,248.00 8,864.00 58,800.00 18,300.00
2.02.03.02.01.036
1 Unit Pengadaan dan Pemasangan Patok Tikungan Pipa Besi Delineator Pipa Besi Reflektor High Intensity Grade 10 x 20 cm Cat Cor Pondasi Beton Galian Tanah Urugan Kembali Galian Tanah Urugan Pasir di Bawah Pondasi Bekisting Beton Patok Tikungan Ongkos Angkut ke Lokasi
Unit
Nilai HSPK (Dibulatkan): 245,400.00 97,000.00 71,500.00 1,183,700.00 70,800.00 23,600.00 221,600.00 73,500.00 18,300.00
685,000.00
Nilai HSPK (Dibulatkan): 82,000.00 30,000.00 6,150.00 853,750.00 13,000.00 4,508,300.00
5,769,400.00
9,100.00 5,200.00 45,600.00 1,183,700.00 70,800.00 23,600.00 221,600.00 73,500.00 18,300.00
9,100.00 20,800.00 45,600.00 284,088.00 21,240.00 7,080.00 6,648.00 84,525.00 18,300.00
Nilai HSPK (Dibulatkan): 12,100.00 92,400.00 4,300.00 20,600.00 8,500.00 13,400.00
16,649,900.00
1.08.24.03.01.055.001 1.08.24.03.01.999.029 1.08.23.01.01.006.001 2.01.01.03.01.005 2.01.01.01.02.001 2.01.01.01.02.009 2.01.01.01.02.019 2.02.03.02.01.001 2.02.03.02.01.005 2.02.03.02.01.037 1.08.23.01.01.008.052 1.08.23.01.01.008.056 1.08.23.01.01.027.015 1.08.24.02.07.001.040 1.08.24.03.01.050.002 1.08.24.03.01.053.003 2.02.03.02.01.002 2.01.01.07.03.005 2.02.03.02.01.003 2.01.01.03.01.005 2.01.01.01.02.001 2.01.01.01.02.009 2.01.01.01.02.019 2.02.03.02.01.001 2.02.03.02.01.005 2.02.03.02.01.038 1.08.23.01.01.008.031 1.08.23.01.01.008.080 1.08.23.01.01.027.017 1.08.23.01.01.008.081 1.08.24.03.01.999.030 1.08.23.01.01.999.013
1.0000 2.0000 0.3400 0.1000 0.1800 0.1800 0.0400 0.8000 1.0000
1 Unit Pengadaan dan Pemasangan Cermin Tikungan Besi Pengikat Galvanis Angkur Besi Siku Ukuran 30 x 30 x 3 mm Mur Baut 10 cm Pipa Galvanis 2" Medium A Tutup Pipa Diameter 2 " Cermin Arcyclic Cembung Diameter 90 cm s/d 100 cm Pemotongan Pengelasan Perakitan dan Penyetelan Cor Pondasi Beton Galian Tanah Urugan Kembali Galian Tanah Urugan pasir di Bawah Pondasi Bekisting Pondasi Ongkos Angkut ke Lokasi 1 Unit Pengadaan dan Pemasangan RPPJ 120 x 180 (Overhead) Besi Siku L30x30x3 Angkur dia 19 mm panjang 60 cm Mur/baut klem Tutup Baut Angkur Rivet / Panel Klem 3x40x450 mm
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
Buah Buah Kg m3 m3 m3 m3 m3 Buah Unit
1.0000 0.6000 4.0000 0.7334 1.0000 1.0000
Buah m Buah Btg Buah Unit
1.0000 4.0000 1.0000 0.2400 0.3000 0.3000 0.0300 1.1500 1.0000
Batang cm Unit m3 m3 m3 m3 m3 Buah Unit
12.9200 4.0000 16.0000 4.0000 22.0000 16.0000
190
Kg Buah Buah Buah Buah Buah
383,600.00 194,000.00
245,400.00 194,000.00 24,310.00 118,370.00 12,744.00 4,248.00 8,864.00 58,800.00 18,300.00
82,000.00 18,000.00 24,600.00 626,140.25 13,000.00 4,508,300.00
156,332.00 369,600.00 68,800.00 82,400.00 187,000.00 214,400.00
KODE BARANG 1.08.24.02.07.999.001 1.08.24.02.07.999.002 1.08.24.02.07.001.040 1.08.24.02.07.001.045 1.08.24.02.07.002.022 1.08.24.02.07.999.003 1.08.24.02.07.999.004 1.08.24.03.01.050.004 1.08.24.03.01.050.007 1.08.24.02.07.999.005 1.08.24.03.01.051.001 1.08.23.03.07.999.070 2.01.01.01.02.004 2.01.01.03.01.005 2.01.01.03.01.014 2.01.01.01.02.020 2.01.01.07.03.001 1.09.27.01.01.008.001 2.02.03.02.01.001 2.02.03.02.01.005 2.02.03.02.01.039 1.08.23.01.01.008.031 1.08.23.01.01.008.080 1.08.23.01.01.027.017 1.08.23.01.01.008.081 1.08.24.03.01.999.030 1.08.23.01.01.999.013 1.08.24.02.07.999.001 1.08.24.02.07.999.002 1.08.24.02.07.001.040 1.08.24.02.07.001.045 1.08.24.02.07.002.022 1.08.24.02.07.999.003 1.08.24.02.07.999.004 1.08.24.03.01.050.004 1.08.24.03.01.050.007 1.08.24.02.07.999.005 1.08.24.03.01.051.002 1.08.23.03.07.999.070 2.01.01.01.02.004 2.01.01.03.01.005 2.01.01.03.01.014 2.01.01.01.02.020 2.02.03.02.01.001 2.01.01.07.03.001 1.09.27.01.01.008.001 2.02.03.02.01.005
URAIAN KEGIATAN Baut/Mur dia. 14 mm untuk flange Flange Pipa dia. 3" t=10 mm Pipa Galvanis Dia. 2" Medium A Pipa Galvanis Dia. 6" Medium A Pipa Hitam dia. 1.5" Rib Base Plate t=10mm Rib Plate Flange Pipa dia 3" t=10 mm Tutup Pipa dia. 3" Tutup Pipa dia. 6" Base Plate (400x400x12 mm) Daun RPPJ 120 x 180 cm dengan reflektif Sheeting tebal 2 mm Logo Kementerian Galian Tanah Keras Pekerjaan Pengecoran Pekerjaan Pembesian Urugan Sirtu di bawah Pondasi Biaya pembuatan/ pengelasan Sewa Crane Bekisting Pondasi Ongkos Angkut ke Lokasi 1 Unit Pengadaan dan Pemasangan RPPJ 120 x 240 (Overhead) Besi Siku L30x30x3 Angkur dia 19 mm panjang 60 cm Mur/baut klem Tutup Baut Angkur Rivet / Panel Klem 3x40x450 mm Baut/Mur dia. 14 mm untuk flange Flange Pipa dia. 3" t=10 mm Pipa Galvanis Dia. 2" Medium A Pipa Galvanis Dia. 6" Medium A Pipa Hitam dia. 1.5" Rib Base Plate t=10mm Rib Plate Flange Pipa dia 3" t=10 mm Tutup Pipa dia. 3" Tutup Pipa dia. 6" Base Plate (400x400x12 mm) Daun RPPJ 120 x 240 cm dengan reflektif Sheeting tebal 2 mm Logo Kementerian Galian Tanah Keras Pekerjaan Pengecoran Pekerjaan Pembesian Urugan Sirtu di bawah Pondasi Bekisting Pondasi Biaya pembuatan/ pengelasan Sewa Crane Kapasitas 5 ton Ongkos Angkut ke Lokasi
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
191
KOEF 8.0000 4.0000 1.0000 1.0000 0.2667 4.0000 24.0000 4.0000 1.0000 1.0000 1.0000
SAT Buah Buah Btg Btg Btg Buah Buah Buah Buah Buah Lembar
1.0000 Buah 0.5600 m3 0.4300 m3 36.0000 kg 0.0500 m3 293.4000 Kg 0.5000 Unit-Hari 3.6000 m3 1.0000 Unit Unit 14.3800 4.0000 16.0000 4.0000 22.0000 16.0000 8.0000 4.0000 1.0000 1.0000 0.2667 4.0000 24.0000 4.0000 1.0000 1.0000 1.0000
Kg Buah Buah Buah Buah Buah Buah Buah Btg Btg Btg Buah Buah Buah Buah Buah Lembar
1.0000 Buah 0.5600 m3 0.4300 m3 36.0000 kg 0.0500 m3 2.8800 m3 293.4000 Kg 0.5000 Unit-Hari 1.0000 Unit
HARGA SATUAN 12,900.00 161,100.00 853,750.00 3,263,000.00 391,600.00 146,800.00 19,000.00 16,800.00 23,300.00 428,500.00 2,241,000.00
JUMLAH HARGA 103,200.00 644,400.00 853,750.00 3,263,000.00 104,439.72 587,200.00 456,000.00 67,200.00 23,300.00 428,500.00 2,241,000.00
19,300.00 94,200.00 1,183,700.00 16,000.00 258,300.00 13,110.00 3,000,000.00 73,500.00 18,300.00
19,300.00 52,752.00 508,991.00 576,000.00 12,915.00 3,846,474.00 1,500,000.00 264,600.00 18,300.00
Nilai HSPK (Dibulatkan): 12,100.00 92,400.00 4,300.00 20,600.00 8,500.00 13,400.00 12,900.00 161,100.00 853,750.00 3,263,000.00 391,600.00 146,800.00 19,000.00 16,800.00 23,300.00 428,500.00 2,933,600.00
17,307,200.00
19,300.00 94,200.00 1,183,700.00 16,000.00 258,300.00 73,500.00 13,110.00 3,000,000.00 18,300.00
19,300.00 52,752.00 508,991.00 576,000.00 12,915.00 211,680.00 3,846,474.00 1,500,000.00 18,300.00
173,998.00 369,600.00 68,800.00 82,400.00 187,000.00 214,400.00 103,200.00 644,400.00 853,750.00 3,263,000.00 104,439.72 587,200.00 456,000.00 67,200.00 23,300.00 428,500.00 2,933,600.00
KODE BARANG 2.02.03.02.01.040
1.08.23.01.01.008.082 1.08.23.01.01.008.083 2.01.01.07.03.005 2.01.01.07.03.005 1.11.29.01.01.005.022 2.01.01.01.02.004 2.01.01.01.02.009 2.01.01.01.02.015 2.01.01.01.02.020 2.01.01.03.01.020
URAIAN KEGIATAN 1 Unit Pengadaan dan Pemasangan RPPJ Portal Bentang 9 m' s/d 11 m' Pipa Galvanis 5" Medium A Pipa Galvanis 3" Medium A Pipa Galvanis 2.5" Medium A Daun RPPJ 120 x 240 cm dengan reflektif Sheeting tebal 2 mm Pelat Tebal 10 mm Angkur Dia 18 dengan Mur Baut Pekerjaan Pengelasan Tiang (1 titik ± 10 cm) Pekerjaan Pengelasan Brancing Pekerjaan Erection Galian Tanah Urugan Kembali Galian Tanah Pemadatan Tanah Urugan Sirtu di bawah Pondasi Pekerjaan Beton Bertulang untuk Pelat Beton
1.11.29.01.01.005.026 2.02.03.02.01.007
Pengecatan Pipa RPPJ Gapura Ongkos Angkut ke Lokasi
2.02.03.02.01.041
1 Unit Pengadaan dan Pemasangan RPPJ Portal Bentang 18 m' Besi Siku L30x30x3 Angkur dia 22 mm panjang 100 cm Mur/baut klem Tutup Baut Angkur Rivet / Panel Klem 3x40x450 mm Klem 3x40x600 mm Baut/Mur dia. 22 mm untuk flange Mur Baut Klem dia. 16" Flange Pipa dia. 3" t=10 mm Pipa Galvanis Dia. 4" Pipa Galvanis Dia. 6" Pipa Galvanis Dia. 12" Pipa Galvanis Dia. 8" Rib Base Plate t=10mm Rib Plate Flange Pipa dia 6" t=6 mm Rib Plate Flange Pipa dia 8" t=6 mm Tutup Pipa dia. 12" Tutup Pipa dia. 6" Tutup Pipa dia. 8" Base Plate (650x650x22 mm) Daun RPPJ 120 x 240 cm dengan reflektif Sheeting tebal 2 mm Logo Kementerian Patok Pengaman (Delineator) Galian Tanah Cor Beton Pondasi ( 80 x 80 x 200 cm ) Cor Tiang Pancang Beton dia. 20 mm Pembesian Urugan Sirtu di bawah Pondasi Bekisting Pondasi Biaya pembuatan/ pengelasan Sewa Crane Kapasitas 5 ton
1.08.24.02.07.001.044 1.08.24.02.07.001.042 1.08.24.02.07.001.041 1.08.24.03.01.051.002
1.08.23.01.01.008.031 1.08.23.01.01.008.084 1.08.23.01.01.027.017 1.08.23.01.01.008.081 1.08.24.03.01.999.030 1.08.23.01.01.999.013 1.08.23.01.01.999.013 1.08.24.02.07.999.001 1.08.23.01.01.027.017 1.08.24.02.07.999.002 1.08.24.02.07.001.032 1.08.24.02.07.001.034 1.08.24.02.07.999.006 1.08.24.02.07.999.007 1.08.24.02.07.999.003 1.08.24.02.07.999.008 1.08.24.02.07.999.009 1.08.24.02.07.999.010 1.08.24.03.01.050.007 1.08.24.02.07.999.011 1.08.24.02.07.999.012 1.08.24.03.01.051.001 1.08.23.03.07.999.070 1.08.24.03.01.999.004 2.01.01.01.02.001 2.01.01.03.01.005 2.01.01.03.01.005 2.01.01.03.01.014 2.01.01.01.02.020 2.02.03.02.01.001 2.01.01.07.03.001 1.09.27.01.01.008.001
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
192
KOEF
4.0000 5.0000 2.0000 1.0000
SAT Unit Batang Batang Batang Lembar
HARGA SATUAN Nilai HSPK (Dibulatkan): 2,741,000.00 1,406,800.00 1,088,950.00 2,933,600.00
JUMLAH HARGA 51,634,800.00 10,964,000.00 7,034,000.00 2,177,900.00 2,933,600.00
0.6700 16.0000 480.0000 300.0000 1.0000 3.0000 3.0000 1.2914 0.3200 1.7600
m2 Buah cm cm Unit m3 m3 m3 m3 m3
2,446,200.00 86,400.00 5,200.00 5,200.00 4,383,700.00 94,200.00 23,600.00 51,500.00 258,300.00 7,930,200.00
1,638,954.00 1,382,400.00 2,496,000.00 1,560,000.00 4,383,700.00 282,600.00 70,800.00 66,507.10 82,656.00 13,957,152.00
1.0000 1.0000
Unit Unit
1,108,800.00 1,495,700.00
1,108,800.00 1,495,700.00
Unit
Nilai HSPK (Dibulatkan): 12,100.00 105,800.00 4,300.00 20,600.00 8,500.00 13,400.00 13,400.00 12,900.00 4,300.00 161,100.00 1,697,300.00 2,654,100.00 1,356,800.00 812,500.00 146,800.00 146,800.00 43,400.00 39,000.00 23,300.00 27,300.00 1,092,000.00 2,241,000.00
146,484,200.00
19,300.00 401,900.00 70,800.00 1,183,700.00 1,183,700.00 16,000.00 258,300.00 73,500.00 13,110.00 3,000,000.00
77,200.00 2,411,400.00 79,296.00 1,515,136.00 284,088.00 2,265,600.00 49,077.00 940,800.00 47,232,445.80 3,000,000.00
60.8000 12.0000 36.0000 12.0000 18.0000 6.0000 6.0000 96.0000 8.0000 8.0000 6.5830 3.1667 14.0000 19.0000 12.0000 54.0000 54.0000 2.0000 2.0000 2.0000 2.0000 6.6667
Kg Buah Buah Buah Buah Buah Buah Buah Buah Buah Ljr Batang m' m' Buah Buah Buah Buah Buah Buah Buah Lembar
4.0000 Buah 6.0000 Buah 1.1200 m3 1.2800 m3 0.2400 m3 141.6000 Kg 0.1900 m3 12.8000 m3 3,602.7800 Kg 1.0000 Unit-Hari
735,680.00 1,269,600.00 154,800.00 247,200.00 153,000.00 80,400.00 80,400.00 1,238,400.00 34,400.00 1,288,800.00 11,173,325.90 8,404,738.47 18,995,200.00 15,437,500.00 1,761,600.00 7,927,200.00 2,343,600.00 78,000.00 46,600.00 54,600.00 2,184,000.00 14,940,074.70
KODE BARANG 2.02.03.03 2.02.03.03.01 2.02.03.03.01.001 1.11.29.01.01.002.013 1.11.29.01.01.002.014 1.08.23.01.01.020.001 1.08.23.03.01.999.005
URAIAN KEGIATAN L. TAMAN & KEBERSIHAN Taman 1 m3 Penyiapan Bibit Tanaman/ Pemutaran Tanaman (Vol 0.063 m3) Tukang Taman Pekerja Terampil Glangsing Tali Rafia
2.02.03.03.01.002
1 m3 Tanah Taman (Terolah)
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.01.01.004.009
Mandor Pekerja Terampil Tanah Taman
2.02.03.03.01.003
Pengapuran dan Pengecatan 1 Batang Pohon
1.11.29.01.01.001.001 1.11.29.01.01.001.004 1.11.29.01.01.002.003 1.08.23.01.01.006.026 1.08.23.01.01.006.016 1.08.23.01.01.006.031
Mandor Kepala Tukang Cat Tukang Cat Cat Tembok Cat Kayu Minyak Cat / Afduner
2.02.03.03.01.004
1 m2 Membabat/ Merapikan Rumput Tinggi < 20 cm Mandor Tukang Taman Pekerja Terampil
1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.11.29.01.01.002.014 2.02.03.03.01.005 1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.11.29.01.01.002.014 2.02.03.03.01.006 1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.11.29.01.01.002.014 2.02.03.03.01.007
KOEF
0.2000 0.1000 1.0000 0.2500
0.0100 0.2500 0.2500
m3
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 3,250.00 21,700.00
39,700.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 729,750.00
206,200.00
Nilai HSPK (Dibulatkan): 130,000.00 120,000.00 110,000.00 141,700.00 77,500.00 24,500.00
18,700.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00
2,100.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00
3,200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00
5,200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00
7,400.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 36,000.00
49,900.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 6,350.00
21,200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00
11,500.00
O.H O.H Buah Roll
O.H O.H Rit Batang
0.0020 0.0059 0.0585 0.0500 0.0500 0.0150
1 m2 Membabat/ Merapikan Rumput 20 cm < Tinggi < 50 cm Mandor Tukang Taman Pekerja Terampil
O.H O.H O.H Galon Kg Liter m2
0.0005 0.0100 0.0100
O.H O.H O.H m2
0.0005 0.0200 0.0100
1 m2 Membabat/ Merapikan Rumput Tinggi > 50 cm Ringan Mandor Tukang Taman Pekerja Terampil
1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.11.29.01.01.002.014 2.02.03.03.01.008
1 m2 Menanam Rumput Manila Sistem Tandur
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.05.19.02.04.025.013
Mandor Pekerja Terampil Rumput Manila Tandur
2.02.03.03.01.009
1 m2 Menanam Rumput Lamur
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.05.19.02.04.025.001
Mandor Pekerja Terampil Rumput Lamur (Embun)
2.02.03.03.01.010
1 m2 Mengolah Tanah (Mencangkul) Sedalam 30 cm Mandor Tukang Taman
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
HARGA SATUAN
m3
1 m2 Membabat/ Merapikan Rumput Tinggi > 50 cm Berat Mandor Tukang Taman Pekerja Terampil
1.11.29.01.01.001.001 1.11.29.01.01.002.013
SAT
O.H O.H O.H m2
0.0005 0.0300 0.0200
O.H O.H O.H m2
0.0005 0.0300 0.0450
O.H O.H O.H m2
0.0200 0.1250 1.0000
O.H O.H m2 m2
0.0100 0.1500 1.0000
193
O.H O.H m2 m2
0.0035 0.1000
O.H O.H
JUMLAH HARGA
22,000.00 9,000.00 3,250.00 5,425.00
1,300.00 22,500.00 182,437.50
260.00 708.00 6,435.00 7,085.00 3,875.00 367.50
65.00 1,100.00 900.00
65.00 2,200.00 900.00
65.00 3,300.00 1,800.00
65.00 3,300.00 4,050.00
2,600.00 11,250.00 36,000.00
1,300.00 13,500.00 6,350.00
455.00 11,000.00
KODE BARANG 2.02.03.03.01.011
URAIAN KEGIATAN 1 m2 Ongkos kerja Menanam Tanaman Pagar
1.11.29.01.01.001.001 1.11.29.01.01.002.013
Mandor Tukang Taman
2.02.03.03.01.012 1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.03.004.004 1.08.23.01.01.999.002 1.08.23.01.01.004.009 1.05.19.02.07.002.020
1 Batang Penanaman Pohon Pelindung Mahoni t = 1.5 m Mandor Tukang Taman Mahoni Tinggi 1.5 m Ajir Tanah taman Pupuk Kandang
2.02.03.03.01.013
1 m2 Ongkos Menanam Semak Hias (15 Batang)
1.11.29.01.01.001.001 1.11.29.01.01.002.013
Mandor Tukang Taman
2.02.03.03.01.014
1 Batang Pemijahan Bibit Taman (Batang Pohon)
1.11.29.01.01.002.013 1.11.29.01.01.002.014 1.08.23.01.01.004.009 1.05.19.02.07.002.020 1.08.23.01.01.020.001
Tukang Taman Pekerja Terampil Tanah Taman Pupuk Kandang Kantong Plastik 15 x 22 cm
2.02.03.03.01.015
1 Batang Penanaman Pohon Pelindung Tanjung t = 1.5 m Mandor Tukang Taman Tanjung Tinggi 1.5 m Ajir Tanah taman Pupuk Kandang
1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.04.015.002 1.08.23.01.01.999.002 1.08.23.01.01.004.009 1.05.19.02.07.002.020 2.02.03.03.01.016 1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.04.026.003 1.08.23.01.01.999.002 1.08.23.01.01.004.009 1.05.19.02.07.002.020 2.02.03.03.01.017 1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.03.006.002 1.08.23.01.01.999.002 1.08.23.01.01.004.009 1.05.19.02.07.002.020 2.02.03.03.01.018 1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.04.999.090 1.08.23.01.01.999.002 1.08.23.01.01.004.009 1.05.19.02.07.002.020
KOEF
0.0050 0.1000
0.0200 0.4000 1.0000 0.0600 0.0025 0.0100
O.H O.H Batang Batang Rit m3 m2 O.H O.H Batang
0.0400 0.0400 0.0003 0.0010 1.0000
O.H O.H Rit m3 Lembar Batang
0.0200 0.4000 1.0000 0.0600 0.0025 0.0100
O.H O.H Batang Batang Rit m3 Batang
0.0200 0.4000 1.0000 0.0600 0.0025 0.0100
1 Batang Penanaman Pohon Pelindung Sono t = 1.5 m Mandor Tukang Taman Pohon Sono Tinggi 1.5 m Ajir Tanah taman Pupuk Kandang 1 Batang Penanaman Pohon Pelindung Bintaro t = 1.5 m Mandor Tukang Taman Pohon Bintaro Tinggi 2 - 3 m Ajir Tanah taman Pupuk Kandang
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
O.H O.H Batang
0.0200 0.3300
1 Batang Penanaman Pohon Pelindung Spathodea t = 1.5 m Mandor Tukang Taman Spathodea Tinggi 1.5 m Ajir Tanah taman Pupuk Kandang
SAT m2
194
O.H O.H Batang Batang Rit m3 Batang
0.0200 0.4000 1.0000 0.0600 0.0025 0.0100
O.H O.H Batang Batang Rit m3 Batang
0.0200 0.4000 1.0000 0.0600 0.0025 0.0100
O.H O.H Batang Batang Rit m3
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 110,000.00
JUMLAH HARGA 11,700.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 141,600.00 181,450.00 729,750.00 101,150.00
201,900.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00
38,900.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 729,750.00 101,150.00 3,250.00
11,600.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 142,100.00 181,450.00 729,750.00 101,150.00
202,400.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 101,150.00 181,450.00 729,750.00 101,150.00
161,500.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 233,600.00 181,450.00 729,750.00 101,150.00
293,900.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 124,400.00 181,450.00 729,750.00 101,150.00
184,700.00
650.00 11,000.00
2,600.00 44,000.00 141,600.00 10,887.00 1,824.38 1,011.50
2,600.00 36,300.00
4,400.00 3,600.00 218.93 101.15 3,250.00
2,600.00 44,000.00 142,100.00 10,887.00 1,824.38 1,011.50
2,600.00 44,000.00 101,150.00 10,887.00 1,824.38 1,011.50
2,600.00 44,000.00 233,600.00 10,887.00 1,824.38 1,011.50
2,600.00 44,000.00 124,400.00 10,887.00 1,824.38 1,011.50
KODE BARANG 2.02.03.03.01.019
URAIAN KEGIATAN Perawatan 1000 Batang Mangrove
KOEF
1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.08.23.03.06.010.002 1.08.23.01.01.999.002 1.05.19.02.04.999.183 1.05.19.02.07.002.024 1.09.27.02.01.001.010 1.09.27.01.02.999.026 1.09.27.01.02.999.027 1.09.27.01.02.999.028 1.09.27.01.02.999.029
Mandor Tukang Tanam Baterai Kecil ex. ABC Ajir (2m) Penggantian Tanaman Pupuk daun @ 100 gr Sewa Mobil Pick up Sewa Rakit Sewa Hand Spray Sewa Cutter Sewa Senter
0.3000 3.0000 16.0000 100.0000 250.0000 12.0000 1.0000 1.0000 3.0000 3.0000 3.0000
2.02.03.03.01.020
Penanaman 1000 Batang Mangrove
1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.08.23.03.06.010.002 1.05.19.02.04.999.183 1.08.23.01.01.999.002 1.09.27.01.02.999.028 1.09.27.01.02.999.029 1.09.27.01.02.999.007 1.09.27.01.02.999.026 E08
Mandor Tukang Tanam Batteray kecil Mangrove T. 1M Ajir (2m) Sewa Cutter Sewa Senter Sewa Linggis Sewa Rakit Sewa Truk
2.02.03.03.01.021
Penanaman 1 Batang Mangrove
1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.08.23.03.06.010.002 1.05.19.02.04.999.183 1.08.23.01.01.999.002 E08 1.09.27.01.02.999.026 1.09.27.01.02.999.026
Mandor Tukang Tanam Batteray kecil Mangrove T. 1M Ajir (2m) Sewa Truk Sewa Rakit Sewa Perahu
2.02.03.03.01.022
Perawatan 1 Batang Mangrove (Batang Pohon)
1.11.29.01.01.001.001 1.11.29.01.01.002.014 1.08.23.03.06.010.002 1.08.23.01.01.999.002 1.05.19.02.07.002.024 1.09.27.02.01.001.010 1.09.27.01.02.999.026 1.09.27.01.02.999.027 1.09.27.01.02.999.026
Mandor Pekerja Terampil Batteray kecil Bambu (Ajir) Pupuk daun Sewa Mobil Pick up Sewa Rakit Sewa Sprayer Sewa Perahu
2.02.03.03.01.023
1 Batang Penanaman Pohon Semak ex. Agave T = 1m Mandor Tukang Taman Agave Hijau T = 1 m Tanah taman Pupuk Kandang
1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.04.001.001 1.08.23.01.01.004.009 1.05.19.02.07.002.020 2.02.03.03.01.024 1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.04.024.003 1.08.23.01.01.004.009 1.05.19.02.07.002.020
0.8000 8.0000 38.0000 1,000.0000 100.0000 8.0000 9.0000 8.0000 2.0000 0.6250
0.0008 0.0080 0.0360 1.0000 0.0100 0.0065 0.0020 0.0020
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
30,102,500.00
Batang
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 15,450.00 9,800.00 181,450.00 336,248.16 36,400.00 36,400.00
15,500.00
Nilai HSPK (Dibulatkan): 130,000.00 90,000.00 15,450.00 181,450.00 7,050.00 372,450.00 36,400.00 11,800.00 36,400.00
19,300.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 102,000.00 729,750.00 101,150.00
151,400.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 86,150.00 729,750.00 101,150.00
135,600.00
O.H O.H Buah Batang Batang Jam Buah Hari
O.H O.H Buah Batang Kg Buah Buah Buah Hari
O.H O.H Batang Rit m3 Pohon
0.0200 0.4000 1.0000 0.0025 0.0100
195
39,000.00 330,000.00 247,200.00 18,145,000.00 2,450,000.00 84,600.00 372,450.00 36,400.00 35,400.00 3,000.00 82,200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 15,450.00 9,800.00 181,450.00 1,000.00 27,400.00 6,100.00 36,400.00 336,248.16
Pohon 0.0200 0.4000 1.0000 0.0025 0.0100
JUMLAH HARGA 21,825,300.00
1000 Batang O.H O.H Buah Batang Batang Buah Buah Buah Hari Jam
Batang 0.0003 0.0030 0.0160 0.1000 0.0120 0.0010 0.0010 0.0030 0.0010
1 Batang Penanaman Pohon Semak ex. Anglonema Mandor Tukang Taman Anglonema Sumatera Tanah taman Pupuk Kandang
SAT HARGA SATUAN 1000 Nilai HSPK Batang (Dibulatkan): O.H 130,000.00 OH 110,000.00 Buah 15,450.00 Batang 181,450.00 Batang 9,800.00 Bungkus 7,050.00 Hari 372,450.00 Hari 36,400.00 Hari 11,800.00 Buah 1,000.00 Buah 27,400.00
O.H O.H Batang Rit m3
104,000.00 880,000.00 587,100.00 9,800,000.00 18,145,000.00 8,000.00 246,600.00 48,800.00 72,800.00 210,155.10
104.00 880.00 556.20 9,800.00 1,814.50 2,185.61 72.80 72.80
39.00 270.00 247.20 18,145.00 84.60 372.45 36.40 35.40 36.40
2,600.00 44,000.00 102,000.00 1,824.38 1,011.50
2,600.00 44,000.00 86,150.00 1,824.38 1,011.50
KODE BARANG 2.02.03.03.01.025 1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.04.003.001 1.08.23.01.01.004.009 1.05.19.02.07.002.020 2.02.03.03.01.026
URAIAN KEGIATAN 1 Batang Penanaman Pohon Semak ex. Bougenvile Mandor Tukang Taman Bougenvile Pagar Tanah taman Pupuk Kandang
KOEF
0.0200 0.4000 1.0000 0.0025 0.0100
1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.04.035.001 1.08.23.01.01.004.009 1.05.19.02.07.002.020
1 Batang Penanaman Pohon Semak ex. Cendrawasih Mandor Tukang Taman Cendrawasih Tanah taman Pupuk Kandang
2.02.03.03.01.027
1 Batang Penanaman Pohon Semak ex. Drasena
1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.04.036.001 1.08.23.01.01.004.009 1.05.19.02.07.002.020
Mandor Tukang Taman Drasena Tanah taman Pupuk Kandang
2.02.03.03.01.028 1.11.29.01.01.001.001 1.11.29.01.01.002.013 1.05.19.02.04.037.001 1.08.23.01.01.004.009 1.05.19.02.07.002.020
1 Batang Penanaman Pohon Semak ex. Elfak Merah Mandor Tukang Taman Elfak Merah Tanah taman Pupuk Kandang
2.02.03.03.02 2.02.03.03.02.001
Pemeliharaan Taman 1 m2 Penyapuan Taman
1.11.29.01.01.002.014 1.08.23.03.07.999.071 1.08.23.01.01.020.001 1.08.23.03.05.001.006 1.08.23.03.05.004.013
Tukang Sapu Seragam Glangsing Sapu Lidi Sekrop Sampah ex. Beta Lion Star
2.02.03.03.02.002
1 m2 Penyiraman Taman
1.11.29.01.01.002.013 1.11.29.01.01.002.014 1.08.23.03.07.999.071 1.08.23.01.04.002.001 1.08.23.01.04.001.001 1.09.27.01.02.002.001
Tukang Taman Pekerja Tak Terampil Seragam Oli Pompa Air Bensin Pompa Air Sewa Pompa Air + Selang Plastik
2.02.03.03.02.003
1 m2 Pemotongan Rumput
1.11.29.01.01.002.014 1.08.23.03.07.999.071 1.08.23.01.04.002.001 1.08.23.01.04.001.001 1.08.23.01.01.020.001 1.09.27.01.02.999.003
Tukang Potong Rumput Seragam Oli Mesin Potong Rumput Bensin Mesin Potong Rumput Glangsing Sewa Mesin Pemotong Rumput (Chainsaw Gendong)
2.02.03.03.02.004
1 m2 Pemangkasan Semak Hias
1.11.29.01.01.002.014 1.08.23.03.07.999.071 1.08.23.01.01.020.001 1.09.27.01.02.999.030
Tukang Pangkas Seragam Glangsing Gunting Pangkas
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
SAT Pohon O.H O.H Batang Rit m3 Pohon
0.0200 0.4000 1.0000 0.0025 0.0100
O.H O.H Batang Rit m3 Pohon
0.0200 0.4000 1.0000 0.0025 0.0100
O.H O.H Pot Rit m3 Pohon
0.0200 0.4000 1.0000 0.0025 0.0100
O.H O.H Pot Rit m3
m2 0.0020 0.0001 0.0001 0.0001 0.0001
O.H Buah Buah Buah Buah m2
0.0002 0.0013 0.0001 0.0001 0.0001 0.0008
O.H O.H Buah Liter Liter Jam m2
0.0020 0.0001 0.0001 0.0001 0.0001 0.0001
O.H Buah Liter Liter Buah Hari
m2 0.0025 0.0001 0.0001 0.0001
196
O.H Buah Buah Hari
HARGA SATUAN Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 66,750.00 729,750.00 101,150.00
JUMLAH HARGA 116,200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 19,400.00 729,750.00 101,150.00
68,800.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 34,650.00 729,750.00 101,150.00
84,100.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 48,450.00 729,750.00 101,150.00
97,900.00
Nilai HSPK (Dibulatkan): 90,000.00 106,100.00 3,250.00 23,200.00 44,650.00
200.00
Nilai HSPK (Dibulatkan): 110,000.00 90,000.00 106,100.00 42,300.00 8,350.00 36,000.00
200.00
Nilai HSPK (Dibulatkan): 90,000.00 106,100.00 42,300.00 8,350.00 3,250.00 46,600.00
200.00
Nilai HSPK (Dibulatkan): 90,000.00 106,100.00 3,250.00 316,400.00
300.00
2,600.00 44,000.00 66,750.00 1,824.38 1,011.50
2,600.00 44,000.00 19,400.00 1,824.38 1,011.50
2,600.00 44,000.00 34,650.00 1,824.38 1,011.50
2,600.00 44,000.00 48,450.00 1,824.38 1,011.50
180.00 10.61 0.33 2.32 4.47
22.00 117.00 10.61 4.23 0.84 28.80
180.00 10.61 4.23 0.84 0.33 4.66
225.00 10.61 0.33 31.64
KODE BARANG 2.02.03.03.02.005 1.11.29.01.01.002.013 1.08.23.03.07.999.071 1.05.19.02.07.002.020 1.05.19.02.07.002.040 1.08.23.04.03.001.030
URAIAN KEGIATAN 1 m2 Pemupukan, Pemberantasan Hama, dan Pendangiran Tukang Taman Seragam Pupuk Kandang NPK Obat Hama
2.02.03.03.02.006
1 m2 Angkut Sampah Taman
1.11.29.01.02.001.001 1.11.29.01.01.002.014 1.08.23.01.04.001.001 1.09.27.02.01.001.010
Sopir Pekerja Tak Terampil BBM Sewa Mobil Pick Up
2.02.03.03.02.007
1 m2 Pemberantasan Hama Rayap/Termite Control Mandor Mekanik Pekerja Tak Terampil Imidacloprid 200 gr
1.11.29.01.01.001.001 1.11.29.01.02.001.002 1.11.29.01.01.002.014 1.08.23.04.03.001.030
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
0.0085 0.0001 0.0001 0.0004 0.0001
SAT m2 O.H Buah m3 Kg Liter m2
0.0001 0.0001 0.0011 0.0004
O.H O.H Liter Jam m2
0.0150 0.0350 0.3500 0.2100
197
O.H O.H O.H Liter
HARGA SATUAN Nilai HSPK (Dibulatkan): 110,000.00 106,100.00 101,150.00 22,600.00 175,800.00
JUMLAH HARGA 1,000.00
Nilai HSPK (Dibulatkan): 120,000.00 90,000.00 8,350.00 372,450.00
200.00
Nilai HSPK (Dibulatkan): 130,000.00 110,000.00 90,000.00 175,800.00
74,200.00
935.00 10.61 10.12 9.04 17.58
12.00 9.00 9.19 148.98
1,950.00 3,850.00 31,500.00 36,918.00
KODE BARANG 2.02.04 2.02.04.01 2.02.04.01.01 2.02.04.01.01.001
URAIAN KEGIATAN PERAWATAN KENDARAAN M. SERVICE KENDARAAN Service Ringan Truck Besar Service Radiator
1.11.29.01.02.001.004 1.11.29.01.02.001.002
Pembantu Mekanik Mekanik
2.02.04.01.01.002
Tune Up (Tahun)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.01.003
Ganti Pangkon Mesin (Tahun)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.01.004
Ganti Oli Lengkap (Tahun)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.01.005
Ganti / Penyetelan Nozzle
1.11.29.01.02.001.002
Mekanik
2.02.04.01.01.006
Ganti Master Rem Set
1.11.29.01.02.001.002
Mekanik
2.02.04.01.01.007
Ganti Master Kopling Set
1.11.29.01.02.001.002
Mekanik
2.02.04.01.01.008
Ganti Cross Joint
1.11.29.01.02.001.002
Mekanik
2.02.04.01.02 2.02.04.01.02.001
Service Sedang Truck Besar Overhoul Master Rem dan Ganti Kampas Rem
1.11.29.01.02.001.002
Mekanik
2.02.04.01.02.002 1.11.29.01.02.001.002
Overhoul Master Kopling dan Ganti Kampas Kopling (Tahun) Mekanik
2.02.04.01.02.003
Ganti Bearing Roda Lengkap Depan & Belakang
1.11.29.01.02.001.002
Mekanik
2.02.04.01.02.004
Ganti Per
1.11.29.01.02.001.002
Mekanik
2.02.04.01.02.005
Skur Klep
1.11.29.01.02.001.002
Mekanik
2.02.04.01.03 2.02.04.01.03.001
Service Berat Truck Besar Membongkar / Ganti Seker dan Ring Seker Set
1.11.29.01.02.001.002
Mekanik
2.02.04.01.03.002
Over Houl Set
1.11.29.01.02.001.002 1.11.29.01.02.001.012
Mekanik Colter & Kalibrasi
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
1.0000 5.0000
SAT
HARGA SATUAN
Unit
Nilai HSPK (Dibulatkan): 90,000.00 110,000.00
640,000.00
Nilai HSPK (Dibulatkan): 110,000.00
2,530,000.00
Nilai HSPK (Dibulatkan): 110,000.00
660,000.00
Nilai HSPK (Dibulatkan): 110,000.00
1,045,000.00
Nilai HSPK (Dibulatkan): 110,000.00
91,700.00
Nilai HSPK (Dibulatkan): 110,000.00
352,000.00
Nilai HSPK (Dibulatkan): 110,000.00
484,000.00
Nilai HSPK (Dibulatkan): 110,000.00
330,000.00
Nilai HSPK (Dibulatkan): 110,000.00
1,430,000.00
Nilai HSPK (Dibulatkan): 110,000.00
1,815,000.00
Nilai HSPK (Dibulatkan): 110,000.00
3,520,000.00
Nilai HSPK (Dibulatkan): 110,000.00
2,090,000.00
Nilai HSPK (Dibulatkan): 110,000.00
990,000.00
Nilai HSPK (Dibulatkan): 110,000.00
5,005,000.00
Nilai HSPK (Dibulatkan): 110,000.00 425,000.00
31,662,500.00
O.H O.H Unit
23.0000
O.H Unit
6.0000
O.H Unit
9.5000
O.H Unit
0.8334
O.H Unit
3.2000
O.H Unit
4.4000
O.H Unit
3.0000
O.H
Unit 13.0000
O.H Unit
16.5000
O.H Unit
32.0000
O.H Unit
19.0000
O.H Unit
9.0000
O.H
Unit 45.5000
O.H Unit
85.0000 52.5000
198
O.H O.H
JUMLAH HARGA
90,000.00 550,000.00
2,530,000.00
660,000.00
1,045,000.00
91,674.00
352,000.00
484,000.00
330,000.00
1,430,000.00
1,815,000.00
3,520,000.00
2,090,000.00
990,000.00
5,005,000.00
9,350,000.00 22,312,500.00
KODE BARANG 2.02.04.01.04 2.02.04.01.04.001
URAIAN KEGIATAN Service Ringan Buldoser Service tip 250 HM (Hour Machine)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.04.002
Service tiap 1000 HM (Hour Machine)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.05 2.02.04.01.05.001
Service Ringan Eskavator Service tiap 250 HM (Hour Machine)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.05.002
Service tiap 500 HM (Hour Machine)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.05.003
Service tiap 1000 HM (Hour Machine)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.05.004
Service tiap 2000 HM (Hour Machine)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.06 2.02.04.01.06.001
Service Ringan Whell Loader Service tiap 250 HM (Hour Machine)
1.11.29.01.02.001.002
Mekanik
2.02.04.01.06.002
Service tiap 1000 HM (Hour Machine)
1.11.29.01.02.001.002
Mekanik
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
KOEF
14.5000
SAT
HARGA SATUAN
set
Nilai HSPK (Dibulatkan): 110,000.00
1,595,000.00
Nilai HSPK (Dibulatkan): 110,000.00
2,090,000.00
Nilai HSPK (Dibulatkan): 110,000.00
1,595,000.00
Nilai HSPK (Dibulatkan): 110,000.00
1,870,000.00
Nilai HSPK (Dibulatkan): 110,000.00
2,090,000.00
Nilai HSPK (Dibulatkan): 110,000.00
2,640,000.00
Nilai HSPK (Dibulatkan): 110,000.00
1,595,000.00
Nilai HSPK (Dibulatkan): 110,000.00
2,090,000.00
O.H set
19.0000
O.H
set 14.5000
O.H set
17.0000
O.H set
19.0000
O.H set
24.0000
O.H
set 14.5000
O.H set
19.0000
199
O.H
JUMLAH HARGA
1,595,000.00
2,090,000.00
1,595,000.00
1,870,000.00
2,090,000.00
2,640,000.00
1,595,000.00
2,090,000.00
LAMPIRAN
ANALISA HSPK FISIK
STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TA 2017
PEMERINTAH KOTA MOJOKERTO 2016
ANALISA HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO 2017 NO
URAIAN
KODE
KOEF
SAT
KET
LAMPIRAN I ANALISA HARGA PENGADAAN AGREGAT KASAR DAN HALUS I 1 2 4
5 6 7 8 9 II 1 2 3 4
6
7
8
9
ASUMSI Bahan dasar Sirtu (material Batu bercampur pasir) diterima di lokasi Alat Pemecah Batu (di Base Camp) Kegiatan dilakukan di dalam lokasi Base Camp Berat Isi Bahan : - Batu / Gravel - Pasir - Batu Pecah Harga Satuan Bahan Dasar : - Batu Kali - Sirtu Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Kapasitas Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Kehilangan Material METHODE PELAKSANAAN Wheel Loader mengangkut Sirtu dari tumpukan dan menuangkannya ke Alat Pemecah Batu. Bahan dasar yang digunakan Sirtu (material Batu bercampur kerikil dan pasir) Dilokasi hooper/Feeder dipasang penyiram air (water sprayer) berfungsi sebagai pencucian bahan dari kotoran (lumpur) Setelah disemprot air Sirtu dimasukkan kedalam pemecah pertama (primary crusher) kapasitas 60 ton/jam (bukaan Jaw 10 cm s.d 20 cm tergantung ukuran boulder) Hasil Primary Crusher disaring memakai Scalping Screen(screen 1) dengan ukuran ayakan #1,5 inch (3,75 cm) atau #2,0 inch (5,00 cm) yg menghasilkan lolos ayakan agregat ukuran (0 - 50) dan tdk lolos agg.(50 - 200) Asumsi material yang lolos saringan (screen1) Asumsi keseluruhannya menghasilkan ukuran (0 - 50) Hasil yang lolos saringan(screen1) sebagai fraksi halus tidak boleh dipakai langsung untuk bahan campuran lapisan perkerasan aspal, tetapi dapat digunakan untuk bahan campuran Agregat kelas B dan S, khusus untuk Agregat A yang digunakan hanya ukuran (0 - 5) Hasil yang tidak lolos screen1 dimasukan ke pemecah kedua (Secondary Crusher) kemudian dipisahkan mempergunakan Screen2 yang menghasilkan ukuran (0 - 5), (5 - 3/8"=9,50mm) dan (3/8" - 3/4"=19mm atau 1"=2,54mm)) yang dapat langsung digunakan untuk kebutuhan Agregat Kasar Lapis pondasi Agregat A (ukuran 5 - 1") dan Agg.Kasar dan Agg.Halus lapisan perkerasan Aspal Asumsi proporsi hasil pemisahan saringan (screen2) - menghasilkan ukuran (0 - 5) - menghasilkan ukuran (5 - 3/8"=9,5mm) - menghasilkan ukuran (3/8" - 3/4"=19mm) Hasil yang tidak lolos dimasukan kedalam pemecah ketiga (Tertiary crusher) atau (secondary Crusher) dan hasilnya dimasukan kembali ke saringan screen2
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
200
D1 D2 D3 Rp1 Rp2 E21 E15 Cp1 Cp2 Fa1 Fa2 Fh
1.04 1.37 1.23 193,250.00 193,750.00 904,696.53 579,263.86 60.00 1.50 0.70 0.83 1.10
Ton/M3 Ton/M3 Ton/M3 Rp./M3 Rp./M3 Rp./Jam Rp./Jam Ton/Jam M3 -
20.00 8.74
% m3
80.00 38.96
% m3
20.00 30.00 50.00
% % %
Berongga Berongga Berongga
Kap. Bucket
NO III 1.a.
1.b.
1.c.
1.d.
IV 1
2
III.2.
URAIAN ANALISA ALAT Kerja Stone Crusher memecah gravel : - Waktu kerja Stone Crusher - Produksi Stone Crusher 1 jam - Kebutuhan batu/gravel 1 jam
KODE
= (Fa1 x Cp1) : D3 = (Fa1 x Cp1) : D1
KOEF
SAT
Tst Qb Qg
1.00 34.09 40.38
Jam M3/Jam M3/Jam
Kerja Wheel Loader melayani Stone Crusher : - Kap. Angkut / rit = (Fa2 x Cp2) - Waktu Siklus (Muat, Tuang, Tunggu, dll) - Waktu kerja W.Loader memasok gravel = {(Qg : Ka) x Ts} : 60 menit
Ka Ts
1.25 2.00
M3 menit
Tw
1.08
Jam
Biaya Produksi Batu Pecah stone crusher 1 set dgn wheel loader = {(Tst x Rp3) + (Tw x Rp4)}
Bp
1,531,024.46
Rp./Jam
Harga Satuan Batu Pecah Produksi St.Crusher / M3 = {(Qg : Qb) x Fh x Rp1} + Bp
HSb
1,782,844.08
Rp.
PERHITUNGAN Primary Crusher Produksi Primary Crusher + scalping Screen 1 Lolos scalping screen (sreen1) Tidak lolos scalping screen(screen1) ( 100 - LSc 1 ) Asumsi % Biaya proses scalping screen ukuran # 2"=50 mm thdp biaya produksi Biaya Produksi scalping Screen Volume (0 - 50) = ((Prod x LSc 1) x LSc2))/D1
Prod LSc 1 TLSc1 LSc2 BPSc V1
60.00 20.00 80.00 20.00 306,204.89 8.74
Ton/Jam % % % Rp. m3
Secondary Crusher Produksi Secondary Crusher + scalping Screen 2 Asumsi % Biaya proses produksi Batu Pecah thdp BOP S.Crusher 1 set Biaya Produksi = LSc3 : 100 x BP + BPSc : 2 kapasitas yang diproduksi = Prod x TLSc1/100 : D3 Lolos screen2 ukuran ( 0 - 5) Volume ukuran ( 0 - 5) = (CpSC1 x LSc4/100) Lolos screen2 ukuran ( 5 - 9,5) Volume ukuran ( 5 - 9,5) = (CpSC1 x LSc5/100) Lolos screen2 ukuran ( 9.5 - 19,0) Volume ukuran ( 9,5 - 19.0) = (CpSC1 x LSc6/100)
Prod LSc3 Bprod CpSC1 LSc4 V2 LSc5 V3 LSc6 V4
48.00 80.00 1,377,922.01 38.96 20.00 7.79 30.00 11.69 50.00 19.48
Ton/Jam % Rp. m3 % m3 % m3 % m3
HARGA SATUAN AGREGAT Primary Crusher Harga Satuan Agregat Halus+Kasar untuk Lapis Pondasi / M3 dengan asumsi memerlukan biaya setengah biaya proses scalping screen 1, setengah masuk ke screen1, setengahnya lagi masuk ke Secunder Crusher = ((BPSc : 2) : V1) + Rp2
Hs1
211,267.47
Rp
Secondary Crusher Asumsi %Biaya produksi per fraksi (untuk tiap lengan conveyor 1/3 biaya produksi) Biaya Produksi per Fraksi = Hs 1 : 3 Agregat pecah mesin (0 - 5) = PF : V2 + Rp2 Agregat pecah mesin (5 - 9.5) = PF : V3 + Rp2 Agregat pecah mesin (9.5 - 19) = PF : V4 + Rp2 Agregat pecah kasar = PF x 2/(V3 + V4) + Rp2
LSc2 PF Hs2 Hs3 Hs4 Hs5
33.33 594,281.36 270,016.11 244,594.07 224,256.44 231,883.05
% Rp. Rp./M3 Rp./M3 Rp./M3 Rp./M3
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
201
KET
Batu pecah
NO
URAIAN
KODE
KOEF
SAT
KET
LAMPIRAN II ANALISA HARGA PENGADAAN AGREGAT KELAS C I 1 2 3
ASUMSI Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi Base Camp Kegiatan dilakukan di dalam lokasi Base Camp Proporsi campuran : - Agregat Kasar - Pasir
Ak Ps
32.50 67.50
% %
4
Harga Satuan :
- Agregat Kasar - Pasir
HSAk HSPs
244,594.07 148,650.00
Rp./M3 Rp./M3
5 6 7
Biaya Operasi Alat : Faktor Efisiensi Alat : Kapasitas Alat :
- Wheel Loader - Wheel Loader - Wheel Loader
Rp1 Fa1 Cp2
579,263.86 0.83 1.50
Rp./Jam M3
II
METHODE PELAKSANAAN
1
Wheel Loader melakukan pencampuran (blending) Agregat Kasar, Pasir & Tanah menjadi Agregat Kelas C.
Vk Vp Vt Va
0.325 0.675 0.000 1.000
M3 M3 M3 M3
Tc
0.083
Jam/M3
III.1
PROSES PENCAMPURAN AGREGAT KELAS C Untuk setiap 1 M3 Agregat Kelas C, diperlukan :
1.a.
- Agregat Kasar - Pasir - Tanah - Total volume agregat
= = = =
Ak x 1 M3 Ps x 1 M3 Tn x 1 M3 Vk + Vp + Vt
1.b.
Waktu pencampuran (blending) oleh Blending Equipmen
III.2
HARGA SATUAN BAHAN AGREGAT KELAS C
2.a.
Agregat Kasar
= Vk x HSAk
Hs1
48,311.25
Rupiah
2.b.
Pasir
= Vh x HSPs
Hs2
165,101.00
Rupiah
2.c.
Tanah
= Vs x HSTn
Hs3
0.00
Rupiah
2.d.
Biaya Pencampuran
= Tc x Rp1
Hs4
48,271.99
Rupiah
2.e.
Harga Satuan Agregat Kelas C / M3 = Hs1 + Hs2 + Hs3 + Hs4
HSAB
261,684.24
Rp./M3
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
Diluar PPN
202
Kap. Bucket
ANALISA HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO 2017 URAIAN ANALISA ALAT ASPHALT MIXING PALANT
No.
URAIAN
KODE
KOEF.
SATUAN
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
5.
Kapastas tangki aspal
Ca
30,000.00
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
C
357,430,830
2.
Faktor Angsuran Modal
i x (1 + i)^A (1 + i)^A - 1
D
0.16275
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
(B-C)xD W
E
349,021.33
Rupiah
F
4,765.74
Rupiah
G
353,787.07
Rupiah
H1 H2
652,680.00 7,459,200.00
Rupiah Rupiah
H3
444,000.00
I
373,086.00
J
208,501
K
417,002.64
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
9,606,612.81
Rupiah
T
9,960,399.88
Rupiah
=
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam C. 1.
=
(E+F)
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Bahan Bakar Pemanasan Material = 12 ltr x Ms dan aspal (Oil Heater) Bahan Bakar Pemanas Aspal =1/1000 *Ca*Ms
2.
Pelumas
= (2.5%-3%) x Pw x Mp
3.
Biaya bengkel
4.
Biaya perbaikan
5. 6.
Operator Pembantu Operator
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+J+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan Bahan bakar Batubara
8.
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
i U1 U2 Mb Ms Mp
ASPHALT MIXING PALANT 294.0 HP 60.0 T/Jam 10.0 Tahun 1,500.0 Jam 3,574,308,300.0 Rupiah
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
857.58
203
KET.
E01
liter
Rupiah -
Rupiah
% / Tahun Rp./Jam Rp./Jam Rp./liter Rp./liter Rp./liter
Rp/kg
Khusus AMP
URAIAN ANALISA ALAT ASPHALT FINISHER
No.
A. 1. 2. 3. 4.
URAIAN
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
KODE
KOEF.
SATUAN
Pw Cp A W B
ASPHALT FINISHER 72.4 10.0 6.0 1,400.0 981,052,550
HP Ton Tahun Jam Rupiah
E02
5.
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
C
98,105,255
i x (1 + i)^A (1 + i)^A - 1
D
0.22961
(B-C)xD W
E
144,808.01
Rupiah
F
1,401.50
Rupiah
G
146,209.51
Rupiah
0.002 x B W
Biaya Pasti per Jam
=
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
160,728.00
Rupiah
2.
Pelumas
I
91,875.60
Rupiah
J
43,797
K
122,631.57
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
446,889.30
Rupiah
S
593,098.82
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
204
KET.
URAIAN ANALISA ALAT ASPHALT SPRAYER
No.
URAIAN
KODE
KOEF.
SATUAN
ASPHALT SPRAYER 4.0 850.0 5.0 2,000.0 66,643,400
HP Liter Tahun Jam Rupiah
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
5
Kapastas tangki aspal
Ca
850
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
C
6,664,340
2.
Faktor Angsuran Modal
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
-
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
(B-C)xD W
E
7,911.16
Rupiah
F
66.64
Rupiah
G
7,977.81
Rupiah
H H3
7,104.00 12,580.00
Rupiah Rupiah
I
4,230.00
Rupiah
J
2,916
Rupiah
K
4,165.21
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
55,280.58
Rupiah
S
63,258.38
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
=
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam
=
(E+F)
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms
2.
Pelumas
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
205
KET.
E03
Liter
Rupiah
URAIAN ANALISA ALAT BULLDOZER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
Pw Cp A W B
BULLDOZER 100-150 HP 155.0 HP 5.0 Tahun 2,000.0 Jam 3,130,688,900 Rupiah
C
313,068,890
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
371,640.53
Rupiah
F
3,130.69
Rupiah
G
374,771.22
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
275,280.00
Rupiah
2.
Pelumas
I
163,912.50
Rupiah
J
136,968
K
195,668.06
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
799,685.34
Rupiah
S
1,174,456.56
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
i U1 U2 Mb Ms Mp
206
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
KET.
E04
URAIAN ANALISA ALAT COMPRESSOR
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
COMPRESSOR 4000-6500 L\M Pw 60.0 HP Cp 5,000.0 CPM/(L/m) A 5.0 Tahun W 2,000.0 Jam B 134,302,400 Rupiah
C
13,430,240
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
15,942.89
Rupiah
F
134.30
Rupiah
G
16,077.19
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
106,560.00
Rupiah
2.
Pelumas
I
63,450.00
Rupiah
J
5,876
K
8,393.90
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
208,565.34
Rupiah
S
224,642.53
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
207
KET.
E05
URAIAN ANALISA ALAT CONCRETE MIXER 0.3 - 0.6 M3
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
CONCRETE MIXER 0.3-0.6 M3 Pw 20.0 HP Cp 500.0 Liter A 2.0 Tahun W 1,500.0 Jam B 190,134,300 Rupiah
C
19,013,430
i x (1 + i)^A (1 + i)^A - 1
D
0.57619
(B-C)xD W
E
65,732.14
Rupiah
F
253.51
Rupiah
G
65,985.66
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
44,400.00
Rupiah
2.
Pelumas
I
25,380.00
Rupiah
J
11,091
Rupiah
K
22,182.34
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
127,339.22
Rupiah
S
193,324.87
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
208
KET.
E06
URAIAN ANALISA ALAT CRANE 10 - 15 TON
No.
A. 1. 2. 3. 4.
URAIAN
KODE
KOEF.
SATUAN
Pw Cp A W B
CRANE 10-15 TON 138.0 15.0 5.0 2,000.0 799,921,750
HP Ton Tahun Jam Rupiah
C
79,992,175
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
94,957.80
Rupiah
F
799.92
Rupiah
G
95,757.73
Rupiah
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
E07
5.
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam
=
(E+F)
-
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
245,088.00
Rupiah
2.
Pelumas
I
145,935.00
Rupiah
J
34,997
Rupiah
K
49,995.11
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
503,871.83
Rupiah
S
599,629.55
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
209
KET.
URAIAN ANALISA ALAT DUMP TRUCK 3.5 TON
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
Pw Cp A W B
DUMP TRUCK 3.5 TON 100.0 HP 3.5 Ton 5.0 Tahun 2,000.0 Jam 110,821,150 Rupiah
C
11,082,115
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
13,155.45
Rupiah
F
110.82
Rupiah
G
13,266.27
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
177,600.00
Rupiah
2.
Pelumas
I
105,750.00
Rupiah
J
4,848
K
6,926.32
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
322,981.89
Rupiah
S
336,248.16
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir / Mekanik Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
210
KET.
E08
URAIAN ANALISA ALAT DUMP TRUCK 10 TON
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
Pw Cp A W B
DUMP TRUCK 10 TON 190.0 HP 10.0 Ton 5.0 Tahun 2,000.0 Jam 309,647,200 Rupiah
C
30,964,720
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
36,757.87
Rupiah
F
309.65
Rupiah
G
37,067.52
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
337,440.00
Rupiah
2.
Pelumas
I
200,925.00
Rupiah
J
13,547
Rupiah
K
19,352.95
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
599,122.16
Rupiah
S
636,189.67
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir / Mekanik Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
211
KET.
E09
URAIAN ANALISA ALAT EXCAVATOR 80-140 HP
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
Pw Cp A W B
EXCAVATOR 80-140 HP 133.0 HP 0.93 M3 5.0 Tahun 2,000.0 Jam 1,343,716,500 Rupiah
C
134,371,650
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
159,511.06
Rupiah
F
1,343.72
Rupiah
G
160,854.78
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
236,208.00
Rupiah
2.
Pelumas
I
140,647.50
Rupiah
J
58,788
Rupiah
K
83,982.28
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
547,482.52
Rupiah
S
708,337.30
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
212
KET.
E10
URAIAN ANALISA ALAT FLAT BED TRUCK 3-4 M3
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
FLAT BED TRUCK 3-4 M3 190.0 HP 10.0 M3 5.0 Tahun 2,000.0 Jam 338,500,000 Rupiah
C
33,850,000
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
40,182.95
Rupiah
F
338.50
Rupiah
G
40,521.45
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
337,440.00
Rupiah
2.
Pelumas
I
200,925.00
Rupiah
J
14,809
Rupiah
K
21,156.25
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
602,187.77
Rupiah
S
642,709.22
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
213
KET.
E11
URAIAN ANALISA ALAT GENERATOR SET
No.
URAIAN
KODE
KOEF.
SATUAN
Pw Cp A W B
GENERATOR SET 180.0 135.0 5.0 2,000.0 274,573,800
HP KVA Tahun Jam Rupiah
C
27,457,380
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
32,594.34
Rupiah
F
274.57
Rupiah
G
32,868.92
Rupiah
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam
=
(E+F)
E12
-
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
319,680.00
Rupiah
2.
Pelumas
I
190,350.00
Rupiah
J
12,013
Rupiah
K
17,160.86
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
567,060.61
Rupiah
S
599,929.53
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
214
KET.
URAIAN ANALISA ALAT MOTOR GRADER >100 HP
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
Pw Cp A W B
MOTOR GRADER >100 HP 135.0 HP 10,800.0 5.0 Tahun 2,000.0 Jam 1,354,081,400 Rupiah
C
135,408,140
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
160,741.47
Rupiah
F
1,354.08
Rupiah
G
162,095.55
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
239,760.00
Rupiah
2.
Pelumas
I
142,762.50
Rupiah
J
59,241
Rupiah
K
84,630.09
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
554,250.79
Rupiah
S
716,346.34
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
215
KET.
E13
URAIAN ANALISA ALAT TRACK LOADER 75-100 HP
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
TRACK LOADER 75-100 HP 70.0 HP 0.8 M3 5.0 Tahun 2,000.0 Jam 1,785,903,250 Rupiah
C
178,590,325
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
212,002.55
Rupiah
F
1,785.90
Rupiah
G
213,788.45
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
124,320.00
Rupiah
2.
Pelumas
I
74,025.00
Rupiah
J
78,133
Rupiah
K
111,618.95
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
415,954.36
Rupiah
S
629,742.82
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
216
KET.
E14
URAIAN ANALISA ALAT WHEEL LOADER 1.0 - 1.6 M3
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
WHEEL LOADER 1.0-1.6 M3 96.0 HP 1.5 M3 5.0 Tahun 2,000.0 Jam 1,236,467,150 Rupiah
C
123,646,715
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
146,779.61
Rupiah
F
1,236.47
Rupiah
G
148,016.08
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
170,496.00
Rupiah
2.
Pelumas
I
101,520.00
Rupiah
J
54,095
Rupiah
K
77,279.20
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
431,247.78
Rupiah
S
579,263.86
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
217
KET.
E15
URAIAN ANALISA ALAT THREE WHEEL ROLLER 6-8 T
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
THREE WHEEL ROLLER 6-8 T Pw 55.0 HP Cp 8.0 Ton A 5.0 Tahun W 2,000.0 Jam B 407,430,500 Rupiah
C
40,743,050
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
48,365.61
Rupiah
F
407.43
Rupiah
G
48,773.04
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
97,680.00
Rupiah
2.
Pelumas
I
58,162.50
Rupiah
J
17,825
Rupiah
K
25,464.41
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
226,989.13
Rupiah
S
275,762.18
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
218
KET.
E16
URAIAN ANALISA ALAT TANDEM ROLLER 6 - 8 T
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
TANDEM ROLLER 6-8 T. 82.0 HP 8.1 Ton 5.0 Tahun 2,000.0 Jam 495,312,550 Rupiah
C
49,531,255
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
58,797.99
Rupiah
F
495.31
Rupiah
G
59,293.30
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
145,632.00
Rupiah
2.
Pelumas
I
86,715.00
Rupiah
J
21,670
Rupiah
K
30,957.03
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
312,831.10
Rupiah
S
372,124.41
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
219
KET.
E17
URAIAN ANALISA ALAT TIRE ROLLER 8-10 T
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
TIRE ROLLER 8-10 T. 100.5 HP 9.0 Ton 5.0 Tahun 2,000.0 Jam 1,286,356,700 Rupiah
C
128,635,670
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
152,701.95
Rupiah
F
1,286.36
Rupiah
G
153,988.30
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
178,488.00
Rupiah
2.
Pelumas
I
106,278.75
Rupiah
J
56,278
Rupiah
K
80,397.29
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
449,299.29
Rupiah
S
603,287.59
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
220
KET.
E18
URAIAN ANALISA ALAT VIBRATORY ROLLER 5-8 T
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
VIBRATORY ROLLER 5-8 T. 82.0 HP 7.050 Ton 5.0 Tahun 2,000.0 Jam 808,555,200 Rupiah
C
80,855,520
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
95,982.67
Rupiah
F
808.56
Rupiah
G
96,791.23
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
145,632.00
Rupiah
2.
Pelumas
I
86,715.00
Rupiah
J
35,374
Rupiah
K
50,534.70
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
346,113.13
Rupiah
S
442,904.36
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
221
KET.
E19
URAIAN ANALISA ALAT CONCRETE VIBRATOR
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
CONCRETE VIBRATOR 5.5 HP 25.0 4.0 Tahun 1,000.0 Jam 15,618,250 Rupiah
C
1,561,825
i x (1 + i)^A (1 + i)^A - 1
D
0.31547
-
(B-C)xD W
E
4,434.39
Rupiah
F
31.24
Rupiah
G
4,465.63
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
12,210.00
Rupiah
2.
Pelumas
I
6,979.50
Rupiah
J
976
Rupiah
K
2,733.19
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
47,184.55
Rupiah
S
51,650.18
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
222
KET.
E20
URAIAN ANALISA ALAT STONE CRUSHER
No.
URAIAN
KODE
KOEF.
SATUAN
Pw Cp A W B
STONE CRUSHER 220.0 60.0 5.0 2,000.0 1,068,010,900
HP T/Jam Tahun Jam Rupiah
C
106,801,090
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
126,782.36
Rupiah
F
1,068.01
Rupiah
G
127,850.37
Rupiah
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam
=
(E+F)
E21
-
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
390,720.00
Rupiah
2.
Pelumas
I
232,650.00
Rupiah
J
46,725
Rupiah
K
66,750.68
Rupiah
L M
15,714.29 24,285.71
Rupiah Rupiah
P
776,846.16
Rupiah
S
904,696.53
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 2 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
223
KET.
URAIAN ANALISA ALAT WATER PUMP 70 - 100 mm
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
WATER PUMP 70-100 mm 6.0 HP 3.0 Tahun 2,000.0 Jam 12,104,300 Rupiah
C
1,210,430
i x (1 + i)^A (1 + i)^A - 1
D
0.40211
-
(B-C)xD W
E
2,190.29
Rupiah
F
12.10
Rupiah
G
2,202.40
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
10,656.00
Rupiah
2.
Pelumas
I
6,345.00
Rupiah
J
530
Rupiah
K
756.52
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
42,572.80
Rupiah
S
44,775.19
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
224
KET.
E22
URAIAN ANALISA ALAT WATER TANKER 3000-4500 L
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
WATER TANKER 3000-4500 L. Pw 100.0 HP Cp 4,000.0 Liter A 5.0 Tahun W 2,000.0 Jam B 142,539,700 Rupiah
C
14,253,970
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
16,920.73
Rupiah
F
142.54
Rupiah
G
17,063.27
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
177,600.00
Rupiah
2.
Pelumas
I
105,750.00
Rupiah
J
6,236
Rupiah
K
8,908.73
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
326,351.99
Rupiah
S
343,415.25
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
225
KET.
E23
URAIAN ANALISA ALAT PEDESTRIAN ROLLER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
PEDESTRIAN ROLLER 8.8 HP 835.000 Ton 3.0 Tahun 2,000.0 Jam 74,695,700 Rupiah
C
7,469,570
i x (1 + i)^A (1 + i)^A - 1
D
0.40211
(B-C)xD W
E
13,516.31
Rupiah
F
74.70
Rupiah
G
13,591.01
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
15,628.80
Rupiah
2.
Pelumas
I
9,306.00
Rupiah
J
3,268
Rupiah
K
4,668.48
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
57,156.93
Rupiah
S
70,747.94
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
226
KET.
E24
URAIAN ANALISA ALAT TAMPER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
TAMPER 4.7 121.000 4.0 1,000.0 13,037,900
HP Ton Tahun Jam Rupiah
C
1,303,790
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.31547
-
(B-C)xD W
E
3,701.77
Rupiah
F
26.08
Rupiah
G
3,727.84
Rupiah
(E+F)
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
10,434.00
Rupiah
2.
Pelumas
I
5,964.30
Rupiah
J
815
Rupiah
K
2,281.63
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
43,780.52
Rupiah
S
47,508.36
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
227
KET.
E25
Pw Cp A W B
0.002 x B W
Biaya Pasti per Jam
KOEF.
URAIAN ANALISA ALAT JACK HAMMER
No.
URAIAN
KODE
KOEF.
SATUAN
Pw Cp A W B
JACK HAMMER 0.0 1,330.000 5.0 2,000.0 41,783,000
HP Tahun Jam Rupiah
C
4,178,300
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
-
(B-C)xD W
E
4,960.01
Rupiah
F
41.78
Rupiah
G
5,001.80
Rupiah
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam
=
(E+F)
E26
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
0.00
Rupiah
2.
Pelumas
I
0.00
Rupiah
J
1,828
Rupiah
K
2,611.44
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
28,725.16
Rupiah
S
33,726.95
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
228
KET.
URAIAN ANALISA ALAT FULVI MIXER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
FULVI MIXER 345.0 2,005 4.0 1,000.0 1,074,419,100
HP Tahun Jam Rupiah
C
107,441,910
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.31547
(B-C)xD W
E
305,053.07
Rupiah
F
2,148.84
Rupiah
G
307,201.91
Rupiah
Pw Cp A W B
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
E27
-
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
765,900.00
Rupiah
2.
Pelumas
I
437,805.00
Rupiah
J
67,151
Rupiah
K
188,023.34
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
1,486,736.68
Rupiah
S
1,793,938.59
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
i U1 U2 Mb Ms Mp
229
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
KET.
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
URAIAN ANALISA ALAT CONCRETE PUMP
No.
URAIAN
KODE
KOEF.
SATUAN
Pw Cp A W B
CONCRETE PUMP 100.0 8.00 6.0 2,000.0 190,134,300
HP M3 Tahun Jam Rupiah
C
19,013,430
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.22961
(B-C)xD W
E
19,645.31
Rupiah
F
190.13
Rupiah
G
19,835.44
Rupiah
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam
=
(E+F)
E28
-
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
177,600.00
Rupiah
2.
Pelumas
I
105,750.00
Rupiah
J
8,318
Rupiah
K
11,883.39
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
327,837.48
Rupiah
S
347,672.93
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
230
KET.
URAIAN ANALISA ALAT TRAILER 20 TON
No.
URAIAN
KODE
KOEF.
SATUAN
Pw Cp A W B
TRAILER 20 TON 175.0 20.00 6.0 2,000.0 716,279,400
HP Ton Tahun Jam Rupiah
C
71,627,940
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.22961
(B-C)xD W
E
74,008.37
Rupiah
F
716.28
Rupiah
G
74,724.65
Rupiah
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam
=
(E+F)
E29
-
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
310,800.00
Rupiah
2.
Pelumas
I
185,062.50
Rupiah
J
31,337
Rupiah
K
44,767.46
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
599,824.33
Rupiah
S
674,548.97
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
231
KET.
URAIAN ANALISA ALAT PILE DRIVER + HAMMER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
PILE DRIVER + HAMMER 25.0 HP 2.50 Ton 5.0 Tahun 2,000.0 Jam 950,671,000 Rupiah
C
95,067,100
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
112,853.08
Rupiah
F
950.67
Rupiah
G
113,803.75
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
44,400.00
Rupiah
2.
Pelumas
I
26,437.50
Rupiah
J
41,592
Rupiah
K
59,416.94
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
199,703.44
Rupiah
S
313,507.18
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
232
KET.
E30
URAIAN ANALISA ALAT CRANE ON TRUCK 35 TON
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
CRANE ON TRUCK 35 TON 125.0 HP 35.00 Ton 6.0 Tahun 2,000.0 Jam 1,901,341,900 Rupiah
C
190,134,190
i x (1 + i)^A (1 + i)^A - 1
D
0.22961
(B-C)xD W
E
196,452.96
Rupiah
F
1,901.34
Rupiah
G
198,354.30
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
222,000.00
Rupiah
2.
Pelumas
I
132,187.50
Rupiah
J
83,184
Rupiah
K
118,833.87
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
584,062.22
Rupiah
S
782,416.52
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
233
KET.
E31
URAIAN ANALISA ALAT WELDING SET
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
WELDING SET 40.0 250.00 5.0 2,000.0 20,891,500
HP Amp Tahun Jam Rupiah
C
2,089,150
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
-
(B-C)xD W
E
2,480.01
Rupiah
F
20.89
Rupiah
G
2,500.90
Rupiah
Pw Cp A W B
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
E32
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
71,040.00
Rupiah
2.
Pelumas
I
42,300.00
Rupiah
J
914
Rupiah
K
1,305.72
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
139,845.44
Rupiah
S
142,346.33
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
234
KET.
URAIAN ANALISA ALAT BORE PILE MACHINE
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
SATUAN
Pw Cp A W B
BORE PILE MACHINE 150.0 HP 2,000.00 Meter 6.0 Tahun 2,000.0 Jam 3,055,727,900 Rupiah
C
305,572,790
i x (1 + i)^A (1 + i)^A - 1
D
0.22961
(B-C)xD W
E
315,727.96
Rupiah
F
3,055.73
Rupiah
G
318,783.68
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
266,400.00
Rupiah
2.
Pelumas
I
158,625.00
Rupiah
J
133,688
Rupiah
K
190,982.99
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
777,553.23
Rupiah
S
1,096,336.92
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
i U1 U2 Mb Ms Mp
235
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
KET.
E33
URAIAN ANALISA ALAT ASPHALT LIQUID MIXER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
ASPHALT LIQUID MIXER 5.0 HP 1,000.0 Liter 4.0 Tahun 2,000.0 Jam 20,371,650 Rupiah
C
2,037,165
i x (1 + i)^A (1 + i)^A - 1
D
0.31547
-
(B-C)xD W
E
2,892.00
Rupiah
F
20.37
Rupiah
G
2,912.37
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
8,880.00
Rupiah
2.
Pelumas
I
5,287.50
Rupiah
J
891
Rupiah
K
1,273.23
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
40,617.70
Rupiah
S
43,530.07
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
236
KET.
E34
URAIAN ANALISA ALAT TRONTON
No.
A. 1. 2. 3. 4.
URAIAN
KODE
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
KOEF.
SATUAN
TRONTON 150.0 15.0 10.0 1,500.0 460,500,000
HP Ton Tahun Jam Rupiah
C
46,050,000
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.16275
(B-C)xD W
E
44,966.55
Rupiah
F
614.00
Rupiah
G
45,580.55
Rupiah
Pw Cp A W B
E35
5.
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam C.
=
(E+F)
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
333,000.00
Rupiah
2.
Pelumas
I
190,350.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
26,863
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2
K
53,725.00
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
656,080.36
Rupiah
T
701,660.91
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
237
KET.
URAIAN ANALISA ALAT COLD MILLING MACHINE
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
=
SATUAN
COLD MILLING MACHINE 248.0 HP 1,000 m 5.0 Tahun 2,000.0 Jam 5,903,336,100 Rupiah
C
590,333,610
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
700,778.34
Rupiah
F
5,903.34
Rupiah
G
706,681.67
Rupiah
0.002 x B W
Biaya Pasti per Jam C.
Pw Cp A W B
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
440,448.00
Rupiah
2.
Pelumas
I
262,260.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
258,271
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2
K
368,958.51
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
1,382,080.32
Rupiah
T
2,088,761.99
Rupiah
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
i U1 U2 Mb Ms Mp
238
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
KET.
E37
URAIAN ANALISA ALAT ROCK DRILL BREAKER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
=
SATUAN
Pw Cp A W B
ROCK DRILL BREAKER 3.0 HP 10.0 Tahun 1,500.0 Jam 1,074,419,100 Rupiah
C
107,441,910
i x (1 + i)^A (1 + i)^A - 1
D
0.16275
(B-C)xD W
E
104,914.06
Rupiah
F
1,432.56
Rupiah
G
106,346.62
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
6,660.00
Rupiah
2.
Pelumas
I
3,807.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
62,674
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2
K
125,348.90
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
250,633.20
Rupiah
T
356,979.81
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
239
KET.
E36
URAIAN ANALISA ALAT COLD RECYCLER
No.
A. 1. 2. 3. 4.
URAIAN
KODE
KOEF.
SATUAN
Pw Cp A W B
COLD RECYCLER 900.0 2,200 5.0 2,000.0 23,279,080,500
HP M Tahun Jam Rupiah
C
2,327,908,050
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
2,763,433.26
Rupiah
F
23,279.08
Rupiah
G
2,786,712.34
Rupiah
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
E38
5.
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam C.
=
(E+F)
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
1,598,400.00
Rupiah
2.
Pelumas
I
951,750.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
1,018,460
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2
K
1,454,942.53
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
5,075,695.16
Rupiah
T
7,862,407.50
Rupiah
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
i U1 U2 Mb Ms Mp
240
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
KET.
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
URAIAN ANALISA ALAT HOT RECYCLER
No.
URAIAN
KODE
KOEF.
SATUAN
Pw Cp A W B
HOT RECYCLER 400.0 3 5.0 2,000.0 34,918,620,800
HP M Tahun Jam Rupiah
C
3,491,862,080
Rupiah
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
4,145,149.89
Rupiah
F
34,918.62
Rupiah
G
4,180,068.51
Rupiah
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam C.
=
(E+F)
E39
-
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
710,400.00
Rupiah
2.
Pelumas
I
423,000.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
1,527,690
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2
K
2,182,413.80
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
4,895,646.32
Rupiah
T
9,075,714.83
Rupiah
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
i U1 U2 Mb Ms Mp
241
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
KET.
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
URAIAN ANALISA ALAT AGGREGAT (CHIP) SPREADER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
=
SATUAN
AGGREGAT (CHIP) SPREADER Pw 115.0 HP Cp 3.5 M A 4.0 Tahun W 1,000.0 Jam B 404,200,000.0 Rupiah
C
40,420,000
i x (1 + i)^A (1 + i)^A - 1
D
0.31547
(B-C)xD W
E
114,761.97
Rupiah
F
808.40
Rupiah
G
115,570.37
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
255,300.00
Rupiah
2.
Pelumas
I
145,935.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
25,263
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 13 Orang / Jam ) x U2
K
70,735.00
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
549,375.36
Rupiah
T
664,945.73
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
242
KET.
E40
URAIAN ANALISA ALAT ASPHALT DISTRIBUTOR
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
=
SATUAN
ASPHALT DISTRIBUTOR 115 HP 4,000 Liter 5.0 Tahun 2,000.0 Jam 404,200,000 Rupiah
C
40,420,000
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
47,982.12
Rupiah
F
404.20
Rupiah
G
48,386.32
Rupiah
0.002 x B W
Biaya Pasti per Jam C.
Pw Cp A W B
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
204,240.00
Rupiah
2.
Pelumas
I
121,612.50
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
17,684
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2
K
25,262.50
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
420,941.61
Rupiah
T
469,327.93
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
243
KET.
E41
URAIAN ANALISA ALAT SLIP FORM PAVER
No.
URAIAN
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
=
KOEF.
SATUAN
Pw Cp A W B
SLIP FORM PAVER 105 2.50 6.0 2,000.0 1,368,400,000
HP M Tahun Jam Rupiah
136,840,000
i x (1 + i)^A (1 + i)^A - 1
D
0.22961
(B-C)xD W
E
141,387.63
Rupiah
F
1,368.40
Rupiah
G
142,756.03
Rupiah
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
186,480.00
Rupiah
2.
Pelumas
I
111,037.50
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
59,868
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2
K
85,525.00
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
495,052.86
Rupiah
T
637,808.89
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
244
KET.
E42
C
0.002 x B W
Biaya Pasti per Jam
KODE
URAIAN ANALISA ALAT CONCRETE PAN MIXER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
=
SATUAN
Pw Cp A W B
CONCRETE PAN MIXER 134 HP 600.00 Liter 10.0 Tahun 1,500.0 Jam 1,193,799,000 Rupiah
C
119,379,900
i x (1 + i)^A (1 + i)^A - 1
D
0.16275
(B-C)xD W
E
116,571.17
Rupiah
F
1,591.73
Rupiah
G
118,162.91
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
297,480.00
Rupiah
2.
Pelumas
I
170,046.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
69,638
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
139,276.55
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
728,583.68
Rupiah
T
846,746.59
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
245
KET.
E43
URAIAN ANALISA ALAT CONCRETE BREAKER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
=
SATUAN
Pw Cp A W B
CONCRETE BREAKER 290 HP 20.00 m3/jam 5.0 Tahun 2,000.0 Jam 1,074,419,100 Rupiah
C
107,441,910
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
127,543.07
Rupiah
F
1,074.42
Rupiah
G
128,617.49
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
515,040.00
Rupiah
2.
Pelumas
I
306,675.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
47,006
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
67,151.19
Rupiah
L M
15,714.29 36,428.57
Rupiah Rupiah
P
988,014.89
Rupiah
T
1,116,632.38
Rupiah
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
i U1 U2 Mb Ms Mp
246
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
KET.
E44
URAIAN ANALISA ALAT ASPAHLT TANKER
No.
A. 1. 2. 3. 4.
5.
B. 1.
URAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
ASPAHLT TANKER 190 4,000.00 6.0 2,000.0 511,700,000
HP liter Tahun Jam Rupiah
Kapasitas tangki air
Ca
4,000.00
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
C
51,170,000
i x (1 + i)^A (1 + i)^A - 1
D
0.22961
(B-C)xD W
E
52,870.54
Rupiah
F
511.70
Rupiah
G
53,382.24
Rupiah
H1 H2
337,440.00 59,200.00
Rupiah Rupiah
I
200,925.00
Rupiah
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
0.002 x B W
Biaya Pasti per Jam C.
=
(E+F)
Bahan Bakar = (12%-15%) x Pw x Ms Bahan Bakar Pemanas Aspal = 1/1000 x ca x Ms
2.
Pelumas
3. 4. 5.
E45
liter
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
22,387
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
31,981.25
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
679,790.27
Rupiah
T
733,172.51
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
247
KET.
URAIAN ANALISA ALAT CEMENT TANKER
No.
URAIAN
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
=
KOEF.
SATUAN
Pw Cp A W B
CEMENT TANKER 190 4,000.00 6.0 2,000.0 511,700,000
HP liter Tahun Jam Rupiah
51,170,000
i x (1 + i)^A (1 + i)^A - 1
D
0.22961
(B-C)xD W
E
52,870.54
Rupiah
F
511.70
Rupiah
G
53,382.24
Rupiah
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
337,440.00
Rupiah
2.
Pelumas
I
200,925.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
22,387
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
31,981.25
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
620,590.27
Rupiah
T
673,972.51
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
248
KET.
E46
C
0.002 x B W
Biaya Pasti per Jam
KODE
URAIAN ANALISA ALAT CONCRETE MIXER (350)
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
=
SATUAN
CONCRETE MIXER (350) 20 HP 350.00 liter 2.0 Tahun 2,000.0 Jam 35,800,000 Rupiah
C
3,580,000
i x (1 + i)^A (1 + i)^A - 1
D
0.57619
-
(B-C)xD W
E
9,282.43
Rupiah
F
35.80
Rupiah
G
9,318.23
Rupiah
0.002 x B W
Biaya Pasti per Jam C.
Pw Cp A W B
KOEF.
(E+F)
Rupiah
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
35,520.00
Rupiah
2.
Pelumas
I
21,150.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
1,566
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
2,237.50
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
84,759.46
Rupiah
T
94,077.69
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
249
KET.
E47
URAIAN ANALISA ALAT VIBRATING RAMMER
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
=
SATUAN
VIBRATING RAMMER 4 HP 80.00 KG 4.0 Tahun 1,000.0 Jam 23,876,000 Rupiah
C
2,387,600
i x (1 + i)^A (1 + i)^A - 1
D
0.31547
-
(B-C)xD W
E
6,778.96
Rupiah
F
47.75
Rupiah
G
6,826.71
Rupiah
0.002 x B W
Biaya Pasti per Jam C.
Pw Cp A W B
KOEF.
(E+F)
Rupiah
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
9,324.00
Rupiah
2.
Pelumas
I
5,329.80
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
1,492
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
4,178.30
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
44,610.06
Rupiah
T
51,436.78
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
250
KET.
E48
URAIAN ANALISA ALAT TRUK MIXER (AGITATOR)
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
=
SATUAN
TRUK MIXER (AGITATOR) 220 HP 5.00 M3 5.0 Tahun 2,000.0 Jam 767,500,000 Rupiah
C
76,750,000
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
91,109.05
Rupiah
F
767.50
Rupiah
G
91,876.55
Rupiah
0.002 x B W
Biaya Pasti per Jam C.
Pw Cp A W B
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
390,720.00
Rupiah
2.
Pelumas
I
232,650.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
33,578
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
47,968.75
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
732,774.02
Rupiah
T
824,650.57
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
251
KET.
E49
URAIAN ANALISA ALAT BORE PILE MACHINE
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
=
SATUAN
Pw Cp A W B
BORE PILE MACHINE 125 HP 60.00 CM 10.0 Tahun 1,500.0 Jam 2,927,039,000 Rupiah
C
292,703,900
i x (1 + i)^A (1 + i)^A - 1
D
0.16275
(B-C)xD W
E
285,817.27
Rupiah
F
3,902.72
Rupiah
G
289,719.99
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
277,500.00
Rupiah
2.
Pelumas
I
158,625.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
170,744
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
341,487.88
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
976,213.97
Rupiah
T
1,265,933.96
Rupiah
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
i U1 U2 Mb Ms Mp
252
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
KET.
E50
URAIAN ANALISA ALAT CRANE ON TRUCK 75-100 TON
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
=
SATUAN
CRANE ON TRUCK 75-100 TON Pw 200 HP Cp 75.00 Ton A 5.0 Tahun W 2,000.0 Jam B 1,074,419,100 Rupiah
C
107,441,910
i x (1 + i)^A (1 + i)^A - 1
D
0.26380
(B-C)xD W
E
127,543.07
Rupiah
F
1,074.42
Rupiah
G
128,617.49
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
355,200.00
Rupiah
2.
Pelumas
I
211,500.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
47,006
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
67,151.19
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
708,714.17
Rupiah
T
837,331.66
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
253
KET.
E51
URAIAN ANALISA ALAT BLENDING EQUIPMENT
No.
URAIAN
KODE
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
=
SATUAN
BLENDING EQUIPMENT 50 HP 30.00 Ton 10.0 Tahun 1,500.0 Jam 596,899,500 Rupiah
C
59,689,950
i x (1 + i)^A (1 + i)^A - 1
D
0.16275
(B-C)xD W
E
58,285.59
Rupiah
F
795.87
Rupiah
G
59,081.45
Rupiah
0.002 x B W
Biaya Pasti per Jam C.
Pw Cp A W B
KOEF.
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
111,000.00
Rupiah
2.
Pelumas
I
63,450.00
Rupiah
3. 4. 5.
= (2.5%-3%) x Pw x Mp
Biaya bengkel
(6.25% dan 8.75%) x B W
J
34,819
Rupiah
Perawatan dan = perbaikan Operator Pembantu Operator
(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
K
69,638.2750
Rupiah
L M
15,714.29 12,142.86
Rupiah Rupiah
P
306,764.56
Rupiah
T
365,846.01
Rupiah
i U1 U2 Mb Ms Mp
10.00 15,714.29 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
254
KET.
E52
URAIAN ANALISA ALAT ASPHALT LIQUID MIXER
No.
A. 1. 2. 3. 4.
URAIAN
KODE
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
B. 1.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
Pw Cp A W B
=
SATUAN
ASPHALT LIQUID MIXER 40.0 HP 20,000.0 Liter 4.0 Tahun 2,000.0 Jam 15,300,000 Rupiah Kapasitas 20.000
C
Khusus digunakan untuk Asphalt Modifikasi 1,530,000
i x (1 + i)^A (1 + i)^A - 1
D
0.31547
-
(B-C)xD W
E
2,172.02
Rupiah
F
15.30
Rupiah
G
2,187.32
Rupiah
0.002 x B W
Biaya Pasti per Jam
KOEF.
(E+F)
Rupiah
C.
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (12%-15%) x Pw x Ms
H
71,040.00
Rupiah
2.
Pelumas
I
42,300.00
Rupiah
J
669
Rupiah
K
956.25
Rupiah
L M
12,142.86 12,142.86
Rupiah Rupiah
P
139,251.34
Rupiah
S
141,438.66
Rupiah
i U1 U2 Mb Ms Mp
10.00 12,142.86 12,142.86 8,800.00 14,800.00 42,300.00
% / Tahun Rp./Jam Rp./Jam Liter Liter Liter
= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W
Biaya bengkel
3.
4. 5.
Perawatan dan perbaikan
(12,5 % - 17,5 %) x B W
=
Operator Pembantu Operator
= ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2
Biaya Operasi per Jam
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
255
KET.
E34a
ANALISA
HSPK NON FISIK
STANDAR HARGA SATUAN POKOK KEGIATAN (HSPK) PEMERINTAH KOTA MOJOKERTO TA 2017
PEMERINTAH KOTA MOJOKERTO 2016
HARGA SATUAN POKOK KEGIATAN (HSPK) NON FISIK PEMERINTAH KOTA MOJOKERTO 2017 KODE BARANG 1 2.03 2.03.01
NAMA BARANG 2 HSPK NON FISIK Harga Satuan Pokok Pekerjaan Non Fisik
VOL. 4
SAT. 3
HARGA SATUAN 5
2.03.01.01 2.03.01.01.01 2.03.01.01.01.001 1.08.23.03.01.005.004 1.08.23.03.01.001.003 1.08.23.03.07.999.040
Biaya Operasional Kegiatan Biaya Operasional Kegiatan Non Fisik Alat Tulis Kantor (ATK) PesertaTipe I Buku Block Note 1 Pcs Ball point 1 Pcs Tas 1 Pcs Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Sosialisasi dan Sejenisnya) b. kegiatan berdurasi 4 Jam per hari
2.03.01.01.01.002 1.08.23.03.01.005.004 1.08.23.03.01.001.003 1.08.23.03.07.999.040 1.08.23.03.01.014.00102
Alat Tulis Kantor (ATK) PesertaTipe II Buku Block Note Ball point Tas Cetak ID Card
1 1 1 1
Pcs Pcs Pcs Pcs
JUMLAH 6
Nilai HSPK 2,550.00 4,250.00 75,000.00
81,800.00 2,550.00 4,250.00 75,000.00
Nilai HSPK 2,550.00 4,250.00 75,000.00 5,100.00
86,900.00 2,550.00 4,250.00 75,000.00 5,100.00
Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Pelatihan/Forum/Dialog dan Sejenisnya) b. kegiatan berdurasi (> 4 Jam) per hari
2.03.01.01.01.003 1.08.23.03.01.005.004 1.08.23.03.01.001.003 1.08.23.03.07.999.040 1.08.23.03.01.014.00102
Alat Tulis Kantor (ATK) Peserta Tipe III Buku Block Note Ball point Tas Cetak ID Card
1.08.23.03.04.006.001 1.08.23.03.01.014.0095
Flasdisk (kapasitas 8 GB) 1 Sertifikat 1 Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Pelatihan)
2.03.01.01.01.004 1.08.23.03.01.005.004 1.08.23.03.01.001.003 1.08.23.03.04.006.001 1.08.23.03.01.006.0013 1.08.23.03.01.014.00102
Alat Tulis Kantor (ATK) PesertaTipe IV Buku Block Note Ballpoint Flasdisk (kapasitas 8 GB) Snelhechter Map Cetak ID Card
1.08.23.03.01.014.0095 1.08.23.03.07.999.0038
Sertifkat 1 Lmbr 2,600.00 2,600.00 Tas Pelatihan 1 Bh 128,750.00 128,750.00 Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Pendidikan dan Pelatihan (Diklat)), yang diselenggarakan oleh Lembaga Diklat (Bandiklat)
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
256
1 1 1 1
1 1 1 1 1
Pcs Pcs Pcs Pcs
Nilai HSPK 2,550.00 4,250.00 75,000.00 5,100.00
197,900.00 2,550.00 4,250.00 75,000.00 5,100.00
Bh Lmbr
108,400.00 2,600.00
108,400.00 2,600.00
Pcs Pcs Bh Pcs Pcs
Nilai HSPK 2,550.00 4,250.00 108,400.00 2,750.00 5,100.00
254,400.00 2,550.00 4,250.00 108,400.00 2,750.00 5,100.00
KODE BARANG 1
NAMA BARANG 2
VOL. 4
SAT. 3
HARGA SATUAN 5
2.03.01.01.02.001 1.08.23.03.02.001.006 1.08.23.03.04.004.0051 1.08.23.03.01.006.0010 1.08.23.03.01.999.007 1.08.23.03.01.006.0013 1.08.23.03.01.001.0022 1.08.23.03.01.013.001
ATK Administrasi Kegiatan Tipe I Kertas HVS F4 70 gr 1 Toner HP, CB436A (36) 0.02 Stop Map Plastik 0.5 Paper Clip No 1 0.25 Snelhechter Map 5 Spidol Marker 1 Isi Staples No. 10 0.5 Catatan: a. untuk kegiatan yang bersifat Evaluasi dan Pelaporan
2.03.01.01.02.002 1.08.23.03.01.006.0010 1.08.23.03.02.001.006 1.08.23.03.01.999.006 1.08.23.03.01.999.007 1.08.23.03.01.013.001 1.08.23.03.04.004.0051 1.08.23.03.01.014.0097 1.08.23.03.01.014.0096
ATK Administrasi Kegiatan Tipe II Nilai HSPK Stop Map Plastik 0.5 Pak 8,500.00 Kertas HVS F4 70 gr 2 Rim 41,200.00 Binder Clip 105 0.5 Dos 4,150.00 Paper Clip No 1 0.25 Pak 20,400.00 Isi Staples No. 10 0.25 Dos 31,900.00 Toner HP, CB436A (36) 0.05 Bh 1,016,900.00 Materai 6000 4 Buah 7,000.00 Materai 3000 2 Buah 4,000.00 Catatan: a. untuk kegiatan yang bersifat Perencanaan (Penyusunan Dokumen Perencanaan/Dokumen Kajian/Analisa) b. untuk kegiatan yang bersifat Pelaksanaan (Penelitian)
188,645.00 4,250.00 82,400.00 2,075.00 5,100.00 7,975.00 50,845.00 28,000.00 8,000.00
2.03.01.01.02.003 1.08.23.03.02.004.0031 1.08.23.03.02.004.007 1.08.23.03.01.006.0010 1.08.23.03.02.001.006 1.08.23.03.01.999.006 1.08.23.03.01.999.007 1.08.23.03.01.001.0022 1.08.23.03.01.013.001 1.08.23.03.04.004.0051 1.08.23.03.01.014.0097 1.08.23.03.01.014.0096
ATK Administrasi Kegiatan Tipe III Nilai HSPK Amplop Tali (No. 312) 0.25 Dus 154,500.00 Amplop putih (AM 90) 1 Pak 23,750.00 Stop Map Plastik 0.5 Pak 8,500.00 Kertas HVS F4 70 gr 1 Rim 41,200.00 Binder Clip 105 0.5 Dos 4,150.00 Paper Clip No 1 0.25 Pak 20,400.00 Spidol Marker 1 Bh 13,100 Isi Steples No 10 0.25 Dos 31,900.00 Toner HP, CB436A (36) 0.02 Bh 1,016,900.00 Materai 6000 4 Buah 7,000.00 Materai 3000 2 Buah 4,000.00 Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Sosialisasi dan Sejenisnya)
192,413.00 38,625.00 23,750.00 4,250.00 41,200.00 2,075.00 5,100.00 13,100.00 7,975.00 20,338.00 28,000.00 8,000.00
2.03.01.01.02.004 1.08.23.03.01.006.0010 1.08.23.03.02.004.0031 1.08.23.03.02.004.007 1.08.23.03.02.004.0046 1.08.23.03.02.001.006 1.08.23.03.01.999.006 1.08.23.03.01.001.0022 1.08.23.03.04.004.0051 1.08.23.03.01.014.0097 1.08.23.03.01.014.0096
ATK Administrasi Kegiatan Tipe IV Nilai HSPK 350,182.50 Stop Map Plastik 0.5 Pak 8,500.00 4,250.00 Amplop Tali (No. 312) 0.5 Dus 154,500.00 77,250.00 Amplop putih (AM 90) 1 Pak 23,750.00 23,750.00 Amplop Coklat Uk Map 0.25 Pak 77,250.00 19,312.50 Kertas HVS F4 70 gr 3 Rim 41,200.00 123,600.00 Binder Clip 105 0.5 Dos 4,150.00 2,075.00 Spidol Marker 1 Bh 13,100 13,100.00 Toner HP, CB436A (36) 0.05 Bh 1,016,900.00 50,845.00 Materai 6000 4 Buah 7,000.00 28,000.00 Materai 3000 2 Buah 4,000.00 8,000.00 Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Pendidikan dan Pelatihan (Diklat)), yang diselenggarakan oleh Lembaga Diklat (Bandiklat)
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
257
Rim Bh Pak Pak Pcs Bh Pack
Nilai HSPK 41,200.00 1,016,900.00 8,500.00 20,400.00 2,750.00 13,100 31,900.00
JUMLAH 6 113,688.00 41,200.00 20,338.00 4,250.00 5,100.00 13,750.00 13,100.00 15,950.00
KODE BARANG 1
NAMA BARANG 2
VOL. 4
SAT. 3
HARGA SATUAN 5
JUMLAH 6
2.03.01.01.02.005 1.08.23.03.02.001.006 1.08.23.03.01.001.003 1.08.23.03.01.999.006 1.08.23.03.04.004.0051 1.08.23.03.01.006.0010 1.08.23.03.01.999.007 1.08.23.03.01.013.001 1.08.23.03.01.006.0013 1.08.23.03.01.014.0097 1.08.23.03.01.014.0096
ATK Administrasi Kegiatan Tipe V Nilai HSPK 270,220.00 Kertas HVS F4 70 gr 3 Rim 41,200.00 123,600.00 Ballpoint 0.5 Pak 22,950.00 11,475.00 Binder Clip 105 0.5 dos 4,150.00 2,075.00 Toner HP, CB436A (36) 0.05 Bh 1,016,900.00 50,845.00 Stop Map Plastik 1 Pak 8,500.00 8,500.00 Paper Clip No 1 1 Pak 20,400.00 20,400.00 Isi Steples No 10 0.5 dos 31,900.00 15,950.00 Snelhechter Map 0.5 Pak 2,750.00 1,375.00 Materai 6000 4 Buah 7,000.00 28,000.00 Materai 3000 2 Buah 4,000.00 8,000.00 Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Penyelenggaraan Event/Festival/Lomba/ dan Sejenisnya) b. diberikan 1 (satu) kali per Kegiatan
2.03.01.01.03.001 1.08.23.03.01.014.0060 1.08.23.03.01.014.0053
Jilid dan Penggandaan Tipe I (Modul) Nilai HSPK Jilid (Lengkap) 1 Buku 4,150.00 Fotocopy (lbr) 100 Lembar 250.00 Catatan: a. Modul Kegiatan (dengan tebal cetakan 1 Buku: 50 s/d 100 Lembar); Dicetak 1 Buku
29,150.00 4,150.00 25,000.00
2.03.01.01.03.002 1.08.23.03.01.014.0060 1.08.23.03.01.014.0053
Jilid dan Penggandaan Tipe II (Modul) Nilai HSPK Jilid Soft Cover (buku) 1 Buku 4,150.00 Fotocopy (lbr) 200 Lembar 250.00 Catatan: a. Modul Kegiatan (dengan tebal cetakan 1 Buku: 101 s/d 200 Lembar); Dicetak 1 Buku
54,150.00 4,150.00 50,000.00
2.03.01.01.03.003 1.08.23.03.01.014.0060 1.08.23.03.01.014.0053
Jilid dan Penggandaan Tipe III (Laporan) Nilai HSPK Jilid Soft Cover (buku) 1 Buku 4,150.00 Fotocopy (lbr) 100 Lembar 250.00 Catatan: a. Laporan Kegiatan (dengan tebal cetakan 1 Buku: 50 s/d 100 Lembar); Dicetak 1 Buku
29,150.00 4,150.00 25,000.00
2.03.01.01.03.004 1.08.23.03.01.014.0060 1.08.23.03.01.014.0053
Jilid dan Penggandaan Tipe IV (Laporan) Nilai HSPK Jilid Soft Cover (buku) 1 Buku 4,150.00 Fotocopy (lbr) 200 Lembar 250.00 Catatan: a. Laporan Kegiatan (dengan tebal cetakan 1 Buku: 101 s/d 200 Lembar); Dicetak 1 Buku
54,150.00 4,150.00 50,000.00
2.03.01.01.03.005 1.08.23.03.01.014.0060 1.08.23.03.01.014.0053
Jilid dan Penggandaan Tipe V (Laporan) Nilai HSPK Jilid Soft Cover (buku) 1 Buku 4,150.00 Fotocopy (lbr) 300 Lembar 250.00 Catatan: a. Laporan Kegiatan (dengan tebal cetakan 1 Buku: 201 s/d 300 Lembar); Dicetak 1 Buku
79,150.00 4,150.00 75,000.00
2.03.01.01.04.001 1.11.29.02.01.002.004 1.11.29.02.01.003.003 1.08.23.03.02.999.007
Biaya Dokumentasi Tipe I Cetak Foto Digital Uk. 4R 10 Lembar Penggandaan VCD/CD 1 Keping Album Foto (Biasa) 1 Bh Catatan: a. untuk kegiatan yang bersifat Perencanaan dan evaluasi b. diberikan 1 (satu) kali per Kegiatan
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
258
Nilai HSPK 3,300.00 10,900.00 89,250.00
133,150.00 33,000.00 10,900.00 89,250.00
KODE BARANG 1
NAMA BARANG 2
VOL. 4
SAT. 3
HARGA SATUAN 5
JUMLAH 6
2.03.01.01.04.002 1.11.29.02.01.002.004 1.11.29.02.01.003.003 1.08.23.03.02.999.007
Biaya Dokumentasi Tipe II Nilai HSPK 166,150.00 Cetak Foto Digital Uk. 4R 20 Lembar 3,300.00 66,000.00 Penggandaan VCD/CD 1 Keping 10,900.00 10,900.00 Album Foto (Biasa) 1 Bh 89,250.00 89,250.00 Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Pelatihan/Sosialisasi dan Sejenisnya; (Penyelenggaraan Event dan sejenisnya skala Kel. / Kec.) b. untuk kegiatan yang bersifat Pengawasan/Pengendalian (Pemeriksaan); (Penertiban) c. untuk Kegiatan lomba kecuali pemilihan duta wisata d. diberikan 1 (satu) kali per Kegiatan
2.03.01.01.04.003 1.11.29.02.01.003.003 1.11.29.02.01.003.002 1.08.23.03.02.999.008
Biaya Dokumentasi Tipe III Nilai HSPK 1,565,500.00 Penggandaan VCD/CD 10 Keping 10,900.00 109,000.00 Transfer Gambar ke VCD 1 Keping 54,100.00 54,100.00 Album Foto Kolase 2 Bh 701,200.00 1,402,400.00 Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Penyelenggaraan Event/Pagelaran/Pawai/Festival skala Regional/Nasional) b. Pemilihan duta wisata Kota dan Sejenisnya c. diberikan 1 (satu) kali per Kegiatan
2.03.01.01.05.001
Perlengkapan Dekorasi dan Sound System Nilai HSPK 7,932,300.00 Tipe I Sewa Panggung (Uk. 4 x 4 m - 50 cm) 1 Buah 264,400.00 264,400.00 Sewa Taman, Backdrop,dll 12 m2/hari 300,000.00 3,600,000.00 Sewa Podium Lengkap 1 Unit/hari 264,400.00 264,400.00 Sewa Umbul-umbul Kain 8 Unit/hari 24,900.00 199,200.00 Sewa Sound System (1.500 Watt) 1 Unit/hari 3,604,300.00 3,604,300.00 Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Pelatihan dan sejenisnya > Non Hotel) b. anggaran berlaku untuk SKPD yang tidak mempunyai Perlengkapan Dekorasi & Sound System c. Biaya Sewa berlaku per hari
1.10.28.03.01.002.008 1.10.28.03.01.999.0018 1.10.28.03.01.999.0013 1.10.28.03.01.999.0021 1.10.28.01.04.002.001
2.03.01.01.05.002 1.10.28.03.01.002.002 1.10.28.03.01.999.0018 1.10.28.03.01.999.0021 1.10.28.01.04.002.0010
2.03.01.01.05.003 1.10.28.03.01.002.001 1.10.28.03.01.999.0018 1.10.28.03.01.999.0021 1.10.28.01.04.002.0012
Perlengkapan Dekorasi dan Sound System Nilai HSPK 21,136,800.00 Tipe II Sewa Panggung (80-100 cm) 20 m2/hari 564,700.00 11,294,000.00 Sewa Taman, Backdrop,dll 18 m2/hari 300,000.00 5,400,000.00 Sewa Umbul-umbul Kain 10 Unit/hari 24,900.00 249,000.00 Sewa Sound System (2.000 Watt) 1 Unit/hari 4,193,800.00 4,193,800.00 Catatan: a. untuk kegiatan Lomba b. Penyelenggaraan Event Indoor / Outdoor b. anggaran berlaku untuk SKPD yang tidak mempunyai Perlengkapan Dekorasi & Sound System c. Biaya Sewa berlaku per hari Perlengkapan Dekorasi dan Sound System Nilai HSPK Tipe III Sewa Panggung (>100 cm) 25 m2/hari 684,900.00 Sewa Taman, Backdrop,dll 20 m2/hari 300,000.00 Sewa Umbul-umbul Kain 1 Unit/hari 24,900.00 Sewa Sound System (FOH dan Monitor 1 Unit/hari 5,392,000.00 5.000 Watt) Catatan: a. Penyelenggaraan Event Indoor / Outdoor >Skala Regional/Nasional) b. panggung dianggarkan jika diperlukan (efisiensi) c. berlaku untuk SKPD yang tidak mempunyai Perlengkapan Dekorasi & Sound System d. Biaya Sewa berlaku per hari
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
259
28,539,400.00 17,122,500.00 6,000,000.00 24,900.00 5,392,000.00
KODE BARANG 1 2.03.01.01.05.004 1.10.28.03.01.002.001 1.10.28.03.01.999.0018 1.10.28.03.01.999.0021 1.10.28.01.04.002.0013
2.03.01.01.06.001 1.08.23.03.01.014.0091 1.08.23.03.01.014.0075 1.08.23.03.01.014.0094 1.08.23.03.01.014.0082
2.03.01.01.06.002 1.08.23.03.01.014.0091 1.08.23.03.01.014.0075 1.08.23.03.01.014.0094 1.08.23.03.01.014.0082
2.03.01.01.07.001 1.05.18.01.05.999.010 1.05.18.01.05.001.0042 1.05.18.01.05.001.0045 1.05.18.01.05.001.0047 1.08.23.03.01.014.0095
NAMA BARANG 2
VOL. 4
SAT. 3
HARGA SATUAN 5
JUMLAH 6
Perlengkapan Dekorasi dan Sound System Nilai HSPK 37,020,800.00 Tipe IV Sewa Panggung (>100 cm) 30 m2/hari 684,900.00 20,547,000.00 Sewa Taman, Backdrop,dll 30 m2/hari 300,000.00 9,000,000.00 Sewa Umbul-umbul Kain 1 Unit/hari 24,900.00 24,900.00 Sewa Sound System (FOH dan Monitor 1 Unit/hari 7,448,900.00 7,448,900.00 10.000 Watt) Catatan: a. untuk kegiatan yang bersifat Pelaksanaan (Penyelenggaraan Event Outdoor > Skala Regional/Nasional) b. panggung dianggarkan jika diperlukan (efisiensi) c. berlaku untuk SKPD yang tidak mempunyai Perlengkapan Dekorasi & Sound System d. Biaya Sewa berlaku per hari
Publikasi Tipe I Cetak Brosur/Leaflet (Per 1000 Lembar) 1 Paket Cetak Poster (A3, 210 gr Full Color 1 Sisi, 0.02 Rim 500 Eksemplar) Spanduk Print Digital (5 x 1m) 10 m2 Cetak Back Drop / Banner (Bahan Vinyl 240 10 m2 gr) Catatan: a. untuk kegiatan Pelatihan/Sosialisasi/Dialog dan Sejenisnya b. untuk kegiatan (Event/Pameran/Pawai>Tk. Kel dan Kec.)
Nilai HSPK 637,450.00 1,416,400.00
1,245,278.00 637,450.00 28,328.00
25,750.00 32,200.00
257,500.00 322,000.00
Publikasi Tipe II Nilai HSPK Cetak Brosur/Leaflet (Per 1000 Lembar) 2 Paket 637,450.00 Cetak Poster (A3, 210 gr Full Color 1 Sisi, 0.2 Rim 1,416,400.00 500 Eksemplar) Spanduk Print Digital (5 x 1m) 75 m2 25,750.00 Cetak Back Drop / Banner (Bahan Vinyl 240 20 m2 32,200.00 gr) Catatan: a. untuk kegiatan (Event/Pameran/Pagelaran Tk. >Regional/Nasional) b. untuk Lomba Tk> Regional/Nasional
4,133,430.00 1,274,900.00 283,280.00
Hadiah / Penghargaan Kegiatan Lomba Tipe I Hadiah Pemenang Lomba Untuk Juara I, II, III
1,931,250.00 644,000.00
Nilai HSPK
16,302,700.00
15,000,000.00
15,000,000.00
Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 467,500.00 empat, 100cm) Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 424,200.00 empat, 80cm) Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 395,400.00 empat, 70cm) Sertifkat 6 Lmbr 2,600.00 Catatan: Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Olahraga (Perorangan)
467,500.00
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
260
1
Orang
424,200.00 395,400.00 15,600.00
KODE BARANG 1 2.03.01.01.07.002 1.05.18.01.05.999.013 1.05.18.01.05.001.0038 1.05.18.01.05.001.0041 1.05.18.01.05.001.0042 1.08.23.03.01.014.0095
2.03.01.01.07.003 1.05.18.01.05.999.016 1.05.18.01.05.001.0042 1.05.18.01.05.001.0045 1.05.18.01.05.001.0047 1.08.23.03.01.014.0095
2.03.01.01.07.004 1.05.18.01.05.999.019 1.05.18.01.05.001.0038 1.05.18.01.05.001.0041 1.05.18.01.05.001.0042 1.08.23.03.01.014.0095
2.03.01.01.07.005 1.05.18.01.05.999.022 1.05.18.01.05.001.0042 1.05.18.01.05.001.0045 1.05.18.01.05.001.0047 1.08.23.03.01.014.0095
NAMA BARANG 2
VOL. 4
Hadiah / Penghargaan Kegiatan Lomba Tipe II Hadiah Pemenang Lomba Untuk Juara I, II, III
SAT. 3
HARGA SATUAN 5
JUMLAH 6
Nilai HSPK
31,611,600.00
30,000,000.00
30,000,000.00
Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 576,400.00 empat, 140 cm) Trofi Pemenang Lomba untuk Juara 2 (kaki 1 Buah 481,900.00 empat, 110 cm) Trofi Pemenang Lomba untuk Juara 3 (kaki 1 Buah 467,500.00 empat, 100 cm) Sertifkat 33 Lmbr 2,600.00 Catatan: Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Olahraga (Kelompok)
576,400.00
Hadiah / Penghargaan Kegiatan Lomba Tipe III Hadiah Pemenang Lomba Untuk Juara I, II, III
1
Paket
481,900.00 467,500.00 85,800.00
Nilai HSPK
13,302,700.00
12,000,000.00
12,000,000.00
Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 467,500.00 empat, 100cm) Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 424,200.00 empat, 80cm) Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 395,400.00 empat, 70cm) Sertifkat 6 Lmbr 2,600.00 Catatan: Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Seni Budaya (Perorangan)
467,500.00
Hadiah / Penghargaan Kegiatan Lomba Tipe IV Hadiah Pemenang Lomba Untuk Juara I, II, III
1
Paket
424,200.00 395,400.00 15,600.00
Nilai HSPK
19,681,800.00
18,000,000.00
18,000,000.00
Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 576,400.00 empat, 140 cm) Trofi Pemenang Lomba untuk Juara 2 (kaki 1 Buah 481,900.00 empat, 110 cm) Trofi Pemenang Lomba untuk Juara 3 (kaki 1 Buah 467,500.00 empat, 100 cm) Sertifkat 60 Lmbr 2,600.00 Catatan: Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Seni Budaya (Kelompok)
576,400.00
Hadiah / Penghargaan Kegiatan Lomba Tipe V Hadiah Pemenang Lomba Untuk Juara I, II, III
1
Paket
481,900.00 467,500.00 156,000.00
Nilai HSPK
6,302,700.00
5,000,000.00
5,000,000.00
Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Orang 467,500.00 empat, 100cm) Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 424,200.00 empat, 80cm) Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 395,400.00 empat, 70cm) Sertifkat 6 Lmbr 2,600.00 Catatan: Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Umum (Perorangan)
467,500.00
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
261
1
Paket
424,200.00 395,400.00 15,600.00
KODE BARANG 1 2.03.01.01.07.006 1.05.18.01.05.999.025 1.05.18.01.05.001.0038 1.05.18.01.05.001.0041 1.05.18.01.05.001.0042 1.08.23.03.01.014.0095
2.03.01.01.07.007 1.05.18.01.05.999.028 1.05.18.01.05.001.0042 1.05.18.01.05.001.0045 1.05.18.01.05.001.0047 1.08.23.03.01.014.0095
NAMA BARANG 2
VOL. 4
Hadiah / Penghargaan Kegiatan Lomba Tipe VI Hadiah Pemenang Lomba Untuk Juara I, II, III
SAT. 3
HARGA SATUAN 5
JUMLAH 6
Nilai HSPK
11,681,800.00
10,000,000.00
10,000,000.00
Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 576,400.00 empat, 140 cm) Trofi Pemenang Lomba untuk Juara 2 (kaki 1 Buah 481,900.00 empat, 110 cm) Trofi Pemenang Lomba untuk Juara 3 (kaki 1 Buah 467,500.00 empat, 100 cm) Sertifkat 60 Lmbr 2,600.00 Catatan: Hadiah / Penghargaan Kegiatan Lomba Tk.Kota Bidang Umum (Kelompok)
576,400.00
1
Paket
481,900.00 467,500.00 156,000.00
Hadiah / Penghargaan Kegiatan Lomba Tipe Nilai HSPK 51,313,100.00 VII Hadiah Pemenang Lomba Untuk Juara I, II, III 1 Paket 50,000,000.00 50,000,000.00 dan Kategori Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 467,500.00 467,500.00 empat, 100cm) Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 424,200.00 424,200.00 empat, 80cm) Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 395,400.00 395,400.00 empat, 70cm) Sertifkat 10 Lmbr 2,600.00 26,000.00 Catatan: Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Khusus (Pemilihan Duta Wisata dan Semacamnya)
WALIKOTA MOJOKERTO
MAS’UD YUNUS
Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017
262