VI. SATUAN HARGA PARAMETER UJI, SEWA ALAT, JASA DAN HARGA DASAR SATUAN 1. HARGA PADA UPTD BALAI PENGUJIAN
a. DAFTAR HARGA SATUAN TARIF PENGUJIAN KUALITAS AIR NO
PARAMETER
HARGA SATUAN
TARIF (Rp.)
1
2
3
4
I
FISIKA
1 2 3 4 5 6 7 8 9
DHL Kekeruhan PH Suhu Oksigen Terlarut Warna Residu Terlarut (TDS) Residu Tersuspensi (TSS) Sedimen
II
KIMIA
10 11 12 13 14 15 16 17 18 19
Kelindian Keasaman Boron (B) Nitrogen Organik Amonium (NH3-N) Flourida (F) Fenol Deterjen Ortho Phospat Total Phospat
Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji
3,900 3,900 3,900 3,900 3,900 9,100 8,580 8,580 8,580
Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji
3,978 3,978 12,142 23,062 23,062 12,142 11,102 15,002 15,002 15 002
NO
PARAMETER
III
BAKTERIOLOGI
36 37
Coli Tinja Total Coli
IV
LOGAM
38 39 40 41 42 43 44 45 46 47 48 49 50
Besi Mangan Kadmium Kromium Nikel Seng Timbal Tembaga Selenium Natrium Kalium Raksa Arsen
HARGA SATUAN
TARIF (Rp.)
Per Parameter Uji Per Parameter Uji
16,042 16,042
Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji
90,480 90,480 90,480 90,480 90,480 90,480 90,480 90,480 90,480 90,480 90,480 118,040 95,992
NO
PARAMETER
III
BAKTERIOLOGI
36 37
Coli Tinja Total Coli
IV
LOGAM
38 39 40 41 42 43 44 45 46 47 48 49 50
Besi Mangan Kadmium Kromium Nikel Seng Timbal Tembaga Selenium Natrium Kalium Raksa Arsen
HARGA SATUAN
TARIF (Rp.)
Per Parameter Uji Per Parameter Uji
16,042 16,042
Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji Per Parameter Uji
90,480 90,480 90,480 90,480 90,480 90,480 90,480 90,480 90,480 90,480 90,480 118,040 95,992
PEKERJAAN DESAIN MIXED LABORATORIUM BAHAN BANGUNAN
No.
URAIAN
SATUAN
TARIF (Rp)
1
2
3
4
1.
DMF ASPAL (AC-WC, AC-BC, AC-BASE, ATB)
DMF
1,230,710
2.
DMF ASPAL LAPEN
DMF
1,009,710
3.
DMF BETON MUTU
DMF
713,050
J u m l a h
2,953,470
DAFTAR HARGA SATUAN TARIF QUALITY CONTROL ASPAL
NO.
URAIAN
SATUAN
TARIF ( Rp )
1
2
3
4
1 QUALITY CONTROL ASPAL CAMPURAN ASPAL - TES PIT
PER SAMPLE
45,500
- EXTRAKSI
PER SAMPLE
22,295
- ANALISA SARINGAN
PER SAMPLE
11,375
- ABRASI
PER SAMPLE
12,740
- BJ/KEPADATAN LAPANGAN
PER SAMPLE
44,135
- BJ/KEPADATAN LAB
PER SAMPLE
13,195
- MARSHAAL CONTROL
PER SAMPLE
13,195
- RETAINED MARSHAAL
PER SAMPLE
22,750
- CORE DRILL
PER SAMPLE
32,500
KET 5
2. DAFTAR HARGA SEWA PERALATAN MILIK PEMDA JAMBI YANG BERADA DI DINAS PEKERJAAN UMUM PROVINSI JAMBI
NO
JENIS PERALATAN
1
2
TAHUN PEMBUATAN 3
TAHUN PEMAKAIAN 4
SEWA/JAM (RP) 5
SEWA/HARI (RP) 6
1
MOTOR GRADER MERK/TYPE : MITSUBISHI MG.330
2005
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. T AHUN KEEMPAT e. TAHUN KELIMA
372,063.00 299,355.00 223,505.00 174,481.00 122,316.00
2,174,177.00 1,749,300.00 1,364,501.00 1,019,592.00 714,761.00
2
CRANE MERK/TYPE : KATO KR 250 KAPASITAS : 20 TON
1986
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. TAHUN KEEMPAT
169,914.00 136,710.00 106,710.00 79,682.00
1,189,403.00 956,970.00 746,970.00 557,777.00
3
WHELL LOADER BACK HOES MERK/TYPE : CASE 580 SERIES 3 KAPASITAS : SUPER M
2010
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. T AHUN KEEMPAT e. TAHUN KELIMA
311,674.00 250,767.00 195,605.00 146,161.00 92,417.00
2,181,723.00 1,755,371.00 1,369,237.00 1,023,130.00 646,922.00
4
EXCAVATOR ON TRACK MERK/TYPE : KOMATSU PC 130F-7
2011
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. TAHUN KEEMPAT e. TAHUN KELIMA
266,458.00 214,381.00 167,223.00 124,953.00 87,590.00
1,865,156.00 1,500,667.00 1,170,561.00 874,674.00 613,170.00
5
MOTOR GRADER MERK/TYPE : KOMATSU GD.511A-1
2011
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. T AHUN KEEMPAT e. TAHUN KELIMA
340,514.00 273,971.00 159,686.00 213,705.00 111,944.00
2,383,602.00 1,917,798.00 1,495,935.00 1,117,802.00 783,609.00
6
VIBRO ROLLER MERK/TYPE : BOMAG BW. 211D-40 KAPASITAS : 10 TON
2011
a. TAHUN PERTAMA b. TAHUN KEDUA c TAHUN KETIGA
217,623.00 175,095.00 136 579 00
1,523,363.00 1,225,667.00 956 053 00
NO
JENIS PERALATAN
1
2
TAHUN PEMBUATAN 3
TAHUN PEMAKAIAN 4
SEWA/JAM (RP) 5
SEWA/HARI (RP) 6
10 EXCAVATOR ON TRACK CAPASITAS 0,8 M3
2005
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. TAHUN KEEMPAT
2,150,485.00 1,730,237.00 1,349,632.00 1,008,481.00
11 BULLDOZER D6D
2009
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. TAHUN KEEMPAT
2,054,278.00 1,652,831.00 1,289,253.00 963,364.00
12 BULLDOZER KOMATSU CAPASITAS 18 TON
2013
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. TAHUN KEEMPAT dan seterusnya
3,587,968.00 2,886,808.00 2,251,788.00 1,682,596.00 1,179,546.00
13 VIBRO ROLLER 4 TON SAKAI
2009
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. TAHUN KEEMPAT
1,039,129.00 836,062.00 652,151.00 487,305.00
14 WHEEL LOADER BACK HOES
2005
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. TAHUN KEEMPAT
2,182,170.00 1,755,371.00 1,369,237.00 1,023,130.00
15 EXCAVATOR ON WHEEL HYUNDAI
2006
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. TAHUN KEEMPAT
2,182,170.00 1,755,371.00 1,369,518.00 1,023,340.00
16 EXCAVATOR ON TRACK KOBELKO
2009
a. TAHUN PERTAMA b. TAHUN KEDUA c. TAHUN KETIGA d. TAHUN KEEMPAT
1,935,257.00 1,557,069.00 1,214,556.00 907,549.00
17 FINISHER , MAINTENANCE
2009
a. TAHUN PERTAMA b TAHUN KEDUA
1,652,435.00 1 369 387 00
7. HARGA DASAR SATUAN a. HARGA DASAR SATUAN UPAH PER KABUPATEN / KOTA PROVINSI JAMBI NO
URAIAN
KODE
SATUAN
BTG.HARI ( Rp. )
BUNGO ( Rp. )
JAMBI ( Rp. )
KERINCI ( Rp. )
MA.JAMBI ( Rp. )
KABUPATEN/KOTA MERANGIN SAROLANGUN ( Rp. ) ( Rp. )
TEBO ( Rp. )
TJB.BARAT ( Rp. )
TJB.TIMUR ( Rp. )
S.PENUH (Rp)
1
Pekerja
( L 01 )
Jam
6.900 - 10.500
7.600 - 10.800
7.500 - 10.200
7.300 - 10.300
6.800 - 10.600
7.300 - 10.500
7.200 - 10.300
7.200 - 10.300
7.500 - 10.450
7.300 - 10.400
7.500 - 10.450
2
Tukang
( L 02 )
Jam
8.500 - 11.900
8.600 - 11.800
8.450 - 11.950
8.200 - 11.850
8.500 - 11.650
8.500 - 11.650
8.500 - 11.650
8.800 - 11.700
8.500 - 11.700
8.500 - 11.700
8.500 - 11.700
3
Kepala Tukang
( L 03 )
Jam
10.900 - 13.900 10.900 - 14.000 10.800 - 14.000 10.900 - 14.000 10.800 - 13.400 10.800 - 13.400 10.800 - 13.400 10.800 - 13.400 10.800 - 13.400 10.800 - 13.400
10.300 - 13.400
4
Mandor
( L 04 )
Jam
9.750 - 14.000
9.800 - 14.100
9.800 - 14.600
10.100 - 14.500
9.750 - 14.400
9.750 - 13.400
9.750 - 14.400
9.750 - 15.400
9.750 - 14.400
9.750 - 14.400
9.750 - 14.400
5
Operator
( L 05 )
Jam
9.750 - 14.800
9.800 - 14.600
9.800 - 14.600
10.000 - 14.800
8.300 - 13.400
8.300 - 13.400
8.300 - 13.400
8.300 - 13.400
8.300 - 13.400
8.300 - 13.400
8.300 - 13.400
6
Pembantu Operator
( L 06 )
Jam
8.100 - 11.900
8.600 - 13.400
8.400 - 11.900
8.200 - 13.300
7.350 - 10.800
7.350 - 10.800
7.350 - 10.800
7.350 - 10.800
7.350 - 10.800
7.350 - 10.800
7.350 - 10.800
7
Sopir / Driver
( L 07 )
Jam
7.150 - 10.850
7.150 - 10.900
7.500 - 11.000
7.250 - 10.850
6.900 - 10.000
6.900 - 10.000
6.900 - 10.000
6.900 - 10.000
6.900 - 10.000
6.900 - 10.000
6.900 - 10.000
8
Pembantu Sopir
( L 08 )
Jam
6.600 - 9.900
6.600 - 9.900
6.750 - 9.850
6.800 - 9.900
6.800 - 9.900
6.800 - 9.900
6.800 - 9.900
6.800 - 9.900
6.800 - 9.900
6.800 - 9.900
5.300 - 9.900
9
Mekanik
( L 09 )
Jam
8.250 - 11.850
8.150 - 11.900
8.300 - 11.900
8.500 - 12.100
8.500 - 12.100
8.500 - 12.100
8.500 - 12.100
8.500 - 12.100
8.500 - 12.100
8.500 - 12.100
8.500 - 12.100
10
Pembantu Mekanik
( L 10 )
Jam
6.950 - 9.400
7.000 - 9.850
6.900 - 9.800
6.800 - 10.000
6.800 - 10.000
7.300 - 9.900
7.300 - 9.900
7.300 - 9.900
7.300 - 9.900
7.300 - 9.900
7.300 - 9.900
11
Tukang Las
( L 11 )
Jam
8.200 - 11.400
8.200 - 11.500
8.500 - 11.600
8.200 - 11.300
8.900 - 11.600
8.900 - 11.500
8.900 - 11.500
8.900 - 11.500
8.900 - 11.500
8.900 - 11.500
8.900 - 11.500
12
Oil Man/Crew
( L 12 )
Jam
6.600 - 9.400
6.600 - 9.500
6.500 - 9.500
6.600 - 9.400
6.800 - 9.500
6.800 - 9.500
6.800 - 9.500
6.800 - 9.500
6.800 - 9.500
6.800 - 9.500
6.300 - 9.500
13
Juru Ukur
( L 13 )
Jam
9.000 - 11.900
9.300 - 12.100
9.250 - 11.850
9.300 - 11.900
8.900 - 11.900
9.300 - 11.900
9.300 - 11.950
9.300 - 11.900
9.300 - 11.950
9.300 - 11.900
9.300 - 11.950
Cat : Asumsi : 1 (satu) hari = 8 jam kerja 7 jam kerja efektif
b. HARGA DASAR SATUAN BAHAN PER-KABUPATEN/KOTA DI PROVINSI JAMBI I . A GR EG AT NO
URAIAN
KODE
SATUAN
( M0 1) ( M0 2) (M03)
M3 M3 M3
Ja mbi 2 01 7( Rp)
13 5,5 00 13 5,5 00 135,500
9 7, 50 0 9 7, 50 0 100,000 -
1 55, 00 0 1 55, 00 0 300,800
1 05, 00 0 1 05, 00 0 110,500 -
18 7,0 00 18 7,0 00 320,100
Batang Hari2017 (Rp) 95 0 , 00 95 0 , 00 100,000 -
Tebo 2017 (Rp) 1 60, 00 0 1 60, 00 0 100,000
-
2 00 ,50 0 2 00 ,50 0 154,250
10 0,0 00 19 0,0 00 80,000
-
S ar ol an gu n 20 17 ( Rp )
1 50 0 , 00 1 50 0 , 00 185,000
1 50, 00 0 1 90, 00 0 80,000 -
22 8, 100 15 0, 000 98,100
M er an gi n 20 17 ( Rp ) 22 0, 000 22 0, 000 80,000 -
3 10 0 , 00 3 10 0 , 00 100,000
Kerinci 2017 (Rp) 3 15 0 , 00 3 15 0 , 00 80,000
-
( M0 4) (M05)
M3 kg
5 30 0 , 00 5,500 -
55 6,0 00 9,000
5 31, 00 0 5,500 -
55 1,0 00 9,000
5 24, 00 0 5,500 -
5 56, 00 0 9,000
5 24, 00 0 5,500 -
55 6,0 00 9,000
5 30 0 , 00 5,500 -
55 6, 000 9,000
5 31, 00 0 5,500 -
5 51 ,00 0 9,000
53 1,0 00 5,500 -
5 51 0 , 00 9,000
5 31, 00 0 5,500 -
55 1, 000 9,000
53 2, 000 5,500 -
5 51 0 , 00 9,000
3 45 0 , 00 5,500 -
4 15 0 , 00 9,000
3 20, 00 0 5,500 -
B atu B el ah Gr ave l/ ker iki l
( M0 6) ( M0 7)
M3 M3
4 00 5 , 00 5 75 0 , 00 -
50 0,0 00 60 5,0 00
4 01, 50 0 5 76, 00 0
50 0,0 00 60 5,0 00
3 70, 00 0 5 00, 00 0 -
4 15, 50 0 6 67, 92 0
3 75, 00 0 5 05, 00 0 -
41 6,0 00 66 7,9 20
4 01 5 , 00 5 75 0 , 00 -
50 0, 000 60 5, 000
3 75, 00 0 5 85, 00 0 -
4 16 ,00 0 6 67 ,00 0
37 5,0 00 58 5,0 00
-
4 16 0 , 00 6 67 0 , 00
5 35, 00 0 5 85, 00 0 -
57 5, 000 66 7, 000
53 6, 000 58 5, 000 -
5 78 0 , 00 6 67 0 , 00
3 27 5 , 00 5 88 0 , 00
4 09 0 , 00 6 67 0 , 00
3 28, 00 0 5 88, 00 0 -
8 9 10
Tan ah T imbun an Bi asa/Uru g Ta nah t im bu na n p il ih an S ir tu
(M08) ( M0 9) ( M1 0)
M3 M3 M3
40,000 1 20 0 , 00 2 71 0 , 00 -
75,000 14 3,8 00 30 7,0 00
40,000 1 20, 00 0 2 71, 50 0 -
70,000 14 3,8 00 30 7,0 00
39,500 1 20, 00 0 2 70, 00 0 -
75,000 1 60, 00 0 2 98, 00 0
39,000 9 1, 50 0 2 75, 00 0 -
120,000 15 0,0 00 29 8,0 00
41,000 1 20 0 , 00 2 71 0 , 00 -
75,000 14 3, 800 30 7, 000
47,500 1 24, 00 0 2 71, 00 0 -
81,000 1 63 ,75 0 3 07 ,00 0
47,500 12 4,5 00 27 2,0 00 -
81,000 1 64 0 , 00 3 07 0 , 00
47,500 1 20, 90 0 2 73, 00 0 -
81,000 19 0, 000 30 7, 500
47,500 12 0, 900 27 2, 000 -
81,000 1 90 0 , 00 3 07 0 , 00
48,000 1 20 9 , 00 2 72 0 , 00 -
82,500 1 90 0 , 00 3 07 0 , 00
48,000 1 20, 90 0 2 72, 00 0 -
11 12
Ba ha n A gg re ga t Uk ur an ( 1 -2 & 2 -3 ) cm B ah an A gg re ga t Uk ur an 3 - 4 c m
( M1 1) ( M1 2)
M3 M3
4 15 ,0 00 4 10 ,0 00 -
5 55 ,0 00 4 97 ,0 00
4 15 ,0 00 4 10 ,0 00
-
5 55 ,0 00 4 97 ,0 00
5 17 ,0 00 5 10 ,0 00 -
5 50 ,0 00 5 50 ,0 00
5 17 ,5 00 5 10 ,0 00 -
5 50 ,0 00 5 79 ,9 00
4 15 ,0 00 4 10 ,0 00 -
5 55 ,0 00 4 97 ,0 00
5 18 ,5 00 5 12 ,5 00 -
5 50 ,0 00 5 79 ,9 00
5 19 ,0 00 5 13 ,0 00
-
5 50 ,0 00 3 20 ,5 00
5 19 ,0 00 5 13 ,0 00 -
5 50 ,0 00 3 20 ,5 00
5 19 ,0 00 5 13 ,0 00 -
5 50 ,0 00 3 20 ,5 00
2 80 ,7 00 4 99 ,8 00
-
3 45 ,2 00 5 98 ,0 00
2 80 ,7 00 4 99 ,8 00 -
13 14
B ah an A gg re ga t Uk ur an 5 - 7 c m B atu A la m
( M1 3) ( M1 4)
M3 M2
4 01 ,0 00 5 98 0 , 00 -
4 98 ,0 00 87 9,0 00
4 01 ,0 00 5 97, 00 0 -
4 98 ,0 00 87 9,0 00
4 03 ,5 00 60 , 00, 00 0 -
5 13 ,0 00 8 90, 00 0
4 02 ,5 00 6 00, 00 0 -
5 13 ,0 00 88 0,0 00
4 01 ,0 00 5 97 0 , 00
4 98 ,0 00 87 9, 000
4 02 ,8 00 4 81, 50 0 -
5 25 ,0 00 6 62 ,00 0
4 03 ,8 00 48 1,5 00
-
5 23 ,5 00 6 62 0 , 00
4 03 ,0 00 4 81, 50 0 -
5 24 ,0 00 66 2, 000
4 03 ,0 00 48 1, 500 -
5 24 ,0 00 6 62 0 , 00
3 99 ,0 00 3 31 8 , 00
-
4 97 ,5 00 6 62 0 , 00
3 99 ,0 00 3 30, 00 0 -
KODE
SATUAN
Jambi2017 (Rp) 4 2,0 00 4 0,0 00
Muara Jambi 2017 (Rp) 1 7, 00 0 2 0,0 00 1 5, 00 0 1 9,0 00
1 5, 00 0 -
Tj.Timur 2017 (Rp) 1 8, 00 0 3 4, 20 0
2 3, 32 0 -
1 4, 00 0
1 7, 136 -
Kerinci2017 (Rp) 23 0 , 00 20 0 , 00
1 5, 00 0 -
1 5, 00 0
Merangin 2017 (Rp) 18 5 , 64 19 8 , 90
16 0 , 00
2 5, 06 9 -
Sarolangun 2017 (Rp) 1 8,0 00 2 1,0 00
1 5, 994 -
3 2, 10 0 -
15 0 , 00
1 6, 00 0 -
Jambi2017 (Rp) 12,000 9,000 10,300 7,300 13,000 6,900 35,000 4 0,0 00 3 7, 50 0 4 3,5 00 50,000 6 3,0 00 47,700 6 2,7 00 165,000 2 00 ,0 00 154,500 1 84 ,5 00 2,500 4 ,180
Muara Jambi 2017 (Rp) 12,000 9,000 10,300 7,300 13,000 6,900 3 3, 50 0 4 0,5 00 3 6, 25 0 4 4,2 50 5 0, 52 5 6 1,0 25 5 0, 45 0 5 9,9 50 1 65 ,0 00 2 00 ,0 00 1 25 ,0 00 1 25 ,0 00 2,030 4,180
-
4 00 0 , 00 4 00 0 , 00 100,000
S. Penuh 20
B atu K al i Filler
-
14 0, 000 14 0, 000 109,925
Muaro Bungo 2017 (Rp)
6 7
3 33, 00 0 3 33, 00 0 80,000 -
ASPAL
NO
URAIAN
15
Asp al semen Pen etrasi
(M15)
KG
37 0 , 00 -
16
Aspal semen Emulsi
(M16)
L tr
35 0 , 00 -
Tj.Barat 2017 (Rp) 2 3,3 20 2 5,0 69
Batang Hari 2017 (Rp) 14 0 , 00 2 0, 000 16 0 , 00 2 2, 000
Tj.Barat 2017 (Rp) 13059 13,059 9,000 10,300 7,300 13,000 6,900 4 3, 64 2 5 0,1 88 4 1, 20 0 4 7,3 50 3 4, 91 4 4 0,1 51 5 3, 52 5 5 8,0 25 1 65 ,0 00 2 00 ,0 00 1 7 3, 10 0 1 92 ,6 00 1,788 3,388
Batang Hari2017 (Rp) 12,000 9,000 10,300 7,300 13,000 6,900 42 1 , 98 4 8, 246 4 2. 65 3 54 .7 53 5 2. 63 5 58 .6 85 5 8. 98 8 6 6, 248 1 65 ,0 00 2 00 ,0 00 1 68 .7 95 1 92 .9 95 1.625 3.375
Tebo 2017 (Rp) 22 ,00 0 25 ,00 0
Muaro Bungo 2017 (Rp) 1 3,0 00 17 2 , 09 1 4,0 00 20 5 , 00
Tebo 2017 (Rp)
Muaro Bungo 2017 (Rp) 12,000 9,000 10,300 7,300 13,000 6,900 37 .2 50 44 .3 25 2 9,0 00 45 .5 00 49 .3 25 60 .3 25 60 .1 00 65 .1 00 1 65 ,0 00 2 00 ,0 00 1 62 .5 00 1 82 .5 00 1.918 3.718
1 6, 00 0 1 9, 00 0
S. Penuh 20
BBM
NO
KODE
SATUAN
17 18 19
K er os en / m in ya k t an ah i n du st ri K e ro se n / m in ya k t an ah n o ni n du s tr i Bensin industri
( M1 7) ( M1 8) (M19)
L IT E R L IT E R LITER
20 21
Bensin non industri Solar industri
(M20) (M21)
LITER LITER
22 23
Solar Non Industri Minyak Pelumas / oli
(M22) (M23)
LITER L ITER
24 25 26
Mi ny ak P el um as / o li n on i nd us tr i Hidrolic Oil Gear Oil
( M2 4) (M26) (M27)
L IT ER LITER LITER
27 28
Elpiji (12 kg) Oksigen
(M28) (M29)
Tabung Tabung
29
Batu Bara
(M30)
Kg
IV
9 7, 00 0 9 7, 00 0 88,500 -
T j. Bar at 20 17 (Rp )
4 5
III
13 5,0 00 13 5,0 00 130,000
Tj .Ti mur 2 01 7(Rp )
P as ir B et on P as ir P as an g Pasir Urug
II
96 0 , 00 96 0 , 00 88,000 -
Mu ar aJa mbi 2 01 7(Rp )
1 2 3
URAI AN
Tj.Timur 2017 (Rp) 1 3,550 9,000 10,300 7,300 13,000 6,900 3 8, 50 0 48,500 3 9, 50 0 44,000 4 7, 00 0 68,000 5 5, 00 0 59,000 1 65 ,0 00 2 00 ,0 00 1 71 ,5 00 196,500 2,213 4,113 12,600
12,000 9,000 10,300 7,300 13,000 3 6. 82 5
-
6,900 4 4. 82 5
4 3. 25 0 4 8. 37 5 6 1. 28 5
-
6 0. 25 0 6 0. 87 5 7 4. 18 5
1 65 ,0 00 2 31 .5 00
-
2 00 ,0 00 3 66 .5 00
1.900
-
3.850
Sarolangun 2017 (Rp) 12,000 9,000 10,300 7,300 13,000 6,900 3 4, 87 5 3 9,8 75 3 5, 25 0 4 5,2 50 4 6, 75 0 5 6,7 50 5 5, 50 0 5 9,5 00 1 65 ,0 00 2 00 ,0 00 1 74 ,7 50 2 04 ,7 50 2,070 4,370
Merangin 2017 (Rp) 14,560 16,900 10,080 11,700 12,699 14,739 12,656 14,690 12,699 14,739 6,900 5 0, 400 58 5 , 00 27 .00 0 4 2. 00 0 5 1, 520 59 8 , 00 6 4, 960 75 4 , 00 1 38 ,8 80 1 61 ,2 00 1 72 ,4 80 2 00 ,2 00 650 750
Kerinci 2017 (Rp) 12,000 9,000 10,300 7,300 13,000 6,900 41 2 , 50 49 5 , 00 39 8 , 25 48 8 , 25 53 8 , 25 62 0 , 00 49 5 , 75 55 0 , 75 1 65 ,0 00 2 00 ,0 00 1 60 ,1 00 1 99 ,0 00 2,075 4,250
S. Penuh 20
4 2, 00 0 3 8, 00 0 4 1, 82 5 5 3, 32 5 1 65 ,0 00 1 57 ,2 50 2,145 -
SEME N
NO
KODE
SATUAN
Tj.Timur 2017 (Rp)
Tj.Barat 2017 (Rp)
30
Semen / PC (50 Kg)
URAI AN
(M31)
ZAK
64,000 -
71,000
65,150
-
73,000
66,000
-
6 6, 50 0 -
7 9, 50 0
6 5, 30 0 -
31 32
Semen Putih Semen / P C(40 Kg)
(M32) (M33)
kg ZAK
5,000 53,000 -
9,500 70,000
2,500 53,500
-
13,000 70,500
6,000 55,400
-
8, 80 0 56,300 -
1 5,0 00 73,000
24 , 00 53,900
Jambi 2017 (Rp)
Muara Jambi2017 (Rp)
Catatan : Harga dasar terendah di Ibukota kabupaten Harga dasar tertinggi di kecamatan paling jauh/sulit dijangkau dari kabupaten yang bersangkutan Harga BBM belum termasukbiaya transportasi ke lokasi pekerjaan Harga BBM dan Elpiji tergantung harga yang dikeluarkan oleh Pemerintah
75,000 8,000 72,500
Batang Hari 2017 (Rp)
-
5, 000 71,000
Tebo 2017 (Rp)
69,300 21,000 57,900
-
Muaro Bungo 2017(Rp) 82,000 25,000 74,000
6 8,5 00
-
81 5 , 00
1 4, 00 0 57,500
-
1 7, 00 0 73,500
Sarolangun 2017 (Rp)
Merangin 2017 (Rp)
6 7, 20 0
Kerinci 2017 (Rp)
S. Penuh 20
-
8 1,5 00
6 8, 000 -
82 0 , 00
6 9, 90 0 -
8 3, 00 0
6 9, 50 0 -
1 3,800 56,900 -
21,100 72,000
9,000 57,100
12,000 72,300
4,500 57,900 -
7,000 75,000
2,600 57,800 -
V
BESI
NO
KODE
SATUAN
33 34
Besi Beton U 24 Besi Beton U 32
(M34) (M35)
KG KG
35 36
Kawat Beton KawatBeronjo ng Pabrikan (P 2m xL 0,5 m xT 1m)
(M36) (M37)
KG Unit
21 0 , 00 5 00 ,0 00 -
2 5,7 00 6 20 ,0 00
37 38 39
Paku Uk. 3 cm - 7 cm Dempul Paku Halus
(M38) (M39) (M40)
KG kg kg
17 2 , 00 28 7 , 00 22 0 , 00 -
3 0,0 00 3 3,0 00 2 7,8 00
40 41
P aku p ayu ng u li r p ak ai k ar et Plat Rambu (En g. Grade)
( M4 1) (M42)
kg BH
30 0 , 00 3 79 ,0 50 -
4 4,3 00 4 19 ,0 50
42 43
P la t Ra mb u ( hi gh I . Gr ad e) Rel Pengaman
( M4 3) (M44)
BH M'
4 20 ,5 63 9 35 ,0 00 -
4 50 ,5 63 1 ,0 20 ,0 00
44 45 46
Baja Struktur = U32 Ti ang P ancan gBaja = U32 Kawat Las
(M45) (M46) (M47)
KG KG kg
15 5 , 00 28 5 , 00 2 20 ,0 00 -
3 0,5 00 5 2,0 00 2 40 ,0 00
47 48
Kawat Galvanis Kawat Kasa
(M48) (M49)
Kg M1
29 8 , 80 18 3 , 38 -
4 1,8 80 2 1,3 38
49 50
Paku Bulian Baut/Mur/ring
(M50) (M51)
Kg Bh
27 3 , 13 7,085 -
3 8,8 13 8,785
51 52 53
Sling 3/4 Baja L 300 Track Stang
(M52) (M53) (M54)
M1 Kg Bh
1 04 ,0 75 36 5 , 00 1 56 ,6 88 -
1 15 ,5 75 4 4,0 00 1 73 ,9 38
54 55
Besi angker 25 mm Mur/baut/pl at an gker
(M55) (M56)
M1 un it
47 7 , 25 6,775 -
5 5,7 75 23,125
56 57
Plat Pengikat Gu nti ng p em oto ng b es i/ ba a j
(M57) ( M5 8)
Kg Bh
25 8 , 75 1 79 ,0 00 -
3 1,6 25 2 70 ,8 25
58 59
Engsel Handel 3' Engsel Handel 4'
(M59) (M60)
Bh bh
22 0 , 00 27 5 , 00 -
2 7,5 00 3 5,9 00
60 61 62 63
Grandel 3 (M61) Chipping (M63) Ar Borel (M64) Pintu Air Tipe A1 ( As Double pakai gigi,uk. 1,5 M x ( M6 5) 2,0 M x 4,5 M )
Bh M3 KG
66
Pintu Air Tipe A2 ( As Double pakai gigi,uk. 1,5 M x ( M6 6) 2,0 M x 5,0 M)
U ni t
67
Pintu Air Tipe A3 ( As Double pakai gigi,uk. 1,5 M x ( M6 7) 2,0 M x 8,0 M )
U ni t
68
Pintu Air Tipe A4 ( As Double pakai gigi,uk. 1,5 M x ( M6 8) 2,0 M x 10,0 M )
U ni t
69
Pintu Air Tipe B ( As Single pakai gigi,uk. 1,0 M x 1,5 M x 4,0 M )
( M6 9)
U ni t
70
Pintu Air Tipe C ( As Single Tanpa Gigi,uk. 1,0 M x 1,5 M x 4,0 M)
( M7 0)
U ni t
(M71)
Unit
71
URAI AN
Pin tu A ir Ti pe T ersi er ( 0,6 x 1,0 x 1,5 ) M
U ni t
Jambi 2017 (Rp) 16 2 , 50 2 0,0 00 15 5 , 00 2 1,0 00
22 0 , 00 3 93 ,0 00 53 0 , 00 54,535,000
-
4 1,5 00 4 27 ,0 00 6 7,0 00 67,135,000
Muara Jambi 2017 (Rp) 1 4, 20 0 1 4,6 00 1 6, 00 0 2 1,0 00 1 7, 20 0 2 4,2 00 5 15 ,0 00 6 25 ,0 00 1 5, 00 0 2 0,0 00 2 0, 00 0 2 8,0 00 2 0, 00 0 2 5,0 00 3 1, 80 0 4 1,8 00 3 83 ,3 00 4 14 ,8 00 5 00 ,0 00 5 00 ,0 00 9 20 ,0 00 1 ,0 35 ,0 00 2 0, 00 0 2 2,5 00 3 2, 00 0 4 8,5 00 2 00 ,0 00 2 25 ,0 00 2 8, 90 5 4 2,8 55 1 5, 00 0 1 7,5 00 2 7, 88 8 3 8,2 38 7,235 8,635 9 0, 82 5 1 28 ,8 25 2 8, 50 0 5 2,0 00 1 62 ,4 38 1 68 ,1 88 3 9, 60 0 6 3,9 00 8,700 21,200 2 4, 87 5 3 2,6 25 1 82 ,0 75 2 67 ,5 75 5 2, 00 0 5 2,0 00 2 3, 05 0 4 0,2 00 2 5, 00 0 2 5,0 00 4 00 ,4 00 4 18 ,4 00 5 3, 00 0 6 7,0 00 52,535,000 69,135,000
Tj.Timur 2017 (Rp) 2 0, 00 0 2 5, 00 0 3 5, 00 0 69,000
56,580,000
-
70,380,000
55,130,000
-
71,830,000
56,580,000
-
70,380,000
48,675,0 00
-
65,175,000
41,800,000
-
58,080,000
38,500,000
86,905,000
-
92,955,000
83,830,000
-
96,030,000
86,905,000
-
92,955,000
65,850,0 00
-
92,850,000
72,600,000
-
82,280,000
66,000,000
98,905,000 -
107,4 05,0 00
93,305,000 -
113,005,000
98,905,000 -
107,4 05,000
82,750,000 -
89,750,000
74,250,000 -
82,500,000
72,050,000
25,022,500 -
30,522,500
25,597,500 -
29,947,500
25,022,500 -
300,5 22,500 24,525,000 -
29,525,000
21,780,000 -
25,410,000
20,350,000
19,719,125
-
23,469,125
21,000,000
-
23,000,000
19,719,150
-
26,075,000
16,940,000
-
22,385,000
16,280,000
5,387,5 00 -
7,837,5 00
5,662,5 00 -
7,562,5 00
5,387,5 00
5,475,0 00 -
7,175,0 00
4,235,0 00
-
3 0, 50 0 5 20 ,5 00 -
3 7, 50 0 4 28 ,2 50 4 70 ,7 50 8 58 ,5 00
-
3 1, 55 0 4 8, 37 5 1 20 ,3 20 -
42,000 34,915
43,500 537,750 575,750
4 9, 55 5 5 3 5, 00 0 -
3 6, 37 7 4 5 4, 74 0 -
4 0,0 15 4 54 ,7 40
5 1 8, 87 0 , 51 ,7 32 958,500 1 0 53,550 3 4, 98 0 5 3, 63 6 60,875 128,000 1 6 3, 24 0 -
5 18 ,8 70 1 ,0 51 ,7 32
25,708 96,075
36,235 181,750
47,750 55,200 33,750
245,350 23,300
24,800 11,600
4 9,5 55 6 80 ,0 00 3 3,2 31 3 4,2 00 2 8,6 50
51,900 68,200 66,068
Tj.Barat 2017 (Rp) 2 0, 98 8 2 0,9 88 2 6, 81 8 2 6,8 18
3 3, 23 1 1 8, 70 0 1 9, 65 0 -
3 2, 75 0 32,200 -
2 1, 90 0 2 3, 35 0 -
675,500 43,125
6 2, 10 3 24,166 -
2 3, 75 0 1 66 ,3 50 -
50,000
3 0, 90 0 4 2, 20 0 -
7 7, 57 5 2 3, 33 5 1 51 ,7 50 -
4 0, 60 0 3 9, 50 0 2 2, 81 5 -
3 4,9 80 5 3,6 36 1 63 ,2 40
2 9, 12 5 2 8, 17 5 -
4 5,6 25 3 9,6 75
3 1, 42 5 1 8, 42 5 -
4 7,9 25 3 7, 92 5
7 8, 13 5 2 2, 17 5 1 44 ,3 00 -
1 01 ,0 35 3 4, 17 5 1 59 ,3 00
2 9, 44 0 3 2, 97 5 -
3 4, 04 0 5 5, 57 5
2 3, 45 0 2 44 ,8 60 -
2 9, 45 0 2 44 ,8 60
9 ,2 04 2 1, 97 9 -
1 0, 58 5 2 5, 27 6
1 0, 90 0 4 10 ,2 50 5 0, 00 0 54,535,000 -
2 6, 02 5 3 9, 52 5 3 48 ,0 00 3 88 ,0 00 475,250 4 8, 44 0 6 1, 04 0 65,000 67,135,000 46,900,0 00 - 61,200,000
-
23,469,150 -
7,837,5 00
21,075,0 00
Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) 13 5 , 00 2 0, 990 1 6, 00 0 24 ,45 0 1 7,6 25 22 6 , 25 21 1 , 20 2 4, 420 1 8, 00 0 25 ,68 5 1 7,5 50 21 5 , 50 19 0 , 00 2 2, 200 1 6, 00 0 45 ,12 5 2 0,0 00 25 2 , 50 5 10 ,0 00 6 20 ,0 00 5 45 ,0 00 6 75 ,0 00 5 56 ,5 00 6 83 ,0 00 22 5 , 50 2 8, 050 2 4, 57 5 34 ,07 5 1 0,5 00 35 8 , 50 29 9 , 20 4 0, 920 1 8, 22 5 31 ,22 5 2 3,0 00 37 5 , 00 23 0 , 00 2 5, 575 2 4, 88 5 39 ,28 5 1 5,2 50 28 7 , 50 27 8 , 75 3 5, 375 3 2, 62 5 42 ,12 5 3 0,0 00 49 5 , 00 3 72 ,5 00 3 79 ,5 00 4 34 ,0 00 5 43 ,5 00 4 29 ,0 00 5 25 ,5 00 4 29 ,0 00 4 57 ,0 00 4 25 ,8 35 4 61 ,7 35 4 26 ,8 35 4 37 ,7 35 8 56 ,0 00 9 38 ,0 00 1 ,2 22 ,5 00 1 ,8 82 ,5 00 9 01 ,5 00 1 ,0 53 ,5 00 36 7 , 50 6 6, 750 3 1, 25 0 49 ,25 0 3 0,0 00 50 9 , 00 48 2 , 50 7 8, 250 3 9, 25 0 52 ,75 0 4 3,0 00 60 5 , 00 1 28 ,0 00 1 48 ,0 00 1 18 ,0 00 1 58 ,0 00 1 00 ,0 00 1 35 ,5 00 26 2 , 50 3 1, 250 2 6, 73 5 39 ,73 5 2 9,2 75 40 8 , 75 26 2 , 50 3 1, 250 3 5, 12 5 62 ,62 5 3 5,1 25 62 6 , 25 24 2 , 50 3 3, 250 3 7, 00 0 55 ,00 0 3 5,0 00 50 5 , 50 9,000 6,000 7 ,5 00 - 8 ,1 00 1 2, 60 0 11,550 92,800 79,700 7 2, 80 0 7 6, 25 0 9 6, 25 0 99 7 , 00 28,000 30,650 1 8, 00 0 - 3 0, 65 0 4 9, 85 0 49 8 , 50 1 38 ,5 50 - 153,550 9 5, 25 0 2 15 ,2 50 152,200 1 65 ,2 00 31,250 37,770 2 6, 25 0 - 3 3, 00 0 4 7, 50 0 56 0 , 70 1 3, 90 0 - 22,900 2 1, 70 0 3 5, 80 0 30,700 49 8 , 00 42,000 25,585 2 7, 00 0 - 2 5, 58 5 3 3, 98 5 33 9 , 85 1 55 ,5 00 - 235,500 1 40 ,0 00 3 20 ,0 00 190,000 2 70 ,0 00 20,750 20,875 1 5, 00 0 - 3 5, 00 0 3 5, 00 0 30,875 34,550 21,075 2 7, 55 0 - 2 1, 07 5 3 7, 57 5 37 5 , 75 35,000 25,275 2 2, 50 0 - 2 5, 27 5 4 0, 27 5 40 2 , 75 371,500 434,750 3 41 ,5 00 - 4 34 ,7 50 5 19 ,7 50 5 19 ,7 50 4 6, 75 0 - 56,750 5 3, 75 0 7 2, 75 0 53,750 72 7 , 50 38,500,000 53,350,000 38,500,000 54,890,000 40,700,000 54,956,0 00 -
6,050,0 00
3,850,0 00
-
53,900,000
39,050,000
82,500,000
66,880,000
82,500,000
72,050,000
23,870,000
20,350,000
20,790,000
16,280,000
6,380,000
-
3,850,000 -
Sarolangun 2017 (Rp) 1 4, 00 0 2 1,2 00 1 4, 20 0 2 1,7 00
Merangin 2017 (Rp) 1 6, 565 17 9 , 01 2 1, 706 25 1 , 94
Kerinci 2017 (Rp) 13 9 , 50 16 9 , 50 17 2 , 00 24 2 , 00
3 0, 30 0 5 25 ,0 00
-
4 3,3 00 6 45 ,0 00
2 2, 000 5 71 ,2 00 -
31 0 , 00 6 63 ,0 00
2 0, 70 0 1 9, 05 0 2 0, 37 5
-
3 1,5 00 3 1,5 50 3 1,3 75
2 2, 000 3 9, 000 2 0, 000 -
25 0 , 00 50 0 , 00 25 0 , 00
3 7, 20 0 5 12 ,7 50
-
5 0,2 00 7 52 ,2 50
3 0, 000 3 90 ,0 00 -
40 0 , 00 5 00 ,0 00
4 83 ,7 50 9 79 ,0 75
-
6 08 ,7 50 1 ,2 64 ,5 75
4 25 ,0 00 8 90 ,0 00 -
5 50 ,0 00 1 ,1 50 ,0 00
2 3, 27 5 4 2, 02 5 1 20 ,5 00
-
3 0,7 75 5 8,0 25 1 55 ,5 00
4 0, 000 2, 20 0, 00 0 9 8, 00 0 -
48 5 , 00 26 , 50 0 , 00 1 20 ,0 00
2 6, 92 5 1 9, 72 5
-
4 0,9 25 2 9,7 25
2 7, 000 1 5, 000 -
42 0 , 00 19 5 , 00
26 0 , 00 16 7 , 00
3 7, 35 0 6,800
-
5 4,6 50 9,300
2 6, 000 2,250 -
35 0 , 00 4,750
9 0, 25 0 3 1, 22 5 1 51 ,7 50
-
12 8, 250 5 2,7 25 1 81 ,7 50
6 5, 000 3 4, 200 1 98 ,0 00 -
92 0 , 00 53 2 , 00 3 08 ,0 00
73 0 , 00 28 0 , 00 1 44 ,5 00
4 0, 00 0 1 9, 20 0
-
6 3,5 00 3 3,7 00
48 5, 000 2 2, 250 -
6 50 0 , 00 35 2 , 50
3 0, 50 0 1 81 ,7 50
-
5 0,0 00 2 66 ,7 50
2 1, 000 1 80 ,0 00 -
19,550 1 6, 77 5
-
24,000 2 5,7 75
2 5, 55 0 4 37 ,5 00 5 4, 50 0 51,150,000 -
3 8,8 50 5 97 ,5 00 7 2,5 00 51,700,000
43,500,000 -
48,000,000
53,900,0 00
55,000,000
-
60,000,000
45,000,000 -
51,000,000
82,500,0 00
85,800,000
-
90,000,000
77,500,000 -
85,000,000
82,500,0 00
85,800,000
-
89,000,000
82,000,000 -
90,000,000
23,870,0 00
25,850,000
-
28,050,000
22,800,000 -
25,000,000
20,790,0 00
21,450,000
-
29,150,000
20,000,000 -
22,000,000
6,050,0 00 -
6,105,0 00
7,480,0 00
36 7 , 00 6 75 ,0 00
1 8, 00 0 5 56 ,5 00 -
-
31 3 , 50 46 0 , 00 35 0 , 00
1 2, 80 7 2 7, 00 0 2 3, 02 5 -
36 2 , 00 3 90 ,0 00 -
51 2 , 00 4 50 ,0 00
3 2, 69 0 3 66 ,5 00 -
4 18 ,8 00 8 32 ,5 00
-
4 43 ,7 50 8 92 ,5 00
4 18 ,7 50 7 82 ,5 00 -
35 0 , 00 70 5 , 00 1 22 ,0 00 -
55 0 , 00 1 27 0 , 00 1 66 ,5 00
3 2, 00 0 6 8, 50 0 9 6, 66 5 -
-
37 5 , 00 24 7 , 00
2 5, 05 0 2 0, 70 0 -
27 8 , 75 6,150 -
35 3 , 75 7,650
2 7, 87 5 6,000 -
-
88 0 , 00 41 0 , 00 1 54 ,5 00
7 3, 00 0 1 8, 00 0 1 44 ,5 00 -
32 7 , 50 30 2 , 50
-
47 7 , 50 50 2 , 50
3 4, 70 0 3 2, 52 5 -
26 5 , 00 2 80 ,0 00
25 2 , 50 1 60 ,5 00
-
32 2 , 50 2 30 ,5 00
2 5, 25 0 1 60 ,5 00 -
10,875 2 1, 075 -
17,875 37 5 , 75
17,500 22 5 , 00
-
17,500 22 5 , 00
33,350 4 8, 00 0 -
7 0, 000 4 25 ,0 00 4 9, 000 -
90 0 , 00 5 30 ,0 00 65 0 , 00
22 5 , 00 3 41 ,5 00 46 7 , 50
-
35 0 , 00 3 71 ,5 00 56 7 , 50
2 3, 00 0 3 41 ,5 00 4 6, 75 0 -
33,000,000 -
51,700,000
33,000,000 -
38,500,000 -
55,000,000
38,500,000 -
66,000,000 -
85,800,000
56,000,000 -
71,500,000 -
85,800,000
71,500,000 -
19,800,000 -
28,050,000
19,800,000 -
20,350,000 -
29,150,000
20,350,000 -
6,105,0 00
4,950,0 00 -
4,800,0 00 -
5,500,0 00
25 5 , 00 5 56 ,0 00 -
S. Penuh 20 1 3, 00 0 1 2, 00 0 -
23 8 , 50 28 0 , 00 23 0 , 00
4,950,000
-
VI
CAT
NO
URAI AN
KODE
SATUAN
Jambi 2017 (Rp) 90 0 , 00 11 7,0 00
72
C at M ar ka ( no n th er mo pl ast ic )
( M7 2)
KG
73 74
C at M ar ka ( th er mo pl as ti c) Cat Tembok
( M7 3) (M74)
KG KG
1 00 7 , 00 44,000 -
12 4,0 00 85,000
75 76
Cat Kayu/Cat Kilat Cat Perak
(M75) (M76)
KG K G
66,000 77,000 -
95,500 108,500
77 78
Meni Besi Minyak Cat
(M77) (M78)
KG Liter
29,000 11,500 -
49,000 15,500
79 80
Tiner Plitur
(M79) (M80)
Liter KG
20,500 15,500 -
25,000 30,500
KODE
SATUAN
Muara Jambi 2017 (Rp) 9 0, 00 0 9 0,0 00 9 7, 50 0 12 2,0 00 1 45,000 200,000 80,525 146,025 71,575 113,575 32,500 47,025 10,000 10,000 20,000 25,000 55,000 55,000
Tj.Timur 2017 (Rp) 2 7, 26 0 29,000 6 5, 33 0 177,879 64,049 60,000
-
59,000 33,700
-
14,100 49,000
-
69,500 189,233 68,138
1 98 ,2 20 6 4,1 30
78,000 113,750
Tj.Barat 2017 (Rp) 9 2, 11 4 9 2,1 14
1 9 8, 22 0 6 4, 13 0 1 32, 92 4 7 9, 75 3 -
13 2,9 24 9 1,7 16
7 6, 95 6 1 2, 82 6 -
7 6,9 56 1 2,8 26 1 1,6 60 8 7,6 75
53,700 15,000
89,000
1 1, 66 0 4 9, 50 0 -
Tj.Timur 2017 (Rp) 37,050 48,050
Tj.Barat 2017 (Rp) 4 2, 55 9 4 2,5 59
84,535 1 0, 50 0 -
Batang Hari 2017 (Rp) 63 5 , 00 8 6, 000 2 55 ,2 50 4 2, 000 55 0 , 00 8 0, 650 74 0 , 00 12 1, 500 41 7 , 50 6 1, 750 34 7 , 00 5 2, 700 30 0 , 00 4 8, 750 52 8 , 90 6 3, 490
1 70 ,2 50 20 0 , 00
Tebo 2017 (Rp) 6 3, 50 0 86 ,00 0 1 70 ,2 50 4 5, 00 0 -
2 55 ,2 50 45 ,00 0
5 8, 00 0 7 4, 00 0 -
58 ,00 0 1 21 ,50 0
4 1, 75 0 3 4, 70 0 -
61 ,75 0 52 ,70 0
3 1, 75 0 5 2, 89 0 -
48 ,75 0 63 ,49 0
Muaro Bungo 2017 (Rp) 6 3,0 00 87 8 , 25 1 60 ,7 50 1 95 ,7 50 4 5,0 00 80 0 , 00 8 0,2 75 1 46 2 , 75 6 4,2 50 96 7 , 50 4 5,0 00 50 2 , 50 1 3,0 00 29 7 , 50 2 6,5 00 33 5 , 00 5 5,0 00 78 0 , 00
Sarolangun 2017 (Rp) 6 4, 00 0 8 6,0 00 2 36 ,5 00 11 7, 800 7 0, 00 0 7 1,0 00 7 8, 55 0 13 3, 050 3 1, 00 0 4 9,5 00 3 0, 50 0 5 0,0 00 2 6, 45 0 4 0,3 00 6 3, 87 5 9 1,3 75
1 63 ,0 00 4 6, 00 0
Merangin 2016 (Rp) 7 1, 400 82 8 , 75 2 00 ,8 89 86 1 , 90 5 7, 120 66 3 , 00 3 8, 000 50 0 , 00 2 2, 848 26 5 , 20 9, 000 17 0 , 00 1 8, 278 26 5 , 20 3 9, 984 46 4 , 10
1 73 ,0 74 7 4, 256 -
Kerinci 2017 (Rp) 65 0 , 00 94 0 , 00 1 82 ,5 00 49 0 , 00 -
S. Penuh 20 5 9, 00 0 -
2 00 ,0 00 55 0 , 00
1 72 ,5 00 5 6, 00 0 -
77 0 , 00 67 8 , 25
-
95 0 , 00 1 05 8 , 25
5 4, 00 0 6 8, 00 0 -
30 5 , 00 33 3 , 00
-
50 5 , 00 51 8 , 00
3 0, 50 0 2 6, 00 0 -
35 4 , 00 53 7 , 00
-
47 4 , 00 80 7 , 00
2 9, 00 0 5 2, 50 0 -
VII PLASTIK NO
URAI AN
81
Plastik Filler
(M81)
M2
82 83
Geotextil e Ember Cor
(M82) (M83)
M2 Buah
Jambi 2017 (Rp) 29,625 33,625 93,400 6,500 -
113,600 12,000
Muara Jambi 2017 (Rp) 27,500 35,750 85,000 95,000 7,500 7,500
300,000 10,800
-
320,000
16,800
84,535 1 6,0 00
Batang Hari 2017 (Rp) 26 0 , 00 3 1, 500 64,250 85,250 95 , 00 1 3, 500
Tebo 2016 (Rp) 2 5, 57 5 33 ,07 5 64,900 1 0, 50 0 -
86,900 16 ,00 0
Muaro Bungo 2017 (Rp) 2 9,1 25 35 1 , 25 70,000 89,700 95 , 00 13 5 , 00
73,000 1 0, 00 0 -
S ar ol an gu n2 01 7 ( Rp ) 2 8, 50 0 3 7,5 00 99,800 1 4,5 00
45,000 1 0, 150 -
M er an gi n2 01 7( Rp ) 1 7, 000 27 0 , 00 95,000 15 1 , 50
Muaro Bungo 2017 (Rp)
K er in ci 2 01 7( Rp ) 25 0 , 00 30 0 , 00
S. Penuh 20 2 4, 00 0 -
64,000 10 5 , 00 -
65,000 1 0, 80 0 -
86,000 16 0 , 00
V II I K AC A NO
KODE
SATUAN
84
Glass Bead
(M84)
KG
52,600 -
73,900
85 86 87
P ema nt ul C ah ay a( Re fl ect or ) Kaca Ben ing 3 mm Kaca Bening 4 mm
( M8 5) (M86) (M87)
BH M2 M2
17 0 , 00 80,500 -
88 89
Kaca Ben ing 5 mm Kaca Rayb and 3 mm
(M88) (M89)
M2 M2
150,000 236,000 -
90 91
Kaca Rayband 4 mm Kaca Rayb and 5 mm
(M90) (M91)
M2 M2
290,750 -
318,750
260,000
-
270,000
261,450
-
92 93
Kaca Es 3 mm Kaca Es 5 mm
(M92) (M93)
M2 M2
263,500 316,000 -
288,500 351,000
230,000 285,000
-
250,000 300,000
145,500 163,500
-
IX
URAI AN
Jambi2017 (Rp)
M ua ra J am bi 2 01 7 ( Rp ) 50,500
-
60,000
2 3,5 00 185,000
1 7, 12 5 150,000 -
288,500 270,500
225,000 200,000
-
T j. Ti mu r2 01 7 ( Rp ) 129,000
-
2 3,1 25 165,000
2 2, 50 0 189,900 -
235,000 230,000
248,350 222,050
-
S ar ol an gu n2 01 7 ( Rp )
M er an gi n2 01 7( Rp )
1 51, 58 0 -
T j. Ba ra t 2 01 7 ( Rp ) 15 1,5 80
74 0 , 00
-
9 8, 800
7 4, 30 0 -
91 ,30 0
7 8,2 00
-
1 01 2 , 00
7 5, 50 0
-
9 8,5 75
2 5, 000 -
40 0 , 00
77 5 , 00
-
1 20 0 , 00
7 9, 45 0 -
202,150
2 0, 38 8 6 9, 43 1 -
2 9,6 38 7 9,8 45
17 3 , 25 1 00 0 , 00
-
2 0, 625 12 4, 300
2 2, 82 5 8 5, 00 0 -
35 ,82 5 85 ,00 0
2 4,0 75 7 5,0 00
-
34 5 , 75 1 20 5 , 00
2 2, 70 5 7 9, 82 5 -
3 6,4 05 10 5, 325
1 3, 500 7 6, 500 -
22 5 , 00 87 9 , 75
25 4 , 25 82 5 , 00
-
37 8 , 25 1 13 0 , 00
2 3, 67 5 7 8, 00 0 -
264,350 236,300
9 0, 50 0 8 3, 31 7 -
1 03 ,7 99 9 5, 81 5
1 22 ,0 00 8 6, 00 0 -
1 91 ,3 50 1 21 ,2 75
1 50 ,0 00 1 54 ,8 00
1 30 ,0 00 1 10 ,0 00
-
1 50 ,0 00 1 65 ,0 00
2 14 ,6 60 1 10 ,2 50
9 1, 80 0 7 1, 40 0 -
1 05 ,5 70 8 2, 11 0
1 15 ,2 50 9 6, 22 5 -
1 49 ,2 50 1 10 ,7 75
1 00 ,0 00 9 5, 30 0 -
158,750 35,000
B at an g H ar i 20 17 (R p)
T eb o2 01 7( Rp )
1 50 ,0 00 1 02 ,8 00
-
1 36 ,5 00 8 5, 25 0
-
K er in ci 2 01 7( Rp )
S. Penuh 20
278,250 165,500
193,500
1 0 4, 14 6 -
1 19 ,7 68
1 02 ,0 00
-
1 30 ,1 85
1 18 ,0 00
-
1 58 ,0 00
1 50 ,0 00
-
1 87 ,5 00
1 15 ,0 00
-
1 50 ,0 00
8 1, 60 0 -
9 3, 84 0
1 29 ,6 50
-
1 57 ,8 50
1 25 ,7 00 -
1 2 4, 50 0 1 5 3, 50 0 -
1 40 ,0 00 1 62 ,8 75
1 00 ,2 50 1 50 ,4 50
-
1 18 ,2 50 1 78 ,4 50
3 02 ,5 00 2 05 ,2 50
-
5 02 ,5 00 2 20 ,2 50
1 50 ,7 50 1 67 ,1 75
-
1 73 ,7 50 1 76 ,6 75
2 93 ,0 00 2 97 ,5 00
-
4 78 ,5 00 5 42 ,5 00
3 64 ,5 00 3 52 ,5 00 -
6 59 ,5 00 6 82 ,5 00
1 15 ,5 00 1 41 ,7 85
-
1 15 ,5 00 1 62 ,9 65
9 9, 30 0 1 21 ,0 00 -
BETON/MORTAR
NO
KODE
SATUAN
94 95
Kapur Batako Uk. 20 x 40 x 10 cm
URAI AN
(M94) (M95)
kg Buah
96 97 98
Batu Bata Uk. 5,5 x 11 x 23 cm Batu Tela Uk. 20 x 30 x 10 cm Beton Roster / K erawang
(M96) (M97) (M98)
Buah Buah Buah
Jambi 2017 (Rp) 10,375 12,625 3,425 4,625 500 4,975 8,675 -
1,000 5,375 10,875
99 10 0
B ui s B et on 1/ 2d ia 20 c m B ui s B et on d ia 6 0cm
( M9 9) ( M10 0)
B ua h B ua h
30 0 , 00 2 00 3 , 50 -
11 8,2 50 22 2,8 50
10 1
B ui s B et on d ia 1 00 c m
( M10 1)
B ua h
2 64 4 , 75 -
29 0,9 75
10 2
P avi ng B lo k/ C on B lo k
( M10 2)
M2
11 2 , 50 -
4 6,2 50
X
KAYU
NO
URAI AN
Muara Jambi 2017 (Rp) 10,000 10,000 3,000 4,000 650 1,500 3,150 7,200 6,000 6,000 8 0, 00 0 11 5,5 00 2 02, 10 0 22 1,1 00 2 66, 97 5 28 8,4 75 1 2, 00 0 5 9,5 00
Tj.Timur 2017 (Rp) 8,200 10,200 12,600 13,400 1,312 985 24,075 9 5, 25 0 2 04, 50 0
-
3 79, 00 0
-
1 63, 25 0
-
KODE
SATUAN
1 03
K ay u B al ok K el as I
( M1 03 )
M3
5 ,7 50 ,0 00 -
7 ,6 70 ,0 00
5 ,0 00 ,0 00
-
7 ,0 00 ,0 00
1 04 1 05 1 06
K ay u B al ok K el as I I K ay u P ap an K el as I I K ay u P ap an K el as I I
( M1 04 ) ( M1 05 ) ( M1 06 )
M3 M3 M3
2 ,8 75 ,0 00 3 ,2 20 ,0 00 2 ,7 50 ,0 00 -
4 ,3 80 ,0 00 4 ,6 80 ,0 00 3 ,1 80 ,0 00
4 ,0 00 ,0 00 4 , 68 0, 00 0 2 ,0 00 ,0 00 -
5 ,0 00 ,0 00 5 ,6 80 ,0 00 3 ,0 00 ,0 00
1 07 108
K ay u P ap an K el as I V Kayu Cru cu k15 cm
( M1 07 ) (M108)
M3 Batang
1 ,9 55 ,0 00 48,000 -
2 ,0 62 ,5 00 55,500
2 ,0 62 ,5 00 30,000
-
10 9 11 0
K ayu B ek is ti ng K ayu l ap is 4 m m( uk. 8" x 4 ")
( M10 9) ( M11 0)
M3 l br
20 , 75 0 , 00 74 5 , 50 -
2, 52 5,0 00 10 2,5 50
1 ,7 50, 00 0 1 02, 55 0 -
1 11 1 12 11 3
Mu lt i P le x 1 2m m ( uk . 8 " x 4 ") P ap an b ow pl an k P ap an K el as I
( M1 11 ) ( M1 12 ) ( M11 3)
l br m3 m3
2 01 ,2 25 1 ,3 68 ,0 00 82 , 05 0 , 00 -
2 16 ,2 25 1 ,6 68 ,0 00 9, 50 5,0 00
2 16 ,2 25 1, 66 8, 00 0 5 ,0 00, 00 0 -
2 16 ,2 25 1 ,6 68 ,0 00 6, 00 0,0 00
3 73 ,0 00 1 , 88 0, 00 0 78 , 37, 50 0
114 115
Triplex 2,7 mm Triplex 3,6 mm
(M114) (M115)
l br l br
52,000 71,300 -
75,000 89,500
1,046 69,025
-
1,046 85,000
59,750 97,050
116 117
Triplex 5 mm Tripleks 2,2 mm
(M116) (M117)
lbr l br
84,500 41,143 -
99,500 46,143
99,500 46,143
-
99,500 46,143
117,800 45,275
118 119 120
Tripleks 3 mm Tripleks 4 mm Tripleks 6 mm
(M118) (M119) (M120)
lbr l br lbr
60,500 71,500 85,500 -
75,100 80,250 98,500
53,000 62,000 80,000
-
55,000 65,000 85,000
92,000 119,750 90,005
121
Tri pl eks 12 mm
(M121)
l br
155,000 -
167,000
155,000
-
160,000
177,375
12 2
T ri pl eks 15 mm
( M12 2)
l br
2 34 0 , 50 -
24 2,0 50
2 42, 05 0 -
24 2,0 50
2 21, 20 0
Jambi 2017 (Rp)
M ua ra J am bi 2 01 7 ( Rp )
Catatan : Harga dasar terendah di Ibukota kabupaten Harga dasar tertinggi di kecamatan paling jauh/sulit dijangkau dari kabupaten yang bersangkutan
-
1,862
1,085 34,575 1 00, 25 0 209,500 449,000
Tj.Barat 2017 (Rp) 184,228 184,228 4,675 5,675
-
1,345 780 30,125
9 3, 33 5 1 8 9, 50 0 -
10 8,8 35 2 24 ,5 00
3 5 9, 00 0 -
4 69 ,0 00
1 35, 25 0 -
26 7,2 50
1 93, 25 0
T j. Ti mu r2 01 7 ( Rp ) 7 ,2 42 ,5 00 4 ,9 07 ,5 00 3 ,3 17 ,5 00 2 ,5 37 ,5 00
-
2 ,0 62 ,5 00 30,000
2 ,3 10 ,0 00 42,750
1, 90 0,0 00 10 2,5 50
18 , 30, 00 0 1 12, 25 0
-
-
-
11,042,500 7,857,5 00 3,467,5 00 3,787,5 00
1,159 830 2 1,625
T j. Ba ra t 2 01 7 ( Rp ) 10,960,000 - 10,960,000 6,996,0 00 3,847,8 00 3,498,0 00
Batang Hari 2017 (Rp) 8,000 10,093 4,775 5,575 745 1,095 468 568 11,650 13,650 68 4 , 50 7 6, 450 1 63 ,5 50 1 86 ,0 50 2 55 ,0 00 2 97 ,0 00 87 0 , 75 13 2, 575
Batang Hari 2017 (Rp)
Tebo 2017 (Rp) 9,285 11,185 5,500 6,000 150 375 8,600
-
850 1,325 12,100
9 9, 75 0 1 88 ,7 50 -
1 18 ,75 0 2 13 ,7 50
2 82 ,0 00
-
3 62 ,0 00
1 20, 00 0 -
2 25 ,00 0
Tebo 2017 (Rp)
6,000,0 00 -
9,870,0 00
4,000,0 00 -
Muaro Bungo 2016(Rp) 6,000 10,200 5,200 8,450 400 950 450 950 13,000 21,500 9 6,0 00 1 11 0 , 00 1 95 ,2 50 2 30 ,2 50 3 13 ,5 00 3 53 ,5 00 9 5,3 00 1 62 3 , 00
Muaro Bungo 2017 (Rp)
10,9 35,000
Sarolangun 2016 (Rp) 8,025 11,525 5,825 6,825 736 1,220 728 1,228 9,175 12,675 9 1, 50 0 10 4, 000 1 69 ,0 00 1 99 ,0 00 2 82 ,0 00 3 62 ,0 00 1 41, 57 5 28 5, 075
S ar ol an gu n 20 17 ( Rp )
Merangin 2017 (Rp) 5,000 10,000 4,000 8,000 750 1,200 1,105 1,655 7,625 9,625 9 5, 000 1 12 0 , 00 2 41 ,0 00 1 27 ,0 00 2 77 ,0 00 3 67 ,0 00 2, 000 40 , 00
M er an gi n 20 17 ( Rp )
Kerinci 2017 (Rp) 4,500 6,500 3,400 4,600 800 1,150 6,400 -
800 2,300 7,400
81 7 , 50 1 69 ,0 00
-
2 58 ,5 00
-
1 36 7 , 50 1 99 ,0 00 2 70 ,5 00
98 0 , 00
-
1 78 0 , 00
Kerinci 2017 (Rp)
3,500,0 00 -
5,372,5 00
4,100,5 00 -
6,236,4 50
5,000,0 00 -
5,500,0 00
7,070,0 00 -
S. Penuh 20 4,500 3,392 600 1,650 6,400 8 1, 75 0 1 69 ,0 00 2 58 ,5 00 1 07, 75 0 -
S. Penuh 20
10,8 70,000
2,762,8 00 -
-
6,996,0 00 3,847,8 00 3,498,0 00
2,400,0 00 2,400,0 00 2,150,0 00
-
3,215,0 00 3,487,5 00 2,285,0 00
3,500,0 00 3,785,0 00 2,770,0 00
-
4,805,0 00 5,185,0 00 3,670,0 00
1,550,0 00 2,600,0 00 2,506,5 50
-
2,850,0 00 3,506,5 63 3,443,5 50
2,682,5 00 3,279,9 50 2,588,6 50
-
4,079,8 00 3,620,0 50 2,701,3 50
3,000,0 00 3,000,0 00 2,475,0 00 -
3,300,0 00 3,300,0 00 3,275,0 00
3,025,0 00 2,950,0 00 2,375,0 00
-
3,875,0 00 3,950,0 00 3,375,0 00
3,118,2 50 2,950,0 00 3,000,0 00 -
3,785,0 00 2,355,0 00 60,750 4 0, 32 0 2,310,0 00 1,720,0 00 1 52 ,2 50 1 05 ,6 25 -
3,855,0 00 5 8,1 20
1,900,0 00 26 2 , 50 -
2,392,5 00 3 1, 250
2,325,0 00 3 5, 25 0 -
3,425,0 00 45 ,25 0
2,020,7 50 4 4,1 55
-
2,475,7 50 56 3 , 55
2,375,4 77 4 1, 75 0 -
2,512,0 23 6 1,7 50
1,605,0 00 2 5, 000 -
2,305,0 00 27 5 , 00
1,670,0 00 32 7 , 50 -
2,470,0 00 47 7 , 50
1,027,5 00 2 8, 78 5 -
2,190,0 00 1 53 ,1 25
1,280,0 00 8 8, 00 0 -
1,480,0 00 9 6, 00 0
1,770,0 00 1 20 ,5 00
-
2,370,0 00 1 55 ,5 00
1,900,0 00 9 0, 07 5 -
2,375,0 00 1 06 ,5 75
1,690,0 00 1 11 ,4 50
-
1,990,0 00 1 53 ,0 50
2,000,0 00 1 23 ,0 00 -
2,200,0 00 1 53 ,0 00
1,330,0 00 7 5, 50 0 -
1,430,0 00 8 5, 50 0
1,362,5 00 7 5, 50 0 -
3 5 2, 50 0 4 52 ,5 00 2,030,0 00 1,871,5 75 - 2,097,0 75 9,987,5 00 7,820,000 - 10,120,0 00 6 2,7 00 89,750 4 7, 70 0 9 8,8 56 1 26 ,0 50 8 5, 96 2 -
2 39 ,7 50 1,345,0 00 6,900,0 00 -
2 54 ,7 50 1,645,0 00 9,050,0 00
2 87 ,2 50 1,700,0 00 7,725,0 00
-
3 22 ,2 50 1,980,0 00 9,525,0 00
3 01 ,8 75 2,212,5 00 8,107,5 00
-
3 59 ,3 75 2,962,5 00 10,4 07,500
1 52 ,0 00 1,985,0 00 7,495,0 00 -
2 16 ,0 00 2,385,0 00 9,295,0 00
1 60 ,0 00 1,970,0 00 7,625,0 00 -
1 70 ,0 00 2,170,0 00 9,625,0 00
1 74 ,0 00 1,387,5 00 7,050,0 00 -
1 94 ,0 00 1,487,5 00 9,050,0 00
1 83 ,7 50 1,394,0 00 7,180,0 00 -
-
5 8,3 00 9 7,7 50
6 0, 300 6 4, 500 -
82 3 , 00 96 5 , 00
4 78 ,0 00
1 39 ,8 00
-
54,775 99,100
-
1 29 ,0 50 1 00 ,2 05
-
1 84 ,8 75 2 34, 20 0
66 0 , 00 81 0 , 00
-
8 0, 000 9 0, 000
5 0, 35 0 7 1, 05 0 -
62 ,35 0 83 ,05 0
5 3,3 45 6 4,0 00
-
57 7 , 45 71 3 , 25
8 5, 00 0 4 6,8 58 -
9 5, 96 3 57 9 , 08
1 14 ,0 00 4 3, 05 0 -
1 62 ,0 00 5 3,5 50
4 8, 50 0 4 5, 750 -
1 05 ,5 00 57 7 , 50
5 3,4 18 7 3,7 38 8 5,0 58
60 3 , 18 84 9 , 63 92 1 , 58
5 1, 75 0 7 4, 75 0 1 15, 85 0 -
7 8,6 00 11 3, 700 16 0, 150
6 2, 832 7 4, 256 9 0, 250 -
72 9 , 30 86 1 , 90 1 04 7 , 54
1 20 ,9 55 4 3, 70 0 -
1 56 ,6 55 5 2,9 00
1 04 ,3 50 44 1 , 00
-
1 23 ,3 50 5 7, 100
8 7, 00 0 4 8, 05 0 -
9 7, 00 0 60 ,05 0
6 4,1 25 8 4,3 75 10 5,2 50
66 0 , 00 81 0 , 00 85 9 , 80
-
7 1, 850 9 0, 900 9 6, 180
5 5, 00 0 8 0, 00 0 1 24, 25 0 -
55 ,00 0 1 34 ,20 0 1 86 ,25 0
5 6, 62 5 7 0, 87 5 9 0, 25 0 -
1 7 4, 75 0 -
1 81 ,7 50
1 78 ,7 50
-
2 00 ,7 50
1 75 ,5 00
2 14, 80 0 -
22 6,8 00
2 16 2 , 00
-
23 9, 200
2 14, 05 0 -
-
1 92 ,5 00
2 05 ,0 00
2 16 ,05 0
22 8,4 50
-
4 9, 80 0 7 4, 75 0
49 5 , 00 67 0 , 00
-
51 7 , 00 71 0 , 00
5 6, 75 0 6 2, 07 5 -
1 16 ,0 00 45 7 , 00 -
1 65 ,0 00 55 5 , 00
1 12 ,5 75 3 9, 75 0 -
67 7 , 00 79 2 , 00 93 5 , 00
5 8, 85 8 9 6, 64 1 9 8, 00 0 -
57 5 , 00 72 6 , 00 89 0 , 00
-
2 25 ,0 00
1 72 ,0 50
-
1 89 ,0 50
1 77 ,0 72 -
2 05 ,5 30
1 85 ,9 00
-
1 93 ,6 00
1 62 ,0 00 -
2 44 2 , 00
2 02, 75 0
-
22 2, 750
29 1, 312 -
3 38 1 , 30
2 24 9 , 50
-
2 30 4 , 50
2 11, 00 0 -
X I B AH AN A TA P NO
KODE
SATUAN
123 12 4 125
Genteng Plentong 's' B ub un ga nG en te ng P le nto ng ' s' Seng Plat BJLS 25
URAI AN
(M123) ( M12 4) (M125)
Buah B u ah Lbr
5,300 75 , 00 54,250 -
10,800 1 1,0 00 72,250
126 12 7
Seng Plat BJLS 30 Ge nte ng Me ta l( 2 s us un )
(M126) ( M12 7)
Lbr B ua h
65,250 52 5 , 00 -
84,250 6 2,5 00
12 8 B ub un ga nG en te ng M eta l 12 9 S en gG el om ba ng B JLS 30
( M12 8) ( M12 9)
B ua h L br
38 2 , 00 44 8 , 00 -
4 9,2 00 4 7,5 50
KODE
SATUAN
Jambi 2017 (Rp)
Muara Jambi 2017 (Rp) 5,000 5,500 6, 50 0 1 0,9 00 47,000 50,000 65,000 65,000 5 2, 50 0 6 2,5 00 4 5, 00 0 4 5,0 00 4 5, 00 0 4 5,0 00
Tj.Timur 2017 (Rp) 14,000 12,000 79,450 191,125 119,375 8 1, 80 0 72,300 5 1, 50 0 60,000 16 , 80, 00 0 - 1,687,700 20,500 9, 00 0 99,950 -
Tj.Barat 2017 (Rp) 9,225 4,000 9,470 7,800 6 2, 10 0 7 1,4 15 7 5, 32 5 8 6,6 23 6 9, 87 5 5 8,0 00 4 5, 30 0 3 6,0 00 8 9, 27 5 7 2,5 00
Batang Hari 2017 (Rp) 6,000 11,500 5,150 8,650 52 0 , 50 7 9, 050 74 4 , 50 7 6, 450 66 7 , 00 8 9, 700 36 5 , 50 4 8, 550 93 5 , 00 11 3, 500
Tebo 2017 (Rp) 9,650 9,470 6 4, 75 0 -
17,950 10,770 84 ,75 0
8 2, 75 0 6 5, 20 0 -
1 12 ,75 0 68 ,20 0
4 1, 75 0 9 6, 00 0 -
61 ,75 0 1 11 ,00 0
Muaro Bungo 2017 (Rp) 7,000 12,700 6,500 9,500 5 6,5 00 76 5 , 00 9 2,0 00 1 10 0 , 00 5 6,0 00 76 5 , 00 4 3,5 00 49 5 , 00 9 2,0 00 1 20 0 , 00
S ar ol an gu n 20 17 ( Rp ) 9,225 17,225 8,725 10,825 5 4, 00 0 8 4,0 00 3 2, 00 0 4 8,6 00 5 8, 25 0 6 8,2 50 4 1, 75 0 6 1,7 50 9 6, 50 0 15 6, 500
Muaro Bungo 2017 (Rp)
Sarolangun 2017 (Rp)
M er an gi n 20 17 ( Rp ) 9,625 19,125 50,500 122,000 4 1, 000 67 5 , 00 5 1, 000 80 0 , 00 4 0, 000 70 0 , 00 4 1, 750 61 7 , 50 5 1, 000 80 0 , 00
Kerinci 2017 (Rp) 16,055 12,375 3 76 4 , 00 56 7 , 50 81 2 , 50 57 7 , 50 68 7 , 50 40 6 , 25 50 9 , 25 95 7 , 00 1 06 7 , 00
8,555 7,175 2 26 9 , 00 -
S. Penuh 20 10,500 6,700 5 0, 00 0 4 0, 37 0 5 8, 55 0 4 0, 00 0 9 5, 20 0 -
XII PI PA NO
URAI AN
Jambi2017 (Rp)
M ua ra Ja mb i 2 01 7 ( Rp )
T j. Ti mu r 2 01 7 ( Rp )
130 131 132
Pipa GIP Dia. 1/2" Pipa GIP Dia. 3/4" Pipa GIP Dia. 1"
(M130) (M131) (M132)
M M M
14,750 28,000 6,000 -
19,750 41,000 39,500
14,750 28,000 95,000
-
19,750 41,000 120,000
29,000 34,000 58,500
-
133 134
Pipa GIP Dia. 11/2" Pipa GIP Dia. 2"
(M133) (M134)
M M
8,750 11,250 -
51,000 580,000
110,000 500,000
-
110,000 600,000
80,750 105,250
-
13 5 136
P ip a GI P D ia . 3" Pipa GIP Dia. 4"
( M13 5) (M136)
M M
10 , 85 0 , 00 98,500 -
1, 10 0,0 00 108,500
9 50, 00 0 98,500 -
1, 10 0,0 00 108,500
137 138 139
Pip aGI PD ia. 6" Pip aGI PD ia. 8" Pipa PVC Dia. 1/2"
(M137) (M138) (M139)
M M M
213,500 294,000 5,000 -
223,500 304,000 18,600
140 141
Pipa PVC Dia. 3/4" Pipa PVC Dia. 1"
(M140) (M141)
M M
6,500 29,500 -
23,200 35,000
25,000 30,000
-
25,000 30,000
30,000 56,212
-
142 143
Pipa PVC Dia. 1 1/2" Pipa PVC Dia. 2"
(M142) (M143)
M M
48,500 20,000 -
66,500 90,000
48,500 70,000
-
66,500 70,000
99,000 140,600
-
144 145 146
Pipa PVC Dia. 3" Pipa PVC Dia. 4" Pip aPVC Di a. 6"
(M144) (M145) (M146)
M M M
38,750 64,000 191,250 -
124,000 231,000 211,250
135,000 215,000 127,000
-
135,000 215,000 175,000
278,000 426,800 838,532
-
147 148
Pip aPVC Di a. 8" Pipa Besi 3/4
(M147) (M148)
M Batang
618,000 67,500 -
1,038,000 70,500
207,000 81,000
-
264,000 115,000
1,268,500 83,000
-
149
Pip aBesi 2 1/2
(M149)
Batang
492,500 -
542,500
360,000
-
415,000
519,750
-
213,500 294,000 17,000
-
223,500 304,000 17,000
1 59, 30 0 233,500 261,750 324,700 11,550
-
46,000
53,000 102,500
137,750 155,250 236,300
341,500 336,250
Tj.Barat 2017 (Rp)
110,000
148,000 293,538
453,848 892,055
1,349,500 40,000 549,750
Tebo 2017 (Rp)
7 2,8 00 8 7,6 00 15 9,0 00
15 7 , 25 28 8 , 50 32 4 , 50
-
2 2, 225 4 0, 150 4 3, 450
1 33 ,8 00 2 7 5, 75 9 -
1 80 ,0 00 2 75 ,7 59
4 2, 50 0 5 7, 75 0 -
4 9, 50 0 6 8, 75 0
7 2, 50 0 1 16 ,0 00
-
2 6 5, 90 0 6 3 2, 55 5 -
4 03 ,0 00 6 32 ,5 55
6 7, 25 0 1 01 ,7 50 -
8 2, 25 0 1 16 ,7 50
1 15 ,7 50 1 91 ,0 00
-
3 60 ,3 00 4 23 ,7 50 5,000
-
5 8 6, 50 0 337,700 1, 52 2, 00 0 7,800 13,000 40,500 8,500 59,800 2 5, 06 9
Batang Hari2017 (Rp)
4 3, 00 0 6 7, 20 0 1 39, 00 0 -
-
6 83 ,0 00 1 ,7 88 ,0 00 22,800
2 13 ,5 00 2 94 ,0 00 24,500
-
2 23 ,5 00 3 04 ,0 00 30,000
1 8, 77 5 3 3, 12 5 4 8, 75 0 -
23 ,77 5 53 ,12 5 1 01 ,25 0
4 4,2 00 6 8,2 00 8 6,8 00
2 2,6 25 6 5,5 00 8 0,2 30
Merangin 2017 (Rp) 22 4, 400 28 5, 600 41 8, 200 -
2 58 0 , 60 3 28 4 , 40 4 80 9 , 30
Kerinci 2017 (Rp) 37 2 , 00 35 0 , 00 57 0 , 00
-
78 8 , 00 92 6 , 00 1 17 0 , 00
1 7, 62 5 3 8, 00 0 4 9, 03 0 -
1 52 ,5 00 1 84 ,0 00
6 6, 98 8 1 73 ,0 00 -
7 8, 48 8 2 33 ,0 00
5 2, 79 5 6 3, 50 0
-
7 2, 09 5 8 6, 00 0
7 09 ,9 20 8 94 ,5 40 -
1 ,0 28 ,7 21 1 ,0 28 ,7 21
6 5, 00 0 1 22 ,0 00
1 46 ,8 00 1 74 ,0 00 -
1 94 ,7 50 3 38 ,0 00
2 45 ,0 00 3 54 ,0 00
-
2 91 ,0 00 4 28 ,7 50
8 2, 75 0 1 12 ,2 50
-
1 12 ,7 50 1 52 ,2 50
1 ,8 52 ,3 20 2 ,6 26 ,5 00 -
2 ,1 30 ,1 68 3 ,0 20 ,4 75
1 16 ,0 00 1 51 ,5 00
-
1 23 ,5 00 2 06 ,5 75
2 68 ,8 00 3 51 ,8 00 -
5 00 ,0 00 6 22 ,7 50 5,000
5 69 ,0 00 8 67 ,0 00 5,000
-
6 95 ,5 00 9 82 ,0 00 9,000
2 44 ,5 00 3 00 ,0 00 7,700
-
2 84 ,5 00 3 68 ,1 50 5,200
4 ,6 17 ,5 40 7 ,2 77 ,7 00 20,400 -
5 ,3 10 ,1 71 8 ,3 69 ,3 55 23,460
2 00 ,5 00 3 45 ,2 00 14,000 -
3 05 ,5 00 3 63 ,2 00 20,500
5 89 ,6 00 1 ,5 47 ,0 00 9,500 -
5 0, 00 0 8 6, 50 0 -
75 0 , 00 49 0 , 00 85 5 , 00
S. Penuh 20
-
4 5, 80 0 7 0, 00 0 8 7, 80 0 -
-
23,500 2 5,0 69
31,000 42 0 , 00
-
33,300 4 4, 250
6,500 8, 25 0 -
6,500 45 ,87 5
7,000 1 3,7 50
-
11,025 15 0 , 00
6,625 7, 50 0
-
10,000 1 1,2 00
28,560 3 7, 740 -
32,844 43 4 , 01
22,350 32 6 , 00
-
36,300 54 8 , 25
10,800 1 1, 00 0 -
1 3, 00 0 6 8, 21 1 -
2 9,5 00 6 8,2 11
75 0 , 00 92 0 , 00
-
8 2, 000 10 1, 000
5 2, 95 0 2 0, 00 0 -
68 ,95 0 20 ,00 0
5 7,5 00 3 5,5 10
-
74 7 , 50 40 3 , 75
4 9, 02 5 1 7, 50 0
-
6 2,5 25 2 6,5 00
6 7, 320 7 4, 460 -
77 4 , 18 85 6 , 29
46 0 , 00 58 0 , 00
-
74 0 , 00 92 8 , 00
1 5, 00 0 2 1, 90 0 -
3 1, 90 0 1 74 ,9 00 1 2 9, 50 0 -
5 1,0 00 1 74 ,9 00 2 28 ,0 00
1 84 0 , 00 1 92 ,5 00 3 80 ,0 00
-
21 0, 000 3 00 ,0 00 6 55 ,0 00
4 0, 00 0 6 5, 00 0 2 11 ,0 00 -
40 ,00 0 6 5, 00 0 2 26 ,0 00
7 1,3 00 1 04 ,7 00 2 20 ,6 30
-
80 1 , 25 1 25 ,7 50 2 6, 90 0
2 8, 75 0 4 7, 50 0 2 14 ,0 75 -
4 3,6 00 7 2, 00 0 2 24 ,0 75
9 9, 960 1 38 ,7 20 2 95 ,8 00 -
1 14 9 , 54 1 59 ,5 28 3 40 ,1 70
90 5 , 00 1 36 ,6 25 1 74 ,5 00 -
1 24 8 , 25 1 73 ,8 75 2 62 ,5 00
3 8, 50 0 6 8, 50 0 1 31 ,3 00 -
2 0 8, 40 0 8 3, 00 0 -
3 17 ,0 00 12 3,0 00
6 88 ,5 00 69 7 , 50
-
1 ,1 28 ,5 00 7 9, 750
6 54 ,3 50 9 1, 25 0 -
1 ,0 68 ,3 50 1 27 ,25 0
3 50 ,7 10 8 0,2 13
-
5 00 ,0 00 91 7 , 13
6 15 ,0 00 8 2, 25 0
-
9 95 ,0 00 10 6, 350
5 15 ,1 00 8 5, 200 -
9 61 ,8 60 1 26 0 , 00
6 76 ,0 00 76 7 , 25 -
1 ,1 07 ,8 25 87 7 , 25
2 11 ,3 00 9 2, 10 0 -
3 6 8, 00 0 -
4 23 ,0 00
4 92 ,5 00
-
5 42 ,5 00
5 60 ,5 00
5 64 ,3 63
-
6 21 ,8 63
3 16 ,7 50
-
7 29 ,7 50
3 72 ,2 00 -
4 50 ,0 00
5 41 ,7 50
5 96 ,7 50
3 74 ,5 00 -
5 20 ,5 00
-
-
XIII SANITAIR NO
KODE
SATUAN
1 50
Ba k A ir F ib er G la ss K a p. 1 .0 M 3 ( to we r)
URAI AN
( M1 50 )
Bh
2 75 ,0 00 -
1 51 1 52
Ba k A ir F ib er G la ss K a p. 2 .0 M 3 ( to we r) Ba k ai r m an di F ib re G la ss k ap . 0 ,5 m 3
( M1 51 ) ( M1 52 )
Bh Bh
1 53 1 54 1 55
Ba k a ir m an d i F ib r eG la ss k ap . 1 m 3 K l os et D u du k K er a mi k t er p as an g K l os et J o ng ko k K er am ik S t an da r t er p as an g
( M1 53 ) ( M1 54 ) ( M1 55 )
Bh Bh Bh
1 56 1 57
U ru no ar K er am ik S ta nd ar W as ta fe l G an tu ng K er am ik
( M1 56 ) ( M1 57 )
Bh Bh
KODE
SATUAN
(M158) ( M1 59 )
t iti k u ni t
150,000 1 19 ,7 50 -
142,250 1 44 ,7 50
160 Sakl ar gan da setara broco 16 1 s akl ar t un gg al s eta ra b ro co 162 stop kon tak setara br oco
(M160) ( M16 1) (M162)
bh bh bh
46,750 38 5 , 00 22,000 -
163
(M163)
u nit
( M16 4)
u ni t
Jambi 2017 (Rp)
M ua ra Ja mb i 2 01 7 ( Rp )
6 60 ,0 00
4 00 ,0 00
-
5 50 ,0 00
4 65 ,0 00 4 65 ,0 00 -
9 15 ,0 00 5 70 ,0 00
6 00 ,0 00 1 75 ,0 00
-
6 99 ,0 00 1 ,9 83 ,8 00 2 87 ,5 00 -
1 ,1 41 ,0 00 3 ,1 55 ,0 00 3 38 ,7 50
7 20 ,0 00 2 ,3 50 ,0 00 2 25 ,0 00
-
8 62 ,0 00 7 50 ,0 00 -
1 ,3 62 ,5 00 1 ,3 55 ,0 00
7 50 ,0 00 1 ,5 00 ,0 00
-
8 00 ,0 00 1 ,5 00 ,0 00
T j. Ti mu r 2 01 7 ( Rp ) 1 ,7 90 ,0 00
-
7 50 ,0 00 2 50 ,0 00
2 ,7 89 ,2 50 7 70 ,3 00
1 ,1 20 ,0 00 2 ,5 00 ,0 00 2 50 ,0 00
1 ,1 70 ,7 50 2 ,8 87 ,5 00 3 88 ,5 00 1 ,0 01 ,8 15 6 79 ,0 00
Tj.Barat 2017 (Rp)
Batang Hari 2017 (Rp)
Tebo 2017 (Rp)
Muaro Bungo 2017 (Rp)
Sarolangun 2017 (Rp)
2,337,5 00
1,575,0 00
-
1,875,0 00
1,804,0 00
-
2,244,0 00
2,400,0 00
-
3,500,0 00
2,322,5 00
-
2,465,000 1,687,5 00 3,984,250 2,122,5 00 1,890,800 6 6 8, 00 0 -
2,822,5 00 1 , 10 3, 00 0
2,662,5 00 3 80 ,0 00 -
3,662,5 00 5 08 ,7 50
2,255,0 00 5 14 ,2 50
-
2,805,0 00 6 24 ,2 50
2,581,7 50 4 79 ,5 00
-
3,501,7 50 7 11 ,5 00
-
1,945,750 1 1 , 13 ,7 50 3,437,500 2,5 55,000 508,500 3 6 3, 68 7 -
1 ,8 18 ,7 50 2,926,6 92 4 18 ,2 40
5 94 ,0 00 2,010,0 00 2 50 ,0 00 -
9 24 ,0 00 3,270,0 00 2 18 ,7 50
7 56 ,2 50 3,225,0 00 2 50 ,0 00
-
1 ,1 41 ,2 50 3,775,0 00 2 50 ,0 00
7 90 ,7 00 1,600,0 00 3 39 ,2 50
-
1 ,1 93 ,5 00 2,755,0 00 4 54 ,2 50
-
2,176,815 1,7 83,825 1,078,272 942,500
2,794,3 25 1,242,5 00
1,215,0 00 550,000 -
1,597,5 00 1,070,0 00
1,782,0 00 1,650,0 00 -
2,772,0 00 1,650,0 00
1,160,0 00 1,083,5 50 -
2,575,0 00 1,428,0 50
-
Merangin 2017 (Rp)
Kerinci 2017 (Rp)
S. Penuh 20
-
3,772,5 00
1,250,0 00 -
2,000,0 00
1,887,5 00
-
2,237,5 00
1,787,5 00 -
2,405,0 00 5 32 ,5 00
-
3,805,0 00 7 32 ,5 00
1,800,0 00 5 00 ,0 00 -
2,400,0 00 1 ,1 00 ,0 00
2,375,0 00 5 32 ,5 00
-
3,375,0 00 7 32 ,5 00
2,375,0 00 5 32 ,5 00 -
9 15 ,0 00 1,897,5 00 2 87 ,5 00
-
1 ,6 15 ,0 00 2,300,0 00 3 40 ,0 00
7 00 ,0 00 2,856,0 00 3 99 ,8 40 -
1 ,3 00 ,0 00 3,315,0 00 4 64 ,1 00
7 93 ,7 50 2,668,5 00 3 05 ,1 75 -
1 ,2 18 ,7 50 3,081,5 00 4 42 ,3 25
7 93 ,7 50 3,300,0 00 2 30 ,0 00 -
1,645,0 00 1,150,0 00
-
2,495,0 00 1,749,0 00
415,000 375,000 -
625,000 575,000
1,792,0 00 1,644,5 00 -
2,772,0 00 2,909,5 00
1,782,0 00 672,000 -
XIV LISTRIK NO
158 1 59
URAI AN
In stalasi Listrik B ox z ek ri ng /p an el b ox +M CB
Lampu P ijar 40 watt
16 4 L amp u X l 2 0w at t (l en gk ap )
Jambi2017 (Rp)
Muara Jambi 2017 (Rp)
Tj.Timur 2017 (Rp)
-
130,000 1 34 ,7 50
52,700 4 3,2 00 26,500
17,500 1 5, 00 0 17,500 -
21,500 2 0,0 00 21,500
43,750 3 3, 50 0 39,800 -
36,150 -
46,650
36,000
-
42,000
30,000
95 0 , 00 -
11 5,0 00
9 6, 00 0 -
12 5,0 00
Catatan : Harga dasar terendah di Ibukota kabupaten Harga dasar tertinggi di kecamatan paling a j uh/sulit dijangkau dari kabupaten yang bersangkutan
120,000 1 29 ,7 50
238,000 1 89 ,5 00
-
-
8 3, 95 0 -
339,000
224,500 105,750
Tj.Barat 2017 (Rp)
Batang Hari 2017 (Rp)
1 9 8, 50 0 1 4 2, 75 0 -
2 28 ,5 00 1 67 ,7 50
1 22 ,2 50 1 29 ,7 50
-
1 42 ,2 50 1 34 ,7 50
7 4,5 00 4 9,0 00 6 6,8 20
28 0 , 00 23 0 , 00 23 0 , 00
-
4 8, 750 4 2, 000 3 2, 250
Tebo 2017 (Rp) 2 10 ,0 00 1 54 ,2 50
Muaro Bungo 2017 (Rp)
-
3 65 ,0 00 1 79 ,2 50
1 00 ,0 00 1 49 ,5 00
-
1 30 ,0 00 1 55 ,5 00
7 4, 50 0 5 2, 80 0 3 8, 20 0 -
1 21 ,00 0 66 ,80 0 49 ,20 0
8 0,5 00 5 3,5 00 3 0,0 00
-
92 0 , 00 60 0 , 00 45 7 , 50
Sarolangun 2017 (Rp) 1 47 ,5 00 3 16 ,2 50 5 1, 75 0 4 0, 25 0 5 1, 75 0
Merangin 2017 (Rp)
Kerinci2017 (Rp)
S. Penuh 20
-
1 97 ,5 00 4 80 ,8 00
1 50 ,0 00 9 5, 00 0 -
2 60 ,0 00 1 65 ,0 00
1 87 ,5 50 1 42 ,5 00
-
2 42 ,5 50 1 49 ,0 00
1 87 ,5 50 1 42 ,2 25 -
-
8 9,7 50 6 1,0 00 5 4,0 00
2 1, 500 1 7, 000 3 0, 000 -
35 0 , 00 32 0 , 00 51 5 , 00
47 7 , 00 40 5 , 00 34 0 , 00
-
73 0 , 50 63 5 , 00 46 7 , 00
2 5, 00 0 1 7, 00 0 1 8, 00 0 -
53,000 68,300
5 2, 00 0 3 1, 50 0 3 8, 52 0 -
57,000 1 00, 05 0
4 3, 64 2 -
5 0,1 88
13 5 , 00
-
2 1, 000
2 1, 00 0 -
36 ,50 0
1 5,5 25
-
24 1 , 50
1 4, 00 0
-
2 0,5 00
1 3, 500 -
21 0 , 00
16 0 , 00
-
25 5 , 00
2 0, 50 0 -
8 8, 37 5 -
12 0,0 00
76 2 , 50
-
9 6, 250
7 2, 45 0 -
95 ,45 0
8 9,0 00
-
1 11 5 , 00
8 2, 25 0
-
10 0, 000
7 3, 750 -
98 7 , 50
1 15 0 , 00
-
1 28 0 , 00
1 00, 00 0 -
XV BAHAN LANTAI NO
KODE
SATUAN
165 166
Keramik 20x20 cm Keramik 30x30 cm
URAI AN
(M165) (M166)
M2 M2
48,750 55,000 -
66,250 85,000
87,000 60,000
-
112,000 85,000
69,000 75,000
-
167 168
Keramik 40x40 cm Cincin Keramik
(M167) (M168)
M2 M1
86,200 11,500 -
98,500 16,000
97,000 10,000 -
130,000 15,000
73,000 54,000
-
KODE
SATUAN
Jambi 2017 (Rp)
Muara Jambi 2017 (Rp)
Tj.Timur 2017 (Rp)
Tj.Barat 2017 (Rp)
75,000 80,000 153,000 67,000
Batang Hari 2017 (Rp)
Tebo 2017 (Rp)
Muaro Bungo 2017 (Rp)
Sarolangun 2017 (Rp)
Merangin 2017 (Rp)
8, 00 0 9 1, 00 0 -
9 2,0 00 1 04 ,0 00
66 0 , 00 6 9, 00 0 -
7 5, 750 7 3, 50 0
8 9, 25 0 9 6, 75 0 -
1 29 ,25 0 1 44 ,7 50
6 0,0 00 7 5, 00 0 -
95 0 , 00 8 5, 00 0
7 1, 25 0 1 01 ,0 00 -
10 1, 250 1 63 ,5 00
6 8, 000 1 50 ,1 44 -
1 32 6 , 00 1 29 ,9 48
8 8, 47 9 1 21, 50 0 -
10 1,7 50 14 0,0 00
66 0 , 00 10 3 , 00
9 5, 500 1 7, 300
2 75, 00 0 2 0, 95 0 -
2 75 ,00 0 31 ,95 0
6 5,0 00 2 3,5 75
97 0 , 00 29 3 , 25
1 22, 50 0 1 9, 00 0 -
21 2, 700 2 7,0 00
6 8, 544 1 9, 000 -
66 3 , 00 27 0 , 00
-
-
Kerinci2017 (Rp) 52 2 , 50 8 6, 35 0 77 5 , 50 22 5 , 50
-
S. Penuh 20
74 2 , 50 1 41 ,3 50
4 7, 50 0 7 8, 50 0 -
99 5 , 50 28 0 , 50
4 6, 00 0 2 0, 50 0 -
XVI PEKERJAAN PER PAKET NO
URAI AN
Jambi 2017 (Rp)
Muara Jambi 2017 (Rp)
Tj.Timur 2017 (Rp)
169 17 0 171
Pek profil ekepala ti ang P ek p ro fi le ti an g Pek list plafondt 3 cm
(M169) ( M17 0) (M171)
bh u ni t m1
24,500 8 75 0 , 00 15,500 -
44,500 1, 42 5,0 00 19,000
29,500 1 ,0 00, 00 0 13,500 -
39,500 1, 30 0,0 00 21,000
66,250 13 , 60, 00 0 5,950 -
17 2 17 3
P ek p as je nd el a te ra li sb es i P ek p in tu te ra li s b es i
( M17 2) ( M17 3)
m2 m2
4 13 0 , 00 6 60 0 , 00 -
50 7,0 00 95 0,0 00
4 35, 00 0 7 05, 00 0 -
48 5,0 00 90 5,0 00
4 91, 00 0 8 67, 75 0 -
174 17 5
Pek pagar besi hias P ek p as mu r b au t & p la tk ud a- ku da
(M174) ( M17 5)
m2 bh
600,000 42 , 50 -
780,000 72 , 50
590,000 4, 50 0 -
790,000 70 , 00
725,500 1 7, 50 0 -
17 6 177
P ek ven ti la si u ki ra nj amb i Pas Batu A lam
( M17 6) (M177)
m2 M2
1 25 0 , 00 230,000 -
22 0,0 00 460,000
1 32, 50 0 320,000 -
21 2,5 00 370,000
1 53, 00 0 352,500 -
Tj.Barat 2017 (Rp)
106,250
5 98 ,0 00 1 ,0 70 ,0 00
4 35 ,0 00 7 05 ,0 00
-
4 85 ,0 00 9 05 ,0 00
4 77 ,5 00 7 72 ,5 00
-
5 57 ,5 00 9 52 ,5 00
1 ,0 37 ,5 00 43,450
5 90 ,0 00 4,500
-
7 90 ,0 00 7,000
7 12 ,5 00 25,500
-
1 ,0 12 ,5 00 32,000
1 5 2, 00 0 3 4 5, 50 0 -
2 62 ,0 00 4 33 ,6 00
1 32 ,5 00 3 20 ,0 00
-
2 12 ,5 00 3 70 ,0 00
1 50 ,5 00 3 49 ,7 00
-
2 40 ,5 00 4 27 ,7 00
1 52 ,5 00 3 68 ,0 00
30,000 238,000
452,500
3 9, 500 1,300,0 00 6,500
5 6, 50 0 1,375,0 00 13,825 -
Muaro Bungo 2017 (Rp)
6 8 7, 50 0 2 0,950 -
29 5 , 00 1,000,0 00 5,000 -
Tebo 2017 (Rp)
7 9,0 50 1,605,0 00 36,000
1,045,500
Batang Hari 2017 (Rp)
5 2, 05 0 2,090,000 1,155,0 00 12,450 2 3,000 613,000 4 8 3, 00 0 1,317,250 7 7 0, 00 0 -
81 ,50 0 2,075,0 00 21,825
3 4,0 00 1,299,5 00 5,763
Sarolangun 2017 (Rp)
-
45 5 , 00 1,874,5 00 7,463
7 2, 75 0 1,130,0 00 16,000 -
5 00 ,2 50 8 10 ,7 50
-
5 57 ,7 50 1 ,0 40 ,7 50
4 22 ,0 00 7 34 ,5 00
6 78 ,5 00 6,170
-
9 08 ,5 00 9,470
5 87 ,0 00 24,500
-
2 44 ,5 00 4 25 ,5 00
1 41 ,5 00 3 55 ,0 00
-
Merangin 2017 (Rp)
Kerinci 2017 (Rp)
8 1, 000 1,562,5 00 12,700 -
1 26 0 , 00 2,462,5 00 17,200
48 2 , 50 1,146,2 50 6,700 -
-
4 52 ,0 00 9 44 ,5 00
4 78 ,5 00 8 95 ,0 00 -
5 33 ,5 00 1 ,2 90 ,0 00
5 19 ,5 00 7 40 ,7 50
-
6 99 ,5 00 9 95 ,7 50
4 35 ,0 00 7 05 ,0 00 -
-
7 47 ,0 00 39,500
8 03 ,5 00 30,500 -
1 ,2 43 ,5 00 50,000
6 87 ,5 00 7,500 -
1 ,0 37 ,5 00 12,500
5 90 ,0 00 20,000 -
2 26 ,5 00 4 50 ,0 00
2 23 ,7 50 4 17 ,5 00 -
4 08 ,7 50 6 17 ,5 00
4 06 ,0 00 6 32 ,5 00
1 32 ,5 00 3 20 ,0 00 -
2 15 ,0 00 4 02 ,5 00
-
78 2 , 50 1,671,2 50 10,800
S. Penuh 20
12 2, 750 1,630,0 00 20,000
2 9, 50 0 1,000,0 00 28,000 -
XVII LAIN-LAIN NO
URAI AN
KODE
SATUAN
(M178) (M179)
Bh M2
Dop 2 1/2 Karung Plastik
(M180) (M181)
Bh Bh
9,925 3,000 -
13,075 6,000
Water Stop Gemuk
(M182) (M183)
M KG
60,000 30,750 -
78,000 38,250
184 185 186
Amplas Paku seng Plamour
(M184) (M185) (M186)
lbr m3 m3
6,400 20,000 17,000 -
7,400 26,000 29,000
187 18 8
178 179
Pompa Tangan Gebalan Rumput
180 181 182 183
Jambi 2017 (Rp) 50,000 543,750 12,000 22,500
Tarikan jendela T ed an g l aya r + ko ns en
(M187) ( M18 8)
bh m2
23,750 7 57 5 , 00 -
33,750 96 7,5 00
18 9 U ki ra nj amb i/ li stp la nk 190 GRC
( M18 9) (M190)
bh lbr
1 10 0 , 00 104,025 -
17 7,5 00 111,025
191 1 92
Gypsum B es i W ir em es h m 6" ( 2, 1X 5, 4)
(M191) ( M1 92 )
lbr L br
82,500 6 50 ,0 00 -
87,750 7 50 ,0 00
1 93 B es i W ir em es h m 8" ( 2, 1X 5, 4) 19 4 B aj aRi ng an 75 19 5 A ta p Gu tt a2 00 x 9 5
( M1 93 ) (M 19 4) (M 19 5)
L br M2 L br
7 50 ,0 00 1 30 0 , 00 1 40 0 , 00 -
8 50 ,0 00 16 0,0 00 18 0,0 00
19 6 N ok Gu t a1 04 x 5 0 19 7 T al an g A ir Gu tta 10 4x 50
( M19 6) ( M19 7)
K pg K pg
80 0 , 00 70 0 , 00 -
8 7,0 00 8 0,0 00
19 8 F la sh in g Gu tta 10 4x 34 199 Sekrup 6,5 cm
( M19 8) (M199)
K pg Bh
80 0 , 00 1,500 -
8 7,0 00 2,000
Catatan : Harga dasar terendah di Ibukota kabupaten Harga dasar tertinggi di kecamatan paling a j uh/sulit dijangkau dari kabupaten yang bersangkutan
Muara Jambi 2017 (Rp) 492,500 542,500 12,250 22,250 10,000 13,000 5,000 8,000 64,000 74,000 30,750 38,250 6,000 6,000 20,000 26,000 18,000 28,000 26,250 31,250 7 62, 50 0 96 2,5 00 1 13, 75 0 17 3,7 50 129,000 129,000 75,000 75,000 6 50 ,0 00 7 50 ,0 00 7 50 ,0 00 8 50 ,0 00 1 37, 00 0 16 8,0 00 1 47, 00 0 18 9,0 00 8 4, 00 0 9 1,0 00 7 3, 50 0 8 4,0 00 8 4, 00 0 9 1,0 00 1,500 2,000
Tj.Timur 2017 (Rp) 608,500 748,500 26,750 53,750 28,000 14,600
-
72,000 37,000
-
13,500 36,600 25,700
-
35,650 4 30, 25 0 4 0, 00 0 123,500 132,500 6 50 ,0 00
-
Tj.Barat 2017 (Rp) 5 9 5, 50 0 7 15 ,5 00 1 9, 62 5 3 2,1 25
Batang Hari 2017 (Rp) 5 50 ,0 00 6 00 ,0 00 12 2 , 50 2 2, 250
Tebo 2017 (Rp) 6 62 ,5 00 8 32 ,5 00 2 8, 75 0 51 ,75 0
37,775 26,900 89,000
2 7, 50 0 1 2,500 -
3 8,5 00 24,600
10 0 , 00 4,775
-
1 3, 000 9,025
2 2, 15 0 10,050 -
37 ,65 0 17,550
51,800 23,500
6 9, 00 0 3 4, 00 0 -
8 6,5 00 4 6,5 00
64 0 , 00 30 7 , 50
-
7 4, 000 3 8, 250
9 0, 25 0 3 7, 45 0 -
1 28 ,25 0 49 ,95 0
50,800 38,700
1 3,550 3 3, 50 0 2 1, 70 0 -
25,550 4 8,7 00 3 7,5 00
5,250 23 4 , 50 17 0 , 00
-
6,250 2 9, 450 2 9, 000
12,500 3 5, 25 0 2 4, 20 0 -
22,000 45 ,25 0 40 ,20 0
67,850 685,250 535,000
2 3, 55 0 3 9 2, 50 0 -
3 8,5 50 6 42 ,5 00
19 7 , 50 3 92 ,5 00
-
3 7, 750 6 42 ,5 00
3 1, 50 0 4 78 ,2 50 -
49 ,00 0 7 17 ,7 50
1 4 2, 00 0 1 10 ,0 00 -
2 72 ,0 00 1 77 ,5 00
8 5, 00 0 6 9, 75 0 -
1 45 ,0 00 7 9, 75 0
1 96 ,5 00 1 82 ,2 50
-
4 01 ,5 00 3 46 ,7 50
1 67, 00 0 6 50 ,0 00 -
10 9,0 00 7 50 ,0 00
77 0 , 00 6 50 ,0 00 -
8 4, 000 7 50 ,0 00
1 59, 50 0 6 50 ,0 00 -
2 54 ,50 0 7 50 ,0 00
7 50 ,0 00 1 57 5 , 00 1 69 0 , 00
-
8 50 ,0 00 19 4, 000 21 7, 000
7 50 ,0 00 1 65, 00 0 1 77, 00 0 -
8 50 ,0 00 2 03 ,00 0 2 27 ,00 0
210,000 212,500 7 50 ,0 00
7 50 ,0 00 1 43, 00 0 1 54, 00 0 -
8 50 ,0 00 1 76, 40 0 1 98, 50 0
7 50 ,0 00 1 50, 00 0 1 61, 00 0 -
8 50 ,0 00 18 5,0 00 20 7,9 00
8 8, 00 0 7 7, 00 0 -
9 5, 50 0 8 8, 00 0
9 2, 00 0 8 0, 50 0 -
10 0,0 00 9 2,0 00
96 6 , 00 85 0 , 00 -
10 5, 000 9 6, 600
1 01, 00 0 8 9, 00 0 -
1 10 ,00 0 1 00 ,80 0
8 8, 00 0 1,500 -
9 5, 50 0 2,000
9 2, 00 0 1,500 -
10 0,0 00 2,000
96 6 , 00 1,500
10 5, 000 2,000
1 01, 00 0 1,500 -
1 10 ,00 0 2,000
-
Muaro Bungo 2017 (Rp) 5 82 ,5 00 7 40 ,0 00 1 4,5 00 25 5 , 88 1 1,5 00 14 9 , 50 5,000 8,500 7 3,6 00 85 1 , 00 3 5,5 00 44 0 , 00 8,800 11,200 2 6,4 50 28 7 , 50 62 , 50 17 7 , 50 42 , 50 15 7 , 50 4 14 ,0 00 6 44 ,0 00 9 7, 75 0 1 66 ,7 50 8 5, 50 0 1 00 ,0 00 8 0,0 00 99 7 , 50 6 50 ,0 00 7 50 ,0 00 7 50 ,0 00 8 50 ,0 00 17 3,0 00 2 13 0 , 00 18 5,0 00 2 38 0 , 00 10 6,0 00 1 15 5 , 00 9 3,0 00 1 06 0 , 00 10 6,0 00 1 15 5 , 00 1,500 2,000
Sarolangun 2017 (Rp) 6 82 ,5 00 9 27 ,5 00 2 3, 20 0 4 1,2 00
Merangin 2017 (Rp) 7 02 ,7 50 9 87 ,7 50 5, 000 15 0 , 00
Kerinci 2017 (Rp) 6 05 ,0 00 6 60 ,0 00 13 7 , 00 24 5 , 00
S. Penuh 20 5 50 ,0 00 3 0, 25 0 -
1 7, 95 0 11,950
-
2 3,4 50 23,700
2 1, 800 1,500 -
28 8 , 00 3,000
12 0 , 00 5,000
-
17 0 , 00 10,000
2 6, 05 0 10,250 -
7 5, 27 5 3 4, 00 0
-
9 3,7 75 4 6,5 00
1, 10 8, 50 0 2 4, 000 -
11 , 57 0 , 00 36 0 , 00
70 4 , 00 37 0 , 00
-
81 4 , 00 42 5 , 00
4 1, 50 0 3 5, 00 0 -
12,600 2 9, 70 0 2 1, 25 0
-
21,900 3 4,7 00 3 6,2 50
9,000 2 5, 000 2 2, 500 -
15,000 40 0 , 00 37 5 , 00
6,000 26 0 , 00 19 8 , 00
-
12,000 32 5 , 00 30 8 , 00
12,250 2 3, 45 0 1 8, 00 0 -
2 6, 55 0 4 02 ,0 00
-
3 5,5 50 5 87 ,0 00
7, 500 4 02 ,5 00 -
13 5 , 00 6 32 ,5 00
29 0 , 00 3 96 ,0 00 -
35 0 , 00 6 16 ,0 00
2 6, 25 0 3 60 ,0 00 -
1 91 ,5 00 1 13 ,2 50
-
4 06 ,5 00 1 85 ,7 50
2 11 ,2 50 7 5, 00 0 -
4 21 ,2 50 1 50 ,0 00
9 3, 50 0 7 6, 50 0 -
1 59 ,5 00 8 9, 00 0
1 77 ,2 50 1 99 ,7 50 -
1 14, 75 0 6 50 ,0 00 -
14 9, 750 7 50 ,0 00
9 0, 000 6 50 ,0 00 -
1 50 0 , 00 7 50 ,0 00
87 6 , 00 6 50 ,0 00 -
96 0 , 00 7 50 ,0 00
8 0, 00 0 6 50 ,0 00 -
7 50 ,0 00 1 81, 00 0 1 94, 00 0 -
8 50 ,0 00 22 3, 000 25 0, 000
7 50 ,0 00 19 0, 000 20 3, 000 -
8 50 ,0 00 2 34 0 , 00 2 62 0 , 00
7 50 ,0 00 1 99 0 , 00 2 13 0 , 00 -
8 50 ,0 00 2 45 0 , 00 2 75 0 , 00
7 50 ,0 00 2 08, 00 0 2 23, 00 0 -
1 11, 00 0 9 7, 00 0 -
12 1, 000 11 1, 000
11 6, 000 10 1, 000 -
1 27 0 , 00 1 16 0 , 00
1 21 0 , 00 1 06 0 , 00 -
1 33 0 , 00 1 21 0 , 00
1 27, 00 0 1 11, 00 0 -
1 11, 00 0 1,500
12 1, 000 2,000
11 6, 000 1,500 -
1 27 0 , 00 2,000
1 21 0 , 00 1,500 -
1 33 0 , 00 2,000
1 27, 00 0 1,500
-
17 (Rp) 407,500 407,500 100,000 370,300 9,000 409,000 667,000 82,500 190,000 307,000 345,200 598,000 497,500 662,000
17 (Rp) 22,000 20,000
17 (Rp) 12,000 9,000 10,300 7,300 13,000 6,900 48,500 45,000 61,425 66,450 200,000 198,000 4,295
17 (Rp) 83,500 8,200 75,000
17 (Rp) 14,000 17,000 22,000 675,000 25,307 45,000 30,225 42,290 381,000 443,750 942,500 45,000 127,000 135,485 37,050 24,700 35,375 12,000 88,000 28,000 154,500 52,700 56,025 32,250 230,500 46,500 67,000 35,000 371,500 56,750 51,700,000 55,000,000 85,800,000 85,800,000 28,050,000 29,150,000 6,105,000
17 (Rp) 79,000 200,000 75,150 77,100 105,500 50,500 26,000 35,000 78,500
17 (Rp) 29,000 85,000 16,800
17 (Rp) 110,000 31,075 95,000 125,000 120,500 157,200 99,400 160,300
17 (Rp) 6,500 4,609 1,500 1,800 7,400 136,750 199,000 270,500 202,750
17 (Rp) 6,462,800 5,168,250 3,950,000 5,000,000 3,227,500 37,685 1,512,500 85,500 218,750 1,504,000 9,380,000 71,500 65,575 153,075 52,250 66,358 110,141 101,625 194,500 226,000
17 (Rp) 21,500 11,000 72,000 69,870 72,550 49,500 107,200
17 (Rp) 85,000 103,100 127,500 190,500 243,500 418,500 425,000 695,500 1,803,000 37,800 43,800 46,100 45,500 56,500 97,800 105,450 243,500 334,000 136,000 460,000
17 (Rp) 2,237,500 3,375,000 732,500 1,218,750 3,370,000 375,000 2,772,000 1,451,750
17 (Rp) 242,550 148,725 35,000 24,250 25,000 37,000 120,000
17 (Rp) 67,500 128,500 66,000 25,500
17 (Rp) 39,500 1,300,000 52,500 485,000 905,000 790,000 37,500 212,500 370,000
17 (Rp) 600,000 50,250 36,050 16,200 96,500 41,000 22,250 29,450 28,000 31,250 560,000 363,250 409,750 95,000 750,000 850,000 257,000 288,000 139,000 127,000 139,000 2,000
d. HARGA DASAR MATERIAL ALAM UNTUK QUARRY SELURUH KABUPATEN DI PROVINSI JAMBI KABUPATEN
1. MUARA BUNGO
JARAK KE IBUKOTA KABUPATEN (Km)
NAMA DESA / TEMPAT
1. Desa Lubuk Landai (Ruas Jalan Ma. Bungo-Bts.Sumbar)
± ± ± ± ± ±
29.00 29.00 29.00 29.00 29.00 29.00
JENIS MATERIAL
PERKIRAAN KUANTITAS
Pasir Batu Kali Batu Quarry Besar Gravel Sirtu Split
54,450.00 66,550.00 78,650.00 133,100.00 66,550.00 350,900.00
-
49,050.00 78,650.00 78,650.00 133,100.00 66,550.00 350,900.00
-
2. Desa Rantau Ikil (Ruas Jalan Ma. Bungo-Bts.Sumbar)
± ± ± ± ±
44.00 Pasir 44.00 Batu Kali 44.00 Batu Quarry Besar 44.00 Gravel 44.00 Sirtu Split
3. Desa Sungai Arang (Ruas Jalan Ma.Bungo-Rt. Pandan) (Ruas Jalan Kabupaten)
± ± ±
7.00 Pasir urug 7.00 Pasir 7.00 Sirtu
4. Desa Rantau Pandan (Ruas Jalan Ma.Bungo-Rt. Pandan) (Ruas Jalan Kabupaten)
± ± ± ± ±
37.00 37.00 37.00 37.00 37.00
HARGA DIQUARRY ( Rp./ M3
Kerikil Batu kali Batu Quarry Besar Gravel Sirtu
JENIS QUARRY
PERKIRAAN KAPASITAS PRODUKSI ( M3 / HARI )
KETERANGAN
Sungai
Masyarakat Masyarakat
Sungai
Masyarakat
Tergantung hujan dan air
Sungai (S. Batang Bungo)
Masyarakat
60-80 60-80
Kapasitas Tergantung Kemampuan Alat dan Truk Pengangkut
71,500.00 Tergantung hujan 99,000.00 dan air 127,600.00 127,600.00 71,500.00
Sungai (S. Batang Bungo)
Masyarakat
100 - 125
Kapasitas Tergantung Kemampuan Alat dan Truk Pengangkut
42,350.00 54,450.00 66,550.00
Sungai
NAMA PEMILIK
-
-
1. Batu pecah diambil dari padang
Tebing Jalan ± 200 - 300 m
KABUPATEN
JARAK KE IBUKOTA KABUPATEN (Km)
NAMA DESA / TEMPAT
JENIS MATERIAL
2. MUARO JAMBI ( Sengeti)
1. Desa Sekernan (Sengeti) (Ruas Jalan Jambi-Sp. Tuan )
± ±
3. TANJUNG JABUNG BARAT (Ka. Tungkal )
1. Desa Kampung Baru (Ruas Jalan Merlung-Bts Riau )
± ± ±
183.58 Batu Quarry Besar 183.58 Sirtu 183.58 Split
2.Desa Lubuk Terap (Ruas Jalan Merlung-Lbk Kambing )
±
3.Desa Sekernan (Sengeti) (Ruas Jalan Jambi-Sp. Tuan )
4. TANJUNG JABUNG TIMUR (Ma. Sabak)
5.KOTA JAMBI
JENIS QUARRY
-
Sungai
78,650.00 66,550.00 330,000.00
-
Sungai
158.00 Sirtu
77,000.00
-
±
27.00 Pasir
33,000.00
-
1.Desa Tanjung Batu (Ruas Jalan Simp Lagan-Parit Culum )
±
36.00 137,500.00 341,000.00 54,450.00
-
1. Paal 10
±
Batu Quarry Besar Split Sirtu
±
2.Kasang
6.BATANG HARI Ma. Bulian
PERKIRAAN KUANTITAS
54,450.00 66,550.00
2.Desa Kebun Bohok (Jln. Lingkar Selatan Kota Jambi)
7.20 Pasir 7.20 Kerikil Jagung
HARGA DIQUARRY ( Rp./ M3
10.00 Tanah Timbunan 14.00 T anah Timbunan Pilihan Tanah Timbunan - Pasir Kerikil
1.Jalan Gajah Mada No.59 (Kota Ma. Bulian)
± ± ±
2. Desa Muara Jangga kec.Batin XXIV
± ± ±
2.00 Pasir 2.00 Kerikil 2.00 Split 25.00 K rikil
NAMA PEMILIK
PERKIRAAN KAPASITAS PRODUKSI ( M3 / HARI )
Masyarakat Masyarakat
-
-
Bukit-bukit
Masyarakat
Bukit-bukit -
Masyarakat
38,500.00 Tergantung hujan 154,000.00 dan air 440,000.00 -
Sungai
Masyarakat
-
143,000.00
Sungai
Masyarakat
-
49,500.00 71,500.00 49,500.00
Tergantung hujan dan Alat
KETERANGAN
-
Sudah tidak diambil
1. Batu pecah diambil dari Riau 2. Batu Kerikil diambil dari JAMBI 40 - 50 M3
60,000.00 280,000.00
-
Kapasitas Tergantung Kemampuan Tenaga Kerja
KABUPATEN
7.SAROLANGUN (Kota Sarolangun)
JARAK KE IBUKOTA KABUPATEN (Km)
NAMA DESA / TEMPAT
1. Desa Lindung (Ruas Jalan Pauh-Sarolangun)
± ±
2.Desa Dalam (Ruas Jalan Sarolangun-Pemenang)
± ± ± ± ±
JENIS MATERIAL
5.00 Pasir 5.00 Kerikil Sirtu 28.00 Pasir Kerikil Batu Quarry Besar Batu Kali Gravel
3.Desa Batu Peyabung (Ruas Jalan Sarolangun-Pemenang)
± ± ± ± ± ±
26.00 26.00 26.00 26.00 26.00 26.00
Pasir Batu Kali Batu Quarry Besar Gravel Sirtu Split
4.Desa Musi Rawas (Ruas Jalan Sarolangun-Linggau)
± ± ± ± ± ±
110.00 Pasir 110.00 Batu Kali 110.00 Batu Quary Besar 110.00 Gravel 110.00 Sirtu 110.00 Split
5. Desa Sebakul ( Ruas Jalan Sp. Pelawan - Btng Asai )
±
34.00 Sirtu
6. Desa Sei. Pinang ( Ruas Jalan Sp. Pelawan - Btng Asai )
± ± ± ±
84.00 84.00 84.00 84.00
7. Desa Sei. Keradak ( Ruas Jalan Pekan Gedang - Jangkat )
± ± ± ± ±
130.00 110.00 110.00 110.00 110.00
HARGA DIQUARRY ( Rp./ M3 59,895.00 73,205.00
54,450.00
PERKIRAAN KUANTITAS
-
Tergantung hujan dan air
JENIS QUARRY
NAMA PEMILIK
PERKIRAAN KAPASITAS PRODUKSI ( M3 / HARI )
KETERANGAN
Sungai
Masyarakat
Sungai
Masyarakat
60-80 60-80
Kapasitas Tergantung Kemampuan Alat dan Truk Pengangkut
Sungai
Masyarakat
100 - 125
Kapasitas Tergantung Kemampuan Alat dan Truk Pengangkut
Sungai
Masyarakat
77,000.00 78,650.00 133,100.00 55,000.00 79,750.00 Tergantung hujan 82,500.00 dan air 132,000.00 66,500.00 360,900.00
54,450.00 Tergantung hujan 78,650.00 dan air 77,000.00 134,200.00 71,500.00 357,500.00 66,000.00
Batu Kali B atu Quary Besar Grevel Sirtu
77,550.00 Tergantung hujan 78,650.00 dan air 133,100.00 66,550.00
Sungai
Masyarakat
Pasir Batu Kali Batu Quarry Besar Grevel Sirtu
54,450.00 Tergantung hujan 78,650.00 dan air 77,550.00 133,100.00 66,550.00
Sungai
Masyarakat
Kapasitas Tergantung Kemampuan Alat dan Truk Pengangkut
KABUPATEN
8. MERANGIN ( Kota Bangko )
JARAK KE IBUKOTA KABUPATEN (Km)
NAMA DESA / TEMPAT
JENIS MATERIAL
HARGA DIQUARRY ( Rp./ M3
PERKIRAAN KUANTITAS
JENIS QUARRY
NAMA PEMILIK
PERKIRAAN KAPASITAS PRODUKSI ( M3 / HARI )
KETERANGAN
1. Desa Tanjung Lamin ( Ruas Jalan Sarolangun Bangko )
± ± ± ± ± ±
19.00 Spilt 1:2 Abu Batu Pasir Sirtu Tanah Urug Pasir Urug
61,875.00 Tergantung Cuaca 61,875.00 38,500.00 110,000.00 60,500.00 33,000.00
Sungai
Masyarakat
Quarry milik perusahaan dan dapat dijual kepada umum
2. Desa Sekancing ( Ruas Jalan Sp. Pl. Rengas - Ds. Tuo )
± ± ± ±
29.50 29.50 29.50 29.50
Batu Kali Batu Quarry Besar Grevel Sirtu
80,300.00 82,500.00 137,500.00 84,700.00
Tergantung Cuaca
Sungai
Masyarakat
3. Desa Pl. Tengah ( Ruas Jalan Ds. Tuo - Jangkat )
± ± ± ± ±
115.55 115.55 115.55 115.55 115.55
P asir Batu Kali Batu Quarry Besar Grevel Sirtu
60,500.00 84,700.00 84,700.00 139,150.00 80,300.00
Tergantung cuaca
Sungai
4. Desa Batu Penyabung ( Ruas Jalan Sarolangun - Pamenang )
± ± ± ± ± ±
47.45 47.45 47.45 47.45 47.45 47.45
Pasir Batu Kali Batu Quarry Besar Grevel Sirtu Split
60,500.00 Tergantung cuaca 77,000.00 82,500.00 132,000.00 60,500.00 330,000.00
Sungai
Masyarakat
5. Desa Pemenang ( Ruas Jalan Bangko -Sarolangun )
±
25.00 Pasir Hitam Krikil Jagung Pasir Kuning
80,850.00 84,700.00 126,500.00
Sungai
Masyarakat
Kapasitas Tergantung Kemampuan Tenaga Kerja
1. Desa Siulak Deras ( Ruas Jalan Sei. Penuh - Bts Sumbar Leter W )
± ± ± ± ±
21.30 21.30 21.30 21.30 21.30
93,500.00 Tergantung cuaca 121,000.00 187,000.00 110,000.00 60,500.00 49,500.00
Sungai & Bukit
Masyarakat
Quarry milik perusahaan dan dapat dijual kepada umum
Masyarakat
9. KERINCI ( Kota Sei. Penuh )
Pasir ayak Batu Pasang Batu 3/5 dan 2/3 Abu Batu Sirtu Tanah Urug
Tergantung cuaca
KABUPATEN
10. TEB0 ( Kota Ma. Tebo )
JARAK KE IBUKOTA KABUPATEN (Km)
NAMA DESA / TEMPAT
JENIS MATERIAL
HARGA DIQUARRY ( Rp./ M3
PERKIRAAN KUANTITAS
JENIS QUARRY
NAMA PEMILIK
2. Desa Jujun ( Ruas Jalan Sangg Agung - Jujun - Sei. Penuh )
± ± ± ± ±
22.50 22.50 22.50 22.50 22.50
Pasir Batu Kali Batu Quarry Besar Grevel Sirtu
60,000.00 93,500.00 82,500.00 132,000.00 66,000.00
Tergantung Sungai
Sungai
Masyarakat
3. Desa Sako ( Bts Sumbar ) ( Ruas Jalan Bts Sumbar - Tapan ) ( Ruas Jalan Provinsi SUMBAR )
± ± ± ± ±
40.00 40.00 40.00 40.00 40.00
Pasir Batu Kali Batu Quarry Besar Grevel Sirtu
55,000.00 Tergantung Sungai 990,000.00 99,000.00 126,500.00 60,500.00
Sungai
Masyarakat
4. Desa Lempur
±
35.00 Pasir 20.00 Gravel Split Krikil Gunung
60,000.00 99,000.00 143,000.00 132,000.00
Tergantung Sungai
Sungai
Masyarakat
Sungai
Masyarakat
5. Desa Siulak Gedang
± ±
22.00 Kerikil 40.00 Split
176,000.00 176,000.00 319,000.00
Tergantung Sungai
1. Desa Jambu ( Ruas Jalan Ma. Tebo - Pl. Temiang )
± ±
32.00 Pasir 32.00 Sirtu
51,975.00 75,075.00
Tergantung Sungai
2. Desa Pl. Temiang ( Ruas Jalan Ma. Tebo Pl. Temiang )
± ±
49.90 P asir 49.90 Sirtu
51,975.00 63,525.00
Tergantung Cuaca
Sungai
Masyarakat
3. Desa Tanjung ( Ruas Jalan Ma. Tebo Pl. Temiang Tanjung )
± ± ±
75,075.00 127,050.00 137,500
Tergantung Cuaca
Sungai
Masyarakat
4. Desa Lubuk Madrasah ( Ruas Jalan Simp. Niam - Lbk Kambing )
±
54.00 Sirtu
71,500.00
Tergantung Cuaca
Bukit-bukit
Masyarakat
5. Desa Ma. Kilis ( Ruas Jalan Sei. Bengkal - Ma. Tebo )
± ±
32.00 Pasir 32.00 Kerikil Jagung
71,500.00 137,500.00
Tergantung Cuaca
Sungai Batang Tebo Masyarakat
107.90 Batu Kali 107.90 Gravel 107.90 Sirtu
PERKIRAAN KAPASITAS PRODUKSI ( M3 / HARI )
40 - 60
-
40 - 50 M3
Paraf
KETERANGAN
3. BESARAN MAKSIMAL BIAYA LANGSUNG PERSONIL (REMUNERASI) UNTUK TENAGA AHLI BERPENDIDIKAN (S1, S2, S3) BERDASARKAN PENGALAMAN PROFESI DAN SERTIFIKASI Klasifikasi
Tahun Pengalaman
Rupiah Per Bulan S1
Tahun Pengalaman
Rupiah Per Bulan S2
Tahun Pengalaman
Rupiah Per Bulan S3
1
2
3
4
5
6
7
Ket 8 1. Biaya Langsung Personil/Remunerasi ini dipergunakan sebagai dasar perhitungan Harga Perkiraan Sendiri (HPS)
AHLI MUDA
1 2
21,100,000 22,900,000
-
-
-
-
3
24,600,000
-
-
-
-
4
26,400,000
-
-
-
-
2. Biaya langsung personil tenaga ahli pada lampiran merupakan biaya langsung personil untuk Provinsi DKI Jakarta yang dipakai sebagai benchmark untuk bagi provinsi Pekerjaan jasa konsultansi di daerah-daerah lain dilakukan penyesuaian dengan
AHLI MADYA
1
28,200,000
1
29,500,000
-
-
mempertimbangkan tempat (lokasi), keterbatasan
2
30,000,000
2
31,600,000
-
-
fasilitas /sarana prasarana/biaya setempat yang
3 4
31,700,000 33,500,000
3 4
-
-
wajar. Penyesuaian dimaksud dengan mengguna
33,600,000 35,800,000
kan indikator ekonomi yang dikeluarkan BPS atau memperhitungkan faktor pengali (indeks) seperti pada lampiran 2.
AHLI UTAMA
1 2 3 4 5 6 7 8 9 10 11 12
35,300,000 37,100,000 38,800,000 40,600,000 42,400,000 44,100,000 45,900,000 47,700,000 49,500,000 51,200,000 53,000,000 54,800,000
Sumber : Surat Edaran Menteri PU No: 03/SE/M/2013
1 2 3 4 5 6 7 8 9 10 11 12
37,800,000
39,800,000 41,900,000 43,900,000 46,100,000 48,100,000 50,100,000 52,200,000 54,200,000 56,200,000 58,400,000 60,400,000
1 2 3 4 5 6 7 8 9 10 11 12
41,400,000 43,700,000 46,000,000 48,200,000 50,400,000 52,800,000 55,000,000 57,200,000 59,400,000 61,800,000 64,200,000 66,800,000
TABEL BESARAN INDEKS WILAYAH PROVINSI DI INDONESIA No
Provinsi
Indeks
1
Nangroe Aceh Darussalam
1.010
2
Sumatera Utara
0.935
3
Sumatera Barat
0.935
4
Riau
0.921
5
Kepulauan Riau
0.892
6
Jambi
0.907
7
Sumatera Selatan
0.904
8
Kepulauan Bangka Belitung
0.968
9
Bengkulu
0.871
10
Lampung
0.880
11
Banten
0.909
12
DKI Jakarta
1.000
13
Jawa Barat
0.781
14
Jawa Tengah
0.760
15
DI Yogyakarta
0.816
16
Jawa Timur
0.772
17
Bali
0.861
18
Nusa Tenggara Barat
0.913
19
Nusa Tenggara Timur
0.897
20
Kalimantan Barat
0.857
21
Kalimantan Tengah
0 952
PRESENTASE KOMPONEN BIAYA PEMBANGUNAN BANGUNAN GEDUNG NEGARA KLASIFIKASI KHUSUS
s.d.
250 s.d.
500 s.d.
1,000 s.d.
2,500 s.d.
5,000 s.d.
10,000 s.d.
25,000 s.d.
50,000 s.d.
100,000 s.d.
250,000 s.d.
250
500
1,000
2,500
5,000
10,000
25,000
50,000
100,000
250,000
500,000
2
3
4
5
6
7
8
9
10
11
12
PERENCANAAN KONSTRUKSI (dalam %)
9.75
8.20 s.d. 8.20
6.89 s.d. 6.89
5.85 s.d. 5.85
5.00 s.d. 5.00
4.35 s.d. 4.35
3.85 s.d. 3.85
3.45 s.d. 3.45
3.10 s.d. 3.10
2.90 s.d. 2.90
2.90 s.d. 2.72
MANAJEMEN KONSTRUKSI (dalam %)
7.95
7.95 s.d. 6.68
6.68 s.d. 5.70
5.70 s.d. 4.87
4.87 s.d. 4.15
4.15 s.d. 3.60
3.60 s.d. 3.10
3.10 s.d. 2.77
2.77 s.d. 2.49
2.49 s.d. 2.30
2.30 s.d. 2.17
PENGELOLAAN KEGIATAN (dalam %)
16.00
16.00 s.d. 11.25
11.25 s.d. 7.75
7.75 s.d. 5.10
5.10 s.d. 3.28
3.28 s.d. 2.15
2.15 s.d. 1.42
1.42 s.d. 0.93
0.93 s.d. 0.58
0.58 s.d. 0.31
0.31 s.d. 0.19
BIAYA KONSTRUKSI FISIK (JUTA Rp.)
KOMPONEN KEGIATAN 1 1.
2.
3.
KHUSUS
Sumber : Peraturan Menteri PU No. 45/PRT/M/2007 Tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara
4. PERSENTASE KOMPONEN BIAYA PEMBANGUNAN BANGUNAN GEDUNG NEGARA KLASIFIKASI SEDERHANA
BIAYA KONSTRUKSI FISIK (JUTA Rp.) KOMPONEN KEGIATAN
s.d.
250 s.d.
500 s.d.
1,000 s.d.
2,500 s.d.
5,000 s.d.
10,000 s.d.
25,000 s.d.
50,000 s.d.
100,000 s.d.
250,000 s.d.
250
500
1,000
2,500
5,000
10,000
25,000
50,000
100,000
250,000
500,000
2
3
4
5
6
7
8
9
10
11
12
PERENCANAAN KONSTRUKSI (dalam %)
8.23
8.23 s.d. 6.83
6.83 s.d. 5.63
5.63 s.d. 4.65
4.65 s.d. 3.90
3.90 s.d. 3.28
3.28 s.d. 2.82
2.82 s.d. 2.44
2.44 s.d. 2.16
2.16 s.d. 1.94
1.94 s.d. 1.80
PENGAWASAN KONSTRUKSI (dalam %)
5.35
5.35 s.d. 4.62
4.62 s.d. 3.90
3.90 s.d. 3.27
3.27 s.d. 2.73
2.73 s.d. 2.27
2.27 s.d. 1.92
1.92 s.d. 1.65
1.65 s.d. 1.43
1.43 s.d. 1.26
1.26 s.d. 1.18
PENGELOLAAN KEGIATAN (dalam %)
14.00
14.00 s.d. 10.00
10.0 s.d. 6.75
6.75 s.d. 4.20
4.20 s.d. 2.85
2.85 s.d. 1.90
1.90 s.d. 1.20
1.20 s.d. 0.80
0.80 s.d. 0.50
0.50 s.d. 0.28
0.28 s.d. 0.18
1 1.
2.
3.
SEDERHANA
Sumber : Peraturan Menteri PU No. 45/PRT/M/2007 Tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara
PRESENTASE KOMPONEN BIAYA PEMBANGUNAN BANGUNAN GEDUNG NEGARA KLASIFIKASI TIDAK SEDERHANA
s.d.
250 s.d.
500 s.d.
1,000 s.d.
2,500 s.d.
5,000 s.d.
10,000 s.d.
25,000 s.d.
50,000 s.d.
100,000 s.d.
250,000 s.d.
250
500
1,000
2,500
5,000
10,000
25,000
50,000
100,000
250,000
500,000
2
3
4
5
6
7
8
9
10
11
12
9.00
9.00 s.d. 7.55
7.55 s.d. 6.35
6.35 s.d. 5.37
5.37 s.d. 4.55
4.55 s.d. 3.92
3.92 s.d. 3.42
3.42 s.d. 3.02
3.02 s.d. 2.72
2.72 s.d. 2.50
2.50 s.d. 2.32
7.25
7.25 s.d. 6.20
6.20 s.d. 5.25
5.25 s.d. 4.50
4.50 s.d. 3.80
3.80 s.d. 3.25
3.25 s.d. 2.80
2.80 s.d. 2.48
2.48 s.d. 2.19
2.19 s.d. 2.00
2.00 s.d. 1.89
PENGAWASAN KONSTRUKSI (dalam %)
6.00
6.00 s.d. 5.20
5.20 s.d. 4.45
4.45 s.d. 3.80
3.80 s.d. 3.20
3.20 s.d. 2.70
2.70 s.d. 2.30
2.30 s.d. 2.00
2.00 s.d. 1.78
1.78 s.d. 1.60
1.60 s.d. 1.50
PENGELOLAAN KEGIATAN (dalam %)
16.00
16.00 s.d. 11.25
11.25 s.d. 7.75
7.75 s.d. 5.10
5.10 s.d. 3.28
3.28 s.d. 2.15
2.15 s.d. 1.42
1.42 s.d. 0.93
0.93 s.d. 0.58
0.58 s.d. 0.31
0.31 s.d. 0.19
BIAYA KONSTRUKSI FISIK (JUTA Rp.)
KOMPONEN KEGIATAN 1 1.
2.
3.
4.
TIDAK SEDERHANA
PERENCANAAN KONSTRUKSI (dalam %)
MANAJEMEN KONSTRUKSI (dalam %) atau
Sumber : Peraturan Menteri PU No. 45/PRT/M/2007 Tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara
5. BESARAN BIAYA PERAWATAN BANGUNAN GEDUNG NEGARA DI PROVINSI JAMBI TA 2017 No
TINGKAT KERUSAKAN
BIAYA PERAWATAN MAKSIMUM
1
RINGAN
35% gedung baru yang ditetapkan oleh bupati / walikota untuk tipe / klas dan l okasi yang sama.
2
SEDANG
45% Dari harga satuan tertinggi pembangunan gedung baru yang ditetapkan oleh Bupati / Walikota untuk tipe / klas dan lokasi yang sama.
3
BERAT
65% Dari harga satuan tertinggi pembangunan gedung baru yang ditetapkan oleh Bupati / Walikota untuk tipe / klas dan lokasi yang sama.
sumber : Peraturan menteri pekerjaan umum No. 45 / PRT / M / 2007 Tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara
KET
6. BESARAN BIAYA PEMELIHARAAN BANGUNAN GEDUNG NEGARA DI PROVINSI JAMBI TA 2017 No. 1
Uraian
Keterangan
2
Biaya pemeliharaan Per - M bangunan gedung setiap tahunnya maksimum 2
adalah sebesar 2% dari harga satuan tertinggi per - M pembangunan gedung baru yang tetapkan oleh Bupati / Walikota untuk tipe / klas dan lokasi yang sama.
Sumber :
Peraturan Menteri Pekerjaan Umum No. 45 / PRI / M / 2007 tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara.
TENAGA ALAT
KAPASITAS ALAT
HARGA ALAT UMUR
ALAT YANG DIPAKAI JAM KERJA HARGA
ALAT 1 TAHUN (HP) No.
1 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
JENIS PERALATAN
2
KETERANGAN :
(Tahun)
(Tahun)
(Jam)
ALAT (Rp.)
E35 E37 E36 E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 E51 E52 E34a
1 2 3 4 5 6 7 8
HP 3 150.0 248.0 3.0 900.0 400.0 115.0 115.0 105.0 134.0 290.0 190.0 190.0 20.0 4.2 220.0 125.0 200.0 50.0 40.0
Cp 4
B 5
A 6
W 7
B 8
15.0 T on 1,000.0 m 2,200.0 M 3.0 M 3.5 M 4,000.0 Liter 2.5 M 600.0 Liter 20.0 m3/jam 4,000.0 liter 4,000.0 liter 350.0 liter 80.0 K G 5.0 M3 60.0 CM 75.0 Ton 30.0 Ton 20,000.0 Liter
450,000,000 4,945,000,000 900,000,000 19,500,000,000 29,250,000,000 395,000,000 395,000,000 1,337,142,857 1,000,000,000 900,000,000 500,000,000 500,000,000 35,000,000 20,000,000 750,000,000 1,170,000,000 900,000,000 500,000,000 150,000,000
10.0 5.0 10.0 5.0 5.0 4.0 5.0 6.0 10.0 5.0 6.0 6.0 2.0 4.0 5.0 10.0 5.0 10.0 4.0
1,500.0 2,000.0 1,500.0 2,000.0 2,000.0 1,000.0 2,000.0 2,000.0 1,500.0 2,000.0 2,000.0 2,000.0 2,000.0 1,000.0 2,000.0 1,500.0 2,000.0 1,500.0 2,000.0
450,000,000 4,945,000,000 900,000,000 19,500,000,000 29,250,000,000 395,000,000 395,000,000 1,337,142,857 1,000,000,000 900,000,000 500,000,000 500,000,000 35,000,000 20,000,000 750,000,000 1,170,000,000 900,000,000 500,000,000 150,000,000
FAKTOR PENGEMBALIAN MODAL
BIAYA PENGEM-
BIAYA PASTI PER JAM ASURANSI TOTAL DAN BIAYA
BIAYA OPERASI PER JAM KERJA WORKSHOP PERBAIKAN & PERAWATAN
BAHAN BAKAR & PELUMAS BAHAN MINYAK
PASTI / JAM
BAKAR P ELUMAS
BIAYA
KOEF.
BIAYA
KOEF.
BIAYA
-
BALIAN MODAL (Rp.)
LAIN-LAIN
(Rp.)
(Rp.)
(Rp.)
t/HP/Jam tr/HP/Jam
(Rp.)
-
(Rp.)
-
(Rp.)
(10% X B)
i(1+i)^A ----------(1+i)^A-1
(B - C) x D ----------W
0.002 x B ----------W
(g1 x B') ----W
0.125 s/d 0.175
(g1 x B') ----------W
C 9
D 10
e1 11
e2 12
G 18
g1 17
KODE ALAT
2a
TRONTON COLD MILLING MACHINE ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON BLENDING EQUIPMENT ASPHALT LIQUID MIXER
-
NILAI SISA ALAT
45,000,000 494,500,000 90,000,000 1,950,000,000 2,925,000,000 39,500,000 39,500,000 133,714,286 100,000,000 90,000,000 50,000,000 50,000,000 3,500,000 2,000,000 75,000,000 117,000,000 90,000,000 50,000,000 15,000,000
0.19925 0.29832 0.19925 0.29832 0.29832 0.35027 0.29832 0.26424 0.19925 0.29832 0.26424 0.26424 0.61512 0.35027 0.29832 0.19925 0.29832 0.19925 0.35027
53,798.06 663,826.68 107,596.11 2,617,718.97 3,926,578.46 124,519.33 53,025.59 158,995.12 119,551.24 120,817.80 59,453.30 59,453.30 9,688.08 6,304.78 100,681.50 139,874.95 120,817.80 59,775.62 23,642.91
600.00 4,945.00 1,200.00 19,500.00 29,250.00 790.00 395.00 1,337.14 1,333.33 900.00 500.00 500.00 35.00 40.00 750.00 1,560.00 900.00 666.67 150.00
(e1 + e2)
0.125 s/d 0.175
0.01 s/d 0.02
E 13
f1 14
f2 15
0.1500 0. 1200 0.1500 0 .1 20 0 0 .1 20 0 0.1500 0.1200 0.1200 0.1500 0. 1200 0.1200 0.1200 0.1200 0.1500 0. 1200 0.1500 0.1200 0.1500 0.1200
0.0300 0.025 0 0.0300 0 .0 25 0 0 .0 25 0 0.0300 0.0250 0.0250 0.0300 0.025 0 0.0250 0.0250 0.0250 0.0300 0.025 0 0.0300 0.0250 0.0300 0.0250
54,398.06 668,771.68 108,796.11 2,637,218.97 3,955,828.46 125,309.33 53,420.59 160,332.26 120,884.57 121,717.80 59,953.30 59,953.30 9,723.08 6,344.78 101,431.50 141,434.95 121,717.80 60,442.29 23,792.91
Tingkat Suku Bunga = 15.00 % per-tahun Upah Operator / Sopir / Mekanik = 15,000 R upiah per-orang/jam Upah Pembantu Operator/Sopir/Mekanik = 12,000 Rupiah per-orang/jam Harga Bahan Bakar Solar = 7,333 Rupiah per-liter (Mengikuti perkembangan harga ) Minyak Pelumas = 40,000 Rupiah per-liter (Mengikuti perkembangan harga ) Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16) AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
▪ Jika terjadi kenaikan harga BBM maka perhitungan analisa biaya sewa peralatan yang memperhitungkan komponen langsung BBM akan menyesuaikan
f1 x HP x Harga BBM + f2 x HP x Harga Olie F 16 900,000.00 1,19 0,400 .00 18,000.00 4 ,3 20 ,0 00 .0 0 1 ,9 20 ,0 00 .0 0 690,000.00 552,000.00 504,000.00 804,000.00 1,39 2,000 .00 938,193.40 912,000.00 96,000.00 25,200.00 1,05 6,000 .00 750,000.00 960,000.00 300,000.00 192,000.00
0.0625 s/d 0.0875 g1 17 0.0875 0. 0875 0.0875 0 .0 87 5 0 .0 87 5 0.0625 0.0875 0.0875 0.0875 0. 0875 0.0875 0.0875 0.0875 0.0625 0. 0875 0.0875 0.0875 0.0875 0.0875
26,250.00 2 16,34 3.75 52,500.00 8 53 ,1 25 .0 0 1 ,2 79 ,6 87 .5 0 24,687.50 17,281.25 58,500.00 58,333.33 39 ,375 .00 21,875.00 21,875.00 1,531.25 1,250.00 32 ,812 .50 68,250.00 39,375.00 29,166.67 6,562.50
0.1750 0 .125 0 0.1750 0 .1 25 0 0 .1 25 0 0.1750 0.1250 0.1250 0.1750 0 .125 0 0.1250 0.1250 0.1250 0.1750 0 .125 0 0.1750 0.1250 0.1750 0.1250
G 18 52,500.00 309, 062. 50 105,000.00 1 ,2 18 ,7 50 .0 0 1 ,8 28 ,1 25 .0 0 69,125.00 24,687.50 83,571.43 116,666.67 56, 250. 00 31,250.00 31,250.00 2,187.50 3,500.00 46, 875. 00 136,500.00 56,250.00 58,333.33 9,375.00
UPAH OPERATOR PEMBANTU / SOPIR (Rp.)
OPERATOR / SOPIR (Rp.)
1 Orang Per Jam Kerja = Rp15,000.0 H 19
1 Orang Per Jam Kerja = Rp12,000.0 I 20
15,000.00 15, 000. 00 15,000.00 1 5, 00 0. 00 1 5, 00 0. 00 15,000.00 15,000.00 15,000.00 15,000.00 15, 000. 00 15,000.00 15,000.00 15,000.00 15,000.00 15, 000. 00 15,000.00 15,000.00 15,000.00 15,000.00
36,000.00 36 ,000. 00 36,000.00 3 6, 00 0. 00 3 6, 00 0. 00 36,000.00 36,000.00 36,000.00 36,000.00 36 ,000. 00 12,000.00 12,000.00 12,000.00 12,000.00 12 ,000. 00 12,000.00 12,000.00 12,000.00 12,000.00
TOTAL BIAYA
TOTAL BIAYA SEWA ALAT
OPERASI / JAM (Rp.)
PER JAM KERJA (Rp.)
F+G+H+I
E+J
J 21
K 22
1,029,750.0 0 1,766,806.2 5 2 26 ,5 00 .0 0 6,442,875.0 0 5,078,812.5 0 8 34 ,8 12 .5 0 6 44 ,9 68 .7 5 6 97 ,0 71 .4 3 1,030,000.0 0 1,538,625.0 0 1,018,318.4 0 992,1 25.0 0 1 26 ,7 18 .7 5 5 6, 95 0. 00 1,162,687.5 0 981,7 50.0 0 1,082,625.0 0 4 14 ,5 00 .0 0 2 34 ,9 37 .5 0
1,084,148.0 6 2,435,577.9 3 3 35 ,2 96 .1 1 9,080,093.9 7 9,034,640.9 6 9 60 ,1 21 .8 3 6 98 ,3 89 .3 4 8 57 ,4 03 .6 9 1,150,884.5 7 1,660,342.8 0 1,078,271.7 0 1,052,078.3 0 1 36 ,4 41 .8 3 6 3, 29 4. 78 1,264,119.0 0 1,123,184.9 5 1,204,342.8 0 4 74 ,9 42 .2 9 2 58 ,7 30 .4 1
KET.
L 23 Pek. Ringan Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Ringan Pek. Berat Pek. Ringan Pek. Berat
NO
URAIAN
HARGA UPAH (Rp)
SATUAN
KETERANGAN
1
2
3
4
5
1
Pengamat Jaringan
1,700,000
org/bulan
S1
2
Juru Pengairan
1,200,000
org/bulan
STM/SMA
3
Petugas Operasi Bendung (POB)
1,200,000
org/bulan
SMA
4
Petugas Pintu Air (PPA)
1,200,000
org/bulan
SMA
5
Staff Pengamat Jaringan Irigasi
1,200,000
org/bulan SLTA
GUBERNUR JAMBI,
H. ZUMI ZOLA ZULKIFLI
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA DENGAN HARGA BBM INDUSTRI PER KABUPATEN NO
URAIAN
KODE
SATUAN
BTG.HARI ( Rp. )
BUNGO ( Rp. )
KERINCI ( Rp. )
KABUPATEN MA.JAMBI JAMBI ( Rp. ) ( Rp. )
MERANGIN ( Rp. )
SAROLANGUN ( Rp. )
TEBO ( Rp. )
TJB.BARAT ( Rp. )
TJB.TIMUR ( Rp. )
1
ASPHALT MIXING PLANT
(E01)
Jam
8,727,718 .13
8,727,7 18.13
8,727,718.13
8 ,727,718.13
8,727,71 8.13
8 ,727,718.13
8 ,727,7 18.13
8,727,718 .13
8,7 27,718.13
8,727,7 18.13
2
ASPHALT FINISHER
(E02)
Jam
997,078.32
997,078.32
997,078.32
997,078.32
997,078.32
997,078.32
997,078.32
997,078.32
997,078.32
997,078.32
3
ASPHALT SPRAYER
(E03)
Jam
54,065.90
54,065.90
54,065.90
54,065.90
54,065.90
54,065.90
54,065.90
54,065.90
54,065.90
54,065.90
4
BULLDOZER 100-150 HP
(E04)
Jam
631,392.80
631,392.80
631,392.80
631,392.80
631,392.80
631,392.80
631,392.80
631,392.80
631,392.80
631,392.80
5
COMPRESSOR 400 0-6500 L\M
(E0 5)
Jam
197,414.12
197,414.12
197,414.12
197,414.12
197,414.12
197,414.12
197,414.12
197,414.12
197,414.12
197,414.12
6
CONCRETE MIXER 0.3-0 .6 M3
(E0 6)
Jam
175,968.24
175,968.24
175,968.24
175,968.24
175,968.24
175,968.24
175,968.24
175,968.24
175,968.24
175,968.24
7
CRANE 10-15 TON
(E07)
Jam
729,870.09
729,870.09
729,870.09
729,870.09
729,870.09
729,870.09
729,870.09
729,870.09
729,870.09
729,870.09
8
DUMP TRUCK 3.5 TON
(E08)
Jam
302,229.04
302,229.04
302,229.04
302,229.04
302,229.04
302,229.04
302,229.04
302,229.04
302,229.04
302,229.04
9
DUMP TRUCK 10 TON
(E09)
Jam
590,587.12
590,587.12
590,587.12
590,587.12
590,587.12
590,587.12
590,587.12
590,587.12
590,587.12
590,587.12
10 EXCAVATOR 80-140 HP
(E10)
Jam
562,998.20
562,998.20
562,998.20
562,998.20
562,998.20
562,998.20
562,998.20
562,998.20
562,998.20
562,998.20
11 EXCAVATOR SEMI LONG ARM
(E11)
Jam
587,189.60
587,189.60
587,189.60
587,189.60
587,189.60
587,189.60
587,189.60
587,189.60
587,189.60
587,189.60
12 E XCAV ATO R S UPE R L ON G AR M
( E1 2)
Jam
722,911.80
722,911.80
722,911.80
722,911.80
722,911.80
722,911.80
722,911.80
722,911.80
722,911.80
722,911.80
13 FLAT BED TRUCK 3-4 M3
(E13)
Jam
583,535.55
583,535.55
583,535.55
583,535.55
583,535.55
583,535.55
583,535.55
583,535.55
583,535.55
583,535.55
14 GENERATOR SET
(E14)
Jam
528,038.84
528,038.84
528,038.84
528,038.84
528,038.84
528,038.84
528,038.84
528,038.84
528,038.84
528,038.84
15 MOTOR GRADER >100 HP
(E15)
Jam
526,098.59
526,098.59
526,098.59
526,098.59
526,098.59
526,098.59
526,098.59
526,098.59
526,098.59
526,098.59
16 TRACK LOADER 75-100 HP
(E16)
Jam
327,338.66
327,338.66
327,338.66
327,338.66
327,338.66
327,338.66
327,338.66
327,338.66
327,338.66
327,338.66
17 WHEEL LOADER 1.0-1.6 M3
(E17)
Jam
399,211.49
399,211.49
399,211.49
399,211.49
399,211.49
399,211.49
399,211.49
399,211.49
399,211.49
399,211.49
18 THREE WHEEL ROLLER 6-8 T
(E18)
Jam
242,572.20
242,572.20
242,572.20
242,572.20
242,572.20
242,572.20
242,572.20
242,572.20
242,572.20
242,572.20
19 TANDEM ROLLER 6-8 T.
(E19)
Jam
515,855.57
515,855.57
515,855.57
515,855.57
515,855.57
515,855.57
515,855.57
515,855.57
515,855.57
515,855.57
20 TIRE ROLLER 8-10 T.
(E20)
Jam
491,872.80
491,872.80
491,872.80
491,872.80
491,872.80
491,872.80
491,872.80
491,872.80
491,872.80
491,872.80
21 VIBRATORY ROLLER 5-8 T.
(E21)
Jam
449,049.83
449,049.83
449,049.83
449,049.83
449,049.83
449,049.83
449,049.83
449,049.83
449,049.83
449,049.83
22 CONCRETE VIBRATOR
(E22)
Jam
36,793.96
36,793.96
36,793.96
36,793.96
36,793.96
36,793.96
36,793.96
36,793.96
36,793.96
36,793.96
23 STONE CRUSHER
(E23)
Jam
832,095.92
832,095.92
832,095.92
832,095.92
832,095.92
832,095.92
832,095.92
832,095.92
832,095.92
832,095.92
24 WATER PUMP 70-100 mm
(E24)
Jam
34,131.70
34,131.70
34,131.70
34,131.70
34,131.70
34,131.70
34,131.70
34,131.70
34,131.70
34,131.70