GT13E2 M/MXL Upgrades Erol Morgan
July 2006
Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade 2 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade 2 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 Turbine Upgrades GT13E2 Upgrades:
GT Power output and efficiency (ISO conditions)
y c n e i n c i i f e f s e a / t e r u c p n t i : u e o d r a e r w g o p p U T M G
GT13E2 M
z
Enhanced GT power output and efficiency versus extended inspection intervals
D i f f f f e er r e e n t n p o s i t t i i o o n i n g n p o s s i ib s l e b e
GT13E2 MXL GT13E2
GT13E2 XL
Baseline, GT13E2 ISO conditions, NG
24,000
32, 000
36,000
XL & MXL Upgrades: extend C-inspection intervals intervals
Hot gas path C insp. interval (EOH) 3
ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade 4 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
M Blading
Customized solutions e n c a r m o f r P e
M Blading
L i f e t i m e
GT13E2 M
z
Unchanged firing temperature
z
Clear performance increase
z
Inspection intervals unchanged
GT13E2 MXL
Whatever suits best
z
Lower temperature
z
Extended inspection intervals
z
SC performance slightly increased 5
ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
M Blading Concept
# blades: 63 (all rows) z # vanes: 40/48/48/60/50 z SHS-A,B,C new heat shields z Shroud-less blade 1,2,3,4 z Cooled vane 3 z Blade 4 hollow design z Shrouded blade 5 (w/o damping bolt) z Blade 5 cast solid blade z All blades & vanes in CC-IN738LC z
TBC at Vane 1, 2 & Blade 1 Module 3 New stages 4,5
Module 2 New stages 2,3
Module 1 Modified stage 1 6
ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
M Upgrades Commissioning & Operational Requirements
z
TIT changed – M Æ TIT increased – MXL Æ TIT decreased Re-Commissioning Procedure – Heat Balance – NOx mapping in the upper load range (70 % - 100%) • incl. pulsation measurement add. equipment / measurements: – Tk2, exhaust pressure, ∆p air inlet implementation of new ODC delivering more detailed information regarding operating mode of GT (e.g. frequency response, peak mode) EOH formula modified
z
approx. 4 - 5 days re-commissioning time required
z
z
z
z
12 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Summary
z z
z
Simplified design of M-blading components Thorough validation of new components under real operation conditions Design benefits from 10 years of operating experience with GT13E2 – > 1,300,000 OH
z z
Increased operation flexibility with M-technology M-blading technology is now standard for all new GT13E2 units since mid 2003
13 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade 14 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 MXL
Power output & efficiency (ISO conditions)
Extended Lifetime Improved Availability z Reduced maintenance costs z
GT13E2 M + 6.1 MW / + 0.4 %
+ 1.0 MW / + 0.2 %
GT13E2
GT13E2 XL
GT13E2 MXL
+/- 0 MW / +/- 0 %
24’000
z z
32’000
36’000
Hot gas path insp. interval (EOH)
Extended inspection intervals (36 kEOH) Slightly increased SC performance (power output & efficiency) 15 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 MXL - Scope of Work
Modification of Turbine Vane Carrier on-site
z z
Zone 2 inner and outer shell with TBC
Improved stage 1 version A with TBC and optimized cooling New Vanes, Blades & Heat-Shields at Stage 2-5
Enlarged Axial Thrust Bearing
Operation Concept z Hot gas path C-inspection each 36’000 EOH z Slightly increased SC performance
16 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 M / MXL Modifications of Turbine Vane Carrier
GT13E2
New: z Vane row 2 direct cooling air feed from Plenum z 24 add. cool. holes in TVC z Old cooling holes plugged
New: z Cooled vane row 3 z 82 add. cooling holes in expansion bends
GT13E2 M / MXL 17
ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 M / MXL Modifications of Turbine Vane Carrier Stage 1: z
SHSS A: no modification required for Power Plants equipped with 1st stage version A
Stage 2: z
Vane 2: (48 vanes instead of 60) — —
z
new fixation of vanes new cooling feed
SHSS B: new design of stator heat shield require intermediate rings
Stage 3: z
Vane 3: (48 vanes instead of 60) —
z
All rework can be done on site
new fixation of vanes
SHSS C: new design of stator heat shield require intermediate rings 18
ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 MXL - Summary
GT13E2
24’000
GT13E2 MXL Years
C
24’000
36’000 1
2
3
C
C 4
24’000 36’000
5
6
7
C
24’000
C 8
9
C
36’000 10
11
C 12
Save 1 out of 3 C-inspections in a span of 9 years z z
GT13E2 MXL with 36’000 EOH C-inspection intervals Slightly increased SC performance (ISO / Baseload) – + 1.0 MW / + 0.2%
Boost your plant availability with 36’000 EOH C-inspection intervals 19 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Additional advantages of MXL
z
z z
Peak load application up to 16°C increased TIT allowed for continuous operation and counted with only factor 1.5 A-, B-inspection cycle 9,000 EOH (+ 3,000 EOH) Lower TIT compared to GT13E2 and GT13E2 XL – less thermal stress – reduced reconditioning efforts – direct positive impact on lifetime
20 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade 21 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 M
Power output & efficiency (ISO conditions)
Improved performance Increased Power Output z Increased Efficiency z
GT13E2 M + 6.1 MW / + 0.4 %
+ 1.0 MW / + 0.2 %
GT13E2
GT13E2 XL
GT13E2 MXL
+/- 0 MW / +/- 0 %
24’000 z
32’000
36’000
Hot gas path insp. interval (EOH)
Unchanged inspection intervals compared to GT13E2 22 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 M - Scope of Work
Site specific checks (e.g. Generator & Transformer capacity, etc.) necessary Modification of Turbine Vane Carrier on-site
z z
Zone 2 inner and outer shell with TBC
Improved stage 1 version A with TBC and optimized cooling New Vanes, Blades & Heat-Shields at Stage 2-5
Enlarged Axial Thrust Bearing
Operation Concept z Hot gas path C- inspection each 24’000 EOH z Increased performance 23
ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Performance compared to GT13E2 Performance [Power & Efficiency] Standard C-inspection
Upgrade
Standard C-inspection
+ 6.1 MW / + 0.4%
Maintenance Interval
24’000 EOH
Performance recovery during a standard C-inspection
24’000 EOH
24’000 EOH
Plant Lifetime
Increase power output and efficiency 24 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 M - Summary
GT13E2
24’000
C
24’000
C
24’000
C
24’000
C
GT13E2 M
24’000
C
24’000
C
24’000
C
24’000
C
1
3
4
6
7
9
10
Years
2
5
8
11
12
Increase performance while keeping insp. intervals unchanged z z
GT13E2 M with 24’000 EOH C-inspection intervals Increased performance (ISO / Baseload) – + 6.1 MW / + 0.4 %
Reduced costs per MWh due to increased power output and efficiency ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
25
Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade 26 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 M/MXL - Fleet Growths Status: January 2006 45 40
GT13E2 upgrade packages
35 30 25
s t i n 20 U
15
13 units in operation z 43 units sold z
Customized solutions for competitive markets.
y a d o t
Higher power output z Increased efficiency z Increased availability z Extended inspection intervals z
10 5 0 Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
2002
2003
2004
2005
2006
2007
2008
2009
ALSTOM’s implementation success: z 36 MXL configuration sold 5 M configurations sold z
GT13E2 M/MXL – higher performance at increased availability 27 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Status: February 2006
…GT13E2 Upgrade List (2) Plant
Unit
In Op
Zawia Zawia Benghazi Keppel Keppel Braemar Braemar Braemar Aluar Aluar Diemen 33 Lageweide Wagerup Wagerup Sohar Sohar Sohar Sohar
GT12 GT16 GT14 GT11 GT12 GT11 GT12 GT13 GT11 GT12 GT1 GT7 GT11 GT12 GT11 GT12 GT13 GT14
2Q/00 3Q/05 2Q/02 1Q/07 1Q/07 3Q/06 3Q/06 3Q/06 4Q/07 4Q/07 2Q/95 4Q/94 4Q/07 4Q/07 3Q/08 3Q/08 3Q/08 3Q/08
Current Set-up MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL
Since 2006 Aug 2005 2006 Jan 2007 Jan 2007 July 2006 July 2006 July 2006 Nov 2007 Nov 2007 Oct 2008 Mar 2009 Oct 2007 Oct 2007 June 2008 June 2008 June 2008 June 2008
Last Set-up -
Original Set-up V96 MXL VA MXL MXL MXL MXL MXL MXL MXL V96 V96 MXL MXL MXL MXL MXL MXL 29
ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Status: February 2006
…GT13E2 Upgrade List (3) Plant
Unit
In Op
Afam Afam Afam Dubal Dubal Kwinana Deeside Dunkerque Dunkerque
GT11 GT12 GT13 GT1 GT2 GT1 GT1 GT1 GT2
2008 2008 2008 1Q/07 3Q/07 4Q/08 2Q/94
Current Set-up MXL MXL MXL MXL MXL MXL MXL MXL MXL
Since
Last Set-up
2008 2008 2008 March 2007 Sept 2007 Nov 2008 Oct 2006 -
Original Set-up MXL MXL MXL MXL MXL MXL V96 VA VA
30 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 M - Reference Kuala Langat First unit (GT#14) in Kuala Langat completed 1 st C-cycle Operation data Commercial base load operation, primarily on z natural gas 22,103 OH, 45 starts, 26,795 EOH by z March 31, 2005 Operation experience z 100% reliability of M-blading Good conditions allowed stretched C-cycle! z
31 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 M/MXL - Fleet Key Data Status: May 2006
43 units sold of which 13 units in commercial operation 5 M and 38 MXL (5 M and 8 MXL in operation) Total Fleet Data z First unit in operation since June 2002 z > 130’000 Equivalent Operating Hours z > 120’000 Operating Hours z > 580 Starts Fleet Leader completed C-cycle z More than 22,103 OH on gas – More than 26,795 EOH
32 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade 33 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
New Blade 5 M for GT13E2 M & MXL New
z
z
z
z
Extensive testing showed potential for improvement Further Improvement of the existing Blade 5 Version M Achieves an even further improved turbine exit profile shape and exhaust diffusor characteristic Improves both power and efficiency of the GT13E2 M & MXL
Original New Tip
Mid
Original
New
Hub
Original 34 ©
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
New Blade 5 M for GT13E2 M & MXL z
New Blade 5 M NOT mixable with old Blade 5 M
z
No influence on duration of C-inspection
z
No other new hardware required Æ Only new Blade 5 M
z
Hardware available within standard delivery time
z
Unchanged Operation Concept
z
Unchanged EOH formula
z
Already implemented and validated in 2 units Status May 2006
– GT#14: S = 38; OH = 7’482; EOH = 9’813 – GT#15: S = 17; OH = 7’628; EOH = 8’190
35 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Benefits of New Blade 5 M
z
Simple Cycle – Power + 1.1 MW compared to GT13E2 M/MXL – Efficiency + 0.2% (additive) compared to GT13E2 M/MXL – At ISO, Base Load, Gas Operation
z
Combined Cycle – Expected Power ~+ 0.5 MW compared to GT13E2 M/MXL – Expected Efficiency ~+ 0.1% (additive) compared to GT13E2 M/MXL – To be determined case per case
36 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Benefits of New Blade 5 M GT13E2 M/MXL performance compared to GT13E2 Performance [Power & Efficiency] Upgrade
Standard C-inspection
M SC + 7.2 MW/ Standard + 0.6%
C-inspection Maintenance Interval
24’000 EOH
MXL (SC +2.1 MW/ +0.4%)
24’000 EOH
Performance recovery during a standard C-inspection
M 24’000 EOH (MXL 36’000 EOH)
Plant Lifetime
37 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Benefits of GT13E2 M/MXL & New Blade 5 M Power output & efficiency (ISO/Base Load/ New & Clean) + 7.2 MW / + 0.6 % + 6.1 MW / + 0.4 %
+ 2.1 MW / +0.4 % + 1.0 MW / +0.2 %
GT13E2 M + New Blade 5M (2005) GT13E2 M (2003)
GT13E2 MXL + New Blade 5M (2005)
165.1 MW / 35.7 %
GT13E2 (1993) 24’000
GT13E2 MXL (2003)
36’000
Hot gas path insp. interval (EOH)
Continuous improvement keeps your plant competitive 38 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Benefits of GT13E2 M
GT13E2
24’000
C
24’000
C
24’000
C
24’000
C
GT13E2 M
24’000
C
24’000
C
24’000
C
24’000
C
1
3
4
6
7
9
10
Years
2
5
8
11
12
z
Increase performance while keeping inspection intervals unchanged
z
GT13E2 M with 24’000 EOH C-inspection intervals and New Blade 5 M
z
Increased SC performance (ISO / Baseload) – + 7.2 MW / + 0.6 %
Reduced Costs of Electricity due to increased power output and efficiency 39 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Benefits of GT13E2 MXL
GT13E2
24’000
GT13E2 MXL Years
C
24’000
36’000 1
2
3
C
C 4
24’000 36’000
5
6
7
C
24’000
C 8
9
C
36’000 10
11
C 12
z
Save 1 out of 3 C-inspections in a span of 9 years
z
GT13E2 MXL with 36’000 EOH C-inspection intervals and New Blade 5 M
z
Slightly increased SC performance (ISO / Baseload) – + 2.1 MW / + 0.4%
Boost your plant availability with 36’000 EOH C-inspection intervals 40 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade 41 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Product Information
GT13E2 MXL Compressor Upgrade VELE
VELA
VIGV
Flow
Restaggered Rows 42 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
GT13E2 Compressor Compressor Upgrade z
Increased mass flow by stagger angle adjustment on leading compressor rows
z
Development with the proven tools and methods already used for earlier compressor upgrades
Stagger angle adjustment Stagger angle change
Compressor row Stages 1 to 5
Open
Between 0.6° and 1.5°
Stagger Angle Engine Axis
Output increase through approx. 4% mass flow increase 43 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Product Information – Degree of re-stagger angle reduced at every row in flow direction – Material & coating unchanged i.e. ST12TNIE + Coating (VIGV, Blades 1-5 & Vanes 1-4) – Upgrade released for GT13E2 MXL (combination with Maximum Continuous Load (MCL) operation to be checked due to possible capacity limitations such as Geno, Transformer, etc.) – Other upgrade applications (e.g. GT13E2, GT13E2 XL and GT13E2 M) are being investigated
44 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Product Information Compressor Upgrade results in:
z
¾ ¾ ¾ ¾ ¾
~3-4 % increased Air Mass flow Increased power output of ~5 MW SC (CC details must be calculated case by case) + 0.2% Efficiency (additive) No extension of C-insp duration All casings & assembly material unchanged, only blades and vanes replaced with re-staggered ones
Compressor Upgrade settings are specific for each unit
z ¾ ¾
Site specific re-commissioning settings are required Adaptation of operation concept (e.g. VIGV)
Already implemented and validated in one unit
z ¾
GT#13 more than S = 18, OH = 5’746, EOH = 6’695 45 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Benefits of Compressor Upgrade Performance compared to GT13E2 MXL SC Performance [Power & Efficiency] Standard C-inspection
Upgrade
Standard C-inspection SC +5 MW /+0.2%
Maintenance Interval
36’000 EOH
Performance recovery during a standard C-inspection
36’000 EOH
36’000 EOH
Plant Lifetime
Increase power output 46 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Benefits of GT13E2 MXL Upgrade Power output & efficiency (SC / ISO / Base Load / New & Clean / Gas) + 7,1 MW / +0.6 %
New Blade 5 M + Compressor Upgrade (2005)
+ 6.1 MW / + 0.4 %
+ 6 MW / +0.4 %
GT13E2 M (2003) + 1.0 MW / +0.2 % 165.1 MW / 35.7 %
GT13E2 (1993) 24’000
GT13E2 XL
32’000
GT13E2 MXL (2003)
36’000
Hot gas path insp. interval (EOH)
Reduced Cost of Electricity due to increased power output 47 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Benefits of GT13E2 MXL Upgrade with Compressor Upgrade
GT13E2
24’000
GT13E2 MXL Years
z z z
C
24’000
36’000 1
2
3
C
C 4
24’000 36’000
5
6
7
C
24’000
C 8
9
C
36’000 10
11
C 12
Save 1 out of 3 C-inspections in a span of 9 years GT13E2 MXL with 36’000 EOH C-inspection intervals and Compressor Upgrade Increased SC performance (ISO / Baseload / Gas / New & Clean) – + 6 – 7.1 MW / + 0.4 – 0.6% compared to GT13E2 (depending on B5 M version)
Boost your plant availability with 36’000 EOH C-inspection intervals Extremely reduced Cost of Electricity due to increased power output 48 ALSTOM (Switzerland)Ltd © 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.